Loading...
Sheetz Shade Tree - Traffic Impact AnalysisJeff Hochanadel, PE, PTOE North Carolina Transportation Group Leader 919-866-4511 Jeff.Hochanadel@Timmons.com 5410 Trinity Road, Ste 102 Raleigh, NC 27607 Sheetz (Shade Tree) Traffic Impact Analysis January 2024 January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC I TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................................. I APPENDICIES .......................................................................................................................................................... II LIST OF TABLES ...................................................................................................................................................... II LIST OF FIGURES ................................................................................................................................................... II 1 EXECUTIVE SUMMARY ............................................................................................................................... 1-1 2 INTRODUCTION .......................................................................................................................................... 2-1 2.1 SITE LOCATION AND STUDY AREA ................................................................................................................ 2-1 2.2 SITE DESCRIPTION ..................................................................................................................................... 2-1 3 EXISTING TRAFFIC CONDITIONS .......................................................................................................... 3-1 3.1 EXISTING GEOMETRIC CONDITIONS ............................................................................................................. 3-1 3.2 ALTERNATIVE MODES OF TRANSPORTATION ................................................................................................. 3-1 3.3 EXISTING TRAFFIC VOLUMES ....................................................................................................................... 3-1 4 BACKGROUND TRAFFIC CONDITIONS .................................................................................................. 4-1 4.1 PUBLIC IMPROVEMENT PROJECTS ................................................................................................................. 4-1 4.2 APPROVED AREA DEVELOPMENTS ................................................................................................................. 4-1 4.3 BACKGROUND TRAFFIC VOLUMES ................................................................................................................. 4-1 5 DEVELOPMENT TRAFFIC ........................................................................................................................... 5-1 5.1 TRIP GENERATION...................................................................................................................................... 5-1 5.2 TRIP DISTRIBUTION ................................................................................................................................... 5-1 6 BUILD TRAFFIC CONDITIONS ................................................................................................................. 6-1 6.1 BUILD TRAFFIC VOLUMES ............................................................................................................................ 6-1 7 ANALYSIS RESULTS ................................................................................................................................... 7-1 7.1 CAPACITY ANALYSIS ................................................................................................................................... 7-1 7.2 TURN LANE WARRANTS .............................................................................................................................. 7-2 7.3 2023 CAPACITY ANALYSIS RESULTS ............................................................................................................ 7-3 7.4 2025 CAPACITY ANALYSES RESULTS ............................................................................................................ 7-4 8 CONCLUSIONS & RECOMMENDATIONS ............................................................................................... 8-1 January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC II APPENDICIES Appendix A – Scoping Information Appendix B – Traffic Counts Appendix C – Traffic Signal Plans & Timings Appendix D – NCDOT Nomographs Appendix E – Synchro / SimTraffic Analysis Outputs LIST OF TABLES TABLE 1-1:TRIP GENERATION SUMMARY .................................................................................................................... 1-2 TABLE 3-1:EXISTING ROADWAYS ............................................................................................................................... 3-1 TABLE 5-1:TRIP GENERATION SUMMARY .................................................................................................................... 5-1 TABLE 7-1:LEVEL OF SERVICE DEFINITIONS ................................................................................................................ 7-1 TABLE 7-2:SIGNALIZED AND UNSIGNALIZED INTERSECTION LEVEL OF SERVICE CRITERIA ............................................ 7-2 TABLE 7-3:2023 EXISTING INTERSECTION LOS,DELAY, AND QUEUE SUMMARY .......................................................... 7-3 TABLE 7-4:2025 BACKGROUND INTERSECTION LOS,DELAY, AND QUEUE SUMMARY .................................................. 7-4 TABLE 7-5:2025 BUILD INTERSECTION LOS,DELAY, AND QUEUE SUMMARY............................................................... 7-5 LIST OF FIGURES FIGURE 1-1:PROPOSED LANE CONFIGURATION FIGURE 2-1:SITE LOCATION MAP FIGURE 2-2:SITE PLAN FIGURE 3-1:2023 EXISTING LANE CONFIGURATION FIGURE 3-2:2023 EXISTING TRAFFIC VOLUMES FIGURE 4-1:2025 BACKGROUND TRAFFIC VOLUMES FIGURE 5-1A:TRIP DISTRIBUTION PERCENTAGES FIGURE 5-1B:PRIMARY TRIP DISTRIBUTION VOLUMES FIGURE 5-1C:PASS-BY TRIP DISTRIBUTION PERCENTAGES FIGURE 5-1D:PASS-BY TRIP DISTRIBUTION VOLUMES FIGURE 5-1E:TOTAL SITE TRIP DISTRIBUTION VOLUMES FIGURE 6-1:2025 BUILD TRAFFIC VOLUMES FIGURE 8-1:PROPOSED LANE CONFIGURATION January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 1-1 1 EXECUTIVE SUMMARY A Traffic Impact Analysis (TIA) was completed for the proposed Sheetz development in accordance with the Wilmington Urban Area Metropolitan Planning Organization (WMPO) and the North Carolina Department of Transportation’s (NCDOT) standards and procedures. The proposed development will be located in the northeast US 421 (Carolina Beach Road) / Shade Tree Lane quadrant intersection, in Wilmington, NC. Development Summary The proposed development will be constructed by 2025 and consist of the following: ·6,139 SF Convenience Store / Gas Station with 12 Vehicle Fueling Positions (VFPs) Access to the proposed development will be provided via two (2) connections to the outside roadway network. Study Conditions and Limits In accordance with applicable WMPO and NCDOT guidelines, the study analyzes the following conditions during the weekday AM and PM peak hours: ·Existing (2023) Traffic Condition ·Background (2025) Traffic Conditions ·Build (2025) Traffic Conditions Per discussions with WMPO / NCDOT the following intersections were analyzed: ·US 421 (Carolina Beach Road) and SR 1262 (Horn Road) ·US 421 (Carolina Beach Road) and Site Access 1 (right-in/right-out) ·US 421 (Carolina Beach Road) and SR 1197 (Silver Lake Road) / SR 2361 (Shade Tree Lane) ·SR 2361 (Shade Tree Lane) and Site Access 2 Background Traffic Condition Summary Per discussions with the WMPO and the NCDOT, Background traffic volumes include the following: ·Existing traffic volumes grown by 2% annually (2025) Per discussions with WMPO / NCDOT there were no private developer improvement projects within the study area. There is one (1) public improvement project within the study area: W-5703C. This project involves pedestrian safety improvements including MUP and sidewalk along US 421. Site Trip Generation Summary Site-generated trips are based on trip generation information provided in the 11th Edition of the Institute of Transportation Engineers (ITE)Trip Generation Manual and the anticipated building program. Site trips are summarized in Table 1-1 below: January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 1-2 Table 1-1: Trip Generation Summary ITE Land Use Code Independent Variable Daily Traffic AM Peak Hour PM Peak Hour In Out Total In Out Total 945-Convenience Store / Gas Station – GFA (5.5-10K)12 VFP 4,149 190 189 379 161 162 323 Pass-By LUC 945 (62% AM / 56% PM):---118 -117 -235 -90 -91 -181 Total External Trips:4,149 72 72 144 71 71 142 SOURCE: ITE Trip Generation Manual 11th Edition (2021) Per WMPO / NCDOT standards and procedures, pass-by percentages were applied to the projected traffic volumes. As shown in Table 1-1, following these reductions, projected trips totaled 144 (72 incoming and 72 outgoing) during the AM peak hour and 142 (71 incoming and 71 outgoing) during the PM peak hour. Projected Average Daily Traffic (ADT) volumes totaled 4,149 vehicles per day (VPD). Build volumes were determined by summing the Background traffic volumes and site trip distribution volumes. Recommended Developer Improvements Per the performed analyses, the following improvements are recommended in conjunction with the proposed development’s construction (see Figure 1-1): ·Carolina Beach Road / Site Access 1 o Construct a northbound right-turn lane with 175-foot of effective storage (with appropriate taper) o Construct Site Access 1 with an internal protected stem of 100-feet ·Shade Tree Lane / Site Access 2 o Construct Site Access 2 with an internal protected stem of 50-feet SITE Sheetz (Shade Tree) Traffic Impact Analysis 2025 Proposed Lane Configuration NOT TO SCALE N Shade Tree Lane Horn Road Figure 1-1 Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 125' 100'275'175' 200'125' SPEED LIMIT45 SPEED LIMIT25 SPEED LIMIT25 350' 350'150' SPEED LIMIT35 LEGEND: Existing Road Proposed Road Signalized Intersection Unsignalized Intersection Existing Lane Configuration Proposed Lane Configuration 175' EffectiveStorage 100' IPS 50' IPS January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 2-1 2 INTRODUCTION This report presents the Sheetz (Shade Tree) Development TIA findings. The proposed development will be constructed off Shade Tree Lane in Wilmington, NC. The TIA’s purpose is to verify that the existing study area intersection geometry is sufficient to accommodate the projected traffic volumes, and to determine what, if any, improvements are necessary. The proposed development will be constructed by 2025. Per the scoping document (see Appendix A), the study analyzes the following conditions during the weekday AM and PM peak hours: ·Existing (2023) Traffic Condition ·Background (2025) Traffic Conditions ·Build (2025) Traffic Conditions 2.1 SITE LOCATION AND STUDY AREA The proposed development will be located in the northeast US 421 (Carolina Beach Road) / Shade Tree Lane intersection quadrant (see Figure 2-1). Per the scoping document, the following intersections were analyzed: ·US 421 (Carolina Beach Road) and SR 1262 (Horn Road) ·US 421 (Carolina Beach Road) and Site Access 1 (right-in/right-out) ·US 421 (Carolina Beach Road) and SR 1197 (Silver Lake Road) / SR 2361 (Shade Tree Lane) ·SR 2361 (Shade Tree Lane) and Site Access 2 2.2 SITE DESCRIPTION The proposed development will consist of the following land use: ·6,139 SF Convenience Store / Gas Station with 12 VFPs Access to the proposed development will be provided via two (2) connections to the roadway network (see Figure 2-2). Site Access 1 will be a Right-In/Right-Out (RIRO) connection to Carolina Beach Road located approximately 445 feet (C/L to C/L) north of Shade Tree Lane. Site Access 2 will be a full access connection to Shade Tree Lane located approximately 340 feet (C/L to C/L) east of Carolina Beach Road. Sheetz (Shade Tree) Traffic Impact Analysis Site Location Map Figure 2-1 NOT TO SCALE N Legend = Study Area Intersection = Driveway Intersection = Study Area / Driveway Intersection Sheetz (Shade Tree)Traffic Impact Analysis Site Plan NOT TO SCALE N Figure 2-2 January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 3-1 3 EXISTING TRAFFIC CONDITIONS 3.1 EXISTING GEOMETRIC CONDITIONS The existing intersection geometry and traffic control is shown in Figure 3-1. Existing roadway data is summarized in Table 3-1 below: Table 3-1: Existing Roadways * All roadways classified per the NCDOT Functional Class Map. 3.2 ALTERNATIVE MODES OF TRANSPORTATION Currently, there are two bus routes that service the study area, routes 201 and 210. No special accommodations for bicyclists or pedestrians (i.e., separate bike lanes, sharrows, or sidewalks) were noted. Due to the proposed land use type, it is unlikely that the aforementioned alternative transportation modes will significantly impact site trips. 3.3 EXISTING TRAFFIC VOLUMES Timmons Group calculated peak hour study area intersection volumes using the weekday AM (7:00 – 9:00) and PM (4:00 – 6:00) peak period turning movement counts undertaken in November 2023. Traffic count data is summarized in Figure 3-2. Traffic count data is located in Appendix B. Road Name Route Number Functional Class* Cross Section Posted Speed Limit (mph) AADT (Year) AADT Location Carolina Beach Road US 421 Principal Arterial 4-Lane Divided 45 35,500 (2021) South of Willoughby Park Court Horn Road SR 1262 Local 2-Lane Undivided 35 No data available NA Silver Lake Road SR 1197 Local 2-Lane Undivided 25 No data available NA Shade Tree Lane SR 2361 Local 2-Lane Undivided 25 No data available NA SITE Sheetz (Shade Tree) Traffic Impact Analysis 2023 Existing Lane Configuration NOT TO SCALE N Shade Tree Lane Horn Road Figure 3-1 Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 LEGEND: Existing Road Proposed Road Signalized Intersection Unsignalized Intersection Existing Lane Configuration 125' 100'275'175' 200'125' SPEEDLIMIT45 SPEEDLIMIT25 SPEEDLIMIT25 350' 350'150' SPEEDLIMIT35 SITE LEGEND: Existing Road Proposed Road AM Peak Hour Volume (vph) PM Peak Hour Volume (vph) XX (XX) 100 (37) 20 (10) 51 (42) 91 1499 35(109)(1370) (70) 119 (78) 4 (6) 142 (137) 56 1260 23(90) (1796) (57)167 (209) 265 (221) 1638(1568)1466(1994) 19 1727(65) (1447) (47) 21 1287(61) (1852)40 (126) 48 (47) 1727 (1447) 1327 (1938) 48 (1511) 1357(1969) 1736 171 (89) 62 (133) 171 (89) 62 (133) Sheetz (Shade Tree) Traffic Impact Analysis 2023 Existing Traffic Volumes NOT TO SCALE N Shade Tree Lane Horn Road Figure 3-2 Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 0(8) 13(19) 18(26) 19(25) January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 4-1 4 BACKGROUND TRAFFIC CONDITIONS 4.1 PUBLIC IMPROVEMENT PROJECTS Per discussions with WMPO / NCDOT, there is one (1) public improvement project within the study area: W-5703C. This project involves pedestrian safety improvements including MUP and sidewalk along US 421. W-5703C improvements were not included in the conducted analyses. 4.2 APPROVED AREA DEVELOPMENTS Per discussions with WMPO / NCDOT, there are no approved developments (located in the project study area) included in this study. 4.3 BACKGROUND TRAFFIC VOLUMES Per discussions with WMPO / NCDOT, Background traffic volumes were calculated using a 2% annual growth rate. The 2025 Background traffic volumes are shown in Figure 4-1. SITE LEGEND: Existing Road Proposed Road AM Peak Hour Volume (vph) PM Peak Hour Volume (vph) XX (XX) 104 (38) 21 (10) 53 (44) 95 1560 36(113)(1425) (73) 124 (81) 4 (6) 148 (143) 58 1311 24(94) (1869) (59)174 (217) 276 (230) 1704(1631)1525(2075) 20 1797(68) (1505) (49) 22 1339(63) (1927)42 (131) 50 (49) 1797 (1505) 1381 (2016) 50 (1572) 1412(2049) 1806 178 (93) 65 (138) 178 (93) 65 (138) Sheetz (Shade Tree) Traffic Impact Analysis 2025 Background Traffic Volumes Shade Tree Lane Horn Road Figure 4-1 Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 0(8) 14(20) 19(27) NOT TO SCALE N 20(26) January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 5-1 5 DEVELOPMENT TRAFFIC The Sheetz Development site trips were estimated based on the proposed land use supplied by the developer and subsequently distributed onto the surrounding roadway network. 