Loading...
HomeMy WebLinkAboutS221106_SHEETS_COMBINED_v1CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 R Know what's below.Call before you dig. RACEWAY - CAPE FEAR PROJECT INFORMATION ZONING TAX MAP # PERMIT TYPE PERMIT NUMBER (APPROVAL DATE) CONSULTANTS ENGINEER SITE DESIGN, INC. CRAIG WINNALL, P.E. 1074 ASHEVILLE HWY SPARTANBURG, SC 29303 PHONE: 864-285-0618 LANDSCAPE ARCHITECT SITE DESIGN, INC. ALISON BRANDT 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PHONE: 864-271-0496 SURVEYOR UTILITY PROVIDERS WATER CAPE FEAR PUBLIC UTILITY 235 GOVERNMENT CENTER DR. WILMINGTON, NC 28403 BERNICE JOHNSON PHONE: 910-332-6620 ELECTRIC TELEPHONE DUKE ENERGY PROCESS N/A N/A DALE ELLIOTT PHONE: 910-200-5792 UTILITY DEPARTMENT ADRESS CITY, STATE, ZIP CONTACT NAME PHONE: SANITARY SEWER GAS CABLE PIEDMONT NATURAL GAS N/A N/A PAUL GONKA PHONE: 910-251-2810 UTITLITY DEPARTMENT ADRESS CITY, STATE, ZIP CONTACT NAME PHONE: STORM FIRE DISTRICT OTHER UTITLITY DEPARTMENT ADRESS CITY, STATE, ZIP CONTACT NAME PHONE: SHEET INDEX NO. COV S1 BOUNDARY & TOPOGRAPHIC SURVEY COVER SHEET PLAT (AS REQUIRED) DEMOLITION PLAN GENERAL REQUIREMENTS S1.2 C1 C2 GR1 C4 C2.2 - C2.4 C5 C7 C7.1 C8 C8.1 - C8.3 PAVING PLAN DRAINAGE PLAN UTILITY PLAN OVERALL GRADING PLAN EROSION AND SEDIMENT CONTROL NOTES AND ADDITIONAL DETAILS UTILITY DETAILS SD1 - SD8 RACETRAC STANDARD DETAILS L1 - L1.3 LANDSCAPE PLANS, DETAILS AND SPECIFICATIONS (BY OTHERS, LIST COMPANY) L2 - L2.3 IRRIGATION PLANS, DETAILS AND SPECIFICATIONS (BY OTHERS, LIST COMPANY) L3 MAINTENANCE SPECIFICATIONS SHEET DESCRIPTION TS1 - TS2 CITY/COUNTY/STATE DOT PLANS, SECTIONS AND DETAILS SP1 PHOTOMETRIC PLAN (AS REQUIRED) PERMIT TYPE PERMIT TYPE PERMIT TYPE PERMIT TYPE PERMIT TYPE PERMIT TYPE PERMIT TYPE PERMIT TYPE CONSTRUCTION INFORMATION RACETRAC 24-HOUR PHONE NUMBER: 706-969-0594 CONTACT NAME: SAMANTHA JONES VICINITY MAP 1.IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND INSPECTION REQUIREMENTS OF THE VARIOUS GOVERNMENTAL AGENCIES. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE INSPECTION ACCORDING TO AGENCY INSTRUCTION. 2.ALL WORK PERFORMED SHALL COMPLY WITH THE REGULATIONS AND ORDINANCES OF THE VARIOUS GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK, INCLUDING LANDSCAPING. 3.CONTRACTOR SHALL SUBMIT FOR REVIEW TO THE OWNER'S CONSTRUCTION MANAGER SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED ITEMS TO USE ON THIS SITE. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE. CONSTRUCTION MANAGER'S APPROVAL OF A SHOP DRAWING DOES NOT RELIEVE CONTRACTOR'S RESPONSIBILITY FOR PERFORMANCE OF THE ITEM. 4.WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT IS NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES, WHERE NECESSARY WITH OTHER CONTRACTOR'S AND UTILITY COMPANIES. 5.MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY. 6.CONTRACTOR SHALL REVIEW SOIL REPORTS AND BORINGS PRIOR TO BIDDING THE PROJECT AND COMMENCING CONSTRUCTION. 7.AT LEAST 72 HOURS PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND APPROPRIATE AGENCIES AND SUPPLY THEM WITH ALL REQUIRED SHOP DRAWINGS, THE CONTRACTOR'S NAME, STARTING DATE, PROJECTED SCHEDULE, AND OTHER INFORMATION AS REQUIRED. ANY WORK PERFORMED PRIOR TO NOTIFYING THE ENGINEER OR WITHOUT AGENCY INSPECTOR PRESENT MAY BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 8.THE CONTRACTOR SHALL USE EACH PLAN IN CONJUNCTION WITH THE ENTIRE SET OF DRAWINGS AND JOB SPECIFICATIONS. DO NOT REMOVE OR DEMOLISH ANYTHING WITHOUT VERIFYING AND COORDINATING WITH ALL ELECTRICAL, PLUMBING, MECHANICAL, GENERAL TRADES, AND UTILITY COMPANIES AS THEY AFFECT THE OVERALL PROJECT. 9.ALL WORK SHOWN SHALL BE DONE IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS GENERAL NOTES: THIS MATRIX HAS BEEN PROVIDED FOR INFORMATION PURPOSES. THE CONTRACTOR SHALL PROVIDE ANY AND ALL APPURTANCES, TRENCHING AND BACKFILL, AND OTHER INCIDENTALS TO MEET OR EXCEED THE SPECIFICATIONS OF THE ITEMS LISTED. (EXPIRATION DATE) REV DATE DRAINAGE PROFILES SITE R04000-003-008-000 I-2 (HEAVY INDUSTRIAL DISTRICT) NEW HANOVER COUNTY 230 GOVERMENT CENTER DR. #160 WILMINGTON, NC 28403 GALEN JAMISON PHONE: 910-798-7072 2100 CAPITAL DRIVE WILMINGTON, NC 28405 RAYMON GRISWOLD PHONE: 910-798-7448 NEW HANOVER COUNTY COV CO V E R S H E E T 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg EROSION CONTROL PLAN (PHASE II)C2.1 EROSION CONTROL PLAN (PHASE I) SITE DESIGN, INC. CLAY JONES, P.L.S. 225 ROCKY CREEK ROAD GREENVILLE, SC 29615 PHONE: 864-271-0496 C4.1 POND NOTES AND DETAILS OVERALL SITE PLANC3 C4.3 GRADING AND STORMWATER DETAILS CAPE FEAR PUBLIC UTILITY 235 GOVERNMENT CENTER DR. WILMINGTON, NC 28403 BERNICE JOHNSON PHONE: 910-332-6620 GR1 GE N E R A L R E Q U I R E M E N T S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 STORM DRAINAGE NOTES: 1.All pipes entering storm sewer structures shall be sealed to assure connection at structure is water tight. 2.Reference detail sheets for storm water details. 3.The contractor shall submit buoyancy calculations on all runs of pipe that do not utilize concrete pipe. Buoyancy calculations shall be prepared, signed, and sealed by a registered engineer, shall represent actual field conditions, and shall demonstrate that the pipe utilized will not become buoyant under any conditions. The contractor may elect to provide a restraining system, designed by a registered engineer, adequate to resist buoyant forces where necessary. TANK NOTES: TOP OF DIELSEL TANK ELEVATION= XXX.0' TOP OF AUTO TANK ELEVATION= XXX.0' CONTRACTOR SHALL MAINTAIN A MINIMUM GROUND COVER OF 3' OVER UNDERGROUND STORAGE TANKS. 1.Drainage structures shall be precast or cast-in-place concrete in accordance with dot requirements as follows: A.Area inlets - CB-01 or PC-01 (pipe size 36" and smaller) all inlet frames and grates shall be Vulcan Foundry Corp. Catalog # V-4863 or equal. B.Trench drains shall be aqueduct. provided by RaceTrac and installed by general contractor. STRUCTURE TYPES: SITE SPECIFIC NOTES: 1.Contractor to include for all secondary conduits (conduit only) depicted on utility page in base bid. include for length up pole approx. 30ft. Wire is assumed to be by utility department. Secondary wire will be provided in bid as an alternate price in L.F. and handled as a change order if required. 2.Contractor to include two (2) 1” conduit to both sign locations. A.One (1) 1” conduit is for electrical. B.One (1) 1” conduit is for communication. C.Contractor is responsible to provide CAT 5 home-run between price sign and final destination inside the building. Final destination to be determined by RaceTrac Construction manager during construction. 3.Contractor to see sheet SD1 for air/vac service station electrical requirements. A.Contractor to provide small concrete utility vaults for utility junctions. Concrete vault to be flush with concrete or landscaping. B.Air/vac service station electrical conduits to be 1”. C.Include a weather proof junction box inside of the concrete vault. Leave three (3) pull strings inside conduit for future use. GENERAL NOTES: 1.It is the contractor's responsibility to become familiar with the permit and inspection requirements of the various governmental agencies. The contractor shall obtain all necessary permits prior to construction, and schedule inspection according to agency instruction. 2.All work performed shall comply with the regulations and ordinances of the various governmental agencies having jurisdiction over the work, including landscaping. 3.At least 3 working days prior to construction the contractor shall notify the owner, engineer and appropriate agencies and supply them with all required shop drawings, the contractor's name, starting date, projected schedule, and other information as required. Any work performed prior to notifying the owner & engineer of record or without agency inspector present may be subject to removal and replacement at the contractor's expense. Failure to obtain approval before installation may result in removal and replacement at the contractor's expense. Contractor shall submit for review to the owner's construction manager, shop drawings on all precast and manufactured items to use on this site. Construction manager's approval of a shop drawing does not relieve contractor's responsibility for performance of the item. 4.Work performed under this contract shall interface smoothly with other work being performed on site by other contractors and utility companies. it is necessary for the contractor to coordinate and schedule his activities, where necessary, with other contractor's and utility companies. 5.Materials and construction methods for streets and storm drainage construction shall be in accordance with the local regulatory agency. 6.Contractor shall review soil reports and borings prior to bidding the project and commencing construction. 7.The contractor shall use each plan in conjunction with the entire set of drawings and job specifications. Do not remove or demolish anything without verifying and coordination with all electrical, plumbing, mechanical, general trades, and utility companies as they effect the overall project. 8.Refer to architectural drawings for building dimensions. GENERAL DEMOLITION NOTES & SPECIFICATIONS: 1.The contractor is responsible for all permits required to carry out the work as shown on the Demolition Plan. 2.The contractor is responsible to verify existing utilities prior to demolition and excavation. 3.The contractor is responsible to comply with all local, state and federal regulations in the removal/demolition of hazardous materials. 4.Contractor is responsible for all registrations, permits and fees required to remove and properly dispose of all demolition materials. 5.Demolition contractor is responsible for obtaining approvals and notifications to all local, state and federal authorities. 6.The contractor shall be responsible for the disconnection of the utility services to the existing structures prior to demolition of any buildings. The contractor shall coordinate with respective utility companies prior to the removal and/or relocation of utilities. 7.The contractor shall coordinate with the utility company concerning portions of work which may be performed by the utility company's forces and any fees which are to be paid to the utility company for their services. The contractor is not responsible for paying all fees and charges. 8.The contractor is responsible for the demolition and removal of all structures, pads, walls, flumes, foundations, parking, drives, drainage structures, utilities, etc., such that the improvements shown on the remaining plans can be constructed. All facilities to be removed shall be undercut to suitable material and brought to grade with suitable, compact fill material per the specifications. The contractor is responsible for all permits involved and is responsible for removing and dumping the debris in an approved, lawful manner. 9.All existing utilities are to be removed, terminated and capped at the right-of-way. All existing meters, valves, etc. are to be removed unless otherwise noted on the plans. 10.All existing service lines for telephone, electric, sewer, and cable television services are to be removed to existing trunk lines unless otherwise noted on the plans. 11.Contractor is responsible for all costs involved in the removal or relocation of any utility.The contractor is responsible for coordination with applicable utility companies. 12.The contractor shall maintain all utility services to the existing adjacent businesses at all times. The contractor shall coordinate with the tenant and utility company for the relocation and/or removal of utilities if necessary. Services shall not be interrupted without approval from the tenant. 13.The site may be occupied by existing structures, storm lines, pavement, power poles and utilities. It is the contractor's responsibility to contact all utility companies that may have utilities on the site to get a determination if any utilities existing will be impacted. The contractor is responsible for determining if the utilities should be abandoned or removed. 14.All areas where pavement, structure slabs, foundations, utilities, conduits, and/or utility structures have been removed shall be backfilled with select backfill material. All select backfill material shall be placed and compacted per the requirements of specifications and the owners geotechnical engineer. 15.All existing fences, signs, power poles, and light poles located on-site shall be demolished and removed unless otherwise noted. 16.Existing cast in place septic tanks (if found on-site) shall be pumped by a licensed contractor. The septic tank shall then be removed and the area backfilled per the project specifications unless otherwise noted. All work shall be in accordance with health department requirements. 17.Contractor is responsible for walking site and determining extents of demolition work prior to bid date. 18.Existing manhole tops, valve boxes, etc. to remain are to be adjusted as required to match proposed grades. If necessary, re-adjustments shall be performed upon completion of paving and fine grading to ensure a smooth transition. 19.Prior to any work on-site, the contractor shall contact the one call system. The contractor is responsible for all utility removals whether located by the one call system or not. 20.Contractor shall coordinate removal of existing electrical services on-site with the power company. Power company is responsible for the disconnection and removal of existing services unless otherwise noted. 21.Limits of pavement shown to be removed are approximate and for reference only. Contractor shall field verify the limits of pavement to determine the extent of the existing pavement to be removed. 22.If not shown on the demolition drawings, the contractor shall remove all existing materials as necessary to complete all new work as required by other portions of the contract documents. 23.Salvage rights for all demolished materials shall be first given to the owner. Any materials not retained by the owner shall be removed from the site and disposed of by the contractor at the contractor's expense. 24.Refer to survey for limits and boundary of property. SITE PLAN NOTES: 1.Boundary and topographic survey was prepared by Site Design Inc dated 08/22/2022. 2.Contractor shall refer to plans by architect for exact locations and dimensions of vestibule, towers, slope paving, columns, door locations, sidewalks, exit porches, ramps, precise building dimensions, and exact building utility entrance locations. 3.Contractor shall refer to plans by others for entry locations of all water, sewer service, electrical, and telephone service. Contractor shall coordinate installation of utilities in such a manner as to avoid conflicts and assure proper depths are achieved as well as coordinating with the regulatory agency as to the location and tie-in locations and/or connections to their facilities. 4.Contractor shall be responsible for all relocations, including but not limited to, all utilities, storm drainage, signs, traffic signals and poles, etc. as required for all site improvements. All work shall be in accordance with governing authorities specifications and shall be approved by such. 5.Existing utility lines shown are approximate locations only. The contractor shall field verify all existing utility line locations prior to any construction. Any deviations from the design locations shall be reported to the owner or engineer prior to construction. 6.See Cover Sheet for list of utility companies and contact persons. 7.All necessary permits and approvals from agencies governing the construction of this work shall be secured prior to beginning construction. 8.The contractor is responsible for the protection of all areas indicated to remain undisturbed or to remain as buffers, all property corners, and coordination of a registered land surveyor to replace all pins eliminated or damaged during construction. 9.Existing structures within construction limits are to be abandoned, removed, or relocated per plans. All cost shall be included in base bid. 10.Contractor is responsible for repairs or damage to any existing improvements during construction, such as but not limited to, drainage, utilities, pavement, striping, curb, etc, and all repairs shall be equal to or better than existing conditions. 11.The contractor shall coordinate the installation of all underground utilities with his work. All underground utilities (water, sanitary sewer, storm sewer, electrical conduit, irrigation systems, and any other miscellaneous utilities) shall be in place prior to the placement of base course material, and the placement of any appropriate soil stabilization technique. 12.Contractor shall provide bollards for protection of all above ground utilities and appurtenances adjacent to drive areas. 13.Contractor shall match existing pavement in grade and alignment. 14.Construction shall comply with all governing codes and improvements shall be constructed to the same. 15.All work shall be done in accordance with the plans and specifications. 16.All work and material shall comply with all regulatory agency's regulations and codes and O.S.H.A. standards. DIMENSION NOTES: 1.All dimensions shown to building are to face of structural CMU. 2.All curb dimensions are to the face of gutter of curb unless otherwise noted. GRADING PLAN NOTES: 1.Topographic information was taken from a topographic survey by Site Design Inc. dated 08/22/2022. If contractor does not accept the existing topography as shown on the plans, without exception, he shall have made, at his expense, a topographic survey by a registered land surveyor and submit it to the owner for review. 2.Existing contours interval is shown at one foot (1'). 3.The contractor is specifically cautioned that the location and/or elevation of existing utilities (above and below ground) as shown on the these plans is based on record on either the various utility companies, visual observations at the site, existing surveys and/or where possible, measurements taken in the field. RaceTrac Petroleum does not guarantee that existing utility locations area exact and the information is not to be relied on as being exact or complete. It shall be the responsibility of the contractor to determine the exact locations of existing utilities (above and below ground) before beginning any construction. The contractor must call the appropriate utility company at least forty-eight hours (48 hrs) before any excavation to request exact field location of utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed improvements shown on the plans. 4.It shall be the responsibility of the contractor to notify owner and/or engineer of any utility conflicts with the proposed improvements shown on the plans. 5.All cut or fill slopes shall be 2:1 or flatter unless otherwise noted. 6.Contractor shall verify horizontal and vertical location of all existing storm sewer structures, pipes, and all utilities prior to construction. 7.Clearing and grubbing limits shall include all areas disturbed by grading operations. Contractor is responsible for the protection of all undisturbed areas, all property corners, and coordination of a registered land surveyor to replace all pins eliminated or damaged during construction. 8.Existing drainage structures to remain are to be inspected and repaired as needed, and existing pipes to be cleaned out to remove all silts and debris. 9.If any existing structures to remain are damaged during construction, it shall be the contractors responsibility to repair and/or replace the existing structure as necessary to return it to existing conditions or better. 10.Contractor is responsible for repairs of damage to any existing improvements during construction, such as, but not limited to, drainage, utilities, pavement, striping, curbs, etc. and all repairs shall be equal to or better than existing conditions. 