Loading...
S-1.0-4.1 3401 Merchant CourtN 75°37'38" E 290.01' (TOTAL) S 75°37'38" W 295.06' (TOTAL) 7' PRIVATE ACCESS EASEMENT MB 43 PG 213 30 ' A C C E S S , D R A I N A G E & U T I L I T Y E A S E M E N T M B 4 3 P G 2 1 3 30.0'30.0' 20.0' 7.0' LOT 6R-1 VACANT MB 43 PG 213 1.02 ACRES ± LOT 6R-3 VACANT MB 43 PG 213 0.64 ACRES ± LOT 6R-4 MB 43 PG 213 LOT 7R MB 36 PG 329 N O R T H C H A S E P A R K W A Y N O R T H E A S T -S .R .2 6 5 2 30 . 0 ' 30 . 0 ' E.C.M. E.C.M. M.N.F. E.I.P. (P.O.L.) (BENT) M.N.S. PK NAIL DROP INLET RIM 35.45' (FULL OF DEBRIS) N.P.S. N.P.S. E.C.M. DROP INLET RIM 35.58' 15" RCP INV. 31.98' SSMH RIM 36.33' INV. OUT 29.72' SSMH RIM 36.01 CL INV. 29.60' SSMH RIM 35.44' CL INV. 27.34' DROP INLET RIM 34.57' 15" RCP OUT 31.72' DROP INLET RIM 34.60' 15" RCP IN/OUT 31.35' DROP INLET RIM 34.58' 15" RCP IN/OUT 31.18' DROP INLET RIM 34.90' 15" RCP IN 31.45' 24" RCP OUT 31.45'15" RCP 15" RCP 15 " R C P 24" R C P 15 " R C P 15 " R C P 15 " R C P 1 5 " R C P DROP INLET RIM 34.52' INV. IN/OUT 31.07' DROP INLET RIM 35.38' (FULL OF DEBRIS) OUTLET BOX RIM 35.50' (FULL OF DEBRIS)EDGE OF PAVEMENT LOT 6R-2 MB 43 PG 213 1.60 ACRES ± I.P.S. SSMH RIM 35.20' CL INV.26.48' S 1 4 ° 2 2 ' 2 2 " E 2 3 8 . 8 3 ' E.I.P. 20' DRAINAGE EASEMENT MB 43 PG 213 N.P.S.I.P.S. (P.O.L.) E.I.P. (P.O.L.) R/W R/W R/W C/L 30' DRAINAGE EASEMENT MB 43 PG 213 30' DRAINAGE EASEMENT MB 43 PG 213 30' DRAINAGE EASEMENT MB 43 PG 213 C/L 30.00' 30.86' CHORD N.P.S. 17 0 . 0 6 ' N 1 3 ° 1 1 ' 1 1 " W 23 8 . 8 8 ' N 1 4 ° 2 2 ' 2 3 " W 90 . 2 8 ' N 0 0 ° 3 7 ' 3 0 " E 52 . 0 3 ' N 1 4 ° 2 2 ' 2 2 " W 19 . 9 7 ' N 1 4 ° 2 2 ' 2 2 " W 2 3 8 . 8 3 ' N 1 4 ° 2 2 ' 2 2 " W 9 5 . 7 1 ' N 1 3 ° 1 1 ' 1 1 " W (6 0 'P U B L IC R I G H T O F W A Y ) C1 TOTAL C2 53.02' S 75°37'30" W 30 ' A C C E S S , D R A I N A G E & U T I L I T Y E A S E M E N T M B 4 3 P G 2 1 3 30.00' 30.00' N 75°37'38" E 290.12' (TOTAL) 9.90' N 1 4 ° 2 2 ' 2 2 " W 1 4 2 . 6 8 ' N 68°59'20" E 230.36 ' ( T I E ) S 75°36'51" W 32.87'N 30°36'36" E 42.41' S 1 4 ° 2 2 ' 2 2 " E 9 5 . 7 1 ' L1 L2 24" R C P CO T T T T T T G 36 36 36 36 35 35 35 35 35 34 34 34 32 33 33 33 3535 34 34 36 36 36 33 33 32 34 34 35 35 36 37 3 7 38 36 33 32 32 32 32 33 33 35 35 36 36 37 39 38 38 37 38 36 37 36 34 34 15" RCP 1 5 " R C P 12" RCP12" RCP 36 34 WEST SHORE HOMES WAREHOUSE AND OFFICE SITE INFORMATION PROJECT ADDRESS:3401 MERCHANT COURT WILMINGTON, NC 28411 PARCEL ID: R02612-002-004-000 PROPERTY OWNER:THE CAMP GROUP, LLC 311 JUDGES ROAD, SUITE 12F WILMINGTON, NC 28409 CURRENT ZONING:PD; PLANNED DEVELOPMENT; COMMERCIAL EXISTING USE:VACANT PROPOSED USE:COMMERCIAL OFFICE CAMA LAND USE CLASSIFICATION:URBAN TOTAL SITE AREA:± 1.02 ACRES OR 43,575 SF WETLANDS:N/A FLOOD PLAIN:SITE IS NOT LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA BUT ZONE X ACCORDING TO THE DFIRM PANEL 3720324000k EFFECTIVE DATE 8/28/2018 SOIL TYPES:MURVILLE FINE SAND (Mu) CAMA AREAS OF ENVIRONMENTAL CONCERNS:N/A CONSERVATION RESOURCES:N/A HISTORIC AND ARCHAEOLOGICAL SITES:N/A SURVEY - BOUNDARY AND TOPOGRAPHY:INTRACOASTAL LAND SURVEYING CHRIS CARROLL, PLS SCALE: 1"=30' GRAPHIC SCALE NA D 8 3 ( 2 0 1 1 ) (N C G R I D ) 0 30 60 90 DATE: PROJECT ID: SCALE: REVISIONS: 4/15/23 2023-12 D OGW O O D LD, P L L C 1701-462 )01 9 ( THE CAMP GROUP, LLC | 3401 Merchant Court, Wilmington NC PARKWAY CORPORATE PARK - NORTHCHASE 5872-P .CIL C N PRELIMIN A R Y NOT FOR CONSTRU C T I O N 3401 MERCHANT COURT EXISTING CONDITIONS 1 of 5 1" = 30'S-1.0 VICINITY MAP 1" = 1000' SITE 3401 MERCHANT COURT THE CAMP GROUP, LLC S 75°37'38" W 295.06' (TOTAL) 30.0'30.0' N O R T H C H A S E P A R K W A Y N O R T H E A S T -S .R .2 6 5 2 30 . 0 ' 30 . 0 ' S 1 4 ° 2 2 ' 2 2 " E 2 3 8 . 8 3 ' 30.00' 30.86' CHORD 17 0 . 0 6 ' N 1 3 ° 1 1 ' 1 1 " W 23 8 . 8 8 ' N 1 4 ° 2 2 ' 2 3 " W 90 . 2 8 ' N 0 0 ° 3 7 ' 3 0 " E 52 . 0 3 ' N 1 4 ° 2 2 ' 2 2 " W 19 . 9 7 ' N 1 4 ° 2 2 ' 2 2 " W 2 3 8 . 8 3 ' N 1 4 ° 2 2 ' 2 2 " W 9 5 . 7 1 ' N 1 3 ° 1 1 ' 1 1 " W (6 0 'P UB L I C R IG HT O F W A Y ) C1 TOTAL C2 53.02' S 75°37'30" W 30.00' N 75°37'38" E 290.12' (TOTAL) 9.90' N 1 4 ° 2 2 ' 2 2 " W 1 4 2 . 6 8 ' N 68°59'20" E 230.36 ' ( T I E ) S 75°36'51" W 32.87'N 30°36'36" E 42.41' S 1 4 ° 2 2 ' 2 2 " E 9 5 . 