Loading...
NCB230257 - Plan Set_v1OWNER WILM PROPCO LLC. DURHAM, NC 277047 DEVELOPER MCDONALDYORK 801 OBERLIN RD, SUITE 235 RALEIGH, NC. 27605 (910) 832-3770 SITE PLAN DOCUMENTS PROPOSED GREGORY POOLE RENTAL FACILITY 8310 MARKET ST WILMINGTON, NC 28411 NEW HANOVER COUNTY FOR CONTACT: WILL SWARINGEN PHONE: 919-578-9000 PREPARED BY C-101 COVER SHEET LOCATION MAP SCALE: 1" = 1,000' REFERENCES ¨BOUNDARY & TOPOGRAPHIC SURVEY: BOHLER ENGINEERING NC, PLLC 4130 PARKLAKE AVE. STE 200 RALEIGH, NC. 27612 DATED: 02/23/2024 ELEVATIONS: NAVD 1988 OR NGVD1929 OR ELSE (IDENTIFY SOURCE) ¨GEOTECHNICAL INVESTIGATION REPORT: XXXXXXX. XXXXXXXX XXXXXXX DATED: XX/XX/XX ¨WETLAND DELINEATION REPORT: ESC SOUTHEAST LLC. 5260 GREENS DAIRY RD RALEIGH, NC 27612 DATED: 02/08/2024 ¨ARCHITECTURAL PLAN: 310 ARCHITECT + INTERIORS, PA P.O. BOX 97935 RALEIGH, NC. 2864-7935 GOVERNING AGENCIES ¨PLANNING, ZONING COMMITTEE NEW HANOVER PLANNING AND LAND USE 230 GOVERNMENT CENTER DR #110 WILMINGTON, NC 28403 PHONE:(910) 798-7165 ¨BUILDING DEPARTMENT NEW HANOVER COUNTY BUILDING SAFETY 230 GOVERNMENT CENTER DR #170 WILMINGTON, NC 28403 PHONE: (910) 798-7308 ¨CAPE FEAR PUBLIC UTILITY AUTHORITY 235 GOVERNMENT CENTER DR WILMINGTON, NC 28403 PHONE: (910) 332-6550 ROW JURISDICTION ¨TRAFFIC, STORMWATER, WATER & SEWER DISCTRICT 3 NCDOT OFFICE 300 DIVISION DR WILMINGTON, NC 28401 PHONE: (910) 341-2000 THE ABOVE REFERENCED DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THESE PLANS, HOWEVER, BOHLER ENGINEERING DOES NOT CERTIFY THE ACCURACY OF THE WORK REFERENCED OR DERIVED FROM THESE DOCUMENTS, BY OTHERS. REFERENCES AND CONTACTS ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R Th i s d r a w i n g a n d / o r f i l e h a s b e e n p r e p a r e d b y B o h l e r a t t h e r e q u e s t o f t h e P r o j e c t O w n e r o r h i s R e p r e s e n t a t i v e a n d i s b e i n g p r o v i d e d s o l e l y a s a c o n v e n i e n c e t o t h e r e c i p i e n t . B o h l e r m a k e s n o r e p r e s e n t a t i o n r e g a r d i n g t h e s u i t a b i l i t y f o r t h e i n t e n d e d u s e b y t h e r e c i p i e n t . F u r t h e r , B o h l e r m a k e s n o PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - C N D S - 0 - - - - - > L A Y O U T : C - 1 0 1 C O V R DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F E SSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 SKHHW LLVW TDEOH Sheet Number Sheet Title C-101 COVER SHEET C-102 GENERAL NOTES --ALTA SURVEY --TREE SURVEY C-201 DEMOLITION PLAN C-202 TREE REMOVAL PLAN C-301 SITE PLAN C-401 GRADING & DRAINAGE PLAN C-402 SCM PLAN C-501 UTILITY PLAN C-601 EROSION & SEDIMENT CONTROL PH1 C-602 EROSION & SEDIMENT CONTROL PH2 C-603 EROSION & SEDIMENT CONTROL DETAILS C-701 LANDSCAPE PLAN C-702 LANDSCAPE DETAILS C-703 LIGHTING PLAN C-901 SITE DETAILS DEMOLITION NOTES (Rev. 1/2023) 1.THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2.THE CONTRACTOR MUST CONDUCT DEMOLITION/REMOVALS ACTIVITIES IN SUCH A MANNER AS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, SIDEWALKS, WALKWAYS, AND ALL OTHER ADJACENT FACILITIES. THE CONTRACTOR MUST OBTAIN ALL APPLICABLE PERMITS FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY(IES) PRIOR TO THE COMMENCEMENT OF ANY ROAD OPENING OR DEMOLITION ACTIVITIES IN OR ADJACENT TO THE RIGHT-OF-WAY. 3.WHEN DEMOLITION-RELATED ACTIVITIES IMPACT ROADWAYS AND/OR ROADWAY RIGHT-OF-WAY, THE CONTRACTOR MUST PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE WITH THE CURRENT FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), AND THE FEDERAL, STATE, AND LOCAL REGULATIONS. 4.THE DEMOLITION (AND/OR REMOVALS) PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION AND TO IDENTIFY ONLY CONDITIONS REGARDING ITEMS TO BE DEMOLISHED, REMOVED, AND/OR TO REMAIN. A.THE CONTRACTOR MUST ALSO REVIEW ALL CONSTRUCTION DOCUMENTS AND INCLUDE WITHIN THE DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS. B.THIS PLAN IS NOT INTENDED TO AND DOES NOT PROVIDE DIRECTION REGARDING THE MEANS, METHODS, SEQUENCING, TECHNIQUES AND PROCEDURES TO BE EMPLOYED TO ACCOMPLISH THE WORK. ALL MEANS, METHODS, SEQUENCING, TECHNIQUES AND PROCEDURES TO BE USED MUST BE IN STRICT ACCORDANCE AND CONFORMANCE WITH ALL STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR MUST COMPLY WITH ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE FOR THE CONTRACTOR AND THE PUBLIC. 5.THE CONTRACTOR MUST PROVIDE ALL "METHODS AND MEANS" NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE. THE CONTRACTOR, AT THE CONTRACTOR'S SOLE COST, MUST REPAIR ALL DAMAGE TO ALL ITEMS AND FEATURES THAT ARE TO REMAIN. CONTRACTOR MUST USE NEW MATERIAL FOR ALL REPAIRS. CONTRACTOR'S REPAIRS MUST INCLUDE THE RESTORATION OF ALL ITEMS AND FEATURES REPAIRED TO THEIR PRE-DEMOLITION CONDITION, OR BETTER. CONTRACTOR MUST PERFORM ALL REPAIRS AT THE CONTRACTOR'S SOLE EXPENSE. 6.THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. THE CONTRACTOR MUST PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER, COMPLYING WITH ALL OSHA REQUIREMENTS, TO ENSURE PUBLIC AND CONTRACTOR SAFETY AND SAFETY TO ALL PROPERTY ON THE SITE OR ADJACENT OR NEAR TO THE SAME. 7.THE CONTRACTOR IS RESPONSIBLE FOR JOB SITE SAFETY, WHICH MUST INCLUDE, BUT IS NOT LIMITED TO, THE INSTALLATION AND MAINTENANCE OF BARRIERS, FENCING, OTHER APPROPRIATE AND/OR NECESSARY SAFETY FEATURES AND ITEMS NECESSARY TO PROTECT THE PUBLIC FROM AREAS OF CONSTRUCTION AND CONSTRUCTION ACTIVITIES. THE CONTRACTOR MUST SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE ENTRY OF ALL UNAUTHORIZED PERSONS AT ANY TIME, TO OR NEAR THE DEMOLITION AREA. 8.PRIOR TO THE COMMENCEMENT OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY, THE CONTRACTOR MUST, IN WRITING, RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS AND/OR SPECIFICATIONS, ALL CONCERNS OR QUESTIONS REGARDING THE APPLICABLE SAFETY STANDARDS, AND/OR THE SAFETY OF THE CONTRACTOR AND/OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT. ANY SUCH CONCERNS MUST BE CONVEYED TO THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING AND MUST ADDRESS ALL ISSUES AND ITEMS RESPONDED TO, BY THE PROFESSIONAL OF RECORD AND BY BOHLER, IN WRITING. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES. 9.THE CONTRACTOR MUST BECOME FAMILIAR WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AND/OR DISCONNECTION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED, REMOVED AND/OR ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 10.PRIOR TO COMMENCING ANY DEMOLITION, THE CONTRACTOR MUST: A.OBTAIN ALL REQUIRED PERMITS AND MAINTAIN THE SAME ON SITE FOR REVIEW BY THE PROFESSIONAL OF RECORD AND ALL PUBLIC AGENCIES WITH JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK, AND DEMOLITION WORK. B.NOTIFY, AT A MINIMUM, THE MUNICIPAL ENGINEER, DESIGN ENGINEER, AND LOCAL SOIL CONSERVATION JURISDICTION, AT LEAST 72 BUSINESS HOURS PRIOR TO THE COMMENCEMENT OF WORK. C.INSTALL THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO SITE DISTURBANCE, AND MAINTAIN SAID CONTROLS UNTIL SITE IS STABILIZED D.IN ACCORDANCE WITH STATE LAW, THE CONTRACTOR MUST CALL THE STATE ONE-CALL DAMAGE PROTECTION SYSTEM FOR UTILITY MARK OUT, IN ADVANCE OF ANY EXCAVATION. E.LOCATE AND PROTECT ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN AND ADJACENT TO THE LIMITS OF PROJECT ACTIVITIES. THE CONTRACTOR MUST USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL UNDERGROUND UTILITIES. F.PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE UTILITIES AND SYSTEMS THAT ARE NOT BEING REMOVED DURING ANY DEMOLITION ACTIVITIES. G.ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) FOR THE TEMPORARY OR PERMANENT TERMINATION OF SERVICE REQUIRED BY THE PROJECT PLANS AND SPECIFICATIONS REGARDING THE METHODS AND MEANS TO CONSTRUCT SAME. THESE ARE NOT THE PROFESSIONAL OF RECORD'S OR BOHLER RESPONSIBILITY. IN THE EVENT OF ABANDONMENT, THE CONTRACTOR MUST PROVIDE THE UTILITY ENGINEER AND OWNER WITH IMMEDIATE WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH JURISDICTIONAL AND UTILITY COMPANY REQUIREMENTS. H.ARRANGE FOR AND COORDINATE WITH THE APPLICABLE UTILITY SERVICE PROVIDER(S) REGARDING WORKING "OFF-PEAK" HOURS OR ON WEEKENDS AS NECESSARY OR AS REQUIRED TO MINIMIZE THE IMPACT ON, OF, AND TO THE AFFECTED PARTIES. WORK REQUIRED TO BE PERFORMED "OFF-PEAK" IS TO BE PERFORMED AT NO ADDITIONAL COST TO THE OWNER. I.IN THE EVENT THE CONTRACTOR DISCOVERS ANY HAZARDOUS MATERIAL, THE REMOVAL OF WHICH IS NOT ADDRESSED IN THE PROJECT PLANS AND SPECIFICATIONS OR THE CONTRACT WITH THE OWNER/DEVELOPER, THE CONTRACTOR MUST IMMEDIATELY CEASE ALL WORK IN THE AREA OF DISCOVERY, AND IMMEDIATELY NOTIFY, IN WRITING AND VERBALLY, THE OWNER, PROFESSIONAL OF RECORD AND BOHLER, THE DISCOVERY OF SUCH MATERIALS TO PURSUE PROPER AND COMPLIANT REMOVAL OF SAME. 11.THE CONTRACTOR MUST NOT PERFORM ANY EARTH MOVEMENT ACTIVITIES, DEMOLITION OR REMOVAL OF FOUNDATION WALLS, FOOTINGS, OR OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE, UNLESS SAME IS IN STRICT ACCORDANCE AND CONFORMANCE WITH THE PROJECT PLANS AND SPECIFICATIONS, OR PURSUANT TO THE WRITTEN DIRECTION OF THE OWNER'S STRUCTURAL OR GEOTECHNICAL ENGINEER. 12.DEMOLITION ACTIVITIES AND EQUIPMENT MUST NOT USE OR INCLUDE AREAS OUTSIDE THE DEFINED PROJECT LIMIT LINE, WITHOUT SPECIFIC WRITTEN PERMISSION AND AUTHORITY OF AND FROM THE OWNER AND ALL GOVERNMENTAL AGENCIES WITH JURISDICTION. 13.THE CONTRACTOR MUST BACKFILL ALL EXCAVATION RESULTING FROM, OR INCIDENTAL TO, DEMOLITION ACTIVITIES. BACKFILL MUST BE ACCOMPLISHED WITH APPROVED BACKFILL MATERIALS AND MUST BE SUFFICIENTLY COMPACTED TO SUPPORT ALL NEW IMPROVEMENTS AND MUST BE PERFORMED IN COMPLIANCE WITH THE RECOMMENDATIONS AND GUIDANCE ARTICULATED IN THE GEOTECHNICAL REPORT. BACKFILLING MUST OCCUR IMMEDIATELY AFTER DEMOLITION ACTIVITIES AND MUST BE PERFORMED SO AS TO PREVENT WATER ENTERING THE EXCAVATION. FINISHED SURFACES MUST BE GRADED TO PROMOTE POSITIVE DRAINAGE. THE CONTRACTOR IS RESPONSIBLE FOR COMPACTION TESTING AND MUST SUBMIT SUCH REPORTS AND RESULTS TO THE PROFESSIONAL OF RECORD AND THE OWNER. 14.EXPLOSIVES MUST NOT BE USED WITHOUT PRIOR WRITTEN CONSENT FROM BOTH THE OWNER AND ALL APPLICABLE, NECESSARY AND REQUIRED GOVERNMENTAL AUTHORITIES. PRIOR TO COMMENCING ANY EXPLOSIVE PROGRAM AND/OR ANY DEMOLITION ACTIVITIES, THE CONTRACTOR MUST ENSURE AND OVERSEE THE INSTALLATION OF ALL OF THE REQUIRED PERMIT AND EXPLOSIVE CONTROL MEASURES THAT THE FEDERAL, STATE, AND LOCAL GOVERNMENTS REQUIRE. THE CONTRACTOR IS ALSO RESPONSIBLE TO CONDUCT AND PERFORM ALL INSPECTION AND SEISMIC VIBRATION TESTING THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURES AND THE LIKE. 15.IN ACCORDANCE WITH FEDERAL, STATE, AND/OR LOCAL STANDARDS, THE CONTRACTOR MUST USE DUST CONTROL MEASURES TO LIMIT AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR. AFTER THE DEMOLITION IS COMPLETE, THE CONTRACTOR MUST CLEAN ALL ADJACENT STRUCTURES AND IMPROVEMENTS TO REMOVE ALL DUST AND DEBRIS WHICH THE DEMOLITION OPERATIONS CAUSE. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR "PRE-DEMOLITION" CONDITION AT CONTRACTOR'S SOLE COST. 16.PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS OUTSIDE OF APPROVED AREAS WILL NOT BE PERMITTED, INCLUDING BUT NOT LIMITED TO, THE PUBLIC RIGHT-OF-WAY. 17.THE CONTRACTOR MUST MAINTAIN A RECORD SET OF PLANS WHICH INDICATES THE LOCATION OF EXISTING UTILITIES THAT ARE CAPPED, ABANDONED IN PLACE, OR RELOCATED DUE TO DEMOLITION ACTIVITIES. THIS RECORD DOCUMENT MUST BE PREPARED IN A NEAT AND WORKMAN-LIKE MANNER AND TURNED OVER TO THE OWNER/DEVELOPER UPON COMPLETION OF THE WORK, ALL OF WHICH IS AT THE CONTRACTOR'S SOLE COST. 18.THE CONTRACTOR MUST EMPTY, CLEAN AND REMOVE FROM THE SITE ALL UNDERGROUND STORAGE TANKS, IF ENCOUNTERED, IN ACCORDANCE WITH FEDERAL, STATE, COUNTY AND LOCAL REQUIREMENTS, PRIOR TO CONTINUING CONSTRUCTION IN THE AREA AROUND THE TANK WHICH EMPTYING, CLEANING AND REMOVAL ARE AT THE CONTRACTOR'S SOLE COST. SITE LAYOUT NOTES (Rev. 1/2020) 1.THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2.PRIOR TO THE COMMENCEMENT OF GENERAL CONSTRUCTION, THE CONTRACTOR MUST INSTALL SOIL EROSION CONTROL AND ANY STORMWATER POLLUTION PREVENTION PLAN (SWPPP) MEASURES NECESSARY, AS INDICATED ON THE APPROVED SOIL EROSION AND SEDIMENT CONTROL PLAN AND IN ACCORDANCE WITH APPLICABLE AND/OR APPROPRIATE AGENCIES' GUIDELINES TO PREVENT SEDIMENT AND/OR LOOSE DEBRIS FROM WASHING ONTO ADJACENT PROPERTIES OR THE RIGHT OF WAY. 3.ALL DIRECTIONAL/TRAFFIC SIGNING AND PAVEMENT STRIPING MUST CONFORM TO THE LATEST STANDARDS OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND ANY APPLICABLE STATE OR LOCALLY APPROVED SUPPLEMENTS, GUIDELINES, RULES, REGULATIONS, STANDARDS AND THE LIKE. 4.THE LOCATIONS OF PROPOSED UTILITY POLES AND TRAFFIC SIGNS SHOWN ON THE PLANS ARE SCHEMATIC AND PRELIMINARY. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR FIELD-VERIFYING THEIR LOCATION. THE CONTRACTOR MUST COORDINATE THE RELOCATION OF TRAFFIC SIGNS WITH THE ENTITY WITH JURISDICTION OVER THE PROJECT. 5.ALL DIMENSIONS SHOWN ARE TO BOTTOM FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, EXCEPT WHEN DIMENSION IS TO A PROPERTY LINE, STAKE OUT OF LOCATIONS OF INLETS, LIGHT POLES, ETC. MUST BE PERFORMED IN STRICT ACCORDANCE WITH THE DETAILS, UNLESS NOTED CLEARLY OTHERWISE. GRADING NOTES (Rev. 1/2023) 1.THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2.SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AS REFERENCED IN THIS PLAN SET. IF NO GEOTECHNICAL REPORT HAS BEEN REFERENCED, THE CONTRACTOR MUST HAVE A GEOTECHNICAL ENGINEER PROVIDE WRITTEN SPECIFICATIONS AND RECOMMENDATIONS PRIOR TO THE CONTRACTOR COMMENCING THE GRADING WORK. THE CONTRACTOR MUST FOLLOW THE REQUIREMENTS OF ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS, WHICH HAVE JURISDICTION OVER THIS PROJECT. 