5.1 TRIP GENERATION The site-generated trips shown in Table 5-1 are based on trip generation information provided in the 11th Edition of the Institute of Transportation Engineers (ITE)Trip Generation Manual and the anticipated building program. Table 5-1: Trip Generation Summary ITE Land Use Code Independent Variable Daily Traffic AM Peak Hour PM Peak Hour In Out Total In Out Total 945-Convenience Store / Gas Station – GFA (5.5-10K)12 VFP 4,149 190 189 379 161 162 323 Pass-By LUC 945 (62% AM / 56% PM):---118 -117 -235 -90 -91 -181 Total External Trips:4,149 72 72 144 71 71 142 SOURCE: ITE Trip Generation Manual 11th Edition (2021) Prior to pass-by reductions, 379 AM peak hour trips (190 incoming and 189 outgoing) and 323 PM peak hour trips (161 incoming and 162 outgoing) were projected. Projected ADT volumes totaled 4,149 VPD. Per WMPO / NCDOT standards and procedures, pass-by percentages were applied to projected traffic volumes. For LUC 945, 62% and 56% AM and PM peak hour pass-by percentages (respectively) were applied to projected traffic site volumes. Upon applying pass-by percentages, 144 AM peak hour trips (72 incoming and 72 outgoing) and 142 PM peak hour trips (71 incoming and 71 outgoing) were projected. 5.2 TRIP DISTRIBUTION The directional traffic patterns, or site trip distribution, was determined using the existing traffic characteristics and Engineering judgement. It was assumed, for study purposes, that all site traffic would enter and exit the study area similar to existing traffic volumes. The trip distribution percentages and volumes are shown in Figures 5-1a – 5-1e. SITE LEGEND: Existing Road Proposed Road AM Peak Hour Percents PM Peak Hour Percents XX% (XX%) 5%(5%) 40%(40%) 40% 5%(40%) (5%) 5%(5%) 5%35%(5%) (35%)5% (5%) 5% (5%) 45%(45%)45%(45%) 0% 45%(0%) (45%) (0%) 45%(45%)0% (0%) 0% (0%) 45% (45%) 45% (45%) 0% (50%) 50%(50%) 45%(45%)50% (50%) 50% (50%) 50% 5%(5%) 45%(45%) 45%5%(45%) (5%) 50% (50%) 50%(50%) 5% (5%) 5% (5%) Sheetz (Shade Tree) Traffic Impact Analysis Trip Distribution Percentages Shade Tree Lane Horn Road Figure 5-1a Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 5%(5%) 10%(10%) OUT IN 5%(5%) NOT TO SCALE N SITE LEGEND: Existing Road Proposed Road AM Peak Hour Volume (vph) PM Peak Hour Volume (vph) XX (XX) 0 (0) 4 (4) 29 (28) 29 4(28) (4) 4 (4) 4 25(4) (25)4 (4) 4 (4) 32(32)32(32) 0 32(0) (32) (0) 32(32)0 (0) 0 (0) 32 (32) 32 (32) 0 (36) 36(0) (36) 32(32)36 (36) 36 (36) 36 0 4 (4) 32 (32) 32 4(32) (4) 36 (36) 36(36) 4 (4) 4 (4) Sheetz (Shade Tree) Traffic Impact Analysis Primary Trip Distribution Volumes Shade Tree Lane Horn Road Figure 5-1b Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 4(4) 7(7) OUT IN 4(4) NOT TO SCALE N SITE LEGEND: Existing Road Proposed Road AM Peak Hour Percents PM Peak Hour Percents XX% (XX%) (90%) 90%-(90%)(90%) 90% (90%) 90% (90%) 90% -90% 5%(5%) -5%-(5%) 5%(5%) -5%-(5%) 5%5%(5%) (5%) 10% (10%) 10%(10%) Sheetz (Shade Tree) Traffic Impact Analysis Pass-By Trip Distribution Percentages Shade Tree Lane Horn Road Figure 5-1c Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 NOT TO SCALE N SITE LEGEND: Existing Road Proposed Road AM Peak Hour Volume (vph) PM Peak Hour Volume (vph) XX (XX) (81) 106-(81) (81) 106 (81) 106 (81) 106 -106 6 (5) -6 -(5) 6 (5) -6 -(5) 6 6(5)(5) 12 (9) 12(9) Sheetz (Shade Tree) Traffic Impact Analysis Pass-By Trip Distribution Volumes Shade Tree Lane Horn Road Figure 5-1d Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 NOT TO SCALE N SITE LEGEND: Existing Road Proposed Road AM Peak Hour Volume (vph) PM Peak Hour Volume (vph) XX (XX) 0 (0) 4 (4) 29 (28) 0 29 4(0) (28) (4) 0 (0) 4 (4) 0 (0) 0 4 25(0) (4) (25)4 (4) 4 (4) 32(32)32(32) 0 32(0) (32) (0) 0 32(0) (32)0 (0) 0 (0) 32 (32) 32 (32) 0 (117) 142-(81) (117) 32(32)142 (117) 142 (117) 142 -106 10 (8) -6 -(5) 38 (36) -6 -(5) 38 10(36) (8) 48 (45) 48(45) 4 (4) 4 (4) Sheetz (Shade Tree) Traffic Impact Analysis Total Site Trip Distribution Volumes Shade Tree Lane Horn Road Figure 5-1e Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 4(4) 0(0) 7(7) OUT IN 4(4) NOT TO SCALE N 0(0) January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 6-1 6 BUILD TRAFFIC CONDITIONS 6.1 BUILD TRAFFIC VOLUMES Build traffic volumes were determined by summing the Background traffic volumes and the projected site trips (as applicable). The 2025 Build traffic volumes are shown in Figure 6-1. SITE LEGEND: Existing Road Proposed Road AM Peak Hour Volume (vph) PM Peak Hour Volume (vph) XX (XX) 104 (38) 24 (14) 82 (72) 95 1588 40(113)(1454) (76) 124 (81) 8 (10) 148 (143) 58 1315 49(94) (1872) (84)177 (221) 279 (233) 1737(1663)1558(2107) 20 1829(68) (1537) (49) 22 1371(63) (1959)42 (131) 50 (49) 1829 (1537) 1413 (2048) 50 (117) 142(1491)(117) 1448(2084)142 (117) 142 (117) 142 1700 10 (8) 172 (88) 38 (36) 59 (134) 38 10(36) (8) 48 (45) 48(45) 182 (96) 68 (142) Sheetz (Shade Tree) Traffic Impact Analysis 2025 Build Traffic Volumes Shade Tree Lane Horn Road Figure 6-1 Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 4(12) 14(20) 26(34) NOT TO SCALE N 20(26) January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 7-1 7 ANALYSIS RESULTS 7.1 CAPACITY ANALYSIS Capacity analysis allows traffic engineers to determine the impacts of traffic on the surrounding roadway network. The Transportation Research Board’s (TRB)Highway Capacity Manual (HCM) methodologies govern how the Capacity analyses are conducted and how the results are interpreted. There are six letter grades of Levels of Service (LOS) from A to F, with LOS A representing the best operating conditions and LOS F the worst operating conditions. Typically, a LOS E (or worse) is considered unacceptable. Nevertheless, it is not uncommon for side streets to function unacceptably during peak traffic periods because the traffic volumes often do not warrant a traffic signal to assist side street traffic.Table 7-1 shows in detail how each of these levels of service are interpreted. Table 7-1: Level of Service Definitions January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 7-2 For signalized and unsignalized intersections, level of service is defined in terms of delay, a measure of driver discomfort, frustration, fuel consumption and lost travel time.Table 7-2 summarizes the delay associated with each LOS category: Table 7-2: Signalized and Unsignalized Intersection Level of Service Criteria Capacity analyses were performed to assess operational conditions. Study area intersections were analyzed using SYNCHRO Version 11.1 based on Highway Capacity Manual (HCM) methodologies with the following assumptions: ·Existing grades ·12-foot lane widths ·No parking activity, bus stops, or pedestrians ·Peak hour factor (PHF) of 0.90 ·Heavy vehicle percentages 2% ·Signal timing data provided by the City of Wilmington (see Appendix C) ·Updated signal phasing for future conditions (as appropriate) 7.2 TURN LANE WARRANTS The proposed site access turn lane needs / lengths were determined using the NCDOT Policy on Street and Driveway Access to North Carolina Highways Manual: “Generally left and right turn lanes and tapers shall be considered when: ·In accordance with G.S. 137-18(29), the average daily traffic meets or exceeds 4,000 vehicles per day on any secondary route (the average daily traffic should include both the existing traffic plus traffic generated by the proposed development)” All site accesses intersecting roadways with a projected ADT of at least 4,000 VPD (during the Build condition) were evaluated using the NCDOT Turn Lane Warrant Nomograph (see Appendix D) and WMPO methodologies. If warrants were met, turn lanes were recommended accordingly (as needed). To ensure adequate storage, all turn lanes were evaluated using the 2025 Build traffic volumes. All recommended turn lanes are to be constructed with the appropriate taper. A ≤ 10 A 0 to 10 B > 10 to ≤ 20 B > 10 to ≤ 15 C > 20 to ≤ 35 C > 15 to ≤ 25 D > 35 to ≤ 55 D > 25 to ≤ 35 E > 55 to ≤ 80 E > 35 to ≤ 50 F > 80 F > 50 Source: Exhibit 16-2 and Exhibit 17-2 from TRB's "Highway Capacity Manual 2000" Signalized Intersections Level of Service Level of Service Control Delay per Vehicle (sec/veh) Unsignalized Intersections Average Control Delay (sec/veh) January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 7-3 7.3 2023 CAPACITY ANALYSIS RESULTS Table 7-3 summarizes the 2023 Existing intersection LOS, delay, and queue lengths based on existing geometry (see Figure 3-1) and 2023 Existing traffic volumes (see Figure 3-2). The corresponding SYNCHRO and SimTraffic outputs are included in Appendix E. Table 7-3: 2023 Existing Intersection LOS, Delay, and Queue Summary January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 7-4 7.4 2025 CAPACITY ANALYSES RESULTS 2025 Background Analysis Results Table 7-4 summarizes the 2025 Background intersection LOS, delay, and queue lengths based on existing geometry (see Figure 3-1) and 2025 Background traffic volumes (see Figure 4-1). The corresponding SYNCHRO and SimTraffic outputs are included in Appendix E. Table 7-4: 2025 Background Intersection LOS, Delay, and Queue Summary January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 7-5 2025 Build Analysis Results Table 7-5 summarizes the 2025 Build Intersection LOS, delay, and queue lengths based on existing geometry (see Figure 3-1) and 2025 Build traffic volumes (see Figure 6-1). The corresponding SYNCHRO and SimTraffic outputs are included in Appendix E. Table 7-5: 2025 Build Intersection LOS, Delay, and Queue Summary Carolina Beach Road / Horn Road ·All unsignalized intersection approaches are projected to operate at a LOS D or better during both 2025 Build peak hours. Because all intersection movements are projected to operate acceptably,no improvements are recommended due to the proposed development’s construction. Carolina Beach Road / Site Access 1 ·All unsignalized intersection approaches are projected to operate at a LOS E or better during both 2025 Build peak hours. Based on the NCDOT Turn Lane Warrant Nomograph, WMPO methodologies, and 2025 Build Traffic volumes, the following improvement has been identified at the subject intersection: 1) the construction of a northbound right-turn lane. The nomograph recommends a 500-foot northbound right-turn lane. The turn lane should be designed to provide 175-feet of effective storage and allow for an appropriate taper length. Following turn-lane construction, the intersection is projected to continue to operate acceptably. Carolina Beach Road / Silver Lake Road / Shade Tree Lane ·The east and westbound intersection approaches are projected to operate at a LOS F and E during the 2025 Background and Build AM and PM peak hours (respectively). All other intersection approaches are projected to operate at a LOS C during both peak hours. The proposed January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 7-6 development is projected to add a maximum of 2.8% trips to the intersection during either peak hour. No improvements are recommended due to the proposed development’s construction. Shade Tree Lane / Site Access 2 ·All unsignalized intersection approaches are projected to operate at a LOS A during both 2025 Build peak hours. Turn-lanes are not warranted at this intersection as projected 2025 Build ADTs along Shade Tree Lane are projected to be less than 4,000 VPD. Because the intersection is projected to operate acceptably, no improvements are recommended due to the proposed development’s construction. January 2024 Sheetz (Shade Tree) Traffic Impact Analysis – Wilmington, NC 8-1 8 CONCLUSIONS & RECOMMENDATIONS Capacity analyses were performed for the Existing (2023), Background (2025), and Build (2025) traffic volumes. In closing, the following improvements (see Figure 8-1) are recommended in conjunction with the proposed development’s construction: ·Carolina Beach Road / Site Access 1 o Construct a northbound right-turn lane with 175-foot of effective storage (with appropriate taper) o Construct Site Access 1 with an internal protected stem of 100-feet ·Shade Tree Lane / Site Access 2 o Construct Site Access 2 with an internal protected stem of 50-feet SITE Sheetz (Shade Tree) Traffic Impact Analysis 2025 Proposed Lane Configuration NOT TO SCALE N Shade Tree Lane Horn Road Figure 8-1 Silver Lake Road Carolina Beach Road Site Access 2 Site Access 1 125' 100'275'175' 200'125' SPEED LIMIT45 SPEED LIMIT25 SPEED LIMIT25 350' 350'150' SPEED LIMIT35 LEGEND: Existing Road Proposed Road Signalized Intersection Unsignalized Intersection Existing Lane Configuration Proposed Lane Configuration 100' IPS 50' IPS 175' Effective Storage Appendix A – Scoping Information November 29, 2023 Mr. Jeff Hochanadel, PE, PTOE Timmons Group 5410 Trinity Road, Suite 102 Raleigh, NC 27607 RE: Scope of study for the Traffic Impact Analysis (TIA) associated with the Sheetz (Shade Tree) commercial development in New Hanover County, NC Dear Mr. Hochanadel, Based on the information provided in the scoping documents submitted, it is our understanding that the proposed development will consist of: ITE Land Use Code 945 – 6,139 SF of Convenience Store/Gas Station with 14 vehicle fueling positions The estimated build out year is 2025. Following is the scope of study for the Traffic Impact Analysis: 1. Data collection – Analysis Parameters a) Study Intersections: For existing intersections, provide turning movement counts for weekday AM peak hour (7:00am – 9:00am) and PM peak hour (4:00pm – 6:00pm), including bike and pedestrians, signal timing (if applicable), and lane geometry: o US 421 (Carolina Beach Road) and SR 2361 (Shade Tree Lane) o US 421 (Carolina Beach Road) and SR 1262 (Horn Road) - RCI o US 421 (Carolina Beach Road) and Site Access 1 (right-in/right-out) o SR 2361 (Shade Tree Lane) and Site Access 2 (full movement) Scope of study for the Sheetz (Shade Tree) development Traffic Impact Analysis – New Hanover Page 3 of 3 Attachments: Scoping request packet (provided by Timmons) Traffic Impact Analysis Supplemental Guidelines – dated September 28, 2022 Ec: Ben Hughes, PE, District Engineer, NCDOT Jon Roan, Deputy District Engineer, NCDOT Michael Bass, Assistant District Engineer, NCDOT Frank Mike, Assistant District Engineer, NCDOT Stonewall Mathis, PE, Division Traffic Engineer, NCDOT Krupa Koilada, Senior Assistant Division Traffic Engineer, NCDOT Bryce Cox, Assistant Traffic Engineer, NCDOT Nick Drees, Engineering Specialist, NCDOT Denys Vielkanowitz, PE, City Traffic Engineer, Wilmington Robert Farrell, Development Review Supervisor, New Hanover County Jamar Johnson, EI, Engineering Associate, WMPO Bill McDow, Associate Planner, WMPO Development Name: Willows at Wilmington WMPO ID # ______________________________ Updated 5/23/18 Page 1 of 5 P.O. Box 1810 Wilmington, North Carolina 28402 910 341 3258 910 341 7801 FAX Traffic Impact Analysis (TIA): Procedures and Scoping Checklist Date Submitted: 11/07/2023 Date Received by WMPO or NCDOT: ___/___/______ (To be filled out by applicant) (To be filled out by the Department) The purpose of this checklist is to outline and streamline the Traffic Impact Analysis (TIA) scoping process and provide scoping information for WMPO to review and comment prior to developing a TIA. The review procedures are as follows: Contact the Wilmington Metropolitan Planning Organization (WMPO) to determine if a TIA will be required for the development you are proposing within the WMPO Planning Area Boundary. If a TIA is required, the WMPO will coordinate scoping with the Applicant, NCDOT and the governing planning department. Also, if a TIA is required, the Applicants Traffic Engineer shall fill out the checklist below in its entirety in as much detail as possible, include all exhibits and documentation as noted in the checklist and provide it to the WMPO representative no later than 7 business days prior to the date of the next scoping meeting. Scoping meetings occur each Wednesday. The Applicant’s Traffic Engineer (and other interested representatives from the Applicants Design Team) may attend the scoping meeting as deemed necessary and by WMPO request only. Once the scope has been established and submitted, the WMPO will coordinate with NCDOT and the governing Planning department to finalize and submit a formal Scoping Letter to the Transportation Engineer (applicant). If the checklist is deemed complete and in sufficient detail, the scoping letter will be issued within 10 business days of the date of the official receipt date. TIA Submittal: The Applicant shall submit 4 hardcopies and Digital Copy of the TIA and associated