6-19-2024 TRC Agenda Full1
TECHNICAL REVIEW COMMITTEE AGENDA
June 19th, 2024
New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, June 19, 2024
at 2:00 p.m. to discuss the below items.
PLEASE NOTE:
This meeting will be conducted remotely via teleconference. Interested parties can contact the Planning
and Land Use Department at 910-798-7165 for more information.
Item 1: Sheetz at Shade Tree – Commercial Site Plan – SITECN-24-000019
Request by Cristine C Point, property owner, for a Sheetz convenience store with fuel stations. The site
is 4.4 acres and is zoned B-2, located at 4915 Carolina Beach Road. The engineer is Patrick Barbeau with
Timmons Group (Patrick.barbeau@timmons.com). The case planner is Love Ott, (lott@nhcgov.com, 910-
798-7444)
Item 2: Old Lendire Parking Lot – Commercial Site Plan – SITECN-24-000020
Request by Justin Fulford of JGAT LLC for a conversion of an old street (Old Lendire Road, no longer a
street) to a parking lot for their mixed commercial development, and conversion of two buildings on site
from storage to commercial use. The site is 1 acre and is zoned B-2, located at 7227, 7223 and 7231
Market St. The engineer is Howard Resnick with CSD Engineering (howard@csd-engineering.com). The
case planner is Zach Dickerson (zdickerson@nhcgov.com, 910-798-7450)
Item 3: Jay’s Place – Commercial Site Plan – SITECN-24-000021
Request by Joseph Hudson with Castle Plaza Development, LLC for Office/Warehouse flex space. The site
is 1.03 acres and is zoned B-2, located at 5409 Castle Hayne Road. The engineer is Mark Hargrove with
Port City Consulting Engineers, PLLC (mark@portcityeng.com), the case planner is Wendell Biddle
(wbiddle@nhcgov.com, 910-798-7068)
Item 4: Flemington Warehouse and Laydown Yard – Commercial Site Plan – SITECN-24-000022
Request by Vince Burgess, IV of Burgess Land Lease, LLC for a warehouse and laydown yard. The site is
4.00 acres and is zoned I-2, located at 133 Flemington Road. The engineer is Phil Tripp with Tripp
Engineering (ptripp@trippengineering.com), the case planner is Amy Doss, (adoss@nhcgov.com, 910-
798-7571).
Item 5: Blue Bay Townhomes – Major Subdivision – SUBPP-24-0005
Request by Elizabeth Shelton- Division President with DR Horton, on behalf of Blue Tank LLC, property
owners, for a 263 unit townhome development. The site is located at 5735 Blue Clay Rd and is zoned
Conditional RMF-L. The engineer is John Wall with Timmons Group (john.wall@timmons.com), the case
planner is Zach Dickerson (zdickerson@nhcgov.com, 910-798-7450).
Item 6: Construction Office and Laydown Yard – Commercial Site Plan – SITECN-24-000023
Request by David Honeycutt of DMH Land, LLC, owner, for a construction office and laydown yard. The
site is 31.26 acres and is zoned I-2, located at 4720 N College Road. The engineer is Mark Hargrove with
Port City Consulting Engineers, PLLC (mark@portcityeng.com), the case planner is Zach Dickerson
(zdickerson@nhcgov.com, 910-798-7450).
4915 Carolina Beach Road – Preliminary Plan – TRC Review
To: Patrick Barbeau
Timmons Group (patrick.barbeau@timmons.com)
From: Love Ott – Development Review Planner
Date: June 19,2024
PID#: R07100-003-024-000
Egov#: SITECN-24-000019
Subject: 4915 Carolina Beach Rd. – Sheetz – Preliminary Plan – TRC Review
The following comments have been received for the June 19, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
Planning, Love Ott 910-798-7444
1. General Comments
a. Zoning district: B-2. Proposed use: Convenience Store, Fuel Station
b. Please note the below standards from UDO Section 4.3.4.I.2 for Fuel Sales:
i. Fuel sales in all districts where allowed shall comply with the following standards:
a. The premises shall not be used for the sale of vehicles.
b. Fuel pump canopies shall meet the setbacks of the underlying
zoning district, as measured from the outer edge of any
supportive structure physically connected to a fuel pump and the
ground along a straight line to the nearest point of the property
line.
c. Setback distances from street rights-of-way may be reduced by
one-half.
2. UDO Section 5.1, Parking and Off-Street Loading
a. Parking is sufficient.
3. UDO Section 5.2, Traffic, Access and Connectivity:
a. Any access questions, please refer to NCDOT comments.
b. Please be aware that no building permit will be issued until NCDOT has issued the
Driveway Permit.
4915 Carolina Beach Road – Preliminary Plan – TRC Review
4. UDO Section 5.3, Tree Retention:
a. Tree Removal Permit has been received.
5. UDO Section 5.4, Landscaping and Buffering:
a. Please use distinct graphics to illustrate trees to be removed
b. Please show sight triangles on the landscape plan.
c. Exemption request from foundation plantings at drive through granted, UDO 5.4.7.C.1.
d. Perimeter landscaping includes existing trees, please ensure tree protection is used
during disturbance.
e. Parking lot interior landscaping appears to meet requirements, UDO Table 5.4.5.C.
6. UDO Section 5.5, Lighting:
a. Please note that with the latest update to the UDO, a lighting plan is not required at time
of TRC Approval. See below excerpt from Section 5.5.3:
i. Information about the exterior lighting for the site that demonstrates compliance
with the standards in this section shall be submitted in conjunction with an
application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance
approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first,
approved no later than at time of construction plan approval.
b. When available, please send over lighting plan for review and approval.
7. UDO Section 5.6, Signs:
a. Please note that all signs are subject to section 5.6 of the UDO.
b. Please submit for sign permits prior to installation.
c. Please note that per UDO Section 5.6.2.J.4.a.3, Carolina Beach Road, Freestanding signs
along Carolina Beach Road shall comply with the provisions of this section except that only
one freestanding ground sign not to exceed six feet in height and a maximum surface area
of 150 square feet is permitted.
8. UDO Section 5.7, Conservation Resources
a. Per the New Hanover County Conservation Resource Overlay map, there are no
Conservation Resources on this portion of the site.
NHC Fire, Sunnie Batson 910-798-7464
1. Required for Plan Review Submittal:
a. The complete TRC/Site plans comments by fire during review shall be submitted along with
the building plans for review to New Hanover County Fire Marshal’s Office. This shall
include the complete set of civil plans showing existing and proposed fire hydrant
locations. Failure to submit the comments or a complete set of civil plans will result in a
resubmittal for review for verification of compliance.
b. Any plans involving an underground storage tank (UST) shall include an engineered plan
complying with the NCFC Chapter 23, 57 and NFPA 30 for Underground Storage Tank Cover
requirements. This plan shall also show all vent lines.
2. Accessibility – Fire Apparatus Access Road:
a. Fire apparatus access is required at the time of construction. These roads are required to
be capable of supporting 85,000 lbs. in all weather conditions.
3. Addressing:
a. Premises identification signage is required during construction. The signage is permitted
to be temporary until permanent signage is installed.
4. Water Supply (Chapter 5 and Appendix C) – Fire Hydrants:
4915 Carolina Beach Road – Preliminary Plan – TRC Review
a. All fire hydrants shall be installed to Cape Fear Public Utility Authority specifications.
CFPUA specifications are available from the Fire Marshal’s Office or CFPUA.
b. A fire hydrant will be required to be installed at the entrance to the project site off Carolina
Beach Road.
5. Construction and Demolition
a. Chapter 33 must be adhered to during the construction process and any demolition.
NHC Engineering (Stormwater), Galen Jamison 910-798-7072
1. The County stormwater and land disturbance permit is currently under review. Any comments will
be forwarded the designer.
2. The offsite drainage coming from the north that is conveyed in culvert FE300-301 shall be placed
in a public drainage easement sized in accordance with NHC Stormwater Manual. Construction
within this offsite drainage conveyance measure that will be maintained by the county will need
to be observed during construction by Stormwater Services and a turnover meeting scheduled
once the system is ready to be conveyed to the county. Please add a plan note to ensure county
construction observation and a turnover meeting occurs. Note, should the applicant elect to
maintain the conveyance measures themselves, the POA covenants shall indicate the operation
and maintenance roles and responsibilities for the conveyance measure.
3. Please contact the State for their stormwater permitting requirements. It is anticipated a high
density permit will be necessary.
NHC Environmental Health, Dustin Fenske 910-798-7324
1. Site plan reflects connection to public water. Environmental Health has a record of a well being
installed on this property in 1995. There is also a record for a well abandonment but specifics are
not given. The developers must be mindful if there is a well head encountered during demolition,
and it has not been properly abandoned; it must be properly abandoned by a certified well driller.
This is extremely necessary since this will be a gas station. Environmental Health does not have
any records on surrounding properties in which setbacks (sewer and UST's) will be violated.
2. If food service is occurs at this facility then application submitted and approval must be received
from the NC Environmental Health Plan Review Unit.
3. Site Plan reflects connection to public sewer. Environmental Health records reflect a septic system
being installed in 1981. If a septic tank is encountered during demolition, then it shall be pumped,
crushed and filled. Proposed infrastructure does not violate setbacks to any surrounding
properties septic systems.
NHC Addressing, Katherine May
1. No comments. Current address is acceptable.
CFPUA, Bernice Johnson 910-332-6620
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan review required by CFPUA.
3. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload
all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-
103.
4. CFPUA water available via mainline extension
5. CFPUA sewer will be available through mainline extension and installation of pump station.
6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains).
4915 Carolina Beach Road – Preliminary Plan – TRC Review
7. A capacity is determination can be provided upon submittal of the NC DWQ FTA/FTSE Application
Form and a Preliminary Plan; this determination does not guarantee capacity.
8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans
meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority.
NCDOT, Nick Drees, 910-398-9100
1. Please see attached appendix from NCDOT.
WMPO, Scott James, 910-473-5130
1. Please see attached appendix from WMPO.
Army Corps of Engineers, Brad Shaver 910-251-4611
1. JD completed, and permit is expected.
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J.R. “JOEY” HOPKINS
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Memorandum
To: New Hanover County Technical Review Committee
Date: June 5, 2024
Subject: Sheetz Shade Tree Lane – 4915 Carolina Beach Road
________________________________________________________________________
These are preliminary comments and are based on the plans as submitted for the proposed
site. They are subject to further review upon receipt of any additional information.
Subsequently, additional comments and/or requirements may be necessary for this site.
General Comments:
NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT
Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx
NCDOT Driveway Permit:
An NCDOT Driveway permit has been submitted to NCDOT for review.
x Permit # D033-065-24-00079.
Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway
Access to North Carolina Highways to include access locations within 500’ of the
proposed access on both sides of the State Road. Submit to the local NCDOT District
Engineer’s Office.
x Refer to the NCDOT checklist (included) for required documents and site plan
information.
NCDOT Encroachment Agreement:
An NCDOT Encroachment Agreement is required for any utility connections or
installations within the NCDOT right-of-way (form 16.6).
x No private utilities are allowed to run parallel in the NCDOT right-of-way.
An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths
installed within the NCDOT right-of-way (form 16.6).
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Required Roadway Improvements:
Roadway improvements are required per the approved TIA (included):
x The required roadway improvements can be incorporated into the driveway
permit and will not require a separate encroachment agreement.
Refer to the NCDOT Roadway Design Manual for help with the design of any required
roadway improvements.
x Figure 8-10 Recommended Treatment for Turn Lanes (Included).
Site Plan Comments:
Hydraulic calculations and associated plan sheets will need to be submitted for the site.
x This will be reviewed by the NCDOT Hydraulics Unit.
Include/update the NCDOT Standard Drawings (2024) that are applicable to the
development.
x Sheet C7.4
The proposed driveways need to be designed accordingly to allow for the ingress and
egress without any conflicts.
The proposed pavement design and the limits of the final layer of asphalt will be
reviewed during the driveway permit review.
Sight Triangles and Sight Distance:
x Show and label the 10’ X 70’ NCDOT sight triangles.
o No obstructions shall be placed within the NCDOT sight triangles.
x Show and label the stopping sight distance.
o No obstructions shall be placed within the stopping sight distance.
o Reference table 3-1 below for design requirements.
Label the internal protection stem length for the proposed driveway connection.
x Measured from the right-of-way line.
x These will need to meet the minimum requirements of the approved TIA.
You can coordinate with the district office with any questions 910-398-9100.
Mailing Address:
NCDEPARTMENTOFTRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101WILMINGTON, NC 28403
04-11-03COURIER
Telephone:910-398-9100
CustomerService:1-877-368-4968
Website:ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
March 13, 2024
Mr. Jeff Hochanadel, PE, PTOE
Timmons Group
5410 Trinity Road, Suite 102
Raleigh, NC 27607
RE: Approval with conditions for the Traffic Impact Analysis (TIA) associated with the Sheetz (Shade Tree)
commercial development in New Hanover County, NC
Dear Mr. Hochanadel,
The WMPO, NCDOT and New Hanover County staffs have reviewed the Sheetz (Shade Tree)TIA (sealed
January 23, 2024) and based on the information provided and conversations held to date, it is our
understanding that the proposed development will be built in 2025 and consist of the following:
ITE Land Use Code 945 – 6,139 SF of Convenience Store/Gas Station with 12 vehicle fueling positions
The following improvements are required of this development:
US 421 (Carolina Beach Rd) and SR 1262 (Horn Rd) (Left-in/Right-in/Right-out intersection)
o No improvements are required.
US 421 (Carolina Beach Rd) and SR 1197 (Silver Lake Rd)/SR 2361 (Shade Tree Lane)(Signalized
intersection)
o Extend the southbound left turn lane on US 421 (Carolina Beach Road) to provide 300 feet of storage,
appropriate full-width deceleration, and taper.
o Extend the northbound left turn lane on US 421 (Carolina Beach Road) to extend the full width storage
by 100 feet. The existing 200-foot taper may be reduced to 100 feet in length to accommodate this
improvement.
US 421 (Carolina Beach Rd) and Site Access 1 (Right-in/Right-out intersection)
o Construct a northbound right turn lane on US 421 (Carolina Beach Road) with 175 feet of storage,
appropriate full width deceleration and taper.
o Construct site access (westbound approach) with an internal protected stem of 100 feet, measured
from the right-of-way line and configured as right-in/right-out operation.
o Provide stop controls for westbound approach.
NCDOT/WMPO Required Improvements Figure
Sheetz - Shade Tree
Legend
Black - Existing Infrastructure
Blue -Full build Improvements
-Stop Control
-Signal
- Right-in/Right-out
Extend the northbound left turn lane on US 421
(Carolina Beach Road) to extend the full width storage
by 100 feet. The existing 200-foot taper may be
reduced to 100 feet in length to accommodate this
US
4
2
1
Site Access 1
Si
t
e
A
c
c
e
s
s
2
Secure Self Storage
Driveway
Horn Road
US
4
2
1
30
0
'
s
t
o
r
a
g
e
,
de
c
e
l
e
r
a
t
i
o
n
a
n
d
50
'
I
P
S
100' IPS
17
5
'
20
0
'
s
t
o
r
a
g
e
,
10
0
'
t
a
p
e
r
Attachment
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
C
0
.
0
-
C
O
V
R
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
4
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C0.0
CO
V
E
R
S
H
E
E
T
332
P. BARBEAU
P. BARBEAU
NA
D
8
3
VICINITY MAP
NTS
CIVIL ENGINEER:
TIMMONS GROUP
5410 TRINITY ROAD
SUITE 102RALEIGH, NC 27607
PROJECT MANAGER:
PATRICK BARBEAU, PE
PATRICK.BARBEAU@TIMMONS.COMPH: (919) 866-4512
ENGINEER OF RECORD:
PATRICK BARBEAU, P.E.
PATRICK.BARBEAU@TIMMONS.COMPH: (919) 866-4512
WILMINGTON, NORTH CAROLINA 28412
NEW HANOVER COUNTY
DEVELOPER:
BRIAN DOWNS
ENTITLEMENT MANAGER
5700 SIXTH AVENUEALTOONA, PA 16602
PH: (919) 264-8593
BDOWNS@SHEETZ.COM
POINT CLAN 1, LLC
4915 CAROLINA BEACH ROAD
WILMINGTON, NC 28409
SITE PLAN REVIEW
OWNER:SURVEYOR:
CONVENIENCE ARCHITECTURE
AND DESIGN P.C.
351 SHEETZ WAY
CLAYSBURG PA 16625
PH: (814) 239-6013TCOLUMBU@SHEETZ.COM
ARCHITECT:
SITE PLAN SUMMARY
PROJECT: SHEETZ - SHADE TREE LANE
OWNERS:POINT CLAN 1 LLC;4915 CAROLINA BEACH ROADWILMINGTON, NC 28409
PROJECT ADDRESS: 4915 CAROLINA BEACH ROAD
PID #:R07100-003-024-000
DEED: DB 3687 PG 680
ZONING: B2 - BUSINESS DISTRICT
EXISTING USE: LANDSCAPE NURSERY
PROPOSED USE:CONVENIENCE STORE WITH GAS SALES AND RESTAURANT WITHSEATING AND DRIVE THRU
FLOOD ZONE:NOT LOCATED IN FLOOD HAZARDS AREA PER FEMA MAP#3720313400K (EFFECTIVE 08/28/2018)
TOTAL EXISTING TRACTAREA:4.40 AC
PROPOSED TRACTAREA:PARCEL #1 (SHEETZ): 2.76 AC POST-ROW DEDICATIONPARCEL #2: 1.55 AC POST-ROW DEDICATION
DISTURBED AREA:3.9 AC TOTALON-SITE: 2.95 ACOFF-SITE WITHIN PUBLIC ROW: 0.95 AC
EXISTING IMPERVIOUSSURFACE AREA:25,526 SF
PROPOSEDIMPERVIOUS SURFACEAREA:87,676 SF (62%) - INCLUDES 0.1 AC (4,356 SF) FUTURE IMPERVIOUS
TYPE OF BUILDINGCONSTRUCTION:V-B (NON-SPRINKLERED)
TYPE OF CANOPYCONSTRUCTION:II-B
VEHICLE PARKINGSUMMARY: REQUIRED
RESTAURANT: 6 SPACES PER 1000 SQUARE FEET OF GFA =2,363 SF / 1000 * 6 = 14 SPACES REQUIREDRETAIL: 2.5 SPACES PER 100 SQUARE FEET OF GFA =4,151 SF / 1000 * 2.5 = 10 SPACES PROVIDEDTOTAL: 24 SPACES
VEHICLE PARKINGSUMMARY: PROVIDED 44 SPACES ON-SITE, ADA: 2 REQ'D; 2 PROV'D W/ 1 VAN ACCESSIBLE1 LOADING SPACE
SHEETZ - SHADE TREE LANE
SITE
CA
R
O
L
I
N
A
B
E
A
C
H
R
D
TIMMONS GROUP
MARTIN WEBB, PLS
610 E MOREHEAD STREETSUITE 250
CHARLOTTE, NC
PH: (919) 866-4952
MARTIN.WEBB@TIMMONS.COM
GENERAL NOTE
ALL CONTRACTORS SHALL VISIT THE PROJECT TO FAMILIARIZE THEMSELVES WITH SITECONDITIONS PRIOR TO BIDDING OR CONSTRUCTION. BY SUBMITTING A BID, THE CONTRACTORAND HIS SUBCONTRACTORS ARE CONFIRMING THAT THEY HAVE VISITED THE SITE AND HAVEINCLUDED IN THEIR BID ANY ADDITIONAL ITEMS OF CONSTRUCTION THAT MAY BE REQUIREDDUE TO EXISTING SITE CONDITIONS.
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
SHADE
T
R
E
E
L
A
N
E
SP
L
I
T
R
A
I
L
D
R
SILVER
L
A
K
E
R
D
Sheet List Table
Sheet Number Sheet Title
C0.0 COVER SHEET
C1.0 EXISTING CONDITIONS PLAN
C1.1 EXISTING CONDITIONS PLAN
C1.2 TREE CLEARING PLAN
C1.3 TREE CLEARING PLAN
C1.4 DEMOLITION PLAN
C1.5 DEMOLITION PLAN
C2.0 SITE PLAN
C2.1 TURN LANE PLAN
C2.2 TURN LANE PLAN
C2.3 VEHICULAR CIRCULATION PLAN
C2.4 VEHICULAR CIRCULATION PLAN
C3.0 GRADING AND DRAINAGE PLAN
C3.1 SCM DETAILS
C3.2 SCM DETAILS
C4.0 EROSION CONTROL PLAN - PHASE I
C4.1 EROSION CONTROL PLAN - PHASE I
C4.2 EROSION CONTROL PLAN - PHASE II
C4.3 EROSION CONTROL PLAN - PHASE II
C4.4 NPDES PLAN
C4.5 NPDES AND NCG01 SPECIFICATIONS
C5.0 UTILITY PLAN
C5.1 UTILITY PLAN
C5.2 LIGHTING PLAN
C6.0 LANDSCAPE PLAN
C6.1 LANDSCAPE DETAILS
C7.0 NOTES AND DETAILS
C7.1 NOTES AND DETAILS
C7.2 NOTES AND DETAILS
C7.3 NOTES AND DETAILS
C7.4 NOTES AND DETAILS
C7.5 NOTES AND DETAILS
C7.6 NOTES AND DETAILS
C7.7 NOTES AND DETAILS
C7.8 NOTES AND DETAILS
C7.9 NOTES AND DETAILS
C7.10 NOTES AND DETAILS
C7.11 NOTES AND DETAILS
A1.0 EXTERIOR ELEVATIONS
A1.1 EXTERIOR ELEVATIONS
A1.2 FUEL CANOPY DETAILS
PS1.0 PRIVATE LIFT STATION SITE LAYOUT
PS1.1 PRIVATE LIFT STATION FORCE MAIN PLAN AND PROFILE
PS1.2 PRIVATE LIFT STATION DETAILS
PS1.3 PRIVATE LIFT STATION DETAILS
MUNICIPAL CONTACT LIST
GAS
PIEDMONT NATURAL GAS1321 SOUTH 10TH STREET, WILMINGTON, NC 28401
PHONE: 910-251-2814JARRED GARRISON
JARRED.GARRISON@DUKE-ENERGY.COM
NEW HANOVER COUNTY ENGINEERING
230 GOVERNMENT CENTER DRIVE, SUITE 160WILMINGTON, NC 28403
PHONE: 910-798-7117TIM LOWE, PE
TLOWE@NHCGOV.COM
NEW HANOVER ZONING
NEW HANOVER COUNTY ZONING230 GOVERNMENT CENTER DRIVE, SUITE 110
WILMINGTON, NC 28403PHONE: 910-798-7450
ZACHARY DICKERSONZDICKERSON@NHCGOV.COM
WATER AND SEWERCAPE FEAR PUBLIC UTILITY AUTHORITY
235 GOVERNMENT CENTER DRIVEWILMINGTON, NC 28403
PHONE: 910-332-6673JEFF THEBERGE, PE
BUILDING CODE OFFICIALNEW HANOVER COUNTY BUILDING INSPECTIONS
230 GOVERNMENT CENTER DRIVE, SUITE 170WILMINGTON, NC 28403
PHONE: 910-798-7308
ELECTRIC
DUKE ENERGY
5700 HOLLY SHELTER ROAD
CASTLE HAYNE, NC 28429PHONE: 910-386-3232
AMY NEELEYAMY.NEELEY@DUKE-ENERGY.COM
TELEPHONE/CABLESPECTRUM
2321 SCIENTIFIC PARK DRIVEWILMINGTON, NC 28405
PHONE: 980-508-0794ZACHARY WAHL
ZACHARY.WAHL@CHARTER.NET
DEPARTMENT OF PLANNING
NEW HANOVER COUNTY PLANNING230 GOVERNMENT CENTER DRIVE, SUITE 110
WILMINGTON, NC 28403PHONE: 910-798-7450
ZACHARY DICKERSONZDICKERSON@NHCGOV.COM
NCDOT5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403PHONE: 910-398-9100
BEN HUGHES, PEBTHUGHES@NCDOT.GOV
TC
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
OH
P
OH
P
OH
P
OHP
OH
P
OHPOHPOHP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
OH
P
OH
P
OHP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
VAN
STO
P
STANDARDUST FIELD
NEW SHEETZ STORE
6139 SQ. FT.FFE: 22.50'
25' FRONT BUILDING SETBACKAND STREETCAPE BUFFER
25' SIDE STREETBUILDING SETBACK
20' REAR BUILDING SETBACK
10' REAR LANDSCAPE BUFFER
10' SIDE LANDSCAPE BUFFER
32'
10'
65'27'
5'
32'
26'
60'
47.1'
60'
35'
48'
20'
30'
8'
10'
12'
±7.27' ANTICIPATEDRIGHT-OF-WAY DEDICATION3,764 SQFT
100'
58'
14'
19'
14'
R25'R25'
R25'
R8'
R3'R39'
R3'
R8'R39'
R2'
R2'
R20'
R3'R3'R10'
R5'
R20'
R3'
R3'
R15'R15'
R50'
R5'
R15'R15'
R25'
R40'
R4'R15'
R50'R50'
R25'ZS01
ZS02
ZS03
ZS04
ZS05
ZS06
ZS13
ZS13
ZS18
ZS19
ZS20
ZS21ZS22
ZS24
ZS25
ZS26
ZS29
ZS30
ZS33
ZS34
ZS35
ZS36
ZS37
ZS37
ZS42
ZS46
R3'
ZS48
ZS51
ZS52
ZS54R3'
ZS55 ZS56ZS56
R3'R3'
ZS57
ZS57
ZS59 ZS60
ZS62
ZS62
ZS67
ZS68
ZS69
ZS705'ZS71
R3'
12.5' SECONDARYSTREETYARDBUFFER
149.58'
12.33'
S01
S02
S02
S02
S03
S04
S04
S05 S06
S07
S07
S07
S08
82'
6.16'
28'
S09
R25'
175' FULL STORAGE 100' TAPER
2' PAVED SHOULDER
S10
300' FULL STORAGE150' TAPER S04
S11
S12
12'
N5
0
°
1
1
'
2
0
"
E
20
8
.
3
6
'
S39°34'02"E 185.69'S39°34'02"E 329.71'
7.91'
10'
20'
10'
5'
20'
6.5'10'8'
20'
10'
8'
20'
20'
30'
S13
ZS62
43.54'
S14
S15
S15
S15
S15
S16
S16
2' PAVED SHOULDER
ZS60
ZS60
ZS60
PARCEL 1PARCEL 2
20'
25'S16
S87°2
1
'
0
9
"
E
229.6
7
'
SITE LAYOUT KEYNOTES
NUMBER DESCRIPTION
ZS01 C-STORE BUILDING; REFER TO ARCHITECTURAL AND MEPPLANS.
