Smith Creek Park Phase 2A Site Plans_v129.0
30.0
35.0
40.0
43.0
29.
0
33.0
38.0
42.0
44.0 43.044.0
45.0
42.
0
43.
0
44.0
44.0
42.041.0
41.040.0
35.0
36.0
40.0
39.038.0
37.0
36.0
35.0
35.0
36.0
37.0
38.0
39.0
39.0
37.0
43.0
48.0
53.0
43.045.0
42.0
45.0
38.0
41.0
40.0
37.0
38.0
40.0
41.0
42.0
43.0
35.034.0
31.0
32.033.0
34.0
35.0
36.0
37.0
38.0
35.0
37.0
38.0
36.0
36.0
32.0
33.
0
34.0
31.030.0
33.0
32.0
33.0
30.0
29.0
29.0
28.027.0
28.0
38.0
37.0
38.0
37.0
38.0
28.
0
28.0
30.0
21.0
27.0
23.
0
20.0
32.
0
33.0 33.0
34.0
36.0
35.0
37.036.0
37.036.035.0
36.0
35.0
36.0
37.0
37.0
39.0
38.0
41.0
39.0
42.0
41.0
42.0
38.039.0
40.0
36.0
31.
0
32.0
30.0
24.0
29.
030.0
31.0
36.0
40.039.0
39.0 40.0
41.
042.
0
40.0
41.040.039.0
41.0
42.0
40.0
43.0
44.0
21.0
21.0
44.0
45.0
39.0
39.0
41.0
40.0
39.0
41.0 42.0 43.0
37.0
39.0
38.0
40.0
41.0
28.0
44.0
42.0
43.
0
42.0
45.0
41.0
37.0
38.0
41.0
29.0
45.0
38.0
UC
UC
UC
UC
UC
FO
FO
FO
FO
FO
FO
FO
UE
UE
UE
UE
UE
UE
UE
UE
UE
UEUE
UE UEUE
UEUE
UE
UE
UE
W
W
W
SS SS SS SS SS SS SS
SS
SS
SS
SS
SS
SS
UE
UE
UE
UE
UE
FO
31.0
35.0
40.0 30.0
35.0
31.0
35.0
40.0
39.0
38.0
32.0
42.0
37.036.0
34.033.032.0
31.0
38.037.0
39.0
34.035.0
38.0
37.0
37.0
37.0
40.
0
43.0
H/CVAN
H/C
N/F
CLEARWATER
PRESERVE HOA INC
PIN: 3149-65-1839.000
DB 6052 PG 1052
N/F
FRANK E. FORTE
PIN: 3149-55-9698.000
DB 6076 PG 1957
N/F
PHILIP J. ROSE and
MAGGIE H. ROSE
PIN: 3149-55-9681.000
DB 6079 PG 268N/F
CHASE BRITTIANY BARDEN
PIN: 3149-55-9565.000
DB 6094 PG 1624 N/F
THU V DE TRUONG and
TRAN T. TRUONG
PIN: 3149-55-9459.000
DB 6088 PG 1985
N/F
MICHAEL PIROZZI
PIN: 3149-55-9432.000
DB 6374 PG 1182
N/F
JAMES V. COLANGELO JR. and
SUZANNE M. COLANGELO
PIN: 3149-55-9307.000
DB 6122 PG 2101
N/F
SEAN HEATHER ROSS
PIN: 3149-55-8361.000
DB 6567 PG 2359 N/F
RONALD J. BOWSER and
NICOLE L. BOWSER
PIN: 3149-55-8236.000
DB 6118 PG 865
N/F
STEPHANIE ETVIR SMITH
PIN: 3149-55-8201.000
DB 6448 PG 909 N/F
MARIA E. CRESPO
PIN: 3149-55-7185.000
DB 6188 PG 2187
N/F
KASSIE M. COLEY
PIN: 3149-55-7140.000
DB 6258 PG 1951 N/F
JEAN B. CABANTOUS
and TRICIA SMITH
PIN: 3149-55-7014.000
DB 6513 PG 41
N/F
MATTHEW P. RAY and
JENNIFER M. RAY
PIN: 3149-54-6989.000
DB 6464 PG 1633
N/F
GORDON ROAD
OWNERS ASSN
PIN: 3149-54-4569.000
DB 6051 PG 1368
N
/
F
A
L
E
X
A
N
D
R
A
V
.
C
A
V
A
S
O
S
a
n
d
A
A
R
O
N
M
.
C
A
V
A
S
O
S
P
I
N
:
3
1
4
9
-
5
4
-
2
6
7
0
.
0
0
0
D
B
6
5
0
3
P
G
1
4
5
2
N
/
F
D
A
W
N
O
.
S
I
M
M
O
N
S
P
I
N
:
3
1
4
9
-
5
4
-
1
7
7
5
.
0
0
0
D
B
1
3
5
0
P
G
1
7
5
2
N/
F
JE
R
O
N
E
E
.
K
A
H
A
M
PI
N
:
3
1
4
9
-
5
4
-
0
7
4
1
.
0
0
0
D
B
1
4
5
2
P
G
8
8
2
N/F
JOE
C
H
A
R
L
E
S
H
R
S
PIN
:
3
1
4
9
-
4
4
-
8
7
4
7
.
0
0
0
DB
9
9
0
7
P
G
1
7
9
0
N/F
HAT
T
I
E
W
.
S
C
H
M
I
D
T
PIN
:
3
1
4
9
-
4
4
-
7
8
0
6
.
0
0
0
DB
5
3
1
8
P
G
9
7
0
N/FDAWN O.
S
I
M
M
O
N
S
PIN: 3149
-
4
4
-
5
8
5
3
.
0
0
0
DB 6332
P
G
1
3
7
5
N/F
NEW HANOVER COUNTY
PIN: 3149-35-9962.000
DB 5940 PG 1175
N/F
NEW HANOVER COUNTY
PIN: 3149-56-3801.000
DB 5570 PG 857
N/F
HAWTHORNE AT SMITH
CREEK APARTMENTS LLC
PIN: 3149-34-3939.000
DB 6265 PG 1120
N/F
GORDON ROAD
OWNERS ASSN
PIN: 3149-54-4569.000
DB 6051 PG 1368
N/F
DERRICK DANA BLANKS
PIN: 3149-54-68953.000
DB 6090 PG 568
N/F
KEVIN HARLA JOHNSON
PIN: 3149-54-6634.000
DB 6132 PG 2369
N/F
EMMANUEL B. IBARRA
PIN: 3149-54-6828.000
DB 6509 PG 1255
N/F
KEVIN A. HALL
PIN: 3149-54-8716.000
DB 6098 PG 2430
N/F
MICHAEL A. ALTILIO
PIN: 3149-54-7762.000
DB 6345 PG 2545
N/F
MDM PROPERTIES LLC
PIN: 3149-54-7616.000
DB 6345 PG 2564
N/F
CLEARWATER
PRESERVE HOA INC
PIN: 3149-54-6811.000
DB 6052 PG 1052
PROPERT
Y
L
I
N
E
PROPERTY LINE
PROPERTY
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
N/F
GREGORY G. THOMPSON
and JAMIE K. THOMPSON
PIN: 3149-65-3867.000
DB 6113 PG 199
N/F
KRISTINA SAUNDERS
PIN: 3149-65-4839.000
DB 6382 PG 35
N/F
LENORSE T. MCKENZIE and
ELIZABETH A. MCKENZIE
PIN: 3149-65-4990.000
DB 6147 PG 1131
PROJECT SITE
I-4
0C
O
L
L
E
G
E
R
O
A
D
GO
R
D
O
N
R
O
A
D
LA
K
E
E
M
E
R
A
L
D
DR
I
V
E
E
HA
R
R
I
S
R
O
A
D
SMITH CREEK PARK
SHEET INDEX
Cover Sheet
SITE/CIVIL
SW-1 Overall Site Plan
SW-2 Existing Conditions
SW-3 Site Demolition and Clearing Plan
SW-4 Tree Removal Plan
SW-5 Site Layout Plan
SW-6 Site Layout Plan
SW-7 Site Layout Plan
SW-8 Site Layout Plan
SW-9 Site Details
SW-10 Planting Plan
SW-11 Planting Plan and Details
C-1.0 Grading and Drainage Plan
C-1.1 Grading and Drainage Plan
C-1.2 Grading and Drainage Plan
C-1.3 Grading and Drainage Plan
C-1.4 Grading Details
C-1.5 Retaining Wall Details
C-2.0 Utility Plan
C-2.1 Utility Plan
C-2.2 Utility Detail
VICINITY MAP
NOT TO SCALE
SCALE: 1" = 200' - 0"
4001000200
PARK
ENTRANCE
Hatchell
Susan
Landscape Architecture, PLLC
PROPOSED
SHELTER/
RESTROOM
SMITH CREEK PARK PHASE 2A
New Hanover County, North Carolina
OCTOBER 24, 2023 - 60% DESIGN DEVELOPMENT DRAWINGS
PROPOSED
ASPHALT
PARKING LOT
PROPOSED
8'-WIDE ASPHALT
MULTI-USE PATH
EXISTING
NON-PAVED
TRAIL
TU
P
E
L
O
D
R
LA
K
E
E
M
E
R
A
L
D
D
R
E
PROPOSED
8'-WIDE ASPHALT
MULTI-USE PATH
20'-WIDE
TRANSITIONAL
BUFFER
20'-WIDE
TRANSITIONAL
BUFFER
SITE DATA
NAME:
OWNER:
DEVELOPER:
CONTACT:
ADDRESS:
TELEPHONE:
PROPERTY ADDRESS:
PARCEL ID NUMBER:
PIN:
DEED BOOK AND PAGE:
ZONING DISTRICT:
TOTAL LAND AREA:
PROPOSED DISTURBED AREA:
CURRENT USE:
PROPOSED USE:
EXISTING IMPERVIOUS AREA:
PROPOSED IMPERVIOUS AREA:
PROPOSED BUILDING:
FLOOD INFORMATION:
WATER AND SEWER SERVICE:
ELECTRICAL SERVICE:
SMITH CREEK PARK PHASE 2A
NEW HANOVER COUNTY
NEW HANOVER COUNTY PARKS & GARDENS
TARA DUCKWORTH, DIRECTOR
896 AIRLIE ROAD, WILMINGTON, NC 28403
(910) 798-7635
251 LAKE EMERALD DRIVE E, WILMINGTON, NC 28411
R03500-006-001-000
3149-35-9962.000
DB 5940, PG 1175
R-15
85.01 ACRES
6.4 ACRES
PARK / RECREATIONAL FACILITIES
PARK / RECREATIONAL FACILITIES
725 SF, 0.02% OF THE OVERALL SITE
88,750 SF WITHIN PROJECT LIMITS, 2.4% OF THE OVERALL SITE
SHELTER/RESTROOM, MAXIMUM 14'-8" HEIGHT, 1,984 S.F.
THIS PARCEL CONTAINS AREAS LOCATED IN FLOOD ZONE "X", AS
DETERMINED BY FEMA FLOOD PANEL 3720314900K DATED AUGUST 28, 2018
CAPE FEAR PUBLIC UTILITY AUTHORITY - 910.332.6550
DUKE ENERGY - 800.452.2777
10'-WIDE SIDE
SETBACK
25'-WIDE FRONT
SETBACK
10'-WIDE SIDE
SETBACK
20'-WIDE REAR
SETBACK
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
40'-WIDE DRAINAGE
EASEMENT
DB 5940 PG 1175
40
'
-
0
"
PROJECT DIRECTORY
Landscape Architect / Prime Consultant:
Susan Hatchell Landscape Architecture, PLLC
711 W. North Street, Raleigh, NC 27603
910.444.9209
Civil Engineer: RK&K
8601 Six Forks Road, Forum 1, Suite 700
Raleigh, NC 27615
919.878.9560
Architect: Huffman Architects
632 Pershing Road, Raleigh, NC 27608
919.270.6455
Structural Engineer: Lysaght & Associates
120 St. Mary’s Street, Raleigh, NC 27605
919.833.0495
MEP Engineer: Sigma Engineered Solutions, PC
5909 Falls of Neuse Road, Suite 101
Raleigh, NC 27609
919.840.9300
Surveyor: Colliers Engineering & Design
301 Government Center Drive, Suite 201
Wilmington, NC 28403
910.444.3517
Environmental Services: Axiom Environmental, Inc.
218 Snow Avenue, Raleigh, NC 27603
919.270.9306
Geotechnical Engineer: S&ME
3006 Hall Waters Drive, Suite 100
Wilmington, NC 28405
910.799.9945
DRAFT
H/C
VAN
H/C
N/FNEW HANOVER COUNTYPIN: 3149-56-3801.000DB 5570 PG 857
N/F
HAWTHORNE AT SMITH CREEKAPARTMENTS LLCPIN: 3149-34-3939.000DB 6265 PG 1120
N/F
CLEARWATER PRESERVE HOAINCPIN: 3149-65-1839.000DB 6052 PG 1052
N/F
GORDON ROAD OWNERS ASSNPIN: 3149-54-4569.000DB 6051 PG 1368
N/F
GORDON ROAD OWNERS ASSN
PIN: 3149-54-4569.000
DB 6051 PG 1368
N/FKEVIN HARLA JOHNSON
PIN: 3149-54-6634.000DB 6132 PG 2369
N
/
F
M
D
M
P
R
O
P
E
R
T
I
E
S
L
L
C
PI
N
:
3
1
4
9
-
5
4
-
7
6
1
6
.
0
0
0
D
B
6
3
4
5
P
G
2
5
6
4
N/F
EMMA
N
U
E
L
B
.
I
B
A
R
R
A
PIN: 3
1
4
9
-
5
4
-
6
8
2
8
.
0
0
0
DB 65
0
9
P
G
1
2
5
5
N/F
DERRI
C
K
D
A
N
A
B
L
A
N
K
S
PIN: 3
1
4
9
-
5
4
-
6
8
9
5
3
.
0
0
0
DB 60
9
0
P
G
5
6
8
N/F
MATT
H
E
W
P
.
R
A
Y
a
n
d
JENNI
F
E
R
M
.
R
A
Y
PIN: 3
1
4
9
-
5
4
-
6
9
8
9
.
0
0
0
DB 64
6
4
P
G
1
6
3
3
N/F
JEAN
B
.
C
A
B
A
N
T
O
U
S
a
n
d
TRICI
A
S
M
I
T
H
PIN: 3
1
4
9
-
5
5
-
7
0
1
4
.
0
0
0
DB 65
1
3
P
G
4
1
N/FKASS
I
E
M
.
C
O
L
E
Y
PIN: 31
4
9
-
5
5
-
7
1
4
0
.
0
0
0
DB 62
5
8
P
G
1
9
5
1
N/FMARI
A
E
.
C
R
E
S
P
O
PIN: 3
1
4
9
-
5
5
-
7
1
8
5
.
0
0
0
DB 61
8
8
P
G
2
1
8
7
N/F
STEP
H
A
N
I
E
E
T
V
I
R
S
M
I
T
H
PIN: 3
1
4
9
-
5
5
-
8
2
0
1
.
0
0
0
DB 64
4
8
P
G
9
0
9
N/F
RONA
L
D
J
.
B
O
W
S
E
R
a
n
d
NICO
L
E
L
.
B
O
W
S
E
R
PIN: 3
1
4
9
-
5
5
-
8
2
3
6
.
0
0
0
DB 61
1
8
P
G
8
6
5
N/F
SEAN
H
E
A
T
H
E
R
R
O
S
S
PIN: 3
1
4
9
-
5
5
-
8
3
6
1
.
0
0
0
DB 65
6
7
P
G
2
3
5
9
N/F
JAME
S
V
.
C
O
L
A
N
G
E
L
O
J
R
.
a
n
d
SUZA
N
N
E
M
.
C
O
L
A
N
G
E
L
O
PIN: 3
1
4
9
-
5
5
-
9
3
0
7
.
0
0
0
DB 61
2
2
P
G
2
1
0
1
N/FMICH
A
E
L
P
I
R
O
Z
Z
I
PIN: 31
4
9
-
5
5
-
9
4
3
2
.
0
0
0
DB 63
7
4
P
G
1
1
8
2
N/FTHU V DE TRUONG andTRAN T. TRUONGPIN: 3149-55-9459.000
DB 6088 PG 1985
N/FCHASE BRITTIANY BARDEN
PIN: 3149-55-9565.000DB 6094 PG 1624
N/FPHILIP J. ROSE andMAGGIE H. ROSEPIN: 3149-55-9681.000DB 6079 PG 268
N/FFRANK E. FORTEPIN: 3149-55-9698.000DB 6076 PG 1957
N/
F
G
R
E
G
O
R
Y
G
.
T
H
O
M
P
S
O
N
a
n
d
J
A
M
I
E
K
.
T
H
O
M
P
S
O
N
PI
N
:
3
1
4
9
-
6
5
-
3
8
6
7
.
0
0
0
D
B
6
1
1
3
P
G
1
9
9
N/
F
K
R
I
S
T
I
N
A
S
A
U
N
D
E
R
S
P
I
N
:
3
1
4
9
-
6
5
-
4
8
3
9
.
0
0
0
DB
6
3
8
2
P
G
3
5
N/
F
LE
N
O
R
S
E
T
.
M
C
K
E
N
Z
I
E
a
n
d
EL
I
Z
A
B
E
T
H
A
.
M
C
K
E
N
Z
I
E
PI
N
:
3
1
4
9
-
6
5
-
4
9
9
0
.
0
0
0
DB
6
1
4
7
P
G
1
1
3
1
N/F
ALEXANDRA V. CAVASOS andAARON M. CAVASOSPIN: 3149-54-2670.000DB 6503 PG 1452
N/FDAWN O. SIMMONS
PIN: 3149-54-1775.000DB 1350 PG 1752
N/
F
MI
C
H
A
E
L
A
.
A
L
T
I
L
I
O
PI
N
:
3
1
4
9
-
5
4
-
7
7
6
2
.
0
0
0
D
B
6
3
4
5
P
G
2
5
4
5
N/
F
K
E
V
I
N
A
.
H
A
L
L
PI
N
:
3
1
4
9
-
5
4
-
8
7
1
6
.
0
0
0
D
B
6
0
9
8
P
G
2
4
3
0
N/FJERONE E. KAHAMPIN: 3149-54-0741.000DB 1452 PG 882N/FJOE CHARLES HRSPIN: 3149-44-8747.000DB 9907 PG 1790
N/FHATTIE W. SCHMIDTPIN: 3149-44-7806.000DB 5318 PG 970
N/FDAWN O. SIMMONSPIN: 3149-44-5853.000DB 6332 PG 1375
N/F
CLEARWATERPRESERVE HOA INCPIN: 3149-54-6811.000DB 6052 PG 1052
LA
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
.
UC
U
C
UC
UC
FO
FO
FO
FO
FO
FO
UE
UE
UE
U
E
UE
UE
UE
UE
UE
UEUE UE
UE
UE
UE
UE
UE
UE
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UE
UE
UE
UE
UE
F
O
TUPEL
O
D
R
I
V
E
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-1
12060 240
SCALE: 1" = 120' - 0"
NAD 83 NC GRID
0
OV
E
R
A
L
L
SI
T
E
P
L
A
N
SHEETS
SW-7 & C-1.2
PROPOSED
PARKING LOTPROPOSED
RESTROOM
& SHELTER
PROPOSED 8' WIDE
ASPHALT MULTI-USE PATH
SHEETS
SW-8 & C-1.3 SHEETS
SW-6 & C-1.1
SHEETS
SW-5 & C-1.0
40'-WIDE DRAINAGE
EASEMENT
DB 5940 PG 1175
DRAFT
LA
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
.
WC09 WC10
WC04WC05
WC08
WC103
WC02WC03
WC102 WC101
WC01
UC
UC
U
C
U
C
UC
UC
UC
UC
UC
FO
FO
FO
F
O
FO
FO
FO
FO
F
O
FO
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UEUE
UE
UE
UE
UE
UE
UE
UE
UE
W
W
W
W
W
F
O
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UEUEUEUE
UE
UE
UE
UE
UE
UE
UE
FO
FO
TUPE
L
O
D
R
I
V
E
WOOD SHELTE
R
PAVERS
PARK SIGN
WOOD FENCE
CHAINLINK FE
N
C
E
PARK SIGN
WOOD FENC
E
WOOD FENCE
WOOD FENC
E
PARK SIGN
WOOD FENCE
~TOP OF SLOPE~
~TOP OF SLOPE~
~T
O
P
O
F
S
L
O
P
E
~
4X6 WOOD
TRAIL INDICA
T
O
R
S
CENTER OF
T
R
A
I
L
CENTER OF T
R
A
I
L
EDGE OF DR
I
V
E
~TOP OF SLOPE~
CENTER OF
T
R
A
I
L
CENTER OF T
R
A
I
L
CENTER OF T
R
A
I
L
TREELINE
CENTER OF T
R
A
I
L
TREELINE
~DITCH~
TREELINE
~DITCH~
~MOUND~
~MOUND~
~T
O
E
O
F
S
L
O
P
E
~
~TOE OF SLO
P
E
~
WIRE FENCE
WOOD FENCE
WOOD FENCE
N/F
NEW HANOVER COUNTY
PIN: 3149-56-3801.000
DB 5570 PG 857
N/F
HAWTHORNE AT SMITH CREEKAPARTMENTS LLC
PIN: 3149-34-3939.000
DB 6265 PG 1120
N/FCLEARWATER PRESERVE HOA
INC
PIN: 3149-65-1839.000
DB 6052 PG 1052
N/F
GORDON ROAD OWNERS ASSNPIN: 3149-54-4569.000
DB 6051 PG 1368
N
/
F
KE
V
I
N
H
A
R
L
A
J
O
H
N
S
O
N
PI
N
:
3
1
4
9
-
5
4
-
6
6
3
4
.
