Loading...
23-0065 CBA-TRC_PLAN SETBY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION CO V E R C1 23-0065_cs.dwg Know what's below. before you dig.Call R CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811". REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. N VICINITY MAP NOT TO SCALE SITE OWNER CONTACT: ARAB SHRINE CLUB H CORP WEST PALM BEACH, FL SITE LOCATION MAP NOT TO SCALE MAJOR SITE PLAN FOR CHRISTIAN BROTHERS AUTOMOTIVE CORP. 4580 S. COLLEGE ROAD WILMINGTON, NC 28412 NEW HANOVER COUNTY TRC SUBMITTAL #1 - 11/15/2023 N PARCEL DATA: PARID:R07114-004-001-000 DB 1116, PG 0245 ZONING: CZD CB 1.34 ACRES ARCHITECTURAL CONTACT: CORTLAND MORGAN ARCHITECT DANA KING, ARCHITECTURAL PROJECT COORDINATOR 979-255-6927 (PHONE) DLK-ARCHITECT@OUTLOOK.COM SITE DEVELOPER CONTACT: CHRISTIAN BROTHERS AUTOMOTIVE CORP. BILLY GREEN, JR. 17725 KATY FREEWAY, SUITE 200 HOUSTON, TX 77094 (281) 675-6192 (PHONE) BILLY.GREEN@CBAC.COM CIVIL ENGINEER CONTACT: SUMMIT DESIGN & ENGINEERING SERVICES GREG THOMPSON, PE, PLS 2715 ASHTON DRIVE, SUITE 104 WILMINGTON, NC 28412 (910) 475-1208 x3805 (PHONE) (919) 732-6676 (FAX) GREG.THOMPSON@SUMMITDE.COM SURVEY CONTACT: SUMMIT DESIGN & ENGINEERING SERVICES BRANTLEY WELLS, PLS 320 EXECUTIVE CT. HILLSBOROUGH, NC 27278 (919) 732-3883 x3136 (PHONE) (919) 732-6676 (FAX) BRANTLEY.WELLS@SUMMITDE.COM LANDSCAPE CONTACT: EVERGREEN DESIGN GROUP LISA CUTSHAW, PLA 4509 CREEDMOOR RD. SUITE 201 RALEIGH, NC 27612 800-680-6630 x16 (PHONE) LISA@EVERGREENDESIGNGROUP.COM COVER C1 NOTES C2 SURVEY - EX. CONDITIONS C3 TREE REMOVAL PLAN C3A EROSION CONTROL PH1 C4 EROSION CONTROL PH2 C5 SITE PLAN C6 GRADING PLAN C7 EROSION CONTROL DETAILS D1 EROSION CONTROL DETAILS D2 EROSION CONTROL DETAILS D3 SITE DETAILS D4 CFPUA WATER DETAILS D5 STORM DETAILS D6 LANDSCAPE PLANTING PLAN LP-1 LANDSCAPE SPECIFICATIONS & DETAILS LP-2 TREE DISPOSITION SPECIFICATIONS & DETAILS TD-2 TREE DISPOSITION PLAN TD-1 SITE PHOTOMETRIC PLAN A-4.1 N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ C S . d w g , C 1 C O V E R , 1 1 / 1 4 / 2 0 2 3 6 : 3 1 : 1 3 A M , D W G T o P D F . p c 3 , 1 : 1 BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION Know what's below. before you dig.Call R 23-0065_notes.dwg C2 NO T E S GENERAL NOTES: 1.COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF ANY EXISTING UNDERGROUND UTILITIES AND STRUCTURES SHOWN HEREON IS NOT GUARANTEED. 2.LOCATION OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND SHALL BE CONFIRMED INDEPENDENTLY WITH LOCAL UTILITY COMPANIES AND NC811 PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS SHALL BE CONFIRMED INDEPENDENTLY BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED IMMEDIATELY IN WRITING TO THE ENGINEER. CONSTRUCTION SHALL COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED CROSSINGS WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. 3.CONSTRUCTION/DEMOLITION; ALL CONSTRUCTION AND DEMOLITION CONDUCTED SHALL BE IN COMPLIANCE WITH THE 2018 EDITION - CHAPTER 33 OF THE NC FPC. 4.PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY OR FINAL ACCEPTANCE, APPLICANT SHALL REPLACE ANY TREES SHOWN AS PRESERVED-PROTECTED ON THE LANDSCAPE PROTECTION PLAN THAT HAVE DIED OR ARE IN POOR HEALTH AS A RESULT OF LAND DISTURBING ACTIVITIES. 5.ALL DIMENSIONS SHALL BE TO FACE OF CURB UNLESS NOTED OTHERWISE. 6.CONTRACTOR SHALL MAINTAIN ANY ACCESSES TO ADJACENT RESIDENCES, BUSINESSES, AND PROPERTIES AT ALL TIMES AND NOTIFY THEM OF ANY DISRUPTIONS OF SERVICE OR ACCESS WITH A 24-HOUR NOTICE. 7.CONSTRUCTION ON THIS PROJECT SHALL BE IN ACCORDANCE WITH ALL APPLICABLE AND THE MOST CURRENT TOWN, COUNTY, STATE, DOT AND UTILITY PROVIDER STANDARDS, SPECIFICATIONS, AND BUILDING CODES. 8.ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED BY THE PROJECT ENGINEER, PLANNING DEPARTMENT STAFF, AND DEVELOPER PRIOR TO INSTALLATION/CONSTRUCTION OF CORRESPONDING ITEMS. THE CONTRACTOR SHALL WAIVE ANY ADDITIONAL COSTS CLAIMS FOR SUBSTITUTING OR MODIFYING FROM WHAT HAS BEN APPROVED. CONSTRUCTION WASTE NOTES: 1.ALL EXISTING STRUCTURES 500 SQUARE FEET AND LARGER SHALL BE ASSESSED PRIOR TO THE ISSUANCE OF A DEMOLITION PERMIT TO ENSURE COMPLIANCE WITH THE GOVERNING MUNICIPALITIES' REGULATED RECYCLABLE MATERIALS ORDINANCE (RRMO) AND TO ASSESS THE POTENTIAL FOR DECONSTRUCTION AND/OR THE REUSE OF SALVAGEABLE MATERIALS. 2.PURSUANT TO THE GOVERNING MUNICIPALITIES' RRMO, CLEAN WOOD WASTE, SCRAP METAL, AND CORRUGATED CARDBOARD PRESENT IN CONSTRUCTION OR DEMOLITION WASTE MUST BE RECYCLED. 3.PURSUANT TO THE GOVERNING MUNICIPALITIES' RRMO, ALL HAULERS OF MIXED CONSTRUCTION AND DEMOLITION WASTE, WHICH INCLUDES ANY REGULATED RECYCLABLE MATERIALS, SHALL BE LICENSED BY THE GOVERNING MUNICIPALITIES. 4.PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTIVITY ON THE SITE, THE APPLICANT SHALL HOLD A PRE-DEMOLITION/PRE-CONSTRUCTION CONFERENCE WITH SOLID WASTE STAFF. THIS MAY BE THE SAME PRE-CONSTRUCTION MEETING HELD WITH OTHER DEVELOPMENT/ENFORCEMENT OFFICIALS. 5.THE PRESENCE IF ANY ASBESTOS CONTAINING MATERIALS (ACM) AND/OR OTHER HAZARDOUS MATERIALS SHALL BE HANDLED IN ACCORDANCE WITH ANY AND ALL LOCAL, STATE, AND FEDERAL REGULATIONS AND GUIDELINES. INSPECTION NOTES: 1.ADDRESS NUMBERS MUST BE A MINIMUM OF 6 INCHES HIGH AND OF CONTRASTING COLOR TO THEIR BACKGROUND. REFLECTIVE NUMBERS ARE PREFERRED. WHEN THE DISTANCE FROM THE STREET OR FIRE DEPARTMENT ACCESS LANE TO THE FRONT OR ADDRESS SIDE OF THE BUILDING EXCEEDS 25 FEET, LARGER NUMBERS ARE REQUIRED. 26 FEET TO 50 FEET SHALL HAVE 8 INCH NUMBERS, 51-75 FEET SHALL HAVE 12 INCH NUMBERS AND OVER 75 FEET SHALL HAVE 18 INCH NUMBERS. WHERE ACCESS IS BY PRIVATE MEANS OF A PRIVATE ROAD AND THE BUILDING CANNOT BE VIEWED FROM THE PUBLIC WAY, A MONUMENT, POLE OR OTHER SIGN OR MEANS SHALL BE USED TO IDENTIFY THE STRUCTURE. 2.KEY BOXES SHALL BE REQUIRED ON ANY BUILDING THAT HAS A FIRE ALARM SYSTEM, A FIRE SPRINKLER SYSTEM, AN ELEVATOR, OR SPECIAL LOCKING ARRANGEMENTS. THE KEY BOX SHALL BE OF AN APPROVED TYPE AS REQUIRED FROM THE FIRE DEPARTMENT. THE SIZE OF THE KEY BOX WILL BE DETERMINED BY THE NUMBER OF KEYS NECESSARY TO MITIGATE ANY EMERGENCY SITUATION BASED ON THE BUILDING AND ITS OCCUPANCY. AN APPROVED LOCK SHALL BE INSTALLED ON GATES OR SIMILAR BARRIERS WHEN REQUIRED BY THE FIRE CODE OFFICIAL. KEYS SHALL BE CHANGED OUT IMMEDIATELY IF THE LOCKS ARE CHANGED OR RE-KEYED. 3.A LEAD-FREE RPZ WITH BYPASS FOR THE BACKFLOW PROTECTION IS REQUIRED. ENSURE AT LEAST 18 INCHES OF WORKING CLEARANCE IS PROVIDED AROUND OR MORE IF MANUFACTURER'S INSTRUCTIONS REQUIRE MORE. 4.DEMOLITION OF THE EXISTING STRUCTURES WILL REQUIRE AN ASBESTOS TEST PRIOR TO DEMOLITION AND A SECOND ASBESTOS TEST OF THE SOIL AFTER THEY HAVE BEEN REMOVED. 5.iIF REQUIRED, THE PROPOSED BUILDINGS SHALL BE PROTECTED BY NFPA 13 SPRINKLER SYSTEM GENERAL CONSTRUCTION AND GRADING NOTES: 1.ALL WORK SHALL COMPLY WITH APPLICABLE STATE, FEDERAL AND LOCAL CODES AND OSHA STANDARDS ALL NECESSARY LICENSES AND PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE UNLESS PREVIOUSLY OBTAINED BY THE OWNER/DEVELOPER. 2.THE CONTRACTOR SHALL BE REQUIRED TO REVIEW AND ABIDE BY SPECIFICATIONS OF THE PLAN AND ALL SUPPORTING DOCUMENTS, PERMITS, AND REPORTS FOR THIS SITE, INCLUDING NOT BUT NOT LIMITED TO: EROSION AND SEDIMENTATION CONTROL PLAN AND STORMWATER MANAGEMENT PLAN. 3.THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER OF ANY DISCREPANCIES OR ERRORS THEY DISCOVER IN COMPARING THE PLANS TO ACTUAL FIELD CONDITIONS. 4.DEVIATION FROM THESE PLANS AND NOTES WITHOUT THE PRIOR CONSENT OF THE OWNER OR HIS REPRESENTATIVE OR THE ENGINEER MAY CAUSE THE WORK TO BE UNACCEPTABLE AND WITHOUT COMPENSATION. 5.UTILITY COORDINATION SHALL BE INCLUDED IN THE PROJECT SCHEDULE AND IT IS THE EXPLICIT RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE PROJECT SCHEDULE INCLUDES THE NECESSARY RELOCATIONS. THE CONTRACTOR WILL NOT BE PAID ADDITIONALLY FOR THIS COORDINATION. THE CONTRACTOR SHOULD SEEK ASSISTANCE FROM ALL UTILITY COMPANIES TO LOCATE AND PROTECT THEIR FACILITIES. IF CONFLICTS ARE FOUND, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND DESIGN ENGINEER FOR INSTRUCTION BEFORE PROCEEDING WITH WORK. 6.ALL MATERIALS SHALL BE NEW UNLESS USED OR SALVAGED MATERIALS ARE AUTHORIZED BY THE OWNER AND APPLICANT IN WRITING. 7.TRAFFIC CONTROL METHODS, SUCH AS BARRICADES, SUFFICIENT LIGHTS, SIGNS, ETC., MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC AND SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE CONSTRUCTION IN ACCORDANCE WITH CURRENT MUTCD STANDARDS. 8.CONTRACTOR SHALL FURNISH AND MAINTAIN ALL NECESSARY BARRICADES, FENCING AND OTHER APPROPRIATE SAFETY ITEMS/MEASURES NECESSARY TO PROTECT THE PUBLIC FROM THE WORK AREA CONSTRUCTION ACTIVITIES. 9.HIGH INTENSITY LIGHTING FACILITIES SHALL BE SO ARRANGED THAT THE SOURCE OF ANY LIGHT IS CONCEALED FROM PUBLIC VIEW AND FROM ADJACENT RESIDENTIAL PROPERTY AND DOES NOT INTERFERE WITH TRAFFIC. 10.THE CONTRACTOR SHALL MAINTAIN ACCESS FOR EMERGENCY VEHICLES AROUND AND TO ALL BUILDINGS NEAR CONSTRUCTION. IN TIME OF RAIN OR MUD, ROADS SHALL BE ABLE TO CARRY A FIRE TRUCK BY BEING PAVED OR HAVING A CRUSHED STONE BASE, ETC. WITH A MINIMUM WIDTH OF 20 FEET. ACCESS TO BUILDINGS THAT HAVE SPRINKLER OR STANDPIPE SYSTEMS SHALL BE WITHIN 40 FEET OF THE FIRE DEPARTMENT CONNECTOR. (NFPA 1141 3-1) 11.BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK. 12.BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS AND SHALL BE PLACED IN LAYERS NOT TO EXCEED SIX (6) INCHES IN COMPACTED FILL THICKNESS. A REPORT FROM A GEOTECHNICAL ENGINEER MAY BE REQUIRED BY THE GOVERNING MUNICIPALITY INSPECTOR. CORRECTION OF ANY TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 13.THE CONTRACTOR WILL ENSURE THAT POSITIVE AND ADEQUATE DRAINAGE IS MAINTAINED AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT NOT BE LIMITED TO, A) REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE STRUCTURES THAT HAVE BEEN DAMAGED OR REMOVED, OR B) REGRADING AS REQUIRED BY THE ENGINEER, EXCEPT FOR THOSE DRAINAGE ITEMS SHOWN AT SPECIFIC LOCATIONS AND HAVING SPECIFIC PAY ITEMS IN THE DETAILED ESTIMATE. NO SEPARATE PAYMENT WILL BE MADE FOR ANY COSTS INCURRED TO COMPLY WITH THIS REQUIREMENT. 14.THE CONTRACTOR SHALL PROVIDE ANY AND ALL EXCAVATION AND MATERIAL SAMPLES NECESSARY TO CONDUCT REQUIRED SOIL TESTS. ALL ARRANGEMENTS AND SCHEDULING FOR THE TESTING SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 15.SOIL TESTING AND ON-SITE INSPECTION SHALL BE PERFORMED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS REQUIRED TO INSPECT, TEST AND CERTIFY TO THE COMPACTION OF ALL LOAD BEARING FILLS. THE GEOTECHNICAL ENGINEER SHALL PROVIDE COPIES OF TEST REPORTS TO THE CONTRACTOR, THE OWNER AND TO THE OWNER'S REPRESENTATIVE AND SHALL PROMPTLY NOTIFY THE OWNER, HIS REPRESENTATIVE AND THE CONTRACTOR, SHOULD WORK PERFORMED BY THE CONTRACTOR FAIL TO MEET THESE SPECIFICATIONS. 16.ALL PERMITS MUST BE OBTAINED PRIOR TO THE START OF CONSTRUCTION. 17.ALL PAVEMENT MARKINGS, REGULATORY SIGNS, AND STREET NAME SIGNS SHALL CONFORM TO CURRENT MUTCD STANDARDS. 18.ALL DAMAGE TO PUBLIC OR PRIVATE MAINTAINED STREETS DUE TO PROJECT CONSTRUCTION WILL BE REPAIRED AT NO COST TO THE OWNER PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY. 19.A PRE-CONSTRUCTION MEETING WITH THE GOVERNING MUNICIPALITY, ENGINEER, OWNER OR OWNER'S REPRESENTATIVE, CONTRACTOR, AND SUB-CONTRACTORS IS REQUIRED PRIOR TO START OF PROJECT. 20.PRIOR TO ANY WORK IN THE STREET OR RIGHT-OF-WAYS AND PRIOR TO ANY PUBLIC ROAD LANE CLOSURE, THE CONTRACTOR IS REQUIRED TO CONTACT THE GOVERNING MUNICIPALITY (3) DAYS IN ADVANCE. 21.CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATIONS OF ANY SPILL CURB REQUIRED TO PROVIDE POSITIVE DRAINAGE TO STORM STRUCTURES AND PREVENT ANY LOW SPOTS OR "BIRD BATHS" WITHIN THE CURB & GUTTER OR PAVED SECTIONS. 22.NO VISUAL OBSTRUCTIONS SHALL BE WITHIN ANY SIGHT DISTANCE TRIANGLES BETWEEN 2 AND 8 FEET IN HEIGHT ABOVE FINISHED GRADE. 23.ANY VERTICAL DROPS MORE THAN 30" FROM A RETAINING WALL WILL REQUIRE A 42" HIGH SAFETY FENCE ALONG THE TOP OF WALL. 24.THE CONTRACTOR SHALL NOTE THAT EVERY OFFSET, FITTING, TIE-IN POINT, ETC, MAY NOT BE SHOWN ON THE PLANS. CONTRACTOR SHALL USE STANDARD CONSTRUCTION PROCEDURES TO FOLLOW THE PLANS AS CLOSELY AS POSSIBLE AND NOTIFY THE ENGINEER IF DISCREPANCIES ARE FOUND. 25.POSITIVE DRAINAGE SHALL BE PROVIDED AWAY FROM ALL BUILDINGS. 26.THE EARTHWORK ON THIS PLAN DOES NOT NECESSARILY BALANCE; OFFSITE BORROW OR WASTE MAY BE REQUIRED. 27.ALL CONCRETE PIPE SHALL BE REINFORCED CLASS III, UNLESS NOTED OTHERWISE. 28.ALL PIPE TO BE INSTALLED ON-SITE AND IN THE RIGHTS OF WAY SHALL MEET OR EXCEED THE DOT ASTM AND AASHTO SPECIFICATION REQUIREMENTS FOR SUCH PIPE MATERIAL. CONTRACTOR SHALL VERIFY APPROVAL WITH DOT FOR ALL PIPE MATERIALS TO BE USED IN THE RIGHT OF WAY. 29.ROOF DRAIN CONNECTIONS AND INLINE CATCH BASINS IN NON-TRAFFIC BEARING LOCATIONS MAY BE HDPE SYSTEMS SUCH AS "NYLOPLAST" BY ADS OR APPROVED EQUAL (SEE DETAILS FOR USE AS STORM DRAINAGE SYSTEM). 30.ALL ON-SITE PIPE SHALL BE INSTALLED MEETING COVER, BACKFILL AND BEDDING REQUIREMENTS PER DOT OR THE MANUFACTURER'S RECOMMENDATIONS, WHICHEVER IS MOST STRINGENT. 31.DOT PRE-CAST DRAINAGE STRUCTURES / MANHOLES CAN BE USED IN LIEU OF DOT STANDARD BRICK OR CONCRETE CATCH BASINS. ANY DEVIATION FROM THE SPECIFIED STRUCTURES SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION AND SHALL MAINTAIN COMPLIANCE WITH ALL CORRESPONDING DOT MATERIAL, DRAWING & DETAILED SPECIFICATIONS. NO "KNOCK-OUT" OR WAFFLE BOXES SHALL BE USED WITHOUT PERMISSION FROM THE ENGINEER. 32.ADDITIONAL SPECIFICATIONS AND REQUIREMENTS FOR FOOTER AND BUILDING PAD PREPARATION AND COMPACTION MAY EXIST IN ARCHITECTURAL AND STRUCTURAL DRAWINGS AND SHALL BE EXECUTED/IMPLEMENTED AS REQUIRED. WATER AND SEWER SEPARATION NOTES: 1.HORIZONTAL AND VERTICAL SEPARATION: 1.1.SANITARY SEWERS SHALL BE LAID AT LEAST 10-FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 10-FOOT SEPARATION, THE PUBLIC WORKS SUPPLY MAY ALLOW DEVIATION ON A CASE-BY-CASE BASIS, IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. SUCH DEVIATION ON MAY ALLOW THE INSTALLATION OF THE SANITARY SEWER CLOSER TO A WATER MAIN, PROVIDED THAT THE WATER MAIN IS IN A SEPARATE TRENCH OR ON AN UNDISTURBED EARTH SHELF LOCATED ON ONE SIDE OF THE SANITARY SEWER AND AT AN ELEVATION SO THE BOTTOM OF THE WATER MAIN IS AT LEAST 18-INCHES ABOVE THE TOP OF THE SEWER. 1.2.IF IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS DESCRIBED ABOVE OR ANYTIME THE SANITARY SEWER IS OVER THE WATER MAIN, BOTH THE WATER MAIN AND SANITARY SEWER MUST BE CONSTRUCTED OF FERROUS PIPE COMPLYING WITH THE PUBLIC WATER SUPPLY DESIGN STANDARDS AND BE PRESSURE TESTED TO 150PSI TO ASSURE WATER TIGHTNESS BEFORE BACKFILLING. 1.3.A 24-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND SANITARY SEWER LINES OR FERROUS PIPE SPECIFIED. A 12-INCH VERTICAL SEPARATION SHALL BE PROVIDED BETWEEN STORM SEWER AND WATER MAIN. 1.3.1. IF A 12-INCH VERTICAL SEPARATION IS NOT MAINTAINED AT A CROSSING BETWEEN STORM SEWER AND WATER MAINS (OR PRESSURE SEWERS). THE WATER MAIN SHALL BE CONSTRUCTED OF FERROUS PIPE AND A CONCRETE COLLAR SHALL BE POURED AROUND WATER MAINS AND STORM SEWER TO IMMOBILIZE THE CROSSING 2.CROSSINGS: 2.1.SANITARY SEWER CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 18-INCHES BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF THE SANITARY SEWER. THE CROSSING SHALL BE ARRANGED SO THAT THE SANITARY SEWER JOINTS WILL BE EQUIDISTANT AND AS FAR AS POSSIBLE FROM THE WATER MAIN JOINTS. 