HomeMy WebLinkAbout2023-10-02 RM ExhibitsExhibit
Page -j2L.JIq
New Hanover County Monthly Collection Report for August 2023
Current Year 2023-2024
Real Estate
Personal Property
Motor Vehicles
Combined
Scroll/Billed
$
188,243,360.35
$
.10,040,869.04
$
2,399,805.17
$
200,684,034.56
Abatements
$
(129,928.38)
$
(10,858.15)
$
$
(140,786.53)
Adjustments
$
54,765.50
$
3,420.53
$
$
58,186.03
Total Taxes Charged
$
188,168,197.47
$
10,033,431.42
$
2,399,805.17
200,601,434.06
Collections to Date
$
21,563,463.48
$
2,335,287.31
$
2,399,805.17
$
26,298,555.96
*Refunds
$
36,130.68
$
373.04
$
$
36,50172
Write-off
$
-
$
-
$
$
-
Outstanding Balance
$
166,640,864.67
$
7,698,517.15
$
i
$
174,339,381.82
Collection Percentage_
11.44
23.27
100.00
13.09
YTD Interest Collected
$
2,114.10
$
-
$
19,855.69
$
21,969.79
Tots! 2023-2024 Cof[rtct{orrs YTD 262.',84402103]
Prior Years 2013-2022
Real Estate
Personal Property
Motor Vehicles
Combined
Scroll
$
1,518,383.70
$
4,309,089.93
$
116,471.59
$ 5,943,945.22
Abatements
$
(16,319.04)
$
(291,294.40)
$
-
$ (307,613.44)
Adjustments
$
-
$
-
$
-
$
Total Levy
$
1,502,064.66
$
4,017,795.53
$
116,471.59
$ 5,636,331.78
Collections to Date
$
108,346.56
$
46,818.56
$
95.68
$ 155,260.80
*Refunds
$
82,996.53
$
8,335.04
$
-
$ 91,331.57
Write-off
$
-
$
-
$
-
$ -
Outstanding Balance
$
1,476,714.63
$
3,979,312.01
$
116,375.91
5,572,402.55
YTD Interest Collected
$
T2,513.54
$
8,339.63
$
157.17
21,010.354
Total Prior Year Collections YTD
84,939-57
Grand Total Ali Collections Y fD $ 26,368,961,6
* Detailed information for Refunds can be found in the Tax office
NEW HANOVER COUNTY —
Chair
Cle&A the Board ov
l W
old.e.,WJ3
Date
Exhibit
Book -1-01- Pagelb-oJ-10
Current Year 2023-2024
Real Estate
Personal Property
Motor Vehicles
Combined
Scroll/Billed
10,604,909.51.
$
571,736.87
$
172,757.45
$
11,349,403,83
Abatements
$
(7,319.88)
$
(611.71)
$
-
$
(7,931.59)
Adjustments
$
3,085,38
$
192.70
$
__$_172,757A5
-
$
3,27&08
Total Taxes Charged
$
10,600,675.01
$
571,317,86
$
11,344,750.3-2
Collections to Date
$
1,209,825A1
$
131,636.94
$
172,757A5
$
1,514,219,80
*Refunds
$
$
-
$
Write-off
$
-
$
6—utstanding Balance
$
9,390,849.60
$
439,680.92
$
-
$
9,830,530.52
Collection Percentage
11.41
23.04
100.00
1135
YTD Interest Collected
$
231.84
$
-
$
1,56636
$
1,798,60
Prior Years 2013-2022
Scroll
Real Estate
Personal Property
Motor Vehicles
Combined
$ 143,039.18
$ 351,58&21
$ -
$
494,62739
Abatements
$
(1,178.13)
$
(37,821.51)
$
(38,999,64)
Adjustments
$
-
$
$
-
Total Levy
$
141,861,05
$
313,76630
$ -
$
455,627,75
Collections to Date
$
9,44169
$
(3,029.26)
$ -
$
6,41143
*Refunds
$
4,33232
$
307,52
$ -
$
4,640,24
Write-off
$
-
$
-
$
Outstanding Balance
136,751.08
$
317,103LA8
$
$
453,854.56
YTD Interest Collected
fli
1,03136
$
J�
874�574$
-4s
1,905,93
Total Prior Year Collections YTD
$ 3,679,12
Erand Total All Collections YTD $ 1,519,697.52
-Detailed information for Refunds can befound in the Tax Office
NEW HANOVER COUNTY
o)
Chair
CI to the Board
Exhibit
Book %U)( Page la�,j C,
New Hanover County Fire District Monthly Collection Report for August 2023
Current Year 2023-2024
Real Estate
Personal Property
Motor Vehicles
Combined
Scroll/Billed
$
12,023,180.85
$
786,456.99
$
198,525.93
13,008,16337
Abatements
$
(2,551.71)
$
(547A3)
$
(3,09834)
Adjustments
$
61032
$
182,34
$
79166
Total Taxes Charged
$
12,021,239.46
$