models and files to the WMPO for distribution to NCDOT and governing planning agency for review. The TIA preliminary review comments will be sent within 20 business days of TIA submittal. The 20-day review clock is re-set with each set of comments to the Applicant. The TIA is not considered as final and approved until the TIA Approval Letter is submitted by the WMPO. 1 2 3 4 5 Development Name: Sheetz (Wilmington) WMPO ID #: _____________________________ Updated 5/23/18 Page 2 of 5 TIA Scoping Checklist: 1. Engineering Firm of Record: Timmons Group 2. Contact information: a. Applicant Name: Jeff Hochanadel, PE, PTOE b. Email: jeff.hochanadel@timmons.com c. Address: 5410 Trinity Rd, Suite 102, Raleigh, NC 27607 d. Phone Number: 919-866-4511 3. Development Name: Sheetz (Shade Tree) 4. Tax Parcel ID #: R07100-003-024-000 5. Site Address(s): 4915 Carolina Beach Road Wilmington, NC 28412 6. Type of Development: List Land Use(s)/Intensity and ITE codes: ITE 945 Convenience Store/Gas Station VFP (16-24) – 6,139 SF 7. Development Concept: a. Provide a site plan or conceptual plan (include road circulation pattern and development access points to public rights of way). See attached b. Add scaled site plan on Arial imagery which includes adjacent properties and access points 8. If this development is intended to be built in multiple phases the TIA is required to accurately reflect the phasing. If the phasing is not included within the TIA, a revision and/or interim TIA’s will be required. a. What is the proposed build out year? 2025 b. If the project is phased, specify the build out year for each phase. Not phased Development Name: Sheetz (Wilmington) WMPO ID #: _____________________________ Updated 5/23/18 Page 3 of 5 9. Site Trip Generation: a. Provide a trip generation estimate using the ITE Trip Generation Manual (latest) by phase, if applicable. Trip Generation Summary ITE Land Use Code Independent Variable Daily Traffic AM Peak Hour PM Peak Hour In Out Total In Out Total 945 –Convenience Store / Gas Station – VFP (16-24) 6,139 SF 7,880 280 281 561 242 243 485 *Pass-By LUC 945 (62% AM / 56% PM): -- -174 -174 -348 -136 -136 -272 Total External Trips: 7,880 106 107 213 106 107 213 *Pass-By trips to be capped by 10% of the volume on the adjacent street once traffic counts are collected. b. Provide pass-by and internal capture reduction calculations, if applicable. See above c. Provide a trip generation on AM / PM and Saturday peak hour. NA 10. Check to see if any of the following apply: a. Proposed TIA is within the area of a known Transportation Improvement Project (TIP) Yes – W-5703C b. NCDOT STIP Map (http://ncdot.maps.arcgis.com/home/webmap/viewer.html?webmap=cb02f4f82897467 0ad01bb83be91b18c) c. Proposed TIA is within a surrounding municipality that has a planned or active transportation projects 11. Approved Adjacent Developments can be found at the following link: a. List all approved adjacent developments within the TIA study area: WMPO TIA WebApp (http://wilmingtonnc.maps.arcgis.com/apps/webappviewer/index.html?id=d3af4a0e091 941d8886344c4d1c609d5) • Unknown – Unable to access site b. Additional developments may be added to the approved scope once reviewed. 12. Roadway and/or Intersection improvements (planned and funded or required by others based on an approved TIA) within the general study area. List the proposed Intersections to be studied. Development Name: Sheetz (Wilmington) WMPO ID #: _____________________________ Updated 5/23/18 Page 4 of 5 Attached a map with a list that includes streets and intersections labeled as described below. Unknown 13. Streets and intersections should include State Road Designation (US or State Road Number US/SR #, followed by the local road name in parenthesis. E.g.: Carolina Beach Road should be denoted as US-421 (Carolina Beach Road) Shade Tree Lane should be denoted as SR-2361 (Shade Tree Lane) Horn Road should be denoted as SR-1262 (Horn Road) State Road designations can be found via the following link: NCDOT State Maintained Network Map (http://ncdot.maps.arcgis.com/home/webmap/viewer.html?webmap=5d3ad78971714a30be7ff 97fd580e4d5) a. US-421 (Carolina Beach Road) / SR-2361 (Shade Tree Lane) b. US-421 (Carolina Beach Road) / RIRO Site Access 1 c. US-421 (Carolina Beach Road) / U-Turn – SR-1262 (Horn Road) d. SR-2361 (Shade Tree Lane) / Site Access 2 14. Growth Factor: 2% (provide supporting methodology/reasoning) Per NCDOT AADT maps (count station 0650000031) 15. Hours of Study and Data Collection to be determined once the scoping documents is reviewed. 7:00 a.m. – 9:00 a.m. and 4:00 p.m. – 6:00 p.m. 16. Methods of Study as outlined in the NCDOT Congestion Management Capacity Analysis Guidelines. (https://connect.ncdot.gov/resources/safety/Pages/Congestion-Management.aspx) 17. Include Traffic Signal Warrant Analysis for locations with proposed signals. (13 hours counts must be provided.) Proposed Signal Locations: a. ________________________________________________ b. ________________________________________________ c. ________________________________________________ d. ________________________________________________ e. ________________________________________________ f. ________________________________________________ 18. Note: a. The TIA report shall be prepared following NCDOT Congestion Management guidelines and signed and sealed by a Professional Engineer. Any deviations must be approved prior to submitting the TIA. Failure to do so will result in an invalid submittal. NCDOT Congestion Management Capacity Analysis Guidelines. Development Name: Sheetz (Wilmington) WMPO ID #: _____________________________ Updated 5/23/18 Page 5 of 5 (https://connect.ncdot.gov/resources/safety/Pages/Congestion-Management.aspx) b. Any improvements shown as needed for the background no-build condition SHALL reflect programmed and funded State/Municipal projects or those required as mitigation for surrounding approved developments. Should improvements outside those listed above be included, the TIA is considered INVALID and will not be returned for resubmission. c. If any changes occur (including but not limited to; land use, intensity and/or site access/configuration) additional scoping and analysis may be required. d. Data collected or analysis performed prior to an official scoping letter is issued may be considered invalid. e. TIA approved scoping letter remain valid for three months from the date of issuance. FUEL CANOPY 0' S E T B A C K NO B U F F E R CASHIER SHEETZ CAR WASH 1,649 SQFT VA N DRIVE THRU FINISHGRADE 6" BELOW F.F. ELECTRICAL SERVICE AUTO ST O P 10"WIDE X 6" HIGH CONCRETECURB OFFSET FROM BUILDING NEW SHEETZ STORE 6139 SQ. FT. PR O P A N E 2" WATER SERVICE LINE UP FROM BELOW 2" GAS AND METER ELECTRICAL SERVICE 6" SAN 6'-0"H X 6"DIA. BOLLARD 1'-4" OFFSET FROM BUILDING STANDARD UST FIELD UNLOADING ZONE OR D E R CLEARANCE BAR EXIT ONLY B Y - P A S S L A N E PROPANE LOCKER STOREFRONT BUMPER POSTS AND CURBING (TYP.) BRICK UNIT PAVING ALUMINUM FENCE CLEARANCE BAR MENU BOARD 70 . 0 0 ' GREASE TRAP AIR PAD AIR PAD FUEL CANOPY VACUUM STATION PROPERTY LINE TABLE AND CHAIRS BY OTHERS CONCRETE/ASPHALT TRANSITION, (TYP.) PROPERTY LINE HANDICAP SIGN (TYP.) STOP SIGN STOP BAR MENU MONUMENT SIGN 35 ' F R O N T S E T B A C K ( S E C O N D A R Y ) 50' FRONT SETBACK 12.5' MIN. STREET YARD 20' RE A R S E T B A C K CAROLINA BEACH ROAD US HWY 421 PUBLIC R/W WIDTH VARIES SH A D E T R E E L A N E SR - 2 3 6 1 50 ' P U B L I C R / W EXISTING TRAFFIC SIGNAL BUIL D I N G S E T B A C K 25' AVG. STREET YARD 37.5' MAX. STREET YARD 12 . 5 ' M I N . S T R E E T Y A R D 25 ' A V G . S T R E E T Y A R D 37 . 5 ' M A X . S T R E E T Y A R D 50' FRONT SETBACK 12.5' MIN. STREET YARD 25' AVG. STREET YARD 37.5' MAX. STREET YARD FLAGPOLE UTILITY EASEMENT AND ACCESS EASEMENT ALONG ENTRANCE DRIVE MONUMENT SIGN UNDERGROUND STORAGE TANKS & VENT RISER DUMPSTER ENCLOSURE CURB AND GUTTER SITE PAVEMENT BOLLARD (TYP.) 20' LANDSCAPE BUFFER GRAVEL DRIVE 8' X 8' TRANSFORMER PAD APPROXIMATE LOCATION OF EXISTING STREAM POTENTIALLY CLASSIFIED AS JURISDICTIONAL PROPOSED SUBDIVISION LINE DRIVE THROUGH CURB AND PAD 10' X 70' SIGHT DISTANCE TRIANGLE (TYP.) R5. 0 0 ' R3. 5 0 'R5. 0 0 ' R25 . 0 0 ' R3. 5 0 ' R3. 5 0 ' R8. 0 0 ' R19 . 3 8 ' R3. 0 0 ' R19 . 5 5 ' R3. 0 0 ' R3.0 0 ' R15 . 0 0 ' R86 . 0 0 ' R50 . 0 0 ' R5. 0 0 ' R25 . 0 0 ' R5. 0 0 ' R5. 0 0 ' R25 . 0 0 ' R39 . 0 0 ' R25 . 0 0 ' R15 . 0 0 ' R25 . 0 0 ' R25 . 0 0 ' R15 . 0 0 ' R15 . 0 0 ' R39 . 0 0 ' R50 . 0 0 ' R29 . 0 0 ' R50 . 0 0 ' 14.00' 30 . 0 0 ' 65 . 0 0 ' 41.71' 21 . 2 1 ' 60.00' 32.00'35.00' 30 . 0 0 ' 14.00' 14 . 0 0 ' 12 . 5 0 ' 12 . 3 3 ' 28 . 6 1 ' 14.00' 10.00' 20 . 0 0 ' 5. 0 0 ' 10 . 0 0 ' 20.00' 10 . 0 0 ' 20.00' 10 . 0 0 ' 20.00' 28 . 0 0 ' 82.00' 36.00' 15.00' 28.86' R3. 0 0 ' R8. 0 0 ' R3. 0 0 ' 14.00' R25 . 0 0 ' FOR REVIEW ONLY NOT FOR CONSTRUCTION SHEETZ - SHADE TREE LANE WILMINGTON, NC 06655-0022 DESCRIPTIONS DATE REVISIONS SCALE HORIZONTAL: VERTICAL: DRAWING NUMBER STATUS: DRAWN PROJ. MGR. DESIGNED CHECKED DATE: MCE PROJ. # REV.NO. REVISION www.mckimcreed.com NC License# F-1222 Phone: (910) 343-1048, Fax: (910) 251-8282 Wilmington, North Carolina 28401 243 N. Front Street 10-27-2023 C3.0 N/A 1"=30' RMC RMC RMC 0 SITE PLAN SITE DATA1 0 SCALE: 1"=30' (Horiz.) 60'30'30' GENERAL INFORMATION DATA CLASS VALUE PARCEL ADDRESS 4915 CAROLINA BEACH RD, WILMINGTON NC, 28412 TAX PARCEL IDENTIFICATION NUMBER R07100-003-024-000 OWNER POINT CLAN 1, LLC CURRENT ZONING B2 - BUSINESS EXISTING USE LANDSCAPING SALES PROPOSED USE CONVENIENCE STORE WITH GAS SALES TOTAL PROJECT AREA 3.27 ACRES (±142,606 SF) R07100-003-024-000 3.27 ACRES (±142,606 SF) DISTURBED ACREAGE 2.75 AC (119,829 SF) ON-SITE 2.64 AC (114,939 SF) OFF-SITE 0.11 AC (4,890 SF) SPECIAL FLOOD HAZARD AREAS NONE CAMA LAND USE CLASSIFICATION URBAN AREAS OF ENVIRONMENTAL CONCERN JURISDICTIONAL STREAM ON SITE FUTURE LAND USE MAP COMMUNITY MIXED USE BUILDING INFORMATION DATA CLASS VALUE TOTAL BUILDING FOOTPRINT AREA 7,778 SF GFA TOTAL BUILDING GROSS FLOOR AREA 7,778 SF GFA TOTAL BUILDINGS 2 NC BUILDING CODE CONSTRUCTION TYPE V-B NON-SPRINKLERED CONSTRUCTION BUILDING LOT COVERAGE 5% DATA CLASS REQUIRED PROPOSED SETBACK REQUIREMENTS FRONT (CAROLINA BEACH ROAD)50'195' SIDE (COMMERCIAL)0'95' REAR (RESIDENTIAL)20'32' SIDE (SHADE TREE LANE)35'165' SITE INFORMATION DATA CLASS EXISTING (TO REMAIN)PROPOSED TOTAL IMPERVIOUS SURFACE AREA 0 SF 70,170 SF ROOF TOPS 0 SF 7,788 SF HEAVY DUTY PAVEMENT 0 SF 47,798 SF SIDEWALKS / PLAZA 0 SF 14,584 SF IMPERVIOUS AREA COVERAGE -70.1% DATA CLASS REQUIRED PROPOSED TOTAL PARKING SPACES 27 43 RESTAURANT PARKING - 6 SPACES / 1000 SQUARE - 1,988 SF INTERIOR AREA - 375 SF EXTERIOR SEATING AREA - 2,363 SF TOTAL AREA - 2,363 SF / 1000 = 2.36 - 2.3 X 6 = 14.16 14 SEE TOTAL RETAIL PARKING - 2.5 SPACES / 1000 SQUARE - 4,151 SF INTERIOR AREA - 4,151 SF / 1000 = 4.15 - 2.5 X 4.15 = 10.37 10 SEE TOTAL RETAIL PARKING - 3 SPACES PER 1 CAR SERVICEABLE AT A TIME - 1 CAR SERVICEABLE AT A TIME - 3*1=3 3 SEE TOTAL SITE PLAN2 LEGEND ASPHALT CONCRETE/SIDEWALK I:\ 0 6 6 5 5 \ 0 0 2 2 \ E N G \ 8 0 - D r a w i n g s \ 8 1 _ P r o d u c t i o n _ S h e e t s \ 1 _ P r e l i m i n a r y _ D w g s \ C S 1 0 0 - 0 6 6 5 5 0 0 2 2 . d w g , 1 1 / 6 / 2 0 2 3 1 2 : 3 3 : 5 6 P M , D W G T o P D F . p c 3 Future No Build Synchro Review TIA Name and date: Sheetz Shade Tree Reviewer: KK Date Reviewed: 1/11/2024 Check parameters of study against the approved TIA Scope and Congestion Management guidelines. Use Blue ink for items that check off and Red ink for items that potentially need correction/revision or determine the TIA to be invalid and a resubmittal necessary. Intersections Intersection: US 421 and Silver Lake Road/Shade Tree Lane Settings • Are all entered volumes a minimum of 4 vph? (There should be no values of 0, 1, 2, or 3 for the most accurate calculations) o Yes • Is the model showing the correct lane configuration at each approach? o Yes • If entered, is the grade correct for each approach? o Yes • Are the correct number of storage lanes entered and are they the correct lengths? o SBR storage should be 125 feet. SBL storage should be 200 feet. o All tapers should be minimum of 100 feet • Is the right turn set to channelized where necessary? o EBR should be channelized and should be under yield control. • Is Right Turn on Red (RTOR) used? Eliminate all RTOR phasing (existing and future). Congestion Management guidelines state “do not analyze right turn on red at any proposed intersection approaches to ensure that adequate storage is provided.” o No Timing Settings • Are the turn types correct and associated with the correct phases? Eliminate all PT+PM left-turn phasing in future conditions. Congestion Management guidelines state that analysis of Protected-only phasing in future conditions will identify required storage in the event that Protected-only phasing is necessary. Existing Permissive left-turn phasing should remain Permissive in future conditions, except where Protected-only phasing is being analyzed as an improvement to the intersection in Future + Improvement condition. o Use protected only for NBL, NBU, SBL and SBU • Is the lost time greater than or equal to 5 seconds? o Yes • Check for Recall Mode on Signalized Intersection. If simulating ‘free run’ operation (actuated-uncoordinated), use Min Recall on main street phase. If simulating ‘Coordinated Mode’ (Actuated-Coordinate), use C-Max.” o Yes Phasing Settings • Is the control type correct? o Yes • Is the cycle length correct? o Yes • Is the offset correct? o Yes • Check “Referenced to” and “Reference Phase.” o Yes • Check the times for minimum initial, maximum split, yellow time, all-red time, vehicle extension, minimum gap, time before reduce, time to reduce, walk time, and flash don’t walk. Yellow times should either match the signal plans or be entered as a default of Y=5 s. All-Red times should either match the signal plans or be entered as a default of R=2 s. o Yes • Are the correct phases marked as pedestrian phases? o N/A Detector Settings • Do the size and distance from the stop bar match the included signal plans? o Yes • Are the leading and trailing detectors correct? o Yes • Is the detector type correct? o Yes • Are the detector channels, extend, and queue correct? o Yes • Are the detector delays correct? o Yes Roads 1. Road: US 421 • Is the speed limit correct? o Yes • If this road is a Y line, is it at least 1000 feet? o Yes 2. Road: Silver Lake Drive • Is the speed limit correct? o Yes • If this road is a Y line, is it at least 1000 feet? o Yes 3. Road: Shade Tree Lane • Is the speed limit correct? o Yes • If this road is a Y line, is it at least 1000 feet? o No Intersection: US 421 and Horn Road Lane Settings • Are all entered volumes a minimum of 4 vph? (There should be no values of 0, 1, 2, or 3 for the most accurate calculations) o Yes • Is the model showing the correct lane configuration at each approach? o Yes • If entered, is the grade correct for each approach? o Not entered • Are the correct number of storage lanes entered and are they the correct lengths? o SBL storage is 350 feet. o SBR storage is 150 feet. o NBL storage is 350 feet. • Is the right turn set to channelized where necessary? o N/A • Is Right Turn on Red (RTOR) used? Eliminate all RTOR phasing (existing and future). Congestion Management guidelines state “do not analyze right turn on red at any proposed intersection approaches to ensure that adequate storage is provided.” o No Roads 4. Road: US 421 • Is the speed limit correct? o Yes • If this road is a Y line, is it at least 1000 feet? o Yes 5. Road: Horn Road • Is the speed limit correct? o Update speed limit is 35 mph. • If this road is a Y line, is it at least 1000 feet? o Yes Appendix B – Traffic Counts File Name : Wilmington(US 421 and Horn) Site Code : Start Date : 11/16/2023 Page No : 1 Groups Printed- Cars + - Trucks US 421 Southbound Commercial Driveway Westbound US 421 Northbound Horn Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total 07:00 AM 2 164 0 5 0 171 0 0 0 0 0 0 0 326 4 1 0 331 11 0 0 0 0 11 513 07:15 AM 4 303 0 2 0 309 0 0 0 0 0 0 0 427 3 0 0 430 14 0 0 0 0 14 753 07:30 AM 6 300 0 6 0 312 0 0 0 0 0 0 0 442 3 0 0 445 8 0 0 0 0 8 765 07:45 AM 5 346 0 9 0 360 0 0 0 0 0 0 0 440 6 0 0 446 15 0 0 0 0 15 821 Total 17 1113 0 22 0 1152 0 0 0 0 0 0 0 1635 16 1 0 1652 48 0 0 0 0 48 2852 08:00 AM 6 338 0 2 0 346 0 0 0 0 0 0 0 418 7 0 0 425 11 0 0 0 0 11 782 08:15 AM 3 211 0 5 0 219 0 0 0 0 0 0 0 383 15 0 0 398 11 0 0 