ZS02 TRASH ENCLOSURE AND BOLLARDS; REFER TO SHEETZTRASH ENCLOSURE DETAIL.ZS03 GAS CANOPY; REFER TO CANOPY PLANS BY OTHERS.
ZS04 DISPENSER AND ISLAND; REFER TO UNDERGROUND STORAGETANK SYSTEM PLANS.
ZS05 UNDERGROUND STORAGE TANKS AND PAD; REFER TOUNDERGROUND STORAGE TANK SYSTEM PLANS.
ZS06 UNDERGROUND STORAGE TANKS VENT STACK; REFER TOSHEETZ DETAIL 35 UNDERGROUND STORAGE TANK SYSTEMPLANS BY OTHERS.
ZS13 MONUMENT SIGN. VERIFY EXACT LOCATION AND LOCATIONBEFORE ROUGH-IN. PERMITTED BY OTHERS.
ZS18 BRICK PAVER SIDEWALK; REFER TO A100 OF ARCHITECTURALPLANS.
ZS19 ROOF ACCESS LADDER AND CLEARANCE AREA; REFER TOARCHITECTURAL PLANS.
ZS20 PROPANE LOCKERS, BOLLARDS, AND CONCRETE PAD; REFERTO SHEETZ DETAIL 18 OR 19 AND ARCHITECTURAL PLANS.ZS21 ICE MERCHANDISER (TYP.).ZS22 AUTOMOTIVE RETAIL SALES DISPLAY.
ZS24 PUSHPLATE BOLLARD; REFER TO A100 OF ARCHITECTURALPLANS.
ZS25 FENCE @ SEATING AREA (TYP.); REFER TO A100 OFARCHITECTURAL PLANS.
ZS26 OUTDOOR SEATING AREA AND TABLES; REFER TO REFER TOARCHITECTURAL PLANS. OUTDOOR SEATING MUST NOTPROHIBIT ADA ACCESS.
ZS29 24" WIDE CONCRETE BAND "ZERO REVEAL" FLUSH CURB;REFER TO ARCHITECTURAL PLANS.ZS30 24" CURB & GUTTER; REFER TO SHEETZ DETAIL 15.
ZS33 STOREFRONT BUMPER POST, REFER TO SHEETZ DETAIL 01(TYP.). PLACE ACCORDING TO SHEETZ DETAIL 07 AND/OR 08.
ZS34 6" OR 8" BOLLARD(S); REFER TO SHEETZ DETAIL 17 ANDUNDERGROUND STORAGE TANK SYSTEM PLANS FOR SIZE,LOCATION, AND COUNT (TYP.).
ZS35 FLAGPOLE AND FLAGPOLE FOUNDATION; REFER TO SHEETZDETAILS 11 AND 12.
ZS36 FLAGPOLE LIGHT AND LIGHT FOUNDATION; REFER TO SHEETZDETAILS 13 AND 14.
ZS37 AIR MACHINE PAD AND BUMPER POSTS; REFER TO SHEETZDETAIL 05.
ZS41 EMERGENCY SHUT-OFF SWITCH, REFER TO ELECTRICAL,UNDERGROUND STORAGE TANK SYSTEM PLANS, AND SHEETZDETAIL 29.
ZS42 ELECTRIC TRANSFORMER PAD; GC TO COORDINATELOCATION WITH LOCAL PROVIDER. LOCAL PROVIDER CANSUPERSEDE THE PROPOSED TRANSFORMER PAD LOCATION.
ZS43 24" DIA. LIGHT POLE BASE (TYPICAL - PER LIGHTING PLAN);REFER TO SHEETZ DETAIL 33 AND LIGHTING PLANS BYOTHERS.
ZS44 24" DIA. FLUSH LIGHT POLE BASE (TYPICAL - PER LIGHTINGPLAN); REFER TO SHEETZ DETAIL 34 AND LIGHTING PLANS BYOTHERS.ZS46 CONCRETE LOT PAVEMENT; REFER TO SHEETZ DETAIL 20.
ZS48 ASPHALT LOT PAVEMENT; REFER TO SHEETZ DETAIL 20.
ZS51 CONCRETE / ASPHALT PAVEMENT TRANSITION; REFER TOSHEETZ DETAIL 27.
ZS52 CONCRETE / ASPHALT CHAMFER; REFER TO SHEETZ DETAIL28.
ZS54 ACCESSIBLE PARKING SIGN (TYPICAL - PER ADA AND LOCALCODES) R7-8A (MUTCD).
ZS55 VAN ACCESSIBLE PARKING SIGN (TYPICAL - PER ADA ANDLOCAL REQUIREMENTS) R7-8A (MUTCD).
ZS56 ADA ACCESSIBLE AISLE AND STRIPING, PER ADA AND LOCALCODES.
ZS57 ADA ACCESSIBLE PARKING SPACE AND SYMBOL STRIPING.PER ADA AND LOCAL CODES.ZS58 PAINTED ADA TRAVEL PATH STRIPING.ZS59 PAINTED 4" WIDE PARKING STRIPES (TYP.).
ZS60 PAINTED DIRECTIONAL TRAFFIC ARROW (TYP.); PER LOCALCODES.
ZS61 PAINTED UNDERGROUND STORAGE TANK PAVEMENTMARKING.ZS62 30"x30" R1-1 "STOP" SIGN AND 24" WIDE "STOP" BAR.
ZS67 DRIVE-THRU CANTILEVERED CLEARANCE BAR; REFER TO BARDETAILS ON DT-1 AND DT-2.
ZS68 DRIVE-THRU ORDER POINT; REFER TO ORDER POINT DETAILSON DT-2.
ZS69 DRIVE-THRU MENU BOARD; REFER TO MENU BOARD DETAILON DT-2.ZS70 DRIVE-THRU CURB AND PAD; REFER TO SHEETZ DETAIL 10.
ZS71 DRIVE-THRU "PICK UP" PARKING SPACE; REFER TO PAINTINGDETAIL ON DT-1.S01 RIGHT-OF-WAY (TYP.)S02 PROPERTY BOUNDARY (TYP.)
S03 RIGHT-OF-WAY DEDICATION, VARIABLE WIDTH
S04 EXISTING ROAD CENTERLINES05 RIGHT IN / RIGHT OUT DRIVEWAYS06 ROAD WIDENING FOR RIGHT TURN LANE
S07 10' X 70' SIGHT DISTANCE TRIANGLE (TYP.)
S08 TURN LANE STRIPING PER NCDOT STD DETAIL 1205.05S09 RELOCATED "ADOPT A HIGHWAY" SIGNS10 ROAD WIDENING FOR LEFT TURN LANE
S11 RETAINING WALL WITH 42" MINIMUM SAFETY RAILING AT ALLAREAS TALLER THAN 30" (DESIGN BY OTHERS)S12 NCDOT GUARDRAIL PER NCDOT DETAIL 862.02
S13 SANITARY SEWER LIFT STATION, REFER TO LIFT STATIONPLANS AND MEP PLANS BY OTHERS.
S14 PROPOSED GRAVEL DRIVE WAY TO CONNECT TO EXISTINGGRAVEL DRIVEWAY. 6" OF ABC GRAVEL
S15 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCEEASEMENTS16 VARIABLE WIDTH PRIVATE SEWER EASEMENT
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
C
2
.
0
-
S
I
T
E
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
6
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C2.0
SI
T
E
P
L
A
N
332
P. BARBEAU
P. BARBEAU
NA
D
8
3
0
SCALE 1"=30'
60'30'
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
SITE LAYOUT NOTES
1. CONTRACTOR SHALL REFER TO THE SHEETZ ARCHITECTURAL PLANS FOR THE EXACT LOCATION OF UTILITY ENTRANCES, BUILDING DIMENSIONS, ROOFLEADERS, EXIT DOORS, EXIT RAMPS AND PORCHES.2. ALL DIMENSIONS ARE TO BUILDING FACE, FACE OF CURB, OR EDGE OF SIDEWALK UNLESS NOTED OTHERWISE. ALL ANGLES ARE 90 DEGREES UNLESSOTHERWISE NOTED.3. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS FOR THE INSTALLATION OF TRAFFIC SIGNAGE AND PAVEMENT MARKINGS AS SHOWN ONTHE CONSTRUCTION PLANS.4. ALL NON-LANDSCAPED ISLANDS SHALL BE PAINTED WITH STRIPES 4" WIDE, AT 45° AND 2 FEET O.C.5. ALL STRIPING SHALL BE 4" WIDE UNLESS NOTED OTHERWISE.6. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF THE SHEETZ MAIN FREESTANDING SIGN WITH THE SHEETZ CONSTRUCTION MANAGER.7. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION.8. ALL DIMENSIONS SHOWN ON THIS PLAN SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFYSHEETZ REPRESENTATIVE AND DESIGN ENGINEER OF ANY DISCREPANCIES BETWEEN THE PLAN AND FIELD CONDITIONS. CONTRACTOR ISRESPONSIBLE FOR ALL DIMENSIONS AT THE PROJECT SITE.9. SEE DETAILS SHEETS FOR ADDITIONAL CONSTRUCTION INFORMATION.10. CONTRACTOR SHALL NEATLY SAW-CUT ALL JOINTS WHERE THE PROPOSED CONSTRUCTION MEET EXISTING PAVEMENT AND CONCRETE.
C2
.
2
MA
T
C
H
L
I
N
E
CTC
OHU
CT
OH
U
OH
U
OH
U
OHU
OHU
8'' W
8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W
8''
W
D
DUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
G UCATV UCATV UCATVUGTUGTUGT UGT UCATV
UC
A
T
V
UGT UGT
UFOUGP
UFO
XXXXXX
XXXXXX
OH
P
OH
P
OH
P
OH
P
OHU OHU OHU OHU OHU OHUOHPOHPOHPOHPOHPOHPOHPOHP OHP
X
XXX
OH
P
OH
P
OH
P
OH
P
UCATVUCATV
UGT
UG
T
UG
T
UGT
UG
T
UG
T
UG
T
UC
A
T
V
UC
A
T
V
OH
U
OH
U
GGGGGGGGGGGGG
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
OHP
OH
P
OH
P
OH
P
OH
P
UC
A
T
VUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UGTUGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGT
WWWWWWWWWW
8'' W
8'' W
8'' W
W
EXISTING EDGE OF PAVEMENT
EXISTING ROAD STRIPING
EXISTING EDGE OF PAVEMENT
EXISTING ROAD STRIPING
±7.27' ANTICIPATEDRIGHT-OF-WAY DEDICATION3,764 SQFT
EXISTING CENTERLINE
EXISTING CENTERLINE
EXISTING SIGNALIZED INTERSECTION
EXISTING RIGHT-IN,RIGHT-OUT DRIVEWAY
CTC
OHU
CT
OH
U
OH
U
OH
U
OHU
OHU
8'' W
8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W
8'' W
D
DUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
G UCATV UCATV UCATVUGTUGTUGT UGT UCATV
UC
A
T
V
UGT UGT
UFOUGP
UFO
OH
P
OHP
OH
P
OH
P
OHU OHU OHU OHU OHU OHUOHPOHPOHPOHPOHPOHPOHPOHP OHP
UCATVUCATV
UGT
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UCA
T
V
UC
A
T
V
OH
U
OH
U
GGGGGGGGGGGGG
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
OH
P
OH
P
OHP
OHP
UC
A
T
VUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UGTUGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGT
WWWWWWWWWW
8'' W
8'' W
8'' W
WW
FM
20
16 17 18 19
20
1819
FE121 18" RCP
FE120
EW20019181716
17181920
21
20
1918171820
20
16 17 18 19 20
15171615
CTC
C
8'' W
8''
W
8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W
8'' W UFO
UFO
8'' W
8''
W
8'' W
150' TAPER
12'
175' STORAGE 100' TAPER
12'
T61
T4
T4
T20
T20
T21
T21
T71
T70
T71 PROPOSED EDGEOF PAVEMENT
PROPOSED EDGEOF PAVEMENT
PROPOSED EDGEOF PAVEMENT
30"X30" R1-1 "STOP" SIGN PROPOSED RELOCATED "ADOPT AHIGHWAY" SIGN
PROPOSED RIGHT-IN,RIGHT-OUT DRIVEWAY
PROPOSED RIGHT TURN LANE
300' STORAGE
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
R
D
W
Y
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
6
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C2.1
TU
R
N
L
A
N
E
P
L
A
N
332
P. BARBEAU
P. BARBEAU
NA
D
8
3
0
SCALE 1"=30'
60'30'
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
CAROLINA BEACH ROAD - EXISTING CONDITIONS
CAROLINA BEACH ROAD - PROPOSED WIDENING AND GRADING
CAROLINA BEACH ROAD - PROPOSED STRIPING AND SIGNAGE
TRAFFIC CONTROL KEYNOTES
Symbol Description Material Linear LengthAdjustment
T4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 90 MIL); REFER TO NCDOT STANDARD DETAIL1205.01.Thermo .25
T20 WHITE EDGELINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1T21WHITE SOLID LANE LINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1
T61 WHITE STOPBAR (24", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1
T70 LEFT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1T71RIGHT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1
PROPOSED HEAVY DUTY ASPHALT PAVEMENT SECTIONPER NCDOT SPECIFICATIONS. SEE DETAIL BELOW.
ROAD WIDENING NOTES
POSTED SPEED LIMIT = 45 MPHDESIGN SPEED LIMIT = 50 MPH
MILL AND REPLACE MIN. 1.5" S9.5C
MATERIALS LEGEND
1. CONTRACTOR SHALL OBTAIN AND READ ALL NCDOT DRIVEWAY PERMITS AND ENCROACHMENTS. THEY SHALLBE A PART OF THESE PLANS.
2. ALL FINISHED SURFACES SHALL SLOPE TOWARDS DRAINAGE STRUCTURES AT POSITIVE SLOPE AND TO AVOIDSTANDING WATER.
3. CONTRACTOR SHALL COORDINATE ALL WORK IN R/W WITH NCDOT AND NEW HANOVER COUNTY INSPECTORS.
4. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE THE RELOCATION OF EXISTING UTILITIES AS NEEDED TOFUNCTION WITH THE PROPOSED IMPROVEMENTS.
PAVEMENT MARKING NOTES1. LOCATION OF PAVEMENT MARKINGS SHALL CONFORM TO NCDOT PAVEMENT MARKING STANDARDS. APPLICATION OFPAVEMENT MARKINGS SHALL BE DONE IN ACCORDANCE WITH SECTION 1205 OF THE N.C. DIVISION OF HIGHWAYSSTANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES HANDBOOK (2024 EDITION) WITH REVISION(S) THERETO.2. ALL EXISTING PAVEMENT MARKINGS SHALL BE ERADICATED PER NCDOT SPECIFICATIONS PRIOR TO PLACEMENT OFMARKING SHOWN HEREIN.3. THE CONTRACTOR SHALL BE REQUIRED TO PRE-MARK THE PAVEMENT PRIOR TO ACTUAL APPLICATION OF MARKINGSWITHIN THE NCDOT RIGHT OF WAY. THE CONTRACTOR SHALL SCHEDULE A PRE-MARKING INSPECTION REVIEW WITH THENCDOT DISTRICT ENGINEER AT LEAST ONE WEEK PRIOR TO MARKING. PAVEMENT MARKINGS SHALL NOT BE INSTALLEDUNTIL AFTER FIELD REVIEW AND APPROVAL BY THE NCDOT DISTRICT ENGINEER.4. PAVEMENT MARKINGS SHALL MATCH TO AND ALIGN WITH EXISTING CONDITIONS AND MARKINGS. THE CONTRACTOR SHALLPROVIDE THERMOPLASTIC MARKINGS ON ROADWAYS .5. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL THERMOPLASTIC MARKINGS AND RAISED REFLECTIVE PAVEMENTMARKERS FOR NEWLY CONSTRUCTED TURN LANES TO NCDOT SPECIFICATIONS AND DIMENSIONAL STANDARDS. RAISEDPAVEMENT MARKERS TO BE APPROVED AND INSTALLED PER NCDOT STANDARDS.6. ALL PAVEMENT MARKINGS WITHIN NCDOT RIGHT-OF-WAY SHALL BE LONG LIFE THERMOPLASTIC.7. CONTACT NCDOT TRAFFIC SERVICES FOR PAVEMENT MARKING LAYOUT.8. ALL DIMENSIONS ARE TO FACE OF CURB.9. CONTRACTOR TO ADJUST ALL APPURTENANCES TO MATCH EXISTING GRADE.10. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DRIVEWAYS AND DRIVEWAY PIPESTHROUGHOUT CONSTRUCTION. MAINTAIN VEHICULAR ACCESS AT ALL TIMES.11. CONTRACTOR TO PERFORM TRAFFIC CONTROL AND TEMPORARY LANE CLOSURES PER NCDOT AND NEW HANOVERCOUNTY STANDARDS.12. ALL CURB AND GUTTER INSIDE PUBLIC RIGHT-OF-WAY SHALL BE 30 INCHES WIDE PER NCDOT STANDARDS.
NOTES:
NCDOT ASPHALT PAVEMENT SECTION
NOT TO SCALE
COMPACTED SUBGRADE
BASE COURSETYPE B-25.0C
BINDER COURSE
SURFACE COURSETYPE S-9.5C
TYPE I19.0C
3-IN
4-IN
5-IN
1. PREPARING, GRADING, SHAPING, AND COMPACTION OFSUBGRADE SOILS SHOULD BE PERFORMED INACCORDANCE WITH DIVISION 5, SECTION 501 OF THENCDOT STANDARD SPECIFICATIONS FOR ROADS ANDSTRUCTURES (2006). PREPARING, GRADING, SHAPING, ANDCOMPACTION OF AGGREGATE BASE COURSE (CABC)STONE SHOULD BE PERFORMED IN ACCORDANCE WITHDIVISION 5, SECTION 520 OF THE NCDOT STANDARDSPECIFICATIONS FOR ROADS AND STRUCTURES (2006).PLACEMENT AND COMPACTION OF THE BITUMINOUSCONCRETE SHOULD BE PERFORMED IN ACCORDANCEWITH DIVISION 6, SECTION 600 OF THE NCDOT STANDARDSPECIFICATIONS FOR ROADS AND STRUCTURES (2006).PROPER SUBGRADE COMPACTION, ADHERENCE TO THENCDOT SPECIFICATIONS, AND COMPLIANCE WITH PROJECTPLANS AND SPECIFICATIONS ARE CRITICAL TO THEPERFORMANCE OF THE CONSTRUCTED PAVEMENT.
2. THE CONTRACTOR MAY CHOOSE TO INSTALLINTERMEDIATE COURSES OF PAVEMENT TO STABILIZE THESITE DURING CONSTRUCTION AT NO ADDITIONAL COST.THE CONTRACTOR IS RESPONSIBLE FOR DETERMININGTHE ADEQUATE THICKNESS REQUIRED FOR INTERMEDIATEPAVING. INCREASES IN THE DESIGN PAVEMENT SECTIONTO FACILITATE INTERMEDIATE PAVING SHALL BE PROVIDEDAT NO ADDITIONAL COST.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FORREPAIRING ANY DAMAGES TO SUBGRADE, INSTALLED BASECOURSE AND/OR INTERMEDIATE PAVING PRIOR TOPLACING SUBSEQUENT PAVEMENT LIFTS AT NOADDITIONAL COST.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FORPROTECTING PAVEMENT DURING ALL PHASES OF WORK.THE FINAL SURFACE OF PAVEMENT SHALL BE FREE OF ALLDEFECTS OR DAMAGE.
COMPACTED SUBGRADE
BASE COURSEAGGREGATE
BINDER COURSE
SURFACE COURSETYPE S-9.5C
TYPE I19.0C
3-IN
4-IN
10-IN
PAVEMENT SECTION-WIDENING GREATER THAN 6' WIDTH
* OVERLAY AREAS - 1.5" S9.5C
PAVEMENT SECTION-WIDENING LESS THAN OREQUAL TO 6' WIDTH
1.5" ASPHALT MILL & OVERLAY; 1.5' WIDE
HEAVY DUTY NCDOTASPHALT PAVEMENT;REFER TO PAVEMENTSECTION
PROPOSED 2'PAVED SHOULDER
PROPOSED 2' PAVED SHOULDER
10'' W10'' W10'' W10'' W
OHU
TC
TC
OH
U
OH
U
OH
U
OH
U
8'' W
CT CT C
UGTOHP
UCATVUCATVUCATVUCATV
UGTUGT
GGG
X X X OHP
OHP OHP
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
UGTUGT
X X
OHPOHP
OH
P
OH
P
OH
P
OH
P
OHP
OHP
OHP
OHP
EXISTING ROAD STRIPING EXISTING CENTERLINE
10'' W10'' W10'' W10'' W
OHU
TC
TC
OH
U
OH
U
OH
U
OH
U
8'' W
CT CT C
UGTOHP
UCATVUCATVUCATVUCATV
UGTUGT
GGG
X X X OHP
OHP OHP
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
UGTUGT
X X
OHPOHP
OH
P
OH
P
OH
P
OH
P
OHP
OHP
OHP
OHP
18
18
TC
TC
8'' W
GGG
X X X X X
T20
T4
T70
209' EXISTING STORAGE
91' TAPER
12'
EXISTING CENTERLINE
PROPOSED EDGE OF PAVEMENT
100' FULL STORAGE
PROPOSED 2' PAVED SHOULDER
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
R
D
W
Y
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
6
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C2.2
TU
R
N
L
A
N
E
P
L
A
N
332
P. BARBEAU
P. BARBEAU
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
CAROLINA BEACH ROAD - EXISTING CONDITIONS
CAROLINA BEACH ROAD - PROPOSED WIDENING AND GRADING
CAROLINA BEACH ROAD - PROPOSED STRIPING AND SIGNAGE
TRAFFIC CONTROL KEYNOTES
Symbol Description Material Linear LengthAdjustment
T4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 90 MIL); REFER TO NCDOT STANDARD DETAIL1205.01.Thermo .25
T20 WHITE EDGELINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1T21WHITE SOLID LANE LINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1
T61 WHITE STOPBAR (24", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1
T70 LEFT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1T71RIGHT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1
PROPOSED HEAVY DUTY ASPHALT PAVEMENT SECTIONPER NCDOT SPECIFICATIONS. SEE DETAIL BELOW.
ROAD WIDENING NOTES
POSTED SPEED LIMIT = 45 MPHDESIGN SPEED LIMIT = 50 MPH
MILL AND REPLACE MIN. 1.5" S9.5C
MATERIALS LEGEND
1. CONTRACTOR SHALL OBTAIN AND READ ALL NCDOT DRIVEWAY PERMITS AND ENCROACHMENTS. THEY SHALLBE A PART OF THESE PLANS.
2. ALL FINISHED SURFACES SHALL SLOPE TOWARDS DRAINAGE STRUCTURES AT POSITIVE SLOPE AND TO AVOIDSTANDING WATER.
3. CONTRACTOR SHALL COORDINATE ALL WORK IN R/W WITH NCDOT AND NEW HANOVER COUNTY INSPECTORS.
4. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE THE RELOCATION OF EXISTING UTILITIES AS NEEDED TOFUNCTION WITH THE PROPOSED IMPROVEMENTS.
PAVEMENT MARKING NOTES1. LOCATION OF PAVEMENT MARKINGS SHALL CONFORM TO NCDOT PAVEMENT MARKING STANDARDS. APPLICATION OFPAVEMENT MARKINGS SHALL BE DONE IN ACCORDANCE WITH SECTION 1205 OF THE N.C. DIVISION OF HIGHWAYSSTANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES HANDBOOK (2024 EDITION) WITH REVISION(S) THERETO.2. ALL EXISTING PAVEMENT MARKINGS SHALL BE ERADICATED PER NCDOT SPECIFICATIONS PRIOR TO PLACEMENT OFMARKING SHOWN HEREIN.3. THE CONTRACTOR SHALL BE REQUIRED TO PRE-MARK THE PAVEMENT PRIOR TO ACTUAL APPLICATION OF MARKINGSWITHIN THE NCDOT RIGHT OF WAY. THE CONTRACTOR SHALL SCHEDULE A PRE-MARKING INSPECTION REVIEW WITH THENCDOT DISTRICT ENGINEER AT LEAST ONE WEEK PRIOR TO MARKING. PAVEMENT MARKINGS SHALL NOT BE INSTALLEDUNTIL AFTER FIELD REVIEW AND APPROVAL BY THE NCDOT DISTRICT ENGINEER.4. PAVEMENT MARKINGS SHALL MATCH TO AND ALIGN WITH EXISTING CONDITIONS AND MARKINGS. THE CONTRACTOR SHALLPROVIDE THERMOPLASTIC MARKINGS ON ROADWAYS .5. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL THERMOPLASTIC MARKINGS AND RAISED REFLECTIVE PAVEMENTMARKERS FOR NEWLY CONSTRUCTED TURN LANES TO NCDOT SPECIFICATIONS AND DIMENSIONAL STANDARDS. RAISEDPAVEMENT MARKERS TO BE APPROVED AND INSTALLED PER NCDOT STANDARDS.6. ALL PAVEMENT MARKINGS WITHIN NCDOT RIGHT-OF-WAY SHALL BE LONG LIFE THERMOPLASTIC.7. CONTACT NCDOT TRAFFIC SERVICES FOR PAVEMENT MARKING LAYOUT.8. ALL DIMENSIONS ARE TO FACE OF CURB.9. CONTRACTOR TO ADJUST ALL APPURTENANCES TO MATCH EXISTING GRADE.10. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DRIVEWAYS AND DRIVEWAY PIPESTHROUGHOUT CONSTRUCTION. MAINTAIN VEHICULAR ACCESS AT ALL TIMES.11. CONTRACTOR TO PERFORM TRAFFIC CONTROL AND TEMPORARY LANE CLOSURES PER NCDOT AND NEW HANOVERCOUNTY STANDARDS.12. ALL CURB AND GUTTER INSIDE PUBLIC RIGHT-OF-WAY SHALL BE 30 INCHES WIDE PER NCDOT STANDARDS.
NOTES:
NCDOT ASPHALT PAVEMENT SECTION
NOT TO SCALE
COMPACTED SUBGRADE
BASE COURSETYPE B-25.0C
BINDER COURSE
SURFACE COURSETYPE S-9.5C
TYPE I19.0C
3-IN
4-IN
5-IN
1. PREPARING, GRADING, SHAPING, AND COMPACTION OFSUBGRADE SOILS SHOULD BE PERFORMED INACCORDANCE WITH DIVISION 5, SECTION 501 OF THENCDOT STANDARD SPECIFICATIONS FOR ROADS ANDSTRUCTURES (2006). PREPARING, GRADING, SHAPING, ANDCOMPACTION OF AGGREGATE BASE COURSE (CABC)STONE SHOULD BE PERFORMED IN ACCORDANCE WITHDIVISION 5, SECTION 520 OF THE NCDOT STANDARDSPECIFICATIONS FOR ROADS AND STRUCTURES (2006).PLACEMENT AND COMPACTION OF THE BITUMINOUSCONCRETE SHOULD BE PERFORMED IN ACCORDANCEWITH DIVISION 6, SECTION 600 OF THE NCDOT STANDARDSPECIFICATIONS FOR ROADS AND STRUCTURES (2006).PROPER SUBGRADE COMPACTION, ADHERENCE TO THENCDOT SPECIFICATIONS, AND COMPLIANCE WITH PROJECTPLANS AND SPECIFICATIONS ARE CRITICAL TO THEPERFORMANCE OF THE CONSTRUCTED PAVEMENT.