11.All unsurfaced areas in disturbed by grading operations shall receive four inches (4") of topsoil, seed, mulch,water, etc. Contractor shall grass disturbed areas in accordance with the landscape plan and City/County specifications until healthy stand of grass is obtained. 12.Proposed spot elevations represent finished pavement or ground surface grade unless otherwise noted on drawings. 13.Contractor shall trim, tack, and match existing pavement at locations where new pavement meets existing pavement. 14.All grading operations shall be staked by a registered civil engineer or licensed land surveyor approved by the owner. 15.Reference structural specifications and geotechnical report for building pad preparation and compaction. 16.Contractor to review boring logs provided by RaceTrac. 17.All storm pipe entering structures shall be grouted to assure connection at structure is watertight. 18.All storm sewer manholes in paved areas shall be flush with pavement, and shall have traffic bearing ring and covers. 19.Existing manhole tops, valve boxes, etc. to remain are to be adjusted as required to match proposed grades. If necessary, re-adjustments shall be performed upon completion of paving and fine grading to ensure a smooth transition. 20.The contractor shall adhere to all terms and conditions as outlined in the General N.P.D.E.S. Permit for storm water discharge associated with construction activities. 21.Contractor shall assure positive drainage away from building and for all natural and paved areas. 22.All retaining walls to be protected during backfill by contractor. This includes but is not limited to, providing and installing proper bracing during backfill being places adjacent to retaining walls. PAVING & STRIPING NOTES: 1.Standard duty pavement areas shall be Portland cement concrete. Details of the standard duty concrete pavement are provided on detail sheets. 2.Area over tanks, dumpster pad, and the approach in front of the dumpster to be eight inches (8") thick 4000 PSI w/ fiber mesh and number five (#5) rebar placed eighteen inches (18") on center each way. 3.Notify owner 3 days prior to pour of initial section of driveway paving. Racetrac representative to approve initial pour. 4.Testing of materials required for the construction of the paving improvements shall be performed by an agency, approved by the owner, for testing materials. It shall be the contractor's responsibility to ensure, by the standard testing procedures, that the work constructed meets the requirements of the project specifications. 5.All signs, pavement markings, and other traffic control devices shall conform to the "manual on uniform traffic control devices" latest edition. 6.Traffic control shall be in accordance with the state dot standard specifications for roads and bridges. The contractor shall review all traffic control devices with dot prior to installation. 7.Contractor shall furnish and install all pavement markings for parking stalls, handicapped parking symbols, and miscellaneous striping within parking lot and around building. 8.See Irrigation Plans and MEP Plans prior to paving for location of proposed sleeving and conduits. Extra conduit shall be placed under driveways for future use. 9.All handicap ramping, striping, and pavement markings shall conform to the Americans with disabilities act of 1990. 10.Contractor to submit a pouring plan to the construction manager prior to the beginning of any paving work. 11.Contractor shall install slab construction joints at the end of a days pour. Slab contraction and slab construction joints are to be installed in accordance with the concrete specifications as shown on the RaceTrac Standard Details, sheets SD3 and SD4. 12.Paving contractor to coordinate with building contractor on the construction and paving near the screening walls and the dumpster pads. 13.All discrepancies found by contractor related to underground utilities or other appurtenances shall be resolved to the satisfaction of owner and engineer prior to placement of any paving. Contractor to ensure positive drainage from the proposed buildings and no ponding in subgrade of areas to be paved, and notify owner and engineer if any discrepancies are found prior to installation of any paving. 14.Existing manhole tops, valve boxes, etc. to remain are to be adjusted as required to match proposed grades. If necessary, re-adjustments shall be performed upon completion of paving and fine grading to ensure a smooth transition. 15.All joints shall extend through the curb. 16.Compaction shall be done in accordance with the recommendations of the geotechnical report. 17.All pavement to be sloped for positive drainage. UTILITY NOTES: 1.The contractor is specifically cautioned that the location and/or elevation of existing utilities (above and below ground) as shown on the these plans is based on record on either the various utility companies, visual observations at the site, existing surveys and/or where possible, measurements taken in the field. Racetrac Petroluem does not guarantee that existing utility locations area exact and the information is not to be relied on as being exact or complete. It shall be the responsibility of the contractor to determine the exact locations of existing utilities (above and below ground) before beginning any construction. The contractor must call the appropriate utility complany at least forty-eight hours (48 hrs) before any excavation to request exact field location of utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed improvements shown on the plans. 2.Contractor shall verify horizontal and vertical location of all existing storm sewer structures, pipes, and all utilities prior to construction. Existing utility lines shown are approximate locations only. The contractor shall field verify all existing utility line locations prior to any construction. Any deviations from the design locations shall be reported to the owner and engineer of record prior to construction. 3.Contractor to remove or relocate when applicable, all existing buildings, foundations, easements, and connecting improvements, drain pipes, sanitary sewer pipe, power poles and guy wires, water meters and water lines, wells, sidewalks, sign poles, underground gas, septic tanks, and asphalt, shown and not shown, within construction limits and where needed, to allow for fill material, unless otherwise denoted, to be removed as unclassified excavation. 4.Contractor is responsible for repairs of damage to any existing improvements during construction, such as, but not limited to, utilities, pavement, striping, curbs, etc. Repairs shall be equal to or better than existing conditions. 5.Contractor shall refer to architects plans and specifications for actual location of all utility entrances to include sanitary sewer laterals, domestic and fire protection water service, electrical, and telephone. Contractor shall coordinate installation of utilities in such a manner as to avoid conflicts and assure proper depths are achieved as well as coordinating with city utility requirements as to locations and scheduling for tie-ins/connections prior to connecting existing facilities. 6.Contractor shall coordinate with architectural plans, power company, & telephone company for actual routing of power and telephone service to building. 7.See detail sheets for backfilling and compaction requirements on utility trenches. 8.Contractor shall comply to the fullest extent with the latest standard of OSHA directives or any other agency having jurisdiction for excavation and trenching procedures. The contractor shall use support systems, sloping, benching, and other means of protection. This to include but not limited to, access and egress from all excavation and trenching. The contractor is responsible for complying with the performance criteria for OSHA. 9.Contractor shall coordinate with other utilities to assure proper depth and prevent any conflict of utilities. 10.The minimum horizontal separation between the closest two points of the water and sewer line is ten (10) feet, or minimum vertical separation between the closest two points of the water and sewer line is eighteen (18) inches. 11.Contractor shall grout around all pipe entrances to sanitary sewer manholes with non-shrinking grout to assure connection is water tight. 12.Contractor shall on all utilities, coordinate inspection with the appropriate authorities prior to covering trenches at installation. 13.The contractor shall conduct all required tests to the satisfaction of the respective utility companies and owners inspecting authorities. 14.Site contractor to coordinate proposed reconnection of all utilities with Architectural Plans as well as utility companies and building contractor. The general contractor is responsible for any and all expenses that result from delayed or failed test during any phase of the construction process. This includes fees incurred through rescheduling of any Racetrac vendors or equipment to accommodate. 15.All water and sanitary sewer crossings to be perpendicular with a full stick of ductile iron pipe in the sewer lines at the crossing. 16.Contractor to coordinate with signage contractor and architect for exact location of signage, required electrical conduits, foundations, etc. 17.See cover sheet for list of utility companies and contact persons. 18.Contractor shall provide bollards for protection of all above ground utilities and appurtenances adjacent to drive areas. ENCROACHMENT NOTES 1.Prior to construction all erosion control features shall be installed per the SWPPP. 2.Contractor shall follow all NCDOT approved traffic control standards during construction. 3.Emergency services (e911) shall be notified prior to road closures and/or rerouting. 4.Where sidewalks intersect roads, handicapped ramps shall be installed per NCDOT specifications 5.New sidewalk to be installed in accordance with NCDOT specifications. 6.Existing pavements to be removed by method of saw cutting per NCDOT guidelines. If existing pavement type is sidewalk, damaged section will be removed and replaced. If existing pavement is asphalt, the contractor will mill 2" depth for a width of 6.5' for the length of the damage for a patch. EROSION CONTROL NOTES: 1.The contractor shall construct the silt fencing as shown on the Erosion Control Plan at the perimeter of the disturbed area prior to land clearing activities. 2.Land disturbing activities shall be kept to a minimum and will not extend beyond the limits shown. 3.Prior to construction, the erosion and sediment control measures shown on the Erosion Control Plan shall be in place. Clearing and grubbing operations will be engaged in only as necessary to allow the placement of erosion and sediment control measures as shown until all such measures are in place. 4.Contractor shall install temporary construction entrance prior to any earthwork operations. 5.Contractor shall maintain silt fences for the duration of the project until accepted by the owner at no expense to owner. 6.Contractor shall maintain erosion control facilities during the entire construction period. Facilities are not to be removed until completion of the project and the site is stabilized. 7.Silt fences shall be cleaned or replaced when trapped sediment reaches 50 percent of the above ground fence height or a lower height based on manufacturer's specifications. 8.Sediment and erosion control measures will be inspected on a daily basis and repaired, adjusted and maintained as needed or required by governing agencies at no addition expense to the owner to provide erosion and sediment control for the duration of construction and until all disturbed areas are stabilized. 9.Contractor shall inspect on a daily basis for needed removal of any accumulated silts, debris, or repair of damaged silt fence at no additional expense to owner. 10.All erosion control measures except the required rip rap are temporary devices. These temporary devices shall be removed prior to completion of construction once stabilization of all grassed areas are complete. 11.Additional devices may be required as deemed necessary by governing authorities. 12.All graded areas shall be stabilized with a permanent fast growing cover and/or mulch upon completion of grading operations. Completion of grading operations does not mean at the end of the project. As soon as final grades are established in an unpaved area, the contractor shall stabilize with a temporary grass or permanent sod. If a temporary grass is applied, it will be the contractor's responsibility to apply a permanent seed or sod at the proper time of year. 13.Fill slopes should be planted as soon as an area of the site is brought to final grade. Surface runoff shall be intercepted at the top of temporary and permanent slopes during construction so that water is not allowed to flow over the slope face. 14.The general contractor and the grading contractor shall review there proposed grading sequence to insure that the least amount of land possible at any one time is disturbed with out permanent stabilization. 15.Contractor shall be responsible to ensure compliance with the N.P.D.E.S. Stormwater requirements. This includes, but is not limited to, inspection requirements. 16.Contractor is responsible for repairs or damage to any existing improvements during construction, such as, but not limited to, drainage, utilities, pavement, striping, curb, etc., and all repairs shall be equal to or better than existing conditions. 17.Ground cover to be provided on all disturbed areas within 7 or 14 days of activity halting in an area per Part II.E.1 of the NCG010000 General Permit. C1 DE M O L I T I O N P L A N 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 30 6015 1" = 30' R Know what's below. Call before you dig. GENERAL DEMOLITION SPECIFICATIONS: 1.CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSE WILL BE MAINTAINED BY OWNER AS FAR AS PRACTICAL.. 2.MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING DEMOLITION OPERATIONS. 3.DRAIN, PURGE, OR OTHERWISE REMOVE, COLLECT, AND DISPOSE OF CHEMICALS, GASES, EXPLOSIVES, ACIDS, FLAMMABLES OR OTHER DANGEROUS MATERIALS BEFORE PROCEEDING WITH DEMOLITION OPERATIONS ACCORDING TO APPLICABLE CODES OR REGULATIONS. 4.EMPLOY A CERTIFIED, LICENSED EXTERMINATOR TO TREAT BUILDING AND TO CONTROL RODENTS AND VERMIN BEFORE AND DURING DEMOLITION OPERATIONS. 5.DO NOT CLOSE OR OBSTRUCT STREETS, WALKS, OR OTHER ADJACENT OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM OWNER AND AUTHORITIES HAVING JURISDICTION. PROVIDE ALTERNATE ROUTES AROUND CLOSED OR OBSTRUCTED TRAFFIC WAYS IF REQUIRED BY GOVERNING REGULATIONS. PROVIDEALTERNATE ROUTES AND SIGNAGE FOR SIDEWALKS ON CHARLESTON HWY, DURING THE DEMOLITION AND RECONSRUCTION OF THE SIDEWALK. 6.DO NOT CREATE HAZARDOUS OR OBJECTIONABLE CONDITIONS, SUCH AS ICE, FLOODING, AND POLLUTION, WHEN USING WATER. REMOVE AND TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON ADJACENT SURFACES AND AREAS. 7.REMOVE DEBRIS FROM ELEVATED PORTIONS OF BUILDING BY CHUTE, HOIST, OR OTHER DEVICE THAT WILL CONVEY DEBRIS TO GRADE LEVEL. 8.PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE. 9.DO NOT BURN DEMOLISHED MATERIALS. GENERAL DEMOLITION NOTES: 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DISCONNECTION OF UTILITY SERVICES TO THE EXISTING STRUCTURES PRIOR TO DEMOLITION OF THE BUILDINGS. THE CONTRACTOR SHALL COORDINATE WITH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. 2.THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK WHICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAYED TO THE UTILITY COMPANY FOR THEIR SERVICES. 3.THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL STRUCTURES, PADS, WALLS, FLUMES, FOUNDATIONS, PARKING, DRIVES, DRAINAGE STRUCTURES, UTILITIES, ETC., SUCH THAT THE IMPROVEMENTS SHOWN ON THE REMAINING PLANS CAN BE CONSTRUCTED. ALL FACILITIES TO BE REMOVED SHALL BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHT TO GRADE WITH SUITABLE, COMPACTED FILL MATERIAL PER THE SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS INVOLVED AND IS RESPONSIBLE FOR REMOVING AND DUMPING THE DEBRIS IN AN APPROVED, LAWFUL MANNER. 4.ALL EXISTING UTILITIES ARE TO BE REMOVED, TERMINATED AND CAPPED AT THE RIGHT-OF-WAY. ALL EXISTING METERS, VALVES, ETC. ARE TO BE REMOVED UNLESS OTHERWISE NOTED ON THE PLANS. 5.ALL EXISTING SERVICE LINES FOR TELEPHONE, ELECTRIC, SEWER, AND CABLE T.V. SERVICES ARE TO BE REMOVED TO EXISTING TRUNK LINES UNLESS OTHERWISE NOTED ON THE PLANS. 6.ALL AREAS WHERE PAVEMENT, STRUCTURE SLABS, FOUNDATIONS, UTILITIES, CONDUITS, AND/OR UTILITY STRUCTURES HAVE BEEN REMOVED SHALL BE BACKFILLED WITH SELECT BACKFILL MATERIAL. ALL SELECT BACKFILL MATERIAL SHALL BE PLACED AND COMPACTED PER THE REQUIREMENTS OF SPECIFICATIONS AND THE OWNERS GEOTECHNICAL ENGINEER. 7.ALL EXISTING FENCES, SIGNS, POWER POLES, AND LIGHT POLES LOCATED ON-SITE SHALL BE DEMOLISHED AND REMOVED UNLESS OTHERWISE NOTED. 8.EXISTING CAST IN PLACE SEPTIC TANKS (IF FOUND ON-SITE) SHALL BE PUMPED BY A LICENSED CONTRACTOR. THE SEPTIC TANK SHALL THEN BE REMOVED AND THE AREA BACKFILLED PER THE PROJECT SPECIFICATIONS UNLESS OTHERWISE NOTED. ALL WORK SHALL BE IN ACCORDANCE WITH HEALTH DEPARTMENT REQUIREMENTS. 9.CONTRACTOR IS RESPONSIBLE FOR WALKING SITE AND DETERMINING EXTENTS OF DEMOLITION WORK PRIOR TO BID DATE. 10.PRIOR TO ANY WORK ONSITE, THE CONTRACTOR SHALL CONTACT THE ONE CALL SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY REMOVALS WHETHER LOCATED BY THE ONE CALL SYSTEM OR NOT. 11.CONTRACTOR SHALL COORDINATE REMOVAL OF EXISTING ELECTRICAL SERVICES ON SITE WITH THE POWER COMPANY. POWER COMPANY IS RESPONSIBLE FOR THE DISCONNECTION AND REMOVAL OF EXISTING SERVICES UNLESS OTHERWISE NOTED. 12.LIMITS OF PAVEMENT SHOWN TO BE REMOVED ARE APPROXIMATE AND FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY THE LIMITS OF PAVEMENT TO DETERMINE THE EXTENT OF THE EXISTING PAVEMENT TO BE REMOVED. 13.IF NOT SHOWN ON THE DEMOLITION DRAWINGS, THE CONTRACTOR SHALL REMOVE ALL EXISTING MATERIALS AS NECESSARY TO COMPLETE ALL NEW WORK AS REQUIRED BY OTHER PORTIONS OF THE CONTRACT DOCUMENTS. 14.SALVAGE RIGHTS FOR ALL DEMOLISHED MATERIALS SHALL BE FIRST GIVEN TO THE OWNER. ANY MATERIALS NOT RETAINED BY THE OWNER SHALL BE REMOVED FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR AT THE CONTRACTORS EXPENSE. 15.THE CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS IN THE REMOVAL/DEMOLITON OF HAZARDOUS MATERIALS. 16.THE CONTRACTOR IS RESPONSIBLE TO VERIFY EXISTING UTILITIES PRIOR TO DEMOLITION & EXCAVATION. 17.CONTRACTOR IS RESPONSIBLE FOR ALL REGISTRATIONS, PERMITS AND FEES REQUIRED TO REMOVE & PROPERLY DISPOSE OF ALL DEMOLITION MATERIALS. 18.DEMO CONTRACTOR IS RESPONSIBLE FOR OBTAINING APPROVALS AND NOTIFICATIONS TO ALL LOCAL, STATE AND FEDERAL AUTHORITIES. 19.REFER TO SURVEY FOR LIMITS AND BOUNDARY OF PROPERTY .SAWCUT EXISTING EOP TO PROVIDE A SMOOTH CONNECTION FOR NEW DRIVE SUBJECT PROPERTY (DEMOLITION SHOWN ± 0.50 ACRES) (LIMITS OF DISTURBANCE 5.0 ACRES) EX. 16" WATER MAIN (TO REMAIN) LEGEND LIMITS OF DISTURBANCE AREA OF DEMOLITION, CLEARING & GRUBBING PAVEMENT , SIDEWALK, AND CURBING TO BE REMOVED LIMITS OF BUILDING DEMOLITION AREA 217,750 SF ± 4.5 ACRES ± ± 4,940 S.F. BUILDING DEMOLITION REMOVE ± 200 L.F. CURB & GUTTER ± 5,712 S.F. BUILDING DEMOLITION EX. POWER POLE TO REMAIN SAWCUT EXISTING EOP TO PROVIDE A SMOOTH CONNECTION FOR NEW DRIVE EX. DRAINAGE TO BE REMOVED EDGE OF DELINEATED WETLANDS REMOVE ± 40 L.F. CURB & GUTTER REMOVE EXISTING PROPANE TANK GRAVEL PARKING TO WASTED ON-SITE OR BURIED WHERE PRACTICAL DEMO EXISTING LIGHT POLE DEMO EXISTING LIGHT POLE DEMO EXISTING LIGHT POLE AND OVERHEAD SERVICE EX. POWER POLE TO REMAIN END REMOVAL OF FENCE ALONG PROPERTY BOUNDARY BEGIN REMOVAL OF FENCE ALONG PROPERTY BOUNDARY REMOVE ± 280 L.F. OF CHAIN LINK FENCE (5)(6)(7)(8) (7) (8) (6) (5) (5) (3)(4) (6) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (3 ) (4) (6 ) (5 ) ( 3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) (1 0 ) (10 ) (9) (8) (7) (7)(6) (4) (5) (5 ) (3) (4) (6 ) (8) (9) (10) (10) (9) (10) (9) (8) (7) (8) (8) (9) (10 ) ( 1 0 ) ( 9 ) ( 8 ) (9)(8)(7) (3) (4) (5) (6) (7 ) (7) (6) (5) (4 ) (3) ( 9 ) ( 8 ) ( 7 ) (7) (8) (3 ) (4 ) (5 ) (6 ) (8 ) (9 ) (5 ) (5 ) (6 ) ( 6 ) (4 ) (5 ) ( 7 ) (0) (2) (3) (4) (5) (6 ) (6 ) (5) (9) (10) (6) (3) (4 ) (5) (7) (7 ) (6 ) (6 ) (5 ) (4 ) (3 ) (7 ) (6 ) (5 ) (4 ) (3 ) (3) (8) (7 ) (9 ) (8 ) (1 0 ) (1 0 ) (7 ) (7 ) C2 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 30 6015 1" = 30'R Know what's below. Call before you dig. ER O S I O N C O N T R O L P L A N P H . 