Loading...
Smith_Crk_Ph2A_SW_Report_v1SMITH CREEK PARK PHASE 2A – SMITH CREEK PARK PRESERVE STORMWATER MANAGEMENT REPORT 215 Lake Emerald Drive E, Wilmington, NC 28411 November 2023 8601 Six Forks Road, Suite 700 Raleigh, NC 27615 Phone: 919-878-9560 11/1/2023 Table of Contents Page Project Summary and Land Use Tables ....................................................................................................... 1 Appendix A: Drainage Area Maps Appendix B: Ditch and Pipe Schedules Appendix C: FHWA Hydraulic Toolbox Calculations for Ditches and Pipes Appendix D: Pre versus Post Rational Method Calculations Appendix E: NOAA Atlas 14 precipitation data Appendix F: WinTR-55 Time of Concentration Calculations 1.0 Project Summary North Parcel – Smith Creek Park Existing Conditions (Pre-Project) The existing Smith Creek Park north parcel site in Hanover County is currently considered a low-density development (less than 24% built-upon area) per Stormwater Management Permit Number SW8 091003, latest revision dated March 8, 2011. Discharge from this site includes runoff from the buildings, hardscapes, parking lot, streets, and sidewalks. Existing SCMs include three swales on the site and runoff is discharged into an existing pond as well. The total impervious area draining from the site is 146,919 sq ft. The site has a permit area of 4,013,680 sq ft, of which 1,558,030 sq ft is surface water, leaving the permit area for density as 2,455,650 sq ft. Proposed Conditions The Smith Creek Park Phase 2 project portion located adjacent on the south side of the existing permitted area is adding an additional 5008 sq. ft. of impervious to the north parcel. As a result, the percentage of impervious area will be increased, but will remain less than 12%. The parcel will remain a low-density development and will retain the existing SCM comprised of an NCDOT borrow pit acquired by the County. The project is designed for this new impervious area to sheet flow and minimize Table 1 below shows the drainage area land use between existing and proposed conditions. The total permitted site area will remain the same. Existing Conditions Proposed Conditions Land Cover Area (sf) Area (ac) % Land Cover Area (sf) Area (ac) % Existing Roof, Pavement, Hardscape 146,919 3.37 5.98 Roof, Pavement, Hardscape 151,927 3.49 6.19 Existing Open Space 2,308,731 53.00 94.02 Open Space 2,303,723 52.89 93.81 Total Site w/out Pond 2,455,650 56.37 Total Site w/out Pond 2,455,650 56.37 Table 1: North Parcel Land Use Tabulation South Park – Smith Creek Park Existing Conditions (Pre-Project) The existing Smith Creek Park south parcel site in Hanover County is currently an undeveloped parcel consisting of natural trails and mature trees - mostly Long Leaf pines. Proposed improvements include a paved walking trail, driveway, parking, and a picnic shelter. The total impervious area draining from the site is 725 square feet consisting of pavement at the Lake Emerald Drive and Tupelo Honey Drive. Please see Appendix A for drainage area maps for pre- and post-project conditions. Proposed Conditions Proposed improvements include a paved walking trail, driveway, parking, and