Loading...
Signed Approved Site Plans F8 Yacht Club Tennis Parking Lot8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 8' 10' PROPOSED PARKING AREA #2 NA D 8 3 ( 2 0 1 1 ) 8' 8' 8' 8' 8' MA T C H L I N E SHEET C-1 SHEET C-2 MHW Line Table Line # L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 Length 51.46 54.66 37.15 197.08 80.71 55.93 74.81 158.59 64.90 111.15 76.95 60.81 55.25 58.59 41.34 83.60 102.47 116.78 78.21 120.89 Direction 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( L21 L22 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L36 L37 L38 L39 L40 81.18 83.05 71.07 40.24 39.94 59.04 52.00 113.74 42.25 195.62 68.89 34.76 128.46 6.05 54.99 26.03 62.27 1.57 29.14 18.68 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 1ƒ ( 1ƒ ( 6ƒ ( MHW Line Table Line # L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L52 L53 L54 L55 L56 L57 L58 L59 L60 Length 9.23 64.35 39.76 257.47 35.25 125.57 168.91 52.58 41.91 55.55 62.24 64.12 76.22 53.11 128.82 83.92 75.15 58.54 117.74 85.49 Direction 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 6ƒ ( 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : L61 L62 L63 L64 L65 L67 L68 L69 L70 L71 L72 L73 L74 L76 L75 L77 L78 L79 L80 L81 69.86 89.63 78.55 95.47 87.59 86.72 112.88 73.28 89.35 54.31 125.60 60.99 54.08 68.51 68.85 85.11 70.97 92.11 88.40 102.49 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : MHW Line Table Line # L82 L83 L85 L86 L87 L88 L89 Length 178.27 72.38 103.23 62.06 32.63 51.91 40.63 Direction 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : 1ƒ : Curve Table Curve # C1 Length 134.01 Radius 589.23 Delta 13.03 Chord Direction 6ƒ : Chord Length 133.72 MAT C H L I N E EXISTING SHED TO BE RELOCATED MA T C H L I N E MA T C H L I N E C-0 1 EX I S T I N G C O N D I T I O N S P L A N 1" = 100' PROPERTY LINE ADJOINERS RIGHT OF WAY EXISTING EDGE OF PAVEMENT LIMITS OF DISTURBANCE LEGEND REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H B L A C K F I N P T . SA N D Y P T . SITE DATA PARCEL ID:R04500-005-001-000 CURRENT ZONING:R-20S PROJECT ADDRESS:15 BRIDGE RD. WILMINGTON, NC 28411 CURRENT OWNERS:FIGURE EIGHT ISLAND CLUB INC 15 BRIDGE RD. WILMINGTON, NC 28411 TOTAL ACREAGE IN PROJECT BOUNDARY 6) “DF *Calculated to MHWL* SOILS TYPE:Nh (Newhan fine sand) DEVELOPMENT NOTES: 1. ALL DEVELOPMENT SHALL BE IN ACCORDANCE WITH NEW HANOVER COUNTY LAND DEVELOPMENT CODE. 2.PROJECT SHALL COMPLY WITH ALL FEDERAL, STATE & NEW HANOVER COUNTY REGULATIONS. 3.EXISTING SURVEYING PERFORMED BY E.S.P. ASSOCIATES, INC. 4.A PORTION OF THE PROPERTY SHOWN HEREON LIES WITHIN FEMA FLOOD HAZARD ZONES "AE", BFE 12', "AE", BFE 13', "VE" BFE 13', "VE" BFE 14', "VE", BFE 15' PER FEMA MAP # 3720317900K, EFFECTIVE DATE AUGUST 28 2018. FLOOD ZONES SHOWN ON PLAN. 5.NO WETLANDS OR SURFACE WATERS EXIST ON SITE. 6.HORIZONTAL & VERTICAL DATUM USED FOR THIS PROJECT IS NAD 1983/NAVD 1988. HORIZONTAL NAD 83 (2011) VERTICAL NAVD 88 7.NO REGULATED TREES TO BE REMOVED DURING THIS PROJECT. 200'100'50'100'0' Scale: 1"=100' SURVEY NOTES: 1. THIS TOPOGRAPHIC SURVEY IS DERIVED FROM INFORMATION GATHERED BY AN ACTUAL FIELD SURVEY MADE BY E.S.P. ASSOCIATES, INC. JULY, 2023. 2. HORIZONTAL & VERTICAL DATUM USED FOR THIS PROJECT IS NAD 1983/NAVD 1988. 3. ALL DISTANCES ARE HORIZONTAL GROUND MEASUREMENTS UNLESS OTHERWISE NOTED. 4. ALL AREAS COMPUTED BY COORDINATE COMPUTATION METHOD. 