2. THE CONTRACTOR MAY CHOOSE TO INSTALLINTERMEDIATE COURSES OF PAVEMENT TO STABILIZE THESITE DURING CONSTRUCTION AT NO ADDITIONAL COST.THE CONTRACTOR IS RESPONSIBLE FOR DETERMININGTHE ADEQUATE THICKNESS REQUIRED FOR INTERMEDIATEPAVING. INCREASES IN THE DESIGN PAVEMENT SECTIONTO FACILITATE INTERMEDIATE PAVING SHALL BE PROVIDEDAT NO ADDITIONAL COST.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FORREPAIRING ANY DAMAGES TO SUBGRADE, INSTALLED BASECOURSE AND/OR INTERMEDIATE PAVING PRIOR TOPLACING SUBSEQUENT PAVEMENT LIFTS AT NOADDITIONAL COST.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FORPROTECTING PAVEMENT DURING ALL PHASES OF WORK.THE FINAL SURFACE OF PAVEMENT SHALL BE FREE OF ALLDEFECTS OR DAMAGE.
COMPACTED SUBGRADE
BASE COURSEAGGREGATE
BINDER COURSE
SURFACE COURSETYPE S-9.5C
TYPE I19.0C
3-IN
4-IN
10-IN
PAVEMENT SECTION-WIDENING GREATER THAN 6' WIDTH
* OVERLAY AREAS - 1.5" S9.5C
PAVEMENT SECTION-WIDENING LESS THAN OREQUAL TO 6' WIDTH
NA
D
8
3
0
SCALE 1"=30'
60'30'
1.5" ASPHALT MILL & OVERLAY; 1.5' WIDE
HEAVY DUTY NCDOTASPHALT PAVEMENT; REFERTO PAVEMENT SECTION
10'' W10'' W
TC
TC
OH
U
OH
U
OHU
OH
U
OH
U
OH
U
OHU
OHU
8'' W
8'' W
8''
W
8''
W
8'' W
D
D
D
X X
X
X
X
X
X
X
UGP
UG
P
UCA
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UCA
T
V
UG
P
UGTUGT UGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
G
G
V UCATV
OHP
OH
P
OH
P
OHP
OH
P
OHPOHPOHP
UCA
T
V
X
X
X
X
X
X
X
X
X
X
X
X
UCATVUCATVUCATVUCATVUCATVUCATV
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UGTUGTUGT
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UCA
T
V
UC
A
T
V
OHU
OH
U
GGGGGGGGGGGGGGGGGG
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
X X X OHP
O
H
P
O
H
P
O
H
P
O
H
P
OH
P
OH
P
OHP
UC
A
T
V
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UGTUGTUGTUGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATV
UGP
UGP
UGP
UGP
UGP
UGP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
W
W
W
WWWWWWWWWWWW
8'' W
8'' W
8'' W
W
FM
FM
FM
FM
FM
FMFM
GG
G
G
G
G
G
W
W
W
W
W
W
W
RD RD
RD
RD
RD RD
RD RD RD
SAN
VAN
STO
P
STANDARDUST FIELD
NEW SHEETZ STORE
6139 SQ. FT.FFE: 22.50'
G01
G02
G05
G07
G08
G09
G14
G16
G21
MA
T
C
H
L
I
N
E
-
R
E
F
E
R
T
O
I
N
S
E
T
20
19 20 21 22
21
21
20
21
22
20
20
18
18
19
19
17
17
20
19
20
20
17
18
19
21
22
21
21
18 19
20 21
15
20
16171819
11 1010
1514
161718 19
20 20
19
21 2120
21
20
2
0 20
21 21 20
17
17
18
18
19
21
22
21
22
20 1921
19
21
21
21
21
21
21
20
20
161718
19
2021
131515
22 22
REVERSE CROWN
REV
E
R
S
E
C
R
O
W
N
CRO
W
N
CROWN
CROWN
CR
O
W
N
CROWN
CRO
W
N
CR
O
W
N
CB107
CB101
CB103
FE300
CB105
CB104
CB102 CB106
FE121
FE120
FE301
EW200
15"
H
D
P
E
18
"
H
D
P
E
18
"
H
D
P
E
15" HDPE
15" HDPE
18" RCP
15" HDPE
24" R
C
P
24" HDPE
15"
H
D
P
E
20
17
18
19
1717
1717
19
18
21
18
18
16
15
"
H
D
P
E
FE108
G01
G01
G02
G07 G08
G08
G08
G09
G14
G14
G14
G14
G14 G14 G14
JB400
G10
G21
G21
G22
G23
G24
GRADING & STORMWATER KEYNOTES
NUMBER DESCRIPTIONG0124" CURB & GUTTER (TYP.)
G02 FLUSH CONCRETE STRIP (FOR A.D.A.)
G05 UNDERGROUND STORMWATER CONTROL MEASURE; REFERTO DETAILSG07RIPRAP OUTLET PROTECTION; REFER TO SIZING CHART
G08 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCEEASEMENTG09ADA STALLS (MAX SLOPE 1:50)
G10 20' PRIVATE SEWER EASEMENTG14 MATCH EXISTING PAVEMENT ELEVATION
G16 CONVERT EXISTING STRUCTURE TO NCDOT TRAFFIC BEARINGJUNCTION BOX; REFER TO STORM CHARTSG21ROOF DRAIN (TYP.); MIN. COVER OF 2' AND MIN. SLOPE OF 1%
G22 EXISTING 36" LIVE OAK TREE TO REMAIN UNDISTURBED
G23 RETAINING WALL WITH 42" MINIMUM SAFETY RAILING AT ALLAREAS TALLER THAN 30" (DESIGN BY OTHERS)
G24 NCDOT GUARDRAIL PER NCDOT DETAIL 862.02
10'' W10'' W10'' W
CT
CT C
UCATVUCATV
UGT
G
OHP
OHP OHP
OH
P
OH
P
OH
P
UGT
OHPOHP
OH
P
OH
P
OH
P
OHP
OHP
OHP
18
STORM STRUCTURE TABLE
STR. #
CB101
CB102
CB103
CB104
CB105
CB106
CB107
EW200
FE108
FE120
FE121
FE300
FE301
JB400
TOP
20.56'
19.54'
20.23'
19.79'
20.00'
19.29'
20.71'
12.57'
19.24'
18.09'
19.21'
17.88'
17.88'
20.26'
INV. IN
14.70' (18" HDPE FROM CB102)14.70' (18" HDPE FROM CB104)15.00' (15" HDPE FROM CB103)
10.24' (24" RCP FROM )
16.38' (18" RCP FROM FE121)
16.44' (15" HDPE FROM FE301)
INV. OUT
14.50' (24" HDPE TO )
15.30' (18" HDPE TO CB101)
16.00' (15" HDPE TO CB101)
15.25' (18" HDPE TO CB101)
14.00' (15" HDPE TO )
14.00' (15" HDPE TO )
16.90' (15" HDPE TO )
17.80' (15" HDPE TO )
17.50' (18" RCP TO FE120)
16.44' (15" HDPE TO FE300)
DESCRIPTION
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 840.02 CONCRETE CATCH BASIN
NCDOT 838.80 CONCRETE ENDWALL
NCDOT ES-1 for 15 inch Pipe
NCDOT ES-1 for 18 inch Pipe
NCDOT ES-1 for 18 inch Pipe
NCDOT ES-1 for 18 inch Pipe
NCDOT ES-1 for 18 inch Pipe
NCDOT 840.34 TRAFFIC BEARING JUNCTION BOX
STORM PIPE TABLE
FROM - TO
- EW200
CB101 -
CB102 - CB101
CB103 - CB101
CB104 - CB101
CB105 -
CB106 -
CB107 -
FE108 -
FE121 - FE120
FE301 - FE300
UPSTREAMINVERT
10.50'
14.50'
15.30'
16.00'
15.25'
14.00'
14.00'
16.90'
17.80'
17.50'
16.44'
DOWNSTREAMINVERT
10.24'
13.00'
14.70'
15.00'
14.70'
13.50'
13.50'
13.50'
13.50'
16.38'
16.44'
SLOPE
0.80%
0.70%
1.11%
1.59%
1.00%
4.25%
4.99%
4.41%
3.85%
1.00%
0.00%
LENGTH
32.60 LF
214.48 LF
54.00 LF
62.87 LF
55.14 LF
11.77 LF
10.03 LF
77.08 LF
111.78 LF
111.82 LF
52.70 LF
DIA.
24"
24"
18"
15"
18"
15"
15"
15"
15"
18"
15"
MATERIAL
RCP
HDPE
HDPE
HDPE
HDPE
HDPE
HDPE
HDPE
HDPE
RCP
HDPE
DESCRIPTION
CLASS III; SINGLE OFFSET O-RING
24" HDPE
18" HDPE
15" HDPE
18" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
CLASS IV
15" HDPE
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
C
3
.
0
-
G
R
A
D
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
7
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C3.0
GR
A
D
I
N
G
A
N
D
D
R
A
I
N
A
G
E
P
L
A
N
332
P. BARBEAU
P. BARBEAU
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
GRADING AND STORMWATER MANAGEMENT NOTES
1. ALL SITE WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANSPREPARED BY TIMMONS GROUP, THE CURRENT REQUIREMENTS OF NEWHANOVER COUNTY, THE APPLICABLE SECTIONS OF THE NCDOT STANDARDSPECIFICATIONS FOR ROADWAY CONSTRUCTION, AND ALL OTHERPERTINENT FEDERAL AND STATE LAWS.2. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLEFEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES GOVERNINGSAFETY AND HEALTH.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS ANDCONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIORTO THE SUBMISSION OF A BID. SUBMISSION OF A BID SHALL BE CONSTRUEDTO MEAN THE CONTRACTOR HAS REVIEWED THE SITE AND IS FAMILIAR WITHCONDITIONS AND CONSTRAINTS OF THE SITE. IF DISCREPANCIES BETWEENFIELD CONDITIONS AND DESIGN PLANS ARE DISCOVERED, CONTRACTORSHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY.4. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE LOCATED INTHE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFYNC 811. THE LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURESARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITYOF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND EXACT LOCATIONOF ALL UTILITIES AND UNDERGROUND STRUCTURES.5. ALL EXISTING TREES, VEGETATION, PAVEMENTS, CONCRETE FOUNDATIONS,STRUCTURES AND ORGANIC TOPSOIL SHALL BE STRIPPED AND REMOVEDFROM NEW CONSTRUCTION AREAS UNLESS NOTED OTHERWISE.6. ALL SLOPES SHALL BE 2:1 (HORIZONTAL: VERTICAL) MAXIMUM UNLESSNOTED OTHERWISE. ALL SLOPES 3:1 OR GREATER SHALL BE PERMANENTLYSTABILIZED WITH VEGETATION.7. AN AS-BUILT DRAWING OF NEW UTILITY SERVICES MUST BE PREPARED BYTHE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OFTHE PROJECT.8. ALL AREAS NOT PAVED SHALL BE TOP SOILED, SEEDED, SODDED, MULCHEDAND/OR LANDSCAPE UNLESS OTHERWISE NOTED IN THE CONSTRUCTIONDRAWINGS, SITE SPECIFICATIONS OR INSTRUCTED BY THE OWNER.9. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PREPARED BYGEOTECHNOLOGIES, INC PRIOR TO INITIATION OF ANY EARTHWORKACTIVITY.10. ALL ELEVATIONS SHOWN ARE REFERENCED TO BENCHMARKS ON THEPROJECT SURVEY AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR ATGROUNDBREAKING.11. ALL SPOT ELEVATIONS ARE REFERENCED TO THE FINISHED GROUNDSURFACE UNLESS NOTED OTHERWISE.12. CONTRACTOR SHALL REFERENCE DETAILED BUILDING PLANS FOR EXACTBUILDING DIMENSIONS, ELEVATIONS, AND UTILITY CONNECTION POINTS.13. CONTRACTOR SHALL COORDINATE FUEL ISLAND CANOPY DRAINSCONNECTION TO THE MAIN COLLECTOR PIPE WITH THE SHEETZCONSTRUCTION MANAGER AND PROVIDE ALL NECESSARY FITTINGS TOMAKE THE CONNECTION TO THE MAIN COLLECTOR PIPE.14. CONTRACTOR TO PROVIDE SHOP DRAWINGS ON ALL STORM SEWER PIPE,MANHOLES, AND INLETS TO THE SHEETZ CONSTRUCTION MANAGER FORAPPROVAL.15. AN AS-BUILT DRAWING OF NEW UTILITY SERVICES SHALL BE PROVIDED BYTHE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OFTHE PROJECT.16. ALL STORM PIPE SHALL BE AS SPECIFIED. ALL JOINTS SHALL BEWATERTIGHT.17. ALL STORM STRUCTURES ADJACENT TO CURBS SHALL BE NCDOTSTANDARD..18. ALL STORM STRUCTURES DIRECTLY DOWN GRADIENT OF THE FUEL PUMPPAD OR UNDERGROUND STORAGE TANKS SHALL HAVE A SUMP AND BMPFEATURE (FOR EXAMPLE 'SNOUT') INSTALLED ON THE OUTFLOW PIPE.19. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTIONSET FOR OTHER PERTINENT INFORMATION.
NA
D
8
3
0
SCALE 1"=30'
60'30'
INSET - SCALE 1" = 30'
NOTES:1. TOP REFERS TO:1.1. CATCH BASIN: TOP OF CURB1.2. YARD INLET / DROP INLET: SILL
RIPRAP SIZING CHARTxFE120CLASS 'A'6'L X 4.5'W X 12"DxFE300CLASS 'A'5'L X 3.8'W X 12"D
U07
VA
N
ST
O
P
STANDARDUST FIELD
NEW SHEETZ STORE6139 SQ. FT.
FFE: 22.50'
OH
U
OH
U
OH
U
OHU
D
D
D
UGP
UGP
UC
A
T
V
UC
A
T
V
UCA
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UCA
T
V
UC
A
T
V
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UCA
T
V
UCA
T
V
U
UCATV
UGP
UGP
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UC
A
T
V
UC
A
T
V
HU
OH
U
OH
U
GGGGGGGGGGGGGGGGG
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
OHP
OHP
OHP
OHP
P
UCA
T
V
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UGT
UGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UGP
UGP
UGP
UGP
UGP
UGP
UGP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W
WWWWWWWWWWWWWW
8''
W
8''
W
8'' W
FM
FM
FM
FM
FM
FM
FM
M
GGGG
G
G
G
G
G
G
G
W W
W
W
W
W
W
W
W
W
W
W
RD RD RD
RD
RD
RD
RD RD RD
RD RD RD RD
SANSAN
SA
N
ATVUCATVUCCA
GTINV IN 18.00INV OUT 17.75
CO-02TOP 21.71INV OUT 17.23
6"
P
V
C
CO-01TOP 21.31INV OUT 16.55 6" PVC 6" PVC
CO-03TOP 21.50INV OUT 17.80
6"
P
V
C
CO-04TOP 22.44INV OUT 18.20
6" PVC
6" PVC
6"
P
V
C
6"
P
V
C
U03
ZU40
ZU53
ZU40
ZU39
ZU39
ZU36 ZU36ZU37
ZU32
ZU28
ZU01ZU50
ZU01U52U19
ZU05
ZU06
ZU04
ZU07
ZU10
ZU14
ZU12
ZU22
ZU22
ZU23
ZU24
ZU25
ZU26
ZU52
U23
U21U16U16
U08
U09
U10
U10
U14
U37
U14
U20
6" PVC
CO-06TOP 19.37INV OUT 18.10
CO-05TOP 18.93INV OUT 17.70
U27
INV: 18.33
INV: 18.33
INV: 18.33
3" PVC
U34
U34
20'
20'
UTILITY KEYNOTES
NUMBER DESCRIPTION
U01 EXISTING 8" PVC WATER MAIN PER CFPUA GIS
U03 EXISTING 10" WATER MAIN; LOCATION BASED ON PHOTOMETRICDATA. CONTRACTOR TO CONFIRM LOCATION AND DEPTH PRIOR TOCONSTRUCTION.U05 EXISTING SANITARY SEWER MANHOLE (TYP.)
U06 EXISTING 8" SANITARY SEWER MAIN (TYP.)
U07 EXISTING UTILITY POLE (TYP.)U08 EXISTING OVERHEAD UTILITY LINE (TYP.)
U09 EXISTING UNDERGROUND TELEPHONE (TYP.)
U10 EXISTING UNDERGROUND CABLE TV LINE (TYP.)
U14 EXISTING GUY WIRE TO REMAINU16EXISTING GAS MAIN TO REMAIN
U19 8"x2" TAPPING SLEEVE & VALVE
U20 8"x6" TAPPING SLEEVE & VALVEU21 6" DIP WATER LINEU23FIRE HYDRANT ASSEMBLY (TYP.)
U27 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCEEASEMENTU34PROPOSED PRIVATE SEWER EASEMENT
U36 CONNECT TO EXISTING SANITARY SEWER MANHOLE. CORE DRILLAND INSTALL FLEXIBLE RUBBER BOOT. (CONTRACTOR TO FIELDVERIFY LOCATION AND ELEVATION)
U37 FORCE MAIN; REFER TO PUMP STATION PLANS BY TIMMONSGROUP.U47 EXISTING 1" WATER METER TO REMAIN
U52 COORDINATE WITH WATER DEPARTMENT TO ENSURE THATSERVICE IS NOT INTERRUPTED AT ANY TIME.
U53
CONNECT TO EXISTING SANITARY SERVICE. CONTRACTOR TO FIELDVERIFY LOCATION, SIZE, CONDITION, AND INVERT PRIOR TO ANYCONSTRUCTION. COORDINATE WITH UTILITY PROVIDER.CONTRACTOR SHALL HAVE EXISTING LINE JETTED AND A CAMERARUN THROUGH IT TO VERIFY PRIOR TO ANY CONSTRUCTION.
U60 6" PVC SANITARY SEWER SERVICE (TYP.)
ZU01
CONTRACTOR TO VERIFY EXISTING UTILITY LOCATIONS PRIOR TOSTART OF CONSTRUCTION. IMMEDIATELY NOTIFY SHEETZ AND CIVILENGINEER OF RECORD IF DISCREPANCIES OR CONFLICTS AREFOUND.ZU02 DOMESTIC WATER SERVICE POINT OF CONNECTION.
ZU04 2" TYPE "K" SOFT COPPER DOMESTIC WATER SERVICE. SERVICELINE SHALL HAVE 3' MINIMUM COVER.ZU05 2" DOMESTIC WATER METER.
ZU06 2" DOMESTIC RPZ BACKFLOW PREVENTER (PER LOCALREQUIREMENTS) DOWNSTREAM OF THE DOMESTIC WATER METER.PROVIDE POWER TO HOT BOX.
ZU07 WATER LINE POINT OF ENTRY TO BUILDING; REFER TO MEP PLANSBY OTHERS.
ZU10 IRRIGATION WATER SERVICE POINT OF CONNECTION.
ZU12
1" TYPE "K" COPPER IRRIGATION WATER SERVICE. SERVICE LINESHALL HAVE 3' MINIMUM COVER. INSTALL IRRIGATION SLEEVESUNDER PAVEMENT. REFER TO IRRIGATION PLANS FOR QUANTITIY,SIZE, MATERIAL, AND LOCATIONS. VERIFY EXACT LOCATION WITHSHEETZ CONSTRUCTION MANAGER PRIOR TO PLACING PAVEMENT.
ZU14 1" RPZ IRRIGATION BACKFLOW PREVENTER (PER LOCALREQUIREMENTS) DOWNSTREAM OF THE IRRIGATION WATER METER.PROVIDE POWER TO HOT BOX.ZU20 SANITARY SEWER POINT OF CONNECTION.
ZU22 6" PVC SANITARY SEWER SERVICE @ 1/8" PER LF MIN. SLOPE, 4' MIN.COVER (TYP.). ALL PVC SEWER PIPING SHALL HAVE TRACER WIREPER NC PLUMBING CODE SECTION 306.2.4.
ZU23 SANITARY SEWER CLEANOUT. TRAFFIC RATED IF WITHIN PAVEMENT(TYP.).
ZU24 2,000 GALLON GREASE TRAP; REFER TO SHEETZ DETAIL 21 AND MEPPLANS FOR VENTING DETAILS.
ZU25 SANITARY SEWER POINT OF ENTRY TO BUILDING; REFER TO MEPPLANS BY OTHERS.
ZU26 GREASE SERVICE POINT OF ENTRY TO BUILDING; REFER TO MEPPLANS BY OTHERS.
ZU28 SANITARY SEWER LIFT STATION; REFER TO LIFT STATION PLANSAND MEP PLANS BY OTHERS.
ZU32
ELECTRIC TRANSFORMER PAD LOCATION. COORDINATE WITHLOCAL PROVIDER. LOCAL PROVIDER CAN SUPERSEDE THEPROPOSED TRANSFORMER PAD LOCATION. PROVIDE TWO (2) 6"__MATERIAL__ CONDUITS BETWEEN POINT OF CONNECTION ANDTRANSFORMER. 24" MINIMUM BURY DEPTH WITH 18" OF VERTICALSEPARATION AT WATER AND SEWER CROSSINGS.
ZU36 PROVIDE POWER TO EMERGENCY SHUT-OFF SWITCH; REFER TOELECTRICAL, UNDERGROUND STORAGE TANK SYSTEM PLANS, ANDSHEETZ DETAIL 29.ZU37 PROVIDE POWER TO LIGHTED BOLLARD (TYP.).
ZU39 PROVIDE POWER TO AIR AND VACUUM MACHINES.
ZU40 PROVIDE POWER TO MID SIGN; WIRED BY BUILDING ELECTRICALCONTRACTOR. VERIFY EXACT LOCATION AND DESIGN BEFOREROUGH-IN. PERMITTED BY OTHERS.ZU50 NATURAL GAS SERVICE POINT OF CONNECTION.
ZU52 NATURAL GAS SERVICE CONSTRUCTED BY LOCAL PROVIDER.
ZU53 NATURAL GAS SERVICE METER LOCATION AND POINT OF ENTRY TOBUILDING; REFER TO MEP PLANS BY OTHERS.
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
C
5
.
0
-
U
T
I
L
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
9
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C5.0
UT
I
L
I
T
Y
P
L
A
N
332
P. BARBEAU
P. BARBEAU
NA
D
8
3
0
SCALE 1"=20'
40'20'
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
C5
.
0
IN
S
E
T
A
MA
T
C
H
L
I
N
E
C
5
.
1
UTILITY NOTES
1. ALL SITE WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANSPREPARED BY TIMMONS GROUP, THE CURRENT REQUIREMENTS OF NEWHANOVER COUNTY AND CAPE FEAR PUBLIC UTILITY AUTHORITY (CFPUA),THE APPLICABLE SECTIONS OF THE NCDOT STANDARD SPECIFICATIONS FORROADWAY CONSTRUCTION, AND ALL OTHER PERTINENT FEDERAL ANDSTATE LAWS.2. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLEFEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES GOVERNINGSAFETY AND HEALTH.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS ANDCONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIORTO THE SUBMISSION OF A BID. SUBMISSION OF A BID SHALL BE CONSTRUEDTO MEAN THE CONTRACTOR HAS REVIEWED THE SITE AND IS FAMILIAR WITHCONDITIONS AND CONSTRAINTS OF THE SITE. IF DISCREPANCIES BETWEENFIELD CONDITIONS AND DESIGN PLANS ARE DISCOVERED, CONTRACTORSHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY.4. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE LOCATED INTHE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFYNC "ONE CALL" AT 811. THE LOCATION OF ALL UTILITIES AND UNDERGROUNDSTRUCTURES ARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE ANDEXACT LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES.5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BID AND PERFORM ALLUTILITY WORK IN COMPLIANCE TO ALL APPLICABLE LOCAL AND STATECODES AND REGULATIONS.6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES ASSOCIATEDWITH THE INSTALLATION, INSPECTING, TESTING AND FINAL ACCEPTANCE OFALL PROPOSED UTILITY CONSTRUCTION UNLESS OTHERWISE COORDINATEDBEFOREHAND WITH SHEETZ.7. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITYCOMPANY ON THE ADDITION, REMOVAL AND/OR RELOCATION OF UTILITIESAND UTILITY POLES AND THE EXTENSION OF ALL PROPOSED UTILITIES TOTHE SHEETZ PROJECT STRUCTURES.8. ALL UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH THESPECIFICATIONS OF THE RESPECTIVE UTILITY COMPANY. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL UTILITIES AREINSTALLED CORRECTLY TO MEET PROJECT REQUIREMENTS WHETHERPERFORMED BY THE CONTRACTOR OR NOT.9. AN AS-BUILD DRAWING OF NEW UTILITY SERVICES SHALL BE PREPARED BYTHE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OFTHE PROJECT.10. UTILITY COMPANIES AND CONTACTS ARE LISTED ON SHEET C0.0.11. CONDUIT LOCATIONS TO FREESTANDING SIGNS AND SITE LIGHT POLES TOBE COORDINATED WITH SHEETZ CONSTRUCTION MANAGER.12. CONTRACTOR SHALL COORDINATE AND VERIFY WITH SHEETZCONSTRUCTION MANAGER ON LOCATION AND SIZE OF THE STORE GREASETRAP. GREASE TRAP SHALL BE PROVIDED WITH "T" PIPE IN OUTFLOWCHAMBER. ALL SANITARY SEWER PIPE SHALL BE THE SDR-35 PVC UNLESSOTHERWISE NOTED.13. CONTRACTOR SHALL COORDINATE WITH SHEETZ CONSTRUCTION MANAGERAND SHEETZ IT DEPARTMENT ON THE CONDUIT ROUTE TO STORE FORTELE/COMMUNICATION SERVICES.14. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTIONSET FOR OTHER PERTINENT INFORMATION.