786,09120
$
198,525.93
$
13,005,857.59
Collections to Date
$
1,420,73237
$
177,90339
$
198,525,93
$
1,797,161,69
*Refunds
$
$
-
$
Write-off
$
$
-
$
Outstanding Balance
$
10,600,507.09
$
608,188.81
$
J_$
11,208,695.90
Collection Percentage
11.82
22.63
160. 0
13.82
YTD Interest Collected
$
7017
$
-
$
1,55038
$
1,620.65
Total 2023-2024 Collections YTO 1,798,73234 1
Prior Years 2013-2022
Real Estate
Personal Property
Motor Vehicles
Combined
Scroll
120,022.91
$
231,475.46
$
7,288.27
$
358,786.64
Abatements
$
-
$
(44,238,59)
$
-
$
(44,238.59)
Adjustments
$
-
$
-
$
-
TotalLevy
$
120,022.91
$
187,236,87
$
7,288,27
$
314,548,05
Collections to Date
$
9,56634
$
46,08
$
-
$
9,61232
*Refunds
$
428.88
$
16122
$
-
$
59110
Write. -off
$
$
-
$
-
$
-
Outstanding Balance
$
110,885,05
187,354.01
$
7,28817
$
305,527.33
YTD Interest Collected
$
951.48
$
473,84
$
-
$
1,42532
Total Prior Year Collections YTD
$1 11809,82048
*Detailed information for Refunds can be found in the Tax Office
NEW HANOVER COUNTY12_
Chair
Date
Exhibit
Book Page
AGENDA: October 2, 2023
NEW HANOVER COUNTY BOARD OF COMMISSIONERS
AN ORDINANCE AMENDING THE FISCAL YEAR 2024 BUDGET
BE IT ORDAINED by the Board of County Commissioners of New Hanover County, North Carolina, that the following
Budget Amendment(s) be made to the annual budget ordinance for the fiscal year ending June 30, 2024.
Section 1: Details of Budget Amendment
Strategic Focus Area: Good Governance
Strategic Objective(s): Align services and programs with strategic priorities.
Fund: American Rescue Plan (ARP)
Department: Finance
Prior to Actions Total if Actions Taken
Today
ARP Budget LL __47174,477J
Section 2: Explanation
BA 24-019 budgets interest earned on American Rescue Plan (ARP) funds to address funding gaps in the contruction, of
Starway Village resulting from recent interest rate increases,,rhis project, which will provide affordable housing in the
community, has already been approved by the Board of Commissioners, This amendment provides additional funding to that
effirt. Other gap funding for this project is expected to be provided by the City of Wilmington and by the removal of
development fees. The U.S, Treasury has given direction that interest earned on ARP funds is not restricted to use on ARP. -
eligible programs and may be used for any allowable governmental purpose.
Section 3. Documentation of Adoption
This ordinance shall be effective upon its adoption,
NOW, THER1,TORE, BE IT RESOLVED by the Board of County Commissioners of New Hanover County, North Carolina,
that the Ordinance for Budget Arnendment(s) 24-019 amending the annual budget ordinance for the fiscal year ending June 30,
2024, is adopted.
Adopted, this 2nd day of October, 2023,
(SEAL)
4.111 in E. Rienbark, Chairman
VATTE'T:
Kyi erleighG.Crowell, rktothe Board
Exhibit
Book Page L
CAPITAL PROJECT ORDINANCE
NEW H4NOVERCOUNTY
REDEVELOPMENT OFTHE VV\LKx|wGTONCITY BLOCK BORDERED BY
GRACE STREET, 3^»STREET, CHESTNUT STREET, AND 2woSTREET
BEITORDAINED, bythe Board nfCommissioners nfNew Hanover County:
1. Subject to the Local Government Commission's approval of the financing, New Hanover County (County) plans
to construct a new, 95,000 square font modem, purpose-built county museum and library facility by the
developer on the northern portion of the block and to improve the existing parking deck on the same block.