3.THE CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF-SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. THE CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO THE PROFESSIONAL OF RECORD, BOHLER AND THE OWNER PRIOR TO THE CONTRACTOR COMMENCING ANY WORK. 4.THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFYING EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. SHOULD DISCREPANCIES BETWEEN THE PLANS AND INFORMATION OBTAINED THROUGH FIELD VERIFICATIONS BE IDENTIFIED OR EXIST, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING. 5.THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING ALL UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN THE GEOTECHNICAL REPORT. THE CONTRACTOR MUST COMPACT ALL EXCAVATED OR FILLED AREAS IN STRICT ACCORDANCE WITH THE GEOTECHNICAL REPORT'S GUIDANCE. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED. THIS REPORT MUST VERIFY THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES WHICH ARE IN EFFECT AND WHICH ARE APPLICABLE TO THE PROJECT. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE MUST BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL, COMPACTED AS THE GEOTECHNICAL REPORT DIRECTS. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. EARTHWORK ACTIVITIES MUST COMPLY WITH THE STANDARD STATE DOT SPECIFICATIONS FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANY AMENDMENTS OR REVISIONS THERETO. 6.IN THE EVENT OF A DISCREPANCY(IES) AND/OR A CONFLICT(S) BETWEEN PLANS, OR RELATIVE TO OTHER PLANS, THE GRADING PLAN TAKES PRECEDENCE AND CONTROLS. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, OF ANY DISCREPANCY(IES) AND/OR CONFLICT(S). 7.THE CONTRACTOR IS RESPONSIBLE TO IMPORT FILL OR EXPORT EXCESS MATERIAL AS NECESSARY TO CONFORM TO THE PROPOSED GRADING, AND TO BACKFILL EXCAVATIONS FOR THE INSTALLATION OF UNDERGROUND IMPROVEMENTS. SOIL EROSION & SEDIMENT CONTROL PLAN NOTES (Rev. 4/2023) 1.THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2.EROSION CONTROL MEASURES MUST CONFORM TO THE GUIDELINES FOR URBAN EROSION AND SEDIMENT CONTROL UNLESS OTHERWISE NOTED, OR UNLESS THE PROFESSIONAL OF RECORD CLEARLY AND SPECIFICALLY, IN WRITING, DIRECTS OTHERWISE. INSTALLATION OF EROSION CONTROL, CLEARING, AND SITE WORK MUST BE PERFORMED EXACTLY AS INDICATED IN THE EROSION CONTROL CONSTRUCTION NOTES. 3.THE DISTURBED LAND AREA OF THIS SITE IS APPROXIMATELY ACRES. 4.INSTALLATION OF EROSION CONTROL DEVICES MUST BE IN ACCORDANCE WITH ALL OF THE MANUFACTURER'S RECOMMENDATIONS. 5.THE CONTRACTOR MUST INSPECT EROSION CONTROL MEASURES WEEKLY. THE CONTRACTOR MUST REMOVE ANY SILT DEPOSITS GREATER THAN COLLECTED ON THE FILTER FABRIC AND/OR SILT SOCK BARRIERS AND EXCAVATE AND REMOVE ANY SILT FROM DROP INLET PROTECTION. 6.THE CONTRACTOR MUST APPLY TEMPORARY SEED AND MULCH TO ALL DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINISHED GRADE AND VEGETATED WITHIN 7 DAYS. WHEN AREAS ARE DISTURBED AFTER THE GROWING SEASON, THE CONTRACTOR MUST STABILIZE SAME WITH GEOTEXTILE FABRIC AND MAINTAIN SAME IN STRICT ACCORDANCE WITH BEST MANAGEMENT PRACTICES. 7.THE CONTRACTOR MUST INSTALL ADDITIONAL EROSION CONTROL MEASURES IF THE PROFESSIONAL OF RECORD SO REQUIRES, TO PREVENT ANY, INCLUDING THE INCIDENTAL, DISCHARGE OF SILT-LADEN RUNOFF FROM EXITING THE SITE. 8.THE CONTRACTOR MUST BE RESPONSIBLE FOR INSPECTING AND MAINTAINING ALL EROSION CONTROL MEASURES ON THE SITE UNTIL PERMANENT PAVING AND TURF/LANDSCAPING IS ESTABLISHED. THE COSTS OF INSTALLING AND MAINTAINING THE EROSION CONTROL MEASURES MUST BE INCLUDED IN THE BID PRICE FOR THE SITE WORK AND THE CONTRACTOR IS RESPONSIBLE FOR ALL SUCH COSTS. 9.THE CONTRACTOR MUST CONTINUE TO MAINTAIN ALL EROSION CONTROL MEASURES UNTIL THE COMPLETION OF CONSTRUCTION AND THE ESTABLISHMENT OF VEGETATION. 10.THE CONTRACTOR MUST REMOVE EROSION CONTROL MEASURES, SILT AND DEBRIS AFTER ESTABLISHING PERMANENT VEGETATION COVER OR OTHER INSTALLING A DIFFERENT, SPECIFIED METHOD OF STABILIZATION. 11.THIS PLAN REPRESENTS THE MINIMUM LEVEL OF IMPLEMENTATION OF TEMPORARY EROSION AND SEDIMENTATION CONTROL FACILITIES, MEASURES AND STRUCTURES. ADDITIONAL FACILITIES, MEASURES AND STRUCTURES MUST BE INSTALLED WHERE NECESSARY TO COMPLY WITH ALL APPLICABLE CODES AND STANDARDS AND/OR TO PREVENT ANY, INCLUDING THE INCIDENTAL DISCHARGE OF SILT-LADEN RUNOFF FROM EXITING THE SITE. 12.THE CONTRACTOR MUST PROTECT ALL EXISTING TREES AND SHRUBS. THE CONTRACTOR MUST REFER TO THE LANDSCAPE AND/OR DEMOLITION PLAN(S) FOR TREE PROTECTION, FENCE LOCATIONS AND DETAILS. 13.THE CONTRACTOR MUST REFER TO GRADING PLANS FOR ADDITIONAL INFORMATION. 14.THE CONTRACTOR MUST CLEAN EXISTING AND PROPOSED DRAINAGE STRUCTURES AND INTERCONNECTING PIPES ON OR OFF-SITE AS THE JURISDICTIONAL AGENCY REQUIRES, BOTH AT THE TIME OF SITE STABILIZATION AND AT END OF PROJECT. 15.SOIL EROSION CONTROL MEASURES MUST BE ADJUSTED OR RELOCATED BY THE CONTRACTOR AS IDENTIFIED DURING SITE OBSERVATION IN ORDER TO MAINTAIN THE COMPLETE EFFECTIVENESS OF ALL CONTROL MEASURES. 16.THE CONTRACTOR MUST IDENTIFY, ON THE PLAN, THE LOCATION OF WASTE CONTAINERS, FUEL STORAGE TANKS, CONCRETE WASHOUT AREAS AND ANY OTHER LOCATIONS WHERE HAZARDOUS MATERIALS ARE STORED. NORTH CAROLINA 3.08 6" ACCESSIBILITY DESIGN GUIDELINES (Rev. 1/2023) 1.ALL ACCESSIBLE (A.K.A. ADA) COMPONENTS AND ACCESSIBLE ROUTES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF: (A) THE REQUIREMENTS OF THE "AMERICANS WITH DISABILITIES ACT" (ADA) CODE (42 U.S.C. § 12101 ET SEQ. AND 42 U.S.C. § 4151 ET SEQ.); AND (B) ANY APPLICABLE LOCAL AND STATE GUIDELINES, AND ANY AND ALL AMENDMENTS TO BOTH, WHICH ARE IN EFFECT WHEN THESE PLANS WERE COMPLETED. 2.THE CONTRACTOR MUST REVIEW ALL DOCUMENTS REFERENCED IN THESE NOTES FOR ACCURACY, COMPLIANCE AND CONSISTENCY WITH INDUSTRY GUIDELINES. 3.THE CONTRACTOR MUST EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ACCESSIBLE (ADA) COMPONENTS AND ACCESSIBLE ROUTES FOR THE SITE. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACES, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, AND INTER-BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCE/EXIT, MUST COMPLY WITH THE ACCESSIBLE GUIDELINES AND REQUIREMENTS WHICH INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: A.ACCESSIBLE PARKING SPACES AND ACCESS AISLES SLOPES MUST NOT EXCEED 1:50 (2.0%) IN ANY DIRECTION. B.PATH OF TRAVEL ALONG ACCESSIBLE ROUTE MUST PROVIDE A 48-INCHES MINIMUM WIDTH, OR AS SPECIFIED BY THE GOVERNING AGENCY. UNOBSTRUCTED WIDTH OF TRAVEL (CAR OVERHANGS AND/OR HANDRAILS) MUST NOT REDUCE THIS MINIMUM WIDTH. THE SLOPE MUST NOT EXCEED 1:20 (5.0%) IN THE DIRECTION OF TRAVEL AND MUST NOT EXCEED 1:50 (2.0%) IN CROSS SLOPE. WHERE ACCESSIBLE PATH OF TRAVEL IS GREATER THAN 1:20 (5.0%), AN ACCESSIBLE RAMP MUST BE PROVIDED. ALONG THE ACCESSIBLE PATH OF TRAVEL, OPENINGS MUST NOT EXCEED 1/2-INCH IN WIDTH. VERTICAL CHANGES OF UP TO 1/2-INCH ARE PERMITTED ONLY IF THEY INCLUDES A 1/4-INCH BEVEL AT A SLOPE NOT STEEPER THAN 1:2. NO VERTICAL CHANGES OVER 1/4-INCH ARE PERMITTED. C.ACCESSIBLE RAMPS MUST NOT EXCEED A SLOPE OF 1:12 (8.3%) AND A RISE OF 30-INCHES. LEVEL LANDINGS MUST BE PROVIDED AT EACH END OF ACCESSIBLE RAMPS. LANDING MUST PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES, AND MUST NOT EXCEED 1:50 (2.0%) SLOPE IN ANY DIRECTION. RAMPS THAT CHANGE DIRECTION BETWEEN RUNS AT LANDINGS MUST HAVE A CLEAR LANDING OF A MINIMUM OF 60-INCHES BY 60-INCHES. HAND RAILS ON BOTH SIDES OF THE RAMP MUST BE PROVIDED ON AN ACCESSIBLE RAMP WITH A RISE GREATER THAN 6-INCHES. D.ACCESSIBLE CURB RAMPS MUST NOT EXCEED A SLOPE OF 1:12 (8.3%). WHERE FLARED SIDES ARE PROVIDED, THEY MUST NOT EXCEED 1:10 (10%) SLOPE. LEVEL LANDING MUST BE PROVIDED AT RAMPS TOP AT A MINIMUM OF 36-INCHES LONG (48-INCHES PREFERRED). IN ALTERATIONS, WHEN THERE IS NO LANDING AT THE TOP, FLARE SIDES SLOPES MUST NOT EXCEED A SLOPE OF 1:12 (8.3%). E.DOORWAY LANDINGS AREAS MUST BE PROVIDED ON THE EXTERIOR SIDE OF ANY DOOR LEADING TO AN ACCESSIBLE PATH OF TRAVEL. THIS LANDING MUST BE SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (2.0%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO FEWER THAN 60-INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE CLEARLY PERMITTED BY ACCESSIBLE STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI A117.1-2009 AND OTHER REFERENCES INCORPORATED BY CODE). F.WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ACCESSIBLE COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, THE CONTRACTOR MUST VERIFY ALL EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR IN ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS BEFORE COMMENCING ANY WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ACCESSIBLE GUIDELINES. G.THE CONTRACTOR MUST VERIFY ALL OF THE SLOPES OF THE CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE EXISTS OR IS OBSERVED OR DISCOVERED, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, PRIOR TO POURING CONCRETE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND/OR REPLACE NON-CONFORMING CONCRETE AND/OR PAVEMENT SURFACES. 4.IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION TO ENSURE SAME IS CONSISTENT WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCING CONSTRUCTION. DRAINAGE AND UTILITY NOTES (Rev. 3/2023) 1.THE GENERAL NOTES MUST BE INCLUDED AS PART OF THIS ENTIRE DOCUMENT PACKAGE AND ARE PART OF THE CONTRACT DOCUMENTS. THE GENERAL NOTES ARE REFERENCED HEREIN, AND THE CONTRACTOR MUST REFER TO THEM AND FULLY COMPLY WITH THESE NOTES, IN THEIR ENTIRETY. THE CONTRACTOR MUST BE FAMILIAR WITH AND ACKNOWLEDGE FAMILIARITY WITH ALL OF THE GENERAL NOTES AND ALL OF THE PLANS' SPECIFIC NOTES. 2.LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE, AND THE CONTRACTOR MUST INDEPENDENTLY VERIFY AND CONFIRM THOSE LOCATIONS AND SERVICES WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCING ANY CONSTRUCTION OR EXCAVATION. THE CONTRACTOR MUST INDEPENDENTLY VERIFY AND CONFIRM ALL SANITARY CONNECTION POINTS AND ALL OTHER UTILITY SERVICE CONNECTION POINTS IN THE FIELD, PRIOR TO COMMENCING ANY CONSTRUCTION. THE CONTRACTOR MUST REPORT ALL DISCREPANCIES, ERRORS AND OMISSIONS IN WRITING, TO THE PROFESSIONAL OF RECORD AND BOHLER. 3.THE CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL OF THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EXISTING UTILITIES WHICH OCCUR DURING CONSTRUCTION, AT NO COST TO THE OWNER AND AT CONTRACTOR'S SOLE COST AND EXPENSE. THE CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH DAMAGE TO ANY EXISTING UTILITIES WHICH OCCURS DURING CONSTRUCTION. 4.THE CONTRACTOR MUST FIELD VERIFY THE PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES BY USING A TEST PIT TO CONFIRM EXACT DEPTH, PRIOR TO COMMENCEMENT OF CONSTRUCTION. 5.STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON ARCHITECTURAL PLANS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING LOCATIONS, SIZE, AND MATERIAL OF SAME BASED UPON FINAL ARCHITECTURAL PLANS.  6.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING SITE PLAN DOCUMENTS AND ARCHITECTURAL PLANS FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS; GREASE TRAP REQUIREMENTS; AND DETAILS, DOOR ACCESS, AND EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITY SERVICES WITH THE INDIVIDUAL COMPANIES TO AVOID CONFLICTS AND TO ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS OF THE APPLICABLE JURISDICTION AND REGULATORY AGENCIES AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE A CONFLICT(S) EXISTS BETWEEN THESE DOCUMENTS AND THE ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, AND PRIOR TO CONSTRUCTION, MUST RESOLVE SAME. 7.ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE EXACTLY AS PER THE RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT AND THE CONTRACTOR MUST COORDINATE SAME WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL AND COMPACTION MUST COMPLY WITH APPLICABLE REQUIREMENTS AND SPECIFICATIONS. THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR DESIGN OF TRENCH BACKFILL OR FOR COMPACTION REQUIREMENTS 8.DURING THE INSTALLATION OF SANITARY, STORM, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS-INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY INSTALLATIONS THAT DEVIATE, IN ANY RESPECT, FROM THE INFORMATION CONTAINED IN THESE PLANS. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THE APPROPRIATE PLAN(S), WHICH THE CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER IMMEDIATELY UPON THE COMPLETION OF WORK. 9.THE CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING SANITARY, WATER AND STORM SYSTEMS, ARE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND OR STATE DOT DETAILS AS APPLICABLE. THE CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME. 10.FINAL LOCATIONS OF PROPOSED UTILITY POLES, AND/ OR POLES TO BE RELOCATED ARE AT THE SOLE DISCRETION OF THE RESPECTIVE UTILITY COMPANY, REGARDLESS OF WHAT THIS PLAN DEPICTS. 11.WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY COMPANY. THE CONTRACTOR MUST CONTACT THE APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING CONSTRUCTION. 12.THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROPOSED FINISHED GRADES WITH NO TRIPPING OR SAFETY HAZARD IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. GENERAL NOTES (Rev. 1/2023) 1.THESE PLANS ARE SOLELY BASED ON INFORMATION THE OWNER AND OTHERS PROVIDED TO (HEREIN “BOHLER”) PRIOR TO THE DATE ON WHICH THE PROFESSIONAL OF RECORD AND BOHLER PREPARED THESE PLANS. THE CONTRACTOR MUST FIELD VERIFY ALL EXISTING CONDITIONS AND IMMEDIATELY NOTIFY BOHLER , IN WRITING, IF ANY ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THESE PLANS, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES. 2.THE CONTRACTOR MUST STRICTLY COMPLY WITH THESE NOTES AND ALL SPECIFICATIONS/REPORTS CONTAINED HEREIN. THE CONTRACTOR MUST ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE REQUIREMENTS, THESE NOTES, AND THE REQUIREMENTS ARTICULATED IN THE NOTES CONTAINED IN ALL THE OTHER DRAWINGS THAT COMPRISE THE PLAN SET OF DRAWINGS. ADDITIONAL NOTES AND SPECIFIC PLAN NOTES MAY BE FOUND ON THE INDIVIDUAL PLANS. THESE GENERAL NOTES APPLY TO THIS ENTIRE DOCUMENT PACKAGE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE, PRIOR TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. 