1 FILTER BARRIER N.T.S. FRONT WOOD STAKE, SEE DETAIL 3/15 PLAN VIEW STORM SEWER DROP INLET STORM SEWER DROP INLET SEE DETAIL 2/15 SEE DETAIL 2/15 SURFA C E F L O W DIREC T I O N ( T Y P I C A L ) SUR F A C E F L O W DIR E C T I O N ( T Y P I C A L ) FLOW CURLEX SEDIMENT LOGS ® WOOD STAKE 16" MINIMUM WOOD STAKE TO ONLY PENETRATE NETTING, NOT CURLEX® MATERIAL SOIL SURFACE FLOW CURLEX SEDIMENT LOGS ® WOOD STAKE 16" MINIMUM WOOD STAKE TO ONLY PENETRATE NETTING, NOT CURLEX® MATERIAL DETAIL 1 STAKE SEDIMENT LOG DETAIL N.T.S. STAKE DETAIL N.T.S. DETAIL 2 CURLEX SEDIMENT LOGS ® DROP INLET PROTECTION N.T.S. CURLEX SEDIMENT LOG ® CURLEX SEDIMENT LOG ® SITE DRAINS TO WETLANDS THAT EMPTY INTO THE NORTH CAPE FEAR RIVER WATER BODY WHICH HAS CLASSIFICATION OF SC;SW. STREAM INDEX 18-74-(61) 3:1 2' TEMPORARY BERM (TYP.) N.T.S MAINTENANCE STATEMENT EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. LIMITS OF DISTURBANCE: 5.0 ACRES ANY EXCESS SOIL HAULED OFF-SITE MUST BE TO AN APPROVED PERMITTED SITE. DIVERSIONS TO BE SEEDED IMMEDIATELY AFTER INSTALLATION CONTRACTOR SHALL CLEAR AND GRUB ONLY IN AREAS REQUIRED FOR INSTALLATION OF EROSION CONTROL MEASURES BEFORE ANY OTHER SITE DISTURBANCE 24-HOUR CONTACT TOMMY PEASE TPEASE@RACETRAC.COM (770) 595-0309 LEGEND TYPE B INLET PROTECTION - SEE SHEET C2.2 FOR DETAIL STAKED SILT FENCE TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY CONSTRUCTION ENTRANCE AND WHEEL WASH (SEE DETAIL ON SHEET C2.3) TYPE 'B' INLET PROTECTION 3:1 MAX SLOPE TEMPORARY DIVERSION BERM CONSTRUCTED TO DIVERT FLOW TO BACK OF POND BEGIN DOUBLE ROW SILT FENCE STABILIZE ALL SIDES OF POND UPON COMPLETION W/ PERMANENT SEED MIX AND EROSION CONTROL BLANKET CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. APPROXIMATE LOCATION OF PORT-A-JOHN, CONCRETE WASHOUT, AND TRASH CONTAINER - CONTRACTOR TO MARK IN RED ON PLANS IF RELOCATED INSTALL ± 250 L.F. DOUBLE ROW SILT FENCE END DOUBLE ROW SILT FENCE - BEGIN SINGLE ROW SILT FENCE INSTALL ± 1,050 L.F. SINGLE ROW SILT FENCE END SINGLE ROW SILT FENCE - BEGIN DOUBLE ROW SILT FENCE INSTALL ± 500 L.F. DOUBLE ROW SILT FENCE STORM DRAIN FOR DIESEL ISLANDS TO BE STUBBED OUT AS PART OF GRADING CONSTRUCT STORM DRAINS AS NECESSARY AS PART OF THE INITIAL GRADING - BUT CONTINUE TO DIRECT WATER TO THE BASIN AS PRACTICAL END DOUBLE ROW SILT FENCE T T TT (5)(6)(7)(8) (7) (8) (6) (5) (5) (3)(4) (6) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (3 ) (4) (6 ) (5 ) ( 3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) (1 0 ) (10 ) (9) (8) (7) (7)(6) (4) (5) (5 ) (3) (4) (6 ) (8) (9) (10) (10) (9) (10) (9) (8) (7) (8) (8) (9) (10 ) ( 1 0 ) ( 9 ) ( 8 ) (9)(8)(7) (3) (4) (5) (6) (7 ) (7) (6) (5) (4 ) (3) ( 9 ) ( 8 ) ( 7 ) (7) (8) (3 ) (4 ) (5 ) (6 ) (8 ) (9 ) (5 ) (5 ) (6 ) ( 6 ) (4 ) (5 ) ( 7 ) (0) (2) (3) (4) (5) (6 ) (6 ) (5) (9) (10) (6) (3) (4 ) (5) (7) 20K - REGULAR 12K - PREMIUM 24K - DIESEL 12K - DEF 12K - B100 ALTERNATE P C2.1 ER O S I O N C O N T R O L P L A N P H . 2 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 30 6015 1" = 30' PROJECT STABILIZATION AREA TO BE STABILIZED AREAS DISTURBED OUTSIDE THE LIMIT OF CAPTURE FOR THE SEDIMENT POND DURING CONSTRUCTION SHALL BE STABILIZED DURING CONSTRUCTION ACTIVITIES. (SEE LANDSCAPE PLANS FOR POST CONSTRUCTION STABILIZATION) LEGEND TYPE 'B' INLET PROTECTION DURING GRADING - CONVERT TO TYPE 'F' ONCE CURBING IS INSTALLED (SEE SHEET C2.2 AND C2.3) STAKED SILT FENCE R Know what's below. Call before you dig. TEMPORARY CONSTRUCTION ENTRANCE PLACE STONE FOR STABILIZATION ONCE BUILDING PAD REACHES SUBGRADE STOCKPILE FOR UST EXCAVATION CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. MAINTENANCE STATEMENT EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE. TOTAL SITE DISTURBANCE: 5.0 ACRES ANY EXCESS SOIL HAULED OFF-SITE MUST BE TO AN APPROVED PERMITTED SITE. DIVERSIONS TO BE SEEDED IMMEDIATELY AFTER INSTALLATION CONTRACTOR SHALL CLEAR AND GRUB ONLY IN AREAS REQUIRED FOR INSTALLATION OF EROSION CONTROL MEASURES BEFORE ANY OTHER SITE DISTURBANCE 24-HOUR CONTACT TOMMY PEASE TPEASE@RACETRAC.COM (770) 595-0309 TEMPORARY CONSTRUCTION ENTRANCE AND WHEEL WASH (SEE DETAIL ON SHEET C2.3) APPROXIMATE LOCATION OF PORT-A-JOHN, CONCRETE WASHOUT, AND TRASH CONTAINER - CONTRACTOR TO MARK IN RED ON PLANS IF RELOCATED ADD SECOND CONSTRUCTION ENTRANCE ON N. TERMINAL ROAD AS NECESSARY FILTER BARRIER N.T.S. FRONT WOOD STAKE, SEE DETAIL 3/15 PLAN VIEW STORM SEWER DROP INLET STORM SEWER DROP INLET SEE DETAIL 2/15 SEE DETAIL 2/15 SURFA C E F L O W DIREC T I O N ( T Y P I C A L ) SUR F A C E F L O W DIR E C T I O N ( T Y P I C A L ) FLOW CURLEX SEDIMENT LOGS ® WOOD STAKE 16" MINIMUM WOOD STAKE TO ONLY PENETRATE NETTING, NOT CURLEX® MATERIAL SOIL SURFACE FLOW CURLEX SEDIMENT LOGS ® WOOD STAKE 16" MINIMUM WOOD STAKE TO ONLY PENETRATE NETTING, NOT CURLEX® MATERIAL DETAIL 1 STAKE SEDIMENT LOG DETAIL N.T.S. STAKE DETAIL N.T.S. DETAIL 2 CURLEX SEDIMENT LOGS ® DROP INLET PROTECTION N.T.S. CURLEX SEDIMENT LOG ® CURLEX SEDIMENT LOG ® C2.2 SW P P P N O T E S A N D D E T A I L S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasing land disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (8) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (4) (6 ) (5 ) (3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) (1 0 ) (10 ) (9) (8) (9) (10) (10) (9) (7 ) (6 ) (6 ) (5 ) (4 ) (3 ) (7 ) (6 ) (5 ) (4 ) (3 ) (3) (8) (7 ) (9 ) (8 ) (1 0 ) (1 0 ) (7 ) (7 ) C2.3 SW P P P N O T E S & D E T A I L S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 EL.= 7' - TOP OF POND SEDIMENT BASIN CONFIGURATION NO SCALE EL.= 6' - TOP OF RISER CLEANOUT STAKE - EL.: 4.5' (7,380 CUFT STORAGE) PLAN VIEW OUTSIDE WIDTH OF RISER + 1/2" 2' 6" PROFILE TRASH RACK FOR OUTLET STRUCTURES NOT TO SCALE NOTE: ALL TRASH RACK BARS SHALL BE WELDED TOGETHER AS REQUIRED. SEE ABOVE FOR REBAR SIZE. COAT REBAR W/ RUSTOLEUM COLD GALVANIZING PAINT OR APPOVED EQUAL. TOP OF RISER TWELVE #4 REBAR "SPOKES" #3 REBAR HOOPS TOP OF POND - 7' COIR FIBER BAFFLES (TYP.) 3" SKIMMER (TYP.) 3:1 SLOPE 32L.F. 15" CPP @ 0.5% 48" DIA. CMP RISER W/ ANTIFLOATION BASE TEMPORARY SEDIMENT BASIN FOR PHASE 1: BASIN TO REMAIN IN PLACE UNTIL MAJORITY OF SITE IS STABILIZED WITH STONE AND OUTSIDE SLOPES ARE SEEDED 3" M.F. SKIMMER W/ 2" ORIFICE NO A U T O E N T R Y NO A U T O E N T R Y NO T R U C K P A R K I N G NO T R U C K P A R K I N G NO T R U C K P A R K I N G NO T R U C K P A R K I N G T T TT 20K - REGULAR 12K - PREMIUM 24K - DIESEL 12K - DEF 12K - B100 ALTERNATE C3 SI T E P L A N 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 30 6015 1" = 30' LEGEND PROPOSED CONCRETE SIDEWALK PROPOSED BOLLARD CURB BACKING (DETAIL 4, SHEET SD1) PROPOSED AREA LIGHT POLES (DETAIL 6, SHEET SD2) (SEE MEP PLANS FOR CONDUIT INFORMATION) SITE DESIGN STANDARDS BUILDING SETBACK FRONT (WEST) SIDE, STREET (SOUTH) SIDE, INTERIOR (NORTH) REAR (EAST) REQUIRED PROVIDED 50'50.0' 50'167.4' 0'113.0' 0'139.4' LAND USE SUMMARY (ON SITE) CATEGORY BUILDING PAVEMENT / SIDEWALK PERVIOUS TOTAL AREA PERCENTAGE 0.08 AC.1.7 % 2.51 AC.52.3 % 2.212 AC.46.1 % 20.43 AC.100 % SITE PLAN NOTES: 1.ALL WORK AND MATERIALS SHALL COMPLY WITH NEW HANOVER COUNTY AND/OR NCDOT REGULATIONS AND CODES AND O.S.H.A. STANDARDS. 2.CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF TOWERS, SLOPE PAVING, COLUMNS, DOOR LOCATIONS, AND UTILITY ENTRANCES. 3.EXISTING STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED, OR RELOCATED PER PLANS. ALL COST SHALL BE INCLUDED IN BASE BID. 4.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, TRAFFIC SIGNALS AND POLES, ETC. AS REQUIRED PER PLANS. 5.ALL CURB DIMENSIONS ARE TO THE FACE OF GUTTER OF CURB UNLESS OTHERWISE NOTED. 6.ALL BUILDING DIMENSIONS ARE TO THE FACE OF STRUCTURAL CMU. 7.THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL AREAS INDICATED TO REMAIN UNDISTURBED OR TO REMAIN AS BUFFERS, ALL PROPERTY CORNERS, AND REPLACING ALL PINS ELIMINATED OR DAMAGED DURING CONSTRUCTION. 8.CONTRACTOR SHALL MATCH EXISTING PAVEMENT IN GRADE AND ALIGNMENT. 9.SIGNS TO BE DESIGNED AND PERMITTED AS PART OF SEPARATE REVIEW. R Know what's below. Call before you dig. TEMPORARY CONSTRUCTION EASEMENT & PROPOSED SLOPE EASEMENT AREA PARKING SPOT COUNTS SIGN SETBACK REQUIRED PROVIDED FRONT (WEST) SIDE, STREET (SOUTH) N/A 5' N/A 5' PARKING SUMMARY CATEGORY STANDARD PARKING SPACES HANDICAP ACCESSIBLE SPACES TOTAL COUNT 18 2 20 50 ' F R O N T S E T B A C K 24" WHITE STOP BAR 24" WHITE STOP BAR 5' CONC. SIDEWALK (TYP.) HANDICAP SIGNS (SEE DETAIL 11B, SHEET SD4) BOLLARD (TYP.) (SEE DETAIL 11A, SHEET SD4) SE E D E T A I L 2 , S H E E T S D 2 (C A N O P Y A C C E S S O R Y L A Y O U T ) DUMPSTER ENCLOSURE 4" YELLOW STRIPING (TYP.) STALLS REQ'D = 1 PER 200 S.F.18 MAX # OF STALL = NOT SPECIFIED N.A. SITE DATA: TM#: R04000-003-008-000 TOTAL SITE = 4.802 AC TOTAL DISTURBED AREA = 5.0 AC ZONING - HEAVY INDUSTRIAL DISTRICT (I-2) PHYSICAL ADDRESS: 2102 U.S. HWY. 421 N. WILMINGTON, NC 28401 FLOOD ZONE 'AE' PER FEMA PANEL 3720311800L EFF. 8/28/2018 CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. 141.2' 22 0 . 0 ' 30.0' 31.2' 27 . 5 ' 33 . 0 ' 48 . 0 ' 33.0' 32.7' 18.0' 10 . 0 ' (T Y P . ) 12 . 0 ' (T Y P . ) 18.0' 33. 0 ' 33 . 0 ' 27 . 5 ' 39. 0 ' 39. 0 ' 31.0' 20.0'20.0'20.0' 86.0' 14.5' 68 . 0 ' 17 0 . 4 ' 24 8 . 0 ' 231.2' R33.5' R35.0' R13.5' R33.5' R33.5' R33.5'R33.5' R31.5' R31.5' R38.5' R38.5' R23.5' R23.5' R99.1' R63.3' R18.5' R8.5' R13.5' R3.5' R3.5' R13.5' R13.5' R13.5' R13.5' 50' SIDE SETBACK 24" WHITE STOP BAR 24" WHITE STOP BAR 50.0' 16 7 . 4 ' 11 3 . 0 ' 139.4' 4" WHITE STRIPING (TYP.) 8' DOUBLE GATE 8' DOUBLE GATE 6' CHAIN LINK FENCE 6' CHAIN LINK FENCE PROPOSED SIGN T T TT (5)(6)(7)(8) (7) (8) (6) (5) (5) (3)(4) (6) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (3 ) (4) (6 ) (5 ) ( 3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) (1 0 ) (10 ) (9) (8) (7) (7)(6) (4) (5) (5 ) (3) (4) (6 ) (8) (9) (10) (10) (9) (10) (9) (8) (7) (8) (8) (9) (10 ) ( 1 0 ) ( 9 ) ( 8 ) (9)(8)(7) (3) (4) (5) (6) (7 ) (7) (6) (5) (4 ) (3) ( 9 ) ( 8 ) ( 7 ) (7) (8) (3 ) (4 ) (5 ) (6 ) (8 ) (9 ) (5 ) (5 ) (6 ) ( 6 ) (4 ) (5 ) ( 7 ) (0) (2) (3) (4) (5) (6 ) (6 ) (5) (9) (10) (6) (3) (4 ) (5) (7) 20K - REGULAR 12K - PREMIUM 24K - DIESEL 12K - DEF 12K - B100 ALTERNATE P TC: 6.90 BC: 6.40 TC: 6.84 BC: 6.34 TC: 7.08 BC: 6.58 TC: 7.31 BC: 6.81 TC: 8.76 BC: 8.26 TC: 7.30 BC: 6.80 TC: 6.74 BC: 6.24TC: 6.82 BC: 6.32 TC: 7.92 BC: 7.42 TC: 8.50 BC: 8.00 TC: 8.86 BC: 8.36 TC: 8.68 BC: 8.18 TC: 9.35 BC: 8.85 TC: 8.63 BC: 8.13 TC: 8.37 BC: 7.87 TC: 8.80 BC: 8.30 TC: 9.40 BC: 8.90 TC: 10.57 BC: 10.07 TC: 9.46 BC: 8.96 TC: 8.10 BC: 7.60 TC: 8.97 BC: 8.47 TC: 9.32 BC: 8.82 TC: 9.72 BC: 9.22TC: 10.50 BC: 10.00 TC: 10.11 BC: 9.61 TC: 10.21 BC: 9.71 TC: 9.93 BC: 9.43 TC: 8.67 BC: 8.17TC: 8.04 BC: 7.54 TC: 7.22 BC: 6.72 TC: 8.60 BC: 8.10 TC: 6.54 BC: 6.12 TC: 7.17 BC: 6.75 TC: 6.85 BC: 6.43 TC: 6.38 BC: 5.96 TC: 6.38 BC: 5.96 TC: 7.05 BC: 6.63 TC: 7.87 BC: 7.45 TC: 7.90 BC: 7.48 TC: 8.36 BC: 7.94 TC: 10.33 BC: 9.91 TC: 10.13 BC: 9.71 TC: 9.97 BC: 9.55 TC: 9.91 BC: 9.49 TC: 9.73 BC: 9.31 TC: 8.90 BC: 8.48 TC: 8.39 BC: 7.97 TC: 8.55 BC: 8.13 TC: 6.88 BC: 6.46 TC: 6.77 BC: 6.35 TC: 7.50 BC: 7.08 TC: 8.28 BC: 7.86 TC: 8.91 BC: 8.49 TC: 9.25 BC: 8.83 TC: 9.11 BC: 8.69 TC: 7.45 BC: 7.03 TC: 7.45 BC: 7.03TC: 7.73 BC: 7.31 TC: 8.52 BC: 8.10 TC: 6.87 BC: 6.45 TC: 7.71 BC: 7.29 TC: 7.95 BC: 7.53 TC: 8.27 BC: 7.85 TC: 8.88 BC: 8.46 TC: 8.41 BC: 7.99 TC: 8.23 BC: 7.81 TC: 7.89 BC: 7.47 TC: 7.29 BC: 6.87 TC: 6.90 BC: 6.48 TC: 6.51 BC: 6.09 TC: 6.11 BC: 5.69 TC: 10.66 BC: 10.24 TC: 10.10 BC: 9.68 TC: 8.94 BC: 8.52 TC: 9.84 BC: 9.42 TC: 9.82 BC: 9.40 TC: 7.98 BC: 7.56 FF ELEV: 11.00 FF ELEV: 11.00 FF ELEV: 11.00 FF ELEV: 11.00 - 1 . 9 % -1. 0 % -1.2 % - 2 . 1 % -1. 1 % -1.3 % - 2 . 3 % -1. 3 % -1.3 %-2.4 % -2.4 % -2.5 % -2.2% -2.2% -2.1 % -2. 1 % -2.5 % -1.7 % -3.3% -2.6 % -2. 4 % -2. 4 % -3 . 2 % -3 . 5 % -2. 5 % -2 . 0 % -2 . 8 % -0.9% -1.2% - 2 . 4 % - 2 . 4 % - 2 . 4 % - 2 . 4 % - 2 . 4 % -2 . 5 % - 2 . 5 % - 1 . 6 % -1 . 9 % - 2 . 3 % - 2 . 5 % -2.5 % - 2 . 6 % -2 . 5 % - 2 . 9 % -1 . 8 % -2 . 9 % - 2 . 6 % -1.1 % - 2 . 2 % -2.8 % -2.2 % -2. 0 % -2.3 % -2 . 1 % - 1 . 5 % -2. 9 % - 2 . 2 % -2.8 % -3.1 % -2.7% -2 . 1 % -2.8 % -2.8 % -2.7% -2.8% -1.4 % -1.3% - 1 . 3 % - 2 . 6 % - 1 . 5 % -2 . 8 % - 2 . 4 % - 2 . 2 % - 2 . 7 % -2 . 6 % - 3 . 8 % -2. 4 % -3 . 0 % -2 . 9 % -2. 0 % - 2 . 3 % - 2 . 5 % - 2 . 6 % -2.8% -2.8% -2.4% -2.4% - 1 . 3 % -2.1 % - 2 . 2 % C4 GR A D I N G P L A N 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 30 6015 1" = 30' R Know what's below. Call before you dig. LEGEND TEMPORARY CONSTRUCTION EASEMENT & PROPOSED SLOPE EASEMENT AREA CATCH CURB (DETAIL 1, SHEET SD1 & SD6) SHED CURB (DETAIL 2, SHEET SD1 & SD6) CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. ( 9 ) ( 8 ) (9)(8)(7) (3) (4) (5 ) (6) (7 ) (5 ) (4) (8 ) (7 ) (7) (0) (2) (3) (4) (5) (6 ) (6 ) (5) (6) (3) (4 ) (5) (7) C4.1 WE T P O N D D E T A I L S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 PLAN VIEW OUTSIDE WIDTH OF RISER + 1/2" 2' 6" PROFILE TRASH RACK FOR OUTLET STRUCTURES NOT TO SCALE NOTE: ALL TRASH RACK BARS SHALL BE WELDED TOGETHER AS REQUIRED. SEE ABOVE FOR REBAR SIZE. COAT REBAR W/ RUSTOLEUM COLD GALVANIZING PAINT OR APPOVED EQUAL. TOP OF RISER TWELVE #4 REBAR "SPOKES" #3 REBAR HOOPS SECTION ALONG TOP OF LEVEE DETENTION POND EMERGENCY SPILLWAY 15' NOTE: "T" = THICKNESS = 8" CROSS SECTION TOP OF BERM = 6' TURF REINFORCEMENT MATTING NO SCALE OR FLATTER 3 1 "9"SMOOTH FOUNDATION FABRIC NON-WOVEN GEOTEXTILE FILTER FABRIC 6" AVG. DIA. STONE SIZE "T" 9" KEYWAY AT TOE OF SLOPE TOP OF SPILLWAY: 5.3' POND SIDE SPILLWAY TO BE CONSTRUCTED W/ TURF REINFORCMENT MATTING TOP OF BERM: 6' Know what's below.Call before you dig. NOTES: 1.CONCRETE SHALL BE 3,000 PSI. 2.COLLAR TO BE PLACED AT THE CENTER OF A SECTION OF PIPE. 3.LOWER HALF OF COLLAR CAN BE DIRT FORMED WHILE THE UPPER HALF IS WOOD FORMED. 4.PLACE ROLL MASTIC AT THE PIPE COLLAR INTERFACE. 5.A GALVANIZED STEEL PLATE ANTI-SEEP COLLAR CAN BE SUBMITTED FOR APPROVAL BY THE ENGINEER. ANTI-SEEP COLLAR NO SCALE WET POND MAINTENANCE SCHEDULE 1.THE LANDOWNER, ITS SUCCESSORS AND ASSIGNS, WILL PERFORM THE WORK NECESSARY TO KEEP THESE FACILITIES IN GOOD WORKING ORDER AS APPROPRIATE. 2.PERMANENT WET DETENTION POND TO BE OWNED AND MAINTAINED BY OWNER. 3.GRASS TO BE MOWED ON A REGULAR BASIS (MINIMUM 2 TIMES A YEAR). AREAS NOT VEGETATED SHOULD BE STABILIZED IMMEDIATELY. 4.DIKE TO BE MAINTAINED WITH PROMPT REPAIR OF ANY ERODED AREAS AND NO TREE GROWTH ALLOWED TO OCCUR IN THE BERM. 5.TRASH AND DEBRIS TO BE REMOVED FROM WITHIN AND AROUND THE POND ON A REGULAR BASIS AND AFTER ANY LARGE STORM EVENTS. 6.OUTLET STRUCTURE TO BE INSPECTED FOR STRUCTURE INTEGRITY AND SEDIMENT TO BE REMOVED IF IT IS RESTRICTING WATER FLOW. REPAIRS TO OUTLET STRUCTURE TO BE MADE IF NEEDED. 7.SEDIMENT ACCUMULATION TO BE REMOVED FROM WET POND. RIPRAP PAD (TYP.) TOP OF POND @ 6' 3:1 INSIDE SLOPE (2) 4' DOUBLE SWING GATE ACCESS 6' TALL CHAIN LINK FENCE WET POND #1 NO SCALE EXCAVATE FOREBAY (2:1 SIDE SLOPES INSIDE FOREBAY) PERMANENT POOL EL=3.5 PERMANENT POOL EL=3.5 SOIL BERM ELEV. 2.5 (2' WIDTH) 2' 6' AQUATIC BENCH @ 6:1 SLOPE (PLANT WITH WETLAND PLANTS) 2 1 3 1 6 1 3 1 2 13' TOP OF BERM ELEV=6.0 GRADE BACK 3:1 BOT. EL=-0.5 BOT. EL=0.0' PROPOSED RCP & HEADWALL (TYP.) 3 1 6' NO SCALEWET POND #1 STAGE/STORAGE TOP OF RISER ELEV= 5.0' 1- YR EVENT - 4.07' - 18,667 CUFT EL. = 6.0' - TOP OF POND 2- YR EVENT - 4.18' - 19,694 CUFT 10- YR EVENT - 4.64' - 24,018 CUFT 100- YR EVENT - 5.27' - 30,299 CUFT PERMANENT POOL EL=3.50 BOTTOM EL=0.0 FOREBAY 8' NOTES: 1.WEIRS & ORIFICES SHALL BE BLOCKED OFF DURING CONSTRUCTION. 2.AFTER FINAL STABILIZATION OPEN ORIFICES AND WEIR. 3.INSTALL PERMANENT TEE AND ORIFICE CUT PER DETAIL. 4.RISER SHALL HAVE TRASH RACK PER DETAIL. 5.POND TO BE DEWATERED FOR MAINTENCE USING PUMP. 8' 8' 10" 4'X4' PRECAST CONCRETE RISER 18" R.C.P. OUTLET PIPE 8'x8'x10" CONCRETE FOOTER 10" 18" RCP OUTLET INV EL=3.5 EL.= 5.0 TOP OF RISER 4'X4' PRECAST CONCRETE RISER 8'x8'x10" CONCRETE FOOTER 4.0'4.0 ' INSIDE DIMENSION (TYPICAL) (1) - 1" ORIFICE INV. EL = 3.5 INV. EL=3.5 (1) - 1" DIA. ORIFICE EL= 2.50 NO SCALEWET POND #1 OUTLET STRUCTURE DETAIL 3" PVC TEE FITTING AT RISER W/ INVERTED ORIFICE OPENING 3" PVC TEE FITTING AT RISER W/ INVERTED ORIFICE OPENING INV. EL=4.0 (2) - 4" DIA. ORIFICE (2)- 4" DIA. ORIFICE INV. EL=4.0 10' WIDE SHELF BOT OF POND @ 0.0' 3' DEEP FORBAY AT PIPE OUTFALL - 2.5' TALL FOREBAY AT EXIT (7) (6) (5) (5) (3) (4) (6) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (3 ) (4) (6 ) (5 ) ( 3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) ( 1 0 ) (10 ) (9) (8) (7) (6) (4) (5) (5 ) (3) (4) (6) Know what's below.Call before you dig. NOTES: 1.CONCRETE SHALL BE 3,000 PSI. 2.COLLAR TO BE PLACED AT THE CENTER OF A SECTION OF PIPE. 3.LOWER HALF OF COLLAR CAN BE DIRT FORMED WHILE THE UPPER HALF IS WOOD FORMED. 4.PLACE ROLL MASTIC AT THE PIPE COLLAR INTERFACE. 5.A GALVANIZED STEEL PLATE ANTI-SEEP COLLAR CAN BE SUBMITTED FOR APPROVAL BY THE ENGINEER. ANTI-SEEP COLLAR NO SCALE STORMWATER WETLANDS MAINTENANCE SCHEDULE 1.THE LANDOWNER, ITS SUCCESSORS AND ASSIGNS, WILL PERFORM THE WORK NECESSARY TO KEEP THESE FACILITIES IN GOOD WORKING ORDER AS APPROPRIATE. 2.PERMANENT STORMWATER WETLANDS TO BE OWNED AND MAINTAINED BY OWNER. 3.GRASS TO BE MOWED ON A REGULAR BASIS (MINIMUM 2 TIMES A YEAR). AREAS NOT VEGETATED SHOULD BE STABILIZED IMMEDIATELY. 4.DIKE TO BE MAINTAINED WITH PROMPT REPAIR OF ANY ERODED AREAS AND NO TREE GROWTH ALLOWED TO OCCUR IN THE BERM. 5.TRASH AND DEBRIS TO BE REMOVED FROM WITHIN AND AROUND THE POND ON A REGULAR BASIS AND AFTER ANY LARGE STORM EVENTS. 6.OUTLET STRUCTURE TO BE INSPECTED FOR STRUCTURE INTEGRITY AND SEDIMENT TO BE REMOVED IF IT IS RESTRICTING WATER FLOW. REPAIRS TO OUTLET STRUCTURE TO BE MADE IF NEEDED. 7.SEDIMENT ACCUMULATION TO BE REMOVED FROM WETLANDS. 8.DEEP WETLAND POOLS TO BE INSPECTED AS NECESSARY TO PROVIDE POSITIVE DRAINAGE TO THE OUTLET. (REFER TO THE DEQ'S STORMWATER DESIGN MANUAL FOR STORMWATER WETLANDS DESIGN GUIDE FOR A MORE DETAILED CHECKLIST FOR MAINTENANCE.) C4.2 S. W . W E T L A N D S D E T A I L S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 PLAN VIEW OUTSIDE WIDTH OF RISER + 1/2" 2' 6" PROFILE TRASH RACK FOR OUTLET STRUCTURES NOT TO SCALE NOTE: ALL TRASH RACK BARS SHALL BE WELDED TOGETHER AS REQUIRED. SEE ABOVE FOR REBAR SIZE. COAT REBAR W/ RUSTOLEUM COLD GALVANIZING PAINT OR APPOVED EQUAL. TOP OF RISER TWELVE #4 REBAR "SPOKES" #3 REBAR HOOPS SECTION ALONG TOP OF LEVEE DETENTION POND EMERGENCY SPILLWAY 15' NOTE: "T" = THICKNESS = 8" CROSS SECTION TOP OF BERM = 6' TURF REINFORCEMENT MATTING NO SCALE OR FLATTER 3 1 "9"SMOOTH FOUNDATION FABRIC NON-WOVEN GEOTEXTILE FILTER FABRIC 6" AVG. DIA. STONE SIZE "T" 9" KEYWAY AT TOE OF SLOPE TOP OF SPILLWAY: 5.5' POND SIDE SPILLWAY STONE TO BE CONSTRUCTED WITH TURF REINFORCEMENT MATTING TOP OF BERM: 6' STORMWATER WETLANDS #1 NO SCALE EXCAVATE FOREBAY (2:1 SIDE SLOPES INSIDE FOREBAY) PERMANENT POOL EL=5' PERMANENT POOL EL=5 SOIL BERM ELEV. 4.5 (2' WIDTH) 2' TEMPORARY INUNDATION ZONE (MIN. ELEVATION @ 5') 2 1 3 1 3 1 2 12' TOP OF BERM ELEV=6.0 GRADE BACK 3:1 BOT. EL=2.5 BOT. EL=3' PROPOSED RCP & HEADWALL (TYP.) 3 1 VARIES' NO SCALESTORMWATER WETANDS STAGE/STORAGE TOP OF RISER ELEV= 6.0' 1- YR EVENT - 5.66' - 21,363 CUFT EL. = 6.0' - TOP OF WETLANDS 2- YR EVENT - 5.69' - 21,901 CUFT 10- YR EVENT - 5.79' - 23,287 CUFT 100- YR EVENT - 5.94' - 25,632 CUFT PERMANENT POOL EL=5.0 BOTTOM EL=3.0 FOREBAY 8' NOTES: 1.WEIRS & ORIFICES SHALL BE BLOCKED OFF DURING CONSTRUCTION. 