0
0
0
D
B
6
1
3
2
P
G
2
3
6
9
N
/
F
M
D
M
P
R
O
P
E
R
T
I
E
S
L
L
C
P
I
N
:
3
1
4
9
-
5
4
-
7
6
1
6
.
0
0
0
D
B
6
3
4
5
P
G
2
5
6
4
N/F
EMM
A
N
U
E
L
B
.
I
B
A
R
R
A
PIN:
3
1
4
9
-
5
4
-
6
8
2
8
.
0
0
0
DB 65
0
9
P
G
1
2
5
5
N/F
DERR
I
C
K
D
A
N
A
B
L
A
N
K
S
PIN: 3
1
4
9
-
5
4
-
6
8
9
5
3
.
0
0
0
DB 60
9
0
P
G
5
6
8
N/F
MATT
H
E
W
P
.
R
A
Y
a
n
d
JENN
I
F
E
R
M
.
R
A
Y
PIN: 3
1
4
9
-
5
4
-
6
9
8
9
.
0
0
0
DB 6
4
6
4
P
G
1
6
3
3
N/F
JEAN
B
.
C
A
B
A
N
T
O
U
S
a
n
d
TRICI
A
S
M
I
T
H
PIN: 3
1
4
9
-
5
5
-
7
0
1
4
.
0
0
0
DB 6
5
1
3
P
G
4
1
N/FKASS
I
E
M
.
C
O
L
E
Y
PIN:
3
1
4
9
-
5
5
-
7
1
4
0
.
0
0
0
DB 62
5
8
P
G
1
9
5
1
N/FMARI
A
E
.
C
R
E
S
P
O
PIN: 3
1
4
9
-
5
5
-
7
1
8
5
.
0
0
0
DB 6
1
8
8
P
G
2
1
8
7
N/F
STEP
H
A
N
I
E
E
T
V
I
R
S
M
I
T
H
PIN:
3
1
4
9
-
5
5
-
8
2
0
1
.
0
0
0
DB 64
4
8
P
G
9
0
9
N/F
RON
A
L
D
J
.
B
O
W
S
E
R
a
n
d
NICO
L
E
L
.
B
O
W
S
E
R
PIN:
3
1
4
9
-
5
5
-
8
2
3
6
.
0
0
0
DB 61
1
8
P
G
8
6
5
N/F
SEAN
H
E
A
T
H
E
R
R
O
S
S
PIN: 3
1
4
9
-
5
5
-
8
3
6
1
.
0
0
0
DB 65
6
7
P
G
2
3
5
9
N/F
JAME
S
V
.
C
O
L
A
N
G
E
L
O
J
R
.
a
n
d
SUZA
N
N
E
M
.
C
O
L
A
N
G
E
L
O
PIN:
3
1
4
9
-
5
5
-
9
3
0
7
.
0
0
0
DB 61
2
2
P
G
2
1
0
1
N/FMICH
A
E
L
P
I
R
O
Z
Z
I
PIN: 3
1
4
9
-
5
5
-
9
4
3
2
.
0
0
0
DB 63
7
4
P
G
1
1
8
2
N/F
THU V DE TRUONG and
TRAN T. TRUONG
PIN: 3149-55-9459.000
DB 6088 PG 1985
N/FCHASE BRITTIANY BARDEN
PIN: 3149-55-9565.000
DB 6094 PG 1624
N/FPHILIP J. ROSE and
MAGGIE H. ROSE
PIN: 3149-55-9681.000
DB 6079 PG 268
N/FFRANK E. FORTEPIN: 3149-55-9698.000
DB 6076 PG 1957
N/F
ALEXANDRA V. CAVASOS and
AARON M. CAVASOS
PIN: 3149-54-2670.000DB 6503 PG 1452
N/FDAWN O. SIMMONS
PIN: 3149-54-1775.000
DB 1350 PG 1752
N
/
F
MI
C
H
A
E
L
A
.
A
L
T
I
L
I
O
PI
N
:
3
1
4
9
-
5
4
-
7
7
6
2
.
0
0
0
D
B
6
3
4
5
P
G
2
5
4
5
N
/
F
K
E
V
I
N
A
.
H
A
L
L
P
I
N
:
3
1
4
9
-
5
4
-
8
7
1
6
.
0
0
0
D
B
6
0
9
8
P
G
2
4
3
0
N/FJERONE E. KAHAM
PIN: 3149-54-0741.000
DB 1452 PG 882N/F
JOE CHARLES HRS
PIN: 3149-44-8747.000DB 9907 PG 1790
N/F
HATTIE W. SCHMIDT
PIN: 3149-44-7806.000
DB 5318 PG 970
N/F
DAWN O. SIMMONSPIN: 3149-44-5853.000
DB 6332 PG 1375
N/F
CLEARWATER
PRESERVE HOA INC
PIN: 3149-54-6811.000DB 6052 PG 1052
5" PEAR
12" PINE
4" PEAR
12" PINE
12" PINE
7" PEAR
8"OAK
10" OAK (2) 12" OAK
26" PINE
18" PINE
22" OAK
20" PINE20" OAK
20" PINE
18" PINE
13" PINE
16" PINE
9" DOGWOOD (DEAD)
9" OAK
9" OAK
(2) 8" OAK 10" OAK
24" PINE
12" OAK
7" PEAR
10" OAK
14" PINE
16" PINE
6" OAK
17" PINE
12" MYRTLE
12" MYRTLE
8" LONG
LEAF PINE
15" LONG LEAF PINE
10" MYRTLE
12" OAK8" OAK5" PEAR
21" PINE
18" PINE
11" OAK
18" PINE
9" OAK 22" OAK
22" PINE
6" MAGNOLIA
8" OAK
24" PINE13" PINE
22" LONG
LEAF PINE
8" OAK
11" OAK
CLUSTER
8" PEAR12" PINE
6" PEAR
5" PEAR12" PINE
8" PEAR
18" LONG
LEAF PINE
16" LONG
LEAF PINE
18" LONG
LEAF PINE
13" PINE
18" PINE
12" PINE
6" PEAR
6" PEAR
12" PINE
12" PINE
13" PINE
8" PEAR
12" PINE6" HOLLY
11" OAK
9" OAK
8" PEAR
7" PEAR
7" PEAR
9" OAK 11" OAK
10" OAK
11" CEDAR
9" PEAR
22" PINE
16" PINE
8" OAK
16" PINE
11" PINE
16" PINE
8" PINE 12" PINE8" PINE
8" OAK22" PINE
9" OAK 9" PEAR
10" PINE17" PINE
17" PINE
13" PINE12" PINE
10" OAK
10" OAK
8" OAK
12" OAK
8" OAK
8" OAK
9" OAK
8" OAK
10" OAK
8" OAK
8" OAK19" PINE
24" PINE
20" LONG
LEAF PINE
14" PINE
21" LONG
LEAF PINE
22" LONG
LEAF PINE
16" LONG
LEAF PINE
14" PINE 24" PINE
30" PINE
9" OAK
8" OAK
12" PINE
6" MAGNOLIA
23" PINE
27" PINE
20" LONG
LEAF PINE
19" LONG
LEAF PINE10" OAK
17" LONG
LEAF PINE
8" OAK
10" OAK
14" LONG
LEAF PINE
16" LONG
LEAF PINE
10" LONG
LEAF PINE14" OAK
13" LONG
LEAF PINE
18" PINE14" PINE
18" PINE
15" PINE20" PINE
27" PINE
13" PINE
8" PINE
19" PINE
11" PINE
18" PINE
16" PINE
14" PINE
17" PINE
19" PINE
17" LONG
LEAF PINE
16" PINE
22" PINE
18" PINE
28" PINE
8" PINE
10" PINE
10" PINE15" PINE
14" LONG
LEAF PINE
(2) 20" PINE
32" PINE
40" PINE
19" LONG
LEAF PINE
28" PINE
30" PINE
24" DEAD PINE
7" PEAR
5" PEAR
6" PEAR
5" PEAR
7" PEAR
12" LONG
LEAF PINE
21" PINE
17" LONG
LEAF PINE
20" PINE
14" OAK
22" PINE
16" PINE
13" PINE
16" PINE
19" PINE
14" PINE
8" OAK
14" PINE
19" LONG
LEAF PINE
12" PINE
13" OAK
12" PINE
12" PINE
12" PINE
9" PINE
4" HOLLY
10" PEAR
8" PEAR 16" PINE
24" PINE
24" PINE
12" PINE
8" OAK
8" OAK
8" OAK
22" PINE
24" LONG
LEAF PINE
12" DOUBLE
OAK
17" PINE
12" PINE
8" OAK
34" LONG
LEAF PINE
28" PINE
18" GUM 27" PINE
12" OAK
24" PINE
19" PINE
12" PINE
16" PINE
14" OAK
CLUSTER
22" PINE
19" PINE
19" PINE
17" PINE
10" OAK
16" PINE
17" PINE
16" PINE
12" PINE
12" PINE 12" PINE
20" PINE
20" PINE
18" PINE
18" PINE
20" PINE
18" PINE
14" PINE
16" PINE
16" PINE
16" PINE
18" PINE
14" PINE
18" PINE19" PINE
12" PINE
18" PINE
14" PINE17" PINE
14" PINE
15" PINE18" PINE
18" PINE
(2) 16" PINE
18" PINE
22" PINE
24" PINE
14" PINE
16" PINE
14" PINE
20" PINE
16" PINE
19" PINE
18" PINE
20" PINE
23" PINE
18" PINE
24" PINE
24" PINE
10" OAK26" PINE
15" OAK
15" PINE
18" PINE
22" PINE
20" PINE
14" PINE
10" OAK14" PINE
10" OAK
12" PINE
22" PINE
22" PINE
12" PINE20" PINE
20" PINE
10" OAK
20" PINE
20" PINE
20" PINE12" OAK
16" PINE
24" PINE
12" OAK16" OAK
14" OAK
8" OAK
15" PINE
8" OAK
8" OAK
13" OAK
17" PINE
13" PINE
12" PINE
21" PINE
16" PINE
19" OAK
19" PINE
18" PINE
17" PINE
16" PINE
17" OAK
19" PINE
15" PINE
16" PINE
12" PINE
12" PINE
16" PINE
8" OAK
12" PINE
20" PINE
14" PINE
13" PINE
20" PINE
16" PINE
21" PINE
12" PINE
16" PINE
15" OAK
14" PINE
16" PINE
16" PINE
15" PINE
17" PINE20" PINE 15" PINE
20" PINE 19" PINE
20" PINE
15" PINE
12" OAK
17" PINE
8" OAK
20" PINE 14" PINE
16" PINE
24" PINE
16" PINE
14" PINE 20" PINE
19" PINE
14" PINE15" PINE12" PINE
16" PINE
18" PINE
16" PINE
20" PINE16" PINE
16" PINE
18" PINE
14" PINE
16" PINE
16" PINE
18" PINE
9" OAK
24" PINE19" PINE
22" PINE
14" PINE
20" PINE
11" OAK
15" PINE
8" PINE
29.
0
30.0
35.0
40.0
43.0
2
9
.
0
42.0
44.0 43.0
44.0
45.0
4
2
.
0
4
3
.
0
44
.
0
44.0
42
.
0
41.0
41
.
0
40.0
35.0
36.0
40.
039.
038.
037.
0
36.0
35.0
35.0
36.0
37.0
38.0
39.0
39.0
37.0
43.048.053.0
43.0
45.0
42.0
45
.
0
38.0
41.0
40.0
37.0
38.
0
40.0
41.0
42.0
43.
035.0
34
.
0
31.032.033.034.035.036.037.0
38
.
035
.
0
37.0
38.0
36
.
0
36.0
3
2
.
0
3
3
.
0
34.0
31.0
30.0 33.0
32.0
33.0
30.0
29.0
29.0
28
.
0
27
.
0
28
.
0
38.0
37.0
38.0
37.0
38.0
2
8
.
0
28.0
30.0
21.0
27.0
20.0
32.
0
33.0 33.0
34.0
36.0
35.0
37.036.0
37.036.035.0
36.0 35.0
36.0 37.0
37.0
39.0
38.0
41.0
39.0
42.0
41.0
42.0
38.039.0
40.
0
36.0
31
.
0
32.0
30.0
24.0
29
.
0
30
.
0
31.0
36.0 40.039.0
39.0
40.0
41
.
0
42
.
0
40.0
44.0
44
.
0
45
.
0
39.0
39.0
41.0
40.039.0
37.0
39.0
38.0
40.0
41.0
28
.
0
44.0
42.0
4
3
.
0
42.0
45.0
41
.
0
37.0
38
.
0
41
.
0
29.0
45.0
38.0
31.0
35.0
40.0
35.0
31.0
35.0
40.0
39.0
38.0
37.036.0
34.0
35.0
38.037.0
37.0 37.0
40
.
0
43.0
PARK SIGN
CHAINLINK F
E
N
C
E
EDGE OF GR
A
V
E
L
~DITCH~
EXISTING
ASPHALT TRA
I
L
16" PINE
12" PINE
12" PINE 12" PINE
18" PINE16" PINE
14" PINE
12" PINE
16" PINE
16" PINE
16" PINE
16" PINE8" TREE
16" PINE
12" PINE
12" PINE12" PINE
12" PINE
12" PINE
12" PINE
26" PINE16" PINE
12" PINE
12" PINE
16" PINE12" PINE
14" PINE
12" PINE
14" PINE
12" PINE
22" PINE
14" PINE
12" PINE
18" PINE
38.039.0
40.
0
41
.
0
42
.
0
40.0
41.040.039.0
41.0
42.040.0 43.0
41.0 42.0 43.0
30.0
35.0
35.0
31.0
35.0
40.0
32.0
42.037.036.0
34.033.032.031.0
38.037.0
36.0
43.0
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-2
8040 160
SCALE: 1" = 80' - 0"
NAD 83 NC GRID
0
EX
I
S
T
I
N
G
CO
N
D
I
T
I
O
N
S
N/F
NEW HANOVER COUNTY
PIN: 3149-35-9962.000
DB 5940 PG 1175
L
A
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
TU
P
E
L
O
D
R
MATHCLINE - SEE AREA BELOW
WETLAND
EXISTING
VEGETATION
TO REMAIN
STEEP
SLOPE
±33%
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING NON-PAVED
TRAIL TO REMAIN
20'-WIDE
TRANSITIONAL
BUFFER
20'-WIDE
TRANSITIONAL
BUFFER
EXISTING
ASPHALT
TRAIL
EXISTING
NON-PAVED
TRAIL
EXISTING
NON-PAVED
TRAIL
EXISTING
NON-PAVED
TRAIL
EXISTING
NON-PAVED
TRAILS
NOTES:
1. SURVEY INFORMATION WAS RECEIVED
JUNE 27, 2023.
2. SURVEY PERFORMED BY:
COLLIERS ENGINEERING & DESIGN
301 GOVERNMENT CENTER DR, STE 201
WILMINGTON, NC 28403
3. ELEVATIONS TIED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988
(NAVD 88) AND HORIZONTAL COORDINATES
TIED TO THE NORTH CAROLINA GRID
SYSTEM.