5. THE NATURE OF THIS SURVEY IS TO DEPICT EXISTING TOPOGRAPHY WITHIN A PORTION OF THE PROPERTY WITH CURRENT PHYSICAL FEATURES AND HARDSCAPE. 6. SUBSURFACE UTILITY INVESTIGATION WAS NOT PERFORMED AS A PART OF THIS PROJECT. 7. ANY ENCUMBRANCES OR EASEMENTS REGARDING CANALS, DRAINAGE, CONSERVATION, MINERAL RIGHTS, INGRESS / EGRESS, ACCESS, UTILITY OR MAINTENANCE ARE AT THE DISCRETION OF THE TITLE ATTORNEY TO REPORT FOR THIS PROJECT. THIS OFFICE ASSUMES NO LIABILITY INTO THE INTERPRETATION AS TO WHETHER ENCUMBRANCES, EASEMENTS, OR RIGHT-OF-WAYS CURRENTLY EXIST. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT A FULL CURRENT TITLE REPORT AND IS SUBJECT TO ANY RIGHT-OF-WAYS, ENCUMBRANCES OR EASEMENTS A FULL TITLE REPORT MAY REVEAL. 8. EXISTING MONUMENTATION RECOVERED IN THE FIELD WAS HELD TO RE-ESTABLISH THE PERIMETER BOUNDARIES OF THE SUBJECT TRACT. 9. REFERENCE DEED BOOK 1231 PAGE 735 NEW HANOVER COUNTY REGISTRY FOR OVERALL PLAT. 10. A PORTION OF THE PROPERTY SHOWN HEREON LIES WITHIN FEMA FLOOD HAZARD ZONES "AE", BFE 12', "AE", BFE 13', "VE" BFE 13', "VE" BFE 14', "VE", BFE 15' PER FEMA MAP # 3720317900K, EFFECTIVE DATE AUGUST 28 2018. 06/06/2024 8' 8' 8' 8' 8' 9 NA D 8 3 ( 2 0 1 1 ) GRASSED SPILLWAY ELEV. 6.7 10' 7.2 30 ' M E A N H I G H W A T E R S E T B A C K 50 ' ME A N H I G H W A T E R S E T B A C K 30 ' M E A N H I G H W A T E R S E T B A C K 50 ' M E A N H I G H W A T E R S E T B A C K MA T C H L I N E FLOOD ZONE LINE FLOOD ZONE LINE GR A S S E D P A R K I N G A R E A 18' 1 0 '16 ' 16 ' 18 ' 6 7.2 8 9 5 5 . 0 7.0 5.05' 7.2 MATCH EX. ASPHALT “ MATCH EX. ASPHALT “ 7.6 7.5 7.5 MATCH EX. ASPHALT “ ONE WAY/DO NOT ENTER SIGNS C-1 2 1" = 30' SITE DATA ASPHALT PARKING AREA #1 PARCEL ID:R04500-005-001-000 CURRENT ZONING:R-20S PROJECT ADDRESS:15 BRIDGE RD. WILMINGTON, NC 28411 CURRENT OWNERS:FIGURE EIGHT ISLAND CLUB INC 15 BRIDGE RD. WILMINGTON, NC 28411 TOTAL ACREAGE IN PROJECT BOUNDARY 6) “DF *Calculated to MHWL* EXISTING/PROPOSED USE:PARK & RECREATION AREA PROPOSED IMPERVIOUS AREA: GRASSED PARKING AREA 4,940 S.F. PARKING REQUIRED:0 SPACES PARKING PROVIDED:9 SPACES PARKING LOT INTERIOR LANDSCAPING REQUIRED 4,940 S.F. * 8% 395 S.F. PROVIDED 795 S.F.* *EXISTING VEGETATION TO MEET THIS REQUIREMENT* REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H BL A C K F I N P T . SA N D Y P T . PROPERTY LINE ADJOINERS RIGHT OF WAY EX. EDGE OF PAVEMENT RUNOFF DIRECTION SPOT ELEVATION PARKING LOT LANDSCAPING LEGEND 25.5 DEVELOPMENT NOTES: 1. ALL DEVELOPMENT SHALL BE IN ACCORDANCE WITH NEW HANOVER COUNTY LAND DEVELOPMENT CODE. 2. PROJECT SHALL COMPLY WITH ALL FEDERAL, STATE & NEW HANOVER COUNTY REGULATIONS. 3. RUNOFF FROM ALL PROPOSED IMPERVIOUS SURFACES TO BE ROUTED TO PROPOSED OPEN INFILTRATION BASINS. 4. NO REGULATED TREES TO BE REMOVED DURING THIS PROJECT. 60'30'15'30'0' Scale: 1"=30' SI T E , G R A D I N G , D R A I N A G E , & ST O R M W A T E R P L A N - A S P H A L T PA R K I N G A R E A # 1 5-16-24 ADDED LAND USE AND "ONE-WAY/DO NOT ENTER" SIGNS 8' 8' 8' 8 ' 8' 8' 8' 8 ' 10' 16 ' 18 ' 9' ƒ 20' 2 5 ' 22 5:1 G R A S S E D S W A L E 8' 8' 8' 8' 8' 8.2 50' MEA N H I G H W A T E R S E T B A C K 30' M E A N H I G H W A T E R S E T B A C K 30 ' M E A N H I G H W A T E R S E T B A C K 50 ' M E A N H I G H W A T E R S E T B A C K FLOOD ZONE LINE FLOOD ZONE LINE ASP H A L T P A R K I N G A R E A 5' 7.5 7.5 5.2 5 5 ' 3' 3'-5' GRASSED/VEGETATED