2.AFTER FINAL STABILIZATION OPEN ORIFICES AND WEIR. 3.INSTALL PERMANENT TEE AND ORIFICE CUT PER DETAIL. 4.RISER SHALL HAVE TRASH RACK PER DETAIL. 5.POND TO BE DEWATERED FOR MAINTENCE USING PUMP. 8' 8' 10" 4'X4' PRECAST CONCRETE RISER 15" R.C.P. OUTLET PIPE 8'x8'x10" CONCRETE FOOTER 10" 15" RCP OUTLET INV EL= 5.0 EL.= 6.0 TOP OF RISER 4'X4' PRECAST CONCRETE RISER 8'x8'x10" CONCRETE FOOTER 4.0'4.0 ' INSIDE DIMENSION (TYPICAL) (1) - 1" ORIFICE INV. EL = 5.0 INV. EL=5.0 (1) - 1.25" DIA. ORIFICE EL= 4.0 NO SCALEOCS #2 OUTLET STRUCTURE DETAIL 3" PVC TEE FITTING AT RISER W/ INVERTED ORIFICE OPENING 3" PVC TEE FITTING AT RISER W/ INVERTED ORIFICE OPENING EL.= 5.4 (3) 4' WEIR = 12' TOTAL (3) 4' WIDE WEIR @ EL. 5.4' 3:1 INSIDE SLOPE FOREBAY - 2' DEEP FOREBAY - 2' DEEP NON-FOREBAY DEEP POOL - 2' DEEP NON-FOREBAY DEEP POOL - 2' DEEP NON-FOREBAY DEEP POOL - 2' DEEP SHALLOW WATER ZONE - AVG. EL. 4.5' (0-9" DEEP) TEMPORARY INUNDATION ZONE - MIN. EL. 5.0' C4.3 GR A D I N G & S W D E T A I L S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 NO SCALE RIPRAP PLACEMENT AROUND HEADWALL AND PIPE NO SCALE PLACE RIPRAP AROUND AND ABOVE END OF PIPE IN ADDITION TO RIPRAP APRON PLACE RIPRAP AROUND WINGWALLS IN ADDITION TO RIPRAP APRON PRECAST CONCRETE HEADWALL (5)(6)(7)(8) (7) (8) (6) (5) (5) (3)(4) (6) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (3 ) (4) (6 ) (5 ) ( 3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) (1 0 ) (10 ) (9) (8) (7) (7)(6) (4) (5) (5 ) (3) (4) (6 ) (8) (9) (10) (10) (9) (10) (9) (8) (7) (8) (8) (9) (10 ) ( 1 0 ) ( 9 ) ( 8 ) (9)(8)(7) (3) (4) (5) (6) (7 ) (7) (6) (5) (4 ) (3) ( 9 ) ( 8 ) ( 7 ) (7) (8) (3 ) (4 ) (5 ) (6 ) (8 ) (9 ) (5 ) (5 ) (6 ) ( 6 ) (4 ) (5 ) ( 7 ) (0) (2) (3) (4) (5) (6 ) (6 ) (5) (9) (10) (6) (3) (4 ) (5) (7) P HW - 10 IE: 4.92 OCS - 2 RIM EL.: 7.0 IE OUT: 5.00 CB - 1 V-4863 FRAME RIM EL.: 6.98 IE OUT: 2.83 HW - 8 IE: 4.26 CB -2 V-4863 FRAME RIM EL.: 6.36 IE OUT: 0.68 CB - 4 V-4863 FRAME RIM EL.: 6.31 IE IN: 2.91 IE OUT: 2.91 HW - 6 IE: 3.50 CB - 3 V-4863 FRAME RIM EL.: 6.23 IE OUT: 3.50 HW - 7 IE: 4.00 CB - 5 V-4863 FRAME RIM EL.: 5.91 IE OUT: 4.22 HW - 5 IE: 3.00 OCS 1 RIM EL.: 5.0 IE OUT: 3.50 HW - 9 IE: 3.13 HW -3 IE: 3.00 HW - 4 IE: 2.68 HW -2 IE: 0.00 HW -1 IE: 0.00 28LF-18"RCP @ 10.00% 68 L F - 1 8 " R C P @ 1 . 0 0 % 47LF-18"RCP @ 0.51% 262LF-15"RCP @ 0.50% 54LF-18"RCP @ 0.49% 76LF- 2 4 " R C P @ 0 . 6 6 % 17LF-18"RCP @ 3.00% 74LF-18" R C P @ 0 . 5 0 % 15LF-15"RCP @ 0.50% C7 DR A I N A G E P L A N 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 30 6015 1" = 30' R Know what's below. Call before you dig. DIESEL ISLAND CATCH BASIN (SEE DETAIL 2 ON SHEET SD8) OIL WATER SEPARATOR (SEE DETAIL 3 ON SHEET SD8) 6" PVC SDR 40 IN/OUT OF OIL WATER SEPARATOR CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. C - STORM - A PROFILE 0 5 10 15 0 5 10 15 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+25 C - STORM - B PROFILE 0 5 10 15 0 5 10 15 0+00 0+25 C - STORM - C PROFILE 0 5 10 15 0 5 10 15 0+00 0+50 0+75 C - STORM - D PROFILE 0 5 10 15 0 5 10 15 0+00 0+50 1+00 C - STORM - E PROFILE 0 5 10 15 0 5 10 15 0+00 0+50 C - STORM - F PROFILE 0 5 10 15 0 5 10 15 0+00 0+50 0+75 CB - 5 RI M E L : 5 . 9 1 IE O U T : 4 . 2 2 262LF-15"RCP @ 0.50% CB - 4 RI M E L : 6 . 3 1 IE I N : 2 . 9 1 IE O U T : 2 . 9 1 47LF-18"RCP @ 0.51% HW - 4 IE: 2.68 HW -3 IE: 3.00 17LF-18 " R C P @ 3 . 0 0 % CB - 3 RI M E L : 6 . 2 3 IE O U T : 3 . 5 0 HW -2 IE: 0.00 68LF-18"RCP @ 1.00 % CB - 2 RI M E L : 6 . 3 6 IE O U T : 0 . 6 8 HW - 5 IE: 3.00 76LF-24"RCP @ 0.66% HW - 6 IE: 3.50 CB - 1 RI M E L : 6 . 9 8 IE O U T : 2 . 8 3 2 8 L F - 1 8 " R C P @ 1 0 . 0 0 % HW -1 IE: 0.00 HW - 8 IE: 4.26 54LF-18"RCP @ 0.49% HW - 7 IE: 4.00 C7.1 DR A I N A G E P R O F I L E S 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 50 10025 1" = 50' R Know what's below. Call before you dig. CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. 0 1. 5 3 6 1" = 3 ' EXISTING GRADE (TYP.) PROPOSED GRADE (TYP.) EXISTING GRADE (TYP.) PROPOSED GRADE (TYP.) T T TT 20K - REGULAR 12K - PREMIUM 24K - DIESEL 12K - DEF 12K - B100 ALTERNATE P P C8 UT I L I T Y P L A N 5/7/2023 ZHEYDENBURG S221106_BASE_SHEETS.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 0 50 10025 1" = 50'R Know what's below. Call before you dig. TELEPHONE NOTES: CONTRACTOR IS RESPONSIBLE FOR INSTALLING THE PVC CONDUIT INCLUDING TRENCHING BEDDING, PULL WIRE, AND BACKFILLING. CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE TELEPHONE COMPANY TO SCHEDULE AND COORDINATE WORK PRIOR TO INSTALLING CONDUIT. POWER NOTES: CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL NECESSARY CONDUIT AND PULL WIRE ON-SITE UP TO PROPERTY. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF THE SERVICE LINES WITH THE POWER COMPANY. CONTRACTOR SHALL PROVIDE TRANSFORMER PAD (UNLESS TRANSFORMER IS POLE MOUNTED) TO ALLOW FOR INSTALLATION OF TRANSFORMER BY POWER COMPANY. ALL VERTICAL BENDS ON WATER MAIN SHALL BE RESTRAINED WITH A MECHANICAL JOINT FITTING SUPPLIED WITH THE RETAINER GLANDS. ANY JOINTS 25 FEET OR LESS FROM EITHER SIDE OF VERTICAL BEND SHALL BE RESTRAINED WITH A RETAINER GLAND. DIMENSIONS SHOWN ARE TO CENTERLINE OF PIPE OR FITTING. THRUST BLOCKS SHALL BE PROVIDED AT ALL HORIZONTAL BENDS, TEES, AND FIRE HYDRANTS. THE MINIMUM COVER ON WATER MAINS SHALL BE 3 FEET. PIPE MATERIAL SHALL BE "ENDOPURE" PE 3408 - 200PSI. GENERAL CONTRACTOR IS RESPONSIBLE TO COORDINATE THE IRRIGATION SYSTEM REQUIREMENTS BETWEEN THE IRRIGATION CONTRACTOR AND PLUMBING CONTRACTOR. IRRIGATION TAP, METERS, ETC. SHALL BE INCLUDED IN GENERAL CONTRACTOR'S BASE BID. SITE SPECIFIC NOTES: CONTRACTOR TO INCLUDE FOR ALL SECONDARY CONDUITS (CONDUIT ONLY) DEPICTED ON UTILITY PAGE IN BASE BID. INCLUDE FOR LENGTH UP POLE APPROX 30FT. WIRE IS ASSUMED TO BE BY UTILITY DEPARTMENT. A.SECONDARY WIRE WILL BE PROVIDED IN BID AS AN ALTERNATE PRICE IN L.F. AND HANDLED AS A CHANGE ORDER IF REQUIRED. CONTRACTOR TO INCLUDE TWO (2) 1” CONDUITD TO BOTH SIGN LOCATIONS. A.ONE (1) 1” CONDUITIS FOR ELECTRICAL. ONE (1) 1” CPNDUIT IS FOR COMMMUNICATION. B.CONTRACTOR IS RESPONSBILE TO PROVIDE CAT 5 HOME-RUN BETWEEN PRICE SIGN AND FINAL DESTINATION INSIDE THE BUIILDING. FINAL DESTINATION TO BE DETERMINED BY RACETRAC CONSTRUCTION MANAGER DURING CONSTRUCTION. SEE UTILITY CONNECTION BLOW-UP (THIS SHEET) GREASE TRAP (SEE DETAIL 4, SHEET SD2) YARD HYDRANTS (SEE DETAIL 7, SD6) EXISTING HYDRANT 4" SCH 40 SERVICE LATERAL 2" ENDOPURE WATER LINE CLEANOUT (TYP.) CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. UPSIZE EXISTING METER TO 1.5" - REPLACE CONNECTION W/ 1.5" TAPPING SLEEVE R400.0' HYDRANT RADIUS RPZ BACKFLOW PROTECTION IS REQUIRED HOSE BIBB (SEE DETAIL 12, SHEET SD1) RELOCATE EXISTING HYDRANT 3/4" ENDOPURE WATER SERVICE UTILITY CONNECTION BLOW-UP: SCALE: 1" = 10' 3/4" ENDOPURE WATER SERVICE ELECTRICAL SERVICE ELECTRICAL PANEL 2" ENDOPURE WATER SERVICE LINE 2" SUPPLY FROM METER GREASE TRAP (SEE DETAIL 4, SHEET SD2) 4" GREASE WASTE EXIST 4" SAN I.E. -3' BFF 4" SCH 40 SERVICE LATERAL 2" GREASE INTERSEPTOR VENT CLEANOUT (TYP.) 5' DIA. M.H. I.E. 6.4' PRECASE CONCRETE WET WELL W/ EXT BASE & DUPLEX SUBMERSIBLE PUMP VALVE VAULTMETER VAULT 4" DIP 4" DIP ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg SD1 APPROXIMATE TANK LOCATION TRANSITION FOR CATCH CURB WITH 1' CONCRETE BACKING TRANSITION FOR SHED CURB WITH 1' CONCRETE BACKING 2'- 3 " TA P E R 712" 712" 8" MIN 18" 25" 2" 7" 27" 25" 2'-3" TAPE R 12" 712" 2'-3 " TA P E R TRANSITION FOR CATCH CURB WITH 1' CONCRETE BACKING AT CORNER LANDSCAPE ISLAND 25" 12" 8" MIN 8" MIN APPROXIMATE LOCATION OF BUILDING FOOTPRINT AND SIDEWALK ENVELOPE PLAN VIEW CONC. DRIVE CONC. DRIVE SECTION VIEW FRONT VIEW SIDE VIEW ELECTRICAL REQUIREMENTS: 1.110V - 20A - CLASS C, WITH GROUND 2.ELECTRICAL STUB TO BE 1" RIGID CONDUIT INSTALLATION REQUIREMENTS: 1.CONC. SLAB TO BE INSTALLED BY G.C. 2.AIR/VAC STAND (XactAir), PROVIDED, INSTALLED & CONNECTED BY VENDOR. 3.3/8" MOUNTING STUDS, PROVIDED, INSTALLED & CONNECTED BY VENDOR. TRASH CAN CL CL CL SECTION VIEW PLAN VIEW NOTES: 1.REFER TO "SITE PLAN" FOR EXACT LOCATIONS OF THE DIFFERING CURB TYPES. 2.* = RACETRAC CONSTRUCTION PROJECT MANAGER TO COORDINATE WITH CONCRETE SUBCONTRACTOR TO DETERMINE BEST TRANSITION METHOD BETWEEN DIFFERING CURB TYPES. 3.MAILBOX TO BE PROVIDED BY GC. INSTALL LOCATION TO BE COORDINATED BY GC WITH USPS NOTES: 1.ALTERNATIVE PAINT USTC ACRYLIC AKLYD CO POLYMER 'SUPREME PAINT' (WHITE) TO BE USED 2.REFER TO "SITE PLAN" FOR EXACT LOCATIONS OF THE DIFFERING CURB TYPES. 3.REFER TO SITE PLAN FOR EXACT LOCATIONS. NOTES: 1.PVC CHASE TO BE PLACED UNDER ALL DRIVEWAYS. REFER TO "SITE PLAN" FOR EXACT LOCATIONS. 2.CHASES ARE NOT TO BE USED FOR IRRIGATION INSTALLED WITH THIS DEVELOPMENT. IRRIGATION SLEEVES WILL BE SEPARATE. 3.REFER TO "UTILITY PLAN" AND IRRIGATION PLAN FOR IRRIGATION SLEEVE LOCATIONS. NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 9A, SHEET SD3. VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 4.THIS CURB TYPE IS TO BE USED ALONG THE CURB LINE ADJACENT TO THE TANK PAVEMENT. SEE PLAN FOR LOCATION. NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OFAGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP. FILL JOINTS WITH PAVEMENT SEALANT PER DETAIL 3B, SHEET SD3. VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 4.CURB BACKING WIDTHS: A.THREE (3) FOOT BACKING IS TO BE USED ALONG THE RADIUS OF DRIVEWAYS AND IS STRUCTURALLY REINFORCED WITH #3 REBARS @ 9" O.C. EACH WAY. B.TWO (2) FOOT BACKING IS TO BE USED ALONG THE RADIUS OF LANDSCAPE ISLANDS WITHIN HIGH TRAFFIC AREAS. TWO (2) FOOT BACKING IS NOT STRUCTURALLY REINFORCED. C.ONE (1) FOOT BACKING IS TO BE USED AS A PEDESTRIAN WALKWAY WITHIN LANDSCAPE ISLANDS. ONE (1) FOOT BACKING IS NOT STRUCTURALLY REINFORCED. 5.SEE PAVING PLAN FOR EXACT LOCATIONS OF CURB BACKING. NOTES: 1.SECURE VAULT TO PAD W/ TWO (2) 29-00450 ANGLE BRACKETS AND FOUR (4) 12"Ø x 4" SIMPSON TITAN HD SCREWTYPE ANCHORS (TYP.) 2.REFER TO PAVING PLAN FOR EXACT CONCRETE THICKNESS. 3.REFER TO PAVING PLAN FOR CONCRETE COMPRESSIVE STRENGTH & SUBGRADE COMPACTION REQUIREMENTS. NOTES: 1.SEE "SITE PLAN" FOR EXACT LOCATIONS. 2.REFER TO PAVING PLAN FOR EXACT CONCRETE THICKNESS. 3.REFER TO PAVING PLAN FOR CONCRETE COMPRESSIVE STRENGTH & SUBGRADE COMPACTION REQUIREMENTS. NOTES: 1.BUMPER POSTS TO BE PLUMB AND ALIGNED IN A STRAIGHT LINE AND FILLED WITH CONCRETE. 2.TOPS TO BE GROUND SMOOTH W/ SQUARE EDGE, THE PRIMED WITH "END RUST" BY DURO AND PAINTED WITH INDUSTRIAL OIL BASED ENAMEL. COLOR TO MATCH DECORATIVE LIGHT POLES. 3.REFER TO PAVING PLAN FOR EXACT CONCRETE THICKNESS. 4.REFER TO PAVING PLAN FOR CONCRETE COMPRESSIVE STRENGTH & SUBGRADE COMPACTION REQUIREMENTS. REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 9B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, SEE DETAIL 3B, SHEET SD3 (TYP). PEA GRAVEL TO GRADE WITHIN TANKPIT 2'-3" GRAVEL TANK PAD PAVEMENT SE E P L A N FO R PA V E M E N T TH I C K N E S S EQ EQ COMPACTED SUBGRADE 5'-0" FOR SEMI-TRUCK DRIVEWAYS 3'-0" FOR AUTO DRIVEWAYS 2'-0" FOR RADIUS OF LANDSCAPE ISLANDS 1'-0" FOR LANDSCAPE ISLAND WALKWAY 1'-0"6" EQ EQ #3 REBAR @ 9" O.C. EACH WAY (3' BACKING ONLY) 45° TAPER *SEE NOTE 2* SEE NOTE 2 CIVIL ENGINEER TO DETERMINE IF CURB TYPES USED ON SITE ARE ACCEPTABLE FOR USE WITHIN RIGHT OF WAY. IF NOT, ENGINEER TO PROVIDE DETAIL OF CURB TO BE USED. EXISTING RIGHT OF WAY LINE TANK AREA PAVEMENT 3' CONC. BACKING SEE DETAIL 4 SHEET SD-1 PROPERTY BOUNDARY CIVIL ENGINEER TO DETERMINE IF CURB BACKING IS ALLOWED IN PUBLIC RIGHT OF WAYS 1' CONC. BACKING * SEE DETAIL 4 SHEET SD1 CURB TRANSITION SEE DETAIL 5 SHEET SD1 TYPICAL DRIVEWAY (REFER TO "SITE PLAN" FOR EXACT DISTANCE) CLEANOUTS IN 2'x2' CONC. PAD TWO (2) 4" PVC CHASES CLEANOUTS IN 2'x2' CONC. PAD 5.00' (TYP) TWO (2) 4" PVC CHASE 5.00' (TYP.) PVC "T" CONNECTION WITH EXTENSION CAP 3' CONC. BACKING SEE DETAIL 4, SHEET SD1 COMPACTED SUBGRADE 6.625" O.D., 0.188" WALL STEEL TUBE FILLED WITH CONCRETE. FURNISHED & INSTALLED BY G.C. 3' - 4 " 6" 2'-0" DIA. 3'- 6 " 1/4" FOAM PLANK TO BE FULL DEPTH OF PAVEMENT WRAPPED AROUND BOLLARD TO ENSURE COMPLETE SEPARATION OF CONCRETE AND BOLLARD. PROVIDE 1/4" THICK MASTIC COATING ON EXPOSED PORTION OF BOLLARD BELOW TOP OF PAVEMENT TO PREVENT CORROSION SE E P A V I N G P L A N FO R P A V E M E N T TH I C K N E S S SEE PAVING PLAN FOR REINFORCEMENT COMPACTED SUBGRADE AGGREGATE BASE 36 " 54" 72" 5" COMPACTED SUBGRADECOMPACTED SUBGRADE BURY SLAB IN GROUND BURY SLAB IN GROUND CURB 1" WATER-TIGHT ELECTRICAL JUNCTION BOX 1" CONDUIT FROM BUILDING TO WATER-TIGHT ELECTRICAL JUNCTION BOX. 1" CONDUIT FROM BUILDING. REFER TO "UTILITY PLAN" FOR EXACT LOCATION 6" 1'-0" 27 12" 3'-6" 2'-1138" PR O V I D E 34" M I N . C L E A R B E T W E E N LE A D I N G E D G E O F H Y D R A N T A N D OU T S I D E F A C E O F B U M P E R P O S T 1'-51116" 12 " WOODFORD MODEL Y34 FREEZELESS YARD HYDRANT WOODFORD MODEL Y34 FREEZELESS YARD HYDRANT PRODUCT DISPENSER BEYOND DISPENSER ISLAND BEYOND CONCRETE BOLLARD SEE DETAIL 9, SHEET SD1 3/4" WATER SUPPLY FROM "SITE WATER SUPPLY" LINE FILL WITH LOOSE GRAVEL AROUND VALVE BODY FOR DRAINAGE COMPACTED SUBGRADE 9" #3 REBAR @ 16" O.C. (USE FOR ALL BACKING WIDTHS) 3/4" RADIUS HAND TOOLED 1 34" RADIUS HAND TOOLED 2'-3" 9" 2" 11 " 6" M I N 5" 3" 3" EQ EQ 3" #3 REBARS @ 16" O.C. EACH WAY W/ 14" LAPSPLICE 1'-6" 6" M I N TO 7 12" 312" 3" 3" 12" LONG #3 REBAR SPACED @ 36" O.C. CENTERED WITH JOINT. AGGREGATE BASE COMPACTED SUBGRADE CATCH CURB DETAIL @ CONCRETE SLAB 12" MIN NTS 1 SD1 SHED CURB DETAIL @ CONCRETE SLAB NTS 2 SD1 NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 9A, SHEET SD3. 4.VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 5.USE THIS DETAIL WHEN ADJACENT PAVEMENT SLOPES AWAY FROM CURBING. AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION 3/4" RADIUS HAND TOOLED 1 34" RADIUS HAND TOOLED 9" 2" 11 1 2" 612" 5" 3" 3" EQ EQ 3" 1'-6" 6" 3" 3" AGGREGATE BASE COMPACTED SUBGRADE 12" MIN AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION TANK AREA CURB DETAIL NTS 3 SD1 CONCRETE BACKING FOR ON-SITE CURB NTS 5 SD1 AGGREGATE BASE CURB TRANSITION DETAILS NTS 6 SD1 12" 8" MIN 12" 8" MIN 2'-3 " TA P E R 8" MIN 18" 25" 2" 7" 6" 6" 27" SEE SITE PLAN FOR EXACT LOCATIONS CURB LAYOUT PLAN VIEW NTS 7 SD1 45° TAPER 2' CONC. BACKING SEE DETAIL 4 SHEET SD11' CONC. BACKING SEE DETAIL 4 SHEET SD1 CONCRETE BACKING & PAINT DETAIL NTS 8 SD1 CLEANOUTS IN 2'x2' CONC. PAD AGGREGATE BASE CLEANOUTS IN 2'x2' CONC. PAD PVC CHASE DETAIL NTS 9 SD1 1 SD3 CANOPY BOLLARD DETAIL NTS 10 SD1 REMOVE TOP PORTION OF FOAM PLANK, INSTALL BACKER ROD AND THEN SEALANT SIMILAR TO DETAIL 9B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. AIR/VAC SERVICE DETAIL NTS 11 SD1 YARD HYDRANT DETAIL NTS 12 SD1 3/4" WATER SUPPLY FROM "SITE WATER SUPPLY" LINE FILTER FABRIC 3"8" MIN AGGREGATE BASE TO EXTEND PAST CURB BACKING DURING INSTALLATION 12" LONG #3 REBAR SPACED @ 36" O.C. CENTERED WITH JOINT. WHEN WATER FLOWS AWAY FROM CURB, SLOPE OF GUTTER TO MATCH SLOPE OF ADJACENT PAVEMENT. 1 12 SEE DETAIL 3, SHEET SD1 FROST LINE 3/4" FEMALE PIPE THREAD 2'- 0 " TO T O P OF V A L V E AGGREGATE BASE 1/8" NPT DRAIN HOLE 1'-51116" #4 REBARS #4 REBAR #4 REBARS #4 REBAR 1" O F C O N C . AB O V E G R A D E 5" O F C O N C . BE L O W G R A D E 1" O F C O N C . AB O V E G R A D E TOP VIEW NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 9A, SHEET SD3. 4.VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 8" M I N 6" SLOPE OF CURB TO MATCH ADJACENT PAVEMENT CONCRETE PAVEMENT SE E P L A N FO R PA V E M E N T TH I C K N E S S 3"12" MIN COMPACTED SUBGRADE AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION AGGREGATE BASE 3" 512"512" NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 9A, SHEET SD3. VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 4.THIS CURB TYPE IS TO BE USED ALONG THE CURB LINE ADJACENT TO THE DRIVEWAY TRENCH DRAINS. SEE PLAN FOR LOCATIONS. MONOLITHIC CURB DETAIL NTS 4 SD1 REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 9B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, SEE DETAIL3B, SHEET SD3 (TYP). REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 9B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, SEE DETAIL 3B, SHEET SD3 (TYP). 3/4" COUPLING SEE DETAILS 1 & 2, SHEET SD1 FOR INFORMATION NOT SHOWN SLOPE OF CURB TO MATCH ADJACENT PAVEMENT SEE DETAILS 1 & 2, SHEET SD1 FOR INFORMATION NOT SHOWN #3 REBARS @ 16" O.C. EACH WAY W/ 14" LAPSPLICE #3 REBARS @ 16" O.C. EACH WAY W/ 24" LAPSPLICE #3 REBARS @ 16" O.C. EACH WAY W/ 14" LAPSPLICE COMPACTED SUBGRADE 12" MIN MAILBOX LOCATION TO BE COORDINATED BY GC. SEE NOTE #3 RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 PARKING STRIPED TO BE USTC ACRYLIC AKLYD CO POLYMER 'SUPREME PAINT', YELLOW SEE NOTES FOR ALT. ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 SD2 SEE PAVING PLAN FOR REINFORCEMENT C ISOLATION JOINT EQ EQ 2'-0" MIN 1'-0" #4 STIRRUPS @ 18" O.C. AQUADUCT TRENCH DRAIN (TYP.) #4 @ 18" O.C. TRANSVERSE BARS CANOPY DECK 9" UP T O 1 8 " 8" UP T O 3 6 " L 1' - 0 " #4 CONT. @ 12" O.C. 3" CL R #4 CONT. @ 6" O.C. ENSURE TOP LONGITUDINAL BARS ARE ON TOP AS SHOWN ENSURE TOP SURFACE IS CLEAN AND FREE OF LAITANCE IMMEDIATELY PRIOR TO PLACING PAVEMENT CONCRETE. CANOPY DECK UP T O 2 4 " 9" 9" 10 " 10 " NTS 4 SD2 GREASE TRAP (1500 GALLON CAPACITY) & SAMPLE WELL DETAILS OR "APPROVED EQUAL" INITIAL CONCRETE PLACEMENT NTS 5 SD2 TYP. CONCRETE DETAIL FOR AQUADUCT TRENCH DRAIN 3" C L R INSTALL FOAM OR WOOD BRACING PRIOR TO CONCRETE POUR 1'-0 " 2" C L R C ISOLATION JOINT L 2'-0" MIN 2" CLR SE E P A V I N G P L A N FO R P A V E M E N T TH I C K N E S S SEE PAVING PLAN FOR REINFORCEMENT NOTES: 1.G.C. MUST READ INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION OF AQUADUCT TRENCH DRAIN. 2.REFER TO DETAIL 6, SHEET SD2 FOR BRACING RECOMMENDATIONS. 4.SOME PROJECTS MAY HAVE MULTIPLE TRENCH DRAINS ON SITE. (REFER TO "GRADING PLAN" FOR EXACT LOCATIONS.) 5.EACH TRENCH DRAIN IS INDIVIDUALLY DESIGNED AND SIZED BY AQUADUCT, INC. (REFERE TO DESIGN SPECS FOR EXACT SIZING.) UP T O 1 2 " NO BRACING REQUIRED NTS 6 SD2 AQUADUCT TRENCH DRAIN BRACING LAYOUT DETAILS NOTE: 1.FOR TRENCH DRAINS OVER 36" IN DEPTH, ADD AN ADDITIONAL LEVEL OF BRACING FOR EACH ADDITIONAL 12" OF DEPTH. 2X4 @ 18" O.C. (TYP.) 1X6, CONTINUOUS (TYP.) 1X6, CONTINUOUS (TYP.) 1X6, CONTINUOUS (TYP.) 2X4 @ 18" O.C. (TYP.) 2X4 @ 18" O.C. (TYP.) ISOLATION JOINT SEE DETAIL 5, SHEET SD3 FOR INFORMATION NOT SHOWN ISOLATION JOINT SEE DETAIL 5A, SHEET SD3 FOR INFORMATION NOT SHOWN 3/4" X 10" SQUARE DOWEL AT 24" O.C. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL 1/2" FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 9B, SHEET SD3 (TYP). PNA SQUARE DOWEL CLIP AGGREGATE BASE ELEVATION PLAN VIEW 6" VENT SLEEVE DATE MANUFACTURED MODEL: GT-1 OUTLET SAMPLE WELL SEWER LINE C-1613MEMBER EA FSS RTI A SSS NE EEE IE GR I AN S I O 5 6 I NE 0 0-5 -068 4 1 QU M TNE O C 4" VENT W FL2 WWW.PARK-USA.COM Z1001 120V GREASE INTERCEPTOR SCHEDULE LIQUID SURFACE GRADE CONCRETE EXTENSION MFG: ParkUSA NAMEPLATE INDICATING: 888-611-PARK INLET GREASE TRAP R NAS M E SS A AAA Y SE IG N N CCO Y ET EPA Park 2012 C INTERCEPTOR 8 0 0-2 -8 0 4 1 P A R K EQU PM T C O INTERCEPTOR 8 2 P A R K E IP 4" VENT H FL1 L R OTHER SIZES ARE AVAILABLE. CONTACT RACETRAC FOR MORE INFORMATION. ENGINEERING DATA: THE GREASE INTERCEPTOR IS STRUCTURALLY & HYDRAULICALLY ENGINEERED TO CONFORM TO REGIONAL PLUMBING CODES RECOMMENDED IN MOST CITIES. CONSULT WITH LOCAL AUTHORITIES FOR SPECIFIC APPLICATION REQUIREMENTS. SHOP DRAWINGS SHALL INCLUDE COMPLETE STRUCTURAL AND BUOYANCY CALCULATIONS CERTIFIED BY A LICENSED PROFESSIONAL ENGINEER. CONSULT WITH PARK EQUIPMENT COMPANY FOR EXACT EXCAVATION DIMENSIONS & SHIPPING INFORMATION. TYPICAL APPLICATIONS INCLUDE COMMERCIAL AND INDUSTRIAL FOOD SERVICE KITCHENS WHERE EXCESSIVE GREASE MAY INTERFERE WITH THE PROPER DRAINAGE OF THE SEWER SYSTEM. THE GREASE INTERCEPTOR IS GENERALLY BURIED BELOW GRADE FOR GRAVITY FLOW SEWER SYSTEMS. A SAMPLE WELL IS UTILIZED ON THE OUTLET SIDE FOR SAMPLING BY THE LOCAL WATER AUTHORITY. SPECIFICATIONS: CONCRETE: CLASS II CONCRETE WITH DESIGN STRENGTH OF 4500 PSI AT 28 DAYS. UNIT IS OF MONOLITHIC CONSTRUCTION AT FLOOR, FIRST STAGE OF WALL AND BAFFLE WITH SECTIONAL RISER TO REQUIRED DEPTH. (MONOLITHIC BAFFLE REQUIRED. SLIDE-IN TYPE IS NOT ACCEPTABLE). REINFORCEMENTS: GRADE 60 REINFORCEMENT WITH STEEL REBAR CONFORMING TO ASTM A615 ON REQUIRED CENTERS OR EQUAL. C.I. CASTINGS: MANHOLE FRAMES, COVERS OR GRATES ARE MANUFACTURED OF GRAY CAST IRON CONFORMING TO ASTM A48-76 CLASS 30. MANHOLE SHALL BE NOMINAL 24 INCH DIAMETER AND BE TRAFFIC DUTY. MODEL NO. CAPACITY USGAL GREASE CAP. (LBS) EMPTY WT (LBS) LENGTH L WIDTH W HEIGHT H OUTLET FL2 INLET FL1 GT-1500 1,500 3,500 16,050 9'-2"5'-8"7'-0"5'-9"5'-6" NOTE: 1.ENGINEER OF RECORD APPROVAL REQUIRED FOR "APPROVED EQUAL". 