Loading...
210236 TIA 9.15.20229/15/2022 Lendire Mixed Use – Transportation Impact Analysis i Lendire Mixed Use development – Transportation Impact Analysis Wilmington, NC Prepared for Tribute Investment & Development, Inc. September 15, 2022 Executive Summary Site Description The proposed Lendire Mixed Use development is to be located on the north quadrant of the intersection of Middle Sound Loop Road and Lendire Road in Wilmington, North Carolina. DAVENPORT was retained to analyze the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The findings from the analysis are summarized in this report. Project Description The proposed Lendire Mixed Use development is to be located on the north quadrant of the intersection of Middle Sound Loop Road and Lendire Road in Wilmington, North Carolina. As currently planned, this site development proposes 694 dwelling units of multifamily housing (low-rise), 26,000 square feet of general office, 10,000 square feet of medical office, 29,000 of retail, 7,000 of high turnover restaurant and 2,500 square feet of fast food restaurant with drive thru. Three (3) accesses are proposed to the site, one full access on Lendire Road, one full access and one right-in / right-out on US 17 (Market Street). Per the approved scope, an additional access scenario was provided with only RI/RO access to Market St. Trip Generation Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 10th Edition), this development has a trip generation potential of 386 net trips in the AM peak, 457 net trips in the PM peak and 7,473 of total daily trips. Capacity Analysis and Recommendations Based on NCDOT turn lane warrant analysis at Site Access 1 in scenario 1, it is recommended to provide a southbound right turn lane with 175 feet of storage length and appropriate taper. In scenario 2, it is recommended to provide a southbound right turn lane with 100 feet of storage length and appropriate taper. Based on NCDOT turn lane warrant analysis at Site Access 2 in scenario 1, it is recommended to provide a southbound right turn lane with 250 feet of storage length and appropriate taper. If the signal is installed in scenario 2, it is recommended to provide a southbound right turn lane with 150 feet of storage length and appropriate taper. It is recommended to provide a southbound right turn lane with 150 feet of storage length and appropriate taper in scenario 2. Also, this study finds that traffic volumes at the 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis ii intersection at US 17 at Site Access 2 during scenario 2 are high enough to meet MUTCD Warrants 1, 2, and 3 under future conditions. At Lendire Road at Site Access 3, it is recommended to provide an eastbound left turn lane with 50 feet of storage length and appropriate taper for both scenario 1 & 2. Also, it is recommended to provide a westbound right turn taper with 50 feet of taper for both scenario 1 & 2. At both intersections of US 17 at Middle Sound Loop Road / Lendire Road and US 17 (Market Street) at Wendover Lane no improvements are recommended. Based on SimTraffic and Synchro queueing outputs, there is sufficient distance on Market Street between Site Access 2 and (if signalized) and the future RCI at Wendover to accommodate the Market Street left turn queues for both intersections and the transition taper between them. The recommended improvements are illustrated in Exhibit A and Exhibit B. Conclusion This TIA was performed in order to assess transportation impacts of the proposed site as well as background traffic. The analysis documented here indicates there will be adequate capacity to accommodate future traffic. Table A present the improvements summary. It is recommended that the site accesses be constructed to comply with NCDOT standards where applicable. Table A – Recommended Improvement Summary Intersection 2024 Future Build Scenario 1 2024 Future Build Scenario 2 US 17 at Middle Sound Loop Road / Lendire Road No improvements recommended No improvements recommended US 17 (Market Street) at Wendover Lane No improvements recommended No improvements recommended Lendire Road at Site Access 3 Provide an eastbound left turn lane with 50 feet of storage length and appropriate taper Provide an eastbound right turn taper with 50 feet Provide an eastbound left turn lane with 50 feet of storage length and appropriate taper Provide an eastbound right turn taper with 50 feet US 17 (Market Street) at Site Access 1 Provide a southbound right turn lane with 175 feet of storage length and appropriate taper in scenario 1 Provide a southbound right turn lane with 100 feet of storage length and appropriate taper in scenario 2 US 17 (Market Street) at Site Access 2 Provide a southbound right turn lane with 250 feet of storage length and appropriate taper in scenario 1 Provide a southbound right turn lane with 150 feet of storage length and appropriate taper in scenario 2 Provide a northbound right turn lane with 100 feet of storage length and appropriate taper in scenario 2 Install a signal in scenario 2 *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared.Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreementbetweenDAVENPORT and the client. PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC EXHIBIT A RECOMMENDED IMPROVEMENTS SCENARIO 1 425' 35 0 ' US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road TW L T L 425' 150' 90 0 ' FULL 150' TW L T L 15 0 ' TWO WAY LEFT TURN LANE Lendire Road TWLTL US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road 12 5 ' Wendover Lane TW L T L Og d e n Bu s i n e s s L a n e Site Access 2 Site Access 1 17 5 ' 25 0 ' 65 0 ' 50' Taper 50' Si t e A c c e s s 3 Dennys Entrance BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Construct site accesses according NCDOT standards FULL *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared.Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreementbetweenDAVENPORT and the client. PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC EXHIBIT B RECOMMENDED IMPROVEMENTS SCENARIO 2 425' 35 0 ' US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road TW L T L 425' 150' 90 0 ' FULL 150' TW L T L 15 0 ' TWO WAY LEFT TURN LANE Lendire Road TWLTL US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road 12 5 ' Wendover Lane TW L T L Og d e n Bu s i n e s s L a n e Site Access 2 Site Access 1 10 0 ' 15 0 ' 65 0 ' 50' Taper 50' Si t e A c c e s s 3 Dennys Entrance BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Construct site accesses according NCDOT standards FULL 10 0 ' 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 1 Lendire Mixed Use development – Transportation Impact Analysis Wilmington, NC Prepared for Tribute Investment & Development, Inc. September 15, 2022 Table of Contents 1.0 Introduction ............................................................................................................. 3  Figure 1 – Site Plan ..................................................................................................... 4  Figure 2A – Site Location Map .................................................................................... 5  Figure 2B – Vicinity Map .............................................................................................. 6  2.0 Existing Conditions ................................................................................................ 7  2.1 Inventory ................................................................................................................ 7  2.2 Existing Traffic Volumes ........................................................................................ 7  Figure 3 – Existing Lane Geometry ............................................................................. 8  Figure 4 – 2021 Existing Traffic Volumes .................................................................... 9  3.0 Approved Developments and Committed Improvements ................................. 10  3.1 Approved Developments ...................................................................................... 10  3.2 Committed Improvements .................................................................................... 10  4.0 Methodology ......................................................................................................... 10  4.1 Base Assumptions and Standards ....................................................................... 10  4.2 Trip Generation .................................................................................................... 11  4.3 Trip Distribution .................................................................................................... 12  4.4 2021 Future No Build Traffic ................................................................................ 12  4.5 2024 Future Build Total Traffic ............................................................................. 12  Figure 5A – Residential Trip Distribution Scenario 1 ................................................. 13  Figure 5B – Commercial Trip Distribution Scenario 1 ................................................ 14  Figure 5C – Pass by Trip Distribution Scenario 1 ...................................................... 15  Figure 5D – Residential Trip Distribution Scenario 2 ................................................. 16  Figure 5E – Commercial Trip Distribution Scenario 2 ................................................ 17  Figure 5F – Pass by Trip Distribution Scenario 2 ...................................................... 18  Figure 6 – 2024 Future No Build Volumes ................................................................. 19  Figure 7A – Site Trips ................................................................................................ 20  Figure 7B – Residential Site Trips Scenario 1 ........................................................... 21  Figure 7B – Commercial Site Trips Scenario 1 .......................................................... 22  Figure 7C – Pass by Site Trips Scenario 1 ................................................................ 23  Figure 7D – Residential Site Trips Scenario 2 ........................................................... 24  Figure 7D – Commercial Site Trips Scenario 2 .......................................................... 25  Figure 7E – Pass by Site Trips Scenario 2 ................................................................ 26  Figure 8A – 2024 Future Build Volumes .................................................................... 27  Figure 8B – 2024 Future Build Volumes .................................................................... 28  5.0 Capacity Analysis ................................................................................................. 29  5.1 Level of Service Evaluation Criteria ..................................................................... 29  5.2 Level of Service Results ...................................................................................... 30  6.0 Queue Results ...................................................................................................... 36  7.0 Signal Warrant Analysis ...................................................................................... 40  9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 2 Figure 9A – Recommended Improvements Scenario 1 ............................................. 42  Figure 9B – Recommended Improvements Scenario 2 ............................................. 43  8.0 Summary and Conclusion ................................................................................... 44  Appendix ...................................................................................................................... 46  9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 3 Lendire Mixed Use development – Transportation Impact Analysis Wilmington, NC Prepared for Tribute Investment & Development, Inc. September 15, 2022 1.0 Introduction The Lendire Mixed Use development is to be located on the north quadrant of the intersection of Middle Sound Loop Road and Lendire Road in Wilmington, North Carolina. As currently planned, this site development proposes 694 dwelling units of multifamily housing (low-rise), 26,000 square feet of general office, 10,000 square feet of medical office, 29,000 of retail, 7,000 of high turnover restaurant and 2,500 square feet of fast food restaurant with drive thru. Three (3) accesses are proposed to the site, one full access on Lendire Road and two full access on us 17 (Market Street). Figure 1 shows the site plan. The site location and vicinity map are illustrated in Figure 2A and Figure 2B respectively. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: US 17 (Market Street) at SR 1403 (Middle Sound Loop Road) / SR 2892 (Lendire Road) US 17 (Market Street) at SR 1929 (Wendover Lane) SR 2892 (Lendire Road) at Ogden Business Park / Site Access 3 SR 2892 (Lendire Road) at Site Access 1 SR 2892 (Lendire Road) at Site Access 2 The intersections were analyzed during the AM (7-9 am) and PM (4-6 pm) peaks for the following conditions: 2021 Existing Conditions 2024 Future No Build Conditions 2024 Future Build Conditions 2024 Future Build Conditions with Improvements The Wilmington Metropolitan Organization (WMPO) and NCDOT were contacted to obtain background information and to ascertain the elements to be covered in this Transportation Impact Analysis (TIA). The approved scope for this TIA is included in the appendix. Information regarding the property was provided by Tribute Investment & Development, Inc. Figure 1A – Site Plan    Site Access 3   Site Access 1   Site Access  2    SITE FIGURE 2A SITE LOCATION MAP US 17 (Market Street) SITE STUDY INTERSECTIONS EXISTING PROPOSED FIGURE 2B VICINITY MAP 1 2 3 4 Lendire Road Lendire Road (Private) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 7 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 contains the results of this effort. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Market Street US 17 4-Lane Undivided with TWLTL Approx. 60’ 45 MPH NCDOT Middle Sound Loop Road SR 1403 2-Lane Undivided Approx. 24’ 35 MPH NCDOT Lendire Road SR 2892 2-Lane Undivided Approx. 20’ 35 MPH NCDOT Wendover Lane SR 1929 2-Lane Undivided Approx. 20’ 25 MPH NCDOT 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT staff. Table 2.2 contains the dates these counts were conducted. Schools were in session at the time of traffic counts. Figure 4 shows the 2021 existing AM and PM peak hour volumes. More information can be found in the Traffic Volume Data section of the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: By: US 17 at Middle Sound Loop Road 09/1/2021 True Direction Traffic Service US 17 at Wendover Lane 09/1/2021 True Direction Traffic Service Lendire Road at Ogden Business Park 10/28/2019 BSI *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared.Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreementbetweenDAVENPORT and the client. PROJECT NUMBER 210236 LENDIRE MIXED USE Wilmington NC FIGURE 3EXISTING LANE GEOMETRY BLACK = EXISTING AADT 2019 VOLUMEXXXX 425' 35 0 ' US 1 7 ( M a r k e t S t r e e t ) 50 , 5 0 0 47 , 5 0 0 Middle Sound Loop Road TW L T L 425' 150' 90 0 ' FULL 150' SPEED LIMIT 35 TW L T L 15 0 ' 11,500 TWO WAY LEFT TURN LANE Lendire Road TWLTL SPEED LIMIT 45 SPEED LIMIT 35 SPEED LIMIT 45 US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road 12 5 ' Wendover Lane TW L T L Og d e n Bu s i n e s s L a n e *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND AM / PM PEAKS PROJECT NUMBER 210236 LENDIRE MIXED USE Wilmington NC FIGURE 4 2021 EXISTING TRAFFIC VOLUMES 20 0 1 / 2 0 5 3 73 / 146 99 / 67 52 / 64111 / 169 12 8 / 2 0 2 308 / 199 249 / 166 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. US 1 7 ( M a r k e t S t r e e t ) Lendire Road US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road BLACK = EXISTING Lendire Road Wendover Lane 18 8 0 / 1 9 6 4 24 6 / 2 7 5 18 9 4 / 1 5 6 4 13 7 / 2 2 2 63 / 4 7 1 / 2 31 / 1 1 2 0 / 2 0 / 0 1 / 3 14 / 270 / 093 / 1006 / 1 66 / 1 2 3 20 4 8 / 1 7 8 0 Og d e n Bu s i n e s s L a n e 363 / 167 135 / 270 2 / 1 0 8 / 7 11 / 6 1 / 1 4 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 10 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per WMPO staff, there are no approved developments to be considered in this analysis. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, the City, or a developer in the area, but not yet constructed. Per WMPO staff, there are two (2) committed improvements to be considered in this analysis. The proposed development is within the study area for the NCDOT STIP Project U- 4902D (Design Year 2038) and U-4751 (Design Year 2037). These projects recommend improvements in the study area of the proposed development. The recommended improvements are as follows: an additional eastbound right turn lane and extend southbound right turn lane to 175 feet of storage on Middle Sound Loop Road at US 17 with signal modifications, and a right-in right-out intersection configuration at US 17 and Lendire Access Road. These improvements were assumed to be in place along with the approved development in 2021 future no build conditions. It was requested to determine whether the development has been rezoned from what was included in the TIP forecast. If the development has been rezoned, then the TIA must include the TIP design year (2038) analysis for the difference of the zoned use. It was determined and confirmed with WMPO/NCDOT that the TIP design year (2038) will not be required. More information can be found in the supporting documents section of the appendix. 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 1.0% per year for all roadways Analysis Software Synchro/SimTraffic Version 10.0 Base Signal Timing/Phasing City of Wilmington Lane widths 12-feet Truck percentages 2% 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 11 4.2 Trip Generation The Lendire Mixed Use development is planned to consist of 694 dwelling units of multifamily housing (low-rise), 26,000 square feet of general office, 10,000 square feet of medical office, 29,000 of retail, 7,000 of high turnover restaurant and 2,500 square feet of fast food restaurant with drive thru. The trip generation potential of this site was projected based on the 10th Edition of the ITE Trip Generation Manual. Table 4.2 presents the results. Table 4.2 - ITE Trip Generation Lendire Mixed Use, New Hanover County Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Apartments/ Townhomes 221 694.0 Dwelling Units Adjacent/ Equation 3,781 60 169 174 111 General Office 710 26.0 1000 GFA Generator/ Equation 287 45 6 17 77 Medical Office 720 10.0 1000 GFA Adjacent/ Rate 348 22 6 10 25 Retail 820 29.0 1000 GLA Adjacent/ Equation 1,095 17 10 53 57 High-Turnover (Sit-down) Restaurant 932 7.0 1000 GFA Generator/ Rate 785 56 42 63 59 Fast Food Restaurant with Drive Thru 934 2.5 1000 GFA Adjacent/ Rate 1,177 51 49 43 39 Total Unadjusted Trips 7,473 251 282 360 368 Office Internal Capture -13 -11 -8 -7 Retail Internal Capture -7 -5 -34 -29 Restaurant Internal Capture -30 -14 -28 -43 Residential Internal Capture -4 -25 -28 -18 Total Internal Trips Reduction - -54 -55 -98 -97 LUC 820 General Retail (0%AM, 34% PM) 0 0 -8 -8 LUC 932 High-Turnover (Sit-down) Restaurant (0%AM, 43% PM) 0 0 -17 -17 LUC 934 Fast Food Restaurant with Drive Thru (49%AM, 50% PM) -19 -19 -13 -13 Total Pass-By Peak Reduction - -19 -19 -38 -38 Total Adjusted (Primary) Trips - 178 208 224 233 Total Adjusted (Residential) Trips - 56 144 146 93 Total Adjusted (Retail) Trips - 122 64 78 140 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 12 This development satisfies the criteria of a “multi-use” development as defined in the ITE Trip Generation Handbook. Therefore, the trips for this development were reduced using the NCHRP 684 Internal Trip Capture Estimation Tool provided by NCDOT. This is summarized in Table 4.1. More information can be found in the Trip Generation section of the Appendix. Developments of this type also generate what are called “pass-by” trips. The ITE Trip Generation Manual defines “pass-by” trips as trips that are generated by the development but are already on the adjacent roadway. These trips are not new trips but are part of the existing background traffic. Pass-by trip percentages were applied to the applicable commercial land uses based on rates from the ITE Trip Generation Manual and based on NCDOT Congestion Management standards. 4.3 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. These distributions were reviewed and approved by NCDOT and WMPO. Both residential and primary commercial trip distributions are shown in Figure 5A and 5D in scenario 1 and 5B and 5E in scenario 2, respectively. The directional distributions site trips are as follows: 35% to and from the north on US 17 30% to and from the south on US 17 25% to and from the west on Lendire Road 10% to and from the east on Middle Sound Loop Road The pass-by trip distribution (shown in Figure 5C in scenario 1 and Figure 5F in scenario 2, respectively) applies 50% of pass-by trips to southbound and northbound on US 17 ( Market Street). 4.4 2024 Future No Build Traffic The 2024 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2021 existing traffic volumes. Figure 6 shows 2024 future no build traffic volumes for AM and PM peaks. 4.5 2024 Future Build Total Traffic The 2024 build-out traffic volumes were obtained by summing the 2024 future no build volumes and site trips due to the proposed development. Site trips for scenario1 and 2 are shown in Figures 7A through 7F. The 2024 future build volumes are shown for AM and PM peaks for both build scenarios in Figures 8A and 8B. *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P DESTINATION NODE% PROJECT NUMBER 210236 LENDIRE MIXED USE W ILMINGTON, NC FIGURE 5ARESIDENTIALTRIP DISTRIBUTION(SCENARIO 1) 5% I N US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 5% O U T RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT 5% O U T 25% Site Access 2 Site Access 1 25% IN *1 0 % I N +1 5 % I N 25 % O U T 20 % I N 20 % O U T 15% OUT 35% 10% 30% *1 0 % I N +3 5 % O U T 10 % I N +3 5 % O U T 20% OUT Wendover Lane 10 % I N +1 0 % O U T 10 % O U T 5% IN 20 % I N 25 % O U T *1 0 % I N 35 % O U T 25 % I N 5% IN 5% OUT 25% OUT 40 % O U T 30% IN 35 % I N * = DIVERTED LEFT TURN IN TRAFFIC 10% OUT *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% DESTINATION NODE% PROJECT NUMBER 210236 LENDIRE MIXED USE W ILMINGTON, NC FIGURE 5BCOMMERCIALTRIP DISTRIBUTION(SCENARIO 1) 30 % I N US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 10 % O U T RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT 30 % O U T 25% Site Access 2 Site Access 1 25% IN *2 0 % I N +2 5 % I N 25 % O U T *2 0 % I N +1 0 % I N 30 % O U T 35% OUT 35% 10% 30% *4 0 % I N +3 5 % O U T 40 % I N +3 5 % O U T 30% OUT Wendover Lane 40 % O U T 10% IN *2 0 % I N +1 0 % I N 25 % O U T *4 0 % I N 35 % O U T * = DIVERTED LEFT TURN IN TRAFFIC 35 % I N 10% OUT 10 % O U T 40 % I N +1 0 % O U T Og d e n Bu s i n e s s L a n e *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% DESTINATION NODE% PROJECT NUMBER 210236 LENDIRE MIXED USE W ILMINGTON, NC FIGURE 5CPASSBY DISTRIBUTION(SCENARIO 1) US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road Lendire Road Middle Sound Loop Road RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 50% OUT 50 % I N -5 0 % I N + 5 0 % O U T 50% OUT US 1 7 Ma r k e t S t r e e t 50% 50% 50 % I N Wendover Lane -5 0 % I N +5 0 % O U T 50 % I N 50 % O U T 50 % O U T 50 % O U T Og d e n Bu s i n e s s L a n e Si t e A c c e s s 3 *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% DESTINATION NODE% PROJECT NUMBER 210236 LENDIRE MIXED USE W ILMINGTON, NC FIGURE 5DRESIDENTIALTRIP DISTRIBUTION(SCENARIO 2) 15 % I N 5% IN US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 15% OUT 5% O U T RIGHT IN / RIGHT OUT 5% OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT 15 % O U T 25% Site Access 2 Site Access 1 25% IN 25% I N 35% OUT 20 % O U T 25% OU T 20% IN 10 % I N 10 % O U T 10% OUT US 1 7 Ma r k e t S t r e e t 35% 10% 30% 20 % I N 15 % I N 20 % I N 10% OUT Wendover Lane 20 % I N 20 % O U T 5% IN 10 % I N *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% DESTINATION NODE% PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC FIGURE 5ECOMMERCIALTRIP DISTRIBUTION(SCENARIO 2) 30 % I N US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 10 % O U T RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT 30 % O U T 25% Site Access 2 Site Access 1 25% IN 20 % I N 35% OUT 25 % O U T 15 % I N 15 % O U T 25% OUT US 1 7 Ma r k e t S t r e e t 35% 10% 30% 40 % I N 40 % I N 15% OUT Wendover Lane 40 % I N 40 % O U T 10% IN 15 % I N *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% DESTINATION NODE% PROJECT NUMBER 210236 LENDIRE MIXED USE W ILMINGTON, NC FIGURE 5FPASSBY DISTRIBUTION(SCENARIO 2) US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 50% OUT 25 % I N -3 5 % I N 35% OUT US 1 7 Ma r k e t S t r e e t 50% 50% 50 % I N15% OUT Wendover Lane -5 0 % I N 25 % I N -2 5 % I N *** NOT TO SCALE *** PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 6 2024 FUTURE NO BUILD VOLUMES US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT US 1 7 Ma r k e t S t r e e t 76 / 151 102 / 70 54 / 66 115 / 175 13 2 / 2 0 9 318 / 206 257 / 172 19 3 7 / 2 0 2 4 25 4 / 2 8 4 19 5 2 / 1 6 1 2 14 2 / 2 2 9 65 / 4 9 20 6 4 / 2 1 1 9 Wendover Lane 32 / 1 1 6 2 / 7 111 / 132 7 / 2 68 / 1 2 7 21 1 1 / 1 8 3 4 US 1 7 ( M a r k e t S t r e e t ) Og d e n Bu s i n e s s L a n e 374 / 173 140 / 279 3 / 1 1 9 / 8 12 / 7 2 / 1 5 Bojangles/Advance/Preschool and  Starbucks  preclude balancing.  *** NOT TO SCALE *** PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 7A RESIDENTIAL SITE TRIPS (SCENARIO 1) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 7 / 5 14 / 9 3 / 7 3 / 7 14 / 3 7 0 / 0 36 / 23 3 / 7 0 / 0 7 / 5 7 / 5 0 / 0 22 / 14 11 / 2 9 29 / 1 9 29 / 19 14 / 3 7 11 / 2 9 56 / 4 7 14 / 37 58 / 3 7 36 / 2 3 56 / 4 7 17 / 44 20 / 2 4 Wendover Lane 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 14 / 9 Og d e n Bu s i n e s s L a n e 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 36 / 2 3 0 / 0 *** NOT TO SCALE *** PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 7B RETAIL SITE TRIPS (SCENARIO 1) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 0 / 0 6 / 14 0 / 0 12 / 8 0 / 0 0 / 0 0 / 0 37 / 2 3 0 / 0 19 / 4 2 6 / 1 4 0 / 0 22 / 49 37 / 2 3 19 / 4 2 19 / 42 55 / 3 5 37 / 2 3 71 / 8 0 31 / 20 6 / 1 4 16 / 3 5 71 / 8 0 0 / 0 55 / 4 5 Wendover Lane 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 26 / 5 6 Og d e n Bu s i n e s s L a n e 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 16 / 3 5 0 / 0 *** NOT TO SCALE *** PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 7C PASSBY TRIPS (SCENARIO 1) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 44 / 63 48 / 5 2 48 / 6 1 48 / 61 69 / 7 2 48 / 5 2 12 7 / 1 2 7 12 7 / 1 2 7 Wendover Lane 52 / 5 8 Og d e n Bu s i n e s s L a n e Si t e A c c e s s 3 *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 7D RESIDENTIAL SITE TRIPS (SCENARIO 2) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 7 / 5 0 / 0 3 / 7 3 / 7 8 / 2 2 0 / 0 22 / 14 8 / 2 2 0 / 0 22 / 1 4 7 / 5 0 / 0 14 / 9 6 / 1 5 14 / 9 14 / 9 14 / 3 7 6 / 1 5 0 / 0 11 / 2 9 11 / 2 9 Wendover Lane 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 29 / 1 9 11 / 2 9 50 / 33 14 / 37 29 / 1 9 36 / 2 3 11 / 29 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 7E RETAIL SITE TRIPS (SCENARIO 2) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 0 / 0 0 / 0 0 / 0 12 / 8 0 / 0 0 / 0 0 / 0 37 / 2 3 0 / 0 19 / 4 2 6 / 1 4 0 / 0 16 / 35 18 / 1 2 10 / 2 1 10 / 21 24 / 1 6 18 / 1 2 0 / 0 49 / 3 1 49 / 3 1 Wendover Lane 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 26 / 5 6 49 / 3 1 22 / 49 31 / 20 0 / 0 16 / 3 5 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 0 / 0 10 / 1 9 0 / 0 *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 7F PASSBY TRIPS (SCENARIO 2) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 7 / 13 5 / 1 0 -7 / - 1 3 3 / 6 5 / 1 0 -5 / - 1 0 -1 0 / - 1 9 Wendover Lane 10 / 1 9 10 / 19 *** NOT TO SCALE *** PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 8A 2024 FUTURE BUILD VOLUMES (SCENARIO 1) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 83 / 156 122 / 93 57 / 73 130 / 190 14 6 / 2 4 6 318 / 206 293 / 195 19 7 7 / 2 0 5 4 25 4 / 2 8 4 19 7 8 / 1 6 5 9 15 5 / 2 4 8 65 / 4 9 54 / 82 58 / 7 1 22 3 4 / 2 0 2 4 58 / 80 79 / 9 1 22 3 4 / 2 0 1 5 23 1 2 / 2 3 9 7 45 / 57 64 / 5 1 52 / 5 8 23 1 2 / 2 3 9 7 17 / 44 21 3 9 / 2 1 8 8 Wendover Lane 32 / 1 1 6 2 / 7 111 / 132 7 / 2 68 / 1 2 7 21 5 1 / 1 8 9 9 Og d e n Bu s i n e s s L a n e 374 / 173 140 / 279 3 / 1 1 9 / 8 12 / 7 2 / 1 5 0 / 0 0 / 0 62 / 7 7 Bojangles/Advance/Preschool and  Starbucks  preclude balancing.  *** NOT TO SCALE *** Og d e n Bu s i n e s s L a n e PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. P 1% AM/PM PEAKS FIGURE 8B 2024 FUTURE BUILD VOLUMES (SCENARIO 2) US 1 7 M a r k e t S t r e e t Middle Sound Loop Road Lendire Road Middle Sound Loop Road Si t e A c c e s s 3 RIGHT IN / RIGHT OUT BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Site Access 2 Site Access 1 US 1 7 Ma r k e t S t r e e t 83 / 156 102 / 70 57 / 73 130 / 190 14 0 / 2 3 1 318 / 206 279 / 186 19 8 2 / 2 0 6 9 25 4 / 2 8 4 19 9 3 / 1 6 6 8 15 5 / 2 4 8 65 / 4 9 37 / 57 29 / 3 7 22 0 3 / 1 9 8 0 27 / 36 43 / 6 3 22 0 5 / 1 9 8 0 21 6 5 / 2 2 3 2 22 3 5 / 2 3 1 1 21 2 4 / 2 1 7 9 Wendover Lane 32 / 1 1 6 2 / 7 111 / 132 7 / 2 68 / 1 2 7 21 6 6 / 1 9 0 9 70 / 7 9 82 / 101 45 / 57 29 / 1 9 52 / 5 8 11 / 29 374 / 173 140 / 279 3 / 1 1 9 / 8 12 / 7 2 / 1 5 0 / 0 0 / 0 Bojangles/Advance/Preschool and  Starbucks  preclude balancing.  0 / 0 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 29 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents low-volume traffic operations and Level of Service “F” represents high-volume, oversaturated traffic operations. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A  10 A  10 B  10 and  20 B  10 and  15 C  20 and  35 C  15 and  25 D  35 and  55 D  25 and  35 E  55 and  80 E  35 and  50 F  80 F  50 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 30 5.2 Level of Service Results The following section discusses the level of service for each intersection. US 17 at Middle Sound Loop Road This signalized intersection currently operates at LOS E during the AM and PM peaks. In 2024 future no build condition with future committed improvements, this intersection is expected to operate at LOS E during the AM peak and LOS F in the PM peak. In the 2024 future build conditions, the level of service is expected to operate at LOS F during the AM and PM peaks. It should be noted that the total average delay at the intersection or individual approaches do not increase by 25% or greater. Therefore, no improvements are recommended to accommodate the future build traffic. Table 5.2 - Market Street / Middle Sound Loop Road Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2021 Existing E (57.0) L T R L T R L T R L T R F (85.0) F (92.6) F (123.0) E (75.7) E (62.9) D (49.6) F (89.6) E (57.9) A (4.9) D (54.5) D (48.3) A (5.1) F (109.0) E (68.1) D (53.9) D (47.4) 2024 Future No Build E (75.1) L T R L T R U T R L T R F (90.0) F (93.7) E (65.1) E(75.3) E (66.4) D (46.4) F (197.5) F (95.7) A (6.2) F (83.9 E (58.6) A (4.4) E (75.9) E (67.5) F (91.7) E (58.7) 2024 Future Build Scenario 1 F (87.5) L T R L T R L T R L T R F (95.0) F (97.3) E (67.9) E (73.6) E (67.1) D (46.2) F (236.8) F (118.8) A (6.6) F (82.4) E (66.3) A (4.4) F (79.4) E (65.8) F (114.0) E (65.6) 2024 Future Build Scenario 2 E (84.9) L T R L T R L T R L T R F (116.2) F (97.3) E (66.5) E (75.5) E (61.9) D (42.8) F (220.6) F (111.7) A (6.3) E (86.3) D (46.4) A (5.3) F (82.9) E (65.6) F (106.9) E (66.0) PM Peak Hour 2021 Existing E (70.7) L T R L T R L T R L T R F (183.3) F (280.0) F (165.0) F (157.0) F (138.2) F (128.2) F (145.9) D (37.3) A (4.4) F (351.5) C (22.4) A (3.6) F (216.6) F (143.0) D (42.5) E (61.9) 2024 Future No Build F (114.6) L T R L T R L T R L T R F (185.8) F (298.6) F (128.8) F (144.2) F (132.3) F (131.5) F (816.1) D (40.1) A (3.9) F (721.6) C (25.8) A (4.2) F (204.2) F (137.5) F (100.3) F (109.5) 2024 Future Build Scenario 1 F (143.0) L T R L T R L T R L T R F (199.4) F (311.7) F (131.7) F (140.3) F (134.4) F (138.8) F (1019.2) D (41.6) A (3.7) F (960.7) C (27.7) A (4.1) F (209.0) F (138.8) F (130.4) F (145.6) 2024 Future Build Scenario 2 F (131.6) L T R L T R L T R L T R F (185.8) F (130.5) F (131.7) F (142.5) F (133.0) F (134.2) F (939.5) D (42.5) A (3.8) F (856.1) C (27.0) A (4.3) F (208.4) F (137.7) F (118.5) F (131.2) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 31 US 17 Northbound at Wendover Lane This unsignalized intersection currently operates at LOS A during the AM and PM peaks. In 2024 future no build condition with the committed improvements in place, this signalized intersection is expected to operate at LOS C during the AM and PM peaks. In the 2024 future build conditions, the level of service is expected to remain unchanged. Based on capacity analysis at between both signalize intersections of Market street at Wendover and Market Street at Site Access 2, the queueing is adequate to accommodate the traffic. Therefore, no improvements are recommended to accommodate the future build traffic. Table 5.3 - Wendover Lane & US 17 Northbound (Market Street) Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2021 Existing A (0.9) SB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) C (21.8) A (0.0) A (0.0) D (28.7) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (0.9) 2024 Future No Build C (29.1) L T R L T R L T R L T R C (29.8) C (29.8) D (35.2) C (28.8) C (28.8) C (29.8) D (35.2) C (28.8) 2024 Future Build Scenario 1 C (34.2) L T R L T R L T R C (34.7) C (34.7) C (34.8) C (34.1) C (34.1) C (34.7) C (34.8) C (34.1) 2024 Future Build Scenario 2 C (25.1) L T R L T R L T R C (29.8) C (29.8) D (35.7) C (24.4) C (24.4) C (29.8) D (35.7) C (24.4) PM Peak Hour 2021 Existing A (3.7) SB Approach L T R L T R L T R L T R A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) C (17.7) A (0.0) A (0.0) F (57.2) A (0.0) A (0.0) A (0.0) A (0.0) A (0.0) A (3.7) 2024 Future No Build C (20.0) L T R L T R L T R L T R E (73.6) E (73.6) F (82.9) B (13.2) B (13.2) E (73.6) F (82.9) B (13.2) 2024 Future Build Scenario 1 C (24.9) L T R L T R L T R F (91.6) F (91.6) E (73.8) B (16.2) B (16.2) F (91.6) E (73.8) B (16.2) 2024 Future Build Scenario 2 C (21.1) L T R L T R L T R E (73.6) E(73.6) F (82.9) B (14.6) B (14.6) E (73.6) F (82.9) B (14.6) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 32 Lendire Road / Ogden Business Park at Site Access 3 This signalized intersection currently operates at LOS B during the AM and PM peaks. In 2024 future no build conditions and future build conditions, LOS is expected to remain unchanged. In 2024 future build conditions scenario 1, This unsignalized intersection is expected to operate at LOS C during both the AM and PM peaks. In scenario 2 2024 future build conditions, it is expected to operate at LOS B during both the AM and PM peaks. Based on the NCDOT nomograph and capacity analysis, the following improvements are recommended: Provide an eastbound left turn lane with 50 feet of storage length and appropriate taper for both scenario 1 & 2 Provide a westbound right turn taper with 50 feet of taper for both scenario 1 & 2 Table 5.5 - Lendire Road at Ogden Business Park Lane / Site Access 3 Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2021 Existing B (11.8) NB Approach L T R L T R L T R A (0.0) A (0.0) A (8.2) A (0.0) B (11.8) B (11.8) A (0.0) A (0.4) B (11.8) 2024 Future No Build B (11.9) NB Approach L T R L T R L T R A (0.0) A (0.0) A (8.2) A (0.0) B (11.9) B (11.9) A (0.0) A (0.5) B (11.9) 2024 Future Build Scenario 1 C (16.3) SB Approach L T R L T R L T R L T R A (7.7) A (0.0) A (0.0) A (8.2) A (0.0) A (0.0) B (14.9) B (14.9) B (14.9) C (16.3) C (16.3) C (16.3) A (0.8) A (0.4) B (14.9) C (16.3) 2024 Future Build Scenario 1 with improvements C (16.0) SB Approach L T R L T R L T R L T R A (7.7) A (0.0) A (0.0) A (8.2) A (0.0) A (0.0) B (14.8) B (14.8) B (14.8) C (16.0) C (16.0) C (16.0) A (0.8) A (0.5) B (14.8) C (16.0) 2024 Future Build Scenario 2 B (14.8) NB Approach L T R L T R L T R L T R A (7.6) A (0.0) A (0.0) A (8.2) A (0.0) A (0.0) B (14.8) B (14.8) B (14.8) B (13.2) B (13.2) B (13.2) A (0.8) A (0.5) B (14.8) B (13.2) 2024 Future Build Scenario 2 with improvements B (14.8) NB Approach L T R L T R L T R L T R A (7.6) A (0.0) A (0.0) A (8.2) A (0.0) A (0.0) B (14.8) B (14.8) B (14.8) B (13.0) B (13.0) B (13.0) A (0.8) A (0.5) B (14.8) B (13.0) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 33 Table 5.5 (continued) - Lendire Road at Ogden Business Park Lane / Site Access 3 Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound PM Peak Hour 2021 Existing B (10.6) NB Approach L T R L T R L T R A (0.0) A (0.0) A (7.6) A (0.0) B (10.6) B (10.6) A (0.0) A (0.2) B (10.6) 2024 Future No Build B (10.7) NB Approach L T R L T R L T R A (0.0) A (0.0) A (7.6) A (0.0) B (10.7) B (10.7) A (0.0) A (0.2) B (10.7) 2024 Future Build Scenario 1 C (15.8) SB Approach L T R L T R L T R L T R A (8.2) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (13.6) B (13.6) B (13.6) C (15.8) C (15.8) C (15.8) A (2.0) A (0.2) B (13.6) C (15.8) 2024 Future Build Scenario 1 with improvements C (15.8) SB Approach L T R L T R L T R L T R A (8.2) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (13.5) B (13.5) B (13.5) C (15.2) C (15.2) C (15.2) A (2.0) A (0.2) B (13.5) C (15.2) 2024 Future Build Scenario 2 B (13.5) NB Approach L T R L T R L T R L T R A (8.1) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (13.5) B (13.5) B (13.5) C (12.9) C (12.9) C (12.9) A (2.0) A (0.2) B (13.5) C (12.9) 2024 Future Build Scenario 2 with improvements B (13.4) NB Approach L T R L T R L T R L T R A (8.1) A (0.0) A (0.0) A (7.6) A (0.0) A (0.0) B (13.4) B (13.4) B (13.4) C (12.7) C (12.7) C (12.7) A (2.0) A (0.2) B (13.4) C (12.7) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 34 US 17 at Site Access 1 In 2024 future build conditions scenario 1, This unsignalized intersection is expected to operate at LOS E during both the AM and PM peaks. In scenario 2 2024 future build conditions, it is expected to operate at LOS D during both the AM and PM peaks. Based on the NCDOT nomograph and capacity analysis, the following improvements are recommended: Provide a southbound right turn lane with 175 feet of storage length and appropriate taper in scenario 1 Provide a southbound right turn lane with 100 feet of storage length and appropriate taper in scenario 2 Table 5.6 -US 17 (Market Street) & Site Access 1 Scenario LOS of Worst Approach Level of Service by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2024 Future Build Scenario 1 E (41.1) EB Approach L T R L T R L T R E (41.1) A (0.0) A (0.0) A (0.0) E (41.1) A (0.0) A (0.0) 2024 Future Build Scenario 1 with improvements E (38.5) EB Approach L T R L T R L T R E(38.5) A (0.0) A (0.0) A (0.0) E(38.5) A (0.0) A (0.0) 2024 Future Build Scenario 2 D (33.5) EB Approach L T R L T R L T R D (33.5) A (0.0) A (0.0) A (0.0) D (33.5) A (0.0) A (0.0) 2024 Future Build Scenario 2 with improvements D (32.6) EB Approach L T R L T R L T R D (32.6) A (0.0) A (0.0) A (0.0) D (32.6) A (0.0) A (0.0) PM Peak Hour 2024 Future Build Scenario 1 E (40.9) EB Approach L T R L T R L T R E (40.9) A (0.0) A (0.0) A (0.0) E (40.9) A (0.0) A (0.0) 2024 Future Build Scenario 1 with improvements E (37.5) EB Approach L T R L T R L T R E (37.5) A (0.0) A (0.0) A (0.0) E (37.5) A (0.0) A (0.0) 2024 Future Build Scenario 2 D (31.1) EB Approach L T R L T R L T R D (31.1) A (0.0) A (0.0) A (0.0) D (31.1) A (0.0) A (0.0) 2024 Future Build Scenario 2 with improvements D (29.9) EB Approach L T R L T R L T R D (29.9) A (0.0) A (0.0) A (0.0) D (29.9) A (0.0) A (0.0) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 35 US 17 at Site Access 2 In 2024 future build conditions scenario 1, This unsignalized intersection is expected to operate at LOS E during both the AM and PM peaks. In scenario 2 2024 future build conditions, it is expected to operate at LOS F during both the AM and PM peaks. Based on the NCDOT nomograph and signal warrant analysis (see section 6 of the report), the following improvements are recommended: Provide a southbound right turn lane with 250 feet of storage length and appropriate taper in scenario 1 Provide a southbound right turn lane with 150 feet of storage length and appropriate taper in scenario 2 Provide a northbound right turn lane with 100 feet of storage length and appropriate taper in scenario 2 Install a signal in scenario 2 Table 5.7 -US 17 (Market Street) & Site Access 2 Scenario Overall & Worst LOS Level of Service by Approach (Delay in sec/veh) Eastbound Northbound Southbound AM Peak Hour 2024 Future Build Scenario 1 E (43.8) EB Approach L T R L T R L T R E (43.8) A (0.0) A (0.0) A (0.0) E (43.8) A (0.0) A (0.0) 2024 Future Build Scenario 1 with improvements E (39.8) EB Approach L T R L T R L T R E (39.8) A (0.0) A (0.0) A (0.0) E (39.8) A (0.0) A (0.0) 2024 Future Build Scenario 2 F (14952.9) NB Approach L T R L T R L T R F (81.0) F (81.0) F (14952.9) F (14952.9) B (12.7) B (12.7) F (81.0) F (14952.9) B (12.7) 2024 Future Build Scenario 2 with improvements C (27.0) L T R L T R L T R F (81.1) F (81.1) F (84.1) C (20.3) C (29.5) A (6.5) F (81.1) C (22.3) C (29.0) PM Peak Hour 2024 Future Build Scenario 1 E (40.9) EB Approach L T R L T R L T R E (40.9) A (0.0) A (0.0) A (0.0) E (40.9) A (0.0) A (0.0) 2024 Future Build Scenario 1 with improvements E (36.4) EB Approach L T R L T R L T R E (36.4) A (0.0) A (0.0) A (0.0) E (36.4) A (0.0) A (0.0) 2024 Future Build Scenario 2 F (14681.8) NB Approach L T R L T R L T R F (14681.8) F (14681.8) D (31.6) D (31.6) A (0.0) A (0.0) F (14681.8) D (31.6) A (0.0) 2024 Future Build Scenario 2 with improvements B (17.4) L T R L T R L T R F (84.4) F (84.4) F (89.6) A (7.4) C (21.5) A (6.8) F (84.4) B (10.2) C (21.0) 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 36 6.0 Queue Results Below in Table 6.1 – Table 6.4 are the queue results for all exclusive turn lanes. Recommended improvements are illustrated in Figure 9A and 9B for Scenario 1 & 2, respectively . Table 6.1 - Queue Results AM Peak Hour Queues Scenario Market Street / Middle Sound Loop Road 2021 Existing EBL EBR WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 166 233 246 274 167 350 821 149 225 95th Percentile Queue (ft) #224 #477 223 223 148 #231 81 180 27 Storage Bay (ft) 150 FULL 425 425 75 350 900 150 125 2024 Future No Build EBL EBR1 EBR2 WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 183 188 192 235 265 182 350 1000 150 225 95th Percentile Queue (ft) 180 210 210 229 229 154 #331 102 229 23 Storage Bay (ft) 150 FULL FULL 425 425 75 350 900 150 125 2024 Future Build Scenario 1 EBL EBR1 EBR2 WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 194 226 215 218 255 193 350 1000 149 225 95th Percentile Queue (ft) #214 239 239 227 227 167 #369 107 246 24 Storage Bay (ft) 150 FULL FULL 425 425 75 350 900 150 125 2024 Future Build Scenario 2 EBL EBR1 EBR2 WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 190 226 209 252 282 186 350 1000 149 225 95th Percentile Queue (ft) #230 227 227 229 229 164 #354 94 253 29 Storage Bay (ft) 150 FULL FULL 425 425 75 350 900 150 125 PM Peak Hour Queues 2021 Existing EBL EBR WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 200 338 261 325 225 350 1000 150 186 95th Percentile Queue (ft) 229 #545 286 286 481 #449 79 #955 21 Storage Bay (ft) 150 FULL 425 425 75 350 900 150 125 2024 Future No Build EBL EBR1 EBR2 WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 200 292 197 284 338 225 350 1000 150 207 95th Percentile Queue (ft) 237 #649 #649 294 294 499 #1010 82 #1110 23 Storage Bay (ft) 150 FULL FULL 425 425 75 350 900 150 125 2024 Future Build Scenario 1 EBL EBR1 EBR2 WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 200 278 264 267 325 225 350 1000 150 162 95th Percentile Queue (ft) #358 304 304 294 294 540 #1193 82 #1206 23 Storage Bay (ft) 150 FULL FULL 425 425 75 350 900 150 125 2024 Future Build Scenario 2 EBL EBR1 EBR2 WBL1 WBL2 WBR NBL NBR SBL SBR Max Queue (ft) 200 324 214 279 312 225 350 1000 150 164 95th Percentile Queue (ft) 237 290 290 294 294 540 #1122 82 #1193 22 Storage Bay (ft) 150 FULL FULL 425 425 75 350 900 150 125 #: 95th percentile volume exceeds capacity; queue may be longer m: Volume for 95th percentile queue is metered by upstream signal. 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 37 Table 6.2 - Queue Results AM Peak Hour Queues Scenario US 17 Northbound (Market Street) at Wendover Lane 2021 Existing WBLTR NBLT NBTR SBLT SBTR Max Queue (ft) 1125 697 717 1180 1178 95th Percentile Queue (ft) 0 3 0 35 0 Storage Bay (ft) FULL FULL FULL FULL 2024 Future No Build WBR NBTR SBUL SBTR Max Queue (ft) 148 387 626 669 95th Percentile Queue (ft) 99 m1132 68 0 Storage Bay (ft) FULL FULL 650 FULL 2024 Future Build Scenario 1 WBR NBTR SBUL SBTR Max Queue (ft) 143 404 151 0 95th Percentile Queue (ft) 98 m1160 112 0 Storage Bay (ft) FULL FULL 650 FULL 2024 Future Build Scenario 2 WBR NBTR SBUL SBTR Max Queue (ft) 146 520 106 0 95th Percentile Queue (ft) 98 m898 68 98 Storage Bay (ft) FULL FULL 650 FULL PM Peak Hour Queues 2021 Existing WBLR NBLT NBTR SBLT SBTR Max Queue (ft) 1132 156 454 1668 1670 95th Percentile Queue (ft) 0 3 0 110 0 Storage Bay (ft) FULL FULL FULL FULL 2024 Future No Build WBR NBTR SBUL SBTR Max Queue (ft) 246 285 683 682 95th Percentile Queue (ft) 218 1302 210 0 Storage Bay (ft) FULL FULL 650 FULL 2024 Future Build Scenario 1 WBR NBTR SBUL SBTR Max Queue (ft) 234 290 258 244 95th Percentile Queue (ft) 218 1390 #359 0 Storage Bay (ft) FULL FULL 650 FULL 2024 Future Build Scenario 2 WBR NBTR SBUL SBTR Max Queue (ft) 234 262 222 251 95th Percentile Queue (ft) 218 1381 210 0 Storage Bay (ft) FULL FULL 650 FULL #: 95th percentile volume exceeds capacity; queue may be longer m: Volume for 95th percentile queue is metered by upstream signal. 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 38 Table 6.3 - Queue Results AM Peak Hour Queues Scenario Lendire Road at Ogden Business Park Lane / Site Access 3 2021 Existing EBTR WBLT NBLR Max Queue (ft) 223 34 34 95th Percentile Queue (ft) 0 0 3 Storage Bay (ft) FULL FULL FULL 2024 Future No Build EBTR WBLT NBLR Max Queue (ft) 0 30 29 95th Percentile Queue (ft) 0 0 3 Storage Bay (ft) FULL FULL FULL 0 2024 Future Build Scenario 1 EBTR WBLT NBLR SBLTR Max Queue (ft) 62 24 35 117 95th Percentile Queue (ft) 3 0 3 30 Storage Bay (ft) FULL FULL FULL FULL 2024 Future Build Scenario 2 EBLTR WBLTR NBLTR SBLTR Max Queue (ft) 59 33 33 92 95th Percentile Queue (ft) 3 0 3 15 Storage Bay (ft) FULL FULL FULL FULL 2024 Future Build Scenario 1 with Improvements EBL EBTR WBR WBLT NBLTR SBLTR Max Queue (ft) 34 0 15 34 35 102 95th Percentile Queue (ft) 3 0 0 0 3 30 Storage Bay (ft) 50 FULL 50' Taper FULL FULL FULL 2024 Future Build Scenario 2 with Improvements EBL EBTR WBR WBLT NBLTR SBLTR Max Queue (ft) 32 0 16 23 37 88 95th Percentile Queue (ft) 3 0 0 0 3 15 Storage Bay (ft) 50 FULL 50' Taper FULL FULL FULL PM Peak Hour Queues 2021 Existing EBTR WBLT NBLR Max Queue (ft) 0 23 38 95th Percentile Queue (ft) 0 0 3 Storage Bay (ft) FULL FULL FULL 2024 Future No Build EBTR WBLT NBLR Max Queue (ft) 0 12 38 95th Percentile Queue (ft) 0 0 3 Storage Bay (ft) FULL FULL FULL 2024 Future Build Scenario 1 EBLTR WBLTR NBLTR SBLTR Max Queue (ft) 118 24 50 136 95th Percentile Queue (ft) 5 0 5 28 Storage Bay (ft) FULL FULL FULL 2024 Future Build Scenario 2 EBLTR WBLTR NBLTR SBLTR Max Queue (ft) 56 23 55 79 95th Percentile Queue (ft) 5 0 5 15 Storage Bay (ft) FULL FULL FULL 2024 Future Build Scenario 1 with Improvements EBL EBTR WBR WBLT NBLTR SBLTR Max Queue (ft) 43 0 40 8 51 100 95th Percentile Queue (ft) 5 0 0 0 5 25 Storage Bay (ft) 50 FULL 50' Taper FULL FULL FULL 2024 Future Build Scenario 2 with Improvements EBL EBTR WBR WBLT NBLTR SBLTR Max Queue (ft) 40 0 34 7 58 91 95th Percentile Queue (ft) 5 0 0 0 5 15 Storage Bay (ft) 50 FULL 50' Taper FULL FULL FULL 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 39 Table 6.4 - Queue Results AM Peak Hour Queues Scenario US 17 (Market Street) & Site Access 1 US 17 (Market Street) & Site Access 2 2024 Future Build Scenario 1 EBR SBTR EBR SBTR Max Queue (ft) 351 322 1001 704 95th Percentile Queue (ft) 40 0 45 0 Storage Bay (ft) FULL FULL FULL FULL 2024 Future Build Scenario 2 EBR SBTR EBLR NBLT SBTR Max Queue (ft) 306 330 999 293 698 95th Percentile Queue (ft) 23 0 433 50 0 Storage Bay (ft) FULL FULL FULL FULL FULL 2024 Future Build Scenario 1 with Improvements EBR SBR EBR SBR Max Queue (ft) 890 224 990 350 95th Percentile Queue (ft) 38 0 43 0 Storage Bay (ft) FULL 175 FULL FULL 2024 Future Build Scenario 2 with Improvements EBR SBR EBLR NBL SBR Max Queue (ft) 71 20 224 187 250 95th Percentile Queue (ft) 28 0 189 m96 26 Storage Bay (ft) FULL 100 FULL 100 150 PM Peak Hour Queues 2024 Future Build Scenario 1 EBR SBTR EBR SBTR Max Queue (ft) 738 315 927 498 95th Percentile Queue (ft) 60 0 58 0 Storage Bay (ft) 0 0 FULL FULL 2024 Future Build Scenario 2 EBR SBTR EBLR NBLT SBTR Max Queue (ft) 242 330 617 141 499 95th Percentile Queue (ft) 33 0 528 45 0 Storage Bay (ft) 0 0 FULL FULL FULL 2024 Future Build Scenario 1 with Improvements EBR SBR EBR NBLT SBR Max Queue (ft) 957 268 920 350 95th Percentile Queue (ft) 55 0 53 0 Storage Bay (ft) 0 0 Full Full Full 2024 Future Build Scenario 2 with Improvements EBR SBR EBLR NBL SBR Max Queue (ft) 236 180 610 134 250 95th Percentile Queue (ft) 30 0 228 m102 35 Storage Bay (ft) FULL 100 FULL 100 150 m: Volume for 95th percentile queue is metered by upstream signal. 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 40 7.0 Signal Warrant Analysis The signal warrant analysis was conducted for the intersection of US 17 (Market Street) / Site Access 2. The analysis was conducted using PC-Warrants software. The Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD 2009 Edition), has established nine criteria that can be used to justify the installation of a Traffic signal, which are the following: Warrant 1, Eight-Hour Vehicular Volume Warrant 2, Four-Hour Vehicular Volume Warrant 3, Peak Hour Warrant 4, Pedestrian Volume Warrant 5, School Crossing Warrant 6, Coordinated Signal System Warrant 7, Crash Experience Warrant 8, Roadway Network Warrant 9, Intersection Near a Grade Crossing The applicable warrants were measured for future build conditions. Warrants 4 – 9 were not applied for this analysis. Warrants 1-3, Traffic Volumes Warrants 1-3 are related to traffic volumes and were considered for existing and future conditions. The speed limit on US 17 (Market Street) is 45 MPH. The 85th percentile speed on US 17 (Market Street) was assumed to be greater than 40 MPH; therefore, the 70% volumes were utilized for the warrants. Signal Warrant Analysis Results The results of the signal warrant analysis are summarized in Table 712. As shown, the intersection currently meets the volume warrants for signalization and will continue to meet the warrants in the future conditions. Additional information and reports from PC- Warrants can be found in the Appendix. Table 7.1 - Signal Warrant Analysis Results 2024 Build Warrant 1 (8-hour volume) Yes Warrant 2 (4-hour volume) Yes Warrant 3 (peak-hour volume) Yes This study has found that this intersection is anticipated to meet three (3) warrants among the applicable MUTCD signal warrants in 2024 future conditions. This study 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 41 finds that traffic volumes at the intersection of US 17 (Market Street) / Site Access 2 are high enough to meet MUTCD Warrants 1, 2, and 3 under existing conditions. Overall, the signal should be considered in future conditions of the proposed development. *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared.Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreementbetweenDAVENPORT and the client. PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC FIGURE 9A RECOMMENDED IMPROVEMENTS SCENARIO 1 425' 35 0 ' US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road TW L T L 425' 150' 90 0 ' FULL 150' TW L T L 15 0 ' TWO WAY LEFT TURN LANE Lendire Road TWLTL US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road 12 5 ' Wendover Lane TW L T L Og d e n Bu s i n e s s L a n e Site Access 2 Site Access 1 17 5 ' 25 0 ' 65 0 ' 50' Taper 50' Si t e A c c e s s 3 Dennys Entrance BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Construct site accesses according NCDOT standards FULL *** NOT TO SCALE *** SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared.Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreementbetweenDAVENPORT and the client. PROJECT NUMBER 210236 LENDIRE MIXED USE WILMINGTON, NC FIGURE 9B RECOMMENDED IMPROVEMENTS SCENARIO 2 425' 35 0 ' US 1 7 ( M a r k e t S t r e e t ) Middle Sound Loop Road TW L T L 425' 150' 90 0 ' FULL 150' TW L T L 15 0 ' TWO WAY LEFT TURN LANE Lendire Road TWLTL US 1 7 (M a r k e t S t r e e t ) Middle Sound Loop Road 12 5 ' Wendover Lane TW L T L Og d e n Bu s i n e s s L a n e Site Access 2 Site Access 1 10 0 ' 15 0 ' 65 0 ' 50' Taper 50' Si t e A c c e s s 3 Dennys Entrance BLACK = EXISTING BLUE = PROPOSED GREEN = COMMITTED IMPROVEMENT Construct site accesses according NCDOT standards FULL 10 0 ' 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 44 8.0 Summary and Conclusion The proposed Lendire Mixed Use development is to be located on the north quadrant of the intersection of Middle Sound Loop Road and Lendire Road in Wilmington, North Carolina. As currently planned, this site development proposes 694 dwelling units of multifamily housing (low-rise), 26,000 square feet of general office, 10,000 square feet of medical office, 29,000 of retail, 7,000 of high turnover restaurant and 2,500 square feet of fast food restaurant with drive thru. Three (3) accesses are proposed to the site, one full access on Lendire Road, one full access and one right-in / right-out on US 17 (Market Street). Trip Generation Based on trip generation rates and equations published in Trip Generation (Institute of Transportation Engineers, 10th Edition), this development has a trip generation potential of 386 net trips in the AM peak, 457 net trips in the PM peak and 7,473 of total daily trips. Capacity Analysis and Recommendations Based on NCDOT turn lane warrant analysis at Site Access 1 in scenario 1, it is recommended to provide a southbound right turn lane with 175 feet of storage length and appropriate taper. In scenario 2, it is recommended to provide a southbound right turn lane with 100 feet of storage length and appropriate taper. Based on NCDOT turn lane warrant analysis at Site Access 2 in scenario 1, it is recommended to provide a southbound right turn lane with 250 feet of storage length and appropriate taper. If the signal is installed in scenario 2, it is recommended to provide a southbound right turn lane with 150 feet of storage length and appropriate taper. It is recommended to provide a southbound right turn lane with 150 feet of storage length and appropriate taper in scenario 2. Also, this study finds that traffic volumes at the intersection at US 17 at Site Access 2 during scenario 2 are high enough to meet MUTCD Warrants 1, 2, and 3 under future conditions. At Lendire Road at Site Access 3, it is recommended to provide an eastbound left turn lane with 50 feet of storage length and appropriate taper for both scenario 1 & 2. Also, it is recommended to provide a westbound right turn taper with 50 feet of taper for both scenario 1 & 2. At both intersections of US 17 at Middle Sound Loop Road / Lendire Road and US 17 (Market Street) at Wendover Lane no improvements are recommended. Based on SimTraffic and Synchro queueing outputs, there is sufficient distance on Market Street between Site Access 2 and (if signalized) and the future RCI at Wendover to accommodate the Market Street left turn queues for both intersections and the transition taper between them. 9/15/2022 Lendire Mixed Use – Transportation Impact Analysis 45 Conclusion In conclusion, this study has reviewed the impacts of both background traffic and traffic generated by Dollar General development. The development and proposed site traffic can be accommodated without significant additional degradation to the roadway and intersection operations, but roadway operations could be improved with the installation of the suggested improvements. Table 8.1 present the improvements summary. It is recommended that the site accesses be constructed to comply with NCDOT standards where applicable. Table 8.1 – Recommended Improvement Summary Intersection 2024 Future Build Scenario 1 2024 Future Build Scenario 2 US 17 at Middle Sound Loop Road / Lendire Road No improvements recommended No improvements recommended US 17 (Market Street) at Wendover Lane No improvements recommended No improvements recommended Lendire Road at Site Access 3 Provide an eastbound left turn lane with 50 feet of storage length and appropriate taper Provide an eastbound right turn taper with 50 feet Provide an eastbound left turn lane with 50 feet of storage length and appropriate taper Provide an eastbound right turn taper with 50 feet US 17 (Market Street) at Site Access 1 Provide a southbound right turn lane with 175 feet of storage length and appropriate taper in scenario 1 Provide a southbound right turn lane with 100 feet of storage length and appropriate taper in scenario 2 US 17 (Market Street) at Site Access 2 Provide a southbound right turn lane with 250 feet of storage length and appropriate taper in scenario 1 Provide a southbound right turn lane with 150 feet of storage length and appropriate taper in scenario 2 Provide a northbound right turn lane with 100 feet of storage length and appropriate taper in scenario 2 Install a signal in scenario 2 9/2/2022 Lendire Mixed Use – Transportation Impact Analysis 46 Appendix Lendire Mixed Use – Transportation Impact Analysis Level of Service Analysis Lendire Mixed Use – Transportation Impact Analysis US 17 at Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/23/2022 Lendire Mixed Use 06/20/2021 1a. AM Existing Synchro 10 Report A. Some Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)99 73 249 308 52 111 128 1880 246 137 1894 63 Future Volume (vph)99 73 249 308 52 111 128 1880 246 137 1894 63 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft)50 250 0 0 Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.051 0.051 Satd. Flow (perm)1770 1863 1583 3433 1863 1583 95 3539 1583 95 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph)35 35 45 45 Link Distance (ft)381 1203 2106 987 Travel Time (s)7.4 23.4 31.9 15.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)110 81 277 342 58 123 142 2089 273 152 2104 70 Shared Lane Traffic (%) Lane Group Flow (vph) 110 81 277 342 58 123 142 2089 273 152 2104 70 Turn Type Prot NA pm+ov Prot NA pm+ov pm+pt NA pm+ov pm+pt NA pm+ov Protected Phases 745381523167 Permitted Phases 4 8 2 2 6 6 Detector Phase 745381523167 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s)10.6 10.8 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s)17.0 17.0 16.0 34.0 34.0 26.0 16.0 79.0 34.0 26.0 89.0 17.0 Total Split (%)10.9% 10.9% 10.3% 21.8% 21.8% 16.7% 10.3% 50.6% 21.8% 16.7% 57.1% 10.9% Maximum Green (s) 11.4 11.2 10.2 28.2 28.2 19.9 10.2 72.9 28.2 19.9 82.9 11.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s)2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.8 -0.8 -0.8 -0.8 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None None C-Max None None C-Max None Act Effct Green (s)15.2 10.7 26.7 20.7 18.4 35.6 90.2 90.2 110.9 93.6 93.6 109.8 Actuated g/C Ratio 0.10 0.07 0.17 0.13 0.12 0.23 0.58 0.58 0.71 0.60 0.60 0.70 v/c Ratio 0.64 0.64 1.03 0.75 0.26 0.34 0.82 1.02 0.24 0.72 0.99 0.06 Control Delay 85.8 92.6 123.0 75.7 62.9 49.6 89.6 57.9 4.9 54.5 48.3 5.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 85.8 92.6 123.0 75.7 62.9 49.6 89.6 57.9 4.9 54.5 48.3 5.1 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/23/2022 Lendire Mixed Use 06/20/2021 1a. AM Existing Synchro 10 Report A. Some Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFFEEDFEADDA Approach Delay 109.0 68.1 53.9 47.4 Approach LOS F E D D Queue Length 50th (ft) 112 81 284 175 54 103 92 ~1187 40 101 ~1108 13 Queue Length 95th (ft) #224 142 #477 223 97 148 #231 #1475 81 180 #1366 27 Internal Link Dist (ft) 301 1123 2026 907 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 172 143 270 638 346 428 173 2045 1209 282 2123 1114 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.64 0.57 1.03 0.54 0.17 0.29 0.82 1.02 0.23 0.54 0.99 0.06 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 124 (79%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 130 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.03 Intersection Signal Delay: 57.0 Intersection LOS: E Intersection Capacity Utilization 89.1% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/19/2022 Lendire Mixed Use 08/19/2022 1b. AM Future No Build Synchro 10 Report A. Some Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 102 76 257 318 54 115 132 1937 254 142 1952 65 Future Volume (vph) 102 76 257 318 54 115 132 1937 254 142 1952 65 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft) 50 250 0 0 Lane Util. Factor 1.00 1.00 0.88 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 45 45 Link Distance (ft) 381 1203 2187 493 Travel Time (s) 7.4 23.4 33.1 7.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 113 84 286 353 60 128 147 2152 282 158 2169 72 Shared Lane Traffic (%) Lane Group Flow (vph) 113 84 286 353 60 128 147 2152 282 158 2169 72 Turn Type Prot NA pm+ov Prot NA pt+ov Prot NA pm+ov Prot NA pm+ov Protected Phases 745388 1523167 Permitted Phases 4 2 6 Detector Phase 745388 1523167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s) 10.6 10.9 10.8 10.8 10.7 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s) 23.0 17.0 16.0 40.0 34.0 16.0 73.0 40.0 26.0 83.0 23.0 Total Split (%) 14.7% 10.9% 10.3% 25.6% 21.8% 10.3% 46.8% 25.6% 16.7% 53.2% 14.7% Maximum Green (s) 17.4 11.1 10.2 34.2 28.3 10.2 66.9 34.2 19.9 76.9 17.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s) 2.6 2.1 2.8 2.8 1.9 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None C-Max None None C-Max None Act Effct Green (s) 14.4 10.8 26.8 21.2 17.7 41.3 11.0 84.7 105.9 19.3 92.9 107.3 Actuated g/C Ratio 0.09 0.07 0.17 0.14 0.11 0.26 0.07 0.54 0.68 0.12 0.60 0.69 v/c Ratio 0.69 0.65 0.60 0.76 0.28 0.31 1.19 1.12 0.26 0.72 1.03 0.07 Control Delay 90.0 93.7 65.1 75.3 66.4 46.4 197.5 95.7 6.2 83.9 58.6 4.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 90.0 93.7 65.1 75.3 66.4 46.4 197.5 95.7 6.2 83.9 58.6 4.4 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/19/2022 Lendire Mixed Use 08/19/2022 1b. AM Future No Build Synchro 10 Report A. Some Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFEEEDFFAFEA Approach Delay 75.9 67.5 91.7 58.7 Approach LOS E E F E Queue Length 50th (ft) 113 84 153 181 57 105 ~179 ~1340 56 157 ~1254 12 Queue Length 95th (ft) 180 145 210 229 104 154 #331 #1615 102 229 #1445 23 Internal Link Dist (ft) 301 1123 2107 413 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 204 143 479 770 346 448 124 1920 1214 251 2108 1125 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.55 0.59 0.60 0.46 0.17 0.29 1.19 1.12 0.23 0.63 1.03 0.06 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 122 (78%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.19 Intersection Signal Delay: 75.1 Intersection LOS: E Intersection Capacity Utilization 89.6% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 122 83 293 318 57 130 146 1977 254 155 1978 65 Future Volume (vph) 122 83 293 318 57 130 146 1977 254 155 1978 65 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft) 50 250 0 0 Lane Util. Factor 1.00 1.00 0.88 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 45 45 Link Distance (ft) 381 1203 2106 493 Travel Time (s) 7.4 23.4 31.9 7.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 136 92 326 353 63 144 162 2197 282 172 2198 72 Shared Lane Traffic (%) Lane Group Flow (vph) 136 92 326 353 63 144 162 2197 282 172 2198 72 Turn Type Prot NA pm+ov Prot NA pt+ov Prot NA pm+ov Prot NA pm+ov Protected Phases 745388 1523167 Permitted Phases 4 2 6 Detector Phase 745388 1523167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s) 10.6 10.9 10.8 10.8 10.7 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s) 23.0 17.0 16.0 40.0 34.0 16.0 73.0 40.0 26.0 83.0 23.0 Total Split (%) 14.7% 10.9% 10.3% 25.6% 21.8% 10.3% 46.8% 25.6% 16.7% 53.2% 14.7% Maximum Green (s) 17.4 11.1 10.2 34.2 28.3 10.2 66.9 34.2 19.9 76.9 17.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s) 2.6 2.1 2.8 2.8 1.9 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None C-Max None None C-Max None Act Effct Green (s) 15.6 11.1 27.1 21.8 17.2 42.3 11.0 82.4 104.2 20.8 92.2 107.8 Actuated g/C Ratio 0.10 0.07 0.17 0.14 0.11 0.27 0.07 0.53 0.67 0.13 0.59 0.69 v/c Ratio 0.77 0.70 0.67 0.74 0.31 0.34 1.31 1.18 0.27 0.73 1.05 0.07 Control Delay 95.0 97.3 67.9 73.6 67.1 46.2 236.8 118.8 6.6 82.4 66.3 4.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 95.0 97.3 67.9 73.6 67.1 46.2 236.8 118.8 6.6 82.4 66.3 4.4 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFEEEDFFAFEA Approach Delay 79.4 65.8 114.0 65.6 Approach LOS E E F E Queue Length 50th (ft) 136 93 177 180 60 119 ~210 ~1415 59 171 ~1292 11 Queue Length 95th (ft) #214 #168 239 227 107 167 #369 #1695 107 246 #1489 24 Internal Link Dist (ft) 301 1123 2026 413 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 204 143 483 770 346 449 124 1869 1191 258 2090 1117 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.67 0.64 0.67 0.46 0.18 0.32 1.31 1.18 0.24 0.67 1.05 0.06 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 122 (78%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.31 Intersection Signal Delay: 87.5 Intersection LOS: F Intersection Capacity Utilization 91.5% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 102 83 279 318 57 130 140 1982 254 155 1993 65 Future Volume (vph) 102 83 279 318 57 130 140 1982 254 155 1993 65 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft) 50 250 0 0 Lane Util. Factor 1.00 1.00 0.88 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 45 45 Link Distance (ft) 381 1203 2106 493 Travel Time (s) 7.4 23.4 31.9 7.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 113 92 310 353 63 144 156 2202 282 172 2214 72 Shared Lane Traffic (%) Lane Group Flow (vph) 113 92 310 353 63 144 156 2202 282 172 2214 72 Turn Type Prot NA pm+ov Prot NA pt+ov Prot NA pm+ov Prot NA pm+ov Protected Phases 745388 1523167 Permitted Phases 4 2 6 Detector Phase 745388 1523167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s) 10.6 10.9 10.8 10.8 10.8 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s) 17.0 17.0 16.0 34.0 34.0 16.0 79.0 34.0 26.0 89.0 17.0 Total Split (%) 10.9% 10.9% 10.3% 21.8% 21.8% 10.3% 50.6% 21.8% 16.7% 57.1% 10.9% Maximum Green (s) 11.4 11.1 10.2 28.2 28.3 10.2 72.9 28.2 19.9 82.9 11.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s) 2.6 2.1 2.8 2.8 1.9 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None C-Max None None C-Max None Act Effct Green (s) 11.7 11.1 27.1 21.2 20.5 45.9 11.0 83.7 104.9 20.0 92.7 104.5 Actuated g/C Ratio 0.08 0.07 0.17 0.14 0.13 0.29 0.07 0.54 0.67 0.13 0.59 0.67 v/c Ratio 0.85 0.70 0.64 0.76 0.26 0.31 1.26 1.16 0.27 0.76 1.05 0.07 Control Delay 116.2 97.3 66.5 75.5 61.9 42.8 220.6 111.7 6.3 86.3 66.4 5.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 116.2 97.3 66.5 75.5 61.9 42.8 220.6 111.7 6.3 86.3 66.4 5.3 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFEEEDFFAFEA Approach Delay 82.9 65.6 106.9 66.0 Approach LOS F E F E Queue Length 50th (ft) 116 93 168 181 58 113 ~198 ~1414 59 171 ~1303 13 Queue Length 95th (ft) #230 #168 227 229 103 164 #354 #1641 94 253 #1494 29 Internal Link Dist (ft) 301 1123 2026 413 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 136 143 483 638 346 482 124 1899 1144 250 2103 1062 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.83 0.64 0.64 0.55 0.18 0.30 1.26 1.16 0.25 0.69 1.05 0.07 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 122 (78%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.26 Intersection Signal Delay: 84.9 Intersection LOS: F Intersection Capacity Utilization 91.6% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & MIddle Sound Loop Road 08/23/2022 Lendire Mixed Use 06/20/2021 2a. PM Existing Synchro 10 Report A. Some Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 67 146 166 199 64 169 202 1964 275 222 1564 47 Future Volume (vph) 67 146 166 199 64 169 202 1964 275 222 1564 47 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft) 50 250 0 0 Lane Util. Factor 1.00 1.00 1.00 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.102 0.021 Satd. Flow (perm) 1770 1863 1583 3433 1863 1583 190 3539 1583 39 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 45 45 Link Distance (ft) 381 1203 2106 987 Travel Time (s) 7.4 23.4 31.9 15.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 74 162 184 221 71 188 224 2182 306 247 1738 52 Shared Lane Traffic (%) Lane Group Flow (vph) 74 162 184 221 71 188 224 2182 306 247 1738 52 Turn Type Prot NA pm+ov Prot NA pm+ov pm+pt NA pm+ov pm+pt NA pm+ov Protected Phases 745381523167 Permitted Phases 4 8 2 2 6 6 Detector Phase 745381523167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s) 10.6 10.9 10.8 10.8 10.8 11.1 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s) 25.0 25.0 20.0 37.0 37.0 20.0 20.0 222.0 37.0 20.0 222.0 25.0 Total Split (%) 8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2% Maximum Green (s) 19.4 19.2 14.2 31.2 31.2 13.9 14.2 215.9 31.2 13.9 215.9 19.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s) 2.6 2.0 2.8 2.8 2.0 3.1 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -1.1 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s) 5.0 4.9 5.0 5.0 5.1 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None None C-Max None None C-Max None Act Effct Green (s) 16.8 20.1 40.0 24.7 27.8 55.2 217.0 217.0 241.7 224.3 224.3 241.1 Actuated g/C Ratio 0.06 0.07 0.13 0.08 0.09 0.18 0.71 0.71 0.80 0.74 0.74 0.79 v/c Ratio 0.76 1.32 0.88 0.79 0.42 0.66 1.05 0.86 0.24 1.59 0.67 0.04 Control Delay 183.3 280.0 165.0 157.0 138.2 128.2 145.9 37.3 4.4 351.5 22.4 3.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 183.3 280.0 165.0 157.0 138.2 128.2 145.9 37.3 4.4 351.5 22.4 3.6 Lanes, Volumes, Timings 100: US 17 (Market Street) & MIddle Sound Loop Road 08/23/2022 Lendire Mixed Use 06/20/2021 2a. PM Existing Synchro 10 Report A. Some Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFFFFFFDAFCA Approach Delay 212.6 143.0 42.5 61.9 Approach LOS F F D E Queue Length 50th (ft) 150 ~418 373 230 139 361 ~222 1685 69 ~653 920 12 Queue Length 95th (ft) 229 #623 #545 286 211 481 #449 1724 79 #955 1037 21 Internal Link Dist (ft) 301 1123 2026 907 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 116 123 208 361 195 287 213 2526 1296 155 2610 1272 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.64 1.32 0.88 0.61 0.36 0.66 1.05 0.86 0.24 1.59 0.67 0.04 Intersection Summary Area Type: Other Cycle Length: 304 Actuated Cycle Length: 304 Offset: 25 (8%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.59 Intersection Signal Delay: 70.7 Intersection LOS: E Intersection Capacity Utilization 96.5% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & MIddle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/19/2022 Lendire Mixed Use 06/20/2021 2b. PM Future No Build Synchro 10 Report A. Some Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 70 151 172 206 66 175 209 2024 284 229 1612 49 Future Volume (vph) 70 151 172 206 66 175 209 2024 284 229 1612 49 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft) 50 250 0 0 Lane Util. Factor 1.00 1.00 0.88 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 45 45 Link Distance (ft) 381 1203 2106 493 Travel Time (s) 7.4 23.4 31.9 7.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 78 168 191 229 73 194 232 2249 316 254 1791 54 Shared Lane Traffic (%) Lane Group Flow (vph) 78 168 191 229 73 194 232 2249 316 254 1791 54 Turn Type Prot NA pm+ov Prot NA pt+ov Prot NA pm+ov Prot NA pm+ov Protected Phases 745388 1523167 Permitted Phases 4 2 6 Detector Phase 745388 1523167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s) 10.6 10.9 10.8 10.8 10.8 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s) 25.0 25.0 20.0 37.0 37.0 20.0 222.0 37.0 20.0 222.0 25.0 Total Split (%) 8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2% Maximum Green (s) 19.4 19.1 14.2 31.2 31.3 14.2 215.9 31.2 13.9 215.9 19.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s) 2.6 2.1 2.8 2.8 1.9 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None C-Max None None C-Max None Act Effct Green (s) 17.2 20.0 40.0 29.2 32.0 54.1 15.0 217.0 246.2 17.8 219.8 237.0 Actuated g/C Ratio 0.06 0.07 0.13 0.10 0.11 0.18 0.05 0.71 0.81 0.06 0.72 0.78 v/c Ratio 0.78 1.38 0.52 0.70 0.37 0.69 2.67 0.89 0.25 2.47 0.70 0.04 Control Delay 185.8 298.6 128.8 144.2 132.3 131.5 816.1 40.1 3.9 721.6 25.8 4.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 185.8 298.6 128.8 144.2 132.3 131.5 816.1 40.1 3.9 721.6 25.8 4.2 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/19/2022 Lendire Mixed Use 06/20/2021 2b. PM Future No Build Synchro 10 Report A. Some Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFFFFFFDAFCA Approach Delay 204.2 137.5 100.3 109.5 Approach LOS FFFF Queue Length 50th (ft) 158 ~445 208 233 140 376 ~785 1827 66 ~877 1073 15 Queue Length 95th (ft) 237 #649 269 294 214 499 #1010 1863 82 #1110 1120 23 Internal Link Dist (ft) 301 1123 2026 413 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 116 122 366 361 201 280 87 2526 1296 103 2558 1248 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.67 1.38 0.52 0.63 0.36 0.69 2.67 0.89 0.24 2.47 0.70 0.04 Intersection Summary Area Type: Other Cycle Length: 304 Actuated Cycle Length: 304 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 2.67 Intersection Signal Delay: 114.6 Intersection LOS: F Intersection Capacity Utilization 99.1% ICU Level of Service F Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/24/2022 Synchro 10 ReportLendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 1 A. Some Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)93 156 195 206 73 190 246 2054 284 248 1659 49 Future Volume (vph)93 156 195 206 73 190 246 2054 284 248 1659 49 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft)50 250 0 0 Lane Util. Factor 1.00 1.00 0.88 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot)1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm)1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph)35 35 45 45 Link Distance (ft)381 1203 2106 493 Travel Time (s)7.4 23.4 31.9 7.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)103 173 217 229 81 211 273 2282 316 276 1843 54 Shared Lane Traffic (%) Lane Group Flow (vph) 103 173 217 229 81 211 273 2282 316 276 1843 54 Turn Type Prot NA pm+ov Prot NA pt+ov Prot NA pm+ov Prot NA pm+ov Protected Phases 745388 1523167 Permitted Phases 4 2 6 Detector Phase 745388 1523167 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s)10.6 10.9 10.8 10.8 10.8 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s)25.0 25.0 20.0 37.0 37.0 20.0 222.0 37.0 20.0 222.0 25.0 Total Split (%)8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2% Maximum Green (s) 19.4 19.1 14.2 31.2 31.3 14.2 215.9 31.2 13.9 215.9 19.4 Yellow Time (s)3.0 3.8 3.0 3.0 3.8 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s)2.6 2.1 2.8 2.8 1.9 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None C-Max None None C-Max None Act Effct Green (s)19.4 20.0 40.0 31.2 31.8 53.0 15.0 217.0 248.2 15.8 217.8 237.2 Actuated g/C Ratio 0.06 0.07 0.13 0.10 0.10 0.17 0.05 0.71 0.82 0.05 0.72 0.78 v/c Ratio 0.91 1.42 0.59 0.65 0.42 0.77 3.14 0.90 0.24 3.00 0.73 0.04 Control Delay 199.4 311.7 131.7 140.3 134.4 138.8 1019.2 41.6 3.7 960.7 27.7 4.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 199.4 311.7 131.7 140.3 134.4 138.8 1019.2 41.6 3.7 960.7 27.7 4.1 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/24/2022 Synchro 10 ReportLendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 1 A. Some Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFFFFFFDAFCA Approach Delay 209.0 138.8 130.4 145.6 Approach LOS FFFF Queue Length 50th (ft) 211 ~466 239 233 156 415 ~956 1903 66 ~968 1139 14 Queue Length 95th (ft) #358 #670 304 294 235 540 #1193 1938 82 #1206 1183 23 Internal Link Dist (ft) 301 1123 2026 413 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 116 122 366 361 196 272 87 2526 1296 92 2535 1238 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.89 1.42 0.59 0.63 0.41 0.78 3.14 0.90 0.24 3.00 0.73 0.04 Intersection Summary Area Type:Other Cycle Length: 304 Actuated Cycle Length: 304 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green, Master Intersection Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 3.14 Intersection Signal Delay: 143.0 Intersection LOS: F Intersection Capacity Utilization 101.3% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 70 156 186 206 73 190 231 2069 284 246 1652 48 Future Volume (vph) 70 156 186 206 73 190 231 2069 284 246 1652 48 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 150 275 425 150 350 900 150 125 Storage Lanes 1 0 2 1 1 1 1 1 Taper Length (ft) 50 250 0 0 Lane Util. Factor 1.00 1.00 0.88 0.97 1.00 1.00 1.00 0.95 1.00 1.00 0.95 1.00 Frt 0.850 0.850 0.850 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 2787 3433 1863 1583 1770 3539 1583 1770 3539 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 35 35 45 45 Link Distance (ft) 381 1203 2106 493 Travel Time (s) 7.4 23.4 31.9 7.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 78 173 207 229 81 211 257 2299 316 273 1836 53 Shared Lane Traffic (%) Lane Group Flow (vph) 78 173 207 229 81 211 257 2299 316 273 1836 53 Turn Type Prot NA pm+ov Prot NA pt+ov Prot NA pm+ov Prot NA pm+ov Protected Phases 745388 1523167 Permitted Phases 4 2 6 Detector Phase 745388 1523167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 5.0 12.0 5.0 Minimum Split (s) 10.6 10.9 10.8 10.8 10.8 10.8 18.1 10.8 11.1 18.1 10.6 Total Split (s) 25.0 25.0 20.0 37.0 37.0 20.0 222.0 37.0 20.0 222.0 25.0 Total Split (%) 8.2% 8.2% 6.6% 12.2% 12.2% 6.6% 73.0% 12.2% 6.6% 73.0% 8.2% Maximum Green (s) 19.4 19.1 14.2 31.2 31.3 14.2 215.9 31.2 13.9 215.9 19.4 Yellow Time (s) 3.0 3.8 3.0 3.0 3.8 3.0 4.5 3.0 3.0 4.5 3.0 All-Red Time (s) 2.6 2.1 2.8 2.8 1.9 2.8 1.6 2.8 3.1 1.6 2.6 Lost Time Adjust (s) -0.6 -0.9 -0.8 -0.8 -0.7 -0.8 -1.1 -0.8 -1.1 -1.1 -0.6 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lag Lag Lag Lag Lag Lead Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 2.0 6.0 2.0 Minimum Gap (s) 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 2.0 3.0 2.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 30.0 0.0 0.0 30.0 0.0 Recall Mode None None None None None None C-Max None None C-Max None Act Effct Green (s) 17.2 20.0 40.0 30.0 32.8 55.2 15.0 217.0 247.0 17.0 219.0 236.2 Actuated g/C Ratio 0.06 0.07 0.13 0.10 0.11 0.18 0.05 0.71 0.81 0.06 0.72 0.78 v/c Ratio 0.78 1.42 0.57 0.68 0.40 0.74 2.95 0.91 0.25 2.76 0.72 0.04 Control Delay 185.8 311.7 130.5 142.5 133.0 134.2 939.5 42.5 3.8 856.1 27.0 4.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 185.8 311.7 130.5 142.5 133.0 134.2 939.5 42.5 3.8 856.1 27.0 4.3 Lanes, Volumes, Timings 100: US 17 (Market Street) & Middle Sound Loop Road 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFFFFFFDAFCA Approach Delay 208.4 137.7 118.5 131.2 Approach LOS FFFF 90th %ile Green (s) 19.4 19.1 14.2 31.2 31.3 14.2 215.9 31.2 13.9 215.9 19.4 90th %ile Term Code Max Max Max Hold Max Max Coord Hold Max Coord Max 70th %ile Green (s) 19.4 19.1 14.2 31.2 31.3 14.2 215.9 31.2 13.9 215.9 19.4 70th %ile Term Code Max Max Max Hold Max Max Coord Hold Max Coord Max 50th %ile Green (s) 17.8 19.1 14.2 31.2 32.9 14.2 215.9 31.2 13.9 215.9 17.8 50th %ile Term Code Gap Max Max Hold Max Max Coord Hold Max Coord Gap 30th %ile Green (s) 15.1 19.1 14.2 31.2 35.6 14.2 215.9 31.2 13.9 215.9 15.1 30th %ile Term Code Gap Max Max Hold Max Max Coord Hold Max Coord Gap 10th %ile Green (s) 11.2 19.1 14.2 21.2 29.5 14.2 215.9 21.2 23.9 225.9 11.2 10th %ile Term Code Gap Max Max Hold Gap Max Coord Hold Max Coord Gap Queue Length 50th (ft) 158 ~466 227 233 155 413 ~889 1944 66 ~956 1129 14 Queue Length 95th (ft) 237 #670 290 294 235 540 #1122 1977 82 #1193 1175 22 Internal Link Dist (ft) 301 1123 2026 413 Turn Bay Length (ft) 150 275 425 150 350 900 150 125 Base Capacity (vph) 116 122 366 361 203 284 87 2526 1296 99 2549 1244 Starvation Cap Reductn 000000000000 Spillback Cap Reductn 000000000000 Storage Cap Reductn 000000000000 Reduced v/c Ratio 0.67 1.42 0.57 0.63 0.40 0.74 2.95 0.91 0.24 2.76 0.72 0.04 Intersection Summary Area Type: Other Cycle Length: 304 Actuated Cycle Length: 304 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green, Master Intersection Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 2.95 Intersection Signal Delay: 131.6 Intersection LOS: F Intersection Capacity Utilization 101.6% ICU Level of Service G Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: US 17 (Market Street) & Middle Sound Loop Road Lendire Mixed Use – Transportation Impact Analysis US 17 at Wendover Lane HCM 6th TWSC 200: Dennys Entrance/Wendover Lane & US 17 (Market Street)08/23/2022 Lendire Mixed Use 06/20/2021 1a. AM Existing Synchro 10 Report A. Some Page 4 Intersection Int Delay, s/veh 0.