40'-WIDE DRAINAGE
EASEMENT
DB 5940 PG 1175
20'-WIDE
TRANSITIONAL
BUFFER
STEEP
SLOPE
±33%
STEEP SLOPE ±33%
STEEP
SLOPE
±33%
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
SHEET KEY
SW-2
MATCHLINE - SEE AREA ABOVE
EXISTING TREES
LEGEND:
EXISTING NON-PAVED TRAIL
CENTERLINE
EXISTING WOODLINE
EXISTING CONTOUR40.0
EXISTING PROPERTY LINE
EXISTING DRAINAGE EASEMENT
10'-WIDE
SIDE SETBACK
2
5
'
-
W
I
D
E
F
R
O
N
T
S
E
T
B
A
C
K
10'-WIDE
SIDE SETBACK
10'-WIDE
SIDE SETBACK DRAFT
UC
UC
U
C
U
C
UC
U
C
UC
UC
UC
FO
FO
FO
F
O
FO
FO
FO
FO
F
O
FO
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UEUE
UE
UE
UE
UE
UE
UE
UE
UE
W
W
W
W
W
F
O
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UEUEUEUE
UE
UE
UE
UE
UE
UE
UE
FO
FO
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CRZ
C
R
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
C
R
Z
CR
Z
CRZ
C
R
Z
CRZ
CR
Z
CR
Z
CRZ
CRZ
CRZ
CRZ
CRZ
C
R
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CRZ
CRZ
CRZ
CR
Z
CRZ
CR
Z
CR
Z
C
R
Z
CRZ
CR
Z
CRZ
C
R
Z
C
R
Z
CR
Z
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
C
R
ZCRZ
C
R
Z
C
R
Z
CRZ
CR
Z
CR
Z
C
R
Z
CRZ
CRZ
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CR
Z
C
R
Z
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CR
Z
C
R
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CRZ
CRZCRZ
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CR
Z
CRZ
CRZ
CRZ
CR
Z
CRZ
CR
Z
CRZ
CRZ
CR
Z
CRZ
CRZ
CRZ
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CRZCR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ C
R
Z
CR
Z
CRZ
CRZ
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
ZCR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CRZ
CR
Z
C
R
Z
C
R
Z
CRZ
CRZ
CRZ
CRZ
CRZ
CR
Z
CR
Z
CRZ
CR
ZCR
Z
CR
Z
CRZ
CR
Z
CR
Z
C
R
Z
CR
Z
CRZ
CRZ
C
R
Z
C
R
Z
CR
Z
CR
Z
C
R
Z
CR
Z
C
R
Z
CRZ
C
R
Z
CRZ
C
R
Z
CRZ
CRZ
CRZ
CRZ
CR
Z
C
R
Z
CR
Z
CRZ
CRZ
CRZ
CRZ
C
R
Z CR
Z
CRZ
CR
Z
CRZ
CRZ
C
R
Z
C
R
Z
CRZ
C
R
Z
C
R
Z
CR
Z
CRZ
CR
Z
CR
Z
CRZ
C
R
Z
C
R
Z
CR
Z
C
R
Z
CRZ
CRZ
CRZ
CRZ
CR
Z
CRZ
CRZ
C
R
Z
CR
Z
CR
Z
CRZ
CRZ
CRZ
C
R
Z
CR
Z
CRZC
R
Z
CR
Z
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CRZ
CRZ
CR
Z
CRZ
CRZ
CRZ
CR
ZCRZ
CRZ
CRZ CRZ
CRZ
CR
Z
CRZ
CR
Z
C
R
Z
C
R
Z
C
R
Z
CRZ
CR
Z
C
R
Z
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CRZ
C
R
Z
CRZ
C
R
Z
CR
Z
CRZ
CRZ
CR
Z
CRZ
CRZ
C
R
Z
CR
Z
CR
Z
C
R
Z
CR
Z
CRZ
CRZ
CR
Z
CR
Z
C
R
Z
C
R
Z
C
R
Z
CR
Z
CRZ CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
C
R
Z
C
R
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
ZCR
Z
CR
ZCR
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CR
Z CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
5" PEAR
12" PINE
4" PEAR
12" PINE
12" PINE
7" PEAR
8"OAK
10" OAK (2) 12" OAK
26" PINE
18" PINE
22" OAK
20" PINE20" OAK
20" PINE
18" PINE
13" PINE
16" PINE
9" DOGWOOD (DEAD)
9" OAK
9" OAK
(2) 8" OAK 10" OAK
24" PINE
12" OAK
7" PEAR
10" OAK
14" PINE
16" PINE
6" OAK
17" PINE
12" MYRTLE
12" MYRTLE
8" LONG
LEAF PINE
15" LONG LEAF PINE
10" MYRTLE
12" OAK8" OAK5" PEAR
21" PINE
18" PINE
11" OAK
18" PINE
9" OAK 22" OAK
22" PINE
6" MAGNOLIA
8" OAK
24" PINE13" PINE
22" LONG
LEAF PINE
8" OAK
11" OAK
CLUSTER
8" PEAR12" PINE
6" PEAR
5" PEAR12" PINE
8" PEAR
18" LONG
LEAF PINE
16" LONG
LEAF PINE
18" LONG
LEAF PINE
13" PINE
18" PINE
12" PINE
6" PEAR
6" PEAR
12" PINE
12" PINE
13" PINE
8" PEAR
12" PINE6" HOLLY
11" OAK
9" OAK
8" PEAR
7" PEAR
7" PEAR
9" OAK 11" OAK
10" OAK
11" CEDAR
9" PEAR
22" PINE
16" PINE
8" OAK
16" PINE
11" PINE
16" PINE
8" PINE 12" PINE8" PINE
8" OAK22" PINE
9" OAK 9" PEAR
10" PINE17" PINE
17" PINE
13" PINE12" PINE
10" OAK
10" OAK
8" OAK
12" OAK
8" OAK
8" OAK
9" OAK
8" OAK
10" OAK
8" OAK
8" OAK19" PINE
24" PINE
20" LONG
LEAF PINE
14" PINE
21" LONG
LEAF PINE
22" LONG
LEAF PINE
16" LONG
LEAF PINE
14" PINE 24" PINE
30" PINE
9" OAK
8" OAK
12" PINE
6" MAGNOLIA
23" PINE
27" PINE
20" LONG
LEAF PINE
19" LONG
LEAF PINE10" OAK
17" LONG
LEAF PINE
8" OAK
10" OAK
14" LONG
LEAF PINE
16" LONG
LEAF PINE
10" LONG
LEAF PINE14" OAK
13" LONG
LEAF PINE
18" PINE14" PINE
18" PINE
15" PINE20" PINE
27" PINE
13" PINE
8" PINE
19" PINE
11" PINE
18" PINE
16" PINE
14" PINE
17" PINE
19" PINE
17" LONG
LEAF PINE
16" PINE
22" PINE
18" PINE
28" PINE
8" PINE
10" PINE
10" PINE15" PINE
14" LONG
LEAF PINE
(2) 20" PINE
32" PINE
40" PINE
19" LONG
LEAF PINE
28" PINE
30" PINE
24" DEAD PINE
7" PEAR
5" PEAR
6" PEAR
5" PEAR
7" PEAR
12" LONG
LEAF PINE
21" PINE
17" LONG
LEAF PINE
20" PINE
14" OAK
22" PINE
16" PINE 13" PINE
16" PINE
19" PINE
14" PINE
8" OAK
14" PINE
19" LONG
LEAF PINE
12" PINE
13" OAK
12" PINE
12" PINE
12" PINE
9" PINE
4" HOLLY
10" PEAR
8" PEAR 16" PINE
24" PINE
24" PINE
12" PINE
8" OAK
8" OAK
8" OAK
22" PINE
24" LONG
LEAF PINE
12" DOUBLE
OAK
17" PINE
12" PINE
8" OAK
34" LONG
LEAF PINE
28" PINE
18" GUM 27" PINE
12" OAK
24" PINE
19" PINE
12" PINE
16" PINE
14" OAK
CLUSTER
22" PINE
19" PINE
19" PINE
17" PINE
10" OAK
16" PINE
17" PINE
16" PINE
12" PINE
12" PINE 12" PINE
20" PINE
20" PINE
18" PINE
18" PINE
20" PINE
18" PINE
14" PINE
16" PINE
16" PINE
16" PINE
18" PINE
14" PINE
18" PINE19" PINE
14" PINE17" PINE
14" PINE
15" PINE18" PINE
18" PINE
(2) 16" PINE
18" PINE
22" PINE
24" PINE
14" PINE
16" PINE
14" PINE
20" PINE
16" PINE
19" PINE
18" PINE
20" PINE
23" PINE
18" PINE
24" PINE
24" PINE
10" OAK26" PINE
15" OAK
15" PINE
18" PINE
22" PINE
20" PINE
14" PINE
10" OAK14" PINE
10" OAK
12" PINE
22" PINE
22" PINE
12" PINE20" PINE
20" PINE
10" OAK
20" PINE
20" PINE
20" PINE12" OAK
16" PINE
24" PINE
12" OAK16" OAK
14" OAK
8" OAK
15" PINE
8" OAK
8" OAK
13" OAK
17" PINE
13" PINE
12" PINE
21" PINE
16" PINE
19" OAK
19" PINE
18" PINE
17" PINE
16" PINE
17" OAK
19" PINE
15" PINE
16" PINE
12" PINE
12" PINE
16" PINE
8" OAK
12" PINE
20" PINE
14" PINE
13" PINE
20" PINE
16" PINE
21" PINE
12" PINE
16" PINE
15" OAK
14" PINE
16" PINE
16" PINE
15" PINE
17" PINE20" PINE 15" PINE
20" PINE 19" PINE
20" PINE
15" PINE
12" OAK
17" PINE
8" OAK
20" PINE 14" PINE
16" PINE
24" PINE
16" PINE
14" PINE 20" PINE
19" PINE
14" PINE15" PINE12" PINE
16" PINE
18" PINE
16" PINE
20" PINE16" PINE
16" PINE
18" PINE
14" PINE
16" PINE
16" PINE
18" PINE
9" OAK
24" PINE19" PINE
22" PINE
14" PINE
20" PINE
11" OAK
15" PINE
8" PINE
29.
0
30.0
35.0
40.0
43.0
2
9
.
0
42.0
44.0 43.0
44.0
45.0
4
2
.
0
4
3
.
0
44
.
0
44.0
42
.
0
41.0
41
.
0
40.0
35.0
36.0
40.
039.
038.
037.
0
36.0
35.0
35.0
36.0
37.0
38.0
39.0
39.0
37.0
43.048.053.0
43.0
45.0
42.0
45
.
0
38.0
41.0
40.0
37.0
38.
0
40.0
41.0
42.0
43.
035.0
34
.
0
31.032.033.034.035.036.037.0
38
.
035
.
0
37.0
38.0
36
.
0
36.0
3
2
.
0
3
3
.
0
34.0
31.0
30.0 33.0
32.0
33.0
30.0
29.0
29.0
28
.
0
27
.
0
28
.
0
38.0
37.0
38.0
37.0
38.0
2
8
.
0
28.0
30.0
21.0
27.0
20.0
32.
0
33.0 33.0
34.0
36.0
35.0 37.036.0
37.036.035.0
36.0 35.0
36.0 37.0
37.0
39.0
38.0
41.0
39.0
42.0
41.0
42.0
39.0
40.
0
36.0
31
.
0
32.0
30.0
24.0
29
.
0
30
.
0
31.0
36.0 40.039.0
39.0
40.0
41
.
0
42
.
0
44.0
44
.
0
45
.
0
39.0
39.0
41.0
40.039.0
37.0
39.0
38.0
40.0
41.0
28
.
0
44.0
42.0
4
3
.
0
42.0
45.0
41
.
0
37.0
38
.
0
41
.
0
29.0
45.0
38.0
31.0
35.0
40.0
31.0
35.0
40.0
39.0
38.0
34.0
35.0
38.037.0
37.0 37.0
40
.
0
43.0
LO
D
LO
D
LO
D
LO
D
LO
D
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD LOD
LODLODLOD
LOD
LO
D
LO
D
LOD
LODLODLODLODLODLODLODLOD
LODLOD
LOD
LODLODLODLOD
LOD
LOD
LODLODLODLODLOD
LOD
LO
D
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
L
O
D
L
O
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LOD LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
L
O
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
L
O
D
LO
D
LODLODLODLODLODLODLODLODLODLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD LOD LOD LOD
LOD LOD LOD LOD LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LOD
LO
D
LO
D
L
O
D
L
O
D
LO
D
LO
D
SF
SFSFSF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF
SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
LOD
LO
D
LO
D
L
O
D
L
O
D
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CRZ
CRZ
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
C
R
Z
CRZ
CRZ
CRZ
CRZ
CR
Z CRZ
CRZ
CR
Z
CR
Z
CR
Z
CR
ZCRZ
C
R
Z
CR
Z
16" PINE
12" PINE
12" PINE 12" PINE
8" TREE
16" PINE
12" PINE
12" PINE12" PINE
12" PINE
12" PINE
12" PINE
26" PINE16" PINE
12" PINE12" PINE
16" PINE12" PINE
14" PINE
12" PINE
14" PINE
12" PINE
22" PINE
14" PINE
12" PINE
18" PINE
38.039.0
40.
0
41
.
0
42
.
0
40.0
41.0
42.040.0 43.0
41.0 42.0 43.0
30.0
35.0
35.0
40.0
42.037.036.0
34.033.032.031.0
43.0
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLOD
LOD
SF
SFSFSF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSF
SFSFSFSFSFSFSFSF
SFSFSFSFSFSFSF
SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SFSFSF
SF
SF SF SF SF SF SF SF SF
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-3
8040 160
SCALE: 1" = 80' - 0"
NAD 83 NC GRID
0
SI
T
E
D
E
M
O
L
I
T
I
O
N
AN
D
C
L
E
A
R
I
N
G
PL
A
N
N/F
NEW HANOVER COUNTY
PIN: 3149-35-9962.000
DB 5940 PG 1175
L
A
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
TU
P
E
L
O
D
R
MATCHLINE - SEE AREA BELOW
WETLAND
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING NON-PAVED
TRAIL TO REMAIN
PROPERTY LINE
PROPERTY LINE
PROPERTY
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
SHEET KEY
SW-3
MATCHLINE - SEE AREA ABOVE
NOTE:
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION ALONG
NEW ENTRY DRIVE, PARKING LOT, AND TRAILS. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
ACTUAL CLEARING LIMITS WILL BE DETERMINED IN THE
FIELD ONCE THE DRIVE, PARKING LOT, AND TRAILS HAVE
BEEN STAKED/FLAGGED.
NOTES:
1. SELECT TRAIL ALIGNMENT TO AVOID ANY LARGE OR SIGNIFICANT TREES OR
STEEP SLOPES. FINAL TRAIL CENTERLINE TO BE FLAGGED OR STAKED IN THE
FIELD FOR APPROVAL BY LANDSCAPE ARCHITECT AND OWNER PRIOR TO
CONSTRUCTION.
2. VEGETATION SHOULD BE CLEARED TO A HEIGHT OF 96" ABOVE TRAILBED.
BRANCHES THAT COULD RESTRICT TRAIL USE WHEN WEIGHTED DOWN WITH
RAIN OR SNOW SHOULD ALSO BE REMOVED.
3. AN OVERHEAD CANOPY OF BRANCHES SHOULD REMAIN TO SLOW THE
GROWTH OF GRASSES OR WEEDS THAT THRIVE IN SUNLIGHT.
4. VERIFY REMOVAL AND/OR PRUNING OF LARGE TREES ON TRAIL WITH OWNER
PRIOR TO CONSTRUCTION.
Not to Scale
1
SW-3
TRAIL CLEARING LIMITS
EXISTING VEGETATION PROTECTIVE MEASURES:
1. EXISTING TREES, REGARDLESS OF SIZE, SHALL NOT BE CUT OR
OTHERWISE DAMAGED OR DESTROYED EXCEPT AS SHOWN ON AN
APPROVED LANDSCAPE AND TREE PRESERVATION PLAN, TREE
REMOVAL PLAN, OR SITE PLAN.
2. DURING CONSTRUCTION ACTIVITIES, ADEQUATE PROTECTIVE
MEASURES SHALL BE PROVIDED TO MINIMIZE DAMAGE TO EXISTING
TREES AND OTHER VEGETATION.
3. ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY
GRADING, CONSTRUCTION TRAFFIC OR ACTIVITY TAKING PLACE ON
SITE.
4. LOGGING MATS SHALL BE USED IN AREAS WHERE CRITICAL ROOT
ZONES MAY BE DISTURBED DURING CONSTRUCTION.
5. SIGNS SHALL BE POSTED IDENTIFYING THE TREE PROTECTION AREAS
AND SHALL STATE THE AREA IS NOT TO BE DISTURBED. SUCH
PROTECTIVE DEVICES SHALL EFFECTIVELY PROTECT THE CRITICAL
ROOT ZONES, TRUNKS, AND TOPS OF TREES TO BE RETAINED AND
SHALL BE MAINTAINED UNTIL ALL WORK HAS BEEN COMPLETED.
6. CONSTRUCTION TRAFFIC, STORAGE OF VEHICLES AND MATERIALS, SOIL
COMPACTION, FILING, AND GRADING SHALL NOT TAKE PLACE WITHIN
THE DRIP LINE OF TREES TO BE PRESERVED.
7. CONSTRUCTION ACCESS TO A SITE SHOULD BE LOCATED WHERE AN
EXISTING OR PROPOSED ENTRANCE/EXIT IS LOCATED.
8. A STABILIZED OPEN AREA SHOULD BE DESIGNATED FOR STORAGE OF
MATERIALS (INCLUDING STOCKPILING OF SOIL AND GRAVEL) AND FOR
PARKING CONSTRUCTION VEHICLES AND EQUIPMENT.
TRAIL CLEARING LIMITS
CLEARING LIMITS, TREES TO BE REMOVED,
AND SPECIFIC BRANCHES TO BE PRUNED
MUST BE STAKED/FLAGGED IN THE FIELD
FOR LANDSCAPE ARCHITECT APPROVAL
AND/OR FIELD ADJUSTMENT. SELECTIVELY
CLEAR TREES AND PRUNE BRANCHES IN
THIS AREA ONLY AFTER APPROVAL.
SW-3
1
CL
TRAILBED
TRAILWAY AND DRAINAGE SWALES
LIMIT OF CLEARING
LIMBS TO BE
REMOVED
AT COLLAR
PRUNE, TYP.
LI
M
I
T
O
F
C
L
E
A
R
I
N
G
LI
M
I
T
O
F
C
L
E
A
R
I
N
G
WIDTH
VARIES
96
"
8' TRAIL
2'
SHOULDER
2'
SHOULDER
DRAINAGE
SWALE
REMOVE
DEMOLITION NOTES:
1. CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO
LANDSCAPE ARCHITECT PRIOR TO CONSTRUCTION.
2. CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR
WITH PROJECT PLANS, SPECIFICATIONS AND SITE
CONDITIONS PRIOR TO STARTING CONSTRUCTION.
SOME FIELD ADJUSTMENT IS EXPECTED, ESPECIALLY
FOR WALKWAY AND TRAIL LAYOUT. LAYOUT CENTERLINE
OF TRAILS AND CLEARING LIMITS IN THE FIELD FOR
APPROVAL PRIOR TO CLEARING.
3. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS,
DEPTHS, DISTANCES, ANGLES AND SLOPES PRIOR TO
ORDERING MATERIALS OR CONSTRUCTING PROJECT.
LIMITS OF DEMOLITION SHALL BE MARKED IN THE FIELD
PRIOR TO CONSTRUCTION.
4. REFER TO CONSTRUCTION SEQUENCE ON CIVIL SHEETS.
5. CONTRACTOR SHALL LOCATE ALL UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION AND SHALL BE
RESPONSIBLE FOR THE PROTECTION AND REPAIR OF
THESE UTILITIES DURING THE CONSTRUCTION OF THE
PROJECT WITHOUT ANY ADDITIONAL COST TO THE
OWNER.
6. CONTRACTOR SHALL DEMOLISH AND REMOVE ITEMS
LABELED "TO BE REMOVED" AND DISPOSE OF THEM
OFFSITE IN A LAWFUL MANNER.
7. TREE/SILT AND TREE PROTECTION FENCE SHALL BE
INSTALLED PRIOR TO START OF DEMOLITION.
8. THROUGHOUT THE DURATION OF THE CONTRACT, THE
CONTRACTOR SHALL PROVIDE TEMPORARY
BARRICADES AT THE PARK'S ENTRANCE TO PROTECT
THE PUBLIC AND KEEP PEDESTRIANS OUT OF THE
CURRENT PORTION OF THE WORK.
9. CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
10. ALL TREES, STUMPS, LIMBS, DIRT, OTHER SIMILAR
GREEN WASTE, AND CONSTRUCTION DEBRIS TO BE
DISPOSED OF AT A CERTIFIED LANDFILL OR GROUND
INTO MULCH ON-SITE.
CRITICAL ROOT ZONE (CRZ):
1.0 FOOT PER 1.0 INCH OF TREE
DIAMETER AT BREAST HEIGHT (DBH)
LEGEND:
CRZ
EXISTING WOODS AND VEGETATION
TO BE REMOVED
EXISTING WOODS AND VEGETATION
TO BE SELECTIVELY CLEARED
APPROX. 2.15 ACRES OF
WOODS AND VEGETATION
TO BE CLEARED FOR ENTRY DRIVE,
PARKING, UTILITIES, AND
RESTROOM/PICNIC SHELTER
LAYOUT CENTERLINE OF
TRAILS AND FLAG LIMITS OF
TREE REMOVAL IN THE FIELD
FOR LANDSCAPE ARCHITECT
APPROVAL PRIOR TO CLEARING
LAYOUT CENTERLINE OF
TRAILS AND FLAG LIMITS
OF TREE REMOVAL IN THE
FIELD FOR APPROVAL
PRIOR TO CLEARING
EXISTING PARK SIGN
AND SPLIT RAIL
FENCE TO BE
REMOVED AND GIVEN
TO THE OWNER
LIMITS OF DISTURBANCELODLOD
STAGING AREA
DRAFT
LO
D
LO
D
LO
D
LO
D
LO
D
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
LO
D
LO
D
L
O
D
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD LOD
LODLODLOD
LOD
LO
D
LO
D
LOD
LODLODLODLODLODLODLODLOD
LODLOD
LOD
LODLODLODLOD
LOD
LOD
LODLODLODLODLOD
LOD
LO
D
LOD
LOD
LOD
LOD
LODLODLODLOD
LODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
L
O
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
LOD LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
L
O
D
LO
D
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
L
O
D
LO
D
LODLODLODLODLODLODLODLODLODLO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD
LOD
LOD LOD LOD LOD
LOD
LOD LOD LOD LOD
LOD LOD LOD LOD LOD LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LOD
LO
D
LO
D
L
O
D
L
O
D
LO
D
LO
D
SF
SFSFSF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF
SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF SF
SF
SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
LOD
LO
D
L
O
D
L
O
D
L
O
D
LA
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
.
