Loading...
HomeMy WebLinkAboutConcept PlanSite Inventory Notes: I . Soils Type: Ls (Lynchburg fine sandy loam) 4 Pn (Pante jo loam) 2. This property is not impacted by any AEC. 3. There are no Conservation Overlay boundaries affecting this property. 4. This site is not impacted by any recognized historic or archeological significance. 5. No cemeteries were evidenced on the site. G. There is no regulated vegetation within the proposed development area. 7. There are no Jurisdictional wetlands within the project boundaries. 8. There is no evidence of endangered species or habitat issues on the site. 9. This property is not within any Special Flood hazard Area as evidenced on N.C. Flood Map 3720322000J. 10. The site dramage flows into the Ness Creek watershed / 5C class waters. I 146 / l \ / 1 / �y, CAR0I o' -4 -�p DSlk C� Re A Illy \� / ` EX15ting New 13eginnlnoj Church Christian 12 Units Utility Notes: I . Existing water and sanitary sewer services are currently available to the site from Cape Fear Public Utility Authority public mains. 2. All utility services, such as electric power, CATV, gas * telephone shall be installed underground. 3. All water * sewer utilities to be installed per CFPUA Technical Specifications � Standards. 4. Project shall comply with CPPUA Cross Connection Control requirements. Water meter(s) cannot be released until all requirements are met and N.C.D.E.N.R. has issued their "Final Approval.". Call 343-3910 for information. 5. Any backflow prevention devices required by the CFPUA will need to be on the list of approved devices by USCPCCCHR or A55E. G. Water t sewer services can not be activated on new mains until the Engmeer's Certification and as-bullts are received and "Final Approval" issued by the Public Water Supply Section of NCDENR, and "Final Engmeermg Certification" issued by Division of Water Quality Section of NCDENR. 7. If contractor desires CFPUA water for construction, he shall apply in advance for this service and must provide a reduced pressure zone (P.PZ) backflow prevention device on the developer's side of the water meter box. 8. When PVC water mains and services are proposed, the pipes are to be marked with No. 10 insulated, smgle-strand copper wire installed t strapped to the pipes with duct tape. This is to be accessible in all valves and meter boxes to aid in future location of facilities. 9. The contractor is responsible for the location and protection or existing utilities during construction. Call U-LOCO at I-800-G32-4949. Contractor is responsible for the repair and replacement of any utilities, curb � gutter, pavement, etc. that may be be damaged during construction. Damaged items shall be repaired to at least the quality or workmanship found in the onginal item. 10. The process for telephone cable placement: * Final grade will need to be established. * Power will place their cable first - approximately 3' deep. BellSouth * Cable TV will then place their cable at approximately 2' deep. I I . Solid waste disposal will be serviced by private contractor. 107 • Existing • Stormwater / / / / / ( Open • �// �/ l i Space \ \ \ \ 12 \ Units 30�\ \�\ ¢) 12 3-5tory Units Pond ` \ Expansion 3-Story 12 ; / �� \ \\ \ Units \\ 3-5tory \ / /-----,\ 12 Units / 12 • • • • d 3-5tory Units II d \ / 3-5tory c I • Rachels Place 5ectlon 3 M,3. 29/G4 Connect to existing _ stubbed pavement as required by Life -Safety regulations. Development Notes: I . All development shall be In accordance with the New Hanover County Zoning Ordinance. 2. Project shall comply with all Federal, State t- New Hanover County regulations. Development Data: Total Tract Area - 10.95 ac. Maximum RMF-M Density - 1 0.95 ac. @ 17.0 units/ac. _ Total Unit5 Permitted - 18G " 180 Units Proposed " Parking: @ 2 spaces / unit - 3GO spaces read- ** 302 Spaces Provided ** ** Note: Parking analysis to be provided for typical affordable housing needs. Surface Coverage: Rooftops - 52,900 s.f.± Pavement - 9 1,300 5.f.± walks - 18,500 5.f.± Total - 192,700 5.f.± (40.4%) 12 Units 3-Story 12 U n I t 5 3-Story Coy , /7t N 64 4403„ � (-q5, r/�a�� General Notes: I . NHCo Parcel No.: 322020.91 .7300 [ RO 3 3 00-003 -00 2 -0001 2. Total Rezoning Area: 9.GO ac.± 3. Existing Zoning: R-20 t- CZD R-10 Proposed - CZD R-5 4. CAMA Land Classification: Community Mixed -use Project No.: 23- 14 Scale: 1"=GO, Date: 1 0/02/23 REVISon5: \ U12 n is � 3-Story Fire * Life Safety Notes: I . New hydrants must be available for use prior to construction of the buildmcJs within any development. 2. Hydrants must be located within 8' of the curb. 3. Contractor shall maintain an all weather access for emergency vehicles at all times dunmg construction. 4. A minimum of 5' shall separate underground fire lines or private water mains from other underground utilities. 5. Underground fire line * private water mains must be permitted * mspected by the Fire Dept. from the public right-of-way to the buildmg. G. Construction Type - 513 7. Residences will not have sprinkler systems. 8. Landscaping or parking can not block or impede the fire hydrants. A 3-foot (3') clear space shall be maintained around the circumference of hydrants. Vicinity Map (No Scale) I 22' G-G 5' WALK I GRASSED I 3: MAX. W1 _ OO (�, to W 3: I MAX \ 4, SLOPE 4 �' TO GRADE G - _ _ SLOPE MED�IVIALLEY =0 GRADE I ' 2'-0" /2" Way GUTTER Covenant Lane X-Section 12 Units \ \ \ Ivy Wood 3-5tory - \ \ at Runnymea e \ \ 5ectlon 12 29/64 Units 3-5tory ° v • ° 12 • Units 3-Story \\� \��� \1��'��� ° \ - • Open • � Space I / / / • t{ ° ° 12 \\ °• Units Comunity 3-5tory I/ I Clubhouse /I II Tot / I 1 Lot 12 \� / / //Q fl Units / I oLo >L \\ 3-5tory , I I l w cp � `- I / / V Q) Graphic Scale GO 50 40 30 20 10 0 30 GO