TT
T
CT
8'' 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W
8'' W
UGP8'' SAN
8'' SAN8'' SAN8'' SAN
TC T
S
UGTUGTUGT
UGTUGTUGTUGTUGTUGTUGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCAUCATVUCATVUCATVUCATVUCATVUCATV
UCATVUCATV
UGTUGTUGTUGT
G
G
G
OH
P
OHP
OH
P
OH
P
OHP
OH
P
UCATVUCATVUCATVUGTUGTUGT
UCATV
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHUOHUOHUOHUOHUOHU
OH
U
OHP OHP
OH
P
OHP
OHP
OHP
OHP
OHPOHPOHP GGGGGGGGGG
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UGUGTUGTUGTUGTUGTUGT
UFO UFO UFO
UGPUGPUCATV
UCATV
UCATV UCATV UCATV UCATV UCATV
UGTUGT
UGTUGTUCATVUCATVUCATV
UGTUGTUGTUGT
UCATVUCATVUCATV
UGT UGT
UFO UFO
G
UGP
UGPUCAT
VUGTUFOUGP
OH
U
OHU
OH
U
OHPX
UGP
UGP
UGP
UGP
G G
X
X
X
X
X
X
WWWWWWWWWWWWWW
FM
FM
FMFMFMFMFMFM
U05U36ZU01ZU20
U06
U16
U37
U14
U3420'
U34 25'
UTILITY KEYNOTES
NUMBER DESCRIPTION
U01 EXISTING 8" PVC WATER MAIN PER CFPUA GIS
U03 EXISTING 10" WATER MAIN; LOCATION BASED ON PHOTOMETRICDATA. CONTRACTOR TO CONFIRM LOCATION AND DEPTH PRIOR TOCONSTRUCTION.U05 EXISTING SANITARY SEWER MANHOLE (TYP.)
U06 EXISTING 8" SANITARY SEWER MAIN (TYP.)
U07 EXISTING UTILITY POLE (TYP.)U08 EXISTING OVERHEAD UTILITY LINE (TYP.)
U09 EXISTING UNDERGROUND TELEPHONE (TYP.)
U10 EXISTING UNDERGROUND CABLE TV LINE (TYP.)
U14 EXISTING GUY WIRE TO REMAINU16EXISTING GAS MAIN TO REMAIN
U19 8"x2" TAPPING SLEEVE & VALVE
U20 8"x6" TAPPING SLEEVE & VALVEU21 6" DIP WATER LINEU23FIRE HYDRANT ASSEMBLY (TYP.)
U27 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCEEASEMENTU34PROPOSED PRIVATE SEWER EASEMENT
U36 CONNECT TO EXISTING SANITARY SEWER MANHOLE. CORE DRILLAND INSTALL FLEXIBLE RUBBER BOOT. (CONTRACTOR TO FIELDVERIFY LOCATION AND ELEVATION)
U37 FORCE MAIN; REFER TO PUMP STATION PLANS BY TIMMONSGROUP.U47 EXISTING 1" WATER METER TO REMAIN
U52 COORDINATE WITH WATER DEPARTMENT TO ENSURE THATSERVICE IS NOT INTERRUPTED AT ANY TIME.
U53
CONNECT TO EXISTING SANITARY SERVICE. CONTRACTOR TO FIELDVERIFY LOCATION, SIZE, CONDITION, AND INVERT PRIOR TO ANYCONSTRUCTION. COORDINATE WITH UTILITY PROVIDER.CONTRACTOR SHALL HAVE EXISTING LINE JETTED AND A CAMERARUN THROUGH IT TO VERIFY PRIOR TO ANY CONSTRUCTION.
U60 6" PVC SANITARY SEWER SERVICE (TYP.)
ZU01
CONTRACTOR TO VERIFY EXISTING UTILITY LOCATIONS PRIOR TOSTART OF CONSTRUCTION. IMMEDIATELY NOTIFY SHEETZ AND CIVILENGINEER OF RECORD IF DISCREPANCIES OR CONFLICTS AREFOUND.ZU02 DOMESTIC WATER SERVICE POINT OF CONNECTION.
ZU04 2" TYPE "K" SOFT COPPER DOMESTIC WATER SERVICE. SERVICELINE SHALL HAVE 3' MINIMUM COVER.ZU05 2" DOMESTIC WATER METER.
ZU06 2" DOMESTIC RPZ BACKFLOW PREVENTER (PER LOCALREQUIREMENTS) DOWNSTREAM OF THE DOMESTIC WATER METER.PROVIDE POWER TO HOT BOX.
ZU07 WATER LINE POINT OF ENTRY TO BUILDING; REFER TO MEP PLANSBY OTHERS.
ZU10 IRRIGATION WATER SERVICE POINT OF CONNECTION.
ZU12
1" TYPE "K" COPPER IRRIGATION WATER SERVICE. SERVICE LINESHALL HAVE 3' MINIMUM COVER. INSTALL IRRIGATION SLEEVESUNDER PAVEMENT. REFER TO IRRIGATION PLANS FOR QUANTITIY,SIZE, MATERIAL, AND LOCATIONS. VERIFY EXACT LOCATION WITHSHEETZ CONSTRUCTION MANAGER PRIOR TO PLACING PAVEMENT.
ZU14 1" RPZ IRRIGATION BACKFLOW PREVENTER (PER LOCALREQUIREMENTS) DOWNSTREAM OF THE IRRIGATION WATER METER.PROVIDE POWER TO HOT BOX.ZU20 SANITARY SEWER POINT OF CONNECTION.
ZU22 6" PVC SANITARY SEWER SERVICE @ 1/8" PER LF MIN. SLOPE, 4' MIN.COVER (TYP.). ALL PVC SEWER PIPING SHALL HAVE TRACER WIREPER NC PLUMBING CODE SECTION 306.2.4.
ZU23 SANITARY SEWER CLEANOUT. TRAFFIC RATED IF WITHIN PAVEMENT(TYP.).
ZU24 2,000 GALLON GREASE TRAP; REFER TO SHEETZ DETAIL 21 AND MEPPLANS FOR VENTING DETAILS.
ZU25 SANITARY SEWER POINT OF ENTRY TO BUILDING; REFER TO MEPPLANS BY OTHERS.
ZU26 GREASE SERVICE POINT OF ENTRY TO BUILDING; REFER TO MEPPLANS BY OTHERS.
ZU28 SANITARY SEWER LIFT STATION; REFER TO LIFT STATION PLANSAND MEP PLANS BY OTHERS.
ZU32
ELECTRIC TRANSFORMER PAD LOCATION. COORDINATE WITHLOCAL PROVIDER. LOCAL PROVIDER CAN SUPERSEDE THEPROPOSED TRANSFORMER PAD LOCATION. PROVIDE TWO (2) 6"__MATERIAL__ CONDUITS BETWEEN POINT OF CONNECTION ANDTRANSFORMER. 24" MINIMUM BURY DEPTH WITH 18" OF VERTICALSEPARATION AT WATER AND SEWER CROSSINGS.
ZU36 PROVIDE POWER TO EMERGENCY SHUT-OFF SWITCH; REFER TOELECTRICAL, UNDERGROUND STORAGE TANK SYSTEM PLANS, ANDSHEETZ DETAIL 29.ZU37 PROVIDE POWER TO LIGHTED BOLLARD (TYP.).
ZU39 PROVIDE POWER TO AIR AND VACUUM MACHINES.
ZU40 PROVIDE POWER TO MID SIGN; WIRED BY BUILDING ELECTRICALCONTRACTOR. VERIFY EXACT LOCATION AND DESIGN BEFOREROUGH-IN. PERMITTED BY OTHERS.ZU50 NATURAL GAS SERVICE POINT OF CONNECTION.
ZU52 NATURAL GAS SERVICE CONSTRUCTED BY LOCAL PROVIDER.
ZU53 NATURAL GAS SERVICE METER LOCATION AND POINT OF ENTRY TOBUILDING; REFER TO MEP PLANS BY OTHERS.
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
C
5
.
0
-
U
T
I
L
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
9
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C5.1
UT
I
L
I
T
Y
P
L
A
N
332
P. BARBEAU
P. BARBEAU
NA
D
8
3
0
SCALE 1"=30'
60'30'
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
UTILITY NOTES
1. ALL SITE WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANSPREPARED BY TIMMONS GROUP, THE CURRENT REQUIREMENTS OF NEWHANOVER COUNTY AND CAPE FEAR PUBLIC UTILITY AUTHORITY (CFPUA),THE APPLICABLE SECTIONS OF THE NCDOT STANDARD SPECIFICATIONS FORROADWAY CONSTRUCTION, AND ALL OTHER PERTINENT FEDERAL ANDSTATE LAWS.2. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLEFEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES GOVERNINGSAFETY AND HEALTH.3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS ANDCONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIORTO THE SUBMISSION OF A BID. SUBMISSION OF A BID SHALL BE CONSTRUEDTO MEAN THE CONTRACTOR HAS REVIEWED THE SITE AND IS FAMILIAR WITHCONDITIONS AND CONSTRAINTS OF THE SITE. IF DISCREPANCIES BETWEENFIELD CONDITIONS AND DESIGN PLANS ARE DISCOVERED, CONTRACTORSHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY.4. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE LOCATED INTHE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFYNC "ONE CALL" AT 811. THE LOCATION OF ALL UTILITIES AND UNDERGROUNDSTRUCTURES ARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE ANDEXACT LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES.5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BID AND PERFORM ALLUTILITY WORK IN COMPLIANCE TO ALL APPLICABLE LOCAL AND STATECODES AND REGULATIONS.6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES ASSOCIATEDWITH THE INSTALLATION, INSPECTING, TESTING AND FINAL ACCEPTANCE OFALL PROPOSED UTILITY CONSTRUCTION UNLESS OTHERWISE COORDINATEDBEFOREHAND WITH SHEETZ.7. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITYCOMPANY ON THE ADDITION, REMOVAL AND/OR RELOCATION OF UTILITIESAND UTILITY POLES AND THE EXTENSION OF ALL PROPOSED UTILITIES TOTHE SHEETZ PROJECT STRUCTURES.8. ALL UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH THESPECIFICATIONS OF THE RESPECTIVE UTILITY COMPANY. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL UTILITIES AREINSTALLED CORRECTLY TO MEET PROJECT REQUIREMENTS WHETHERPERFORMED BY THE CONTRACTOR OR NOT.9. AN AS-BUILD DRAWING OF NEW UTILITY SERVICES SHALL BE PREPARED BYTHE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OFTHE PROJECT.10. UTILITY COMPANIES AND CONTACTS ARE LISTED ON SHEET C7.8.11. CONDUIT LOCATIONS TO FREESTANDING SIGNS AND SITE LIGHT POLES TOBE COORDINATED WITH SHEETZ CONSTRUCTION MANAGER.12. CONTRACTOR SHALL COORDINATE AND VERIFY WITH SHEETZCONSTRUCTION MANAGER ON LOCATION AND SIZE OF THE STORE GREASETRAP. GREASE TRAP SHALL BE PROVIDED WITH "T" PIPE IN OUTFLOWCHAMBER. ALL SANITARY SEWER PIPE SHALL BE THE SDR-35 PVC UNLESSOTHERWISE NOTED.13. CONTRACTOR SHALL COORDINATE WITH SHEETZ CONSTRUCTION MANAGERAND SHEETZ IT DEPARTMENT ON THE CONDUIT ROUTE TO STORE FORTELE/COMMUNICATION SERVICES.14. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTIONSET FOR OTHER PERTINENT INFORMATION.
C5
.
0
MA
T
C
H
L
I
N
E
C
5
.
1
REMOVE AND REPLACE ASPHALT PAVEMENT ANDCURB AND GUTTER TO INSTALL FORCE MAIN REMOVE AND REPLACE GRAVELDRIVEWAY TO INSTALL FORCE MAIN
VAN
STO
P
STANDARDUST FIELD
NEW SHEETZ STORE
6139 SQ. FT.FFE: 22.50'
OH
U
OH
U
OHU
OHU
8'' W
8'' W
8''
W
8''
W
8'' W
D
D
D
D
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
UGP
UG
P
UCA
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UC
A
T
V
UCA
T
V
UGP
UG
P
UGTUGT UGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
G
G
V UCATV
OH
P
OH
P
OH
P
OHP
OH
P
OHPOHPOHP
UCA
T
V
X
X
X
X
X
X
X
X
X
X
X
X
X
UCATVUCATV
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UG
P
UGT
UGT
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UCA
T
V
UC
A
T
V
OHU
OH
U
GGGGGGGGGGGGGGGG
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
OH
P
OH
P
OHP
UC
A
T
V
UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV
UGTUGTUGT
UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT
UCATV
UGP
UGP
UGP
UGP
UGP
UGP
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
WWWWWWWWWWWW
8'' W
8'' W
8'' W
W
FM
FM
FM
FM
FM
FMFM
GG
G
G
G
G
G
W
W
W
W
W
W
W
RD RD
RD
RD
RD RD
RD RD RD
SAN
CACACATVUC
A
T
V
TVTV
V
G
TVTTTTVTTVV
QL (1)QL (1)QL (1)
QL (1)
QL (1)
QL (1)
QL (1)
QL (1)
QL (1)
NS (6)NS (2)NS (3)
NS (1)
NS (1)
NS (1)
NS (1)
ND (3)
ND (3)
ND (3)
ND (3)
LC (23)LC (11)LC (2)
IC (11)IC (2)IC (23)
LC (6)
IC (6)
IEB (14)
LM (20)LM (16)
LM (39)LM (40)
SEED
SEED
SOD SOD
SOD
SOD
SODSEED
LG (1)
LG (1)
EXISTING FENCE
EXISTING TREE LINE
IEB (3)
LM (13)LM (19)
SOD
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
The
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
AS SHOWN
S:\3
3
2
\
6
4
2
5
0
-
S
h
e
e
t
z
\
0
0
2
-
3
3
2
-
S
h
a
d
e
T
r
e
e
L
n
\
D
W
G
\
S
h
e
e
t
\
C
D
\
6
4
2
5
0
.
0
0
2
-
C
6
.
0
-
P
L
N
T
.
d
w
g
|
P
l
o
t
t
e
d
o
n
5
/
1
5
/
2
0
2
4
4
:
3
9
P
M
|
b
y
J
a
c
o
b
F
r
e
n
c
h
ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVERCOUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS
PRELIMINARY - NOT RELEASED FOR CONSTRUCTION
05/15/2024
C6.0
LA
N
D
S
C
A
P
E
P
L
A
N
332
P. BARBEAU
P. BARBEAU
05/15/2024
SH
E
E
T
Z
-
S
H
A
D
E
T
R
E
E
L
A
N
E
WIL
M
I
N
G
T
O
N
-
N
E
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
-
N
O
R
T
H
C
A
R
O
L
I
N
A
64250.002
LANDSCAPE NOTES:
PRE-CONSTRUCTIONxPRIOR TO CONSTRUCTION LOCATE ALL UNDERGROUND UTILITIES WITHIN AND ADJACENT TOTHE WORK AREA. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE PLANS AREBASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE.PROTECT ALL UTILITIES. REPAIR ALL DAMAGE TO UTILITIES, STRUCTURES, SITEAPPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF CONSTRUCTION.x CONTRACTOR ENGAGED IN LANDSCAPE IMPLEMENTATION SHALL BE A LANDSCAPECONTRACTOR REGISTERED IN THE STATE OF NORTH CAROLINA.x VERIFY ALL PLANT MATERIAL QUANTITIES ON PLANS PRIOR TO BIDDING. PLANT LIST TOTALSARE FOR CONVENIENCE ONLY AND MUST BE VERIFIED.x PLANT MATERIAL SUBSTITUTIONS CAN ONLY OCCUR WITH PRIOR WRITTEN APPROVAL BYLANDSCAPE ARCHITECT.x PRIOR TO THE COMMENCEMENT OF ANY ACTIVITIES REQUIRING A BUILDING OR ZONINGPERMIT AN ON-SITE PRE-CONSTRUCTION CONFERENCE SHALL TAKE PLACE WITH THEDEVELOPER AND THE ADMINISTRATOR TO REVIEW PROCEDURES FOR THE PROTECTION ANDMANAGEMENT OF ALL LANDSCAPE ELEMENTS TO REMAIN.x ALL PLANT MATERIALS ARE SUBJECT TO LANDSCAPE ARCHITECT APPROVAL BEFORE, DURING,AND AFTER INSTALLATION.o ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TOSUBSTANTIAL COMPLETION) SHALL BE PROMPTLY REMOVED FROM THE SITE ANDREPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE.x ALL PLANT MATERIALS AND INSTALLATION SHALL COMPLY WITH RECOMMENDATIONS ANDREQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK".o ALL PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE.o ALL PLANT MATERIAL SHALL BE CONTAINER GROWN OR BALLED AND BURLAPPED ASINDICATED IN THE PLANT LIST.
o ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD.
CONSTRUCTION/INSTALLATIONxCONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING INSTAGES FOR SOIL STABILIZATION AS AREAS ARE COMPLETED AFTER GRADING. THIS PLANDOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN.x CONTRACTOR SHALL TAKE 3 REPRESENTATIVE SOIL SAMPLES OF EACH PROPOSED PLANT BEDAND SUBMIT COPIES OF THE RESULTS TO THE LANDSCAPE ARCHITECT PRIOR TO BEGINNINGWORK.x STUMPS LABELED FOR REMOVAL SHALL BE EXCAVATED, NOT GROUND. REMOVE ALL DEBRISFROM THE HOLE. FILL WITH TOP SOIL, COMPACT, AND RAKE SMOOTH PRIOR TO INSTALLINGNEW PLANT MATERIAL.x CONTRACTOR IS RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTECTION BETWEENDELIVERY AND PLANTING TO MAINTAIN HEALTHY PLANT CONDITIONS.x ALL LANDSCAPED AND LAWN AREAS ARE TO RECEIVE A MINIMUM OF 4” OF TOPSOIL.x ALL LANDSCAPE ISLANDS SHALL BE GRADED FOR POSITIVE DRAINAGE WITH NO LOW SPOTSALLOWING WATER TO BE TRAPPED.x INSTALL LANDSCAPE PLANTINGS AT ENTRANCES/EXITS AND PARKING AREAS ACCORDING TOPLANS SO MATERIAL WILL NOT INTERFERE WITH SIGHT DISTANCES.x THE SIZE OF THE PLANTING AREA AND SIZE OF PLANT MATERIAL AT MATURITY SHALL ALLOWFOR A 2.5' BUMPER OVERHANG FROM THE BACK OF CURB.x ALL TREES MUST BE GUYED OR STAKED AS DETAILED.x AREAS DAMAGED FROM PLANT RELOCATION OR OTHER ACTIVITIES OF LANDSCAPECONTRACTOR TO BE RESEEDED AND ESTABLISHED AT NO ADDITIONAL COST TO THE OWNER.x CONTRACTOR IS RESPONSIBLE FOR WATERING ALL PLANT MATERIAL DURING INSTALLATIONAND UNTIL FINAL INSPECTION AND ACCEPTANCE BY OWNER. CONTRACTOR SHALL NOTIFYOWNER OF CONDITIONS WHICH AFFECTS THE GUARANTEE. IT MAY BE NECESSARY TO TRUCKIN NON-CITY WATER TO MEET PLANT NEEDS.x USE HERBICIDES, PESTICIDES, AND FERTILIZER IN A MANNER CONSISTENT WITH THE FEDERALINSECTICIDE, FUNGICIDE, AND RODENTICIDE ACT AND IN ACCORDANCE WITH LABELRESTRICTIONS.x ALL LAWN AREAS TO BE SEEDED SHALL USE A LOCALLY GROWN COMMERCIAL MIX MEETINGLATEST STATE OF NORTH CAROLINA AGRICULTURE STANDARDS FOR SEED AND PLANTCERTIFICATION.x SEEDING AND STRAW NOTES FOR LAWN AREAS:
o RIP THE ENTIRE AREA TO DEPTH OF NOT LESS THAN 6”.
o REMOVE ALL LOOSE ROCKS, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACESMOOTH AND UNIFORM. DISPOSE OF WASTE MATERIAL OFF-SITE.o CHISEL COMPACTED AREAS AND SPREAD TOPSOIL TO SPECIFIED DEPTH.o APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPER PHOSPHATE UNIFORMLY AND MIXWITH SOIL. APPLY SOIL AMENDMENTS PER REQUIRED SOIL ANALYSIS RECOMMENDATIONS.
o CONTINUE TILAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED ISPREPARED.o SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDINGEQUIPMENT OR CULTIPACK AFTER SEEDING.
o MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH.
o INSPECT ALL SEEDED AREAS AND IF POSSIBLE, MAKE NECESSARY REPAIRS ORRESEEDINGS WITHIN THE PLANTING SEASON. IF GRANDSTAND SHOULD BE OVER 60%DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER, AND SEEDING RATES.
o ANCHOR TACK WITH LIQUID ASPHALT AT 400 GAL/ACRE OR EMULSIFIED ASPHALT AT 300GAL/ACRE.x PLANTING BEDS TO BE COMPLETELY COVERED WITH A MINIMUM 4" DEPTH OF MATERIAL FROMA LOCAL SOURCE HARVESTED IN A SUSTAINABLE MANNER. REFER TO LANDSCAPE SCHEMEFOR MATERIAL SPECIFICATIONS.x MULCH ALL PLANT BEDS AND TREE RINGS WITH FRESH, CLEAN MATERIAL PERSPECIFICATIONS. ALL MULCH EDGES SHALL BE NEATLY TUCKED. ALL STRING AND/OR BAILINGWIRE SHALL BE REMOVED. DUST SHRUBS AND GROUND COVER AFTER MULCHING TO REMOVELOOSE MATERIAL FROM PLANTS. DO NOT PLACE MULCH IN CONTACT WITH THE TREE TRUNK:KEEP A MINIMUM OF 4" AWAY FROM TREE TRUNK OR BASE OF PLANT.x MULCH AND NO-MOW MIXES SHALL BE REPLENISHED AS NEEDED, ESPECIALLY AFTER HEAVYRAIN EVENTS. IF NO-MOW MIX GERMINATES AT A RATE OF LESS THAN 90%, THEN REMOVEOTHER SPECIES AND RESEED.
TEMPORARY IRRIGATIONxCONTRACTOR TO PROVIDE AND MAINTAIN TEMPORARY IRRIGATION FOR SOD WITHIN THESTORMWATER CONTROL MEASURE UNTIL SOD BECOMES ESTABLISHED.
INSPECTIONS/GUARANTEExLANDSCAPE CONTRACTOR SHALL NOTIFY GENERAL CONTRACTOR UPON COMPLETION OFLANDSCAPE INSTALLATION. CONTRACTOR WILL VERIFY COMPLETENESS INCLUDING THEREPLACEMENT OF ALL DEAD PLANT MATERIAL. CONTRACTOR IS RESPONSIBLE FORSCHEDULING A FINAL INSPECTION BY LANDSCAPE ARCHITECT.x PLANT MATERIAL QUANTITIES AND SIZES WILL BE INSPECTED FOR COMPLIANCE WITHAPPROVED PLANS BY A SITE PLAN REVIEW AGENT PRIOR TO THE RELEASE OF THECERTIFICATE OF OCCUPANCY.x CONTRACTOR TO GUARANTEE ALL PLANT MATERIALS FOR ONE FULL YEAR AGAINST DEFECTSINCLUDING DEATH AND UNSATISFACTORY GROWTH. WARRANTY PERIOD SHALL BEGIN UPONCERTIFICATE OF OCCUPANCY OR WHEN THE OWNER TAKES OVER MAINTENANCE, WHICHEVERCOMES FIRST.
NA
D
8
3
0
SCALE 1"=30'
60'30'
NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________
Applicant
Checklist NCDOT
Checklist
Driveway Application Process and Site Plan Requirements
ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND
DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE
APPLICATION TO THE APPLICANT FOR REVISION.
***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS***
Electronic Pre-Submittals
In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to
identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all
other required documents.
ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž
/ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘
Online resources:
x NCDOT Policy on Street and Driveway Access to North Carolina Highways:
https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an
d%20Driveway%20Access.pdf
x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way:
https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx
x Electronic Forms Database:
https://connect.ncdot.gov/Pages/default.aspx
1)
Ă͘Cover >etter
Include contact information for applicant and engineer, including email address, mailing address, and phone
number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be
served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant.
ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below)
https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc
Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ
Attach to Permit Application form (not applicable for municipalities, churches, and schools)
Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc
Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf
Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional
site plan requirement details can be found in section 2 of this document.
Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ
If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕
ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ
Y N n/a
Engineering Studies
The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined
herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local
government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs
that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses
(TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina
licensed Professional Engineer.
Section 1: Requi
red Documents
|Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘
ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ
ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘
If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ
ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘
State of North Carolina | Department of Transportation | Division 3 | District 3
%DUEDGRV%OYG,&DVWOH+D\QH, NC 284
Form Updated/20(910) T NCDOT Permit #___________________
Y N n/a
Section 1: Required Documents (continued)
2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL
Ă͘Site Plans
Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement
details can be found in section 2 of this document.
ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ
^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ
Đ͘Performance and Indemnity Bond Amount
100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by
ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕
ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway
Rights of Way for acceptable bond types
Ě͘Radius Encroachment Letter (if applicable)
If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required
Ğ͘Hold Harmless Letter (if applicable)
If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill
be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ
Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below
Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways
ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown
ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable
ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address
ϰͿ Show Zͬt lines, highway control of access, and property lines
ϱͿ All existing utilities (including handholes) and easements
ϲͿ Rͬt width
ϳͿ Existing posted speed limit(s) and design speed limit(s)
ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of
the property lines of the proposed development
ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any
other relevant transportation facilities in the development area
ϭϬͿ Include a plan sheet showing full site build-out and land use
ϭϭͿ Buildings shown with “gross leasable area”
ϭϮͿ Width of property frontage
ϭϯͿ Distance from Rͬt to buildings and gasoline service islands
ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34)
ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc.
Section 3: Driveway Plan Requirements
|
All driveway plans shall include and show, at a minimum, the items listed below
ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů
ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ
ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘
ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways
ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ
ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ)
ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required
shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51)
In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ
In shoulder sections, show grades at the KW and centerline
ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31)
ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90°
allowed for right-in/right-out on a case-by-case basis) (page 51)
ϴͿ Driveway Wrofile (pages 42- 43)
Y N n/a Y N n/a
පප පපප ප
Y N n/a Y N n/a
Y N n/a Y N n/a
Section 3: Driveway Plan Requirements (continued)
ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW)
Asphalt: 8” ABC stone and 1.5” S9.5
Concrete: 6” of concrete
ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’
ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std.
ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31)
ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29)
ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41)
ϭϱͿ Distance between driveways being requested (if applicable; page 51)
ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33)
ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34)
ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ
|
Section ϲ: Roadway
Plan Requirements
If off-site improvements are required, roadway plans shall show, at a minimum, the items below
ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway)
ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders)
Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below
x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000
5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5
x Secondary Routes with AADT<ϭϬ,000
5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ
ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary
The grinding of pavement markings will not be allowed
ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ
ϲͿ Indicate existing roadway grade
ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78)
ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79)
See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details
ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services
ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ
ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ
ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic
Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ.
|
Section ϰ: Drainag e Requirements
All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below
Section ϱ: Internal Circ ulation Requirements
|All internal circulation details shall adhere to, at a minimum, the items listed below
ϭͿ Interior driveway channelization stems
Minimum 100’ from the RKW or at the discretion of the District Engineer
ϮͿ Traffic flow pattern
ϯͿ Traffic control devices
ϰͿ Pavement Markings
Y N n/a Y N n /a
Y N n/a Y N n/a
Y N n/a Y N n/a
Y N n/a Y N n/a
ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade)
High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”
ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ
WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ
ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ
WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů
WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ
ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ
ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ
ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown
;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ
ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline)
ϲͿ Provide grades and spot elevations for existing and proposed ditches
ϳͿ Show how drainage will be accommodated along property frontage
(District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ
Roadway Design Manual At Grade INTERSECTIONS
May 2023 Part I General Design Information | 8-22
Figure 8-10 Recommended Treatment for Turn Lanes
Note: Make every attempt possible to use the desirable deceleration length. It can be shortened as needed but shall not be less
than the minimum. Coordinate with NCDOT and get approval on anything less than the desirable deceleration length.
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: 6/11/2024
Subject: 4195 Carolina Beach Road, Sheetz Shade Tree C-Store
Comments:
• The project is part of the Sheetz Shade Tree TIA Approval with Conditions, dated March
13, 2024. The project is required to build the necessary improvements listed.
• Driveway will be subject to NCDOT review.
• Please label the drive thru length from the menu board.
• The proposed eastbound left-turn lane does not meet the TIA conditions of approval: 300’
full storage, 100’ taper and appropriate full width deceleration length. Please revise.
• The proposed westbound right-turn lane does not meet the TIA conditions of approval:
175’ full storage, appropriate full width deceleration length and taper length. Please
revise.
• The proposed “storefront bumper posts” appear to block access to the parking spaces.
Please revise.
NCDOT Projects:
TIP Projects in the Area: N/A
WMPO 2045 Projects: N/A
New Hanover County CTP: N/A
TIA: A TIA was completed for this project and the conditions of approval letter is attached.
March 13, 2024 Mr. Jeff Hochanadel, PE, PTOE Timmons Group 5410 Trinity Road, Suite 102 Raleigh, NC 27607 RE: Approval with conditions for the Traffic Impact Analysis (TIA) associated with the Sheetz (Shade Tree) commercial development in New Hanover County, NC Dear Mr. Hochanadel, The WMPO, NCDOT and New Hanover County staffs have reviewed the Sheetz (Shade Tree) TIA (sealed
January 23, 2024) and based on the information provided and conversations held to date, it is our
understanding that the proposed development will be built in 2025 and consist of the following:
ITE Land Use Code 945 – 6,139 SF of Convenience Store/Gas Station with 12 vehicle fueling positions
The following improvements are required of this development:
US 421 (Carolina Beach Rd) and SR 1262 (Horn Rd) (Left-in/Right-in/Right-out intersection)
o No improvements are required. US 421 (Carolina Beach Rd) and SR 1197 (Silver Lake Rd)/SR 2361 (Shade Tree Lane) (Signalized intersection)
o Extend the southbound left turn lane on US 421 (Carolina Beach Road) to provide 300 feet of storage, appropriate full-width deceleration, and taper.
o Extend the northbound left turn lane on US 421 (Carolina Beach Road) to extend the full width storage by 100 feet. The existing 200-foot taper may be reduced to 100 feet in length to accommodate this improvement. US 421 (Carolina Beach Rd) and Site Access 1 (Right-in/Right-out intersection)
o Construct a northbound right turn lane on US 421 (Carolina Beach Road) with 175 feet of storage, appropriate full width deceleration and taper.
o Construct site access (westbound approach) with an internal protected stem of 100 feet, measured from the right-of-way line and configured as right-in/right-out operation.
o Provide stop controls for westbound approach.
NCDOT/WMPO Required Improvements Figure
Sheetz - Shade Tree
Legend
Black - Existing Infrastructure
Blue - Full build Improvements
- Stop Control
- Signal
- Right-in/Right-out
Extend the northbound left turn lane on US 421
(Carolina Beach Road) to extend the full width storage
by 100 feet. The existing 200-foot taper may be
reduced to 100 feet in length to accommodate this
US
4
2
1
Site Access 1
Si
t
e
A
c
c
e
s
s
2
Secure Self Storage
Driveway
Horn Road
US
4
2
1
30
0
'
s
t
o
r
a
g
e
,
de
c
e
l
e
r
a
t
i
o
n
a
n
d
50
'
I
P
S
100' IPS
17
5
'
20
0
'
s
t
o
r
a
g
e
,
10
0
'
t
a
p
e
r
Old Lendire Mixed Use Conversion and Parking Lot – 7721 Market St – TRC Review
Page | 1
To: Justin Fulford, justin@fulfordhvac.com
Howard Resnick, CSD Engineering – howard@csdengineering.com
From: Zach Dickerson – Development Review Senior Planner
Date: June 19th TRC Review
PID#: R04400-002-034-000, R04400-002-032-000, R04400-002-031-001
Egov# SITECN-24-000020
Subject: 7227, 7223 and 7231 Market St – Old Lendire Road Mixed Use - TRC Review
The following comments have been received for the June 19th, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
Planning, Zachary Dickerson 910-798-7450
1. General Comments
a. The bottle shop and western parking lot were approved on 08/19/2022.
b. Zoning is B-2.
i. Setbacks for B-2 are met.
c. Proposed new uses:
i. Parking lot, conversion of storage building to ice cream shop and storage building
to walk-up pizza shop.
2. UDO Section 5.1, Parking and Loading
a. Parking is sufficient.
i. Note, parking is based on 2,500 sf shared seating area between the bottle shop,
the ice cream shop and the pizza shop.
ii. Microbrewery/Microdistillery require 8/1,000 sf. Originally, at 3,000 sf this would
require 24 parking spaces. First parking lot had 26 spaces, so this was sufficient.
iii. 64 new spaces being added in this phase, for a total of 90 on the site.
b. Please detail length and width of the spaces.
Old Lendire Mixed Use Conversion and Parking Lot – 7721 Market St – TRC Review
Page | 2
c. Please note that parking spaces at a 90° require a stall width of 9 feet and a depth of 18
feet.
d. The remaining aisle width must be 22 feet.
e. Please note the following from Section 5.1.4, Off Street Parking Design Standards, A.
Surfacing
i. The use of pervious or semi-pervious parking lot surfacing materials, including,
but not limited to pervious asphalt and concrete, open joint pavers, and
reinforced grass/gravel/shell grids may be approved for off-street parking and
loading areas, provided such surfacing is subject to an on-going maintenance
program (e.g. sweeping, annual vacuuming).
3. UDO Section 5.2, Traffic, Access and Connectivity
a. NHC fire has some major concerns about access on this site- please see their comments.
b. Please detail what kind of barricade will be used to close off the access on Market Street.
4. UDO Section 5.3, Tree Retention
a. Tree Removal Permit for this site is already granted, TR-22-000045
b. Please confirm that no further trees are being removed for this development.
5. UDO Section 5.4, Landscaping and Buffering
a. Per the original plans, the existing treeline along Old Lendire Road was approved as a
street yard, though because this is a private drive within the development a street yard is
not technically required. Please confirm this treeline remains- if any trees are removed, a
revision to the tree removal permit would be required.
b. Parking lot landscaping:
i. Please detail parking lot landscaping per section 5.4.5 of the UDO.
6. UDO Section 5.5, Lighting
a. Is any new lighting proposed for the parking lot?
7. UDO Section 5.6, Signs
a. If there are any new signs proposed for this development, please apply for sign permits
prior to installation.
8. UDO Section 5.7, Conservation Resources
a. Per the New Hanover County Conservation Resource Overlay map, there are no
Conservation Resources on this portion of the site.
Old Lendire Mixed Use Conversion and Parking Lot – 7721 Market St – TRC Review
Page | 3
NHC Fire Services, David Stone 910-798-7458
1. The proposed turnaround does not meet the 96’ diameter requirement for fire apparatus
turnaround. (Can that end be left open to Market St. to avoid the need for a turnaround and
provide easier access to Market St?( This would also allow for faster Fire Department response
to this area as the proposed plan would require the first due Engine Company go past this area
to get to the back access off Lendire causing a delay in response time.)
2. Closing the first driveway does not allow for the required fire department access to within 150
feet of the rear of the existing building being serviced by that driveway. (Can the driveway to
Tract 4 be closed instead to relocate the parking spots at the first driveway? Tract 4 currently
has its own driveway to Market St
3. If the 12-foot-wide access road to the parking area behind Tract 4 is meant fir vehicle access and
not a foot path it does not meet the required 16-foot minimum access on a one-way road for
fire apparatus.
4. The 15ft turning radius on the curve located on tract 3 and tract 4 will not support the turning
radius of fire apparatus.
NHC Engineering, Galen Jamison 910-798-7072
1. Please update the site plan to reflect the as-built and planned condition. For example,
significantly more aggregate has been placed on 7225 Market, the future ice cream shed has
added impervious on 3 sides, the gravel placed adjacent the old roadway should be labeled ABC
stone, and the additional area on the south side of the bottle shop are not shown. What are the
intended upgrades the future pizza shed?
2. The increase of impervious area was not previously indicated and the total impervious area on
7221 Market exceeds 13,000 SF. Therefore, a county stormwater permit will be required.
3. The overall disturbance for the common plan of development appears to have exceed 1 acre, if
so, a County permit is required.
4. Please contact the State for their stormwater permitting requirements.
NHC Environmental Health, Dustin Fenske 910-798-6732
1. All previous Environmental Health comments still apply. Addition of new ice cream shop will
require plan review to be conducted by NCDA and permitted under this agency accordingly. The
pizza food service will require application, plan review and permitting by NHC Environmental
Health Food Service Plan Review. Well permit and septic construction authorization must be
issued prior to building permit issuance.
NHC Addressing, Katherine May 910-798-7443
1. No comments
Old Lendire Mixed Use Conversion and Parking Lot – 7721 Market St – TRC Review
Page | 4
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan review required by CFPUA.
3. CFPUA is moving toward becoming paperless. When ready to submit plan review package,
upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-
Review-103.
4. CFPUA water and sewer are available.
5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains).
6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application
Form and a Preliminary Plan, this determination does not guarantee capacity.
7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the
plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the
Authority.
NCDOT, Nick Drees 910-343-3915
1. See attachment.
WMPO, Scott James 910-473-5130
1. See attachment.
Army Corps of Engineers, Brad Shaver 910-251-4611
1. No comment.
Comments not received at this time from:
Emergency Services & E911, Steve Still
NCDEQ, Chad Coburn
New Hanover Soil & Water, Dru Harrison
USACE, Rachel Capito
NCDEMLR, Dan Sams
DCM, Tanya Pietila
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J.R. “JOEY” HOPKINS
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403
Memorandum
To: New Hanover County Technical Review Committee
Date: June 5, 2024
Subject: Fulford Development_7223, 7225, 7231 Market Street
________________________________________________________________________
These are preliminary comments and are based on the plans as submitted for the proposed
site. They are subject to further review upon receipt of any additional information.
Subsequently, additional comments and/or requirements may be necessary for this site.
General Comments:
NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT
Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx
Old Lendire Road & Market Street:
x If the property owner wants to close the connection at Old Lendire Road &
Market Street there are currently two options (the 1st is time sensitive!).
o Send an official letter to the following: District Engineer (Ben Hughes)
and the Resident Engineer requesting the closure, and this could be done
with the current NCDOT project if the curbing hasn’t been placed along
this section.
o Submit a non-utility encroachment (16.1 B) agreement to request the
removal of the apron and replace with curb & gutter.
This would require a hold harmless letter from Sealand
Contractors.
A mutli-use path is being installed along Lendire Road and crosses Old Lendire Road
near the proposed development, a connection to this may be beneficial.
x I have included an image of this for you.
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
NCDOT Driveway Permit:
An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and
15 of the Policy on Street and Driveway Access to North Carolina Highways to include
access locations within 500’ of the proposed access on both sides of the State Road.
Submit to the local NCDOT District Engineer’s Office.
x Refer to the NCDOT checklist (included) for required documents and site plan
information.
NCDOT Encroachment Agreement:
An NCDOT Encroachment Agreement is required for any utility connections or
installations within the NCDOT right-of-way (form 16.6).
An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths
installed within the NCDOT right-of-way (form 16.6).
Site Plan Comments:
Additional plan sheets are needed to review the submittal.
Label the internal protection stem length for the proposed driveway connection.
x Measured from the right-of-way line.
You can coordinate with the district office with any questions 910-398-9100.
Mailing Address:
NCDEPARTMENTOFTRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON,NC 28403
04-11-03 COURIER
Telephone:910-398-9100
CustomerService:1-877-368-4968
Website:ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
MA
R
K
E
T
S
T
R
E
E
T
-
U
.
S
.
H
I
G
H
W
A
Y
1
7
10
0
'
P
U
B
L
I
C
R
I
G
H
T
-
O
F
-
W
A
Y
C
B
TRAC
T
4
19,16
9
S
q
.
F
t
.
(0.44
A
c
r
e
s
)
TRAC
T
3
33,05
7
S
q
.
F
t
.
(0.76
A
c
r
e
s
)
D
TRAC
T
2
48,53
7
S
q
.
F
t
.
(1.11
A
c
r
e
s
)
A TRAC
T
1
16,538
S
q
.
F
t
.
(0.38
A
c
r
e
s
)
LINDIRE ROAD60' PRIVATE RIGHT-OF-WAY
(MAP BOOK 39, PAGE 58)E
NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________
Applicant
Checklist NCDOT
Checklist
Driveway Application Process and Site Plan Requirements
ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND
DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE
APPLICATION TO THE APPLICANT FOR REVISION.
***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS***
Electronic Pre-Submittals
In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to
identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all
other required documents.
ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž
/ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘
Online resources:
x NCDOT Policy on Street and Driveway Access to North Carolina Highways:
https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an
d%20Driveway%20Access.pdf
x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way:
https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx
x Electronic Forms Database:
https://connect.ncdot.gov/Pages/default.aspx
1)
Ă͘Cover >etter
Include contact information for applicant and engineer, including email address, mailing address, and phone
number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be
served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant.
ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below)
https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc
Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ
Attach to Permit Application form (not applicable for municipalities, churches, and schools)
Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc
Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf
Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional
site plan requirement details can be found in section 2 of this document.
Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ
If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕
ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ
Y N n/a
Engineering Studies
The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined
herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local
government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs
that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses
(TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina
licensed Professional Engineer.
Section 1: Requi
red Documents
|Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘
ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ
ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘
If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ
ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘
State of North Carolina | Department of Transportation | Division 3 | District 3
%DUEDGRV%OYG,&DVWOH+D\QH, NC 284
Form Updated/20(910) T NCDOT Permit #___________________
Y N n/a
Section 1: Required Documents (continued)
2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL
Ă͘Site Plans
Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement
details can be found in section 2 of this document.
ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ
^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ
Đ͘Performance and Indemnity Bond Amount
100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by
ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕
ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway
Rights of Way for acceptable bond types
Ě͘Radius Encroachment Letter (if applicable)
If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required
Ğ͘Hold Harmless Letter (if applicable)
If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill
be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ
Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below
Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways
ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown
ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable
ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address
ϰͿ Show Zͬt lines, highway control of access, and property lines
ϱͿ All existing utilities (including handholes) and easements
ϲͿ Rͬt width
ϳͿ Existing posted speed limit(s) and design speed limit(s)
ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of
the property lines of the proposed development
ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any
other relevant transportation facilities in the development area
ϭϬͿ Include a plan sheet showing full site build-out and land use
ϭϭͿ Buildings shown with “gross leasable area”
ϭϮͿ Width of property frontage
ϭϯͿ Distance from Rͬt to buildings and gasoline service islands
ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34)
ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc.
Section 3: Driveway Plan Requirements
|
All driveway plans shall include and show, at a minimum, the items listed below
ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů
ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ
ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘
ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways
ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ
ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ)
ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required
shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51)
In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ
In shoulder sections, show grades at the KW and centerline
ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31)
ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90°
allowed for right-in/right-out on a case-by-case basis) (page 51)
ϴͿ Driveway Wrofile (pages 42- 43)
Y N n/a Y N n/a
පප පපප ප
Y N n/a Y N n/a
Y N n/a Y N n/a
Section 3: Driveway Plan Requirements (continued)
ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW)
Asphalt: 8” ABC stone and 1.5” S9.5
Concrete: 6” of concrete
ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’
ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std.
ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31)
ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29)
ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41)
ϭϱͿ Distance between driveways being requested (if applicable; page 51)
ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33)
ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34)
ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ
|
Section ϲ: Roadway
Plan Requirements
If off-site improvements are required, roadway plans shall show, at a minimum, the items below
ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway)
ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders)
Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below
x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000
5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5
x Secondary Routes with AADT<ϭϬ,000
5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ
ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary
The grinding of pavement markings will not be allowed
ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ
ϲͿ Indicate existing roadway grade
ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78)
ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79)
See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details
ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services
ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ
ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ
ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic
Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ.
|
Section ϰ: Drainag e Requirements
All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below
Section ϱ: Internal Circ ulation Requirements
|All internal circulation details shall adhere to, at a minimum, the items listed below
ϭͿ Interior driveway channelization stems
Minimum 100’ from the RKW or at the discretion of the District Engineer
ϮͿ Traffic flow pattern
ϯͿ Traffic control devices
ϰͿ Pavement Markings
Y N n/a Y N n /a
Y N n/a Y N n/a
Y N n/a Y N n/a
Y N n/a Y N n/a
ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade)
High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”
ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ
WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ
ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ
WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů
WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ
ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ
ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ
ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown
;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ
ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline)
ϲͿ Provide grades and spot elevations for existing and proposed ditches
ϳͿ Show how drainage will be accommodated along property frontage
(District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: 6/11/24
Subject: 7225 Market Street
Comments:
• Site access driveways are subject to NCDOT review.
• The site application appears to be part of the revised Lendire Commercial Mixed-Use TIA
(approved May 30, 2024). This project is required to construct improvements required by the TIA.
• Please verify proposed land uses match land uses in the Lendire Commercial Mixed-Use TIA approval with conditions letter (attached).
• Please label the parking lot dimensions for Fire/EMS review.
• Please consider adding sidewalks along the site aisles and access roads that front the commercial buildings.
NCDOT Projects:
TIP Projects in the Area: U-4751 Military Cutoff Road Extension
U-4902 Market Street Widening Project
WMPO 2045 Projects: N/A
New Hanover County CTP: N/A
TIA: Please verify the intensity of existing land use(s).
Land Use (ITE Code) Intensity 24 Hour
Volumes
AM Peak
Hour Trips
PM Peak
Hour Trips
Storage Building (s), existing 3,000 4 1 1
Brewery, Tap Room (971) proposed 3,000 SF 185 2 29
Pizza/ Ice Cream Shop, (933) proposed 1,368 SF 616 73 72
TOTAL 801 75 100
November 14, 2022 REVISED May 30, 2024 Ms. Dionne Brown, PE DAVENPORT 5917 Oleander Drive, Suite 206 Wilmington, NC 28403 RE: REVISED TIA approval with conditions of the Traffic Impact Analysis (sealed April 22, 2024) associated with the proposed Lendire Commercial Mixed-Use development in New Hanover County, NC. Dear Ms. Brown:
The WMPO, NCDOT and New Hanover County staffs have reviewed the revised and updated Lendire Commercial Mixed Use development TIA (sealed April 22, 2024). According to the submitted documents, this development proposes the following land uses with a build year of 2026:
o ITE Land Use Code 151 – Mini storage 100,000 SF
o ITE Land Use Code 310 – Hotel 120 rooms
o ITE Land Use Code 710 – General Office 10,000 SF
o ITE Land Use Code 822 – Strip Retail (<40ksf) Plaza 40,000 SF
o ITE Land Use Code 912 – Bank with Drive-thru 4,090 SF
o ITE Land Use Code 932 – High Turnover (Sit-down) Restaurant 13,120 SF
o ITE Land Use Code 934 – Fast-Food Restaurant with Drive-Thru 3,390 SF
o ITE Land Use Code 945 – Convenience Store with gasoline pumps – 16 VFP Scenario 1 Assumes U-4902 improvements & Wendover RCI with Site Access 2 as Right-In/Right-Out Scenario 2 Assumes U-4902 improvements & Wendover RCI with Site Access 2 as Full Movement Based on the review of the submitted analysis and related documents, the following improvements are required of the development:
REVISED TIA approval with conditions of Lendire Commercial Mixed-use development (NHC)
Page 2 of 4
US 17 (Market St) at SR 1403 (Middle Sound Loop Rd) / SR 2892 (Lendire Rd) Scenarios 1 & 2 No improvements are required. US 17 (Market St) at SR 1929 (Wendover Ln) (Future Signalized Intersection) Scenario 1 No improvements are required. Scenario 2
• Modify the southbound left turn lane on US 17 (Market St) to provide 350 feet of full-width storage with appropriate taper. US 17 (Market St) at Site Access 1 (Proposed Right-in/Right-out Intersection) Scenario 1
• Construct a southbound right turn lane on US 17 (Market St) with full-width storage extended back to Site Access 2.
• Construct Site Access 1 (eastbound approach) with an internal protected stem of 100 feet, measured from the right-of-way line, and with one ingress and one egress lane, configured as a right-in, right-out intersection.
• Provide stop controls for the eastbound approach. Scenario 2
• Construct a southbound right turn lane on US 17 (Market St) with 125 feet of storage, and appropriate full-width deceleration and taper.
• Construct Site Access 1 (eastbound approach) with an internal protected stem of 100 feet, measured from the right-of-way line, and with one ingress and one egress lane, configured as a right-in, right-out intersection.
• Provide stop controls for the eastbound approach. US 17 (Market St) at Site Access 2 Scenario 1
• Construct a southbound right turn lane on US 17 (Market St) with 500 feet of storage, and appropriate full-width deceleration and taper.
• Construct Site Access 2 (eastbound approach) with an internal protected stem of 100 feet, measured from the right-of-way line and with one ingress and one egress lane, configured as a right-in, right-out intersection.
• Provide stop controls for the eastbound approach.
REVISED TIA approval with conditions of Lendire Commercial Mixed-use development (NHC)
Page 4 of 4
Nick Drees, Engineering Specialist, NCDOT Stonewall Mathis, PE, Division Traffic Engineer, NCDOT Krupa Koilada, Senior Assistant Traffic Engineer, NCDOT
Bryce Cox, Assistant Traffic Engineer, NCDOT Clarence Bunting, PE, Congestion Management Regional Engineer, NCDOT Ken Vafier, Planning Manager, New Hanover County Robert Farrell, Development Review Supervisor, New Hanover County Zach Dickerson, Senior Development Review Planner, New Hanover County Denys Vielkanowitz, PE, City Traffic Engineer, City of Wilmington Chris Walker, Assistant Chief - Fire Marshall, City of Wilmington Bill McDow, Associate Planner, WMPO
NCDOT Required Improvements Figure
Lendire Commercial Mixed Use (Scenario 1)
Legend
Black -Existing Infrastructure
Blue -Scenario 1 Improvements
-Stop Control
-Signal
-Right-in/Right-out
Site Access 2
10
0
'
I
P
S
Middle Sound
Loop Road
50
0
'
s
t
o
r
a
g
e
100' IPS
Site Access 1
100' taper
Wendover Lane
US
1
7
Ma
r
k
e
t
S
t
Lendire Road50'
storage
Si
t
e
A
c
c
e
s
s
3
US
1
7
Ma
r
k
e
t
S
t
100' IPS
FU
L
L
NCDOT Required Improvements Figure
Lendire Commercial Mixed Use (Scenario 2)
Legend
Black -Existing Infrastructure
Blue -Scenario 2 Improvements
-Stop Control
-Signal
-Right-in/Right-out Install a traffic signal
& coordinate with
existing signal
system.
Site Access 2
10
0
'
I
P
S
Middle Sound
Loop Road
25
0
'
s
t
o
r
a
g
e
200'storage
for each
egress lane
Site Access 1
100' taper
Modify to
provide 350'
storage.
Wendover Lane
US
1
7
Ma
r
k
e
t
S
t
Lendire Road50'
storage
Si
t
e
A
c
c
e
s
s
3
US
1
7
Ma
r
k
e
t
S
t
100' IPS
12
5
'
st
o
r
a
g
e
20
0
'
s
t
o
r
a
g
e
100' storage
5409 Castle Hayne Road – Jay’s Place – Commercial Site Plan – TRC Review
Page | 1
To: Mark N. Hargrove of Port City Consulting Engineers, PLLC; mark@portcityeng.com
Joseph L. Hudson of Castle Plaza Development, LLC; hud99son@bellsouth.net
From: Wendell E. Biddle
Development Review Associate Planner
Date: June 19th, 2024, TRC Review
PID#: R01100-014-013-000
Egov# SITECN-24-000021
Subject: 5409 Castle Hayne Road – Jay’s Place – Commercial Site Plan – TRC Review
The following comments have been received for the June 19th, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
NHC Planning, W. E. Biddle 910-798-7068
1. General Comments –
a. The listed scope of work is for a 9,000 square foot flex space.
b. Please detail if there will be associated outdoor storage.
c. Please detail on the site plan the dimensions of the proposed offices vs warehouse
space. Per Site Data Table office space is 1,800 sq ft and warehouse space is 7,200 sq ft.
2. UDO Section 5.1 Parking and Loading
a. The parking quantity is adequate with the annotated quantity detailed on the Site Data
Table.
b. The minimum off-street parking standards have been met per Site Data Table on Cover
Sheet.
c. Please detail location and method of screening from street view for
i. Dumpster
3. UDO Section 5.2 Traffic, Access, and Connectivity
a. A NCDOT Driveway Permit must be obtained.
5409 Castle Hayne Road – Jay’s Place – Commercial Site Plan – TRC Review
Page | 2
4. UDO Section 5.3 Tree Retention
a. The proposed development does not appear to require the removal of any trees. If
trees are to be removed, a tree removal permit will need to be submitted prior to TRC
approval.
b. A land disturbing permit obtained from NHC Engineering must be obtained prior to
development.
5. UDO Section 5.4 Landscaping and Buffering
a. UDO Table 5.4.1: Landscaping Upgrade Standards details the landscaping requirements
for specific amounts of impervious ground cover expansion.
b. Please provide a landscape plan that meets the specific requirements established in the
UDO Section 5.4.2 General Standards.
6. UDO Section 5.5 Exterior Lighting
a. Please detail if there is to be any expansion or alteration of the lighted outdoor area.
b. Please note that except for street lighting, all exterior lighting and indoor lighting visible
from outside shall be designed and located so that the maximum illumination measured
in foot candles at ground level at a lot line shall not exceed the standards in Table
5.5.4.B: Maximum Illumination Levels.
c. The height of exterior light fixtures shall not exceed 25 feet.
7. UDO Section 5.6 Signs
a. Please note that all signs are subject to Section 5.6 of the UDO.
b. Please submit for sign permits prior to installation.