2.2.WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATION AS STIPULATED ABOVE, ONE OF THE FOLLOWING METHODS MUST BE SPECIFIED: 2.2.1.THE SANITARY SEWER SHALL BE DESIGNED AND CONSTRUCTED OF FERROUS PIPE AND SHALL BE PRESSURE TESTED AT 150-PSI TO ASSURE WATER TIGHTNESS PRIOR TO BACKFILLING, OR 2.2.2.EITHER THE WATER MAIN OR THE SANITARY SEWER LINE MAY BE ENCASED IN A WATERTIGHT CARRIER PIPE, WHICH EXTENDS 10-FEET ON BOTH SIDES OF THE CROSSING, MEASURED PERPENDICULAR TO THE WATER MAIN. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE PUBLIC WATER SUPPLY FOR USE IN WATER MAIN CONSTRUCTION. GENERAL UTILITY NOTES: 1.ALL EXISTING UTILITIES AND SERVICES INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC, ETC. WITHIN THE LIMITS OF DISTURBANCE SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION AT NO COST TO THE OWNER. 2.UTILITY COORDINATION SHALL BE INCLUDED IN THE PROJECT SCHEDULE AND IT IS THE EXPLICIT RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE PROJECT SCHEDULE INCLUDES THE NECESSARY RELOCATIONS. THE CONTRACTOR WILL NOT BE PAID ADDITIONALLY FOR THIS COORDINATION. 3.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATIONS AND DEPTHS OF ALL EXISTING UNDERGROUND UTILITIES AND STRUCTURES BEFORE THE START OF WORK AND TO TAKE WHATEVER STEPS NECESSARY TO PROVIDE FOR THEIR PROTECTION. THE ENGINEER HAS DILIGENTLY ATTEMPTED TO LOCATE AND INDICATE ALL EXISTING FACILITIES ON THESE PLANS; HOWEVER, THIS INFORMATION IS SHOWN FOR THE CONTRACTOR'S CONVENIENCE ONLY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR THE LOCATIONS OF UTILITIES SHOWN OR NOT SHOWN. COMPLETENESS OR ACCURACY OF LOCATION AND DEPTH OF UNDERGROUND UTILITIES AND STRUCTURES IS NOT GUARANTEED. 4.THE CONTRACTOR SHALL CONTACT ALL UTILITY COMPANIES FOR EXACT LOCATION AND PROTECTION OF THEIR UTILITIES PRIOR TO STARTING CONSTRUCTION. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO REPAIR AND REPLACE ANY AND ALL DAMAGE MADE TO UTILITIES BY THE CONTRACTOR. 5.CONTRACTOR MUST APPLY FOR ALL UTILITY CONNECTION APPLICATIONS/PERMITS. CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY CONNECTION FEES FOR CONSTRUCTION. REFER TO COVER SHEET FOR AVAILABLE UTILITY COMPANY LIST. 6.CONTRACTOR MUST OBTAIN ANY REQUIRED UTILITY DETAILS FOR RECONNECTION OF EXISTING SERVICES OR NEW SERVICE AND IS RESPONSIBLE FOR THE CONSTRUCTION OF EACH NEW SERVICE PER THE APPROPRIATE UTILITY COMPANY'S SPECIFICATIONS. 7.THE CONTRACTOR SHALL COORDINATE LOCATION AND INSTALLATION OF ALL UNDERGROUND UTILITIES AND APPURTENANCES TO MINIMIZE DISTURBANCE TO CURBING, PAVING, AND COMPACTED SUB-GRADE. 8.IF CONFLICTS ARE FOUND, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND ENGINEER FOR INSTRUCTION BEFORE PROCEEDING WITH WORK. 9.ALL PIPE LENGTHS AND DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE. 10.THE CONTRACTOR SHALL PROVIDE ANY AND ALL EXCAVATION AND MATERIAL SAMPLES NECESSARY TO CONDUCT REQUIRED SOIL TESTS. ALL ARRANGEMENTS AND SCHEDULING FOR THE TESTING SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 11.SOILS TESTING AND ON-SITE INSPECTION SHALL BE PERFORMED BY AN INDEPENDENT GEOTECHNICAL ENGINEER. THE SOILS ENGINEER SHALL PROVIDE COPIES OF TEST REPORTS TO THE CONTRACTOR, THE OWNER AND THE OWNER'S REPRESENTATIVE AND SHALL PROMPTLY NOTIFY THE OWNER, HIS REPRESENTATIVE AND THE CONTRACTOR SHOULD WORK PERFORMED BY THE CONTRACTOR FAIL TO MEET THESE SPECIFICATIONS. 12.CONTRACTOR SHALL EXCAVATE ONLY ENOUGH TRENCH FOR WHICH PIPE CAN BE INSTALLED AND TRENCH BACKFILLED BY THE END OF EACH WORK DAY. ALL OSHA STANDARDS FOR TRENCH EXCAVATIONS SHALL BE OBSERVED BY ALL PARTIES INVOLVED WITH UTILITY INSTALLATIONS. 13.BEDDING REQUIREMENTS SPECIFIED HEREIN ARE TO BE CONSIDERED AS MINIMUMS FOR RELATIVELY DRY, STABLE EARTH CONDITIONS. ADDITIONAL BEDDING SHALL BE REQUIRED FOR ROCK TRENCHES AND WET AREAS. CONTRACTOR SHALL HAVE THE RESPONSIBILITY TO PROVIDE SUCH ADDITIONAL BEDDING AS MAY BE REQUIRED TO PROPERLY CONSTRUCT THE WORK. 14.COMPACTION OF THE BACKFILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACKFILL MATERIAL SHALL BE FREE FROM VEGETATION, ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS, AND SHALL BE NON-PLASTIC IN NATURE, OR HAVE A TENDENCY TO SHIFT OR FLOW UNCHARACTERISTICALLY WHEN TAMPED. BACKFILL MATERIAL SHALL BE PLACED IN LIFTS NOT TO EXCEED 6 INCHES IN COMPACTED FILL THICKNESS. A REPORT FROM A GEOTECHNICAL ENGINEER MAY BE REQUIRED BY THE PUBLIC WORKS INSPECTOR. CORRECTION OF ANY TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 15.RUNOFF FROM IMPERVIOUS AREAS SHALL NOT BE DIRECTED INTO THE SANITARY SEWER OR ONTO ADJACENT PROPERTIES. 16.ALL JOINTS ON THE STORM WATER CONVEYANCE SYSTEM SHALL BE WATERTIGHT. 17.ALL CONSTRUCTION ASSOCIATED WITH WATER AND SANITARY SEWER SHALL BE IN ACCORDANCE WITH GOVERNING MUNICIPALITY STANDARDS AND SPECIFICATIONS. 18.ALL ELECTRICAL SERVICE LINES TO OR AROUND THE PROPOSED STRUCTURE SHALL BE UNDERGROUND. 19.THE CONTRACTOR SHALL COORDINATE ALL UTILITY CONNECTIONS AND DISTURBANCES WITH EXISTING USERS AND LOCAL MUNICIPALITY SO THAT ANY SERVICE INTERRUPTIONS ARE MINIMAL. 20.CONTRACTOR SHALL KEEP A RECORD PLAN SET SHOWING UTILITY CONSTRUCTION, LOCATIONS, CLEARANCES, ETC, AND PROVIDE A COPY TO THE ENGINEER TO ASSIST WITH PREPARATION OF AS-BUILT DRAWINGS. CONTACT ENGINEER IF EXPLANATION OF WHAT ITEMS ARE REQUIRED IF UNSURE, PRIOR TO BEGINNING CONSTRUCTION. 21.PAVEMENT CUTS FOR UTILITY INSTALLATIONS SHALL BE SAWCUT FOR STRAIGHT, CLEAN EDGES. PATCHES SHALL BE IN ACCORDANCE WITH GOVERNING MUNICIPALITY. 22.CONTRACTOR SHALL COORDINATE INSTALLATIONS OR CONDUITS ON SITE PRIOR TO PREPARING ROADWAY, DRIVE OR PARKING AREA SUBGRADES. 23.WATER SHALL NOT BE ALLOWED TO RISE WITHIN UNFILLED UTILITY TRENCHES AFTER PIPE HAS BEEN INSTALLED. BACKFILL IMMEDIATELY AFTER PIPE INSTALLATION. 24.PIPES IN STORM DRAINAGE STRUCTURES SHALL BE CUT FLUSH TO INSIDE WALLS. INVERTS SHALL BE POURED IN DRY CONDITIONS WITH STRUCTURES BEING PUMPED OUT PRIOR TO INVERTS IF REQUIRED. 25.ALL CASTINGS AND FERROUS MATERIAL PIPING ASSOCIATED WITH WATER, SEWER, AND STORM DRAINAGE SHALL BE DOMESTICALLY CAST. 26.CONTRACTOR SHALL PROVIDE SURVEY AS-BUILTS OF STORM DRAINAGE NETWORKS AND STORMWATER CONTROL MEASURE. STORM DRAINAGE AS-BUILTS MUST BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO BACKFILING, THE STORMWATER CONTROL MEASURE AS-BUILT(S) MUST BE COMPLETED UPON FINAL CONSTRUCTION OF NEW CONVEYANCES AND SUBMITTED FOR THE ENGINEER TO REVIEW AND APPROVE. A SEALED AS-BUILT DRAWING MAY BE REQUIRED FOR STORMWATER CONTROL CERTIFICATION. CONTACT THE ENGINEER TO VERIFY. 27.CONTRACTOR SHALL PROVIDE EASEMENT SURVEYS FOR STORM DRAINAGE SYSTEMS AND STORMWATER CONTROL MEASURES. EASEMENTS SHALL BE PLATTED AND PRESENTED TO THE ENGINEER FOR REVIEW AND APPROVAL. SEE SITE PLAN, GRADING, AND STORM DRAINAGE PLAN SHEETS FOR EASEMENT LOCATIONS. ADA INSTRUCTIONS TO CONTRACTOR: CONTRACTORS MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ADA ACCESSIBLE COMPONENTS AND ACCESS ROUTES FOR THE SITE. THESE COMPONENTS, AS CONSTRUCTED, MUST COMPLY WITH THE CURRENT ADA STANDARDS AND REGULATIONS BARRIER FREE ACCESS AND ANY MODIFICATIONS, REVISIONS OR UPDATES TO SAME. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACE(S), PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, INTER-BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCE/EXIT, MUST COMPLY WITH THESE ADA CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: 1.PARKING SPACES AND PARKING AISLES - SLOPE SHALL NOT EXCEED 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION. 2.CURB RAMPS - SLOPE MUST NOT EXCEED 1:12 (8.3%) FOR A MAXIMUM OF SIX (6) FEET. 3.LANDINGS - MUST BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AND MUST NOT EXCEED 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) IN ANY DIRECTION. 4.PATH OF TRAVEL ALONG ACCESSIBLE ROUTE - MUST PROVIDE A 48-INCH OR GREATER UNOBSTRUCTED WIDTH OF TRAVEL (CAR OVERHANGS AND/OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO GREATER THAN 1:20 (5.0%) IN THE DIRECTION OF TRAVEL, AND MUST NOT EXCEED 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) IN CROSS SLOPE. WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:20 (5.0%), ADA RAMP REGULATIONS MUST BE ADHERED TO. A MAXIMUM SLOPE OF 1:12 (8.3%), FOR A MAXIMUM RISE OF 2.5 FEET, MUST BE PROVIDED. THE RAMP MUST HAVE ADA HAND RAILS AND “LEVEL” LANDINGS ON EACH END THAT ARE CROSS SLOPED NO MORE THAN 1:50 IN ANY DIRECTION (1/4” PER FOOT OR NOMINALLY 2.0%) FOR POSITIVE DRAINAGE. 5.DOORWAYS - MUST HAVE A “LEVEL” LANDING AREA ON THE EXTERIOR SIDE OF THE DOOR THAT IS SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (1/4” PER FOOT OR NOMINALLY 2.0%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO LESS THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY ADA STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI A117.1-2003 AND OTHER REFERENCED INCORPORATED BY COD.) 6.WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ADA COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. PRIOR TO THE COMMENCEMENT OF WORK, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER IN WRITING OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE COMMENCEMENT OF WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS. 7.THE CONTRACTOR MUST VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE IS OBSERVED OR EXISTS, CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER PRIOR TO POURING CONCRETE. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE NON-CONFORMING CONCRETE. 8.THE SITE SHALL BE FULLY COMPLIANT WITH THE NORTH CAROLINA ACCESSIBILITY CODES (ANSI 117.1 -2009 AND CHAPTER 11 OF THE NCBC) UNLESS AND EXCEPT IN AREAS WHERE AN APPROVED STATEMENT FROM A SITE ENGINEER, SURVEYOR OR ARCHITECT VERIFIES THAT SITE CONDITIONS EXIST WHERE THE TOPOGRAPHY OF THE SITE IS EXTREME AND ONLY ALTERNATE METHODS OF COMPLIANCE ARE POSSIBLE. 9.ACCESSIBILITY REQUIREMENTS: THAT PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY, THE APPLICANT SHALL PROVIDE THE MINIMUM REQUIRED ACCESSIBLE PARKING SPACES AND DESIGN ALL ACCESSIBLE PARKING SPACES, RAMPS, AND CROSSWALKS, AND ASSOCIATED INFRASTRUCTURE ACCORDING TO AMERICANS WITH DISABILITIES ACT STANDARDS, NORTH CAROLINA BUILDING CODE, AMERICAN NATIONAL STANDARDS INSTITUTE ANSI CODE, AND TOWN STANDARD.1. PARKING - NUMBER OF SPACES TO COMPLY WITH NCBC 2018 SECTION 1106.1, 1 PER 6 COMPLIANT SPACES OR PORTION THEREOF MUST BE VAN ACCESSIBLE, NO SLOPE TO EXCEED 2 PERCENT IN ANY DIRECTION. SIGNAGE PER NC REQUIREMENTS, MUT-CD AND ICC A 117.1.2. CURB CUTS AND ACCESSIBLE ROUTES PER ICC A117.1 2009 ED. CROSS SLOPE LIMITED TO 2 PERCENT, CALL FOR INSPECTION BEFORE PLACEMENT OF CONCRETE. A SLOPE GREATER THAN 5 PERCENT REQUIRES CONSTRUCTION AS A RAMP. IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCEMENT OF CONSTRUCTION. DEMOLITION NOTES 1.ALL DEMOLITION, TRANSPORT, AND DISPOSAL OF WASTE MATERIALS SHALL BE IN ACCORDANCE WITH ALL APPLICABLE TOWN, COUNTY, STATE AND FEDERAL REGULATIONS. 2.REGULATED MATERIALS SUCH AS ASBESTOS, LEAD, ETC. MAY EXIST ON SITE AND SHALL BE IDENTIFIED AND A PLAN FOR DEMOLITION AND DISPOSAL SHALL BE PRESENTED TO, AND APPROVED BY, THE TOWN/COUNTY AND OWNERS PRIOR TO COMMENCING DEMOLITION ON CORRESPONDING STRUCTURES. 3.THE LOCATIONS OF ALL EXISTING FEATURES SHOWN ON THIS PLAN SET WERE PROVIDED AS PART OF THE SURVEY REFERENCED WITHIN THIS PLAN SET. OTHER UNIDENTIFIED UTILITIES OR SITE FEATURES MAY EXIST AND SPECIAL CARE SHALL BE EXERCISED DURING ANY SUBGRADE WORK OR DEMOLITION TO PREVENT UNINTENDED LOSS OF SERVICE TO SURROUNDING PROPERTIES. 4.CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY PERMITS FOR WORK IN THE DOT RIGHTS-OF-WAY. ANY DAMAGED INFRASTRUCTURE IN THE RIGHTS-OF-WAY CAUSED BY CONSTRUCTION ACTIVITIES MUST BE REPAIRED TO DOT STANDARDS. THIS INCLUDES, BUT IS NOT LIMITED TO UTILITIES, CURB & GUTTER, PAVEMENT, SIGNS AND ROADSIDE SWALES. 5.CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN, IF REQUIRED BY ENCROACHMENT PERMIT TO DOT FOR APPROVAL, PRIOR TO ANY WORK WITHIN THE DOT RIGHTS-OF-WAY. 6.ALL UTILITIES SHOWN TO BE REMOVED, DISPOSED OF, AND/OR ABANDONED SHALL BE DONE PER THE CORRESPONDING SERVICE PROVIDERS GUIDELINES. N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ N O T E S . d w g , C 2 N O T E S , 1 1 / 1 3 / 2 0 2 3 2 : 1 8 : 2 2 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 W W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 10 ' W A T E R E A S E M E N T D B 1 7 3 2 - 1 2 3 9 JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 N. C . H I G H W A Y # 1 3 2 (S O U T H C O L L E G E R O A D ) 20 0 ' P U B L I C R / W S R 1 3 2 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G SCM #1 +/- SF Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION 23-0065_tr.dwg C3A1 inch = ft. GRAPHIC SCALE ( IN FEET ) 20 TR E E R E M O V A L P L A N TREES TO BE REMOVED WITHIN THIS AREA TREES TO BE REMOVED WITHIN THIS AREA TREES TO BE REMOVED WITHIN THIS AREA WATER VALVE LEGEND: EXIST / PROPOSED FIRE HYDRANT WATER METER EXISTING WATER MAIN EXISTING GAS MAIN SANITARY SEWER MANHOLE SEWER CLEAN OUT DROP INLET CURB INLET FLARED END SECTION (FES) EXISTING SEWER MAIN EXISTING STORM PIPE EXISTING OVERHEAD ELECTRIC JUNCTION BOX STORM MANHOLE OPEN THROAT INLET NOTE: ALL TREES INDICATED IN RED ARE TO BE REMOVED AND MITIGATION MEASURES SHALL APPLY BASED ON REQUIREDMENTS FROM NEW HANOVER COUNTY TREE AND LANDSCAPING MANUAL FOUND AT WWW.NHCGOV.COM. N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ T R . d w g , C 3 A T R E E R E M O V A L P L A N , 1 1 / 1 3 / 2 0 2 3 2 : 1 8 : 3 3 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 W W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 10 ' W A T E R E A S E M E N T D B 1 7 3 2 - 1 2 3 9 JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 N. C . H I G H W A Y # 1 3 2 (S O U T H C O L L E G E R O A D ) 20 0 ' P U B L I C R / W S R 1 3 2 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G LD/ S F / T P LD/SF/ T P LD/SF/T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/S F / T P LD/ S F / T P LD/ S F / T P LD/S F / T P LD/S F / T P L D / S F / T P L D / S F / T P L D / S F / T P LD/ S F / T P LD/SF/T P LD/SF/T P LD/SF/T P LD/SF/T P LD/SF/TP LD/ S F / T P LD / S F / T P LD/SF/ T P LD/SF/T P LD/SF/T P LD/SF/T P LD / S F / T P LD/SF / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD / S F / T P LD/SF/TP LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P OHE OHE OHE SS SS LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/ T P LD/SF / T P LD/S F / T P LD/SF/ T P LD/SF / T P LD/S F / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION 23-0065_ec.dwg C4 EROSION CONTROL LEGEND: EXIST / PROPOSED LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR CURB INLET FLARED END SECTION (FES) LIMITS OF DISTURBANCE EXISTING STORM PIPE PROPOSED STORM PIPE TREE PROTECTION FENCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE TP TP NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. ROCK PIPE INLET PROTECTION CATCH BASIN INLET PROTECTION SILT FENCE OUTLET STRAW WATTLE / SILT DIKE DIVERSION DITCH SF SILT FENCESFSF CONSTRUCTION ENTRANCE / EXIT LD LD/TP LD/TP DROP INLET JUNCTION BOX OPEN THROAT INLET LIMITS OF DISTURBANCE & SILT FENCELD/SF LD/SF 98 100 WHERE SILT FENCE AND TREE PROTECTION FENCE COINCIDE, CONSTRUCT ONLY ORANGE SILT FENCE AND ADHERE TO THE SIGNAGE AND DIMENSIONAL REQUIREMENT SHOWN ON TREE PROTECTION DETAIL (SEE EROSION CONTROL DETAIL SHEET). FOR STAKING AND CONSTRUCTING SILT FENCE, USE LOCATION OF "LD/TP" LINE, AS "SF" LINE IS OFFSET ONLY FOR LEGIBILITY -- ACTUAL LOCATION IS AT "LD/TP". CATCH BASIN 1 inch = ft. GRAPHIC SCALE ( IN FEET ) 20 ER O S I O N C O N T R O L P H 1 TREES TO BE REMOVED WITHIN THIS AREA ONSITE DISTURBED AREA 41,803 SF (0.96 AC) OFFSITE DISTURBED AREA 3,085 SF (0.07 AC) TOTAL DISTURBED AREA 44,888 SF (1.03 AC) 10' X 10' CONCRETE WASHOUT PIT (SEE EC DETAIL SHEETS) 50 . 