UC
UC
U
C
U
C
UC
UC
UC
UC
UC
FO
FO
FO
F
O
FO
FO
FO
FO
F
O
FO
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UEUE
UE
UE
UE
UE
UE
UE
UE
UE
W
W
W
W
W
F
O
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UEUEUEUE
UE
UE
UE
UE
UE
UE
UE
FO
FO
TUPE
L
O
D
R
I
V
E
CR
Z
CR
Z
CRZ
CRZ
C
R
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
C
R
Z
CR
Z
CRZ
C
R
Z
CRZ
CR
Z
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
C
R
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CRZ
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CRZ
CR
Z
CRZ
C
R
Z
C
R
Z
CR
Z
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
CRZ
C
R
Z
CRZ
C
R
Z
C
R
Z
CRZ
CR
Z
CR
Z C
R
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
C
R
Z
CR
Z
C
R
Z
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CR
Z
C
R
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CRZ
CRZCRZ
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CR
Z
CRZ
CRZ
CRZ
CR
Z
CRZ
CR
Z
CRZ
CRZ
CR
Z
CRZ
CRZ
CRZ
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ C
R
Z
CR
Z
CRZ
CRZ
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CRZ
CR
Z
CR
Z
CRZ
CR
Z
C
R
Z
C
R
Z
CRZ
CRZ
CRZ
CRZ
CRZ
CR
Z
CR
Z
CRZ
CR
ZCR
Z
CR
Z
CRZ
CR
Z
CR
Z
C
R
Z
C
R
Z
CRZ
CRZ
C
R
Z
C
R
Z
CR
Z
CR
Z
C
R
Z
CR
Z
C
R
Z
CRZ
CR
Z
CRZ
C
R
Z
CRZ
CRZ
CRZ
CRZ
CR
Z
C
R
Z
CR
Z
CRZ
CRZ
CRZ
C
R
Z CR
Z
CRZ
CR
Z
CRZ
CRZ
C
R
Z
C
R
Z
CRZ
CR
Z
C
R
Z
CR
Z
CRZ
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
C
R
Z
C
R
Z
CRZ
CRZ
CRZ
CRZ
CR
Z
CRZ
CRZ
C
R
Z
CR
Z
CR
Z
CRZ
CRZ
CRZ
C
R
Z
CR
Z
CRZC
R
Z
CR
Z
CR
Z
CRZ
CRZ
CR
Z
CR
Z
CRZ
CRZ
CR
Z
CRZ
CRZ
CRZ
CRZCRZ
CRZ
CRZ CRZ
CRZ
C
R
Z
C
R
Z
CRZ
CR
Z
C
R
Z
CRZ
CRZ
CR
Z
CRZ
C
R
Z
CRZ
C
R
Z
CR
Z
CRZ
CRZ
CR
Z
CRZ
CRZ
C
R
Z
CR
Z
CR
Z
C
R
Z
CR
Z
CRZ
CRZ
CR
Z
CR
Z
C
R
Z
C
R
Z
C
R
Z
CR
Z
CRZ
CRZ
C
R
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
Z
CR
ZCR
Z
CR
Z
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CR
Z CR
Z
C
R
Z
CR
Z
CR
Z
5" PEAR12" PINE
4" PEAR
12" PINE
12" PINE
7" PEAR
8"OAK
10" OAK (2) 12" OAK
26" PINE
18" PINE
22" OAK
20" PINE20" OAK
20" PINE
18" PINE
13" PINE
16" PINE
9" DOGWOOD
(DEAD)
9" OAK
9" OAK
10" OAK
24" PINE
12" OAK
7" PEAR
10" OAK
14" PINE
16" PINE
6" OAK
17" PINE
12" MYRTLE
12" MYRTLE
8" LONG
LEAF PINE
15" LONG
LEAF PINE
10" MYRTLE
12" OAK
8" OAK
5" PEAR21" PINE
18" PINE
11" OAK
18" PINE
9" OAK 22" OAK
22" PINE
6" MAGNOLIA
8" OAK
24" PINE13" PINE
22" LONG
LEAF PINE
8" OAK
11" OAK
CLUSTER
8" PEAR12" PINE
6" PEAR
5" PEAR
12" PINE
8" PEAR
18" LONG
LEAF PINE
16" LONG
LEAF PINE
18" LONG
LEAF PINE
13" PINE 18" PINE
12" PINE
6" PEAR
6" PEAR
12" PINE
12" PINE
13" PINE
8" PEAR
12" PINE6" HOLLY
11" OAK
9" OAK
8" PEAR
7" PEAR
7" PEAR
9" OAK 11" OAK
10" OAK
11" CEDAR
9" PEAR
22" PINE
16" PINE
8" OAK
16" PINE
11" PINE
16" PINE
8" PINE 12" PINE8" PINE
8" OAK
22" PINE
9" OAK
9" PEAR
10" PINE
17" PINE
17" PINE
13" PINE12" PINE
10" OAK10" OAK
8" OAK
12" OAK
8" OAK
8" OAK
8" OAK19" PINE
20" LONG
LEAF PINE
14" PINE
21" LONGLEAF PINE
22" LONG
LEAF PINE
16" LONG
LEAF PINE
14" PINE 24" PINE
30" PINE 12" PINE
6" MAGNOLIA
20" LONGLEAF PINE
19" LONG
LEAF PINE10" OAK
17" LONG
LEAF PINE 8" OAK
10" OAK
14" LONGLEAF PINE
16" LONGLEAF PINE
10" LONG
LEAF PINE
14" OAK
13" LONG
LEAF PINE
18" PINE14" PINE
18" PINE
15" PINE20" PINE
27" PINE
13" PINE
8" PINE
19" PINE
11" PINE
18" PINE
16" PINE
14" PINE
17" PINE
19" PINE
17" LONG
LEAF PINE
16" PINE
22" PINE
18" PINE
28" PINE
8" PINE
14" LONG
LEAF PINE
32" PINE
40" PINE
19" LONGLEAF PINE
28" PINE
30" PINE
24" DEAD PINE
7" PEAR
5" PEAR
6" PEAR
5" PEAR
7" PEAR12" LONG
LEAF PINE
21" PINE
17" LONG
LEAF PINE
20" PINE
14" OAK 22" PINE
13" PINE
16" PINE
19" PINE
14" PINE
8" OAK
14" PINE
19" LONGLEAF PINE
12" PINE
13" OAK
12" PINE
12" PINE
12" PINE
9" PINE
4" HOLLY 10" PEAR
8" PEAR
16" PINE
24" PINE
24" PINE
12" PINE
8" OAK
8" OAK
8" OAK 22" PINE
24" LONG
LEAF PINE
12" DOUBLE
OAK
17" PINE
12" PINE
8" OAK34" LONG
LEAF PINE
28" PINE
18" GUM 27" PINE
12" OAK
24" PINE
19" PINE
12" PINE
16" PINE
14"
OAK
CLUSTER
22" PINE
19" PINE
19" PINE
16" PINE
17" PINE
16" PINE
12" PINE
12" PINE
12" PINE
20" PINE
20" PINE
18" PINE
18" PINE
20" PINE
18" PINE
14" PINE
16" PINE
16" PINE
16" PINE
18" PINE
14" PINE
18" PINE
19" PINE
17" PINE
(2) 14" PINE
15" PINE18" PINE18" PINE
(2) 16" PINE
18" PINE
22" PINE
24" PINE
14" PINE
16" PINE
14" PINE
20" PINE
16" PINE
19" PINE
18" PINE
20" PINE
23" PINE
18" PINE
24" PINE
24" PINE
10" OAK26" PINE
15" OAK
15" PINE
18" PINE
22" PINE
20" PINE
14" PINE
10" OAK
14" PINE
10" OAK
12" PINE
22" PINE
22" PINE
12" PINE
20" PINE
20" PINE
10" OAK
20" PINE
20" PINE
12" OAK
16" PINE
24" PINE
12" OAK16" OAK
14" OAK
8" OAK
15" PINE
8" OAK
8" OAK
13" OAK
17" PINE
13" PINE
21" PINE
16" PINE
19" OAK
19" PINE
17" PINE 17" OAK
19" PINE
16" PINE
12" PINE
12" PINE
16" PINE
12" PINE
20" PINE
14" PINE
13" PINE
20" PINE
16" PINE
21" PINE
12" PINE16" PINE
15" OAK
14" PINE
16" PINE
16" PINE
15" PINE
17" PINE20" PINE 15" PINE
20" PINE
15" PINE
12" OAK 17" PINE
8" OAK
20" PINE
14" PINE
16" PINE
16" PINE
14" PINE
20" PINE
19" PINE
14" PINE 15" PINE
12" PINE
16" PINE
18" PINE
16" PINE
20" PINE16" PINE
16" PINE
18" PINE
14" PINE
16" PINE
16" PINE
18" PINE
9" OAK
24" PINE19" PINE
22" PINE
14" PINE
20" PINE
11" OAK
15" PINE
8" PINE
8" OAK
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLOD
LOD
SF
SFSF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SFSFSFSFSFSF
SFSFSFSFSFSFSFSF
SFSFSFSFSFSFSF
SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SFSF
SF
SF
SF SF SF SF SF SF SF SF
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CRZ
CR
Z
CR
Z
CRZ
C
R
Z
CR
Z CRZ
CRZ
CRZ
CRZ
CR
Z CRZ
CRZ
CR
Z
CR
Z
CR
Z
CRZ
12" PINE
12" PINE
12" PINE
16" PINE12" PINE12" PINE 12" PINE14" PINE
12" PINE
12" PINE
12" PINE
16" PINE
12" PINE
16" PINE
12" PINE
14" PINE
12" PINE
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-4
8040 160
SCALE: 1" = 80' - 0"
NAD 83 NC GRID
0
TR
E
E
R
E
M
O
V
A
L
PL
A
N
N/F
NEW HANOVER COUNTY
PIN: 3149-35-9962.000
DB 5940 PG 1175
L
A
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
TU
P
E
L
O
D
R
MATCHLINE - SEE AREA BELOW
WETLAND
20'-WIDE
TRANSITIONAL
BUFFER
20'-WIDE
TRANSITIONAL
BUFFER
40'-WIDE
DRAINAGE
EASEMENT PROPERTY LINE
PROPERTY LINE
PROPERTY
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
13" PINE
TREES TO BE REMOVED
TREE VARIETY DBH SIZE LOCATION REASON FOR REMOVAL
WITHIN A
TRANSITIONAL
BUFFER
OAK (7) 8", (4) 9", (2) 10", 11",
AND (3) 12"EAST EDGE OF THE PROJECT DRIVE AND PARKING LOT
INSTALLATION NO
OAK (2) 10"NORTH EDGE OF THE PROJECT TRAIL INSTALLATION NO
OAK 8"SOUTH EDGE OF THE PROJECT TRAIL INSTALLATION NO
LONG LEAF PINE 14" AND 19"EAST EDGE OF THE PROJECT PARKING LOT INSTALLATION NO
PINE
8", (2) 10", (4) 12", 15",
(2) 16", (2) 20", 21", 23",
27", AND 28"
EAST EDGE OF THE PROJECT DRIVE AND PARKING LOT
INSTALLATION NO
PINE 13" AND 20"PARK ENTRANCE DRIVE INSTALLATION YES
PINE
(4) 12", (2) 14", 17",
(2) 18", (2) 20", (3) 22",
AND 24"
NORTH EDGE OF THE PROJECT TRAIL INSTALLATION NO
PINE 12"WEST EDGE OF THE PROJECT TRAIL INSTALLATION NO
PINE
(2) 12", 14", (2) 15",
(4) 16", 18", 19", (3) 20",
AND 24"
SOUTH EDGE OF THE PROJECT TRAIL INSTALLATION NO
PEAR (2) 5" AND (3) 6"EAST EDGE OF THE PROJECT DRIVE INSTALLATION NO
DOGWOOD 9" (DEAD)PARK ENTRANCE DRIVE INSTALLATION AND
SAFETY YES
9" OAK
8" OAK
9" OAK16" PINE
(2) 12" OAK
12" PINE
6" PEAR
5" PEAR
12" PINE
12" PINE
8" OAK
8" OAK
8" OAK
12" OAK
10" OAK
(2) 8" OAK
8" OAK
9" OAK
23" PINE
27" PINE
8" PINE
10" PINE
28" PINE
10" PINE15" PINE
(2) 20" PINE
14" LONG
LEAF PINE
18" PINE
NHC TREE MITIGATION CALCULATIONS
22" PINE
20" PINE12" PINE
10" OAK
22" PINE
20" PINE
12" PINE
16" PINE
20" PINE
12" PINE
15" PINE
20" PINE
19" PINE 14" PINE
16" PINE
16" PINE
12" PINE
20" PINE
16" PINE
11" OAK
9" OAK
20'-WIDE
TRANSITIONAL
BUFFER
24" PINE
20" PINE
9" DOGWOOD (DEAD)
21" PINE
5" PEAR
NOTE:
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION ALONG
NEW ENTRY DRIVE, PARKING LOT, AND TRAILS. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
ACTUAL CLEARING LIMITS WILL BE DETERMINED IN THE
FIELD ONCE THE DRIVE, PARKING LOT, AND TRAILS HAVE
BEEN STAKED/FLAGGED.
EXISTING VEGETATION PROTECTIVE MEASURES:
1. EXISTING TREES, REGARDLESS OF SIZE, SHALL NOT BE CUT OR
OTHERWISE DAMAGED OR DESTROYED EXCEPT AS SHOWN ON
AN APPROVED LANDSCAPE AND TREE PRESERVATION PLAN,
TREE REMOVAL PLAN, OR SITE PLAN.
2. DURING CONSTRUCTION ACTIVITIES, ADEQUATE PROTECTIVE
MEASURES SHALL BE PROVIDED TO MINIMIZE DAMAGE TO
EXISTING TREES AND OTHER VEGETATION.
3. ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO
ANY GRADING, CONSTRUCTION TRAFFIC OR ACTIVITY TAKING
PLACE ON SITE.
4. LOGGING MATS SHALL BE USED IN AREAS WHERE CRITICAL
ROOT ZONES MAY BE DISTURBED DURING CONSTRUCTION.
5. SIGNS SHALL BE POSTED IDENTIFYING THE TREE PROTECTION
AREAS AND SHALL STATE THE AREA IS NOT TO BE DISTURBED.
SUCH PROTECTIVE DEVICES SHALL EFFECTIVELY PROTECT THE
CRITICAL ROOT ZONES, TRUNKS, AND TOPS OF TREES TO BE
RETAINED AND SHALL BE MAINTAINED UNTIL ALL WORK HAS
BEEN COMPLETED.
6. CONSTRUCTION TRAFFIC, STORAGE OF VEHICLES AND
MATERIALS, SOIL COMPACTION, FILING, AND GRADING SHALL
NOT TAKE PLACE WITHIN THE DRIP LINE OF TREES TO BE
PRESERVED.
7. CONSTRUCTION ACCESS TO A SITE SHOULD BE LOCATED WHERE
AN EXISTING OR PROPOSED ENTRANCE/EXIT IS LOCATED.
8. A STABILIZED OPEN AREA SHOULD BE DESIGNATED FOR
STORAGE OF MATERIALS (INCLUDING STOCKPILING OF SOIL AND
GRAVEL) AND FOR PARKING CONSTRUCTION VEHICLES AND
EQUIPMENT.
10" OAK
(2) 6" PEAR
SHEET KEY
SW-4
CRITICAL ROOT ZONE (CRZ):
1.0 FOOT PER 1.0 INCH OF TREE
DIAMETER AT BREAST HEIGHT (DBH)
LEGEND:
CRZ
EXISTING TREE TO BE REMOVED
MATCHLINE - SEE AREA ABOVE
12" PINE
16" PINE
19" LONG
LEAF PINE
10" OAK
17" PINE
18" PINE
22" PINE
(3) 12" PINE
(2) 14" PINE
18" PINE 15" PINE
8" OAK
24" PINE
LIMITS OF DISTURBANCELODLOD
SILT FENCE/TREE PROTECTION FENCESFSF
10'-WIDE
SIDE
SETBACK
2
5
'
-
W
I
D
E
F
R
O
N
T
S
E
T
B
A
C
K
DRAFT
SD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD LOD LOD LOD
LOD
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LOD LOD LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LOD
L
O
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
L
O
D
LO
D
L
O
D
LO
D
L
O
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
29.
0
30.0
35.0
40.0
43.0
4
2
.
0
4
3
.
0
44
.
0
44.0
42
.
0
41.0
41
.
0
40.0
35.0
36.0
40.
0
39
.
038
.
0
37.
0
36.0
35.0
35.0
36.0
37.0
38.0
39.0
39.0
37.0
43.0
48.0
53.0
43.0
45.0
42.0
45
.
0
37.0
38.
0
40.0
41.0
42.0
43.
035.0
34
.
0
31.032.033.0
34.0
35.0
36.0
37.0
38.0
37.0
38.0
38.0
44.0
44
.
0
37.0
44.
0
42.0
42.0
45.0
41
.
0
37.0
38
.
0
45.0
38.0
UC
UC
UC
UC
U
C
U
C
U
C
U
C
UC
UC
U
C
UC
UC
UC
UC
UC
UC
UC
UC
UC
F
O
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
FO
F
O
FO
FO
FO
U
E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U
E
UE
UE
UE
UE
UE
UE
UE
U
E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U
E
UE
U
E
U
E
UEW
W
W
W
W
W
W
W
W
W
W
W
W
UC
F
O
F
O
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U
E
UE
U
E
UE
UE
UE
UE
UE
UE
FOFO
FO
FO
FO
FO
PROPER
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
SS
S
S
SS
S
S
SS
S
S
SS
S
S
SS
S
S
SS
SS
SS
SS
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-5
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET SW-6
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
S
W
-
8
STAKING NOTES:
1. CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO
LANDSCAPE ARCHITECT.
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS,
DEPTHS, DISTANCES, ANGLES AND SLOPES PRIOR TO
ORDERING MATERIALS OR CONSTRUCTING PROJECT.
3. STAKE PARKING LOT, ADA PARKING SPACES, GATES,
TRAILS, AND SIDEWALKS IN THE FIELD FOR
LANDSCAPE ARCHITECT'S APPROVAL. NOTIFY
LANDSCAPE ARCHITECT OF ANY ADJUSTMENTS OR IF
CLARIFICATION IS NECESSARY. CONTRACTOR SHALL
GIVE LANDSCAPE ARCHITECT A MINIMUM OF 48 HOURS
NOTICE FOR APPROVAL OF STAKING.
4. CONTRACTOR SHALL LOCATE ALL UNDERGROUND
UTILITIES PRIOR TO CONSTRUCTION AND SHALL BE
RESPONSIBLE FOR THE PROTECTION OF THESE
UTILITIES DURING THE CONSTRUCTION OF THE
PROJECT.
5. THE CONTRACTOR SHALL ADEQUATELY AND FULLY
PROTECT ALL PARTS OF THE WORK AGAINST DAMAGE
UNTIL COMPLETED AND ACCEPTED BY THE OWNER.
ANY DAMAGES, INCLUDING VANDALISM OF THE
RESTROOM/PICNIC SHELTER, PARKING LOT, TRAILS,
OR WALKWAYS SHALL BE PROPERLY REPAIRED BY
THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO
THE OWNER.
6. THROUGHOUT THE DURATION OF THE CONTRACT, THE
CONTRACTOR SHALL PROVIDE TEMPORARY
BARRICADES TO KEEP TRAFFIC OUT OF THE CURRENT
PORTION OF THE WORK.
7. THE CONTRACTOR SHALL PROTECT EXPOSED
SURFACES ADJACENT TO THE WORK FROM PHYSICAL
DAMAGE RESULTING FROM CONSTRUCTION
ACTIVITIES. THE CONTRACTOR SHALL CLEAN, REPAIR,
OR REPLACE, AS REQUIRED SURFACES DAMAGED
DURING THE COURSE OF THE WORK AT NO
ADDITIONAL EXPENSE TO THE OWNER.
8. ADJUSTMENTS AND VARIATIONS FROM THE DRAWING
MAY BE NECESSARY IN ORDER TO MAINTAIN A
MAXIMUM 4.8% SLOPE ON ALL TRAILS AND SIDEWALKS.
9. CONCRETE SIDEWALKS SHALL BE A MINIMUM OF 4"
THICK.
10. CONCRETE SIDEWALKS SHALL HAVE A LIGHT BROOM
FINISH, BE SCORED AT ± SIX FOOT (6') INTERVALS AND
BE LAID OUT RADIALLY WHEN WALK CURVES UNLESS
OTHERWISE SHOWN ON PLANS.
PARK ENTRANCE
GATE SW-9
1
GATE HOLD BACK
POST, BOTH SIDES
L
A
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
TUP
E
L
O
D
R
I
V
E
EXISTING FENCE
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING NON-PAVED
TRAIL TO REMAIN
8' ASPHALT TRAIL
SEE CIVIL SHEETS
CONTRACTOR TO STAKE
CENTERLINE OF TRAIL IN
THE FIELD FOR FIELD FOR
LANDSCAPE ARCHITECT
APPROVAL AND/OR
ADJUSTMENTS PRIOR TO
CONSTRUCTION
2
0
'
-
W
I
D
E
T
R
A
N
S
I
T
I
O
N
A
L
B
U
F
F
E
R
1
2
'
-
W
I
D
E
S
T
R
E
E
T
Y
A
R
D
SITE NOTES:
1. PROTECTION OF EXISTING VEGETATION: AT THE START
OF GRADING INVOLVING THE LOWERING OF EXISTING
GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A
CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE
EDGE OF THE TREE SAVE AREA AT THE SAME TIME AS
OTHER EROSION CONTROL MEASURES ARE
INSTALLED. THE TREE PROTECTION FENCING SHALL BE
INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY
FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE
UNTIL ALL CONSTRUCTION IN THE VICINITY OF THE
TREES IS COMPLETE. NO STORAGE OF MATERIALS,
FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE
ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED
AREA.
2. THE TREE PROTECTION FENCE SHALL BE MAINTAINED
ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND
PRIOR TO THE CERTIFICATE OF OCCUPANCY (CO) IS
SCHEDULED. THE FENCING SHALL BE REMOVED PRIOR
TO FINAL SITE INSPECTION FOR THE CO.
3. MAXIMUM LONGITUDINAL SLOPE ON LANDINGS IS 2%,
MAXIMUM LONGITUDINAL SLOPE ON SIDEWALKS AND
TRAILS IS 4.9%.
4. MAXIMUM CROSS SLOPE ON LANDINGS, SIDEWALKS
AND TRAILS IS 2%.
5. MAXIMUM 2% SLOPE IN ANY DIRECTION FOR
ACCESSIBLE PARKING SPACES AND AISLES.
6. EXCESS SOIL THAT CANNOT BE USED FOR ON-SITE FILL
SHALL BE HAULED OFF SITE OR WASTED IN
DESIGNATED STOCKPILE SOILS AREA WITHIN THE
LIMITS OF DISTURBANCE AS SHOWN ON EROSION
CONTROL PLANS. THESE AREAS MAY BE SUBJECT TO
ADDITIONAL EROSION CONTROL MEASURES.
7. CONTRACTOR SHALL ONLY CLEAR AND DISTURB THE
MINIMUM AREA REQUIRED TO CONSTRUCT PARKING
AREAS, SIDEWALKS, AND TRAILS. CONTRACTOR SHALL
FINISH AND SEED DISTURBED AREAS WITH
DETERMINED SEED MIX TO MINIMIZE THE AMOUNT OF
SITE DENUDED AT ANY ONE TIME.