0 0 11 628 08:30 AM 4 251 1 6 0 262 0 0 0 0 0 0 0 368 10 2 0 380 7 0 0 0 0 7 649 08:45 AM 7 269 0 7 0 283 0 0 0 0 0 0 0 312 10 0 0 322 6 0 0 0 0 6 611 Total 20 1069 1 20 0 1110 0 0 0 0 0 0 0 1481 42 2 0 1525 35 0 0 0 0 35 2670 Grand Total 37 2182 1 42 0 2262 0 0 0 0 0 0 0 3116 58 3 0 3177 83 0 0 0 0 83 5522 Apprch %1.6 96.5 0 1.9 0 0 0 0 0 0 0 98.1 1.8 0.1 0 100 0 0 0 0 Total %0.7 39.5 0 0.8 0 41 0 0 0 0 0 0 0 56.4 1.1 0.1 0 57.5 1.5 0 0 0 0 1.5 Cars +37 2126 1 42 0 2206 0 0 0 0 0 0 0 3056 56 3 0 3115 81 0 0 0 0 81 5402 % Cars +100 97.4 100 100 0 97.5 0 0 0 0 0 0 0 98.1 96.6 100 0 98 97.6 0 0 0 0 97.6 97.8 Trucks 0 56 0 0 0 56 0 0 0 0 0 0 0 60 2 0 0 62 2 0 0 0 0 2 120 % Trucks 0 2.6 0 0 0 2.5 0 0 0 0 0 0 0 1.9 3.4 0 0 2 2.4 0 0 0 0 2.4 2.2 File Name : Wilmington(US 421 and Horn) Site Code : Start Date : 11/16/2023 Page No : 2 US 421 Southbound Commercial Driveway Westbound US 421 Northbound Horn Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 4 303 0 2 0 309 0 0 0 0 0 0 0 427 3 0 0 430 14 0 0 0 0 14 753 07:30 AM 6 300 0 6 0 312 0 0 0 0 0 0 0 442 3 0 0 445 8 0 0 0 0 8 765 07:45 AM 5 346 0 9 0 360 0 0 0 0 0 0 0 440 6 0 0 446 15 0 0 0 0 15 821 08:00 AM 6 338 0 2 0 346 0 0 0 0 0 0 0 418 7 0 0 425 11 0 0 0 0 11 782 Total Volume 21 1287 0 19 0 1327 0 0 0 0 0 0 0 1727 19 0 0 1746 48 0 0 0 0 48 3121 % App. Total 1.6 97 0 1.4 0 0 0 0 0 0 0 98.9 1.1 0 0 100 0 0 0 0 PHF .875 .930 .000 .528 .000 .922 .000 .000 .000 .000 .000 .000 .000 .977 .679 .000 .000 .979 .800 .000 .000 .000 .000 .800 .950 US 421 H o r n R o a d C o m m e r c i a l D r i v e w a y US 421 Right 21 Thru 1287 Left 0 UTrn 19 Peds 0 InOut Total 1727 1327 3054 Out 19 In 0 Total 19 Ri g h t 0 Th r u 0 Le f t 0 UT r n 0 Pe d s 0 Ou t To t a l In 0 0 0 Ou t 0 In 0 To t a l 0 UTrn 0 Left 19 Thru 1727 Right 0 Peds 0 Out TotalIn 1335 1746 3081 Out 0 In 0 Total 0 UT r n 0 Le f t 0 Th r u 0 Ri g h t 48 Pe d s 0 To t a l Ou t In 40 48 88 Ou t 0 In 0 To t a l 0 Peak Hour Begins at 07:15 AM Cars + Trucks Peak Hour Data North File Name : Wilmington(US 421 and Horn) Site Code : Start Date : 11/16/2023 Page No : 1 Groups Printed- Cars + - Trucks US 421 Southbound Commercial Driveway Westbound US 421 Northbound Horn Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total 04:00 PM 13 414 0 7 0 434 0 0 0 0 0 0 1 311 10 4 0 326 9 0 0 0 0 9 769 04:15 PM 17 486 0 3 0 506 0 0 0 0 0 0 0 365 10 2 0 377 13 0 0 0 0 13 896 04:30 PM 17 415 0 4 0 436 0 0 0 0 0 0 1 334 14 2 0 351 10 0 0 0 0 10 797 04:45 PM 15 458 0 6 0 479 0 0 1 0 0 1 3 351 14 3 0 371 15 0 0 0 0 15 866 Total 62 1773 0 20 0 1855 0 0 1 0 0 1 5 1361 48 11 0 1425 47 0 0 0 0 47 3328 05:00 PM 20 443 1 6 0 470 0 0 0 0 1 1 0 374 13 2 0 389 9 0 0 0 0 9 869 05:15 PM 15 483 1 7 0 506 0 0 0 0 0 0 0 347 22 2 0 371 9 0 0 0 0 9 886 05:30 PM 11 468 0 4 0 483 0 0 0 0 0 0 0 372 16 1 0 389 14 0 0 0 0 14 886 05:45 PM 15 424 0 5 0 444 0 0 0 0 0 0 3 361 16 4 0 384 13 0 0 0 0 13 841 Total 61 1818 2 22 0 1903 0 0 0 0 1 1 3 1454 67 9 0 1533 45 0 0 0 0 45 3482 Grand Total 123 3591 2 42 0 3758 0 0 1 0 1 2 8 2815 115 20 0 2958 92 0 0 0 0 92 6810 Apprch %3.3 95.6 0.1 1.1 0 0 0 50 0 50 0.3 95.2 3.9 0.7 0 100 0 0 0 0 Total %1.8 52.7 0 0.6 0 55.2 0 0 0 0 0 0 0.1 41.3 1.7 0.3 0 43.4 1.4 0 0 0 0 1.4 Cars +122 3561 2 42 0 3727 0 0 1 0 1 2 8 2751 114 20 0 2893 92 0 0 0 0 92 6714 % Cars +99.2 99.2 100 100 0 99.2 0 0 100 0 100 100 100 97.7 99.1 100 0 97.8 100 0 0 0 0 100 98.6 Trucks 1 30 0 0 0 31 0 0 0 0 0 0 0 64 1 0 0 65 0 0 0 0 0 0 96 % Trucks 0.8 0.8 0 0 0 0.8 0 0 0 0 0 0 0 2.3 0.9 0 0 2.2 0 0 0 0 0 0 1.4 File Name : Wilmington(US 421 and Horn) Site Code : Start Date : 11/16/2023 Page No : 2 US 421 Southbound Commercial Driveway Westbound US 421 Northbound Horn Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 15 458 0 6 0 479 0 0 1 0 0 1 3 351 14 3 0 371 15 0 0 0 0 15 866 05:00 PM 20 443 1 6 0 470 0 0 0 0 1 1 0 374 13 2 0 389 9 0 0 0 0 9 869 05:15 PM 15 483 1 7 0 506 0 0 0 0 0 0 0 347 22 2 0 371 9 0 0 0 0 9 886 05:30 PM 11 468 0 4 0 483 0 0 0 0 0 0 0 372 16 1 0 389 14 0 0 0 0 14 886 Total Volume 61 1852 2 23 0 1938 0 0 1 0 1 2 3 1444 65 8 0 1520 47 0 0 0 0 47 3507 % App. Total 3.1 95.6 0.1 1.2 0 0 0 50 0 50 0.2 95 4.3 0.5 0 100 0 0 0 0 PHF .763 .959 .500 .821 .000 .958 .000 .000 .250 .000 .250 .500 .250 .965 .739 .667 .000 .977 .783 .000 .000 .000 .000 .783 .990 US 421 H o r n R o a d C o m m e r c i a l D r i v e w a y US 421 Right 61 Thru 1852 Left 2 UTrn 23 Peds 0 InOut Total 1444 1938 3382 Out 23 In 0 Total 23 Ri g h t 0 Th r u 0 Le f t 1 UT r n 0 Pe d s 1 Ou t To t a l In 5 2 7 Ou t 0 In 0 To t a l 0 UTrn 8 Left 65 Thru 1444 Right 3 Peds 0 Out TotalIn 1900 1520 3420 Out 8 In 0 Total 8 UT r n 0 Le f t 0 Th r u 0 Ri g h t 47 Pe d s 0 To t a l Ou t In 12 6 47 17 3 Ou t 0 In 0 To t a l 0 Peak Hour Begins at 04:45 PM Cars + Trucks Peak Hour Data North File Name : Wilmington(US 421 and SIlver Lake) Site Code : Start Date : 11/16/2023 Page No : 1 Groups Printed- Cars + - Trucks US-421 Southbound Shade Tree Lane Westbound US-421 Northbound Silver Lake Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total 07:00 AM 11 160 5 2 0 178 23 3 10 0 0 36 6 289 31 2 1 329 24 0 16 0 0 40 583 07:15 AM 23 281 5 6 0 315 20 12 4 0 0 36 6 356 35 1 0 398 42 2 39 0 0 83 832 07:30 AM 18 268 9 5 0 300 37 5 14 0 0 56 6 349 21 4 0 380 42 0 53 0 0 95 831 07:45 AM 5 366 4 4 0 379 24 1 19 0 0 44 7 402 19 7 0 435 35 0 15 0 0 50 908 Total 57 1075 23 17 0 1172 104 21 47 0 0 172 25 1396 106 14 1 1542 143 2 123 0 0 268 3154 08:00 AM 10 345 5 3 1 364 19 2 14 0 0 35 16 392 16 1 0 425 23 2 12 0 0 37 861 08:15 AM 11 215 6 7 0 239 22 1 6 0 0 29 10 357 21 5 0 393 27 1 17 0 0 45 706 08:30 AM 8 241 6 4 0 259 17 0 3 0 1 21 4 337 11 3 0 355 28 0 18 0 0 46 681 08:45 AM 11 258 4 5 0 278 12 0 7 0 0 19 2 288 14 5 0 309 19 0 18 0 0 37 643 Total 40 1059 21 19 1 1140 70 3 30 0 1 104 32 1374 62 14 0 1482 97 3 65 0 0 165 2891 Grand Total 97 2134 44 36 1 2312 174 24 77 0 1 276 57 2770 168 28 1 3024 240 5 188 0 0 433 6045 Apprch %4.2 92.3 1.9 1.6 0 63 8.7 27.9 0 0.4 1.9 91.6 5.6 0.9 0 55.4 1.2 43.4 0 0 Total %1.6 35.3 0.7 0.6 0 38.2 2.9 0.4 1.3 0 0 4.6 0.9 45.8 2.8 0.5 0 50 4 0.1 3.1 0 0 7.2 Cars +95 2081 43 36 0 2255 170 24 77 0 1 272 54 2716 163 28 1 2962 233 5 185 0 0 423 5912 % Cars +97.9 97.5 97.7 100 0 97.5 97.7 100 100 0 100 98.6 94.7 98.1 97 100 100 97.9 97.1 100 98.4 0 0 97.7 97.8 Trucks 2 53 1 0 1 57 4 0 0 0 0 4 3 54 5 0 0 62 7 0 3 0 0 10 133 % Trucks 2.1 2.5 2.3 0 100 2.5 2.3 0 0 0 0 1.4 5.3 1.9 3 0 0 2.1 2.9 0 1.6 0 0 2.3 2.2 File Name : Wilmington(US 421 and SIlver Lake) Site Code : Start Date : 11/16/2023 Page No : 2 US-421 Southbound Shade Tree Lane Westbound US-421 Northbound Silver Lake Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:15 AM 07:15 AM 23 281 5 6 0 315 20 12 4 0 0 36 6 356 35 1 0 398 42 2 39 0 0 83 832 07:30 AM 18 268 9 5 0 300 37 5 14 0 0 56 6 349 21 4 0 380 42 0 53 0 0 95 831 07:45 AM 5 366 4 4 0 379 24 1 19 0 0 44 7 402 19 7 0 435 35 0 15 0 0 50 908 08:00 AM 10 345 5 3 1 364 19 2 14 0 0 35 16 392 16 1 0 425 23 2 12 0 0 37 861 Total Volume 56 1260 23 18 1 1358 100 20 51 0 0 171 35 1499 91 13 0 1638 142 4 119 0 0 265 3432 % App. Total 4.1 92.8 1.7 1.3 0.1 58.5 11.7 29.8 0 0 2.1 91.5 5.6 0.8 0 53.6 1.5 44.9 0 0 PHF .609 .861 .639 .750 .250 .896 .676 .417 .671 .000 .000 .763 .547 .932 .650 .464 .000 .941 .845 .500 .561 .000 .000 .697 .945 US-421 S i l v e r L a k e R o a d S h a d e T r e e L a n e US-421 Right 56 Thru 1260 Left 23 UTrn 18 Peds 1 InOut Total 1718 1358 3076 Out 18 In 0 Total 18 Ri g h t 10 0 Th r u 20 Le f t 51 UT r n 0 Pe d s 0 Ou t To t a l In 62 17 1 23 3 Ou t 0 In 0 To t a l 0 UTrn 13 Left 91 Thru 1499 Right 35 Peds 0 Out TotalIn 1453 1638 3091 Out13 In 0 Total13 UT r n 0 Le f t 11 9 Th r u 4 Ri g h t 14 2 Pe d s 0 To t a l Ou t In 16 7 26 5 43 2 Ou t 0 In 0 To t a l 0 Peak Hour Begins at 07:15 AM Cars + Trucks Peak Hour Data North File Name : Wilmington(US 421 and SIlver Lake) Site Code : Start Date : 11/16/2023 Page No : 1 Groups Printed- Cars + - Trucks US-421 Southbound Shade Tree Lane Westbound US-421 Northbound Silver Lake Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total 04:00 PM 14 400 14 3 0 431 6 2 2 0 0 10 21 300 30 7 0 358 39 5 22 0 0 66 865 04:15 PM 30 464 13 1 0 508 10 4 0 0 0 14 18 352 26 3 0 399 22 1 6 0 0 29 950 04:30 PM 17 383 13 9 0 422 3 3 7 0 0 13 12 332 24 7 0 375 34 1 24 0 0 59 869 04:45 PM 21 453 7 7 0 488 6 1 15 0 0 22 18 333 35 2 0 388 32 2 12 0 0 46 944 Total 82 1700 47 20 0 1849 25 10 24 0 0 59 69 1317 115 19 0 1520 127 9 64 0 0 200 3628 05:00 PM 19 448 10 4 0 481 11 5 7 0 0 23 21 358 30 5 0 414 27 2 17 0 0 46 964 05:15 PM 28 453 19 7 0 507 12 1 10 0 0 23 19 339 24 7 0 389 36 1 19 0 0 56 975 05:30 PM 22 442 21 8 0 493 8 3 10 0 0 21 12 340 20 5 0 377 42 1 30 0 0 73 964 05:45 PM 24 394 12 7 0 437 14 2 13 0 0 29 17 323 35 8 0 383 29 4 23 0 0 56 905 Total 93 1737 62 26 0 1918 45 11 40 0 0 96 69 1360 109 25 0 1563 134 8 89 0 0 231 3808 Grand Total 175 3437 109 46 0 3767 70 21 64 0 0 155 138 2677 224 44 0 3083 261 17 153 0 0 431 7436 Apprch %4.6 91.2 2.9 1.2 0 45.2 13.5 41.3 0 0 4.5 86.8 7.3 1.4 0 60.6 3.9 35.5 0 0 Total %2.4 46.2 1.5 0.6 0 50.7 0.9 0.3 0.9 0 0 2.1 1.9 36 3 0.6 0 41.5 3.5 0.2 2.1 0 0 5.8 Cars +173 3412 107 46 0 3738 67 21 64 0 0 152 137 2617 224 44 0 3022 259 17 149 0 0 425 7337 % Cars +98.9 99.3 98.2 100 0 99.2 95.7 100 100 0 0 98.1 99.3 97.8 100 100 0 98 99.2 100 97.4 0 0 98.6 98.7 Trucks 2 25 2 0 0 29 3 0 0 0 0 3 1 60 0 0 0 61 2 0 4 0 0 6 99 % Trucks 1.1 0.7 1.8 0 0 0.8 4.3 0 0 0 0 1.9 0.7 2.2 0 0 0 2 0.8 0 2.6 0 0 1.4 1.3 File Name : Wilmington(US 421 and SIlver Lake) Site Code : Start Date : 11/16/2023 Page No : 2 US-421 Southbound Shade Tree Lane Westbound US-421 Northbound Silver Lake Road Eastbound Start Time Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Right Thru Left UTrn Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:45 PM 04:45 PM 21 453 7 7 0 488 6 1 15 0 0 22 18 333 35 2 0 388 32 2 12 0 0 46 944 05:00 PM 19 448 10 4 0 481 11 5 7 0 0 23 21 358 30 5 0 414 27 2 17 0 0 46 964 05:15 PM 28 453 19 7 0 507 12 1 10 0 0 23 19 339 24 7 0 389 36 1 19 0 0 56 975 05:30 PM 22 442 21 8 0 493 8 3 10 0 0 21 12 340 20 5 0 377 42 1 30 0 0 73 964 Total Volume 90 1796 57 26 0 1969 37 10 42 0 0 89 70 1370 109 19 0 1568 137 6 78 0 0 221 3847 % App. Total 4.6 91.2 2.9 1.3 0 41.6 11.2 47.2 0 0 4.5 87.4 7 1.2 0 62 2.7 35.3 0 0 PHF .804 .991 .679 .813 .000 .971 .771 .500 .700 .000 .000 .967 .833 .957 .779 .679 .000 .947 .815 .750 .650 .000 .000 .757 .986 US-421 S i l v e r L a k e R o a d S h a d e T r e e L a n e US-421 Right 90 Thru 1796 Left 57 UTrn 26 Peds 0 InOut Total 1485 1969 3454 Out 26 In 0 Total 26 Ri g h t 37 Th r u 10 Le f t 42 UT r n 0 Pe d s 0 Ou t To t a l In 13 3 89 22 2 Ou t 0 In 0 To t a l 0 UTrn 19 Left 109 Thru 1370 Right 70 Peds 0 Out TotalIn 1975 1568 3543 Out19 In 0 Total19 UT r n 0 Le f t 78 Th r u 6 Ri g h t 13 7 Pe d s 0 To t a l Ou t In 20 9 22 1 43 0 Ou t 0 In 0 To t a l 0 Peak Hour Begins at 04:45 PM Cars + Trucks Peak Hour Data North Appendix C – Traffic Signal Timings / Plans existing existing existing existing existing existing existing existing ex ex ex ex ex e x e x e x 45 Mph 0% Grade US 421 (Carolina Beach Road) 45 Mph -1% Grade 3 5 Mp h 0 % Gr a d e S R 2 3 8 1 ( S h a d e T r e e L a n e ) S R 1 1 9 7 ( S i l v e r L a k e R o a d ) US 421 (Carolina Beach Road) 3 5 Mp h + 1 % Gr a d e Case S35H3 Metal Pole #5 Case S35H3 Metal Pole #6 Case S35H3 Metal Pole #7 Case S35H3 Metal Pole #8 21 22 41 42 51 11 62 8182 PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND FEATURE PHASE 1 2 4 5 6 8 MIN RECALL MIN RECALL YELLOW YELLOW ON ON ---- ------ ---- -- ---- ---- --ON --ON ---- ---- ON ON ON ON Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't W alk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap ---- ---- OASIS 2070 TIMING CHART is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D NE W L O O P FU L L T I M E D E L A Y EX T E N S I O N CA L L I N G SY S T E M L O O P ---- - - - - - - - - - -- - - - - - - - - --- - - - -- - - - - -- - - - - - OASIS 2070 LOOP & DETECTOR INSTALLATION CHART Metal Strain Pole existing existing N/ADirectional Drill "YIELD" Sign (R1-2)A A TABLE OF OPERATION FACE SIGNAL PHASE FLASH0 1 + 6 0 1 + 5 02+5 02+6 04+8 R Y FY 12" R Y G 12" F Y F Y F Y F Y R R Y Y R R R YGG R R R RRG R R R R RG R R R YGG 02+6 02+5 01+6 01+5 04+8 SIGNAL FACE I.D. NOTES SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATE PLAN DATE: 0 Division 3 New Hanover County Wilmington SR 2381 (Shade Tree Lane) SR 1197 (Silver Lake Road) / at US 421 (Carolina Beach Road) July 2015 PLA Jeff Spence 1"=30' 30 03-0832 j r s p e n c e S : \ I T S & S U \ I T S S i g n a l s \ S i g n a l D e s i g n S e c t i o n \ E a s t e r n R e g i o n \ D i v - 0 3 \ P O R \ 0 3 - 0 8 3 2 \ 0 3 0 8 3 2 _ s i g _ p o r _ 2 0 2 0 m m d d . d g n 0 9 - J U L - 2 0 2 0 0 7 : 3 8 All Heads L.E.D. Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way 1A 2A 2B 4A 5A 6A 6B 8A 6X40 6X40 6X40 6X40 6X6 6X6 6X6 6X6 0 300 300 300 300 0 0 0 2-4-2 2-4-2 2-4-2 2-4-2 5 5 5 5 1 2 2 4 5 6 6 8 Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y 3 3 3 3 11 21,22 41,42 51 61,62 12 12 2.0 6.0 2.0 2.0 6.0 2.0 15 90 25 25 90 25 3.0 4.6 3.8 2.4 3.0 4.6 3.8 34 15 30 3.0 1.8 34 15 30 3.0 51 11 PHASING DIAGRAM N 6 2 10 10 Wilmington Signal System Fully Actuated 5 Phase Controller Asset # 0832. 7. Signal system data: Sig. 1.0 81,82 81,82 61,62 41,42 21,22 ---6X40 0 2-4-2 8 Y Y8B 15 - 2.5 ex ex 61 PREPARED BY:DATE: DATE:REVIEWED BY: COMMENTS Plan of Record its original state. by field personnel. This plan may have been modified from This plan of record reflects existing field conditions as submitted DATE: SIGNATURE: document. considered a certified This document shall not be on 4/18/2018 Zachary M. Little , 030530 issued and sealed by This document originally Not a certified document. - - - - - - - - - Plan of Record POR Jeff Spence supersede these values. signal system timing values operation only. Coordinated chart are for free-run 5. Maximum times shown in timing presence mode. 4. Set all detector units to lagged. 