STRIP MATCH EX. ASPHALT “ MATCH EX. ASPHALT “ 6" EXTRUDED CURBING 6" EXTRUDED CURBING 6" EXTRUDED CURBING CURB OPENINGS CURB OPENINGS CURB OPENINGS CURB OPENING GRASSED SPILLWAY ELEV. 7.0 7.75 7.75 7.75 1 0 PROPOSED OPEN INFILTRATION BASIN #2 TOB:7.5 FP: 7.0 BTM: 5.25 6.5 6.0 5.25 ONE WAY/DO NOT ENTER SIGNS C-2 3 1" = 30' SITE DATA ASPHALT PARKING AREA #2 PARCEL ID:R04500-005-001-000 CURRENT ZONING:R-20S PROJECT ADDRESS:15 BRIDGE RD. WILMINGTON, NC 28411 CURRENT OWNERS:FIGURE EIGHT ISLAND CLUB INC 15 BRIDGE RD. WILMINGTON, NC 28411 TOTAL ACREAGE IN PROJECT BOUNDARY 6) “DF *Calculated to MHWL* EXISTING/PROPOSED USE:PARK & RECREATION AREA PROPOSED IMPERVIOUS AREA: ASPHALT PARKING AREA 8,705 S.F. TOTAL PROPOSED IMPERVIOUS AREA: GRASSED PARKING AREA 4,940 S.F. ASPHALT PARKING AREA 8,705 S.F. TOTAL:13,645 S.F. PARKING REQUIRED:0 SPACES PARKING PROVIDED:22 SPACES PARKING LOT INTERIOR LANDSCAPING REQUIRED 8,705 S.F. * 8% 696 S.F. PROVIDED 700 S.F. REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H BL A C K F I N P T . SA N D Y P T . DEVELOPMENT NOTES: 1. ALL DEVELOPMENT SHALL BE IN ACCORDANCE WITH NEW HANOVER COUNTY LAND DEVELOPMENT CODE. 2. PROJECT SHALL COMPLY WITH ALL FEDERAL, STATE & NEW HANOVER COUNTY REGULATIONS. 3. RUNOFF FROM ALL PROPOSED IMPERVIOUS SURFACES TO BE ROUTED TO PROPOSED OPEN INFILTRATION BASINS. 4. NO REGULATED TREES TO BE REMOVED DURING THIS PROJECT. 60'30'15'30'0' Scale: 1"=30' SI T E , G R A D I N G , D R A I N A G E , & ST O R M W A T E R P L A N - A S P H A L T PA R K I N G A R E A # 2 PROPERTY LINE ADJOINERS RIGHT OF WAY EX. EDGE OF PAVEMENT RUNOFF DIRECTION SPOT ELEVATION 3:1 GRASSED SWALE PARKING LOT LANDSCAPING LEGEND 25.5 5-16-24 ADDED LAND USE AND "ONE-WAY/DO NOT ENTER" SIGNS 8' 8' 8' GRASSED SPILLWAY ELEV. 6.7 7.2 TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY BARRICADE 30 ' M E A N H I G H W A T E R S E T B A C K 50 ' ME A N H I G H W A T E R S E T B A C K 30 ' M E A N H I G H W A T E R S E T B A C K 50' M E A N H I G H W A T E R S E T B A C K FLOOD ZONE LINE FLOOD ZONE LINE GR A S S E D P A R K I N G A R E A 6 7.2 8 9 5 5 . 0 7.0 5.0 7.2 MATCH EX. ASPHALT “ MATCH EX. ASPHALT “ 7.6 7.5 7.5 MATCH EX. ASPHALT “ C-3 4 1" = 30' SITE DATA PARCEL ID:R04500-005-001-000 CURRENT ZONING:R-20S PROJECT ADDRESS:15 BRIDGE RD. WILMINGTON, NC 28411 CURRENT OWNERS:FIGURE EIGHT ISLAND CLUB INC 15 BRIDGE RD. WILMINGTON, NC 28411 TOTAL ACREAGE IN PROJECT BOUNDARY 6) “DF *Calculated to MHWL* TOTAL PROJECT DISTURBED AREA 1.08 ac. REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H B L A C K F I N P T . SA N D Y P T . SE D I M E N T A T I O N & E R O S I O N CO N T R O L P L A N A S P H A L T PA R K I N G A R E A # 1 * Perimeter dikes, ditches and slopes GROUND STABILIZATION CRITERIA 7 Days SITE AREA DESCRIPTION STABILIZATION TIMEFRAME STABILIZATION TIMEFRAME EXCEPTIONS None 7 Days None * High Quality Water (HQW) Zones 7 Days If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed * Slopes Steeper than 3:1 14 Days* Slopes 3:1 or flatter 7-days for slopes greater than 50 ft. in length 14 Days* All other areas with slopes flatter than 4:1 None (except for perimeters & HQW Zones) SYMBOL BUILDING WASTE HANDLING: -NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS -DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES ARE AVAILABLE. -EARTHEN MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES ARE AVAILABLE. -CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. INSPECTIONS: -SAME WEEKLY REQUIREMENTS -SAME RAIN GAUGE & INSPECTIONS AFTER 0.50" RAIN EVENT. -INSPECTIONS ARE ONLY REQUIRED DURING "NORMAL BUSINESS HOURS" -INSPECTION REPORTS MUST BE AVAILABLE ON-SITE DURING BUSINESS HOURS UNLESS A SITE-SPECIFIC EXEMPTION IS APPROVED. -RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. -ELECTRONICALLY AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. SEDIMENT BASINS: -OUTLET STRUCTURES MUST BE WITHDRAWN FROM BASIN SURFACES UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE. -USE ONLY DWQ APPROVED FLOCCULANTS. NORTH CAROLINA TEMPORARY GRASSING DETAIL SEEDING MIXTURE SPECIES APPLICATION RATE LATE WINTER & EARLY SPRING: Rye (grain)100 (lb/acre) Annual Iespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains)50 (lb/acre) Omit annual Iespedeza when duration of temporary cover is not to extend beyond June SUMMER: German Millet In the Piedmont and Mountains,40 (lb/acre) a small-stemmed sundangrass may be substituted at a rate of 50 (lb/acre) FALL: Rye (grain)120 (lb/acre) SEEDING DATES LATE WINTER & EARLY SPRING: Mountains - Above 2500 ft: Feb. 15-May 15 Piedmont - Jan. 1-May 1 Coastal Plain - Dec. 1-Apr. 15 SUMMER: Mountains - May 15-Aug. 15 Piedmont - May 1-Aug. 15 Coastal Plain - Apr. 15-Aug. 15 FALL: Mountains - Aug. 15-Dec. 15 Coastal Plain and Piedmont - Aug. 15-Dec. 30 SOIL AMENDMENTS: Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. MULCH: apply 4,000 lb/acre straw. anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE: Refertilize if growth is not fully adequate. reseed, refertilize and mulch immediately following erosion or other damage. NORTH CAROLINA PERMANENT GRASSING DETAIL SEEDING MIXTURE SPECIES APPLICATION RATE FALL & WINTER: Tall Fescue (blend of two or 200 (lb/acre) three improved varieties) Rye (grain) 25 (lb/acre) SPRING & SUMMER: Pensacola Bahiagrass 50 (lb/acre) Sericea Lespedeza 30 (lb/acre) Common Bermudagrass 10 (lb/acre) German Millet 10 (lb/acre) Tall Fescue 50 (lb/acre) SEEDING DATES FALL & WINTER: January - April August - December SOIL AMENDMENTS: Apply lime and fertilizer according to soil tests, or apply 3.000-5,000 lb/acre ground agricultural limestone (use the lower rate on sandy soils) and 1,000 lb/acre 10-10-10 fertilizer. MAINTENANCE: Fertilize according to soil tests or apply 40 lb/acre nitrogen in January or february, 40 lb in September and 40 lb in November, from a 12-4-8, 16-4-8, or similar turf fertilizer. Avoid fertilizer applications during warm weather, as this increases stand losses to disease. Reseed, fertilize, and mulch damaged areas immediately. mow to a height of 2.5-3.5 inches as needed. SPRING & SUMMER: April 1 - July 15 SOIL AMENDMENTS: Apply lime and fertilizer according to soil tests, or apply 3,000 lb/acre ground agriculture limestone and 500 lb/acre 10-10-10 fertilizer. MAINTENANCE: Refertilize the following april with 50 lb/acre nitrogen. Repeat as growth requires. may be mowed only once a year. Where a neat appearance is desired, omit sericea and mow as often as needed. MULCH: apply 4,000 lb/acre straw. anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. MAINTENANCE PLAN: 1.ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. 2.ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP-DRESSED WITH AN ADDITIONAL 2 INCHES OF 2-3 INCH STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3.SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, ROCK DOUGHNUT INLET PROTECTION, SEDIMENT TRAP BAFFLES, AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4.SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. CONSTRUCTION SEQUENCE: CONSTRUCTION OF SITE TO START WITH INSTALLATION OF CONSTRUCTION ENTRANCE AND SILT FENCE ALONG ALL LOCATIONS PER PLANS. UPON INSTALLATION OF SILT FENCE, TREES SHOULD BE REMOVED IN LOCATIONS AS NECESSARY. ALL SLOPED AREAS SHOULD BE SEEDED IN ACCORDANCE TO SPECIFICATIONS. SLOPE STABILIZATION IS WITHIN 21 CALENDAR DAYS OF ANY PHASE OF CONSTRUCTION. ALL OTHER AREAS MUST BE STABILIZED WITH IN 15 WORKING DAYS. CONTRACTOR TO FOLLOW NPDES STABILIZATION REQUIREMENTS PER TABLE ON THIS SHEET AS WELL. MOST STRINGENT REQUIREMENT TO BE MET. 1.GENERAL CLEARING AND GRADING OF THIS SITE WILL NOT BE DONE UNTIL THE TEMPORARY SILT FENCE & CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. 2.NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). 3.NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. 4.INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, TREE PROTECTION FENCE & SEDIMENT BASINS. CONTRACTOR TO BE FAMILIAR WITH USACOE GENERAL PERMIT CONDITIONS FOR ROAD CROSSINGS. SPECIFIC CONSTRUCTION METHODS MAY BE REQUIRED ABOVE AND BEYOND WHAT IS SPECIFIED IN THIS PLAN. INSTALL ALL SECONDARY EROSION CONTROL MEASURES, SUCH AS INLET PROTECTION AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 5.ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 6.A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 7.MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. 8.MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 9.REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. 60'30'15'30'0' Scale: 1"=30' PROPERTY LINE ADJOINERS RIGHT OF WAY EX. EDGE OF PAVEMENT RUNOFF DIRECTION SPOT ELEVATION 3:1 GRASSED SWALE LIMITS OF DISTURBANCE SILT FENCE LEGEND 25.5 8' 8' 8' 8 ' 8' 8' 8' 8 ' 10' 5:1 G R A S S E D S W A L E 8' 8' 8' 8.2 TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY BARRICADE 50' MEA N H I G H W A T E R S E T B A C K 30' M E A N H I G H W A T E R S E T B A C K 30 ' M E A N H I G H W A T E R S E T B A C K 50 ' M E A N H I G H W A T E R S E T B A C K FLOOD ZONE LINE FLOOD ZONE LINE ASP H A L T P A R K I N G A R E A 5' 7.5 7.5 5.25 5 ' 3' 3'-5' GRASSED/VEGETATED STRIP MATCH EX. ASPHALT “ MATCH EX. ASPHALT “ GRASSED SPILLWAY ELEV. 7.0 7.75 7.75 7.75 1 0 PROPOSED OPEN INFILTRATION BASIN #2 TOB:7.5 FP: 7.0 BTM: 5.25 6.5 6.0 5.25 C-4 5 1" = 30' SITE DATA PARCEL ID:R04500-005-001-000 CURRENT ZONING:R-20S PROJECT ADDRESS:15 BRIDGE RD. WILMINGTON, NC 28411 CURRENT OWNERS:FIGURE EIGHT ISLAND CLUB INC 15 BRIDGE RD. WILMINGTON, NC 28411 TOTAL ACREAGE IN PROJECT BOUNDARY 6) “DF *Calculated to MHWL* TOTAL PROJECT DISTURBED AREA 1.08 ac. REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H B L A C K F I N P T . SA N D Y P T . SE D I M E N T A T I O N & E R O S I O N CO N T R O L P L A N A S P H A L T PA R K I N G A R E A # 2 4-16-24 ADDED WATTLES TO PROP. SWALE. 60'30'15'30'0' Scale: 1"=30' PROPERTY LINE ADJOINERS RIGHT OF WAY EX. EDGE OF PAVEMENT RUNOFF DIRECTION SPOT ELEVATION 3:1 GRASSED SWALE LIMITS OF DISTURBANCE SILT FENCE WATTLE LEGEND 25.5 MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF INCH RAINFALL. 