7 1 ' CO T T T T T T WEST SHORE HOMES WAREHOUSE AND OFFICE 25' FRONT SE T B A C K 33 33 34 33 34 35 33 34 34 33 34 33 33 34 34 33 35 35 35 36 36 25' (BUFFER) 36 36 . 5 36 36 33 36.5 33 31 ' ± B U F F E R X X X X X X X X X X X X X X X X XXXXXXXXXXXX X X X X X X X X 121' 185' 24' 21,520 SF 36 36 . 5 33 30 . 0 MA X 30 . 5 MA X 29 . 7 0 BO T T O M 33 34 34 32 . 5 SITE INFORMATION PROJECT ADDRESS:3401 MERCHANT COURT WILMINGTON, NC 28411 PARCEL ID: R02612-002-004-000 PROPERTY OWNER:THE CAMP GROUP, LLC 311 JUDGES ROAD, SUITE 12F WILMINGTON, NC 28409 CURRENT ZONING:PD; PLANNED DEVELOPMENT; COMMERCIAL EXISTING USE:VACANT PROPOSED USE:COMMERCIAL OFFICE CAMA LAND USE CLASSIFICATION:URBAN TOTAL SITE AREA:± 1.02 ACRES OR 43,575 SF WETLANDS:N/A FLOOD PLAIN:SITE IS NOT LOCATED WITHIN A SPECIAL FLOOD HAZARD AREA BUT ZONE X ACCORDING TO THE DFIRM PANEL 3720324000k EFFECTIVE DATE 8/28/2018 SOIL TYPES:MURVILLE FINE SAND (Mu) CAMA AREAS OF ENVIRONMENTAL CONCERNS:N/A CONSERVATION RESOURCES:N/A HISTORIC AND ARCHAEOLOGICAL SITES:N/A PARKING REQUIREMENTS NA TRAFFIC GENERATION NA LIGHTING SITE LIGHTING SHALL BE FULLY-CUT OFF LUMINANCE WITH NO LIGHT POLLUTION IN THE SKY OIR ADJACENT PROPERTIES. THE FOOT-CANDLE SPECIFICATION REQUIRED FOR COMMERCIAL IS 2.0 MAX. OWNER WILL CONTRACT WITH DUKE ENERGY IF ANY POLES ARE TO BE INSTALLED AND WILL INFORM DUKE OF THE COUNTY REQUIREMENTS. TRASH TRASH SERVICE TO BE PROVIDED WITH SITE DUMPSTERS AND ROLL CANS AS NEEDED. WETLAND INFORMATION NOTE: THERE ARE NO REGULATED WETLANDS OR WATERWAYS LOCATED ON THE PROPERTY. THERE ARE NON-JURISDICTIONAL DITCHES THAT NEED COUNTY OR PRIVATE MAINTEANANCE AS PROPOSED ON THE PLAN. LANDSCAPE STANDARDS - NHC UDO SECTION 5.4 STREETYARD - PRIMARY - NORTHCHASE BLVD. STREETYARD = 25'x237' = 5925 sf TREES REQUIRED: 1 PER 600 SF:5925/600 = 9.8 TREES 10 PROVIDED OR UNDERSTORY TREES: 3 PER 600 SF: 9.8*3 = 30 TREES AND SHURBS: 6 PER 600SF: 9.8x6 = 60 SHRUBS 60 PROVIDED STREETYARD - SECONDARY - MERCHANT COURT (PRIVATE) STREETYARD = 12.5'x120' = 1500 sf TREES REQUIRED: 1 PER 600 SF:1500/600 = 2.5 TREES 3 PROVIDED OR UNDERSTORY TREES: 3 PER 600 SF: 2.5*3 = 8 TREES AND SHURBS: 6 PER 600SF: 2.5x6 = 15 SHRUBS 15 PROVIDED PARKING ISLANDS NA FOUNDATION PLANTINGS NA SCALE: 1"=30' GRAPHIC SCALE NA D 8 3 ( 2 0 1 1 ) (N C G R I D ) 0 30 60 90 ME R C H A N T C O U R T 60 - F T P R I V A T E A C C E S S AN D D R A I N A G E E A S E M E N T EXISTING DITCH IN PUBLIC DRAINAGE EASEMENT DATE: PROJECT ID: SCALE: REVISIONS: 4/15/23 2023-12 D OGW O O D LD, P L L C 1701-462 )01 9 ( Merchant Court, Wilmington, NC 28411 PARKWAY CORPORATE PARK - NORTHCHASE 5872-P .CIL C N 3401 MERCHANT COURT SITE AND LANDSCAPE PLAN 2 of x 1" = 30'S-2.0 VICINITY MAP 1" = 1000' SITE PROPOSED PAVED DRIVEWAY WITH GATE PROPOSED GRAVEL EQUIPMENT YARD PROPOSED STORM DRAIN (10) 'AR' TREES PM 15 SIDEYARD NO.KEY BOTANICAL NAME AR 5 RED MAPLEACER RUBRUM 6-8'STREETYARD 2.0-2.5" Cal. 3 GAL.FG 60 COMMON NAME FOTHERGILLA GARDENII DWARF FOTHERGILLA STREETYARD (60) 'FG' SHRUBS (3) 'AR' TREES (15) 'PM' SHRUBS MUHLENBERGIA CAPILLARIS 3 GAL.PINK MUHLY GRASS SIZE LOCATION STORMWATER WETLAND (SEE DETAILS) EXISTING STORM DRAIN TO PROPOSED WETLAND PROPOSED 6-FT CHAINLINK FENCE PROPOSED 6-FT SHADOW-BOX FENCE EXISTING HYDRANT S 75°37'38" W 295.06' (TOTAL) 30.0'30.0' N O R T H C H A S E P A R K W A Y N O R T H E A S T -S .R .2 6 5 2 30 . 0 ' 30 . 0 ' S 1 4 ° 2 2 ' 2 2 " E 2 3 8 . 8 3 ' 30.00' 30.86' CHORD 17 0 . 0 6 ' N 1 3 ° 1 1 ' 1 1 " W 23 8 . 8 8 ' N 0 0 ° 3 7 ' 3 0 " E 52 . 0 3 ' N 1 4 ° 2 2 ' 2 2 " W 19 . 9 7 ' N 1 4 ° 2 2 ' 2 2 " W 2 3 8 . 8 3 ' N 1 3 ° 1 1 ' 1 1 " W (6 0 'P U B L IC R I G H T O F W A Y ) C1 TOTAL C2 53.02' S 75°37'30" W 30.00' N 75°37'38" E 290.12' (TOTAL) 9.90' N 1 4 ° 2 2 ' 2 2 " W 1 4 2 . 6 8 ' N 68°59'20" E 230.36' ( T I E ) S 75°36'51" W 32.87'N 30°36'36" E 42.41' CO T T T WEST SHORE HOMES WAREHOUSE AND OFFICE 25' FRONT SET B A C K 25' (BUFFER) 31 ' ± B U F F E R X X X X X X X X X X X X X X X X XXXXXXXXXXXX X X X X X X X X 21,520 SF 33 33 34 33 34 35 33 34 34 33 34 33 33 34 34 33 35 35 35 36 36 36 . 5 36 36 33 36.5 33 36 36 . 5 33 30 . 0 MA X 30 . 5 MA X 29 . 7 0 BO T T O M 33 34 34 32 . 