120V FROM KITCHEN WASTE INLET AND OUTLET PIPING PROVIDED BY OTHERS. TO PUBLIC SEWER SYSTEM PRECAST CONCRETE INTERCEPTOR GALVANIZED RISER SUPPORT (TYPICAL) INTERIOR EPOXY LINER 6" PVC DOUBLE TEE MANIFOLD MONOLITHIC BAFFLE GREASE SENSOR CAST IRON FRAME & COVER (TYP-2) CABLE & CONDUIT ROUTED TO ALARM PANEL BY OTHERS "SERVICE ALERT PANEL" NOTIFIES OF GREASE MAXIMUM CAPACITY w/ AUDIBLE & VISUAL ALARM TO SANITARY SEWER FROM KITCHEN WASTE NTS 3 SD2 CONDUIT PENETRATION DETAIL SEAL CANOPY DECK PENETRATION CANOPY COLUMN CONTINUOUS THROUGH DECKING 1/2" RIGID CONDUIT ON CANOPY RED-IRON COLUMN WRAP REFER TO C100 FUEL CANOPY PLAN & ELEVATIONS FOR EXACT MATERIAL 1.LIGHT POLES SHALL MEET 139 MPH WIND (Vasd); 180 MPH (Vult). 2.CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH (F'c) OF 3,500 PSI FOR ALL LIGHT POLE FOOTINGS. 3.ALL REINFORCING STEEL SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL CONFORMING TO ASTM A-615 GRADE 60. NOTES: 1.LIGHT POLES TO BE SPALDING, PROVIDED BY RACETRAC AND TO BE INSTALLED BY GENERAL CONTRACTOR. SEE SITE PLAN FOR POLE LOCATIONS. 2.LIGHT FIXTURES TO BE CREE "EDGE" HIGH OUTPUT AREA LUMINAIRE WITH A MAXIMUM EFFECTIVE PROJECTED AREA OF 2.0 S.F. (REFER TO "PHOTOMETRIC PLAN" FOR DETAILS). ONE LIGHT FIXTURE PER POLE. 3.WIND DESIGN CRITERIA BASED ON THE FOLLOWING: A.ASCE 7-10 B.Vult=180 MPH WITH EXPOSURE C RISK CATEGORY II C.Vasd=139 MPH D.IMPORTANCE FACTOR I = 1.0 E.DESIGN WIND PRESSURE = 81.6 PSF 1.LIGHT POLES SHALL MEET 139 MPH WIND (Vasd); 180 MPH (Vult). 2.CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH (F'c) OF 3,500 PSI FOR ALL LIGHT POLE FOOTINGS. 3.ALL REINFORCING STEEL SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL CONFORMING TO ASTM A-615 GRADE 60. 4.CONCRETE ABOVE FINISH GRADE TO BE SMOOTH WITH RUBBED FINISH. 5.CONCRETE LIGHT POLE BASES TO BE PAINTED TO MATCH BOLLARD. 6" #6 COPPER WIRE TIED TO BASE OF NUT ANCHOR BOLTS DESIGNED AND PROVIDED BY MANUFACTURER, TYP. (CENTER ANCHOR BOLTS ON BASE POST) FINISH GRADE COMPACTED SUBGRADE TO P O F G R O U N D RO D T O B E 1 2 " BE L O W G R A D E 10'-0" LONG #3 REBAR (LIGHTING GROUND ROD) 24" 3' - 0 " 5' (TYP.) UNLESS NOTED ON SITE PLAN CL EIGHT (8) #6 VERT. BARS W/ #3 TIES @ 14" O.C. 3" CL R 3" CLR 1" CONDUIT 2'- 0 " (R E F E R T O " P H O T O M E T R I C P L A N " FO R E X A C T H E I G H T ) 28 ' - 0 " M A X . T O T O P O F P O L E . (R E F E R T O " P H O T O M E T R I C P L A N " FO R E X A C T H E I G H T ) 9' - 0 " M I N . E M B E D M E N T 2' - 6 " 12.75" O.D., 0.25" WALL STEEL TUBE FURNISHED AND INSTALLED BY G.C. BASE POSTS TO BE PLUMB AND ALIGNED IN A STRAIGHT LINE, FILLED WITH CONCRETE AND TOPS TO BE GROUND SMOOTH WITH SQUARE EDGE, THEN PRIMED WITH "END RUST" BY DURO AND PAINTED WITH INDUSTRIAL, OIL BASED, ENAMEL. COLOR TO MATCH CANOPY COLUMNS. #6 COPPER WIRE TIED TO BASE OF NUT. COVER PLATE TO FACE STORE (TYP). TOP OF GROUND ROD TO BE 12" BELOW GRADE 1" CONDUIT 10 ' - 0 " ' ( R E F E R T O "P H O T O M E T R I C P L A N " FO R E X A C T H E I G H T ) 4' - 0 " M I N . EM B E D M E N T 30 34" 12 3 4" ANCHOR BOLTS DESIGNED AND PROVIDED BY MANUFACTURER, TYP. (CENTER ANCHOR BOLTS ON BASE POST)JOINT SEE DETAIL 12A, SHEET SD4. CL #3 REBAR CONTINUOUS WITH 12" LAP SPLICE SEE DETAIL 11A, SHEET SD4 3" CLR 12 BUILDING SIDEWALK CONCRETE TURNDOWN DEPTH OF SIDEWALK TO MATCH DEPTH OF PARKING PAVEMENT NOTES: 1.LIGHT POLES TO BE AAL, PROVIDED BY RACETRAC AND TO BE INSTALLED BY GENERAL CONTRACTOR. SEE SITE PLAN FOR POLE LOCATIONS. 2.LIGHT FIXTURES TO BE AAL - SPECTRA SP2 AREA LIGHTING MODEL STR-Y4-2050 FCO-MOD (KB6-12LED)-DB-POST TOP MOUNT WITH A MAXIMUM EFFECTIVE PROJECTED AREA OF 0.63 S.F. (REFER TO "PHOTOMETRIC PLAN" FOR DETAILS). ONE LIGHT FIXTURE PER POLE. 3.WIND DESIGN CRITERIA BASED ON THE FOLLOWING: A.ASCE 7-10 B.Vult=180 MPH WITH EXPOSURE C RISK CATEGORY II C.Vasd=139 MPH D.IMPORTANCE FACTOR I = 1.0 E.DESIGN WIND PRESSURE = 42.8 PSF 7 SD2 DECORATIVE LIGHTING SECTION 180 MPH WIND (VULT)10'-0" LONG #3 BAR (LIGHTING GROUND ROD) 8 SD2 SITE LIGHTING SECTION 180 MPH WIND (VULT) EMBEDDED SQUARE DOWEL POCKET FORMER WITH DIAMOND DOWEL PLATE, SEE DETAIL 2, SHEET SD3 REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3 (TYP). SEALANT TO BE FLUSH WITH TOP OF PAVEMENT 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, WRAPPED AROUND BOLLARD TO ENSURE COMPLETE SEPARATION OF CONCRETE AND BOLLARD. SEE DETAIL 3B,. SHEET SD3 (TYP) DISPENSER ISLAND DETAIL NTS 1 SD2 CANOPY ACCESSORIES LAYOUT NTS 2 SD2 STORE SIDE STREET SIDE 3/4" RIGID CONDUIT FROM STORE TO CANOPY FOR SPEAKER WIRE & CAMERA CONDUIT. RUN UP COLUMN AND THRU DECK; SEAL PENETRATION. 123456789101112 WASH BUCKET SPEAKER 1/2" RIGID CONDUIT ON CANOPY STEEL TO EACH SPEAKER LOCATION. YARD HYDRANT DETAIL 12, SHEET SD1 TRASH CAN (TYP) NOTES: 1.SINGLE ROW OF EIGHT (8) SINGLE COLUMN MPD'S. 2.SIXTEEN (16) FUELING POSITIONS. 3.REFER TO CANOPY PLANS FOR CANOPY DIMENSIONS AND COLUMN LOCATIONS. 4.CONDUIT TO BE DRILLED AND RUN THROUGH COLUMN SPEAKERSPEAKER WASH BUCKET WASH BUCKET WASH BUCKET WASH BUCKET WASH BUCKET 1314 SPEAKER WASH BUCKET 1516 WASH BUCKET CANOPY TWO 1" SPARE RIGID CONDUITS IN ADDITION TO CONDUITS SHOWN IN ELECTRICAL PLANS YARD HYDRANT DETAIL 12, SHEET SD1 TRASH CAN (TYP.) SEE SITE PLAN FOR LOCATIONS PRODUCT DISPENSER 12' - 7" 4' - 4"2'5' 9" 1'- 6 " 9" 1'-3" 2'- 6 " 10' - 7" CONCRETE BOLLARD DETAIL 10, SHEET SD1 (TYP) CANOPY COLUMN NOTE: ISLAND TO SIT 2"-MIN / 4"-MAX FROM EXISTING GRADE max 4" min 2" ISOLATION JOINT SEE DETAIL 5, SHEET SD3 FOR INFORMATION NOT SHOWN MPD EXISTING GRADE 3' - 6" MIN 5% MAX 4 5 % MIN 5 % MAX 4 5 % 9"± FLOAT ISLAND LATERALLY TO MAINTAIN SLOPE STANDARDS IN REFERENCE TO CONCRETE SLUMP 9"± FLOAT ISLAND LATERALLY TO MAINTAIN SLOPE STANDARDS IN REFERENCE TO CONCRETE SLUMP RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 CONSTRUCTION, CONTRACTION OR ISOLATION JOINT. SEE DETAILS 3, 4 OR 5, SHEET SD3 FOR INFORMATION. DO NOT LET REINFORCEMENT CROSS JOINT (TYP) 2 - #4 1-1/2" CLR FROM TOP 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, WRAPPED AROUND PENETRATION, FULL DEPTH OF PAVEMENT. REMOVE ZIP STRIP AND FILL WITH SEALANT. SIMILAR TO DETAIL 9B, SHEET SD3 WITH SEALANT FLUSH WITH TOP PAVEMENT. PAVEMENT PENETRATION NOTE TO CIVIL ENGINEERING COMPANY TYPICALLY USE "MODERATE" EXPOSURE FROM TABLE. CONTACT EPM IF EXPOSURE CLASS SHOULD BE CHANGED. ISOLATION JOINT CL GENERAL CONCRETE PAVEMENT NOTES 1.REVIEW AND VERIFY ALL AS-BUILT CONDITIONS WHICH AFFECT NEW CONSTRUCTION PRIOR TO SUBMISSION OF SHOP DRAWINGS AND ANY FABRICATION. 2.INDUSTRY STANDARDS GOVERNING THIS WORK ARE OF THE LATEST ISSUE AT THE DATE OF THIS DRAWING RELEASE. 3.ENSURE STORAGE, HANDLING, PREPARATION, INSTALLATION, ETC. OF ALL MATERIALS ARE IN ACCORDANCE WITH MANUFACTURER'S / VENDOR'S PRINTED RECOMMENDATIONS AND INSTRUCTIONS. PAVEMENT SUBGRADE AND BASE NOTES 1.ENSURE TESTING AGENCY VERIFIES THE SUBGRADE IS COMPACTED TO THE SPECIFIED MAXIMUM DRY DENSITY AS DETERMINED BY THE GEOTECHNICAL ENGINEER. RECOMPACT SOFT AREAS AS DIRECTED BY THE GEOTECHNICAL ENGINEER. TESTING AGENCY TO PROVIDE A LETTER REPORT TO THE OWNER'S REPRESENTATIVE STATING THAT THE SUBGRADE HAS BEEN PROPERLY COMPACTED. 2.ENSURE TESTING AGENCY EVALUATES THE SUBGRADE BY PROOF-ROLLING. PROOF ROLLING TO BE DONE BY A FULLY LOADED TANDEM-AXLE DUMP TRUCK OR OTHER EQUIVALENTLY WHEELED VEHICLE ACCEPTABLE TO THE TESTING AGENCY. REPAIR SOFT AREAS THAT DEPRESS DEEPER THAN 1/2 INCH AS DIRECTED BY THE TESTING AGENCY. TESTING AGENCY TO PROVIDE A LETTER REPORT TO THE OWNER'S REPRESENTATIVE STATING THE SUBGRADE HAS BEEN PROOF-ROLLED AND IS ACCEPTABLE. ** DO NOT PROOF-ROLL ON TOP OF OR WITHIN 5 FEET OF THE EDGE OF THE UNDERGROUND STORAGE TANK LOCATIONS. A.IF APPLICABLE, THIS PROCESS SHOULD BE IMPLEMENTED AFTER COMPLETION OF THE ROUGH GRADING AND SHOULD BE REPEATED BEFORE THE PLACEMENT OF THE SLAB. B.IF RUTTING OR PUMPING IS EVIDENT AT ANY TIME DURING PREPARATION OF THE SUBGRADE, SUBBASE, BASE ROLLING, OR SLAB PLACEMENT, CORRECTIVE ACTION SHOULD BE TAKEN. FULL SOIL SUPPORT HAS BEEN ACHIEVED IF THE ROLLED AREA IS OBSERVED TO BE FIRM AND UNYIELDING, WITH NO DEPRESSIONS GREATER THAN 1/2 IN. RUTTING NORMALLY OCCURS WHEN THE SURFACE OF THE BASE OR SUBBASE IS WET, GREATER THAN THREE PERCENTAGE POINTS ABOVE OPTIMUM MOISTURE CONTENT, AND THE UNDERLYING SOILS OR SUBGRADE ARE FIRM. PUMPING NORMALLY OCCURS WHEN THE SURFACE OF THE BASE OR SUBBASE IS DRY AND THE UNDERLYING SOILS ARE WET. C.REPAIRS SHOULD INCLUDE, BUT NOT BE LIMITED TO, RAKING SMOOTH OR CONSOLIDATING WITH SUITABLE COMPACTION EQUIPMENT. 3.AGGREGATE BASE MATERIAL: A.COARSE AGGREGATE BASE: CRUSHER RUN WITH ROCK FINES. USE ASTM D448, NO. 467, 57 OR 67 BLEND ONLY IF NOTED OR ALLOWED. B.FINE AGGREGATE BASE: CLEAN SCREENINGS ASTM D 448, NO. 10 WITH 6% TO 12% PASSING NO. 200 SIEVE. 5.AGGREGATE BASE MATERIAL INSTALLATION: A.COMPACT COARSE AGGREGATE BASE TO FINAL THICKNESS SHOWN IN LAYERS NOT EXCEEDING 6 INCHES, WITH MINIMUM OF 2 PASSES PER LAYER WITH A VIBRATORY COMPACTOR. B.COMPACT BASE TO THE SPECIFIED MAXIMUM DRY DENSITY AS DETERMINED BY THE GEOTECHNICAL ENGINEER. C.CHOKE-OFF TOP SURFACE OF COARSE AGGREGATE BASE WITH FINE AGGREGATE BASE MATERIAL DUE TO THE FOLLOWING: C.1.AS REQUIRED TO MEET FINE GRADE ELEVATION TOLERANCES SPECIFIED. C.2.WHERE COARSE AGGREGATE BASE MATERIAL DOES NOT HAVE SUFFICIENT FINE PARTICLES TO PRODUCE A SURFACE THAT IS FREE OF EXPOSED AGGREGATE OR SURFACE VOIDS IMMEDIATELY PRIOR TO PAVEMENT INSTALLATIONS. D.COMPACT FINE AGGREGATE BASE CHOKE-OFF LAYER WITH A MINIMUM OF 2 PASSES WITH A VIBRATORY COMPACTOR. E.TOP SURFACE OF BASE MATERIAL TO BE DRY, SMOOTH, FLAT, DENSE SURFACE IMMEDIATELY BEFORE PLACING CONCRETE. 6.ENSURE TESTING AGENCY VERIFIES AGGREGATE BASE IS COMPACTED TO THE SPECIFIED MAXIMUM DRY DENSITY AS DETERMINED BY THE GEOTECHNICAL ENGINEER IMMEDIATELY PRIOR TO PLACING PAVEMENT. TESTING AGENCY TO PROVIDE LETTER REPORT TO OWNER'S REPRESENTATIVE STATING THE BASE IS ACCEPTABLE. 7.NOTIFY THE OWNER'S REPRESENTATIVE IMMEDIATELY IF UNUSUAL SOIL CONDITIONS ARE FOUND. 8.PROTECT EXISTING STRUCTURES, UTILITIES, PROPERTY CORNERS, ETC. RESTORE ALL ITEMS DAMAGED, AS REQUIRED BY OWNER, AT NO COST TO OWNER OR WITHOUT EXTENSION OF CONTRACT TIME. ** DO NOT ALLOW STORED EXCAVATION MATERIAL TO DISRUPT PROPER DRAINAGE OF AREA, DAMAGE TO SURROUNDING AREAS, OR STAIN ADJACENT CONCRETE. 9.DISPOSE OF EXCAVATED MATERIAL AS REQUIRED BY OWNER'S REPRESENTATIVE. CONCRETE PAVEMENT NOTES: 1.CONFORM TO ACI 318 AND 117 FOR THE DESIGN AND PLACEMENT OF CONCRETE, REINFORCING, AND RELATED ITEMS. 2.CONFORM TO ACI 306.1 FOR COLD WEATHER CONCRETING AND ACI 305R WHEN ANY COMBINATION OF HIGH TEMPERATURE, LOW RELATIVE HUMIDITY, AND WIND VELOCITY TEND TO IMPAIR THE QUALITY OF THE CONCRETE. REJECT CONCRETE IF ITS TEMPERATURE AT TIME OF PLACEMENT IS 90 DEGREES FAHRENHEIT (°F) OR ABOVE. PROTECT SURFACES OF EXPOSED CONCRETE FROM PRECIPITATION DAMAGE UNTIL ADEQUATE STRENGTH IS GAINED TO PREVENT DAMAGE. A.MINIMUM CONDITIONS FOR CONCRETE PLACEMENT- ·AMBIENT CONDITIONS - 35° AND RISING ·AGGREGATE BASE TEMP - 45° AND RISING ·CONCRETE TEMPERATURE - 65° (+/- 5°) ·CURE APPLICATION - 45° AND RISING 3.CONFORM TO ACI 302.1R, 304R, 308, 309R AND 347R FOR CONCRETE, FORM WORK, CURING, AND RELATED ITEMS. CONFORM TO CRSI MANUAL OF STANDARD PRACTICE AND CRSI PLACING REINFORCING BARS FOR PLACING REINFORCING. 4.PROVIDE A MINIMUM CONCRETE COMPRESSIVE STRENGTH AT 28 DAYS OF 3500 psi. 5.PROVIDE A MINIMUM CEMENTITIOUS CONTENT IN ACCORDANCE WITH ACI 302.1R AND A MAXIMUM WATER/CEMENTITIOUS RATIO OF 0.50. MEASURE AND MIX CONCRETE IN ACCORDANCE WITH ACI 211.1. AIR ENTRAIN CONCRETE EXPOSED TO THE WEATHER. USE SLUMP OF FIVE INCHES (+1/2 INCH, -ONE INCH). 6.SUBMIT FOR APPROVAL MIX DESIGNS AND TEST RESULTS FOR COMPRESSIVE STRENGTH, SLUMP, AND AIR ENTRAINMENT. INCLUDE STANDARD DEVIATIONS AND AVERAGE COMPRESSIVE STRENGTHS FOR FIELD DATA. INCLUDE BRAND NAME AND CHEMICAL COMPOSITION OF ALL ADMIXTURES. INCLUDE AGGREGATE TYPE, SOURCE, AND AGGREGATE GRADATION WITH PERCENT RETAINED ON EACH SIEVE FOR EACH AGGREGATE SIZE GROUP AND TOTAL COMBINED FOR ALL SIZE GROUPS. SUBMIT 14 DAYS MINIMUM PRIOR TO USE. 7.MIX AND TRANSPORT READY-MIXED CONCRETE IN ACCORDANCE WITH ASTM C94, EXCEPT REDUCE MAXIMUM DISCHARGE TIME TO 75 AND 60 MINUTES FOR AIR TEMPERATURES OF 85-90 AND 90 F, RESPECTIVELY. 8.THE OWNER'S TESTING AGENCY WILL TEST SAMPLES OF CONCRETE FOR COMPRESSIVE STRENGTH, AIR ENTRAINMENT, SLUMP, DENSITY (UNIT WEIGHT) AND TEMPERATURE IN ACCORDANCE WITH ASTM C31, C39 AND C138 FROM THE FIRST TRUCK EACH DAY AND THEN EACH 100 CUBIC YARDS FOR EACH TYPE OF CONCRETE PLACED PER DAY, BUT NOT LESS THAN ONCE FOR EACH DAY OF CONCRETE PLACEMENT. WHEN ABOVE SCHEDULE PROVIDES LESS THAN FIVE TESTS PER TYPE OF CONCRETE, TEST FIVE RANDOM BATCHES. IF FEWER THAN 5 BATCHES ARE USED, TEST EACH BATCH. IF CONCRETE IS PUMPED, ENSURE TEST SAMPLES ARE TAKEN AT THE POINT OF PLACEMENT. EACH COMPRESSIVE TEST SHALL CONSIST OF FOUR TEST CYLINDERS TO BE TESTED AS FOLLOWS: ONE AT SEVEN DAYS, TWO AT 28 DAYS, ONE RESERVE. 9.CONFORM TO THE FOLLOWING: A.CEMENT: ASTM C 150. 1. TYPE I-II, II OR TYPE I CEMENT WITH MAXIMUM C3A CONTENT OF 8%. B.AGGREGATES: 1.ASTM C33, SUBJECT TO SEVERE WEATHERING AND ABRASION, SURFACE APPEARANCE IS IMPORTANT. 2.OF TOTAL COMBINED COARSE AND FINE AGGREGATES PER MIX DESIGN, DO NOT ALLOW MATERIAL RETAINED ON ANY ONE SIEVE TO BE LESS THAN 6% NOR MORE THAN 24% OF TOTAL BY WEIGHT, EXCEPT: (1)LARGEST COARSE AGGREGATE SIZE TO BE #4 STONE. RETAIN 1% TO 8% OF TOTAL COMBINED AGGREGATES PER MIX DESIGN ON LARGEST SIEVE WITH RETAINED AGGREGATE. (2)NO. 30 AND 50 SIEVES TO BE 6% TO 15%. (3)NO. 100 SIEVE TO BE 2% TO 5%. 3.GRADATION REQUIREMENTS OF ASTM C33 MAY BE WAIVED, IF ALLOWED BY ENGINEER, IN ORDER TO MEET 6% - 24% RANGE NOTED ABOVE. C.WATER: CLEAN AND POTABLE. D.AIR ENTRAINMENT: ASTM C260. E.WATER-REDUCER: ASTM C494, TYPE A, OR D IF APPROVED. NON-CHLORIDE TYPE. F.RETARDER: ASTM C494, TYPE B OR D. G.ACCELERATOR: ASTM C494, TYPE C OR E. NON-CHLORIDE AND NON-THIOCYANATE TYPE. H.FLY ASH: ASTM C 618, CLASS C OR F, EXCEPT LOSS ON IGNITION NOT TO EXCEED 3%. I.SLAG: ASTM C989, GRADE 100 MINIMUM. J.AGGREGATE BASE: CRUSHER RUN WITH ROCK FINES COMPACT WITH A MINIMUM OF TWO PASSES WITH A SMOOTH VIBRATORY COMPACTOR. K.JOINT BACK-UP MATERIAL: POLYETHYLENE FOAM, 100% CLOSED CELL. L.FIRM PREFORMED JOINT FILLER (PJF): ASTM D 1751, NONEXTRUDING, USE FULL DEPTH OF CONCRETE. M.SOFT PREFORMED JOINT FILER: “EXPANSION-JOINT FILLER” BY SONNEBORN, “DECK-O-FOAM” BY W. R. MEADOWS, OR “CERAMAR” FLEXIBLE FOAM BY W. R. MEADOWS. USE FULL DEPTH OF CONCRETE. N.EVAPORATION RETARDANT: “EUCO-BAR” BY EUCLID, “CONFILM” BY MASTER BUILDERS OR AQUAFILM BY DAYTON SUPERIOR O.LOAD PLATE DOWELS AND CLIPS: PNA, 1-800-542-0214 P.DIAMOND DOWELS AND POCKET FORMERS: DIAMOND DOWEL SYSTEM BY PNA. 1-800-542-0214, SPEED PLATE SYSTEM BY GREENSTREAK GROUP, INC 1-800-325-9504. Q.PAVEMENT SEALANT: DOW 888 BY DOW CORNING, 301 NS BY PECORA, SPECTRUM 800 OR 900 BY TREMCO. R.LIQUID CURING AND SEALING COMPOUND: ASTM C1315, TYPE I, STYRENE ACRYLATE OR METHACRYLATE TYPE, 29% MINIMUM SOLIDS CONTENT, CLEAR, NON-YELLOWING, STYRENE BUTADIENE NOT ALLOWED AS PART OF BLEND. S.REBAR SUPPORT DEVICES: CRSI MANUAL OF STANDARD PRACTICE. 10.DO NOT USE MANUFACTURED SAND EXCEPT AS A BLEND WITH NATURAL SAND AND/OR AS APPROVED BY ENGINEER. 11.IF POZZOLAN IS APPROVED, ENSURE WEIGHT OF POZZOLAN DIVIDED BY SUM OF CEMENT AND POZZOLAN WEIGHTS IS AT LEAST 15% AND DOES NOT EXCEED FOLLOWING: A.FLY ASH: CLASS C FLY ASH: 25%. CLASS F FLY ASH: 20%. B.SLAG: 30% 12.DO NOT USE CALCIUM CHLORIDE AS PART OF ADMIXTURE OR BY ITSELF. 13.ENSURE REINFORCING BARS CONFORM TO ASTM A615 GRADE 60, DEFORMED 14.THE GEOTECHNICAL ENGINEERING REPORT INDICATES THAT THE SOILS ON-SITE HAVE A XXXXXXXX SULFATE EXPOSURE. WHERE IMPORTED FILL OR BASE MATERIALS ARE IN CONTACT WITH CONCRETE, THE SULFATE CONTENT AND EXPOSURE OF THESE MATERIALS SHALL BE ACQUIRED BY TEST. SUBMIT ALL TEST RESULTS WITH CONCRETE MIX DESIGNS. FAILURE TO PROVIDE SUPPORTING TEST RESULTS FROM AN ACCREDITED TESTING LABORATORY WILL REQUIRE THE CONCRETE MIX TO BE PROPORTIONED FOR VERY SEVERE SULFATE EXPOSURE AT NO ADDITIONAL COST OR DELAY IN THE PROJECT SCHEDULE. 15.CONCRETE SHALL BE PROPORTIONED TO MEET THE PROJECT SPECIFICATIONS AND THE MINIMUM CRITERIA ESTABLISHED IN "TABLE A" (THIS SHEET) BASED ON THE SULFATE EXPOSURE FROM ANY ADJACENT SOILS OR FILL MATERIALS. 16.ADDITIONALLY, EXTERIOR CONCRETE EXPOSED TO FREEZING TEMPERATURES AND/OR SALT OR DEICING CHEMICALS SHALL HAVE AIR ENTRAINMENT AND THE CEMENT CONTENT APPROPRIATE FOR THE EXPECTED EXPOSURE. A.MINIMUM 4500 psi AND A 0.45 w/cm RATIO. AIR ENTRAIN CONCRETE TO PROVIDE 6% (+/ 1.5%) AIR. PROVIDE SLUMP OF FIVE INCHES (+/-ONE INCH) AT POINT OF CONCRETE PLACEMENT. 17.CONCRETE TO MEET DURABILITY REQUIREMENTS OF ACI 301. FREEZING AND THAWING EXPOSURE CATEGORY TO BE [F0] [F1] [F2] [F3], SULFATE EXPOSURE CATEGORY TO BE [S0] [S1] [S2] [S3], AND CORROSION PROTECTION EXPOSURE CATEGORY TO BE [C0] [C1] [C2]. PROVIDE A MINIMUM CONCRETE COMPRESSIVE STRENGTH AT 28 DAYS OF [3500 PSI] [4000 PSI] [4500 PSI] [5000 PSI] WITH MAXIMUM WATER/CEMENTITIOUS RATIO OF [0.55] [0.50] [0.45] [0.40]. 18.ENSURE REINFORCING BARS CONFORM TO ASTM A615 GRADE 60, DEFORMED. 19.PROVIDE CLASS B TENSION LAP SPLICES PER ACI 318, FOR CONCRETE STRENGTH AND BAR LOCATIONS NOTED. 20.MAINTAIN FULL THICKNESS FOR DEPRESSED OR SLOPED PAVEMENTS. 21.** DO NOT ADD WATER OR PLAIN CEMENT TO ANY PAVEMENT SURFACE DURING FINISHING OPERATIONS. 22.PERFORM NO FINISHING OPERATION WHILE WATER IS PRESENT ON PAVEMENT SURFACE. 23.STRIKE OFF CONCRETE TO REQUIRED ELEVATIONS AND IMMEDIATELY START FINISHING/FLATTENING OPERATIONS. ENSURE FINISHING OPERATIONS ARE NO MORE THAN NECESSARY TO REMOVE IRREGULARITIES AND MEET SPECIFIED TOLERANCES. USE A HIGHWAY STRAIGHTEDGE 10-FOOT-WIDE MAXIMUM, UNLESS OTHERWISED ALLOWED BY OWNER'S REPRESENTATIVE, IN ORDER TO CUT OFF HIGH SPOTS AND FILL IN LOW SPOTS. PERFORM FINISHING OPERATIONS AS NECESSARY TO ENSURE PAVEMENT WILL DRAIN WELL. UNIFORMLY FINISH SURFACE TO TEXTURE PREVIOUSLY APPROVED BY OWNER'S REPRESENTATIVE. ** DO NOT ALLOW SURFACE TO DRY DURING FINISHING OPERATIONS AND BEFORE CURING COMPOUND IS APPLIED; USE EVAPORATION RETARDANT AS NECESSARY TO PREVENT SURFACE DRYING AND PLASTIC SHRINKAGE CRACKS. 