Loading...
Avenue One - TRC Responses 20240510Page 1 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com May 10, 2024 New Hanover County Planning Re: Avenue One Major Subdivision Site Plans Thank you for your review of our plans for Avenue One, Major Subdivision. We have received your comments and our responses are below written in RED text. TRC Date: 01/17/2024 Reviewer: Amy Doss, Wendell Biddle Department: Planning 1. General Comments – Straight rezoning for R-5/RMF-L with a proposed Performance Residential use, refer to case Z20-18. a. Please note that prior to final plat of this development or phasing, the HOA Covenants must be on record with the New Hanover County Register of Deeds. Noted. b. At a density of 8 units per acre for the R-5, a total of 496 units permitted for the proposed 62.12 acres of development. Correct. 357 units are proposed. c. Please detail Performance setbacks and make a note detailing minimum distance between structures. Setbacks are prescribed as follows, per unit type: Front Rear Side Corner Row Home 7’ 14’ 0’ - Townhome 18’ 10’ 0’ - Single Family 20’ 10’ 5’ 7’ It is also noted in the Site Data table on MP-01 that the minimum building separation is 20’ for townhomes and 10’ for row homes and single family homes. Additionally, just to clarify, the row home “front” setback refers to the building façade with the front door and “rear” setback refers to the alley-facing side. d. Please note that Performance setback requirements are for lots on the periphery of the development and require a 20’ rear setback. Though permissible, a 30’ rear setback is detailed. The 30’ setback will remain in place. e. At a density of 10 units per acre for the RMF-L, a total of 966 units permitted for the proposed 96.62 acres of development. Correct. 376 units are proposed. f. Total Area- 158.74 Acres g. Wetlands 1.05 Acres (Preliminary) – Pending USACE permit action. Confirmed. h. Please detail the Performance Subdivision setbacks and distance between structures. Please see response for comment “c”. CLD Engineering, PLLC Civil Engineering/Landscape Architecture Land Planning/Construction Management Page 2 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com i. Will the R-5 portion be fee simple? Please clarify if there are lot lines around the rowhomes. Yes, the rowhomes will be privately owned and there are lot lines extending to the right of way and access easement. 2. UDO Section 5.1 Parking and Loading a. Please detail all parking and loading areas for all community centers, amenities, and or open space areas. The community centers will be submitted separately for review. b. Please detail all traffic calming devices to include gate for Emergency Access Only point of entry/exit. The Emergency access has been labeled, to include a note that this point of entry will be restricted with siren-activated gate. Other traffic calming devises include an undulating layout of the primary boulevard and a planted median that will make the vehicular traffic corridor feel narrower, encouraging slower speeds, and providing a point of refuge for pedestrians. 3. UDO Section 5.2. Traffic, Access, & Connectivity a. Site plan details one point of access for both phases. Please detail if there are other points of egress/ingress for the future residents of Avenue One. There is a second “emergency” access proposed along the property frontage. This access will be controlled by a siren activated lift gate. Aside from the proposed “future access” in Phase II there are no additional access points proposed. Due to surrounding parcels and I-140 and environmental conditions, additional access points are not possible. b. No building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for the building permit. Noted. An application for a driveway permit will be submitted. c. Please make note of all sight triangle dimensions. Sight distance triangles are dimensioned at 10’ by 70’, measured along the right of way of intersecting streets. Visibility shall be unimpeded between 3’ and 7’ in these areas. 4. UDO Section 5.3 Tree Retention a. Please submit a Tree Removal Permit to the COAST permitting portal. Noted, A tree removal permit will be submitted. b. Please detail on a site plan the location of all regulated trees to be removed. In a table, stipulate the species, diameter at breast height (DBH), and regulation type of each tree to be removed and provide the total sum of regulated DBH removed for mitigation calculation. Sheets TR-01 Through TR-08 have been added to the plan set. All trees proposed for removal and preservation have been included. An excel worksheet has also been provided that details mitigation. c. For tree retention and credit towards tree mitigation, please detail the species and DBH of all documented trees to remain on site. Please see response for comment “b”. d. Please detail the proposed method of mitigation for the accumulated DBH removed. With the removal of 4,393 inches of tree material, a total of 8,786 mitigation inches were required to be preserved or replaced. 