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP-DRESSED WITH AN ADDITIONAL 2 INCHES OF 2-3 INCH STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED, WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, ROCK DOUGHNUT INLET PROTECTION, SEDIMENT TRAP BAFFLES, AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. 4. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE IN THE SEDIMENT FENCE THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. 5. INSPECT WATTLES WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT (1/2 INCH OR GREATER). REMOVE ACCUMULATED SEDIMENT AND ANY DEBRIS. THE WATTLE MUST BE REPLACED IF CLOGGED OR TORN. IF PONDING BECOMES EXCESSIVE, THE WATTLE MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT MEASURE. THE WATTLE NEEDS TO BE REINSTALLED IF UNDERMINED OR DISLODGED. THE WATTLE SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE AREA ABOVE THE MEASURE HAS BEEN PERMANENTLY STABILIZED. CONSTRUCTION SEQUENCE: CONSTRUCTION OF SITE TO START WITH INSTALLATION OF CONSTRUCTION ENTRANCE AND SILT FENCE ALONG ALL LOCATIONS PER PLANS. UPON INSTALLATION OF SILT FENCE, TREES SHOULD BE REMOVED IN LOCATIONS AS NECESSARY. ALL SLOPED AREAS SHOULD BE SEEDED IN ACCORDANCE TO SPECIFICATIONS. SLOPE STABILIZATION IS WITHIN 21 CALENDAR DAYS OF ANY PHASE OF CONSTRUCTION. ALL OTHER AREAS MUST BE STABILIZED WITH IN 15 WORKING DAYS. CONTRACTOR TO FOLLOW NPDES STABILIZATION REQUIREMENTS PER TABLE ON THIS SHEET AS WELL. MOST STRINGENT REQUIREMENT TO BE MET. 1. GENERAL CLEARING AND GRADING OF THIS SITE WILL NOT BE DONE UNTIL THE TEMPORARY SILT FENCE & CONSTRUCTION ENTRANCE HAS BEEN INSTALLED. 2. NO CUT SLOPE OR FILL SLOPE SHALL EXCEED A RISE OR FALL OF ONE FOOT FOR EVERY RUN OF 3 FEET (1 VERTICAL TO 3 HORIZONTAL). 3. NO SEDIMENT WILL BE ALLOWED TO EXIT THE SITE. ALL EROSION SHALL BE CONTROLLED INCLUDING SIDE SLOPES DURING AND AFTER CONSTRUCTION. 4. INSTALL PRIMARY EROSION CONTROL MEASURES BEFORE BEGINNING CONSTRUCTION INCLUDING BUT NOT LIMITED TO GRAVELED CONSTRUCTION ENTRANCE, SILT FENCE, TREE PROTECTION FENCE & SEDIMENT BASINS. CONTRACTOR TO BE FAMILIAR WITH USACOE GENERAL PERMIT CONDITIONS FOR ROAD CROSSINGS. SPECIFIC CONSTRUCTION METHODS MAY BE REQUIRED ABOVE AND BEYOND WHAT IS SPECIFIED IN THIS PLAN. INSTALL ALL SECONDARY EROSION CONTROL MEASURES, SUCH AS INLET PROTECTION AS SOON AS POSSIBLE AFTER BEGINNING CONSTRUCTION. 5. ALL EROSION CONTROL MEASURES TO BE INSPECTED AFTER EACH RAIN. SILT FENCE AND INLET PROTECTION TO BE CLEANED WHEN HALF FULL. 6. A 4" LAYER OF TOPSOIL SHALL BE APPLIED TO ALL NEW AREAS TO BE GRASSED. 7. MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PROJECT IS COMPLETE. 8. MORE STRINGENT MEASURES MAY BE REQUIRED TO HALT EROSION IF THOSE ON THIS PLAN PROVE TO BE LESS EFFECTIVE. 9. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES UPON COMPLETION OF CONSTRUCTION. ALL PERMANENT MEASURES SHALL BE WELL ESTABLISHED PRIOR TO PROJECT COMPLETION. C-5 6 DE T A I L S NTS REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H B L A C K F I N P T . SA N D Y P T . 4-16-24 ADDED WATTLE DETAIL. NTS 2" S9.5B 8" ABC PAVEMENT SECTION COMPACTED SUBGRADE SITE WORK NOTES: 1. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BOTH ON AND ADJACENT TO THE SITE. 2. CLEARING: CONTRACTOR SHALL REMOVE ALL TREES AND VEGETATION WITHIN LIMITS OF CONSTRUCTION UNLESS OTHERWISE DESIGNATED TO REMAIN. 