24.FOR TOLERANCES CONFORM TO ACI 117 AND ACI 347R, EXCEPT AS NOTED BELOW: A.PAVEMENT AGGREGATE BASE FINE GRADE +0, -3/4 INCH. B.MINIMUM PAVEMENT TOLERANCE: -3/4 INCH. C.WHEN COMPUTING THE AVERAGE OF ALL SAMPLES, SAMPLES WITH A THICKNESS MORE THAN ¾ INCH ABOVE THE SPECIFIED THICKNESS SHALL BE ASSUMED TO HAVE A THICKNESS OF 3/4 INCH MORE THAN THE SPECIFIED THICKNESS. D.AVERAGE PAVEMENT THICKNESS TOLERANCE: -0. E.THICKNESS SAMPLES ARE TO BE RANDOMLY LOCATED FROM EACH PAVEMENT PLACEMENT AND NOT EXCEED 1000 SQUARE FEET OF PAVEMENT SURFACE AREA. 25.START SAWING PAVEMENT CONTRACTION JOINTS USING A "SOFF-CUT" SAW, BLADES AND SKID PLATES AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. UNLESS RAVELING OR DISLODGING OCCURS, COMPLETE SAWING OF JOINTS WITHIN THE MAXIMUM ELAPSED TIME LIMIT NOTED BELOW, BUT PREFERABLY LESS. THE SPECIFIED TIME FOR ANY ONE LOCATION STARTS WHEN FINISHING OPERATIONS ARE COMPLETE FOR THAT LOCATION. THE SPECIFIED TEMPERATURE IS THE MAXIMUM AIR TEMPERATURE IN DEGREES FAHRENHEIT (°F) THAT OCCURS WITHIN THE SPECIFIED TIME LIMIT. THE ELAPSED TIME MAY NEED TO BE SHORTENED EVEN MORE IF DRY AND OR WINDY CONDITIONS ARE PRESENT. ENSURE JOINTS ARE CLEANED AFTER SAWING AND REMAIN CLEAN UNTIL SEALED. MAX DEGREES FAHRENHEIT (°F) MAX ELAPSED HOURS 85 AND ABOVE 1 60 - 84 2 50 - 59 3 40 - 49 4 26.START CURING AS SOON AS CONCRETE SURFACE WILL NOT BE DAMAGED BY CURING OPERATIONS. 27.ENSURE PAVEMENT SURFACE IS PROTECTED FROM EQUIPMENT SCRAPES, IMPACT ABRASIONS, STAINS, ETC. REPAIR PAVEMENT SURFACE AS DIRECTED BY OWNER'S REPRESENTATIVE. ENSURE VEHICLES AND EQUIPMENT ARE DIAPERED TO PREVENT OIL OR OTHER FLUID LEAKS FROM STAINING THE PAVEMENT. VEHICLE AND EQUIPMENT TRAFFIC IS PROHIBITED UNTIL THE COMPLETION OF PAVEMENT CURING PERIOD (MINIMUM OF SEVEN CONSECUTIVE DAYS). 28.REFER TO ARCHITECTURAL, MECHANICAL, ELECTRICAL, PROCESS, CIVIL AND VENDOR'S DRAWINGS FOR EMBEDDED ITEMS NOT SHOWN. COORDINATE AND PLACE ALL EMBEDDED ITEMS SHOWN ON THE DRAWINGS OR REQUIRED BY ALL TRADES. 29.PRE-CONSTRUCTION MEETINGS: A.ATTEND PRE-CONSTRUCTION / PLACEMENT MEETING TO BE SCHEDULED AT LEAST 7 DAYS BEFORE STARTING MAIN CONCRETE PAVEMENT. B.ATTENDANCE DESIGNATED BY THE OWNER'S REPRESENTATIVE AND THE FOLLOWING: STRUCTURAL SERVICES INC. REPRESENTATIVE (863-393-4495), TESTING AGENCY, CONTRACTOR, CONCRETE SUPPLIER (INCLUDING QUALITY CONTROL PERSONNEL), AND SUBCONTRACTORS FOR SUBGRADE AND BASE PREPARATION, REINFORCEMENT, PUMPING OR OTHER MEANS OF CONVEYING,PLACEMENT, FINISHING, SAWING, FORMWORK, AND OTHER PERTINENT PORTIONS OF WORK. C.REPRESENTATIVES ARE TO BE PERSONNEL WHO ARE DIRECTLY INVOLVED IN PROJECT AND WHO HAVE AUTHORITY TO CONTROL WORK. SLAB PENETRATIONS DETAIL (SSW, BOLLARD,ETC) NTS 1 SD3 2 - #4 1-1/2" CLR FROM TOP 1" CLR (TYP) 1'-6" (TYP) 3" (MIN) CONSTRUCTION JOINT PARTIAL PLAN DETAIL NTS 4 SD3 NTS 4C SD3 CONSTRUCTION JOINT INTERSECTION PARTIAL PLAN DETAIL #3 X 24" LONG REBAR SPACED AT 16" O.C. CENTERED WITH JOINT. TOP OF PAVEMENT D/ 2 CL CHAIRS REQUIRED FOR REBAR ALIGNMENT DURING CONCRETE PLACEMENT SLAB CONSTRUCTION JOINT SECTION NTS 4A SD3 CONSTRUCTION JOINT SLAB DEPTH = D (SEE PAVING PLAN FOR THICKNESS) SEE PAVING PLAN FOR REINFORCEMENT SLAB CONSTRUCTION JOINT SECTION NTS 4B SD3 CL 3"3" IMMEDIATELY AFTER REMOVING BULKHEAD, APPLY CURING COMPOUND TO PAVEMENT VERTICAL EDGE AT A COVERAGE RATE OF 300 SF MAX PER GALLON. PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. COARSE AGGREGATE BASE SEE PLAN FOR REINFORCEMENT CONSTRUCTION JOINT TOP OF PAVEMENT D/ 2 SLAB DEPTH = D (SEE PAVING PLAN FOR THICKNESS) 5A SD3 24 " 24 " NTS 5 SD3 ISOLATION JOINT PARTIAL PLAN DETAIL 2" CLR 2" CLR SU B G R A D E SU B G R A D E PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. COARSE AGGREGATE BASE ISOLATION JOINT SECTION NTS 5A SD3 CL 3"3" IMMEDIATELY AFTER REMOVING BULKHEAD, APPLY CURING COMPOUND TO PAVEMENT VERTICAL EDGE AT A COVERAGE RATE OF 300 SF MAX PER GALLON. PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. COARSE AGGREGATE BASE ISOLATION JOINT TOP OF PAVEMENT D/ 2 SLAB DEPTH = D (SEE PAVING PLAN FOR THICKNESS) 2" CLR SU B G R A D E ISOLATION JOINT REMOVE ZIP STRIP AND FILL WITH JOINT SEALANT, SEE DETAIL 3A OR 3B, SHEET SD3. TOP OF PAVEMENT CL SLAB CONTRACTION JOINT SECTION NTS 3 SD3 CONTRACTION JOINT SLAB DEPTH = D (SEE PAVING PLAN FOR THICKNESS) SEE PAVING PLAN FOR REINFORCEMENT 2" CLR SU B G R A D E PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. COARSE AGGREGATE BASE SAWCUT TO BE 1/8" WIDE BY 1" MIN. TO 1-1/2" MAX. DEEP "SOFF-CUT". PCC JOINT SEE DETAIL 3A OR 3B, SHEET SD3 12 1 PAVEMENT ISOLATION JOINTL NTS 5B SD3 C SLAB DEPTH (SEE PAVING PLAN FOR THICKNESS) ISOLATION JOINT @ TANK PAD AND DUMPSTER PAD PAVEMENT SECTION TOP OF PAVEMENT 3"3" TANK OR DUMSTER PAVEMENT TANK OR DUMPSTER SLAB DEPTH = D (SEE PAVING PLAN FOR THICKNESS) D/ 2 SU B G R A D E 2" CLR NOTE: 1.THIS SECTION ASSUMES THE TANK OR DUMPSTER PAD PAVEMENT WILL BE PLACED PRIOR TO THE THINNER MAIN PAVEMENT. COARSE AGGREGATE BASE 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3A OR 3B, SHEET SD3. PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. PCC JOINT SEE DETAIL 9A, SHEET SD3 PCC JOINT SEE DETAIL 3A or 3B, SHEET SD3 SD3 NOTES: 1.SLAB PENETRATIONS INCLUDE, BUT ARE NOT LIMITED TO, BOLLARDS, MANHOLES, INLETS, CLEANOUTS, WATER VALVES, ETC. 2.DO NOT INSTALL CLOSED CELL FOAM AROUND TANK MANHOLE PENETRATIONS. 1/2" REMOVE ZIP STRIP AND FILL WITH JOINT SEALANT NTS 3B SD3 COMPRESSIBLE CLOSED FOAM PLANK ISOLATION JOINT DETAIL FU L L D E P T H O F P A V E M E N T COARSE AGGREGATE BASE 1/2" CLOSED CELL FOAM PLANK W/ REMOVABLE ZIP STRIP. MUST BE FULL DEPTH OF SLAB. ISOLATION JOINT REMOVE ZIP STRIP AND FILL WITH JOINT SEALANT, SEE DETAIL 9B, SHEET SD3. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3B, SHEET SD3. FIRST SLAB POUR SECOND SLAB POUR 1/2" CLOSED FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3B, SHEET SD3. ENSURE PNA DOWEL ALIGNER IS USED IN FORM 3/4" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. PNA SQUARE DOWEL CLIP ON TOP OF SQUARE BAR TO ISOLATE CONCRETE FROM BAR. ENSURE DOWEL CLIP FITS TIGHT WITH FACE OF CONCRETE. PNA CONTACT INFORMATION IS: 1-800-542-0214, PNA-INC.COM #3 x 24" LONG REBAR DOWELL SPACED @ 24" O.C. CENTERD WITH JOINT CONSTRUCTION JOINT CL 24 " 24 " 12 " 24 " 4A SD3 4B SD3 #3 X 24" LONG REBAR SPACED @ 24" O.C. CENTERED WITH JOINT (TYP) 3 4" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. 18 " M I N 34" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. #3 x 24" LONG REBAR DOWELL SPACED @ 24" O.C. CENTERD WITH JOINT CONSTRUCTION JOINT CL CO N S T R U C T I O N JO I N T CL 18" MIN 34" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. ENSURE PNA DOWEL ALIGNER IS USED IN FORM 3/4" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. PNA SQUARE DOWEL CLIP ON TOP OF SQUARE BAR TO ISOLATE CONCRETE FROM BAR. ENSURE DOWEL CLIP FITS TIGHT WITH FACE OF CONCRETE. PNA CONTACT INFORMATION IS: 1-800-542-0214, PNA-INC.COM 3/4" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. PNA SQUARE DOWEL CLIP ON TOP OF SQUARE BAR TO ISOLATE CONCRETE FROM BAR. ENSURE DOWEL CLIP FITS TIGHT WITH FACE OF CONCRETE. PNA CONTACT INFORMATION IS: 1-800-542-0214, PNA-INC.COM #3 REBARS @ 16" O.C. EACH WAY W/ 14" LAPSPLICE #3 REBARS @ 16" O.C. EACH WAY W/ 14" LAPSPLICE CONC R E T E 3/4" SQUARE x 10" LONG DOWELS @ 24" O.C.; EMBED 5" TO 6" INTO CONCRETE DRILL 1" + OVERSIZED HOLE AND SET SQUARE DOWEL W/ NON-SHRINK GROUT PNA SQUARE DOWEL CLIP W/ 1/4" WIDE "CLOSED CELL" FOAM SIDES TO ALLOW FOR HORIZONAL MOVEMENT SULFATE EXPOSURE WATER SOLUBLE SULFATE (SO4) IN WATER PPM SULFATE (SO4) IN WATER PPM PORTLAND CEMENT TYPE MAXIMUM W/C RATIO CONCRETE PAVEMENTS NEGLIGIBLE 0.00 < SO4 < 0.10 0 < SO4 < 150 I 0.55 3500 MODERATE 0.10 < SO4 < 0.20 150 < SO4 < 1500 II 0.50 4000 SEVERE 0.20 < SO4 < 2.00 1500 < SO4 < 10,000 V 0.45 4500 VERY SEVERE SO4 > 2.00 SO4 > 10,000 V PLUS POZZOLAN 0.40 5000 TABLE A: NASHVILLE & BELOW (SEE CONCRETE PAVEMENT NOTE #5) PCC JOINT DETAIL NTS 3A SD3 TOP OF PAVEMENT NOTES: 1.SAWCUT JOINTS IN ACCORDANCE WITH CONCRETE PAVEMENT NOTE 25, SHEET SD3. 2.WAIT AS LONG AS FEASIBLE TO SEAL JOINTS TO ALLOW CONCRETE SHRINKAGE TO OCCUR. 1" M I N T O 1" - 1 / 2 " M A X COARSE AGGREGATE BASE 1/8" SAWCUT NTS 2 SD3 NOTES: 1.PNA CONTACT INFORMATION IS: 1-800-542-0214, PNA-INC.COM PNA SQUARE DOWEL PLATE DETAIL (TYP) FIRST SLAB POUR SECOND SLAB POUR PNA SQUARE DOWEL CLIP MID DEPTH ENSURE PNA DOWEL ALIGNER IS USED IN FORM 6" MIN. BASE (SEE PAVING PLAN EXACT THICKNESS) 6" MIN. BASE (SEE PAVING PLAN EXACT THICKNESS)6" MIN. BASE (SEE PAVING PLAN EXACT THICKNESS) 6" MIN. BASE (SEE PAVING PLAN EXACT THICKNESS) 6" MIN. BASE (SEE PAVING PLAN EXACT THICKNESS) ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 SD4 FACE OF DISPENSER ISLAND NOTES: 1.SEE DETAIL 3, SHEET SD3 FOR INFORMATION NOT SHOWN. 3" CLR 1/2" COURSE AGGREGATE BASE TOP OF PAVEMENT SEE PAVING PLAN FOR REINFORCEMENT ENSURE FOAM PLANK IS FLUSH WITH BASE 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, WRAPPED AROUND DISPENSER ISLAND TO ENSURE COMPLETE SEPARATION OF PAVEMENT AND DISPENSER ISLAND. SIMILAR TO DETAIL3B, SHEET SD3. REMOVE ZIP STRIP AND FILL WITH SEALANT, SIMILAR TO DETAIL 3B, SHEET SD3 WITH SEALANT FLUSH WITH TOP OF PAVEMENT. NTS 4 SD4 DISPENSER ISLAND SECTION ENSURE SOIL IS WELL COMPACTED EXISTING ASPHALT 8" SAWCUT FULL DEPTH OF EXISTING ASPHALT A DISTANCE BACK FROM EXISTING EDGE TO ENSURE A STRAIGHT EDGE ALONG ENTIRE LENGTH OF PAVEMENT. OBTAIN OWNER'S REPRESENTATIVE APPROVAL PRIOR TO SAWCUTTING. TOP OF PAVEMENT 1-1/2" (TYP) 2'- 0 " (TY P ) 1-1 / 2 " (TY P ) 1.4 WELDED WIRE REINFORCEMENT (WWR) FLATSHEET TWO (2) - #4 REBARS 1-1/2" CLR FROM TOP (TYP) TWO (2) - #4 REBARS 1" CLR FROM TOP (TYP) ASPHALT PAVEMENT GEOTEXTILE 6" ASPHALT THICKNESS AND BASE BY OTHERS ENSURE SOIL IS WELL COMPACTED TOP OF PAVEMENT FO R 6 " T H I C K PA V E M E N T FO R 8 " T H I C K PA V E M E N T 10 " MANHOLE OR OPENING ENSURE SOIL IS WELL COMPACTED SAWCUT EXISTING SLAB FULL DEPTH. APPLY BOND BREAK TO SLAB VERTICAL EDGE (AVOID APPLYING TO TOP OF SLAB). 3/4" SQUARE x 10" LONG DOWEL @ 24" O.C. W/ PNA DOWEL CLIP DRILL 1" + DIAMETER HOLE 5" TO 6" INTO EXISTING CONCRETE. SET SQUARE DOWEL W/ NON-SHRINK GROUT. SEE DETAIL 2, SHEET SD3 NTS 5 SD4 CONCRETE / EXISTING ASPHALT SECTION NTS 5A SD4 CONCRETE / NEW ASPHALT SECTION NTS 5B SD4 CONCRETE / EXISTING CONCRETE SECTION NTS 6 SD4 TANK MANHOLE PLAN TWO (2) #4 REBARS X 3'-0" LONG, 1-1/2" CLEAR FROM TOP OF SLAB SLAB JOINT 1' - 6 " 1' - 6 " REENTRANT CORNER IF REINFORCEMENT WILL CROSS A CONSTRUCTION JOINT OR CONTRACTION JOINT, RELOCATE REINFORCEMENT TO CLEAR JOINT BY 2". REENTRANT CORNER TYPICAL REENTRANT CORNER DETAIL THREE (3) - #4 REBARS X 4'-0" LONG, 1-1/2" CLR FROM TOP (TYP) JOINTS NOT TO EXCEED 15'-0" B A RATIO OF A:B NOT TO EXCEED 1.25 CURB SAWCUTS PLUNGE SAWCUT AT CURB FACE 1 0 ' - 0 " M A X 1" CLR. 1'-6" 1'-6" 1" CLR. 1" CLR #4 (TYP) 1-1/2" CLR NTS 7 SD4 DISCONTINUOUS SLAB REINFORCEMENT JOINT DETAIL NTS 8 SD4 REENTRANT CORNER DETAIL NTS 8A SD4 REENTRANT CORNER SECTION NTS 9 SD4 RADIUS REINFORCEMENT DETAIL NTS 10 SD4 JOINT SPACING DETAIL PARTIAL PLAN (TYP) NTS 11A SD4 BOLLARD @ SIDEWALK SECTION NTS 11 SD4 ISOLATION JOINT @ SIDEWALK PARTIAL PLAN ISOLATION JOINTCL 24 " 24 " ISOLATION JOINT CL 24 " SI D E W A L K CO N C R E T E 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, SEE DETAIL 3B, SHEET SD3. #3 REBAR CONTINUOUS WITH 12" LAP SPLICE #3 REBAR CONTINUOUS WITH 12" LAP SPLICE PA R K I N G PA V E M E N T PARKING PAVEMENT 11A SD4 SLAB DEPTH (SEE PAVING PLAN FOR THICKNESS) NOTES: 1.REFER TO LOCAL JURISDICTION REQUIREMENTS FOR SPECIFIC CONNECTION DETAILS. NOTES: 1.REFER TO LOCAL JURISDICTION REQUIREMENTS FOR SPECIFIC CONNECTION DETAILS. 3" 5"2'-0"4'-0" 1 3 EXISTING CONCRETE MID-DEPTH 121 COURSE AGGREGATE BASE SEE PAVING PLAN FOR REINFORCEMENT NOTES: 1.IF EXISTING SLAB IS LESS THAN 5-1/2" THICK, NOTIFY OWNER'S REPRESENTATIVE. SLAB DEPTH (SEE PAVING PLAN FOR THICKNESS)18 " (M I N ) ± 6" (MATCH) TOP OF PAVEMENT SLAB DEPTH (SEE PAVING PLAN FOR THICKNESS) COURSE AGGREGATE BASE COURSE AGGREGATE BASE COURSE AGGREGATE BASE PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. PROVIDE SKIM COAT OF FINE AGGREGATE BASE ON TOP OF COARSE AGGREGATE BASE IF SURFACE IS NOT SMOOTH. ENSURE SURFACE IS SMOOTH AND PLANAR IMMEDIATELY PRIOR TO PLACING CONCRETE. 1 1 SLAB DEPTH (SEE PAVING PLAN FOR THICKNESS) TWO (2) - #4 REBARS 1" CLR FROM TOP (TYP) CURB (TYP) SEE PAVING PLAN FOR REINFORCEMENTEQ EQ EQ EQ EXTENSION OF CONTRACTION JOINT OR CONSTRUCTION JOINT. SEE PAVING PLAN FOR EXACT LOCATIONS. EDGE OF PAVMENT @ CURB RADIUS 1" CLR (TYP) 1" CLR (TYP) CURB (TYP) RADIUS REINFORCEMENT SEE DETAIL 10, SHEET SD4 2'-0 " (M I N ) CONTRACTION OR CONSTRUCTION JOINTS. SEE PAVING PLAN FOR EXACT LOCATIONS. 9A SD 4 TWO (2) - #4 REBARS 1-1/2" CLR FROM TOP (TYP) CONCRETE BOLLARD SEE DETAIL 10, SHEET SD1 FOR INFORMATION NOT SHOWN 3'- 4 " 6" 2'-0" DIA. 3' - 6 " 1/2" FOAM PLANK TO BE FULL DEPTH OF PAVEMENT WRAPPED AROUND BOLLARD TO ENSURE COMPLETE SEPARATION OF CONCRETE AND BOLLARD. SIMILAR TO DETAIL 3B, SHEET SD3. PROVIDE 1/4" THICK MASTIC COATING ON EXPOSED PORTION OF BOLLARD BELOW TOP OF PAVEMENT TO PREVENT CORROSION SE E P A V I N G P L A N FO R P A V E M E N T TH I C K N E S S SEE ARCHITECTURAL PLANS FOR REINFORCEMENT COMPACTED SUBGRADE AGGREGATE BASE REMOVE ZIP STRIP AND FILL WITH SEALANT. SIMILAR TO DETAIL 3B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 12 BUILDING SIDEWALK CONCRETE TURNDOWN DEPTH OF SIDEWALK TO MATCH DEPTH OF PARKING PAVEMENT HANDICAP SIGNAGE SEE DETAIL 12A, SHEET SD4 3" CLR FROM ISOLATION JOINT TO FACE OF BOLLARDS/LIGHTS 3" CLR 1" CLR (TYP) TRANSITION FROM 6" TO 4" CONCRETE 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL3B, SHEET SD3. REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3.CL ISOLATION JOINTREMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3. REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3B, SHEET SD3. VAN ACCESSIBLE PARKING BY DISABLED PERMIT ONLY TOW AWAY ZONE AND FINE UP TO $250.00 NOTES: 1.REFER TO LOCAL JURISDICTION REQUIREMENTS FOR SPECIFIC DETAILS. 2.CONTRACTOR SHALL VERIFY ALL THE REQUIRED INFORMATION NECESSARY AT EACH SIGN WITH LOCAL AUTHORITIES PRIOR TO PURCHASING.3'- 6 " 2" DIA. BY .154 (WALL THICKNESS) GALVANIZED POST 14" RADIUS (TYP.)516" x 212" CADMIUM PLATED BOLT (TYP.) 316" Ø HOLE (TYP.) TYPE AND GAGE OF MATERIAL FOR SIGN AND POST SHALL MEET OR EXCEED LOCAL SIGN REQUIREMENTS 7' - 0 " CONCRETE BOLLARD SEE DETAIL 11A, SHEET SD4 FOR INFORMATION NOT SHOWN HANDICAP SIGNAGE DETAIL NTS 11B SD4 11B SD4 CONCRETE BOLLARD SEE DETAIL 11, SHEET SD4 TWO (2) #4 REBARS X 3'-0" LONG, 1-1/2" CLEAR FROM TOP OF SLAB 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3B, SHEET SD3. 3 4" X 10" SQUARE DOWEL SPACED 24" O.C. CENTER WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE C ISOLATION JOINTL RADIUS REINFORCEMENT SEE DETAIL 10, SHEET SD4 ToP to Toi 3" MIN 6" MAX 12 1 HIGH POINT OF PAVEMENT SLOPE OF PAVEMENT BEYOND MANHOLE PEA GRAVEL TO GRADE WITHIN TANK PIT 1- 1 / 2 " M I N . TO 2 " M A X . 2'-0" (TYP) FILTER FABRIC NTS 6A SD4 TANK MANHOLE SECTION LOW POINT OF PAVEMENT SEE PAVING PLAN FOR REINFORCEMENT #4 REBARS SEE DETAIL6, SHEET SD4 2" EMBEDMENT DEPTH 1.4 WELDED WIRE REINFORCEMENT (WWR) FLATSHEETS TOP OF PAVEMENT 34" X 10" SQUARE DOWEL 34" X 10" SQUARE DOWEL PAVEMENT CONSTRUCTION OR CONTRACTION JOINTS SEE PAVING PLAN FOR EXACT LOCATIONS (TYP) ISOLATION JOINTS ON ALL SIDES OF TRENCH DRAIN SEE DETAIL 5, SHEET SD3 (TYP) REENTRANT CORNER REINFORCEMENT SEE DETAIL 8, SHEET SD4 (TYP) NOTES: 1.TRENCH DRAIN TO BE ISOLATED ON BOTH SIDES WITH ISOLATION JOINT. SEE DETAIL 5, SHEET SD3 2.2'-0" (MIN) CLEARANCE BETWEEN EDGE OF TRENCH DRAIN AND ISOLATION JOINTS. 3.CURBING BETWEEN ISOLATION JOINTS TO BE A MONOLITHIC POUR, INSTALLED AND FORMED AT TIME OF TRENCH DRAIN CONCRETE. SEE DETAIL 4, SHEET SD1. 4.TRENCH DRAIN TO EXTEND TO FACE OF CURB. NTS 3B SD4 SITE TRENCH DRAIN PLAN NTS 3A SD4 DRIVEWAY TRENCH DRAIN PLAN CURB (TYP.) OR CURB (24") PAVEMENT CONSTRUCTION OR CONTRACTION JOINTS SEE PAVING PLAN FOR EXACT LOCATIONS (TYP) ISOLATION JOINTS ON BOTH SIDES OF TRENCH DRAIN SEE DETAIL 11, SHEET SD3 (TYP) MONOLITHICALLY POURED CURB AT DRIVEWAY TRENCH DRAINS, SEE DETAIL 4, SHEET SD1 OR DETAIL 7, SHEET SD 5 SEE NOTE 3 (TYP) 2'-0" (TYP) 2'-0" (MIN) NOTES: 1.TRENCH DRAIN TO BE ISOLATED ON ALL SIDES WITH ISOLATION JOINT. SEE DETAIL 11, SHEET SD3 2.2'-0" (MIN) CLEARANCE BETWEEN EDGE OF TRENCH DRAIN AND ISOLATION JOINTS. NTS 2 SD4 CANOPY COLUMN SECTION USE TWO SHEETS OF POLY BETWEEN THE BOTTOM OF THE PAVEMENT AND TOP OF CMU TO ACT AS A BOND REAKER BETWEEN PAVEMENT AND CMU. EXTEND PLOY 2" EACH SIDE OF CMU. (TYP ALL SIDES) C COLL LC C O L CJ CONSTRUCTION, CONTRACTION OR ISOLATION JOINT SEE DETAILS 3, 4 OR 5, SHEET SD3 FOR INFORMATION. (TYP) CJ CJ CJ (TYP) CJCJ 1/2" FOAM PLANK AROUND PUMP ISLAND, FULL DEPTH OF PAVEMENT. REMOVE ZIP STRIP AND FILL WITH SEALANT, SIMILAR TO DETAIL 3B, SHEET SD3 WITH SEALANT FLUSH WITH TOP PAVEMENT. (TYP) C COLL 2 SD4 BOLLARD (TYP) SEE DETAIL 10, SHEET SD1 1/2" FOAM PLANK AROUND COLUMN WITH SEALANT SIMILAR TO DETAIL 3B, SHEET SD3. COL CL TOP OF FOUNDATION TOP OF PAVEMENT COURSE AGGREGATE BASE PROVIDE 1/4" THICK MASTIC COATING ON EXPOSED PORTION OF BASE PLATE, BOLTS AND COLUMN BELOW TOP OF PAVEMENT TO PREVENT CORROSION. FILL BETWEEN CMU WITH BASE MATERIAL SOLID GROUT CMU TO TOP AND ENSURE TOP SURFACE IS TROWELED SMOOTH CMU AROUND COLUMN ENSURE FOAM PLANK IS FLUSH WITH BASESEE PAVING PLAN FOR REINFORCEMENT 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, WRAPPED AROUND COLUMN TO ENSURE COMPLETE SEPARATION OF CONCRETE AND COLUMN. REMOVE TOP PORTION OF FOAM PLANK, INSTALL BACKER ROD AND THEN SEALANT SIMILAR TO DETAIL 3A, SHEET SD3 WITH SEALANT FLUSH WITH TOP OF PAVEMENT. 3" CLR COLUMN NOTES: 1.SEE DETAIL 3, SHEET SD3 FOR INFORMATION NOT SHOWN. NOTES: 1.SEE DETAIL 1, SHEET SD2 FOR ISLAND LAYOUT DIMENSIONS. 2.SEE DETAIL 3, SHEET SD3 FOR INFORMATION NOT SHOWN. NTS 1 SD4 CONCRETE DETAIL @ DISPENSER ISLAND 3 SD4 NOTES: 1.SEE DETAIL 1, SHEET SD2 FOR ISLAND LAYOUT DIMENSIONS. 2.SEE DETAIL 3, SHEET SD3 FOR INFORMATION NOT SHOWN. TWO (2) #4 REBARS X 3'-0" LONG, SIMILAR TO DETAIL 8, SHEET SD4 (TYP). TWO (2) #4 REBARS X 3'-0" LONG, ALL SIDES OF COLUMNS, SIMILAR TO DETAIL 8, SHEET SD4 (TYP). WITHOUT COLUMN CLADDING REMOVE THE PETROLEUM CONNECTOR/ANGLE IRON FORM AFTER USE ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 SD5 DECORATIVE PAVER SECTION DETAIL NTS 1 SD5 CL 3"3" COARSE AGGREGATE BASE ISOLATION JOINT TOP OF PAVEMENT D/ 2 SLAB DEPTH = D (SEE PAVING PLAN FOR THICKNESS) 2" CLR SU B G R A D E SEE PLAN FOR REINFORCEMENT ISOLATION JOINT REMOVE ZIP STRIP AND FILL WITH JOINT SEALANT, SEE DETAIL 3B, SHEET SD3. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3B, SHEET SD3. DECORATIVE CONCRETE PAVER OR STAMPED CONCRETE TWO (2) CONTINUOUS #3 REBARS WITH #3 TRAVERSE BARS EVERY THREE (3) FEET. DECORATIVE PAVER PARTIAL PLAN NTS 2 SD5 ISOLATION JOINT SEE DETAIL 5, SHEET SD3 (TYP) STANDARD CONCRETE PAVEMENT DECORATIVE OR STAMPED CONCRETE PAVEMENT CJ CJ CJ PCC JOINT SEE DETAIL 3A OR 3B, SHEET SD3 (TYP) REENTRANT CORNER REINFORCEMENT SEE DETAIL 8, SHEET SD4 (TYP) SEE PAVEMENT PLAN FOR REINFORCEMENT 2'-0" SLOPE OF CURB TO MATCH ADJACENT PAVEMENT CONCRETE PAVEMENT SE E P L A N FO R PA V E M E N T TH I C K N E S S 3"12" MIN COMPACTED SUBGRADE AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION AGGREGATE BASE 512" NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 9A, SHEET SD3. VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 4.THIS CURB TYPE IS TO BE USED ALONG THE CURB LINE ADJACENT TO THE DRIVEWAY TRENCH DRAINS. SEE PLAN FOR LOCATIONS. MONOLITHIC CURB (L-BACK) DETAIL NTS 3 SD5 SEE DETAIL 1, SHEET SD6 FOR INFORMATION NOT SHOWN 34" X 10" SQUARE DOWEL 34" X 10" SQUARE DOWEL 3 4" X 10" SQUARE DOWEL SPACED 24" O.C. CENTER WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE TRUCK PARKING CURB NTS 4 SD5 REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, EE DETAIL 3B, SHEET SD3 (TYP). 1 34" RADIUS HAND TOOLED 2'-0" 6" 3" 3" EQ EQ 3" SEE PLAN FOR REINFORCEMENT 1'-6" 12" LONG #3 REBAR SPACED @ 36" O.C. CENTERED WITH JOINT. AGGREGATE BASE COMPACTED SUBGRADE 8" MIN AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION #4 REBAR NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 3A, SHEET SD3. 4.VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 5.USE THIS DETAIL WHEN ADJACENT PAVEMENT SLOPES AWAY FROM CURBING. 