6,006 inches of native tree material was preserved, and with a x1.5 tree credit awarded, the 9,009 banked mitigation inches was enough to cover required mitigation. Page 3 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com 5. UDO Section 5.4 Landscaping and Buffering a. Please provide a detailed landscape and buffering plan detailing the requirements in accordance with UDO Section 5.4. A landscape has been included. It includes the required street yard and a detail including standards for the typical buffer visibility. b. Landscaping is only required for the amenity center. Noted. The community centers will be submitted separately for review. 6. UDO Section 5.5 Exterior Lighting a. Is any lighting proposed for the development? Yes, street lighting will be proposed. b. Please note that with the latest update to the UDO, a lighting plan is not required at time of TRC approval. See below excerpt from Section 5.5.3: i. Information about the exterior lighting for the site that demonstrates compliance with the standards in this section shall be submitted in conjunction with an application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first, approved no later than at time of construction plan approval. A lighting plan is being developed and will be submitted before final approvals are requested. See note on MP-01. c. When the lighting plan is submitted, please ensure that the foot candles from the street lights at the lot lines do not exceed 0.5, as the adjacent land is residential. Noted. A note has been added to MP-01. 7. UDO Section 5.6 Signs a. Please note that all signs are subject to Section 5.6 of the UDO. Noted. b. Please submit for sign permits prior to installation. Noted. 8. UDO Section 5.7 Conservation Resources. a. New Hanover GIS records indicate a Swamp Forest and Pocosin Conservation Overlay on site. Please delineate on the site plan the aggregate acreage of Swamp Forest and Pocosin for both Phase I and II. b. Please refer to UDO Section 5.7.3 for Conservation Space General Performance Controls. c. Please refer to UDO Table 5.7.3.A.5: Worktable for Determining Required Conservation Space Developable Land. a Please note 5.7.3.E Methods for Conservation. After the issue of conservation space was discussed independently with County Planning staff, it was determined that the conservation resource requirement was only applicable if Class IV soils were present. It was also confirmed that there are no Class IV soils (Dorovan, Johnston, or Pamlico) on site and that since the site consisted of purely buildable soils, the conservation resource requirement did not apply. 9. UDO Section 5.8 Open Space Requirements a. Required open space for total development is 31.75-acres and a total of 33.6 acres are proposed. Confirmed. b. Please detail each section of open space and the corresponding acreage on site plan. Each contiguous section of open space has been numbered and labeled with its total acreage. Please see MP-02. Page 4 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com c. Please reference Section 5.8.4 Design Standards regarding accessibility and configuration. Noted. 10. UDO Section 6 Subdivision Design and Improvements a. Please note that residential blocks are not to exceed 1,000 feet in length per Section 6.2.2.A.2.b. Noted. The length of Rodanthe Avenue which was previously longer than 1,000 feet has been revised and is now interrupted with the intersection of a cross street (. b. Section 6.2.2.A.3.a – please detail the width of the easement of the development that is adjacent to the I-140 corridor. Per 6.2.2.A.3.a,”The County may require an easement as much as 50 feet in depth” The required 30’ perimeter setback currently exists along the southern edge of the property. If the County is requiring a larger easement, we would request a clarification on that dimension. 50’ can be accommodated with limited vegetative disturbance in most areas. There is one section of road, approx. 