a picnic shelter. The total parcel area is. Table 2 details the added impervious as part of Phase 2A improvements. The percentage of impervious area is less than 12%. Please see Appendix D for Pre versus post stormwater discharge results. The drainage infrastructure was kept to minimum to keep the primitive setting of the park and minimize tree impacts. Pipes with rip rap outlet pads at drawings and ditches were used as needed to Page 1 SMITH CREEK PARK PRESERVE SWM– NEW HANOVER COUNTY OCTOBER 2023 convey point discharges to pipes. The proposed pipe and ditch drainage schedules are shown in Appendix B. Time of concentrations were capped at 30 minutes for POI 1 and POI 2. TR-55 time of concentration calculations area included in Appendix E. Existing Conditions Proposed Conditions Land Cover Area (sf) Area (ac) % Land Cover Area (sf) Area (ac) % Existing Roof, Pavement, Hardscape 725 0.02 0.02 Roof, Pavement, Hardscape 88,750 2.04 2.40 Existing Open Space 3,702,311 84.99 99.98 Open Space 3,614,286 82.97 97.60 Total Site 3,703,036 85.01 Total Site 3,703,036 85.01 Table 2: South Parcel Land Use Tabulation Page 2 APPENDIX A: Drainage Area Maps ST M STM ST M S T M S T M ST M STM ST M ST M ST M 100-YR 100-Y R 1 0 0 - Y R 1 0 0 - Y R 100-Y R 100-Y R 100-YR 100 - Y R 100 - Y R 100- Y R 1 0 0 - Y R 10 0 - Y R 100-YR 1 0 0 - Y R 100-Y R 100 - Y R 1 0 0 - Y R 100-YR 100-YR 10 0 - Y R 100-YR 100 - Y R 10 0 - Y R 100 - Y R 100 - Y R POI 2 Development is newer than most recent contours. Rear of parcels contribute to DA POI 1 10050 200 SCALE: 1" = 100' - 0" 0SMITH CREEK PARK PRESERVE PRE MAPPING 2 POIs H/C VAN H/C 2% 2% 2% 2% H/C VAN H/C Ditch A Ditch B Pipe A Pipe B Pipe A-1 Ditch A-2 Pipe A-2 Pipe C Pipe B-1 Pipe B-2 Ditch C Ditch A-1 Ditch A-0 ST M STM ST M S T M S T M ST M STM ST M ST M ST M 100-YR 100-Y R 1 0 0 - Y R 1 0 0 - Y R 100-Y R 100-Y R 100-YR 100 - Y R 100 - Y R 100- Y R 1 0 0 - Y R 10 0 - Y R 100-YR 1 0 0 - Y R 100-Y R 100 - Y R 1 0 0 - Y R 100-YR 100-YR 10 0 - Y R 100-YR 100 - Y R 10 0 - Y R 100 - Y R 100 - Y R POI 2 Development is newer than most recent contours. Rear of parcels contribute to DA POI 1 10050 200 SCALE: 1" = 100' - 0" 0SMITH CREEK PARK PRESERVE POST MAPPING APPENDIX B: Ditch and Pipe Schedules Sheet 1 of 2 Designed WTG Date Checked Date NO.AREA C CA SUM CA YR Tc I Q Q100 n LENGTH V Df DEPTH SLOPE T (lb/ft^2)LINER T ALLOWED REMARKS A-0 0.69 0.17 0.12 0.12 25 15 7.36 0.85 1.009 0.015 198'4.278 0.257 1.00 0.0308 0.2346 SEE C-1.4 1.7500 A-1 4.89 0.17 0.83 0.83 25 15 7.36 6.08 7.149 0.015 225'3.128 0.805 1.50 0.0036 0.0858 SEE C-1.4 1.7500 A-2 6.99 0.17 1.19 1.19 25 15 7.36 8.64 10.22 0.015 65'5.245 0.741 1.50 0.0113 0.2478 SEE C-1.4 1.7500 A 0.72 0.47 0.34 0.34 25 5 10.9 3.72 4.365 0.015 427'2.878 0.656 1.00 0.0040 0.0777 SEE C-1.4 1.7500 B 0.69 0.39 0.27 0.27 25 5 10.9 2.91 3.471 0.015 326'4.647 0.457 1.00 0.0169 0.2285 SEE C-1.4 1.7500 C 0.31 0.09 0.03 0.03 25 15 7.36 0.2 0.24 0.015 334'1.886 0.188 1.00 0.0091 0.4541 SEE C-1.4 1.7500 New Hanover County 25 Year Drainage Chart DITCHCONTRIBUTING AREA Smith Creek Park Preserve 10/24/2023 DITCH SCHEDULE RUNOFF DMK 10/30/2023 Sheet 2 of 2 