3. GRUBBING AND STRIPPING: CONTRACTOR SHALL RAKE AND REMOVE ROOTS, STUMPS, VEGETATION, DEBRIS, EXISTING STRUCTURES ABOVE AND BELOW GRADE, ORGANIC MATERIAL OR ANY OTHER UNSUITABLE MATERIAL WITHIN LIMITS OF CONSTRUCTION. 4. MUCKING: CONTRACTOR SHALL COORDINATE WITH OWNER AND THEIR GEOTECHNICAL REPRESENTATIVE TO COORDINATE REMOVAL OF ANY SOFT AREAS. 5. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR OTHER WASTE MATERIAL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN A PROPERLY PERMITTED FACILITY. 6. FILL AND COMPACTION SHOULD COMPLY WITH GEOTECHNICAL RECOMMENDATIONS. 7. THE CONTRACTOR SHALL NOTE THAT THE GRADING PLAN MAY NOT REPRESENT A BALANCED EARTHWORK CONDITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CUT AND FILL QUANTITIES AND COMPLETE INSTALLATION TO SPECIFIED GRADES. 8. THE CONTRACTOR SHALL FURNISH SUITABLE BORROW MATERIAL FROM AN OFF-SITE PROPERLY PERMITTED FACILITY AS REQUIRED. 9. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECORDS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXACT ELEVATIONS AND LOCATIONS OF ALL EXISTING UTILITIES AT ALL CROSSINGS PRIOR TO COMMENCING TRENCH EXCAVATION. IF ACTUAL CLEARANCES ARE LESS THAN INDICATED ON PLAN, THE CONTRACTOR SHALL CONTACT THE DESIGN ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION. ANY CONDITION DISCOVERED OR EXISTING THAT WOULD NECESSITATE A MODIFICATION OF THESE PLANS SHALL BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER BEFORE PROCEEDING WITH CONSTRUCTION. 10. NO CONSTRUCTION IS TO BEGIN BEFORE LOCATION OF EXISTING UTILITIES HAS BEEN DETERMINED. CALL "NC ONE-CALL" AT LEAST 48 HOURS BEFORE COMMENCING CONSTRUCTION. 11. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES DURING CONSTRUCTION. BEFORE COMMENCING ANY EXCAVATIONS IN OR ALONG ROADWAYS OR RIGHT-OF-WAYS, PUBLIC AREAS OR IN PRIVATE EASEMENTS, THE CONTRACTOR SHALL NOTIFY ALL APPROPRIATE PERSONNEL OF THEIR INTENT TO EXCAVATE, IN WRITING, NOT LESS THAN 10 DAYS PRIOR TO EXCAVATING. 12. THE CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE DISCONNECTION/ RECONNECTION AND/OR THE RELOCATION OF ALL EXISTING UTILITIES WITH APPROPRIATE PERSONNEL. 13. CONTRACTOR SHALL ADJUST ALL MANHOLES, VALVE & CURB BOXES TO FINAL GRADE UPON COMPLETION OF ALL CONSTRUCTION. ANY BOXES DAMAGED OR OTHERWISE DISTURBED BY THE CONTRACTOR SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR. 14. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AT THE SITE. FURTHERMORE THE CONTRACTOR SHALL REPORT ALL DISCREPANCIES OR QUESTIONS TO THE ENGINEER PRIOR TO INSTALLATION. 15. THE CONTRACTOR SHALL PROVIDE ANY AND ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK UNLESS OTHERWISE DIRECTED BY OWNER. 16. ALL SERVICE CONNECTIONS SHALL BE INSTALLED TO MEET ALL LOCAL, STATE, AND CFPUA CODES. METERS, TAPS, MATERIALS, WORKMANSHIP AND ALL FEES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL COMPLY WITH ALL REQUIREMENTS. 17. ALL BACKFILL FROM UTILITY INSTALLATION MUST BE COMPACTED OR AMENDED TO PROVIDE TRAFFIC BEARING CAPACITY. GEOTECHNICAL ENGINEER TO BE CONSULTED AT CONTRACTORS COST AS NECESSARY. 18. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO INSTALLATION. ALL AREAS SHALL BE SLOPED TO DRAIN AWAY FROM BUILDINGS AT ALL TIMES. 19. CONCRETE FOR WALKS, CURBS AND DRIVES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI @ 28 DAYS - AIR ENTRAINED. 