5 36 SCALE: 1"=30' GRAPHIC SCALE NA D 8 3 ( 2 0 1 1 ) (N C G R I D ) 0 30 60 90 ME R C H A N T C O U R T 60 - F T P R I V A T E A C C E S S AN D D R A I N A G E E A S E M E N T DATE: PROJECT ID: SCALE: REVISIONS: 4/15/23 2023-12 D OGW O O D LD, P L L C 1701-462 )01 9 ( THE CAMP GROUP, LLC | 3401 Merchant Court, Wilmington NC PARKWAY CORPORATE PARK - NORTHCHASE 5872-P .CIL C N PRELIMIN A R Y NOT FOR CONSTRU C T I O N 3401 MERCHANT COURT GRADING AND GRADING PLAN 3 of 5 1" = 30'S-3.0 DI-3 RIM=35.00 INV=31.00 (10) 'AR' TREES (60) 'FG' SHRUBS (3) 'AR' TREES (15) 'PM' SHRUBS OUTLET STRUCTURE (SEE DETAILS) PROPOSED 6-FT CHAINLINK FENCE PROPOSED 6-FT SHADOW-BOX FENCE EXISTING HYDRANT I HEREBY CERTIFY THAT THIS PLAN HAS BEEN PREPARED IN ACCORDANCE WITH THE LATEST NEW HANOVER COUNTY ORDINANCES AND STORM WATER DESIGN MANUAL. Signature: Name and Title: James Branch Smith, PE Date:11/17/2023 Registration Number:034354 WE HEREBY CERTIFY THAT WE ARE THE CURRENT OWNERS OF THE PROPERTY AND THAT UPON RECEIPT OF THE STORMWATER PERMIT, ANY CLEARING, GRADING, CONSTRUCTION, OR DEVELOPMENT WILL BE PERFORMED IN ACCORDANCE WITH THIS PLAN AND THE APPLICABLE ORDINANCES AND RULES OF NEW HANOVER COUNTY, THE STATE OF NORTH CAROLINA, AND THE FEDERAL GOVERNMENT AND ITS AGENCIES WHICH ARE HEREBY MADE PART OF THIS PLAN. AS THE OWNER, WE ACCEPT FULL RESPONSIBILITY FOR THE CONSTRUCTION AND OPERATION AND MAINTENANCE OF THE PROPOSED FACILITIES. WE WILL NOT ATTEMPT TO TRANSFER THIS RESPONSIBILITY WITHOUT THE WRITTEN AUTHORIZATION OF NEW HANOVER COUNTY. Signature: Name and Title: Richard Campagna, Manager, Camp Group, LLC Date:11/17/2023 WETLAND OUTLET STRUCTURE DETAIL NOT TO SCALE (RISER O.D.+6") x 6" EXTENDED BASE OUTLET STRUCTURE GRATING TO BE SUBMITTED WITH SHOP DRAWING. 3'x3' I.D. RISER OPENING OUTLET BARREL (1) 15" RCP CLASS III 25 LF @ 0% INV=33.00 PERMANENT POOL = 33.00 WEIR OPENING EL. = 34.20 RISER EL. = 35.00 RISER EL. = 35.00 FRONT VIEW SIDE VIEW MIN.1-FT SUMP 1.50" SCH. 40 PVC PIPE PENETRATION BARS OR GRATES, TYP. FES OUT=33.00 SEE PLAN FOR RIP-RAP APRON. 3'x3' GRATE OPENING3'x3' GRATE OPENING (1) 18"x8" OPENING EMERGENCY SPILLWAY NOT TO SCALE RIP-RAP EMERGENCY SPILLWAY* 12" NCDOT CLASS B RIP-RAP (d50 = 8") & 4" NCDOT NO. 57 STONE BEDDING WRAPPED WITH NON-WOVEN FILTER FABRIC (SI GEOTEX 801 OR APPROVED EQUAL) 1 3 3 1 SPWY EL. = 35.50 TOP EL. = 36.50 6" 1.50" SCH. 40 PVC WITH 45° BEND EXTENDED BEYOND THE SHELF INTO THE DEEP POOL PERMANENT POOL = 33.00 WEIR OPENING EL. = 34.20 (1) 8"x18" OPENING PERMANENT POOL 33.00 1.VEGETATE ALL ZONES AS SPECIFIED IN THE STORMWATER WETLAND ZONE PLANTING. SHALLOW WATER ZONE (0-6" BELOW PERMANENT POOL) FOREBAY ZONE (0-40") WETLAND SHALLOW AND DEEP ZONES TYP. SECTION NOT TO SCALE 1.TOPSOIL TO BE ADDED TO TOP OF CONSTRUCTED WETLAND SHELF IF NATIVE SOILS ARE NOT SUITABLE FOR GROWTH OF SELECTED PLANT SPECIES. 2.TOPSOIL SHALL BE WELL MIXED, FREE OF TRASH AND DEBRIS, UNCOMPACTED, AND VOID OF LARGE (>2 INCHES) AND WOODY MATERIAL (>3 INCHES). 3.TOPSOIL (TOP 12") SHALL MEET THE FOLLOWING SPECIFICATIONS: SOIL TYPE: CLAY < 60%, SAND < 80%, SILT < 80% ORGANIC CONTENT: 5-8% P-I: 20<50 pH: 6.0-7.0 4.IN THE EVENT THAT SELECTED TOPSOIL DOES NOT MEET SPECIFICATION LISTED ABOVE, CONSULT WITH LANDSCAPE ARCHITECT. 5.UPON PLACEMENT OF TOPSOIL, AREA SHOULD BE LIGHTLY COMPACTED TO ENSURE STABILIZATION OF MATERIAL. EXCESSIVE TRAFFICKING OF EQUIPMENT OVER CONSTRUCTED WETLAND PLANTING AREAS SHOULD BE AVOIDED. SOIL AMENDMENT SPECIFICATIONS EXISTING SOIL AMENDED TOPSOIL (AS NECESSARY) MIN. 12 IN DEPTH CUT & REMOVE ANY COVERING AROUND ROOTS INSTALL PLANTS WHERE CROWN IS FLUSH WITH SOIL SURFACE TYP. PLANTING DETAIL NOT TO SCALE TEMP. POOL 34.20 3: 1 TOP 36.50 BOTTOM 29.67 SHALLOW WATER ZONE (0-6" BELOW PERMANENT POOL) DEEP POOL (NON-FOREBAY) (18"-30") BOTTOM VARIES 3:1 TOP 36.50 EXISTING DITCH TO BE CLEANED AND GRADED AS SHOWN WETLAND HATCH LEGEND SHALLOW WATER ZONE (SWZ) TEMPORARY INUNDATION ZONE (TIZ) PLANTING SPECIFICATIONS 1.APPROXIMATELY 5 GRAMS OF A BALANCED SLOW RELEASE FERTILIZER SHALL BE INSTALLED NEXT TO EACH HERBACEOUS LARGE PLUG WITHIN THE WETLAND. FERTILIZER MAY BE OMITTED IF 6 INCHES OF FERTILE TOPSOIL HAS BEEN APPLIED THROUGHOUT THE WETLAND. 2.ALL PLANTS SHOULD BE PLANTED IN THE SPECIFIED ZONE TO ENSURE SURVIVAL. 3.AVOID PLANTING INDIVIDUAL SPECIES IN LARGE GROUPS BY SPACING CLUSTERS A MIN. OF 5' APART. 