8. UDO Section 5.7 Conservation Resources
a. Per the New Hanover County resource map, there are no detailed conservation resources
on this site.
NHC Fire Services, Ray Griswold 910-798-7448
1. Approved with the following comments:
a. Fire Final required. Will this building be sprinkled?
b. If so, a fire hydrant shall be placed within 100 feet of the FDC.
c. A Section 510 study shall be required for Emergency Responder Radio Communications
Please review the Typical TRC Comment sheet sent to the Engineer.
NHC Engineering, Galen Jamison 910-798-7072
1. It appears the limits of disturbance will be below 1 acre, thereby not requiring a land disturbing
permit. Should land disturbing activities exceed 1 acre, a permit would be required.
2. A stormwater permit issued by the County is required for this project as more than 10,000 SF of
impervious is planned. Please submit the permit applications documentation with requisite
review fees for County issued permit directly to gjamison@nhcgov.com. Application and forms
can be found at https://www.nhcgov.com/251/Stormwater.
3. Please indicate the approximate size and location of the proposed SCM with the resubmission.
4. Please contact the State for their stormwater permitting requirements. It is anticipated a high-
density permit will be necessary.
5409 Castle Hayne Road – Jay’s Place – Commercial Site Plan – TRC Review
Page | 3
NHC Environmental Health, Dustin Fenske 910-798-6732
1. The proposed project must connect to public water and sewer or individual well and septic
permits must be applied for and received. Proposed infrastructure must maintain setbacks to any
surrounding properties well or septic systems.
NHC Addressing, Katherine May 910-798-7443
1. The current address is acceptable.
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan review required by CFPUA.
3. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload
all documents to https://www.fcpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-
103
4. CFPUA water and sewer are available.
5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains).
6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application
Form and a Preliminary Plan, this determination does not guarantee capacity.
7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans
meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority.
NCDOT, Nick Drees 910-398-9100
1. See attachment
WMPO, Scott James 910-473-5130
1. See attachment
Brad Shaver USACOE Brad.E.Shaver@usace.army.mil
1. No comments
Comments not received at this time from:
Emergency Services & E911, Steve Still
NCDEQ, Chad Coburn
New Hanover Soil & Water, Dru Harrison
NCDEMLR, Dan Sams
DCM, Tanya Pietila
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J.R. “JOEY” HOPKINS
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Memorandum
To: New Hanover County Technical Review Committee
Date: June 5, 2024
Subject: Jays Place – 5409 Castle Hayne Road
________________________________________________________________________
These are preliminary comments and are based on the plans as submitted for the proposed
site. They are subject to further review upon receipt of any additional information.
Subsequently, additional comments and/or requirements may be necessary for this site.
General Comments:
NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT
Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx
NCDOT Driveway Permit:
A Revised NCDOT Driveway Permit is required. Submit plans in accordance with pages
14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to
include access locations within 500’ of the proposed access on both sides of the State
Road. Submit to the local NCDOT District Engineer’s Office.
x Refer to the NCDOT checklist (included) for required documents and site plan
information.
A revised NCDOT Driveway Permit is required due to the expansion of the site.
x When a submission is made in the portal reference the original driveway permit
number D-065-16-050.
NCDOT Encroachment Agreement:
An NCDOT Encroachment Agreement is required for any utility connections or
installations within the NCDOT right-of-way (form 16.6).
An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths
installed within the NCDOT right-of-way (form 16.6).
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Required Roadway Improvements:
The extension of the right turn lane is required per the conditions of the original permit.
Refer to the NCDOT Roadway Design Manual for help with the design of any required
roadway improvements.
x Figure 8-10 Recommended Treatment for Turn Lanes (Included).
Site Plan Comments:
Sight Triangles and Sight Distance:
x Show and label the 10’ X 70’ NCDOT sight triangles.
o No obstructions shall be placed within the NCDOT sight triangles.
x Show and label the stopping sight distance.
o No obstructions shall be placed within the stopping sight distance.
o Reference table 3-1 below for design requirements.
Show and label all gates with distances to the right of way line,
x No gates allowed within 100’ from the r/w line.
Label the internal protection stem length for the proposed driveway connection.
x Measured from the right-of-way line.
You can coordinate with the district office with any questions 910-398-9100.
Mailing Address:
NCDEPARTMENTOFTRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101WILMINGTON, NC 28403
04-11-03COURIER
Telephone:910-398-9100
CustomerService:1-877-368-4968
Website:ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Site Development For
MAY, 2024
CASTLE HAYNE, NORTH CAROLINA
CASTLE PLAZA DEVELOPMENT, LLC
1009 WATERVIEW PLACE
CAROLINA BEACH, NC 28428
TEL: 910-520-8678
PORT CITY CONSULTING
ENGINEERS, PLLC
6216 STONEBRIDGE ROAD
WILMINGTON, NC 28409
910-599-1744 LICENSE No. P-1032
mark@portcityeng.com
11" OAK
PRELIMINARY - DO NOT USE FOR CONSTRUCTION
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.NORTH CAROLINANEW HANOVER COUNTY
C-31009 WATERVIEW PLACE
CASTLE PLAZA DEVELOPMENT, LLC
CAROLINA BEACH, NC 28428 SITE PLANJAY'S PLACE PORT CITY CONSULTING
ENGINEERS, PLLC
6216 STONEBRIDGE ROAD
WILMINGTON, NC 28409910-599-1744 LICENSE No. P-1032
PRELIMINARY DESIGN - NOT RELEASED FOR CONSTRUCTION
GRAPHIC SCALE
1 inch = 20 ft.
20 0 10 20 40
NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________
Applicant
Checklist NCDOT
Checklist
Driveway Application Process and Site Plan Requirements
ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND
DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE
APPLICATION TO THE APPLICANT FOR REVISION.
***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS***
Electronic Pre-Submittals
In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to
identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all
other required documents.
ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž
/ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘
Online resources:
x NCDOT Policy on Street and Driveway Access to North Carolina Highways:
https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an
d%20Driveway%20Access.pdf
x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way:
https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx
x Electronic Forms Database:
https://connect.ncdot.gov/Pages/default.aspx
1)
Ă͘Cover >etter
Include contact information for applicant and engineer, including email address, mailing address, and phone
number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be
served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant.
ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below)
https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc
Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ
Attach to Permit Application form (not applicable for municipalities, churches, and schools)
Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc
Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf
Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional
site plan requirement details can be found in section 2 of this document.
Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ
If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕
ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ
Y N n/a
Engineering Studies
The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined
herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local
government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs
that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses
(TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina
licensed Professional Engineer.
Section 1: Requi
red Documents
|Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘
ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ
ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘
If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ
ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘
State of North Carolina | Department of Transportation | Division 3 | District 3
%DUEDGRV%OYG,&DVWOH+D\QH, NC 284
Form Updated/20(910) T NCDOT Permit #___________________
Y N n/a
Section 1: Required Documents (continued)
2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL
Ă͘Site Plans
Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement
details can be found in section 2 of this document.
ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ
^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ
Đ͘Performance and Indemnity Bond Amount
100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by
ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕
ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway
Rights of Way for acceptable bond types
Ě͘Radius Encroachment Letter (if applicable)
If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required
Ğ͘Hold Harmless Letter (if applicable)
If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill
be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ
Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below
Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways
ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown
ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable
ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address
ϰͿ Show Zͬt lines, highway control of access, and property lines
ϱͿ All existing utilities (including handholes) and easements
ϲͿ Rͬt width
ϳͿ Existing posted speed limit(s) and design speed limit(s)
ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of
the property lines of the proposed development
ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any
other relevant transportation facilities in the development area
ϭϬͿ Include a plan sheet showing full site build-out and land use
ϭϭͿ Buildings shown with “gross leasable area”
ϭϮͿ Width of property frontage
ϭϯͿ Distance from Rͬt to buildings and gasoline service islands
ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34)
ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc.
Section 3: Driveway Plan Requirements
|
All driveway plans shall include and show, at a minimum, the items listed below
ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů
ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ
ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘
ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways
ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ
ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ)
ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required
shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51)
In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ
In shoulder sections, show grades at the KW and centerline
ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31)
ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90°
allowed for right-in/right-out on a case-by-case basis) (page 51)
ϴͿ Driveway Wrofile (pages 42- 43)
Y N n/a Y N n/a
පප පපප ප
Y N n/a Y N n/a
Y N n/a Y N n/a
Section 3: Driveway Plan Requirements (continued)
ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW)
Asphalt: 8” ABC stone and 1.5” S9.5
Concrete: 6” of concrete
ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’
ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std.
ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31)
ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29)
ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41)
ϭϱͿ Distance between driveways being requested (if applicable; page 51)
ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33)
ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34)
ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ
|
Section ϲ: Roadway
Plan Requirements
If off-site improvements are required, roadway plans shall show, at a minimum, the items below
ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway)
ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders)
Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below
x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000
5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5
x Secondary Routes with AADT<ϭϬ,000
5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ
ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary
The grinding of pavement markings will not be allowed
ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ
ϲͿ Indicate existing roadway grade
ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78)
ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79)
See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details
ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services
ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ
ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ
ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic
Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ.
|
Section ϰ: Drainag e Requirements
All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below
Section ϱ: Internal Circ ulation Requirements
|All internal circulation details shall adhere to, at a minimum, the items listed below
ϭͿ Interior driveway channelization stems
Minimum 100’ from the RKW or at the discretion of the District Engineer
ϮͿ Traffic flow pattern
ϯͿ Traffic control devices
ϰͿ Pavement Markings
Y N n/a Y N n /a
Y N n/a Y N n/a
Y N n/a Y N n/a
Y N n/a Y N n/a
ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade)
High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”
ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ
WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ
ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ
WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů
WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ
ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ
ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ
ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown
;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ
ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline)
ϲͿ Provide grades and spot elevations for existing and proposed ditches
ϳͿ Show how drainage will be accommodated along property frontage
(District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ
Roadway Design Manual At Grade INTERSECTIONS
May 2023 Part I General Design Information | 8-22
Figure 8-10 Recommended Treatment for Turn Lanes
Note: Make every attempt possible to use the desirable deceleration length. It can be shortened as needed but shall not be less
than the minimum. Coordinate with NCDOT and get approval on anything less than the desirable deceleration length.
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: 6/11/2024
Subject: 5409 Castle Hayne Road, Jay’s Place
Comments:
• The project is a 9,000 SF office/warehouse building at 5409 Castle Hayne Road.
• Driveway will be subject to NCDOT review.
• Please label the dimensions and radius of the shared driveway.
• The proposed refuse collection vehicle turning movement appears to be unsafe. The
movements are shown from the through lane and not in the Two-Way Left-turn Lane.
Please revise.
• Please confirm the proposed land uses and intensities for the estimated trip generation
numbers.
NCDOT Projects:
TIP Projects in the Area: N/A
WMPO 2045 Projects: N/A
New Hanover County CTP: N/A
TIA: Based upon the proposed ITE Estimated Trip Generation a TIA is not required.
Land Use (ITE Code) Intensity 24 Hour
Volumes
AM Peak
Hour Trips
PM Peak
Hour Trips
Office, (710) 1,800 SF 35 3 3
Warehouse, (150) 7, 200 SF 50 1 1
Total 85 4 4
Warehouse and Laydown Yard – 133 Flemington Road – TRC Review
Page | 1
To: Vincent O. Burgess, IV, Burgess Land Lease – vinceb@burgesscorporation.net
From: Amy Doss – Associate Planner
Date: June 19th TRC Review
PID#: R04011-002-004-000
Egov# SITECN-24-000022
Subject: 133 Flemington Road – Warehouse and Laydown Yard - TRC Review
The following comments have been received for the June 19th, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
Planning, Amy Doss 910-798-7571
1. General Comments
a. Zoning is I-2
i. There are no new proposed structures on the site, so no setbacks are necessary
beyond those shown on the cover sheet.
b. Proposed use:
i. 14,650 SF warehouse
ii. Laydown yard.
iii. The application listed “office and laydown yard” as uses, though on the new site
plan I only noted the expansion of the laydown yard use. Please confirm.
2. UDO Section 5.1, Parking and Loading
a. Parking meets the requirements.
3. UDO Section 5.3, Tree Retention
a. Please confirm no trees will be removed.
b. Please refer to Section 5.3 of the UDO for Tree Removal and Retention Standards, if
needed.
Warehouse and Laydown Yard – 133 Flemington Road – TRC Review
Page | 2
4. UDO Section 5.4, Landscaping and Buffering
a. Please submit a landscape plan to include: foundation plantings, parking lot landscaping,
street yard.
b. Please note that 15 trees are required to be planted or retained per acre disturbed.
5. UDO Section 5.5, Lighting
a. Is any new lighting proposed for the site?
6. UDO Section 5.6, Signs
a. If there are any new signs proposed for this development, please apply for sign permits
prior to installation.
7. UDO Section 5.7, Conservation Resources
a. No wetlands on site.
NHC Fire Services, Ray Griswold 910-798-7448
1. Fire Final Required. Please follow any other items on the TRC Plan review that was sent via e-mail
to the Engineer
2. Gate permits required.
3. Will this building be sprinklered? If so a fire hydrant shall be placed within 100 feet of the TRC.
4. A Section 510 Study will be required for Emergency Responder Radio Coverage.
NHC Engineering, Galen Jamison 910-798-7072
1. The County stormwater and land disturbing permit is currently under review. Any comments will
be forwarded the designer.
2. Please verify there is the required separation between storm piping and a septic area.
3. The offsite drainage coming from the west that will be routed through the site via a ditch shall
be placed in a public drainage easement sized in accordance with NHC Stormwater Manual.
Construction within this offsite drainage conveyance measure that will be maintained by the
county will need to be observed during construction by Stormwater Services and a turnover
meeting scheduled once the system is ready to be conveyed to the county. Please add a plan
note to ensure county construction observation and a turnover meeting occurs.
4. The public drainage requirements outlined in comment #3 appears to result in the proposed
building being inside the easement which is not permitted. Note, should the applicant elect to
maintain the conveyance measures themselves, the POA covenants shall indicate the operation
and maintenance roles and responsibilities for the conveyance measure.
5. How is the roadside grass swale conveyed over the driveway?
6. Why is the small pump necessary in the SCM outlet structure?
7. Please contact the State for their stormwater permitting requirements. It is anticipated a high
density permit will be necessary.
NHC Environmental Health, Dustin Fenske 910-798-6732
1. Site plan shows an existing well head/pump house. This well must be protected during
demolition and properly abandoned by a certified well driller.
Warehouse and Laydown Yard – 133 Flemington Road – TRC Review
Page | 3
2. Site must connect to public water whereas this is a no drill area for drinking water wells.
3. Existing septic systems for existing dwellings on this property must be properly abandoned.
4. New proposed development must apply and receive appropriate septic permits prior to building
permit issuance.
5. Proposed infrastructure such as storm sewer piping will pose an issue when permitting this site
due to the required 15 feet setback to these appurtenances. This must be addressed when
applying for both septic and storm water permits.
NHC Addressing, Katherine May 910-798-7443
1. 133 Flemington Road can be used. The other addresses have been removed from our records.
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan review required by CFPUA. Project currently in CFPUA plan review.
3. CFPUA water is available.
4. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains).
5. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application
Form and a Preliminary Plan, this determination does not guarantee capacity.
6. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the
plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the
Authority.
NCDOT, Nick Drees 910-343-3915
1. See attachment.
WMPO, Scott James 910-473-5130
1. See attachment.
Army Corps of Engineers, Brad Shaver 910-251-4611
1. No JD, no indication the Corps has been to this property. Looking at Google earth both aerial and
street view the pond location appears to be in an area that could be wet. If they have not already
started, a JD would be recommended.
Comments not received at this time from:
Emergency Services & E911, Steve Still
NCDEQ, Chad Coburn
New Hanover Soil & Water, Dru Harrison
USACE, Rachel Capito
NCDEMLR, Dan Sams
DCM, Tanya Pietila
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J.R. “JOEY” HOPKINS
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Memorandum
To: New Hanover County Technical Review Committee
Date: June 5, 2024
Subject: Flemington Equipment Yard – 133 Flemington Road
________________________________________________________________________
These are preliminary comments and are based on the plans as submitted for the proposed
site. They are subject to further review upon receipt of any additional information.
Subsequently, additional comments and/or requirements may be necessary for this site.
General Comments:
NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT
Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx
NCDOT Driveway Permit:
An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and
15 of the Policy on Street and Driveway Access to North Carolina Highways to include
access locations within 500’ of the proposed access on both sides of the State Road.
Submit to the local NCDOT District Engineer’s Office.
x Refer to the NCDOT checklist (included) for required documents and site plan
information.
NCDOT Encroachment Agreement:
An NCDOT Encroachment Agreement is required for any utility connections or
installations within the NCDOT right-of-way (form 16.6).
An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths
installed within the NCDOT right-of-way (form 16.6).
Mailing Address:
NCDEPARTMENTOFTRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101WILMINGTON, NC 28403
04-11-03COURIER
Telephone:910-398-9100
CustomerService:1-877-368-4968
Website:ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Site Plan Comments:
Hydraulic calculations and associated plan sheets will need to be submitted for the site.
x This will be reviewed by the NCDOT Hydraulics Unit.
Include the NCDOT Standard Drawings (2024)that are applicable to the development.
Sight Triangles and Sight Distance:
x Show and label the 10’ X 70’ NCDOT sight triangles.
o No obstructions shall be placed within the NCDOT sight triangles.
x Show and label the stopping sight distance.
o No obstructions shall be placed within the stopping sight distance.
o Reference table 3-1 below for design requirements.
Label all gates with distances to the right of way line.
x No gates allowed within 100’ from the r/w line.
Label the internal protection stem length for the proposed driveway connection.
x Measured from the right-of-way line.
You can coordinate with the district office with any questions 910-398-9100.
NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________
Applicant
Checklist NCDOT
Checklist
Driveway Application Process and Site Plan Requirements
ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND
DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE
APPLICATION TO THE APPLICANT FOR REVISION.
***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS***
Electronic Pre-Submittals
In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to
identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all
other required documents.
ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž
/ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘
Online resources:
x NCDOT Policy on Street and Driveway Access to North Carolina Highways:
https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an
d%20Driveway%20Access.pdf
x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way:
https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx
x Electronic Forms Database:
https://connect.ncdot.gov/Pages/default.aspx
1)
Ă͘Cover >etter
Include contact information for applicant and engineer, including email address, mailing address, and phone
number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be
served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant.
ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below)
https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc
Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ
Attach to Permit Application form (not applicable for municipalities, churches, and schools)
Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc
Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf
Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional
site plan requirement details can be found in section 2 of this document.
Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ
If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕
ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ
Y N n/a
Engineering Studies
The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined
herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local
government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs
that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses
(TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina
licensed Professional Engineer.
Section 1: Requi
red Documents
|Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘
ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ
ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘
If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ
ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘
State of North Carolina | Department of Transportation | Division 3 | District 3
%DUEDGRV%OYG,&DVWOH+D\QH, NC 284
Form Updated/20(910) T NCDOT Permit #___________________
Y N n/a
Section 1: Required Documents (continued)
2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL
Ă͘Site Plans
Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement
details can be found in section 2 of this document.
ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ
^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ
Đ͘Performance and Indemnity Bond Amount
100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by
ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕
ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway
Rights of Way for acceptable bond types
Ě͘Radius Encroachment Letter (if applicable)
If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required
Ğ͘Hold Harmless Letter (if applicable)
If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill
be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ
Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below
Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways
ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown
ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable
ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address
ϰͿ Show Zͬt lines, highway control of access, and property lines
ϱͿ All existing utilities (including handholes) and easements
ϲͿ Rͬt width
ϳͿ Existing posted speed limit(s) and design speed limit(s)
ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of
the property lines of the proposed development
ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any
other relevant transportation facilities in the development area
ϭϬͿ Include a plan sheet showing full site build-out and land use
ϭϭͿ Buildings shown with “gross leasable area”
ϭϮͿ Width of property frontage
ϭϯͿ Distance from Rͬt to buildings and gasoline service islands
ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34)
ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc.
Section 3: Driveway Plan Requirements
|
All driveway plans shall include and show, at a minimum, the items listed below
ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů
ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ
ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘
ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways
ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ
ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ)
ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required
shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51)
In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ
In shoulder sections, show grades at the KW and centerline
ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31)
ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90°
allowed for right-in/right-out on a case-by-case basis) (page 51)
ϴͿ Driveway Wrofile (pages 42- 43)
Y N n/a Y N n/a
පප පපප ප
Y N n/a Y N n/a
Y N n/a Y N n/a
Section 3: Driveway Plan Requirements (continued)
ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW)
Asphalt: 8” ABC stone and 1.5” S9.5
Concrete: 6” of concrete
ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’
ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std.
ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31)
ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29)
ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41)
ϭϱͿ Distance between driveways being requested (if applicable; page 51)
ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33)
ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34)
ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ
|
Section ϲ: Roadway
Plan Requirements
If off-site improvements are required, roadway plans shall show, at a minimum, the items below
ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway)
ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders)
Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below
x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000
5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5
x Secondary Routes with AADT<ϭϬ,000
5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ
ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary
The grinding of pavement markings will not be allowed
ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ
ϲͿ Indicate existing roadway grade
ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78)
ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79)
See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details
ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services
ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ
ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ
ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic
Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ.
|
Section ϰ: Drainag e Requirements
All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below
Section ϱ: Internal Circ ulation Requirements
|All internal circulation details shall adhere to, at a minimum, the items listed below
ϭͿ Interior driveway channelization stems
Minimum 100’ from the RKW or at the discretion of the District Engineer
ϮͿ Traffic flow pattern
ϯͿ Traffic control devices
ϰͿ Pavement Markings
Y N n/a Y N n /a
Y N n/a Y N n/a
Y N n/a Y N n/a
Y N n/a Y N n/a
ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade)
High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”
ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ
WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ
ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ
WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů
WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ
ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ
ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ
ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown
;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ
ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline)
ϲͿ Provide grades and spot elevations for existing and proposed ditches
ϳͿ Show how drainage will be accommodated along property frontage
(District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: 6/11/24
Subject: Flemington Equipment Yard
Comments:
• Site access points are subject to NCDOT review.
• The site does not have sidewalks along the frontage of Sampson Street and Flemington
Road. Please consider adding sidewalks to the frontages of these streets.
• The site has proposed gates on the Sampson Street access and Flemington Road
access. Please ensure the gates provide adequate vehicle storage for vehicles to enter and exit without backing into the ROW.
• Please show the controls/operation of the gates. Knox Boxes and/or siren activation may be required for access by Fire/EMS.
NCDOT Projects:
TIP Projects in the Area: N/A
WMPO 2045 Projects: N/A
New Hanover County CTP: N/A
TIA: A TIA is not required for this project.
Land Use (ITE Code) Intensity 24 Hour
Volumes
AM Peak
Hour Trips
PM Peak
Hour Trips
Office, proposed 1,760 35 3 3
Warehouse, (150) proposed 12,182 SF 58 2 2
TOTAL 93 5 5
Blue Bay Townhomes – Major Subdivision – TRC Review
Page | 1
To: John Wall, Timmons Group –john.wall@timmons.com
From: Zach Dickerson – Senior Planner
Date: June 19th TRC Review
PID#: R01100-008-010-000
Egov# SUBPP-24-0005
Subject: Blue Bay Townhomes Preliminary Plan TRC Review
The following comments have been received for the June 19th, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
Planning, Zachary Dickerson 910-798-7450
1. General Comments
a. Zoning is RMF-L- this is a proposed Performance Residential Development.
i. Concept plan approved up to 278 townhomes, please note this TRC site plan
proposes only 263.
ii. The site proposes 25.94 acres of open space.
b. Please note whether this is a Performance Residential Development or a Conventional
Residential Development. Staff’s understanding from the original proposal for
townhomes put this as a Performance Residential Development, which only requires a
20’ peripheral setback around the boundary of the property.
i. In a performance residential development, the standard RMF-L district setbacks
do not apply.
c. Please note that the amenity center is considered a separate use from the townhomes
and will require its own site plan review when that site is ready to move forward.
d. Thank you for noting the conditions of the rezoning on the site plan!
2. UDO Section 5.1, Parking and Loading
a. Just noting for paperwork purposes: townhomes require 2 parking spaces per dwelling
unit.
Blue Bay Townhomes – Major Subdivision – TRC Review
Page | 2
b. Is parking planned to be in garages in/under the townhomes or in driveways out front?
3. UDO Section 5.2, Traffic, Access and Connectivity
a. Please detail if this is the intended bike/ped connection to the multifamily side of this
development, as outlined in the conditions of the rezoning.
b. Will the internal roads be public or private?
4. UDO Section 5.3, Tree Retention
a. The tree survey is a little confusing. For example, it looks like trees are noted for removal
in the example below but are not elsewhere on the site.
b. Trees planned for removal for the townhome sites and the stormwater ponds will be
required to be shown on the tree survey and for the tree removal permit.
5. UDO Section 5.4, Landscaping and Buffering
a. A Type A: Opaque Transitional Buffer is required along the southern boundary of the site
where the site abuts the R-15 zoning.
b. Foundation plantings are not required for the townhome buildings, but they will be for
the amenity center.
Blue Bay Townhomes – Major Subdivision – TRC Review
Page | 3
c. Please detail landscaping for the parking lots throughout the development. Please note
that parking lot landscaping calculations can be found in UDO Section 5.4.5.
d. Street yard is not required for residential development unless built to the commercial
building code.
e. Please note that the landscaping standards require 15 trees per acre to be planted or
retained for all development. This can likely be ironed out during the tree removal permit
process, since trees retained for that permit can be counted towards this requirement.
6. UDO Section 5.5, Lighting
a. Is any new lighting proposed for this development?
b. Please note a lighting plan is not required at time of TRC approval. See below excerpt from
Section 5.5.3:
i. Information about the exterior lighting for the site that demonstrates compliance
with the standards in this section shall be submitted in conjunction with an
application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance
approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first,
approved no later than at time of construction plan approval.
7. UDO Section 5.6, Signs
a. If there are any new signs proposed for this development, please apply for sign permits
prior to installation.
8. UDO Section 5.7, Conservation Resources
a. Per the New Hanover County Conservation Resource Overlay map, there is pocosin
present on the site. However, there are no Class IV soils on the site, so the Conservation
Resource Standards do not apply on this site.
9. UDO Article 6, Subdivision Design and Improvements.
a. Per Article 6’s Section on Street Connectivity Standards, the street network for any
subdivision shall achieve a connectivity ratio of not less than 1.4.
b. There are 19 links on this site and 13 nodes, for a link:node ratio of 1.46. This requirement
is met.
Blue Bay Townhomes – Major Subdivision – TRC Review
Page | 4
NHC Fire Services, Ray Griswold 910-798-7448
1. Fire finals required
2. Move fire hydrant at lot #61 to lot #57
3. Move fire hydrant at lot #31 to area of lot #19
NHC Engineering, Galen Jamison 910-798-7072
1. A land disturbing and a stormwater permit issued by the County are required for this project.
Please submit the permit applications documentation with requisite review fees for County
issued permit directly to gjamison@nhcgov.com. Application and forms can be found at
https://www.nhcgov.com/251/Stormwater and https://www.nhcgov.com/249/Sediment-
Erosion-Control.