3.PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST CONFIRM WITH THE PROFESSIONAL OF RECORD AND BOHLER THAT THE LATEST EDITION OF THE DOCUMENTS AND/OR REPORTS REFERENCED WITHIN THE PLAN REFERENCES ARE BEING USED FOR CONSTRUCTION. THIS IS THE CONTRACTOR'S SOLE AND COMPLETE RESPONSIBILITY. 4.PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION IS TO BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED THE CONDITIONS OF APPROVAL TO ALL PLANS AND OTHER DOCUMENTS REVIEWED AND APPROVED BY THE PERMITTING AUTHORITIES AND HAS ALSO CONFIRMED THAT ALL NECESSARY AND REQUIRED PERMITS HAVE BEEN OBTAINED. THE CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES. 5.THE CONTRACTOR MUST ENSURE THAT ALL WORK IS PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS/REPORTS AND CONDITIONS OF APPROVAL, AND ALL APPLICABLE REQUIREMENTS, RULES, REGULATIONS, STATUTORY REQUIREMENTS, CODES, LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT, AND ALL PROVISIONS IN AND CONDITIONS OF THE CONSTRUCTION CONTRACT WITH THE OWNER/DEVELOPER INCLUDING ALL EXHIBITS, ATTACHMENTS AND ADDENDA TO SAME. 6.PRIOR TO THE COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFULLY REVIEWING THE MOST CURRENT ARCHITECTURAL, CIVIL AND STRUCTURAL CONSTRUCTION DOCUMENTS (INCLUDING, BUT NOT LIMITED TO, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLANS, WHERE APPLICABLE). THE CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST BETWEEN THESE PLANS AND ANY OTHER PLANS THAT COMPRISE THE CONSTRUCTION DOCUMENTS. 7.CONTRACTOR MUST REFER TO AND ENSURE COMPLIANCE WITH THE APPROVED ARCHITECTURAL/BUILDING PLANS OF RECORD FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY LOCATIONS. 8.THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS SHOWN ON THESE PLANS, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR MUST IMMEDIATELY NOTIFY PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE RE-DONE OR REPAIRED DUE TO DIMENSIONS, MEASUREMENTS OR GRADES SHOWN INCORRECTLY ON THESE PLANS PRIOR TO BOTH (A) THE CONTRACTOR GIVING PROFESSIONAL OF RECORD AND BOHLER WRITTEN NOTIFICATION OF SAME AND (B) PROFESSIONAL OF RECORD AND BOHLER, THEREAFTER, PROVIDING THE CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK. 9.THE CONTRACTOR MUST VERIFY ALL DIMENSIONS AND MEASUREMENTS INCLUDED ON DESIGN DOCUMENTS HEREIN AND MUST NOT SCALE OFF THE DRAWINGS DUE TO POTENTIAL PRINTING INACCURACIES. ALL DIMENSIONS AND MEASUREMENTS ARE TO BE CHECKED AND CONFIRMED BY THE GENERAL CONTRACTOR PRIOR TO PREPARATION OF SHOP DRAWINGS, FABRICATION/ORDERING OF PARTS AND MATERIALS AND COMMENCEMENT OF SITE WORK. SITE PLAN DRAWINGS ARE NOT INTENDED AS SURVEY DOCUMENTS. DIMENSIONS SUPERSEDE GRAPHICAL REPRESENTATIONS. THE CONTRACTOR MUST MAKE CONTRACTOR'S OWN MEASUREMENTS FOR LAYOUT OF IMPROVEMENTS. 10.THE OWNER AND CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 11.WHEN INCLUDED AS ONE OF THE REFERENCED DOCUMENTS, THE GEOTECHNICAL REPORT, SPECIFICATIONS AND RECOMMENDATIONS SET FORTH THEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND, IN CASE OF CONFLICT, DISCREPANCY OR AMBIGUITY, THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS CONTAINED IN: (A) THE PLANS; AND (B) THE GEOTECHNICAL REPORT AND RECOMMENDATIONS, MUST TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE PROFESSIONAL OF RECORD AND BOHLER, IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE GEOTECHNICAL REPORT AND PLANS AND SPECIFICATIONS, PRIOR TO PROCEEDING WITH ANY FURTHER WORK. IF A GEOTECHNICAL REPORT WAS NOT CREATED, THEN THE CONTRACTOR MUST FOLLOW AND COMPLY WITH ALL OF THE REQUIREMENTS OF ANY AND ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE SPECIFICATIONS WHICH HAVE JURISDICTION OVER THIS PROJECT. 12.PROFESSIONAL OF RECORD AND BOHLER ARE NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, HAS NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY. 13.THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN AND WHERE SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS STRUCTURES AND PROPERTIES. ALL OF THIS WORK IS TO BE PERFORMED AT CONTRACTOR'S SOLE COST AND EXPENSE. 14.THE CONTRACTOR MUST EXERCISE EXTREME CAUTION WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. THE CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT. 15.DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE. ALL DEMOLITION AND CONSTRUCTION WASTES, UNSUITABLE EXCAVATED MATERIAL, EXCESS SOIL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL MUNICIPAL, COUNTY, STATE, AND FEDERAL LAWS AND APPLICABLE CODES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER THE CONTRACTOR. 16.IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO MAINTAIN RECORDS TO DEMONSTRATE PROPER AND FULLY COMPLIANT DISPOSAL ACTIVITIES, TO BE PROMPTLY PROVIDED TO THE OWNER UPON REQUEST. 17.THE CONTRACTOR MUST REPAIR, AT CONTRACTOR'S SOLE COST, ALL DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, REDESIGN, RE-SURVEY, RE-PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANY SUCH NEW OR EXISTING CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH APPLICABLE CODES, LAWS, RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. THE CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE CONTRACTOR MUST, PROMPTLY, DOCUMENT ALL EXISTING DAMAGE AND NOTIFY, IN WRITING, THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION. 18.THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR AND HAVE NO CONTRACTUAL, LEGAL OR OTHER RESPONSIBILITIES FOR JOB SITE SAFETY JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME. THE PROFESSIONAL OF RECORD AND BOHLER HAVE NOT BEEN RETAINED TO PERFORM OR TO BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF PROFESSIONAL OF RECORD'S AND BOHLER SERVICES AS RELATED TO THE PROJECT. THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY JOB SITE SAFETY ISSUES OR ANY JOB SITE CONDITIONS, AT ANY TIME. 19.THE CONTRACTOR MUST IMMEDIATELY IDENTIFY IN WRITING, TO THE PROFESSIONAL OF RECORD AND BOHLER , ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF THE CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT PROVIDING PROPER WRITTEN NOTIFICATION AS DESCRIBED ABOVE, IT WILL BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, THE CONTRACTOR MUST INDEMNIFY, DEFEND AND HOLD HARMLESS THE PROFESSIONAL OF RECORD AND BOHLER FOR ANY AND ALL DAMAGES, COSTS, INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM OR ARE IN ANY WAY RELATED TO SAME INCLUDING, BUT NOT LIMITED TO, ANY THIRD PARTY AND FIRST PARTY CLAIMS. 20.THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM THE CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS, AND CURRENT CODES, RULES, STATUTES AND THE LIKE. IF THE CONTRACTOR AND/OR OWNER FAIL TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, RULES, STATUTES, CODES AND THE LIKE, THE CONTRACTOR AND/OR OWNER AGREE TO AND MUST JOINTLY, INDEPENDENTLY, SEPARATELY, AND SEVERALLY INDEMNIFY AND HOLD THE PROFESSIONAL OF RECORD AND BOHLER HARMLESS FOR AND FROM ALL INJURIES, CLAIMS AND DAMAGES THAT PROFESSIONAL OF RECORD AND BOHLER SUFFER AND ANY AND ALL COSTS THAT PROFESSIONAL OF RECORD AND BOHLER INCUR AS RELATED TO SAME. 21.ALL CONTRACTORS MUST CARRY AT LEAST THE MINIMUM AMOUNT OF THE SPECIFIED AND COMMERCIALLY REASONABLE STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S LIABILITY INSURANCE AND COMMERCIAL GENERAL LIABILITY INSURANCE (CGL) INCLUDING ALSO ALL UMBRELLA COVERAGES. ALL CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER , AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS ADDITIONAL NAMED INSUREDS AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE (DEFEND, IF APPLICABLE) AND HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED AND AGREED TO BY THE CONTRACTOR HEREIN. ALL CONTRACTORS MUST FURNISH BOHLER WITH CERTIFICATIONS OF INSURANCE OR CERTIFICATES OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE COVERAGES PRIOR TO COMMENCING ANY WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR TWO YEARS AFTER THE COMPLETION OF CONSTRUCTION AND AFTER ALL PERMITS ARE ISSUED, WHICHEVER DATE IS LATER. IN ADDITION, ALL CONTRACTORS AGREE THAT THEY WILL, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTOR(S), ALL CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. THE CONTRACTOR MUST NOTIFY PROFESSIONAL OF RECORD, IN WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE HEREUNDER. 22.THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY OR FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED BOTH ON THESE PLANS, AND FOR ANY CONFLICTS IN SCOPE AND REVISIONS THAT RESULT FROM SAME. THE CONTRACTOR IS FULLY AND SOLELY RESPONSIBLE FOR DETERMINING THE MEANS AND METHODS FOR COMPLETION OF THE WORK, PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 23.NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER, NOR THE PRESENCE OF BOHLER AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE (HEREIN “BOHLER PARTIES”), RELIEVES OR WILL RELIEVE THE CONTRACTOR OF AND FROM CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE WITH ALL HEALTH AND SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER PARTIES HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER (OR ANY RESPONSIBILITY FOR) ANY CONSTRUCTION, THE CONTRACTOR OR ITS EMPLOYEES RELATING TO THEIR WORK AND ANY AND ALL HEALTH AND SAFETY PROGRAMS OR PROCEDURES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. THE CONTRACTOR MUST INDEMNIFY, DEFEND, PROTECT AND HOLD HARMLESS BOHLER PARTIES FOR AND FROM ANY LIABILITY TO BOHLER PARTIES RESULTING FROM THE CONTRACTOR'S WORK, SERVICES AND/OR VIOLATIONS OF THIS NOTE, THESE NOTES OR ANY NOTES IN THE PLAN SET AND, FURTHER, THE CONTRACTOR MUST NAME BOHLER AS AN ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE. 24.WHEN IT IS CLEARLY AND SPECIFICALLY WITHIN BOHLER'S SCOPE OF SERVICES CONTRACT WITH THE OWNER/DEVELOPER, BOHLER WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF EVALUATING CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND METHODS AND/OR TECHNIQUES OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME. BOHLER WILL PERFORM ITS SHOP DRAWING REVIEW WITH REASONABLE PROMPTNESS, AS CONDITIONS PERMIT. ANY DOCUMENT, DOCUMENTING BOHLER'S REVIEW OF A SPECIFIC ITEM OR LIMITED SCOPE, MUST NOT INDICATE THAT BOHLER HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER IS NOT RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS. THE CONTRACTOR MUST, IN WRITING, PROMPTLY AND IMMEDIATELY BRING ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS TO BOHLER'S ATTENTION. BOHLER IS NOT REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED. 25.IF THE CONTRACTOR DEVIATES FROM THESE PLANS AND/OR SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE PROFESSIONAL OF RECORD AND BOHLER FOR ALL DEVIATIONS WITHIN PROFESSIONAL OF RECORD'S SCOPE, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK PERFORMED WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, MUST DEFEND, INDEMNIFY, PROTECT, AND HOLD HARMLESS THE PROFESSIONAL OF RECORD AND BOHLER PARTIES TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, CLAIMS, INJURIES, PENALTIES AND THE LIKE RELATED TO SAME. 26.THE CONTRACTOR IS RESPONSIBLE FOR A MAINTAINING AND PROTECTING THE TRAFFIC CONTROL PLAN AND ELEMENTS IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL REQUIREMENTS, FOR ALL WORK THAT AFFECTS PUBLIC TRAVEL EITHER IN THE RIGHT OF WAY OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S PRICE AND IS THE CONTRACTOR'S SOLE RESPONSIBILITY. 27.OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN; AND, FURTHER, THE PROFESSIONAL OF RECORD AND BOHLER ARE NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD THE PROFESSIONAL OF RECORD AND BOHLER PARTIES, HARMLESS FOR ALL INJURIES, DAMAGES AND COSTS THAT PROFESSIONAL OF RECORD AND BOHLER INCUR AS A RESULT OF SAID FAILURE OR FAILURE TO PRESERVE. 28.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ENSURING THAT ALL CONSTRUCTION ACTIVITIES AND MATERIALS COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL RULES AND REGULATIONS, LAWS, ORDINANCES, AND CODES, AND ALL APPLICABLE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 ET SEQ.) AS AMENDED, AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME. 29.THE CONTRACTOR MUST STRICTLY COMPLY WITH THE LATEST AND CURRENT OSHA STANDARDS AND REGULATIONS, AND/OR ANY OTHER AGENCY WITH JURISDICTION OVER EXCAVATION AND TRENCHING PROCEDURES. PROFESSIONAL OF RECORD AND BOHLER HAS NO RESPONSIBILITY FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES AND WORK. 30.THE CONTRACTOR AND THE OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND IN ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF THE CONTRACTOR AND/OR OWNER FAIL TO DO SO, THEY AGREE TO JOINTLY, INDEPENDENTLY, SEPARATELY, COLLECTIVELY, AND SEVERALLY INDEMNIFY, DEFEND, PROTECT AND HOLD PROFESSIONAL OF RECORD AND BOHLER PARTIES HARMLESS FOR ALL INJURIES AND DAMAGES THAT PROFESSIONAL OF RECORD SUFFERS AND COSTS THAT PROFESSIONAL OF RECORD INCURS AS A RESULT OF SAID FAILURE. 