Loading...
HomeMy WebLinkAboutCompiled TRC Comments 2771 Alvernia Drive – Sunset Reach Dock/ Boat Slip –Major Subdivision Site Plan – TRC Review Page | 1 To: James Yopp of Hoosier Daddy; james@rockfordpartners.net From: Wendell E. Biddle Development Review Associate Planner Date: May 1st, 2024, TRC Review PID#: R02400-002-010-000 Egov# SITECN-24-00007 Subject: 2771 Alvernia Dr. – Sunset Reach Docks – Commercial Site Plan – TRC Review The following comments have been received for the May 1st, 2024, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. NHC Planning, W. E. Biddle 910-798-7068 1. General Comments – a. The scope of work is for dock/boat slips. b. Please detail which docks are for Phase two. 2. UDO Section 5.1 Parking and Loading a. Parking quantity is sufficient per the UDO. 7. UDO Section 5.6 Signs a. Please note that all signs are subject to Section 5.6 of the UDO. b. Please submit for sign permits prior to installation. NHC Fire Services, Ray Griswold 910-798-7448 1. Approved with the following comments: a. The FDC shall be placed within reach of a fire truck on the side of the road opposite the fire hydrant dedicated to this project. Agreed upon 150 feet. b. Follow all sections of the TRC comments sent to the developer and follow Chapter 36 of the fire code Titled MARINAS 3. c. See attached. 2771 Alvernia Drive – Sunset Reach Dock/ Boat Slip –Major Subdivision Site Plan – TRC Review Page | 2 NHC Engineering, Galen Jamison 910-798-7072 1. A stormwater permit revision to STMW-22-0033 will be required. 2. A land disturbing permit revision to LNDP-20-00024. 3. Please contact the State for their stormwater permit revision requirements. NHC Environmental Health, Dustin Fenske 910-798-6732 1. Environmental Health has no comments for docks and boat slips. NHC Addressing, Katherine May 910-798-7443 No Comments. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.fcpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103 3. CFPUA water and sewer are available. 4. CFPUA Plan Review has been completed. NCDOT, Nick Drees 910-398-9100 No comments. WMPO, Scott James 910-473-5130 No comments. Brad Shaver USACOE Brad.E.Shaver@usace.army.mil 1. Sunset Reach docking facility will likely require a CAMA major permit and the Division of Coastal Management will coordinate with our office for any necessary permits. Division of Coastal Management, Kelsey beachman 910-796-7270 See attached. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Rachel Capito NCDEMLR, Dan Sams DCM, Tanya Pietila MEMORANDUM To: New Hanover County Technical Review Committee Date: 4/23/2024 Subject: Sunset Reach Boating Facility – SUP S-583 (minor modification) Comments: • Verify number of Boat Slips allowed. Original SUP – S583 07/08, dated August 4, 2008, granted 53 boat slips. The site plan shows 56 Boat Slips. • Show offsite parking for the Boating Facility. Original SUP – S583 07/08, dated August 4, 2008, granted 3 offsite parking spaces for site. • For the pervious concrete path, clarify the location of Golf Cart parking area for the facility. The 20’ Pedestrian and Cart access transitions to a 6’ access. • If the 6’ access is pedestrian only, please consider installing signs showing “No Carts beyond this point, pedestrian access only.” Sunset Reach Boating Facility – SUP S-583 (minor modification) 2 NCDOT Projects: TIP Projects in the Area: U-5863 Castle Hayne Road Widening, (Unfunded) WMPO 2045 Projects: N/A New Hanover County CTP: N/A TIA: N/A