Z. County desires toauthorize and budget for said project inaproject ordinance adoptedpunuanttoNorthCaroUna
General Statute Section 159-13.2, such ordinance to authorize all appropriations necessary for the completion of
said project.
3. The County desires to expend its own funds for the purpose of paying certain costs of the project, for which
expenditures the County reasonably expects to reimburse itself from the proceeds of debt to be incurred by the
County.
4. This declaration of official intent is made pursuant to Section 1.150-2 of the Treasury Regulations to expressly
declare the official intent ofthe County ioreimburse itself from the proceeds nfdebt tobehereinafter incurred
by the County for certain expenditures paid by the County on or after the date which is sixty <50> days prior to
the date hereof.
NOW, THEREFORE, WITNESSETH THAT:
l. Subject to the Local Government Commission's approval of the financing, this project ordinance is adopted
pursuant to North Carolina General Statute Section 159-13.2.
2. The project undertaken pursuant to this ordinance is the redevelopment of the Wilmington City Block bordered
byGrace Street, 3mStreet, Chestnut Street, and Ind Street, toinclude the construction ufacounty museum and
library facility and improvements to the existing parking deck on the same block, which project is herewith
authorized.
3. The revenue that will initially finance said project is:
Installment Loan Proceeds
$57,0OU,0UU
Total �571000-000
4. The following initial appropriation necessary for the project is herewith made from the revenue listed above:
Capital Project Expense
$57\0OD0OV
Total ���}���0
5. This project ordinance shall be entered in the minutes of the Board of Commissioners ofNew Hanover County.
Within five days hereof, copies of this ordinance shall be filed with the finance and budget offices in New Hanover
County, and with the Clerk to the Board of Commissioners of New Hanover County.
ADOPTED this Zndday nfOctober ZO2l
KWbedeigh6[ffve|
Clerk tuthe Board ofCommissioners
Board of County Commissioners
William ERivenbork,Chair
August 2, 2023
Mr. Doug Grant
8110 Sidbury Road
Wilmington, NC 28411
Re.: 66 Sites RV Park
Sidbury Road
New Hanover County, NC
Mr. Grant,
AKu
G601;'111c;
�'11 11
& Well PrHHHO
Exhibit
Book Page _!Lao,
The most appropriate water system will include one well system for up to 14 RV spaces
each (66 RV pads/14 = 4.7 wells, rounding to 5). As such, a total of five of these systems
will be installed, with each served by its own, independent well. The well construction
permitting authority will solely be New Hanover County Environmental Health. Each well
will be built within NCAC T:15 02C Well Construction Standards, buffers, and set backs.
The systems will be collectively regulated as a Transient, Non -Community Water System.
I also understand that each well will be designed for production of approximately 25 gallons
per minute (gpm) per well. Because this totals greater than 100,000 gallons per day (gpd)
of capacity, there will be a High Capacity System permitting requirement with the NCDEQ.
So in summary, you will permit five independent well systems. Each system will serve up
to 14 RV spaces at approximately than 25 gpm apiece. Well construction permitting will
be entirely through New Hanover County Environmental Health with buffers and setbacks
as established by the State. Water capacity permitting will be through the NCDEQ as a
High Capacity system.
If you have questions, please do not hesitate to call.
Sincerely,
James L. Comette, PG, CWD
Project Manager
Mamiaoetrwrit, E
F 0. 5:1x 5"tat!"On Koad, Harr�votegad, 1��G 25,445 910,�?70,2919 Fax EWZAO�2988,
July 22, 2023
Doug Grant
8110 Sidbury Rd
Wilmington, NC 28405
Re: (20—ac) Sidbury Road Tract, Castle Hayne, New Hanover County, NC
Parcel Number: R02000-003-012-000, R02000-003-013-000, R02000-003-005-000
Em
In February 2023, Davey Resource Group (DRG) evaluated the —20-acre parcels # R02000-003-
012-000, R02000-003-013-000, R02000-003-005-000, on the south side of Sidbury Road, Scotts
Hill, NC. The purpose of the evaluation was to evaluate the soils onsite and determine the development
potential for the placement of onsite wastewater systems for multiple residences. Multiple, shallow -auger
borings were observed. I utilized the 15A NCAC 18A .1900 subsurface wastewater laws as a guide.