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 4 4 14 4 93 4 2001 31 66 2048 6 Future Vol, veh/h 4 4 4 14 4 93 4 2001 31 66 2048 6 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 4 4 4 16 4 103 4 2223 34 73 2276 7 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 3548 4691 1142 3534 4677 1129 2283 0 0 2257 0 0 Stage 1 2426 2426 - 2248 2248 ------- Stage 2 1122 2265 - 1286 2429 ------- Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 ------- Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 ------- Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver ~ 2 ~ 1 194 ~ 2 ~ 1 198 219 - - 224 - - Stage 1 33 62 - 43 77 ------- Stage 2 219 75 - 174 62 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver - ~ 1 194 - ~ 1 198 219 - - 224 - - Mov Cap-2 Maneuver - ~ 1 - - ~ 1 ------- Stage 1 33 62 - 43 77 ------- Stage 2 99 75 - 158 62 ------- Approach EB WB NB SB HCM Control Delay, s 0 0.9 HCM LOS - - Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 219 ----224-- HCM Lane V/C Ratio 0.02 ----0.327 - - HCM Control Delay (s) 21.8 ----28.7 - - HCM Lane LOS C ----D-- HCM 95th %tile Q(veh) 0.1 ----1.4-- Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/19/2022 Lendire Mixed Use 08/19/2022 1b. AM Future No Build Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 68 0 0 0 111 0 2064 32 0 0 0 Future Volume (vph) 4 68 0 0 0 111 0 2064 32 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.998 Flt Protected 0.998 Satd. Flow (prot) 0 1859 0 0 0 1611 0 3532 0000 Flt Permitted 0.998 Satd. Flow (perm) 0 1859 0 0 0 1611 0 3532 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 669 Travel Time (s) 2.6 20.8 8.1 10.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 76 0 0 0 123 0 2293 36 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 80 0 0 0 123 0 2329 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 25.0 53.0 Total Split (%) 32.1% 32.1% 32.1% 67.9% Maximum Green (s) 18.0 18.0 18.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 12.6 12.6 59.2 Actuated g/C Ratio 0.16 0.16 0.76 v/c Ratio 0.27 0.47 0.87 Control Delay 29.8 35.2 28.8 Queue Delay 0.0 0.0 0.0 Total Delay 29.8 35.2 28.8 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/19/2022 Lendire Mixed Use 08/19/2022 1b. AM Future No Build Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS C D C Approach Delay 29.8 35.2 28.8 Approach LOS C D C Queue Length 50th (ft) 35 55 1109 Queue Length 95th (ft) 68 99 m1132 Internal Link Dist (ft) 15 988 456 589 Turn Bay Length (ft) Base Capacity (vph) 476 413 2682 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.17 0.30 0.87 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 12 (15%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 29.1 Intersection LOS: C Intersection Capacity Utilization 83.3% ICU Level of Service E Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 62 68 0 0 0 111 0 2139 32 0 0 0 Future Volume (vph) 62 68 0 0 0 111 0 2139 32 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.998 Flt Protected 0.977 Satd. Flow (prot) 0 1820 0 0 0 1611 0 3532 0000 Flt Permitted 0.977 Satd. Flow (perm) 0 1820 0 0 0 1611 0 3532 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 283 Travel Time (s) 2.6 20.8 8.1 4.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 69 76 0 0 0 123 0 2377 36 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 145 0 0 0 123 0 2413 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 25.0 53.0 Total Split (%) 32.1% 32.1% 32.1% 67.9% Maximum Green (s) 18.0 18.0 18.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 12.7 12.7 55.3 Actuated g/C Ratio 0.16 0.16 0.71 v/c Ratio 0.49 0.47 0.96 Control Delay 34.7 34.8 34.1 Queue Delay 0.0 0.0 0.0 Total Delay 34.7 34.8 34.1 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS C C C Approach Delay 34.7 34.8 34.1 Approach LOS C C C Queue Length 50th (ft) 65 55 1184 Queue Length 95th (ft) 112 98 m1160 Internal Link Dist (ft) 15 988 456 203 Turn Bay Length (ft) Base Capacity (vph) 466 413 2502 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.31 0.30 0.96 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 12 (15%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 34.2 Intersection LOS: C Intersection Capacity Utilization 86.5% ICU Level of Service E Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 68 0 0 0 111 0 2124 32 0 0 0 Future Volume (vph) 4 68 0 0 0 111 0 2124 32 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% 2% 0% 0% Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.998 Flt Protected 0.998 Satd. Flow (prot) 0 1859 0 0 0 1595 0 3532 0000 Flt Permitted 0.998 Satd. Flow (perm) 0 1859 0 0 0 1595 0 3532 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 283 Travel Time (s) 2.6 20.8 8.1 4.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 76 0 0 0 123 0 2360 36 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 80 0 0 0 123 0 2396 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 12.0 Minimum Split (s) 12.0 12.0 12.0 25.0 Total Split (s) 25.0 25.0 25.0 53.0 Total Split (%) 32.1% 32.1% 32.1% 67.9% Maximum Green (s) 18.0 18.0 18.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 12.4 12.4 59.2 Actuated g/C Ratio 0.16 0.16 0.76 v/c Ratio 0.27 0.49 0.89 Control Delay 29.8 35.7 24.4 Queue Delay 0.0 0.0 0.0 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Delay 29.8 35.7 24.4 LOS C D C Approach Delay 29.8 35.7 24.4 Approach LOS C D C Queue Length 50th (ft) 35 55 961 Queue Length 95th (ft) 68 98 m898 Internal Link Dist (ft) 15 988 456 203 Turn Bay Length (ft) Base Capacity (vph) 476 408 2679 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.17 0.30 0.89 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 34 (44%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 25.1 Intersection LOS: C Intersection Capacity Utilization 83.3% ICU Level of Service E Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 with improvements Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 62 68 0 0 0 111 0 2139 32 0 0 0 Future Volume (vph) 62 68 0 0 0 111 0 2139 32 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.998 Flt Protected 0.977 Satd. Flow (prot) 0 1820 0 0 0 1611 0 3532 0000 Flt Permitted 0.977 Satd. Flow (perm) 0 1820 0 0 0 1611 0 3532 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 283 Travel Time (s) 2.6 20.8 8.1 4.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 69 76 0 0 0 123 0 2377 36 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 145 0 0 0 123 0 2413 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 25.0 53.0 Total Split (%) 32.1% 32.1% 32.1% 67.9% Maximum Green (s) 18.0 18.0 18.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 12.7 12.7 55.3 Actuated g/C Ratio 0.16 0.16 0.71 v/c Ratio 0.49 0.47 0.96 Control Delay 34.7 34.8 34.1 Queue Delay 0.0 0.0 0.0 Total Delay 34.7 34.8 34.1 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 with improvements Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS C C C Approach Delay 34.7 34.8 34.1 Approach LOS C C C Queue Length 50th (ft) 65 55 1184 Queue Length 95th (ft) 112 98 m1160 Internal Link Dist (ft) 15 988 456 203 Turn Bay Length (ft) Base Capacity (vph) 466 413 2502 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.31 0.30 0.96 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 12 (15%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.96 Intersection Signal Delay: 34.2 Intersection LOS: C Intersection Capacity Utilization 86.5% ICU Level of Service E Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 68 0 0 0 111 0 2124 32 0 0 0 Future Volume (vph) 4 68 0 0 0 111 0 2124 32 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%) 0% 2% 0% 0% Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.998 Flt Protected 0.998 Satd. Flow (prot) 0 1859 0 0 0 1595 0 3532 0000 Flt Permitted 0.998 Satd. Flow (perm) 0 1859 0 0 0 1595 0 3532 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 283 Travel Time (s) 2.6 20.8 8.1 4.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 76 0 0 0 123 0 2360 36 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 80 0 0 0 123 0 2396 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 12.0 Minimum Split (s) 12.0 12.0 12.0 25.0 Total Split (s) 25.0 25.0 25.0 53.0 Total Split (%) 32.1% 32.1% 32.1% 67.9% Maximum Green (s) 18.0 18.0 18.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 12.4 12.4 59.2 Actuated g/C Ratio 0.16 0.16 0.76 v/c Ratio 0.27 0.49 0.89 Control Delay 27.7 35.7 24.4 Queue Delay 0.0 0.0 2.7 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Total Delay 27.7 35.7 27.1 LOS C D C Approach Delay 27.7 35.7 27.1 Approach LOS C D C Queue Length 50th (ft) 45 55 961 Queue Length 95th (ft) m47 98 m898 Internal Link Dist (ft) 15 988 456 203 Turn Bay Length (ft) Base Capacity (vph) 476 408 2679 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 188 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.17 0.30 0.96 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 34 (44%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 27.6 Intersection LOS: C Intersection Capacity Utilization 83.3% ICU Level of Service E Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane HCM 6th TWSC 200: Dennys Entrance/Wendover Lane & US 17 (Market Street)08/23/2022 Lendire Mixed Use 06/20/2021 2a. PM Existing Synchro 10 Report A. Some Page 1 Intersection Int Delay, s/veh 1.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 4 4 27 4 100 4 2053 112 123 1780 4 Future Vol, veh/h 4 4 4 27 4 100 4 2053 112 123 1780 4 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 4 4 4 30 4 111 4 2281 124 137 1978 4 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 3405 4667 991 3616 4607 1203 1982 0 0 2405 0 0 Stage 1 2254 2254 - 2351 2351 ------- Stage 2 1151 2413 - 1265 2256 ------- Critical Hdwy 7.54 6.54 6.94 7.54 6.54 6.94 4.14 - - 4.14 - - Critical Hdwy Stg 1 6.54 5.54 - 6.54 5.54 ------- Critical Hdwy Stg 2 6.54 5.54 - 6.54 5.54 ------- Follow-up Hdwy 3.52 4.02 3.32 3.52 4.02 3.32 2.22 - - 2.22 - - Pot Cap-1 Maneuver ~ 3 ~ 1 245 ~ 2 ~ 1 177 288 - - 196 - - Stage 1 42 76 - 37 68 ------- Stage 2 211 63 - 179 76 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver - ~ 1 245 - ~ 1 177 288 - - 196 - - Mov Cap-2 Maneuver - ~ 1 - - ~ 1 ------- Stage 1 42 76 - 37 68 ------- Stage 2 73 63 - 165 76 ------- Approach EB WB NB SB HCM Control Delay, s 0 3.7 HCM LOS - - Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 288 ----196-- HCM Lane V/C Ratio 0.015 ----0.697 - - HCM Control Delay (s) 17.7 0 - - - 57.2 - - HCM Lane LOS C A - - - F - - HCM 95th %tile Q(veh) 0 ----4.4-- Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/19/2022 Lendire Mixed Use 06/20/2021 2b. PM Future No Build Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 127 0 0 0 132 0 2119 116 0 0 0 Future Volume (vph) 4 127 0 0 0 132 0 2119 116 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.992 Flt Protected 0.999 Satd. Flow (prot) 0 1861 0 0 0 1611 0 3511 0000 Flt Permitted 0.999 Satd. Flow (perm) 0 1861 0 0 0 1611 0 3511 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 665 Travel Time (s) 2.6 20.8 8.1 10.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 141 0 0 0 147 0 2354 129 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 145 0 0 0 147 0 2483 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 28.0 28.0 28.0 124.0 Total Split (%) 18.4% 18.4% 18.4% 81.6% Maximum Green (s) 21.0 21.0 21.0 117.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 19.3 19.3 122.7 Actuated g/C Ratio 0.13 0.13 0.81 v/c Ratio 0.61 0.72 0.88 Control Delay 73.6 82.9 13.2 Queue Delay 0.0 0.0 0.0 Total Delay 73.6 82.9 13.2 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/19/2022 Lendire Mixed Use 06/20/2021 2b. PM Future No Build Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E F B Approach Delay 73.6 82.9 13.2 Approach LOS E F B Queue Length 50th (ft) 137 141 1139 Queue Length 95th (ft) 210 218 1302 Internal Link Dist (ft) 15 988 456 585 Turn Bay Length (ft) Base Capacity (vph) 281 243 2833 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.52 0.60 0.88 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 20.0 Intersection LOS: C Intersection Capacity Utilization 89.8% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Synchro 10 ReportLendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 1 A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)77 127 0 0 0 132 0 2188 116 0 0 0 Future Volume (vph)77 127 0 0 0 132 0 2188 116 0 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.992 Flt Protected 0.981 Satd. Flow (prot)0 1827 0 0 0 1611 0 3511 0000 Flt Permitted 0.981 Satd. Flow (perm)0 1827 0 0 0 1611 0 3511 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft)95 1068 536 238 Travel Time (s)2.6 20.8 8.1 3.6 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)86 141 0 0 0 147 0 2431 129 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 227 0 0 0 147 0 2560 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s)14.0 14.0 14.0 25.0 Total Split (s)28.0 28.0 28.0 124.0 Total Split (%)18.4% 18.4%18.4% 81.6% Maximum Green (s) 21.0 21.0 21.0 117.0 Yellow Time (s)5.0 5.0 5.0 5.0 All-Red Time (s)2.0 2.0 2.0 2.0 Lost Time Adjust (s)-2.0 -2.0 -2.0 Total Lost Time (s)5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s)2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s)0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s)7.0 Flash Dont Walk (s)11.0 Pedestrian Calls (#/hr)0 Act Effct Green (s)22.0 22.0 120.0 Actuated g/C Ratio 0.14 0.14 0.79 v/c Ratio 0.86 0.63 0.92 Control Delay 91.6 73.8 16.2 Queue Delay 0.0 0.0 0.0 Total Delay 91.6 73.8 16.2 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS F E B Approach Delay 91.6 73.8 16.2 Approach LOS F E B Queue Length 50th (ft)222 138 1188 Queue Length 95th (ft)#359 218 1390 Internal Link Dist (ft)15 988 456 158 Turn Bay Length (ft) Base Capacity (vph) 276 243 2770 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.82 0.60 0.92 Intersection Summary Area Type:Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 24.9 Intersection LOS: C Intersection Capacity Utilization 95.8% ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 127 0 0 0 132 0 2179 116 0 0 0 Future Volume (vph) 4 127 0 0 0 132 0 2179 116 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.992 Flt Protected 0.999 Satd. Flow (prot) 0 1861 0 0 0 1611 0 3511 0000 Flt Permitted 0.999 Satd. Flow (perm) 0 1861 0 0 0 1611 0 3511 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 238 Travel Time (s) 2.6 20.8 8.1 3.6 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 141 0 0 0 147 0 2421 129 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 145 0 0 0 147 0 2550 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 14.0 14.0 14.0 25.0 Total Split (s) 28.0 28.0 28.0 124.0 Total Split (%) 18.4% 18.4% 18.4% 81.6% Maximum Green (s) 21.0 21.0 21.0 117.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 19.3 19.3 122.7 Actuated g/C Ratio 0.13 0.13 0.81 v/c Ratio 0.61 0.72 0.90 Control Delay 73.6 82.9 14.6 Queue Delay 0.0 0.0 0.0 Total Delay 73.6 82.9 14.6 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E F B Approach Delay 73.6 82.9 14.6 Approach LOS E F B 90th %ile Green (s) 21.0 21.0 21.0 117.0 90th %ile Term Code Max Max Max Coord 70th %ile Green (s) 21.0 21.0 21.0 117.0 70th %ile Term Code Max Max Max Coord 50th %ile Green (s) 18.2 18.2 18.2 119.8 50th %ile Term Code Gap Gap Gap Coord 30th %ile Green (s) 15.3 15.3 15.3 122.7 30th %ile Term Code Gap Gap Gap Coord 10th %ile Green (s) 11.1 11.1 11.1 126.9 10th %ile Term Code Gap Gap Gap Coord Queue Length 50th (ft) 137 141 1199 Queue Length 95th (ft) 210 218 1381 Internal Link Dist (ft) 15 988 456 158 Turn Bay Length (ft) Base Capacity (vph) 281 243 2833 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.52 0.60 0.90 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 21.1 Intersection LOS: C Intersection Capacity Utilization 91.5% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 1 Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 77 127 0 0 0 132 0 2188 116 0 0 0 Future Volume (vph) 77 127 0 0 0 132 0 2188 116 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.992 Flt Protected 0.981 Satd. Flow (prot) 0 1827 0 0 0 1611 0 3511 0000 Flt Permitted 0.981 Satd. Flow (perm) 0 1827 0 0 0 1611 0 3511 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 238 Travel Time (s) 2.6 20.8 8.1 3.6 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 86 141 0 0 0 147 0 2431 129 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 227 0 0 0 147 0 2560 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 14.0 14.0 14.0 25.0 Total Split (s) 28.0 28.0 28.0 124.0 Total Split (%) 18.4% 18.4% 18.4% 81.6% Maximum Green (s) 21.0 21.0 21.0 117.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 22.0 22.0 120.0 Actuated g/C Ratio 0.14 0.14 0.79 v/c Ratio 0.86 0.63 0.92 Control Delay 91.6 73.8 16.2 Queue Delay 0.0 0.0 0.0 Total Delay 91.6 73.8 16.2 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 1 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS F E B Approach Delay 91.6 73.8 16.2 Approach LOS F E B Queue Length 50th (ft) 222 138 1188 Queue Length 95th (ft) #359 218 1390 Internal Link Dist (ft) 15 988 456 158 Turn Bay Length (ft) Base Capacity (vph) 276 243 2770 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 0 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.82 0.60 0.92 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 24.9 Intersection LOS: C Intersection Capacity Utilization 95.8% ICU Level of Service F Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 2 Synchro 10 Report A. Some Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 127 0 0 0 132 0 2179 116 0 0 0 Future Volume (vph) 4 127 0 0 0 132 0 2179 116 0 0 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95 1.00 1.00 1.00 Frt 0.865 0.992 Flt Protected 0.999 Satd. Flow (prot) 0 1861 0 0 0 1611 0 3511 0000 Flt Permitted 0.999 Satd. Flow (perm) 0 1861 0 0 0 1611 0 3511 0000 Right Turn on Red No No No No No Satd. Flow (RTOR) Link Speed (mph) 25 35 45 45 Link Distance (ft) 95 1068 536 238 Travel Time (s) 2.6 20.8 8.1 3.6 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 141 0 0 0 147 0 2421 129 0 0 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 145 0 0 0 147 0 2550 0000 Turn Type Perm NA Prot NA Protected Phases 7 7 2 Permitted Phases 7 Detector Phase 7 7 7 2 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 12.0 Minimum Split (s) 14.0 14.0 14.0 25.0 Total Split (s) 28.0 28.0 28.0 124.0 Total Split (%) 18.4% 18.4% 18.4% 81.6% Maximum Green (s) 21.0 21.0 21.0 117.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 2.0 6.0 Minimum Gap (s) 2.0 2.0 2.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 30.0 Recall Mode None None None C-Max Walk Time (s) 7.0 Flash Dont Walk (s) 11.0 Pedestrian Calls (#/hr) 0 Act Effct Green (s) 19.3 19.3 122.7 Actuated g/C Ratio 0.13 0.13 0.81 v/c Ratio 0.61 0.72 0.90 Control Delay 71.0 82.9 14.6 Queue Delay 0.0 0.0 0.0 Total Delay 71.0 82.9 14.6 Lanes, Volumes, Timings 200: US 17 (Market Street) & Wendover Lane 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 2 Synchro 10 Report A. Some Page 6 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E F B Approach Delay 71.0 82.9 14.6 Approach LOS E F B 90th %ile Green (s) 21.0 21.0 21.0 117.0 90th %ile Term Code Max Max Max Coord 70th %ile Green (s) 21.0 21.0 21.0 117.0 70th %ile Term Code Max Max Max Coord 50th %ile Green (s) 18.2 18.2 18.2 119.8 50th %ile Term Code Gap Gap Gap Coord 30th %ile Green (s) 15.3 15.3 15.3 122.7 30th %ile Term Code Gap Gap Gap Coord 10th %ile Green (s) 11.1 11.1 11.1 126.9 10th %ile Term Code Gap Gap Gap Coord Queue Length 50th (ft) 150 141 1199 Queue Length 95th (ft) m178 218 1381 Internal Link Dist (ft) 15 988 456 158 Turn Bay Length (ft) Base Capacity (vph) 281 243 2833 Starvation Cap Reductn 0 0 0 Spillback Cap Reductn 0 0 3 Storage Cap Reductn 0 0 0 Reduced v/c Ratio 0.52 0.60 0.90 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay: 21.0 Intersection LOS: C Intersection Capacity Utilization 91.5% ICU Level of Service F Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 200: US 17 (Market Street) & Wendover Lane Lendire Mixed Use – Transportation Impact Analysis Lendire Road at Ogden Business Park Lane / Site Access 3 HCM 6th TWSC 300: Ogden Business Park Lane & Lendire Road 08/23/2022 Lendire Mixed Use 06/20/2021 1a. AM Existing Synchro 10 Report A. Some Page 6 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 363 11 8 153 4 4 Future Vol, veh/h 363 11 8 153 4 4 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 403 12 9 170 4 4 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 415 0 597 409 Stage 1 - - - - 409 - Stage 2 - - - - 188 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1144 - 466 642 Stage 1 - - - - 671 - Stage 2 - - - - 844 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1144 - 462 642 Mov Cap-2 Maneuver - - - - 462 - Stage 1 - - - - 671 - Stage 2 - - - - 836 - Approach EB WB NB HCM Control Delay, s 0 0.4 11.8 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 537 - - 1144 - HCM Lane V/C Ratio 0.017 - - 0.008 - HCM Control Delay (s) 11.8 - - 8.2 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - HCM 6th TWSC 500: Ogden Business Park Lane & Lendire Road 08/19/2022 Lendire Mixed Use 08/19/2022 1b. AM Future No Build Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 374 12 9 140 4 4 Future Vol, veh/h 374 12 9 140 4 4 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 416 13 10 156 4 4 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 429 0 599 423 Stage 1 - - - - 423 - Stage 2 - - - - 176 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1130 - 465 631 Stage 1 - - - - 661 - Stage 2 - - - - 855 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1130 - 460 631 Mov Cap-2 Maneuver - - - - 460 - Stage 1 - - - - 661 - Stage 2 - - - - 846 - Approach EB WB NB HCM Control Delay, s 0 0.5 11.9 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 532 - - 1130 - HCM Lane V/C Ratio 0.017 - - 0.009 - HCM Control Delay (s) 11.9 - - 8.2 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - HCM 6th TWSC 500: Ogden Business Lane/Site Access 3 & Lendire Road 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 3.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 45 374 12 9 140 17 4 4 4 64 4 52 Future Vol, veh/h 45 374 12 9 140 17 4 4 4 64 4 52 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 50 416 13 10 156 19 4 4 4 71 4 58 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 175 0 0 429 0 0 740 718 423 713 715 166 Stage 1 ------523523-186186- Stage 2 ------217195-527529- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1401 - - 1130 - - 333 355 631 347 356 878 Stage 1 ------537530-816746- Stage 2 ------785739-535527- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1401 - - 1130 - - 295 335 631 327 336 878 Mov Cap-2 Maneuver ------295335-327336- Stage 1 ------512505-778739- Stage 2 ------722732-502502- Approach EB WB NB SB HCM Control Delay, s 0.8 0.4 14.9 16.3 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 377 1401 - - 1130 - - 450 HCM Lane V/C Ratio 0.035 0.036 - - 0.009 - - 0.296 HCM Control Delay (s) 14.9 7.7 0 - 8.2 0 - 16.3 HCM Lane LOS B A A - A A - C HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 1.2 HCM 6th TWSC 500: Ogden Business Lane/Site Access 3 & Lendire Road 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 2.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 45 374 12 9 140 11 4 4 4 29 4 52 Future Vol, veh/h 45 374 12 9 140 11 4 4 4 29 4 52 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 50 416 13 10 156 12 4 4 4 32 4 58 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 168 0 0 429 0 0 736 711 423 709 711 162 Stage 1 ------523523-182182- Stage 2 ------213188-527529- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1410 - - 1130 - - 335 358 631 349 358 883 Stage 1 ------537530-820749- Stage 2 ------789745-535527- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1410 - - 1130 - - 296 338 631 328 338 883 Mov Cap-2 Maneuver ------296338-328338- Stage 1 ------512505-781742- Stage 2 ------726738-502502- Approach EB WB NB SB HCM Control Delay, s 0.8 0.5 14.8 13.2 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 379 1410 - - 1130 - - 534 HCM Lane V/C Ratio 0.035 0.035 - - 0.009 - - 0.177 HCM Control Delay (s) 14.8 7.6 0 - 8.2 0 - 13.2 HCM Lane LOS B A A - A A - B HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.6 HCM 6th TWSC 500: Ogden Business Lane/Site Access 3 & Lendire Road 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 with improvements Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 45 374 12 9 140 17 4 4 4 64 4 52 Future Vol, veh/h 45 374 12 9 140 17 4 4 4 64 4 52 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 50 ----1------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 50 416 13 10 156 19 4 4 4 71 4 58 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 175 0 0 429 0 0 740 718 423 703 705 156 Stage 1 ------523523-176176- Stage 2 ------217195-527529- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1401 - - 1130 - - 333 355 631 352 361 890 Stage 1 ------537530-826753- Stage 2 ------785739-535527- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1401 - - 1130 - - 298 339 631 334 344 890 Mov Cap-2 Maneuver ------298339-334344- Stage 1 ------518511-796745- Stage 2 ------722732-508508- Approach EB WB NB SB HCM Control Delay, s 0.8 0.4 14.8 16 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 380 1401 - - 1130 - - 459 HCM Lane V/C Ratio 0.035 0.036 - - 0.009 - - 0.29 HCM Control Delay (s) 14.8 7.7 - - 8.2 0 - 16 HCM Lane LOS B A - - A A - C HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 1.2 HCM 6th TWSC 500: Ogden Business Lane/Site Access 3 & Lendire Road 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 2.