31.THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN AN ON-SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN COMPLIANCE WITH THE ENVIRONMENTAL PROTECTION AGENCY (EPA) REQUIREMENTS OR LOCAL GOVERNING AGENCY FOR SITES WHERE ONE (1) ACRE OR MORE IS DISTURBED BY CONSTRUCTION ACTIVITIES (UNLESS THE LOCAL JURISDICTION REQUIRES A DIFFERENT THRESHOLD). THE CONTRACTOR MUST ENSURE THAT ALL ACTIVITIES, INCLUDING THOSE OF ALL SUBCONTRACTORS, ARE IN COMPLIANCE WITH THE SWPPP, INCLUDING BUT NOT LIMITED TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS APPROPRIATE AND FURTHER, THE CONTRACTOR IS SOLELY AND COMPLETELY RESPONSIBLE FOR FAILING TO DO SO. 32.AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED DOCUMENTS PREPARED BY THE PROFESSIONAL OF RECORD AND BOHLER, THE USE OF THE WORDS 'CERTIFY' OR 'CERTIFICATION' CONSTITUTE(S) AN EXPRESSION ONLY OF PROFESSIONAL OPINION REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE PROFESSIONAL OF RECORD'S AND BOHLER KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON AND ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE OF ANY NATURE OR TYPE, EITHER EXPRESSED OR IMPLIED, UNDER ANY CIRCUMSTANCES. NORTH CAROLINA OUTSIDE SOURCE NOTES (Rev. 11/2023) ANY INFORMATION, DRAWINGS, DATA, PLANS, SPECIFICATIONS, MATERIALS, FIGURES, DOCUMENTATION, REPORTS, AND THE LIKE WHICH IS INDICATED TO HAVE BEEN PREPARED “BY OTHERS” (HEREIN, “BY OTHERS REPORTS, DOCUMENTS AND DETAILS”) HAS BEEN OR WILL BE CREATED, DEVELOPED, PREPARED, PERFORMED, AND ANALYZED BY AN ENTITY OR PARTY OTHER THAN THE “BOHLER” ENTITY INVOLVED WITH THIS PROJECT. THE “BOHLER” ENTITY IS NOT IN ANY WAY RESPONSIBLE FOR THE BY OTHERS REPORTS, DOCUMENTS AND DETAILS EVEN IF/WHERE INCLUDED IN THE “BOHLER” ENTITY'S PLANS, REPORTS, ETC. SAME HAS BEEN INCLUDED ON THIS PLAN FOR THE CONVENIENCE, ONLY, OF THE PROJECT OWNER, DEVELOPERS, CONTRACTORS AND CONSULTANTS AND IN ORDER TO COORDINATE THE “BOHLER” ENTITY'S DESIGN WITH THAT OF “OTHERS”. THE “BOHLER” ENTITY HAS ASSUMED, FOR PURPOSES OF THIS PLAN, THAT THE BY OTHERS REPORTS, DOCUMENTS AND DETAILS ARE CURRENT AND, IF APPLICABLE, PREPARED IN STRICT ACCORDANCE WITH ALL APPLICABLE COUNTY, STATE, FEDERAL AND OTHER STATUTES, LAWS, RULES, REGULATIONS, ORDINANCES AND THE LIKE. THE “BOHLER” ENTITY SPECIFICALLY DISCLAIMS ANY AND ALL LIABILITY AND RESPONSIBILITY FOR BY OTHERS REPORTS, DOCUMENTS AND DETAILS. THE ENTITY OR PERSON WHO CREATED THE INFORMATION CONTAINED IN THE BY OTHERS REPORTS, DOCUMENTS AND DETAILS (EXCLUDING INFORMATION AND/OR DETAILS SOLELY SUPPLIED BY A JURISDICTION AND/OR GOVERNING BODY) AGREES BY PARTICIPATING IN THIS PROJECT, RECEIVING, REVIEWING, USING AND/OR RELYING UPON THIS DOCUMENT, AND/OR BY AGREEING TO THE PROJECT OWNER/DEVELOPER'S CONTRACT DOCUMENTS, TO DEFEND, INDEMNIFY, PROTECT AND HOLD HARMLESS THE “BOHLER” ENTITY THAT PREPARED THIS DOCUMENT AND ITS EMPLOYEES FOR ANY AND ALL DAMAGES, INJURIES, COSTS, EXPENSES AND THE LIKE, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, WHICH THE “BOHLER” ENTITY AND/OR ITS EMPLOYEES SUFFER OR INCUR AS A RESULT OF INCLUDING ANY BY OTHERS REPORTS, DOCUMENTS AND DETAILS IN AND ON OR IN THIS PLAN. ANYONE OR ANY ENTITY WHO RECEIVED, RELIES UPON AND/OR USES THIS PLAN, AGREES TO HOLD THE “BOHLER” ENTITY AND ITS EMPLOYEES HARMLESS FROM ANY CLAIMS, DAMAGES, INJURIES, COSTS AND EXPENSES, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, FOR ANY DAMAGES, INJURIES, COSTS, EXPENSES AND THE LIKE, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, WHICH IT OR THEY SUFFER OR INCUR AS A RESULT OF THE ANY BY OTHERS REPORTS, DOCUMENTS AND DETAILS INCORPORATED IN THE PLAN, AND EXPRESSLY CONFIRMS THAT BY RECEIVING, RELYING UPON AND/OR USING SAME, THE “BOHLER” ENTITY SHALL HAVE NO LIABILITY RELATED TO SAME. WITH RESPECT TO ALL BY OTHERS REPORTS, DOCUMENTS AND DETAILS, CONTRACTOR MUST VERIFY ALL INFORMATION CONTAINED IN THE SCOPE OF ALL PARTIES INVOLVED IN PREPARING THE BY OTHERS REPORTS, DOCUMENTS AND DETAILS PRIOR TO COMMENCING ANY CONSTRUCTION AND MUST VERIFY THAT THE INFORMATION IS THE LATEST, THE MOST RECENT AND THE MOST CURRENT REPORT, DOCUMENT AND DETAIL. REFERENCES ON THIS PLAN TO INFORMATION PREPARED OR CONTAINED IN BY OTHERS REPORTS, DOCUMENTS AND DETAILS DEPICTING AN OFF-SITE AREA WHERE NO DETAIL IS INCLUDED IS A REFERENCE TO AN AREA, DETAIL, SPECIFICATION OR DESIGN THAT HAS NOT BEEN DESIGNED OR CONSTRUCTED BY THE “BOHLER” ENTITY AND REGARDING WHICH THE “BOHLER” ENTITY HAS NO CONTROL OVER OR LIABILITY REGARDING, BUT IS ADDED TO THIS PLAN FOR INFORMATIONAL PURPOSES, ONLY. C-102 GENERAL NOTES AND LEGEND ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R Th i s d r a w i n g a n d / o r f i l e h a s b e e n p r e p a r e d b y B o h l e r a t t h e r e q u e s t o f t h e P r o j e c t O w n e r o r h i s R e p r e s e n t a t i v e a n d i s b e i n g p r o v i d e d s o l e l y a s a c o n v e n i e n c e t o t h e r e c i p i e n t . B o h l e r m a k e s n o r e p r e s e n t a t i o n r e g a r d i n g t h e s u i t a b i l i t y f o r t h e i n t e n d e d u s e b y t h e r e c i p i e n t . F u r t h e r , B o h l e r m a k e s n o PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - C N D S - 0 - - - - - > L A Y O U T : C - 1 0 2 N O T E DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F E SSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 GREGORY POOLE EQUIPMENT COMPANY PIN: R03600-005-008 DB 6645, PG 1746 PB 21, PG 49 140,610 SF OR 3.228 AC MARKET STREET - US HIGHWAY 17 (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) N5 0 ° 2 8 ' 0 3 " W 6 7 1 . 4 5 N42°38'56"E 210.39 S5 0 ° 2 9 ' 1 0 " E 1 8 0 . 0 7 S5 0 ° 1 3 ' 5 1 " E 1 2 1 . 1 7 S5 0 ° 3 4 ' 3 2 " E 3 6 6 . 4 6 S41°37'28"W 210.47 (TBR) S41°34'01"W 99.97(TIE) (TBR) (TBR) (TBR) (TBR) (TBR) LO D LO D LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D EXISTING CONDITIONS/ DEMOLITION PLAN C-201 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - D E M O - 0 - - - - - > L A Y O U T : C - 2 0 1 D E M O DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 DEMO-0 DEMO-0 DEMOLITION/REMOVAL NOTE D S C SL W E G OH T OR 516.4TC 516.4 TYPICAL NOTE TEXT DEMOLITION / REMOVAL LEGEND SAN # STM # X EASEMENT LINE CONCRETE CURB & GUTTER UTILITY POLE WITH LIGHT POLE LIGHT TRAFFIC LIGHT UTILITY POLE TYPICAL LIGHT ACORN LIGHT TYPICAL SIGN PARKING COUNTS SPOT ELEVATIONS SANITARY LABEL STORM LABEL SANITARY SEWER LATERAL UNDERGROUND WATER LINE UNDERGROUND ELECTRIC LINE UNDERGROUND GAS LINE OVERHEAD WIRE UNDERGROUND TELEPHONE LINE UNDERGROUND CABLE LINE STORM SEWER SANITARY SEWER MAIN HYDRANT SANITARY MANHOLE STORM MANHOLE WATER METER WATER VALVE GAS VALVE GAS METER S WV WM GENERAL DEMOLITION NOTES: THIS PLAN REFERENCES BOHLER SURVEY DATED: 02/03/24 1.CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 et seq.), AS AMENDED AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME. 2.BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME. 3.THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION, ONLY, REGARDING ITEMS TO BE DEMOLISHED AND/OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE PLAN DRAWINGS AND INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS. 4.CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE SAFETY STANDARDS, OR THE SAFETY OF THE CONTRACTOR OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT, WITH BOHLER ENGINEERING, IN WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES. 5.PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO: OBTAINING ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND OTHER PUBLIC AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND DEMOLITION WORK, INCLUDING DEMOLITION OF THE EXISTING BUILDING. 6.THE LOCATION OF EXISTING UNDERGROUND UTILITIES AS INDICATED ON THE PLAN IS APPROXIMATE AND LOCATIONS SHOWN ARE TO A STANDARD OF ACCURACY BASED ON UTILITY MARKOUT METHOD NOTED IN SURVEY. FIELD LOCATE ALL UNDERGROUND EXISTING UTILITIES LOCATED IN THE AREA OF WORK PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL "NC 811" PRIOR TO CONSTRUCTION FOR ASSISTANCE IN LOCATING EXISTING UNDERGROUND UTILITIES. SUBSURFACE FEATURES ARE SHOWN IN AN APPROXIMATE LOCATION. CONTRACTOR IS RESPONSIBLE FOR SUBSURFACE UTILITY EXPLORATION TO DETERMINE UNDERGROUND UTILITY LOCATIONS AND DEPTH. 7.ALL SIDEWALKS AND CURB AND GUTTER SECTIONS SHALL BE REMOVED BY SAWCUTTING THE NEAREST CONTROL JOINT AWAY FROM THE LOCATION DESIGNATED FOR REMOVAL ON THE PLANS. EXISTING PAVEMENT SHALL BE SAWCUT IN ALL LOCATIONS WHERE ABUTTING NEW PAVEMENT OR CONCRETE. 8.COORDINATE ALL UTILITY REMOVAL, RELOCATION, & ABANDONMENT WITH THE APPROPRIATE UTILITY SERVICE PROVIDER. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL UTILITY SERVICES TO ADJACENT PROPERTIES DURING ALL PHASES OF CONSTRUCTION. 9.CONTRACTOR TO SUPPLY SUFFICIENT TRAFFIC CONTROL DEVICES AT ALL TIMES. 10.TRAFFIC PLATES MUST BE USED OVER MAIN DRIVES. W E S NAD 8 3 NAD 8 3 1"=40' 0 40102040 SITE PLAN DATA TABLE & NOTES: 1.THIS PLAN REFERENCE DOCUMENTS AND INFORMATION BY: BOHLER ENGINEERING NC, PLLC 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 DATED: 02/03/24 2.OWNER: WILM PROPCO LLC. DURHAM, NC 27707 3.PARCEL: 8310 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY 4.PROJECT NAME:MARKET ST STORAGE 5.ZONING:B-2 6.EXISTING USE:STORAGE YARD 7.PROPOSED USE:STORAGE FACILITY 8.PARCEL SIZE: 3.23 AC 9.DISTURBED AREA:3.08 AC 10.SIDE INTERIOR SETBACK:10' 11.REAR SETBACK:0' 12.FRONT SETBACK:25' GREGORY POOLE EQUIPMENT COMPANY PIN: R03600-005-008 DB 6645, PG 1746 PB 21, PG 49 140,610 SF OR 3.228 AC MARKET STREET - US HIGHWAY 17 (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) (TBR) N5 0 ° 2 8 ' 0 3 " W 6 7 1 . 4 5 N42°38'56"E 210.39 S5 0 ° 2 9 ' 1 0 " E 1 8 0 . 0 7 S5 0 ° 1 3 ' 5 1 " E 1 2 1 . 1 7 S5 0 ° 3 4 ' 3 2 " E 3 6 6 . 4 6 S41°37'28"W 210.47 (TBR) S41°34'01"W 99.97(TIE) (TBR) (TBR) (TBR) (TBR) (TBR) LOD LO D LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D TREE REMOVAL PLAN C-202 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - T R E E - 0 - - - - - > L A Y O U T : C - 2 0 2 T R E E DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 DEMO-0 DEMO-0 W E S NAD 8 3 NAD 8 3 1"=40' 0 40102040 TREE LEGEND: TREES TO BE REMOVED TREES TO REMAIN Point Number Northing Easting Type Size(IN) 40133 201067.4 2364414.9 Pine 12 40135 201030.3 2364458.5 Pine 13 40149 201193.9 2364590.8 Maple 10 40150 201197.3 2364577.4 White Oak 8 40151 201204.2 2364567.3 White Oak 14 40152 201211.4 2364560.4 White Oak 12 40153 201223.3 2364544.2 White Oak 12 90000 200744.3 2364988.7 White Oak 6 90001 200732.6 2364982.7 White Oak 15 90002 200735.9 2364984.5 White Oak 6 90003 200714.8 2364968.6 White Oak 14 90004 200713.0 2364964.1 White Oak 8 90005 200712.2 2364960.9 White Oak 7 90006 200704.4 2364951.7 White Oak 12 90007 200702.1 2364948.2 White Oak 23 90008 200690.7 2364940.5 White Oak 6 90009 200683.4 2364929.8 Pine 14 90010 200680.9 2364927.6 Pine 22 90011 200678.1 2364919.5 Pine 26 90012 200672.7 2364926.6 Pine 12 90013 200665.5 2364920.8 Pin Oak 12 90014 200674.5 2364909.4 Pin Oak 8 90015 200731.2 2364832.9 Pine 28 90016 200724.2 2364834.6 White Oak 16 90017 200729.4 2364835.1 White Oak 6 90018 200728.5 2364827.9 White Oak 21 90019 200745.3 2364821.7 White Oak 8 90020 200745.7 2364807.7 White Oak 12 90021 200748.2 2364807.2 White Oak 23 90022 200760.0 2364797.1 White Oak 13 90023 200771.0 2364783.1 Birch 13 90024 200773.9 2364770.1 Pine 20 90025 200783.2 2364764.2 Pine 22 90026 200778.2 2364764.0 Pine 12 90027 200793.5 2364746.0 Pine 24 90028 200806.0 2364727.7 Pine 19 90029 200815.6 2364717.7 Pine 11 90030 200843.7 2364690.0 White Oak 23 90031 200856.3 2364668.0 Pine 38 90032 200869.1 2364656.3 White Oak 24 90033 201024.8 2364784.7 Pine 12 90034 201004.8 2364787.4 Birch 7 90035 200955.5 2364838.3 White Oak 8 90036 200975.5 2364849.2 Pine 16 90037 200969.5 2364860.9 Pin Oak 13 90038 200951.1 2364868.2 Pine 7 90039 200948.5 2364874.7 White Oak 6 90040 200925.2 2364899.3 Pin Oak 7 90041 200907.5 2364935.0 Pine 6 90042 200872.9 2364979.1 Pine 26 90043 200840.9 2365030.0 Pine 15 MARKET STREET - US HIGHWAY 17 N5 0 ° 2 8 ' 0 3 " W 6 7 1 . 4 5 N42°38'56"E 210.39 S5 0 ° 2 9 ' 1 0 " E 1 8 0 . 0 7 S5 0 ° 1 3 ' 5 1 " E 1 2 1 . 1 7 S5 0 ° 3 4 ' 3 2 " E 3 6 6 . 4 6 S41°37'28"W 210.47S41°34'01"W 99.97(TIE) LO D LO D LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D 25' STREET YARD BUFFER 50' PARKING SETBACK 100' BUILDING SETBACK 5 10 ' S I D E S E T B A C K 10 ' S I D E S E T B A C K 18' 6.5' 24' 10' 10 ' 8 PROP TRASH ENCLOSURE PROP FUEL STATION 7PROP SLIDING GATE WITH KEYPADS AND KNOX BOX PROP SLIDING GATE WITH KEYPADS AND KNOX BOX 16' 11.4' 12 4 ' PROP SCM PROP 3' FOUNDATION PLANTING AREA PROP BUILDING 9,750 SF FFE = 39.75' 65' 17 0 ' SERVICE BAYS PROP EMERGENCY SPILLWAY PROP RIP RAP 3 0 ' R 30 ' R 7 5 ' R 5 0 ' R 5 0 ' R 57 ' R 10'R 5'R 1 0 ' R 5' R 36' PROP APPROX LOCATION OF SIGN (REFER TO SIGNAGE PLAN FOR FINAL LOCATION) PROP PEDESTRIAN GATE PROP PEDESTRIAN GATE PROP WASHPAD PROP BOLLARD MOUNTED ADA SIGN 5'R 5'R C-301 SITE PLAN W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R Th i s d r a w i n g a n d / o r f i l e h a s b e e n p r e p a r e d b y B o h l e r a t t h e r e q u e s t o f t h e P r o j e c t O w n e r o r h i s R e p r e s e n t a t i v e a n d i s b e i n g p r o v i d e d s o l e l y a s a c o n v e n i e n c e t o t h e r e c i p i e n t . B o h l e r m a k e s n o r e p r e s e n t a t i o n r e g a r d i n g t h e s u i t a b i l i t y f o r t h e i n t e n d e d u s e b y t h e r e c i p i e n t . F u r t h e r , B o h l e r m a k e s n o PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - S I T E - 0 - - - - - > L A Y O U T : C - 3 0 1 S I T E DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F E SSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 SITE-0 1"=40' 0 40102040 SITE PLAN DATA TABLE & NOTES: 1.THIS PLAN REFERENCE DOCUMENTS AND INFORMATION BY: BOHLER ENGINEERING NC, PLLC 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 DATED: 02/23/24 2.OWNER: WILM PROPERTIES LLC. DURHAM, NC 27707 3.PARCEL: 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY 4.PROJECT NAME:MARKET ST STORAGE 5.ZONING:B-2 6.EXISTING USE:STORAGE YARD 7.PROPOSED USE:STORAGE FACILITY 8.REQUIRED PARKING:.5 PER 1,000 SF = (9750 / 1,000)/.5 = 5 9.PROPOSED PARKING:20 SPACES 10.PROPOSED PARCEL SIZES: 2.83 AC 11.DISTURBED AREA:3.08 AC 12.SIDE SETBACK:10' 13.REAR SETBACK:0' 14.FRONT SETBACK:25' PAVEMENT LEGEND DELINEATES PROPOSED STANDARD DUTY ASPHALT DELINEATES PROPOSED SIDEWALK DELINEATES PROPOSED HEAVY DUTY CONCRETE DELINEATES PROPOSED GRAVEL DELINEATES PROPOSED HEAVY DUTY ASPHALT MARKET STREET - US HIGHWAY 17 LO D LOD LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D PROP BUILDING 9,750 SF FFE = 39.75' SERVICE BAYS 3 0 ' R 30 ' R 7 5 ' R 5 0 ' R 5 0 ' R 57' R 10'R 5'R 1 0 ' R 5' R 5'R 5'R F F F F F F F F F F F F F W W W W W W E E E E E E W E E E E E E E E E E E W W ME 47.22 ME 47.45 TC 46.29 TC 45.89 TC 42.03 TC 40.83 TC 39.32 TC 39.85 TC 40.05 G 39.54 TC 40.45 G 39.37 TC 40.38 TC 40.52 TC 40.98 TC 41.55 TC 42.39 TC 40.42 G 38.03 G 37.55 G 37.28 G 38.14 G 39.33 FF 39.75 FF 39.68 FF 39.75 FF 39.75 G 33.71 G 33.00 G 33.00 G 34.35 G 39.59 G 39.60 G 33.83 G 33.23 G 34.48 G 38.68 G 38.05 G 39.70 G 39.68 31 303130 G 36.87 G 38.35 G 37.94 G 38.22 32 37 40 42 43 44 34 2829 262524 26 29 A-20 P R O P 1 8 " H D P E A-10 G 38.78 G 33.03 G 38.67 G 39.50 G 39.53 G 39.33 G 39.33 G 33.50 23 23 24 25 26 27 28 28 27 26 25 STORM STRUCTURE SCHEDULE STRUCTURE # A-10 A-20 TYPE PROP FES RIM 29.31 31.94 INV IN INV IN = 29.80' (18") INV OUT INV OUT = 29.31 (18") STORM SEWER PIPE SCHEDULE FROM A-10 FROM INV 29.80' TO A-20 TO INV 29.31' PIPE LENGTH 42' SLOPE (%) -1.17% DIAMETER (IN.) 18" MATERIAL HDPE C-401 GRADING AND DRAINAGE PLAN W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - G R A D - 0 - - - - - > L A Y O U T : C - 4 0 1 G R A D DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 GRAD-0 1"=40' 0 40102040 31.35' GRAVEL 5 RIDGE 3:1 M A X 3% AVG TYPICAL EDGE OF CONCRETE DETAIL NTS LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D G 33.71 G 33.00 G 33.00 G 34.35 G 33.83 G 33.23 G 34.48 31 30 31 30 32 34 28 29 262524 26 29 A-20 P R O P 1 8 " H D P E A-10 G 33.03 G 33.50 23 23 24 25 26 27 28 28 27 26 25 C-402 SCM PLAN W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - G R A D - 0 - - - - - > L A Y O U T : C - 4 0 2 S C M DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 GRAD-0 1"=20' 0 2051020 NOTES: 1.BASIN SHALL BE CLEANED OUT AND STABILIZED UPON CONVERSION TO WET DETENTION BASIN A B B A SECTION A-A PLAN VIEW (TOP REMOVED)ISOMETRIC VIEW (TRASH RACK NOT SHOWN)NOTES: 1.RISER TO BE PRE-CAST CONCRETE STRUCTURE. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL. SCM #1: WET DETENTION BASIN TOP OF RISER ELEV. 31.35' FILL WITH 1.5' CONCRETE TO INVERT ELEV. SECTION B-B 5.0' 5. 0 ' 4. 0 ' 4.0' 2' ELEV 29.50' 1.CONSTRUCTION SHALL BE PERFORMED UNDER THE OBSERVATION OF A QUALIFIED GEOTECHNICAL ENGINEER REGISTERED AS A PE IN THE STATE OF NORTH CAROLINA. THE GEOTECHNICAL ENGINEER SHALL OBSERVE ALL ASPECTS OF THE CONSTRUCTION OF THE POND. THE FREQUENCY OF OBSERVATION AND TESTING MUST BE SUFFICIENT FOR THE GEOTECHNICAL ENGINEER TO STATE, IN HIS/HER PROFESSIONAL OPINION, THAT THE SPECIFIC ITEMS OBSERVED AND TESTED WERE INSTALLED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION DRAWINGS, SPECIFICATIONS, AND HIS/HER GEOTECHNICAL RECOMMENDATIONS, INCLUDING BUT NOT LIMITED TO: 1.1.THE INSTALLATION OF CONTROLLED FILL AROUND PIPES AND STRUCTURES EXITING AND ENTERING THE POND. EARTHWORK COMPACTION WITHIN 3-FEET OF ANY STRUCTURES SHALL BE ACCOMPLISHED BY MEANS OF HAND TAMPERS, MANUALLY DIRECTED POWER TAMPERS OR PLATE COMPACTORS OR MINIATURE SELF-PROPELLED ROLLERS. 1.2.THE REMOVAL OF STONES AND VISIBLE ORGANIC DEBRIS SUCH AS ROOTS AND LIMBS AND FROM THE FILL MATERIAL PRIOR TO COMPACTION TO THE REQUIRED DENSITY. SOILS SHALL NOT CONTAIN STONES OR ORGANIC MATTER CONTENT EXCEEDING THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. 1.3.FILL MATERIAL MINIMUM DENSITIES AND MOISTURE CONTENT RANGES. ANY FILL MATERIAL INSTALLED AT LOWER THAN SPECIFIED MINIMUM DENSITIES, AT MOISTURE CONTENTS OUTSIDE THE SPECIFIED RANGES, OR OTHERWISE NOT CONFORMING TO SPECIFIED REQUIREMENTS SHALL BE REMOVED AND REPLACED WITH ACCEPTABLE MATERIALS. 1.4.THE CONTINUOUS CONTROL OF SURFACE WATER AND THE PLACEMENT OF CONTROLLED FILL. 1.5.UNDERCUTTING OF COMPRESSIBLE AND/OR UNSUITABLE SOILS IN ADDITION TO THAT INDICATED ON THE PLANS. ALL SUCH UNDERCUTTING SHALL BE PERFORMED AT THE DISCRETION OF THE GEOTECHNICAL ENGINEER AND SHALL BE MONITORED AND DOCUMENTED. 1.6.TREATMENT OF SEEPAGE AREAS, SUBGRADE PREPARATION, FOUNDATION DEWATERING AND ROCK FOUNDATION PREPARATION (I.E., TREATMENT WITH SLUSH GROUTING, DENTAL CONCRETE, ETC.) 1.7.THE INSTALLATION OF ANY RETAINING WALLS WITHIN OR ADJACENT TO THE POND. 2.THE DEGREE (%) OF COMPACTION SHALL BE DIRECTED BY A GEOTECHNICAL ENGINEER AND BE PERFORMED AS A PART OF THE NORMAL QUALITY CONTROL PROGRAM FOR CONSTRUCTION. TESTS SHALL BE CONDUCTED CONCURRENT WITH THE INSTALLATION OF THE COMPACTED FILL, AND THE CONTRACTOR SHALL COORDINATE CONSTRUCTION SO THAT TESTING CAN BE COMPLETED. SHOULD THE RESULTS OF THE TESTS INDICATE THAT THE SPECIFIED DEGREE OF COMPACTION HAS NOT BEEN OBTAINED, THE PORTIONS REPRESENTED BY SUCH TESTS SHALL BE REWORKED OR REBUILT. ALL PORTIONS SHALL ACHIEVE THE SPECIFIED MINIMUM DEGREE OF COMPACTION. 3.A BUILDING PERMIT WILL BE REQUIRED FOR THE CONSTRUCTION OF THE GABION WALL SYSTEM AND IS TO BE AQUIRED BY THE CONTRACTOR BEFORE THE START OF THE POND CONSTRUCTION. 6" X 36"ORIFICE - ELEV 30.45' NOT TO SCALE DETENTION BASIN CONTROL STRUCTURE DETAILS 10' POND CONSTRUCTION STANDARDS: NOT TO SCALE WET DETENTION BASIN CROSS SECTION OUTLET PIPE SEDIMENT CLEANOUT BOTTOM ELEVATION ELEV. 22.50' SOD SIDESLOPES TOP OF SEDIMENT STORAGE (BOTTOM OF BASIN) ELEV. 23.00' 6" OF SEDIMENT STORAGE 6' VEGETATED SHELF (6:1 SLOPE) FOREBAY RIP RAP DISSIPATER PAD (SEE PLAN FOR EXTENTS PERMANENT POOL ELEV. 29.50' TEMPORARY POOL ELEV. 30.50' OUTLET STRUCTURE ELEV. = 31.35' TOP OF BERM ELEV. 33.00' TOP OF BERM ELEV. 33.00' SOIL OVER OUTLET PIPE ONLY 6" OF SEDIMENT STORAGE GROUT 0.75" DIA. DRAWDOWN ORIFICE / 4" Ø PIPE TEE PEAKED TRASH RACK 18" Ø OUTLET PIPE GROUT EACH SIDE 4' x 4' PRECAST RC BOX, 6" WALLS (ONE PIECE CAST) STEPS ON INSIDE AND OUTSIDE OF RISER, 12" O.C. EPOXY COATED PEAK ROOF TRASH RACK WITH ACCESS HATCH CENTERED ON STEPS, BOLTED TO RISER 18" HDPE OUTLET CULVERT ELEV=29.50' 6" X 36" ORIFICE OUTLET STM STRUCT. A-10 EMERGENCY SPILLWAY ELEV. 31.65'1YR STM: 30.57' 10YR STM: 31.28' 100YR STM: 31.94' 6" CLAY LINER EMERGENCY SPILLWAY: ELEV = 31.65' 15'X10' LOD LO D LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D PROP BUILDING 9,750 SF FFE = 39.75' SERVICE BAYS S S S S S S S EX-10 A-10 A-40 A-20A-30 F F F F F F F F F F F F F W W W W W W E E E E E E PROP. 1" TYPE K COPPER WATERLINE W E PROP. ELECTRIC MAIN PROP. 34" SCH40 PVC WATERLINE PROP. 6" PVC WATERLINE E E E E E E E E E E PROP. ELECTRIC CONNECTION FROM EXISTING POWERPOLE PROP. FIRE HYDRANT PROP. FIRE DEPARTMENT CONNECTION PROP. ELECTRIC CONDUIT PROP. WATER VALVE PROP. 1" RPZ HEATED ENCLOSURE PROP. ELECTRIC CONNECTION FOR PROP SIGN PROP TAPPING SLEEVE TO EXISTING WATER MAIN W W PROP. TEE AND REDUCER PROP. 6" RPZ HEATED ENCLOSURE SANITARY STRUCTURE SCHEDULE STRUCTURE # A-10 A-20 A-30 A-40 EX-10 TYPE PROP. TRAFFIC RATED CLEANOUT PROP. TRAFFIC RATED CLEANOUT PROP. TRAFFIC RATED CLEANOUT PROP BUILDING CONNECTION EX. MANHOLE RIM 43.29 40.11 39.86 39.75 47.41 INV IN INV IN = 35.44' (4") INV IN = 36.36' (4") INV IN = 36.64' (4") INV IN = 34.52' (4") INV OUT INV OUT = 35.44 (4") INV OUT = 36.36 (4") INV OUT = 36.64 (4") INV OUT = 37.00 (4") SANITARY PIPE SCHEDULE FROM A-10 A-20 A-30 EX-10 FROM INV 35.44' 36.36' 36.64' 34.52' TO A-20 A-30 A-40 A-10 TO INV 36.36' 36.64' 37.00' 35.44' PIPE LENGTH 88' 27' 35' 88' SLOPE (%) 1.04% 1.04% 1.04% 1.04% DIAMETER (IN.) 4" 4" 4" 4" MATERIAL PVC Pipe PVC Pipe PVC Pipe PVC Pipe C-501 UTILITY PLAN W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - U T I L - 0 - - - - - > L A Y O U T : C - 5 0 1 U T I L DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 UTIL-0 1"=40' 0 40102040 PROPOSED NOTE W E G OH EB TYPICAL NOTE TEXT UTILITY LEGEND SAN # SANITARY LABEL UNDERGROUND WATER LINE UNDERGROUND ELECTRIC LINE UNDERGROUND GAS LINE OVERHEAD WIRE STORM SEWER SANITARY SEWER HYDRANT WATER METER WATER VALVE YARD INLET CURB INLET CLEAN OUT ELECTRIC BOX S WV WM N/A INV OUT =26.04' (12") MARKET STREET - US HIGHWAY 17 (TBR) N5 0 ° 2 8 ' 0 3 " W 6 7 1 . 4 5 N42°38'56"E 210.39 S5 0 ° 2 9 ' 1 0 " E 1 8 0 . 0 7 S5 0 ° 1 3 ' 5 1 " E 1 2 1 . 1 7 S5 0 ° 3 4 ' 3 2 " E 3 6 6 . 4 6 S41°37'28"W 210.47S41°34'01"W 99.97(TIE) (TBR) (TBR) LO D LOD LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D PROP BUILDING 9,750 SF FFE = 39.75' SERVICE BAYS PROPTEMPORARYSTOCKPILEAREAIF REQUIRED PROP WASH RACK PROP CONSTRUCTION ENTRANCE 50 ' 36' SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROP SILT FENCE (PLACED ON LOD NEAR LOT LINE) PROP. 2" SKIMMER WITH 2" DIAM. ORIFICE ELEV= 30.00 PROP. 4" DIAM. OUTLET PIPE @1.9% PROP. CLASS B RIP RAP OUTLET WIDTH: 3.8' END WIDTH: 12.4' LENGTH: 7.5' THICKNESS: 12" D50 = 8" PROP. DIVERSION DITCH #1A CHANNEL BOTTOM WIDTH: 1.5' DEPTH: 1.5' SIDE SLOPE: 2:1 STABILIZED USING 9-INCH D50 TEMP. SEDIMENT BASIN #1 DRAINAGE AREA: 2.19 AC BTM ELEV.: 29.00 TOP ELEV.: 33.00 EMERGENCY SPILLWAY ELEV.: 30.00 SA REQUIRED: 5,274 SF SA PROVIDED: 9,577 SF VOLUME REQUIRED: 2,637 CF VOLUME PROVIDED: 8,968 CF PROP BAFFLES PROP. ERONET SC250 LINED (OR APPROVED EQUIVALENT) EMERGENCY SPILLWAY 7.5' WIDTH @ ELEV 30.00' PROP. DIVERSION DITCH #1B CHANNEL BOTTOM WIDTH: 1' DEPTH: 1.5' SIDE SLOPE: 3:1 STABILIZED USING 9-INCH D50 30 29 33 33 30 29 C-601 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - E R O S - 0 - - - - - > L A Y O U T : C - 6 0 1 E R O 1 DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 EROS-0 1"=40' 0 40102040 EROSION CONTROL LEGEND SILT FENCE LIMITS OF DISTURBANCE SF SF SF LOD LOD LOD PROP. CONST. ENTRANCE INLET PROTECTION PROP. SILT SOCK PROP. SILT FENCE OUTLET PHASE I EROSION CONTROL CONSTRUCTION SEQUENCE: 1.SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE NEW HANOVER COUNTY EROSION & SEDIMENT CONTROL INSPECTOR. 2.POST REQUIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION EXIT, AND WITHIN EASY ACCESS TO THE GENERAL PUBLIC WITHOUT ENTERING THE SITE. 2.PRIOR TO ANY CLEARING OR INSTALLATION OF EROSION CONTROL DEVICES, CONTRACTOR SHALL STAKE/FLAG THE LOD (WHERE STAKING IS NOT POSSIBLE/PRACTICAL, THE LOD MUST BE CONSPICUOUSLY AND PROMINENTLY MARKED TO DENOTE THE BOUNDARY). LOD MUST REMAIN CONSPICUOUSLY MARKED THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT. NO DISTURBANCE IS TO TAKE PLACE BEYOND THE LOD. 3.INSTALL GRAVEL CONSTRUCTION PAD AND CONCRETE WASHOUT AREA. 4.INSTALL SILT FENCE AROUND THE SITE AS SHOWN IN PHASE I. CLEAR THE MINIMUM AMOUNT NECESSARY TO INSTALL THE SILT FENCE. 5.CLEAR AND GRUB THE AREA FOR THE SEDIMENT CONTROL BASIN. 6.GRADE IN SEDIMENT CONTROL BASIN. INSTALL BAFFLES AND SKIMMER AS SHOWN ON THE PLANS. 7.GRADE IN DRAINAGE DITCHES AS SPECIFIED ON THE EROSION CONTROL PLANS FOR PHASE I. STABILIZE SIDE SLOPES AND ALL SIDES OF EMBANKMENTS OF THE DRAINAGE DITCHES AND INSTALL TEMPORARY MATTING. 8.CONTACT SEDIMENT CONTROL INSPECTOR UPON COMPLETION OF INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROLS PRIOR TO PROCEEDING WITH ANY OTHER EARTH DISTURBANCE OR GRADING. 9.UPON APPROVAL FROM THE SEDIMENT CONTROL INSPECTOR, BEGIN STRIPPING THE SITE (COMPLETE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME. 10.SCM OUTLET STRUCTURE SHALL BE ONSITE PRIOR TO CONSTRUCTION OF THE DAM. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR. MARKET STREET - US HIGHWAY 17 N5 0 ° 2 8 ' 0 3 " W 6 7 1 . 4 5 N42°38'56"E 210.39 S5 0 ° 2 9 ' 1 0 " E 1 8 0 . 0 7 S5 0 ° 1 3 ' 5 1 " E 1 2 1 . 1 7 S5 0 ° 3 4 ' 3 2 " E 3 6 6 . 4 6 S41°37'28"W 210.47S41°34'01"W 99.97(TIE) LO D LO D LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D PROP BUILDING 9,750 SF FFE = 39.75' SERVICE BAYS PROP TEMPORARY STOCKPILEAREAIF REQUIRED PROP WASH RACK PROP CONSTRUCTION ENTRANCE 50 ' 36' SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF PROP SILT FENCE (PLACED ON LOD NEAR LOT LINE) F F F F F F F F F F F F F W W W W W W E E E E E E W E E E E E E E E E E E W W S S S S S S S 30 3 030 30 35 35 4 0 40 45 27 27 28 28 29 29 31 31 31 31 31 3132 32 32 32 32 32 33 3333 33 33 33 34 34 36 36 37 37 3 8 38 39 39 41 42 43 44 46 C-602 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - E R O S - 0 - - - - - > L A Y O U T : C - 6 0 2 E R O 2 DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 EROS-0 1"=40' 0 40102040 PHASE II EROSION CONTROL CONSTRUCTION SEQUENCE: 1.CONTINUE CLEARING, GRUBBING, AND STRIPPING THE SITE. (PHASE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME) 2.CONTINUE GRADING THE SITE, ADJUST TEMPORARY DIVERSION DIKES, CHANNELS AND OTHER BMP'S AS GRADES ARE ADJUSTED. 2.1.GRADE BUILDING PAD AREA . DURING PAD GRADING OPERATIONS SLOPE PAD SUCH THAT RUNOFF FROM PAD IS DIRECTED TOWARD SKIMMER BASIN AND DIVERSION DIKES/CHANNELS. 3.START CONSTRUCTION OF BUILDING SLAB, FOUNDATIONS, AND STRUCTURES. 4.TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 5.IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 6.INSTALL UTILITIES, STORM SEWERS, CURBS AND GUTTERS. AS STORM DRAINS ARE BROUGHT TO GRADE, INLET PROTECTION IS TO BE INSTALLED. 7.ONCE NEW HANOVER COUNTY INSPECTS THE SITE FOR STABILIZATION AND APPROVES, CONTINUE CONSTRUCTION. REMOVE THE SEDIMENT BASIN AND STABILIZE THE AREA. 8.PAVE SITE. 9.COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS. 10.OBTAIN CONCURRENCE FROM THE OWNER THAT THE SITE HAS BEEN FULLY STABILIZED, SEDIMENT HAS BEEN REMOVED FROM STORM INLETS, AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: a.REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), b.STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY BMPS. c.STABILIZE SOIL STOCKPILE. 12. DEMOBILIZE FROM SITE- CONTRACTOR SHALL NOT DEMOBILIZE UNTIL ENTIRE SITE HAS BEEN FULLY STABILIZED. NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION-RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR. EROSION CONTROL LEGEND SILT FENCE LIMITS OF DISTURBANCE SF SF SF LOD LOD LOD PROP. CONST. ENTRANCE INLET PROTECTION PROP. SILT SOCK PROP. SILT FENCE OUTLET N.T.S.N.T.S. NOTES: 1.TEMPORARY CONCRETE WASHOUT FACILITIES SHOULD BE LOCATED A MINIMUM OF 50 FT. FROM STORM DRAIN INLETS. 2.ONCE CONCRETE WASTES ARE WASHED INTO THE DESIGNATED AREA AND ALLOWED TO HARDEN, THE CONCRETE SHOULD BE BROKEN UP, REMOVED, AND DISPOSED OF OFF-SITE. CONTRACTOR TO DISPOSE OF HARDENED CONCRETE ON A REGULAR BASIS. 3.THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30 FT. OF THE TEMPORARY CONCRETE WASHOUT FACILITY. 4.PLASTIC LINING MATERIAL SHOULD BE A MINIMUM OF 10 MIL POLYETHYLENE SHEETING AND SHOULD BE FREE OF HOLES, TEARS, OR OTHER DEFECTS THAT COMPROMISE THE IMPERMEABILITY OF THE MATERIAL. 