4.ALL ZONES TO BE PLANTED WITH BARE ROOT, PLUGS, OR CONTAINER LIVE PLANTINGS AS SPECIFIED 5.BEGIN PLANTING DURING LOCAL GROWING SEASON IN ORDER TO ENSURE THAT PLANTS HAVE ADAQUET TIME TO ESTABLISH BEFORE WINTER MONTHS. 6.FRESH PLANTS WILL BE OBTAINED FROM A NURSERY AND WILL BE STORED WITH ROOTS IN MOIST SOILS. 7.PLANTINGS WILL BE INSPECTED AND MAINTAINED. PLANTS WILL BE INSPECTED FOR WASHOUT. WASHED OUT PLANTS WILL BE REPLACED. 8.A SUITABLE STAND OF WETLAND PLANTS WILL BE ESTABLISHED WITHIN 8 MONTHS OF PLANTING. A 90% SURVIVAL RATE MEETS THIS OBJECTIVE. SUPPLEMENTAL PLANTINGS WILL BE PROVIDED AS NEEDED TO MEET THIS CRITERIA. SCHEDULE 40 PVC PIPE (BARREL OR ARM) PVC VENT PIPE FLOAT L = 1.4 x DEPTH TO THE OVERFLOW MINIMUM LENGTH APPLIES GENERAL NOTES: 1.PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2.PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3.EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 4.INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 5.EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. FLEXIBLE HOSE TO CONNECT TO POND OUTLET STRUCTURE (SEE OUTLET STRUCTURE DETAILS) TEMPORARY SKIMMER DEWATERING DEVICE NOT TO SCALE 0.90 SKIMMER ORIFICE (IN.) SED BASIN 1 1.5 BASIN #SKIMMER SIZE (IN.) 99LF 15"DIA. PIPE DI-2 RIM=35.00 INV=30.50 DI-1 RIM=35.00 INV=29.50 ES-1 INV=29.00 27LF 18" DIA PIPE 100LF 18" DIA PIPE ES-2 INV=29.00 57LF 18" DIA PIPE EXISTING 15" PIPE EXISTING STORM DRAIN EXISTING DITCH TO BE CLEANED AND GRADED AS SHOWN FOREBAY ZONE OUTLET DEEP POOL ZONE OUTLET DEEP POOL ZONE FENCING NOTES AND SPECIFICATIONS 1. SPECIFICATIONS FOR WOOD FENCES THE FOLLOWING SPECIFICATIONS, DERIVED FROM ASTM F 537 AND STANDARD PRACTICE IN THE FENCE INDUSTRY, SHALL APPLY TO THE MATERIALS AND CONSTRUCTION OF WOOD FENCES: (A) POSTS AND FRAMING - POST SPACING SHALL NOT EXCEED EIGHT FEET (8') ALL POST HOLES SHOULD BE A MINIMUM OF THIRTY INCHES (30") DEEP FOR FOUR FEET (4') HIGH FENCES AND THIRTY-SIX INCHES (36") DEEP FOR FENCES HIGHER THAN FOUR FEET (4') UP TO SIX FEET (6'). ALL TERMINAL, CORNER AND GATE POSTS SHOULD BE SET TO THIRTY-SIX INCHES (36") DEEP. (B) POST HOLES SHOULD BE AT LEAST FOUR INCHES (4") LARGER IN DIAMETER THAN THE LARGEST DIMENSION OF THE POST. ALL TERMINAL, CORNER AND GATE POSTS SHOULD BE SET IN CONCRETE. (C) FENCES UP TO FIVE FEET (5') SHALL HAVE A MINIMUM OF TWO RAILS (STRINGERS) TOP AND BOTTOM. FENCES OVER FIVE FEET (5') SHALL HAVE A THIRD RAIL AT CENTER HEIGHT. STRINGERS SHALL BE 2X6 MINIMUM (NOMINAL). (D) MATERIALS - ALL MATERIALS USED IN WOOD FENCING SHOULD BE EITHER (1) NATURALLY ROT-RESISTANT WOOD (SUCH AS CEDAR), (2) A WOOD PRESSURE TREATED FOR ROT-RESISTANCE, OR (3) BE COATED THOROUGHLY WITH A PAINT OR PROTECTIVE COATING IMMEDIATELY ON ERECTION. (E) FASTENERS - FASTENERS SHALL BE MADE OF A NON-RUSTING, NON-CORROSIVE MATERIAL, OR COATED TO RESIST RUSTING. NAILS SHALL BE LONG ENOUGH TO PENETRATE THE RECEIVING MEMBER TWICE THE THICKNESS OF OF THE THINNER MEMBER BUT NOT LESS THAN ONE AND ONE-HALF INCHES (1 1/2"). (F) COVER BOARDS SHALL BE 1/2" MINIMUM THICKNESS. (G) SOLID WOOD FENCES SHOULD ALLOW FOR EXPANSION TO AVOID BUCKLING AS FOLLOWS: FOR WIDTHS 2 TO 4 INCHES, A ONE SIXTEENTH INCH (1/16") SPACE SHOULD BE PROVIDED; FOR WIDTHS 6 TO 8 INCHES, A MINIMUM SPACE OF ONE EIGHTH INCH (1/8") SHOULD BE PROVIDED. (H) THE TOPS OF THE COVER BOARDS SHALL BE CUT AS DOG EAR (CORNERS CUT OFF AT 45 DEGREE ANGLES). X 8'-0" POST FACE TO FACE (MAX.)LC 3" TYP. X 4" X 4" 3'- 0 " 6'- 0 " 4" LC THE TOP AND BOTTOM WOOD CROSS BRACES SHALL BE PLACED 6" FROM THE END OF THE WOOD PICKETS. THE MIDDLE BRACE SHALL BE CENTERED WITHIN THE FENCE. 4 x 4 TREATED WOOD POST (TYP.) ATTACH EACH 2 x 6 x 8 CROSS BRACE TO THE 4 x 4 TREATED WOOD POST WITH 2-3" x 1/4" GALVANIZED LAG BOLTS WITH WASHERS (TYP.) 2 x 6 x 8 TREATED WOOD CROSS BRACE (TYP.) ATTACH EACH 1 x 6 WOOD PICKET TO THE 2 x 6 CROSS BRACE WITH 3 GALVANIZED NAILS (TYP.) 1 x 6 TREATED WOOD PICKET (TYP.) TOP OF CONCRETE FOUNDATION TO BE A RECTANGULAR SHAPE 1/2" SLOPE INSTALL 1 x 6 BOARDS VERT., 2 x 6's MAY SLOPE OR BE HORIZ. TO ACCOUNT FOR GRADE CHANGES. SPACE 1 x 6 BOARDS EQUALLY 4000 PSI MIN. OR AS SPECIFIED IN THE GEOTECH REPORT GRADE 4" CABC ELEVATION WOOD FENCE SECTION 4 x 4 TREATED WOOD POST (TYP.) 1 x 6 TREATED WOOD PICKET (TYP.)2 x 6 TREATED WOOD CROSS BRACE (TYP.) INSTALL 1 x 6 BOARD AT END OF FENCE IF SIDE IS VISIBLE 4 x 4 TREATED WOOD POST (TYP.) PLAN VIEW SHADOW BOX FENCE AND GATE DETAILS NOT TO SCALE 16" 6' - 0 " 4" 1-1/2" 6' 4' - 0 " 3'- 6 " 6" 8" 4" 4" 11 " 2" 9" PLAN VIEW FRONT ELEVATION 4" x 4" x 1/4" STEEL TUBE GROUT FILLED & CAPED W/ CONCRETE, PAINTED PER OWNER. GATE FRAME: 1-1/2"x 1-1/2"x 1/8" STEEL TUBE OR 2"x 2"x 1/8" ANGLE W/ WELDED JOINTS. ATTACH HORZ. C.C.A. 2 X 4'S ON STEEL FRAME @ TOP & BOTTOM W/ 4" X 1/4" GALV. CARRIAGE BOLTS ON OUTSIDE TO RECEIVE FENCE FACE BOARD. BARREL BOLT: STANLEY HEAVY BARREL BOLT # CD1084BB SCREW THROUGH WOOD & INTO METAL FRAME. 