3. Phase 1 and/or phase 5 may be the Engineer. unless otherwise directed by night flashing operation 2. Do not program signal for late Structures" dated January 2018. Specifications for Roads and 2018 and "Standard Drawings NCDOT" dated January 1. Refer to "Roadway Standard 5 5 5 5 2.6 1.5 1.6 1.63.1 July 2020 July 2020KGP,Jr. DATE 1 1 Updated clearance times. - jrs Relocated phase 1,5 Stopbars; decreased Sec./ Act. times for phase 2. REVISION SEAL1 NO RTH CARO LI N A ENGINEER P ROFESSIO NAL 024885 SEAL .RJ NIDEEP .G H T ENN E K A 2A 2B 5A 4A 1A 6B 6A T N T T I N D E P A R T ME N OF TRA SPORT A IO N STA E OF NORTH C AROL A noisi v i D ytefaS dna ytiliboM noitatrop sn a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared in the Offices of: 8A 8B 7/9/2020 7/9/2020 7/9/2020 832 - Beach Rd @ Silver Lake / Shade Tree B - Scheduling Events 1-100 12/12/2023 5:33 PMStartStopStart Stop DOW Del Event Pri Date Date Time Time Enabled When Event Groups Assigned #Event Type Event Details LMH MM DD MM DD HH MM HH MM 1 2 3 4 5 6 7 Done Cont 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 Coordination Plan Free L 1 1 12 31 0 0 24 0 1 2 3 4 5 6 7 N N 2 None 0 0 0 0 0 0 0 0 N N 3 None 0 0 0 0 0 0 0 0 N N 4 None 0 0 0 0 0 0 0 0 N N 5 None 0 0 0 0 0 0 0 0 N N 6 None 0 0 0 0 0 0 0 0 N N 7 None 0 0 0 0 0 0 0 0 N N 8 None 0 0 0 0 0 0 0 0 N N 9 None 0 0 0 0 0 0 0 0 N N 10 None 0 0 0 0 0 0 0 0 N N 11 None 0 0 0 0 0 0 0 0 N N 12 None 0 0 0 0 0 0 0 0 N N 13 Change Phase Timing Page (1-4)2 1 1 12 31 8 0 18 0 1 N N 14 None 0 0 0 0 0 0 0 0 N N 15 Coordination Plan 32-3 L 1 1 12 31 12 0 16 0 1 N N 16 None 0 0 0 0 0 0 0 0 N N 17 None 0 0 0 0 0 0 0 0 N N 18 None 0 0 0 0 0 0 0 0 N N 19 None 0 0 0 0 0 0 0 0 N N 20 None 0 0 0 0 0 0 0 0 N N 21 None 0 0 0 0 0 0 0 0 N N 22 None 0 0 0 0 0 0 0 0 N N 23 None 0 0 0 0 0 0 0 0 N N 24 None 0 0 0 0 0 0 0 0 N N 25 None 0 0 0 0 0 0 0 0 N N 26 None 0 0 0 0 0 0 0 0 N N 27 None 0 0 0 0 0 0 0 0 N N 28 None 0 0 0 0 0 0 0 0 N N 29 None 0 0 0 0 0 0 0 0 N N 30 None 0 0 0 0 0 0 0 0 N N 31 Coordination Plan 3-3 L 1 1 12 31 6 25 7 0 2 3 4 5 6 N N 32 None 0 0 0 0 0 0 0 0 N N 33 Coordination Plan 4-1 L 1 1 12 31 7 0 8 58 2 3 4 5 6 N N 34 Coordination Plan 44-1 L 1 1 12 31 7 25 8 58 N N 35 None 0 0 0 0 0 0 0 0 N N 36 Coordination Plan 6-3 L 1 1 12 31 8 58 10 15 2 3 4 5 6 N N 37 None 0 0 0 0 0 0 0 0 N N 38 None 0 0 0 0 0 0 0 0 N N 39 None 0 0 0 0 0 0 0 0 N N 40 None 0 0 0 0 0 0 0 0 N N 41 Coordination Plan 8-3 L 1 1 12 31 10 15 16 15 2 3 4 5 6 N N 42 None 0 0 0 0 0 0 0 0 N N 43 None 0 0 0 0 0 0 0 0 N N 44 None 0 0 0 0 0 0 0 0 N N 45 None 0 0 0 0 0 0 0 0 N N 46 None 0 0 0 0 0 0 0 0 N N 47 Coordination Plan 12-3 L 1 1 12 31 15 0 16 30 N N 48 None 0 0 0 0 0 0 0 0 N N 49 Coordination Plan 13-2 L 1 1 12 31 16 15 18 15 2 3 4 5 6 N N 50 None 0 0 0 0 0 0 0 0 N N 832 - Beach Rd @ Silver Lake / Shade Tree 9 - Coordination Plan 4 12/12/2023 5:33 PM Coordination Plan # 4 Cycle length (0-999 sec)156 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)18 0 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 16 102 0 38 22 96 0 38 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 6 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)0 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)2 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data 832 - Beach Rd @ Silver Lake / Shade Tree 9 - Coordination Plan 13 12/12/2023 5:33 PM Coordination Plan # 13 Cycle length (0-999 sec)156 Min Transition Cycle (0-999 sec)0 Max Transition Cycle (0-999 sec)180 Offset # or Ring: 1 2 3 4 Offsets (0-999 sec)0 62 0 0 Act Coord Phase Min Green 0 0 0 0 (0-255) Splits (0-255 sec) Phase 1 2 3 4 5 6 7 8 Split 18 108 0 30 25 101 0 30 Phase 9 10 11 12 13 14 15 16 Split 0 0 0 0 0 0 0 0 Phase/Function Settings: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Coordinated Phase 2 6 Float Force Offs Hold to Force Off Hi Priority Ped Dynamic/Backup Options: (Y/N)Manual Permissives by Phase: Split/Timing in percent? N *Applies when "Manual" permissive is selected *Permissive Mode (0-4)0 *0 = Auto Vehicle Pedestrian Enable Transition Permissive Mode?N 1 = Open (0-255 sec)Start Stop Start Stop Adjust Non-Coordinated Splits?Y 2 = Manual Phase 1 0 0 0 0 Cycle Once per Cycle Length?Y 3 = Window Phase 2 0 0 0 0 4 = Walk Phase 3 0 0 0 0 Active Pages:Phase 4 0 0 0 0 Phase Sequence Page (1-12)3 Phase 5 0 0 0 0 Phase Timing Page (1-4)2 Phase 6 0 0 0 0 Phase Control Page (1-4)1 Phase 7 0 0 0 0 OverLap Control Page (1-4)1 Phase 8 0 0 0 0 Input Page (1-4)1 Phase 9 0 0 0 0 Output Page (1-4)1 Phase 10 0 0 0 0 Phase 11 0 0 0 0 Global Manual Permissive windows:Phase 12 0 0 0 0 *Applies when "Window" permissive is selected Phase 13 0 0 0 0 Manual Perm 1 End Point (0-255 sec)0 Phase 14 0 0 0 0 Manual Perm 2 Start Point (0-255 sec)0 Phase 15 0 0 0 0 Manual Perm 2 End Point (0-255 sec)0 Phase 16 0 0 0 0 Verify Plan Data 832 - Beach Rd @ Silver Lake / Shade Tree 4 - Phase Sequence Page 2 12/12/2023 5:34 PM Rings Barrier 1 Barrier 2 Barrier 3 Barrier 4 1 0 2 1 0 0 4 0 0 0 0 0 0 0 0 0 0256000800000000003000000000000000040000000000000000 Rings Barrier 5 Barrier 6 Barrier 7 Barrier 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 020000000000000000 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 040000000000000000 Phase Directions 10 50 90 130 20 60 100 140 30 70 110 150 40 80 120 160 832 - Beach Rd @ Silver Lake / Shade Tree 4 - Phase Sequence Page 3 12/12/2023 5:34 PM Rings Barrier 1 Barrier 2 Barrier 3 Barrier 4 1 1 2 0 0 0 4 0 0 0 0 0 0 0 0 0 0206500800000000003000000000000000040000000000000000 Rings Barrier 5 Barrier 6 Barrier 7 Barrier 8 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 020000000000000000 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 040000000000000000 Phase Directions 10 50 90 130 20 60 100 140 30 70 110 150 40 80 120 160 832 - Beach Rd @ Silver Lake / Shade Tree 3 - Phase Timing 2 12/12/2023 5:34 PM Phase Phase Timing Elements 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Minimum Green 1 5 12 0 5 5 12 0 5 0 0 0 0 0 0 0 0 Minimum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Re-service Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Extension 1 (Gap 1)2.0 6.0 0.0 2.0 2.0 6.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Extension 2 (Gap 2)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Maximum Green 1 20 90 0 25 20 90 0 25 0 0 0 0 0 0 0 0 Maximum Green 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Yellow Clearance 3.0 4.6 4.0 3.1 3.0 4.6 4.0 3.2 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Red Clearance 2.6 1.6 2.0 3.1 3.1 1.6 2.0 3.2 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Red Revert 0.0 0.0 2.0 0.0 0.0 0.0 0.0 0.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dont Walk 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Walk Advance Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Walk Delay Time 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alternate Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Dont Walk 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternate Min Green 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max / Max 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Dynamic Max Adjust 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Seconds / Actuation 0.0 1.5 0.0 0.0 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Max Variable Initial 0 34 0 0 0 34 0 0 0 0 0 0 0 0 0 0 Time Before Reduction 0 15 0 0 0 15 0 0 0 0 0 0 0 0 0 0 Time To Reduce 0 30 0 0 0 30 0 0 0 0 0 0 0 0 0 0 Minimum Gap 0.0 3.0 0.0 0.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Alt Flash Frequency (0-25.5 Hz)1.0 Appendix D – NCDOT Nomograph Ramah Church Road / McCord Road (Southbound Left-Turn) Carolina Beach Road / Site Access 1Northbound Right-Turn LEGEND = AM Peak = PM Peak2025 Build AM and PM Peak Hours AM Peak Hour VR =142 V = 1842 PM Peak Hour 1171608VR =V = Appendix D – Synchro / SimTraffic Analysis Outputs 2023 Existing Traffic Volumes Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2023 Existing AM Peak Hour Synchro 11 Report Timmons Group Page 1 Lane Group EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Volume (vph)0 48 4 19 1727 19 1287 21 Future Volume (vph)0 48 4 19 1727 19 1287 21 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 350 350 150 Storage Lanes 0 1 1 1 1 Taper Length (ft)100 100 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)0 1611 0 1770 3539 1770 3539 1583 Flt Permitted 0.950 0.950 Satd. Flow (perm)0 1611 0 1770 3539 1770 3539 1583 Link Speed (mph)35 45 45 Link Distance (ft)1366 432 1733 Travel Time (s)26.6 6.5 26.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 53 4 21 1919 21 1430 23 Shared Lane Traffic (%) Lane Group Flow (vph)0 53 0 25 1919 21 1430 23 Enter Blocked Intersection No No No No No No No No Lane Alignment Left Right R NA Left Left R NA Left Right Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 9 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 52.2%ICU Level of Service A Analysis Period (min) 15 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2023 Existing AM Peak Hour Synchro 11 Report Timmons Group Page 2 Intersection Int Delay, s/veh 0.7 Movement EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Vol, veh/h 0 48 4 19 1727 19 1287 21 Future Vol, veh/h 0 48 4 19 1727 19 1287 21 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free Free RT Channelized - None -- None -- None Storage Length -0 - 350 - 350 - 150 Veh in Median Storage, # 0 ---0 -0 - Grade, %0 ---0 -0 - Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 2 2 Mvmt Flow 0 53 4 21 1919 21 1430 23 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 715 1430 1453 0 1919 -0 Stage 1 -------- Stage 2 -------- Critical Hdwy - 6.94 6.44 4.14 - 6.44 -- Critical Hdwy Stg 1 -------- Critical Hdwy Stg 2 -------- Follow-up Hdwy - 3.32 2.52 2.22 - 2.52 -- Pot Cap-1 Maneuver 0 373 175 462 - 84 -- Stage 1 0 ------- Stage 2 0 ------- Platoon blocked, %--- Mov Cap-1 Maneuver - 373 341 341 - 84 -- Mov Cap-2 Maneuver -------- Stage 1 -------- Stage 2 -------- Approach EB NB SB HCM Control Delay, s 16.3 0.2 0.9 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBU SBT SBR Capacity (veh/h)341 - 373 84 -- HCM Lane V/C Ratio 0.075 - 0.143 0.251 -- HCM Control Delay (s)16.4 - 16.3 61.7 -- HCM Lane LOS C -C F -- HCM 95th %tile Q(veh)0.2 - 0.5 0.9 -- Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing AM Peak Hour Synchro 11 Report Timmons Group Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph)119 4 142 51 20 100 13 91 1499 35 18 23 Future Volume (vph)119 4 142 51 20 100 13 91 1499 35 18 23 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%)1%0%0% Storage Length (ft)0 100 0 125 275 175 200 Storage Lanes 0 1 0 1 1 1 1 Taper Length (ft)100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.850 0.850 0.850 Flt Protected 0.954 0.965 0.950 0.950 Satd. Flow (prot)0 1768 1575 0 1798 1583 0 1770 3539 1583 0 1778 Flt Permitted 0.642 0.521 0.129 0.110 Satd. Flow (perm)0 1190 1575 0 970 1583 0 240 3539 1583 0 206 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph)25 25 45 Link Distance (ft)1241 337 1468 Travel Time (s)33.8 9.2 22.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)132 4 158 57 22 111 14 101 1666 39 20 26 Shared Lane Traffic (%) Lane Group Flow (vph)0 136 158 0 79 111 0 115 1666 39 0 46 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right R NA Left Left Right R NA Left Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 Turning Speed (mph)15 9 15 9 9 15 9 9 15 Turn Type Perm NA Perm Perm NA Perm pm+pt pm+pt NA Perm pm+pt pm+pt Protected Phases 4 8 5 5 2 1 1 Permitted Phases 4 4 8 8 2 2 2 6 6 Detector Phase 4 4 4 8 8 8 5 5 2 2 1 1 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 5.0 Minimum Split (s)24.2 24.2 24.2 24.3 24.3 24.3 11.5 11.5 24.2 24.2 11.5 11.5 Total Split (s)38.0 38.0 38.0 38.0 38.0 38.0 22.0 22.0 102.0 102.0 16.0 16.0 Total Split (%)24.4% 24.4% 24.4% 24.4% 24.4% 24.4% 14.1% 14.1% 65.4% 65.4% 10.3% 10.3% Maximum Green (s)31.8 31.8 31.8 31.6 31.6 31.6 15.9 15.9 95.8 95.8 10.4 10.4 Yellow Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.0 3.0 4.6 4.6 3.0 3.0 All-Red Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.1 3.1 1.6 1.6 2.6 2.6 Lost Time Adjust (s)-1.2 -1.2 -1.4 -1.4 -1.1 -1.2 -1.2 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes Vehicle Extension (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 2.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing AM Peak Hour Synchro 11 Report Timmons Group Page 4 Lane Group SBT SBR Lane Configurations Traffic Volume (vph)1260 56 Future Volume (vph)1260 56 Ideal Flow (vphpl)1900 1900 Grade (%)-1% Storage Length (ft)125 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot)3557 1591 Flt Permitted Satd. Flow (perm)3557 1591 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)423 Travel Time (s)6.4 Peak Hour Factor 0.90 0.90 Adj. Flow (vph)1400 62 Shared Lane Traffic (%) Lane Group Flow (vph)1400 62 Enter Blocked Intersection No No Lane Alignment Left Right Median Width(ft)12 Link Offset(ft)0 Crosswalk Width(ft)16 Two way Left Turn Lane Headway Factor 0.99 0.99 Turning Speed (mph)9 Turn Type NA Perm Protected Phases 6 Permitted Phases 6 Detector Phase 6 6 Switch Phase Minimum Initial (s)12.0 12.0 Minimum Split (s)24.2 24.2 Total Split (s)96.0 96.0 Total Split (%)61.5% 61.5% Maximum Green (s)89.8 89.8 Yellow Time (s)4.6 4.6 All-Red Time (s)1.6 1.6 Lost Time Adjust (s)-1.2 -1.2 Total Lost Time (s)5.0 5.0 Lead/Lag Lag Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)6.0 6.0 Minimum Gap (s)3.0 3.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing AM Peak Hour Synchro 11 Report Timmons Group Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Time Before Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 Recall Mode None None None None None None None None C-Max C-Max None None Act Effct Green (s)22.8 22.8 22.8 22.8 110.4 110.4 110.4 108.9 Actuated g/C Ratio 0.15 0.15 0.15 0.15 0.71 0.71 0.71 0.70 v/c Ratio 0.78 0.69 0.56 0.48 0.44 0.67 0.03 0.19 Control Delay 92.0 77.5 75.4 66.6 14.3 16.1 9.4 15.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 92.0 77.5 75.4 66.6 14.3 16.1 9.4 15.6 LOS F E E E B B A B Approach Delay 84.2 70.3 15.9 Approach LOS F E B Queue Length 50th (ft)136 155 76 105 37 494 12 13 Queue Length 95th (ft)203 222 128 162 72 686 30 36 Internal Link Dist (ft)1161 257 1388 Turn Bay Length (ft)100 125 275 175 200 Base Capacity (vph)251 333 205 334 336 2503 1120 254 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.54 0.47 0.39 0.33 0.34 0.67 0.03 0.18 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 18 (12%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 23.1 Intersection LOS: C Intersection Capacity Utilization 75.3%ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing AM Peak Hour Synchro 11 Report Timmons Group Page 6 Lane Group SBT SBR Time Before Reduce (s)15.0 15.0 Time To Reduce (s)30.0 30.0 Recall Mode C-Max C-Max Act Effct Green (s)108.9 108.9 Actuated g/C Ratio 0.70 0.70 v/c Ratio 0.56 0.06 Control Delay 14.0 9.3 Queue Delay 0.0 0.0 Total Delay 14.0 9.3 LOS B A Approach Delay 13.9 Approach LOS B Queue Length 50th (ft)344 18 Queue Length 95th (ft)531 45 Internal Link Dist (ft)343 Turn Bay Length (ft)125 Base Capacity (vph)2482 1110 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.56 0.06 Intersection Summary Queuing and Blocking Report 2023 Existing AM Peak Hour 01/15/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 1 Intersection: 1: Carolina Beach Road & Horn Road Movement EB NB SB Directions Served R UL U Maximum Queue (ft)53 41 47 Average Queue (ft)19 13 12 95th Queue (ft)40 37 38 Link Distance (ft)1307 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)350 350 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement EB EB WB WB B4 NB NB NB NB SB SB SB Directions Served LT R LT R T UL T T R UL T T Maximum Queue (ft)252 198 241 202 9 99 278 278 110 85 255 263 Average Queue (ft)108 18 86 84 0 47 132 116 8 24 122 118 95th Queue (ft)196 110 183 154 9 84 245 237 56 64 231 231 Link Distance (ft)1183 251 1048 1438 1438 350 350 Upstream Blk Time (%)0 Queuing Penalty (veh)0 Storage Bay Dist (ft)100 125 275 175 200 Storage Blk Time (%)18 6 4 0 2 1 6 Queuing Penalty (veh)25 6 2 0 1 1 3 Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement SB Directions Served R Maximum Queue (ft)138 Average Queue (ft)12 95th Queue (ft)67 Link Distance (ft) Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)125 Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 38 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2023 Existing PM Peak Hour Synchro 11 Report Timmons Group Page 1 Lane Group EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Volume (vph)0 47 8 65 1447 25 1852 61 Future Volume (vph)0 47 8 65 1447 25 1852 61 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 350 350 150 Storage Lanes 0 1 1 1 1 Taper Length (ft)100 100 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)0 1611 0 1770 3539 1770 3539 1583 Flt Permitted 0.950 0.950 Satd. Flow (perm)0 1611 0 1770 3539 1770 3539 1583 Link Speed (mph)35 45 45 Link Distance (ft)1366 432 1733 Travel Time (s)26.6 6.5 26.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 52 9 72 1608 28 2058 68 Shared Lane Traffic (%) Lane Group Flow (vph)0 52 0 81 1608 28 2058 68 Enter Blocked Intersection No No No No No No No No Lane Alignment Left Right R NA Left Left R NA Left Right Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 9 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 68.6%ICU Level of Service C Analysis Period (min) 15 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2023 Existing PM Peak Hour Synchro 11 Report Timmons Group Page 2 Intersection Int Delay, s/veh 1.4 Movement EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Vol, veh/h 0 47 8 65 1447 25 1852 61 Future Vol, veh/h 0 47 8 65 1447 25 1852 61 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free Free RT Channelized - None -- None -- None Storage Length -0 - 350 - 350 - 150 Veh in Median Storage, # 0 ---0 -0 - Grade, %0 ---0 -0 - Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 2 2 Mvmt Flow 0 52 9 72 1608 28 2058 68 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1029 2058 2126 0 1608 -0 Stage 1 -------- Stage 2 -------- Critical Hdwy - 6.94 6.44 4.14 - 6.44 -- Critical Hdwy Stg 1 -------- Critical Hdwy Stg 2 -------- Follow-up Hdwy - 3.32 2.52 2.22 - 2.52 -- Pot Cap-1 Maneuver 0 231 68 252 - 134 -- Stage 1 0 ------- Stage 2 0 ------- Platoon blocked, %--- Mov Cap-1 Maneuver - 231 180 180 - 134 -- Mov Cap-2 Maneuver -------- Stage 1 -------- Stage 2 -------- Approach EB NB SB HCM Control Delay, s 25.1 1.9 0.5 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBU SBT SBR Capacity (veh/h)180 - 231 134 -- HCM Lane V/C Ratio 0.451 - 0.226 0.207 -- HCM Control Delay (s)40.5 - 25.1 38.8 -- HCM Lane LOS E -D E -- HCM 95th %tile Q(veh)2.1 - 0.8 0.7 -- Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing PM Peak Hour Synchro 11 Report Timmons Group Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph)78 6 137 42 10 37 19 109 1370 70 26 57 Future Volume (vph)78 6 137 42 10 37 19 109 1370 70 26 57 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%)1%0%0% Storage Length (ft)0 100 0 125 275 175 200 Storage Lanes 0 1 0 1 1 1 1 Taper Length (ft)100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.850 0.850 0.850 Flt Protected 0.956 0.961 0.950 0.950 Satd. Flow (prot)0 1772 1575 0 1790 1583 0 1770 3539 1583 0 1778 Flt Permitted 0.700 0.616 0.042 0.142 Satd. Flow (perm)0 1297 1575 0 1147 1583 0 78 3539 1583 0 266 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph)25 25 45 Link Distance (ft)1241 337 1468 Travel Time (s)33.8 9.2 22.