8. CONTRACTOR SHALL GIVE LANDSCAPE ARCHITECT A
MINIMUM OF 24-HOURS' NOTICE PRIOR TO TESTING.
9. CONTRACTOR SHALL ACCEPT ACTUAL CONDITIONS AT
THE SITE AND PERFORM THE WORK SPECIFIED
WITHOUT ADDITIONAL COMPENSATION FOR POSSIBLE
VARIATION FROM GRADES AND CONDITIONS SHOWN
WHETHER SURFACE OR SUBSURFACE, EXCEPT AS
PROVIDED FOR BY THE CONTRACT DOCUMENTS
NOTE:
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION ALONG
NEW ENTRY DRIVE, PARKING LOT, AND TRAILS. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
ACTUAL CLEARING LIMITS WILL BE DETERMINED IN THE
FIELD ONCE THE DRIVE, PARKING LOT, AND TRAILS HAVE
BEEN STAKED/FLAGGED.
24'-0"
8'-0"
8'-
0
"
TIE NEW ASPHALT FLUSH
TO EXISTING ASPHALT
CONSTRUCTION
ENTRANCE
SEE CIVIL SHEETS
SW-5
LIMITS OF DISTURBANCE
LEGEND:
LOD LOD
SHEET KEY
TRAIL LAYOUT:
1. THE CENTERLINE OF THE TRAIL IS SHOWN ON THE PLANS. THE TRAIL
WIDTH IS 8' WITH A 2' SHOULDER ON EACH SIDE. DRAINAGE IS SHOWN
ON THE CIVIL GRADING SHEETS.
2. MAXIMUM LONGITUDINAL SLOPE ON ALL TRAILS AND AT ALL TRAIL
HEADS IS LESS THAN 5%.
3. MAXIMUM CROSS SLOPE ON TRAILS IS 2%.
4. LOW HANGING OBJECTS OR BRANCHES THAT ARE LOWER THAN 96
INCHES ABOVE THE TRAIL SURFACE ARE NOT ALLOWED. VERTICAL
CLEARANCE OF THE TRAIL SHALL NOT BE LESS THAN 96 INCHES.
CONTRACTOR TO FLAG BRANCHES TO BE PRUNED FOR LANDSCAPE
ARCHITECT APPROVAL PRIOR TO REMOVAL.
5. FINAL TRAIL ALIGNMENT TO BE DETERMINED IN THE FIELD USING
MAXIMUM SLOPES OF FIELD CONDITIONS, AND AVOIDING MAJOR TREE
REMOVAL AND STEEP SLOPES. THE CONTRACTOR SHALL LAYOUT AND
FLAG THE TRAIL FOR REVIEW BY THE LANDSCAPE ARCHITECT AND THE
OWNER.
PROPOSED
WATER AND
SEWER LINES,
SEE CIVIL SHEETS
PARK SIGN
BY OTHERS
SI
T
E
L
A
Y
O
U
T
PL
A
N
2
5
'
-
W
I
D
E
F
R
O
N
T
S
E
T
B
A
C
K
SILT FENCE/TREE PROTECTION FENCESFSF
20'-W
I
D
E
TRAN
S
I
T
I
O
N
A
L
BUFF
E
R
10'-WI
D
E
S
I
D
E
SETB
A
C
K
R100'-0"
STOP SIGN
ASPHALT PAVING
SEE CIVIL SHEET C1.4
DRAFT
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LODLOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLOD
LODLODLODLOD
LODLODLODLOD
LOD
LOD
LODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD LOD
LOD LOD LOD
LOD LOD LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
SF
SF
SFSFSFSF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SFSFSFSFSFSFSFSFSFSFSFSF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SFSFSFSFSFSFSFSFSFSFSFSFSFSFSF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
L
O
D
LOD
LO
D
LO
D
LO
D
L
O
D
L
O
D
LO
D
H/C
VAN
H/C
38.0
41.0
40.0
38.0
37.0
38.0
37.0
38.0
37.0
37.0
39.0
38.0
41.0
39.0
42.0
41.0
42.0
38.0
39.0
40.
0
36.0 40.0 39.0
39.0
40.0
41
.
0
42
.
0
40.0
40.0
39.0
39.0
41.0
40.039.0
41.0
42.0
37.0
39.0
38.0
40.0
41.0
4
3
.
0
41
.
0
31.0
35.0
40.0
30.0
35.0
31.0
35.0
40.0
39.0
38.0
37.0
36.0
34.0
33.0
32.0
31.0
39.0
34.0
35.0
38.0
37.0
37.0 37.0
4
0
.
0
43.0
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LODLOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSFSF
SFSF
SF
SF
SF
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
41.0
40.0
41.0
42.0 43.0
42.0 43.0
42.0
SW-6
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET SW-5
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
S
W
-
7
MA
T
C
H
L
I
N
E
-
S
E
E
A
R
E
A
B
E
L
O
W
MA
T
C
H
L
I
N
E
-
S
E
E
A
R
E
A
A
B
O
V
E
SI
T
E
L
A
Y
O
U
T
PL
A
N
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SHELTER/RESTROOM
8' ASPHALT TRAIL
SEE CIVIL SHEETS
CONTRACTOR TO STAKE
CENTERLINE OF TRAIL IN THE
FIELD FOR FIELD FOR
LANDSCAPE ARCHITECT
APPROVAL AND/OR
ADJUSTMENTS PRIOR TO
CONSTRUCTION
8' ASPHALT TRAIL
SEE CIVIL SHEETS
CONTRACTOR TO STAKE
CENTERLINE OF TRAIL IN
THE FIELD FOR APPROVAL
BY LANDSCAPE ARCHITECT
& OWNER
EXISTING FENCE
TO REMAIN
EXISTING PAVED
TRAIL, TO REMAIN
20'-WIDE
TRANSITIONAL
BUFFER
40'-WIDE DRAINAGE
EASEMENT
DB 5940 PG 1175
20'-WIDE
TRANSITIONAL
BUFFER
8' ASPHALT TRAIL
SEE CIVIL SHEETS
CONTRACTOR TO STAKE
CENTERLINE OF TRAIL IN THE
FIELD FOR FIELD ADJUSTMENTS
AND APPROVAL BY LANDSCAPE
ARCHITECT AND OWNER
ASPHALT PARKING LOT
SEE CIVIL SHEETS
WHEEL STOP,
TYP.
4" THICK
CONCRETE
SIDEWALK
2
SW-9
ACCESSIBLE PAVEMENT
MARKINGS AND SIGNS
3
SW-9
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
8'-0"
8'-0
"
18'-
0
TY
P
24'-
0
"
9'-0
"
TY
P
6'-
0
"
8'-0"
8'-0"
PARKING CALCULATIONS
PER THE NEW HANOVER COUNTY (NHC) UNIFIED DEVELOPMENT
ORDINANCE (UDO) TABLE 5.1.2.A: MINIMUM OFF-STREET PARKING, THERE IS
NO MINIMUM NUMBER OF OFF-STREET PARKING SPACES REQUIRED FOR A
PARK AND RECREATION AREA USE.
TOTAL NUMBER OF PARKING SPACES PROVIDED: 43
SHEET KEY
SW-6
NOTE:
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION ALONG
NEW ENTRY DRIVE, PARKING LOT, AND TRAILS. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
ACTUAL CLEARING LIMITS WILL BE DETERMINED IN THE
FIELD ONCE THE DRIVE, PARKING LOT, AND TRAILS HAVE
BEEN STAKED/FLAGGED.
EXISTING
NON-PAVED TRAIL
TO REMAIN
EXISTING NON-PAVED
TRAIL CENTERLINE,
TRAIL TO REMAIN
BIKE RACKS,
BY OTHERS
8'-0
"
EXISTING
VEGETATION
TO REMAIN
LOW RETAINING WALL
SEE SHEET C-1.5
LIMITS OF DISTURBANCE
LEGEND:
LOD LOD
SILT FENCE/TREE PROTECTION FENCESFSF
10'-WIDE SIDE
SETBACK
6" THICK
CONCRETE
PAD
ELECTRICAL TRANSFORMER
R30'-0"
R32'-8"
TRAIL LAYOUT:
1. THE CENTERLINE OF THE TRAIL IS SHOWN ON THE PLANS. THE TRAIL
WIDTH IS 8' WITH A 2' SHOULDER ON EACH SIDE. DRAINAGE IS SHOWN
ON THE CIVIL GRADING SHEETS.
2. MAXIMUM LONGITUDINAL SLOPE ON ALL TRAILS AND AT ALL TRAIL
HEADS IS LESS THAN 5%.
3. MAXIMUM CROSS SLOPE ON TRAILS IS 2%.
4. LOW HANGING OBJECTS OR BRANCHES THAT ARE LOWER THAN 96
INCHES ABOVE THE TRAIL SURFACE ARE NOT ALLOWED. VERTICAL
CLEARANCE OF THE TRAIL SHALL NOT BE LESS THAN 96 INCHES.
CONTRACTOR TO FLAG BRANCHES TO BE PRUNED FOR LANDSCAPE
ARCHITECT APPROVAL PRIOR TO REMOVAL.
5. FINAL TRAIL ALIGNMENT TO BE DETERMINED IN THE FIELD USING
MAXIMUM SLOPES OF FIELD CONDITIONS, AND AVOIDING MAJOR TREE
REMOVAL AND STEEP SLOPES. THE CONTRACTOR SHALL LAYOUT AND
FLAG THE TRAIL FOR REVIEW BY THE LANDSCAPE ARCHITECT AND THE
OWNER.
DRAFT
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF SF SF SF
LODLODLODLODLODLOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLODLODLODLODLODLOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD LOD LOD LOD
2
8
.
0
28.0
30.0
21.0
27.0
2
3
.
0
20.0
32.
0
33.0 33.0
34.0
36.0
35.0
37.036.0
37.0
36.0
35.0
36.0
35.0
36.0
24.0
29
.
0
30
.
0
31.0
21
.
0
21
.
0
29.0
PROPERTY LINE
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-7
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET SW-8
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
S
W
-
6
8' ASPHALT TRAIL
SEE CIVIL SHEETS
CONTRACTOR TO STAKE
CENTERLINE OF TRAIL IN
THE FIELD FOR FIELD FOR
LANDSCAPE ARCHITECT
APPROVAL AND/OR
ADJUSTMENTS PRIOR TO
CONSTRUCTION
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
40'-WIDE DRAINAGE
EASEMENT
DB 5940 PG 1175
EXISTING
NON-PAVED TRAIL
TO REMAIN
8'-0"
SHEET KEY
SW-7
NOTE:
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION ALONG
NEW ENTRY DRIVE, PARKING LOT, AND TRAILS. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
ACTUAL CLEARING LIMITS WILL BE DETERMINED IN THE
FIELD ONCE THE DRIVE, PARKING LOT, AND TRAILS HAVE
BEEN STAKED/FLAGGED.
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
SI
T
E
L
A
Y
O
U
T
PL
A
N
LIMITS OF DISTURBANCE
LEGEND:
LOD LOD
SILT FENCE/TREE PROTECTION FENCESFSF
10'-0" WIDE SIDE
SETBACK
TRAIL LAYOUT:
1. THE CENTERLINE OF THE TRAIL IS SHOWN ON THE PLANS. THE TRAIL
WIDTH IS 8' WITH A 2' SHOULDER ON EACH SIDE. DRAINAGE IS SHOWN
ON THE CIVIL GRADING SHEETS.
2. MAXIMUM LONGITUDINAL SLOPE ON ALL TRAILS AND AT ALL TRAIL
HEADS IS LESS THAN 5%.
3. MAXIMUM CROSS SLOPE ON TRAILS IS 2%.
4. LOW HANGING OBJECTS OR BRANCHES THAT ARE LOWER THAN 96
INCHES ABOVE THE TRAIL SURFACE ARE NOT ALLOWED. VERTICAL
CLEARANCE OF THE TRAIL SHALL NOT BE LESS THAN 96 INCHES.
CONTRACTOR TO FLAG BRANCHES TO BE PRUNED FOR LANDSCAPE
ARCHITECT APPROVAL PRIOR TO REMOVAL.
5. FINAL TRAIL ALIGNMENT TO BE DETERMINED IN THE FIELD USING
MAXIMUM SLOPES OF FIELD CONDITIONS, AND AVOIDING MAJOR TREE
REMOVAL AND STEEP SLOPES. THE CONTRACTOR SHALL LAYOUT AND
FLAG THE TRAIL FOR REVIEW BY THE LANDSCAPE ARCHITECT AND THE
OWNER.
DRAFT
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
LO
D
LO
D
LO
D
LO
D
LOD
LO
D
LO
D
L
O
D
LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD
L
O
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L
O
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
LO
D
LOD
LOD
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF SF
SF
SF SF
SF
SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SF
SF SF
SF
SF SF
SF
SF SF SF SF SF SF SF SF
35
.
0
37.036
.
0
36.0
3
2
.
0
3
3
.
0
34.0
31.0
30.0
33.0
32.0
33.0
30.0
29.0
29.0
28
.
0
27
.
0
28
.
0
36.0
3
1
.
0
32.0
30.0
28
.
0
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY L
I
N
E
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-8
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET SW-7
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
S
W
-
5
8' ASPHALT TRAIL
SEE CIVIL SHEETS
CONTRACTOR TO STAKE
CENTERLINE OF TRAIL IN
THE FIELD FOR FIELD FOR
LANDSCAPE ARCHITECT
APPROVAL AND/OR
ADJUSTMENTS PRIOR TO
CONSTRUCTION
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING NON-PAVED
TRAIL CENTERLINE,
TRAIL TO REMAIN
8'-0"
SHEET KEY
SW-8
NOTE:
CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE
DAMAGE TO EXISTING TREES AND VEGETATION ALONG
NEW ENTRY DRIVE, PARKING LOT, AND TRAILS. ANY
DAMAGE OUTSIDE APPROVED CLEARING LIMITS SHALL
BE REPAIRED AND RESTORED BY THE CONTRACTOR.
ACTUAL CLEARING LIMITS WILL BE DETERMINED IN THE
FIELD ONCE THE DRIVE, PARKING LOT, AND TRAILS HAVE
BEEN STAKED/FLAGGED.
EXISTING NON-PAVED
TRAIL CENTERLINE,
TRAIL TO REMAIN
EXISTING
VEGETATION
TO REMAIN
EXISTING
VEGETATION
TO REMAIN
SI
T
E
L
A
Y
O
U
T
PL
A
N
LIMITS OF DISTURBANCE
LEGEND:
LOD LOD
SILT FENCE/TREE PROTECTION FENCESFSF
10'-0" WIDE S
I
D
E
SETBACK
TRAIL LAYOUT:
1. THE CENTERLINE OF THE TRAIL IS SHOWN ON THE PLANS. THE TRAIL
WIDTH IS 8' WITH A 2' SHOULDER ON EACH SIDE. DRAINAGE IS SHOWN
ON THE CIVIL GRADING SHEETS.
2. MAXIMUM LONGITUDINAL SLOPE ON ALL TRAILS AND AT ALL TRAIL
HEADS IS LESS THAN 5%.
3. MAXIMUM CROSS SLOPE ON TRAILS IS 2%.
4. LOW HANGING OBJECTS OR BRANCHES THAT ARE LOWER THAN 96
INCHES ABOVE THE TRAIL SURFACE ARE NOT ALLOWED. VERTICAL
CLEARANCE OF THE TRAIL SHALL NOT BE LESS THAN 96 INCHES.
CONTRACTOR TO FLAG BRANCHES TO BE PRUNED FOR LANDSCAPE
ARCHITECT APPROVAL PRIOR TO REMOVAL.
5. FINAL TRAIL ALIGNMENT TO BE DETERMINED IN THE FIELD USING
MAXIMUM SLOPES OF FIELD CONDITIONS, AND AVOIDING MAJOR TREE
REMOVAL AND STEEP SLOPES. THE CONTRACTOR SHALL LAYOUT AND
FLAG THE TRAIL FOR REVIEW BY THE LANDSCAPE ARCHITECT AND THE
OWNER.
DRAFT
CONTROL JOINT
LIGHT BROOM FINISH
CONCRETE SURFACE
IN THE OPPOSITE
DIRECTION OF
TRAVEL
LAYOUT SCORING PATTERN
RADIALLY ALONG CURVED WALK. COORDINATE
SCORING WITH THE LANDSCAPE ARCHITECT IN THE
FIELD PRIOR TO POURING THE WALKS
EXPANSION JOINT 18'
MAXIMUM DISTANCE
BETWEEN JOINTS
LENGTHWISE UNLESS
SHOWN OTHERWISE
6' X 6' OR
8' X 8' TYP.
OR AS SHOWN
ON PLAN
COMPACTED SUBGRADE
4000 PSI CONCRETE
(LIGHT BROOM FINISH &
TOOLED JOINTS)
1.PLACE A 1/2 INCH EXP. JT. W/WATERPROOF CAULK EVERY
18' FOR 6'-WIDE SIDEWALK AND EVERY 16' FOR 8-WIDE
SIDEWALK OR BETWEEN POURS.
2.SCORE CONCRETE FOR SIDEWALKS AS SHOWN ON PLANS.
3.SCORE CONCRETE RADIALLY TO MATCH CURVE WHEN
WALK CURVES.
JOINT
AS SHOWN
CONTROL
4"
4000 PSI CONCRETE
(LIGHT BROOM FINISH &
TOOLED JOINTS)
COLORS:
LEGEND AND BORDER - GREEN
WHITE SYMBOL ON BLUR BACKGROUND
BACKGROUND - WHITE
COLORS:
LEGEND AND BORDER - GREEN
BACKGROUND - WHITE
CONCRETE
FOOTING
FINISHED
GRADE
SIGN
R7-8a
60
"
o
r
8
4
"
SIGN
R7-8D
BOTTOM OF SIGN
R7-8a
NOTE:
MAY ALSO USE COMBINATION SIGN
R7-8E IN LIEU OF R7-8A AND R7-8D.
COLORS/CORNER RADII SAME AS R7-8A.
VAN ACCESSIBLE SIGN TO BE PLACED
UNDER R7-8E IF APPLICABLE.
2% MAX
SLOPE IN ANY
DIRECTION
10' MIN.
STANDARD
ACCESSIBLE SPACE
2'
TY
P
.
R7-8a
R7-8D
VAN
ACCESSIBLE
SIGN (WHERE
INDICATED ON
PLANS)
SLOPE TO
DRAINPAVEMENT
MARKINGS
4" WIDE
STRIPES
6" CONCRETE
WHEEL STOP,
CENTERED
6" THICK HEAVY DUTY CONCRETE
PAVING TO EXTEND BEYOND PAINT
STRIPING 1' ON THREE SIDES
5' MIN.
6' TYP.
1'1'
1'
ASPHALT
PAVING
11' MIN.
VAN ACCESSIBLE
SPACE
2% MAX
SLOPE IN ANY
DIRECTION
2% MAX
SLOPE IN
ANY
DIRECTION
PARK ENTRANCE GATE
CONCRETE FOOTER
3" O.D. GALVANIZED
STEEL POST WITH
CAP, SEE SPECS
Not to Scale
2 1/2" O.D. GALVANIZED ROUND
PIPE FRAME, SEE SPECS
2" O.D. GALVANIZED ROUND PIPE
BRACE, SEE SPECS
WELDED
"U" BAR
ASPHALT ROAD
APPROXIMATELY 27'
VERIFY IN THE FIELD
NOTE:
1. SEE PLANS FOR LOCATIONS.
ONE (1) HOLD BACK POST
PER GATE REQUIRED.
SLOPE TO
DRAIN
13'
9"
2'
3'
1'-6"
4'
-
1
1 2"
CONCRETE
FOOTER
2'
-
6
"
1'
VIEW FROM INSIDE THE PARK:
HOLD BACK POST:
TOP VIEW:
WELDED "U" BAR
WELDED
"U" BAR
CHAIN
6"
6"
2"
5"
12"
D
I
A
.
4"
4" MAX.
SEE GATE
CLOSURE
DETAIL,
RIGHT
GATE CLOSURE DETAIL:
1
SW-9
COMPACTED SUBGRADE
CONCRETE FOOTER
CONCRETE
FOOTER
SLOPE TO DRAIN
4" MAX.