5.WASHOUT FACILITIES MUST BE CLEANED, OR NEW FACILITIES MUST BE CONSTRUCTED AND READY FOR USE ONCE THE WASHOUT IS 75% FULL. 6.STRAW BALE AND STAPLES MAY BE SUBSTITUTED WITH ALTERNATE SECURING MEASURES SUCH AS CONCRETE BLOCK. A CONCRETE WASHOUT SIGN DETAIL (OR EQUIVALENT) SECTION A-A STAPLE DETAIL PLAN CONCRETE WASHOUT A STAPLES 2 PER BALE) 10 MIL PLASTIC LINING BINDING WIRE STRAW BALE (SEE NOTE 6) NATIVE MATERIAL (OPTIONAL) WOOD OR METAL STAKES (2 PER BALE) 1/8" DIA. STEEL WIRE WOOD POST 3" X 3" X 8' 0.5" LAG SCREWS BLACK LETTERS PLYWOOD 48" X 24" PAINTED WHITE STAKE (TYP.) 10 MIL PLASTIC LINING STRAW BALE (TYP.) CONCRETE WASTE MANAGEMENT DETAIL STABILIZED CONSTRUCTION ENTRANCE PLAN VIEW PROFILE PERCENT SLOPE OF ROADWAY 0 TO 2% 2% TO 5% >5% LENGTH OF STONE REQUIRED COARSE GRAINED SOILS FINE GRAINED SOILS 50 FT 100 FT ENTIRE ENTRANCE STABILIZED WITH FABC BASE COURSE (1) (1) AS PRESCRIBED BY LOCAL ORDINANCE OR OTHER GOVERNING AUTHORITY. 100 FT 200FT CHART 1 PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND PUBLIC R.O.W. 25'R 25'R EXISTING GROUND 2-1/2" CLEAN STONE EXISTING GROUND PUBLIC RIGHT OF WAY N.T.S. 1 3 TEMPORARY STOCKPILE 1:3 MAXIMUM SLOPE CONSTRUCT SILT FENCE AROUND PERIMETER OF STOCKPILE N.T.S. INLET SEDIMENT FILTER SILT AREA OF DISTURBANCE DIG 6" WIDE AND 6" DEEP TRENCH, BURY BOTTOM 1'-0" OF FILTER FABRIC, TAMP IN PLACE SILT FENCE APPROVED FILTER FABRIC TO MEET APPLICABLE STATE/TOWN REGULATION SPECIFICATIONS (3'-0" WIDE) WOOD OR METAL FENCE POSTS SPACED 8'-0" O.C. EXISTING UNDISTURBED GROUND FLOW NOTES: 1.PLACE SILT FENCE LOCATIONS AS SHOWN ON THE SOIL EROSION AND SEDIMENT CONTROL PLAN. 2.THE SLOPE OF THE LAND FOR AT LEAST 30 FEET ADJACENT TO ANY SILT FENCE SHALL NOT EXCEED 5% 3.SILT FENCE SHALL BE INSTALLED SO WATER CANNOT BYPASS THE FENCE AROUND THE SIDES. 4.INSPECTION SHALL BE FREQUENT AND REPAIR OR REPLACEMENT SHALL BE MADE AS PROMPTLY AS POSSIBLE 5.SILT FENCE SHALL REMAIN IN PLACE FOR THE DURATION OF THE PROJECT UNLESS OTHERWISE INSTRUCTED BY THE TOWNSHIP ENGINEER. C-603 EROSION AND SEDIMENT CONTROL DETAILS ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - E R O S - 0 - - - - - > L A Y O U T : C - 6 0 3 D E T A I L S DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 EROS-0 MARKET STREET - US HIGHWAY 17 LO D LOD LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D W W W W W W E E E E E E W E E E E E E E E E E E W W 25' STREET YARD BUFFER 50' PARKING SETBACK 100' BUILDING SETBACK 5 10 ' S I D E S E T B A C K 10 ' S I D E S E T B A C K 8 7 PROP BUILDING 9,750 SF FFE = 39.75' SERVICE BAYS S S S S S S S 35 40 45 34 36 37 38 3 9 41 42 43 44 46 47 30 31 3132 3233 33 25 25 25 30 25 25 30 30 30 25 25 (1) FG (1) FG (1) CCE (1) FG (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (2) IN (3) CC (7) QP (1) FG (10) TA (7) TA (10) IS (10) IS (11) TA (9) TA SEEDED LAWN EX. TREE (TO REMAIN) EX. TREE (TO REMAIN) SLOPES TO BE SODDED C-701 LANDSCAPE PLAN W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - L S C P - 0 - - - - - > L A Y O U T : C - 7 0 1 L S C P DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 LSCP-0 1"=40' 0 40102040 LANDSCAPE NOTES 1.ALL LANDSCAPED AND LAWN AREAS ARE TO RECEIVE A MINIMUM OF 4" OF TOPSOIL. 2.ALL PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. 3.ALL PLANT MATERIAL SHALL BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE PLANT LIST. 4.ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD AND MEET ALL REQUIREMENTS SPECIFIED. 5.ALL LAWN AREAS TO BE SEEDED SHALL USE A LOCALLY GROWN COMMERCIAL BERMUDA SEED MIX MEETING LATEST NORTH CAROLINA AGRICULTURE STANDARDS FOR SEED AND PLANT CERTIFICATION. 6.ALL MATERIALS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLATION. 7.ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE DETAILS. 8.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 1) TO VERIFY THE LOCATIONS OF UTILITY LINES AND ADJACENT TO THE WORK AREA 2) TO PROTECT OF ALL UTILITY LINES DURING THE CONSTRUCTION PERIOD 3) TO REPAIR ANY AND ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF THE CONSTRUCTION. 9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK. 10.CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTECTION BETWEEN DELIVERY AND PLANTING PER SPECIFICATIONS TO MAINTAIN HEALTHY PLANT CONDITIONS. 11.THE CONTRACTOR SHALL COMPLETELY GUARANTEE AND BE RESPONSIBLE FOR FULLY MAINTAINING (INCLUDING BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) ALL OF THE PLANT MATERIALS AND LAWN FOR A ONE YEAR GROWING PERIOD. 12.ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TO SUBSTANTIAL COMPLETION) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL PLANT LIST SPECIFICATIONS. 13.STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. 14.WHERE SHOWN ON THE PLANS AND DETAILS, PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH A MINIMUM 4" DEPTH OF TRIPLE SHRED HARDWOOD MULCH FROM A LOCAL MULCH SOURCE HARVESTED IN A SUSTAINABLE MANNER. 15.BIODEGRADABLE WEED MATTING (ALL-PRO WEED MAT OR APPROVED EQUAL) SHALL BE REQUIRED IN SHRUB BEDS AT BUILDING FACADE. 16.ALL PLANT MATERIAL QUANTITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN. 17.THE CONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING IN STAGES FOR SOIL STABILIZATION AS AREAS ARE COMPLETED AFTER GRADING. 18.THIS PLAN DOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN. 19.IRRIGATION OF LAWN AND PLANTED AREAS IS REQUIRED BY THE TOWN OF CLAYTON NC UDO. LANDSCAPE CONTRACTOR SHALL PROVIDE AN IRRIGATION DESIGN BY A LICENSED IRRIGATION SYSTEMS PROVIDER. IRRIGATION DESIGN SHALL BE REVIEWED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 20.TOWN OF CLAYTON DOES NOT ALLOW CREPE MYRTLES IN BUFFER AREAS TO BE TOPPED, POLLARDED, OR OTHERWISE AGGRESSIVELY HACKED BACK. 21.HVAC TO BE GROUND MOUNTED AND BE SCREENED PER ORDINANCE. 22.ALL LANDSCAPED AREAS SHALL BE PROVIDED WITH AN AUTOMATICALLY OPERATED IRRIGATION SYSTEM THAT WILL ADEQUATELY COVER ALL LIVING PLANT MATERIAL; SUCH SYSTEM SHALL INCLUDE A RAIN SENSOR. 23.ALL LANDSCAPED AREAS SHALL BE MAINTAINED IN AN ATTRACTIVE AND HEALTHY CONDITION. DEAD OR DISEASED PLANTINGS SHALL BE REMOVED AND REPLACED IN A TIMELY FASHION. 24.OWNER OF SITE ASSUMES RESPONSIBILITY OF REPLACEMENT OF ANY AND ALL LANDSCAPING DISTURBED DURING MAINTENANCE OF EXISTING UTILITIES WITHIN ANY ON SITE PUBLIC UTILITY EASEMENT AND WITHIN 10’ OF ANY WATER OR SEWER SERVICE. LANDSCAPE COMPLIANCE CHART SECTION REQUIREMENT PROVIDED TABLE 5.4.5.C PARKING LOT INTERIORS LANDSCAPED AREAS IN THE INTERIOR OF PARKING LOTS SHALL BE EQUAL TO 8% OF THE TOTAL AREA TO BE USED FOR VEHICULAR OR PEDESTRIAN USE. TOTAL AREA USED = ±21,888 SF X 0.08 = ±1,751 SF REQUIRED ISLANDS + FOUNDATION = ±1,836 SF PROVIDED TABLE 5.4.5.C PARKING LOT INTERIORS ONE PLANTED OR EXISTING TREE SHALL BE REQUIRED FOR EVERY 144SF OF TOTAL LANDSCAPED AREA 1,836 SF PROVIDED / 144SF = 13 TREES REQUIRED 25 EXISTING TREES TO REMAIN TABLE 5.4.5.C PARKING LOT INTERIORS NO PARKING SPACE SHALL BE LOCATED MORE THAN 120FT FROM A LANDSCAPED ISLAND LANDSCAPED ISLANDS PROVIDED AT APPROPRIATE DISTANCE TABLE 5.4.6.B STREET YARD AREA STANDARDS ZONING DISTRICT B-2 25SF FOR EVERY LINEAR FOOT OF STREET YARD FRONTAGE FRONTAGE EXCLUDING DRIVE : ±168 X 25SF = ± 4,200 SF REQUIRED AREA OF STREET YARD EXCLUDING DRIVE : 4,308SF PROVIDED 5.4.6.C STREET YARD STANDARDS FOR EVERY 600 SF OF STREET YARD THE FOLLOWING IS REQUIRED: 1. ONE CANOPY/SHADE TREE 4,309SF / 600SF = 7.2 (ROUNDED TO 8) TREES REQUIRED 2. SIX SHRUBS, 12" IN HEIGHT AT TIME OF INSTALLATION 7.2 X 6 = 44 SHRUBS REQUIRED PROVIDED 8 TOTAL TREES: 7 PLANTED TREES + 1 EXISTING TREE IN STREET YARD PROVIDED 44 SHRUBS, SPECS FOR MIN HEIGHT REQUIREMENT 5.4.7.B FOUNDATION PLANTINGS 1. FOUNDATION PLANTING AREAS SHALL BE 12% OF THE AREA OF THE FIRST-FLOOR BUILDING FACE 152FT X .12 = ± 18FT REQUIRED 2. FOUNDATION PLANTING AREAS SHALL BE PLANTED AS LANDSCAPED AREAS OF SUFFICIENT VARIETY, HEIGHT, AND SIZE, WITH PLANTINGS LISTED IN NEW HANOVER COUNTY TREE AND LANDSCAPING MANUAL. 142 FT PROVIDED = 93% ALL PLANTS PROVIDED ALIGN WITH STANDARDS LAID OUT IN THE NEW HANOVER COUNTY TREE AND LANDSCAPING MANUAL. CODE QTY BOTANICAL NAME COMMON NAME SIZE CONTAINER CANOPY TREES FG 4 FAGUS GRANDIFOLIA AMERICAN BEECH 3" CAL.B&B QP 7 QUERCUS PHELLOS WILLOW OAK 3" CAL.B&B ORNAMENTAL TREES CCE 1 CERCIS CANADENSIS EASTERN REDBUD 2" CAL.B&B SHRUBS CC 24 CAMELLIA SASANQUA 'GREEN 01-006'OCTOBER MAGIC CARPET CAMELLIA 24-36"CONTAINER IN 20 ILEX VOMITORIA 'NANA'DWARF YAUPON HOLLY 24-36"CONTAINER IS 20 ILEX GLABRA 'SHAMROCK'SHAMROCK INKBERRY HOLLY 18-24"CONTAINER TA 37 THUJA OCCIDENTALIS 'ANNA VAN VLOTEN'ANNA'S MAGIC BALL ARBORVITAE 18-24"CONTAINER PLANT SCHEDULE C-702 LANDSCAPE DETAILS ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - L S C P - 0 - - - - - > L A Y O U T : C - 7 0 2 L S C P D E T A I L S DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F ESSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 LSCP-0 TREE PLANTING ON SLOPE DETAIL NOT TO SCALE EXISTING GRADE DO NOT WRAP TRUNK PREPARED SOIL FOR TREES 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL UNDISTURBED SUBGRADE TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL 12" SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE TREE BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE BEFORE PLANTING ADD 3 TO 4" OF WELL-COMPOSTED LEAVES OR RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL. 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH 4" BUILT-UP EARTH SAUCER SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS. ONLY TREES WITH ONE MAIN LEADER SHALL BE PURCHASED. DO NOT PRUNE TREE AT PLANTING UNLESS DIRECTED TO BY PROJECT LANDSCAPE ARCHITECT 2" DIA. HARDWOOD STAKES 2/3 TREE HT. 2 PER TREE 12 GAUGE GALVANIZED WIRE GUYS TWISTED REINFORCED RUBBER HOSE (1/2" DIA.) NOTE: TREE STAKING TO BE REMOVED AFTER 2 GROWING SEASONS B&B CONTAINER FINISHED GRADE REFERENCE: ARCHITECTURAL GRAPHIC STANDARDS 1998 CUMULATIVE SUPPLEMENT NOT TO SCALE 8-12" 24" MINIMUM DECIDUOUS AND EVERGREEN SHRUB PLANTING DETAIL 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH PLANT SHALL BE TRANSPLANTED AT THE SAME GRADE AS IT BORE IN THE NURSERY PLOT PRIOR TO BALLING AND BURLAPPING. FOR CONTAINER-GROWN SHRUBS, USE FINGER OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS THAT CIRCLE THE PERIMETER OF THE CONTAINER PLANTING MIX: 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL PLANTING MIXTURE WILL CHANGE WITH SOIL CONDITIONS BEFORE PLANTING, ADD 3 TO 4" OF WELL-COMPOSTED LEAVES AND RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL PLACE SHRUB ON FIRM SOIL IN BOTTOM OF HOLE. UNDISTURBED SUBGRADE SOIL SURFACE ROUGHENED TO BIND WITH NEW SOIL. REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE SHRUB BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE EVERGREEN TREE PLANTING DETAIL NOT TO SCALE REFERENCE: ARCHITECTURAL GRAPHIC STANDARDS 1998 CUMULATIVE SUPPLEMENT. 4" BUILT-UP EARTH SAUCER 4-6" DEEPER THAN ROOT BALL BEFORE PLANTING ADD 3 TO 4" OF WELL-COMPOSTED LEAVES OR RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL. SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS. SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH ONLY TREES WITH ONE MAIN LEADER SHALL BE PURCHASED. DO NOT PRUNE TREE AT PLANTING UNLESS DIRECTED TO BY PROJECT LANDSCAPE ARCHITECT FOLD BURLAP AWAY FROM TOP OF ROOT BALL PREPARE WIDTH OF PLANTING HOLE 6 FT OR TWICE THE WIDTH OF THE ROOT BALL; WHICHEVER IS GREATER PREPARED SOIL FOR TREES 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL UNDISTURBED SUBGRADE DIG WIDE, SHALLOW HOLE WITH TAMPED SIDES TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL DO NOT STAKE OR WRAP TRUNK REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE TREE BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE NOT TO SCALE EXISTING SUBSOILMINIMUM 6" TOPSOIL FINISHED GRADE PERENNIAL/GROUND COVER PLANTING DETAIL 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH D DD TYPICAL PERENNIAL AND GROUND COVER SPACING & LAYOUT PLANT MATERIAL SPACED AS SPECIFIED. SEE LANDSCAPE SCHEDULE FOR PROPOSED SPACING. INCORPORATE 2" OF PEAT INTO 6" OF PLANTING MIXTURE, AS SPECIFIED D= PROPOSED ON CENTER (O.C.) SPACING SEE LANDSCAPE SCHEDULE FOR FOR REQUIRED SPACING TYPICAL PERENNIAL AND GROUND COVER PLANTING DECIDUOUS TREE PLANTING DETAIL 4" BUILT-UP EARTH SAUCER BEFORE PLANTING ADD 3 TO 4" OF WELL-COMPOSTED LEAVES OR RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL. 4-6" DEEPER THAN ROOT BALL REFERENCE: ARCHITECTURAL GRAPHIC STANDARDS 1998 CUMULATIVE SUPPLEMENT. NOT TO SCALE 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL DIG WIDE, SHALLOW HOLE WITH TAMPED SIDES ONLY TREES WITH ONE MAIN LEADER SHALL BE PURCHASED. DO NOT PRUNE TREE AT PLANTING UNLESS DIRECTED TO BY PROJECT LANDSCAPE ARCHITECT SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS. FOLD BURLAP AWAY FROM TOP OF ROOT BALL SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE TREE BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE DO NOT STAKE OR WRAP TRUNK PREPARED SOIL FOR TREES 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL UNDISTURBED SUBGRADE PREPARE WIDTH OF PLANTING HOLE 6 FT OR TWICE THE WIDTH OF THE ROOT BALL; WHICHEVER IS GREATER LANDSCAPE SPECIFICATIONS 1. SCOPE OF WORK: THE LANDSCAPE CONTRACTOR SHALL BE REQUIRED TO PERFORM ALL CLEARING, FINISHED GRADING, SOIL PREPARATION, PERMANENT SEEDING OR SODDING, PLANTING AND MULCHING INCLUDING ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY FOR THE COMPLETION OF THIS PROJECT, UNLESS OTHERWISE CONTRACTED BY THE GENERAL CONTRACTOR. 2. MATERIALS A.GENERAL - ALL HARDSCAPE MATERIALS SHALL MEET OR EXCEED SPECIFICATIONS AS OUTLINED IN THE STATE DEPARTMENT OF TRANSPORTATION'S SPECIFICATIONS. B.TOPSOIL - NATURAL, FRIABLE, LOAMY SILT SOIL HAVING AN ORGANIC CONTENT NOT LESS THAN 5%, A PH RANGE BETWEEN 4.5-7.0. IT SHALL BE FREE OF DEBRIS, ROCKS LARGER THAN ONE INCH (1"), WOOD, ROOTS, VEGETABLE MATTER AND CLAY CLODS. C.LAWN - ALL DISTURBED AREAS ARE TO BE TREATED WITH A MINIMUM SIX INCH (6") THICK LAYER OF TOPSOIL, OR AS DIRECTED BY THE LOCAL ORDINANCE OR CLIENT, AND SEEDED OR SODDED IN ACCORDANCE WITH THE PERMANENT STABILIZATION METHODS INDICATED WITHIN THE SOIL EROSION AND SEDIMENT CONTROL NOTES. 