0 0 ' 25'x50' TEMPORARY CONSTRUCTION ENTRANCE (SEE EC DETAIL SHEETS) 25.00' CONSTRUCTION SEQUENCE PHASE I: 1.OBTAIN APPROVED SET OF CONSTRUCTION DRAWINGS. A WATERSHED/STORMWATER PERMIT FROM GREENVILLE COUNTY AND A LAND DISTURBANCE PERMIT ISSUED BY THE SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL (SCDHEC) WILL BE REQUIRED BEFORE THE ONSET OF ANY GRADING ACTIVITY. KEEP A COPY OF BOTH ITEMS ONSITE THROUGHOUT ALL PHASES OF CONSTRUCTION. 2.PRIOR TO INITIATING LAND DISTURBING ACTIVITIES, CONTACT SCDHEC, GREENVILLE COUNTY TO SCHEDULE A PRECONSTRUCTION CONFERENCE. CONTRACTOR SHALL BE RESPONSIBLE FOR NPDES REPORTING THROUGHOUT CONSTRUCTION. SEE SELF-INSPECTION PROGRAM FORM ON SHEET C14. 3.INSTALL TREE PROTECTION FENCING ALONG THE ENTIRE LENGTH OF THE CLEARING / DISTURBANCE LIMITS OF THE PROPOSED SITE AS SHOWN ON THE PLANS. NOTE THAT WHERE SILT FENCE AND TREE PROTECTION FENCE COINCIDE, CONSTRUCT ONLY ORANGE SILT FENCE AND ADHERE TO THE SIGNAGE AND DIMENSIONAL REQUIREMENTS SHOWN ON TREE PROTECTION DETAIL (SEE EC DETAIL SHEET). 4.MAINTAIN CONSTRUCTION ENTRANCE PER THE NOTES ON THIS SHEET AND IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL GUIDELINES. ALL CONSTRUCTION TRAFFIC MUST ENTER AND EXIT THE PROPERTY AT THIS LOCATION. 5.CLEAR ONLY AS NECESSARY TO INSTALL THE EROSION CONTROL DEVICES AS SHOWN ON THIS PLAN. INSTALL SILT FENCING AND SILT FENCE OUTLETS AS SHOWN. PROVIDE SUPPLEMENTAL OUTLETS AS NEEDED IN LOCATIONS WHERE FIELD CONDITIONS INDICATE AREAS WHERE SITE RUNOFF WILL POND. 6.CONVEY SEDIMENT LADEN RUNOFF AND DIRECT FLOW AS NEEDED TO PROMOTE POSITIVE DRAINAGE TO THE SILT FENCE OUTLETS AS SHOWN ON THE PLANS. 7.TEMPORARILY SEED, MULCH, ANCHOR AND STABILIZE ALL EROSION CONTROL DEVICES IMMEDIATELY AFTER CONSTRUCTION. 8.ONCE THIS PHASE I DEMOLITION & EROSION CONTROL CONSTRUCTION HAS BEEN COMPLETED, CONTACT THE SCDHEC EROSION CONTROL INSPECTOR FOR ONSITE INSPECTION AND APPROVAL. ONCE APPROVED, PROCEED TO PHASE II EROSION CONTROL. CONSTRUCTION ENTRANCE NOTES: 1.CONSTRUCTION ENTRANCE SHALL BE 25' MINIMUM WIDTH AND 50' MINIMUM LENGTH AND 6" MINIMUM THICKNESS OF STONE (3"-4") COARSE AGGREGATE WITH GEOTEXTILE UNDERLINER. REFER TO THE LOCAL GOVERNMENT OR STATE FOR ANY ADDITIONAL REQUIREMENTS. 2.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 3"-4" STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY STRUCTURE USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 3.WHEELS MUST BE CLEANED TO REMOVE MUD PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN LOCATED PER THE LOCAL GOVERNMENT OR STATE REQUIREMENTS. 4.MAINTAIN CONSTRUCTION ENTRANCE THROUGHOUT ALL PHASES OF CONSTRUCTION. WHEN SITE IS READY FOR FINAL INSTALLATION OF PAVEMENT SECTION AS NOTED ON THE APPROVED PLANS, CONTACT THE EROSION CONTROL INSPECTOR FOR APPROVAL PRIOR TO REMOVING THE CONSTRUCTION ENTRANCE. LIMITS OF DISTURBANCE / COMBINATION TREE PROTECTION FENCE AND SILT FENCE, (TYP.) SILT FENCE OUTLET, (TYP.) SILT FENCE OUTLET, (TYP.) MA T C H L I N E T H I S S H E E T NEAREST EXISTING SEWER MH MA T C H L I N E T H I S S H E E T N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ E C . d w g , C - 4 E R O S I O N C O N T R O L P H 1 , 1 1 / 1 3 / 2 0 2 3 2 : 2 7 : 1 2 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 W W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 10 ' W A T E R E A S E M E N T D B 1 7 3 2 - 1 2 3 9 JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 N. C . H I G H W A Y # 1 3 2 (S O U T H C O L L E G E R O A D ) 20 0 ' P U B L I C R / W S R 1 3 2 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G SCM #1 +/- SF LD/ S F / T P LD/SF/ T P LD/SF/T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/S F / T P LD/ S F / T P LD/ S F / T P LD/S F / T P LD/S F / T P L D / S F / T P L D / S F / T P L D / S F / T P LD/ S F / T P LD/SF/T P LD/SF/T P LD/SF/T P LD/SF/T P LD/SF/TP LD/ S F / T P LD / S F / T P LD/SF/ T P LD/SF/T P LD/SF/T P LD/SF/T P LD / S F / T P LD/SF / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD / S F / T P LD/SF/TP LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P OHE OHE OHE SS SS LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/ T P LD/SF / T P LD/S F / T P LD/SF/ T P LD/SF / T P LD/S F / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION 23-0065_ec.dwg C5 EROSION CONTROL LEGEND: EXIST / PROPOSED LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR CURB INLET FLARED END SECTION (FES) LIMITS OF DISTURBANCE EXISTING STORM PIPE PROPOSED STORM PIPE TREE PROTECTION FENCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE TP TP NOTE: "WOODS LINE" IS FOR ILLUSTRATIVE PURPOSES ONLY AND CLARITY OF THE PLANS. REFER TO THE "LIMITS OF DISTURBANCE" LINE FOR ACTUAL CLEARING LIMITS. ROCK PIPE INLET PROTECTION CATCH BASIN INLET PROTECTION SILT FENCE OUTLET STRAW WATTLE / SILT DIKE DIVERSION DITCH SF SILT FENCESFSF CONSTRUCTION ENTRANCE / EXIT LD LD/TP LD/TP DROP INLET JUNCTION BOX OPEN THROAT INLET LIMITS OF DISTURBANCE & SILT FENCELD/SF LD/SF 98 100 WHERE SILT FENCE AND TREE PROTECTION FENCE COINCIDE, CONSTRUCT ONLY ORANGE SILT FENCE AND ADHERE TO THE SIGNAGE AND DIMENSIONAL REQUIREMENT SHOWN ON TREE PROTECTION DETAIL (SEE EROSION CONTROL DETAIL SHEET). FOR STAKING AND CONSTRUCTING SILT FENCE, USE LOCATION OF "LD/TP" LINE, AS "SF" LINE IS OFFSET ONLY FOR LEGIBILITY -- ACTUAL LOCATION IS AT "LD/TP". CATCH BASIN 1 inch = ft. GRAPHIC SCALE ( IN FEET ) 20 ER O S I O N C O N T R O L P H 2 ONSITE DISTURBED AREA 41,803 SF (0.96 AC) OFFSITE DISTURBED AREA 3,085 SF (0.07 AC) TOTAL DISTURBED AREA 44,888 SF (1.03 AC) 10' X 10' CONCRETE WASHOUT PIT (SEE EC DETAIL SHEETS) 50 . 0 0 ' 25'x50' TEMPORARY CONSTRUCTION ENTRANCE (SEE EC DETAIL SHEETS) 25.00' CONSTRUCTION SEQUENCE PHASE I: 1.OBTAIN APPROVED SET OF CONSTRUCTION DRAWINGS. A WATERSHED/STORMWATER PERMIT FROM GREENVILLE COUNTY AND A LAND DISTURBANCE PERMIT ISSUED BY THE SOUTH CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL (SCDHEC) WILL BE REQUIRED BEFORE THE ONSET OF ANY GRADING ACTIVITY. KEEP A COPY OF BOTH ITEMS ONSITE THROUGHOUT ALL PHASES OF CONSTRUCTION. 2.PRIOR TO INITIATING LAND DISTURBING ACTIVITIES, CONTACT SCDHEC, GREENVILLE COUNTY TO SCHEDULE A PRECONSTRUCTION CONFERENCE. CONTRACTOR SHALL BE RESPONSIBLE FOR NPDES REPORTING THROUGHOUT CONSTRUCTION. SEE SELF-INSPECTION PROGRAM FORM ON SHEET C14. 3.INSTALL TREE PROTECTION FENCING ALONG THE ENTIRE LENGTH OF THE CLEARING / DISTURBANCE LIMITS OF THE PROPOSED SITE AS SHOWN ON THE PLANS. NOTE THAT WHERE SILT FENCE AND TREE PROTECTION FENCE COINCIDE, CONSTRUCT ONLY ORANGE SILT FENCE AND ADHERE TO THE SIGNAGE AND DIMENSIONAL REQUIREMENTS SHOWN ON TREE PROTECTION DETAIL (SEE EC DETAIL SHEET). 4.MAINTAIN CONSTRUCTION ENTRANCE PER THE NOTES ON THIS SHEET AND IN ACCORDANCE WITH ALL APPLICABLE FEDERAL, STATE AND LOCAL GUIDELINES. ALL CONSTRUCTION TRAFFIC MUST ENTER AND EXIT THE PROPERTY AT THIS LOCATION. 5.CLEAR ONLY AS NECESSARY TO INSTALL THE EROSION CONTROL DEVICES AS SHOWN ON THIS PLAN. INSTALL SILT FENCING AND SILT FENCE OUTLETS AS SHOWN. PROVIDE SUPPLEMENTAL OUTLETS AS NEEDED IN LOCATIONS WHERE FIELD CONDITIONS INDICATE AREAS WHERE SITE RUNOFF WILL POND. 6.CONVEY SEDIMENT LADEN RUNOFF AND DIRECT FLOW AS NEEDED TO PROMOTE POSITIVE DRAINAGE TO THE SILT FENCE OUTLETS AS SHOWN ON THE PLANS. 7.TEMPORARILY SEED, MULCH, ANCHOR AND STABILIZE ALL EROSION CONTROL DEVICES IMMEDIATELY AFTER CONSTRUCTION. 8.ONCE THIS PHASE I DEMOLITION & EROSION CONTROL CONSTRUCTION HAS BEEN COMPLETED, CONTACT THE SCDHEC EROSION CONTROL INSPECTOR FOR ONSITE INSPECTION AND APPROVAL. ONCE APPROVED, PROCEED TO PHASE II EROSION CONTROL. CONSTRUCTION ENTRANCE NOTES: 1.CONSTRUCTION ENTRANCE SHALL BE 25' MINIMUM WIDTH AND 50' MINIMUM LENGTH AND 6" MINIMUM THICKNESS OF STONE (3"-4") COARSE AGGREGATE WITH GEOTEXTILE UNDERLINER. REFER TO THE LOCAL GOVERNMENT OR STATE FOR ANY ADDITIONAL REQUIREMENTS. 2.THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHT-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 3"-4" STONE, AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEAN OUT OF ANY STRUCTURE USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES OR SITE ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 3.WHEELS MUST BE CLEANED TO REMOVE MUD PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN LOCATED PER THE LOCAL GOVERNMENT OR STATE REQUIREMENTS. 4.MAINTAIN CONSTRUCTION ENTRANCE THROUGHOUT ALL PHASES OF CONSTRUCTION. WHEN SITE IS READY FOR FINAL INSTALLATION OF PAVEMENT SECTION AS NOTED ON THE APPROVED PLANS, CONTACT THE EROSION CONTROL INSPECTOR FOR APPROVAL PRIOR TO REMOVING THE CONSTRUCTION ENTRANCE. LIMITS OF DISTURBANCE / COMBINATION TREE PROTECTION FENCE AND SILT FENCE, (TYP.) INLET PROTECTION INLET PROTECTION, (TYP.) PIPE CONNECTION TO BUILDING DOWNSPOUTS, (TYP.) PIPE CONNECTION TO BUILDING DOWNSPOUTS, (TYP.) LIMITS OF DISTURBANCE / COMBINATION TREE PROTECTION FENCE AND SILT FENCE, (TYP.) SILT FENCE OUTLET, (TYP.) SILT FENCE OUTLET, (TYP.) MA T C H L I N E T H I S S H E E T NEAREST EXISTING SEWER MH MA T C H L I N E T H I S S H E E T N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ E C . d w g , C 5 E R O S I O N C O N T R O L P H 2 , 1 1 / 1 3 / 2 0 2 3 2 : 2 7 : 1 5 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 W W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 10 ' W A T E R E A S E M E N T D B 1 7 3 2 - 1 2 3 9 JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 N. C . H I G H W A Y # 1 3 2 (S O U T H C O L L E G E R O A D ) 20 0 ' P U B L I C R / W S R 1 3 2 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G W W W SS SS SS SS SS SS SS SS SS SS SS VA N SCM #1 +/- SF G G G UGE UGE CHRISTIAN BROTHERS AUTOMOTIVE 10-BAY SINGLE STORY BUILDING ± 6,257 SF FFE: 28.6 OHE OHE OHE SS SS LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/ T P LD/SF / T P LD/S F / T P LD/SF/ T P LD/SF / T P LD/S F / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION 23-0065_s.dwg C6 SI T E P L A N - WATER VALVE UTILITIES LEGEND: EXIST / PROPOSED FIRE HYDRANT WATER METER FIRE DEPT. CONNECTION (FDC) AIR RELEASE VALVE (ARV) POST INDICATOR VALVE (PIV) PLUG & BLOCK REDUCER MECHANICAL JOINT / BEND EXISTING WATER MAIN PROPOSED WATER MAIN / SERVICE EXISTING GAS MAIN PROPOSED GAS MAIN SANITARY SEWER MANHOLE SEWER CLEAN OUT DROP INLET CURB INLET FLARED END SECTION (FES) EXISTING SEWER MAIN PROPOSED SEWER MAIN / SERVICE EXISTING STORM PIPE PROPOSED STORM PIPE EXISTING OVERHEAD ELECTRIC PROPOSED UNDERGROUND ELECTRIC SS W G JUNCTION BOX UGE OPEN THROAT INLET CATCH BASIN 1 inch = ft. GRAPHIC SCALE ( IN FEET ) 20 20' BUILDING SETBACK 10' WATER EASEMENT 8' MIN. STREET YARD BUFFER 11 S P A C E S 20' TYPE "A" OPAQUE LANDSCAPE BUFFER 18' MAX. STREET YARD BUFFER EXISTING TREE (TYP) 10' STREET YARD BUFFER 7 S P A C E S 9 S P A C E S 16' TYPE "A" OPAQUE LANDSCAPE BUFFER WITH 6' HIGH WOODEN FENCE (BUFFER PLANTINGS TO BE INSTALLED OUTSIDE OF SWALE) PERMEABLE PAVERS, (TYP.) 2" WATER SERVICE 2" SEWER SERVICE FROM CLEANOUT TO BUILDING DOUBLE SIDED MONUMENT SIGN HEAVY DUTY CONCRETE, (TYP. BOTH SIDES)MA T C H L I N E T H I S S H E E T NEAREST EXISTING SEWER MH MA T C H L I N E T H I S S H E E T PROPERTY INFORMATION: CURRENT OWNER:ARAB SHRINE CLUB HOLDING CORPORATION DEVELOPER:CHRISTIAN BROTHERS AUTOMOTIVE CORPORATION PARCEL ID#:R07114-004-001-000 JURISDICTION:NEW HANOVER COUNTY CITY:WILMINGTON STATE: NORTH CAROLINA ADDRESS:4580 S. COLLEGE ROAD, WILMINGTON, NC 28412 DEED BOOK/PAGE:1116 / 0245 TOTAL AREA:1.34 AC (58,370 SF) LAND USE:EXISTING USE; UNUSED LAND PROPOSED USE; COMMERCIAL - AUTOMOTIVE SHOP ZONING CB - COMMERCIAL BUSINESS DISTRICT ADJACENT ZONING: R-15 RESIDENTIAL DISTRICT (PUBLIC ASSEMBLY AND PLACE OF WORSHIP USE) PARKING REQUIREMENT: REQUIRED: 3/1,000 SF INDOOR OFFICE/WAITING AREA, PLUS 1 PER REPAIR BAY @ 1,150 SF OFFICE/WAITING + 10 BAYS = 12 SPACES TOTAL PROVIDED = 30 SPACES (31 STANDARD, 1 ACCESSIBLE & 1 VAN ACCESSIBLE) REQUIRED STREET YARD LANDSCAPE: 12 SF PER LF OF STREET FRONTAGE @ 706 LF (MINUS DIVEWAY WIDTHS @ 52') = 708 LF 708 X12 = 8,496 SF REQUIRED LANDSCAPING PROVIDED = 8,670 SF SITE INFORMATION HEAVY DUTY CONCRETE SITE PLAN LEGEND: LANDSCAPE BUFFER AREA HEAVY DUTY CONCRETE AREAS PERMEABLE PAVERS HEAVY DUTY ASPHALT PAVING 10'x70' SIGHT TRIANGLE 30 MPH DESIGN SPEED SIGHT TRIANGLE 25 . 0 0 ' 25 . 0 0 ' 3 SPACES 30.12' 30.00' 32.00' 2 0 . 0 0 ' B U I L D I N G S E T B A C K 15' x 335' SIGHT TRIANGLE (BASED ON 30MPH DESIGN SPEED) 15' x 290' SIGHT TRIANGLE (BASED ON 30MPH DESIGN SPEED) 10' x 70' SIGHT TRIANGLE EACH SIDE GRINDER PUMP STATION GAS SERVICE TRANSFORMER DUMPSTER ENCLOSURE STORM SYSTEM, SEE SHEET C7 FOR MORE INFORMATION AC UNIT 6" SEWER SERVICE FROM CLEANOUT TO EXISTING MANHOLE 6' HIGH WOODEN FENCE OR APPROVED EQUAL CONCRETE FLUME, SEE DETAIL FOR ADDDITIONAL INFORMATION STOP BAR 10' STORM MAINTENANCE EASEMENT 10' MAINENANCE EASEMENT 24" CURB AND GUTTER, (TYP.) 24" CURB AND GUTTER, (TYP.) 2" WATER METER BACKFLOW ASSEMBLY BACKFLOW ASSEMBLY 2" WATER METER FOR IRRIGATION SAND / OIL SEPARATOR 9. 0 0 ' 18.50' 9.00' 18 . 5 0 ' 9. 