375’ in length, where the proposed ROW abuts the 30’ perimeter buffer and the road overlaps into a 50’ offset by 6’ (so, affording 42’ separation from the property boundary.) Please advise on the County’s discretionary requirements of width and plantings in this area. c. UDO Section 6.2.2A.7.g - Phase I has approximately 33 links and 21 nodes with a ratio of 1.57. Phase II has approximately 31 links and 20 nodes with a ratio of 1.55. Confirmed. Both ratios are over the required 1:40 ratio. d. Section 6.2.2.A.15. – Cluster style mailboxes are required with paved ingress/egress. Noted. Cluster mailboxes will be proposed in conjunction with the amenity sites. Fire Services, Ray Griswold 910-798-7448 1. Fire Final required. Noted. 2. Gates – require KNOX Entry system and siren activation – Both. Plan only shows one. The primary boulevard is not intended to be gated. 3. Move fire hydrant near 25’ Storm water easement and relocate in area of Building 2-203. Noted. A hydrant will be placed around Lot 2-203. 4. Meet all TRC Plan Review Comments. Noted. NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and a stormwater permit issued by the County are required for this project in addition to the State stormwater permit. Please submit for permits as the design is completed. Noted. This project has received a NCDEQ stormwater permit (SW8 231111). The erosion control and stormwater plans were submitted to the County for review 2/28/2024 with revisions re-submitted on 4/11/2023. 2. It appears the drainage patterns to the 3 culverts along Sidbury Road are being changed slightly which may require the 100 year pre-post storm attenuation requirements with the DOT. It is recommended this be verified with the DOT early in the design. Page 5 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com Thank you for the feedback. The analyses for these culverts was performed for the 100-year storm events and no downstream improvements were warranted. 3. Per Section 7.8.B, 2nd bullet, please include a downstream analysis for each of the 3 existing culverts along Sidbury Road and should they be found to be undersized, a conceptual design for the required size with the narrative report for stormwater permitting. A downstream analysis was provided as part of the Stormwater Narrative section of the latest stormwater submittal to the County (4/11/2024). 4. Please give consideration to moving SCM#3 outside the 100 year floodplain. We were not able to modify the subdivision layout to make that adjustment for Wet Detention Basin #3 or to re-route the stormwater from this area to an adjacent SCM due to the hydraulic length required. 5. Please consider locating the outfall for SCM#1 closer to the existing ditch on the adjacent parcel to the west. We extended the primary spillway barrel system for Wet Detention Basin #1 as far north as the layout constraints would allow without creating a pond outfall directly adjacent to the townhomes. The topography indicates that the pond will be able to discharge adequately in the location provided. 6. There appears offsite drainage coming from the NE parcels and the south that will/may need to be re- routed around/through the site to avoid creating impacts to adjacent parcels. Additionally, the offsite drainage coming from the south If so, is shall be placed in a public drainage easement sized in accordance with NHC Stormwater Manual. Construction in the offsite drainage conveyance measures that will be maintained by the county will need to be observed during construction by Stormwater Services and a turnover meeting scheduled once the system is ready to be conveyed to the county. Please add a plan note to ensure county construction observation and a turnover meeting occurs. Note, should the applicant elect to maintain the conveyance measures themselves, the POA covenants shall indicate the operation and maintenance roles and responsibilities for the conveyance measure. In most locations, there are existing agricultural ditches along the property lines that collect drainage from off-site areas. These ditches will remain and a 30’ wide public drainage easement (comingled with the 30’ property buffer) will be placed on the property-side of the property-line ditches. There is off-site drainage from the south that discharges onto the site before naturally being routed back off-site by the existing agricultural ditches throughout Phase 2. This drainage pattern will be preserved and will be placed in a public drainage easement sized per the NHC Stormwater Manual. The Phase 2 stormwater system has not been finalized but off-site drainage into this area will be re-routed accordingly. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. The utility plans were submitted to the CFPUA for review on 2/28/2024 with revisions (per review comments) anticipated to be submitted the week of 4/22/2024. 2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to: https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. Noted. 