1.1.LAWN SEED MIXTURE SHALL BE FRESH, CLEAN NEW CROP SEED. 1.2.SOD SHALL BE STRONGLY ROOTED, WEED AND DISEASE/PEST FREE WITH A UNIFORM THICKNESS. 1.3.SOD INSTALLED ON SLOPES GREATER THAN 4:1 SHALL BE PEGGED TO HOLD SOD IN PLACE. D.MULCH - THE MULCH AROUND THE PERIMETER OF THE BUILDING SHALL BE A 3" LAYER OF DOUBLE SHREDDED BLACK CEDAR MULCH ONLY. ALL OTHER AREAS SHALL BE MULCHED WITH A 3" LAYER OF DOUBLE SHREDDED DARK BROWN HARDWOOD BARK MULCH, UNLESS OTHERWISE STATED ON THE LANDSCAPE PLAN. E.FERTILIZER 1.1.FERTILIZER SHALL BE DELIVERED TO THE SITE MIXED AS SPECIFIED IN THE ORIGINAL UNOPENED STANDARD BAGS SHOWING WEIGHT, ANALYSIS AND NAME OF MANUFACTURER. FERTILIZER SHALL BE STORED IN A WEATHERPROOF PLACE SO THAT IT CAN BE KEPT DRY PRIOR TO USE. 1.2.FOR THE PURPOSE OF BIDDING, ASSUME THAT FERTILIZER SHALL BE 10% NITROGEN, 6% PHOSPHORUS AND 4% POTASSIUM BY WEIGHT. A FERTILIZER SHOULD NOT BE SELECTED WITHOUT A SOIL TEST PERFORMED BY A CERTIFIED SOIL LABORATORY. F.PLANT MATERIAL 1.1.ALL PLANTS SHALL IN ALL CASES CONFORM TO THE REQUIREMENTS OF THE "AMERICAN STANDARD FOR NURSERY STOCK" (ANSI Z60.1), LATEST EDITION, AS PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION. 1.2.IN ALL CASES, BOTANICAL NAMES SHALL TAKE PRECEDENCE OVER COMMON NAMES FOR ANY AND ALL PLANT MATERIAL. 1.3.PLANTS SHALL BE LEGIBLY TAGGED WITH THE PROPER NAME AND SIZE. TAGS ARE TO REMAIN ON AT LEAST ONE PLANT OF EACH SPECIES FOR VERIFICATION PURPOSES DURING THE FINAL INSPECTION. 1.4.TREES WITH ABRASION OF THE BARK, SUN SCALDS, DISFIGURATION OR FRESH CUTS OF LIMBS OVER 1¼", WHICH HAVE NOT BEEN COMPLETELY CALLUSED, SHALL BE REJECTED.PLANTS SHALL NOT BE BOUND WITH WIRE OR ROPE AT ANY TIME SO AS TO DAMAGE THE BARK OR BREAK BRANCHES. 1.5.ALL PLANTS SHALL BE TYPICAL OF THEIR SPECIES OR VARIETY AND SHALL HAVE A NORMAL HABIT OF GROWTH: WELL DEVELOPED BRANCHES, DENSELY FOLIATED, VIGOROUS ROOT SYSTEMS AND BE FREE OF DISEASE, INSECTS, PESTS, EGGS OR LARVAE. 1.6.CALIPER MEASUREMENTS OF NURSERY GROWN TREES SHALL BE TAKEN AT A POINT ON THE TRUNK SIX INCHES (6") ABOVE THE NATURAL GRADE FOR TREES UP TO AND INCLUDING A FOUR INCH (4") CALIPER SIZE. IF THE CALIPER AT SIX INCHES (6") ABOVE THE GROUND EXCEEDS FOUR INCHES (4") IN CALIPER, THE CALIPER SHOULD BE MEASURED AT A POINT 12" ABOVE THE NATURAL GRADE. 1.7.SHRUBS SHALL BE MEASURED TO THE AVERAGE HEIGHT OR SPREAD OF THE SHRUB, AND NOT TO THE LONGEST BRANCH. 1.8.TREES AND SHRUBS SHALL BE HANDLED WITH CARE BY THE ROOT BALL. 3. GENERAL WORK PROCEDURES A.CONTRACTOR TO UTILIZE WORKMANLIKE INDUSTRY STANDARDS IN PERFORMING ALL LANDSCAPE CONSTRUCTION. THE SITE IS TO BE LEFT IN A CLEAN STATE AT THE END OF EACH WORKDAY. ALL DEBRIS, MATERIALS AND TOOLS SHALL BE PROPERLY STORED, STOCKPILED OR DISPOSED OF. B.WASTE MATERIALS AND DEBRIS SHALL BE COMPLETELY DISPOSED OF AT THE CONTRACTOR'S EXPENSE. DEBRIS SHALL NOT BE BURIED, INCLUDING ORGANIC MATERIALS, BUT SHALL BE REMOVED COMPLETELY FROM THE SITE. 4. SITE PREPARATIONS A.BEFORE AND DURING PRELIMINARY GRADING AND FINISHED GRADING, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AND DISPOSED OF IN ACCORDANCE WITH GENERAL WORK PROCEDURES OUTLINED HEREIN. B.ALL EXISTING TREES TO REMAIN SHALL BE PRUNED TO REMOVE ANY DAMAGED BRANCHES. THE ENTIRE LIMB OF ANY DAMAGED BRANCH SHALL BE CUT OFF AT THE TRUNK. CONTRACTOR SHALL ENSURE THAT CUTS ARE SMOOTH AND STRAIGHT. ANY EXPOSED ROOTS SHALL BE CUT BACK WITH CLEAN, SHARP TOOLS AND TOPSOIL SHALL BE PLACED AROUND THE REMAINDER OF THE ROOTS. EXISTING TREES SHALL BE MONITORED ON A REGULAR BASIS FOR ADDITIONAL ROOT OR BRANCH DAMAGE AS A RESULT OF CONSTRUCTION. ROOTS SHALL NOT BE LEFT EXPOSED FOR MORE THAN ONE (1) DAY. CONTRACTOR SHALL WATER EXISTING TREES AS NEEDED TO PREVENT SHOCK OR DECLINE. C.CONTRACTOR SHALL ARRANGE TO HAVE A UTILITY STAKE-OUT TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY LANDSCAPE MATERIAL. UTILITY COMPANIES SHALL BE CONTACTED THREE (3) DAYS PRIOR TO THE BEGINNING OF WORK. 5. TREE PROTECTION A.CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING TREES TO REMAIN. A TREE PROTECTION ZONE SHALL BE ESTABLISHED AT THE DRIP LINE OR 15 FEET FROM THE TRUNK OR AT THE LIMIT OF CONSTRUCTION DISTURBANCE, WHICHEVER IS GREATER. LOCAL STANDARDS THAT MAY REQUIRE A MORE STRICT TREE PROTECTION ZONE SHALL BE HONORED. B.A FORTY-EIGHT INCH (48") HIGH WOODEN SNOW FENCE OR ORANGE COLORED HIGH-DENSITY 'VISI-FENCE', OR APPROVED EQUAL, MOUNTED ON STEEL POSTS SHALL BE PLACED ALONG THE BOUNDARY OF THE TREE PROTECTION ZONE. POSTS SHALL BE LOCATED AT A MAXIMUM OF EIGHT FEET (8') ON CENTER OR AS INDICATED WITHIN THE TREE PROTECTION DETAIL. C.WHEN THE TREE PROTECTION FENCING HAS BEEN INSTALLED, IT SHALL BE INSPECTED BY THE APPROVING AGENCY PRIOR TO DEMOLITION, GRADING, TREE CLEARING OR ANY OTHER CONSTRUCTION. THE FENCING ALONG THE TREE PROTECTION ZONE SHALL BE REGULARLY INSPECTED BY THE LANDSCAPE CONTRACTOR AND MAINTAINED UNTIL ALL CONSTRUCTION ACTIVITY HAS BEEN COMPLETED. D.AT NO TIME SHALL MACHINERY, DEBRIS, FALLEN TREES OR OTHER MATERIALS BE PLACED, STOCKPILED OR LEFT STANDING IN THE TREE PROTECTION ZONE. 6. SOIL MODIFICATIONS A.CONTRACTOR SHALL ATTAIN A SOIL TEST FOR ALL AREAS OF THE SITE PRIOR TO CONDUCTING ANY PLANTING. SOIL TESTS SHALL BE PERFORMED BY A CERTIFIED SOIL LABORATORY. B.LANDSCAPE CONTRACTOR SHALL REPORT ANY SOIL OR DRAINAGE CONDITIONS CONSIDERED DETRIMENTAL TO THE GROWTH OF PLANT MATERIAL. SOIL MODIFICATIONS, AS SPECIFIED HEREIN, MAY NEED TO BE CONDUCTED BY THE LANDSCAPE CONTRACTOR DEPENDING ON SITE CONDITIONS. C.THE FOLLOWING AMENDMENTS AND QUANTITIES ARE APPROXIMATE AND ARE FOR BIDDING PURPOSES ONLY. COMPOSITION OF AMENDMENTS SHOULD BE REVISED DEPENDING ON THE OUTCOME OF A TOPSOIL ANALYSIS PERFORMED BY A CERTIFIED SOIL LABORATORY. 1.1.TO INCREASE A SANDY SOIL'S ABILITY TO RETAIN WATER AND NUTRIENTS, THOROUGHLY TILL ORGANIC MATTER INTO THE TOP 6-12". USE COMPOSTED BARK, COMPOSTED LEAF MULCH OR PEAT MOSS. ALL PRODUCTS SHOULD BE COMPOSTED TO A DARK COLOR AND BE FREE OF PIECES WITH IDENTIFIABLE LEAF OR WOOD STRUCTURE. AVOID MATERIAL WITH A PH HIGHER THAN 7.5. 1.2.TO INCREASE DRAINAGE, MODIFY HEAVY CLAY OR SILT (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) AND/OR AGRICULTURAL GYPSUM. COARSE SAND MAY BE USED IF ENOUGH IS ADDED TO BRING THE SAND CONTENT TO MORE THAN 60% OF THE TOTAL MIX. SUBSURFACE DRAINAGE LINES MAY NEED TO BE ADDED TO INCREASE DRAINAGE. 1.3.MODIFY EXTREMELY SANDY SOILS (MORE THAN 85%) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX. 7. FINISHED GRADING A.UNLESS OTHERWISE CONTRACTED, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF TOPSOIL AND THE ESTABLISHMENT OF FINE-GRADING WITHIN THE DISTURBANCE AREA OF THE SITE. B.LANDSCAPE CONTRACTOR SHALL VERIFY THAT SUBGRADE FOR INSTALLATION OF TOPSOIL HAS BEEN ESTABLISHED. THE SUBGRADE OF THE SITE MUST MEET THE FINISHED GRADE LESS THE REQUIRED TOPSOIL THICKNESS (1"±). C.ALL LAWN AND PLANTING AREAS SHALL BE GRADED TO A SMOOTH, EVEN AND UNIFORM PLANE WITH NO ABRUPT CHANGE OF SURFACE AS DEPICTED WITHIN THIS SET OF CONSTRUCTION PLANS, UNLESS OTHERWISE DIRECTED BY THE PROJECT ENGINEER OR LANDSCAPE ARCHITECT. D.ALL PLANTING AREAS SHALL BE GRADED AND MAINTAINED TO ALLOW FREE FLOW OF SURFACE WATER IN AND AROUND THE PLANTING BEDS. STANDING WATER SHALL NOT BE PERMITTED IN PLANTING BEDS. 8. TOPSOILING A.CONTRACTOR SHALL PROVIDE A SIX INCH (6") THICK MINIMUM LAYER OF TOPSOIL, OR AS DIRECTED BY THE LOCAL ORDINANCE OR CLIENT, IN ALL PLANTING AREAS. TOPSOIL SHOULD BE SPREAD OVER A PREPARED SURFACE IN A UNIFORM LAYER TO ACHIEVE THE DESIRED COMPACTED THICKNESS. B.ON-SITE TOPSOIL MAY BE USED TO SUPPLEMENT THE TOTAL AMOUNT REQUIRED. TOPSOIL FROM THE SITE MAY BE REJECTED IF IT HAS NOT BEEN PROPERLY REMOVED, STORED AND PROTECTED PRIOR TO CONSTRUCTION. C.CONTRACTOR SHALL FURNISH TO THE APPROVING AGENCY AN ANALYSIS OF BOTH IMPORTED AND ON-SITE TOPSOIL TO BE UTILIZED IN ALL PLANTING AREAS. THE PH AND NUTRIENT LEVELS MAY NEED TO BE ADJUSTED THROUGH SOIL MODIFICATIONS AS NEEDED TO ACHIEVE THE REQUIRED LEVELS AS SPECIFIED IN THE MATERIALS SECTION ABOVE. D.ALL PLANTING AND LAWN AREAS ARE TO BE CULTIVATED TO A DEPTH OF SIX INCHES (6"). ALL DEBRIS EXPOSED FROM EXCAVATION AND CULTIVATION SHALL BE DISPOSED OF IN ACCORDANCE WITH GENERAL WORK PROCEDURES SECTION ABOVE. THE FOLLOWING SHALL BE TILLED INTO THE TOP FOUR INCHES (4") IN TWO DIRECTIONS (QUANTITIES BASED ON A 1,000 SQUARE FOOT AREA): 1.1.20 POUNDS 'GROW POWER' OR APPROVED EQUAL 1.2.20 POUNDS NITRO-FORM (COURSE) 38-0-0 BLUE CHIP E.THE SPREADING OF TOPSOIL SHALL NOT BE CONDUCTED UNDER MUDDY OR FROZEN CONDITIONS. 9. PLANTING A.INSOFAR THAT IT IS FEASIBLE, PLANT MATERIAL SHALL BE PLANTED ON THE DAY OF DELIVERY. IN THE EVENT THAT THIS IS NOT POSSIBLE, LANDSCAPE CONTRACTOR SHALL PROTECT UNINSTALLED PLANT MATERIAL. PLANTS SHALL NOT REMAIN UNPLANTED FOR LONGER THAN A THREE DAY PERIOD AFTER DELIVERY. PLANTS THAT WILL NOT BE PLANTED FOR A PERIOD OF TIME GREATER THAN THREE DAYS SHALL BE HEALED IN WITH TOPSOIL OR MULCH TO HELP PRESERVE ROOT MOISTURE. B.PLANTING OPERATIONS SHALL BE PERFORMED DURING PERIODS WITHIN THE PLANTING SEASON WHEN WEATHER AND SOIL CONDITIONS ARE SUITABLE AND IN ACCORDANCE WITH ACCEPTED LOCAL PRACTICE. PLANTS SHALL NOT BE INSTALLED IN TOPSOIL THAT IS IN A MUDDY OR FROZEN CONDITION. C.ANY INJURED ROOTS OR BRANCHES SHALL BE PRUNED TO MAKE CLEAN-CUT ENDS PRIOR TO PLANTING UTILIZING CLEAN, SHARP TOOLS. ONLY INJURED OR DISEASED BRANCHING SHALL BE REMOVED. D.ALL PLANTING CONTAINERS AND NON-BIODEGRADABLE MATERIALS SHALL BE REMOVED FROM ROOT BALLS DURING PLANTING. NATURAL FIBER BURLAP MUST BE CUT FROM AROUND THE TRUNK OF THE TREE AND FOLDED DOWN AGAINST THE ROOT BALL PRIOR TO BACKFILLING. E.POSITION TREES AND SHRUBS AT THEIR INTENDED LOCATIONS AS PER THE PLANS AND SECURE THE APPROVAL OF THE LANDSCAPE ARCHITECT PRIOR TO EXCAVATING PITS, MAKING NECESSARY ADJUSTMENTS AS DIRECTED. F.PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, THE PROPOSED LANDSCAPE, AS SHOWN ON THE APPROVED LANDSCAPE PLAN, MUST BE INSTALLED, INSPECTED AND APPROVED BY THE APPROVING AGENCY. THE APPROVING AGENCY SHALL TAKE INTO ACCOUNT SEASONAL CONSIDERATIONS IN THIS REGARD AS FOLLOWS. THE PLANTING OF TREES, SHRUBS, VINES OR GROUND COVER SHALL OCCUR ONLY DURING THE FOLLOWING PLANTING SEASONS: 1.1.PLANTS: MARCH 15 TO DECEMBER 15 1.2.LAWN: MARCH 15 TO JUNE 15 OR SEPT. 1 TO DECEMBER 1 G.PLANTINGS REQUIRED FOR A CERTIFICATE OF OCCUPANCY SHALL BE PROVIDED DURING THE NEXT APPROPRIATE SEASON AT THE MUNICIPALITY'S DISCRETION. CONTRACTOR SHOULD CONTACT APPROVING AGENCY FOR POTENTIAL SUBSTITUTIONS. H.FURTHERMORE, THE FOLLOWING TREE VARIETIES ARE UNUSUALLY SUSCEPTIBLE TO WINTER DAMAGE. WITH TRANSPLANT SHOCK AND THE SEASONAL LACK OF NITROGEN AVAILABILITY, THE RISK OF PLANT DEATH IS GREATLY INCREASED. IT IS NOT RECOMMENDED THAT THESE SPECIES BE PLANTED DURING THE FALL PLANTING SEASON: ACER RUBRUM PLATANUS X ACERIFOLIA BETULA VARIETIES POPULOUS VARIETIES CARPINUS VARIETIES PRUNUS VARIETIES CRATAEGUS VARIETIES PYRUS VARIETIES KOELREUTERIA QUERCUS VARIETIES LIQUIDAMBER STYRACIFLUA TILIA TOMENTOSA LIRIODENDRON TULIPIFERA ZELKOVA VARIETIES I.PLANTING PITS SHALL BE DUG WITH LEVEL BOTTOMS, WITH THE WIDTH TWICE THE DIAMETER OF ROOT BALL. THE ROOT BALL SHALL REST ON UNDISTURBED GRADE. EACH PLANT PIT SHALL BE BACKFILLED IN LAYERS WITH THE FOLLOWING PREPARED SOIL MIXED THOROUGHLY: ·1 PART PEAT MOSS ·1 PART COMPOSTED COW MANURE BY VOLUME ·3 PARTS TOPSOIL BY VOLUME ·21 GRAMS 'AGRIFORM' PLANTING TABLETS (OR APPROVED EQUAL) AS FOLLOWS: A) 2 TABLETS PER 1 GALLON PLANT B) 3 TABLETS PER 5 GALLON PLANT C) 4 TABLETS PER 15 GALLON PLANT D) LARGER PLANTS: 2 TABLETS PER ½" CALIPER OF TRUNK J.FILL PREPARED SOIL AROUND BALL OF PLANT HALF-WAY AND INSERT PLANT TABLETS. COMPLETE BACKFILL AND WATER THOROUGHLY. K.ALL PLANTS SHALL BE PLANTED SO THAT THE TOP OF THE ROOT BALL, THE POINT AT WHICH THE ROOT FLARE BEGINS, IS SET AT GROUND LEVEL AND IN THE CENTER OF THE PIT. NO SOIL IS TO BE PLACED DIRECTLY ON TOP OF THE ROOT BALL. L.ALL PROPOSED TREES DIRECTLY ADJACENT TO WALKWAYS OR DRIVEWAYS SHALL BE PRUNED AND MAINTAINED TO A MINIMUM BRANCHING HEIGHT OF 7' FROM GRADE. M.GROUND COVER AREAS SHALL RECEIVE A ¼" LAYER OF HUMUS RAKED INTO THE TOP 1" OF PREPARED SOIL PRIOR TO PLANTING. ALL GROUND COVER AREAS SHALL BE WEEDED AND TREATED WITH A PRE-EMERGENT CHEMICAL AS PER MANUFACTURER'S RECOMMENDATION. N.NO PLANT, EXCEPT GROUND COVERS, GRASSES OR VINES, SHALL BE PLANTED LESS THAN TWO FEET (2') FROM EXISTING STRUCTURES AND SIDEWALKS. O.ALL PLANTING AREAS AND PLANTING PITS SHALL BE MULCHED AS SPECIFIED HEREIN TO FILL THE ENTIRE BED AREA OR SAUCER. NO MULCH IS TO TOUCH THE TRUNK OF THE TREE OR SHRUB. P.ALL PLANTING AREAS SHALL BE WATERED IMMEDIATELY UPON INSTALLATION IN ACCORDANCE WITH THE WATERING SPECIFICATIONS AS LISTED HEREIN. 10. TRANSPLANTING (WHEN REQUIRED) A.ALL TRANSPLANTS SHALL BE DUG WITH INTACT ROOT BALLS CAPABLE OF SUSTAINING THE PLANT. B.IF PLANTS ARE TO BE STOCKPILED BEFORE REPLANTING, THEY SHALL BE HEALED IN WITH MULCH OR SOIL, ADEQUATELY WATERED AND PROTECTED FROM EXTREME HEAT, SUN AND WIND. C.PLANTS SHALL NOT BE DUG FOR TRANSPLANTING BETWEEN APRIL 10 AND JUNE 30. D.UPON REPLANTING, BACKFILL SOIL SHALL BE AMENDED WITH FERTILIZER AND ROOT GROWTH HORMONE. E.TRANSPLANTS SHALL BE GUARANTEED FOR THE LENGTH OF THE GUARANTEE PERIOD SPECIFIED HEREIN. F.IF TRANSPLANTS DIE, SHRUBS AND TREES LESS THAN SIX INCHES (6") DBH SHALL BE REPLACED IN KIND. TREES GREATER THAN SIX INCHES (6") DBH MAY BE REQUIRED TO BE REPLACED IN ACCORDANCE WITH THE MUNICIPALITY'S TREE REPLACEMENT GUIDELINES. 