0 0 ' 18.50' N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ S . d w g , C 6 S I T E P L A N , 1 1 / 1 3 / 2 0 2 3 2 : 1 8 : 5 9 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 W W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE 10 ' W A T E R E A S E M E N T D B 1 7 3 2 - 1 2 3 9 JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 N. C . H I G H W A Y # 1 3 2 (S O U T H C O L L E G E R O A D ) 20 0 ' P U B L I C R / W S R 1 3 2 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G W W W SS SS SS SS SS SS SS SS SS SS SS VA N SCM #1 +/- SF 6,908 G G G UGE UGE CHRISTIAN BROTHERS AUTOMOTIVE 10-BAY SINGLE STORY BUILDING ± 6,257 SF FFE: 28.6 LD/ S F / T P LD/SF/ T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/S F / T P LD/S F / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF / T P LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/ T P LD/SF/ T P LD/S F / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/ S F / T P LD/ S F / T P LD/ S F / T P LD/S F / T P LD/S F / T P L D / S F / T P L D / S F / T P L D / S F / T P LD / S F / T P LD/SF/TP LD/SF/TP LD/SF/T P LD/SF/T P LD/SF/T P LD / S F / T P L D / S F / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/T P LD / S F / T P LD/S F / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD / S F / T P LD/SF/TP LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P FG 27.33 FG 27.65 FG 27.57 FG 28.07 FG 29.5 FG 27.33 FG 27.65 FG 27.57 FG 28.07 FG 27.33 FG 27.65 FG 27.57 FG 28.07 FG 27.58 FG 27.58 LP 27.21 LP 27.21 LP 27.24 LP 27.41 HP 28.19 FG 27.78 LP 27.02 LP 27.30 FG 27.58 FG 27.67 FG 27.58 FG 27.58 FG 28.26 FG 28.23 FG 27.58 FG 27.58 FG 27.56 FG 27.60 FG 28.07 FG 27.84 252524 24 26 26 26 26 26 26 26 26 26 26 2 7 27 27 27 27 27 27 27 27 27 28 28 28 29 29 29 20 20 20 20 20 20 25 25 25 25 FG 27.33 FG 27.65 FG 27.57 FG 28.07 FG 29.5 FG 27.33 FG 27.65 FG 27.57 FG 28.07 FG 27.33 FG 27.65 FG 27.57 FG 28.07 FG 27.58 FG 27.58 LP 27.21 LP 27.21 LP 27.24 LP 27.41 HP 28.19 FG 27.78 LP 27.02 LP 27.30 FG 27.58 FG 27.67 FG 27.58 FG 27.58 FG 28.26 FG 28.23 FG 27.58 FG 27.58 FG 27.56 FG 27.60 FG 28.07 FG 27.84 252524 24 26 26 26 26 26 26 26 26 26 26 2 7 27 27 27 27 27 27 27 27 27 28 28 28 29 29 29 20 20 20 20 20 20 25 25 25 25 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION 23-0065_g.dwg C7 GR A D I N G & S T O R M D R A I N A G E P L A N - GRADING & STORM LEGEND: EXIST / PROPOSED LIMITS OF DISTURBANCE & TREE PROTECTION FENCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR LIMITS OF DISTURBANCE EXISTING STORM PIPE PROPOSED STORM PIPE LD TREE PROTECTION FENCE PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR WOODS LINE TP TP LD/TP LD/TP DROP INLET CURB INLET FLARED END SECTION (FES) JUNCTION BOX STORM MANHOLE OPEN THROAT INLET 98 100 1 inch = ft. GRAPHIC SCALE ( IN FEET ) 10 N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ G . d w g , C 7 G R A D I N G & S T O R M D R A I N A G E P L A N , 1 1 / 1 5 / 2 0 2 3 6 : 2 4 : 4 8 A M , D W G T o P D F . p c 3 , 1 : 1 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION ER O S I O N C O N T R O L D E T A I L S D1 23-0065_d.dwg 10' x 10' SQUARE WASHOUT BASIN 24" MIN. NOTES: 1.INSTALL CONCRETE WASHOUT PIT AT LOCATION(S) SHOWN ON PLANS. 2.LINE PIT WITH IMPERVIOUS FABRIC OR POLYETHYLENE SHEET. ANCHOR FABRIC INTO GROUND OUTSIDE PIT AS SHOWN. 3.MAXIMUM WATER AND SEDIMENT DEPTH IS 12". PIT MUST BE EXCAVATED AND RE-LINED WHEN DEPTH OF SEDIMENT REACHES 12" OR COMBINED WATER/SEDIMENT DEPTH EXCEEDS 12" FOLLOWING WASHOUT OF CONCRETE TRUCK. 4.ALLOW WATER TO EVAPORATE COMPLETELY PRIOR TO EXCAVATING PIT. 5.WASHOUT PIT MAY BE LOCATED NO CLOSER THAN 50' TO DRAINS, INLETS, OR SURFACE WATERS. CONCRETE WASHOUT PIT NTS HANDLING OF CONCRETE NOTES: 1.CONCRETE MATERIALS ONSITE, INCLUDING EXCESS CONCRETE MUST BE CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS OR BUFFERS. NO CONCRETE OR CEMENT SLURRY SHALL BE DISCHARGED FROM THE SITE. 2.ALL LIQUID AND SOLID WASTES GENERATED BY CONCRETE WASHOUT OPERATIONS MUST BE CONTAINED IN A LEAK-PROOF CONTAINMENT FACILITY OR IMPERMEABLE LINER. PLASTIC LINING MATERIAL SHOULD BE A MINIMUM OF 10 MIL POLYETHYLENE SHEETING, OR SIMILAR-STRENGTH MATERIAL, AND FREE OF HOLES OR TEARS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. 3.ALL WASHOUT OPERATIONS MUST BE AT LEAST 50 FEET FROM STORM DRAINS OR WATERBODIES UNLESS INDIVIDUAL SITE DIFFICULTIES MAKE THIS REQUIREMENT IMPRACTICAL. A REDUCTION OF THIS DISTANCE REQUIREMENT WILL BE ALLOWED ON A CASE-BY-CASE BASIS IF THE PERMITTING AUTHORITY DETERMINES THAT THE WASHOUT FACILITY WITH A REDUCED BUFFER WILL ADEQUATELY PROTECT THE WATER QUALITY IN ADJACENT STREAMS. 4.WASHOUT OF CONCRETE TRUCKS SHALL BE PERFORMED IN DESIGNATED AREAS ONLY. 5.A SIGN MUST BE INSTALLED ADJACENT TO EACH WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS ABOUT THE REQUIREMENT TO USE THE FACILITY. 6.THE HARDENED RESIDUE FROM THE CONCRETE WASHOUT WILL BE DISPOSED OF IN THE SAME MANNER AS OTHER NON-HAZARDOUS CONSTRUCTION WASTE MATERIALS OR MAY BE BROKEN UP AND USED ON SITE AS DEEMED APPROPRIATE BY THE CONTRACTOR. MAINTENANCE OF THE WASHOUT IS TO INCLUDE REMOVAL OF HARDENED CONCRETE. FACILITY SHALL HAVE SUFFICIENT VOLUME TO CONTAIN ALL THE CONCRETE WASTE RESULTING FROM WASHOUT AND A MINIMUM FREEBOARD OF 12 INCHES. FACILITY SHALL NOT BE FILLED BEYOND 95% CAPACITY AND SHALL BE CLEANED OUT ONCE 75% FULL UNLESS A NEW FACILITY IS CONSTRUCTED. 7.PORTABLE, REMOVABLE CONTAINERS MAY BE USED AS ABOVE GRADE CONCRETE WASHOUTS PROVIDED TRUCK OPERATORS ARE ABLE TO WASH INDIVIDUAL CHUTE SECTIONS OUT OVER THE WASHOUT. 8.IF STORED LIQUIDS HAVE NOT EVAPORATED AND THE WASHOUT IS NEARING CAPACITY, THE LIQUIDS MAY BE VACUUMED AND DISPOSED OF OFF-SITE IN A LEGALLY ACCEPTABLE MANNER OR DISPOSED OF ON-SITE IN A MANNER AND LOCATION THAT IT WILL NOT REACH STREAMS AND OTHER BODIES OF WATER. ON-SITE PITS AND OTHER INFILTRATION DEVICES WILL BE ACCEPTABLE IF THE DEVICE IS DESIGNED TO INFILTRATE THE ANTICIPATED VOLUME OF WATER AND APPROVED PRIOR TO ITS USE BY THE PERMITTING AUTHORITY. STANDARD CATCH BASIN/YARD INLET PROTECTION NTS GALVANIZED HARDWARE WIRE EXTENDS TO TOP OF BOX STANDARD METAL POSTS 2'-0" IN GROUND #57 WASHED STONE PLACED TO A HEIGHT OF 12"-18" MIN. ABOVE TOP OF BOX TEMPORARY GRAVEL CONSTRUCTION ENTRANCE / EXIT NTS 50' M I N 6" MIN 2-3" COARSE AGGREGATE 25' M I N I M U M ADJO I N I N G R O A D W A Y FILTER FABRIC UNDER STONE NOTES: WASHED STONE PAD TO BE 50'L X 25'W X 6"TH MINIMUM (100'L MIN IN URBAN AREAS). IF THE ADJOINING ROADWAY IS WIDER THAN 25', THEN THE WASHED STONE SHALL BE AS WIDE AS THE ADJOINING ROADWAY. TURNING RADIUS OF 20' MINIMUM TO ACCOMMODATE LARGE TRUCKS SHALL BE PROVIDED. ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM USE BY ALL CONSTRUCTION VEHICLES. MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO ADJACENT STREETS. PERIODIC TOP DRESSING WITH STONE (2" THICK) WILL BE NECESSARY. ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED UP IMMEDIATELY. NOTES: APPLICABLE AT ALL POINTS OF INGRESS AND EGRESS UNTIL SITE IS STABILIZED. FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED BY CONTRACTOR. (100 ' U R B A N A R E A S ) AND ON SIDES 20'R MIN MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REPLACE BURLAP EVERY 60 DAYS. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE.TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE ARE TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENC E SEDIMEN T S T O R A G E P I T CENTER. STEEL POSTS. (NO WOOD POSTS) HOOKED ONTO PERFORMED CHANNELS ON 12 GAUGE 4"X4" OR 2"X4" WELDED WIRE W/ METAL CLIPS OR WIRE AT 8" OFF FABRIC OR EQUIVALENT SECURED TO WIRE ULTRAVIOLET RESISTANT (BLACK) MIRIFI FL O W FLOW SHEET DRAINAGE (ONLY) NATURAL GRADE AS DIRECTED BY CONSERVATION INSPECTOR. MAX. SEDIMENT STORAGE LEVEL. REMOVE CARRY 6" OF WIRE INTO TRENCH. CARRY APPROX.12" OF FABRIC INTO TRENCH TRENCH, COVER W/ SOIL & TAMP BACKFILL. STEEL POSTS @ 8' O.C. MAX.. (NO WOOD POSTS) SEDIMENT WHEN THIS LEVEL IS REACHED OR8" 3' - 0 " 2' M I N NOTES: 1.TOTAL DRAINAGE AREA FLOWING TO THE FENCE MAY NOT EXCEED 1 ACRE. 2.SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW (CREEKS, DITCHLINES, SWALES ETC.) 3.TO INCREASE STORAGE CAPACITY AND PROLONG THE LIFE OF THE SILT FENCE, IT IS GENERALLY ADVISABLE TO DIG A SEDIMENT PIT IN FRONT OF YOUR SILT FENCE WHENEVER POSSIBLE. FLOW OF WATER TEMPORARY SILT FENCE NTS RIP-RAP LENGTH EXISTING GRADE FLARED END SECTION 3 1 1 3 MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES AFTER HEAVY RAINS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATLY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. RIP-RAP RIP RAP W/ FLARED END SECTION DETAIL NTS SECTIONPLAN TYPICAL CHANNEL LINER INSTALLATION 12" (30 cm) (15 cm)6" 6"(15 cm) (15 cm)6" 4"(10 cm) 4" 1. 6. 7. 2. 5. 4.8. 3. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET. BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 3" (7.5cm) 2"-5" (5cm-12.5cm) TYPICAL SLOPE BLANKET INSTALLATION 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE 12" (30 cm) (15 cm)6" 6"(15 cm) BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. AMERICAN NORTH GREEN USA 1-800-772-2040 CANADA 1-800-448-2040 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 2.4. 5. 3B. 1. 3A. IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. AMERICAN NORTH GREEN NOTES: 1. TREE PROTECTION FENCING MUST BE IN PLACE PRIOR TO ANY DEMOLITION, LAND DISTURBANCE OR ISSUANCE OF A GRADING PERMIT. 2. WARNING SIGNS IN BOTH ENGLISH AND SPANISH SHALL BE PLACED IN TREE PROTECTION AREAS @ 50'. THE SIGNS SHOULD READ, "TREE PROTECTION AREA/NO TRESPASSING" AND "ZONA PROTECTORA PARA LOS ARBOLES/ PROHIBIDO ENTRA". 3. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 4. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 5. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 6. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 7. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 8. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT 9. ADDITIONAL SIGNS MAY BE REQUIRED BY CITY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 5' MIN 12' MAX 3' M I N 2' M I N ORANGE UV RESISTANT HIGH-TENSILE STRENGTH POLY BARRICADE FABRIC STEEL POSTS PLASTIC OR WIRE TIES TREE PROTECTION FENCE DETAIL NTS SEDIMENT STORAGE AREA F L O W F L O W BERM EX. GRADE EXCAVATION EXISTING GRADE SEDIMENT STORAGE NOTES: 1.PROVIDE MIN. OF 1,800 CF OF SEDIMENT STORAGE VOLUME PER 1 AC. OF DRAINAGE AREA. 2.PROVIDE SEDIMENT STORAGE AT SILT FENCE OUTLETS NOTED ON PLAN AND AS NECESSARY BASED ON FIELD CONDITIONS OR PER EROSION CONTROL INSPECTOR REQUIREMENTS. 3.PROVIDE TEMPORARY DIVERSIONS TO SEDIMENT STORAGE AREAS AS NEEDED AND DIRECT SEDIMENT LADEN RUNOFF TO THE DIVERSIONS AND SILT FENCE OUTLETS THROUGHOUT ALL PHASES OF CONSTRUCTION. MIN. 36" STONE HEIGHT EXCAVATE OR PROVIDE EARTHEND BERM AT SILT FENCE OUTLETS TO PROVIDE 1-FT TO 2-FT OF SEDIMENT STORAGE FLO W SEDIMENT STORAGE AT SILT FENCE NTS SILT FENCE DUAL SILT FENCE OUTLETS BERM A A SECTION A-A SILT FENCE NOTES: 1.AREA CHOSEN FOR STOCKPILING OPERATIONS SHALL BE DRY AND STABLE. 2.MAXIMUM SLOPE OF STOCKPILE SHALL BE 2:1. 3.UPON COMPLETION OF SOIL STOCKPILING, EACH PILE SHALL BE SURROUNDED WITH SILT FENCING, THEN STABILIZED WITH VEGETATION OR COVERED. TEMPORARY TOP SOIL STOCKPILE DETAIL NTS MAX. 2 1 SLOP E SL O P E FILTER BAG DEWATERING FILTER BAG DETAIL NTS PLAN VIEW ELEVATION VIEW FILTER BAG CLAMP PUMP INTAKE HOSE CLAMP DISCHARGE HOSE CLAMP PUMP INTAKE HOSE DISCHARGE HOSE CLAMP ROCK BASE ROCK BASE N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ D . d w g , D - 1 E R O S I O N C O N T R O L D E T A I L S , 1 1 / 1 3 / 2 0 2 3 2 : 1 9 : 1 8 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION ER O S I O N C O N T R O L D E T A I L S D2 23-0065_d.dwg SEEDING MIXTURE SPECIES RATE (LB/ACRE) RYE (GRAIN)120 ANNUAL LESPEDEZA (KOBE IN PIEDMONT AND COASTAL PLAIN, KOREAN IN MOUNTAINS)50 GERMAN MILLET 40 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IN THE PIEDMONT AND MOUNTAINS, A SMALL-STEMMED SUNDAGRASS RYE (GRAIN)120 IS NOT TO EXTEND BEYOND JUNE. MAY BE SUBSTITUED AT A RATE OF 50 LB/ACRE. SEEDING DATES: MOUNTAINS -ABOVE 2500 ft: FEB. 15 - MAY 15 BELOW 2500 ft: FEB. 1 - MAY 1 PIEDMONT - JAN. 1 - MAY 1 COASTAL PLAIN - DEC. 1 - APR. 15 MOUNTAINS - MAY 15 - AUG. 15 PIEDMONT - MAY 1 - AUG. 15 COASTAL PLAIN - APR. 15 - AUG. 15 MOUNTAINS - AUG. 15 - DEC. 15 COASTAL PLAIN AND PIEDMONT - AUG. 15 - DEC. 30 SOIL AMENDMENTS FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LBS/ACRE 10-10-10 FERTILIZER MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. LATE WINTER & EARLY SPRING SUMMER FALL LATE WINTER & EARLY SPRING SUMMER FALL SEEDING MIXTURE SPECIES RATE (LB/ACRE) TALL FESCUE 250 SERICEA LESPEDEZA 20 KOBE LESPEDEZA 10 50 SEEDING NOTES 1.AFTER AUGUST 15 USE UNSCARIFIED SERICEA SEED. 2.WHERE PERIODIC MOWING IS PLANNED OR A NEAR APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE LESPEZEDA TO 40 LB/ACRE. 3.TO EXTEND SPRING SEEDING DATES INTO JUNE, ADD 15LB/ACRE HULLED BERMUDAGRASS. HOWEVER, AFTER MID-APRIL IT IS PREFERABLE TO SEED TEMPORARY COVER. NURSE PLANTS BETWEEN MAY 1 AND AUGUST 15, ADD 10 LB/ACRE GERMAN MILLET OR 15LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUGUST 15 ADD 40 LB/ACRE RYE (GRAIN). SEEDING DATES BEST POSSIBLE FALL:AUGUST 25 - SEPTEMBER 15 AUGUST 20 - OCTOBER 25 LATE WINTER:FUBRUARY 15 - MARCH 21 FEBRUARY 1 - APRIL 15 FALL IS BEST FOR ALL FESCUE AND LATE WINTER FOR LESPEDEZAS. OVER SEEDING OF KOBE LESPEZEDA OVER FALL-SEEDED TALL FESCUE IS VERY EFFECTIVE. SOIL AMENDMENTS APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY 4,000 LB/ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB/ACRE 10-10-10 FERTILIZER. MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. MAY BE MOWED ONCE OR TWICE A YEAR, BUT MOWING IS NOT NECESSARY. RESEED, FERTILIZE AND MULCH DAMAGED AREAS IMMEDIATELY. PERMANENT SEEDING OF SLOPES TEMPORARY SEEDING OF SLOPES BERM/DITCH 18 " MI N 24" MIN 18" MIN DEPTH DITCH FLOW COMPACTED FILL 18" MIN DEPTH BERM FLOW SLOPE 2:1 MAX 24" MIN FLO W 1.DIVERSIONS SHOULD BE LOCATED TO MINIMIZE DAMAGES BY CONSTRUCTION OPERATIONS. 2.DIVERSIONS SHOULD BE SEEDED AND MULCHED IF THEY ARE TO REMAIN IN PLACE OVER 30 DAYS. 3.CHECK DEVICE AFTER EACH RAIN, BUT ONCE A WEEK REGARDLESS REPAIR AS NECESSARY. NATURAL GROUND OR FILL / CUT SLOPES NOTES: POSITIVE GRADE MUST BE PROVIDED TO ASSURE DRAINAGE. MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY MEASURABLE RAIN EVENT. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED.WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND AREA WITH NATURAL GROUND LEVEL AND STABILIZE APPROPRIATELY. ALL DITCHES SHALL BE SUFFICIENT TO DIRECT ALL SEDIMENT-LADEN STORMWATER INTO A SEDIMENT CONTROL DEVICE. MUST BE INSTALLED PRIOR TO CLEARING AND GRUBBING OF THE AREA (OR IN CONJUNCTION WITH THIS OPERATION IF SEDIMENT CONTROLS AND DIVERSIONS ARE INSTALLED AS EACH CRITICAL POINT IS REACHED). TEMPORARY DIVERSION BERM / DITCH NTS NATURAL GROUND OR FILL / CUT SLOPES NATURAL GROUND OR FILL / CUT SLOPES PLACE EXCAVATED SOILS ON LOW SIDE TO CONSTRUCT BERM NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1.E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: (a)This General Permit as well as the Certificate of Coverage, after it is received. (b)Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1.Occurrences that Must be Reported Permittees shall report the following occurrences: (a)Visible sediment deposition in a stream or wetland. (b)Oil spills if: ·They are 25 gallons or more, ·They are less than 25 gallons but cannot be cleaned up within 24 hours, ·They cause sheen on surface waters (regardless of volume), or ·They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d)Anticipated bypasses and unanticipated bypasses. (e)Noncompliance with the conditions of this permit that may endanger health or the environment. 2.Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a)The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur. The non-surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b)The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c)Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d)Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e)Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f)Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A A BELOW GRADE WASHOUT STRUCTURE 1:1SIDE SLOPE(TYP.) 10 MILPLASTICLINING 3'-0 " MIN . & X ' MA X . SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURENOT TO SCALE PLAN SECTION B-B HIGHCOHESIVE &LOW FILTRATIONSOIL BERM 8" 6" 2' HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE(TYP.) 10 MILPLASTIC LINING B B 3'-0 " MIN . & X ' MA X . A SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.) OR STAPLES NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BEMAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURESSHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THESTRUCTURES CAPACITY TO PROVIDEADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGENOTING DEVICE. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETEWASHOUT CONCRETE WASHOUT PLAN CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) SILT FENCE 10 'MIN 10'MIN SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasing land disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed MAINTENANCE: NEW SEEDLINGS SHOULD BE INSPECTED FREQUENTLY AND MAINTENANCE PERFORMED AS NEEDED. IF RILLS ANG GULLIES DEVELOP, THEY MUST BE FILLED, RE-SEEDED, AND MULCHED AS SOON AS POSSIBLE. DIVERSIONS MAY BE NEEDED UNTIL NEW PLANTS TAKE HOLD. DAMAGE TO VEGETATION FROM DISEASE, INSECTS, TRAFFIC, ETC., CAN OCCUR AT ANY TIME.HERBICIDES AND REGULAR MOWING MAY BE NEEDED TO CONTROL WEEDS. DUST AND SPRAYS MAY BE NEEDED TO CONTROL INSECTS. WEEK OR DAMAGED SPOTS MUST BE RELIMED, FERTILIZED, MULCHED, AND RESEEDED AS PROMPTLY AS POSSIBLE. 1.TILL ALL AREAS THAT ARE TO BE SEEDED TO A 6" DEPTH. REMOVE ALL LOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 2.APPLY AGRICULTURAL LIME & FERTILIZER. UNIFORMLY MIX WITH SOIL (SEE NOTE BELOW*). 3.SEED FRESHLY PREPARED SEEDBED SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK . 4.MULCH IMMEDIATELY AFTER SEEDING. 5.INSPECT ALL SEEDED AREAS AND PERFORM NECESSARY RESEEDING WITHIN THE SAME PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 6.CONTINUE MAINTENANCE AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. * APPLY: AGRICULTURAL LIMESTONE - 2 TONS/ ACRES (3 TONS/ ACRE IN CLAY SOILS) FERTILIZER - 1,000 lbs. / ACRE -10-10-10 SUPERPHOSPHATE- 500 lbs> / ACRE -20% ANALYSIS MLCH -2 TONS / ACRE (5000 LBS/AC FOR STEEP SLOPES) - SMALL GRAIN STRAW ANOTHER - ASPHALT EMULSION @ 300 GALS./ ACRE CRITICAL POINTS A. OVERLAPS AND SEAMS B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE SLOPE VERTICES * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL POINTS ALONG THE CHANNEL SURFACE. A A B C B C WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS. USE 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 USA 1-800-772-2040 CANADA 1-800-448-2040 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED. A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. NOTE: BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. www.nagreen.com 1. 6. 7. 2. 5. 4.8. 3. AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE PREVIOUSLY INSTALLED BLANKET. BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. USA 1-800-772-2040 CANADA 1-800-448-2040 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 www.nagreen.com 2.4. 5. 3B. 1. 3A. IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ D . d w g , D 2 E R O S I O N C O N T R O L D E T A I L S , 1 1 / 1 3 / 2 0 2 3 2 : 1 9 : 2 3 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION ER O S I O N C O N T R O L D E T A I L S D3 23-0065_d.dwg NOTE: OTHER SKIMMERS SUCH AS "MARLEE FLOAT" SKIMMER AND IAS (INNOVATIVE APPLIED SOLUTIONS) SKIMMER ARE AVAILABLE AND APPROVED FOR USE BY SUMMIT DESIGN. IF THESE OR OTHER SKIMMERS ARE PROVEN TO BE MORE ECONOMICAL FOR THIS PROJECT, CONTRACTOR SHALL COORDINATE WITH TOWN/CITY/COUNTY/STATE EROSION CONTROL FOR THEIR APPROVAL AND PROVIDE SUMMIT WITH MANUFACTURERS PRODUCT SHEET STATING THAT IT IS APPROPRIATELY SIZED TO MEET TO MEET THE SPECIFICATIONS OF THE SKIMMER SPECIFIED ON PLANS. NOTE: CONTRACTOR TO INSTALL TWO POINTS OF RESTRAINT BY TETHER TO SKIMMER DEVICE TO ENSURE DEVICE REMAINS PROPERLY LOCATED IN BASIN. SKIMMER TETHER (2) TYP. CONTRACTOR TO STAKE TETHER RESTRAINTS SECURELY TO ENSURE SKIMMER DEVICE REMAINS PROPERLY LOCATED. TETHER TO BE A MINIMUM OF 1/4 INCH POLYPROPYLENE BRAIDED ROPE SKIMMER TETHER N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ D . d w g , D 3 E R O S I O N C O N T R O L D E T A I L S , 1 1 / 1 3 / 2 0 2 3 2 : 1 9 : 2 8 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION SI T E D E T A I L S D4 23-0065_d.dwg NOTE: PAVEMENT SPECS PER GEOTECH REPORT (DATED 10-21-2020 BY MULA DESIGN, LLC) HEAVY-DUTY ASPHALT PAVEMENT (TRAVEL LANES) STANDARD DUTY CONCRETE PAVEMENT (APRON AT SERVICE BAYS) 2.0" TYPE-1 SURFACE* 6.0" CABC*** STANDARD DUTY ASPHALT PAVEMENT (PARKING SPACES) COMPACTED SUBGRADE 1.5" TYPE-1 BINDER** 8.0" CABC*** COMPACTED SUBGRADE 1.5" TYPE-1 SURFACE* 5.0" (MIN.) 4000 PSI CONCRETE 12.0" CABC*** COMPACTED SUBGRADE HEAVY-DUTY CONCRETE PAVEMENT (DUMPSTER PAD AND APRON) 7.0" (MIN.) 4000 PSI CONCRETE 12.0" CABC*** COMPACTED SUBGRADE *TYPE I-C ASPHALT CEMENT SURFACE COURSE – SECTION 403, PAGE 302 OF SCDOT STANDARD SPECIFICATIONS. **ASPHALT CEMENT BINDER COURSE WILL COMPLY WITH SCDOT STANDARD SPECIFICATIONS. ***AGGREGATE BASE COURSE WILL BE CRUSHED AND GRADED LIMESTONE MEETING SCDOT SPECIFICATIONS. 16.17' 28' A PLAN A REFER TO GEOTECH REPORT BY MULA DESIGN, LLC DATED OCTOBER 21, 2020, AND OWNERS SPECIFICATIONS 1/8" TO 1/4" 1/2" 5" JOINT SEALER 1/8" RAD (TYP) JOINT FILLER 4" GRAVEL SURFACE OF CONC. NOTES: · A CONSTRUCTION JOINT 1" DEEP W/ 1/8" RADIUS SHALL BE REQUIRED IN THE CONC. SIDEWALK AT 5' INTERVALS OR AS CALLED OUT ON PLANS. ONE 1/2" EXPANSION JOINT WILL BE REQUIRED AT 50' INTERVALS. A 1/2" EXPANSION JOINT WILL BE REQUIRED WHERE THE SIDEWALK JOINS ANY RIGID STRUCTURE. · FINISHED SURFACE OF SIDEWALK TO BE BROOM FINISHED, PERPENDICULAR TO TRAFFIC FLOW. MN. 3,000 PSI CLASS "A" CONCRETE BOTTOM 76" MAXIMUM $250 PENALTY G.S. 20-37.6 PARKING RESERVED WHITE BACKGROUND ACCESSIBLE VAN R7-8E 12" MAXIMUM $250 PENALTY G.S. 20-37.6 PARKING RESERVED 26" ARROW IS GREEN WHITE BACKGROUND 3/8" CORNER RADIUS 1 1/2" (TYPICAL) VAN ACCESSIBLE LETTERS, BORDER AND NUMBERS ARE GREEN ALL TEXT & LINES ARE GREEN WHITE SYMBOL ON BLUE FIELD OF SIGN 7. 0 ' (TYPICAL) 6" LC 6.5' 2.5'R LOCATE AT EDGE OF PARKING SPACE UNLESS ACCOMPANIED BY "VAN" LETTERING 3/8" PAINT OSHA YELLOW 2'-6" 6" 2'-0" 4'-0" 6" DIA. GALVANIZED SCHEDULE 40 STEEL PIPE FILLED WITH CONCRETE ROUND CONCRETE TOP OF PIPE SMOOTH PAINT CONCRETE BLACK AFTER CURING AT ASPHALT LOCATIONS FINISHED GRADE WHERE GUARDPOST OCCURS ABOVE FOOTING, START PIPE AT TOP OF FOOTING ENCASE IN CONCRETE (TYPICAL) 6"1'-6" 2' MIN. 3,000 PSI CLASS "A" CONCRETE 3" 1' 3" RAD CONTROL JOINTS SHALL BE PLACED AT 10' INTERVALS EXPANSION JOINTS SHALL BE PLACED AT 30' INTERVALS COMPACTED SUBGRADE AGGREGATE BASE COURSE 7"6" 6" 1/2" RAD 1/8" RAD 5" SPILL 12" 3" CLEAR 1 4 MIN. JOINT CONSTRUCTION 4 - #5 CONT #4 @ 2' O/C 8" M I N . STONE BASEMIN 8" 16" BINDER COURSE SURFACE COURSE CA R R Y B E L O W L O C A L FR O S T D E P T H 24 " M I N I M U M 5" 4,000 PSI AIR ENTRAINED CONCRETE 9" 6'-0" 2-#3 REBARS 2" #6 @ 2'-6" LONG SEAL HOLE W/ MORTAR 9" 2" 1/4"1/4" 5" 2" 3" 6" 6" 2-1"Ø H O L E S 4-1 / 2 " SECTION 2-7/8" 2-1/8" STOP R1-130" 10" 10" 10" 30" 0.75" 5" 12.5"12.5"STOP 1'-6" 5' MIN. (7' MIN. WHEN ADJACENT TO SIDEWALK) MUTCD R1-1 30" X 30" GALVANIZED STEEL CHANNEL (TYP.) FINISHED GRADE WHITE (RETROREFLECTIVE) BACKGROUND RED (RETROREFLECTIVE) BACKGROUND NOTES: 1.INSTALL QUANTITY AND AT LOCATIONS REQUIRED BY CODE AND/OR AS INDICATED ON SITE PLAN. 2.ALL SIGNS SHOWN SHALL CONFORM TO N.C. MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. 3.ALL SIGNS SHOWN SHALL BE REFLECTORIZED TO SHOW THE SAME COLOR BY NIGHT AS BY DAY. 4.ALL SIGNS SHALL BE SECURELY MOUNTED ON GALVANIZED STEEL CHANNEL POSTS. 5.ALL STOP SIGNS TO BE LOCATED WHERE THEY WILL NOT IMPACT PEDESTRIAN WALKWAYS. REFER TO SITE PLAN. 12 . 6 6 ' NOTES: 1. COMPACT SUBGRADE BENEATH FOOTINGS PER SPECIFICATIONS. 2. REFER TO ARCHITECTURAL DETAIL SHEET FOR WALL HEIGHT. 3. SEE ARCHITECTURAL AND STRUCTURAL PLANS FOR ALL MATERIAL & FOOTING DETAILS. 10 . 6 7 ' 14 . 6 7 ' BOLLARDS (2) (SEE DETAIL THIS SHEET) SEE ARCHITECTURAL EXTERIOR DETAILS SHEET FOR GATE, DUMPSTER ENCLOSURE ELEVATIONS AND MATERIAL DETAILS. HEAVY DUTY CONCRETE PAVEMENT (SEE TYP. SECTION THIS SHEET) 14 . 6 7 ' 1. 0 0 ' EXISTING ASPHALT PAVEMENT EXISTING CABC (CRUSHED AGGREGATE BASE COURSE) JOIN NEW BASE TO EXISTING BASE NEW BASE AS SPECIFIED IN PAVEMENT SECTION NEW ASPHALT PAVEMENT WITH MIN. 2' OVERLAP ACROSS JOINT OF NEW & OLD BASE REMOVE ASPHALT & LEAVE BASE AS LONG AS MIN. 2" OF NEW ASPHALT CAN BE PROVIDEDMAKE CLEAN, VERTICAL CUT 2' BEYOND EDGE OF PROPOSED PAVEMENT SECTION WEDGE ASPHALT AS NEEDED AT 2' OVERLAP TO PROVIDE UNIFORM FINISHED SURFACE WITH POSITIVE DRAINAGE EXTEND COMPACTED SUBGRADE FOR NEW PAVEMENT EXISTING COMPACTED SUBGRADE 7.0" (MIN.) 4000 PSI CONCRETE 12.0" CABC*** COMPACTED SUBGRADE SECTION A-A CONCRETE CURB & GUTTER B A A B 6" 6" 7" 6" 7" SECTION B-B SECTION A-A 3'-0" PLAN EXTEND RIPRAP 6" BEYOND CURB 6" NOSE DOWN CURB @ 1:1 RIP RAP PLUNGE POOL (SEE DETAIL SHEET D-6) SIZE PER PLANS 3'-0"3'-0" (TYP.) SEE PLAN FOR ACTUAL RADII RADIUS TO MATCH ADJACENT CURB 2' 12.00' 31.30' 19.30' 24" CURB 24" C&G 2'-0" 6" 4" 7 1 2 " ASPHALT PAVING (SEE SITE DETAILS) UNCOMPACTED SUBGRADE 30 MIL HDPE GEOMEMBRANCE LINER (AS REQUESTER) 6" PERFORATED SCH 40 PVC PIPE (PERFORATIONS ANGLED DOWN) SUBGRADE TO SLOPE AT 0.5% MIN TO UNDERDRAIN 8" MIN THICK AGGREGATE SUB BASE NO. 2 WASHED STONE 4" MIN THICK AGGREGATE BASE NO 57 WASHED STONE 2" THICK BEDDING LAYER NO. 8 WASHED STONE PERMEABLE INTERLOCKING PAVERS CONCRETE EDGE RESTRAINT (FLUSH WITH TOP OF PAVERS AND ASPHALT) 3 18" NOTE: 1.IN SOIL GROUP B, C, AND D, THE SURFACE OF THE SUBGRADE SHALL BE SCARIFIED, RIPPED OR TRENCHED IMMEDIATELY PRIOR TO AGGREGATE SUBBASE PLACEMENT IN ORDER TO MAINTAIN PRE-CONSTRUCTION INFILTRATION RATES. 2.GEOTECHNICAL ENGINEER TO DETERMINE IF A GEOMEMBRANE LINER IS REQUIRED, THE LINER SHALL BE INSTALL IN ACCORDANCE WITH ASTM 6497. 3.OPEN VOID FILL MEDIA SHALL BE NO. 8, NO 9, OR 89 WASHED STONE. 4.ALL AGGREGATE SIZED ACCORDING TO ASTM C136. STANDARD 24" OR 36" CURB & GUTTER (SEE SITE PLAN AND DETAILS) N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ D . d w g , D 4 S I T E D E T A I L S , 1 1 / 1 3 / 2 0 2 3 2 : 5 2 : 4 2 P M , D W G T o P D F . p c 3 , 1 : 1 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION CF P U A W A T E R D E T A I L S D5 23-0065_d.dwg N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ D . d w g , D 5 C F P U A W A T E R D E T A I L S , 1 1 / 1 3 / 2 0 2 3 2 : 1 9 : 3 9 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 Know what's below. before you dig.Call R BY DA T E RE V I S I O N S 132456 PROJECT NO. SHEET NO. DR A W I N G A L T E R A T I O N IT I S A V I O L A T I O N O F L A W F O R A N Y P E R S O N , UN L E S S A C T I N G U N D E R T H E D I R E C T I O N O F LI C E N S E D A R C H I T E C T , P R O F E S S I O N A L EN G I N E E R , L A N D S C A P E A R C H I T E C T , O R LA N D S U R V E Y O R T O A L T E R A N Y I T E M O N TH I S D O C U M E N T I N A N Y W A Y . A N Y L I C E N S E E WH O A L T E R S T H I S D O C U M E N T I S R E Q U I R E D BY L A W T O A F F I X H I S O R H E R S E A L A N D T H E NO T A T I O N " A L T E R E D B Y " F O L L O W E D B Y H I S OR H E R S I G N A T U R E A N D S P E C I F I C DE S C R I P T I O N O F T H E A L T E R A T I O N S . PR O J E C T E N G I N E E R / A R C H I T E C T PR O J E C T M A N A G E R DR A W N B Y 7 DRAWING NAME: CO P Y R I G H T 2 0 2 3 SU M M I T D E S I G N A N D EN G I N E E R I N G S E R V I C E S C GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) GT ( G R E G . T H O M P S O N @ S U M M I T D E . C O M ) 23-0065 CH R I S T I A N B R O T H E R S A U T O M O T I V E WI L M I N G T O N , N C 45 8 0 S . C O L L E G E R D . SI T E S U B M I S S I O N P L A N S FI R S T I S S U E D A T E JA ( J I M . A S H L E Y @ S U M M I T D E . C O M ) 11 - 1 5 - 2 0 2 3 NOT FOR CONSTRUCTION ST O R M D E T A I L S D6 23-0065_d.dwg N: \ 2 0 2 3 \ 2 3 - 0 0 6 5 . 0 1 0 2 0 0 - 0 4 C B A W i l m i n g t o n \ C i v i l \ C u r r e n t D r a w i n g s \ 2 3 - 0 0 6 5 _ D . d w g , D 6 S T O R M D E T A I L S , 1 1 / 1 3 / 2 0 2 3 2 : 1 9 : 4 9 P M , _ A u t o C A D P D F ( G e n e r a l D o c u m e n t a t i o n ) . p c 3 , 1 : 1 W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 N. C . H I G H W A Y # 1 3 2 (S O U T H C O L L E G E R O A D ) 20 0 ' P U B L I C R / W S R 1 3 2 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G W W W SS SS SS SS SS SS SS SS SS SS SS VA N G G G UGE UGE LD/ S F / T P LD/SF/T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/S F / T P LD/S F / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/SF / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/ T P LD/SF/ T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/ S F / T P LD/ S F / T P LD/S F / T P LD/S F / T P L D / S F / T P L D / S F / T P L D / S F / T P LD/ S F / T P LD/SF/T P LD/SF/TP LD/SF/T P LD/SF/T P LD/SF/T P LD / S F / T P L D / S F / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD / S F / T P LD/S F / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD / S F / T P LD/SF/TP LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P IV 29 MC 43 IL 25 IN 40 BUFFER SHRUBS BUFFER SHRUBS BUFFER SHRUBS BUFFER SHRUBS IL-2 35BUFFER SHRUBS IV-2 35BUFFER SHRUBS OVERHEAD LINES WATER LINE GAS LINE PC 7 BUFFER TREES PT 14 BUFFER SHRUBS QF 10 PARKING LOT TREES IVN 68PARKING LOT SCREENING SHRUBS IVN 35 FOUNDATION PLANTING VI 5 FOUNDATION PLANTING FG 21 FOUNDATION PLANTING CA 17 FOUNDATION PLANTING VI 3 FOUNDATION PLANTING FG 10 FOUNDATION PLANTING IVN 3 FOUNDATION PLANTING CA 12 FOUNDATION PLANTING MG 1SITE TREE EXISTING TREE TO REMAIN, TYP. IV 39BUFFER SHRUBS IL 34BUFFER SHRUBS IN 13BUFFER SHRUBS MC 10BUFFER SHRUBS AR 2 SITE TREES NOTE: THE STORMWATER POND IS STILL IN DESIGN. A PLANTING PLAN FOR THE WET POND WILL BE PROVIDED WHEN THE DESIGN IS FINALIZED. STEEL EDGING BETWEEN TURF AND SHRUBS (TYP.) MULCHES STEEL EDGING AND MULCH AREA, 3' DIA., AROUND TREES IN TURF (TYP.) AFTER ALL PLANTING IS COMPLETE, CONTRACTOR SHALL INSTALL 3" THICK LAYER OF 1-1/2" SHREDDED WOOD MULCH, NATURAL (UNDYED), OVER LANDSCAPE FABRIC IN ALL PLANTING AREAS (EXCEPT FOR TURF AND SEEDED AREAS). CONTRACTOR SHALL SUBMIT SAMPLES OF ALL MULCHES TO LANDSCAPE ARCHITECT AND OWNER FOR APPROVAL PRIOR TO CONSTRUCTION. ABSOLUTELY NO EXPOSED GROUND SHALL BE LEFT SHOWING ANYWHERE ON THE PROJECT AFTER MULCH HAS BEEN INSTALLED (SUBJECT TO THE CONDITIONS AND REQUIREMENTS OF THE "GENERAL GRADING AND PLANTING NOTES" AND SPECIFICATIONS). GENERAL GRADING AND PLANTING NOTES 1.BY SUBMITTING A PROPOSAL FOR THE LANDSCAPE PLANTING SCOPE OF WORK, THE CONTRACTOR CONFIRMS THAT HE HAS READ, AND WILL COMPLY WITH, THE ASSOCIATED NOTES, SPECIFICATIONS, AND DETAILS WITH THIS PROJECT. 2.THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVING ALL EXISTING VEGETATION (EXCEPT WHERE NOTED TO REMAIN). 