Loading...
HomeMy WebLinkAboutRevised Concept Plan 1-9-2024Ga l w a y R d . Ale x T r a s k D r . H o l l a n d D r . 30 ' D r a i n a g e E s m t . 30' D r a i n a g e E s m t . Existing New Beginning S. Woolwich Ct. Whitewood Way Sky Ct. 30' D r a i n a g e E s m t . S 6 2 ° 0 8 ' 5 1 " E 1 1 2 8 . 2 3 ' Ivy Wood at Runnymeade Section 1 M.B. 29/64 9899 100 105 106 107 116 116A 127 128 129141 142 145 148 (6 0 ' P u b l i c R / W ) ( 6 0 ' P u b l i c R / W ) Christian Church Ne w B e g i n n i n g D r i v e Bl u e C l a y R o a d (Pri v a t e D r i v e ) (6 0 ' P u b l i c R / W ) 322020.91.7300 Connection Control requirements. Water meter(s) General Notes: 1. NHCo Parcel No.: [R03300-003-002-000] 2. Total Rezoning Area: 9.60 ac.± 3. Existing Zoning: R-20 & CZD R-10 4. CAMA Land Classification: Community Mixed-use S N W E 1. New hydrants must be available for use prior to the original item. of NCDENR, and "Final Engineering Certification" issued by 3. There are no Conservation Overlay boundaries is to be accessible in all valves and meter boxes to aid in USCFCCCHR or ASSE. during construction. currently available to the site from Cape Fear wire installed & strapped to the pipes with duct tape. This and protection or existing utilities during and "Final Approval" issued by the Public Water Supply Section repaired to at least the quality or workmanship found in Area as evidenced on N.C. Flood Map 3720322000J. Call 343-3910 for information. met and N.C.D.E.N.R. has issued their "Final Approval.". 11. Solid waste disposal will be serviced by private contractor. Public Utility Authority public mains. CFPUA Technical Specifications & Standards. 3. All water & sewer utilities to be installed per 3. Contractor shall maintain an all weather 9. This property is not within any Special Flood Hazard 8. Landscaping or parking can not block or impede the 8. There is no evidence of endangered species or 8. When PVC water mains and services are proposed, the pipes fire hydrants. A 3-foot (3') clear space at approximately 2' deep. 4. This site is not impacted by any recognized * BellSouth & Cable TV will then place their cable 1. Soils Type: Ls (Lynchburg fine sandy loam) & cannot be released until all requirements are affecting this property. historic or archeological significance. habitat issues on the site. 2. This property is not impacted by any AEC. watershed / SC class waters. 6. There is no regulated vegetation within the proposed 7. There are no jurisdictional wetlands within the project 5. No cemeteries were evidenced on the site. apply in advance for this service and must provide a reduced 4. Project shall comply with CFPUA Cross 10. The site drainage flows into the Ness Creek development area. boundaries. Site Inventory Notes: 9. The contractor is responsible for the location future location of facilities. pressure zone (RPZ) backflow prevention device on the Utility Notes: are to be marked with No. 10 insulated, single-strand copper until the Engineer's Certification and as-builts are received 7. If contractor desires CFPUA water for construction, he shall 5. Any backflow prevention devices required by the CFPUA 1. Existing water and sanitary sewer services are 6. Water & sewer services can not be activated on new mains developer's side of the water meter box. 2. All utility services, such as electric power, CATV, gas & telephone shall be installed underground. Division of Water Quality Section of NCDENR. be damaged during construction. Damaged items shall be will need to be on the list of approved devices by Contractor is responsible for the repair and replacement 10. The process for telephone cable placement: of any utilities, curb & gutter, pavement, etc. that may be construction. Call U-LOCO at 1-800-632-4949. 6. Construction Type - 5B * Power will place their cable first - approximately 3' deep. Fire & Life Safety Notes: 2. Hydrants must be located within 8' of the curb. permitted & inspected by the Fire Dept. of hydrants. 7. Residences will not have sprinkler systems. * Final grade will need to be established. 5. Underground fire line & private water mains must be construction of the buildings within any development. access for emergency vehicles at all times shall be maintained around the circumference from the public right-of-way to the building. 4. A minimum of 5' shall separate underground fire lines or private water mains from other underground utilities. 12060300 Graphic Scale 102030 Cape Fear Township / New Hanover County / North Carolina Project No.: Christian Church, Inc. 3120 Alex Trask Drive Castle Hayne, NC 28429 Developer: The Covenant IIScale: Date: Revisons: 23-14 1'' = 60' 12/18/23 (No Scale) Vicinity Map N E S W Site New Beginning Concept Plan Conditional Zoning District Development Notes: Pn (Pantego loam) a Family Housing Community the New Hanover County Zoning Ordinance. 1. All development shall be in accordance with & New Hanover County regulations. 2. Project shall comply with all Federal, State Proposed - CZD R-5 40 Design Solutions P.O. Box 7221 Wilmington, NC 28406 Tel. 910-620-2374 5060 N 6 4 ° 4 4 ' 0 3 " W 1 2 6 3 . 4 5 ' S 1 2 ° 2 1 ' 5 9 " W 3 3 2 . 8 8 ' Rachels Place Section 3 M.B. 29/64 N 3 4 ° 3 9 ' 1 0 " E 3 8 0 . 5 0 ' Pond Expansion Existing Stormwater Approved Covenant Senior Community Blue B o n n e t C i r c l e (45 ' P r i v a t e R / W ) 10.95 ac.Total Tract Area - 10.95 ac. @ 17.0 units/ac. = Total Units Permitted - 186 Development Data: Maximum RMF-M Density - ** 128 Units Proposed ** (w/ Valley Gutter) 22' G-G Covenant Lane X-Section GUTTER 3:1 MAX. SLOPE TO GRADE VALLEY 2'-0" 1/4"/FT. 6" ABC 2'-0" GUTTER VALLEY 1/4"/FT. CL 1-1/2" I-2 3:1 MAX. SLOPE TO GRADE 5' WALK GRASSED MEDIAN 45' Private Access Easement Property Boundary @ 2 spaces / unit - 256 spaces req'd. Parking: ** 256 Spaces Provided ** Connect to existing stubbed pavement as required by Life-Safety regulations. Community Gardens Tot Lot Community Clubhouse 12 Units 12 Units 12 Units 12 Units 3-Story 3-Story 3-Story 3-Story 8 Units 2-Story 8 Units 8 Units Surface Coverage: Rooftops - Pavement - Walks - Total - 77,550 s.f.± 118,200 s.f.± 16,950 s.f.± 212,700 s.f.± (44.6%) Open Space 34 32 34 38 36 32 3 6 3 6 36 36 3432 34 32 3234 34 34 3 4 5 6 78 9 10 11 12 2-Story 2-Story 13 14 01/09/24 to reduce density (Density = 11.7 units per acre) 8 Units 2-Story 8 Units 2-Story 8 Units 2-Story 8 Units 2-Story 8 Units 2-Story 2 8 Units 2-Story 1 8 Units 2-Story Open Space Existing Pond Case: Z23-25 Open Space Req'd @ 20% = 95,396 s.f. (2.2 ac.±) ** 172,480 s.f. (4.0 ac.±) Provided **