Multiple soil borings across the tract confirmed soil conditions. Davey Resource Group
determined the available space of suitable soils for potential wastewater volumes and the site
plan has been designed around this to incorporate multiple independent drain fields to stay
within New Hanover County requirements and under the 3,000 gallon a day limit requiring State
review. Small cluster systems can be designed and constructed to meet the required separation
between adjacent systems. Site specific evaluations will be conducted for each system. These
will be permitted under the Engineered Option Permit and the site assessment will be performed
by DRG staff of AOWE's.
If you have any questions about this report or require assistance with individual site
plans for wastewater permitting, I may be reached at 910-452-0001, 910-620-1137 or at
migAignav I
Daveyresourcegroup.com/Carolinas - Phone: 910.452.0001 - Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403
DAVEY#'.
Resource Group
Sincerely,
G. Craig Turner
Senior Consultant
SC Certified Soil Classifier, 57
NC Licensed Soil Scientist, 1091
Davey Resource Group
3805 Wrightsville Ave., Suite 15
Wilmington, NC 28403
S.0 Certification
Number 57
Daveyresourcegroup.com/Carolinas • Phone: 910.452.0001 • Fax: 910.452.0060
3805 Wrightsville Ave., Suite 15, Wilmington, NC 28403
Book page LIL
W HANOVER COUNTY
TAX DEPARTMENT
230 GOVERNM MSn CENTER DRIVE, SU1TE 190
WILhMOMN, NORTH C"OLINA. 28403-1671
TELEPHONE {910}798-7300
FAX (910)-798-7310
November 24, 2014
Douglas Harris Grant
8110 Sidbury Rd.
AMImington N. C 28411
Market Value
Present Use Value
Ref: R02000-003- 00&000
$170,000
$6,700
R02000-003- 011-000
$113,000
$47,100
R02000-003- 012-000
$20,500
$600
R02000-003- 013 000
$14,000
$400
Dear Mr. Grant
Roger L< Kelley
Tax Administrator
Almon Snell
Asst. Tax Administrator
Your Present Use Value application has been approved for the continuation
in the program. Your plan will be monitored periodically to ensure you are complying.
Anytime In the future if you change the use or do not follow the plan use value can
be removed. If this happens you will be required to pay the current year taxes at
market and the preceding 3 years at market plus interest.
If you should have any questions or concerns please feel free to contact us.
Sincerely:
C:.�irryri�. ;Bolick
AppWser 910-798-7242
lbollck@nhcgov.com
NC Forest Service
1413 Chadbourn Hwy.
Whiteville, NC 28472
May 20, 2014
D-8 FM Plan
New Hanover County
Tract ID 065-417
Doug Grant
8110 Sidbury Rd
Wilmington NC 28411
Parcel R02000-003-005-000, R02000-003-011-000, R02000-003-012-000 & R02000-003-013-000
20.4 wooded acres
Recently, Assistant County Ranger Sloan Goins and I visited your property off of Sidbury Road. in New
Hanover County. Below you will find our recommendations for the area that you asked us to examine for
forest management, in order to maximize timber production. Acreage its estimated from aerial
photography and Geographic Information Systems (GIS) data.
Area 1 +/ 7 Acres
Stand Description
The area is a planted loblolly pine stand. The ages of the pines are 12, the diameters range from 2-4
inches and the dominant heights are 25 30 feet tell.
The understory consists of wax myrtle, gallbeny, red maple and sweetgum.
The soil consists o€Pantego loam. The soil is considered very poorly drained. The site index is 98 for
loblolly pine. This means the trees should be 98 feet tall in 50 years. Site index is a measure of the soil
productivity.
Recommendations for Area 1
The recommendation for Area I is to re-examine the stand for a commercial thin in 8-10 years. A Ong
will remove the crooked, diseased and undesirable trees and allow the remaining trees to grow. During a
thinning approximately 30% of the stand should be removed.
1610 Brian Service Center, Raleigh, North Carolina 21698-1616
Phone: (019) W74801 - FAX {918j $57-A802 • www.neforestaervke gov
An Equal Oppor�nity Employer
Doug Grant
May 20, 2014
Page 2
Area 2 +t 11.4 Acres
Stand Description
This area is a natural loblolly pine stand. The ages of the pines are 20, the diameters range from 2-6
inches and the dominant heights are 50 feet tall.