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)87 7 152 47 11 41 21 121 1522 78 29 63 Shared Lane Traffic (%) Lane Group Flow (vph)0 94 152 0 58 41 0 142 1522 78 0 92 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right R NA Left Left Right R NA Left Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 Turning Speed (mph)15 9 15 9 9 15 9 9 15 Turn Type Perm NA Perm Perm NA Perm pm+pt pm+pt NA Perm pm+pt pm+pt Protected Phases 4 8 5 5 2 1 1 Permitted Phases 4 4 8 8 2 2 2 6 6 Detector Phase 4 4 4 8 8 8 5 5 2 2 1 1 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 5.0 Minimum Split (s)24.2 24.2 24.2 24.3 24.3 24.3 11.5 11.5 24.2 24.2 11.5 11.5 Total Split (s)30.0 30.0 30.0 30.0 30.0 30.0 25.0 25.0 108.0 108.0 18.0 18.0 Total Split (%)19.2% 19.2% 19.2% 19.2% 19.2% 19.2% 16.0% 16.0% 69.2% 69.2% 11.5% 11.5% Maximum Green (s)23.8 23.8 23.8 23.6 23.6 23.6 18.9 18.9 101.8 101.8 12.4 12.4 Yellow Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.0 3.0 4.6 4.6 3.0 3.0 All-Red Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.1 3.1 1.6 1.6 2.6 2.6 Lost Time Adjust (s)-1.2 -1.2 -1.4 -1.4 -1.1 -1.2 -1.2 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes Vehicle Extension (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 2.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing PM Peak Hour Synchro 11 Report Timmons Group Page 4 Lane Group SBT SBR Lane Configurations Traffic Volume (vph)1796 90 Future Volume (vph)1796 90 Ideal Flow (vphpl)1900 1900 Grade (%)-1% Storage Length (ft)125 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot)3557 1591 Flt Permitted Satd. Flow (perm)3557 1591 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)423 Travel Time (s)6.4 Peak Hour Factor 0.90 0.90 Adj. Flow (vph)1996 100 Shared Lane Traffic (%) Lane Group Flow (vph)1996 100 Enter Blocked Intersection No No Lane Alignment Left Right Median Width(ft)12 Link Offset(ft)0 Crosswalk Width(ft)16 Two way Left Turn Lane Headway Factor 0.99 0.99 Turning Speed (mph)9 Turn Type NA Perm Protected Phases 6 Permitted Phases 6 Detector Phase 6 6 Switch Phase Minimum Initial (s)12.0 12.0 Minimum Split (s)24.2 24.2 Total Split (s)101.0 101.0 Total Split (%)64.7% 64.7% Maximum Green (s)94.8 94.8 Yellow Time (s)4.6 4.6 All-Red Time (s)1.6 1.6 Lost Time Adjust (s)-1.2 -1.2 Total Lost Time (s)5.0 5.0 Lead/Lag Lag Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)6.0 6.0 Minimum Gap (s)3.0 3.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing PM Peak Hour Synchro 11 Report Timmons Group Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Time Before Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 Recall Mode None None None None None None None None C-Max C-Max None None Act Effct Green (s)20.0 20.0 20.0 20.0 108.0 108.0 108.0 107.8 Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.69 0.69 0.69 0.69 v/c Ratio 0.57 0.76 0.40 0.20 0.72 0.62 0.07 0.30 Control Delay 76.6 88.0 69.2 61.4 56.4 14.9 8.7 19.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 76.6 88.0 69.2 61.4 56.4 14.9 8.7 19.2 LOS E F E E E B A B Approach Delay 83.7 66.0 18.0 Approach LOS F E B Queue Length 50th (ft)91 151 55 38 91 415 24 29 Queue Length 95th (ft)152 227 101 76 166 530 47 62 Internal Link Dist (ft)1161 257 1388 Turn Bay Length (ft)100 125 275 175 200 Base Capacity (vph)207 252 183 253 271 2450 1096 309 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.45 0.60 0.32 0.16 0.52 0.62 0.07 0.30 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 62 (40%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 24.6 Intersection LOS: C Intersection Capacity Utilization 86.1%ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2023 Existing PM Peak Hour Synchro 11 Report Timmons Group Page 6 Lane Group SBT SBR Time Before Reduce (s)15.0 15.0 Time To Reduce (s)30.0 30.0 Recall Mode C-Max C-Max Act Effct Green (s)107.8 107.8 Actuated g/C Ratio 0.69 0.69 v/c Ratio 0.81 0.09 Control Delay 22.2 9.7 Queue Delay 0.0 0.0 Total Delay 22.2 9.7 LOS C A Approach Delay 21.5 Approach LOS C Queue Length 50th (ft)708 32 Queue Length 95th (ft)1027 67 Internal Link Dist (ft)343 Turn Bay Length (ft)125 Base Capacity (vph)2458 1099 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.81 0.09 Intersection Summary Queuing and Blocking Report 2023 Existing PM Peak Hour 01/15/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 1 Intersection: 1: Carolina Beach Road & Horn Road Movement EB NB NB NB SB SB SB SB Directions Served R UL T T U T T R Maximum Queue (ft)75 134 108 74 58 4 2 18 Average Queue (ft)24 50 7 4 16 0 0 1 95th Queue (ft)55 104 58 47 43 3 2 10 Link Distance (ft)1307 374 374 1706 1706 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)350 350 150 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement EB EB WB WB NB NB NB NB SB SB SB SB Directions Served LT R LT R UL T T R UL T T R Maximum Queue (ft)180 119 119 91 163 242 238 54 252 387 387 224 Average Queue (ft)74 8 48 34 78 99 83 9 48 191 189 34 95th Queue (ft)143 61 99 77 142 205 190 36 138 356 355 149 Link Distance (ft)1183 251 1438 1438 350 350 Upstream Blk Time (%)1 1 Queuing Penalty (veh)7 7 Storage Bay Dist (ft)100 125 275 175 200 125 Storage Blk Time (%)6 1 0 0 0 1 7 12 Queuing Penalty (veh)9 1 0 0 0 1 6 11 Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement B2 B2 Directions Served T T Maximum Queue (ft)9 10 Average Queue (ft)0 0 95th Queue (ft)8 7 Link Distance (ft)374 374 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 41 2025 Background Traffic Volumes Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2025 Background AM Peak Hour Synchro 11 Report Timmons Group Page 1 Lane Group EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Volume (vph)0 50 4 20 1797 20 1339 22 Future Volume (vph)0 50 4 20 1797 20 1339 22 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 350 350 150 Storage Lanes 0 1 1 1 1 Taper Length (ft)100 100 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)0 1611 0 1770 3539 1770 3539 1583 Flt Permitted 0.950 0.950 Satd. Flow (perm)0 1611 0 1770 3539 1770 3539 1583 Link Speed (mph)35 45 45 Link Distance (ft)1366 432 1733 Travel Time (s)26.6 6.5 26.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 56 4 22 1997 22 1488 24 Shared Lane Traffic (%) Lane Group Flow (vph)0 56 0 26 1997 22 1488 24 Enter Blocked Intersection No No No No No No No No Lane Alignment Left Right R NA Left Left R NA Left Right Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 9 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 53.7%ICU Level of Service A Analysis Period (min) 15 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2025 Background AM Peak Hour Synchro 11 Report Timmons Group Page 2 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Vol, veh/h 0 50 4 20 1797 20 1339 22 Future Vol, veh/h 0 50 4 20 1797 20 1339 22 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free Free RT Channelized - None -- None -- None Storage Length -0 - 350 - 350 - 150 Veh in Median Storage, # 0 ---0 -0 - Grade, %0 ---0 -0 - Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 2 2 Mvmt Flow 0 56 4 22 1997 22 1488 24 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 744 1488 1512 0 1997 -0 Stage 1 -------- Stage 2 -------- Critical Hdwy - 6.94 6.44 4.14 - 6.44 -- Critical Hdwy Stg 1 -------- Critical Hdwy Stg 2 -------- Follow-up Hdwy - 3.32 2.52 2.22 - 2.52 -- Pot Cap-1 Maneuver 0 357 161 438 - 75 -- Stage 1 0 ------- Stage 2 0 ------- Platoon blocked, %--- Mov Cap-1 Maneuver - 357 322 322 - 75 -- Mov Cap-2 Maneuver -------- Stage 1 -------- Stage 2 -------- Approach EB NB SB HCM Control Delay, s 16.9 0.2 1 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBU SBT SBR Capacity (veh/h)322 - 357 75 -- HCM Lane V/C Ratio 0.083 - 0.156 0.296 -- HCM Control Delay (s)17.2 - 16.9 72.1 -- HCM Lane LOS C -C F -- HCM 95th %tile Q(veh)0.3 - 0.5 1.1 -- Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Background AM Peak Hour Synchro 11 Report Timmons Group Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph)124 4 148 53 21 104 14 95 1560 36 19 24 Future Volume (vph)124 4 148 53 21 104 14 95 1560 36 19 24 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%)1%0%0% Storage Length (ft)0 100 0 125 275 175 200 Storage Lanes 0 1 0 1 1 1 1 Taper Length (ft)100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.850 0.850 0.850 Flt Protected 0.954 0.965 0.950 0.950 Satd. Flow (prot)0 1768 1575 0 1798 1583 0 1770 3539 1583 0 1778 Flt Permitted 0.636 0.513 0.950 0.950 Satd. Flow (perm)0 1179 1575 0 956 1583 0 1770 3539 1583 0 1778 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph)25 25 45 Link Distance (ft)1241 337 1468 Travel Time (s)33.8 9.2 22.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)138 4 164 59 23 116 16 106 1733 40 21 27 Shared Lane Traffic (%) Lane Group Flow (vph)0 142 164 0 82 116 0 122 1733 40 0 48 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right R NA Left Left Right R NA Left Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 Turning Speed (mph)15 9 15 9 9 15 9 9 15 Turn Type Perm NA Perm Perm NA Perm Prot Prot NA Perm Prot Prot Protected Phases 4 8 5 5 2 1 1 Permitted Phases 4 4 8 8 2 Detector Phase 4 4 4 8 8 8 5 5 2 2 1 1 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 5.0 Minimum Split (s)24.2 24.2 24.2 24.3 24.3 24.3 11.5 11.5 24.2 24.2 11.5 11.5 Total Split (s)38.0 38.0 38.0 38.0 38.0 38.0 22.0 22.0 102.0 102.0 16.0 16.0 Total Split (%)24.4% 24.4% 24.4% 24.4% 24.4% 24.4% 14.1% 14.1% 65.4% 65.4% 10.3% 10.3% Maximum Green (s)31.8 31.8 31.8 31.6 31.6 31.6 15.9 15.9 95.8 95.8 10.4 10.4 Yellow Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.0 3.0 4.6 4.6 3.0 3.0 All-Red Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.1 3.1 1.6 1.6 2.6 2.6 Lost Time Adjust (s)-1.2 -1.2 -1.4 -1.4 -1.1 -1.2 -1.2 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes Vehicle Extension (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 2.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Background AM Peak Hour Synchro 11 Report Timmons Group Page 4 Lane Group SBT SBR Lane Configurations Traffic Volume (vph)1311 58 Future Volume (vph)1311 58 Ideal Flow (vphpl)1900 1900 Grade (%)-1% Storage Length (ft)125 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot)3557 1591 Flt Permitted Satd. Flow (perm)3557 1591 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)423 Travel Time (s)6.4 Peak Hour Factor 0.90 0.90 Adj. Flow (vph)1457 64 Shared Lane Traffic (%) Lane Group Flow (vph)1457 64 Enter Blocked Intersection No No Lane Alignment Left Right Median Width(ft)12 Link Offset(ft)0 Crosswalk Width(ft)16 Two way Left Turn Lane Headway Factor 0.99 0.99 Turning Speed (mph)9 Turn Type NA Perm Protected Phases 6 Permitted Phases 6 Detector Phase 6 6 Switch Phase Minimum Initial (s)12.0 12.0 Minimum Split (s)24.2 24.2 Total Split (s)96.0 96.0 Total Split (%)61.5% 61.5% Maximum Green (s)89.8 89.8 Yellow Time (s)4.6 4.6 All-Red Time (s)1.6 1.6 Lost Time Adjust (s)-1.2 -1.2 Total Lost Time (s)5.0 5.0 Lead/Lag Lag Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)6.0 6.0 Minimum Gap (s)3.0 3.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Background AM Peak Hour Synchro 11 Report Timmons Group Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Time Before Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 Recall Mode None None None None None None None None C-Max C-Max None None Act Effct Green (s)23.8 23.8 23.8 23.8 15.2 109.4 109.4 9.9 Actuated g/C Ratio 0.15 0.15 0.15 0.15 0.10 0.70 0.70 0.06 v/c Ratio 0.79 0.69 0.57 0.48 0.71 0.70 0.04 0.42 Control Delay 92.0 76.2 74.8 65.7 90.0 17.6 9.8 81.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 92.0 76.2 74.8 65.7 90.0 17.6 9.8 81.5 LOS F E E E F B A F Approach Delay 83.5 69.5 22.1 Approach LOS F E C Queue Length 50th (ft)142 160 79 110 122 543 12 48 Queue Length 95th (ft)210 229 132 166 194 754 31 95 Internal Link Dist (ft)1161 257 1388 Turn Bay Length (ft)100 125 275 175 200 Base Capacity (vph)249 333 202 334 196 2482 1110 125 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.57 0.49 0.41 0.35 0.62 0.70 0.04 0.38 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 18 (12%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.79 Intersection Signal Delay: 28.5 Intersection LOS: C Intersection Capacity Utilization 77.5%ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Background AM Peak Hour Synchro 11 Report Timmons Group Page 6 Lane Group SBT SBR Time Before Reduce (s)15.0 15.0 Time To Reduce (s)30.0 30.0 Recall Mode C-Max C-Max Act Effct Green (s)102.1 102.1 Actuated g/C Ratio 0.65 0.65 v/c Ratio 0.63 0.06 Control Delay 18.7 11.9 Queue Delay 0.0 0.0 Total Delay 18.7 11.9 LOS B B Approach Delay 20.3 Approach LOS C Queue Length 50th (ft)442 23 Queue Length 95th (ft)615 50 Internal Link Dist (ft)343 Turn Bay Length (ft)125 Base Capacity (vph)2326 1041 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.63 0.06 Intersection Summary Queuing and Blocking Report 2025 Background AM Peak Hour 01/15/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 1 Intersection: 1: Carolina Beach Road & Horn Road Movement EB NB B2 SB Directions Served R UL T U Maximum Queue (ft)61 42 5 48 Average Queue (ft)21 15 0 16 95th Queue (ft)47 40 5 42 Link Distance (ft)1307 350 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)350 350 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement EB EB WB WB NB NB NB NB SB SB SB SB Directions Served LT R LT R UL T T R UL T T R Maximum Queue (ft)240 170 215 191 231 389 376 139 156 337 354 206 Average Queue (ft)107 16 85 86 103 203 192 12 37 189 185 19 95th Queue (ft)194 105 174 163 186 350 343 78 100 310 312 100 Link Distance (ft)1183 251 1438 1438 350 350 Upstream Blk Time (%)0 0 0 Queuing Penalty (veh)0 2 2 Storage Bay Dist (ft)100 125 275 175 200 125 Storage Blk Time (%)18 0 5 4 3 8 6 13 Queuing Penalty (veh)27 0 5 3 3 3 3 8 Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement B2 B2 Directions Served T T Maximum Queue (ft)8 13 Average Queue (ft)0 1 95th Queue (ft)9 10 Link Distance (ft)374 374 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 56 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/22/2024 2025 Background PM Peak Hour Synchro 11 Report Timmons Group Page 1 Lane Group EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Volume (vph)0 49 8 68 1505 26 1927 63 Future Volume (vph)0 49 8 68 1505 26 1927 63 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 350 350 150 Storage Lanes 0 1 1 1 1 Taper Length (ft)100 100 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)0 1611 0 1770 3539 1770 3539 1583 Flt Permitted 0.950 0.950 Satd. Flow (perm)0 1611 0 1770 3539 1770 3539 1583 Link Speed (mph)35 45 45 Link Distance (ft)1366 432 1733 Travel Time (s)26.6 6.5 26.