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 45 374 12 9 140 11 4 4 4 29 4 52 Future Vol, veh/h 45 374 12 9 140 11 4 4 4 29 4 52 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 50 ----1------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 50 416 13 10 156 12 4 4 4 32 4 58 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 168 0 0 429 0 0 736 711 423 703 705 156 Stage 1 ------523523-176176- Stage 2 ------213188-527529- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1410 - - 1130 - - 335 358 631 352 361 890 Stage 1 ------537530-826753- Stage 2 ------789745-535527- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1410 - - 1130 - - 299 342 631 334 345 890 Mov Cap-2 Maneuver ------299342-334345- Stage 1 ------518511-797745- Stage 2 ------726738-508509- Approach EB WB NB SB HCM Control Delay, s 0.8 0.5 14.8 13 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 382 1410 - - 1130 - - 542 HCM Lane V/C Ratio 0.035 0.035 - - 0.009 - - 0.174 HCM Control Delay (s) 14.8 7.6 - - 8.2 0 - 13 HCM Lane LOS B A - - A A - B HCM 95th %tile Q(veh) 0.1 0.1 - - 0 - - 0.6 HCM 6th TWSC 500: Ogden Business Park Lane & Lendire Road 08/23/2022 Lendire Mixed Use 06/20/2021 2a. PM Existing Synchro 10 Report A. Some Page 6 Intersection Int Delay, s/veh 0.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 167 6 7 270 10 14 Future Vol, veh/h 167 6 7 270 10 14 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 186 7 8 300 11 16 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 193 0 506 190 Stage 1 - - - - 190 - Stage 2 - - - - 316 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1380 - 526 852 Stage 1 - - - - 842 - Stage 2 - - - - 739 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1380 - 522 852 Mov Cap-2 Maneuver - - - - 522 - Stage 1 - - - - 842 - Stage 2 - - - - 734 - Approach EB WB NB HCM Control Delay, s 0 0.2 10.6 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 674 - - 1380 - HCM Lane V/C Ratio 0.04 - - 0.006 - HCM Control Delay (s) 10.6 - - 7.6 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - HCM 6th TWSC 500: Ogden Business Park Lane & Lendire Road 08/19/2022 Lendire Mixed Use 06/20/2021 2b. PM Future No Build Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.7 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 173 7 8 279 11 15 Future Vol, veh/h 173 7 8 279 11 15 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 192 8 9 310 12 17 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 200 0 524 196 Stage 1 - - - - 196 - Stage 2 - - - - 328 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1372 - 514 845 Stage 1 - - - - 837 - Stage 2 - - - - 730 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1372 - 510 845 Mov Cap-2 Maneuver - - - - 510 - Stage 1 - - - - 837 - Stage 2 - - - - 724 - Approach EB WB NB HCM Control Delay, s 0 0.2 10.7 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 661 - - 1372 - HCM Lane V/C Ratio 0.044 - - 0.006 - HCM Control Delay (s) 10.7 - - 7.6 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.1 - - 0 - HCM 6th TWSC 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road 08/24/2022 Synchro 10 ReportLendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 1 A. Some Page 14 Intersection Int Delay, s/veh 3.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 57 173 7 8 279 44 11 4 15 51 4 58 Future Vol, veh/h 57 173 7 8 279 44 11 4 15 51 4 58 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 63 192 8 9 310 49 12 4 17 57 4 64 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 359 0 0 200 0 0 709 699 196 686 679 335 Stage 1 ------322322-353353- Stage 2 ------387377-333326- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1200 - - 1372 - - 349 364 845 362 374 707 Stage 1 ------690651-664631- Stage 2 ------637616-681648- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1200 - - 1372 - - 298 340 845 333 349 707 Mov Cap-2 Maneuver ------298340-333349- Stage 1 ------649613-625626- Stage 2 ------570611-624610- Approach EB WB NB SB HCM Control Delay, s 2 0.2 13.6 15.8 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)452 1200 - - 1372 - - 458 HCM Lane V/C Ratio 0.074 0.053 - - 0.006 - - 0.274 HCM Control Delay (s) 13.6 8.2 0 - 7.6 0 - 15.8 HCM Lane LOS B A A - A A - C HCM 95th %tile Q(veh) 0.2 0.2 - - 0 - - 1.1 HCM 6th TWSC 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 57 173 7 8 279 29 11 4 15 19 4 58 Future Vol, veh/h 57 173 7 8 279 29 11 4 15 19 4 58 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 63 192 8 9 310 32 12 4 17 21 4 64 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 342 0 0 200 0 0 700 682 196 677 670 326 Stage 1 ------322322-344344- Stage 2 ------378360-333326- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1217 - - 1372 - - 354 372 845 367 378 715 Stage 1 ------690651-671637- Stage 2 ------644626-681648- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1217 - - 1372 - - 303 347 845 338 353 715 Mov Cap-2 Maneuver ------303347-338353- Stage 1 ------650613-632632- Stage 2 ------577621-624610- Approach EB WB NB SB HCM Control Delay, s 2 0.2 13.5 12.9 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 457 1217 - - 1372 - - 545 HCM Lane V/C Ratio 0.073 0.052 - - 0.006 - - 0.165 HCM Control Delay (s) 13.5 8.1 0 - 7.6 0 - 12.9 HCM Lane LOS B A A - A A - B HCM 95th %tile Q(veh) 0.2 0.2 - - 0 - - 0.6 HCM 6th TWSC 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 1 Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 3.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 57 173 7 8 279 44 11 4 15 51 4 58 Future Vol, veh/h 57 173 7 8 279 44 11 4 15 51 4 58 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 50 ----1------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 63 192 8 9 310 49 12 4 17 57 4 64 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 359 0 0 200 0 0 709 699 196 661 654 310 Stage 1 ------322322-328328- Stage 2 ------387377-333326- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1200 - - 1372 - - 349 364 845 376 386 730 Stage 1 ------690651-685647- Stage 2 ------637616-681648- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1200 - - 1372 - - 301 342 845 348 363 730 Mov Cap-2 Maneuver ------301342-348363- Stage 1 ------654617-649642- Stage 2 ------572611-628614- Approach EB WB NB SB HCM Control Delay, s 2 0.2 13.5 15.2 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 455 1200 - - 1372 - - 477 HCM Lane V/C Ratio 0.073 0.053 - - 0.006 - - 0.263 HCM Control Delay (s) 13.5 8.2 - - 7.6 0 - 15.2 HCM Lane LOS B A - - A A - C HCM 95th %tile Q(veh) 0.2 0.2 - - 0 - - 1 HCM 6th TWSC 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 2 Synchro 10 Report A. Some Page 14 Intersection Int Delay, s/veh 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 57 173 7 8 279 29 11 4 15 19 4 58 Future Vol, veh/h 57 173 7 8 279 29 11 4 15 19 4 58 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 50 ----1------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 Heavy Vehicles, % 2 22222222222 Mvmt Flow 63 192 8 9 310 32 12 4 17 21 4 64 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 342 0 0 200 0 0 700 682 196 661 654 310 Stage 1 ------322322-328328- Stage 2 ------378360-333326- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 ------6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 ------6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1217 - - 1372 - - 354 372 845 376 386 730 Stage 1 ------690651-685647- Stage 2 ------644626-681648- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1217 - - 1372 - - 305 350 845 349 363 730 Mov Cap-2 Maneuver ------305350-349363- Stage 1 ------654617-649642- Stage 2 ------578621-628614- Approach EB WB NB SB HCM Control Delay, s 2 0.2 13.4 12.7 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h) 460 1217 - - 1372 - - 559 HCM Lane V/C Ratio 0.072 0.052 - - 0.006 - - 0.161 HCM Control Delay (s) 13.4 8.1 - - 7.6 0 - 12.7 HCM Lane LOS B A - - A A - B HCM 95th %tile Q(veh) 0.2 0.2 - - 0 - - 0.6 Lendire Mixed Use – Transportation Impact Analysis US 17 at Site Access 1 HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 54 0 2312 2234 58 Future Vol, veh/h 0 54 0 2312 2234 58 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 60 0 2569 2482 64 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1273 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 158 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 158 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 41.1 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 158 - - HCM Lane V/C Ratio - 0.38 - - HCM Control Delay (s) - 41.1 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 1.6 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 37 0 2235 2203 29 Future Vol, veh/h 0 37 0 2235 2203 29 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 41 0 2483 2448 32 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1240 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 167 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 167 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 33.5 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 167 - - HCM Lane V/C Ratio - 0.246 - - HCM Control Delay (s) - 33.5 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 0.9 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 with improvements Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 54 0 2312 2234 58 Future Vol, veh/h 0 54 0 2312 2234 58 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 175 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 60 0 2569 2482 64 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1241 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 166 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 166 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 38.5 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 166 - - HCM Lane V/C Ratio - 0.361 - - HCM Control Delay (s) - 38.5 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 1.5 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 37 0 2235 2203 29 Future Vol, veh/h 0 37 0 2235 2203 29 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 175 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 41 0 2483 2448 32 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1224 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 171 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 171 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 32.6 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 171 - - HCM Lane V/C Ratio - 0.24 - - HCM Control Delay (s) - 32.6 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 0.9 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/24/2022 Synchro 10 ReportLendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 1 A. Some Page 10 Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 82 0 2397 2024 71 Future Vol, veh/h 0 82 0 2397 2024 71 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 91 0 2663 2249 79 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1164 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 188 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, %- - - Mov Cap-1 Maneuver - 188 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 40.9 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h)- 188 - - HCM Lane V/C Ratio - 0.485 - - HCM Control Delay (s) - 40.9 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 2.4 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 57 0 2311 1980 37 Future Vol, veh/h 0 57 0 2311 1980 37 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 63 0 2568 2200 41 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1121 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 200 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 200 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 31.1 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 200 - - HCM Lane V/C Ratio - 0.317 - - HCM Control Delay (s) - 31.1 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 1.3 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 1 Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 82 0 2397 2024 71 Future Vol, veh/h 0 82 0 2397 2024 71 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 175 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 91 0 2663 2249 79 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1125 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 199 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 199 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 37.5 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 199 - - HCM Lane V/C Ratio - 0.458 - - HCM Control Delay (s) - 37.5 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 2.2 - - HCM 6th TWSC 300: US 17 (Market Street) & Site Access 1 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 2 Synchro 10 Report A. Some Page 10 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 57 0 2311 1980 37 Future Vol, veh/h 0 57 0 2311 1980 37 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 100 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 63 0 2568 2200 41 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1100 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 207 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 207 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 29.9 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 207 - - HCM Lane V/C Ratio - 0.306 - - HCM Control Delay (s) - 29.9 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 1.2 - - Lendire Mixed Use – Transportation Impact Analysis US 17 at Site Access 2 HCM 6th TWSC 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 12 Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 58 0 2312 2234 79 Future Vol, veh/h 0 58 0 2312 2234 79 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 64 0 2569 2482 88 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1285 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 155 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 155 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 43.8 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 155 - - HCM Lane V/C Ratio - 0.416 - - HCM Control Delay (s) - 43.8 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 1.8 - - HCM 6th TWSC 400: US 17 (Market Street) & Site Access 2 08/29/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 12 Intersection Int Delay, s/veh 355.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 82 27 70 2165 2205 43 Future Vol, veh/h 82 27 70 2165 2205 43 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 91 30 78 2406 2450 48 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 3833 1249 2498 0 - 0 Stage 1 2474 ----- Stage 2 1359 ----- Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 ----- Critical Hdwy Stg 2 5.84 ----- Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver ~ 3 164 180 - - - Stage 1 ~ 49 ----- Stage 2 204 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 3 164 180 - - - Mov Cap-2 Maneuver ~ 3 ----- Stage 1 ~ 49 ----- Stage 2 204 ----- Approach EB NB SB HCM Control Delay, s$ 14952.9 1.2 0 HCM LOS F Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 180 - 4 - - HCM Lane V/C Ratio 0.432 -30.278 - - HCM Control Delay (s) 39.4 0$ 14952.9 - - HCM Lane LOS E A F - - HCM 95th %tile Q(veh) 2 - 17.3 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th TWSC 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 with improvements Synchro 10 Report A. Some Page 12 Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 58 0 2312 2234 79 Future Vol, veh/h 0 58 0 2312 2234 79 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 250 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 64 0 2569 2482 88 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1241 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 166 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 166 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 39.8 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 166 - - HCM Lane V/C Ratio - 0.388 - - HCM Control Delay (s) - 39.8 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 1.7 - - Lanes, Volumes, Timings 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 11 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 82 27 70 2165 2205 43 Future Volume (vph) 82 27 70 2165 2205 43 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 100 150 Storage Lanes 1 0 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.967 0.850 Flt Protected 0.964 0.950 Satd. Flow (prot) 1736 0 1770 3539 3539 1583 Flt Permitted 0.964 0.950 Satd. Flow (perm) 1736 0 1770 3539 3539 1583 Right Turn on Red No No Satd. Flow (RTOR) Link Speed (mph) 10 45 45 Link Distance (ft) 1031 307 678 Travel Time (s) 70.3 4.7 10.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 91 30 78 2406 2450 48 Shared Lane Traffic (%) Lane Group Flow (vph) 121 0 78 2406 2450 48 Turn Type Prot Prot NA NA Perm Protected Phases 4 5 2 6 Permitted Phases 6 Detector Phase 4 5266 Switch Phase Minimum Initial (s) 7.0 7.0 12.0 12.0 12.0 Minimum Split (s) 25.0 14.0 25.0 25.0 25.0 Total Split (s) 25.0 14.0 131.0 117.0 117.0 Total Split (%) 16.0% 9.0% 84.0% 75.0% 75.0% Maximum Green (s) 18.0 7.0 124.0 110.0 110.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None C-Max C-Max C-Max Act Effct Green (s) 17.2 10.5 128.8 113.4 113.4 Actuated g/C Ratio 0.11 0.07 0.83 0.73 0.73 v/c Ratio 0.63 0.66 0.82 0.95 0.04 Control Delay 81.1 84.1 13.8 29.5 6.5 Queue Delay 0.0 0.0 6.5 0.0 0.0 Total Delay 81.1 84.1 20.3 29.5 6.5 LOS F F C C A Approach Delay 81.1 22.3 29.0 Approach LOS F C C Lanes, Volumes, Timings 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 1b1. AM Full Build Scenario 1 Synchro 10 Report A. Some Page 12 Lane Group EBL EBR NBL NBT SBT SBR Queue Length 50th (ft) 119 82 637 1107 13 Queue Length 95th (ft) 189 m96 1076 #1311 26 Internal Link Dist (ft) 951 227 598 Turn Bay Length (ft) 100 150 Base Capacity (vph) 222 118 2922 2571 1150 Starvation Cap Reductn 0 0 484 0 0 Spillback Cap Reductn 0 0000 Storage Cap Reductn 0 0000 Reduced v/c Ratio 0.55 0.66 0.99 0.95 0.04 Intersection Summary Area Type: Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 34 (22%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 140 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.95 Intersection Signal Delay: 27.0 Intersection LOS: C Intersection Capacity Utilization 75.5% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 17 (Market Street) & Site Access 2 HCM 6th TWSC 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 12 Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 80 0 2397 2015 91 Future Vol, veh/h 0 80 0 2397 2015 91 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 89 0 2663 2239 101 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1170 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 186 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 186 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 40.9 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 186 - - HCM Lane V/C Ratio - 0.478 - - HCM Control Delay (s) - 40.9 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 2.3 - - HCM 6th TWSC 400: US 17 (Market Street) & Site Access 2 08/29/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build - Scenario 2 Synchro 10 Report A. Some Page 12 Intersection Int Delay, s/veh 448.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 101 36 79 2232 1980 63 Future Vol, veh/h 101 36 79 2232 1980 63 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 112 40 88 2480 2200 70 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 3651 1135 2270 0 - 0 Stage 1 2235 ----- Stage 2 1416 ----- Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 ----- Critical Hdwy Stg 2 5.84 ----- Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver ~ 4 196 221 - - - Stage 1 ~ 67 ----- Stage 2 190 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver ~ 4 196 221 - - - Mov Cap-2 Maneuver ~ 4 ----- Stage 1 ~ 67 ----- Stage 2 190 ----- Approach EB NB SB HCM Control Delay, s$ 14681.8 1.1 0 HCM LOS F Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 221 - 5 - - HCM Lane V/C Ratio 0.397 -30.444 - - HCM Control Delay (s) 31.6 0$ 14681.8 - - HCM Lane LOS D A F - - HCM 95th %tile Q(veh) 1.8 - 21.1 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 6th TWSC 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 1 Synchro 10 Report A. Some Page 12 Intersection Int Delay, s/veh 0.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 80 0 2397 2015 91 Future Vol, veh/h 0 80 0 2397 2015 91 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 250 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 89 0 2663 2239 101 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1120 - 0 - 0 Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 201 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 201 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach EB NB SB HCM Control Delay, s 36.4 0 0 HCM LOS E Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 201 - - HCM Lane V/C Ratio - 0.442 - - HCM Control Delay (s) - 36.4 - - HCM Lane LOS - E - - HCM 95th %tile Q(veh) - 2.1 - - Lanes, Volumes, Timings 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 2 Synchro 10 Report A. Some Page 11 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 101 36 79 2232 1980 63 Future Volume (vph) 101 36 79 2232 1980 63 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 100 150 Storage Lanes 1 0 1 1 Taper Length (ft) 25 100 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.964 0.850 Flt Protected 0.964 0.950 Satd. Flow (prot) 1731 0 1770 3539 3539 1583 Flt Permitted 0.964 0.950 Satd. Flow (perm) 1731 0 1770 3539 3539 1583 Right Turn on Red No No Satd. Flow (RTOR) Link Speed (mph) 10 45 45 Link Distance (ft) 966 328 476 Travel Time (s) 65.9 5.0 7.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 112 40 88 2480 2200 70 Shared Lane Traffic (%) Lane Group Flow (vph) 152 0 88 2480 2200 70 Turn Type Prot Prot NA NA Perm Protected Phases 4 5 2 6 Permitted Phases 6 Detector Phase 4 5266 Switch Phase Minimum Initial (s) 7.0 7.0 12.0 12.0 12.0 Minimum Split (s) 25.0 14.0 25.0 25.0 25.0 Total Split (s) 25.0 14.0 127.0 113.0 113.0 Total Split (%) 16.4% 9.2% 83.6% 74.3% 74.3% Maximum Green (s) 18.0 7.0 120.0 106.0 106.0 Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None C-Max C-Max C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Dont Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 18.4 9.9 123.6 108.7 108.7 Actuated g/C Ratio 0.12 0.07 0.81 0.72 0.72 v/c Ratio 0.73 0.77 0.86 0.87 0.06 Control Delay 84.4 89.6 6.8 21.5 6.8 Queue Delay 0.0 0.0 0.6 0.0 0.0 Total Delay 84.4 89.6 7.4 21.5 6.8 Lanes, Volumes, Timings 400: US 17 (Market Street) & Site Access 2 08/24/2022 Lendire Mixed Use 06/20/2021 2c. PM Future Build with improvements - Scenario 2 Synchro 10 Report A. Some Page 12 Lane Group EBL EBR NBL NBT SBT SBR LOS F F A C A Approach Delay 84.4 10.2 21.0 Approach LOS F B C 90th %ile Green (s) 18.0 7.0 120.0 106.0 106.0 90th %ile Term Code Max Max Coord Coord Coord 70th %ile Green (s) 18.0 7.0 120.0 106.0 106.0 70th %ile Term Code Max Max Coord Coord Coord 50th %ile Green (s) 18.0 7.0 120.0 106.0 106.0 50th %ile Term Code Max Max Coord Coord Coord 30th %ile Green (s) 15.9 9.1 122.1 106.0 106.0 30th %ile Term Code Gap Max Coord Coord Coord 10th %ile Green (s) 12.0 9.4 126.0 109.6 109.6 10th %ile Term Code Gap Gap Coord Coord Coord Queue Length 50th (ft) 146 94 355 807 19 Queue Length 95th (ft) 228 m102 337 934 35 Internal Link Dist (ft) 886 248 396 Turn Bay Length (ft) 100 150 Base Capacity (vph) 227 115 2878 2531 1132 Starvation Cap Reductn 0 0 132 0 0 Spillback Cap Reductn 0 0000 Storage Cap Reductn 0 0000 Reduced v/c Ratio 0.67 0.77 0.90 0.87 0.06 Intersection Summary Area Type: Other Cycle Length: 152 Actuated Cycle Length: 152 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 110 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.87 Intersection Signal Delay: 17.4 Intersection LOS: B Intersection Capacity Utilization 80.9% ICU Level of Service D Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 400: US 17 (Market Street) & Site Access 2 Lendire Mixed Use – Transportation Impact Analysis Queueing and Blocking Reports Lendire Mixed Use – Transportation Impact Analysis EXISTINGS Queuing and Blocking Report 1a. AM Existing 08/23/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB B5 B6 WB WB WB WB NB NB NB Directions Served L T R T T L L T R L T T Maximum Queue (ft) 166 233 376 396 302 246 274 134 167 350 1513 1495 Average Queue (ft) 75 61 334 223 91 130 162 43 72 211 991 979 95th Queue (ft) 151 163 427 486 352 216 235 97 140 412 1819 1806 Link Distance (ft) 292 292 313 440 1142 2056 2056 Upstream Blk Time (%) 68 28 7 4 5 Queuing Penalty (veh) 125 104 25 0 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 4 2 0 1 0 35 17 Queuing Penalty (veh) 3 2 1 5 2 45 41 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB SB SB SB SB Directions Served R L T T R Maximum Queue (ft) 821 149 896 902 225 Average Queue (ft) 327 110 501 518 50 95th Queue (ft) 1049 181 891 905 189 Link Distance (ft) 906 906 Upstream Blk Time (%) 1 1 Queuing Penalty (veh) 10 11 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 15 29 29 Queuing Penalty (veh) 138 40 18 Intersection: 200: Dennys Entrance/Wendover Lane & US 17 (Market Street) Movement EB WB NB NB SB SB Directions Served LTR LTR LT TR LT TR Maximum Queue (ft) 191 1125 697 717 1180 1178 Average Queue (ft) 93 909 120 121 593 573 95th Queue (ft) 221 1414 552 563 1484 1472 Link Distance (ft) 1048 1106 906 906 1613 1613 Upstream Blk Time (%) 58 0 0 13 11 Queuing Penalty (veh)00000 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1a. AM Existing 08/23/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 300: Ogden Business Park Lane & Lendire Road Movement EB WB NB Directions Served TR LT LR Maximum Queue (ft) 223 34 34 Average Queue (ft) 65 3 8 95th Queue (ft) 426 18 29 Link Distance (ft) 1351 440 1479 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 573 Queuing and Blocking Report 2a. PM Existing 08/23/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 100: US 17 (Market Street) & MIddle Sound Loop Road Movement EB EB EB B5 WB WB WB WB NB NB NB NB Directions Served L T R T L L T R L T T R Maximum Queue (ft) 200 357 338 144 261 325 544 225 350 2112 2113 1000 Average Queue (ft) 106 246 205 21 140 175 228 159 338 1842 1839 627 95th Queue (ft) 218 378 334 116 245 290 517 250 397 2679 2684 1407 Link Distance (ft) 292 292 313 1142 2056 2056 Upstream Blk Time (%) 16 8 0 0 61 63 Queuing Penalty (veh) 15 8 0 0 0 0 Storage Bay Dist (ft) 150 425 425 150 350 900 Storage Blk Time (%) 13 76 15 27 76 74 43 Queuing Penalty (veh) 19 51 53 70 749 149 119 Intersection: 100: US 17 (Market Street) & MIddle Sound Loop Road Movement SB SB SB SB Directions Served L T T R Maximum Queue (ft) 150 927 954 186 Average Queue (ft) 144 830 696 13 95th Queue (ft) 164 1107 1232 88 Link Distance (ft) 906 906 Upstream Blk Time (%) 22 7 Queuing Penalty (veh) 203 62 Storage Bay Dist (ft) 150 125 Storage Blk Time (%) 85 74 18 Queuing Penalty (veh) 666 163 9 Intersection: 200: Dennys Entrance/Wendover Lane & US 17 (Market Street) Movement EB WB NB NB SB SB Directions Served LTR LTR LT