The understory consists of wax myrtle, gailberry, red maple and sweetgum.
The soil consists of Pantego loam. The soil is considered very poorly drained. The site index is 98 for
loblolly pine. This means the trees should be 98 feet tall in 50 years. Site index is a measure of the soil
productivity.
Recommendations for Area 2
The recommendation for Area 2 is to re-examine the stand for a commercial thin in 8-10 years. A thinning
will remove the crooked, diseased and undesirable trees and allow the remaining trees to grow. During a
thinning approximately 30% of the stand should be removed.
Area 3 +l--1.4 Acres
Stand Description
Axes 3 is a natural loblolly and longleaf pine stand. The ages of the trees are 58 years old, the diameters
range from 6-12 inches and the dominant heights are 60 feet tall.
The understory is comprised of red maple, wax myrtle and switchcane.
The soil consists of Pantego loam. The soil is considered very poorly drained The site index is 98 for
loblolly pine. This means the trees should be 98 feet tall in 50 years. Site index is a measure of the soil
productivity.
Recommendations for Area 3
My recommendation for Area 3 is to allow the stand to grow. The trees are mature but due to the small
acreage, you should consider a harvest when thinning Areas 1 & 2.
Area 4 +/ .6 Acres
Stand Description
Area 4 is a natural loblolly and longleaf pine stand. The ages of the trees are 40 years old, the diameters
range from 6-18 inches and the dominant heights are 65 feet tall.
The understory is comprised of grasses.
The soil consists of Pantego loam. The soil is considered very poorly drained. The site index is 98 for
loblolly pine. This means the trees should be 98 feet tali in 50 years. Site index is a measure of the soil
productivity.
Doug Grant
May 20, 2014
Page 3
Recommendations for Area 4
My recommendation for Area 4 is to allow the stand to grow. The trees are mature but due to the small
acreage, you should consider a harvest when thinning Areas 1 & 2.
Tax. Considerations
I have enclosed a handout about North Carolina's Forestry Present -Use Tax Program. I suggest you
mgwre within the New Hanover County Tax Office to make sure the area is classified as "woodland" in
order to be eligible for this lower tax rate. The area must be 20 contiguous acres. If you have any
questions about forest taxation, urge you to talk with your county tax office or your tax accountant.
Schedule of Managememt
.Areas 1 & 2 Commercially thin in 8-10 years.
Areas 3 & 4 Harvest in 8-10 years.
The NC Forest Service appreciates your interest in sound font management. I look forward to working with
you i a the future. If you have any questions, please contact the New Hanover County Office at 910-251-
5750.
Sincerely
fory KSmu
Water Quality Forester
RF ## 1662
cc: Cape Fear Area Ranger
District Office
f ncslosa=: North Carolina's Forestry Present Use Tax Prograrn
Thinning Pine Stands
? <+ df±#»
NAM; , t
!
,, f ,
ADDRESS: 8110 !dbury Rd, Wilmington
!
#
AREA OF SPECIES AND
PRACTICES & PRESCA13MON
BEDONEBYWHOM
'
NO.. ACS. APPROXAGE
FOR CARRING.
-7 Planted loblolly.years.
By 2022-24
e: 12
ByLandowner.
Height: as
Diameters: 2-4
Sitelnd=-
'
98 for loblolly.
Naturalloblolly.
Commercial In 8-10 years.
By 2027,24
Height: so
Diameters: 2.6
Site '
98 for \l+
! B
Natittalloblollygrow.
s for
By 2027,24
1A andiongleaf.
harvest
Landowner.possible
By
« 58
Height- 60
Diameters: U
She Inde=
98 for % ,
#
All pracdees should be carried
according Guidelines
Water
fArea or field number corresponds
to
. . MAP.
»M7tMT, 1M— 1
NORTH CA.ROLINA FOREST SERVICE
Department of Agriculture & Consumer Services
WOODLAND M[ANAGEM"T PLAN
NAME: Doug Grant DATE: May 20, 2014
ADDRESS: $110 Sidbnry Rd, Wilmington NC 29411
* NO.