Date Date NO.AREA C CA SUM CA YR Tc I Q Q100 n LENGTH V DIA.MATERIAL SLOPE TIME (S)INV IN INV OUT TOP ELEV HGL IN HGL OUT REMARKS A 5.58 0.17 0.95 0.95 25 15 7.36 6.93 8.158 0.015 42'7.406 18"HDPE 0.0199 5.67 36.35 35.52 39.04 38.15 36.00 A-1 6.99 0.17 1.19 1.19 25 15 7.36 8.64 10.22 0.015 2x30'5.115 2x15"HDPE 0.0104 5.87 35.07 34.76 37.03 36.55 35.50 A-2 7.82 0.18 1.41 1.41 25 15 7.36 10.09 12.11 0.015 2x22'5.223 2x18"HDPE 0.0097 4.21 34.31 34.10 36.96 35.71 34.77 B 7.98 0.14 1.12 1.12 25 30 5.46 5.96 7.362 0.015 29'3.896 18"HDPE 0.0044 7.44 31.13 31.01 33.89 32.79 31.51 B-1 1.92 0.09 0.17 0.17 25 15 7.36 1.27 1.486 0.015 30'4.387 15"HDPE 0.0162 6.84 35.45 34.97 38.12 36.11 35.30 B-2 1.06 0.09 0.1 0.10 25 15 7.36 0.7 0.82 0.015 29'4.161 15"HDPE 0.0227 6.97 31.96 31.31 34.53 32.43 31.63 C 20.61 0.09 1.85 1.85 25 30 5.46 10.46 12.22 0.015 2x33'6.329 2x15"HDPE 0.0161 5.21 28.34 27.82 31.11 30.11 28.63 New Hanover County 25 Year Drainage Chart Smith Creek Park Preserve Designed Checked WTG 10/24/2023 PIPE SCHEDULE CONTRIBUTING AREA RUNOFF PIPE DMK 10/30/2023 APPENDIX C: Pipe and Ditch Calculations (FHWA Hydraulic Toolbox) Hydraulic Analysis Report Project Data Project Title: SMITH CREEK PARK Designer: WTG Project Date: October 2023 Project Units: U.S. Customary Units Channel Analysis: Ditch A Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0040 ft/ft Manning's n: 0.0150 Flow 3.7200 cfs Result Parameters Depth 0.6564 ft Area of Flow 1.2925 ft^2 Wetted Perimeter 4.1513 ft Hydraulic Radius 0.3113 ft Average Velocity 2.8782 ft/s Top Width 3.9382 ft Froude Number: 0.8854 Critical Depth 0.6252 ft Critical Velocity 3.1726 ft/s Critical Slope: 0.0052 ft/ft Critical Top Width 3.75 ft Calculated Max Shear Stress 0.1638 lb/ft^2 Calculated Avg Shear Stress 0.0777 lb/ft^2 Channel Analysis: Ditch B Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0169 ft/ft Manning's n: 0.0150 Flow 2.9100 cfs Result Parameters Depth 0.4569 ft Area of Flow 0.6263 ft^2 Wetted Perimeter 2.8896 ft Hydraulic Radius 0.2167 ft Average Velocity 4.6467 ft/s Top Width 2.7414 ft Froude Number: 1.7133 Critical Depth 0.5667 ft Critical Velocity 3.0205 ft/s Critical Slope: 0.0054 ft/ft Critical Top Width 3.40 ft Calculated Max Shear Stress 0.4818 lb/ft^2 Calculated Avg Shear Stress 0.2285 lb/ft^2 Channel Analysis: Pipe A Input Parameters Channel Type: Circular Pipe Diameter 1.50 ft Longitudinal Slope: 0.0199 ft/ft Manning's n: 0.0150 Flow 6.9300 cfs Result Parameters Depth 0.7848 ft Area of Flow 0.9358 ft^2 Wetted Perimeter 2.4258 ft Hydraulic Radius 0.3858 ft Average Velocity 7.4056 ft/s Top Width 1.4984 ft Froude Number: 1.6514 Critical Depth 1.0188 ft Critical Velocity 5.4227 ft/s Critical Slope: 0.0090 ft/ft Critical Top Width 1.40 ft Calculated Max Shear Stress 0.9745 lb/ft^2 Calculated Avg Shear Stress 0.4790 lb/ft^2 Channel Analysis: Ditch A-0 Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0308 ft/ft Manning's n: 0.0150 Flow 0.8500 cfs Result Parameters Depth 0.2573 ft Area of Flow 0.1987 ft^2 Wetted Perimeter 1.6276 ft Hydraulic Radius 0.1221 ft Average Velocity 4.2783 ft/s Top Width 1.5441 ft Froude Number: 2.1019 Critical Depth 0.3464 