20. FIELD TESTING SHALL BE DONE BY AN INDEPENDENT TESTING LABORATORY PAID FOR BY THE OWNER. FURTHER TESTING REQUIRED DUE TO A FAILED TEST WILL BE PAID FOR BY THE CONTRACTOR. 21. ALL SIDEWALKS SHALL BE FREE OF CRACKS, BREAKS, OR ANY OTHER DEFECT PRIOR TO RECEIVING A CERTIFICATE OF OCCUPANCY. PROPOSED DRIVEWAY GRADE 2% MIN SLOPE 6' MIN FROM EX. EOP TYPICAL DRIVEWAY GRADING SECTION NTS (;52$'“6/23( WHEEL STOP DETAIL NTS 1. CONTRACTOR SHALL INSTALL PER CITY OF WILMINGTON TECHNICAL STANDARD PER SD 15-13 NOTE: WIDTH x LENGTH x HEIGHT 1/2"1/2"6'-11" FRONT VIEW ‘+2/(6 1/2" END VIEW 4" 4.5" 1/2"8" 9" x 7'-0" x 4" 4000 PSI @ 4 - #4 REBAR 28 DAYS CONCRETE: REINFORCING: PLAN VIEW 12"7'12" 2. CONTRACTOR SHALL INSTALL WHEEL STOP 2.5' FROM SIDEWALK. MIN. 12-1/2 GA. INTERMEDIATE WIRES SHALL HAVE A MIN. OF SIX LINE WIRES WITH 12" STAY 36" IN WIDTH. FABRIC SHALL BE FASTENED SELF-FASTENER STEEL ANGLE TYPE. 1. FENCE FABRIC SHALL BE A MIN. OF 32" IN WIDTH AND 2. FABRIC SHALL BE FOR EROSION CONTROL AND MIN. OF ADEQUATELY TO THE WIRE FABRIC AS DIRECTED BY THE 3. STEEL POST SHALL BE 5'-0" IN HEIGHT AND BE OF THE TEMPORARY SILT FENCE NTS SPACING. ENGINEER. NOTES: VARIES (6'-8' MIN.) AS DIR. BY ENG. STEEL POST FI L T E R F A B R I C WIRE FABRIC FILTER FABRIC 4" 8"6" ANCHOR FABRIC SKIRT AS DIRECTED BY ENGINEER TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NTS PUB L I C R O A D COARSE AGGREGATE 2" - 3" 8" MIN.REQ U I R E D AS 50' M I N . 12' M I N . GEO FABRIC LINER CONSTRUCTION ENTRANCE TO BE 12' OR ENTIRE WIDTH OF NOTE: ENTRANCE. WHICHEVER IS GREATER. BOTTOM OF SPILLWAY EL. 6.7 3 1 3 1 TOP OF BANK1 3 10' EL. 6.7 EL. 7.0 GRASSED SPILLWAY DETAIL BASIN #1 NTS EL. 7.0 7.0 TOP OF BANK 3 1 BOTTOM EL. 5.0 * BASIN BOTTOM TO BE SEEDED IN ACCORDANCE TO SEEDED & MULCHED. 3 1 OPEN INFILTRATION BASIN #1 SECTION NTS * BASIN SIDE SLOPES TO BE SODDED. SIDE SLOPES TO BE SODDED * ANY PORTION OF OPEN INFILTRATION BASIN USED FOR S&EC DURING CONSTRUCTION MUST BE CLEANED OUT AND RETURNED TO DESIGN STATE BEFORE USE AS AN OPEN INFILTRATION BASIN. BOTTOM OF SPILLWAY EL. 7.0 3 1 51 TOP OF BANK1 3 10' EL. 7.0 EL. 7.5 GRASSED SPILLWAY DETAIL BASIN #2 NTS EL. 7.5 7.5 TOP OF BANK 3 1 BOTTOM EL. 5.25 * BASIN BOTTOM TO BE SEEDED IN ACCORDANCE TO SEEDED & MULCHED. 3 1 OPEN INFILTRATION BASIN #2 SECTION NTS * BASIN SIDE SLOPES TO BE SODDED. SIDE SLOPES TO BE SODDED * ANY PORTION OF OPEN INFILTRATION BASIN USED FOR S&EC DURING CONSTRUCTION MUST BE CLEANED OUT AND RETURNED TO DESIGN STATE BEFORE USE AS AN OPEN INFILTRATION BASIN. NTS 5:1 S L O P E 5:1 SLO P E 10 " M I N . TYPICAL GRASS SWALE NOTES: 1. ALL SWALES TO BE IMMEDIATELY LINED WITH EXCELSIOR MAT AND SEEDED IN ACCORDANCE WITH SPECIFICATIONS. EXTRUDED CURB DETAIL NTS 1" 3/8" CONTINUOUS CABLE STEEL AIRCRAFT 6" 6" 3" C-6 7 DE T A I L S REVISIONS PROJECT NUMBER: DRAWING NUMBER: CHECKED: APPROVED: DRAWN: DATE: SCALE: SHEET SIZE: VICINITY MAP (NOT TO SCALE): 2023-014 CLIENT INFORMATION: Figure Eight Island Club, Inc. 15 Bridge Rd. Wilmington, NC 28411 OF 7 JAE CDC CDC 24x36 4/5/2024 FI G U R E E I G H T Y A C H T CL U B SIT E AIRPORT ATL A N T I C I N T R A C O A S T A L W A T E R W A Y BRI D G E R D . NORTH KERR AVE O L D W R I G H T S B O R O R D AC O R N B R A N C H R D S R 1 3 1 9 SR 1 3 7 0 PRE L I M I N A R Y DRA W I N G D O N O T U S E FOR C O N S T R U C T I O N BEA C H R D . S O U T H BEA C H R D . N O R T H BL A C K F I N P T . SA N D Y P T . NTS