3.IN THE CONTEXT OF THESE PLANS, NOTES, AND SPECIFICATIONS, "FINISH GRADE" REFERS TO THE FINAL ELEVATION OF THE SOIL SURFACE (NOT TOP OF MULCH) AS INDICATED ON THE GRADING PLANS. a.BEFORE STARTING WORK, THE LANDSCAPE CONTRACTOR SHALL VERIFY THAT THE ROUGH GRADES OF ALL LANDSCAPE AREAS ARE WITHIN +/-0.1' OF FINISH GRADE. SEE SPECIFICATIONS FOR MORE DETAILED INSTRUCTION ON TURF AREA AND PLANTING BED PREPARATION. b.CONSTRUCT AND MAINTAIN FINISH GRADES AS SHOWN ON GRADING PLANS, AND CONSTRUCT AND MAINTAIN SLOPES AS RECOMMENDED BY THE GEOTECHNICAL REPORT. ALL LANDSCAPE AREAS SHALL HAVE POSITIVE DRAINAGE AWAY FROM STRUCTURES AT THE MINIMUM SLOPE SPECIFIED IN THE REPORT AND ON THE GRADING PLANS, AND AREAS OF POTENTIAL PONDING SHALL BE REGRADED TO BLEND IN WITH THE SURROUNDING GRADES AND ELIMINATE PONDING POTENTIAL. c.THE LANDSCAPE CONTRACTOR SHALL DETERMINE WHETHER OR NOT THE EXPORT OF ANY SOIL WILL BE NEEDED, TAKING INTO ACCOUNT THE ROUGH GRADE PROVIDED, THE AMOUNT OF SOIL AMENDMENTS TO BE ADDED (BASED ON A SOIL TEST, PER SPECIFICATIONS), AND THE FINISH GRADES TO BE ESTABLISHED. d.ENSURE THAT THE FINISH GRADE IN SHRUB AREAS IMMEDIATELY ADJACENT TO WALKS AND OTHER WALKING SURFACES, AFTER INSTALLING SOIL AMENDMENTS, IS 3" BELOW THE ADJACENT FINISH SURFACE, IN ORDER TO ALLOW FOR PROPER MULCH DEPTH. TAPER THE SOIL SURFACE TO MEET FINISH GRADE, AS SPECIFIED ON THE GRADING PLANS, AT APPROXIMATELY 18" AWAY FROM THE WALKS. e.ENSURE THAT THE FINISH GRADE IN TURF AREAS IMMEDIATELY ADJACENT TO WALKS AND OTHER WALKING SURFACES, AFTER INSTALLING SOIL AMENDMENTS, IS 1" BELOW THE FINISH SURFACE OF THE WALKS. TAPER THE SOIL SURFACE TO MEET FINISH GRADE, AS SPECIFIED ON THE GRADING PLANS, AT APPROXIMATELY 18" AWAY FROM THE WALKS. f.SHOULD ANY CONFLICTS AND/OR DISCREPANCIES ARISE BETWEEN THE GRADING PLANS, GEOTECHNICAL REPORT, THESE NOTES AND PLANS, AND ACTUAL CONDITIONS, THE CONTRACTOR SHALL IMMEDIATELY BRING SUCH ITEMS TO THE ATTENTION OF THE LANDSCAPE ARCHITECT, GENERAL CONTRACTOR, AND OWNER. 4.ALL PLANT LOCATIONS ARE DIAGRAMMATIC. ACTUAL LOCATIONS SHALL BE VERIFIED WITH THE LANDSCAPE ARCHITECT OR DESIGNER PRIOR TO PLANTING. THE LANDSCAPE CONTRACTOR SHALL ENSURE THAT ALL REQUIREMENTS OF THE PERMITTING AUTHORITY ARE MET (I.E., MINIMUM PLANT QUANTITIES, PLANTING METHODS, TREE PROTECTION METHODS, ETC.). a.THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR DETERMINING PLANT QUANTITIES; PLANT QUANTITIES SHOWN ON LEGENDS AND CALLOUTS ARE FOR GENERAL INFORMATION ONLY. IN THE EVENT OF A DISCREPANCY BETWEEN THE PLAN AND THE PLANT LEGEND, THE PLANT QUANTITY AS SHOWN ON THE PLAN (FOR INDIVIDUAL SYMBOLS) OR CALLOUT (FOR GROUNDCOVER PATTERNS) SHALL TAKE PRECEDENCE. b.NO SUBSTITUTIONS OF PLANT MATERIALS SHALL BE ALLOWED WITHOUT THE WRITTEN PERMISSION OF THE LANDSCAPE ARCHITECT. IF SOME OF THE PLANTS ARE NOT AVAILABLE, THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT IN WRITING (VIA PROPER CHANNELS). c.THE CONTRACTOR SHALL, AT A MINIMUM, PROVIDE REPRESENTATIVE PHOTOS OF ALL PLANTS PROPOSED FOR THE PROJECT. THE CONTRACTOR SHALL ALLOW THE LANDSCAPE ARCHITECT AND THE OWNER/OWNER'S REPRESENTATIVE TO INSPECT, AND APPROVE OR REJECT, ALL PLANTS DELIVERED TO THE JOBSITE. REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS FOR SUBMITTALS. 5.THE CONTRACTOR SHALL MAINTAIN THE LANDSCAPE IN A HEALTHY CONDITION FOR 90 DAYS AFTER ACCEPTANCE BY THE OWNER. REFER TO SPECIFICATIONS FOR CONDITIONS OF ACCEPTANCE FOR THE START OF THE MAINTENANCE PERIOD, AND FOR FINAL ACCEPTANCE AT THE END OF THE MAINTENANCE PERIOD. 6.SEE SPECIFICATIONS AND DETAILS FOR FURTHER REQUIREMENTS. LANDSCAPE CALCULATIONS ZONING:(CZD) COMMUNITY BUSINESS, CB ADJACENT ZONING TO SOUTH:R-15 TOTAL DISTURBED AREA:57,107 SF (1.31 ACRES) TOTAL TREES REQUIRED:20 TREES (15 PER ACRE OF DISTURBED AREA) TREES PROVIDED:20 TREES MITIGATION TREES REQUIRED:NO MITIGATION TREE PLANTING REQUIRED (SEE SHEET TD-1 FOR CALCULATIONS) SOUTH BUFFER (WEST PORTION), TYPE A OPAQUE OPTION 1 LENGTH OF PROPERTY LINE:307 LF VEGETATION:6' MIN. HT.; 100% OPACITY WITHIN ONE YEAR, MIN. 3 ROWS OF PLANTED MATERIALS NOTE: WE HAVE SHOWN BREAKS IN THE SHRUBS TO ALLOW SPACE FOR EXISTING TREES. IF IN THE FIELD IT PROVES THAT THE EXISTING VEGETATION CAN CONTRIBUTE TO 100% OPACITY, THE CONTRACTOR IS TO MODIFY THE LAYOUT OF THE SHRUBS TO ALLOW EXISTING UNDERSTORY PLANTING TO REMAIN. SOUTH BUFFER EAST PORTION), TYPE A OPAQUE OPTION 3 LENGTH OF PROPERTY LINE:176 LF VEGETATION:3' MIN. HT., 50% OPACITY AT PLANTING, FENCE:SOLID STREET BUFFER YARD, JASMINE COVE WAY, VEGETATIVE 3, 18 WIDE TAPERING TO 10' WIDE LENGTH OF PROPERTY LINE:499 LF (NOT INCLUDING WIDTH OF ACCESS DRIVE) 50% OPACITY WITHIN 1 YEAR, 3 ROWS: SHRUBS REQUIRED:PROVIDED NOTE: THE AGREEMENT TO CONDITIONS STATES THAT THIS BUFFER SHOULD BE VEGETATIVE3, BUT WE WERE UNABLE TO IDENTIFY A BUFFER TYPE BY THAT NAME IN THE ORDINANCE. THE REQUIREMENTS SHOWN ARE DRAWN FROM THE TYPE B, OPTION 1 BUFFER TYPE. STREET BUFFER YARD, COLLEGE ROAD LENGTH OF PROPERTY LINE:231 LF BUFFER AREA REQUIRED:4,158 SF (18 SF PER LF) UNDERSTORY TREES REQUIRED:7 UNDERSTORY TREES (3 PER 600 SF) UNDERSTORY TREES PROVIDED:7 UNDERSTORY TREES SHRUBS REQUIRED:14 SHRUBS (6 PER 600 SF, 12" HT. MIN.) SHRUBS PROVIDED:14 SHRUBS SCREENING OF DUMPSTER ENCLOSURE REQUIRED, AT LEAST 8' HT.:WALL PROVIDED PARKING LOT LANDSCAPING VEHICULAR USE AREA (VUA):17,887 SF LANDSCAPE AREA REQUIRED:1,431 SF (8% OF VUA) LANDSCAPE AREA PROVIDED:1,771 SF NO PKG SPACE MORE THAN 120' FROM AN ISLAND:PROVIDED TREES REQUIRED IN PARKING AREAS:10 TREES (1 PER 144 SF OF REQUIRED LANDSCAPE AREA WITH MIN. 1 PER ISLAND) TREES PROVIDED IN PARKING AREAS:10 TREES PARKING LOT SCREENING ALONG COLLEGE RD. LENGTH OF FRONTAGE:231 LF SHRUBS REQUIRED, MIN. 3' HT.:PROVIDED FOUNDATION LANDSCAPING LENGTH OF BUILDING FACADE ALONG VUA:334 LF LANDSCAPE AREA REQUIRED:40 LF (12% OF LENGTH OF BUILDING FACADE ALONG VUA) Scale 1" = 20' 10'40'20'0' NOTE: PRINTED DRAWING SIZE MAY HAVE CHANGED FROM ORIGINAL. VERIFY SCALE USING BAR SCALE ABOVE. NORTH PLANT SCHEDULE SYMBOL KEY QTY BOTANICAL NAME COMMON NAME SIZE SPACING NOTES TREES AR 2 ACER RUBRUM 'FRANKSRED'RED SUNSET MAPLE MIN. 3" CAL. & 10' HT.PER PLAN MG 1 MAGNOLIA GRANDIFLORA SOUTHERN MAGNOLIA MIN. 2" CAL.PER PLAN PC 7 PRUNUS CAROLINIANA CAROLINA CHERRY LAUREL MIN. 2" CAL.PER PLAN QF 10 QUERCUS FALCATA SOUTHERN RED OAK MIN. 2" CAL.PER PLAN SHRUBS CA 29 CLETHRA ALNIFOLIA 'RUBY SPICE'RUBY SPICE SWEET PEPPERBUSH MIN. 12" HT.3' O.C. FG 31 FOTHERGILLA GARDENII DWARF FOTHERGILLA MIN. 12" HT.3' O.C. IL 59 ILLICIUM ANISATUM JAPANESE ANISE-TREE MIN. 6' HT.5' O.C. IL-2 35 ILLICIUM ANISATUM JAPANESE ANISE-TREE MIN. 3' HT.5' O.C. IN 53 ILEX X 'NELLIE R. STEVENS'NELLIE R STEVENS HOLLY MIN. 6' HT.6' O.C. IV 68 ILEX VOMITORIA YAUPON HOLLY MIN. 6' HT.5' O.C.BRANCHED TO GROUND IV-2 35 ILEX VOMITORIA YAUPON HOLLY MIN. 3' HT.5' O.C.BRANCHED TO GROUND IVN 108 ILEX VOMITORIA 'NANA'DWARF YAUPON HOLLY MIN. 3' HT.3' O.C. MC 53 MYRICA CERIFERA SOUTHERN WAX MYRTLE MIN. 6' HT.5' O.C. PT 14 PITTOSPORUM TOBIRA JAPANESE PITTOSPORUM MIN. 12" HT.PER PLAN VI 8 VIBURNUM DENTATUM ARROWWOOD MIN 12" HT.6' O.C. GROUNDCOVER 17,607 SF SOD: TIFWAY 419 BERMUDA GRASS SOD LP-1 LANDSCAPE PLANTING PLAN LC/RM LC 11/15/2023Date Drawn By Checked By Project Number 45 8 0 S . C o l l e g e R o a d Wi l m i n g t o n , N C Ch r i s t i a n B r o t h e r s A u t o m o t i v e 11/13/2023 Date Comment Pr o j e c t N a m e (800) 680-6630 4509 Creedmoor Rd., Ste 201 Raleigh, NC 27612 www.EvergreenDesignGroup.com of north carolina, pllc EVERGREEN D E S I G N G R O U P X N O R T H CARO L I N A X L I S A J . C U T S H A WRE G I S T ERED L A N DSCAP E A R CHITECT LP-2 LANDSCAPE SPECIFICATIONS &DETAILS IRRIGATION CONCEPT 1.AN AUTOMATIC IRRIGATION SYSTEM SHALL BE INSTALLED AND OPERATIONAL BY THE TIME OF FINAL INSPECTION. THE ENTIRE IRRIGATION SYSTEM SHALL BE INSTALLED BY A LICENSED AND QUALIFIED IRRIGATION CONTRACTOR. 2.THE IRRIGATION SYSTEM WILL OPERATE ON POTABLE WATER, AND THE SYSTEM WILL HAVE APPROPRIATE BACKFLOW PREVENTION DEVICES INSTALLED TO PREVENT CONTAMINATION OF THE POTABLE SOURCE. 3.ALL NON-TURF PLANTED AREAS SHALL BE DRIP IRRIGATED. SODDED AND SEEDED AREAS SHALL BE IRRIGATED WITH SPRAY OR ROTOR HEADS AT 100% HEAD-TO-HEAD COVERAGE. 4.ALL PLANTS SHARING SIMILAR HYDROZONE CHARACTERISTICS SHALL BE PLACED ON A VALVE DEDICATED TO PROVIDE THE NECESSARY WATER REQUIREMENTS SPECIFIC TO THAT HYDROZONE. 5.THE IRRIGATION SYSTEM SHALL BE DESIGNED AND INSTALLED, TO THE MAXIMUM EXTENT POSSIBLE, TO CONSERVE WATER BY USING THE FOLLOWING DEVICES AND SYSTEMS: MATCHED PRECIPITATION RATE TECHNOLOGY ON ROTOR AND SPRAY HEADS (WHEREVER POSSIBLE), RAIN SENSORS, AND MULTI-PROGRAM COMPUTERIZED IRRIGATION CONTROLLERS FEATURING SENSORY INPUT CAPABILITIES. THE CONTRACTOR SHALL INSTALL ROOT BARRIERS NEAR ALL NEWLY-PLANTED TREES THAT ARE LOCATED WITHIN FIVE (5) FEET OF PAVING OR CURBS. ROOT BARRIERS SHALL BE "CENTURY" OR "DEEP-ROOT" 24" DEEP PANELS (OR EQUAL). BARRIERS SHALL BE LOCATED IMMEDIATELY ADJACENT TO HARDSCAPE. INSTALL PANELS PER MANUFACTURER'S RECOMMENDATIONS. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR USE ROOT BARRIERS OF A TYPE THAT COMPLETELY ENCIRCLE THE ROOTBALL. ROOT BARRIERS PLANT SPACING SCALE: NTSC 4 X 2X 3 2 1 5 6 7 4 1 2 3 SHRUB, PERENNIAL, OR ORNAMENTAL GRASS. MULCH, TYPE AND DEPTH PER PLANS. PLACE NO MORE THAN 1" OF MULCH WITHIN 6" OF PLANT CENTER. FINISH GRADE. BACKFILL. AMEND AND FERTILIZE ONLY AS RECOMMENDED IN SOIL FERTILITY ANALYSIS. ROOT BALL. UNDISTURBED NATIVE SOIL. 3" HIGH EARTHEN WATERING BASIN. 5 6 7 SHRUB AND PERENNIAL PLANTING SCALE: NTSB 8 WEED FABRIC UNDER MULCH. 8 PLANTING SPECIFICATIONS FINISH GRADE.4 4 3 2 1 NOTES: 1)INSTALL EDGING SO THAT STAKES WILL BE ON INSIDE OF PLANTING BED. 2)BOTTOM OF EDGING SHALL BE BURIED A MINIMUM OF 1" BELOW FINISH GRADE. 3)TOP OF MULCH SHALL BE 1" LOWER THAN TOP OF EDGING. MULCH, TYPE AND DEPTH PER PLANS.3 TAPERED STEEL STAKES.2 ROLLED-TOP STEEL EDGING PER PLANS.1 D SCALE: NOT TO SCALE STEEL EDGING TURF (WHERE SHOWN ON PLAN).4 PLANT.3 MULCH LAYER.2 CURB.1 1 432 OF MATURE CANOPY 24" MIN. TO EDGE DISTANCE PER PLAN E SCALE: NOT TO SCALE PLANTING AT PARKING AREA TREE PLANTING SCALE: NOT TO SCALEA PLANT CENTER (TYP.) EQ U A L E Q U A L EQ U A L EDGE OF PLANTING AREA EQUAL NOTE: ALL PLANTS SHALL BE PLANTED AT EQUAL TRIANGULAR SPACING (EXCEPT WHERE SHOWN ON PLANS AS INFORMAL GROUPINGS). REFER TO PLANT LEGEND FOR SPACING DISTANCE BETWEEN PLANTS. 1) STEP 1: DETERMINE TOTAL PLANTS FOR THE AREA WITH THE FOLLOWING FORMULA: TOTAL AREA / AREA DIVIDER = TOTAL PLANTS PLANT SPACING AREA DIVIDER PLANT SPACING AREA DIVIDER 6"0.22 18"1.95 8"0.39 24"3.46 10"0.60 30"5.41 12"0.87 36"7.79 15"1.35 2) STEP 2: SUBTRACT THE ROW (S) OF PLANTS THAT WOULD OCCUR AT THE EDGE OF THE PLANTED AREA WITH THE FOLLOWING FORMULA: TOTAL PERIMETER LENGTH / PLANT SPACING = TOTAL PLANT SUBTRACTION EXAMPLE: PLANTS AT 18" O.C. IN 100 SF PLANTING AREA, 40 LF PERIMETER STEP 1: 100 SF/1.95 = 51 PLANTS STEP 2: 51 PLANTS - (40 LF / 1.95 = 21 PLANTS) = 30 PLANTS TOTAL 5 6 7 4 1 8 9 11 10 12 PREVAILING WINDS NOTES: 1.SCARIFY SIDES OF PLANTING PIT PRIOR TO SETTING TREE. 2.REMOVE EXCESS SOIL APPLIED ON TOP OF THE ROOTBALL THAT COVERS THE ROOT FLARE. THE PLANTING HOLE DEPTH SHALL BE SUCH THAT THE ROOTBALL RESTS ON UNDISTURBED SOIL, AND THE ROOT FLARE IS 2"-4" ABOVE FINISH GRADE. 3.FOR B&B TREES, CUT OFF BOTTOM 1/3 OF WIRE BASKET BEFORE PLACING TREE IN HOLE, CUT OFF AND REMOVE REMAINDER OF BASKET AFTER TREE IS SET IN HOLE, REMOVE ALL NYLON TIES, TWINE, ROPE, AND OTHER PACKING MATERIAL. REMOVE AS MUCH BURLAP FROM AROUND ROOTBALL AS IS PRACTICAL. 4.REMOVE ALL NURSERY STAKES AFTER PLANTING. 5.FOR TREES 36" BOX/2.5" CAL. AND LARGER, USE THREE STAKES OR DEADMEN (AS APPROPRIATE), SPACED EVENLY AROUND TREE. 6.STAKING SHALL BE TIGHT ENOUGH TO PREVENT TRUNK FROM BENDING, BUT LOOSE ENOUGH TO ALLOW SOME TRUNK MOVEMENT IN WIND. 1 2 3 TREE CANOPY. CINCH-TIES (24" BOX/2" CAL. TREES AND SMALLER) OR 12 GAUGE GALVANIZED WIRE WITH NYLON TREE STRAPS AT TREE AND STAKE (36" BOX/2.5" CAL. TREES AND LARGER). SECURE TIES OR STRAPS TO TRUNK JUST ABOVE LOWEST MAJOR BRANCHES. GREEN STEEL T-POSTS. EXTEND POSTS 12" MIN. INTO UNDISTURBED SOIL. 24" X 3/4" P.V.C. MARKERS OVER WIRES. PRESSURE-TREATED WOOD DEADMAN, TWO PER TREE (MIN.). BURY OUTSIDE OF PLANTING PIT AND 18" MIN. INTO UNDISTURBED SOIL. MULCH, TYPE AND DEPTH PER PLANS. DO NOT PLACE MULCH WITHIN 6" OF TRUNK. FINISH GRADE. BACKFILL. AMEND AND FERTILIZE ONLY AS RECOMMENDED IN SOIL FERTILITY ANALYSIS. ROOT BALL. UNDISTURBED NATIVE SOIL. 4" HIGH EARTHEN WATERING BASIN. TRUNK FLARE. CONIFEROUS TREE PREVAILING WINDS STAKING EXAMPLES (PLAN VIEW) 2 4 6 7 8 9 10 11 1 4 3X ROOTBALL DIA. 5 2 3 5 12 NON-CONIFEROUS TREE 13 13 FINISH GRADE. ROOT BARRIER - PLAN VIEW SCALE: NOT TO SCALEF GENERAL A.QUALIFICATIONS OF LANDSCAPE CONTRACTOR 1.ALL LANDSCAPE WORK SHOWN ON THESE PLANS SHALL BE PERFORMED BY A SINGLE FIRM SPECIALIZING IN LANDSCAPE PLANTING. 2.A LIST OF SUCCESSFULLY COMPLETED PROJECTS OF THIS TYPE, SIZE AND NATURE MAY BE REQUESTED BY THE OWNER FOR FURTHER QUALIFICATION MEASURES. 3.THE LANDSCAPE CONTRACTOR SHALL HOLD A VALID CONTRACTOR'S LICENSE ISSUED BY THE APPROPRIATE LOCAL JURISDICTION. B.SCOPE OF WORK 1.WORK COVERED BY THESE SECTIONS INCLUDES THE FURNISHING AND PAYMENT OF ALL MATERIALS, LABOR, SERVICES, EQUIPMENT, LICENSES, TAXES AND ANY OTHER ITEMS THAT ARE NECESSARY FOR THE EXECUTION, INSTALLATION AND COMPLETION OF ALL WORK, SPECIFIED HEREIN AND / OR SHOWN ON THE LANDSCAPE PLANS, NOTES, AND DETAILS. 2.ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LAWS, CODES AND REGULATIONS REQUIRED BY AUTHORITIES HAVING JURISDICTION OVER SUCH WORK, INCLUDING ALL INSPECTIONS AND PERMITS REQUIRED BY FEDERAL, STATE AND LOCAL AUTHORITIES IN SUPPLY, TRANSPORTATION AND INSTALLATION OF MATERIALS. 3.THE LANDSCAPE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND UTILITY LINES (WATER, SEWER, ELECTRICAL, TELEPHONE, GAS, CABLE, TELEVISION, ETC.) PRIOR TO THE START OF ANY WORK. PRODUCTS A.ALL MANUFACTURED PRODUCTS SHALL BE NEW. B.CONTAINER AND BALLED-AND-BURLAPPED PLANTS: 1.FURNISH NURSERY-GROWN PLANTS COMPLYING WITH ANSI Z60.1-2014. PROVIDE WELL-SHAPED, FULLY BRANCHED, HEALTHY, VIGOROUS STOCK FREE OF DISEASE, INSECTS, EGGS, LARVAE, AND DEFECTS SUCH AS KNOTS, SUN SCALD, INJURIES, ABRASIONS, AND DISFIGUREMENT. ALL PLANTS WITHIN A SPECIES SHALL HAVE SIMILAR SIZE, AND SHALL BE OF A FORM TYPICAL FOR THE SPECIES. ALL TREES SHALL BE OBTAINED FROM SOURCES WITHIN 200 MILES OF THE PROJECT SITE, AND WITH SIMILAR CLIMACTIC CONDITIONS. 2.ROOT SYSTEMS SHALL BE HEALTHY, DENSELY BRANCHED ROOT SYSTEMS, NON-POT-BOUND, FREE FROM ENCIRCLING AND/OR GIRDLING ROOTS, AND FREE FROM ANY OTHER ROOT DEFECTS (SUCH AS J-SHAPED ROOTS). 3.TREES MAY BE PLANTED FROM CONTAINERS OR BALLED-AND-BURLAPPED (B&B), UNLESS SPECIFIED ON THE PLANTING LEGEND. BARE-ROOT TREES ARE NOT ACCEPTABLE. 4.ANY PLANT DEEMED UNACCEPTABLE BY THE LANDSCAPE ARCHITECT OR OWNER SHALL BE IMMEDIATELY REMOVED FROM THE SITE AND SHALL BE REPLACED WITH AN ACCEPTBLE PLANT OF LIKE TYPE AND SIZE AT THE CONTRACTOR'S OWN EXPENSE. ANY PLANTS APPEARING TO BE UNHEALTHY, EVEN IF DETERMINED TO STILL BE ALIVE, SHALL NOT BE ACCEPTED. THE LANDSCAPE ARCHITECT AND OWNER SHALL BE THE SOLE JUDGES AS TO THE ACCEPTABILITY OF PLANT MATERIAL. 