4'-5"4'-4"4'-3"
4"
4"
4"
2'-
9
"
4'
-
3
"
6 5/8" O.D. STEEL GATE
POST WITH CAP
13'
24'
19
'
1'-6"
18
'
4" THICK CONCRETE SIDEWALK
Not to Scale
2
SW-9
ACCESSIBLE PAVEMENT MARKINGS AND SIGNS
Not to Scale
3
SW-9
NOTES:
1/2" EXPANSION JOINT
WITH WATERPROOF CAULK
EXPANSION JOINT WHERE
ADJACENT TO WALK
2% MAX SLOPE
ALONG WALKWAY IN
ANY DIRECTION
TYPE R7-8a & R7-8D
SIGNS - PER CODE
8'
SW-9
SI
T
E
D
E
T
A
I
L
S
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
DRAFT
SS
S
S
SS
S
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
(2) 12" OAK
26" PINE 8" OAK
24" PINE
12" OAK7" PEAR
10" OAK
14" PINE
6" OAK
8" LONG
LEAF PINE
12" OAK
8" OAK
18" PINE
9" OAK
22" OAK
22" PINE
6" MAGNOLIA
8" OAK
24" PINE
13" PINE
22" LONG
LEAF PINE
8" OAK
11" OAK
CLUSTER
8" PEAR
8" PEAR
18" LONG
LEAF PINE
16" LONG
LEAF PINE
18" LONG
LEAF PINE
13" PINE
18" PINE
12" PINE
13" PINE
8" PEAR
12" PINE
6" HOLLY
9" OAK
8" PEAR
7" PEAR
7" PEAR
9" OAK 11" OAK
10" OAK
11" CEDAR
9" PEAR
22" PINE
16" PINE
8" OAK
16" PINE
11" PINE
16" PINE
8" PINE 12" PINE
8" PINE
8" OAK
22" PINE
9" PEAR
10" PINE
17" PINE
17" PINE
13" PINE
12" PINE
10" OAK10" OAK
9" OAK
8" OAK
19" PINE
24" PINE
20" LONG
LEAF PINE
14" PINE
21" LONG
LEAF PINE
22" LONG
LEAF PINE
16" LONG
LEAF PINE
14" PINE 24" PINE
30" PINE 12" PINE
6" MAGNOLIA
20" LONG
LEAF PINE
19" LONG
LEAF PINE
8" OAK
10" OAK
14" LONG
LEAF PINE
16" LONG
LEAF PINE
10" LONG
LEAF PINE
14" OAK
13" LONG
LEAF PINE
18" PINE
14" PINE
18" PINE
15" PINE20" PINE
27" PINE
13" PINE
8" PINE
19" PINE
11" PINE
18" PINE
16" PINE
14" PINE
17" PINE
19" PINE
17" LONG
LEAF PINE
16" PINE
22" PINE
18" PINE
32" PINE
40" PINE
14" OAK 22" PINE
13" PINE
16" PINE
19" PINE
14" PINE
8" OAK
14" PINE
19" LONG
LEAF PINE
12" PINE
13" OAK
12" PINE
12" PINE
12" PINE
9" PINE
4" HOLLY 10" PEAR
8" PEAR
16" PINE
24" PINE
H/C
VAN
H/C
UC
UC
UC
FO
FO
UE
UE
W
W
W
W
SS
SS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
FOFO
TU
P
E
L
O
D
R
S
S
SS
S
S
SS
S
S
SS
S
S
W
W
W
W
W
W
W
W
5" PEAR
12" PINE
4" PEAR
12" PINE
12" PINE
7" PEAR
18" PINE
22" OAK
20" PINE
20" OAK
18" PINE 12" MYRTLE
12" MYRTLE
15" LONG
LEAF PINE
10" MYRTLE
18" PINE
11" OAK
18" PINE
8" PINE UC
UC
UC
FO
FO
FO
FO
FO
FO
F
O
UE
UE
UE
UE
UE
U
E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UE FO
L
A
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
SW-10
4020 80
SCALE: 1" = 40' - 0"
0
PL
A
N
T
I
N
G
P
L
A
N
PLANTING NOTES:
1. THE LANDSCAPE PLANTING CONTRACTOR SHALL BE A LICENSED LANDSCAPE CONTRACTOR IN
NC, AND SHALL PROVIDE PROOF OF LICENSE AFTER BIDDING.
2. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, DEPTHS, QUANTITIES, DISTANCES, ANGLES
AND SLOPES PRIOR TO ORDERING MATERIALS OR INSTALLING PROJECT.
3. CONTRACTOR SHALL ACCEPT ACTUAL CONDITIONS AT THE SITE AND PERFORM THE WORK
SPECIFIED WITHOUT ADDITIONAL COMPENSATION FOR POSSIBLE VARIATION FROM GRADES AND
CONDITIONS SHOWN WHETHER SURFACE OR SUBSURFACE, EXCEPT AS PROVIDED FOR BY THE
CONTRACT DOCUMENTS.
4. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FROM LANDSCAPE ARCHITECT FOR ANY
PLANT SUBSTITUTIONS OF SPECIES, SIZES, OR TYPE OF CONTAINER.
5. CONTRACTOR SHALL LOCATE ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION, AND
SHALL BE RESPONSIBLE FOR THE PROTECTION OF THESE UTILITIES DURING THE
CONSTRUCTION OF THE PROJECT, AND SHALL PROMPTLY REPAIR AND RESTORE SERVICES AT
NO ADDITIONAL COST TO THE OWNER.
6. THE CONTRACTOR SHALL VISIT THE SITE, FAMILIARIZE HIMSELF WITH ACTUAL CONDITIONS AND
VERIFY EXISTING CONDITIONS IN THE FIELD.
7. CONTRACTOR SHALL MAINTAIN CAREFULLY ALL BENCH MARKS, MONUMENTS AND OTHER
REFERENCED POINTS. IF DISTURBED OR DESTROYED, THE CONTRACTOR SHALL REPLACE AS
DIRECTED AT NO ADDITIONAL COST TO THE OWNER.
8. CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE FULL SET OF CONSTRUCTION
DRAWINGS AND SPECIFICATIONS FOR COORDINATION WITH UTILITIES.
9. CONTRACTOR WILL LEAVE DISTURBED AREAS LEVEL AND RAKED SMOOTH, REMOVING ALL
ROCKS AND DEBRIS.
10. IF FORMAL ARRANGEMENTS OR CONSECUTIVE ORDER OF TREES OR SHRUBS IS SHOWN, SELECT
STOCK FOR UNIFORM HEIGHT AND SPREAD FROM SAME SOURCE TO ASSURE SYMMETRY IN
PLANTING.
11. IF ANY EXISTING CONDITIONS OUTSIDE THE CONTRACT LIMITS, CURBS, SIDEWALKS, TURF AREAS
AND PAVING ARE DAMAGED IN PERFORMANCE OF THIS WORK, THEY SHALL BE RESTORED
WITHOUT EXTRA COST TO THE OWNER IN THE MANNER PRESCRIBED BY AUTHORITIES HAVING
JURISDICTION.
12. CONTRACTOR SHALL REPORT ALL DISCREPANCIES TO LANDSCAPE ARCHITECT. IN CASE OF
DISCREPANCY BETWEEN THE QUANTITY OF PLANTS ON THE PLANS COMPARED TO THE PLANT
LIST, THE CONTRACTOR SHALL SUPPLY QUANTITIES AS DRAWN ON PLANS.
13. CONTRACTOR SHALL SEED ALL AREAS DISTURBED DURING INSTALLATION NOT SPECIFIED TO BE
COVERED BY MULCH. AREAS DAMAGED FROM ACTIVITIES OF CONTRACTOR TO BE RESEEDED
AND ESTABLISHED AT NO ADDITIONAL COST TO THE OWNER.
14. CONTRACTOR TO PREPARE PLANTING BEDS PER THE SPECIFICATIONS.
15. CONTRACTOR IS RESPONSIBLE FOR IMPORTING, TESTING AND PREPARING THE SOIL ON SITE
PER THE SPECIFICATIONS.
16. ALL SIX FOOT MULCH RINGS AND STAND ALONE MULCH AREAS SHALL BE BE MULCHED WITH A 3"
LAYER OF TRIPLE SHREDDED HARDWOOD MULCH UNLESS OTHERWISE NOTED ON THE
CONTRACT DRAWINGS. ALL MULCH AREAS SHOWN TO TIE INTO NATURAL AREAS SHALL BE
MULCHED WITH TRIPLE SHREDDED HARDWOOD MULCH FEATHERED BACK TO CREATE SMOOTH
TRANSITIONS.
17. ALL AREAS WITHIN PROJECT LIMITS SHALL BE EITHER PAVED, SEEDED OR MULCHED. SUBMIT
SAMPLES FOR APPROVAL.
NAD 83 NC GRID
MATCHLINE - SEE AREA AT LEFT
MATCHLINE - SEE AREA AT RIGHT
20'-WIDE
TRANSITIONAL
BUFFER
1
2
'
-
W
I
D
E
S
T
R
E
E
T
Y
A
R
D
2
0
'
-
W
I
D
E
T
R
A
N
S
I
T
I
O
N
A
L
B
U
F
F
E
R
PLANTING CALCULATIONS:
A. GENERAL STANDARDS FOR LANDSCAPING (PER THE NEW HANOVER COUNTY (NHC) UNIFIED DEVELOPMENT
ORDINANCE (UDO) SECTION 5.4.2)
·A MINIMUM OF 15 TREES OF AT LEAST TWO INCHES DBH OR TWO CALIPER INCHES, AS APPLICABLE, SHALL BE
RETAINED OR PLANTED ON A PARCEL WHERE DEVELOPMENT OCCURS FOR EACH ACRE OR PROPORTIONATE
AREA DISTURBED BY THE DEVELOPMENT. TREES RETAINED ON THE PARCEL IN ACCORDANCE WITH SECTION 5.3,
TREE RETENTION SHALL COUNT TOWARD THIS REQUIREMENT.
AREA OF SITE DISTURBANCE: 6.4 ACRES
REQUIRED TREES:96 (6.4 ACRES X 15 TREES)
RETAINED TREES:283 SURVEYED EXISTING PINES AND OAKS (ALL 8" DBH OR GREATER)
B. TRANSITIONAL BUFFER STANDARDS (PER THE NHC UDO TABLE 5.4.3.B.2)
·TYPE A: OPAQUE BUFFER OPTION 1: VEGETATION ONLY REQUIRES THAT THE MINIMUM BUFFER WIDTH SHALL BE
50 PERCENT OF THE MINIMUM REQUIRED SETBACK AS SET FORTH IN ARTICLE 3: ZONING DISTRICTS, 20 FEET, OR
25 PERCENT OF THE MINIMUM STRUCTURE SETBACK FOR TALLER STRUCTURES OUTLINED IN SECTION 3.1.3.C,
WHICHEVER IS GREATER. PLANTED MATERIALS SHALL BE A MINIMUM OF SIX FEET IN HEIGHT AND PROVIDE
APPROXIMATELY FULL OPACITY WITHIN ONE YEAR OF PLANTING. A MINIMUM OF THREE ROWS OF PLANTED
MATERIAL ARE REQUIRED.
·PER SECTION 5.4.3.B.2.C., IF EXISTING TREES AND SHRUBS IN THE LOCATION OF A REQUIRED TRANSITIONAL
BUFFER MEET AT LEAST 50 PERCENT OF THE REQUIRED OPACITY STANDARDS, THEN THOSE TREES AND
SHRUBS SHALL BE RETAINED FOR USE IN BUFFERING AND SUPPLEMENTED AS NEEDED WITH PLANTINGS,
FENCES, AND/OR BERMS TO MEET THE STANDARDS OF THIS SUBSECTION.
TRANSITIONAL BUFFER PROVIDED: 20'-WIDE
REQUIRED PLANTING:UNDISTURBED EXISTING PINE-DOMINATED FOREST VEGETATION TO
REMAIN IN BUFFER AREA TO PROVIDE REQUIRED VEGETATION.
PLANNING DIRECTOR TO DETERMINE IF SUPPLEMENTAL PLANTING IS
NEEDED TO MEET THE BUFFER REQUIREMENTS
C. PARKING LOT PERIMETER LANDSCAPING (PER THE NHC UDO TABLE 5.4.5.B)
·A LANDSCAPED STRIP SHALL BE REQUIRED ALONG ANY SIDE OF A PARKING LOT ABUTTING LAND IN A
RESIDENTIAL ZONING DISTRICT.
·THE PERIMETER LANDSCAPING STRIP SHALL BE A MINIMUM OF TEN FEET IN WIDTH.
·A MINIMUM OF ONE EVERGREEN OR DECIDUOUS TREE FOR EVERY 20 LINEAR FEET OF PLANTING STRIP ON
AVERAGE, ROUNDED TO THE HIGHEST WHOLE NUMBER,SHALL BE PLANTED WITHIN THE PLANTING STRIP.
PARKING LOT PERIMETER AREA: 215 LF
REQUIRED TREES:(11) EVERGREEN OR DECIDUOUS TREES (215 LF / 20 LF)
PROVIDED TREES:UNDISTURBED EXISTING PINE-DOMINATED FOREST VEGETATION TO
REMAIN WITHIN AN APPROXIMATE 100'-WIDE AREA BETWEEN THE PARKING
LOT AND RESIDENTIAL PROPERTIES TO PROVIDE THE REQUIRED
LANDSCAPE STRIP
D. PARKING LOT INTERIORS (PER THE NHC UDO TABLE 5.4.5.C)
·LANDSCAPED AREAS IN THE INTERIOR OF PARKING LOTS SHALL BE EQUAL TO EIGHT PERCENT OF THE TOTAL
AREA TO BE USED FOR PARKING, LOADING, AUTOMOBILE SALES, DRIVEWAYS, INTERNAL DRIVE AISLES, AND
OTHER VEHICULAR OR PEDESTRIAN USE.
TOTAL VEHICULAR USE AREA :39,160 SF
REQUIRED INTERIOR LANDSCAPE AREA: 3,133 SF (39,160 SF X 8%)
PROVIDED INTERIOR LANDSCAPE AREA: 7,690 SF WITH 3,200 SF COVERED WITH MULCH AND PLANTING
·ONE PLANTED OR EXISTING TREE SHALL BE REQUIRED FOR EVERY 144 SQUARE FEET ROUNDED TO THE NEXT
LOWEST WHOLE NUMBER OF TOTAL INTERIOR LANDSCAPED AREA, WITH A MINIMUM OF ONE TREE IN EACH
ISLAND.
REQUIRED TREES:22 TREES (3,133 SF / 144 SF)
EXISTING TREES ALONG DRIVE: 8 TREES
PROVIDED TREES:22 (INCLUDES 8 EXISTING TREES)
100% OF PROPOSED TREES ARE OF A SHADE/CANOPY SPECIES.
NO PARKING SPACE IS MORE THAN 120 LF FROM A LANDSCAPED ISLAND.
E. STREET YARD STANDARDS (PER NHC UDO TABLE 5.4.6.B: STREET YARD AREA STANDARDS)
·TWELVE (12) SQUARE FEET FOR EVERY LINEAR FOOT OF STREET YARD FRONTAGE IS REQUIRED. THE WIDTH OF
DRIVEWAYS AND WALKWAYS/SIDEWALKS ARE NOT INCLUDED IN THE LINEAR STREET FRONTAGE. FOR EVERY 600
SQUARE FEET OF STREET YARD AREA ON AVERAGE, ONE (1) CANOPY/SHADE TREE AND SIX (6) SHRUBS (12
INCHES IN HEIGHT AT TIME OF PLANTING) SHALL BE PROVIDED.
STREET YARD FRONTAGE: 60 LF LESS DRIVEWAY AND TRAIL = 28 LF
STREET YARD PLANTING AREA: 336 SF (28 LF X 12 LF)
REQUIRED PLANTING:(1) CANOPY TREE AND (6) SHRUBS
PROVIDED PLANTING:(1) CANOPY TREE AND (6) SHRUBS
F. FOUNDATION PLANTINGS (PER NHC UDO SECTION 5.4.7)
·FOUNDATION PLANTINGS LOCATED BETWEEN THE BUILDING FACE AND THE PARKING LOT OR DRIVE AISLE SHALL
BE REQUIRED FOR ALL PORTIONS OF BUILDINGS ADJACENT TO PARKING LOTS OR INTERNAL DRIVE AISLES. THE
PLANTING AREA SHALL BE 12 PERCENT OF THE AREA OF THE BUILDING FACE ADJACENT TO THE PARKING AREA
OR INTERNAL DRIVE.
REQUIRED PLANTING: 12 LF (95 LF X 12%)
PROVIDED PLANTING:30 LF
SEE PLANTING PLAN
ENLARGEMENT SHEET SW-11
1-NS
Notes
PLANT SCHEDULE FOR SHEET SW-10
SHADE/CANOPY TREES
SpacingSizeCommon NameBotanical NameQTY.Key
7LS Fruitless SweetgumLiquidambar styraciflua
'Rotundiloba'
NS Black GumNyssa sylvatica As shown2 12" cal. BB8
As shown Specimen
quality
2 12" cal. BB
SHEET KEY
SW-10
2-LS
1-LS
1-NS
1-NS
1-LS
SIGN
1-LS
2-NS
2-NS
2-LS
Specimen
quality
PLANTING BY OTHERS
INCLUDED FOR REFERENCE ONLY
10'-WIDE SIDE
SETBACK
2
5
'
-
W
I
D
E
F
R
O
N
T
S
E
T
B
A
C
K
1-NS
27'-
6
"
154'-0
"
EXAMPLE EXISTING VEGETATION IN THE TRANSITIONAL BUFFER AREAS
IVN Dwarf Yaupon
SHRUBS
As shown67 Gal.18" HT. min.Ilex vomitoria 'Nana'
6-IVN
DRAFT
H/C
VAN
H/C
SW-11
PL
A
N
T
I
N
G
P
L
A
N
AN
D
D
E
T
A
I
L
S
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
10/24/23
1.THIS STANDARD APPLIES TO SINGLE AND MULTI-STEM TREES.
2.NO SYNTHETIC FABRIC IS ALLOWED ON ROOT BALL.
3.DO NOT INSTALL TREES DURING PERIODS OF WET OR FROZEN
SOIL CONDITIONS.
4. THOROUGHLY SOAK THE TREE ROOT BALL AND ADJACENT
PREPARED SOIL SEVERAL TIMES DURING THE FIRST MONTH
AFTER PLANTING AND REGULARLY THROUGHOUT THE
FOLLOWING TWO SUMMERS.
5.SET TREE PLUMB IN ALL DIRECTIONS. THE CONTRACTOR IS
RESPONSIBLE FOR KEEPING THE TREE UPRIGHT AND PLUMB IN
ALL DIRECTIONS.
6.DO NOT CUT OR PRUNE CENTRAL LEADER EXCEPT TO STABILIZE
DAMAGE OR AS DIRECTED BY OWNER.
7.REMOVE ALL BALL TIES OR STRAPPING FROM ROOT BALL.
8.DO NOT STAKE TREES EXCEPT WHERE SPECIFIED BY
LANDSCAPE ARCHITECT. IF STAKING IS NECESSARY, USE TWO
OPPOSING STAKES WITH SEPARATE FLEXIBLE TIES. REMOVE
STAKING AT END OF FIRST GROWING SEASON.
9.WHERE SEVERAL TREES WILL BE PLANTED CLOSE TOGETHER
SUCH THAT THEY WILL LIKELY SHARE ROOT SPACE, TILL IN SOIL
AMENDMENTS TO A DEPTH OF 6 INCHES OVER THE ENTIRE AREA.
10.FOR CONTAINER-GROWN TREES, USE FINGERS OR SMALL HAND
TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF
POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS CIRCLING
THE PERIMETER OF THE CONTAINER.
11. THE PLANTING PROCESS IS SIMILAR FOR DECIDUOUS AND
EVERGREEN TREES.
ROOT COLLAR MUST BE CLEARLY VISIBLE
ABOVE GRADE
TOP OF ROOTBALL TO BE MIN. 2 INCHES TO
MAX. 4 INCHES ABOVE FINISHED GRADE
3 INCH LAYER OF TRIPLE SHREDDED HARDWOOD
MULCH OR PINE STRAW MULCH AS SHOWN ON
PLANS, NO MULCH WITHIN 6 INCHES OF TRUNK
TREE PIT SHALL BE MIN.
TWICE ROOT BALL DIA.
TAMP SOIL ONLY AT BASE TO STABILIZE TREE.
THE DEPTH OF THE PLANTING HOLE SHOULD
NOT BE DEEPER THAN THE ROOT BALL.
SET BALL ON UNDISTURBED SOIL. IF SOIL
HAS BEEN PREVIOUSLY DISTURBED,
LIGHTLY COMPACT SOIL UNDER ROOT
BALL. DO NOT OVER COMPACT.
BACKFILL IN LAYERS WITH SPECIFIED
SOIL, THEN WATER TO SETTLE SOIL
NOTE: WIDTH OF PLANTING HOLE IS 3 TIMES
ROOT BALL DIA. IN HIGHLY COMPACTED OR
CLAY SOIL, AND 2 TIMES THE ROOT BALL DIA.
MIN. IN ALL OTHER CONDITIONS
DO NOT WRAP TRUNK. MARK THE NORTH
SIDE OF THE TREE IN THE NURSERY AND
LOCATE TO THE NORTH IN THE FIELD
CENTRAL LEADER
DO NOT STAKE TREES EXCEPT WHERE SPECIFIED
BY LANDSCAPE ARCHITECT. IF STAKING IS
NECESSARY, USE TWO OPPOSING STAKES WITH
SEPARATE FLEX TIES. OWNER TO REMOVE AT END
OF FIRST GROWING SEASON.