TR LT TR Maximum Queue (ft) 150 1132 456 454 1668 1670 Average Queue (ft) 83 1011 39 39 1393 1380 95th Queue (ft) 194 1362 263 266 2059 2067 Link Distance (ft) 1048 1106 906 906 1613 1613 Upstream Blk Time (%) 73 0 0 62 52 Queuing Penalty (veh)00100 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2a. PM Existing 08/23/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 500: Ogden Business Park Lane & Lendire Road Movement WB NB Directions Served LT LR Maximum Queue (ft) 23 38 Average Queue (ft) 1 16 95th Queue (ft) 11 40 Link Distance (ft) 440 1479 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 2337 Lendire Mixed Use – Transportation Impact Analysis Future No Builds Conditions Queuing and Blocking Report 1b. AM Future No Build 08/19/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB WB WB WB WB NB NB NB NB Directions Served L T R R L L T R L T T R Maximum Queue (ft) 183 186 188 192 235 265 165 182 350 2114 2109 1000 Average Queue (ft) 92 79 109 109 136 169 42 73 247 1579 1568 699 95th Queue (ft) 159 148 174 171 213 237 107 141 421 2498 2495 1434 Link Distance (ft) 293 293 293 1143 2126 2126 Upstream Blk Time (%)18 19 Queuing Penalty (veh)00 Storage Bay Dist (ft) 150 425 425 150 350 900 Storage Blk Time (%) 3 1 0 2 1 42 38 Queuing Penalty (veh) 2 1 1 7 14 56 97 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement SB SB SB SB Directions Served L T T R Maximum Queue (ft) 150 454 467 225 Average Queue (ft) 126 422 424 49 95th Queue (ft) 177 438 446 189 Link Distance (ft) 414 414 Upstream Blk Time (%) 24 23 Queuing Penalty (veh) 258 250 Storage Bay Dist (ft) 150 125 Storage Blk Time (%) 16 33 36 Queuing Penalty (veh) 154 47 23 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 62 148 364 387 Average Queue (ft) 38 66 217 231 95th Queue (ft) 67 123 330 350 Link Distance (ft) 53 1027 491 491 Upstream Blk Time (%) 13 0 Queuing Penalty (veh) 9 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b. AM Future No Build 08/19/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB SB SB Directions Served R L T TR Maximum Queue (ft) 52 564 661 669 Average Queue (ft) 14 69 550 550 95th Queue (ft) 50 377 841 835 Link Distance (ft) 1000 621 621 Upstream Blk Time (%) 0 10 11 Queuing Penalty (veh) 0 111 117 Storage Bay Dist (ft) 650 Storage Blk Time (%) 0 10 Queuing Penalty (veh) 0 7 Intersection: 500: Ogden Business Park Lane & Lendire Road Movement WB NB Directions Served LT LR Maximum Queue (ft) 30 29 Average Queue (ft) 2 6 95th Queue (ft) 17 26 Link Distance (ft) 440 1479 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1561 Queuing and Blocking Report 2b. PM Future No Build 08/19/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 WB WB WB WB NB NB NB Directions Served L T R R T L L T R L T T Maximum Queue (ft) 200 364 292 197 186 284 338 484 225 350 2101 2097 Average Queue (ft) 120 282 120 105 23 141 175 214 160 342 2000 1997 95th Queue (ft) 227 380 232 182 109 246 276 437 250 356 2404 2413 Link Distance (ft) 293 293 293 313 1142 2045 2045 Upstream Blk Time (%) 26 0 0 0 76 78 Queuing Penalty (veh) 16 0 0 0 0 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 12 92 17 25 82 71 31 Queuing Penalty (veh) 18 64 64 69 829 148 87 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB SB SB SB SB Directions Served R L T T R Maximum Queue (ft) 1000 150 436 452 207 Average Queue (ft) 451 145 418 264 15 95th Queue (ft) 1254 154 428 574 98 Link Distance (ft) 414 414 Upstream Blk Time (%) 89 12 Queuing Penalty (veh) 832 110 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 90 79 19 Queuing Penalty (veh) 729 180 9 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 67 246 273 285 Average Queue (ft) 45 112 105 101 95th Queue (ft) 75 205 207 208 Link Distance (ft) 53 1027 491 491 Upstream Blk Time (%) 32 Queuing Penalty (veh) 40 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2b. PM Future No Build 08/19/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB SB SB Directions Served R L T TR Maximum Queue (ft) 54 616 664 682 Average Queue (ft) 13 302 619 518 95th Queue (ft) 44 780 733 921 Link Distance (ft) 999 617 617 Upstream Blk Time (%) 0 47 20 Queuing Penalty (veh) 0 459 201 Storage Bay Dist (ft) 650 Storage Blk Time (%) 0 47 Queuing Penalty (veh) 2 59 Intersection: 500: Ogden Business Park Lane & Lendire Road Movement WB NB Directions Served LT LR Maximum Queue (ft) 12 38 Average Queue (ft) 1 16 95th Queue (ft) 7 41 Link Distance (ft) 440 1479 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 4751 Lendire Mixed Use – Transportation Impact Analysis Future Builds Conditions Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 B6 WB WB WB WB NB NB Directions Served L T R R T T L L T R L T Maximum Queue (ft) 194 246 226 215 38 23 218 255 180 193 350 2093 Average Queue (ft) 122 105 126 124 6 2 131 166 50 86 294 1813 95th Queue (ft) 196 224 205 198 77 33 208 233 120 161 429 2540 Link Distance (ft) 293 293 293 313 456 1142 2045 Upstream Blk Time (%)2000 35 Queuing Penalty (veh)3002 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 9 5 1 2 10 45 Queuing Penalty (veh) 7 6 3 8 97 66 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB NB SB SB SB SB Directions Served T R L T T R Maximum Queue (ft) 2089 1000 149 444 450 225 Average Queue (ft) 1808 821 114 392 397 42 95th Queue (ft) 2540 1437 178 464 468 174 Link Distance (ft) 2045 414 414 Upstream Blk Time (%) 38 5 5 Queuing Penalty (veh) 0 49 59 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 49 9 27 31 Queuing Penalty (veh) 125 93 42 20 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 53 143 410 404 Average Queue (ft) 45 68 233 247 95th Queue (ft) 65 123 374 380 Link Distance (ft) 49 1027 491 491 Upstream Blk Time (%) 22 0 0 Queuing Penalty (veh) 28 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB Directions Served R L Maximum Queue (ft) 33 98 Average Queue (ft) 5 21 95th Queue (ft) 22 68 Link Distance (ft) 999 236 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB NB SB SB Directions Served R T T TR Maximum Queue (ft) 351 6 283 322 Average Queue (ft) 117 0 61 200 95th Queue (ft) 332 6 235 393 Link Distance (ft) 1028 144 250 250 Upstream Blk Time (%) 1 5 Queuing Penalty (veh) 7 61 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB SB SB Directions Served R T TR Maximum Queue (ft) 1001 701 704 Average Queue (ft) 688 671 673 95th Queue (ft) 1142 687 693 Link Distance (ft) 989 651 651 Upstream Blk Time (%) 28 39 65 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Lane/Site Access 3 & Lendire Road Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 62 24 35 117 Average Queue (ft) 7 2 10 48 95th Queue (ft) 34 11 34 86 Link Distance (ft) 1219 456 1132 1172 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 678 Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 B6 WB WB WB WB NB NB Directions Served L T R R T T L L T R L T Maximum Queue (ft) 190 265 226 209 92 46 252 282 206 186 350 2090 Average Queue (ft) 114 108 119 117 7 2 136 169 51 82 260 1842 95th Queue (ft) 192 238 199 187 78 36 217 241 133 154 441 2516 Link Distance (ft) 293 293 293 313 456 1142 2045 Upstream Blk Time (%) 3 0 36 Queuing Penalty (veh) 4 2 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 13 4 1 2 5 45 Queuing Penalty (veh) 11 4 4 7 49 64 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB NB SB SB SB SB Directions Served T R L T T R Maximum Queue (ft) 2100 1000 149 443 447 225 Average Queue (ft) 1839 826 119 387 397 44 95th Queue (ft) 2517 1436 176 472 461 179 Link Distance (ft) 2045 414 414 Upstream Blk Time (%) 39 5 6 Queuing Penalty (veh) 0 55 61 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 49 13 27 30 Queuing Penalty (veh) 123 127 42 19 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 54 146 517 520 Average Queue (ft) 33 67 344 351 95th Queue (ft) 61 123 587 594 Link Distance (ft) 49 1027 491 491 Upstream Blk Time (%) 9 5 6 Queuing Penalty (veh) 6 57 64 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB Directions Served R L Maximum Queue (ft) 31 52 Average Queue (ft) 4 7 95th Queue (ft) 19 33 Link Distance (ft) 999 236 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB NB NB SB SB Directions Served R T T T TR Maximum Queue (ft) 306 186 192 300 330 Average Queue (ft) 110 113 120 70 214 95th Queue (ft) 406 226 234 260 408 Link Distance (ft) 1028 144 144 255 255 Upstream Blk Time (%) 8 14 1 5 Queuing Penalty (veh) 94 156 7 59 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB NB NB SB SB Directions Served LR LT T T TR Maximum Queue (ft) 999 293 322 687 698 Average Queue (ft) 908 228 244 664 668 95th Queue (ft) 1176 360 413 677 687 Link Distance (ft) 989 255 255 645 645 Upstream Blk Time (%) 73 9 18 41 70 Queuing Penalty (veh) 0 104 205 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Lane/Site Access 3 & Lendire Road Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 59 33 33 92 Average Queue (ft) 7 3 10 40 95th Queue (ft) 33 16 34 72 Link Distance (ft) 1219 456 1132 1053 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1406 Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 9: US 17 (Market Street) Movement SB SB NE NE Directions Served R R T T Maximum Queue (ft) 517 551 8 10 Average Queue (ft) 492 233 0 0 95th Queue (ft) 557 645 6 8 Link Distance (ft) 490 490 414 414 Upstream Blk Time (%) 74 11 Queuing Penalty (veh) 703 106 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: US 17 (Market Street) Movement SB SB SB Directions Served R R R Maximum Queue (ft) 215 251 256 Average Queue (ft) 112 201 162 95th Queue (ft) 262 284 308 Link Distance (ft) 202 202 202 Upstream Blk Time (%) 16 41 13 Queuing Penalty (veh) 114 287 94 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 B6 WB WB WB WB NB NB Directions Served L T R R T T L L T R L T Maximum Queue (ft) 200 376 278 264 340 232 267 325 580 225 350 2099 Average Queue (ft) 137 317 128 125 160 77 144 178 276 175 342 2038 95th Queue (ft) 237 409 237 225 433 319 246 289 537 254 358 2301 Link Distance (ft) 293 293 293 313 434 1142 2045 Upstream Blk Time (%) 57 22 4 83 Queuing Penalty (veh) 46 53 10 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 30 88 19 34 79 78 Queuing Penalty (veh) 47 82 76 94 807 192 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB NB SB SB SB SB Directions Served T R L T T R Maximum Queue (ft) 2100 1000 150 434 459 162 Average Queue (ft) 2028 299 145 418 187 8 95th Queue (ft) 2408 1033 154 427 508 71 Link Distance (ft) 2045 414 414 Upstream Blk Time (%) 76 88 8 Queuing Penalty (veh) 0 851 79 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 19 93 84 14 Queuing Penalty (veh) 53 769 209 7 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 56 234 275 290 Average Queue (ft) 43 116 106 109 95th Queue (ft) 70 205 206 214 Link Distance (ft) 48 1027 491 491 Upstream Blk Time (%) 42 0 0 Queuing Penalty (veh) 87 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB SB SB Directions Served R L T TR Maximum Queue (ft) 57 202 228 244 Average Queue (ft) 16 77 193 122 95th Queue (ft) 51 187 253 300 Link Distance (ft) 999 189 189 189 Upstream Blk Time (%) 3 68 13 Queuing Penalty (veh) 22 478 94 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB SB SB Directions Served R T TR Maximum Queue (ft) 738 326 315 Average Queue (ft) 335 169 271 95th Queue (ft) 835 363 346 Link Distance (ft) 962 268 268 Upstream Blk Time (%) 6 12 41 Queuing Penalty (veh) 0 126 428 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB SB SB Directions Served R T TR Maximum Queue (ft) 927 493 498 Average Queue (ft) 734 464 467 95th Queue (ft) 1102 538 530 Link Distance (ft) 914 452 452 Upstream Blk Time (%) 49 62 76 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 118 24 50 136 Average Queue (ft) 19 1 18 51 95th Queue (ft) 95 12 44 116 Link Distance (ft) 1348 434 1479 1221 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 5917 Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 9: US 17 (Market Street) Movement SB SB NE NE Directions Served R R T T Maximum Queue (ft) 522 552 139 141 Average Queue (ft) 495 262 9 10 95th Queue (ft) 540 680 95 99 Link Distance (ft) 490 490 414 414 Upstream Blk Time (%) 71 13 0 0 Queuing Penalty (veh) 682 127 1 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: US 17 (Market Street) Movement NB NB SB SB SB Directions Served T T R R R Maximum Queue (ft) 192 197 220 252 257 Average Queue (ft) 23 23 89 204 171 95th Queue (ft) 121 123 243 274 315 Link Distance (ft) 201 201 202 202 202 Upstream Blk Time (%) 1 1 12 39 16 Queuing Penalty (veh) 7 9 84 263 107 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 B6 WB WB WB WB NB NB Directions Served L T R R T T L L T R L T Maximum Queue (ft) 200 366 320 239 271 22 239 347 564 225 350 2100 Average Queue (ft) 118 294 128 114 63 1 136 171 263 172 342 2045 95th Queue (ft) 227 395 255 202 235 18 230 278 510 257 357 2280 Link Distance (ft) 293 293 293 313 434 1142 2045 Upstream Blk Time (%) 36 0 0 1 84 Queuing Penalty (veh) 25 0 0 3 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 12 91 17 33 80 73 Queuing Penalty (veh) 19 64 66 93 826 169 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB NB SB SB SB SB Directions Served T R L T T R Maximum Queue (ft) 2105 1000 150 439 464 164 Average Queue (ft) 2043 460 145 418 208 8 95th Queue (ft) 2284 1266 154 429 534 72 Link Distance (ft) 2045 414 414 Upstream Blk Time (%) 80 88 9 Queuing Penalty (veh) 0 851 87 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 29 92 82 15 Queuing Penalty (veh) 83 758 202 7 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 107 244 374 378 Average Queue (ft) 66 118 126 122 95th Queue (ft) 122 204 296 300 Link Distance (ft) 48 1027 491 491 Upstream Blk Time (%) 33 1 1 Queuing Penalty (veh) 42 8 12 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB SB SB Directions Served R L T TR Maximum Queue (ft) 48 94 238 250 Average Queue (ft) 12 12 197 138 95th Queue (ft) 49 52 247 314 Link Distance (ft) 999 189 189 189 Upstream Blk Time (%) 0 66 17 Queuing Penalty (veh) 0 446 114 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB NB NB SB SB Directions Served R T T T TR Maximum Queue (ft) 542 235 240 339 333 Average Queue (ft) 242 50 54 196 283 95th Queue (ft) 571 187 195 392 351 Link Distance (ft) 962 202 202 274 274 Upstream Blk Time (%) 2 3 16 40 Queuing Penalty (veh) 28 33 161 406 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB NB NB SB SB Directions Served LR LT T T TR Maximum Queue (ft) 931 307 332 488 498 Average Queue (ft) 893 162 150 464 466 95th Queue (ft) 1032 338 366 478 485 Link Distance (ft) 914 274 274 447 447 Upstream Blk Time (%) 86 5 6 66 80 Queuing Penalty (veh) 0 56 71 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build - Scenario 2 08/29/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 64 17 58 86 Average Queue (ft) 9 1 21 34 95th Queue (ft) 36 10 48 63 Link Distance (ft) 1347 434 1479 1082 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 5909 Lendire Mixed Use – Transportation Impact Analysis Future Builds Conditions with improvements Queuing and Blocking Report 1b1. AM Full Build Scenario 1 with improvements 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 9: US 17 (Market Street) Movement SB SB NE NE Directions Served R R T T Maximum Queue (ft) 241 252 31 61 Average Queue (ft) 81 95 1 2 95th Queue (ft) 199 209 17 43 Link Distance (ft) 490 490 414 414 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: US 17 (Market Street) Movement SB SB SB Directions Served R R R Maximum Queue (ft) 24 61 60 Average Queue (ft) 1 8 3 95th Queue (ft) 12 40 28 Link Distance (ft) 144 144 144 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 with improvements 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB WB WB WB WB NB NB NB NB Directions Served L T R R L L T R L T T R Maximum Queue (ft) 192 207 235 225 247 273 163 176 350 2094 2094 1000 Average Queue (ft) 114 93 131 128 138 172 43 83 271 1849 1841 814 95th Queue (ft) 180 179 205 198 220 239 114 154 440 2530 2536 1439 Link Distance (ft) 293 293 293 1142 2045 2045 Upstream Blk Time (%) 0 38 41 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) 150 425 425 150 350 900 Storage Blk Time (%) 6 3 1 2 14 47 51 Queuing Penalty (veh) 5 4 4 6 140 69 130 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement SB SB SB SB Directions Served L T T R Maximum Queue (ft) 149 442 445 225 Average Queue (ft) 118 399 408 37 95th Queue (ft) 174 465 458 161 Link Distance (ft) 414 414 Upstream Blk Time (%) 6 7 Queuing Penalty (veh) 60 77 Storage Bay Dist (ft) 150 125 Storage Blk Time (%) 8 28 31 Queuing Penalty (veh) 77 43 20 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 53 139 399 392 Average Queue (ft) 45 67 233 245 95th Queue (ft) 64 117 361 373 Link Distance (ft) 49 1027 491 491 Upstream Blk Time (%) 22 Queuing Penalty (veh) 29 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 with improvements 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB Directions Served R L Maximum Queue (ft) 25 93 Average Queue (ft) 4 23 95th Queue (ft) 19 69 Link Distance (ft) 999 236 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB NB SB SB SB Directions Served R T T T R Maximum Queue (ft) 890 5 294 323 224 Average Queue (ft) 524 0 60 191 17 95th Queue (ft) 1014 5 240 400 119 Link Distance (ft) 1030 144 250 250 Upstream Blk Time (%) 7 1 5 0 Queuing Penalty (veh) 0 7 55 0 Storage Bay Dist (ft) 175 Storage Blk Time (%) 2 Queuing Penalty (veh) 1 Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB SB SB SB Directions Served R T T R Maximum Queue (ft) 990 699 701 350 Average Queue (ft) 737 669 672 211 95th Queue (ft) 1189 711 706 492 Link Distance (ft) 978 652 652 Upstream Blk Time (%) 41 31 58 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) 250 Storage Blk Time (%) 52 Queuing Penalty (veh) 41 Queuing and Blocking Report 1b1. AM Full Build Scenario 1 with improvements 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Lane/Site Access 3 & Lendire Road Movement EB WB WB NB SB Directions Served L LT R LTR LTR Maximum Queue (ft) 34 34 15 35 102 Average Queue (ft)521947 95th Queue (ft) 24 17 7 32 82 Link Distance (ft) 455 1126 1162 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 50 1 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Network Summary Network wide Queuing Penalty: 766 Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 9: US 17 (Market Street) Movement SB SB NE NE Directions Served R R T T Maximum Queue (ft) 30 43 87 66 Average Queue (ft)1233 95th Queue (ft) 20 25 51 33 Link Distance (ft) 490 490 414 414 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: US 17 (Market Street) Movement SB SB SB Directions Served R R R Maximum Queue (ft) 53 76 23 Average Queue (ft) 3 10 1 95th Queue (ft) 25 48 17 Link Distance (ft) 144 144 144 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB WB WB WB WB NB NB NB NB Directions Served L T R R L L T R L T T R Maximum Queue (ft) 188 231 209 207 217 250 188 184 350 2092 2091 1000 Average Queue (ft) 109 91 118 114 131 166 45 81 265 1656 1650 766 95th Queue (ft) 187 182 182 179 209 230 116 156 437 2503 2506 1446 Link Distance (ft) 293 293 293 1142 2045 2045 Upstream Blk Time (%) 0 0 0 23 24 Queuing Penalty (veh) 0 0 0 0 0 Storage Bay Dist (ft) 150 425 425 150 350 900 Storage Blk Time (%) 8 2 1 2 5 41 41 Queuing Penalty (veh) 7 2 3 7 46 58 103 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement SB SB SB SB Directions Served L T T R Maximum Queue (ft) 150 386 387 224 Average Queue (ft) 108 240 247 36 95th Queue (ft) 173 334 344 159 Link Distance (ft) 414 414 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 2 2 Storage Bay Dist (ft) 150 125 Storage Blk Time (%) 5 25 30 Queuing Penalty (veh) 48 39 20 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 52 148 400 422 Average Queue (ft) 30 70 212 223 95th Queue (ft) 61 125 365 389 Link Distance (ft) 49 1027 491 491 Upstream Blk Time (%) 8 0 0 Queuing Penalty (veh) 5 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB Directions Served R L Maximum Queue (ft) 32 46 Average Queue (ft) 4 4 95th Queue (ft) 22 25 Link Distance (ft) 999 236 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB NB NB SB SB SB Directions Served R TTTTR Maximum Queue (ft) 71 29 32 293 331 20 Average Queue (ft) 27 1 2 35 168 1 95th Queue (ft) 59 17 17 184 392 28 Link Distance (ft) 1025 144 144 256 256 Upstream Blk Time (%) 0 0 3 Queuing Penalty (veh) 0 4 39 Storage Bay Dist (ft) 100 Storage Blk Time (%) 0 Queuing Penalty (veh) 0 Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB NB NB NB SB SB SB Directions Served LR L TTTTR Maximum Queue (ft) 224 187 305 318 699 703 250 Average Queue (ft) 110 74 162 176 667 669 109 95th Queue (ft) 197 150 294 309 684 688 312 Link Distance (ft) 973 256 256 647 647 Upstream Blk Time (%) 1 1 53 79 Queuing Penalty (veh) 12 16 0 0 Storage Bay Dist (ft) 100 150 Storage Blk Time (%) 9 8 59 Queuing Penalty (veh) 102 6 25 Queuing and Blocking Report 1b1. AM Full Build Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Lane/Site Access 3 & Lendire Road Movement EB WB WB NB SB Directions Served L LT R LTR LTR Maximum Queue (ft) 32 23 16 37 88 Average Queue (ft) 6 2 1 10 37 95th Queue (ft) 25 11 8 35 69 Link Distance (ft) 455 1126 1040 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 50 1 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Network Summary Network wide Queuing Penalty: 543 Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 9: US 17 (Market Street) Movement SB SB NE NE Directions Served R R T T Maximum Queue (ft) 516 555 40 39 Average Queue (ft) 495 219 1 1 95th Queue (ft)538 630 40 38 Link Distance (ft)490 490 414 414 Upstream Blk Time (%) 74 11 0 Queuing Penalty (veh) 708 105 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: US 17 (Market Street) Movement SB SB SB Directions Served R R R Maximum Queue (ft) 229 258 266 Average Queue (ft) 111 210 169 95th Queue (ft)267 273 316 Link Distance (ft)202 202 202 Upstream Blk Time (%) 16 44 12 Queuing Penalty (veh) 113 312 87 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 B6 WB WB WB WB NB NB Directions Served L T R R T T L L T R L T Maximum Queue (ft) 200 369 318 212 350 138 261 330 579 225 350 2099 Average Queue (ft) 142 322 149 126 162 31 145 178 288 174 342 2031 95th Queue (ft)240 401 276 197 421 156 242 290 547 257 356 2312 Link Distance (ft)293 293 293 313 435 1142 2045 Upstream Blk Time (%)59 15 83 Queuing Penalty (veh)47 36 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 29 90 19 34 76 76 Queuing Penalty (veh) 45 84 75 95 777 188 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB NB SB SB SB SB Directions Served T R L T T R Maximum Queue (ft) 2098 1000 149 437 468 184 Average Queue (ft) 2030 300 145 418 193 11 95th Queue (ft)2317 1039 154 428 518 81 Link Distance (ft)2045 414 414 Upstream Blk Time (%) 74 87 9 Queuing Penalty (veh) 0 845 86 Storage Bay Dist (ft)900 150 125 Storage Blk Time (%) 20 91 85 14 Queuing Penalty (veh) 57 754 211 7 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 109 236 225 236 Average Queue (ft) 71 121 107 105 95th Queue (ft)135 201 194 195 Link Distance (ft)48 1027 491 491 Upstream Blk Time (%) 39 Queuing Penalty (veh) 80 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB SB SB Directions Served R L T TR Maximum Queue (ft)57 170 234 246 Average Queue (ft)16 37 197 114 95th Queue (ft)53 123 241 294 Link Distance (ft)999 189 189 189 Upstream Blk Time (%)1 71 14 Queuing Penalty (veh)6 496 96 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB SB SB SB Directions Served R T T R Maximum Queue (ft) 957 319 323 268 Average Queue (ft) 512 199 276 44 95th Queue (ft)1030 381 354 208 Link Distance (ft)965 268 268 Upstream Blk Time (%) 14 16 46 0 Queuing Penalty (veh) 0 169 480 0 Storage Bay Dist (ft)175 Storage Blk Time (%) 55 Queuing Penalty (veh)39 Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB SB SB SB Directions Served R T T R Maximum Queue (ft) 920 498 506 350 Average Queue (ft) 781 454 463 143 95th Queue (ft)1103 581 565 426 Link Distance (ft)906 454 454 Upstream Blk Time (%) 61 57 74 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft)250 Storage Blk Time (%) 71 Queuing Penalty (veh)65 Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 1 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road Movement EB WB WB NB SB Directions Served L LT R LTR LTR Maximum Queue (ft)43 8 40 51 100 Average Queue (ft)7 0 5 19 49 95th Queue (ft)28 4 25 46 82 Link Distance (ft)435 1473 1217 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)50 1 Storage Blk Time (%)0 0 0 Queuing Penalty (veh) 0 0 0 Network Summary Network wide Queuing Penalty: 6064 Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 1 Intersection: 9: US 17 (Market Street) Movement SB SB NE NE Directions Served R R T T Maximum Queue (ft) 510 551 10 8 Average Queue (ft) 481 230 0 0 95th Queue (ft) 580 625 10 8 Link Distance (ft) 490 490 414 414 Upstream Blk Time (%) 72 7 Queuing Penalty (veh) 688 67 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 11: US 17 (Market Street) Movement SB SB SB Directions Served R R R Maximum Queue (ft) 219 256 264 Average Queue (ft) 86 177 146 95th Queue (ft) 239 308 298 Link Distance (ft) 202 202 202 Upstream Blk Time (%) 12 33 9 Queuing Penalty (veh) 80 223 62 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 2 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement EB EB EB EB B5 B6 WB WB WB WB NB NB Directions Served L T R R T T L L T R L T Maximum Queue (ft) 200 374 303 241 268 19 261 284 494 225 350 2097 Average Queue (ft) 116 306 118 107 65 1 141 172 239 163 341 2037 95th Queue (ft) 230 393 234 198 223 21 245 263 464 251 357 2283 Link Distance (ft) 293 293 293 313 435 1142 2045 Upstream Blk Time (%) 40 1 0 1 83 Queuing Penalty (veh) 28 0 0 2 0 Storage Bay Dist (ft) 150 425 425 150 350 Storage Blk Time (%) 10 93 18 28 68 75 Queuing Penalty (veh) 15 65 73 77 707 172 Intersection: 100: US 17 (Market Street) & Middle Sound Loop Road Movement NB NB SB SB SB SB Directions Served T R L T T R Maximum Queue (ft) 2101 1000 149 433 457 166 Average Queue (ft) 2036 523 146 418 198 11 95th Queue (ft) 2296 1337 153 427 514 84 Link Distance (ft) 2045 414 414 Upstream Blk Time (%) 83 89 7 Queuing Penalty (veh) 0 858 64 Storage Bay Dist (ft) 900 150 125 Storage Blk Time (%) 46 92 78 14 Queuing Penalty (veh) 130 762 192 7 Intersection: 200: US 17 (Market Street) & Wendover Lane Movement EB WB NB NB Directions Served LT R T TR Maximum Queue (ft) 104 215 252 263 Average Queue (ft) 61 115 87 85 95th Queue (ft) 118 195 194 193 Link Distance (ft) 48 1027 491 491 Upstream Blk Time (%) 29 0 0 Queuing Penalty (veh) 37 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 3 Intersection: 201: US 17 (Market Street) & Dennys Entrance Movement EB SB SB SB Directions Served R L T TR Maximum Queue (ft) 44 111 221 249 Average Queue (ft) 8 13 178 116 95th Queue (ft) 32 65 274 296 Link Distance (ft) 999 189 189 189 Upstream Blk Time (%) 0 63 9 Queuing Penalty (veh) 0 430 60 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 300: US 17 (Market Street) & Site Access 1 Movement EB NB NB SB SB SB Directions