3. CFPUA water and sewer available through mainline extension; pump station will also be required. Noted. Page 6 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com 4. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). Noted. 5. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. Noted. 6. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. Noted. NCDOT, Nick Drees 910-398-9100 See Attached. The subdivision roadway connections to Sidbury Road (SR-1336) and the improvements to the supporting NCDOT roadway infrastructure as outlined in the approved TIA (1/10/2024) will be designed and permitted by Davenport (traffic engineering consultant). The comments provided from the NCDOT have been submitted to Davenport to incorporate into their design and permitting efforts. Environmental Health, Dustin Fenske 910-798-6732 1. Site plan reflects connection to public water. Proposed infrastructure must maintain setbacks to surrounding properties well heads. Development of this property should be mindful of potential agricultural irrigation wells. Any irrigation wells on the property shall be identified, protected, and properly abandoned. Noted. 2. Site plan reflects connection to public sewer. Proposed infrastructure must maintain setbacks to surrounding properties septic systems. Noted. WMPO, Jamar Johnson 910-473-5130 See attached. The subdivision roadway connections to Sidbury Road (SR-1336) and the improvements to the supporting NCDOT roadway infrastructure as outlined in the approved TIA (1/10/2024) will be designed and permitted by Davenport (traffic engineering consultant). The comments provided from the WMPO have been submitted to Davenport to incorporate into their design and permitting efforts. Brad Shaver USACOE Brad.E.Shaver@usace.army.mil USACE is currently working on a permit action for the Avenue One Site. Page 7 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com Addressing, Katherine May 910-798-7443 1. I will work with emergency services to determine the named street pattern. Please provide street name suggestions prior to TRC approval – I can assist with name options if needed. Street names have been added to the plan and are in the process of being reserved. 2. Addresses can be assigned following TRC approval. Noted, thank you. 3. Please mark the locations of community mailboxes and electric meters. Mailboxes will be included with the community centers. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Rachel Capito NCDEMLR, Dan Sams DCM, Tanya Pietila Page 8 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com Dept of Transportation General Comments: Roadway improvements are required per the approved TIA (12/06/2023). x Right of way dedication may be needed for the required roadway improvements. o The dedication of right of way should account for the right turn lane, left turn lane, traffic signal, shoulder, and drainage ditch sections. Noted. o Any right of way dedicated may impact the setbacks and the internal stem protection. Noted. • Refer to the NCDOT Roadway Design Manual for help with the design of any required roadway improvements. o Figure 8-10 Recommended Treatment for Turn Lanes (included). NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. x Refer to the NCDOT checklist (included) for submittal requirements (Documents, details, and plans). A NCDOT Encroachment Agreement is required for any utility connections or installations within NCDOT right-of-way. Plan Submittal Comments: Emergency Only Access: x The proposed emergency access will need to be on a plan sheet showing the design. o Gate details and signage details will be needed as well. Additional information on the emergency access have been added to SP-D2. x Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. Sight triangles have been added to all intersections x Show and label the appropriate sight distances. o No obstructions shall be placed within the stopping sight distance. o Reference table 3-1 below for design requirements. x The driveway will need to be paved from the edge of pavement to right-of-way line at a minimum. Noted. A paved connection is shown. Page 9 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com x Label the radius for the driveway connection. o Make sure to accommodate the largest proposed vehicle. A 30’ radius dimension was added on the preliminary driveway connection shown. The final driveway design and permitting of the offsite improvements to sidbury road (SR1336) will be performed by others in coordination with the NCDOT. o A radius encroachment letter will be required if the radius of the proposed driveway crosses the adjoining property line. Noted. Site Access One: x Show required roadway improvements