FINISHED GRADE
4 INCH DEEP COMPACTED EARTH SAUCER
REMOVE TOP 23 OF WIRE BASKET WHERE
PRESENT AND REMOVE FROM TREE PIT
TILL SOIL TO A DEPTH OF 6 INCHES UP
TO 4 FEET RADIUS FROM THE TRUNK
CUT BURLAP, ROPE AND WIRE
BASKET AWAY FROM TOP AND
SIDES OF ROOT BALL
IF PLANTING HOLES ARE DUG WITH A LARGE
AUGER, BREAKING DOWN THE SIDES WITH A
SHOVEL CAN ELIMINATE GLAZING AND
CREATE THE PREFERRED SLOPING SIDE.
"V" TRENCH AROUND ENTIRE PLANTING BED
FOLD BURLAP FROM TOP 1/3 OF
ROOT BALL DOWN INTO GROUND
EDGE OF PLANTING BED
EXISTING ADJACENT GRADE
BUILD 3"-4" HIGH SAUCER TO
RETAIN WATER KEEPING INVERT OF
SAUCER THE SAME AS FINISHED GRADE
6" UNMULCHED RADIUS
AROUND TRUNK OF SHRUB
SET TOP OF ROOT BALL 2"-3"
ABOVE ADJACENT GRADE
LOOSEN ROOT BALL, CUT MATTED
OR ENCIRCLING ROOTS AND
SPREAD ROOTS OUT EVENLY
UNDISTURBED SOIL LINE.
IF SOIL HAS BEEN
PREVIOUSLY DISTURBED,
LIGHTLY COMPACT SOIL
12" UNDER ROOT BALL.
BALLED & BURLAPPED
SHRUB
CONTAINER GROWN
SHRUB
3" UNMULCHED RADIUS
AROUND TRUNK OF SHRUB
SET TOP OF ROOT BALL 2"-3"
ABOVE ADJACENT GRADE
LOOSEN ROOT BALL, CUT MATTED
OR ENCIRCLING ROOTS AND
SPREAD ROOTS OUT EVENLY
NOTES:
1. SEE SPECIFICATIONS FOR DETAILS ON
PLANT BED PREPARATION.
2. DO NOT INSTALL SHRUBS DURING
PERIODS OF WET OR FREEZING SOIL
CONDITIONS.
3. NO SYNTHETIC FABRIC IS ALLOWED ON
ROOT BALLS.
4. REMOVE ALL BALL TIES OR STRAPPING
FROM ROOT BALL.
5. FOR MASS PLANTINGS OF SHRUBS AND
GROUNDCOVERS, USE STAGGERED
ROWS WITH EQUAL SPACING BETWEEN
ALL PLANTS.
6. TAMP SOIL FIRMLY AS PIT IS FILLED
AROUND EACH PLANT BALL.
3" DEEP LAYER OF TRIPLE
SHREDDED HARDWOOD MULCH OR PINE
STRAW MULCH AS SHOWN ON PLANS
BACKFILL WITH PREPARED TOPSOIL/AMENDED
NATIVE SOIL IN 9" LAYERS, WATER EACH
LAYER UNTIL SETTLED. (DO NOT TAMP)
3" DEEP LAYER OF TRIPLE SHREDDED
HARDWOOD MULCH OR PINE STRAW
MULCH AS SHOWN ON PLANS
BUILD 3"-4" HIGH SAUCER TO
RETAIN WATER KEEPING INVERT OF
SAUCER THE SAME AS FINISHED GRADE
BACKFILL WITH PREPARED TOPSOIL/
AMENDED NATIVE SOIL IN 9" LAYERS,
WATER EACH LAYER UNTIL SETTLED.
(DO NOT TAMP)
V-TRENCH ALONG EDGE
OF PLANTING BED
EQUAL SPACING
BETWEEN ALL PLANTS
STAGGERED ROWS, TYP.
SEE LANDSCAPE
DRAWINGS FOR
SPACING
NOTES:
1. APPLY 3" LAYER OF TRIPLE SHREDDED
HARDWOOD MULCH OR PINE STRAW
MULCH AS SHOWN ON PLANS.
2. CUT BED EDGE WITH SPADE TO CREATE
CONSISTENT, CLEAN, STRAIGHT EDGE.
SPECIFIED SOIL
TURF
3" TRIPLE SHREDDED
HARDWOOD MULCH OR
PINE STRAW MULCH AS
SHOWN ON PLANS
4"
4"
NOTES:
9" TYP
1
SW-11
TREE PLANTING
Not to Scale
2
SW-11
SHRUB PLANTING
Not to Scale
PLANTING BY OTHERS
INCLUDED FOR REFERENCE ONLY
PLANTING PLAN ENLARGEMENT
SCALE: 1" = 20' - 0"
PINE STRAW
MULCH ACCESS
PATH
5-IVN
3-CA
9-RF
3-CA
9-RF
5-CA
5-IVN
BEDLINE, TYP.
7-MC
7-IVN
5-IG
7-MC
5-IG
5-CA
5-IVN
2010 40
SCALE: 1" = 20' - 0"
0
NAD 83 NC GRID
Notes
PLANT SCHEDULE FOR SHEET SW-11
SpacingSizeCommon NameBotanical NameQTY.Key
IVN Dwarf Yaupon
SHRUBS
7 Gal.IG Dwarf InkberryIlex glabra 'Shamrock'
Clethra alnifolia 'Hummingbird'3 Gal.CA Dwarf Summersweet As shown
As shown
As shown
18" HT. min.
Muhlenbergia capillaris 1 Gal.MC Muhly Grass 24" O.C.
1 Gal.RF Black-Eyed SusanRudbeckia fulgida 'Goldsturm'
40
35
52
127
7 Gal.18" HT. min.Ilex vomitoria 'Nana'
18" HT. min.
GRASSES AND PERENNIALS
18" O.C.
88
MULCH
5-CA
17-RF
7-CA
MULCH
9-IG
9-IG
17-MC
25-RF
15-RF
15-MC
9-IVN
17-RF
MULCH
5-IVN
BEDLINE
25-MC
MULCH
7-IG
BEDLINE
9-IVN
7-CA
20-RF
BEDLINE
MULCH
17-MC
15-RF
7-IVN
5-CA
DRAFT
N/F
GORDON R
O
A
D
O
W
N
E
R
S
A
S
S
N
PIN: 3149-5
4
-
4
5
6
9
.
0
0
0
DB 6051 PG
1
3
6
8
N/F
KEVIN HAR
L
A
J
O
H
N
S
O
N
MDM PROP
E
R
T
I
E
S
L
L
C
PIN: 3149-54
-
7
6
1
6
.
0
0
0
N/F
CLEARWAT
E
R
P
R
E
S
E
R
V
E
H
O
A
I
N
C
PIN: 3149-5
4
-
6
8
1
1
.
0
0
0
DB 6052 PG
1
0
5
2
N/F
EMMANUEL
B
.
I
B
A
R
R
A
PIN: 3149-5
4
-
6
8
2
8
.
0
0
0
DB 6509 PG
1
2
5
5
N/F
DERRICK DA
N
A
B
L
A
N
K
S
PIN: 3149-54
-
6
8
9
5
3
.
0
0
0
DB 6090 PG
5
6
8
N/F
MATTHEW
P
.
R
A
Y
a
n
d
J
E
N
N
I
F
E
R
M
.
R
A
Y
PIN: 3149-5
4
-
6
9
8
9
.
0
0
0
DB 6464 PG
1
6
3
3
N/F
JEAN B. CA
B
A
N
T
O
U
S
a
n
d
T
R
I
C
I
A
S
M
I
T
H
PIN: 3149-5
5
-
7
0
1
4
.
0
0
0
DB 6513 PG
4
1
N/F
KASSIE M.
C
O
L
E
Y
PIN: 3149-5
5
-
7
1
4
0
.
0
0
0
DB 6258 PG
1
9
5
1
N/F
MARIA E. CR
E
S
P
O
PIN: 3149-55
-
7
1
8
5
.
0
0
0
DB 6188 PG
2
1
8
7
STEPHANI
E
E
T
V
I
R
S
M
I
T
H
PIN: 3149-5
5
-
8
2
0
1
.
0
0
0
DB 6448 PG
9
0
9
RONALD J.
B
O
W
S
E
R
a
n
d
N/F
DAWN O. S
I
M
M
O
N
S
PIN: 3149-54
-
1
7
7
5
.
0
0
0
DB 1350 PG
1
7
5
2
N/F
JERONE E
.
K
A
H
A
M
PIN: 3149-5
4
-
0
7
4
1
.
0
0
0
DB 1452 PG
8
8
2N/F
JOE CHARL
E
S
H
R
S
N/F
HATTIE W.
S
C
H
M
I
D
T
PIN: 3149-4
4
-
7
8
0
6
.
0
0
0
DB 5318 PG
9
7
0
N/F
NEW HANO
V
E
R
C
O
U
N
T
Y
PIN: 3149-3
5
-
9
9
6
2
.
0
0
0
DB 5940 P
G
1
1
7
5
29.
0
30.0
35.0
40.0
43.0
4
2
.
0
4
3
.
0
44
.
0
44.0
42
.
0
41.0
41
.
0
40.0
35.0
36.0
40.
0
39.
038.
0
37
.
0
36.0
35.0
35.0
36.0
37.0
38.0
39.0
39.0
37.0
43.0
48.0
53.0
43.0
45.0
42.
0
45
.
0
37.0
38.
0
40.0
41.0
42.0
43.
035.0
34
.
0
31.032.033.0
34.0
35.0
36.0
37.0
38.0
37.0
38.0
38.0
44.0
44
.
0
37.0
44.0
42.0
42.0
45.0
41.
0
37.0
38
.
0
45
.
0
38.0
500373
41.645
SEWER MANHOL
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
PR
O
P
E
R
T
Y
L
I
N
E
PROPER
T
Y
L
I
N
E
2%
2
%
2%
2%
2%
2%
2
%
2%
4
2
41
4
0
39
38
37
36
3
5
3
4
33
33
33
33
34
35
36
37
3
7
3
7
36
37
38
42
41
40
39
38
37
38
39
38
37
36
36
37
43
4
3
42
2%
1%2%
2%0%
2%1%
2%
SD
L
A
K
E
E
M
E
R
A
L
D
D
R
I
V
E
E
TUPE
L
O
D
R
I
V
E
LO
D
L
O
D
L
O
D
L
O
D
LO
D
L
O
D
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
L
O
D
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LOD
LOD LOD LOD
L
O
D
L
O
D
LO
D
LO
D
LO
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LO
D
LO
D
LO
D
L
O
D
LO
D
C-1.0
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET C-1.1
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C
-
1
.
3
SHEET KEY
GR
A
D
I
N
G
A
N
D
DR
A
I
N
A
G
E
PL
A
N
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
C-1.0
C-1.3
C-1.1
C-1.2
PROPOSED 8' WIDE ASPHALT
MULTI-USE TRAIL, TYP.
PROPOSED LIMITS OF
DISTURBANCE (LOD)
PROPOSED 18"
CORRUGATED HDPE
42 L.F.
PROPOSED RIP RIP
APRON, TYP.
PROPOSED
CONVEYANCE DITCH, TYP.
PROPOSED 24' ASPHALT
ENTRANCE ROAD, TYP.
PROPOSED 2x15"
CORRUGATED HDPE
30 L.F. EACH
PROPOSED 18"
CORRUGATED HDPE
29 L.F.
PROPOSED 2X18"
CORRUGATED HDPE
22 L.F. EACH
LEGEND
PIPE WITH RIP RAP PAD
WATER
EXISTING TRAIL
EXISTING WETLAND
EXISTING PROPERTY LINE
EXISTING MULTI-USE PATH
EX. CONTOUR
DITCH FLOW
PROP CONTOUR
PROP ASPHALT MULTI-USE TRAIL
PROP CONCRETE SIDEWALK
PIPE INLET SEDIMENT TRAP
COIR FIBER WATTLE BARRIER
COIR FIBER WATTLE
SILT FENCE
SILT FENCESILT FENCE OUTLET
CONSTRUCTION ENTRANCE
PROP SUPERELEVATION 2%
LIMITS OF DISTURBANCE LOD
EX. FOOT TRAIL
TO REMAIN, TYP.
FULL ASPHALT
REPAIR
DRAFT
N/F
CLEARWAT
E
R
P
R
E
S
E
R
V
E
H
O
A
I
N
C
PIN: 3149-65
-
1
8
3
9
.
0
0
0
DB 6052 PG
1
0
5
2
N/F
JAMES V. C
O
L
A
N
G
E
L
O
J
R
.
a
n
d
SUZANNE M
.
C
O
L
A
N
G
E
L
O
PIN: 3149-5
5
-
9
3
0
7
.
0
0
0
DB 6122 PG
2
1
0
1
N/F
MICHAEL P
I
R
O
Z
Z
I
PIN: 3149-5
5
-
9
4
3
2
.
0
0
0
DB 6374 PG
1
1
8
2
N/F
THU V DE T
R
U
O
N
G
a
n
d
T
R
A
N
T
.
T
R
U
O
N
G
PIN: 3149-5
5
-
9
4
5
9
.
0
0
0
DB 6088 PG
1
9
8
5
N/F
CHASE BRI
T
T
I
A
N
Y
B
A
R
D
E
N
PIN: 3149-5
5
-
9
5
6
5
.
0
0
0
DB 6094 PG
1
6
2
4
N/F
PHILIP J. R
O
S
E
a
n
d
M
A
G
G
I
E
H
.
R
O
S
E
PIN: 3149-5
5
-
9
6
8
1
.
0
0
0
DB 6079 PG
2
6
8
N/F
FRANK E. F
O
R
T
E
PIN: 3149-5
5
-
9
6
9
8
.
0
0
0
DB 6076 PG
1
9
5
7
N/F
NEW HANO
V
E
R
C
O
U
N
T
Y
PIN: 3149-3
5
-
9
9
6
2
.
0
0
0
DB 5940 PG
1
1
7
5
38.0
41.0
40.0
38.0
37.0
38.0
37.0
38.0
37.0
37.0
39.0
38.0
41.0
39.0
42.0
41.0
42.0
38.0
39.0
40.
0
36.0 40.0 39.0
39.0
40.0
41
.
0
4
2
.
0
40.0
40.0
39.0
39.0
41.0
40.039.0
41.0
42.0
37.0
39.0
38.0
40.0
41.0
4
3
.
0
41
.
0
31.0
35.0
40.0
30.0
35.0
31.0
35.0
40.0
39.0
38.0
37.0
36.0
34.0
33.0
32.031.0
39.0
34.0
35.0
38.0
37.0
37.0 37.0
40
.
0
43.0
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XH/C
VAN
H/C
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
2%
2%
2%
2%
2%
2%
2%2%
2%
36
37 38 39
40
41
41 4
1
4
2
4
2
42
38
38
39
40
41
4
1
4141
41
40
40
41
4040
40
40
4041
39
40
40
40
41
2%
2%
2%
2%
EX. 1.35 ACRE PRIVATE
INFILTRATION BASIN
EX. PAVED TRAIL
EX. PAVED TRAIL
LO
D
LO
D
LO
D
L
O
D
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LODLOD LOD LOD
LODLODLODLODLOD
LOD
LOD
LOD
LO
D
LODLODLODLOD
LOD
LODLOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LODLODLOD
LOD
LO
D
LO
D
LO
D
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LO
D
L
O
D
41.0 40.0
41.0
42.0 43.0
42.0 43.0
42.0
2%
42
42
4
1
4
0
3
9
3
8
3
7
EX. PAVED TRAIL
LOD
LOD
LOD
LOD
C-1.1
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET C-1.0
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C
-
1
.
2
MA
T
C
H
L
I
N
E
-
S
E
E
A
R
E
A
B
E
L
O
W
MA
T
C
H
L
I
N
E
-
S
E
E
A
R
E
A
A
B
O
V
E
GR
A
D
I
N
G
A
N
D
DR
A
I
N
A
G
E
PL
A
N
SHEET KEY
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
PROPOSED 8' WIDE ASPHALT
MULTI-USE TRAIL, TYP.
PROPOSED LIMITS OF
DISTURBANCE (LOD)
PROPOSED
CONCRETE PAD
FFE = 39.00 FT
PROPOSED PARKINGPROPOSED
DITCH, TYP
PROPOSED
RETAINING WALL, TYP
SEE SHEET C-1.5
PROPOSED CONNECTION
TO EXISTING MULTI-USE TRAIL
PROPOSED CURB, TYP.
C-1.0
C-1.3
C-1.1
C-1.2
LEGEND
PIPE WITH RIP RAP PAD
WATER
EXISTING TRAIL
EXISTING WETLAND
EXISTING PROPERTY LINE
EXISTING MULTI-USE PATH
EX. CONTOUR
DITCH FLOW
PROP CONTOUR
PROP ASPHALT MULTI-USE TRAIL
PROP CONCRETE SIDEWALK
PIPE INLET SEDIMENT TRAP
COIR FIBER WATTLE BARRIER
COIR FIBER WATTLE
SILT FENCE
SILT FENCESILT FENCE OUTLET
CONSTRUCTION ENTRANCE
PROP SUPERELEVATION 2%
LIMITS OF DISTURBANCE LOD
STAGING AREA
EX. FOOT TRAIL
TO REMAIN, TYP.
DRAFT
2
8
.
0
28.0
30.0
21.0
27.0
2
3
.
0
20.0
32.
0
33.0 33.0
34.0
36.0
35.0
37.036.0
37.0
36.0
35.0
36.0
35.0
36.0
24.0
29
.
0
30
.
0
31.0
21
.
0
21
.
0
29.0
PROPERTY LINE
2%
2
%
2%2%
2%
2%
28
29
30 31 32 33
34 35
36
37
37
36
EX. PAVED TRAIL
LODLOD
LOD
LOD
LOD LODLOD
LODLOD
LODLODLODLODLODLOD
LOD
LOD
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LO
D
LOD
LOD
LOD
LODLODLODLOD
LOD
LODLOD
LOD LOD LOD
LOD
LOD
LOD
LOD
LOD LOD
C-1.2
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET C-1.3
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C
-
1
.
1
SHEET KEY
GR
A
D
I
N
G
A
N
D
DR
A
I
N
A
G
E
PL
A
N
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
PROPOSED 8' WIDE ASPHALT
MULTI-USE TRAIL, TYP.
PROPOSED LIMITS OF
DISTURBANCE (LOD)
EXISTING WETLAND
TO REMAIN
C-1.0
C-1.3
C-1.1
C-1.2
LEGEND
PIPE WITH RIP RAP PAD
WATER
EXISTING TRAIL
EXISTING WETLAND
EXISTING PROPERTY LINE
EXISTING MULTI-USE PATH
EX. CONTOUR
DITCH FLOW
PROP CONTOUR
PROP ASPHALT MULTI-USE TRAIL
PROP CONCRETE SIDEWALK
PIPE INLET SEDIMENT TRAP
COIR FIBER WATTLE BARRIER
COIR FIBER WATTLE
SILT FENCE
SILT FENCESILT FENCE OUTLET
CONSTRUCTION ENTRANCE
PROP SUPERELEVATION 2%
LIMITS OF DISTURBANCE LOD
EX. FOOT TRAIL
TO REMAIN, TYP.
DRAFT
N/F
HAWTHORN
E
A
T
S
M
I
T
H
C
R
E
E
K
A
P
A
R
T
M
E
N
T
S
L
L
C
PIN: 3149-3
4
-
3
9
3
9
.
0
0
0
DB 6265 PG
1
1
2
0
35
.
0
36
.
0
36.0
3
2
.
0
3
3
.
0
34.0
31.0
30.0
33.0
32.0
33.0
30.0
29.0
29.0
28
.
0
27
.
0
28
.
0
36.0
31
.
0
32.0
30.0
28
.
0
X
X
X
X
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY L
I
N
E
2%
2%
2%
2%
2%
2%
3
7
3
6
36
37
38
37
36
35
3
4
3
3
32
32
33
34
33
3
2
3
1
30
29
29
30
29
28
LO
D
L
O
D
LODLODLOD
LOD LOD
LOD
LOD
L
O
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LO
D
LOD
LOD
LOD
LOD
LOD
LOD
LO
D
LOD
LO
D
LODLOD
LOD LOD
LOD LOD
LO
D
C-1.3
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET C-1.2
MA
T
C
H
L
I
N
E
-
S
E
E
S
H
E
E
T
C
-
1
.
0
SHEET KEY
GR
A
D
I
N
G
A
N
D
DR
A
I
N
A
G
E
PL
A
N
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
PROPOSED 8' WIDE ASPHALT
MULTI-USE TRAIL, TYP.