Served R TTTTR Maximum Queue (ft) 236 24 20 319 335 180 Average Queue (ft) 70 1 1 135 244 16 95th Queue (ft) 225 18 17 344 410 105 Link Distance (ft) 965 202 202 274 274 Upstream Blk Time (%) 9 29 Queuing Penalty (veh) 94 297 Storage Bay Dist (ft) 100 Storage Blk Time (%) 33 Queuing Penalty (veh) 12 Intersection: 400: US 17 (Market Street) & Site Access 2 Movement EB NB NB NB SB SB SB Directions Served LR L TTTTR Maximum Queue (ft) 610 134 222 233 493 498 250 Average Queue (ft) 281 53 87 93 465 468 105 95th Queue (ft) 644 116 191 194 487 486 304 Link Distance (ft) 907 274 274 448 448 Upstream Blk Time (%) 2 0 0 61 79 Queuing Penalty (veh) 0 2200 Storage Bay Dist (ft) 100 150 Storage Blk Time (%) 8 4 71 Queuing Penalty (veh) 86 3 45 Queuing and Blocking Report 2c. PM Future Build with improvements - Scenario 2 08/24/2022 Lendire Mixed Use SimTraffic Report A. Some Page 4 Intersection: 500: Ogden Business Park Entrance/Site Access 3 & Lendire Road Movement EB WB WB NB SB Directions Served L LT R LTR LTR Maximum Queue (ft) 40 7 34 58 91 Average Queue (ft) 7 1 3 22 37 95th Queue (ft) 26 8 18 49 67 Link Distance (ft) 435 1473 1079 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 50 1 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Network Summary Network wide Queuing Penalty: 5342 Lendire Mixed Use – Transportation Impact Analysis Traffic Volume Data File Name : Murrayville(Lendire and Ogden Business Park)AM Peak Site Code : Start Date : 10/28/2021 Page No : 1 Groups Printed- Cars + - Trucks Lendire Road Westbound Ogden Business Park Access Northbound Lendire Road Eastbound Start Time Thru Left App. Total Right Left App. Total Right Thru App. Total Int. Total 07:00 AM 11 0 11 0 0 0 0 52 52 63 07:15 AM 25 0 25 0 0 0 1 90 91 116 07:30 AM 31 2 33 1 0 1 3 99 102 136 07:45 AM 41 4 45 0 0 0 3 96 99 144 Total 108 6 114 1 0 1 7 337 344 459 08:00 AM 38 2 40 0 2 2 4 78 82 124 08:15 AM 34 4 38 2 0 2 1 69 70 110 08:30 AM 32 3 35 2 0 2 2 61 63 100 08:45 AM 23 1 24 2 0 2 1 53 54 80 Total 127 10 137 6 2 8 8 261 269 414 Grand Total 235 16 251 7 2 9 15 598 613 873 Apprch %93.6 6.4 77.8 22.2 2.4 97.6 Total %26.9 1.8 28.8 0.8 0.2 1 1.7 68.5 70.2 Cars +235 16 251 7 2 9 15 598 613 873 % Cars +100 100 100 100 100 100 100 100 100 100 Trucks 0 0 0 0 0 0 0 0 0 0 % Trucks 0 0 0 0 0 0 0 0 0 0 File Name : Murrayville(Lendire and Ogden Business Park)AM Peak Site Code : Start Date : 10/28/2021 Page No : 2 Lendire Road Westbound Ogden Business Park Access Northbound Lendire Road Eastbound Start Time Thru Left App. Total Right Left App. Total Right Thru App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 25 0 25 0 0 0 1 90 91 116 07:30 AM 31 2 33 1 0 1 3 99 102 136 07:45 AM 41 4 45 0 0 0 3 96 99 144 08:00 AM 38 2 40 0 2 2 4 78 82 124 Total Volume 135 8 143 1 2 3 11 363 374 520 % App. Total 94.4 5.6 33.3 66.7 2.9 97.1 PHF .823 .500 .794 .250 .250 .375 .688 .917 .917 .903 L e n d i r e R o a d L e n d i r e R o a d Ogden Business Park Access Th r u 13 5 Le f t 8 Ou t To t a l In 36 4 14 3 50 7 Left 2 Right 1 Out TotalIn 19 3 22 Th r u 36 3 Ri g h t 11 To t a l Ou t In 13 7 37 4 51 1 Peak Hour Begins at 07:15 AM Cars + Trucks Peak Hour Data North File Name : Murrayville(Lendire and Ogden Business Park)PM Peak Site Code : Start Date : 10/28/2021 Page No : 1 Groups Printed- Cars + - Trucks Lendire Road Westbound Ogden Business Park Access Northbound Lendire Road Eastbound Start Time Thru Left App. Total Right Left App. Total Right Thru App. Total Int. Total 04:00 PM 51 3 54 2 3 5 0 41 41 100 04:15 PM 48 4 52 3 1 4 1 38 39 95 04:30 PM 49 1 50 1 3 4 0 41 41 95 04:45 PM 62 4 66 7 2 9 1 45 46 121 Total 210 12 222 13 9 22 2 165 167 411 05:00 PM 67 2 69 4 4 8 1 44 45 122 05:15 PM 68 0 68 1 0 1 2 38 40 109 05:30 PM 73 1 74 2 4 6 2 40 42 122 05:45 PM 53 3 56 1 1 2 0 43 43 101 Total 261 6 267 8 9 17 5 165 170 454 Grand Total 471 18 489 21 18 39 7 330 337 865 Apprch %96.3 3.7 53.8 46.2 2.1 97.9 Total %54.5 2.1 56.5 2.4 2.1 4.5 0.8 38.2 39 Cars +471 18 489 21 18 39 7 330 337 865 % Cars +100 100 100 100 100 100 100 100 100 100 Trucks 0 0 0 0 0 0 0 0 0 0 % Trucks 0 0 0 0 0 0 0 0 0 0 File Name : Murrayville(Lendire and Ogden Business Park)PM Peak Site Code : Start Date : 10/28/2021 Page No : 2 Lendire Road Westbound Ogden Business Park Access Northbound Lendire Road Eastbound Start Time Thru Left App. Total Right Left App. Total Right Thru App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 62 4 66 7 2 9 1 45 46 121 05:00 PM 67 2 69 4 4 8 1 44 45 122 05:15 PM 68 0 68 1 0 1 2 38 40 109 05:30 PM 73 1 74 2 4 6 2 40 42 122 Total Volume 270 7 277 14 10 24 6 167 173 474 % App. Total 97.5 2.5 58.3 41.7 3.5 96.5 PHF .925 .438 .936 .500 .625 .667 .750 .928 .940 .971 L e n d i r e R o a d L e n d i r e R o a d Ogden Business Park Access Th r u 27 0 Le f t 7 Ou t To t a l In 18 1 27 7 45 8 Left 10 Right 14 Out TotalIn 13 24 37 Th r u 16 7 Ri g h t 6 To t a l Ou t In 28 0 17 3 45 3 Peak Hour Begins at 04:45 PM Cars + Trucks Peak Hour Data North Count Number: SITE 1 County: NEW HANOVER Division: 03 Location: US 17 MARKET ST. AND MIDDLE SOUND LOOP RD. Location Type: 4 LEG Count Type: TURNING MOVEMENT NO CLASSIFICATION Count Start Date: 09-01-2021 Time: 7:00AM-9:00AM AND 4:00PM-6:00PM Video Time Used: 7:00AM- 9:00AM AND 4:00PM-6:00PM (09-01) Total Volume: 20,000 Weather: SUNNY 1. School in Session: YES 2. Pedestrians Observed During Count: NO 3. Disabled Pedestrians Present: NO 4. Counted By: MICHAEL JOHNSON 5. Data Processor: MICHAEL JOHNSON 6. Signal Inventory: 03-0076 7. Intersection Controlled By: TRAFFIC SIGNAL 8. Data Collection Method: Jamar DB-400 Electronic Count Board 9. Equipment Operating Properly: Yes 10. Area Lighting: YES 11. Construction Present: NO 12. Traffic Problems Observed: NO LOCATION OF COUNT SITE: SITE 1 North LENDIRE RD. US 1 7 M A R K E T S T . MIDDLE SOUND LOOP RD US 1 7 M A R K E T S T . LOCATION CAMERA Southbound Approach: Looking Back Southbound: Southbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: Westbound Approach: Looking Back Westbound: Westbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: Northbound Approach: Looking Back Northbound: Northbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: Eastbound Approach: Looking Back Eastbound: Eastbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: SIGNAL CABINET File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 1 US 17 MARKET ST. AND MIDDLE SOUND LOOP WILMINGTON NEWHANOVER CO. WEATHER: SUNNY COUNTED BY: MICHAEL JOHNSON Groups Printed- ALL VEHICLES LENDIRE RD. SOUTHBOUND US 17 MARKET ST. WESTBOUND MIDDLE SOUND LOOP RD. NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 07:00 AM 29 10 57 0 96 39 399 20 0 458 64 14 28 0 106 11 338 22 0 371 1031 07:15 AM 27 13 58 0 98 23 431 8 0 462 109 12 22 0 143 21 410 39 0 470 1173 07:30 AM 21 14 78 0 113 9 474 16 0 499 94 21 45 0 160 40 448 35 0 523 1295 07:45 AM 23 10 66 0 99 14 489 14 0 517 107 30 22 0 159 37 372 40 0 449 1224 Total 100 47 259 0 406 85 1793 58 0 1936 374 77 117 0 568 109 1568 136 0 1813 4723 08:00 AM 30 25 62 0 117 38 482 16 0 536 90 25 25 0 140 41 399 53 0 493 1286 08:15 AM 25 17 50 0 92 35 452 19 0 506 84 10 31 0 125 30 505 78 0 613 1336 08:30 AM 21 14 73 0 108 29 497 9 0 535 74 10 25 0 109 33 500 64 0 597 1349 08:45 AM 23 17 64 0 104 35 463 19 0 517 60 7 30 0 97 24 476 51 0 551 1269 Total 99 73 249 0 421 137 1894 63 0 2094 308 52 111 0 471 128 1880 246 0 2254 5240 09:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 09:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:15 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:30 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11:45 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 12:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 2 Groups Printed- ALL VEHICLES LENDIRE RD. SOUTHBOUND US 17 MARKET ST. WESTBOUND MIDDLE SOUND LOOP RD. NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 03:00 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:15 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:30 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 03:45 PM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04:00 PM 20 33 24 0 77 54 405 10 0 469 51 7 44 0 102 35 480 93 0 608 1256 04:15 PM 19 26 22 0 67 47 417 13 0 477 23 12 38 0 73 44 458 74 0 576 1193 04:30 PM 22 25 29 0 76 47 421 9 0 477 71 20 34 0 125 43 494 62 0 599 1277 04:45 PM 12 31 38 0 81 53 400 7 0 460 49 22 47 0 118 46 479 53 0 578 1237 Total 73 115 113 0 301 201 1643 39 0 1883 194 61 163 0 418 168 1911 282 0 2361 4963 05:00 PM 12 45 46 0 103 70 372 13 0 455 34 8 49 0 91 55 503 68 0 626 1275 05:15 PM 21 45 53 0 119 52 371 18 0 441 45 14 39 0 98 58 488 92 0 638 1296 05:30 PM 18 43 32 0 93 66 329 16 0 411 66 18 61 0 145 60 480 85 0 625 1274 05:45 PM 23 37 51 0 111 52 363 10 0 425 37 11 54 0 102 40 493 58 0 591 1229 Total 74 170 182 0 426 240 1435 57 0 1732 182 51 203 0 436 213 1964 303 0 2480 5074 Grand Total 346 405 803 0 1554 663 6765 217 0 7645 1058 241 594 0 1893 618 7323 967 0 8908 20000 Apprch %22.3 26.1 51.7 0 8.7 88.5 2.8 0 55.9 12.7 31.4 0 6.9 82.2 10.9 0 Total %1.7 2 4 0 7.8 3.3 33.8 1.1 0 38.2 5.3 1.2 3 0 9.5 3.1 36.6 4.8 0 44.5 TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 3 LENDIRE RD. U S 1 7 M A R K E T S T . U S 1 7 M A R K E T S T . MIDDLE SOUND LOOP RD. Right 803 Thru 405 Left 346 Peds 0 InOut Total 1076 1554 2630 Ri g h t 21 7 Th r u 67 6 5 Le f t 66 3 Pe d s 0 Ou t To t a l In 82 6 3 76 4 5 15 9 0 8 Left 1058 Thru 241 Right 594 Peds 0 Out TotalIn 2035 1893 3928 Le f t 61 8 Th r u 73 2 3 Ri g h t 96 7 Pe d s 0 To t a l Ou t In 86 2 6 89 0 8 17 5 3 4 9/1/2021 07:00 AM 9/1/2021 05:45 PM ALL VEHICLES North TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 4 LENDIRE RD. SOUTHBOUND US 17 MARKET ST. WESTBOUND MIDDLE SOUND LOOP RD. NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 30 25 62 0 117 38 482 16 0 536 90 25 25 0 140 41 399 53 0 493 1286 08:15 AM 25 17 50 0 92 35 452 19 0 506 84 10 31 0 125 30 505 78 0 613 1336 08:30 AM 21 14 73 0 108 29 497 9 0 535 74 10 25 0 109 33 500 64 0 597 1349 08:45 AM 23 17 64 0 104 35 463 19 0 517 60 7 30 0 97 24 476 51 0 551 1269 Total Volume 99 73 249 0 421 137 1894 63 0 2094 308 52 111 0 471 128 1880 246 0 2254 5240 % App. Total 23.5 17.3 59.1 0 6.5 90.4 3 0 65.4 11 23.6 0 5.7 83.4 10.9 0 PHF .825 .730 .853 .000 .900 .901 .953 .829 .000 .977 .856 .520 .895 .000 .841 .780 .931 .788 .000 .919 .971 LENDIRE RD. U S 1 7 M A R K E T S T . U S 1 7 M A R K E T S T . MIDDLE SOUND LOOP RD. Right 249 Thru 73 Left 99 Peds 0 InOut Total 243 421 664 Ri g h t 63 Th r u 18 9 4 Le f t 13 7 Pe d s 0 Ou t To t a l In 20 9 0 20 9 4 41 8 4 Left 308 Thru 52 Right 111 Peds 0 Out TotalIn 456 471 927 Le f t 12 8 Th r u 18 8 0 Ri g h t 24 6 Pe d s 0 To t a l Ou t In 24 5 1 22 5 4 47 0 5 Peak Hour Begins at 08:00 AM ALL VEHICLES Peak Hour Data North TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 5 LENDIRE RD. SOUTHBOUND US 17 MARKET ST. WESTBOUND MIDDLE SOUND LOOP RD. NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 12:45 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 22 25 29 0 76 47 421 9 0 477 71 20 34 0 125 43 494 62 0 599 1277 04:45 PM 12 31 38 0 81 53 400 7 0 460 49 22 47 0 118 46 479 53 0 578 1237 05:00 PM 12 45 46 0 103 70 372 13 0 455 34 8 49 0 91 55 503 68 0 626 1275 05:15 PM 21 45 53 0 119 52 371 18 0 441 45 14 39 0 98 58 488 92 0 638 1296 Total Volume 67 146 166 0 379 222 1564 47 0 1833 199 64 169 0 432 202 1964 275 0 2441 5085 % App. Total 17.7 38.5 43.8 0 12.1 85.3 2.6 0 46.1 14.8 39.1 0 8.3 80.5 11.3 0 PHF .761 .811 .783 .000 .796 .793 .929 .653 .000 .961 .701 .727 .862 .000 .864 .871 .976 .747 .000 .957 .981 LENDIRE RD. U S 1 7 M A R K E T S T . U S 1 7 M A R K E T S T . MIDDLE SOUND LOOP RD. Right 166 Thru 146 Left 67 Peds 0 InOut Total 313 379 692 Ri g h t 47 Th r u 15 6 4 Le f t 22 2 Pe d s 0 Ou t To t a l In 22 0 0 18 3 3 40 3 3 Left 199 Thru 64 Right 169 Peds 0 Out TotalIn 643 432 1075 Le f t 20 2 Th r u 19 6 4 Ri g h t 27 5 Pe d s 0 To t a l Ou t In 19 2 9 24 4 1 43 7 0 Peak Hour Begins at 04:30 PM ALL VEHICLES Peak Hour Data North TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 6 SOUTHBOUND: LENDIRE RD. TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 7 WESTBOUND: US 17 MARKET ST. TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 8 NORTHBOUND: MIDDLE SOUND LOOP RD. TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 9 EASTBOUND: US 17 MARKET ST. TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 1 Site Code : SITE 1 Start Date : 9/1/2021 Page No : 10 TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON Count Number: SITE 2 County: NEW HANOVER Division: 03 Location: US 17 MARKET ST. AND WENDOVER LANE Location Type: 4 LEG Count Type: TURNING MOVEMENT NO CLASSIFICATION Count Start Date: 09-01-2021 Time: 6:00AM-7:00PM Video Time Used: 6:00AM- 7:00PM (09-01) Total Volume: 51.113 Weather: SUNNY 1. School in Session: YES 2. Pedestrians Observed During Count: NO 3. Disabled Pedestrians Present: NO 4. Counted By: MICHAEL JOHNSON 5. Data Processor: MICHAEL JOHNSON 6. Signal Inventory: N/A 7. Intersection Controlled By: STOP SIGN 8. Data Collection Method: Jamar DB-400 Electronic Count Board 9. Equipment Operating Properly: Yes 10. Area Lighting: YES 11. Construction Present: NO 12. Traffic Problems Observed: NO LOCATION OF COUNT SITE: SITE 2 NorthENTRANCE TO DENNYS US 1 7 M A R K E T S T . WENDOVER LANE US 1 7 M A R K E T S T . LOCATION CAMERA Southbound Approach: Looking Back Southbound: Southbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: Westbound Approach: Looking Back Westbound: Westbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’:NO If Yes Distance: Northbound Approach: Looking Back Northbound: Northbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: Eastbound Approach: Looking Back Eastbound: Eastbound Approach: Stop Sign Within 300’: NO Traffic Signal Within 300’: NO Railroad Within 300’: NO If Yes Distance: File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 1 US 17 MARKET ST. AND WENDOVER LANE WILMINGTON NEW HANOVER CO. WEATHER: SUNNY COUNTED BY: MICHAEL JOHNSON Groups Printed- ALL VEHICLES ENTRANCE TO DENNYS SOUTHBOUND US 17 MARKET ST. WESTBOUND WENDOVER LANE NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 06:00 AM 0 0 0 0 0 1 248 0 0 249 3 0 3 0 6 1 177 1 0 179 434 06:15 AM 0 0 0 0 0 0 331 0 0 331 6 0 15 0 21 0 245 1 0 246 598 06:30 AM 1 0 2 0 3 2 364 1 0 367 6 0 9 0 15 2 333 1 0 336 721 06:45 AM 0 0 1 0 1 1 435 0 0 436 6 0 12 0 18 0 413 1 0 414 869 Total 1 0 3 0 4 4 1378 1 0 1383 21 0 39 0 60 3 1168 4 0 1175 2622 07:00 AM 0 0 0 0 0 1 449 0 0 450 8 0 22 0 30 1 383 1 0 385 865 07:15 AM 0 0 2 0 2 10 445 0 0 455 11 0 50 0 61 0 442 4 0 446 964 07:30 AM 0 0 1 0 1 7 484 0 0 491 9 0 50 0 59 0 500 5 0 505 1056 07:45 AM 1 0 2 0 3 10 499 3 0 512 5 0 32 0 37 4 395 11 0 410 962 Total 1 0 5 0 6 28 1877 3 0 1908 33 0 154 0 187 5 1720 21 0 1746 3847 08:00 AM 0 0 0 0 0 15 525 1 0 541 6 0 18 0 24 0 436 5 0 441 1006 08:15 AM 0 0 0 0 0 22 491 2 0 515 3 0 33 0 36 1 530 12 0 543 1094 08:30 AM 0 0 1 0 1 13 527 1 0 541 2 0 26 0 28 0 525 5 0 530 1100 08:45 AM 0 0 0 0 0 16 505 2 0 523 3 0 16 0 19 0 510 9 0 519 1061 Total 0 0 1 0 1 66 2048 6 0 2120 14 0 93 0 107 1 2001 31 0 2033 4261 09:00 AM 2 0 2 0 4 25 423 2 0 450 8 0 17 0 25 2 438 10 0 450 929 09:15 AM 0 0 2 0 2 18 435 0 0 453 6 0 15 0 21 0 445 5 0 450 926 09:30 AM 1 0 5 0 6 15 481 0 0 496 1 0 20 0 21 1 466 6 0 473 996 09:45 AM 0 0 1 0 1 11 465 0 0 476 5 0 11 0 16 0 442 8 0 450 943 Total 3 0 10 0 13 69 1804 2 0 1875 20 0 63 0 83 3 1791 29 0 1823 3794 10:00 AM 1 0 4 0 5 9 460 0 0 469 7 0 10 0 17 1 451 16 0 468 959 10:15 AM 0 0 0 0 0 15 502 0 0 517 5 0 16 0 21 0 465 9 0 474 1012 10:30 AM 0 0 4 0 4 21 531 3 0 555 1 0 26 0 27 2 508 11 0 521 1107 10:45 AM 0 0 0 0 0 10 458 0 0 468 6 0 14 0 20 0 489 15 0 504 992 Total 1 0 8 0 9 55 1951 3 0 2009 19 0 66 0 85 3 1913 51 0 1967 4070 11:00 AM 1 0 1 0 2 14 436 0 0 450 2 0 19 0 21 1 471 26 0 498 971 11:15 AM 0 0 0 0 0 18 455 0 0 473 3 0 22 0 25 0 432 22 0 454 952 11:30 AM 0 0 2 0 2 26 461 2 0 489 8 0 27 0 35 0 443 37 0 480 1006 11:45 AM 0 0 2 0 2 12 498 0 0 510 5 0 15 0 20 0 455 15 0 470 1002 Total 1 0 5 0 6 70 1850 2 0 1922 18 0 83 0 101 1 1801 100 0 1902 3931 12:00 PM 0 0 1 0 1 23 517 2 0 542 2 0 14 0 16 1 427 17 0 445 1004 12:15 PM 0 0 0 0 0 19 502 0 0 521 3 0 25 0 28 0 465 22 0 487 1036 12:30 PM 0 0 6 0 6 33 498 1 0 532 5 0 36 0 41 0 472 30 0 502 1081 12:45 PM 0 0 1 0 1 22 474 0 0 496 4 0 28 0 32 0 432 25 0 457 986 Total 0 0 8 0 8 97 1991 3 0 2091 14 0 103 0 117 1 1796 94 0 1891 4107 01:00 PM 2 0 3 0 5 24 482 0 0 506 5 0 32 0 37 0 421 27 0 448 996 01:15 PM 0 0 0 0 0 15 493 0 0 508 6 0 18 0 24 0 433 19 0 452 984 01:30 PM 0 0 0 0 0 19 516 0 0 535 9 0 21 0 30 1 477 19 0 497 1062 01:45 PM 0 0 0 0 0 11 511 0 0 522 8 0 15 0 23 0 456 16 0 472 1017 Total 2 0 3 0 5 69 2002 0 0 2071 28 0 86 0 114 1 1787 81 0 1869 4059 TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 2 Groups Printed- ALL VEHICLES ENTRANCE TO DENNYS SOUTHBOUND US 17 MARKET ST. WESTBOUND WENDOVER LANE NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 02:00 PM 0 0 1 0 1 19 471 1 0 491 8 0 24 0 32 0 481 20 0 501 1025 02:15 PM 0 0 0 0 0 22 489 0 0 511 6 0 16 0 22 0 489 18 0 507 1040 02:30 PM 1 0 3 0 4 29 440 1 0 470 6 0 27 0 33 1 528 13 0 542 1049 02:45 PM 0 0 0 0 0 25 436 0 0 461 5 0 22 0 27 0 498 11 0 509 997 Total 1 0 4 0 5 95 1836 2 0 1933 25 0 89 0 114 1 1996 62 0 2059 4111 03:00 PM 1 0 2 0 3 23 454 0 0 477 5 0 26 0 31 3 488 22 0 513 1024 03:15 PM 0 0 0 0 0 26 465 0 0 491 4 0 24 0 28 0 492 16 0 508 1027 03:30 PM 0 0 0 0 0 30 493 1 0 524 3 0 15 0 18 0 452 21 0 473 1015 03:45 PM 0 0 0 0 0 25 478 0 0 503 6 0 18 0 24 0 444 19 0 463 990 Total 1 0 2 0 3 104 1890 1 0 1995 18 0 83 0 101 3 1876 78 0 1957 4056 04:00 PM 0 0 0 0 0 12 456 0 0 468 5 0 21 0 26 1 523 19 0 543 1037 04:15 PM 0 0 0 0 0 19 463 0 0 482 3 0 19 0 22 0 489 22 0 511 1015 04:30 PM 0 0 2 0 2 38 458 0 0 496 8 0 26 0 34 1 516 28 0 545 1077 04:45 PM 0 0 0 0 0 26 450 0 0 476 5 0 22 0 27 0 502 25 0 527 1030 Total 0 0 2 0 2 95 1827 0 0 1922 21 0 88 0 109 2 2030 94 0 2126 4159 05:00 PM 2 0 1 0 3 35 440 1 0 476 8 0 28 0 36 1 520 38 0 559 1074 05:15 PM 0 0 0 0 0 24 432 0 0 456 6 0 24 0 30 0 515 21 0 536 1022 05:30 PM 0 0 1 0 1 33 405 1 0 439 3 0 22 0 25 4 526 24 0 554 1019 05:45 PM 0 0 0 0 0 29 418 0 0 447 4 0 20 0 24 0 532 29 0 561 1032 Total 2 0 2 0 4 121 1695 2 0 1818 21 0 94 0 115 5 2093 112 0 2210 4147 06:00 PM 0 0 1 0 1 48 409 0 0 457 8 0 23 0 31 0 464 41 0 505 994 06:15 PM 0 0 0 0 0 32 422 0 0 454 6 0 19 0 25 0 489 32 0 521 1000 06:30 PM 0 0 1 0 1 30 436 0 0 466 7 0 26 0 33 2 469 24 0 495 995 06:45 PM 0 0 0 0 0 25 432 0 0 457 8 0 25 0 33 0 445 25 0 470 960 Total 0 0 2 0 2 135 1699 0 0 1834 29 0 93 0 122 2 1867 122 0 1991 3949 Grand Total 13 0 55 0 68 1008 23848 25 0 24881 281 0 1134 0 1415 31 23839 879 0 24749 51113 Apprch %19.1 0 80.9 0 4.1 95.8 0.1 0 19.9 0 80.1 0 0.1 96.3 3.6 0 Total %0 0 0.1 0 0.1 2 46.7 0 0 48.7 0.5 0 2.2 0 2.8 0.1 46.6 1.7 0 48.4 TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 3 ENTRANCE TO DENNYS U S 1 7 M A R K E T S T . U S 1 7 M A R K E T S T . WENDOVER LANE Right 55 Thru 0 Left 13 Peds 0 InOut Total 56 68 124 Ri g h t 25 Th r u 23 8 4 8 Le f t 10 0 8 Pe d s 0 Ou t To t a l In 24 9 8 6 24 8 8 1 49 8 6 7 Left 281 Thru 0 Right 1134 Peds 0 Out TotalIn 1887 1415 3302 Le f t 31 Th r u 23 8 3 9 Ri g h t 87 9 Pe d s 0 To t a l Ou t In 24 1 8 4 24 7 4 9 48 9 3 3 9/1/2021 06:00 AM 9/1/2021 06:45 PM ALL VEHICLES North TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 4 ENTRANCE TO DENNYS SOUTHBOUND US 17 MARKET ST. WESTBOUND WENDOVER LANE NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 06:00 AM to 12:30 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 0 0 0 0 0 15 525 1 0 541 6 0 18 0 24 0 436 5 0 441 1006 08:15 AM 0 0 0 0 0 22 491 2 0 515 3 0 33 0 36 1 530 12 0 543 1094 08:30 AM 0 0 1 0 1 13 527 1 0 541 2 0 26 0 28 0 525 5 0 530 1100 08:45 AM 0 0 0 0 0 16 505 2 0 523 3 0 16 0 19 0 510 9 0 519 1061 Total Volume 0 0 1 0 1 66 2048 6 0 2120 14 0 93 0 107 1 2001 31 0 2033 4261 % App. Total 0 0 100 0 3.1 96.6 0.3 0 13.1 0 86.9 0 0 98.4 1.5 0 PHF .000 .000 .250 .000 .250 .750 .972 .750 .000 .980 .583 .000 .705 .000 .743 .250 .944 .646 .000 .936 .968 ENTRANCE TO DENNYS U S 1 7 M A R K E T S T . U S 1 7 M A R K E T S T . WENDOVER LANE Right 1 Thru 0 Left 0 Peds 0 InOut Total 7 1 8 Ri g h t 6 Th r u 20 4 8 Le f t 66 Pe d s 0 Ou t To t a l In 20 9 4 21 2 0 42 1 4 Left 14 Thru 0 Right 93 Peds 0 Out TotalIn 97 107 204 Le f t 1 Th r u 20 0 1 Ri g h t 31 Pe d s 0 To t a l Ou t In 20 6 3 20 3 3 40 9 6 Peak Hour Begins at 08:00 AM ALL VEHICLES Peak Hour Data North TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 5 ENTRANCE TO DENNYS SOUTHBOUND US 17 MARKET ST. WESTBOUND WENDOVER LANE NORTHBOUND US 17 MARKET ST. EASTBOUND Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 12:45 PM to 06:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 0 0 2 0 2 38 458 0 0 496 8 0 26 0 34 1 516 28 0 545 1077 04:45 PM 0 0 0 0 0 26 450 0 0 476 5 0 22 0 27 0 502 25 0 527 1030 05:00 PM 2 0 1 0 3 35 440 1 0 476 8 0 28 0 36 1 520 38 0 559 1074 05:15 PM 0 0 0 0 0 24 432 0 0 456 6 0 24 0 30 0 515 21 0 536 1022 Total Volume 2 0 3 0 5 123 1780 1 0 1904 27 0 100 0 127 2 2053 112 0 2167 4203 % App. Total 40 0 60 0 6.5 93.5 0.1 0 21.3 0 78.7 0 0.1 94.7 5.2 0 PHF .250 .000 .375 .000 .417 .809 .972 .250 .000 .960 .844 .000 .893 .000 .882 .500 .987 .737 .000 .969 .976 ENTRANCE TO DENNYS U S 1 7 M A R K E T S T . U S 1 7 M A R K E T S T . WENDOVER LANE Right 3 Thru 0 Left 2 Peds 0 InOut Total 3 5 8 Ri g h t 1 Th r u 17 8 0 Le f t 12 3 Pe d s 0 Ou t To t a l In 21 5 5 19 0 4 40 5 9 Left 27 Thru 0 Right 100 Peds 0 Out TotalIn 235 127 362 Le f t 2 Th r u 20 5 3 Ri g h t 11 2 Pe d s 0 To t a l Ou t In 18 1 0 21 6 7 39 7 7 Peak Hour Begins at 04:30 PM ALL VEHICLES Peak Hour Data North TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 6 SOUTHBOUND: ENTRANCE TO DENNYS TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 7 WESTBOUND: US 17 MARKET ST. TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 8 NORTHBOUND: WENDOVER LANE TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 9 EASTBOUND: US 17 MARKET ST. TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON File Name : SITE 2 Site Code : SITE 2 Start Date : 9/1/2021 Page No : 10 TRUE DIRECTION TRAFFIC SERVICES, INC. 236-1 GRANDVIEW DR. SNEADS FERRY NC 28460 TRUEDIRECTIONTRAFFIC@GMAIL.COM 919-749-3979 MICHAEL JOHNSON Lendire Mixed Use – Transportation Impact Analysis Supporting Documentation DAVENPORT Lendire Mixed Use Development Project # 210236 Study Name : 2024 FB Signal Warrant Page No. : 1Signal Warrants - Summary Major Street Approaches Minor Street Approaches Northbound: US 17 (Market Street) Number of Lanes: 2 85% Speed > 40 MPH. Total Approach Volume: 26,447 Eastbound: Site Access 2 Number of Lanes: 1 Total Approach Volume: 1,232 Southbound: US 17 (Market Street) Number of Lanes: 2 85% Speed > 40 MPH. Total Approach Volume: 26,590 Westbound: None Number of Lanes: 1 Total Approach Volume: 0 Warrant Summary (Rural values apply.) Warrant 1 - Eight Hour Vehicular Volumes ...........................................................................................................................Satisfied Warrant 1A - Minimum Vehicular Volume .........................................................................................Not Satisfied Required volumes reached for 3 hours, 8 are needed Warrant 1B - Interruption of Continuous Traffic ..............................................................................Satisfied Required volumes reached for 13 hours, 8 are needed Warrant 1C - Combination of Warrants ............................................................................................Satisfied Required 1A volumes reached for 11 hours, 8 are needed Required 1B volumes reached for 13 hours, 8 are needed Warrant 2 - Four Hour Volumes .............................................................................................................................................Satisfied Number of hours (13) volumes exceed minimum >= minimum required (4). Warrant 3 - Peak Hour ............................................................................................................................................................Satisfied Warrant 3A - Peak Hour Delay ...........................................................................................................Not Satisfied Total approach volumes and delays on minor street do not exceed minimums for any hour. Warrant 3B - Peak Hour Volumes ......................................................................................................Satisfied Volumes exceed minimums for at least one hour. Warrant 4 - Pedestrian Volumes ............................................................................................................................................Not Evaluated Warrant 5 - School Crossing ..................................................................................................................................................Not Evaluated Warrant 6 - Coordinated Signal System ...............................................................................................................................Not Evaluated Warrant 7 - Crash Experience ................................................................................................................................................Not Evaluated Warrant 8 - Roadway Network ...............................................................................................................................................Not Evaluated Warrant 9 - Intersection Near a Grade Crossing ..................................................................................................................Not Evaluated DAVENPORT Lendire Mixed Use Development Project # 210236 Study Name : 2024 FB Signal Warrant Page No. : 2Signal Warrants - Summary 200 400 600 800 1000 1200 1400 1600 1800 0 100 200 300 400 500 600 700 Major Street - Total of Both Directions (VPH) Mi n o r S t r e e t - H i g h e r V o l u m e A p p r o a c h ( V P H ) Warrant Curves Peak Hour Warrant Four Hour Warrant [Rural, 2+ major lanes and 1 minor lane curves used] 17:1508:3009:3017:0014:3012:4516:4514:4513:00 15:1515:0015:3011:1513:1516:1514:1518:15 11:0016:30 Analysis of 8-Hour Volume Warrants: War 1A-Minimum Volume War 1B-Interruption of Traffic War 1C-Combination of Warrants Hour Major Minor Maj Min Hour Major Minor Maj Min Hour Major Minor 1A 1B Begin Total Vol Dir 420 105 Begin Total Vol Dir 630 53 Begin Total Vol Dir Met Met 17:15 4,321 106 EB Yes Yes 08:45 4,336 120 EB Yes Yes 09:00 4,442 128 EB Yes - 08:30 4,290 112 EB Yes Yes 17:45 4,284 110 EB Yes Yes 17:30 4,321 112 EB Yes Yes 09:30 4,178 110 EB Yes Yes 12:45 4,277 96 EB Yes Yes 08:30 4,290 112 EB -Yes 17:00 4,311 100 EB Yes No 16:45 4,273 92 EB Yes Yes 14:30 4,283 86 EB -Yes 14:30 4,283 86 EB Yes No 14:45 4,272 83 EB Yes Yes 13:00 4,262 100 EB Yes - 12:45 4,277 96 EB Yes No 15:45 4,220 80 EB Yes Yes 15:30 4,252 80 EB No Yes 16:45 4,273 92 EB Yes No 10:45 4,177 86 EB Yes Yes 11:00 4,226 84 EB Yes - 14:45 4,272 83 EB Yes No 18:45 4,175 98 EB Yes Yes 16:30 4,223 84 EB Yes Yes 13:00 4,262 100 EB Yes No 13:45 4,164 94 EB Yes Yes 18:30 4,205 100 EB Yes Yes 15:15 4,256 80 EB Yes No 09:45 4,064 101 EB Yes Yes 14:00 4,197 92 EB Yes - 15:00 4,256 80 EB Yes No 11:45 4,029 84 EB Yes Yes 12:30 4,185 92 EB -Yes 15:30 4,252 80 EB Yes No 07:45 3,928 95 EB Yes Yes 09:30 4,178 110 EB -Yes 11:15 4,237 84 EB Yes No 06:45 1,836 69 EB Yes Yes 13:30 4,176 96 EB -Yes 13:15 4,235 98 EB Yes No 06:30 1,087 46 EB Yes No 11:30 4,163 84 EB -Yes 16:15 4,234 82 EB Yes No 19:45 1,002 24 EB Yes No 10:30 4,062 88 EB -Yes 14:15 4,229 89 EB Yes No 06:15 460 23 EB No No 12:00 4,038 84 EB Yes - 18:15 4,227 104 EB Yes No 22:45 0 0 W No No 08:00 4,023 96 EB Yes - 11:00 4,226 84 EB Yes No 22:30 0 0 W No No 10:00 3,938 92 EB Yes - 16:30 4,223 84 EB Yes No 22:15 0 0 W No No 07:30 3,573 94 EB -Yes 15:45 4,220 80 EB Yes No 22:00 0 0 W No No 07:00 2,741 92 EB Yes - 16:00 4,207 80 EB Yes No 21:45 0 0 W No No 19:30 2,039 48 EB No Yes 18:30 4,205 100 EB Yes No 21:30 0 0 W No No 06:30 1,087 46 EB No Yes 14:00 4,197 92 EB Yes No 21:15 0 0 W No No 15:15 4,256 80 EB No - 12:30 4,185 92 EB Yes No 21:00 0 0 W No No 15:00 4,256 80 EB No - NOTES 11 51 61 62 21 22 6A 6B 2A 2B 5C 5B 7A 3A 3B 8A 5A 1A ( Mi d d l e S o u n d L o o p Ro a d ) S R 1 4 0 3 31328182 4342 71 -0.3% grade 45 MPH EOP EOP sidewalk s i d e w a l k C&G C&G C &G (Market Street) US 17 Business (Market Street) US 17 Business - 0 . 