5.ALL TREES SHALL BE STANDARD IN FORM, UNLESS OTHERWISE SPECIFIED. TREES WITH CENTRAL LEADERS WILL NOT BE ACCEPTED IF LEADER IS DAMAGED OR REMOVED. PRUNE ALL DAMAGED TWIGS AFTER PLANTING. 6.CALIPER MEASUREMENTS FOR STANDARD (SINGLE TRUNK) TREES SHALL BE AS FOLLOWS: SIX INCHES ABOVE THE ROOT FLARE FOR TREES UP TO AND INCLUDING FOUR INCHES IN CALIPER, AND TWELVE INCHES ABOVE THE ROOT FLARE FOR TREES EXCEEDING FOUR INCHES IN CALIPER. 7.MULTI-TRUNK TREES SHALL BE MEASURED BY THEIR OVERALL HEIGHT, MEASURED FROM THE TOP OF THE ROOT BALL. WHERE CALIPER MEASUREMENTS ARE USED, THE CALIPER SHALL BE CALCULATED AS ONE-HALF OF THE SUM OF THE CALIPER OF THE THREE LARGEST TRUNKS. 8.ANY TREE OR SHRUB SHOWN TO HAVE EXCESS SOIL PLACED ON TOP OF THE ROOT BALL, SO THAT THE ROOT FLARE HAS BEEN COMPLETELY COVERED, SHALL BE REJECTED. C.SOD: PROVIDE WELL-ROOTED SOD OF THE VARIETY NOTED ON THE PLANS. SOD SHALL BE CUT FROM HEALTHY, MATURE TURF WITH SOIL THICKNESS OF 3/4" TO 1". EACH PALLET OF SOD SHALL BE ACCOMPANIED BY A CERTIFICATE FROM SUPPLIER STATING THE COMPOSITION OF THE SOD. D.TOPSOIL: SANDY TO CLAY LOAM TOPSOIL, FREE OF STONES LARGER THAN ½ INCH, FOREIGN MATTER, PLANTS, ROOTS, AND SEEDS. E.COMPOST: WELL-COMPOSTED, STABLE, AND WEED-FREE ORGANIC MATTER, pH RANGE OF 5.5 TO 8; MOISTURE CONTENT 35 TO 55 PERCENT BY WEIGHT; 100 PERCENT PASSING THROUGH 3/4-INCH SIEVE; SOLUBLE SALT CONTENT OF 5 TO 10 DECISIEMENS/M; NOT EXCEEDING 0.5 PERCENT INERT CONTAMINANTS AND FREE OF SUBSTANCES TOXIC TO PLANTINGS. NO MANURE OR ANIMAL-BASED PRODUCTS SHALL BE USED. F.FERTILIZER: GRANULAR FERTILIZER CONSISTING OF NITROGEN, PHOSPHORUS, POTASSIUM, AND OTHER NUTRIENTS IN PROPORTIONS, AMOUNTS, AND RELEASE RATES RECOMMENDED IN A SOIL REPORT FROM A QUALIFIED SOIL-TESTING AGENCY (SEE BELOW). G.MULCH: SIZE AND TYPE AS INDICATED ON PLANS, FREE FROM DELETERIOUS MATERIALS AND SUITABLE AS A TOP DRESSING OF TREES AND SHRUBS. H.TREE STAKING AND GUYING 1.STAKES: 6' LONG GREEN METAL T-POSTS. 2.GUY AND TIE WIRE: ASTM A 641, CLASS 1, GALVANIZED-STEEL WIRE, 2-STRAND, TWISTED, 0.106 INCH DIAMETER. 3.STRAP CHAFING GUARD: REINFORCED NYLON OR CANVAS AT LEAST 1-1/2 INCH WIDE, WITH GROMMETS TO PROTECT TREE TRUNKS FROM DAMAGE. I.STEEL EDGING: PROFESSIONAL STEEL EDGING, 14 GAUGE THICK X 4 INCHES WIDE, FACTORY PAINTED DARK GREEN. ACCEPTABLE MANUFACTURERS INCLUDE COL-MET OR APPROVED EQUAL. J.PRE-EMERGENT HERBICIDES: ANY GRANULAR, NON-STAINING PRE-EMERGENT HERBICIDE THAT IS LABELED FOR THE SPECIFIC ORNAMENTALS OR TURF ON WHICH IT WILL BE UTILIZED. PRE-EMERGENT HERBICIDES SHALL BE APPLIED PER THE MANUFACTURER'S LABELED RATES. METHODS A.SOIL PREPARATION 1.BEFORE STARTING WORK, THE LANDSCAPE CONTRACTOR SHALL VERIFY THAT THE GRADE OF ALL LANDSCAPE AREAS ARE WITHIN +/-0.1' OF FINISH GRADE. THE CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY SHOULD ANY DISCREPANCIES EXIST. 2.SOIL TESTING: a.AFTER FINISH GRADES HAVE BEEN ESTABLISHED, CONTRACTOR SHALL HAVE SOIL SAMPLES FROM THE PROJECT'S LANDSCAPE AREAS TESTED BY AN ESTABLISHED SOIL TESTING LABORATORY. EACH SAMPLE SUBMITTED TO THE LAB SHALL CONTAIN NO LESS THAN ONE QUART OF SOIL, TAKEN FROM BETWEEN THE SOIL SURFACE AND 6" DEPTH. IF NO SAMPLE LOCATIONS ARE INDICATED ON THE PLANS, THE CONTRACTOR SHALL TAKE A MINIMUM OF THREE SAMPLES FROM VARIOUS REPRESENTATIVE LOCATIONS FOR TESTING. b.THE CONTRACTOR SHALL HAVE THE SOIL TESTING LABORATORY PROVIDE RESULTS FOR THE FOLLOWING: SOIL TEXTURAL CLASS, GENERAL SOIL FERTILITY, pH, ORGANIC MATTER CONTENT, SALT (CEC), LIME, SODIUM ADSORPTION RATIO (SAR) AND BORON CONTENT. c.THE CONTRACTOR SHALL ALSO SUBMIT THE PROJECT'S PLANT LIST TO THE LABORATORY ALONG WITH THE SOIL SAMPLES. d.THE SOIL REPORT PRODUCED BY THE LABORATORY SHALL CONTAIN RECOMMENDATIONS FOR THE FOLLOWING (AS APPROPRIATE): SEPARATE SOIL PREPARATION AND BACKFILL MIX RECOMMENDATIONS FOR GENERAL ORNAMENTAL PLANTS, XERIC PLANTS, TURF, AND NATIVE SEED, AS WELL AS PRE-PLANT FERTILIZER APPLICATIONS AND RECOMMENDATIONS FOR ANY OTHER SOIL RELATED ISSUES. THE REPORT SHALL ALSO PROVIDE A FERTILIZER PROGRAM FOR THE ESTABLISHMENT PERIOD AND FOR LONG-TERM MAINTENANCE. 3.THE CONTRACTOR SHALL INSTALL SOIL AMENDMENTS AND FERTILIZERS PER THE SOILS REPORT RECOMMENDATIONS. ANY CHANGE IN COST DUE TO THE SOIL REPORT RECOMMENDATIONS, EITHER INCREASE OR DECREASE, SHALL BE SUBMITTED TO THE OWNER WITH THE REPORT. 4.FOR BIDDING PURPOSES ONLY, THE SOIL PREPARATION SHALL CONSIST OF THE FOLLOWING: a.TURF: INCORPORATE THE FOLLOWING AMENDMENTS INTO THE TOP 8" OF SOIL BY MEANS OF ROTOTILLING AFTER CROSS-RIPPING: i.NITROGEN STABILIZED ORGANIC AMENDMENT - 4 CU. YDS. PER 1,000 S.F. ii.PREPLANT TURF FERTILIZER (10-20-10 OR SIMILAR, SLOW RELEASE, ORGANIC) - 15 LBS PER 1,000 S.F. iii."CLAY BUSTER" OR EQUAL - USE MANUFACTURER'S RECOMMENDED RATE b.TREES, SHRUBS, AND PERENNIALS: INCORPORATE THE FOLLOWING AMENDMENTS INTO THE TOP 8" OF SOIL BY MEANS OF ROTOTILLING AFTER CROSS-RIPPING: i.NITROGEN STABILIZED ORGANIC AMENDMENT - 4 CU. YDS. PER 1,000 S.F. ii.12-12-12 FERTILIZER (OR SIMILAR, ORGANIC, SLOW RELEASE) - 10 LBS. PER CU. YD. iii."CLAY BUSTER" OR EQUAL - USE MANUFACTURER'S RECOMMENDED RATE iv.IRON SULPHATE - 2 LBS. PER CU. YD. 5.IN THE CONTEXT OF THESE PLANS, NOTES, AND SPECIFICATIONS, "FINISH GRADE" REFERS TO THE FINAL ELEVATION OF THE SOIL SURFACE (NOT TOP OF MULCH) AS INDICATED ON THE GRADING PLANS. a.BEFORE STARTING WORK, THE LANDSCAPE CONTRACTOR SHALL VERIFY THAT THE ROUGH GRADES OF ALL LANDSCAPE AREAS ARE WITHIN +/-0.1' OF FINISH GRADE. SEE SPECIFICATIONS FOR MORE DETAILED INSTRUCTION ON TURF AREA AND PLANTING BED PREPARATION. b.CONSTRUCT AND MAINTAIN FINISH GRADES AS SHOWN ON GRADING PLANS, AND CONSTRUCT AND MAINTAIN SLOPES AS RECOMMENDED BY THE GEOTECHNICAL REPORT. ALL LANDSCAPE AREAS SHALL HAVE POSITIVE DRAINAGE AWAY FROM STRUCTURES AT THE MINIMUM SLOPE SPECIFIED IN THE REPORT AND ON THE GRADING PLANS, AND AREAS OF POTENTIAL PONDING SHALL BE REGRADED TO BLEND IN WITH THE SURROUNDING GRADES AND ELIMINATE PONDING POTENTIAL. c.THE LANDSCAPE CONTRACTOR SHALL DETERMINE WHETHER OR NOT THE EXPORT OF ANY SOIL WILL BE NEEDED, TAKING INTO ACCOUNT THE ROUGH GRADE PROVIDED, THE AMOUNT OF SOIL AMENDMENTS TO BE ADDED (BASED ON A SOIL TEST, PER SPECIFICATIONS), AND THE FINISH GRADES TO BE ESTABLISHED. d.ENSURE THAT THE FINISH GRADE IN SHRUB AREAS IMMEDIATELY ADJACENT TO WALKS AND OTHER WALKING SURFACES, AFTER INSTALLING SOIL AMENDMENTS, IS 3" BELOW THE ADJACENT FINISH SURFACE, IN ORDER TO ALLOW FOR PROPER MULCH DEPTH. TAPER THE SOIL SURFACE TO MEET FINISH GRADE, AS SPECIFIED ON THE GRADING PLANS, AT APPROXIMATELY 18" AWAY FROM THE WALKS. e.ENSURE THAT THE FINISH GRADE IN TURF AREAS IMMEDIATELY ADJACENT TO WALKS AND OTHER WALKING SURFACES, AFTER INSTALLING SOIL AMENDMENTS, IS 1" BELOW THE FINISH SURFACE OF THE WALKS. TAPER THE SOIL SURFACE TO MEET FINISH GRADE, AS SPECIFIED ON THE GRADING PLANS, AT APPROXIMATELY 18" AWAY FROM THE WALKS. f.SHOULD ANY CONFLICTS AND/OR DISCREPANCIES ARISE BETWEEN THE GRADING PLANS, GEOTECHNICAL REPORT, THESE NOTES AND PLANS, AND ACTUAL CONDITIONS, THE CONTRACTOR SHALL IMMEDIATELY BRING SUCH ITEMS TO THE ATTENTION OF THE LANDSCAPE ARCHITECT, GENERAL CONTRACTOR, AND OWNER. 6.ONCE SOIL PREPARATION IS COMPLETE, THE LANDSCAPE CONTRACTOR SHALL ENSURE THAT THERE ARE NO DEBRIS, TRASH, OR STONES LARGER THAN 1" REMAINING IN THE TOP 6" OF SOIL. TYPICAL CURB AND GUTTER TYPICAL PLANTING AREA LINEAR ROOT BARRIER MATERIAL. SEE PLANTING NOTES FOR TYPE AND MANUFACTURER. INSTALL PER MANUFACTURER'S SPECIFICATIONS. TREE CANOPY TREE TRUNK TYPICAL WALKWAY OR PAVING1 2 3 4 5 6 1 4 2 3 5 6 5' 5' 5' 5' OPEN LANDSCAPE TO 10' PARKWAY OR ISLAND NOTES: 1)INSTALL ROOT BARRIERS NEAR ALL NEWLY-PLANTED TREES THAT ARE LOCATED WITHIN FIVE (5) FEET OF PAVING OR CURBS. 2)BARRIERS SHALL BE LOCATED IMMEDIATELY ADJACENT TO HARDSCAPE. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR USE ROOT BARRIERS OF A TYPE THAT COMPLETELY ENCIRCLE THE ROOTBALL. B.SUBMITTALS 1.THE CONTRACTOR SHALL PROVIDE SUBMITTALS AND SAMPLES, IF REQUIRED, TO THE LANDSCAPE ARCHITECT, AND RECEIVE APPROVAL IN WRITING FOR SUCH SUBMITTALS BEFORE WORK COMMENCES. 2.SUBMITTALS SHALL INCLUDE PHOTOS OF PLANTS WITH A RULER OR MEASURING STICK FOR SCALE, PHOTOS OR SAMPLES OF ANY REQUIRED MULCHES, AND SOIL TEST RESULTS AND PREPARATION RECOMMENDATIONS FROM THE TESTING LAB (INCLUDING COMPOST AND FERTILIZER RATES AND TYPES, AND OTHER AMENDMENTS FOR TREE/SHRUB, TURF, AND SEED AREAS AS MAY BE APPROPRIATE). 3.SUBMITTALS SHALL ALSO INCLUDE MANUFACTURER CUT SHEETS FOR PLANTING ACCESSORIES SUCH AS TREE STAKES AND TIES, EDGING, AND LANDSCAPE FABRICS (IF ANY). 4.WHERE MULTIPLE ITEMS ARE SHOWN ON A PAGE, THE CONTRACTOR SHALL CLEARLY INDICATE THE ITEM BEING CONSIDERED. C.GENERAL PLANTING 1.REMOVE ALL NURSERY TAGS AND STAKES FROM PLANTS. 2.EXCEPT IN AREAS TO BE PLANTED WITH ORNAMENTAL GRASSES, APPLY PRE-EMERGENT HERBICIDES AT THE MANUFACTURER'S RECOMMENDED RATE. 3.TRENCHING NEAR EXISTING TREES: a.CONTRACTOR SHALL NOT DISTURB ROOTS 1-1/2" AND LARGER IN DIAMETER WITHIN THE CRITICAL ROOT ZONE (CRZ) OF EXISTING TREES, AND SHALL EXERCISE ALL POSSIBLE CARE AND PRECAUTIONS TO AVOID INJURY TO TREE ROOTS, TRUNKS, AND BRANCHES. THE CRZ IS DEFINED AS A CIRCULAR AREA EXTENDING OUTWARD FROM THE TREE TRUNK, WITH A RADIUS EQUAL TO 1' FOR EVERY 1" OF TRUNK DIAMETER-AT-BREAST-HEIGHT (4.5' ABOVE THE AVERAGE GRADE AT THE TRUNK). b.ALL EXCAVATION WITHIN THE CRZ SHALL BE PERFORMED USING HAND TOOLS. NO MACHINE EXCAVATION OR TRENCHING OF ANY KIND SHALL BE ALLOWED WITHIN THE CRZ. c.ALTER ALIGNMENT OF PIPE TO AVOID TREE ROOTS 1-1/2" AND LARGER IN DIAMETER. WHERE TREE ROOTS 1-1/2" AND LARGER IN DIAMETER ARE ENCOUNTERED IN THE FIELD, TUNNEL UNDER SUCH ROOTS. WRAP EXPOSED ROOTS WITH SEVERAL LAYERS OF BURLAP AND KEEP MOIST. CLOSE ALL TRENCHES WITHIN THE CANOPY DRIP LINES WITHIN 24 HOURS. d.ALL SEVERED ROOTS SHALL BE HAND PRUNED WITH SHARP TOOLS AND ALLOWED TO AIR-DRY. DO NOT USE ANY SORT OF SEALERS OR WOUND PAINTS. D.TREE PLANTING 1.TREE PLANTING HOLES SHALL BE EXCAVATED TO MINIMUM WIDTH OF TWO TIMES THE WIDTH OF THE ROOTBALL, AND TO A DEPTH EQUAL TO THE DEPTH OF THE ROOTBALL LESS TWO TO FOUR INCHES. 2.SCARIFY THE SIDES AND BOTTOM OF THE PLANTING HOLE PRIOR TO THE PLACEMENT OF THE TREE. REMOVE ANY GLAZING THAT MAY HAVE BEEN CAUSED DURING THE EXCAVATION OF THE HOLE. 3.FOR CONTAINER AND BOX TREES, TO REMOVE ANY POTENTIALLY GIRDLING ROOTS AND OTHER ROOT DEFECTS, THE CONTRACTOR SHALL SHAVE A 1" LAYER OFF OF THE SIDES AND BOTTOM OF THE ROOTBALL OF ALL TREES JUST BEFORE PLACING INTO THE PLANTING PIT. DO NOT "TEASE" ROOTS OUT FROM THE ROOTBALL. 4.INSTALL THE TREE ON UNDISTURBED SUBGRADE SO THAT THE TOP OF THE ROOTBALL IS TWO TO FOUR INCHES ABOVE THE SURROUNDING GRADE. 5.BACKFILL THE TREE HOLE UTILIZING THE EXISTING TOPSOIL FROM ON-SITE. ROCKS LARGER THAN 1" DIA. AND ALL OTHER DEBRIS SHALL BE REMOVED FROM THE SOIL PRIOR TO THE BACKFILL. SHOULD ADDITIONAL SOIL BE REQUIRED TO ACCOMPLISH THIS TASK, USE STORED TOPSOIL FROM ON-SITE OR IMPORT ADDITIONAL TOPSOIL FROM OFF-SITE AT NO ADDITIONAL COST TO THE OWNER. IMPORTED TOPSOIL SHALL BE OF SIMILAR TEXTURAL CLASS AND COMPOSITION IN THE ON-SITE SOIL. 6.TREES SHALL NOT BE STAKED UNLESS LOCAL CONDITIONS (SUCH AS HEAVY WINDS OR SLOPES) REQUIRE STAKES TO KEEP TREES UPRIGHT. SHOULD STAKING BE REQUIRED, THE TOTAL NUMBER OF TREE STAKES (BEYOND THE MINIMUMS LISTED BELOW) WILL BE LEFT TO THE LANDSCAPE CONTRACTOR'S DISCRETION. SHOULD ANY TREES FALL OR LEAN, THE LANDSCAPE CONTRACTOR SHALL STRAIGHTEN THE TREE, OR REPLACE IT SHOULD IT BECOME DAMAGED. TREE STAKING SHALL ADHERE TO THE FOLLOWING GUIDELINES: a.1"-2" TREES TWO STAKES PER TREE b.2-1/2"-4" TREES THREE STAKES PER TREE c.TREES OVER 4" CALIPER GUY AS NEEDED d.MULTI-TRUNK TREES THREE STAKES PER TREE MINIMUM, QUANTITY AND POSITIONS AS NEEDED TO STABILIZE THE TREE 7.UPON COMPLETION OF PLANTING, CONSTRUCT AN EARTH WATERING BASIN AROUND THE TREE. COVER THE INTERIOR OF THE TREE RING WITH MULCH (TYPE AND DEPTH PER PLANS). E.SHRUB, PERENNIAL, AND GROUNDCOVER PLANTING 1.DIG THE PLANTING HOLES TWICE AS WIDE AND 2" LESS DEEP THAN EACH PLANT'S ROOTBALL. INSTALL THE PLANT IN THE HOLE. BACKFILL AROUND THE PLANT WITH SOIL AMENDED PER SOIL TEST RECOMMENDATIONS. 2.WHEN PLANTING IS COMPLETE, INSTALL MULCH (TYPE AND DEPTH PER PLANS) OVER ALL PLANTING BEDS, COVERING THE ENTIRE PLANTING AREA. F.SODDING 1.SOD VARIETY TO BE AS SPECIFIED ON THE LANDSCAPE PLAN. 2.LAY SOD WITHIN 24 HOURS FROM THE TIME OF STRIPPING. DO NOT LAY IF THE GROUND IS FROZEN. 3.LAY THE SOD TO FORM A SOLID MASS WITH TIGHTLY FITTED JOINTS. BUTT ENDS AND SIDES OF SOD STRIPS - DO NOT OVERLAP. STAGGER STRIPS TO OFFSET JOINTS IN ADJACENT COURSES. 4.ROLL THE SOD TO ENSURE GOOD CONTACT OF THE SOD'S ROOT SYSTEM WITH THE SOIL UNDERNEATH. 5.WATER THE SOD THOROUGHLY WITH A FINE SPRAY IMMEDIATELY AFTER PLANTING TO OBTAIN AT LEAST SIX INCHES OF PENETRATION INTO THE SOIL BELOW THE SOD. G.MULCH 1.INSTALL MULCH TOPDRESSING, TYPE AND DEPTH PER MULCH NOTE, IN ALL PLANTING AREAS AND TREE RINGS. 2.DO NOT INSTALL MULCH WITHIN 6" OF TREE ROOT FLARE AND WITHIN 24" OF HABITABLE STRUCTURES, EXCEPT AS MAY BE NOTED ON THESE PLANS. MULCH COVER WITHIN 6" OF CONCRETE WALKS AND CURBS SHALL NOT PROTRUDE ABOVE THE FINISH SURFACE OF THE WALKS AND CURBS. MULCH COVER WITHIN 12" OF WALLS SHALL BE AT LEAST 3" LOWER THAN THE TOP OF WALL. H.CLEAN UP 1.DURING LANDSCAPE PREPARATION AND PLANTING, KEEP ALL PAVEMENT CLEAN AND ALL WORK AREAS IN A NEAT, ORDERLY CONDITION. 2.DISPOSED LEGALLY OF ALL EXCAVATED MATERIALS OFF THE PROJECT SITE. I.INSPECTION AND ACCEPTANCE 1.UPON COMPLETION OF THE WORK, THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE SITE CLEAN, FREE OF DEBRIS AND TRASH, AND SUITABLE FOR USE AS INTENDED. THE LANDSCAPE CONTRACTOR SHALL THEN REQUEST AN INSPECTION BY THE OWNER TO DETERMINE FINAL ACCEPTABILITY. 2.WHEN THE INSPECTED PLANTING WORK DOES NOT COMPLY WITH THE CONTRACT DOCUMENTS, THE LANDSCAPE CONTRACTOR SHALL REPLACE AND/OR REPAIR THE REJECTED WORK TO THE OWNER'S SATISFACTION WITHIN 24 HOURS. 3.THE LANDSCAPE MAINTENANCE PERIOD WILL NOT COMMENCE UNTIL THE LANDSCAPE WORK HAS BEEN RE-INSPECTED BY THE OWNER AND FOUND TO BE ACCEPTABLE. AT THAT TIME, A WRITTEN NOTICE OF FINAL ACCEPTANCE WILL BE ISSUED BY THE OWNER, AND THE MAINTENANCE AND GUARANTEE PERIODS WILL COMMENCE. J.LANDSCAPE MAINTENANCE 1.THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE MAINTENANCE OF ALL WORK SHOWN ON THESE PLANS FOR 90 DAYS BEYOND FINAL ACCEPTANCE OF ALL LANDSCAPE WORK BY THE OWNER. LANDSCAPE MAINTENANCE SHALL INCLUDE WEEKLY SITE VISITS FOR THE FOLLOWING ACTIONS (AS APPROPRIATE): PROPER PRUNING, RESTAKING OF TREES, RESETTING OF PLANTS THAT HAVE SETTLED, MOWING AND AERATION OF LAWNS, WEEDING, TREATING FOR INSECTS AND DISEASES,REPLACEMENT OF MULCH, REMOVAL OF LITTER, REPAIRS TO THE IRRIGATION SYSTEM DUE TO FAULTY PARTS AND/OR WORKMANSHIP, AND THE APPROPRIATE WATERING OF ALL PLANTINGS. THE LANDSCAPE CONTRACTOR SHALL MAINTAIN THE IRRIGATION SYSTEM IN PROPER WORKING ORDER, WITH SCHEDULING ADJUSTMENTS BY SEASON TO MAXIMIZE WATER CONSERVATION. 2. SHOULD SODDED AREAS NOT BE COVERED BY AN AUTOMATIC IRRIGATION SYSTEM, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR WATERING THESE AREAS AND OBTAINING A FULL, HEALTHY STAND OF PLANTS AT NO ADDITIONAL COST TO THE OWNER. 