3/4" BENT STL. BAR (2) 1" I.D. X 2" LONG STL. PIPE WELDED TO FRAME & ALIGNED FOR BENT BAR ON EACH GATE. 6" HINGE: TYP. ( 2 ) STANLEY BB855 PHOSPHATE WITH NO HOLES ON ONE SIDE FOR WELDING TO STEEL PIPE. DUMPSTER PAD: SEE DETAIL. 1" HOLE IN PAVM'T W/ MTL. SLEEVE TO RECEIVE STL. BAR (3" DEPTH MIN.) 4" L 1 1/2" X 1 1/2" X 1/8" X 4'-0" LONG WELDED TO GATE. 3/4" BENT STL. BAR ALL MTL. PARTS PRIMED W/ METAL PRIMER & PAINTED PER OWNER SPECIFICATION. ℄ ℄ GATES OPENING SHOULD BE PLACED AT CENTER LINE OF CONCRETE PAD 12" 4000 PSI MIN. OR AS SPECIFIED IN THE GEOTECH REPORT NOTES: 1. SEE FENCING NOTES, THIS SHEET.DATE: PROJECT ID: SCALE: REVISIONS: 4/15/23 2023-12 D OGW O O D LD, P L LC 1701-462 )01 9 ( THE CAMP GROUP, LLC | 3401 Merchant Court, Wilmington NC PARKWAY CORPORATE PARK - NORTHCHASE 5872-P .CIL C N PRELIMIN A R Y NOT FOR CONSTRU C T I O N 3401 MERCHANT COURT SITE DETAILS 4 of 5 NTS S-4.0 6" 3'- 0 " 4'- 0 " 2'-0" 10" FENCING A. FENCING SHALL CONFORM TO DETAIL SHOWN AND THE CURRENT STANDARDS ESTABLISHED BY THE CHAIN LINK FENCE MANUFACTURERS INSTITUTE. B. FRAMES SHALL CONSIST OF CLFMI TYPE 1 MATERIALS SIZED TO ACCOMMODATE THE SPANS REQUIRED POSTS SHALL BE OF STANDARD WEIGHT, HOT DIPPED GALVANIZED PIPE CONFORMING TO ASTM A-120 SCHEDULE 40 FOR CORNER AND GATE POSTS, AND SCHEDULE 20 FOR LINE AND TOP RAILS. C. GATE FRAMES SHALL BE FABRICATED OF GALVANIZED STEEL AND SIZED TO ACCOMMODATE SPANS REQUIRED. GATES SHALL BE SWING TYPE WITH THREE STRAND BARBED WIRE, SUPPORTED WITH TENSION BARS AND BRACING AS REQUIRED. GATE POSTS SHALL BE SIZED TO ADEQUATELY SUPPORT THE GATE OVER THE SPAN SHOWN ON THE PLANS. GATE POSTS, GATE HINGES, GATE STOPS AND LATCHES SHALL BE OF ADEQUATE STRENGTH FOR THE GATE PROVIDED AND LATCHES SHALL BE SUITABLE FOR SECURING WITH A PADLOCK. D. FENCE FABRIC SHALL BE 2 INCH MESH, 9-GAUGE CHEMICALLY CLEANED AND ZINC COATED, CONFORMING TO ASTM A-392 FOR CLASS 2 FABRIC. E. BARBED WIRE SHALL BE 12-1/2 GAUGE GALVANIZED, WITH 4 BARBS AT 5 INCH SPACING. BARBED WIRE SHALL BE STRETCHED TIGHT, ADEQUATELY SECURED TO EACH ANGLE ARM AND COATED CONFORMING TO ASTM A-392 FOR CLASS 2 FABRIC. MUSHROOM TYPE GATE ANCHOR GROUND CLEARANCE 3" MAXIMUM 1" MINIMUM NO. 11 GAUGE & 1" BEVELED GALVANIZED STEEL BAND WITH BOLT AND NUT 3/8" DIA. DIAG. TENSION ROADS AT EACH GATE & CORNERS OF LINE FENCING (TYP.) WELDED 2" DIA. GATE FRAMES (TYP.)TOP RAIL LINE RAIL ONE TENSION WIRE CLIP EA. LINE POLE (6 OUNCE MIN.) TENSION WIRE NO. 7 GAUGE GALVANIZED COIL SPRINGS STRETCHED OUT BOTTOM HINGE PER MANUFACTURER (TYP.)CONCRETE FOOTING 1'0" DIA. (TYP.) 1'2" DIA. AT CORNER AND GATE POST 10'0" MAXIMUM 1/2" CROWN CHAIN LINK FENCE DETAIL NOT TO SCALE FENCE CONTRACTOR TO PROVIDE BLACK SLATS OR MESH FABRIC SCREEN WT. = 132 LBS PLAN OF GRATE SECTION B-B WT.=120 LBS. PLAN OF FRAME BB 27 3/4" 27 3/4" 2 1/2" 24" 24" 1 3/8" 1 3/8" 1 1/4" 1 1/4" 3000 #CONC. COLLAR 1/2" DOWEL PIN (2 FOR EACH SIDE) 6" BY 1' 9 3/4" 1' 9 3/4" 6" CONC. SIZE VARIABLE STANDARD AREA DRAIN (AD) NTS 6" M I N . MI N . 1 2 " 6" PI P E D I A . VA R I E S NOT TO SCALE STORM DRAIN HDPE/HP PIPE TRENCH 50' MIN. 50' MI N . 