9 % g r a d e 3 5 MP H Wilmington Signal System Fully Actuated 8 Phase R/W R/W C &G R / W R / W 12" R Y 31, 32 R Y F Y 12" SIGNAL FACE I.D. All Heads L.E.D. 16" P22 P21 P82 P81 P21, P22 P81, P82 65' LT +/- Sta. 77+99 -Y1- +/- Metal Pole #11 49' RT +/- Sta. 79+59 -Y1- +/- Metal Pole #13 TABLE OF OPERATION FACE SIGNAL PHASE F L A S H 0 1 + 5 0 2 + 5 0 2 + 6 0 3 + 7 0 3 + 8 0 4 + 7 0 4 + 8 0 1 + 6 11 31, 32 51 Y Y R R R R R R R R R G R R R R G R R R R R R R 81, 82 G G R R R R R R R R R R G R R R R R R G R R R R R G G R R R R R R F Y F Y 21, 22 P21, P22 P81, P82 W W DRK DRK DW DW DW DW DW DW W WDWDWDWDWDWDW Y Y * TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W LO O P F U LL T I M E D E L A Y E X T E N S I O N C A L LI N G S Y S T E M LO O P Y Y --15 -- - - - - - - - - - ----YY Y Y Y Y Y Y Y Y Y Y ---- - - - - - - - ---Y Y Y Y Y Y Y Y --- - -- - - - - -- - - - - - OASIS 2070 LOOP & DETECTOR INSTALLATION CHART 1A 6x40 0 2-4-2 1 2A 2B 3A 3B 5B 5A 6A 6B 4A 8A 6x6 6x6 6x6 6x6 6x40 6x40 6x40 6x40 6x40 6x40 300 300 300 300 0 0 0 0 0 0 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 2-4-2 6 6 5 5 2 2 3 3 5 5 6 6 4 8 - 15 6 Y Y -3 --Y -Y -Y - 2 3 - * * ALTERNATE PHASING DIAGRAM 02+6 02+5 01+6 01+5 03+8 04+7 04+8 03+7 PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND DEFAULT PHASING DIAGRAM 02+6 02+5 01+6 01+5 03+8 04+7 04+8 03+7 Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way Metal Pole with Mastarm existing existing LEGEND 48' RT +/- Sta. 24+50 -Y13- +/- Metal Pole #14 Directional Drill N/A Y Y Y Y Y Y Y Y Y Y Y F Y F Y R N 0 SCALE Division 03 Wilmington SR 1403(Middle Sound Loop Road) at (Market Street) US 17 Business 1"=40' 03-0076 40 U-4751 Y exType II Signal Pedestal FEATURE PHASE 1 2 3 4 5 6 7 8 MIN RECALL MIN RECALL YELLOW YELLOW ON ON 20 100 25 25 20 100 15 30 -----4 -27 -----23 ------ 4 - ------ ------ -------- ------ ------ ON ON ON ON ON ON other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what is shown. Min Green for all Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap ------ ------ OASIS 2070E TIMING CHART 12 125 55555 2.0 6.0 2.0 2.0 6.02.0 2.0 2.0 1.5 34 15 30 3.0 1.5 34 15 30 3.0 3.0 3.4 4.6 2.2 3.0 3.3 3.9 2.3 3.0 3.4 4.6 2.2 3.0 3.5 3.8 2.4 11 51 63 R Y G 12" 81, 82 21, 22 1B -Y Y ---1B 6x40 1Y02-4-2 15 R Y F Y 12" 63 23 83 R R R R23 RRRRR83F Y F Y F Y F Y New Hanover County PORTDAVEN NCBELS FIRM LICENSE NO. C-2522 HOME OFFICE: www.davenportworld.com336.744.1636 WINSTON-SALEM, NC 27101 119 BROOKSTOWN AVENUE, SUITE PH1 Project #: 170257 SHEET NO.PROJECT REFERENCE NO. PREPARED BY: SIG. INVENTORY NO. REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 41 DEFAULT PHASING -Y -Y --7A 6x40 0 2-4-2 7 3Y - 4A Y -Y --5C 6x40 0 2-4-2 5 15Y LD Stouchko MB Toth - 71 10. Signal system data: Controller Asset #0076 values supersede these values. operation only. Coordinated signal system timing 9. Maximum times shown in timing charts are for free-run Don't Walk" time only. 8. Program pedestrain heads to countdown the flashing no pedestrian calls. 7. Omit "WALK" and flashing "DON'T WALK" with hours of use for each phasing plan. 6. The Division (City) Traffic Engineer will determine the 5. Set all detector units to presence mode. 4. Phase 3 and/or phase 7 may be lagged. 3. Phase 1 and/or phase 5 may be lagged. unless otherwise directed by the Engineer. 2. Do not program signal for late night flashing operation and Structures" dated January 2018. dated January 2018 and "Standard Specifications for Roads 1. Refer to "Roadway Standard Drawings NCDOT" 71 43, 44 R R R R R TABLE OF OPERATION FACE SIGNAL PHASE F L A S H 0 1 + 5 0 2 + 5 0 2 + 6 0 3 + 7 0 3 + 8 0 4 + 7 0 4 + 8 0 1 + 6 11 31, 32 51 Y Y R R R R R R R R R G R R R R G R R R R R R R 81, 82 G G R R R R R R R R R R G R R R R R R G R R R R R G G R R R R R R 21, 22 P21, P22 P81, P82 W W DRK DRK DW DW DW DW DW DW W WDWDWDWDWDWDW Y Y R R R R R23 RRRRR83F Y F Y F Y F Y ATERNATE PHASING 71 R R R R R RR RR Y Sig. 8.6 # 15 # # 44 41, 42 +0.3% grade 45 MPH + 0 . 7 % g r a d e 3 5 MP H Phasing Operation. Disable phase call for loop during Alternate Disable delay during Alternate Phasing Operation. 41, 42 43, 44 41, 42 SEAL T N T T I N D E P A R T ME N OF TRA SPORT A IO N S T A E OF NORTH C ARO L A n oi s i v i D y tefaS dn a ytiliboM noitatro p s n a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared for: L e n d i r e E x t e n s i o n 23 F Y F Y F Y F Y F Y F Y F Y F Y 43, 44 F Y F Y F Y F Y F Y F Y F Y F Y April 2017 R/W 1 Construction Revision DATESIGNATURE REVISION SEAL1 Not a certified document as to the Original Document but Only as to the Revisions - This document originally issued and sealed by MELISSA B. TOTH, 025892, on 6-15-17. This document is only certified as to the revisions. 1 1 1 1 1 1 1 1 96' LT +/- Sta. 78+26 -Y1- +/- Metal Pole #12 1 1 61, 62 83 R R R R63 61, 62 F Y F Y F Y F Y R R R R63F Y F Y F Y F Y 1 1 1 1 A A ARight Arrow "ONLY" Sign (R3-5R) 1 1 1 1 61, 62 Added right turn lane on Lendire Extension, relocated cabinet and pole #12, and added new FYA Curb RampN/A 1 for right turns of phases 4 and 6. 1 Updated pavement markings. DocuSign Envelope ID: 02C458A4-D133-4CE6-9FFB-6AEBD9005259 11/14/2019 11/14/2019 N Wilmington Signal System Fully Actuated 2 Phase New Installation 300 1"=30' R/W R/W R/W R/W PHASING DIAGRAM DETECTION LEGEND PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT Directional Arrow 2-in Underground Conduit N/A Right of Way Controller & Cabinet With Push Button & Sign Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head LEGEND PROPOSED EXISTING Sign Junction Box N/ADirectional Drill Metal Pole with Mastarm existing existing Wheelchair Ramp R / W R / W 22 21 71 2A 2B 7A S R 1 9 2 9 ( We n d o v e r L a n e ) * Video Detection Zone 03-1128 B BTO U-TURN" Sign "RIGHT TURN MUST YIELD A ARight Arrow "ONLY" Sign (R3-5R) 2 5 MP H + 2 % Gr a d e 45 MPH 0% Grade 45 MPH 0% Grade Sig. 2.0 0 2 0 F L A S H TABLE OF OPERATION FACE SIGNAL PHASE G R Y21,22 71 72,73 7 R RF Y ALTERNATE PHASING 02 07 ALTERNATE PHASING DIAGRAMDEFAULT PHASING DIAGRAM 02 07 * SIGNAL FACE I.D. All Heads L.E.D. R Y G 12" R Y F Y 12" 21,22 71 72,73 P21,P22 R Y F Y 12" R 0 2 0 F L A S H TABLE OF OPERATION FACE SIGNAL PHASE G R Y F Y 21,22 71 72,73 7 R RF Y DEFAULT PHASING US 17 (Market Street) US 17 (Market Street) SR 1929 (Wendover Lane) at US 17 (Market Street) SidewalkSidewalk Y Y TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W L O O P F U LL T I M E D E LA Y E X T E N S I O N C A LL I N G S Y S T E M LO O P OASIS 2070 LOOP & DETECTOR INSTALLATION CHART Y Y --- Y Y ---2 Y Y --- 6X40 0 0 15Y6X40 - 2-4-2 6X6 Y2A 2-4-2 Y Y ---2 -6X6 Y2B 4 4 300 300 7A 7C Y Y Y Y Y 7 7 10 phasing operation. * Reduce delay to 0 seconds during alternate FEATURE PHASE 2 MIN RECALL YELLOW ON 30 3.0 12 5 - - 7 15 - 1.5 - 34 15 - - 6.0 2.0 1.8 3.0 1.2 4.5 -- ON - - Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap - 90 20 OASIS 2070 TIMING CHART for all other phases should not be lower than 4 seconds. Extension times for phase 2 lower than what is shown. Min Green * These values may be field adjusted. Do not adjust Min Green and 7 Multiuse Path Multiuse Path 7B Y Y ---0 15Y7B Y76X63 7C exType II Signal Pedestal OH L i n e s OH L i n e s 16" P21,P22 P21,P22 W DW DRK P21,P22 W DW DRK P22 P21 NOTES Controller Asset #1128 10. Signal system data: supersede these values. signal system timing values operation only. Coordinated chart are for free-run 9. Maximum times shown in timing for each phasing plan. determine the hours of use 8. The Division Traffic Engineer will installation. Division Traffic Engineer before located in the field by the 7. All pedestrian pushbuttons shall be "DON'T WALK" time only. countdown the flashing 6. Program pedestrian heads to with no pedestrian calls. 5. Omit "WALK" and flashing "DON'T WALK" vehicles turning right on red. to obstruct sight distance of 4. Locate new cabinet so as not presence mode. 3. Set all detector units to the Engineer. unless otherwise directed by night flashing operation 2. Do not program signal for late January 2018. for Roads and Structures" dated 2018 and "Standard Specifications Drawings NCDOT" dated January 1. Refer to "Roadway Standard SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: SCALE T N T T I N D E P A R T ME N OF TR A SPORT A I O N S T A E OF NORTH C ARO L A n oi s i v i D y tefaS dn a ytiliboM noitatro p s n a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared for: Division 03 New Hanover Co.Wilmington February 2018 A.D. Klinksiek A.H. Thornburg N.R. Simmons U-4902D DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED (919) 546-8997 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. A N CRT O H L O RA NIRAPL SEOF N I S O G NI E N E RE 031464 SEAL S N OMMIS .R A H S AT A N 53' Rt +/- Sta. 208+37 +/- -L- Metal Pole with Mast Arm #1 Sta. 208+43 +/- -L- Signal Pedestal #1 72 73B A DocuSign Envelope ID: C2D054F2-78FA-4233-A30C-1586102816A2 8/1/2018 Opposing Lefts Opposing Rights AM 164 45 AM 164 17 PM 328 57 PM 328 44 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY LENDIRE ROAD AT SITE ACCESS 3 Opposing Lefts Opposing Rights AM n/a n/a AM 1296 79 PM n/a n/a PM 1188.8 91 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY MARKET STREET AT SITE ACCESS 2 (SCENARIO 1) Opposing Lefts Opposing Rights AM 2248*70 AM 1256 43 PM 2043*79 PM 1152 63 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY MARKET STREET AT SITE ACCESS 2 (SCENARIO 2) * volumes off the scale. see signal warrant analysis Opposing Lefts Opposing Rights AM n/a n/a AM 1270 58 PM n/a n/a PM 1163.3 71 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY MARKET STREET AT SITE ACCESS 1 (SCENARIO 1) Opposing Lefts Opposing Rights AM 00 AM 1131 29 PM 00 PM 1027 37 Volumes VolumesPeak Hour Peak Hour AM Peak Hour, Vr PM Peak Hour, Vr AM Peak Hour, Vl PM Peak Hour, Vl TURN LANE WARRANT SUMMARY MARKET STREET AT SITE ACCESS 1 (SCENARIO 2) June 23, 2021 Mr. Don Bennett, PE DAVENPORT 5917 Oleander Drive, Suite 206 Wilmington, NC 28403 RE: Approved Scope for the Traffic Impact Analysis (TIA) associated with the proposed Mixed Use development located west of US 17 (Market Street) in Wilmington, NC Dear Mr. Bennett: Based on the information provided and conversations held to date, it is our understanding that the proposed development, with a build out year of 2023, will consist of: o ITE Land Use Code 221 – 694 multi-family apartments o ITE Land Use Code 710 – General Office (26,000 Sq. Ft) o ITE Land Use Code 720 – Medical Office (10,000 Sq. Ft.) o ITE Land Use Code 820 – Shopping Center (29,000 Sq. Ft.) o ITE Land Use Code 932 – High Turnover (Sit-down) Restaurant (7,000 Sq. Ft.) o ITE Land Use Code 934 – Fast-Food Restaurant with Drive-Thru (2,500 Sq. Ft.) Below please find the scope to be used in the Traffic Impact Analysis: 1. Data Collection – Analysis Parameters: a. Study Intersections i. For existing intersections, provide turning movement counts, including pedestrians for weekday during school (T,W,TH) morning (7:00am-9:00am) and afternoon (4:00pm-6:00pm) peak travel periods, plus 13 hour count for US 17 (Market Street)/Wendover Lane: 1. US 17 (Market Street)/SR 1403 (Middle Sound Loop Rd)/SR 2892 (Lendire Rd), 2. US 17 (Market Street)/Wendover Lane 3. US 17 (Market Street)/ Site Access #1 right-in/right-out 4. US 17 (Market Street)/ Site Access #2 (signal warrant analysis) 5. SR 2892 (Lendire Rd)/ Site Access #3 Note: Please use the volume data collected at US 17 (Market Street)/Wendover Lane to perform the signal warrant analysis for Site Access Driveway #2. Lendire Mixed use development Traffic Impact Analysis (TIA) scope Page 2 of 3 b. Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions: i. Site Trip Generation Estimate 1. Trip Generation o Attached 2. Site Trip Distribution o The site access operations must be submitted and approved before use in TIA. 3. Adjacent Development (approved but not yet built): o None 4. Planned Roadway Improvements o TIP U-4751 – NC 417 (Military Cutoff Road Extension) between US 17 (Market Street) and NC 140 o TIP U-4902D – US 17 (Market Street) Median Project between SR 1403 (Middle Sound Loop Road)/SR 2892 (Lendire Road) and SR 1734 (Marsh Oaks Road)/ SR 2290 (Mendenhall Drive) 5. Background Traffic Assumptions o TIP Horizon year – 2040 o Growth Rate – 1% per year 2. Capacity Analysis: Weekday AM & PM Peak Hour a. Technical Analysis to use current signal timing and existing geometry and lane configurations. i. 2021 Existing Conditions ii. 2023 Future No-Build [Existing + 1% background growth] iii. 2023 Build Conditions [Existing + 1% background growth + site trips] iv. 2023 Build Conditions + Improvements v. 2040 U-4751 & U-4902D TIP Design Year Build Conditions + Improvements 3. Final Report Submittal: a. Completed TIA Application b. Signed and sealed by a Professional Engineer c. Electronic copy submitted via file share link to include PDF of TIA and Synchro output files as well as digital Synchro files d. City of Wilmington $250 TIA Review Fee 4. Notes: a. This scope shall remain valid for three months from the date of this letter b. Please note that if any changes occur (including but not limited to: land use, intensity, phasing, and/or site access) additional analysis may be required. Lendire Mixed use development Traffic Impact Analysis (TIA) scope Page 3 of 3 Please feel free to contact me at (910) 473 – 5130 if you have any questions regarding this scope. Sincerely, Scott A. James, PE Transportation Planning Engineer Wilmington Urban Area MPO Attachments: Traffic Impact Analysis Supplemental Guidelines Trip Generation Summary (provided by DAVENPORT) Ec: Ben Hughes, PE, District Engineer, NCDOT Jessi Leonard, PE, Division Traffic Engineer, NCDOT Eva Covarrubias, EI, Transportation Engineering Associate, NCDOT Charles Sorrell, Congestion Management Project Design Engineer, NCDOT James Dunlop, PE, Congestion Management Engineer, NCDOT Denys Vielkanowitz, PE, City Traffic Engineer, City of Wilmington Thomas Bradshaw, PE, ITS Engineer, City of Wilmington Brian Chambers, AICP, Senior Planner, City of Wilmington Mike Kozlosky, Executive Director, WMPO Bill McDow, Transportation Planner, WMPO Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 5917 Oleander Dr, Suite 206 Winston-Salem, NC 27101 Wilmington, NC 28403 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912; Fax: 336.458.9377 June 11, 2021 Transportation Impact Analysis (TIA) Scoping Request Lendire Mixed Use (DAVENPORT Project Number 210236) New Hanover County, NC Proposed Land Uses LUC 221 – 694 Apartments/Townhomes LUC 710 – 26,000 square feet of General Office LUC 720 – 10,000 square feet of Medical Office LUC 820 – 29,000 square feet of Shopping Center LUC 932 – 7,000 square feet of High-Turnover (Sit-down) Restaurant LUC 934 – 2,500 square feet of Fast-Food Restaurant with Drive-thru Proposed Study Intersections 1. US 17 (Market Street) at SR 1403 (Middle Sound Loop Road)/SR 2892 (Lendire Road) 2. SR 2892 (Lendire Road) at Site Access 3 3. US 17 (Market Street) at Site Access 1 (RIRO) 4. US 17 (Market Street) at Site Access 2 (RIRO, RI/RO/LI or Full) Proposed annual growth rate – 1% Analysis Periods – Weekday AM peak (7:00-9:00 am) and PM peak (4:00-6:00 pm) TIA Analysis Scenarios: • 2021 Existing Conditions • 2023 Future No-Build Conditions • 2023 Future Build Conditions • 2023 Future Build Conditions with Improvements (as necessary) • 2040 TIP Build Year Analysis (U-4751) Trip Generation – Based on ITE Trip Generation Manual 10th Edition, Proposed site trip directional distribution – TBD based on background counts Existing Traffic Counts – Counts to be collected at: 1. US 17 (Market Street) at SR 1403 (Middle Sound Loop Road)/SR 2892 (Lendire Road) 2. US 17 (Market Street) at SR 1929 (Wendover Drive) 3. US 17 (Market Street) at Jackson Hewett/PB Driveway 4. SR 2892 (Lendire Road) at Ogden Business Lane Counts will be adjusted to pre-COVID values based on mutually agreeable process. Approved developments – n/a unless instructed otherwise Committed Improvements – U-4751, Military Cutoff Extension 24 Hour Two-Way Land Use ITE Land Code Data Source Volume Enter Exit Enter Exit Apartments/ Townhomes 221 694.0 Dwelling Units Adjacent/ Equation 3,781 60 169 174 111 General Office 710 26.0 1000 GFA Generator/ Equation 287 45 6 17 77 Medical Office 720 10.0 1000 GFA Adjacent/ Rate 348 22 6 10 25 Retail 820 29.0 1000 GLA Adjacent/ Equation 1,095 17 10 53 57 High-Turnover (Sit- down) Restaurant 932 7.0 1000 GFA Generator/ Rate 785 56 42 63 59 Fast Food Restaurant with Drive Thru 934 2.5 1000 GFA Adjacent/ Rate 1,177 51 49 43 39 7,473 251 282 360 368 -13 -11 -8 -7 -7 -5 -34 -29 -30 -14 -28 -43 -4 -25 -28 -18 - -54 -55 -98 -97 0 0 -8 -8 0 0 -17 -17 -19 -19 -13 -13 - -19 -19 -38 -38 - 178 208 224 233 LUC 934 Fast Food Restaurant with Drive Thru (49%AM, 50% PM) Table 4.2 - ITE Trip Generation Lendire Mixed Use, New Hanover County Average Weekday Driveway Volumes AM Peak Hour PM Peak Hour Size Total Pass-By Peak Reduction Total Adjusted (Primary) Trips LUC 820 General Retail (0%AM, 34% PM) Total Unadjusted Trips Office Internal Capture Residential Internal Capture Retail Internal Capture Total Internal Trips Reduction Restaurant Internal Capture LUC 932 High-Turnover (Sit-down) Restaurant (0%AM, 43% PM) Project Name: Organization: Project Location: Performed By: Scenario Description:AM Peak Date: Analysis Year: Checked By: Analysis Period: Date: ITE LUCs1 Quantity Units Total Entering Exiting Office 710, 720 36 1000 Sq. Ft. GFA 79 67 12 Retail 820 29 1000 Sq. Ft. GLA 27 17 10 Restaurant 932, 934 9.5 1000 Sq. Ft. GFA 198 107 91 Cinema/Entertainment 0 Residential 221 694 Dwelling Units 229 60 169 Hotel 0 All Other Land Uses2 0 533 251 282 Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office 1.10 0% 0% 1.10 0% 0% Retail 1.10 0% 0% 1.10 0% 0% Restaurant 1.10 0% 0% 1.10 0% 0% Cinema/Entertainment 1.10 0% 0% 1.10 0% 0% Residential 1.10 0% 0% 1.10 0% 0% Hotel 1.10 0% 0% 1.10 0% 0% All Other Land Uses2 1.10 0% 0% 1.10 0% 0% Office Retail Restaurant Residential Hotel Office Retail Restaurant Cinema/Entertainment Residential Hotel Office Retail Restaurant Residential Hotel Office 4 8 0 0 Retail 3 1 1 0 Restaurant 10 2 3 0 Cinema/Entertainment 0 0 0 0 0 Residential 2 2 24 0 Hotel 0 0 0 0 Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 587 277 310 Office 20% 92% Internal Capture Percentage 20% 22% 19% Retail 42% 45% Restaurant 28% 15% External Vehicle-Trips5 424 197 227 Cinema/Entertainment N/A N/A External Transit-Trips6 0 0 0 Residential 6% 15% External Non-Motorized Trips6 0 0 0 Hotel N/A N/A NCHRP 684 Internal Trip Capture Estimation Tool Table 1-A: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) 0 0 Cinema/Entertainment Development Data (For Information Only ) 0 0 0 Estimated Vehicle-Trips3 Land Use Lendire Mixed Use Table 2-A: Mode Split and Vehicle Occupancy Estimates Table 4-A: Internal Person-Trip Origin-Destination Matrix* Destination (To)Origin (From) Origin (From)Destination (To) Cinema/Entertainment Land Use Entering Trips Exiting Trips Table 3-A: Average Land Use Interchange Distances (Feet Walking Distance) Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 Table 5-A: Computations Summary Table 6-A: Internal Trip Capture Percentages by Land Use 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-A. 1Land Use Codes (LUCs) from Trip Generation Manual , published by the Institute of Transportation Engineers. 6Person-Trips *Indicates computation that has been rounded to the nearest whole number. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual ). 4Enter vehicle occupancy assumed in Table 1-A vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be made to Tables 5-A, 9-A (O and D). Enter transit, non-motorized percentages that will result with proposed mixed-use project complete. New Hanover County AM Street Peak Hour DAVENPORT kkoilada 2021 Project Name: Organization: Project Location: Performed By: Scenario Description:PM Peak Date: Analysis Year: Checked By: Analysis Period: Date: ITE LUCs1 Quantity Units Total Entering Exiting Office 710, 720 36 1000 Sq. Ft. GFA 129 27 102 Retail 820 29 1000 Sq. Ft. GLA 110 53 57 Restaurant 932, 934 9.5 1000 Sq. Ft. GFA 204 106 98 Cinema/Entertainment 0 Residential 221 694 Dwelling Units 285 174 111 Hotel 0 All Other Land Uses2 0 728 360 368 Veh. Occ.4 % Transit % Non-Motorized Veh. Occ.4 % Transit % Non-Motorized Office 1.10 1.10 Retail 1.10 1.10 Restaurant 1.10 1.10 Cinema/Entertainment 1.10 1.10 Residential 1.10 1.10 Hotel 1.10 1.10 All Other Land Uses2 1.10 1.10 Office Retail Restaurant Residential Hotel Office 600 600 1500 Retail 1500 Restaurant 1500 Cinema/Entertainment Residential 1500 1500 Hotel Office Retail Restaurant Residential Hotel Office 4 2 2 0 Retail 1 18 13 0 Restaurant 3 29 15 0 Cinema/Entertainment 0 0 0 0 0 Residential 5 4 10 0 Hotel 0 0 0 0 Total Entering Exiting Land Use Entering Trips Exiting Trips All Person-Trips 801 396 405 Office 30% 7% Internal Capture Percentage 26% 27% 26% Retail 64% 51% Restaurant 26% 44% External Vehicle-Trips5 535 263 272 Cinema/Entertainment N/A N/A External Transit-Trips6 0 0 0 Residential 16% 16% External Non-Motorized Trips6 0 0 0 Hotel N/A N/A *Indicates computation that has been rounded to the nearest whole number. Estimation Tool Developed by the Texas A&M Transportation Institute - Version 2013.1 2021 PM Street Peak Hour Table 1-P: Base Vehicle-Trip Generation Estimates (Single-Use Site Estimate) Land Use Development Data (For Information Only )Estimated Vehicle-Trips3 Table 2-P: Mode Split and Vehicle Occupancy Estimates Land Use Entering Trips Exiting Trips Table 3-P: Average Land Use Interchange Distances (Feet Walking Distance) Origin (From)Destination (To) NCHRP 684 Internal Trip Capture Estimation Tool Lendire Mixed Use DAVENPORT New Hanover County kkoilada Cinema/Entertainment 0 0 Table 4-P: Internal Person-Trip Origin-Destination Matrix* Origin (From)Destination (To) Cinema/Entertainment 6Person-Trips 1Land Use Codes (LUCs) from Trip Generation Manual , published by the Institute of Transportation Engineers. 2Total estimate for all other land uses at mixed-use development site is not subject to internal trip capture computations in this estimator. 3Enter trips assuming no transit or non-motorized trips (as assumed in ITE Trip Generation Manual ). 5Vehicle-trips computed using the mode split and vehicle occupancy values provided in Table 2-P. 0 Table 5-P: Computations Summary Table 6-P: Internal Trip Capture Percentages by Land Use 4Enter vehicle occupancy assumed in Table 1-P vehicle trips. If vehicle occupancy changes for proposed mixed-use project, manual adjustments must be made 0 0 Trip Generation Summary Open Date: Analysis Date: 6/4/2021 6/4/2021Project: Lendire Mixed Use Alternative: Alternative 1 Phase: ITE Land Use Enter Exit Enter ExitEnter Exit TotalTotal Total *** Weekday Average Daily Trips Weekday AM Peak Hour of Adjacent Street Traffic Weekday PM Peak Hour of Adjacent Street Traffic 221 Apartments/Townhomes 694 Dwelling Units 1891 1890 3781 60 169 229 174 111 285 710 OFFICEGENERAL 1 26 1000 Sq. Ft. GFA 144 143 287 0 0 720 OFFICEMEDICAL 1 10 1000 Sq. Ft. GFA 174 174 348 22 6 28 10 25 35 820 CENTERSHOPPING 1 29 1000 Sq. Ft. GLA 548 547 1095 17 10 27 53 57 110 932 RESTAURANTHT 1 7 1000 Sq. Ft. GFA 393 392 785 0 0 934 FASTFOOD-DRIVE 1 2.5 1000 Sq. Ft. GFA 589 588 1177 51 49 100 43 39 82 Unadjusted Volume 3739 3734 7473 150 234 384 280 232 512 Internal Capture Trips 0 0 0 28 28 56 73 73 146 0 0 0 19 19 38 20 20 40 3739 3734 7473 103 187 290 187 139 326 Pass-By Trips Volume Added to Adjacent Streets Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Adjacent Street Traffic Internal Capture = 15 Percent Total Weekday PM Peak Hour of Adjacent Street Traffic Internal Capture = 29 Percent P. 1TRIP GENERATION 10, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 10th Edition - Custom rate used for selected time period.* Trip Generation Summary Open Date: Analysis Date: 6/4/2021 6/4/2021Project: Lendire Mixed Use Alternative: Alternative 1 Phase: ITE Land Use Enter Exit Enter ExitEnter Exit TotalTotal Total *** Weekday Average Daily Trips Weekday AM Peak Hour of Generator Weekday PM Peak Hour of Generator 221 Apartments/Townhomes 694 Dwelling Units 1891 1890 3781 0 0 710 OFFICEGENERAL 1 26 1000 Sq. Ft. GFA 144 143 287 45 6 51 17 77 94 720 OFFICEMEDICAL 1 10 1000 Sq. Ft. GFA 174 174 348 0 0 820 CENTERSHOPPING 1 29 1000 Sq. Ft. GLA 548 547 1095 0 0 932 RESTAURANTHT 1 7 1000 Sq. Ft. GFA 393 392 785 56 42 98 63 59 122 934 FASTFOOD-DRIVE 1 2.5 1000 Sq. Ft. GFA 589 588 1177 0 0 Unadjusted Volume 3739 3734 7473 101 48 149 80 136 216 Internal Capture Trips 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3739 3734 7473 101 48 149 80 136 216 Pass-By Trips Volume Added to Adjacent Streets Total Weekday Average Daily Trips Internal Capture = 0 Percent Total Weekday AM Peak Hour of Generator Internal Capture = 0 Percent Total Weekday PM Peak Hour of Generator Internal Capture = 0 Percent P. 1TRIP GENERATION 10, TRAFFICWARE, LLC Source: Institute of Transportation Engineers, Trip Generation Manual 10th Edition - Custom rate used for selected time period.* SITE FIGURE 2A SITE LOCATION MAP US 17 (Market Street) SITE STUDY INTERSECTIONS EXISTING PROPOSED FIGURE 2B VICINITY MAP 1 2 3 4 Lendire Road Lendire Road (Private)