ft Critical Velocity 2.3615 ft/s Critical Slope: 0.0063 ft/ft Critical Top Width 2.08 ft Calculated Max Shear Stress 0.4946 lb/ft^2 Calculated Avg Shear Stress 0.2346 lb/ft^2 Channel Analysis: Ditch A-1 Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0036 ft/ft Manning's n: 0.0150 Flow 6.0800 cfs Result Parameters Depth 0.8049 ft Area of Flow 1.9436 ft^2 Wetted Perimeter 5.0906 ft Hydraulic Radius 0.3818 ft Average Velocity 3.1282 ft/s Top Width 4.8294 ft Froude Number: 0.8690 Critical Depth 0.7609 ft Critical Velocity 3.5002 ft/s Critical Slope: 0.0049 ft/ft Critical Top Width 4.57 ft Calculated Max Shear Stress 0.1808 lb/ft^2 Calculated Avg Shear Stress 0.0858 lb/ft^2 Channel Analysis: Pipe A-1 Notes: Input Parameters Channel Type: Circular Pipe Diameter 1.25 ft Longitudinal Slope: 0.0104 ft/ft Manning's n: 0.0150 Flow 4.3200 cfs Result Parameters Depth 0.8127 ft Area of Flow 0.8446 ft^2 Wetted Perimeter 2.3447 ft Hydraulic Radius 0.3602 ft Average Velocity 5.1148 ft/s Top Width 1.1923 ft Froude Number: 1.0710 Critical Depth 0.8423 ft Critical Velocity 4.9112 ft/s Critical Slope: 0.0094 ft/ft Critical Top Width 1.17 ft Calculated Max Shear Stress 0.5274 lb/ft^2 Calculated Avg Shear Stress 0.2338 lb/ft^2 Channel Analysis: Ditch A-2 Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0113 ft/ft Manning's n: 0.0150 Flow 8.6400 cfs Result Parameters Depth 0.7410 ft Area of Flow 1.6473 ft^2 Wetted Perimeter 4.6866 ft Hydraulic Radius 0.3515 ft Average Velocity 5.2450 ft/s Top Width 4.4461 ft Froude Number: 1.5185 Critical Depth 0.8758 ft Critical Velocity 3.7550 ft/s Critical Slope: 0.0046 ft/ft Critical Top Width 5.25 ft Calculated Max Shear Stress 0.5225 lb/ft^2 Calculated Avg Shear Stress 0.2478 lb/ft^2 Channel Analysis: Pipe A-2 Notes: Input Parameters Channel Type: Circular Pipe Diameter 1.50 ft Longitudinal Slope: 0.0097 ft/ft Manning's n: 0.0150 Flow 5.0450 cfs Result Parameters Depth 0.8049 ft Area of Flow 0.9659 ft^2 Wetted Perimeter 2.4661 ft Hydraulic Radius 0.3917 ft Average Velocity 5.2232 ft/s Top Width 1.4960 ft Froude Number: 1.1455 Critical Depth 0.8643 ft Critical Velocity 4.7852 ft/s Critical Slope: 0.0077 ft/ft Critical Top Width 1.48 ft Calculated Max Shear Stress 0.4872 lb/ft^2 Calculated Avg Shear Stress 0.2371 lb/ft^2 Channel Analysis: Pipe B Notes: Input Parameters Channel Type: Circular Pipe Diameter 1.50 ft Longitudinal Slope: 0.0044 ft/ft Manning's n: 0.0150 Flow 5.9600 cfs Result Parameters Depth 1.2121 ft Area of Flow 1.5299 ft^2 Wetted Perimeter 3.3518 ft Hydraulic Radius 0.4564 ft Average Velocity 3.8957 ft/s Top Width 1.1815 ft Froude Number: 0.6033 Critical Depth 0.9426 ft Critical Velocity 5.0970 ft/s Critical Slope: 0.0083 ft/ft Critical Top Width 1.45 ft Calculated Max Shear Stress 0.3328 lb/ft^2 Calculated Avg Shear Stress 0.1253 lb/ft^2 Channel Analysis: Pipe B-1 Notes: Input Parameters Channel Type: Circular Pipe Diameter 1.25 ft Longitudinal Slope: 0.0162 ft/ft Manning's n: 0.0150 Flow 1.2700 cfs Result Parameters Depth 0.3573 ft Area of Flow 0.2895 ft^2 Wetted Perimeter 1.4101 ft Hydraulic Radius 0.2053 ft Average Velocity 4.3873 ft/s Top Width 1.1295 ft Froude