2. The offsite drainage coming from the north and west that will be routed through the site via
culverts and ditches shall be placed in a public drainage easement sized in accordance with NHC
Stormwater Manual. Construction within this offsite drainage conveyance measure that will be
maintained by the county will need to be observed during construction by Stormwater Services
and a turnover meeting scheduled once the system is ready to be conveyed to the county.
Please add a plan note to ensure county construction observation and a turnover meeting
occurs. Note, should the applicant elect to maintain the conveyance measures themselves, the
POA covenants shall indicate the operation and maintenance roles and responsibilities for the
conveyance measure.
3. Please include the offsite roadway plans for the work identified in the TIA with the permit
submission.
4. Please contact the State for their stormwater permitting requirements. It is anticipated a high
density permit will be necessary.
NHC Environmental Health, Dustin Fenske 910-798-6732
1. Site plan reflects connection to public sewer. Proposed infrastructure does not violate setbacks
to surrounding properties’ well and septic systems.
2. Site plan reflects connection to public water. Proposed infrastructure does not violate setbacks
to surrounding properties’ well or septic systems.
NHC Addressing, Katherine May 910-798-7443
1. Seven street names are required. Please contact me with the street name suggestions prior to
TRC approval.
2. Addresses will be assigned following TRC approval.
Blue Bay Townhomes – Major Subdivision – TRC Review
Page | 5
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan review required by CFPUA.
3. CFPUA is moving toward becoming paperless. When ready to submit plan review package,
upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-
Review-103.
4. CFPUA water available.
5. CFPUA sewer will be available through mainline extension and installation of pump station.
6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains).
7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application
Form and a Preliminary Plan, this determination does not guarantee capacity.
8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the
plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the
Authority.
NCDOT, Nick Drees 910-343-3915
1. Please see attached PDF.
WMPO, Scott James 910-473-5130
1. See attachment.
Army Corps of Engineers, Brad Shaver 910-251-4611
1. Jurisdictional determination completed and is reflected on site plan and permit expected.
ILM International Airport, Granseur Dick 910-341-4333 x 1016
1. Development is adjacent to an active FAA-owned Navigational Aid to Aviation Facility. Please
submit an air case study for FAA review. More information can be found at
https://oeaaa.faa.gov/oeaaa/external/portal.jsp and expect to use the following form:
https://www.faa.gov/forms/index.cfm/go/document.information/documentID/186273
Comments not received at this time from:
Emergency Services & E911, Steve Still
NCDEQ, Chad Coburn
New Hanover Soil & Water, Dru Harrison
NCDEMLR, Dan Sams
DCM, Tanya Pietila
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J.R. “JOEY” HOPKINS
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Memorandum
To: New Hanover County Technical Review Committee
Date: June 5, 2024
Subject: Blue Bay Townhomes – 5735 Blue Clay Road
________________________________________________________________________
These are preliminary comments and are based on the plans as submitted for the proposed
site. They are subject to further review upon receipt of any additional information.
Subsequently, additional comments and/or requirements may be necessary for this site.
General Comments:
NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT
Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx
NCDOT Driveway Permit:
An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and
15 of the Policy on Street and Driveway Access to North Carolina Highways to include
access locations within 500’ of the proposed access on both sides of the State Road.
Submit to the local NCDOT District Engineer’s Office.
x Refer to the NCDOT checklist (included) for required documents and site plan
information.
NCDOT Encroachment Agreement:
An NCDOT Encroachment Agreement is required for any utility connections or
installations within the NCDOT right-of-way (form 16.6).
An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths
installed within the NCDOT right-of-way (form 16.6).
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Required Roadway Improvements:
Per the approved TIA (included) onsite and offsite roadway improvements are required.
The approved TIA was not done in phases so all improvements will need to be installed
with the initial phase.
Refer to the NCDOT Roadway Design Manual for help with the design of any required
roadway improvements.
x Figure 8-10 Recommended Treatment for Turn Lanes (Included).
Site Plan Comments:
Add to the plan sheets that the proposed subdivision is private and will not be eligible to
be added to the State Highway System for maintenance per General Statute: 136-102.6
Submit plans showing the required roadway improvements.
Hydraulic calculations and associated plan sheets will need to be submitted for the site
due to the proposed discharge within the NCDOT right of way.
x This will be reviewed by the NCDOT Hydraulics Unit.
Sight Triangles and Sight Distance:
x Show and label the 10’ X 70’ NCDOT sight triangles.
o No obstructions shall be placed within the NCDOT sight triangles.
x Show and label the stopping sight distance.
o No obstructions shall be placed within the stopping sight distance.
o Reference table 3-1 below for design requirements.
Show and label all gates with distances to the right of way line,
x No gates allowed within 100’ from the r/w line.
Label the internal protection stem length for the proposed driveway connection.
x Measured from the right-of-way line.
You can coordinate with the district office with any questions 910-398-9100.
Mailing Address:
NCDEPARTMENTOFTRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101WILMINGTON, NC 28403
04-11-03COURIER
Telephone:910-398-9100
CustomerService:1-877-368-4968
Website:ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
April 12, 2023
Mr. Jonathan Guy, PE, PTOE, AICP
Kimley Horn Associates
115 Fairchild Street, Suite 250
Charleston, SC 29492
RE: Approval with conditions of the Traffic Impact Analysis (TIA) associated with the proposed
Castle Hayne Residential development located in New Hanover County, NC.
Dear Mr. Guy:
The WMPO, NCDOT and New Hanover County staffs have reviewed the Blue Clay Residential TIA (sealed
February 16, 2023) and based on the information provided and conversations held to date, it is our
understanding that the proposed development has a build out year of 2026 and will consist of:
o ITE Land Use Code 210 – Single Family detached housing 57 DU
o ITE Land Use Code 215 – Single Family attached housing (duplexes) 231 DU
o ITE Land Use Code 221 – Multi-family (mid-rise) housing 240 DU
Based upon the review of the analysis provided, the following improvements are required of this development:
I-40 Eastbound Ramp and SR 1002 (Holly Shelter Road) (Stop-controlled intersection)
x Signalize the intersection.
I-40 Westbound Ramp and SR 1002 (Holly Shelter Road) (Stop-controlled intersection)
Option 1 (Recommended)
Signalize the intersection and provide necessary coordination.
Option 2
Construct an exclusive northbound right turn lane on I-40 westbound ramps, with 400 feet of storage,
appropriate deceleration, and taper.
Approval with conditions of the Castle Hayne Residential (New Hanover County) Traffic Impact Analysis
Page 2 of 3
SR 1002 (Holly Shelter Road) and SR 2181 (Blue Clay Road) (Stop-controlled intersection)
x Construct an eastbound right turn lane on SR 1002 (Holly Shelter Road) with 100 feet of storage,
appropriate deceleration and taper.
x Construct an exclusive northbound right turn lane on SR 2181 (Blue Clay Road) with 100 feet of
storage, appropriate deceleration and taper.
SR 2181 (Dairy Farm Road) and SR 1336 (Sidbury Road) (Stop-controlled intersection)
x No improvements are required.
SR 1002 (Holly Shelter Road) and Site Access 1 (Proposed stop-controlled intersection)
x Construct an eastbound right turn taper of 200 feet on SR 1002 (Holly Shelter Road).
x Construct site access (northbound approach) with an internal protected stem of 50 feet, measured
from the right-of-way and with one ingress lane and one egress lane.
x Provide stop controls for northbound approach.
SR 2181 (Blue Clay Road) and Concrete Plant Driveway/Site Access 2 (Stop-controlled intersection)
x Construct site access (eastbound approach) with an internal protected stem of 50 feet measured from
the right-of-way, and with one ingress lane and one egress lane.
x Provide stop controls for eastbound approach.
SR 2181 (Blue Clay Road) and Kerry Drive/Site Access 3 (Stop-controlled intersection)
x Construct site access (eastbound approach) with an internal protected stem of 50 feet measured from
the right-of-way, and with one ingress lane and one egress lane.
x Provide stop controls for eastbound approach.
SR 2181 (Blue Clay Road) and Site Access 4 (Proposed stop-controlled intersection)
x Construct site access (eastbound approach) with an internal protected stem of 75 feet measured from
the right-of-way, and with one ingress lane and one egress lane.
x Provide stop controls for eastbound approach.
If changes are made to the proposed site driveways and/or land uses, the current trip distribution may need to
be modified and would require a revised Traffic Impact Analysis to be submitted for review by the NCDOT,
WMPO, and New Hanover County, in which instance this approval would become null and void.
The applicant is required to obtain all applicable New Hanover County and NCDOT permits for access to the
road network. A copy of this TIA approval shall be included with any NCDOT driveway permit application. All
applicable NCDOT and New Hanover County technical standards and policies shall apply.
Approval with conditions of the Castle Hayne Residential (New Hanover County) Traffic Impact Analysis
Page 3 of 3
Please feel free to contact me at (910) 473 – 5130 if you have any questions regarding this approval.
Sincerely,
Scott A. James, PE
Transportation Planning Engineer
Wilmington Urban Area MPO
Ec: Ben Hughes, PE, District Engineer, NCDOT
Jon Roan, Deputy District Engineer, NCDOT
Frank Mike, Assistant District Engineer, NCDOT
Jessi Leonard, PE, Assistant Division Maintenance Engineer, NCDOT
Stonewall Mathis, PE, Deputy Division Traffic Engineer, NCDOT
Krupa Koilada, Senior Assistant Traffic Engineer, NCDOT
Bryce Cox, Assistant Traffic Engineer, NCDOT
Robert Farrell, Senior Planner, New Hanover County
Julian Griffee, Current Planner, New Hanover County
Jamar Johnson, EI, Engineering Associate, WMPO
INV=25.78INV=25.7218 RCP
HOLLY SHELTER ROAD - S.R. 1002100' PUBLIC R/W
BLUE CLAY ROAD - S.R. 1318
60' PUBLIC R/W
GLAZIER RD.60' PUBLIC R/WD.B. 984, PG. 224
BLUE CLAY ROAD - S.R. 1318
60' PUBLIC R/W
INV 25.VVVINV=25.INV=25.INV 25 7INV=25.INV=25.
AYROAD - S.R. 1318
BLUE CLAY ROAD - S.R. 1318AYROAD - S.R. 1318
60' PUBLIC R/W
60'PUB
SITE
HOLLY SHELTER
R
D
-
S
R
1
0
0
2
BL
U
E
C
L
A
Y
R
D
-
S
R
1
3
1
8
GLAZIER RD
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
S:\3
3
1
\
6
3
6
7
7
-
B
l
u
e
_
T
a
n
k
_
T
o
w
n
h
o
m
e
s
\
D
W
G
\
S
h
e
e
t
\
T
R
C
\
6
3
6
7
7
-
3
3
1
-
C
0
.
0
-
C
O
V
R
.
d
w
g
|
P
l
o
t
t
e
d
b
y
A
u
s
t
i
n
M
a
r
t
i
n
BL
U
E
B
A
Y
T
O
W
N
H
O
M
E
S
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
,
N
O
R
T
H
C
A
R
O
L
I
N
A
63677
331
J. WALL
331
5/15/2024
FOR
R
E
V
I
E
W
ONL
Y
PROPOSED USE:
PROJECT:
SITE DATA
ENGINEER:
TOTAL SITE AREA:
PROPERTY LOCATION:
DEVELOPER:
RESIDENTIAL
BLUE BAY TOWNHOMES
JOHN WALL, PEPHONE: 910-746-1174WILMINGTON, NC 28403430 EASTWOOD ROADTIMMONS GROUP
EMAIL: JOHN.WALL@TIMMONS.COM
D.R. HORTON6752 PARKER FARM DRIVE, SUITE 210
5735 BLUE CLAY RD
WILMINGTON, NC 28403GRAYSON MORGAN
TECHNICAL REVIEW COMMITTEE SUBMITTAL
NEW HANOVER COUNTY, NORTH CAROLINA
49.38 AC.
ZONING:RMF-L
EXISTING USE: VACANT
BLUE BAY TOWNHOMES
GAMORGAN@DRHORTON.COMPHONE: 910-602-8215
1" = 1000'OWNER:BLUE TANK LLC24 BACKFIN PTWILMINGTON, NC 28411
PID: R01100-008-010-000
(CONDITIONALLY REZONED WITH CASENUMBER Z23-12 ON 8/7/2023)
CLASS IV SOILS:2.11 AC.
NET AREA:47.27± AC.
Sheet List Table
Sheet Number Sheet Title
C0.0 COVER SHEET
C1.0 EXISTING CONDITIONS AND DEMOLITION PLAN - SHEET 1 OF 2
C1.1 EXISTING CONDITIONS AND DEMOLITION PLAN - SHEET 2 OF 2
C2.0 OVERALL SITE PLAN
C2.1 DETAILED SITE PLAN - SHEET 1 OF 3
C2.2 DETAILED SITE PLAN - SHEET 2 OF 3
C2.3 DETAILED SITE PLAN - SHEET 3 OF 3
C3.0 OVERALL SITE UTILITY PLAN
C3.1 DETAILED SITE UTILITY PLAN - SHEET 1 OF 3
C3.2 DETAILED SITE UTILITY PLAN - SHEET 2 OF 3
C3.3 DETAILED SITE UTILITY PLAN - SHEET 3 OF 3
C3.4 DETAILED OFFSITE UTILITY PLAN - SHEET 1 OF 3
C3.5 DETAILED OFFSITE UTILITY PLAN - SHEET 2 OF 3
C3.6 DETAILED OFFSITE UTILITY PLAN - SHEET 3 OF 3
C4.0 OVERALL GRADING AND DRAINAGE PLAN
C4.1 DETAILED GRADING AND DRAINAGE PLAN - SHEET 1 OF 3
C4.2 DETAILED GRADING AND DRAINAGE PLAN - SHEET 2 OF 3
C4.3 DETAILED GRADING AND DRAINAGE PLAN - SHEET 3 OF 3
C5.0 OVERALL TREE MITIGATION PLAN
C5.1 DETAILED TREE MITIGATION PLAN - SHEET 1 OF 7
C5.2 DETAILED TREE MITIGATION PLAN - SHEET 2 OF 7
C5.3 DETAILED TREE MITIGATION PLAN - SHEET 3 OF 7
C5.4 DETAILED TREE MITIGATION PLAN - SHEET 4 OF 7
C5.5 DETAILED TREE MITIGATION PLAN - SHEET 5 OF 7
C5.6 DETAILED TREE MITIGATION PLAN - SHEET 6 OF 7
C5.7 TREE REMOVAL AND MITIGATION TABLES
C6.0 SITE NOTES AND DETAILS
C6.1 UTILITY NOTES AND DETAILS
C6.2 UTILITY NOTES AND DETAILS
C6.3 UTILITY NOTES AND DETAILS
C6.4 UTILITY NOTES AND DETAILS
C6.5 STORM SEWER NOTES AND DETAILS
C6.6 STORM SEWER NOTES AND DETAILS
X
X
X
163
147
119
103
87
162
146
118
102
86
178
161
145
117
101
73
177
160
144
116
100
72
176
159
143
115
99
71
175
158
142
114
98
70
174
157
141
113
97
69
173
156
140
112
96
68
172
155
139
111
95
67
171
154
138
110
94
66
170
153
137
109
93
169
152
136
108
92
168
151
123
107
91
167
150
122
106
90
165
149
121
105
89
164
148
120
104
88
1
17
52
82
251
234
2
18
53
83
250
233
3
19
54
84
249
4
20
55
85
248
231
5
21
56
247
6
22
57
263
246
723
58
261
245
8
16
24
51
59
81
260
252
244
235
9
25
60
259
243
10
26
61
258
242
11
27
78
257
241
12
28
77
256
239
13
29
76
255
238
14
30
75
254
237
15
50
80
253
236
62
63
64
65
OS #2
AMENITY AREA
33
39
32
38
31
37
44
36
43
OS #1
42
35
41
34
40
126
130
125
OS #4
124
135
134
129
133128132
127
131
213
221
206
214
222
205
207
215
223
204
208
216
224
203
209
217
225
210
218
226
211
219
227
212
220
OS #6
194 186
199
193
185
200
192
184
201
191
183
202
198
190
182
OS #9
197
189
181
196
188
180
195
187
179
OS #11
OS #3
262
229
OS #7
OS #8
OS #5
OS #10
4546474849
232 230 228
240
166
79
74
SCM 1
SCM 2
SCM 3
SCM 3
SCM 4
SCM 5
18" RCPINV=23.73
INV=22.86
INV=17.54
72" CMP
18" R
C
P
INV=21.98
INV=22.43
INV=19.55
INV=20.21
INV=23.98
INV=23.97
INV=24.90
INV=24.90
18" R
C
P
18" RCP
INV=23.62
INV=22.63
INV=22.63
INV=22.25
INV=22.38
INV=22.64
18" RCP
18" RC
P
18" RCP
18" RCP
12" R
C
P
18" R
CP
15" RCP INV=21.25
INV=20.99
18" CM
P
12" R
C
P
INV=22.74
INV=23.23
INV=23.39
18" RC
P
15" R
C
P
INV=24.26
INV=24.75
INV=23.99
INV=24.17
15" R
C
P
DIRIM=25.94IN(N)=22.39IN(S)=22.04OUT=21.99
DIRIM=24.48IN(N)=22.73IN(W)=22.58OUT=22.4812" RCP 6" PVC
INV=22.36
END UKNOWN
END UKNOWN
DIRIM=21.00IN(W)=16.99IN(S)=17.00IN(N)=17.55OUT=16.2518" RCPINV=16.78
15" R
C
P
18" RCP
DIRIM=24.63IN(N)=21.88OUT=21.68
DIRIM=25.21IN(N)=22.86OUT=22.75
YIRIM=20.39IN(W)=15.19OUT=15.15
W
W
W
W
W
W
W
W
W
W
W
W
W
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OHP
OHP
OHP
OHP
OHP
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B
.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G. 17
8
POWE
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
PG.
1
7
8
BLU
E
C
L
A
Y
R
O
A
D
-
S
.
R
.
1
3
1
8
60'
P
U
B
L
I
C
R
/
W
MATCHLINE C2.1
MATCHLINE C2.2
MATCHLINE C2.1
MATCHLINE C2.3
MA
T
C
H
L
I
N
E
C
2
.
2
MA
T
C
H
L
I
N
E
C
2
.
3
S77°43'26"W
68.60'R=200.00'L=65.61'
S58°55
'
3
5
"
W
100.00
'
R=200.00'L=203.36'
N62°4
8
'
5
7
"
W
110.6
8
'
R=270.00'L=126.40'
N89°38'18"W111.14'
R=270.00'L=431.32'
S1
°
1
0
'
0
0
"
E
149
.
8
3
'
R=2500.00'L=487.58'
S1
2
°
2
0
'
2
9
"
E
46
8
.
5
7
'
S77°39'31"W
142.11'
R=140.00'L=443.81'
N77°39'31"E
142.11'
N77°39'31"E
816.15'
R=100.00'L=157.08'
N1
2
°
2
0
'
2
9
"
W
29
2
.
6
0
'
S77°39'31"W
677.18'
R=100.00'L=157.08'
S1
2
°
2
0
'
2
9
"
E
29
2
.
6
0
'
N1
2
°
2
0
'
2
9
"
W
39
2
.
6
0
'
S16
°
5
9
'
3
4
"
W
86.
4
2
'
R=250.00'L=237.79'
R=125.00'L=205.55'
R=250.00'L=268.42'
N1
3
°
0
7
'
2
7
"
W
80
.
0
0
'
N16
°
5
9
'
3
4
"
E
98.
6
5
'
R=55.00'L=70.70'
S89°21'21"E
100.00'
R=55.00'L=73.18'
S1
3
°
0
7
'
2
7
"
E
95
.
4
7
'
N1
°
1
0
'
0
0
"
W
34
0
.
6
2
'
R=100.00'L=25.54'
N15°48'04"W21.26'
S88°50'00"W
210.40'
BLU
E
C
L
A
Y
R
O
A
D
-
S
.
R
.
1
3
1
8
60'
P
U
B
L
I
C
R
/
W
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
S:\3
3
1
\
6
3
6
7
7
-
B
l
u
e
_
T
a
n
k
_
T
o
w
n
h
o
m
e
s
\
D
W
G
\
S
h
e
e
t
\
T
R
C
\
6
3
6
7
7
-
3
3
1
-
C
2
.
0
-
S
I
T
E
.
d
w
g
|
P
l
o
t
t
e
d
b
y
A
u
s
t
i
n
M
a
r
t
i
n
BL
U
E
B
A
Y
T
O
W
N
H
O
M
E
S
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
,
N
O
R
T
H
C
A
R
O
L
I
N
A
63677
331
J. WALL
331
5/15/2024
FOR
R
E
V
I
E
W
ONL
Y
1" = 100'
NA
D
8
3
0
SCALE 1"=100'
200'100'
LEGEND
PROPERTY LINEPROPOSED RIGHT OF WAYPROPOSED LOT LINE
UTILITY EASEMENTSIGHT TRIANGLE
EXISTING WETLANDS
AMENITY AREA
OPEN SPACE
DEVELOPER:
ENGINEER:TIMMONS GROUP
JOHN WALL, PE
430 EASTWOOD ROAD
WILMINGTON, NC 28403
PHONE: 910-746-1174
SITE DATA
PROPOSED NUMBER OF LOTS = 263
TOTAL GROSS ACREAGE OF PARCEL = 49.38 ACRES
ZONING =LAND USE = MULTI-FAMILY RESIDENTIAL TOWNHOMES
PROVIDED OPEN SPACE AREA = 25.94 AC (52.53%)
PROPOSED DENSITY = 5.33 du/a
RMF-L
EMAIL: JOHN.WALL@TIMMONS.COM
USPS NOTE
CLUSTER MAILBOXES TO BE LOCATED ON ROAD A ANDROAD E. KIOSK LOCATION SHALL BE APPROVED BYUSPS PRIOR TO SUBDIVISION APPROVAL. IFTEMPORARY LOCATIONS ARE REQUIRED, APPROVAL OFLOCATIONS SHALL BE RECEIVED FROM USPS. MAILKIOSK WILL HAVE MARKED CROSSWALK WITH ADACOMPLIANT RAMPS AND PARKING SPACES.
FRONT YARD = 20'SIDE YARD = 5'
REAR YARD = 15'
SETBACKS TABLE
GENERAL SITE NOTES1. COUNTY AND STATE STORMWATER PERMITS MUST BEOBTAINED PRIOR TO ANY CONSTRUCTION OF IMPERVIOUSSURFACE. NO NATURAL DRAINAGE AREAS WILL BE CUT OFFOR DISTURBED BEFORE OBTAINING THE PERMITS.2. ALL CONSTRUCTION AND MATERIALS SHALL BE INACCORDANCE WITH NEW HANOVER COUNTY AND NCDOTSTANDARDS AND SPECIFICATIONS.3. CONTRACTOR SHALL VERIFY THE LOCATION OF ALLEXISTING UTILITIES AND SHALL BE RESPONSIBLE FOR ANYDAMAGE RESULTING FROM THEIR ACTIVITIES. CALL UTILITYLOCATOR SERVICE BEFORE DIGGING.4. ALL UTILITIES SHALL BE UNDERGROUND.5. EACH LOT WILL BE SERVED BY CAPE FEAR PUBLIC UTILITYAUTHORITY (CFPUA).6. NEW HANOVER COUNTY EROSION CONTROL PERMIT ANDNCDEQ EROSION CONTROL PERMIT WILL BE REQUIRED,AND ALL EROSION CONTROL REGULATIONS WILL BECOMPLIED WITH.7. CONSTRUCTION DRAWINGS MUST BE FULLY APPROVEDPRIOR TO CONSTRUCTION.8. SIGNAGE SHALL BE APPROVED PRIOR TO INSTALLATION OFANY SIGNAGE.9. STREET NAMES MUST BE APPROVED BY NEW HANOVERCOUNTY PRIOR TO FINAL PLAT.10. ALL STREETS ARE PROPOSED TO BE PRIVATE (BUILT TONEW HANOVER COUNTY STANDARDS/NCDOT PAVEMENTAND SUBGRADE STANDARDS).11. EACH DRIVEWAY WILL HAVE A MIN. OF 2 DRIVEWAYPARKING SPACES PER LOT OUTSIDE OF THE R/W.12. A HOMEOWNERS ASSOCIATION WILL BE FORMED PRIOR TOTHE SALE OF THE LOTS AND MEMBERSHIP WILL BEAUTOMATIC UPON PURCHASE WITHIN THE DEVELOPMENT.THE HOMEOWNERS ASSOCIATION WILL COMPLY WITH THESTANDARDS SET FORTH IN THE NEW HANOVER COUNTYUNIFIED DEVELOPMENT ORDINANCE.13. THE HOME OWNERS ASSOCIATION (HOA) WILL BERESPONSIBLE FOR THE MAINTENANCE OF THE STREETS,STORMWATER SYSTEMS AND OPEN SPACE AREAS.14. THERE SHALL BE A NOTE ON THE FINAL PLATS, MASTERCOVENANTS, AND DEEDS SHOWING THE LOCATION OFWETLANDS AND NOTING THAT THOSE AREAS MAY NOT BEFILLED, DISTURBED, OR ALTERED IN ANY WAY UNLESSPROPERLY PERMITTED BY THE NC DEPARTMENT OFENVIRONMENT AND NATURAL RESOURCES AND/OR THE U.S.ARMY CORPS OF ENGINEERS.15. ALL STREET LIGHTING SHALL BE CONSISTENT WITHSECTION 5.5 OF THE NEW HANOVER COUNTY UDO.16. COUNTY AND/OR STATE STORMWATER PERMITS MUST BEOBTAINED PRIOR TO ANY CONSTRUCTION. NO NATURALDRAINAGE AREAS SHALL BE CUT OFF OR DISTURBEDBEFORE OBTAINING PERMITS.17. PROJECT TO BE BUILT TO CFPUA STANDARDS FOR WATERAND SEWER. A UTILITY PLAN MUST BE SUBMITTED ANDAPPROVED BY CFPUA.18. ONLY NEW HANOVER COUNTY APPROVED MATERIALS ARETO BE USED WITHIN THE RIGHT OF WAY.19. A CORPS OF ENGINEERS 401 PERMIT MUST BE OBTAINEDFOR ANY WORK WITHIN THE WETLANDS WHEREAPPLICABLE, PRIOR TO THE START OF ANY WORK.20. A 5' SIDEWALK IS PROPOSED ON ONE SIDE OF THE ROAD.