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 54 9 76 1672 29 2141 70 Shared Lane Traffic (%) Lane Group Flow (vph)0 54 0 85 1672 29 2141 70 Enter Blocked Intersection No No No No No No No No Lane Alignment Left Right R NA Left Left R NA Left Right Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 9 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 70.8%ICU Level of Service C Analysis Period (min) 15 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/22/2024 2025 Background PM Peak Hour Synchro 11 Report Timmons Group Page 2 Intersection Int Delay, s/veh 1.7 Movement EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Vol, veh/h 0 49 8 68 1505 26 1927 63 Future Vol, veh/h 0 49 8 68 1505 26 1927 63 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free Free RT Channelized - None -- None -- None Storage Length -0 - 350 - 350 - 150 Veh in Median Storage, # 0 ---0 -0 - Grade, %0 ---0 -0 - Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 2 2 Mvmt Flow 0 54 9 76 1672 29 2141 70 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1071 2141 2211 0 1672 -0 Stage 1 -------- Stage 2 -------- Critical Hdwy - 6.94 6.44 4.14 - 6.44 -- Critical Hdwy Stg 1 -------- Critical Hdwy Stg 2 -------- Follow-up Hdwy - 3.32 2.52 2.22 - 2.52 -- Pot Cap-1 Maneuver 0 217 60 234 - 122 -- Stage 1 0 ------- Stage 2 0 ------- Platoon blocked, %--- Mov Cap-1 Maneuver - 217 164 164 - 122 -- Mov Cap-2 Maneuver -------- Stage 1 -------- Stage 2 -------- Approach EB NB SB HCM Control Delay, s 27.1 2.3 0.6 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBU SBT SBR Capacity (veh/h)164 - 217 122 -- HCM Lane V/C Ratio 0.515 - 0.251 0.237 -- HCM Control Delay (s)48.4 - 27.1 43.4 -- HCM Lane LOS E -D E -- HCM 95th %tile Q(veh)2.5 -1 0.9 -- Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Background PM Peak Hour Synchro 11 Report Timmons Group Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph)81 6 143 44 10 38 20 113 1425 73 27 59 Future Volume (vph)81 6 143 44 10 38 20 113 1425 73 27 59 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%)1%0%0% Storage Length (ft)0 100 0 125 275 175 200 Storage Lanes 0 1 0 1 1 1 1 Taper Length (ft)100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.850 0.850 0.850 Flt Protected 0.956 0.961 0.950 0.950 Satd. Flow (prot)0 1772 1575 0 1790 1583 0 1770 3539 1583 0 1778 Flt Permitted 0.698 0.606 0.950 0.950 Satd. Flow (perm)0 1294 1575 0 1129 1583 0 1770 3539 1583 0 1778 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph)25 25 45 Link Distance (ft)1241 337 1468 Travel Time (s)33.8 9.2 22.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)90 7 159 49 11 42 22 126 1583 81 30 66 Shared Lane Traffic (%) Lane Group Flow (vph)0 97 159 0 60 42 0 148 1583 81 0 96 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right R NA Left Left Right R NA Left Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 Turning Speed (mph)15 9 15 9 9 15 9 9 15 Turn Type Perm NA Perm Perm NA Perm Prot Prot NA Perm Prot Prot Protected Phases 4 8 5 5 2 1 1 Permitted Phases 4 4 8 8 2 Detector Phase 4 4 4 8 8 8 5 5 2 2 1 1 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 5.0 Minimum Split (s)24.2 24.2 24.2 24.3 24.3 24.3 11.5 11.5 24.2 24.2 11.5 11.5 Total Split (s)30.0 30.0 30.0 30.0 30.0 30.0 25.0 25.0 108.0 108.0 18.0 18.0 Total Split (%)19.2% 19.2% 19.2% 19.2% 19.2% 19.2% 16.0% 16.0% 69.2% 69.2% 11.5% 11.5% Maximum Green (s)23.8 23.8 23.8 23.6 23.6 23.6 18.9 18.9 101.8 101.8 12.4 12.4 Yellow Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.0 3.0 4.6 4.6 3.0 3.0 All-Red Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.1 3.1 1.6 1.6 2.6 2.6 Lost Time Adjust (s)-1.2 -1.2 -1.4 -1.4 -1.1 -1.2 -1.2 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lag Lag Lead Lead Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes Vehicle Extension (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 2.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Background PM Peak Hour Synchro 11 Report Timmons Group Page 4 Lane Group SBT SBR Lane Configurations Traffic Volume (vph)1869 94 Future Volume (vph)1869 94 Ideal Flow (vphpl)1900 1900 Grade (%)-1% Storage Length (ft)125 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot)3557 1591 Flt Permitted Satd. Flow (perm)3557 1591 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)423 Travel Time (s)6.4 Peak Hour Factor 0.90 0.90 Adj. Flow (vph)2077 104 Shared Lane Traffic (%) Lane Group Flow (vph)2077 104 Enter Blocked Intersection No No Lane Alignment Left Right Median Width(ft)12 Link Offset(ft)0 Crosswalk Width(ft)16 Two way Left Turn Lane Headway Factor 0.99 0.99 Turning Speed (mph)9 Turn Type NA Perm Protected Phases 6 Permitted Phases 6 Detector Phase 6 6 Switch Phase Minimum Initial (s)12.0 12.0 Minimum Split (s)24.2 24.2 Total Split (s)101.0 101.0 Total Split (%)64.7% 64.7% Maximum Green (s)94.8 94.8 Yellow Time (s)4.6 4.6 All-Red Time (s)1.6 1.6 Lost Time Adjust (s)-1.2 -1.2 Total Lost Time (s)5.0 5.0 Lead/Lag Lead Lead Lead-Lag Optimize?Yes Yes Vehicle Extension (s)6.0 6.0 Minimum Gap (s)3.0 3.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Background PM Peak Hour Synchro 11 Report Timmons Group Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Time Before Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 Recall Mode None None None None None None None None C-Max C-Max None None Act Effct Green (s)20.4 20.4 20.4 20.4 20.0 108.6 108.6 12.0 Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.13 0.70 0.70 0.08 v/c Ratio 0.57 0.77 0.41 0.20 0.65 0.64 0.07 0.71 Control Delay 76.4 89.0 69.4 61.0 79.3 15.3 8.8 96.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 76.4 89.0 69.4 61.0 79.3 15.3 8.8 96.5 LOS E F E E E B A F Approach Delay 84.2 65.9 20.3 Approach LOS F E C Queue Length 50th (ft)94 158 57 39 146 457 26 96 Queue Length 95th (ft)156 238 105 77 227 566 49 #173 Internal Link Dist (ft)1161 257 1388 Turn Bay Length (ft)100 125 275 175 200 Base Capacity (vph)207 252 180 253 226 2463 1101 151 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.47 0.63 0.33 0.17 0.65 0.64 0.07 0.64 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 62 (40%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 31.6 Intersection LOS: C Intersection Capacity Utilization 88.7%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Background PM Peak Hour Synchro 11 Report Timmons Group Page 6 Lane Group SBT SBR Time Before Reduce (s)15.0 15.0 Time To Reduce (s)30.0 30.0 Recall Mode C-Max C-Max Act Effct Green (s)100.6 100.6 Actuated g/C Ratio 0.64 0.64 v/c Ratio 0.91 0.10 Control Delay 31.4 11.6 Queue Delay 0.0 0.0 Total Delay 31.4 11.6 LOS C B Approach Delay 33.2 Approach LOS C Queue Length 50th (ft)916 39 Queue Length 95th (ft)#1135 70 Internal Link Dist (ft)343 Turn Bay Length (ft)125 Base Capacity (vph)2292 1025 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.91 0.10 Intersection Summary Queuing and Blocking Report 2025 Background PM Peak Hour 01/22/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 1 Intersection: 1: Carolina Beach Road & Horn Road Movement EB NB NB NB B2 B2 SB SB SB SB Directions Served R UL T T T T U T T R Maximum Queue (ft)104 195 197 155 44 42 52 52 100 28 Average Queue (ft)32 82 32 29 6 5 14 2 4 1 95th Queue (ft)84 204 202 193 73 69 40 39 81 13 Link Distance (ft)1307 374 374 350 350 1706 1706 Upstream Blk Time (%)1 2 1 0 0 Queuing Penalty (veh)0 15 9 2 3 Storage Bay Dist (ft)350 350 150 Storage Blk Time (%)1 2 0 Queuing Penalty (veh)7 2 0 Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement EB EB WB WB NB NB NB NB SB SB SB SB Directions Served LT R LT R UL T T R UL T T R Maximum Queue (ft)186 160 146 109 241 417 399 114 299 432 424 225 Average Queue (ft)80 17 56 38 126 185 161 21 102 299 306 62 95th Queue (ft)151 94 114 87 223 385 362 85 235 458 466 209 Link Distance (ft)1183 251 1438 1438 350 350 Upstream Blk Time (%)6 6 Queuing Penalty (veh)55 61 Storage Bay Dist (ft)100 125 275 175 200 125 Storage Blk Time (%)7 2 1 0 0 2 5 0 16 20 0 Queuing Penalty (veh)9 2 0 0 0 2 3 2 14 19 0 Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement B2 B2 Directions Served T T Maximum Queue (ft)169 168 Average Queue (ft)17 17 95th Queue (ft)119 117 Link Distance (ft)374 374 Upstream Blk Time (%)0 0 Queuing Penalty (veh)2 2 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 210 2025 Build Traffic Volumes Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 1 Lane Group EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Volume (vph)0 50 4 20 1829 20 1371 22 Future Volume (vph)0 50 4 20 1829 20 1371 22 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 350 350 150 Storage Lanes 0 1 1 1 1 Taper Length (ft)100 100 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)0 1611 0 1770 3539 1770 3539 1583 Flt Permitted 0.950 0.950 Satd. Flow (perm)0 1611 0 1770 3539 1770 3539 1583 Link Speed (mph)35 45 45 Link Distance (ft)1366 432 1733 Travel Time (s)26.6 6.5 26.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 56 4 22 2032 22 1523 24 Shared Lane Traffic (%) Lane Group Flow (vph)0 56 0 26 2032 22 1523 24 Enter Blocked Intersection No No No No No No No No Lane Alignment Left Right R NA Left Left R NA Left Right Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 9 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 54.6%ICU Level of Service A Analysis Period (min) 15 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 2 Intersection Int Delay, s/veh 0.8 Movement EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Vol, veh/h 0 50 4 20 1829 20 1371 22 Future Vol, veh/h 0 50 4 20 1829 20 1371 22 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free Free RT Channelized - None -- None -- None Storage Length -0 - 350 - 350 - 150 Veh in Median Storage, # 0 ---0 -0 - Grade, %0 ---0 -0 - Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 2 2 Mvmt Flow 0 56 4 22 2032 22 1523 24 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 762 1523 1547 0 2032 -0 Stage 1 -------- Stage 2 -------- Critical Hdwy - 6.94 6.44 4.14 - 6.44 -- Critical Hdwy Stg 1 -------- Critical Hdwy Stg 2 -------- Follow-up Hdwy - 3.32 2.52 2.22 - 2.52 -- Pot Cap-1 Maneuver 0 347 152 425 - 71 -- Stage 1 0 ------- Stage 2 0 ------- Platoon blocked, %--- Mov Cap-1 Maneuver - 347 308 308 - 71 -- Mov Cap-2 Maneuver -------- Stage 1 -------- Stage 2 -------- Approach EB NB SB HCM Control Delay, s 17.3 0.2 1.1 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBU SBT SBR Capacity (veh/h)308 - 347 71 -- HCM Lane V/C Ratio 0.087 - 0.16 0.313 -- HCM Control Delay (s)17.8 - 17.3 77.3 -- HCM Lane LOS C -C F -- HCM 95th %tile Q(veh)0.3 - 0.6 1.1 -- Sheetz (Shade Tree) 2: Carolina Beach Road & Site Access 1 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)0 142 1700 142 0 1448 Future Volume (vph)0 142 1700 142 0 1448 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95 Frt 0.865 0.988 Flt Protected Satd. Flow (prot)0 1611 3497 0 0 3539 Flt Permitted Satd. Flow (perm)0 1611 3497 0 0 3539 Link Speed (mph)25 45 45 Link Distance (ft)584 423 432 Travel Time (s)15.9 6.4 6.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 158 1889 158 0 1609 Shared Lane Traffic (%) Lane Group Flow (vph)0 158 2047 0 0 1609 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 67.0%ICU Level of Service C Analysis Period (min) 15 Sheetz (Shade Tree) 2: Carolina Beach Road & Site Access 1 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 4 Intersection Int Delay, s/veh 2 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 142 1700 142 0 1448 Future Vol, veh/h 0 142 1700 142 0 1448 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length -0 ---- Veh in Median Storage, # 0 -0 --0 Grade, %0 -0 --0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 0 158 1889 158 0 1609 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 1024 0 0 -- Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 233 --0 - Stage 1 0 ---0 - Stage 2 0 ---0 - Platoon blocked, %--- Mov Cap-1 Maneuver - 233 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach WB NB SB HCM Control Delay, s 47.7 0 0 HCM LOS E Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)-- 233 - HCM Lane V/C Ratio -- 0.677 - HCM Control Delay (s)-- 47.7 - HCM Lane LOS --E - HCM 95th %tile Q(veh)-- 4.3 - Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph)124 8 148 82 24 104 14 95 1588 40 26 49 Future Volume (vph)124 8 148 82 24 104 14 95 1588 40 26 49 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%)1%0%0% Storage Length (ft)0 100 0 125 275 175 200 Storage Lanes 0 1 0 1 1 1 1 Taper Length (ft)100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.850 0.850 0.850 Flt Protected 0.955 0.963 0.950 0.950 Satd. Flow (prot)0 1770 1575 0 1794 1583 0 1770 3539 1583 0 1778 Flt Permitted 0.551 0.507 0.950 0.950 Satd. Flow (perm)0 1021 1575 0 944 1583 0 1770 3539 1583 0 1778 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph)25 25 45 Link Distance (ft)1241 337 1468 Travel Time (s)33.8 9.2 22.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)138 9 164 91 27 116 16 106 1764 44 29 54 Shared Lane Traffic (%) Lane Group Flow (vph)0 147 164 0 118 116 0 122 1764 44 0 83 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right R NA Left Left Right R NA Left Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 Turning Speed (mph)15 9 15 9 9 15 9 9 15 Turn Type Perm NA Perm Perm NA Perm Prot Prot NA Perm Prot Prot Protected Phases 4 8 5 5 2 1 1 Permitted Phases 4 4 8 8 2 Detector Phase 4 4 4 8 8 8 5 5 2 2 1 1 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 5.0 Minimum Split (s)24.2 24.2 24.2 24.3 24.3 24.3 11.5 11.5 24.2 24.2 11.5 11.5 Total Split (s)38.0 38.0 38.0 38.0 38.0 38.0 22.0 22.0 102.0 102.0 16.0 16.0 Total Split (%)24.4% 24.4% 24.4% 24.4% 24.4% 24.4% 14.1% 14.1% 65.4% 65.4% 10.3% 10.3% Maximum Green (s)31.8 31.8 31.8 31.6 31.6 31.6 15.9 15.9 95.8 95.8 10.4 10.4 Yellow Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.0 3.0 4.6 4.6 3.0 3.0 All-Red Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.1 3.1 1.6 1.6 2.6 2.6 Lost Time Adjust (s)-1.2 -1.2 -1.4 -1.4 -1.1 -1.2 -1.2 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes Vehicle Extension (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 2.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph)1315 58 Future Volume (vph)1315 58 Ideal Flow (vphpl)1900 1900 Grade (%)-1% Storage Length (ft)125 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot)3557 1591 Flt Permitted Satd. Flow (perm)3557 1591 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)423 Travel Time (s)6.4 Peak Hour Factor 0.90 0.90 Adj. Flow (vph)1461 64 Shared Lane Traffic (%) Lane Group Flow (vph)1461 64 Enter Blocked Intersection No No Lane Alignment Left Right Median Width(ft)12 Link Offset(ft)0 Crosswalk Width(ft)16 Two way Left Turn Lane Headway Factor 0.99 0.99 Turning Speed (mph)9 Turn Type NA Perm Protected Phases 6 Permitted Phases 6 Detector Phase 6 6 Switch Phase Minimum Initial (s)12.0 12.0 Minimum Split (s)24.2 24.2 Total Split (s)96.0 96.0 Total Split (%)61.5% 61.5% Maximum Green (s)89.8 89.8 Yellow Time (s)4.6 4.6 All-Red Time (s)1.6 1.6 Lost Time Adjust (s)-1.2 -1.2 Total Lost Time (s)5.0 5.0 Lead/Lag Lag Lag Lead-Lag Optimize?Yes Yes Vehicle Extension (s)6.0 6.0 Minimum Gap (s)3.0 3.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Time Before Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 Recall Mode None None None None None None None None C-Max C-Max None None Act Effct Green (s)25.8 25.8 25.8 25.8 15.2 104.2 104.2 11.0 Actuated g/C Ratio 0.17 0.17 0.17 0.17 0.10 0.67 0.67 0.07 v/c Ratio 0.88 0.63 0.76 0.44 0.71 0.75 0.04 0.66 Control Delay 105.0 70.6 89.9 62.6 90.2 20.7 10.5 95.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 105.0 70.6 89.9 62.6 90.2 20.7 10.5 95.3 LOS F E F E F C B F Approach Delay 86.8 76.3 24.9 Approach LOS F E C Queue Length 50th (ft)147 157 116 107 122 600 15 84 Queue Length 95th (ft)#231 229 186 166 194 782 34 #163 Internal Link Dist (ft)1161 257 1388 Turn Bay Length (ft)100 125 275 175 200 Base Capacity (vph)215 333 199 334 196 2363 1057 125 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.68 0.49 0.59 0.35 0.62 0.75 0.04 0.66 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 18 (12%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay: 32.1 Intersection LOS: C Intersection Capacity Utilization 78.5%ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 8 Lane Group SBT SBR Time Before Reduce (s)15.0 15.0 Time To Reduce (s)30.0 30.0 Recall Mode C-Max C-Max Act Effct Green (s)100.0 100.0 Actuated g/C Ratio 0.64 0.64 v/c Ratio 0.64 0.06 Control Delay 20.1 12.7 Queue Delay 0.0 0.0 Total Delay 20.1 12.7 LOS C B Approach Delay 23.6 Approach LOS C Queue Length 50th (ft)470 24 Queue Length 95th (ft)617 50 Internal Link Dist (ft)343 Turn Bay Length (ft)125 Base Capacity (vph)2280 1020 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.64 0.06 Intersection Summary Sheetz (Shade Tree) 4: Shade Tree Lane & Site Access 2 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph)38 59 172 10 10 38 Future Volume (vph)38 59 172 10 10 38 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.993 0.893 Flt Protected 0.981 0.990 Satd. Flow (prot)0 1827 1850 0 1647 0 Flt Permitted 0.981 0.990 Satd. Flow (perm)0 1827 1850 0 1647 0 Link Speed (mph)25 25 25 Link Distance (ft)337 1044 600 Travel Time (s)9.2 28.5 16.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)42 66 191 11 11 42 Shared Lane Traffic (%) Lane Group Flow (vph)0 108 202 0 53 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 28.2%ICU Level of Service A Analysis Period (min) 15 Sheetz (Shade Tree) 4: Shade Tree Lane & Site Access 2 01/15/2024 2025 Build AM Peak Hour Synchro 11 Report Timmons Group Page 10 Intersection Int Delay, s/veh 2.