20' MIN. TEMPORARY INLET PROTECTION NOT TO SCALE La, LENGTH W, W I D T H RIP-RAP THICK (t)STORM DRAIN PIPE FLOW NON-WOVEN FILTER FABRIC STORM DRAIN PIPE TAILWATERSLOPE = 0% PIPE OUTLETS SHALL HAVE FLARED END SECTIONS (UNLESS OTHERWISE INDICATED OR IF PIPES ENTERING PONDS ARE SUBMERGED) NCDOT CLASS B (d50=8") EROSION CONTROL STONE ON A LAYER OF 4" NCDOT #5 OR #57 STONE (t) RIP-RAP APRON DETAIL NOT TO SCALE RIPRAP LOCATIONS PIPE DIA. (IN.) LENGTH, La (ft) PIPE OUTLET WIDTH (FT.) DOWNSTREAM WIDTH, W (FT.) RIP-RAP APRON SCHEDULE STONE THICKNESS t (IN.) 3.018"5.0ES 1 - FOREBAY 13.5"5.0 3.015"5.0ES 2 - FOREBAY 13.5"5.0 (GEOTEX 801 OR APPROVED SUBSTITUTE) DATE: PROJECT ID: SCALE: REVISIONS: 4/15/23 2023-12 D OGW O O D LD, P L LC 1701-462 )01 9 ( THE CAMP GROUP, LLC | 3401 Merchant Court, Wilmington NC PARKWAY CORPORATE PARK - NORTHCHASE 5872-P .CIL C N PRELIMIN A R Y NOT FOR CONSTRU C T I O N 3401 MERCHANT COURT SITE NOTES 5 of 5 NTS S-4.1 Know what's below. before you dig.Call R EROSION CONTROL AND SEQUENCE OF CONSTRUCTION NOTES: NOTE: THESE EROSION CONTROL AND SEQUENCE OF CONSTRUCTION NOTES ARE INTENDED FOR EACH "PHASE" OF CONSTRUCTION. THE ORDER AND STEPS TAKEN MUST BE IMPLEMENTED AS EACH PART OF THE PROJECT IS DEVELOPED; WHETHER AS A WHOLE OR IN PHASES. ANY EROSION CONTROL DEVICES/MEASURES MUST REMAIN IN PLACE UNTIL THE ENTIRE DISTURBANCE IS STABILIZED AND ALL IMPROVEMENTS WITHIN THE DISTURBANCE LIMITS ARE COMPLETE. 1.CONSTRUCT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE(S), ESTABLISH THE LIMITS OF DISTURBANCE, TREE PROTECTION FENCING, AND TEMPORARY SILT FENCE. 2.CLEAR AND REMOVE FROM SITE TREES AS DESIGNATED, ROOTS, ROOT MAT, ETC. FROM THE AREA WITHIN THE DESIGNATED CLEARING LIMITS. 3.CONSTRUCT TEMPORARY SEDIMENT BASIN(S) AND ASSOCIATED SKIMMER, OUTLET PIPE, SPILLWAY, ETC. 4.INSTALL REMAINING EROSION CONTROL MEASURES AS SHOWN ON THE PLANS WITHIN THE AREA DISTURBED. ALL EROSION CONTROL MEASURES MUST BE INSTALLED BEFORE COMMENCING CONSTRUCTION. 5.PLANT GRASS OVER ALL GRADED AREAS WITHIN 14 WORKING DAYS OF CEASE OF ANY GRADING ACTIVITY. 6.IMMEDIATELY UPON THE INSTALLATION OF ANY STORM DRAINAGE CATCH BASIN, DROP INLET, ETC., THE CONTRACTOR SHALL INSTALL INLET PROTECTION TO PREVENT SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING AND RESTORING TO PRE-CONSTRUCTION CONDITIONS ANY AREAS OUTSIDE THE PROJECT LIMITS THAT MAY INADVERTENTLY BE DAMAGED DUE TO THE FAILURE OF THE EROSION CONTROL MEASURES. 8.DURING GRADING AND AFTER GRADING HAS BEEN COMPLETE, THE CONTRACTOR SHALL CONTINUE TO MAINTAIN PERMANENT AND TEMPORARY EROSION CONTROL MEASURES UNTIL FINAL APPROVAL BY ENGINEER OR EROSION CONTROL INSPECTOR. 9.UPON RECEIVING FINAL APPROVAL, THE CONTRACTOR CAN REMOVE TEMPORARY EROSION CONTROL MEASURES. 10.THE CONTRACTOR SHALL CONTINUE TO WATER, FERTILIZE, MOW AND MAINTAIN GRASS & PLANTED AREAS UNTIL ALL CONSTRUCTION IS COMPLETE. EROSION CONTROL MAINTENANCE PLAN: 1.ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY 1/2-INCH OR GREATER RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2.ALL CONSTRUCTION ENTRANCES WILL BE PERIODICALLY TOP DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. ANY SEDIMENT THAT IS TRACKED INTO THE STREET WILL BE IMMEDIATELY REMOVED. 3.SEDIMENT FENCE / SEDIMENT FENCE OUTLETS - SEDIMENT WILL BE REMOVED BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF-FILLED. THE SEDIMENT FENCE WILL BE BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL, AND SPACED 6 FEET WITH EXTRA STRENGTH FABRIC AND NO WIRE BACKING. STAKE SPACING CAN BE 8 FEET WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS (OR EXCELSIOR WATTLES) ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE THE ROCK OR WATTLE WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS, OR IS DAMAGED. 4.ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS ON THESE PLANS AND CONTRACT SPECIFICATIONS TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 5.INLET PROTECTION - SEDIMENT SHALL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL, BLOCK AND GRAVEL, OR ROCK-PIPE INLETS, WHEN IT REACHES HALF-FILLED. ROCK WILL BE CLEANED OR REPLACED WHEN NO LONGER DRAINS. SILT SACKS, BEAVER DAMS, SANDY SACKS, AND SOCKS NEED CHECKING EVERY WEEK AND AFTER RAIN. 6.SEDIMENT BASIN/SEDIMENT TRAPS - REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO WITHIN ONE HALF OF THE DESIGN DEPTH. PLACE SEDIMENT IN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, PIPING, AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. BAFFLES WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE, TEAR, DECOMPOSE, ETC. 7.SEDIMENT BASIN BAFFLES - BAFFLES WILL BE REPAIRED OR REPLACED IF THEY COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE. THEY WILL BE REPLACED PROMPTLY. SEDIMENT WILL BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE FIRST BAFFLE. 