Number: 1.5273 Critical Depth 0.4446 ft Critical Velocity 3.2455 ft/s Critical Slope: 0.0070 ft/ft Critical Top Width 1.20 ft Calculated Max Shear Stress 0.3612 lb/ft^2 Calculated Avg Shear Stress 0.2075 lb/ft^2 Channel Analysis: Pipe B-2 Notes: Input Parameters Channel Type: Circular Pipe Diameter 1.25 ft Longitudinal Slope: 0.0227 ft/ft Manning's n: 0.0150 Flow 0.7000 cfs Result Parameters Depth 0.2435 ft Area of Flow 0.1682 ft^2 Wetted Perimeter 1.1427 ft Hydraulic Radius 0.1472 ft Average Velocity 4.1612 ft/s Top Width 0.9901 ft Froude Number: 1.7790 Critical Depth 0.3268 ft Critical Velocity 2.7391 ft/s Critical Slope: 0.0070 ft/ft Critical Top Width 1.10 ft Calculated Max Shear Stress 0.3449 lb/ft^2 Calculated Avg Shear Stress 0.2085 lb/ft^2 Channel Analysis: Ditch C Notes: Input Parameters Channel Type: Triangular Side Slope 1 (Z1): 3.0000 ft/ft Side Slope 2 (Z2): 3.0000 ft/ft Longitudinal Slope: 0.0091 ft/ft Manning's n: 0.0150 Flow 0.2000 cfs Result Parameters Depth 0.1880 ft Area of Flow 0.1060 ft^2 Wetted Perimeter 1.1890 ft Hydraulic Radius 0.0892 ft Average Velocity 1.8863 ft/s Top Width 1.1280 ft Froude Number: 1.0842 Critical Depth 0.1942 ft Critical Velocity 1.7681 ft/s Critical Slope: 0.0077 ft/ft Critical Top Width 1.17 ft Calculated Max Shear Stress 0.1068 lb/ft^2 Calculated Avg Shear Stress 0.0506 lb/ft^2 Channel Analysis: Pipe C Notes: Input Parameters Channel Type: Circular Pipe Diameter 1.25 ft Longitudinal Slope: 0.0161 ft/ft Manning's n: 0.0150 Flow 5.2300 cfs Result Parameters Depth 0.7974 ft Area of Flow 0.8263 ft^2 Wetted Perimeter 2.3128 ft Hydraulic Radius 0.3573 ft Average Velocity 6.3294 ft/s Top Width 1.2015 ft Froude Number: 1.3450 Critical Depth 0.9271 ft Critical Velocity 5.3587 ft/s Critical Slope: 0.0108 ft/ft Critical Top Width 1.09 ft Calculated Max Shear Stress 0.8011 lb/ft^2 Calculated Avg Shear Stress 0.3589 lb/ft^2 APPENDIX D: Rational Method Pre versus Post Discharges at POIs Smith Creek Park Preserve Rational Method Computations Study Point: Computed By: WTG Date: 10/11/23 Checked By: Date: 1. Compute Rational Q: Q = C*i*A where; i = rainfall intensity* A = Drainage area in acres C = weighted C factor ** Hyd. Soil Grp. Land Use Area 2, 10-YR 25-YR A Woods 2-6% 36.89 acres C = 0.25 0.25 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 A total = 36.89 acres Therefore; Weighted C2, 10 =0.25 where:(∑A*C)/∑A Weighted C25 =0.25 where:(∑A*C)/∑A i2=3.44 in/hr (TOC=30min) i10=4.73 in/hr i25=5.46 in/hr Q2 =31.72 cfs Q10 =43.62 cfs Q25 =50.35 cfs POI-1 PRE Smith Creek Park Preserve Rational Method Computations Study Point: Computed By: WTG Date: 10/11/23 Checked By: Date: 1. Compute Rational Q: Q = C*i*A where; i = rainfall intensity* A = Drainage area in acres C = weighted C factor ** Hyd. Soil Group Land Use Area 2, 10-YR 25-YR A Woods 2-6% 36.47 acres C = 0.25 0.25 A Imper 2-6% = 0.42 acres C = 0.95 0.95 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 A total = 36.89 acres Therefore; Weighted C2, 10 =0.26 where:(∑A*C)/∑A Weighted C25 =0.26 where:(∑A*C)/∑A i2=3.44 in/hr (TOC=30min) i10=4.73 in/hr i25=5.46 in/hr Q2 =32.73 cfs Q10 =45.01 cfs Q25 =51.96 cfs POI-1 POST (Pipe C) Smith Creek Park Preserve Rational Method Computations Study Point: Computed By: WTG Date: 10/11/23 Checked By: Date: 1. Compute Rational Q: Q = C*i*A where; i = rainfall intensity* A = Drainage area in acres C = weighted C factor ** Hyd. Soil Grp. Land Use Area 2, 10-YR 25-YR A Woods 2-6% 34.99 acres C = 0.25 0.25 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 acres C = 0 0 A total = 34.99 acres Therefore; Weighted C2, 10 =0.25 where:(∑A*C)/∑A Weighted C25 =0.25 where:(∑A*C)/∑A i2=4.98 in/hr (TOC=30min) i10=6.53 in/hr i25=7.36 in/hr Q2 =43.56 cfs Q10 =57.12 cfs Q25 =64.38 cfs POI-2 PRE Smith Creek Park Preserve Rational Method Computations Study Point: Computed By: WTG Date: 10/11/23 Checked By: Date: 1. Compute Rational Q: Q = C*i*A where; i = rainfall intensity* A = Drainage area in acres C = weighted C factor ** Hyd. Soil Grp. Land Use Area 2, 10-YR 25-YR A Woods 2-6% 0.76 acres C = 0.25 0.25 A Imper 2-6% = 0.82 acres C = 0.95 0.95 A Woods 2-6% 13.72 acres C = 0.25 0.25 A Imper 2-6% = 0.78 acres C = 0.95 0.95 A Open space 2-6% = 1.35 acres C = 0.25 0.25 A Woods 2-6% 1.44 acres C = 0.25 0.25 A Open space 2-6% = 0.66 acres C = 0.25 0.25 A Open space 2-6% = 15.46 acres C = 0.25 0.25 A total = 34.99 acres Therefore; Weighted C2, 10 =0.28 where:(∑A*C)/∑A Weighted C25 =0.28 where:(∑A*C)/∑A i2=4.98 in/hr (TOC=30min) i10=6.53 in/hr i25=7.36 in/hr Q2 =49.14 cfs Q10 =64.43 cfs Q25 =72.62 cfs POI-2 POST (Pipe A-2, Pipe B, B-1, B-2) APPENDIX E: NOAA Atlas 14 Precipitation Data APPENDIX F: WinTR-55 Time of Concentration Calculations WTG Smith Creek Park New Hanover NOAA-C County, North Carolina Sub-Area Time of Concentration Details Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- DITCH A-1 SHEET 100 0.0063 0.150 0.328 SHALLOW 536 0.0063 2 0.116 CHANNEL 775 3.400 0.063 Time of Concentration .507 ======== DICTH A-0 SHEET 100 0.0100 0.400 0.597 SHALLOW 31 0.0100 2 0.005 CHANNEL 198 4.700 0.012 Time of Concentration .614 ======== DITCH A SHEET 28 0.0001 0.011 0.077 CHANNEL 426 4.000 0.030 Time of Concentration .107 ======== DITCH B SHEET 34 0.0590 0.150 0.057 CHANNEL 325 4.631 0.019 Time of Concentration 0.1 ======== DITCH C SHEET 88 0.0113 0.400 0.514 CHANNEL 333 2.000 0.046 Time of Concentration .56 ======== PIPE A-2 SHEET 100 0.0113 0.400 0.569 SHALLOW 252 0.0113 2 0.041 Time of Concentration .61 ======== PIPE B SHEET 100 0.0082 0.400 0.647 SHALLOW 1113 0.0082 2 0.212 Time of Concentration .859 ======== PIPE B-1 SHEET 100 0.0119 0.400 0.557 SHALLOW 277 0.0119 2 0.044 Time of Concentration .601 ======== WinTR-55, Version 1.00.10 Page 1 11/1/2023 12:49:08 PM WTG Smith Creek Park New Hanover NOAA-C County, North Carolina Sub-Area Time of Concentration Details (continued) Sub-Area Flow Mannings's End Wetted Travel Identifier/ Length Slope n Area Perimeter Velocity Time (ft) (ft/ft) (sq ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------------- PIPE B-2 SHEET 100 0.0170 0.400 0.483 SHALLOW 428 0.0170 2 0.057 Time of Concentration .54 ======== PIPE C SHEET 100 0.0059 0.400 0.738 SHALLOW 1935 0.0059 2 0.434 Time of Concentration 1.172 ======== WinTR-55, Version 1.00.10 Page 2 11/1/2023 12:49:08 PM