per the approved TIA. The offsite improvements to Sidbury Road (SR1336) shown on this plan are preliminary based upon the approved TIA and are illustrated for representation purposes. x Label the internal protection stem length for the proposed driveway connection. o Measured from the right-of-way line. o If right of way is needed this should be measured from the proposed right of way line. x The proposed landscaped median should be designed in accordance of the NCDOT Subdivision Manual o Refer to page 48 for design details. Noted. x Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. Noted. x Show and label the appropriate sight distances. o No obstructions shall be placed within the stopping sight distance. o Reference table 3-1 below for design requirements. Noted x The driveway will need to be paved from the edge of pavement to right-of-way line at a minimum. x Label the radius for the driveway connection. x Make sure to accommodate the largest proposed vehicle. A 30’ radius dimension was added on the preliminary driveway connection shown. The final driveway design and permitting of the offsite improvements to sidbury road (SR1336) will be performed by others in coordination with the NCDOT Page 10 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com WMPO Dear Mr. Anastopoulo: The WMPO, NCDOT, City of Wilmington and New Hanover County staffs have reviewed the Newton Farms (Avenue One) TIA (sealed October 6, 2023) and based on the information provided, it is our understanding that the proposed development will be built over two (2) phases and will consist of: Phase 1 (build year 2027): o ITE Land Use Code 210 – Single Family detached housing 26 DU o ITE Land Use Code 215 – Single Family attached housing (duplexes) 210 DU Full Build (build year 2035): o ITE Land Use Code 210 – Single Family detached housing 397 DU o ITE Land Use Code 215 – Single Family attached housing (duplexes) 344 DU The following improvements are required of the developer: SR 1336 (Sidbury Road) and SR 2181 (Dairy Farm Road) (Existing Unsignalized Intersection) Phase 1 o No improvements are required Full Build o Install a traffic signal and provide the necessary communication equipment for coordination. Approval with conditions of Newton Farms (Avenue One) Residential TIA (New Hanover County) SR 1336 (Sidbury Road) and SR 1318 (Blue Clay Road) (Existing Unsignalized Intersection) o No improvements are required. US 117 / NC 132 (N. College Road) and SR 1318 (Blue Clay Road) (Existing Signalized Intersection) Page 11 of 11 P.O. Box 1172 Wilmington, NC 28402 Phone: 910-254-9333 Fax: 910-254-0502 www.CLDeng.com www.CLDeng.com Phase 1 o Construct an eastbound right turn lane on SR 1318 (Blue Clay Road) with 100 feet of storage, and appropriate full-width deceleration and taper. o Restripe the existing thru-right lane as an exclusive thru lane o Modify signal plan to provide right-turn overlap phasing Full Build o Extend the eastbound right turn lane on SR 1318 (Blue Clay Road) to provide 200 feet of storage, and appropriate full-width deceleration and taper. o Extend the northbound right turn lane on US 117/NC132 (N College Road) to provide 550 feet of storage, and appropriate full-width deceleration and taper. SR 1336 (Sidbury Road) and Site Access 1 (Proposed Signalized Intersection) Phase 1 o Construct an eastbound right turn lane on SR 1336 (Sidbury Road) with 150 feet of storage, and appropriate full-width deceleration and taper. o Construct Site Access 1 (northbound approach) with an internal protected stem of 150 feet, measured from the right-of-way line and with one ingress and two egress lanes, configuring the egress lanes as exclusive left turn and right turn lanes each with at least 150 feet of full-width storage. o Provide stop controls for the northbound approach. Full Build o Install a traffic signal and provide the necessary communication equipment for coordination. o Construct a westbound left turn lane on SR 1336 (Sidbury Road) with 100 feet of storage, and appropriate full-width deceleration and taper. If changes are made to the proposed site driveways and/or land uses, the current trip distribution may need to be modified and would require a revised Traffic Impact Analysis to be submitted for review by the NCDOT, WMPO, City of Wilmington and New Hanover County, in which instance this approval would become null and void. The applicant is required to obtain all applicable New Hanover County and NCDOT permits for access to the road network. A copy of this TIA approval shall be included with any NCDOT driveway permit application. All applicable NCDOT and New Hanover County technical standards and policies shall apply.