8.SKIMMER - INSPECT SKIMMER AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL TO MAKE SURE THAT THE INTAKE MECHANISM, ORIFICE, OR DISCHARGE PIPE IS NOT CLOGGED WITH TRASH OR SEDIMENT. IF THE BASIN IS DRY, MAKE SURE THAT ANY VEGETATION GROWING ON THE BOTTOM IS NOT HOLDING THE SKIMMER DOWN. TAKE SPECIAL PRECAUTION IN WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. 9.OUTLET PROTECTION - INSPECT RIP RAP OUTLET STRUCTURES WEEKLY AND AFTER RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIP RAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER OFFSITE SEDIMENTATION. 10.EMERGENCY SPILLWAY / FOREBAY PROTECTION - AFTER EVERY HIGH-WATER EVENT INSPECT THE INTEGRITY OF THE LINED SPILLWAY AND THE ADJACENT EARTHEN BANKS. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. REPAIR ANY VOIDS IN THE RIP RAP LINED APRONS. RE-ESTABLISH ANY LOOSE STONES, AND FIX GAPS IN THE ADJACENT VEGETATIVE COVER. 11.DIVERSION DITCHES / GRASS SWALES - INSPECT THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. DIVERSIONS SHALL BE LINED OR STABILIZED AS NOTED ON THE PLANS. IF THE DIVERSION WILL BECOME PERMANENT GRASS SWALES. THEN GROW GRASS INTO A HEALTHY, VIGOROUS CONDITION. LININGS OR ROLLED EROSION CONTROL PRODUCTS (RECP) SHALL BE PROPERLY STAKED AND IN CLOSE CONTACT WITH THE GROUND. MONITOR AND REPAIR THE LINING AS NECESSAR UNTIL GROUND COVER IS ESTABLISHED IN THE DITCH. 12.CHECK DAMS - EXCELSIOR OR RIP-RAP - SEDIMENT SHALL BE REMOVED FROM THE DAM WHEN IT REACHES HALF-FILLED. CHECK DAMS SHALL BE REPAIRED OR REPLACED, AND CHANNEL SHALL BE REPAIRED OF RUTS, PIPING, AND SETTLEMENT AROUND THE DAMS AS NEEDED. WASHED STONE ON THE FACE OF THE CHECK DAM SHALL BE REMOVED AND REPLACED WHEN SEDIMENT IS CLEANED FROM FACE OF THE DAM. 13.CONCRETE WASHOUTS - CONCRETE WASHOUTS SHOULD BE INSPECTED DAILY AND AFTER HEAVY RAINS. DAMAGES SHOULD BE REPAIRED PROMPTLY. IF FILLED TO OVER 75% CAPACITY WITH RAIN WATER IT SHOULD BE VACUUMED OR ALLOWED TO EVAPORATE TO AVOID OVERFLOWS. BEFORE HEAVY RAINS THE CONTAINERS LIQUID LEVEL SHOULD BE LOWERED OR THE CONTAINER COVERED TO AVOID AN OVER FLOW DURING RAIN. WHEN SOLIDS HAVE HARDENED THEY SHOULD BE REMOVED AND RECYCLED. 14.SEDIMENT STORAGE BAGS SHALL BE REMOVED ONCE 1/2-CAPACITY IS REACHED. SEDIMENT BAGS SHALL BE DISPOSED OF PROPERLY IN A LANDFILL OR BROKEN ON-SITE FOR BACKFILL. BAGS SHALL BE LIFTED CAREFULLY ACCORDING TO MANUFACTURER'S RECOMMENDATIONS SO THAT BAGS ARE NOT TORN IN-PLACE AND SEDIMENT IS NOT RELEASED OFF-SITE OR DOWNSTREAM. TEMPORARY SEEDING GRASS TYPE LBS/ ACRE TIME OF SEEDING FERTILIZER LIMESTONE RYE GRAIN 50 OCT. - APR.400 LBS/AC. 10-20-20 SWEET SUDAN GRASS 50 JUNE - AUGUST 400 LBS/AC. 10-20-20 GERMAN or BROWNTOP MILLET 50 JUNE - AUGUST 400 LBS/AC. 10-20-20 STRAW MULCH AS NEEDED 4,000 PERMANENT SEEDING GRASS TYPE LBS/ ACRE TIME OF SEEDING FERTILIZER LIMESTONE BERMUDA, HULLED BERMUDA, UNHULLED 10-20 35 MARCH - AUGUST SEPT. - FEB.BY SOIL TEST CENTIPEDE 10 MARCH - AUGUST BY SOIL TEST (NO HIGH PH) TALL FESCUE (COASTAL CULTIVAR RECOMMENDED) 50 MARCH - AUGUST 300 LB/AC 10-20-20 OR BY SOIL TEST SLOPES >= 2:1 CENTIPEDE SERICEA LESPEDEZA 5 20 JAN - DEC BY SOIL TEST EROSION CONTROL AND SEQUENCE OF CONSTRUCTION NOTES: NOTE: THESE EROSION CONTROL AND SEQUENCE OF CONSTRUCTION NOTES ARE INTENDED FOR EACH "PHASE" OF CONSTRUCTION. THE ORDER AND STEPS TAKEN MUST BE IMPLEMENTED AS EACH PART OF THE PROJECT IS DEVELOPED; WHETHER AS A WHOLE OR IN PHASES. ANY EROSION CONTROL DEVICES/MEASURES MUST REMAIN IN PLACE UNTIL THE ENTIRE BASIN DESIGNED TO HANDLE SEDIMENTATION AND EROSION IS STABILIZED AND ALL IMPROVEMENTS WITHIN THE BASIN ARE COMPLETE. 1.EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OF COVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES (INCLUDING TIMBERING AND DEMOLITION) OCCUR.” THE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (E-NOI) FORM AT DEQ.NC.GOV/NCG01. PLEASE NOTE, THE E-NOI FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN APPROVED. A COPY OF THE E&SC PERMIT, THE COC, AND A HARD COPY OF THE PLAN MUST BE KEPT ON SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE DURING INSPECTION. 2.SCHEDULE A PRE-CONSTRUCTION MEETING AND/OR NOTIFY NEW HANOVER COUNTY ENGINEERING OFFICE AT LEAST 48-HOURS PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITIES ON THE PROPERTY @ 910-399-5551. 