11. WATERING A.NEW PLANTINGS OR LAWN AREAS SHALL BE ADEQUATELY IRRIGATED BEGINNING IMMEDIATELY AFTER PLANTING. WATER SHALL BE APPLIED TO EACH TREE AND SHRUB IN SUCH MANNER AS NOT TO DISTURB BACKFILL AND TO THE EXTENT THAT ALL MATERIALS IN THE PLANTING HOLE ARE THOROUGHLY SATURATED. WATERING SHALL CONTINUE AT LEAST UNTIL PLANTS ARE ESTABLISHED. B.SITE OWNER SHALL PROVIDE WATER IF AVAILABLE ON SITE AT TIME OF PLANTING. IF WATER IS NOT AVAILABLE ON SITE, CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER. THE USE OF WATERING BAGS IS RECOMMENDED FOR ALL NEWLY PLANTED TREES. C.IF AN IRRIGATION SYSTEM HAS BEEN INSTALLED ON THE SITE, IT SHALL BE USED TO WATER PROPOSED PLANT MATERIAL, BUT ANY FAILURE OF THE SYSTEM DOES NOT ELIMINATE THE CONTRACTOR'S RESPONSIBILITY OF MAINTAINING THE DESIRED MOISTURE LEVEL FOR VIGOROUS, HEALTHY GROWTH. 12. GUARANTEE A.THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANTS FOR A PERIOD OF ONE (1) YEAR FROM APPROVAL OF LANDSCAPE INSTALLATION BY THE APPROVING AGENCY. CONTRACTOR SHALL SUPPLY THE OWNER WITH A MAINTENANCE BOND FOR TEN PERCENT (10%) OF THE VALUE OF THE LANDSCAPE INSTALLATION WHICH WILL BE RELEASED AT THE CONCLUSION OF THE GUARANTEE PERIOD AND WHEN A FINAL INSPECTION HAS BEEN COMPLETED AND APPROVED BY THE OWNER OR AUTHORIZED REPRESENTATIVE. B.ANY DEAD OR DYING PLANT MATERIAL SHALL BE REPLACED FOR THE LENGTH OF THE GUARANTEE PERIOD. REPLACEMENT OF PLANT MATERIAL SHALL BE CONDUCTED AT THE FIRST SUCCEEDING PLANTING SEASON. ANY DEBRIS SHALL BE DISPOSED OF OFF-SITE, WITHOUT EXCEPTION. C.TREES AND SHRUBS SHALL BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION AND THROUGHOUT THE 90 DAY MAINTENANCE PERIOD AS SPECIFIED HEREIN. CULTIVATION, WEEDING, WATERING AND THE PREVENTATIVE TREATMENTS SHALL BE PERFORMED AS NECESSARY TO KEEP PLANT MATERIAL IN GOOD CONDITION AND FREE OF INSECTS AND DISEASE. D.LAWNS SHALL BE MAINTAINED THROUGH WATERING, FERTILIZING, WEEDING, MOWING, TRIMMING AND OTHER OPERATIONS SUCH AS ROLLING, REGARDING AND REPLANTING AS REQUIRED TO ESTABLISH A SMOOTH, ACCEPTABLE LAWN, FREE OF ERODED OR BARE AREAS. 13. CLEANUP A.UPON THE COMPLETION OF ALL LANDSCAPE INSTALLATION AND BEFORE THE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL UNUSED MATERIALS, EQUIPMENT AND DEBRIS FROM THE SITE. ALL PAVED AREAS ARE TO BE CLEANED. B.THE SITE SHALL BE CLEANED AND LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE OWNER OR AUTHORIZED REPRESENTATIVE. MARKET STREET - US HIGHWAY 17 N5 0 ° 2 8 ' 0 3 " W 6 7 1 . 4 5 N42°38'56"E 210.39 S5 0 ° 2 9 ' 1 0 " E 1 8 0 . 0 7 S5 0 ° 1 3 ' 5 1 " E 1 2 1 . 1 7 S5 0 ° 3 4 ' 3 2 " E 3 6 6 . 4 6 S41°37'28"W 210.47S41°34'01"W 99.97(TIE) LO D LOD LO D LO D LO D LO D LOD L O D LOD LOD LOD LOD LO D LO D LO D L O D L O D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D LO D 25' STREET YARD BUFFER 50' PARKING SETBACK 100' BUILDING SETBACK 10 ' S I D E S E T B A C K 10 ' S I D E S E T B A C K PROP BUILDING 9,750 SF FFE = 39.75' SERVICE BAYS 3 0 ' R 30 ' R 7 5 ' R 5 0 ' R 5 0 ' R 57' R 10'R 5'R 1 0 ' R 5' R 5'R 5'R (1) FG (1) FG (1) CCE (1) FG (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (3) IN (3) CC (2) IN (3) CC (7) QP (1) FG (10) TA (7) TA (10) IS (10) IS (11) TA (9) TA SEEDED LAWN EX. TREE (TO REMAIN) EX. TREE (TO REMAIN) SLOPES TO BE SODDED 6.9 5.9 6.9 9.0 8.6 6.0 4.0 4.0 4.3 4.5 4.1 4.2 4.4 3.5 2.6 2.2 2.3 2.9 3.3 5.7 5.2 4.0 2.8 1.9 1.5 1.5 2.1 2.8 3.9 5.5 5.7 4.9 3.5 2.5 1.5 1.0 1.1 1.7 2.7 3.9 5.2 5.6 9.4 7.6 4.0 2.7 1.7 0.9 0.6 0.7 1.5 2.7 3.8 5.2 5.1 5.3 6.5 7.1 4.3 2.3 1.6 0.9 0.4 0.3 0.4 1.0 2.0 3.1 5.7 8.5 2.1 4.2 4.4 4.4 3.5 2.0 1.2 0.7 0.4 0.2 0.1 0.2 0.5 1.2 2.0 3.8 7.3 8.1 0.8 2.0 2.9 3.2 2.9 2.1 1.2 0.6 0.3 0.1 0.1 0.1 0.1 0.2 0.6 1.1 2.0 4.2 6.3 5.6 0.6 0.8 1.3 1.8 2.0 1.7 1.1 0.5 0.3 0.1 0.1 0.1 0.1 0.1 0.1 0.3 0.6 1.4 2.6 3.8 4.8 6.1 1.7 1.0 0.7 0.8 1.0 1.0 0.8 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.1 0.1 0.1 0.3 0.8 1.7 2.9 3.8 4.9 5.3 3.6 2.2 1.3 0.7 0.6 0.5 0.5 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.9 1.8 2.7 3.7 5.5 5.0 4.9 3.6 2.5 1.4 0.7 0.4 0.3 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 1.0 1.8 2.8 6.0 9.4 8.4 7.8 4.8 3.1 2.1 1.1 0.5 0.2 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.6 1.5 2.7 6.1 6.0 9.1 5.7 3.2 2.1 1.2 0.6 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.2 0.5 1.5 2.9 5.1 4.8 5.4 4.8 2.6 1.6 1.0 0.5 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.2 0.5 1.4 2.8 3.4 3.6 3.4 2.6 1.5 0.8 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.2 0.5 0.8 1.5 2.1 2.5 2.3 1.5 0.8 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.5 0.4 0.3 0.2 0.1 0.1 1.1 1.0 1.0 1.3 1.4 1.2 0.7 0.3 0.1 0.1 0.0 0.0 0.1 0.1 0.3 0.6 1.0 1.1 0.9 0.6 0.3 0.1 3.0 2.0 1.3 0.9 0.8 0.7 0.5 0.3 0.1 0.1 0.0 0.2 0.4 0.8 1.5 2.2 2.1 1.7 1.0 0.4 5.1 3.8 2.5 1.4 0.8 0.5 0.4 0.2 0.1 0.1 0.0 0.4 0.9 1.6 2.6 3.3 3.3 2.8 6.4 5.4 5.1 3.7 2.6 1.4 0.7 0.4 0.2 0.1 0.1 0.5 1.0 1.6 2.7 4.4 4.8 4.6 5.5 9.0 8.4 4.7 2.9 2.0 1.0 0.5 0.2 0.1 0.1 0.3 0.6 1.2 2.0 3.2 5.6 8.4 5.3 5.4 5.8 8.0 5.0 2.7 1.8 1.1 0.5 0.2 0.1 0.1 0.3 0.6 1.2 2.2 3.2 5.4 8.9 8.5 4.4 4.7 4.1 2.4 1.5 1.0 0.5 0.2 0.1 0.0 0.3 0.5 0.9 1.7 2.8 3.9 5.3 5.2 3.3 2.6 1.7 1.0 0.6 0.3 0.1 0.0 0.5 0.6 0.8 1.0 1.6 2.7 4.1 2.4 2.1 1.5 1.0 0.5 0.2 0.1 0.1 0.7 1.1 1.2 1.1 1.1 1.4 2.2 2.2 1.9 1.4 0.8 0.3 0.1 0.1 0.4 0.9 1.6 2.2 2.2 1.8 1.3 1.0 2.9 2.3 1.2 0.4 0.1 0.1 0.0 0.5 0.9 1.7 2.7 3.4 3.3 2.8 1.4 2.3 4.6 3.8 2.9 1.7 0.6 0.2 0.1 0.0 0.0 0.6 1.1 1.7 2.9 4.5 4.8 4.6 5.3 5.1 3.4 1.8 0.7 0.2 0.1 0.1 0.0 0.0 0.7 1.3 2.1 3.4 5.9 8.2 5.1 5.1 7.7 4.4 1.9 0.8 0.3 0.1 0.1 0.2 0.3 0.6 1.3 2.4 3.3 5.8 9.1 8.0 5.7 9.6 5.2 2.0 1.0 0.4 0.2 0.2 0.3 0.5 1.0 1.9 3.0 4.0 5.3 5.1 6.5 7.5 5.6 2.7 1.3 0.6 0.4 0.5 0.7 0.9 1.3 2.0 3.0 4.3 5.2 5.0 5.3 4.7 3.1 1.9 1.1 1.0 1.3 1.6 1.7 1.7 1.9 2.5 2.7 5.3 4.5 3.8 2.7 1.9 2.0 2.5 2.8 2.7 2.1 1.7 1.9 4.8 4.9 4.5 3.9 3.6 4.4 4.5 4.1 3.6 2.8 4.5 5.3 5.1 5.7 7.8 9.3 6.8 5.1 4.7 4.4 4.9 5.3 5.6 6.1 7.0 7.6 5.6 5.1 4.9 5.3 5.7 5.9 5.2 5.7 4.6 3.9 3.2 6.9 9.3 6.2 3.5 2.4 5.0 7.6 6.6 3.6 2.1 4.7 4.8 4.8 3.4 1.8 3.5 3.0 2.0 1.9 A AA A A A A A A C-703 LIGHTING PLAN W E S NAD 8 3 NAD 8 3 ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R Th i s d r a w i n g a n d / o r f i l e h a s b e e n p r e p a r e d b y B o h l e r a t t h e r e q u e s t o f t h e P r o j e c t O w n e r o r h i s R e p r e s e n t a t i v e a n d i s b e i n g p r o v i d e d s o l e l y a s a c o n v e n i e n c e t o t h e r e c i p i e n t . B o h l e r m a k e s n o r e p r e s e n t a t i o n r e g a r d i n g t h e s u i t a b i l i t y f o r t h e i n t e n d e d u s e b y t h e r e c i p i e n t . F u r t h e r , B o h l e r m a k e s n o PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - L G H T - 0 - - - - - > L A Y O U T : C - 7 0 2 L G H T DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F E SSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 LGHT-0 1"=40' 0 40102040 VEHICULAR AREA CALCULATION SUMMARY UNITS AVG MAX MIN FC 2.17 9.6 0.8 AVG/MIN 2.7 C-901 CONSTRUCTION DETAILS ORG. DATE - REVISIONS REV DATE COMMENT DRAWN BY CHECKED BY 03/15/2024 DI S C L A I M E R Th i s d r a w i n g a n d / o r f i l e h a s b e e n p r e p a r e d b y B o h l e r a t t h e r e q u e s t o f t h e P r o j e c t O w n e r o r h i s R e p r e s e n t a t i v e a n d i s b e i n g p r o v i d e d s o l e l y a s a c o n v e n i e n c e t o t h e r e c i p i e n t . B o h l e r m a k e s n o r e p r e s e n t a t i o n r e g a r d i n g t h e s u i t a b i l i t y f o r t h e i n t e n d e d u s e b y t h e r e c i p i e n t . F u r t h e r , B o h l e r m a k e s n o PROJECT No.: DRAWN BY: CHECKED BY: DATE: CAD I.D.: PROJECT: FOR \\ B O H L E R E N G . N E T \ S H A R E S \ N C - P R O J E C T S \ 2 0 2 3 \ N C B 2 3 0 2 5 7 . 0 0 \ L A N D D E V E L O P M E N T \ C A D \ D R A W I N G S \ P L A N S E T S \ N C B 2 3 0 2 5 7 - C N D S - 0 - - - - - > L A Y O U T : C - 9 0 1 D E T L DI THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. SHEET NUMBER: SHEET TITLE: NCB230257 DW WS 03/15/2024 SITE PLAN DOCUMENTS GREGORY POOLE RENTAL FACILITY 8130 MARKET ST WILMINGTON, NC NEW HANOVER COUNTY ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION SC COA NO. 4810 4130 PARKLAKE AVENUE, SUITE 200 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM TH E I N F O R M A T I O N , D E S I G N A N D C O N T E N T O F T H I S P L A N A R E P R O P R I E T A R Y A N D S H A L L N O T B E C O P I E D O R U S E D F O R A N Y P U R P O S E W I T H O U T P R I O R W R I T T E N AU T H O R I Z A T I O N F R O M B O H L E R . O N L Y A P P R O V E D , S I G N E D A N D S E A L E D P L A N S S H A L L B E U T I L I Z E D F O R C O N S T R U C T I O N P U R P O S E S © SI T E C I V I L A N D C O N S U L T I N G E N G I N E E R I N G LA N D S U R V E Y I N G PR O G R A M M A N A G E M E N T LA N D S C A P E A R C H I T E C T U R E SU S T A I N A B L E D E S I G N PE R M I T T I N G S E R V I C E S TR A N S P O R T A T I O N S E R V I C E S BO H L E R SEAL ENGI N E E R PR O F E SSIO N A L N O R T H CAROLI N A 051703W I L L I S E . SW A R I N GEN 03/15/24 NOT TO SCALE BOLLARD DETAIL 4' - 0 " 3' - 0 " 1'- 0 " 1'-6" MIN.1.SEE SITE PLAN FOR LOCATION(S). NOTE: CONCRETE FILL TO BE ROUNDED FOR PROPER RUN OFF 4" DIAMETER STEEL PIPE FILLED W/ CONCRETE PAINTED TRAFFIC YELLOW AND EMBEDDED IN CONCRETE BASE TOP OF ASPHALT OR CONCRETE SLAB 3000 P.S.I. CONCRETE NOT TO SCALE TRAFFIC RATED CLEANOUT DETAIL 3000 P.S.I. CONCRETE SAND CUSHION 4" SEWER CLEANOUT CAP 6" PVC ENCASEMENT PIPE ASPHALT OR CONCRETE AS DETERMINED BY TRAFFIC SURFACE 3,000 P.S.I CONCRETE TRAFFIC RATED CLEANOUT COVER 2" ASPHALT OR CONCRETE FINISHED GRADE 18" SQUARE CONCRETE ENCASEMENT (3000 P.S.I CONCRETE) 4" M A X . 18 "S NOT TO SCALE ADA PARKING SIGN DETAIL 12" REFLECTIVE ALUMINUM LEGEND AND BORDER - GREEN WHITE SYMBOL ON BLUE BACKGROUND BACKGROUND - WHITE TYPICAL AT ALL ADA SPACES THIS SIGN TYPICAL AT ALL "VAN ACCESSIBLE" PARKING SPACES PENALTY SIGN WITH WORDING AS REQUIRED BY STATE OR LOCAL LAW NOT TO SCALE STANDARD DUTY ASPHALT PAVEMENT SECTION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF __ PER GEOTECHNICAL REPORT PREPARED BY ________, ENTITLED _______, DATED _______ (PROJECT #____). FINAL DESIGN TO BE PROVIDED ONCE FINAL CBR'S ARE AVAILABLE ON COMPACTED SUB-BASE. NOTE: 2" ASPHALT SURFACE COURSE (S9.5B) 6" COMPACTED STONE BASE (ABC) COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT) NOT TO SCALE CONCRETE SIDEWALK DETAIL VARIES 3:1 M A X . 3: 1 M A X . 3: 1 M A X . 3:1 M A X . 1. EXPANSION JOINTS 1/2" WIDE PREMOLDED BIT. MATERIAL SHALL BE INSTALLED AT 30' INTERVALS, CRACK CONTROL JOINTS TO BE SPACED AT INTERVALS EQUAL TO SIDEWALK WIDTH. 2% MAX. CROSS SLOPE NOTE: COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT)4" THICK, COMPACTED STONE BASE (TYPE 2a) 4" CLASS A CONCRETE (3000 P.S.I. @ 28 DAYS) 2' MIN. CLEAR ZONE (TYP., LT. & RT.) NOT TO SCALE HEAVY DUTY ASPHALT PAVEMENT SECTION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF __ PER GEOTECHNICAL REPORT PREPARED BY ________, ENTITLED _______, DATED _______ (PROJECT #____). FINAL DESIGN TO BE PROVIDED ONCE FINAL CBR'S ARE AVAILABLE ON COMPACTED SUB-BASE. NOTE: 3" ASPHALT SURFACE COURSE 12:1 MAX. SLOPE 5'-0" MIN. 12:1 MAX. SLOPE NOT TO SCALE ADA ACCESSIBLE RAMP DETAIL 1.ADA ACCESSIBLE RAMP CONSTRUCTION SHALL CONFORM TO CURRENT ADA ACCESSIBLE GUIDELINES. 2.LEVEL LANDING AT TOP OF RAMP TO BE 3' DEEP IF NO CHANGE IN DIRECTION, OR 5'X5' MINIMUM IF A CHANGE IN DIRECTION OCCURS. NOTE: TRUNCATED DOME PATTERN EDGE OF CURB SEE NOTE 2 1:1 2 SL O P E 1:12 SLOPE 3' MI N . NOT TO SCALE ADA ACCESSIBLE RAMP DETAIL 1. ADA ACCESSIBLE RAMP CONSTRUCTION SHALL CONFORM TO CURRENT ADA ACCESSIBLE GUIDELINES. 2. LANDING IS 5'X5' MINIMUM IF A CHANGE IN DIRECTION OCCURS AT THE TOP OF THE RAMP. 3' MI N . NOTE: TRUNCATED DOME PATTERN MAX 1:12 SLOPE MA X MAX FLUSH CURB SEE SITE PLAN FOR DIMENSION MAX 2% IN ANY DIRECTION AT LANDING SEE NOTE 2 NOT TO SCALE ONSITE CONCRETE CURB & GUTTER DETAIL 2'-0" 6"1" 6" 1" PAVEMENT DIMENSION(S) ON PLAN VIEW REFER TO FACE OF CURB 1. CONCRETE FOR CURBING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 P.S.I. @ 28 DAYS. 2. CONSTRUCTION STAKING FOR CURB INSTALLATION SHALL BE REFERENCED (CUT OR FILL) TO THE TOP OF CURB. 3. AT CONTRACTOR'S OPTION, THE GUTTER THICKNESS MAY BE INCREASED AT THE EDGE OF PAVEMENT TO MAKE BOTTOM OF GUTTER CONTIGUOUS WITH BOTTOM OF ASPHALT PAVEMENT. 4. CONTRACTION JOINTS SHALL BE PLACED @ 10'-0" O.C. TOOLED 1/4" (±1/16") WIDE, 1" DEEP. EXPANSION JOINTS SHALL BE PLACED @ 40'-0" INTERVALS, MAXIMUM, AND ALL P.C.'S. 5. GUTTER PAN SLOPE TO BE ADJUSTED WITHIN ACCESSIBLE PARKING SPACES TO MATCH SLOPE BETWEEN SPOT ELEVATIONS. 6. GUTTER TYPE TO MATCH PAVEMENT SLOPE DIRECTION. CONTRACTOR TO FIELD ADJUST AS NECESSARY. 2'-0" 6" 1" 1" 6" 1" SPILL CURB & GUTTER COLLECTOR CURB & GUTTER 6" PAVEMENT DIMENSION(S) ON PLAN VIEW REFER TO FACE OF CURB 5" NOTES: 1-1/2"R 1-1/2"R FI N A L P A V E M E N T S E C T I O N S T O B E P R O V I D E D W I T H G E O T E C H N I C A L R E P O R T FI N A L P A V E M E N T S E C T I O N S T O B E P R O V I D E D W I T H G E O T E C H N I C A L R E P O R T NOT TO SCALE STANDARD DUTY CONCRETE SECTION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF __ PER GEOTECHNICAL REPORT PREPARED BY ________, ENTITLED _______, DATED _______ (PROJECT #____). FINAL DESIGN TO BE PROVIDED ONCE FINAL CBR'S ARE AVAILABLE ON COMPACTED SUB-BASE. NOTE: FI N A L P A V E M E N T S E C T I O N S T O B E P R O V I D E D W I T H G E O T E C H N I C A L R E P O R T NOT TO SCALE TYPICAL CONCRETE PAVEMENT SECTION 6" CONCRETE PAVING @ 5,000 PSI 6" ABC COMPACTED SUBGRADE NOTE: PROVIDE CONTROL JOINTS AT NO MORE THAN 15" OC PROVIDE 12" EXP. JOINTS WITH PRE-MOLDED E.J FILLER AT MAX. 30" OC FI N A L P A V E M E N T S E C T I O N S T O B E P R O V I D E D W I T H G E O T E C H N I C A L R E P O R T NOT TO SCALE SECTION FOR PARKING PAVEMENTS 2" 1-2 ASPHALT 6" ABC LIGHT DUTY PAVEMENT HEAVY DUTY PAVEMENT COMPACTED SUBGRADE 3" 1-2 ASPHALT 8" ABC COMPACTED SUBGRADE FI N A L P A V E M E N T S E C T I O N S T O B E P R O V I D E D W I T H G E O T E C H N I C A L R E P O R T