FOREST TYPE
RECOMMENDED NEANAGEN TENT
WHEN WORK SHOULD
ARVA OF
SPECIES AND
PRA.CT(CES & PMCRIPTION
BE DONE, BY WHOM
NO. AM
APPROX AGE
FOR CARRING OUT TRUTWnM
& OTHER it+rFQRMAT][arr
.6 1 Natural lobloliy Allow to grow. Re-examine 8-lo years for Dy 2022-24
and longleaf possible harvest By Landowner:
Age: 40
Height: 45
Diameters: 64$
Site Index:
98 for loblony.
MrMONAMMAL STATEMMW
All practices should be carried out according to the NC Forest Guidelines Related to Water Quality
*Area or field number corresponds to same number shown on WOODLAND MANAGEMENT MAP.
Prepared W. Corey Klamut
Water Qualify Forester
Woodland Management Map
Acreages and Boundaries ara Annr y1mi2to
1 inch equals 268 bet
Landowner Nam: Doug Grant
County: New Hanover
Latitude: 34*20.36
Longitude: 77.48.1 a
Dane: 08/2012014
Drawn By:Sloan Go9ns
-- Roads
Streams
0 DAVENPORT
Technical Memorandum
Sidbury RV Park
New Hanover County, NC
Prepared for Doug Grant
DAVENPORT Project Number 232027
Prepared by Erin Govea, PE
Reviewed by Don Bennett, PE
September 11, 2023
1.0 Introduction
Exhibi
Book Page-J♦'
Aq,
SEAL
049181
The study site is located at 8102, 8104, and 8106 Sidbury Road in New Hanover County (NHC),
NC. The existing zoning of R-1 5 can support up to 50 single family homes based on 2.5 units per
acre. The proposed development will consist of 66 recreational vehicle (RV) sites on
approximately 20 acres and will require a Special Use Permit per the NHC Unified Development
Ordinance.
DAVENPORT has prepared this technical memorandum to summarize the trip generation based
on the by -right and proposed development land uses, to provide the results of the turn lane
warrants, and to document the available sight distances for the site driveway.
2.0 Existing Conditions
A review of the existing roadway conditions in the study area was conducted. SR 1336 (Sidbury
Road) is a two-lane, 55 mph roadway with a 2021 annual average daily traffic (AADT) volume of
3,200 vehicles per day. The site drive is existing and unpaved; it is currently shared with two
residential homes.
0 DAVENPORT
Page 2 08111/2023
Sidbury RV Park DAVENPORT !MjgdNo. 232�
3.0 Plans
The conceptual site plan shows 66 recreational vehicle (RV) sites as the proposed land use. The
conceptual site plan and a site location map are attached.
TIP Project R-3300A is the US 17 Bypass that extends from south of Hampstead at NC 140
northwards to NC 210. The proposed new roadway passes over Sidbury Road west of this study
site. No access is currently planned; however, a feasibility study is underway to convert the
overpass to an interchange. Right-of-way is in progress with construction scheduled to begin in
2026. Relevant pages from the TIP project preliminary plans are provided.
4.0 Trip Generation, Distribution, &Assignment
The Institute of Transportation Engineers (ITE) 11 th Edition Trip Generation Manual was used to
project the weekday daily, AM peak hour, and PM peak hour traffic that could be generated by
the site for by -right and proposed land uses. No trip reductions are assumed. The results of the
trip generation are shown in Table 1.
The proposed RV Park generates 26 fewer AM peak hour trips and 34 fewer PM peak hour trips
when compared to the by -right land use.
Site trip distribution percentages were determined based on anticipated traffic patterns and
engineering judgement with 75 percent of site traffic distributed to/from the west and 25 percent
to/from the east after construction of the bypass, which is west of the site. Site trips were assigned
to the network based on these trip distributions. Using these values, four fight turns and one left
turn enter in the morning, and sixteen right turns and five left turns enter in the evening.
5.0 Turn Lane Analysis
Turn lanes were considered based upon criteria set forth by the turn lane warrant nomograph
from page 80 of the NCDOT Policy on Street and Driveway Access to North Carolina Highways,
included here in the Supplemental Documents section. The nomograph indicates that turn lanes
are not warranted due to the low turning movement volumes on Sidbury Road at the site driveway.
During the morning and afternoon peak hours, fewer than twenty vehicles enter the site drive from
0 DAVENPORT
Page 3 08/11/2023
Sidbury RV Park DAVENPORT Proiect No. 232027
either direction according trip generation values and estimated traffic from the existing homes.
The nomograph plots below the 50-foot storage line; therefore, no turn lane is warranted due to
traffic volumes.