3.CONSTRUCT TEMPORARY GRAVEL CONSTRUCTION ENTRANCE(S), ESTABLISH THE LIMITS OF DISTURBANCE, TREE PROTECTION FENCING, AND TEMPORARY SILT FENCE [PH I E.C.]. INSTALL ANY REMAINING EROSION CONTROL MEASURES AS SHOWN ON THE PLANS WITHIN THE AREA DISTURBED. ALL EROSION CONTROL MEASURES INCLUDING DIVERISON DITCHES AND SEDIMENT BASINS MUST BE INSTALLED BEFORE COMMENCING MASS GRADING AND CLEARING [PH I E.C.]. 4.CLEAR AND REMOVE TREES AS DESIGNATED, ROOTS, ROOT MAT, ETC. FROM THE AREA WITHIN THE DESIGNATED CLEARING LIMITS [PH I E.C.] TO ROUGH GRADE AND MASS GRADE THE PROPERTY. 5.PLANT GRASS OVER ALL GRADED AREAS WITHIN 14 CALENDAR DAYS OF CEASE OF ANY GRADING ACTIVITY [PH I E.C.]. PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 901 CALENDAR DAYS, HOWEVER, NPDES NCG01 GROUNDCOVER REQUIREMENTS SHALL TAKE PRECEDENCE. REF. SHEET C-1.1. 6.IMMEDIATELY UPON THE INSTALLATION OF ANY STORM DRAINAGE CATCH BASIN, DROP INLET, ETC., THE CONTRACTOR SHALL INSTALL INLET PROTECTION TO PREVENT SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM [PH I OR PH II E.C.]. 7.UPON INSTALLATION OF REQUIRED STORM WATER PIPES, INLETS ETC. THE CONTRACTOR SHALL INSTALL PERM. GRASSED SWALES, RIP-RAP APRONS OR OTHER OUTLET CONTROL MEASURES AS SHOWN ON PLANS [PH II E.C.]. 8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING AND RESTORING TO PRE-CONSTRUCTION CONDITIONS ANY AREAS OUTSIDE THE PROJECT LIMITS THAT MAY INADVERTENTLY BE DAMAGED DUE TO THE FAILURE OF THE EROSION CONTROL MEASURES. 9.DURING GRADING AND AFTER GRADING HAS BEEN COMPLETE, THE CONTRACTOR SHALL CONTINUE TO MAINTAIN PERMANENT AND TEMPORARY EROSION CONTROL MEASURES UNTIL FINAL APPROVAL BY ENGINEER OR EROSION CONTROL INSPECTOR. 10.UPON RECEIVING FINAL APPROVAL, THE CONTRACTOR CAN REMOVE TEMPORARY EROSION CONTROL MEASURES INCLUDING BUT NOT LIMITED TO ANY TEMPORARY DITCH PLUGS. 11.THE CONTRACTOR SHALL CONTINUE TO WATER, FERTILIZE, MOW AND MAINTAIN GRASS & PLANTED AREAS UNTIL ALL CONSTRUCTION IS COMPLETE. 12.ONCE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE EROSION CONTROL PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSEOUT VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT ELECTRONIC N.O.T. (NOTICE OF TERMINATION). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT. NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A A BELOW GRADE WASHOUT STRUCTURE 1:1SIDE SLOPE(TYP.) 10 MILPLASTICLINING 3'- 0 " MIN . & X ' MAX . SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE PLAN SECTION B-B HIGHCOHESIVE &LOW FILTRATIONSOIL BERM 8" 6" 2' HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE(TYP.) 10 MIL PLASTIC LINING B B 3'-0 " MIN . & X ' MA X . A SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.)OR STAPLES NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINEDWHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKEDWITH SIGNAGE NOTING DEVICE. NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLIDREACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH AMINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETEWASHOUT CONCRETEWASHOUT PLAN CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.) SILT FENCE 10 ' M I N 10' MIN SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasing land disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1.E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: (a)This general permit as well as the certificate of coverage, after it is received. (b)Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. (c)All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1.Occurrences that must be reported Permittees shall report the following occurrences: (a)Visible sediment deposition in a stream or wetland. (b)Oil spills if: ·They are 25 gallons or more, ·They are less than 25 gallons but cannot be cleaned up within 24 hours, ·They cause sheen on surface waters (regardless of volume), or ·They are within 100 feet of surface waters (regardless of volume). (a)Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b)Anticipated bypasses and unanticipated bypasses. (c)Noncompliance with the conditions of this permit that may endanger health or the environment. 2.Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. STORMWATER WETLAND VEGETATION NOTES: 1) DO NOT COMPROMISE WETLAND PLANTINGS WITH TEMPORARY OR PERMANENT SEEDING NEAR THE STORMWATER WETLAND.