6.DETAIL ONLY TO BE USED FOR THE BACK CURB OF TRUCK PARKING AREAS, NOT ALONG THE SIDES 8" 4" 3" #4 REBAR 14 " 3"9" 10'-0" EQ EQ ENGINEERINGFILL 5'-0" LANDSCAPING (TYP) SIDEWALK (TYP) SEE SITE PLAN FOR INCLUSION OF SIDEWALK 6" MIN. BASE (SEE PAVING PLAN EXACT THICKNESS) ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 SD6 NOTES: 1.BUMPER POSTS TO BE PLUMB AND ALIGNED IN A STRAIGHT LINE AND FILLED WITH CONCRETE. 2.TOPS TO BE GROUND SMOOTH W/ SQUARE EDGE, THE PRIMED WITH "END RUST" BY DURO AND PAINTED WITH INDUSTRIAL OIL BASED ENAMEL. COLOR TO MATCH DECORATIVE LIGHT POLES. 3.REFER TO PAVING PLAN FOR EXACT CONCRETE THICKNESS. 4.REFER TO PAVING PLAN FOR CONCRETE COMPRESSIVE STRENGTH & SUBGRADE COMPACTION REQUIREMENTS. REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, SEE DETAIL 3B, SHEET SD3 (TYP). 1 34" RADIUS HAND TOOLED 2'-0" 6" 12 " 8" M I N 6" 3" 3" EQ EQ 3" SEE PLAN FOR REINFORCEMENT 1'-6" 3" 3" 12" LONG #3 REBAR SPACED @ 36" O.C. CENTERED WITH JOINT. AGGREGATE BASE COMPACTED SUBGRADE CATCH CURB [24"] DETAIL @ CONCRETE SLAB 12" MIN NTS 1 SD6 AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION SHED CURB [24"] DETAIL @ CONCRETE SLAB NTS 2 SD6 DIESEL CANOPY BOLLARD DETAIL NTS 4 SD6 #4 REBAR NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 3A, SHEET SD3. 4.VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. EDO DISPENSER ISLAND DETAIL NTS 5 SD6 EDO CANOPY ACCESSORIES LAYOUT NTS 6 SD6 #4 REBAR SE E P A V I N G P L A N FO R P A V E M E N T TH I C K N E S S 3'- 6 " 13 " 4" - 6 " MI N NOTES: 1.LIGHT POLES TO BE SPALDING, PROVIDED BY RACETRAC AND TO BE INSTALLED BY GENERAL CONTRACTOR. SEE SITE PLAN FOR POLE LOCATIONS. 2.LIGHT FIXTURES TO BE CREE "EDGE" HIGH OUTPUT AREA LUMINAIRE WITH A MAXIMUM EFFECTIVE PROJECTED AREA OF 2.0 S.F. (REFER TO "PHOTOMETRIC PLAN" FOR DETAILS). ONE LIGHT FIXTURE PER POLE. 3.WIND DESIGN CRITERIA BASED ON THE FOLLOWING: A.ASCE 7-10 B.Vult=140 MPH WITH EXPOSURE C RISK CATEGORY II C.Vasd=110 MPH D.IMPORTANCE FACTOR I = 1.0 E.DESIGN WIND PRESSURE = 51 PSF 1.LIGHT POLES SHALL MEET 110 MPH WIND (Vasd); 140 MPH (Vult). 2.CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH (F'c) OF 3,500 PSI FOR ALL LIGHT POLE FOOTINGS. 3.ALL REINFORCING STEEL SHALL BE NEW DOMESTIC DEFORMED BILLET STEEL CONFORMING TO ASTM A-615 GRADE 60. 4.CONCRETE ABOVE FINISH GRADE TO BE SMOOTH WITH RUBBED FINISH. 5.CONCRETE LIGHT POLE BASES TO BE PAINTED TO MATCH BOLLARD. 6" #6 COPPER WIRE TIED TO BASE OF NUT ANCHOR BOLTS DESIGNED AND PROVIDED BY MANUFACTURER, TYP. (CENTER ANCHOR BOLTS ON BASE POST) FINISH GRADE COMPACTED SUBGRADE TO P O F G R O U N D RO D T O B E 1 2 " BE L O W G R A D E 10'-0" LONG #3 REBAR (LIGHTING GROUND ROD) 24" 3' - 0 " 5' (TYP.) UNLESS NOTED ON SITE PLAN CL EIGHT (8) #5 VERT. BARS W/ #3 TIES @ 10" O.C. 3" CL R 3" CLR 1" CONDUIT 2'- 0 " (R E F E R T O " P H O T O M E T R I C P L A N " FO R E X A C T H E I G H T ) 28 ' - 0 " M A X . T O T O P O F P O L E . (R E F E R T O " P H O T O M E T R I C P L A N " FO R E X A C T H E I G H T ) 7' - 0 " M I N . E M B E D M E N T 10 SD6 SITE LIGHTING SECTION 140 MPH WIND (VULT) APPROXIMATE TANK LOCATION NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 3A, SHEET SD3. VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 4.THIS CURB TYPE IS TO BE USED ALONG THE CURB LINE ADJACENT TO THE TANK PAVEMENT. SEE PLAN FOR LOCATION. 5.USE THIS CURB TYPE WHEN TANK ARE ADJACENT TO CURB IN EDO AREA PEA GRAVEL TO GRADE WITHIN TANKPIT SEE PAVEMENT PLAN FOR REINFORCEMENT 2'-0" TANK PAD PAVEMENT SE E P L A N FO R PA V E M E N T TH I C K N E S S TANK AREA CURB DETAIL NTS 3 SD6 FILTER FABRIC 3" 512" SLOPE OF CURB TO MATCH ADJACENT PAVEMENT SEE DETAILS 1 , SHEET SD6 FOR INFORMATION NOT SHOWN REMOVE ZIP STRIP AND FILL WITH SEALANT, SEE DETAIL 3B, SHEET SD3. SEALANT TO BE FLUSH WITH TOP OF PAVEMENT. 1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB, EE DETAIL 3B, SHEET SD3 (TYP). 1 34" RADIUS HAND TOOLED 2'-0" 6" 3" 3" EQ EQ 3" SEE PLAN FOR REINFORCEMENT 1'-6" 12" LONG #3 REBAR SPACED @ 36" O.C. CENTERED WITH JOINT. AGGREGATE BASE COMPACTED SUBGRADE 12" MIN AGGREGATE BASE TO EXTEND PAST CURB DURING INSTALLATION #4 REBAR NOTES: 1.CURB CONSTRUCTION AND CONTRACTION JOINTS LOCATIONS NOT TO EXCEED 10 FEET. 2.SAWCUT CONTRACTION JOINTS 1/8" WIDE BY 1-1/2" DEEP AS SOON AS CONCRETE HAS HARDENED SUFFICIENTLY TO PREVENT RAVELING OR DISLODGING OF AGGREGATES. 3.SAWCUT CONSTRUCTION JOINTS 1/8" WIDE BY 1" DEEP, SIMILAR TO DETAIL 3A, SHEET SD3. 4.VERIFY JOINT LOCATIONS WITH THE OWNER'S REPRESENTATIVE. 5.USE THIS DETAIL WHEN ADJACENT PAVEMENT SLOPES AWAY FROM CURBING. 6" 8" M I N 6" 3" #4 REBAR 3" 12 " NTS 9 SD6 CANOPY COLUMN SECTION NTS 8 SD6 CONCRETE DETAIL @ DISPENSER ISLAND WITH COLUMN CLADDING 1/2" RIGID CONDUIT ON CANOPY STEEL TO EACH SPEAKER LOCATION. TOP OF FOUNDATION PROVIDE 1/4" THICK MASTIC COATING ON EXPOSED PORTION OF BASE PLATE, BOLTS AND COLUMN BELOW TOP OF PAVEMENT TO PREVENT CORROSION. COURSE AGGREGATE BASE CMU (TYP) C COLL LC C O L EXTEND SAWCUT TO EDGE OF FOAM PLANK IMMEDIATELY AFTER PREVIOUS SAWCUT IS MADE BY USING A SMALL DIAMETER SAW BLADE (TYP)CJ CONSTRUCTION, CONTRACTION OR ISOLATION JOINT SEE DETAILS 3, 4 OR 5, SHEET SD3 FOR INFORMATION. (TYP) CJ CJ CJ (TYP) CJCJ 1/2" FOAM PLANK AROUND PUMP ISLAND, FULL DEPTH OF PAVEMENT. REMOVE ZIP STRIP AND FILL WITH SEALANT. SIMILAR TO DETAIL 3B, SHEET SD3 WITH SEALANT FLUSH WITH TOP PAVEMENT. (TYP) C COLL 7 SD6 NOTES: 1.SEE DETAIL 8, SHEET SD6 FOR ISLAND LAYOUT DIMENSIONS. 2.SEE DETAIL 3, SHEET SD3 FOR INFORMATION NOT SHOWN. TWO (2) #4 REBARS X 3'-0" LONG, SIMILAR TO DETAIL 9, SHEET SD4 (TYP). FILL BETWEEN CMU WITH BASE MATERIAL DEF COLCL COLUMN ENSURE FOAM PLANK IS FLUSH WITH BASE SEE PAVING PLAN FOR REINFORCEMENT TOP OF PAVEMENT 6" CLR REMOVE ZIP STRIP AND FILL WITH SEALANT, SIMILAR TO DETAIL 3B, SHEET SD3 WITH SEALANT FLUSH WITH TOP OF PAVEMENT. NOTES: 1.SEE DETAIL 3, SHEET SD3 FOR INFORMATION NOT SHOWN.1/2" CLOSED CELL FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF SLAB WRAPPED AROUND COLUMN CLADDING TO ENSURE COMPLETE SEPARATION OF CONCRETE AND CLADDING. SIMILAR TO DETAIL 3B, SHEET SD3. TOP OF ISLAND REMOVE THE PETROLEUM CONNECTOR/ANGLE IRON FORM AFTER USE FOAM PLANK EXIT SIDE APPROACH SIDE 3/4" RIGID CONDUIT FROM STORE TO CANOPY FOR SPEAKER WIRE. RUN UP COLUMN AND THRU DECK; SEAL PENETRATION. NOTES: 1.SINGLE ROW OF EIGHT (8) DOUBLE COLUMN MPD'S. 2.SEVEN (7) FUELING POSITIONS. 3.REFER TO CANOPY PLANS FOR CANOPY DIMENSIONS AND COLUMN LOCATIONS. CANOPY COLUMN NEW GILBARCO ENCORE 700S MASTER/SATELLITE DIESEL/DEF DISPENSER TRASH CAN (TYP.) SEE SITE PLAN FOR LOCATIONS CONCRETE BOLLARD DETAIL 4, SHEET SD6 (TYP) 10'-0" 20' - 0" 3' - 0 " 2' - 0" 5'-0" ISLAND BOLLARDS 3'-6" H. CONCRETE MASTER SATELLITE 5'-0" 2' - 4 316"2' - 0"3' - 7 34" DEF FET CANOPY WASH BUCKET SPEAKER FIRE EXTINGUISHER FIRE EXTINGUISHER MA S T E R DE F FE T MA S T E R DE F FE T MA S T E R DE F FE T YARD HYDRANT DETAIL 7, SHEET SD6 YARD HYDRANT DETAIL 7, SHEET SD6 YARD HYDRANT DETAIL 7, SHEET SD6 WASH BUCKET WASH BUCKET SPEAKER SPEAKER WASH BUCKET SPEAKER FIRE EXTINGUISHER MA S T E R DE F FE T YARD HYDRANT DETAIL 7, SHEET SD6 WASH BUCKET SPEAKER WASH BUCKET SPEAKER FIRE EXTINGUISHER MA S T E R DE F FE T YARD HYDRANT DETAIL 7, SHEET SD6 WASH BUCKET SPEAKER WASH BUCKET SPEAKER FIRE EXTINGUISHER MA S T E R DE F FE T YARD HYDRANT DETAIL 7, SHEET SD6 WASH BUCKET SPEAKER WASH BUCKET SPEAKER FIRE EXTINGUISHER MA S T E R DE F FE T YARD HYDRANT DETAIL 7, SHEET SD6 WASH BUCKET SPEAKER GRAVEL COMPACTED SUBGRADE 12" MIN CONCRETE BOLLARD SEE DETAIL 4, SHEET SD6 CL SECTION VIEW PLAN VIEW NOTES: 1.SEE "SITE PLAN" FOR EXACT LOCATIONS. 2.REFER TO PAVING PLAN FOR EXACT CONCRETE THICKNESS. 3.REFER TO PAVING PLAN FOR CONCRETE COMPRESSIVE STRENGTH & SUBGRADE COMPACTION REQUIREMENTS. 6" 1'-0" 27 12" 1'-6" WOODFORD MODEL Y34 FREEZELESS YARD HYDRANT WOODFORD MODEL Y34 FREEZELESS YARD HYDRANT PRODUCT DISPENSER BEYOND DISPENSER ISLAND BEYOND 1/2" WATER SUPPLY FROM "SITE WATER SUPPLY" LINE FILL WITH LOOSE GRAVEL AROUND VALVE BODY FOR DRAINAGE COMPACTED SUBGRADE 9" YARD HYDRANT DETAIL NTS 7 SD6 3/4" WATER SUPPLY FROM "SITE WATER SUPPLY" LINE FROST LINE 3/4" FEMALE PIPE THREAD AGGREGATE BASE 1/8" NPT DRAIN HOLE 1/2" TO 3/4" COUPLING 2'- 0 " TO T O P OF V A L V E 12 " FOAM PLANK FULL DEPTH REMOVE ZIP & FILL W/ SEALANT SEE DETAIL 9B SHEET SD3 TRAFFIC RATED BOX (TYP)3/4" VALVE (TYP) EMBEDDED PVC CHASE 1'-6" CL 12 " PR O V I D E 3 4" M I N . C L E A R B E T W E E N LE A D I N G E D G E O F H Y D R A N T A N D OU T S I D E F A C E O F B U M P E R P O S T ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 SD7 UNLESS OTHERWISE NOTED: DIMENSIONS ARE IN MILLIMETERS DIM & TOL STD 1.0402 & ASME Y14.5M - 1994 SILICONE-FREE STD 4.1208 TOLERANCES: SEE GRACO STANDARDS CENTERLINE VARIANCE STD 1.0406 HOLES STD 1.0407 SHEET METAL STD 4.0100 PLATED & HT TR PARTS STD 1.0409 BURRS & EDGES STD 1.0420 THREADS STD 1.0425 SURFACE ROUGHNESS STD 1.0445 DECIMALS ANGLES X .X .XX METRIC - ASME Y14.5M 229mm 120mm 554mm 175mm 276mm SERIES F - AIR HOSE REEL1 SD7 NOTES: 1.NTS; PRINT FOR REFERENCE ONLY. 2. SEE MANUAL FOR MOUNTING DIMENSIONS FINISH OF CHAMFERS AND FILLETS TO CONFORM TO ROUGHEST ADJACENT AREA. SURFACE ROUGHNESS MAXIMUM PER ASME B46.1. FULL THREAD DEPTHS ARE MINIMUM. DIMENSIONING AND TOLERANCING PER ASME Y14.5-2009 THREADS PER ASME B1.1 GAGING SYSTEM 21 U.O.S., ANSI B1.20.1 & B1.20.3 THIRD ANGLE PROJECTION UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES TOL. ON DECIMALS: .X TOL. ON DECIMALS: .XX TOL. ON DECIMALS: .XXX TOL. ON ANGLES: CONFIDENTIAL - THE INFORMATION CONTAINED IN THIS DOCUMENT IS THE PROPERTY OF GARDNER DENVER, INC. IT IS NOT FOR PUBLIC DISCLOSURE. POSSESSION OF THE INFORMATION DOES NOT CONVEY ANY RIGHT TO LOAN, SELL OR DISCLOSE THE INFORMATION. UNAUTHORIZED REPRODUCTION OR USE OF THE INFORMATION IS PROHIBITED. THIS DOCUMENT IS TO BE RETURNED TO GARDNER DENVER, INC. UPON THE COMPLETION OF THE PURPOSE FOR WHICH IT IS LOANED OR UPON REQUEST. Gardner Denver Inc. Quincy, IL. = `.05 = `.02 = `AS SPECIFIED = `0~-30' 120° Ø26.00 B.C. 3X HOLES Ø.51 ISOLATOR Ø.56 RECEIVER FOOT 14.47 2.65 LOW OIL STOP 1/4" NPT MANUAL TANK DRAIN TEST-OFF-AUTO SWITCH HOUR METER 1/2" NPT VALVE PRESSURE SWITCH PRESSURE GAUGE ASME PRESSURE RELIEF VALVE ELECTRIC TANK DRAIN CONTROL 34.43 76.35 .98VIBRATION ISOLATORS AIR COOLED AFTERCOOLER 80 GALLON ASME AIR RECEIVER MOTOR : 7.5HP (VR7F-8) COMPRESSOR: R10 NOTES: 1. NTS 2. SPECIFICATIONS AND DIMENSIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE OR OBLIGATION. 3. ALL DIMENSIONS ARE IN INCHES. 2.985.43 26.02 11.51 34.13 n24.00 SIMPLEX CONTROL PANEL 2 SD7 0800-OUTLINE-BARE UNIT, 80GL ELECTRIC COMPRESSOR LINE RUNS FROM THE SECOND MPD COLUMN TO THE LAST ON BOTH ENDS EXIT SIDE APPROACH SIDE CANOPY DEF HOSE REEL HOSE REEL HOSE REEL HOSE REEL HOSE REEL HOSE REEL HOSE REEL HOSE REEL NEAREST APPROACH FROM COMPRESSOR UNIT DEF MAS T E R DEF FE MAS T E R SA T E L L I T E DEF MAS T E R SA T E L L I T E DEF FE MAS T E R SA T E L L I T E DEF MAS T E R SA T E L L I T E DEF FE MAS T E R SA T E L L I T E DEF MAS T E R SA T E L L I T E DEF FE SAT E L L I T E AIR CONDUIT TO RUN UP COLUMN 3 SD7 EDO CANOPY - AIR COMPRESSOR/HOSE LAYOUT NOTES: 1. NTS 2. HOSE REEL LOCATION ALTERNATES FROM TO APPROACH SIDE 3. REFERENCE FOR ALL OTHER ACCESSORY LAYOUTS6 SD6 NTS 4 SD7 ABOVE GROUND DEF BOX REMOTE FILL CAPS IMPERVIOUS CONCRETE L-BACK SHED CURB 2/SD6 BOLLARDS 11A/SD4 PAINTED YELLOW REMOTE FILL CURB MOUNT NTS 5 SD7 TRUCK COURT PAINT SPEC USTC SUPREME TRAFFIC LINE MARKING PAINT, YELLOW USTC SUPREME TRAFFIC LINE MARKING PAINT, BLACK 8"4" 4" NOTE: ·REFER TO LOCAL DOT CONSTRUCTION DETAILS ON PAVEMENT ARROW MARKING DIMENSIONS AND DESIGN WHEN APPLICABLE. ·CONFIRM LOCAL JURISDICTION REQUIREMENTS ON PAINT COLOR 9'-4" 5' 1'-7" 12" 10' - 71 2" 4' - 2 " 5' - 3 " 1'-7"4" 4" STRIPING WIDTHS YELLOW BAND BLACK OUTLINE PARKING LINE 0'-8"0'-4" PARKING TEXT 4' TALL 0'-4" STOP BAR 2'-0"N/A VAR. ARROWS 1' TO 1'-3" (SEE DOT MANUAL) 0'-4" 4" 4" 4' 2' 2' ST A N D A R D D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 SD8 SEE PAVING PLAN FOR REINFORCEMENT C ISOLATION JOINT EQ EQ 2'-0" MIN 1'-0" #4 STIRRUPS @ 18" O.C. #93893 HEAVY DUTY DUCTILE IRON GRADE ADA COMPLIANT #4 @ 18" O.C. TRANSVERSE BARS L 1' - 0 " #4 CONT. @ 12" O.C. 3" CL R #4 CONT. @ 6" O.C. ENSURE TOP LONGITUDINAL BARS ARE ON TOP AS SHOWN AQUADUCT TRENCH DRAIN CUSTOM POLYESTER CHANNEL INITIAL CONCRETE PLACEMENT NTS 1 SD8 TYP. CONCRETE DETAIL FOR RT EXTENDED DIESEL OFFER AQUADUCT CUSTOM 8" TRENCH DRAIN SYSTEM 3" C L R INSTALL FOAM OR WOOD BRACING PRIOR TO CONCRETE POUR 1'- 0 " 2" C L R C ISOLATION JOINT L 2'-0" MIN 2" CLR SE E P A V I N G P L A N FO R P A V E M E N T TH I C K N E S S SEE PAVING PLAN FOR REINFORCEMENT NOTES: 1.NOTE SPECIAL CROSSBAR CALLOUTS SPECIFIC TO EXTENDED DIESEL OFFER TRENCH DRAIN SYSTEM 2.G.C. MUST READ INSTALLATION INSTRUCTIONS PRIOR TO INSTALLATION OF AQUADUCT TRENCH DRAIN. 3.REFER TO DETAIL 6, SHEET SD2 FOR BRACING RECOMMENDATIONS. 4.SOME PROJECTS MAY HAVE MULTIPLE TRENCH DRAINS ON SITE. (REFER TO "GRADING PLAN" FOR EXACT LOCATIONS.) 5.EACH TRENCH DRAIN IS INDIVIDUALLY DESIGNED AND SIZED BY AQUADUCT, INC. (REFERE TO DESIGN SPECS FOR EXACT SIZING.) 6.REFERENCE FOR BRACING DETAILS ISOLATION JOINT SEE DETAIL 5, SHEET SD3 FOR INFORMATION NOT SHOWN 1/2" FOAM PLANK WITH REMOVABLE ZIP STRIP, FULL DEPTH OF PAVEMENT, SEE DETAIL 3B, SHEET SD3 (TYP). AGGREGATE BASE COATED STEEL Z-PROFILE GRATE FRAME 6 SD2 3/4" X 10" SQUARE DOWEL SPACED AT 24" O.C. CENTERED WITH JOINT. INSTALL USING PNA DOWEL ALIGNER. DO NOT GREASE DOWEL. PNA SQUARE DOWEL CLIP ON TOP OF SQUARE BAR TO ISOLATE CONCRETE FROM BAR. ENSURE DOWEL CLIP FITS TIGHT WITH FACE OF CONCRETE. PNA CONTACT INFORMATION IS: 1-800-542-0214, PNA-INC.COM 17" 12" (SQ) 8" 17 3 4 " 14 1 2 " (SQ) 32 " 17 3 4 " 17 3 4 " 17 " 17 "BASKET OUTSIDE PUNCH PLATE 17 X 17 GRATE 37 ° LIFTING EYES FOR GALVANIZING ONLY 1 2" HEADED CONCRETE ANCHOR BOLT (4) REQ'D NTS 2 SD8 DIESEL ISLAND CATCH BASIN (TYP.)NTS 3 SD8 OIL WATER SEPERATOR L 8'-8" 5'-2"2'-9" FL2 4'-6" FL1 4-9" H 6'-0" 5"5" 4'-2" W 5'-0" 5" 5" 3" 11" 5" 7" 18" 1 12" CL 12"12" 24" TYP NOTES: 1. Contractor to place OTA-600 alarm within 500 feet of oil water separator. CAT-5 cable to be run from building data closet to alarm location, the maximum length of the CAT-5 cable is 350 feet. RA C E W A Y M A R K E T 3, 5 0 0 S Q . F T . N O A U T O E N T R Y NO A U T O E N T R Y NO T R U C K P A R K I N G NO T R U C K P A R K I N G NO T R U C K P A R K I N G NO T R U C K P A R K I N G 17 0 S Q . F T . L E D , PR I C E L O G O S I G N , 30 ' T O T O P O F S I G N T T TT (5)(6)(7)(8) (7) (8) (6) (5) (5) (3)(4) (6) (5 ) (3) (4) (6 ) (7 ) (8 ) (5 ) (5 ) (3 ) (4) (6 ) (5 ) (3 ) (4 ) (6 ) (3 ) (8) ( 8 ) ( 9 ) ( 1 0 ) (10 ) (9) (8) (7) (7)(6) (4) (5) ( 5 ) (3) (4) (6) (8) (9) (10) (10) (9) (10) (9) (8) (7) (8) (8) (9) (10 ) ( 1 0 ) ( 9 ) ( 8 ) (9)(8)(7) (3) (4) (5) (6 ) (7 ) (7) (6) (5) (4) (3 ) ( 9 ) ( 8 ) (7 ) (7) (8) (3 ) (4 ) (5 ) (6 ) (8 ) (9 ) (5 ) (5 ) (6 ) ( 6 ) (4 ) (5 ) ( 7 ) (0) (2) (3) (4) (5) (6 ) (6 ) (5) (9) (10) (6) (3) (4 ) (5) (7) T A A A 20K - REGULAR 12K - PREMIUM 24K - DIESEL 12K - DEF 12K - B100 ALTERNATE P 26 7 . 3 120' TREE CANOPY COVERAGE TYP. SOD TYP. L1 LA N D S C A P E P L A N 4/28/2023 JWHITE S221106_LANDSCAPE.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CI V I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LI C E N S E # C - 1 3 1 7 0 30 6015 1" = 30' LEGEND PROPOSED CONCRETE SIDEWALK PROPOSED BOLLARD CURB BACKING (DETAIL 4, SHEET SD1) PROPOSED AREA LIGHT POLES (DETAIL 6, SHEET SD2) (SEE MEP PLANS FOR CONDUIT INFORMATION) SITE DESIGN STANDARDS BUILDING SETBACK FRONT (WEST) SIDE, STREET (SOUTH) SIDE, INTERIOR (NORTH) REAR (EAST) REQUIRED PROVIDED 50'62.5' 50'10' 0'123.2' 0'455.1' LAND USE SUMMARY (ON SITE) CATEGORY BUILDING PAVEMENT / SIDEWALK PERVIOUS TOTAL AREA PERCENTAGE 0.08 AC.1.7 % 2.51 AC.52.3 % 2.212 AC.46.1 % 20.43 AC.100 % R Know what's below. Call before you dig. TEMPORARY CONSTRUCTION EASEMENT & PROPOSED SLOPE EASEMENT AREA PARKING SPOT COUNTS SIGN SETBACK REQUIRED PROVIDED FRONT (WEST) SIDE, STREET (SOUTH) 5'10' 5'N/A PARKING SUMMARY CATEGORY STANDARD PARKING SPACES HANDICAP ACCESSIBLE SPACES TOTAL COUNT 16 2 18 STALLS REQ'D = 1 PER 200 S.F.18 MAX # OF STALL = NOT SPECIFIED N.A. SITE DATA: TM#: R04000-003-008-000 TOTAL SITE = 4.802 AC TOTAL DISTURBED AREA = 4.5 AC ZONING - HEAVY INDUSTRIAL DISTRICT (I-2) PHYSICAL ADDRESS: 2102 U.S. HWY. 421 N. WILMINGTON, NC 28401 FLOOD ZONE 'AE' PER FEMA PANEL 3720311800L EFF. 8/28/2018 CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. State o f N o r th Caroli n a A LISONG . B R A N DT REGISTERED L A N DSCAP E A R C HITE CT No . 1 1 6 3 LANDSCAPING REQUIREMENTS: TREE RETENTION: -15 TREES PER ACRE REQUIRED -TOTAL ACREAGE: 4.8 AC X 15 = 72 TREES REQUIRED -72 TREES PROVIDED STREET YARD LANDSCAPING: -1 CANOPY TREE/SHADE TREE OR 3 UNDERSTORY TREES (IF OVERHEAD POWER LINES) AND 6 SHRUBS EVERY 600 SF OF STREET YARD. -US HWY 421 STREET FRONTAGE: 267.3 LF X 12.5' WIDTH = 3,341.3 SF / 600 SF -5.6 CANOPY TREES REQUIRED -(17 UNDERSTORY TREES PROVIDED DUE TO OHP) -34 SHRUBS REQUIRED -34 SHRUBS PROVIDED PARKING LOT INTERIOR: -8% OF VEHICLE USE AREA REQUIRED TO BE LANDSCAPED -99,390 SF VUA * 8% = 7,951 SF REQUIRED -19,297 SF (19.4%) OF PLANTED AREA PROVIDED FOUNDATION PLANTING: -12% OF GROSS FLOOR AREA REQUIRED TO BE LANDSCAPED -3,500 SF * 12% = 420 SF REQUIRED -894 SF (26%) OF PLANTED AREA PROVIDED GENERAL NOTES & SPECIFICATIONS LAWN INSTALLATION: Lawn areas shall be fine graded to a smooth, positively draining slope, removing all stones over 3/4" . Agricultural limestone shall be incorporated into the soil at a rate of 50 pounds per 1000 square feet. Apply specified seed at recommended rate. Straw mulch or hydromulch shall be used as deemed necessary by the Landscape Contractor and Landscape Architect. The Landscape Contractor shall be responsible to establish a full stand of grass and will repair any bare spots 1'- 0" square due to uneven seed distribution, drought or erosion. SOD INSTALLATION: Sodded lawn areas shall be fine graded to a smooth, positively draining slope, removing all stones over 3/4" . Sod shall be healthy, thick sod placed so that joints are butt tight. Staple as necessary. Sod shall be trimmed to match bed lines shown on plan. Startup fertilizer shall be incorporated into the soil at the manufacturer's recommended rate. Any area of sod that fails to root, settles or dies will be replace by the Landscape Contractor. UTILITY LOCATION: The Landscape Contractor is responsible for contacting the utility locator service and is responsible for any damage done to utilities. QUANTITIES Plant quantities are shown for the contractor's convenience only. PLANTS SHALL BE INSTALLED AS SHOWN. Contractor is responsible for confirming all quantities prior to bidding and installation. BIDS In order to keep all bids standard, all bids are to have unit prices listed. The Owner has the option to delete any portion of the contract prior to signing the contract or beginning work. This will be a unit price contract. PLANT QUALITY All plants shall be nursery grown, have a full habit of growth as is characteristic of that species, and shall be free of disease or insects. General plant quality shall be as specified in the "USA Standard for Nursery Stock" (published by the American Association of Nurserymen). Please contact the Landscape Architect if there is difficulty in locating a particular plant. If necessary, a substitute plant will be recommended by the Landscape Architect. PLANTING AREA PREPARATION: Entire planting area shall be scarified and contain amended on-site soil or a soil mix to a depth of no less than 18". (see planting detail for more information.) SETTING OF PLANTS The root ball of container grown plants shall be scarified in several places prior to planting. Plant shrubs and trees so that after initial settlement, the top root balls will be even with or slightly above the adjacent soil line. Around root balls, 1/2 of the original soil shall be removed from the planting hole and throughly mixed with the