6.0 Sight Distance
For this site, the proposed driveway location was evaluated for sight distance under existing
conditions and future conditions, which includes a new bridge west of the site drive.
A field investigation was conducted on July 21, 2023, to evaluate the horizontal and vertical
alignment and determine if the available sight distance in each direction from the proposed site
access meets the minimum requirements. Sight distance requirements are based on the AASHTO
Policy on Geometric Design of Highways and Streets and NGDOT Policy on Street and Driveway
Access to North Carolina Highways standards. Sidbury Road has a posted speed limit of 55 mph
near the site. A design speed of 60 mph (speed limit plus 5 mph) was used to determine the
minimum required stopping sight distance (SSD) and intersection sight distance (ISD).
With the construction of TIP Project R-3300A, a bridge will be located west of the site. The
available sight distance with the bridge constructed was also considered. The current plans
(printed 07/05/2023) for the bridge were examined. The bridge is currently shown to end at Sta.
25+35.48 and has a downgrade of approximately four percent (4%) towards the east. The site
driveway is measured to be approximately 1,440 feet east of the end of the bridge with a grade
near zero percent between the two.
Table 2 summarizes the measured and required sight distance at the design speed of 60 miles
per hour, which is five mph greater than the speed limit.
3
0 DAVENPORT
Page 4 08/11/2023
Sidbury RV Park DAVENPORT Project No. 232027
Based on the proposed driveway location on Sidbury Road, the minimum required stopping and
intersection sight distances are met. Under existing and future geometric conditions, the available
sight distances are greater than 1,000 feet, which exceeds the minimum required sight distance
for stopping or turning at the site driveway.
7.0 Internal Protected Stem
The NCDOT Policy on Street and Driveway Access to North Carolina Highways, or the Driveway
Manual, states that the length of the internal protected stem (IPS) will be determined from the
maximum vehicle storage required as measured from the right-of-way line to the nearest conflict
point with a minimum recommendation of 100 feet. For the purposes of this report, the IPS is
estimated from the edge of pavement as shown in the preliminary conceptual site plan. The IPS
is estimated as 200 feet, which is sufficient to store at least two RVs entering the site.
8.0 Conclusion
In conclusion, this memorandum compares the by -right residential trip generation to the proposed
RV park trip generation and finds that the number of anticipated trips decrease. The estimated
number of peak hour trips at the site drive does not warrant a turn lane. The available sight
distances exceed the minimum requirements for stopping or turning vehicles at the site driveway.
The line of sight should be maintained free from shrubs/foliage that could limit sight distance. The
internal protected stem shown on the conceptual site plan of 200 feet should be sufficient to
remove at least two RVs from Sidbury Road.
DAVENPORT
Page 5 08/11/2023
Sidbury RV Pavk DAVENPORT Project No. 232027
C MoMr.-i it R
Conceptual Site Plan
Site Location Map
NCDOT Preliminary TIP Plans
Turn Lane Nomograph from NCDOT Policy on Street and Driveway Access to North Carolina
Highways:
go
I
I
2m
■
Aw
i
1
i
M 0
W _
U
J
ui
F-
tn
51
I
' 1 w
� � 3 i 3 � III � � ✓ � ' �� �� � M ,�,r:u m
dv
yy a
OFT
w
CI)
++ -
a
1-4
t-
a� Wv
44
w
-• xPo3
---
`�
o �i
RANOVER COUNTY Z�
r
r
mmn
Jyui
09w �V iO ,+1NmM
� �gq11jj "r��MyI� Q1
F1 V N124
kt�h � �t
44
ig
SSd' OOMd NI NHTd "Io06
W 0
ih-.