PROPOSED LIMITS OF
DISTURBANCE (LOD)
PROPOSED RIP RIP
APRON, TYP.
PROPOSED 15"
CORRUGATEDHDPE
29 L.F.
PROPOSED 15"
CORRUGATED HDPE
30 L.F.
PROPOSED 2x15"
CORRUGATED HDPE
33 L.F. EACH
C-1.0
C-1.3
C-1.1
C-1.2
LEGEND
PIPE WITH RIP RAP PAD
WATER
EXISTING TRAIL
EXISTING WETLAND
EXISTING PROPERTY LINE
EXISTING MULTI-USE PATH
EX. CONTOUR
DITCH FLOW
PROP CONTOUR
PROP ASPHALT MULTI-USE TRAIL
PROP CONCRETE SIDEWALK
PIPE INLET SEDIMENT TRAP
COIR FIBER WATTLE BARRIER
COIR FIBER WATTLE
SILT FENCE
SILT FENCESILT FENCE OUTLET
CONSTRUCTION ENTRANCE
PROP SUPERELEVATION 2%
LIMITS OF DISTURBANCE LOD
EX. FOOT TRAIL
TO REMAIN, TYP.
DRAFT
3:
1
3:1
or fl
a
t
t
e
r
D
TYPICAL DITCH SECTION
Natural
Ground
Not to Scale
Max D = 1.5 ftSEE NOTE FOR LINER TYPE
1. PROVIDE NA GREEN S150 TEMP. LINING (STAPLE PATTERN D) OR APPROVED EQUAL, IF REQUIRED.
NOTES
C-1.4
GR
A
D
I
N
G
DE
T
A
I
L
S
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
1'
8"6" ABC
2" S9.5C
LIGHT DUTY ASPHALT
COMPACT SUBGRADE 98% STD. PROCTOR
COMPACTED
PAVEMENT (NTS)
98% MOD. PROCTOR
PER NCDOT
8"4" ABC
1.5" S9.5C
GREENWAY ASPHALT
COMPACT SUBGRADE 98% STD. PROCTOR
COMPACTED
PAVEMENT (NTS)
98% MOD. PROCTOR
PER NCDOT
2%
2%2' SHOULDER
TYP.
COMPACTED
FILL OR CUT
DRAFT
3:1
CUT/FILL
Natu
r
a
l
Grou
n
d
RETAINING WALL TYPICAL SECTION
Natural
Ground
Not to Scale
Max H = 2.0 ft
H
Natural
Ground
Multi-Use Asphalt Path
2% Superelevation41.0
42.0 43.0
2
%
42
41
4
0
3
9
3
8
3
7
EX. PAVED TRAIL
C-1.5
RE
T
A
I
N
I
N
G
WA
L
L
D
E
T
A
I
L
S
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
NORTHEAST TRAIL CONNECTION RETAINING WALL PLAN
NORTHEAST TRAIL CONNECTION RETAINING WALL PROFILE
SCALE 1"=10'
RETAINING WALL BEGINS
BOTTOM OF CUT SLOPE
PROPOSED GROUND/
BOTTOM OF WALL
EXISTING GROUND/
TOP OF WALL
DRAFT
N/F
GORDON R
O
A
D
O
W
N
E
R
S
A
S
S
N
PIN: 3149-5
4
-
4
5
6
9
.
0
0
0
DB 6051 PG
1
3
6
8
N/F
KEVIN HAR
L
A
J
O
H
N
S
O
N
MDM PROP
E
R
T
I
E
S
L
L
C
PIN: 3149-54
-
7
6
1
6
.
0
0
0
N/F
CLEARWAT
E
R
P
R
E
S
E
R
V
E
H
O
A
I
N
C
PIN: 3149-5
4
-
6
8
1
1
.
0
0
0
DB 6052 PG
1
0
5
2
N/F
EMMANUEL
B
.
I
B
A
R
R
A
PIN: 3149-5
4
-
6
8
2
8
.
0
0
0
DB 6509 PG
1
2
5
5
N/F
DERRICK DA
N
A
B
L
A
N
K
S
PIN: 3149-54
-
6
8
9
5
3
.
0
0
0
DB 6090 PG
5
6
8
N/F
MATTHEW
P
.
R
A
Y
a
n
d
J
E
N
N
I
F
E
R
M
.
R
A
Y
PIN: 3149-5
4
-
6
9
8
9
.
0
0
0
DB 6464 PG
1
6
3
3
N/F
JEAN B. CA
B
A
N
T
O
U
S
a
n
d
T
R
I
C
I
A
S
M
I
T
H
PIN: 3149-5
5
-
7
0
1
4
.
0
0
0
DB 6513 PG
4
1
N/F
KASSIE M.
C
O
L
E
Y
PIN: 3149-5
5
-
7
1
4
0
.
0
0
0
DB 6258 PG
1
9
5
1
N/F
MARIA E. CR
E
S
P
O
PIN: 3149-55
-
7
1
8
5
.
0
0
0
DB 6188 PG
2
1
8
7
STEPHANI
E
E
T
V
I
R
S
M
I
T
H
PIN: 3149-5
5
-
8
2
0
1
.
0
0
0
DB 6448 PG
9
0
9
RONALD J.
B
O
W
S
E
R
a
n
d
N/F
DAWN O. S
I
M
M
O
N
S
PIN: 3149-54
-
1
7
7
5
.
0
0
0
DB 1350 PG
1
7
5
2
N/F
JERONE E
.
K
A
H
A
M
PIN: 3149-5
4
-
0
7
4
1
.
0
0
0
DB 1452 PG
8
8
2N/F
JOE CHARL
E
S
H
R
S
N/F
HATTIE W.
S
C
H
M
I
D
T
PIN: 3149-4
4
-
7
8
0
6
.
0
0
0
DB 5318 PG
9
7
0
N/F
NEW HANO
V
E
R
C
O
U
N
T
Y
PIN: 3149-3
5
-
9
9
6
2
.
0
0
0
DB 5940 P
G
1
1
7
5
5" PEAR4" PEAR
12" PINE
7" PEAR
12" PINE
16" PINE
9" DOGWO
O
D
(
D
E
A
D
)
15" LONG
LEAF PINE
10" MYRTL
E
12" MYRTLE
12" MYRTL
E
18" PINE
13" PINE
11" OAK
5" PEAR
12" OAK
8" OAK
21" PINE
9" OAK
8" OAK
8" OAK
9" OAK
12" OAK
6" OAK
12" OAK
7" PEAR
16" PINE
12" PINE8" PEAR
12" PINE
5" PEAR
6" PEAR
8" PEAR
12" PINE
13" PINE
6" HOLLY
12" PINE
17" LONG
LEAF PINE
10" OAK
19" LONG L
E
A
F
P
I
N
E
7" PEAR
5" PEAR
6" PEAR
5" PEAR
21" PINE
10" OAK
24" PINE
12" OAK
9" OAK
22" OAK
22" PINE
8" OAK
24" PINE
6" MAG
13" PINE
18" LONG L
E
A
F
P
I
N
E
16" LONG
LEAF PINE
22" LONG L
E
A
F
P
I
N
E
13" PINE
12" PINE
18" PINE
10" OAK
18" PINE
14" PINE
18" LONG
LEAF PINE
12" PINE
6" PEAR6" PEAR
9" OAK
8" OAK
8" OAK
10" OAK
8" OAK
12" OAK
10" OAK
9" PEAR
8" PEAR
7" PEAR
7" PEAR
12" PINE
8" PINE
8" PINE
16" PINE
11" OAK
CLUSTER
8" PEAR 8" OAK
10" OAK
11" OAK
11" CEDAR
11" PINE
9" PEAR
16" PINE
16" PINE
8" OAK
22" PINE
10" PINE
17" PINE
13" PINE
12" PINE
8" OAK
8" OAK
10" OAK
8" OAK
19" PINE
24" PINE
9" OAK
9" OAK30" PINE
23" PINE
12" PINE
6" MAG 27" PINE
14" PINE
17" PINE
18" PINE
18" PINE
14" LONG L
E
A
F
P
I
N
E
14" OAK
13" LONG L
E
A
F
P
I
N
E
10" LONG L
E
A
F
P
I
N
E
16" LONG L
E
A
F
P
I
N
E
20" LONG L
E
A
F
P
I
N
E
10" OAK
8" OAK
14" PINE
16" LONG L
E
A
F
P
I
N
E
24" PINE
16" PINE
11" OAK
20" PINE
14" PINE
19" PINE 24" PINE
9" OAK
16" PINE
17" PINE
8" OAK
10" OAK
15" PINE
9" OAK
8" OAK9" OAK
11" OAK
14" PINE
20" LONG L
E
A
F
P
I
N
E
21" LONG L
E
A
F
P
I
N
E
22" LONG L
E
A
F
P
I
N
E
22" PINE
12" PINE
8" PINE
20" PINE20" OAK
18" PINE
22" OAK
8" LONG LE
A
F
P
I
N
E
26" PINE
14" PINE
18" PINE
16" PINE
16" PINE16" PINE
18" PINE
20" PINE
22" PINE
18" PINE
16" PINE
500874
44.532
TREE
500875
44.708
TREE
500876
44.720
TREE
500877
44.722
TREE
500878
45.205
TREE
500881
44.235
TREE
500883
44.553
TREE
500884
44.800
TREE
500885
43.971
TREE
500886
45.634
TREE
20" PINE
7" PEAR12" LONG L
E
A
F
P
I
N
E
29.
0
30.0
35.0
40.0
43.0
4
2
.
0
4
3
.
0
44
.
0
44.0
42
.
0
41.0
41
.
0
40.0
35.0
36.0
40.
0
39.
038.
0
37
.
0
36.0
35.0
35.0
36.0
37.0
38.0
39.0
39.0
37.0
43.0
48.0
53.0
43.0
45.0
42.
0
45
.
0
37.0
38.
0
40.0
41.0
42.0
43.
035.0
34
.
0
31.032.033.0
34.0
35.0
36.0
37.0
38.0
37.0
38.0
38.0
44.0
44
.
0
37.0
44.0
42.0
42.0
45.0
41.
0
37.0
38
.
0
45
.
0
38.0
500373
41.645
SEWER MANHOL
E
600437.175
INV 18
6005
37.190
INV 18
600637.251
INV 18
6007
37.699
INV 18
600837.698
INV 18
6009
37.530
INV 18
6010
42.344
CL GRATE
601142.400
CL GRATE
6012
42.459
CL GRATE
6013
42.467
CL GRATE600337.174
INV 24
217
29.000
.25 SPINNER
PARK SIGN
EDGE OF D
R
I
V
E
CENTER OF
T
R
A
I
L
CENTER OF
U
N
P
A
V
E
D
T
R
A
I
L
EDGE OF D
R
I
V
E
~MOUND
~
~MOUND~
~TOE OF S
L
O
P
E
~
WOOD FEN
C
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
8"W
8"W
8"W
8"W
EX. VALVE
EX. ARV
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
>
SD
>
>
>
>
>
>
>
>
>
>
>
PR
O
P
E
R
T
Y
L
I
N
E
PROPER
T
Y
L
I
N
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
S
SS
S
S
SS
S
S
SS
S
S
SS
S
S
SS
S
S
SS
SS
SS
P
R
O
P
.
1
,
0
2
6
T
O
T
A
L
L
F
2
"
S
D
R
9
W
A
T
E
R
S
V
C
P
R
O
P
.
2
6
8
.
2
0
L
F
@
0
.
6
0
%
6
"
P
V
C
S
C
H
4
0
PR
O
P
.
3
9
3
.
1
0
L
F
@
0
.
6
0
%
6"
P
V
C
S
C
H
4
0
INSTALL 2" WATER
SERVICE 2' BENEATH
STORM PIPE
C/O
PROP. SS MH 3
RIM EL = 37.20
INV. IN EL. = 30.37
PROP. 77.50 LF
@ 0.60% 6" DIP
C-2.0
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET C-2.1
SHEET KEY
UT
I
L
I
T
Y
P
L
A
N
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
C-2.0
INSTALL INSIDE DROP AT
EX. MANHOLE
EX. RIM EL. = 41.65
EX. INV. IN EL. (S) = 23.26
EX. INV. OUT EL. (W) = 23.18
PROP. DROP MH PIPE
INLET INV. EL. = 28.29
ADD 2" SERVICE TAP,
SHUTOFF VALVE
PROP. SS MH 4
RIM EL = 43.10
INV. IN EL. = 28.76
C-2.1
INSTALL 2" METER
INSTALL 2" BACKFLOW
PREVENTER
L
A
K
E
E
M
E
R
A
L
D
D
R
.
DRAFT
N/F
CLEARWAT
E
R
P
R
E
S
E
R
V
E
H
O
A
I
N
C
PIN: 3149-65
-
1
8
3
9
.
0
0
0
DB 6052 PG
1
0
5
2
N/F
JAMES V. C
O
L
A
N
G
E
L
O
J
R
.
a
n
d
SUZANNE M
.
C
O
L
A
N
G
E
L
O
PIN: 3149-5
5
-
9
3
0
7
.
0
0
0
DB 6122 PG
2
1
0
1
N/F
MICHAEL P
I
R
O
Z
Z
I
PIN: 3149-5
5
-
9
4
3
2
.
0
0
0
DB 6374 PG
1
1
8
2
N/F
THU V DE T
R
U
O
N
G
a
n
d
T
R
A
N
T
.
T
R
U
O
N
G
PIN: 3149-5
5
-
9
4
5
9
.
0
0
0
DB 6088 PG
1
9
8
5
N/F
CHASE BR
I
T
T
I
A
N
Y
B
A
R
D
E
N
PIN: 3149-5
5
-
9
5
6
5
.
0
0
0
DB 6094 PG
1
6
2
4
N/F
PHILIP J. R
O
S
E
a
n
d
M
A
G
G
I
E
H
.
R
O
S
E
PIN: 3149-5
5
-
9
6
8
1
.
0
0
0
DB 6079 PG
2
6
8
N/F
FRANK E. F
O
R
T
E
PIN: 3149-5
5
-
9
6
9
8
.
0
0
0
DB 6076 PG
1
9
5
7
N/F
NEW HANO
V
E
R
C
O
U
N
T
Y
PIN: 3149-3
5
-
9
9
6
2
.
0
0
0
DB 5940 PG
1
1
7
5
14" LONG L
E
A
F
P
I
N
E
PINE
OAK
16" PINE
21" PINE
20" PINE
17" LONG L
E
A
F
P
I
N
E
8" OAK
27" PINE
18" PINE
18" PINE
13" PINE
8" PINE
19" PINE
11" PINE
8" PINE
10" PINE
10" PINE
15" PINE
12" PINE
12" PINE
9" PINE
4" HOLLY
12" PINE
12" PINE13" OAK14" PINE
14" PINE
19" PINE
16" PINE
13" PINE
8" OAK
19" LONG L
E
A
F
P
I
N
E
16" PINE
8" PEAR
22" PINE
14" OAK
30" PINE
19" LONG L
E
A
F
P
I
N
E
28" PINE
24" DEAD P
I
N
E
16" PINE
12" PINE
12" PINE
14" PINE
12" PINE
14" PINE
22" PINE
14" PINE
12" PINE12" PINE
18" PINE
12" PINE
12" PINE
12" PINE
16" PINE
17" PINE
16" PINE
10" OAK
20" PINE
18" PINE20" PINE
14" PINE
14" PINE
17" PINE
15" PINE
18" PINE
18" PINE
18" PINE
16" PINE
24" PINE
18" PINE
10" OAK 19" PINE
12" OAK
27" PINE
22" PINE
24" PINE
8" OAK
8" OAK
8" OAK
12" PINE
24" PINE
16" PINE
16" PINE
17" LONG
L
E
A
F
P
I
N
E
17" PINE
14" PINE
16" PINE
20" PINE
15" PINE
16" PINE
12" PINE
10" PEAR
17" PINE
12" DOUBLE
O
A
K
8" OAK
12" PINE
24" LONG L
E
A
F
P
I
N
E
18" GUM
34" LONG L
E
A
F
P
I
N
E
14" OAK CL
U
S
T
E
R
19" PINE
22" PINE
17" PINE
19" PINE
32" PINE
24" PINE
28" PINE
20" PINE
20" PINE
40" PINE
22" PINE
18" PINE
28" PINE
22" PINE
328
39.283
TREE
329
39.388
TREE
18" PINE
20" PINE
18" PINE
19" PINE
14" PINE
16" PINE
18" PINE 14" PINE
18" PINE
16" PINE
16" PINE
16" PINE
14" PINE
20" PINE
14" PINE
16" PINE
23" PINE
19" PINE
18" PINE
20" PINE
24" PINE24" PINE
38.0
41.0
40.0
38.0
37.0
38.0
37.0
38.0
37.0
37.0
39.0
38.0
41.0
39.0
42.0
41.0
42.0
38.0
39.0
40.
0
36.0 40.0 39.0
39.0
40.0
41
.
0
4
2
.
0
40.0
40.0
39.0
39.0
41.0
40.039.0
41.0
42.0
37.0
39.0
38.0
40.0
41.0
4
3
.
0
41
.
0
31.0
35.0
40.0
30.0
35.0
31.0
35.0
40.0
39.0
38.0
37.0
36.0
34.0
33.0
32.031.0
39.0
34.0
35.0
38.0
37.0
37.0 37.0
40
.
0
43.0
WETLAND A
R
E
A
3
(COORDIN
A
T
E
S
O
N
SHEET 2 O
F
5
)
CENTERLIN
E
O
F
T
R
A
I
L
WOOD FENC
E PARK SIGN
~TOP OF SLOPE~
EDGE OF G
R
A
V
E
L
CENTER OF
T
R
A
I
L
TREELINE
CENTER OF
T
R
A
I
L
~DITCH~
TREELINE
~DITCH~
WIRE FENC
E
WOOD FENC
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
>
>
2%
2%
2%
2%
H/C
VAN
H/C
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
W
W
W
W
W
W
W
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
CONNECT 6" SANITARY
SERVICE TO BUILDING
SERVICE WITH CLEANOUT
INV. EL. = 34.5
CONNECT 2" SDR 9
SERVICE TO
BUILDING
PR
O
P
.
2
5
9
.
2
0
L
F
@
0
.
6
0
%
6"
P
V
C
S
C
H
4
0
PROP. 36.60 LF @ 0.60%
6" PVC SCH 40
PR
O
P
.
1
,
0
2
6
T
O
T
A
L
L
F
2"
S
D
R
9
W
A
T
E
R
S
V
C
PROP. SS MH 2
RIM EL = 438.50
INV. IN EL. = 32.73
PROP. SS MH 1
RIM EL = 438.50
INV. IN EL. = 34.28
8" TREE
14" PINE
12" PINE12" PINE
12" PINE
12" PINE
12" PINE
12" PINE
12" PINE
16" PINE
16" PINE
26" PINE
16" PINE
41.0 40.0
41.0
42.0 43.0
42.0 43.0
42.0
EDGE OF G
R
A
V
E
L
EX. PAVED TRAIL
C-2.1
4020 80
SCALE: 1" = 40' - 0"
NAD 83 NC GRID
0
MATCHLINE - SEE SHEET C-2.0
MA
T
C
H
L
I
N
E
-
S
E
E
A
R
E
A
B
E
L
O
W
MA
T
C
H
L
I
N
E
-
S
E
E
A
R
E
A
A
B
O
V
E
UT
I
L
I
T
Y
P
L
A
N
SHEET KEY
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
C-2.0
C-2.1
DRAFT
C-2.2
Date:
Ne
w
H
a
n
o
v
e
r
C
o
u
n
t
y
,
N
C
SM
I
T
H
C
R
E
E
K
P
A
R
K
P
H
A
S
E
2
A
REVISIONS
11/01/23
EN
G
I
N
E
E
R
S
C
O
N
S
T
R
U
C
T
I
O
N
M
A
N
A
G
E
R
S
P
L
A
N
N
E
R
S
S
C
I
E
N
T
I
S
T
S
RE
S
P
O
N
S
I
V
E
P
E
O
P
L
E
C
R
E
A
T
I
V
E
S
O
L
U
T
I
O
N
S
P:
(
9
1
9
)
8
7
8
-
9
5
6
0
NC
L
I
C
E
N
S
E
N
O
.
F
-
0
1
1
2
60% DESIGN DEVELOPMENT DRAWINGS
NOT FOR CONSTRUCTION
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
La
n
d
s
c
a
p
e
A
r
c
h
i
t
e
c
t
u
r
e
,
P
L
L
C
Ha
t
c
h
e
l
l
Su
s
a
n
71
1
W
.
N
o
r
t
h
S
t
r
e
e
t
,
R
a
l
e
i
g
h
,
N
C
2
7
6
0
3
p:
9
1
9
-
8
3
8
-
9
6
0
0
f
:
9
1
9
-
8
3
8
-
9
7
0
0
UT
I
L
I
T
Y
DE
T
A
I
L
DRAFT