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 38 59 172 10 10 38 Future Vol, veh/h 38 59 172 10 10 38 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length ----0 - Veh in Median Storage, # -0 0 -0 - Grade, %-0 0 -0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 42 66 191 11 11 42 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 202 0 -0 347 197 Stage 1 ---- 197 - Stage 2 ---- 150 - Critical Hdwy 4.12 --- 6.42 6.22 Critical Hdwy Stg 1 ---- 5.42 - Critical Hdwy Stg 2 ---- 5.42 - Follow-up Hdwy 2.218 --- 3.518 3.318 Pot Cap-1 Maneuver 1370 --- 650 844 Stage 1 ---- 836 - Stage 2 ---- 878 - Platoon blocked, %--- Mov Cap-1 Maneuver 1370 --- 629 844 Mov Cap-2 Maneuver ---- 629 - Stage 1 ---- 809 - Stage 2 ---- 878 - Approach EB WB SB HCM Control Delay, s 3 0 9.9 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h)1370 --- 788 HCM Lane V/C Ratio 0.031 --- 0.068 HCM Control Delay (s)7.7 0 -- 9.9 HCM Lane LOS A A --A HCM 95th %tile Q(veh)0.1 --- 0.2 Queuing and Blocking Report 2025 Build AM Peak Hour 01/15/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 1 Intersection: 1: Carolina Beach Road & Horn Road Movement EB NB SB SB Directions Served R UL U T Maximum Queue (ft)62 62 55 5 Average Queue (ft)21 17 15 0 95th Queue (ft)44 45 41 5 Link Distance (ft)1307 1706 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft)350 350 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 2: Carolina Beach Road & Site Access 1 Movement WB NB NB SB SB Directions Served R T TR T T Maximum Queue (ft)163 20 21 21 28 Average Queue (ft)68 1 1 1 1 95th Queue (ft)127 11 10 12 14 Link Distance (ft)537 349 349 375 375 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement EB EB WB WB NB NB NB NB SB SB SB SB Directions Served LT R LT R UL T T R UL T T R Maximum Queue (ft)253 185 237 202 318 407 400 228 217 328 334 204 Average Queue (ft)113 16 111 94 108 237 232 20 72 193 191 28 95th Queue (ft)205 105 211 174 216 375 374 108 154 311 315 130 Link Distance (ft)1183 256 1438 1438 349 349 Upstream Blk Time (%)0 0 0 Queuing Penalty (veh)1 1 1 Storage Bay Dist (ft)100 125 275 175 200 125 Storage Blk Time (%)19 0 10 5 0 5 12 0 7 15 0 Queuing Penalty (veh)28 0 10 5 0 5 5 1 5 8 0 Queuing and Blocking Report 2025 Build AM Peak Hour 01/15/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 2 Intersection: 4: Shade Tree Lane & Site Access 2 Movement EB WB SB Directions Served LT TR LR Maximum Queue (ft)45 26 56 Average Queue (ft)6 1 26 95th Queue (ft)29 14 51 Link Distance (ft)256 1011 571 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 70 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 1 Lane Group EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Volume (vph)0 49 12 68 1537 26 1959 63 Future Volume (vph)0 49 12 68 1537 26 1959 63 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft)0 0 350 350 150 Storage Lanes 0 1 1 1 1 Taper Length (ft)100 100 100 Lane Util. Factor 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 0.950 Satd. Flow (prot)0 1611 0 1770 3539 1770 3539 1583 Flt Permitted 0.950 0.950 Satd. Flow (perm)0 1611 0 1770 3539 1770 3539 1583 Link Speed (mph)35 45 45 Link Distance (ft)1366 432 1733 Travel Time (s)26.6 6.5 26.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 54 13 76 1708 29 2177 70 Shared Lane Traffic (%) Lane Group Flow (vph)0 54 0 89 1708 29 2177 70 Enter Blocked Intersection No No No No No No No No Lane Alignment Left Right R NA Left Left R NA Left Right Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 9 9 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 71.9%ICU Level of Service C Analysis Period (min) 15 Sheetz (Shade Tree) 1: Carolina Beach Road & Horn Road 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 2 Intersection Int Delay, s/veh 2.2 Movement EBL EBR NBU NBL NBT SBU SBT SBR Lane Configurations Traffic Vol, veh/h 0 49 12 68 1537 26 1959 63 Future Vol, veh/h 0 49 12 68 1537 26 1959 63 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free Free Free RT Channelized - None -- None -- None Storage Length -0 - 350 - 350 - 150 Veh in Median Storage, # 0 ---0 -0 - Grade, %0 ---0 -0 - Peak Hour Factor 90 90 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 2 2 Mvmt Flow 0 54 13 76 1708 29 2177 70 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 1089 2177 2247 0 1708 -0 Stage 1 -------- Stage 2 -------- Critical Hdwy - 6.94 6.44 4.14 - 6.44 -- Critical Hdwy Stg 1 -------- Critical Hdwy Stg 2 -------- Follow-up Hdwy - 3.32 2.52 2.22 - 2.52 -- Pot Cap-1 Maneuver 0 211 57 226 - 115 -- Stage 1 0 ------- Stage 2 0 ------- Platoon blocked, %--- Mov Cap-1 Maneuver - 211 139 139 - 115 -- Mov Cap-2 Maneuver -------- Stage 1 -------- Stage 2 -------- Approach EB NB SB HCM Control Delay, s 27.9 3.4 0.6 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBU SBT SBR Capacity (veh/h)139 - 211 115 -- HCM Lane V/C Ratio 0.639 - 0.258 0.251 -- HCM Control Delay (s)67.8 - 27.9 46.5 -- HCM Lane LOS F -D E -- HCM 95th %tile Q(veh)3.4 -1 0.9 -- Sheetz (Shade Tree) 2: Carolina Beach Road & Site Access 1 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 3 Lane Group WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Volume (vph)0 117 1491 117 0 2084 Future Volume (vph)0 117 1491 117 0 2084 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 0.95 Frt 0.865 0.989 Flt Protected Satd. Flow (prot)0 1611 3500 0 0 3539 Flt Permitted Satd. Flow (perm)0 1611 3500 0 0 3539 Link Speed (mph)25 45 45 Link Distance (ft)584 423 432 Travel Time (s)15.9 6.4 6.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)0 130 1657 130 0 2316 Shared Lane Traffic (%) Lane Group Flow (vph)0 130 1787 0 0 2316 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Right Left Left Median Width(ft)0 12 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 9 15 Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 60.9%ICU Level of Service B Analysis Period (min) 15 Sheetz (Shade Tree) 2: Carolina Beach Road & Site Access 1 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 4 Intersection Int Delay, s/veh 0.9 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 0 117 1491 117 0 2084 Future Vol, veh/h 0 117 1491 117 0 2084 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length -0 ---- Veh in Median Storage, # 0 -0 --0 Grade, %0 -0 --0 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 0 130 1657 130 0 2316 Major/Minor Minor1 Major1 Major2 Conflicting Flow All - 894 0 0 -- Stage 1 ------ Stage 2 ------ Critical Hdwy - 6.94 ---- Critical Hdwy Stg 1 ------ Critical Hdwy Stg 2 ------ Follow-up Hdwy - 3.32 ---- Pot Cap-1 Maneuver 0 284 --0 - Stage 1 0 ---0 - Stage 2 0 ---0 - Platoon blocked, %--- Mov Cap-1 Maneuver - 284 ---- Mov Cap-2 Maneuver ------ Stage 1 ------ Stage 2 ------ Approach WB NB SB HCM Control Delay, s 27.9 0 0 HCM LOS D Minor Lane/Major Mvmt NBT NBRWBLn1 SBT Capacity (veh/h)-- 284 - HCM Lane V/C Ratio -- 0.458 - HCM Control Delay (s)-- 27.9 - HCM Lane LOS --D - HCM 95th %tile Q(veh)-- 2.3 - Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 5 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Lane Configurations Traffic Volume (vph)81 10 143 72 14 38 20 113 1454 76 34 84 Future Volume (vph)81 10 143 72 14 38 20 113 1454 76 34 84 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Grade (%)1%0%0% Storage Length (ft)0 100 0 125 275 175 200 Storage Lanes 0 1 0 1 1 1 1 Taper Length (ft)100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 0.95 1.00 0.95 1.00 Frt 0.850 0.850 0.850 Flt Protected 0.957 0.960 0.950 0.950 Satd. Flow (prot)0 1774 1575 0 1788 1583 0 1770 3539 1583 0 1778 Flt Permitted 0.594 0.589 0.950 0.950 Satd. Flow (perm)0 1101 1575 0 1097 1583 0 1770 3539 1583 0 1778 Right Turn on Red No No No Satd. Flow (RTOR) Link Speed (mph)25 25 45 Link Distance (ft)1241 337 1468 Travel Time (s)33.8 9.2 22.2 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)90 11 159 80 16 42 22 126 1616 84 38 93 Shared Lane Traffic (%) Lane Group Flow (vph)0 101 159 0 96 42 0 148 1616 84 0 131 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right R NA Left Left Right R NA Left Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.01 1.01 1.01 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.99 0.99 Turning Speed (mph)15 9 15 9 9 15 9 9 15 Turn Type Perm NA Perm Perm NA Perm Prot Prot NA Perm Prot Prot Protected Phases 4 8 5 5 2 1 1 Permitted Phases 4 4 8 8 2 Detector Phase 4 4 4 8 8 8 5 5 2 2 1 1 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 12.0 5.0 5.0 Minimum Split (s)24.2 24.2 24.2 24.3 24.3 24.3 11.5 11.5 24.2 24.2 11.5 11.5 Total Split (s)30.0 30.0 30.0 30.0 30.0 30.0 25.0 25.0 108.0 108.0 18.0 18.0 Total Split (%)19.2% 19.2% 19.2% 19.2% 19.2% 19.2% 16.0% 16.0% 69.2% 69.2% 11.5% 11.5% Maximum Green (s)23.8 23.8 23.8 23.6 23.6 23.6 18.9 18.9 101.8 101.8 12.4 12.4 Yellow Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.0 3.0 4.6 4.6 3.0 3.0 All-Red Time (s)3.1 3.1 3.1 3.2 3.2 3.2 3.1 3.1 1.6 1.6 2.6 2.6 Lost Time Adjust (s)-1.2 -1.2 -1.4 -1.4 -1.1 -1.2 -1.2 -0.6 Total Lost Time (s)5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lag Lag Lag Lag Lead Lead Lead-Lag Optimize?Yes Yes Yes Yes Yes Yes Vehicle Extension (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 6.0 2.0 2.0 Minimum Gap (s)2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 3.0 2.0 2.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 6 Lane Group SBT SBR Lane Configurations Traffic Volume (vph)1872 94 Future Volume (vph)1872 94 Ideal Flow (vphpl)1900 1900 Grade (%)-1% Storage Length (ft)125 Storage Lanes 1 Taper Length (ft) Lane Util. Factor 0.95 1.00 Frt 0.850 Flt Protected Satd. Flow (prot)3557 1591 Flt Permitted Satd. Flow (perm)3557 1591 Right Turn on Red No Satd. Flow (RTOR) Link Speed (mph)45 Link Distance (ft)423 Travel Time (s)6.4 Peak Hour Factor 0.90 0.90 Adj. Flow (vph)2080 104 Shared Lane Traffic (%) Lane Group Flow (vph)2080 104 Enter Blocked Intersection No No Lane Alignment Left Right Median Width(ft)12 Link Offset(ft)0 Crosswalk Width(ft)16 Two way Left Turn Lane Headway Factor 0.99 0.99 Turning Speed (mph)9 Turn Type NA Perm Protected Phases 6 Permitted Phases 6 Detector Phase 6 6 Switch Phase Minimum Initial (s)12.0 12.0 Minimum Split (s)24.2 24.2 Total Split (s)101.0 101.0 Total Split (%)64.7% 64.7% Maximum Green (s)94.8 94.8 Yellow Time (s)4.6 4.6 All-Red Time (s)1.6 1.6 Lost Time Adjust (s)-1.2 -1.2 Total Lost Time (s)5.0 5.0 Lead/Lag Lead Lead Lead-Lag Optimize?Yes Yes Vehicle Extension (s)6.0 6.0 Minimum Gap (s)3.0 3.0 Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL Time Before Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 15.0 0.0 0.0 Time To Reduce (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 30.0 30.0 0.0 0.0 Recall Mode None None None None None None None None C-Max C-Max None None Act Effct Green (s)20.4 20.4 20.4 20.4 20.0 106.2 106.2 14.4 Actuated g/C Ratio 0.13 0.13 0.13 0.13 0.13 0.68 0.68 0.09 v/c Ratio 0.70 0.77 0.67 0.20 0.65 0.67 0.08 0.80 Control Delay 89.4 89.0 86.3 61.0 79.3 16.9 9.3 100.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 89.4 89.0 86.3 61.0 79.3 16.9 9.3 100.9 LOS F F F E E B A F Approach Delay 89.1 78.6 21.6 Approach LOS F E C Queue Length 50th (ft)99 158 94 39 146 511 29 131 Queue Length 95th (ft)165 238 158 77 227 588 50 #264 Internal Link Dist (ft)1161 257 1388 Turn Bay Length (ft)100 125 275 175 200 Base Capacity (vph)176 252 175 253 226 2408 1077 165 Starvation Cap Reductn 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.57 0.63 0.55 0.17 0.65 0.67 0.08 0.79 Intersection Summary Area Type:Other Cycle Length: 156 Actuated Cycle Length: 156 Offset: 62 (40%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 100 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 33.7 Intersection LOS: C Intersection Capacity Utilization 89.4%ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Sheetz (Shade Tree) 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 8 Lane Group SBT SBR Time Before Reduce (s)15.0 15.0 Time To Reduce (s)30.0 30.0 Recall Mode C-Max C-Max Act Effct Green (s)100.6 100.6 Actuated g/C Ratio 0.64 0.64 v/c Ratio 0.91 0.10 Control Delay 31.5 11.6 Queue Delay 0.0 0.0 Total Delay 31.5 11.6 LOS C B Approach Delay 34.5 Approach LOS C Queue Length 50th (ft)919 39 Queue Length 95th (ft)#1143 70 Internal Link Dist (ft)343 Turn Bay Length (ft)125 Base Capacity (vph)2292 1025 Starvation Cap Reductn 0 0 Spillback Cap Reductn 0 0 Storage Cap Reductn 0 0 Reduced v/c Ratio 0.91 0.10 Intersection Summary Sheetz (Shade Tree) 4: Shade Tree Lane & Site Access 2 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 9 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Volume (vph)36 134 88 8 8 36 Future Volume (vph)36 134 88 8 8 36 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.989 0.890 Flt Protected 0.990 0.991 Satd. Flow (prot)0 1844 1842 0 1643 0 Flt Permitted 0.990 0.991 Satd. Flow (perm)0 1844 1842 0 1643 0 Link Speed (mph)25 25 25 Link Distance (ft)337 1024 600 Travel Time (s)9.2 27.9 16.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph)40 149 98 9 9 40 Shared Lane Traffic (%) Lane Group Flow (vph)0 189 107 0 49 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Left Left Right Left Right Median Width(ft)0 0 12 Link Offset(ft)0 0 0 Crosswalk Width(ft)16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph)15 9 15 9 Sign Control Free Free Stop Intersection Summary Area Type:Other Control Type: Unsignalized Intersection Capacity Utilization 25.7%ICU Level of Service A Analysis Period (min) 15 Sheetz (Shade Tree) 4: Shade Tree Lane & Site Access 2 01/22/2024 2025 Build PM Peak Hour Synchro 11 Report Timmons Group Page 10 Intersection Int Delay, s/veh 2.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 36 134 88 8 8 36 Future Vol, veh/h 36 134 88 8 8 36 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length ----0 - Veh in Median Storage, # -0 0 -0 - Grade, %-0 0 -0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, %2 2 2 2 2 2 Mvmt Flow 40 149 98 9 9 40 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 107 0 -0 332 103 Stage 1 ---- 103 - Stage 2 ---- 229 - Critical Hdwy 4.12 --- 6.42 6.22 Critical Hdwy Stg 1 ---- 5.42 - Critical Hdwy Stg 2 ---- 5.42 - Follow-up Hdwy 2.218 --- 3.518 3.318 Pot Cap-1 Maneuver 1484 --- 663 952 Stage 1 ---- 921 - Stage 2 ---- 809 - Platoon blocked, %--- Mov Cap-1 Maneuver 1484 --- 644 952 Mov Cap-2 Maneuver ---- 644 - Stage 1 ---- 894 - Stage 2 ---- 809 - Approach EB WB SB HCM Control Delay, s 1.6 0 9.4 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h)1484 --- 876 HCM Lane V/C Ratio 0.027 --- 0.056 HCM Control Delay (s)7.5 0 -- 9.4 HCM Lane LOS A A --A HCM 95th %tile Q(veh)0.1 --- 0.2 Queuing and Blocking Report 2025 Build PM Peak Hour 01/22/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 1 Intersection: 1: Carolina Beach Road & Horn Road Movement EB NB NB NB SB SB SB SB Directions Served R UL T T U T T R Maximum Queue (ft)143 280 222 220 64 181 176 72 Average Queue (ft)49 135 78 70 18 15 16 3 95th Queue (ft)150 315 329 315 50 142 140 38 Link Distance (ft)1307 375 375 1706 1706 Upstream Blk Time (%)3 5 2 Queuing Penalty (veh)0 39 16 Storage Bay Dist (ft)350 350 150 Storage Blk Time (%)6 4 0 1 Queuing Penalty (veh)45 3 0 1 Intersection: 2: Carolina Beach Road & Site Access 1 Movement WB NB NB SB SB Directions Served R T TR T T Maximum Queue (ft)215 149 152 313 319 Average Queue (ft)75 32 32 71 75 95th Queue (ft)193 170 179 257 263 Link Distance (ft)537 349 349 375 375 Upstream Blk Time (%)0 0 1 1 Queuing Penalty (veh)2 3 6 7 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Carolina Beach Road & Silver Lake Road/Shade Tree Lane Movement EB EB WB WB NB NB NB NB SB SB SB SB Directions Served LT R LT R UL T T R UL T T R Maximum Queue (ft)170 133 182 112 241 372 361 216 300 375 379 225 Average Queue (ft)84 13 80 34 120 207 192 27 144 298 302 70 95th Queue (ft)153 81 150 83 201 332 318 120 286 410 416 225 Link Distance (ft)1183 256 1438 1438 349 349 Upstream Blk Time (%)0 5 5 Queuing Penalty (veh)0 51 55 Storage Bay Dist (ft)100 125 275 175 200 125 Storage Blk Time (%)9 1 4 0 0 2 8 1 18 22 Queuing Penalty (veh)13 1 1 0 0 3 6 13 22 21 Queuing and Blocking Report 2025 Build PM Peak Hour 01/22/2024 Scenario 1 Sheetz (Shade Tree)SimTraffic Report Timmons Group Page 2 Intersection: 4: Shade Tree Lane & Site Access 2 Movement EB WB SB Directions Served LT TR LR Maximum Queue (ft)50 2 54 Average Queue (ft)4 0 26 95th Queue (ft)24 2 51 Link Distance (ft)256 990 571 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 307