same quantity peat moss or well rotted, fine textured bark. (Only in areas where the existing soil is 100% fertile, loose topsoil (brown or black in color) can plants be placed directly in the soil with no amendments). PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED. PREPARATION OF GROUND COVER AND SEASONAL COLOR BEDS : The existing soil in ground cover and seasonal color beds shall be thoroughly cultivated 6 inches deep, to a fine texture ( no clods over 1/2") with a mechanical tiller. A plant mix of 60% screened shredded topsoil, 20% sand, and 20% well rotted sawdust or peat shall then be thoroughly incorporated into the existing soil with the tiller so that the soil mix (6" deep) is 1/2 original soil and 1/2 plant mix. All groundcover and seasonal color beds shall receive a 2" layer of fine textured, screened, pine bark mulch, or equal. PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED. FERTILIZING Upon completion of plantings, all shrubs shall receive 1/6 cup of 16-4-8 fertilizer (50% of nitrogen slow release) evenly broadcast at the base of the plants. Trees shall receive 1/4 cup of 16-4-8 fertilizer (50% of nitrogen slow release) per inch of caliper. Ground cover beds shall be fertilized at the rate of 20 pounds of 16-4-8 ( 50% of nitrogen slow release) per 1000 square feet. STAKING OF TREES Deciduous trees, 1 1/2" in caliper and over, and evergreen trees, 8' and taller shall be staked. Rubberhose to be used to cover the wire at the point of its contact with the tree. The Landscape Contractor is responsible for all wind damage to trees, (provided winds are less than 60mph) during the guarantee period, and may stake other trees (for his own protection) at his option. TRANSPLANTS All plant material to be transplanted shall be transplanted according to guidelines set by AAN standards. Transplanted material will not be guaranteed by the landscape contractor. MULCHING As specified on planting list. Hardwood mulch: All beds to receive a 3" layer of aged hardwood bark mulch (free of wood chips or large chunks of bark). Fresh hardwood bark mulch is not recommended to be used, as water run-off may cause staining on adjacent concrete surfaces. All damages incurred by the use of fresh hardwood mulch shall be the responsibility of the landscape contractor. Pinestraw: All beds to receive a 4" layer (prior to compaction) of pinestraw. After natural compaction, pinestraw should have a depth of 2". All trees located in lawn areas shall receive a 3' diameter ring of mulch. Mulch in these areas is to follow the above listed guidelines. A weed barrier shall be provided in all bed areas under mulch layer. GRADING All final grading shall be the responsibility of the landscape contractor. The responsibility for any additional grading (if needed) shall be determined prior to bidding. BACKFILL Landscape contractor to verify any additional backfill/topsoil needed prior to beginning work. A unit price for topsoil shall be included in all bid documents to allow for circumstances that might arise during installation. STABILIZATION Landscape contractor shall ensure that all plantings are stabilized with ground covers, mulches or other approved materials to prevent soil erosion and allow rainwater infiltration. CLEAN UP Final clean up of any disturbances occurring as a result of landscape operations shall be the responsibility of the landscape contractor. INSPECTION It shall be the contractor's responsibility to provide for inspection of the plant material by the Landscape Architect prior to installation. All plant material will be inspected. Plants not conforming precisely to the plant list will not be accepted and shall be replaced at the contractor's own expense. LICENSES The contractor will be responsible for obtaining all licenses necessary to complete the work. INSURANCE With the submittal of bid documents, the landscape contractor shall also submit a certificate of insurance for workman's compensation and a contractor's general liability. Contractors not providing evidence of such insurance will be ineligible to recieve the contract for the job GUARANTEE All plant material and workmanship to be guaranteed for one year from the date of acceptance by the Owner. Plant replacement to occur only once. The contractor will not be responsible for defects resulting from neglect by the Owner, abuse or damage by others, or unusual phenomena or incidents beyond the landscape contractors control which result from natural causes such as floods, lightning, storms, freezing rains, or winds over 60 miles per hour, fire, vandalism or theft. IRRIGATION Unless otherwise specified, if an automatic irrigation system is desired or required, it will be the responsibility of the contractor to have the system designed and installed. NO IRRIGATION TO BE PLACED IN NCDOT ROW. COMPLETE PLANT SCHEDULE DETAILS AND NOTES ON SHEET L2 (14) PICH (5) ZESE (10) ZESE(10) PICH (3) ZESE (6) PICH (3) UPBO (3) ACOG (8) TOMS (3) ZESE (7) DIVJ (3) AGKA (3) AGKA (8) MSRS (9) LIMU (16) DIVJ (18) AGKA (3) QUNI (3) ACOG (3) ACOG (3) QUNI (3) UPBO (6) GAKH (6) MUPC(5) AGKA (3) JCAB (6) LCSU (3) GAKH L2 LA N D S C A P E D E T A I L S 4/28/2023 JWHITE S221106_LANDSCAPE.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 PROPOSED CONCRETE SIDEWALK PROPOSED BOLLARD CURB BACKING (DETAIL 4, SHEET SD1) PROPOSED AREA LIGHT POLES (DETAIL 6, SHEET SD2) (SEE MEP PLANS FOR CONDUIT INFORMATION) SITE DESIGN STANDARDS BUILDING SETBACK FRONT (WEST) SIDE, STREET (SOUTH) SIDE, INTERIOR (NORTH) REAR (EAST) REQUIRED PROVIDED 50'62.5' 50'10' 0'123.2' 0'455.1' CATEGORY BUILDING PAVEMENT / SIDEWALK PERVIOUS TOTAL AREA PERCENTAGE 0.08 AC.1.7 % 2.51 AC.52.3 % 2.212 AC.46.1 % 20.43 AC.100 % R Know what's below. Call before you dig. TEMPORARY CONSTRUCTION EASEMENT & PROPOSED SLOPE EASEMENT AREA PARKING SPOT COUNTS SIGN SETBACK REQUIRED PROVIDED FRONT (WEST) SIDE, STREET (SOUTH) 5'10' 5'N/A PARKING SUMMARY CATEGORY STANDARD PARKING SPACES HANDICAP ACCESSIBLE SPACES TOTAL COUNT 16 2 18 STALLS REQ'D = 1 PER 200 S.F.18 MAX # OF STALL = NOT SPECIFIED N.A. SITE DATA: TM#: R04000-003-008-000 TOTAL SITE = 4.802 AC TOTAL DISTURBED AREA = 4.5 AC ZONING - HEAVY INDUSTRIAL DISTRICT (I-2) PHYSICAL ADDRESS: 2102 U.S. HWY. 421 N. WILMINGTON, NC 28401 FLOOD ZONE 'AE' PER FEMA PANEL 3720311800L EFF. 8/28/2018 CONTACT RACETRAC PETROLEUM, INC. PROJECT MANAGER PRIOR TO ANY REVISIONS TO THE PLAN SUPPLIED BY RACETRAC PETROLEUM, INC. State o f N o r th Caroli n a A LISON G. B R A N DT REGISTERED L A N DSCAP E A R C HITE CT No . 1 1 6 3 COMPACTED SOIL MIX SCARIFY SIDES OF ROOT BALL SUBGRADE 4" SOIL SAUCER NOTES: 1. REMOVE WIRE, NYLON TWINE OR CONTAINER FROM ROOT BALL. 2. SCARIFY SIDES AND BOTTOM OF HOLE AS WELL AS THE ROOT BALL. 3. INSTALL TOP OF BALL 2" ABOVE FINISH GRADE 4. ROOT BALLS GREATER THAN 2' IN DIAMETER SHALL SIT ON MOUND OF UNDISTURBED SOIL TO PREVENT SETTLING. 5. ROOT BALLS SMALLER THAN 2' MAY SIT ON COMPACTED SOIL MIXTURE. 6. BACKFILL PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 8" LAYERS, HAND TAMP TO REMOVE VOIDS. 7. WHEN 23 BACKFILLED, FILL WITH WATER 8. AFTER BACKFILLING AND TAMPING FINAL LAYER, WATER AGAIN UNTIL NO MORE IS ABSORBED. 9. 4" SAUCER WILL BE OUTSIDE OF BACKFILL. PREPARE AREA 3 TIMES WIDTH OF ROOTBALL 3" MULCH (SEE PLANTING SCHEDULE FOR TYPE) BACKFILL MIXTURE SHRUB PLANTING N.T.S. SAUCER SOIL TO RETAIN WATER DEEPROOT ARBORTIE -INSTALLED PER MANUFACTURER www.deeproot.com PULL MULCH AWAY FROM COLLAR OF TREE 2 X 4" STAKE ROOTBALL FINISH GRADE BACKFILL MIXTURE SUBGRADE 3" OR 4" MULCH EARTH PEDESTAL TO KEEP TOP OF ROOT BALL 2" ABOVE FINISH GRADE REMOVE ALL WIRE AND AS MUCH BURLAP AS POSSIBLE NOTES: 1. REMOVE WIRE OR NYLON TWINE FROM ROOT BALL 2. INSTALL TOP OF BALL 2" ABOVE FINISH GRADE 3. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION 4. 4" SAUCER WILL BE OUTSIDE OF BACKFILL. AMENDED SOIL AREA: ENTIRE PLANTING AREA SHALL BE SCARIFIED AND CONTAIN AMENDED ON-SITE SOIL OR A SOIL MIX TO A DEPTH OF 18" (IN SOME SITUATIONS, LAWN WILL BE PLANTED OVER THIS AREA) MULCH RING FOR TREES IN LAWN MINIMUM 6' DIA. TREE OVER 2" CAL. WITH STAKING N.T.S. 6" SAUCER SOIL TO RETAIN WATER PULL MULCH AWAY FROM COLLAR OF TREE ROOTBALL FINISH GRADE AMENDED SOIL AREA SUBGRADE PREPARE AREA 3 TIMES WIDTH OF ROOT BALL 3" MULCH (SEE PLANT SCHEDULE FOR TYPE) EARTH PEDESTAL TO KEEP TOP OF ROOT BALL 2" ABOVE FINISH GRADE REMOVE ALL WIRE AND AS MUCH BURLAP AS POSSIBLE NOTES: 1. REMOVE WIRE OR NYLON TWINE FROM ROOT BALL 2. INSTALL TOP OF ROOT BALL 2" ABOVE FINISH GRADE 3. SCARIFY SIDES AND BOTTOM OF PIT. 4. BACKFILL TREE PIT WITH SPECIFIED PLANTING SOIL MIXTURE IN 8" LAYERS, HAND TAMP TO REMOVE VOIDS. 5. WHEN 23 BACKFILLED, FILL WITH WATER 6. AFTER BACKFILLING AND TAMPING FINAL LAYER, WATER AGAIN UNTIL NO MORE IS ABSORBED 7. 6" SAUCER WILL BE INSIDE OF BACKFILL. 8. DO NOT WRAP TREE TRUNK. AMENDED SOIL AREA: THOROUGHLY TILL IN PLANTING SOIL MIXTURE AMENDMENTS TO DEPTH OF 8" (IN SOME SITUATIONS, LAWN WILL BE PLANTED OVER THIS AREA) MULCH RING FOR TREES IN LAWN MINIMUM 6' DIA. 8' MIN. (WHERE SPACE ALLOWS) TOMAHAWK TREE STABILIZER (2 PER TREE) # 82101 32" (for up to 3" Caliper tree) BORDER CONCEPTS,INC. PH. 704-541-5509, borderconcepts.com TOMAHAWK TREE STABILIZER (2 PER TREE) ROOTBALL MULTI-TRUNK TREE N.T.S. LANDSCAPING REQUIREMENTS: TREE RETENTION: -15 TREES PER ACRE REQUIRED -TOTAL ACREAGE: 4.8 AC X 15 = 72 TREES REQUIRED -72 TREES PROVIDED STREET YARD LANDSCAPING: -1 CANOPY TREE/SHADE TREE OR 3 UNDERSTORY TREES (IF OVERHEAD POWER LINES) AND 6 SHRUBS EVERY 600 SF OF STREET YARD. -US HWY 421 STREET FRONTAGE: 267.3 LF X 12.5' WIDTH = 3,341.3 SF / 600 SF -5.6 CANOPY TREES REQUIRED -(17 UNDERSTORY TREES PROVIDED DUE TO OHP) -34 SHRUBS REQUIRED -34 SHRUBS PROVIDED PARKING LOT INTERIOR: -8% OF VEHICLE USE AREA REQUIRED TO BE LANDSCAPED -99,390 SF VUA * 8% = 7,951 SF REQUIRED -19,297 SF (19.4%) OF PLANTED AREA PROVIDED FOUNDATION PLANTING: -12% OF GROSS FLOOR AREA REQUIRED TO BE LANDSCAPED -3,500 SF * 12% = 420 SF REQUIRED -894 SF (26%) OF PLANTED AREA PROVIDED GENERAL NOTES & SPECIFICATIONS LAWN INSTALLATION: Lawn areas shall be fine graded to a smooth, positively draining slope, removing all stones over 3/4" . Agricultural limestone shall be incorporated into the soil at a rate of 50 pounds per 1000 square feet. Apply specified seed at recommended rate. Straw mulch or hydromulch shall be used as deemed necessary by the Landscape Contractor and Landscape Architect. The Landscape Contractor shall be responsible to establish a full stand of grass and will repair any bare spots 1'- 0" square due to uneven seed distribution, drought or erosion. SOD INSTALLATION: Sodded lawn areas shall be fine graded to a smooth, positively draining slope, removing all stones over 3/4" . Sod shall be healthy, thick sod placed so that joints are butt tight. Staple as necessary. Sod shall be trimmed to match bed lines shown on plan. Startup fertilizer shall be incorporated into the soil at the manufacturer's recommended rate. Any area of sod that fails to root, settles or dies will be replace by the Landscape Contractor. UTILITY LOCATION: The Landscape Contractor is responsible for contacting the utility locator service and is responsible for any damage done to utilities. QUANTITIES Plant quantities are shown for the contractor's convenience only. PLANTS SHALL BE INSTALLED AS SHOWN. Contractor is responsible for confirming all quantities prior to bidding and installation. BIDS In order to keep all bids standard, all bids are to have unit prices listed. The Owner has the option to delete any portion of the contract prior to signing the contract or beginning work. This will be a unit price contract. PLANT QUALITY All plants shall be nursery grown, have a full habit of growth as is characteristic of that species, and shall be free of disease or insects. General plant quality shall be as specified in the "USA Standard for Nursery Stock" (published by the American Association of Nurserymen). Please contact the Landscape Architect if there is difficulty in locating a particular plant. If necessary, a substitute plant will be recommended by the Landscape Architect. PLANTING AREA PREPARATION: Entire planting area shall be scarified and contain amended on-site soil or a soil mix to a depth of no less than 18". (see planting detail for more information.) SETTING OF PLANTS The root ball of container grown plants shall be scarified in several places prior to planting. Plant shrubs and trees so that after initial settlement, the top root balls will be even with or slightly above the adjacent soil line. Around root balls, 1/2 of the original soil shall be removed from the planting hole and throughly mixed with the same quantity peat moss or well rotted, fine textured bark. (Only in areas where the existing soil is 100% fertile, loose topsoil (brown or black in color) can plants be placed directly in the soil with no amendments). PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED. PREPARATION OF GROUND COVER AND SEASONAL COLOR BEDS : The existing soil in ground cover and seasonal color beds shall be thoroughly cultivated 6 inches deep, to a fine texture ( no clods over 1/2") with a mechanical tiller. A plant mix of 60% screened shredded topsoil, 20% sand, and 20% well rotted sawdust or peat shall then be thoroughly incorporated into the existing soil with the tiller so that the soil mix (6" deep) is 1/2 original soil and 1/2 plant mix. All groundcover and seasonal color beds shall receive a 2" layer of fine textured, screened, pine bark mulch, or equal. PLANTINGS NOT DONE IN THIS MANNER SHALL BE REMOVED AND PROPERLY REPLANTED. FERTILIZING Upon completion of plantings, all shrubs shall receive 1/6 cup of 16-4-8 fertilizer (50% of nitrogen slow release) evenly broadcast at the base of the plants. Trees shall receive 1/4 cup of 16-4-8 fertilizer (50% of nitrogen slow release) per inch of caliper. Ground cover beds shall be fertilized at the rate of 20 pounds of 16-4-8 ( 50% of nitrogen slow release) per 1000 square feet. STAKING OF TREES Deciduous trees, 1 1/2" in caliper and over, and evergreen trees, 8' and taller shall be staked. Rubberhose to be used to cover the wire at the point of its contact with the tree. The Landscape Contractor is responsible for all wind damage to trees, (provided winds are less than 60mph) during the guarantee period, and may stake other trees (for his own protection) at his option. TRANSPLANTS All plant material to be transplanted shall be transplanted according to guidelines set by AAN standards. Transplanted material will not be guaranteed by the landscape contractor. MULCHING As specified on planting list. Hardwood mulch: All beds to receive a 3" layer of aged hardwood bark mulch (free of wood chips or large chunks of bark). Fresh hardwood bark mulch is not recommended to be used, as water run-off may cause staining on adjacent concrete surfaces. All damages incurred by the use of fresh hardwood mulch shall be the responsibility of the landscape contractor. Pinestraw: All beds to receive a 4" layer (prior to compaction) of pinestraw. After natural compaction, pinestraw should have a depth of 2". All trees located in lawn areas shall receive a 3' diameter ring of mulch. Mulch in these areas is to follow the above listed guidelines. A weed barrier shall be provided in all bed areas under mulch layer. GRADING All final grading shall be the responsibility of the landscape contractor. The responsibility for any additional grading (if needed) shall be determined prior to bidding. BACKFILL Landscape contractor to verify any additional backfill/topsoil needed prior to beginning work. A unit price for topsoil shall be included in all bid documents to allow for circumstances that might arise during installation. STABILIZATION Landscape contractor shall ensure that all plantings are stabilized with ground covers, mulches or other approved materials to prevent soil erosion and allow rainwater infiltration. CLEAN UP Final clean up of any disturbances occurring as a result of landscape operations shall be the responsibility of the landscape contractor. INSPECTION It shall be the contractor's responsibility to provide for inspection of the plant material by the Landscape Architect prior to installation. All plant material will be inspected. Plants not conforming precisely to the plant list will not be accepted and shall be replaced at the contractor's own expense. LICENSES The contractor will be responsible for obtaining all licenses necessary to complete the work. INSURANCE With the submittal of bid documents, the landscape contractor shall also submit a certificate of insurance for workman's compensation and a contractor's general liability. Contractors not providing evidence of such insurance will be ineligible to recieve the contract for the job GUARANTEE All plant material and workmanship to be guaranteed for one year from the date of acceptance by the Owner. Plant replacement to occur only once. The contractor will not be responsible for defects resulting from neglect by the Owner, abuse or damage by others, or unusual phenomena or incidents beyond the landscape contractors control which result from natural causes such as floods, lightning, storms, freezing rains, or winds over 60 miles per hour, fire, vandalism or theft. IRRIGATION Unless otherwise specified, if an automatic irrigation system is desired or required, it will be the responsibility of the contractor to have the system designed and installed. NO IRRIGATION TO BE PLACED IN NCDOT ROW. TREES CODE QTY BOTANICAL NAME COMMON NAME SIZE REMARKS ACOG 9 Acer rubrum `October Glory`October Glory Red Maple 2" Cal. 10` Ht. Min.6` Clear Trunk PICH 30 Pistacia chinensis Chinese Pistache 2" Cal. 10` Ht. Min.6` Clear Trunk QUNI 6 Quercus nigra Water Oak 2" Cal. 10` Ht. Min.6' Clear Trunk UPBO 6 Ulmus parvifolia `Bosque`Bosque Lacebark Elm 2" Cal. 10` Ht. Min.6` Clear Trunk ZESE 21 Zelkova serrata `Village Green`Sawleaf Zelkova 2" Cal. 10` Ht. Min.6` Clear Trunk 1`-4` EVERGREEN SHRUB CODE QTY BOTANICAL NAME COMMON NAME SIZE REMARKS AGKA 29 Abelia x grandiflora `Kaleidoscope`Glossy Abelia 3 gal 18" Ht. Min. DIVJ 23 Distylium x `Vintage Jade`Vintage Jade Distylium 3 gal 18" Ht. Min. GAKH 9 Gardenia jasminoides `Kleim`s Hardy`Kleim`s Hardy Gardenia 3 gal 18" Ht. Min. JCAB 3 Juniperus chinensis `Angelica Blue`Angelica Blue Juniper 3 gal 18" Ht. Min. LCSU 6 Loropetalum chinense `Suzanne`Suzanne Fringe Flower 3 gal 18" Ht. Min. 6`+ EVERGREEN SHRUB CODE QTY BOTANICAL NAME COMMON NAME SIZE REMARKS TOMS 8 Thuja occidentalis `Smaragd`Emerald Green Arborvitae 6` Ht NATIVE GRASSES CODE QTY BOTANICAL NAME COMMON NAME SIZE REMARKS MUPC 6 Muhlenbergia capillaris `Pink Cloud`Pink Muhly 3 gal 18" Ht. Min. UNDERSTORY TREE CODE QTY BOTANICAL NAME COMMON NAME SIZE REMARKS LIMU 9 Lagerstroemia indica x fauriei 'Muskogee'Muskogee Crape Myrtle Multi-Trunk 8` Ht. MSRS 8 Magnolia stellata 'Royal Star'Royal Star Magnolia 8` Ht. PLANT SCHEDULE NC D O T D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 TS1 NC D O T D E T A I L S 4/28/2023 ZHEYDENBURG S221106_Details.dwg RW 1 5 8 2 - C A P E F E A R NO . DA T E VERSIONSHEET NO. TH E S E P L A N S A R E SU B J E C T T O F E D E R A L CO P Y R I G H T L A W S : A N Y US E O F S A M E W I T H O U T TH E E X P R E S S E D WR I T T E N P E R M I S S I O N OF R A C E T R A C PE T R O L E U M , I N C . I S PR O H I B I T E D . SCALE DRAWN-BY DRAWING NAME: DATE RA C E T R A C P E T R O L E U M , I N C . 20 0 G A L L E R I A P A R K W A Y S E S U I T E 9 0 0 A T L A N T A , G A 3 0 3 3 9 (7 7 0 ) 4 3 1 - 7 6 0 0 21 0 2 U . S . H W Y . 4 2 1 WI L M I N G T O N , N C 2 8 4 0 1 NE W H A N O V E R C O U N T Y 10 7 4 A S H E V I L L E H I G H W A Y SP A R T A N B U R G , S C 2 9 3 0 3 PH : ( 8 6 4 ) 2 8 5 - 0 6 1 8 ww w . s i t e d e s i g n - i n c . c o m CIV I L E N G I N E E R S - S U R V E Y O R S - L A N D S C A P E A R C H I T E C T S LIC E N S E # C - 1 3 1 7 TS2