3.TO ACHIEVE FINAL ACCEPTANCE AT THE END OF THE MAINTENANCE PERIOD, ALL OF THE FOLLOWING CONDITIONS MUST OCCUR: a.THE LANDSCAPE SHALL SHOW ACTIVE, HEALTHY GROWTH (WITH EXCEPTIONS MADE FOR SEASONAL DORMANCY). ALL PLANTS NOT MEETING THIS CONDITION SHALL BE REJECTED AND REPLACED BY HEALTHY PLANT MATERIAL PRIOR TO FINAL ACCEPTANCE. b.ALL HARDSCAPE SHALL BE CLEANED PRIOR TO FINAL ACCEPTANCE. c.SODDED AREAS MUST BE ACTIVELY GROWING AND MUST REACH A MINIMUM HEIGHT OF 1 1/2 INCHES BEFORE FIRST MOWING. BARE AREAS LARGER THAN TWELVE SQUARE INCHES MUST BE RESODDED PRIOR TO FINAL ACCEPTANCE. ALL SODDED TURF SHALL BE NEATLY MOWED. K.WARRANTY PERIOD, PLANT GUARANTEE AND REPLACEMENTS 1.THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL TREES, SHRUBS, PERENNIALS, SOD, AND IRRIGATION SYSTEMS FOR A PERIOD OF ONE YEAR FROM THE DATE OF THE OWNER'S FINAL ACCEPTANCE (90 DAYS FOR ANNUAL PLANTS). THE CONTRACTOR SHALL REPLACE, AT HIS OWN EXPENSE AND TO THE SATISFACTION OF THE OWNER, ANY PLANTS WHICH DIE IN THAT TIME, OR REPAIR ANY PORTIONS OF THE IRRIGATION SYSTEM WHICH OPERATE IMPROPERLY. 2.AFTER THE INITIAL MAINTENANCE PERIOD AND DURING THE GUARANTEE PERIOD, THE LANDSCAPE CONTRACTOR SHALL ONLY BE RESPONSIBLE FOR REPLACEMENT OF PLANTS WHEN PLANT DEATH CANNOT BE ATTRIBUTED DIRECTLY TO OVERWATERING OR OTHER DAMAGE BY HUMAN ACTIONS. L.PROVIDE A MINIMUM OF (2) COPIES OF RECORD DRAWINGS TO THE OWNER UPON COMPLETION OF WORK. A RECORD DRAWING IS A RECORD OF ALL CHANGES THAT OCCURRED IN THE FIELD AND THAT ARE DOCUMENTED THROUGH CHANGE ORDERS, ADDENDA, OR CONTRACTOR/CONSULTANT DRAWING MARKUPS. LC/RM LC 11/15/2023Date Drawn By Checked By Project Number 45 8 0 S . C o l l e g e R o a d Wi l m i n g t o n , N C Ch r i s t i a n B r o t h e r s A u t o m o t i v e 11/13/2023 Date Comment Pr o j e c t N a m e (800) 680-6630 4509 Creedmoor Rd., Ste 201 Raleigh, NC 27612 www.EvergreenDesignGroup.com of north carolina, pllc EVERGREEN D E S I G N G R O U P X N O R T H CARO L I N A X L I S A J . C U T S H A WRE G I S T ERED L A N DSCAP E A R CHITECT W W W W W W UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE JASM I N E C O V E W A Y 60' P U B L I C R / W ( S . R . 1 5 6 5 ) D B 1 1 1 6 - 2 4 5 OH E OH E OH E UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O UF O P P P P P P PPPP G G G G G G G G G G G W W W SS SS SS SS SS SS SS SS SS SS SS VA N G G G UGE UGE LD/ S F / T P LD/SF/T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/S F / T P LD/S F / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/SF / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/SF/ T P LD/SF/ T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/S F / T P LD/ S F / T P LD/ S F / T P LD/S F / T P LD/S F / T P L D / S F / T P L D / S F / T P L D / S F / T P LD/ S F / T P LD/SF/T P LD/SF/TP LD/SF/T P LD/SF/T P LD/SF/T P LD / S F / T P L D / S F / T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD/SF/ T P LD / S F / T P LD/S F / T P LD/ S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD/SF/TP LD/SF/TP LD/SF/TP LD/SF/TP LD / S F / T P LD / S F / T P LD/SF/TP LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P LD / S F / T P T68 T69 T70 T53 T51 T52 T50 T49 T55 T56 T57 T88 T87 T59 T67 T60 T45 T47 T46 T44 T48 T54 T35 T36 T41 T42 T43 T40 T39 T37 T38 T32T33T34 T30 T29 T24 T26 T85 T81 T83 T84 T22 T23 T28 T19 T20 T17 T18 T80 T79 T78 T86 T76T77 T14 T15 T16 T74 T75 T71 T72 T73 T13 T12 T8 T9 T10 T6 T7 T2 T4 T3 T5 T1 T66 T65 T64 T63 T61T62 T58 T25 T31 Scale 1" = 20' 10'40'20'0' NOTE: PRINTED DRAWING SIZE MAY HAVE CHANGED FROM ORIGINAL. VERIFY SCALE USING BAR SCALE ABOVE. NORTH TD-1 TREE DISPOSITION PLAN LC/RM LC 11/15/2023Date Drawn By Checked By Project Number 45 8 0 S . C o l l e g e R o a d Wi l m i n g t o n , N C Ch r i s t i a n B r o t h e r s A u t o m o t i v e 11/13/2023 Date Comment Pr o j e c t N a m e (800) 680-6630 4509 Creedmoor Rd., Ste 201 Raleigh, NC 27612 www.EvergreenDesignGroup.com of north carolina, pllc EVERGREEN D E S I G N G R O U P X N O R T H CARO L I N A X L I S A J . C U T S H A WRE G I S T ERED L A N DSCAP E A R CHITECT INDICATES TREE NUMBERTx LEGEND EXISTING TREES TO BE PROTECTED IN PLACE TREE PROTECTION FENCE INDICATES TREE NUMBERTx EXISTING TREE TO BE REMOVED NOTE: TREE PROTECTION FOR ANY PRESERVED OR RELOCATED TREES MUST BE PROVIDED PER DETAILS AND SPECIFICATIONS ON SHEET TD-2. THESE MUST BE UP PRIOR TO THE COMMENCEMENT OF ANY WORK AND MAINTAINED THROUGHOUT CONSTRUCTION. NOTE: ALL TREE TRIMMING MUST BE APPROVED BY THE OWNER AND LOCAL JURISDICTION PRIOR TO COMMENCEMENT OF WORK. ALL TREE TRIMMING MUST BE DONE BY AN ISA CERTIFIED ARBORIST IN ACCORDANCE WITH LOCAL TREE PRESERVATION ORDINANCE. TD-2 TREE DISPOSITION SPECIFICATIONS &DETAILS LC/RM LC 11/15/2023Date Drawn By Checked By Project Number 45 8 0 S . C o l l e g e R o a d Wi l m i n g t o n , N C Ch r i s t i a n B r o t h e r s A u t o m o t i v e 11/13/2023 Date Comment Pr o j e c t N a m e (800) 680-6630 4509 Creedmoor Rd., Ste 201 Raleigh, NC 27612 www.EvergreenDesignGroup.com of north carolina, pllc EVERGREEN D E S I G N G R O U P X N O R T H CARO L I N A X L I S A J . C U T S H A WRE G I S T ERED L A N DSCAP E A R CHITECT TUNNEL TO MINIMIZE ROOT DAMAGE (TOP) AS OPPOSED TO SURFACE-DUG TRENCHES IN ROOT PROTECTION ZONE WHEN THE 5' MINIMUM DISTANCE FROM TRUNK CAN NOT BE ACHIEVED. TREES THAT ARE MARKED TO BE PRESERVED ON A SITE PLAN AND FOR WHICH UTILITIES MUST PASS TROUGH THEIR ROOT PROTECTION ZONES MAY REQUIRE TUNNELING AS OPPOSED TO OPEN TRENCHES. THE DECISION TO TUNNEL WILL BE DETERMINED ON A CASE BY CASE BASIS BY THE ENGINEER. TUNNELS SHALL BE DUG THROUGH THE ROOT PROTECTION ZONE IN ORDER TO MINIMIZE ROOT DAMAGE. (RPZ) ROOT PROTECTION ZONE IF BARE DIRT 8" MULCH OUTSIDE RPZ ESTABLISH FENCE PROTECTION MINIMUM 5' FROM TRUNK 6" MULCH INSIDE RPZ DRIP LINE OPEN TRENCHING MAY BE USED IF EXPOSED TREE ROOTS DO NOT EXCEED 3" OR ROOTS CAN BE BENT BACK. ROOT PROTECTION ZONE (RPZ) PROPERTY LINE TREE TRUNK STR E E T 5' CURB NOTES: 1.THE FENCING LOCATION SHOWN ABOVE IS DIAGRAMATIC ONLY AND WILL CONFORM TO THE DRIP LINE AND BE LIMITED TO PROJECT BOUNDARY. WHERE MULTIPLE ADJACENT TREES WILL BE ENCLOSED BY FENCING, THE FENCING SHALL BE CONTINUOUS AROUND ALL TREES. 2.FOR ACCEPTABLE FENCING MATERIALS SEE SPECIFICATIONS. AND UNDER DRIP LINE AS MINIMAL PROTECTION FOR ROOTS FROM CONSTRUCTION ACTIVITIES NOTES: 1.OPTION USED FOR TIGHT CONSTRUCTION AREAS OR WHEN CONSTRUCTION OCCURS IN ROOT PROTECTION ZONE. 2.FOR ACCEPTABLE FENCING MATERIALS SEE SPECIFICATIONS. 12" MIN & 48" MAX DEPTH TREE PROTECTION FENCE SCALE: NOT TO SCALEA B SCALE: NOT TO SCALE TREE PROTECTION FENCE - TIGHT CONSTRUCTION BORING THROUGH ROOT PROTECTION ZONE SCALE: NOT TO SCALEC ROOT PROTECTION ZONE (RPZ) MULCH INSIDE RPZ PROTECTION FENCE (SEE SPECS) MATERIALS 1.FABRIC: 4 FOOT HIGH ORANGE PLASTIC FENCING AS SHOWN ON THE PLANS AND SHALL BE WOVEN WITH 2 INCH MESH OPENINGS SUCH THAT IN A VERTICAL DIMENSION OF 23 INCHES ALONG THE DIAGONALS OF THE OPENINGS THERE SHALL BE AT LEAST 7 MESHES. 2.POSTS: POSTS SHALL BE A MINIMUM OF 72 INCHES LONG AND STEEL 'T' SHAPED WITH A MINIMUM WEIGHT OF 1.3 POUNDS PER LINEAR FOOT. 3.TIE WIRE: WIRE FOR ATTACHING THE FABRIC TO THE T-POSTS SHALL BE NOT LESS THAN NO. 12 GAUGE GALVANIZED WIRE. 4.USED MATERIALS: PREVIOUSLY-USED MATERIALS, MEETING THE ABOVE REQUIREMENTS AND WHEN APPROVED BY THE OWNER, MAY BE USED. CONSTRUCTION METHODS 1.ALL TREES AND SHRUBS SHOWN TO REMAIN WITHIN THE PROXIMITY OF THE CONSTRUCTION SITE SHALL BE PROTECTED PRIOR TO BEGINNING ANY DEVELOPMENT ACTIVITY. 2.EMPLOY THE SERVICES OF AN ISA (INTERNATIONAL SOCIETY OF ARBORICULTURE) CERTIFIED ARBORIST AND OBTAIN ALL REQUIRED PERMITS TO PRUNE THE EXISTING TREES FOR CLEANING, RAISING AND THINNING, AS MAY BE REQUIRED. 3.PROTECTIVE FENCING SHALL BE ERECTED OUTSIDE THE CRITICAL ROOT ZONE (CRZ, EQUAL TO 1' FROM THE TRUNK FOR EVERY 1" OF DBH) AT LOCATIONS SHOWN IN THE PLANS OR AS DIRECTED BY THE LANDSCAPE CONSULTANT AND/OR CITY ARBORIST, AND IN ACCORDANCE WITH THE DETAILS SHOWN ON THE PLANS. FENCING SHALL BE MAINTAINED AND REPAIRED BY THE CONTRACTOR DURING SITE CONSTRUCTION. TREES IN CLOSE PROXIMITY SHALL BE FENCED TOGETHER, RATHER THAN INDIVIDUALLY. 4.PROTECTIVE FENCE LOCATIONS IN CLOSE PROXIMITY TO STREET INTERSECTIONS OR DRIVES SHALL ADHERE TO THE APPLICABLE JURISDICTION'S SIGHT DISTANCE CRITERIA. 5.THE PROTECTIVE FENCING SHALL BE ERECTED BEFORE SITE WORK COMMENCES AND SHALL REMAIN IN PLACE DURING THE ENTIRE CONSTRUCTION PHASE. 6.THE INSTALLATION POSTS SHALL BE PLACED EVERY 6 FEET ON CENTER AND EMBEDDED TO 18 INCHES DEEP. MESH FABRIC SHALL BE ATTACHED TO THE INSTALLATION POSTS BY THE USE OF SUFFICIENT WIRE TIES TO SECURELY FASTEN THE FABRIC TO THE T-POSTS TO HOLD THE FABRIC IN A STABLE AND UPRIGHT POSITION. 7.WITHIN THE CRZ: a.DO NOT CLEAR, FILL OR GRADE IN THE CRZ OF ANY TREE. b.DO NOT STORE, STOCKPILE OR DUMP ANY JOB MATERIAL, SOIL OR RUBBISH UNDER THE SPREAD OF THE TREE BRANCHES. c.DO NOT PARK OR STORE ANY EQUIPMENT OR SUPPLIES UNDER THE TREE CANOPY. d.DO NOT SET UP ANY CONSTRUCTION OPERATIONS UNDER THE TREE CANOPY (SUCH AS PIPE CUTTING AND THREADING, MORTAR MIXING, PAINTING OR LUMBER CUTTING). e.DO NOT NAIL OR ATTACH TEMPORARY SIGNS METERS, SWITCHES, WIRES, BRACING OR ANY OTHER ITEM TO THE TREES. f.DO NOT PERMIT RUNOFF FROM WASTE MATERIALS INCLUDING SOLVENTS, CONCRETE WASHOUTS, ASPHALT TACK COATS (MC-30 OIL), ETC. TO ENTER THE CRZ. BARRIERS ARE TO BE PROVIDED TO PREVENT SUCH RUNOFF SUBSTANCES FROM ENTERING THE CRZ WHENEVER POSSIBLE, INCLUDING IN AN AREA WHERE RAIN OR SURFACE WATER COULD CARRY SUCH MATERIALS TO THE ROOT SYSTEM OF THE TREE. 8.ROUTE UNDERGROUND UTILITIES TO AVOID THE CRZ. IF DIGGING IS UNAVOIDABLE, BORE UNDER THE ROOTS, OR HAND DIG TO AVOID SEVERING THEM. 9.WHERE EXCAVATION IN THE VICINITY OF TREES MUST OCCUR, SUCH AS FOR IRRIGATION INSTALLATION, PROCEED WITH CAUTION, AND USING HAND TOOLS ONLY. 10.THE CONTRACTOR SHALL NOT CUT ROOTS LARGER THAN ONE INCH IN DIAMETER WHEN EXCAVATION OCCURS NEAR EXISTING TREES. ALL ROOTS LARGER THAN ONE INCH IN DIAMETER ARE TO BE CUT CLEANLY. FOR OAKS ONLY, ALL WOUNDS SHALL BE PAINTED WITH WOUND SEALER WITHIN 30 MINUTES 11.REMOVE ALL TREES, SHRUBS OR BUSHES TO BE CLEARED FROM PROTECTED ROOT ZONE AREAS BY HAND. 12.TREES DAMAGED OR KILLED DUE TO CONTRACTOR'S NEGLIGENCE DURING CONSTRUCTION SHALL BE MITIGATED AT THE CONTRACTOR'S EXPENSE AND TO THE PROJECT OWNER'S AND LOCAL JURISDICTION'S SATISFACTION. 13.ANY TREE REMOVAL SHALL BE APPROVED BY THE OWNER AND LOCAL JURISDICTION PRIOR TO ITS REMOVAL, AND THE CONTRACTOR SHALL HAVE ALL REQUIRED PERMITS FOR SUCH ACTIVITIES. 14.COVER EXPOSED ROOTS AT THE END OF EACH DAY WITH SOIL, MULCH OR WET BURLAP. 15.IN CRITICAL ROOT ZONE AREAS THAT CANNOT BE PROTECTED DUING CONSTRUCTION AND WHERE HEAVY TRAFFIC IS ANTICIPATED, COVER THE SOIL WITH EIGHT INCHES OF ORGANIC MULCH TO MINIMIZE SOIL COMPACTION. THIS EIGHT INCH DEPTH OF MULCH SHALL BE MAINTAINED THROUGHOUT CONSTRUCTION. 16.WATER ALL TREES IMPACTED BY CONSTRUCTION ACTIVITIES, DEEPLY ONCE A WEEK DURING PERIODS OF HOT DRY WEATHER. SPRAY TREE CROWNS WITH WATER PERIODICALLY TO REDUCE DUST ACCUMULATION ON THE LEAVES. 17.WHEN INSTALLING CONCRETE ADJACENT TO THE ROOT ZONE OF A TREE, USE A PLASTIC VAPOR BARRIER BEHIND THE CONCRETE TO PROHIBIT LEACHING OF LIME INTO THE SOIL. 18.CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL TREE PROTECTION FENCING WHEN ALL THREATS TO THE EXISTING TREES FROM CONSTRUCTION-RELATED ACTIVITIES HAVE BEEN REMOVED. D SCALE: NOT TO SCALE ROOT PRUNING DETAIL EXISTING GRADE NOTES 1.RETENTION AREAS WILL BE SET AS PART OF THE REVIEW PROCESS AND PRE-CONSTRUCTION MEETING. 2.BOUNDARIES OF RETENTION AREAS MUST BE STAKED AT THE PRE-CONSTRUCTION MEETING AND FLAGGED PRIOR TO ROOT PRUNING. 3.EXACT LOCATION OF ROOT PRUNING SHALL BE DETERMINED IN THE FIELD IN COORDINATION WITH THE FORESTRY INSPECTOR . 4.TRENCH SHOULD BE IMMEDIATELY BACKFILLED WITH EXCAVATED SOIL OR OTHER ORGANIC SOIL AS SPECIFIED PER PLAN OR BY THE FORESTRY INSPECTOR. 5.ROOTS SHALL BE CLEANLY CUT USING VIBRATORY KNIFE OR OTHER ACCEPTABLE EQUIPMENT. ROT PRUNING METHODS AND MEANS MUST BE IN ACCORDANCE WITH ANSI STANDARD A3000. 6.ALL PRUNING MUST BE EXECUTED AT LOD SHOWN ON PLANS OR AS AUTHORIZED IN WRITING BY THE FORESTRY INSPECTOR. 7.SUPPLEMENTAL WATERING MAY BE REQUIRED FOR ROOT PRUNED TREES THROUGHOUT THE GROWING SEASON DURING CONSTRUCTION AND SUBSEQUENT WARRANTY AND MAINTENANCE PERIOD. ROOT PRUNE VIA AIRSPACE OR TRENCH (6" WIDE MAX.) 24" MIN. DEPTH OR AS DETERMINED AT PRE-CONSTRUCTION MEETING. TREE PROTECTION FENCE TO BE ERECTED IN LINE WITH ROOT PRUNING LIMITS. SEE DETAILS AND SPECIFICATIONS FOR TREE PROTECTION FENCE REQUIREMENTS. (A) PRIOR TO THE LAND CLEARING STAGE OF DEVELOPMENT, THE CONTRACTOR SHALL CLEARLY MARK ALL PROTECTED TREES FOR WHICH A TREE REMOVAL PERMIT HAS NOT BEEN ISSUED AND SHALL ERECT BARRIERS FOR THE PROTECTION OF THE TREES ACCORDING TO THE FOLLOWING: (1)  AROUND AN AREA AT OR GREATER THAN A SIX-FOOT RADIUS OF ALL SPECIES OF MANGROVES AND PROTECTED CABBAGE PALMS; (2)  AROUND AN AREA AT OR GREATER THAN THE FULL DRIPLINE OF ALL PROTECTED NATIVE PINES; (3)  AROUND AN AREA AT OR GREATER THAN TWO-THIRDS OF THE DRIPLINE OF ALL OTHER PROTECTED SPECIES. (B) NO PERSON SHALL ATTACH ANY SIGN, NOTICE OR OTHER OBJECT TO ANY PROTECTED TREE OR FASTEN ANY WIRES, CABLES, NAILS OR SCREWS TO ANY PROTECTED TREE IN ANY MANNER THAT COULD PROVE HARMFUL TO THE PROTECTED TREE, EXCEPT AS NECESSARY IN CONJUNCTION WITH ACTIVITIES IN THE PUBLIC INTEREST. (C) DURING THE CONSTRUCTION STAGE OF DEVELOPMENT, THE CONTRACTOR SHALL NOT CAUSE OR PERMIT THE CLEANING OF EQUIPMENT OR MATERIAL WITHIN THE OUTSIDE PERIMETER OF THE CROWN (DRIPLINE) OR ON THE NEARBY GROUND OF ANY TREE OR GROUP OF TREES WHICH IS TO BE PRESERVED. WITHIN THE OUTSIDE PERIMETER OF THE CROWN (DRIPLINE) OF ANY TREE OR ON NEARBY GROUND, THE CONTRACTOR SHALL NOT CAUSE OR PERMIT STORAGE OF BUILDING MATERIAL AND/OR EQUIPMENT, OR DISPOSAL OF WASTE MATERIAL SUCH AS PAINTS, OIL, SOLVENTS, ASPHALT, CONCRETE, MORTAR OR ANY OTHER MATERIAL HARMFUL TO THE LIFE OF THE TREE. (D) NO PERSON SHALL PERMIT ANY UNNECESSARY FIRE OR BURNING WITHIN 30 FEET OF THE DRIPLINE OF A PROTECTED TREE. (E)ANY LANDSCAPING ACTIVITIES WITHIN THE BARRIER AREA SHALL BE ACCOMPLISHED WITH HAND LABOR. (F) PRIOR TO ISSUING A CERTIFICATE OF OCCUPANCY OR COMPLIANCE FOR ANY DEVELOPMENT, BUILDING OR STRUCTURE, ALL TREES DESIGNATED TO BE PRESERVED THAT WERE DESTROYED DURING CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR WITH TREES OF EQUIVALENT DIAMETER AT BREAST HEIGHT TREE CALIPER AND OF THE SAME SPECIES AS SPECIFIED BY THE COUNTY ADMINISTRATOR, BEFORE OCCUPANCY OR USE, UNLESS APPROVAL FOR THEIR REMOVAL HAS BEEN GRANTED UNDER PERMIT. (G) THE COUNTY ADMINISTRATOR MAY CONDUCT PERIODIC INSPECTIONS OF THE SITE DURING LAND CLEARANCE AND CONSTRUCTION. (H) IF, IN THE OPINION OF THE COUNTY ADMINISTRATOR, DEVELOPMENT ACTIVITIES WILL SO SEVERELY STRESS SLASH PINES OR ANY OTHER PROTECTED TREE SUCH THAT THEY ARE MADE SUSCEPTIBLE TO INSECT ATTACK, PREVENTATIVE SPRAYING OF THESE TREES BY THE CONTRACTOR MAY BE REQUIRED. TREE PROTECTION GENERAL NOTES TREE PROTECTION SPECIFICATIONS