<
o
'3
" Q�_
8
C�} � Zo � W NNYOF>NuZ
u f �9 !� � 4 �a�01�" r m �� v y✓� Uar y � ry
!'•� .. �, i � 54- i � as �r' h :S c o U
F� °zui wvr"i �n iy
2maC� IX
Nj/j� j/J� j}+/}+ /^�j /%.'/�jj/�//�/ ycr 7 7 ' W i W i j}'D NO(''�/
E6lNN/60 �8%6t;N
u6G"W`%+ f,Pa-VOQ£Fti\i'rr.,�1Fura(�Dt�N\rfl
5'Z(7ZTS1L
R•
+ft �
g
_Q
WS
r
W
r-
n
f�� W
.fdS
gy 1
W W I
-
N
r
Mimi;�J
p
t
I"'iN
Fr
WI
I
g
f09£ 715 -t7_ .YN77WJI�yP/ 8 �A
1 W sly
$ r
'¢
nip
a
®�
y -
"O M
WH
I1'
W W
1
I L`pJ
�p
d2
I
W W 4 » W
! it
WwurdSM
WWffim"��
W
II Uu �Wl
W
W
6, at5 S
�
x6
$ ay
5
W PAW
W w
W
1 \\
W W 1
\
I
11
Hu
N l3jHS J:151
C,M)OFrW VIS - Kk ROO,
11 133H,", a'7;
cr VIS /81 3AY7NUWY
A
17
rs
Z
z
e.-2
wa
23
PA
woo, zg-wgs �Inl LfA-
842
'as
9L
.
.. ............ .. . .. . . ...........
.
IH
..___. _. _.- ___
u
1po SM9 �� '1
G+fir
i
/`,fll � `
�
«
LX
... .. ... . .... .
.
TIM,
it inn
"I 9 ol
MAI�
N. MON Ws— Uoz
A
I
JC MORGAN
REAL ESTATE VALUATION I REVIEW I CONSULTING
September27, 2023
New Hanover County
Board ofCommissioners
2]OGovernment Center Drive, Suite C75
Wilmington, NC284O]
Re: Special Use Permit Request (S23-04)
8102, 8104&81OGSidburyRoad
New Hanover County, NC
JCMorgan Company isareal estate appraisal andoon»ultin8firminVVUminOton NC. Since 2O1lour firm has
appraised and consulted on hundreds of properties in and around the tri-county area (New Hanover,Ponder,
Brunswick), The property types we appraise and provide consulting services for include residential, land, retail,
office, multi -family, industrial, subdivisions, mixed -use and more. Our client base consists of real estate
owners, developers, financial institutions, local and federal governments, attorneys, utility companies and
airport authorities.
I was recently engaged by the applicant to perform research and analysis that would enable me to conclude an
opinion as to Item 6-3 of the applicants Special Use Permit application. Item 6-3 states:
The use will not substantially injure the value of adjoining or abutting property, or that the use isopublic
To develop an opinion for this requirement, I researched several RV parks and their surrounding properties,in
the general market area. The analysis included reviewing the sales history and sales prices of residential
properties that are adjacent to existing RV parks, then, comparing that data to the sales history and sales prices
of similar residential properties in the same subdivision or on the same street that were not adjacent to the RV
park. The parks that I reviewed include the following:
l KOAinOgden
2. Topsail Sound RVPark inSneadsFerry along Morris Landing Road
3. Ocean Aire Travel Park Road in Supply
More parks were reviewed, however, like the subject property, most RVparks are not adjacent to enough
properties for any meaningful type of analysis to be completed.
IurninuStatkm
l984Eastwood Road - 8odn3O5 ' Wilmington, NC ' 20403
POBox 4Ql - Wrightsville Ueoob BC 28480
Tcl:Vl0-25h-2920
The subject property isadjacent tosix separate parcels. Three ofthose properties are residential properties,
one banequestrian center and two are large land tracts, one of which bowned by the NCDOT. All three of
the residential properties front Sidbury Road and are immediately east of where the new Hampstead By -Pass
will cross SidburyRoad.
Based onthe data that | reviewed, there is no indication that being located adjacent tothe proposed RVpark
would have a negative impact on any of the property values of the six adjacent properties or any nearby
property.
Rna|k\ | have recently completed a significant amount ofappraisal work along Si6bury Road. This includes
appraising properties in conjunction with the Hampstead Bypass, the utility easements associated with the
Duke/Progress Energy overhead powerlines currently being built and a Piedmont Natural Gas utility easement,
all along SidburyRoad. What I can confirm is that the Sidbury Road corridor is one that will experience above
average growth over the coming years and that land prices have already started to reflect that. | mention this
to provide support for our awareness and knowledge of the real estate market along the Sidbury Road area.
In conclusion, it is determined that the proposed project will not substantially injure the value of adjoining or
abutting property. Should you have any questions, or want to discuss this matter further, please do not
hesitate to contactme.
Sincerely,
Jack L([a|)Morgan, U1, MAI,6RA,m-Gms
]CMorgan Company