TYPICAL LOT SIZE
INTERIOR LOTS: 20' x 90'
NOTE: THE SMALLEST LOT IN THESUBDIVISION IS 20' x 90' (1800 SF)
END LOTS: 34' x 90'
CONDITIONS FROM BOARD OF COMMISIONERS CASE: Z23-12 WHICH APPROVEDREZONING FROM I-1 TO RMF-L:1. THE APPLICANT PROVIDE BICYCLE AND PEDESTRIAN CONNECTIVITYBETWEEN THE MULTI-FAMILY PHASE DEVELOPMENT AND THESINGLE-FAMILY PHASED DEVELOPMENT.2. NO STRUCTURE ON THE PARCEL SHALL EXCEED 45' IN HEIGHT AND AMAXIMUM OF 3 STORIES.3. A DECLARATION STATEMENT SHALL BE RECORDED IN THE PROPERTY'SCHAIN OF TITLE, AT THE NEW HANOVER COUNTY REGISTRY, STATING THEPROPERTY IS IN PROXIMITY TO EXISTING AND FUTURE COMMERCIAL ANDINDUSTRIAL ACTIVITIES THAT MAY RESULT IN NOISE, VIBRATION, ANDHEAVY VEHICLE TRAFFIC ON AREA ROADWAYS, WHICH ACTIVITIES MAYOCCUR ANY TIME DURING THE DAY OR NIGHT. SUCH DECLARATION SHALLALSO BE PROVIDED WITH ALL FUTURE LEASES.
SIDE YARD ABUTTING STREET = 10'
D.R. HORTON6752 PARKER FARM DRIVE, SUITE 210WILMINGTON, NC 28403GRAYSON MORGAN
GAMORGAN@DRHORTON.COMPHONE: 910-602-8215
TOTAL NET ACREAGE OF PARCEL = 49.38 ACRES
1/4"/FT.
5'22'
50' PRIVATE RIGHT OF WAY
PAVEMENT
LC
2'
1/4"/FT.SLOPE 3:1 MAX SLOPE 3:1 MAX
TYPICAL CROSS SECTION FOR 50' R/W
11'TRAVEL LANE
6'
SID
E
WA
L
K
2' VALLEY GUTTER
2' VALLEY GUTTER
PRIMECOAT
NOT TO SCALE
1'
1/4"/FT.
2'
1/4"/FT.
11'TRAVEL LANE
13.5'
24" COMPACTED SUBGRADE TO 98% DRY DENSITY, AASHTO T-180
PAVEMENT SECTION NOTE: PROPOSED ASPHALT SECTION BASED ONGEOTECHNICAL REPORT/RECOMMENDATIONS BY NV5 ENGINEERS ANDCONSULTANTS, INC. DATED 8/31/2023.
SURFACE: 1" TYPE S9.5B @ 110LBS/SY/INBINDER: 2" TYPE S9.5C @ 112 LBS/SY/INBASE: 8" TYPE B25.0C ASPHALT CONCRETE BASECOURSE @ 114 LBS/SY/IN
OPEN SPACE
CLASS IV SOILS AREA = 0.00 ACRES
MAXIMUM ALLOWED DENSITY = 10.0 du/a
REQUIRED OPEN SPACE AREA = 9.88 AC (20.00%)
BUILDING HEIGHT MAXIMUM = 3 STORIES MAXIMUMBUILDING SEPARATION = 20' MINIMUMBUILDING MATERIAL = TYPE V-A
X
X
X
163
147
119
103
87
162
146
118
102
86
178
161
145
117
101
73
177
160
144
116
100
72
176
159
143
115
99
71
175
158
142
114
98
70
174
157
141
113
97
69
173
156
140
112
96
68
172
155
139
111
95
67
171
154
138
110
94
66
170
153
137
109
93
169
152
136
108
92
168
151
123
107
91
167
150
122
106
90
165
149
121
105
89
164
148
120
104
88
1
17
52
82
251
234
2
18
53
83
250
233
3
19
54
84
249
4
20
55
85
248
231
5
21
56
247
6
22
57
263
246
723
58
261
245
8
16
24
51
59
81
260
252
244
235
9
25
60
259
243
10
26
61
258
242
11
27
78
257
241
12
28
77
256
239
13
29
76
255
238
14
30
75
254
237
15
50
80
253
236
62
63
64
65
OS #2
AMENITY AREA
33
39
32
38
31
37
44
36
43
OS #1
42
35
41
34
40
126
130
125
OS #4
124
135
134
129
133128132
127
131
213
221
206
214
222
205
207
215
223
204
208
216
224
203
209
217
225
210
218
226
211
219
227
212
220
OS #6
194 186
199
193
185
200
192
184
201
191
183
202
198
190
182
OS #9
197
189
181
196
188
180
195
187
179
OS #11
OS #3
262
229
OS #7
OS #8
OS #5
OS #10
4546474849
232 230 228
240
166
79
74
SCM 1
SCM 2
SCM 3
SCM 3
SCM 4
SCM 5
18" RCP
INV=23.73
INV=22.86
INV=25.78
INV=25.72
18 RCP
INV=17.54
72" CMP
18" RCP
INV=21.98
INV=22.43
INV=19.55
INV=20.21
INV=23.98
INV=23.97
INV=24.90
INV=24.90
18" RC
P
18" RC
P
INV=23.62
INV=22.63
INV=22.63
INV=22.25
INV=22.38
INV=22.64
18" R
C
P
18" RC
P
18" RC
P
18" RCP
12" RC
P
18" R
C
P
15" RCP INV=21.25
INV=20.99
18" C
M
P
12" R
C
P
INV=22.74
INV=23.23
INV=23.39
18" R
CP
15" R
CP
INV=24.26
INV=24.75
INV=23.99
INV=24.17
15" R
C
P
INV 22.84
DIRIM=25.94IN(N)=22.39IN(S)=22.04OUT=21.99
DIRIM=24.48IN(N)=22.73IN(W)=22.58OUT=22.4812" RCP 6" PVC
INV=22.36
END UKNOWN
END UKNOWN
DIRIM=21.00IN(W)=16.99IN(S)=17.00IN(N)=17.55OUT=16.2518" RCPINV=16.78
15" R
C
P
18" R
C
P
DIRIM=24.63IN(N)=21.88OUT=21.68
DIRIM=25.21IN(N)=22.86OUT=22.75
YIRIM=20.39IN(W)=15.19OUT=15.15
W
W
W
W
W
W
W
W
W
W
W
W
W
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OHP
OHP
OHP
OHP
OHP
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B
.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B
.
4
7
7
,
P
G
.
1
7
8
POW
E
R
LINE
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
BL
U
E
C
L
A
Y
R
O
A
D
-
S
.
R
.
1
3
1
8
60'
P
U
B
L
I
C
R
/
W
MATCHLINE C3.1
MATCHLINE C3.2
MATCHLINE C3.1
MATCHLINE C3.3
MA
T
C
H
L
I
N
E
C
3
.
2
MA
T
C
H
L
I
N
E
C
3
.
3
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
8''W8''W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SA
N
SA
N
SA
N
SAN
SAN
SA
N
SA
N
SAN
SA
N
SA
N
8''W
8''W
8''W8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
S
MATCHLINE C3.3
MATCHLINE C3.4
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
S:\3
3
1
\
6
3
6
7
7
-
B
l
u
e
_
T
a
n
k
_
T
o
w
n
h
o
m
e
s
\
D
W
G
\
S
h
e
e
t
\
T
R
C
\
6
3
6
7
7
-
3
3
1
-
C
3
.
0
-
U
T
I
L
.
d
w
g
|
P
l
o
t
t
e
d
b
y
A
u
s
t
i
n
M
a
r
t
i
n
BL
U
E
B
A
Y
T
O
W
N
H
O
M
E
S
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
,
N
O
R
T
H
C
A
R
O
L
I
N
A
63677
331
J. WALL
331
5/15/2024
FOR
R
E
V
I
E
W
ONL
Y
1" = 100'
NA
D
8
3
0
SCALE 1"=100'
200'100'
ALL CONSTRUCTION TO BE IN ACCORDANCE WITHALL NEW HANOVER COUNTY, NCDEQ, AND NCDOTSTANDARDS, SPECIFICATIONS, AND DETAILS.
WATERMAIN
PR
O
P
E
R
T
Y
LIN
E
10'
SINGLE 1" WATER SERVICE PERCFPUA STD. (TYP)
SEWERMAIN
SINGLE 4" SEWER SERVICE PERCFPUA STD. (TYP)
VARIES
PUBLIC UTILITY EASEMENT
R/W
SIDEWALK
TYPICAL SERVICE DETAIL
NOT TO SCALE
8''W
UTILITY LEGEND
PROPOSED WATER LINE
PROPOSED SEWER LINE
PROPOSED MANHOLE
FIRE HYDRANT
REDUCER
GATE VALVE
BLOWOFF ASSEMBLY
SAN
S
UTILITY NOTES
1. ALL WATER MAINS TO BE 8" DR18 C900 PVC PIPE WITH PUSH ON JOINTS UNLESSNOTED OTHERWISE ON PLANS.2. MINIMUM CLEAR COVER FOR ALL WATER PIPE SHALL BE 3 FEET.3. ALL WATER METER SETTINGS SHALL BE LOCATED A MINIMUM OF 5 FEET FROM LOTCORNER, UNLESS OTHERWISE NOTED.4. ALL WATER SYSTEM WORK SHALL BE CONSTRUCTED PER NEW HANOVER COUNTYAND CAPE FEAR PUBLIC UTILITY AUTHORITY DETAILS AND SPECIFICATIONS.5. ALL GATE VALVES ARE TO BE LOCATED WITHIN UTILITY STRIP. GATE VALVES ARE NOTTO BE LOCATED WITHIN PAVEMENT OR THE GUTTER PAN.6. LANDSCAPING OR PARKING CANNOT BLOCK OR IMPEDE THE FDC OR FIRE HYDRANTS.A 3-FOOT CLEAR SPACE SHALL BE MAINTAINED AROUND THE CIRCUMFERENCE OFTHE HYDRANT AND FDC.7. ADDITIONAL FIRE PROTECTION AND ACCESSIBILITY REQUIREMENTS MAY BEREQUIRED DUE TO ANY SPECIAL CIRCUMSTANCES CONCERNING THE PROJECT.8. NEW HYDRANTS MUST BE BROUGHT INTO SERVICE PRIOR TO COMBUSTIBLEMATERIALS DELIVERED TO THE JOB SITE.9. A BLOW-OFF VALVE IS REQUIRED AT THE TERMINUS OF ALL "DEAD END" WATER LINES.10. ALL CONNECTIONS TO EXISTING WATER LINE AND BORES TO BE DONE ACCORDING TONEW HANOVER COUNTY AND CAPE FEAR PUBLIC UTILITY AUTHORITY SPECIFICATIONS.11. TIE-INS ARE NOT TO BE MADE UNTIL THE NEW EXTENSION HAS COMPLETED THEDISINFECTION REQUIREMENTS IN ACCORDANCE WITH CAPE FEAR PUBLIC UTILITYAUTHORITY DESIGN STANDARDS AND SPECIFICATIONS AND COORDINATED WITHUTILITIES.12. CONDUCT WATERLINE CUT-IN OPERATIONS DURING NON-PEAK HOURS AND ALERTAFFECTED PROPERTY OWNERS PRIOR TO WATERLINE SHUT OFF AND AFTER SERVICEIS RESTORED.13. ALL MAINS SHALL BE ADEQUATELY FLUSHED, PRESSURE TESTED, AND DISINFECTEDIN ACCORDANCE WITH THE COUNTY SPECIFICATIONS.14. ALL WORK SHALL BE SUBJECT TO INSPECTION BY THE ENGINEER, NEW HANOVERCOUNTY AND CAPE FEAR PUBLIC UTILITY AUTHORITY THE N.C. DEPT. OFENVIRONMENTAL HEALTH AND NATURAL RESOURCES.15. A PRECONSTRUCTION MEETING WITH CAPE FEAR PUBLIC UTILITY AUTHORITY MUSTBE SCHEDULED AT LEAST 48 HOURS PRIOR TO CONSTRUCTION OF WATER ANDSEWER LINES.16. MINIMUM UTILITY SEPARATION SHALL BE MAINTAINED:a. HORIZONTAL CLEARANCE OF 10 FEET BETWEEN SANITARY SEWER PIPES ANDWATER PIPES.b. MINIMUM VERTICAL CLEARANCE OF 18" BETWEEN WATER PIPES AND SANITARYSEWER PIPES.c. MINIMUM VERTICAL CLEARANCE OF 12" BETWEEN WATER PIPES AND OTHERUTILITIES.d. WHERE VERTICAL CLEARANCE IS LESS THAN 18" BETWEEN SANITARY SEWER ANDWATER, OR WHERE SANITARY SEWER CROSSES ABOVE WATER MAIN, BOTHPIPES SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10 FEET ON BOTH SIDESOF CROSSING.e. WHERE VERTICAL CLEARANCE IS LESS THAN 18" BETWEEN SANITARY SEWER ANDSTORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR A MINIMUMOF 10 FEET ON BOTH SIDES OF CROSSING.12. ALL SANITARY SEWER MAINS TO BE 8" UNLESS OTHERWISE INDICATED.13. INSIDE DROPS SHALL BE PROVIDED FOR ANY SANITARY SEWER PIPE ENTERING AMANHOLE 30" ABOVE THE MANHOLE INVERT. DROP MANHOLES SHALL BE 5' DIAMETER.14. 6" SANITARY LATERALS TIED INTO MANHOLES SHOULD HAVE THE PIPE CROWNELEVATION MATCHED TO THE MAIN LINE.15. SANITARY SEWER MANHOLE AND CLEANOUT TOPS SHALL BE FLUSH TO FINISHEDGRADE.16. PROJECT TO BE BUILT TO CFPUA SPECIFICATIONS FOR WATER AND SEWER. A UTILITYPLAN MUST BE SUBMITTED AND APPROVED BY ENGINEERING AND EMERGENCYMANAGEMENT.17. THE LOCATION OF THE PUMP STATION MAY REQUIRE ODOR CONTROL MEASURES.18. ALL TOWNHOME BUILDINGS WILL HAVE WATER SERVED BY A GANG METER THATSERVES EACH UNIT IN THE BUILDING. SEE THE CFPUA DETAIL W-15.
1. FIRE HYDRANTS SHALL BE 18" FROM CENTERLINE OFSTEAMER CONNECTION TO FINISHED GRADE.2. ALL FIRE HYDRANTS REQUIRE A 5" STORZCONNECTION ON THE STEAMER CONNECTION OF THEHYDRANT.3. FIRE HYDRANTS SHALL NOT BE OBSTRUCTED FROMSTREET VIEW BY LANDSCAPING OR OTHER UTILITIESFOR A 3' RADIUS AROUND THE HYDRANT.4. THERE SHALL BE UNOBSTRUCTED ACCESS TO THEFIRE HYDRANT
FIRE HYDRANT NOTES
LEGEND
PROPERTY LINEPROPOSED RIGHT OF WAYPROPOSED LOT LINEUTILITY EASEMENTEXISTING WETLANDS
X
X
X
163
147
119
103
87
162
146
118
102
86
178
161
145
117
101
73
177
160
144
116
100
72
176
159
143
115
99
71
175
158
142
114
98
70
174
157
141
113
97
69
173
156
140
112
96
68
172
155
139
111
95
67
171
154
138
110
94
66
170
153
137
109
93
169
152
136
108
92
168
151
123
107
91
167
150
122
106
90
165
149
121
105
89
164
148
120
104
88
1
17
52
82
251
234
2
18
53
83
250
233
3
19
54
84
249
4
20
55
85
248
231
5
21
56
247
6
22
57
263
246
723
58
261
245
8
16
24
51
59
81
260
252
244
235
9
25
60
259
243
10
26
61
258
242
11
27
78
257
241
12
28
77
256
239
13
29
76
255
238
14
30
75
254
237
15
50
80
253
236
62
63
64
65
OS #2
AMENITY AREA
33
39
32
38
31
37
44
36
43
OS #1
42
35
41
34
40
126
130
125
OS #4
124
135
134
129
133128132
127
131
213
221
206
214
222
205
207
215
223
204
208
216
224
203
209
217
225
210
218
226
211
219
227
212
220
OS #6
194 186
199
193
185
200
192
184
201
191
183
202
198
190
182
OS #9
197
189
181
196
188
180
195
187
179
OS #11
OS #3
262
229
OS #7
OS #8
OS #5
OS #10
4546474849
232 230 228
240
166
79
74
SCM 1
SCM 2
SCM 3
SCM 3
SCM 4
SCM 5
18" RCPINV=23.73
INV=22.86
INV=25.78
INV=25.72
18 R
C
P
INV=17.54
72" CMP
18" R
C
P
INV=21.98
INV=22.43
INV=19.55
INV=20.21
INV=23.98
INV=23.97
INV=24.90
INV=24.90
18" R
C
P
18" RC
P
INV=23.62
INV=22.63
INV=22.63
INV=22.25
INV=22.38
INV=22.64
18" R
C
P
18" RC
P
18" RCP
18" RCP
12" R
C
P
18" R
C
P
15" R
C
P
INV=21.25
INV=20.99
18" CM
P
12" R
C
P
INV=22.74
INV=23.23
INV=23.39
18" RC
P
15" R
C
P
INV=24.26
INV=24.75
INV=23.99
INV=24.17
15" R
C
P
DIRIM=25.94IN(N)=22.39IN(S)=22.04OUT=21.99
DIRIM=24.48IN(N)=22.73IN(W)=22.58OUT=22.4812" RCP 6" PV
C
INV=22.36
END UKNOWN
END UKNOWN
DIRIM=21.00IN(W)=16.99IN(S)=17.00IN(N)=17.55OUT=16.2518" RCPINV=16.78
15" R
C
P
18" R
C
P
DIRIM=24.63IN(N)=21.88OUT=21.68
DIRIM=25.21IN(N)=22.86OUT=22.75
YIRIM=20.39IN(W)=15.19OUT=15.15
W
W
W
W
W
W
W
W
W
W
W
W
W
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OHP
OHP
OHP
OHP
OHP
PO
W
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B
.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
POWE
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
BLU
E
C
L
A
Y
R
O
A
D
-
S
.
R
.
1
3
1
8
60'
P
U
B
L
I
C
R
/
W
MATCHLINE C4.1
MATCHLINE C4.2
MATCHLINE C4.1
MATCHLINE C4.3
MA
T
C
H
L
I
N
E
C
4
.
2
MA
T
C
H
L
I
N
E
C
4
.
3
28
28
28
28
28
28
28
28
28
28
29 29
28
28
27
27
27
2
7
26
28
28
28
29 29
28 28 28
28
2
8
2828
26
28
27
2
6
26
27
27 27
28 28
27
2
7
27
28
28
27
2226
23
27
28
24
27
27
27
17
26
26 26
24 25
16
19 27
1927
27
19
25 27
17
27
17
27 25
2529
28
23
28
23
27
29
29 29
29
30
30
29 29
28
27
2626
26
25
25
27
26
27
2728
29
2929
19
27
1927
29
27
27
28
28
28
27
222222
26262626262626262626
7
2222
2525252
2525252525
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
8''W8''W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SA
N
SA
N
SA
N
SAN
SAN
SA
N
SA
N
SAN
SA
N
SA
N
8''W
8''W
8''W8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
8''W
S
18" RCPINV=23.73
INV=22.86
INV=25.78
INV=25.72
18 R
C
P
INV=17.54
72" CMP
18" R
C
P
INV=21.98
INV=22.43
INV=19.55
INV=20.21
INV=23.98
INV=23.97
INV=24.90
INV=24.90
18" R
C
P
18" RC
P
INV=23.62
INV=22.63
INV=22.63
INV=22.25
INV=22.38
INV=22.64
18" R
C
P
18" RC
P
18" RCP
18" RCP
12" R
C
P
18" R
C
P
15" R
C
P
INV=21.25
INV=20.99
18" CM
P
12" R
C
P
INV=22.74
INV=23.23
INV=23.39
18" RC
P
15" R
C
P
INV=24.26
INV=24.75
INV=23.99
INV=24.17
15" R
C
P
DIRIM=25.94IN(N)=22.39IN(S)=22.04OUT=21.99
DIRIM=24.48IN(N)=22.73IN(W)=22.58OUT=22.4812" RCP 6" PV
C
INV=22.36
END UKNOWN
END UKNOWN
DIRIM=21.00IN(W)=16.99IN(S)=17.00IN(N)=17.55OUT=16.2518" RCPINV=16.78
15" R
C
P
18" R
C
P
DIRIM=24.63IN(N)=21.88OUT=21.68
DIRIM=25.21IN(N)=22.86OUT=22.75
YIRIM=20.39IN(W)=15.19OUT=15.15
W
W
W
W
W
W
W
W
W
W
W
W
W
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OHP
OHP
OHP
OHP
OHP
PO
W
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B
.
4
7
7
,
P
G
.
1
7
8
POW
E
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
POWE
R
L
I
N
E
E
A
S
E
M
E
N
T
D.B.
4
7
7
,
P
G
.
1
7
8
BLU
E
C
L
A
Y
R
O
A
D
-
S
.
R
.
1
3
1
8
60'
P
U
B
L
I
C
R
/
W
JOB NO.
SHEET NO.
SCALE
DESIGNED BY
CHECKED BY
DA
T
E
DRAWN BY
DATE
REV
I
S
I
O
N
D
E
S
C
R
I
P
T
I
O
N
Th
e
s
e
p
l
a
n
s
a
n
d
a
s
s
o
c
i
a
t
e
d
d
o
c
u
m
e
n
t
s
a
r
e
t
h
e
e
x
c
l
u
s
i
v
e
p
r
o
p
e
r
t
y
o
f
T
I
M
M
O
N
S
G
R
O
U
P
a
n
d
m
a
y
n
o
t
b
e
r
e
p
r
o
d
u
c
e
d
i
n
w
h
o
l
e
o
r
i
n
p
a
r
t
and
s
h
a
l
l
n
o
t
b
e
u
s
e
d
f
o
r
a
n
y
p
u
r
p
o
s
e
w
h
a
t
s
o
e
v
e
r
,
i
n
c
l
u
s
i
v
e
,
b
u
t
n
o
t
lim
i
t
e
d
t
o
c
o
n
s
t
r
u
c
t
i
o
n
,
b
i
d
d
i
n
g
,
a
n
d
/
o
r
c
o
n
s
t
r
u
c
t
i
o
n
s
t
a
k
i
n
g
w
i
t
h
o
u
t
t
h
e
e
x
p
r
e
s
s
w
r
i
t
t
e
n
c
o
n
s
e
n
t
o
f
T
I
M
M
O
N
S
G
R
O
U
P
.
NO
R
T
H
C
A
R
O
L
I
N
A
L
I
C
E
N
S
E
N
O
.
C
-
1
6
5
2
S:\3
3
1
\
6
3
6
7
7
-
B
l
u
e
_
T
a
n
k
_
T
o
w
n
h
o
m
e
s
\
D
W
G
\
S
h
e
e
t
\
T
R
C
\
6
3
6
7
7
-
3
3
1
-
C
4
.
0
-
G
R
A
D
.
d
w
g
|
P
l
o
t
t
e
d
b
y
A
u
s
t
i
n
M
a
r
t
i
n
BL
U
E
B
A
Y
T
O
W
N
H
O
M
E
S
NE
W
H
A
N
O
V
E
R
C
O
U
N
T
Y
,
N
O
R
T
H
C
A
R
O
L
I
N
A
63677
331
J. WALL
331
5/15/2024
FOR
R
E
V
I
E
W
ONL
Y
1" = 100'
NA
D
8
3
0
SCALE 1"=100'
200'100'
LEGEND
PROPERTY LINEPROPOSED RIGHT OF WAYPROPOSED LOT LINE
UTILITY EASEMENTSIGHT TRIANGLE
EXISTING WETLANDS
CENTER OF CREEK
AMENITY AREA
OPEN SPACE
SITE BOUNDARY
EXISTING CONTOUR
PROPOSED CONTOUR
PROPOSED EASEMENT
PROPOSED RIGHT-OF-WAY
PROPOSED LOT LINE
PROPOSED ROAD CENTER
PROPOSED EOP
GRADING & DRAINAGE LEGEND
100
100
TW PROPOSED TOP OF WALL250.25
PROPOSED PAD GRADE
BW PROPOSED BOTTOM OF WALL250.25
PAD250.25
PROPOSED CATCH BASIN
PROPOSED DRAINAGE INLET
PROPOSED FLARED END SECTION
PROPOSED RCP STORM PIPE
PROPOSED ADS HP STORM PIPE
PROPOSED ADS N12 WT STORM PIPE
NOTES:1. STATE PERMIT 401/404 SHALL BE OBTAINEDPRIOR TO ANY IMPACT TO JUSRISDICTIONALAND NON-JURISDICTIONAL WETLANDS.2. AS-BUILT INFORMATION FOR THESTORMWATER INFRASTRUCTURE SHALL BEPROVIDED IN A GIS SHAPEFILE TO THE NEWHANOVER COUNTY ENGINEERINGDEPARTMENT FOLLOWING CONSTRUCTIONFOR COMPLIANCE.3. ALL STORMWATER PONDS, PIPES, ANDDITCHES OUTSIDE OF RIGHT-OF-WAY SHALLBE WITHIN A PERMANENT DRAINAGEEASEMENT DEDICATED TO NEW HANOVERCOUNTY.4. ALL LOTS WITHOUT REAR YARD DRAINAGESHALL HAVE ROOF DRAINS THAT LEAD TOTHE FRONT YARD TO THEN BE TREATED BYONE OF THE TWO WET PONDS. THEFOLLOWING LOTS WILL REQUIRE THIS: 1-17,58-66, 161-164, 190-233.5. ALL IMPERVIOUS AREA WITHIN THE 50'VEGETATED SETBACK SHALL BE COLLECTEDAND TREATED BY ONE OF THE TWOPROPOSED WET PONDS.
NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________
Applicant
Checklist NCDOT
Checklist
Driveway Application Process and Site Plan Requirements
ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND
DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE
APPLICATION TO THE APPLICANT FOR REVISION.
***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS***
Electronic Pre-Submittals
In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to
identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all
other required documents.
ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž
/ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘
Online resources:
x NCDOT Policy on Street and Driveway Access to North Carolina Highways:
https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an
d%20Driveway%20Access.pdf
x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way:
https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx
x Electronic Forms Database:
https://connect.ncdot.gov/Pages/default.aspx
1)
Ă͘Cover >etter
Include contact information for applicant and engineer, including email address, mailing address, and phone
number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be
served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant.
ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below)
https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc
Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ
Attach to Permit Application form (not applicable for municipalities, churches, and schools)
Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc
Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf
Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional
site plan requirement details can be found in section 2 of this document.
Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ
If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕
ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ
Y N n/a
Engineering Studies
The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined
herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local
government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs
that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses
(TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina
licensed Professional Engineer.
Section 1: Requi
red Documents
|Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals
WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘
ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ
WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ
ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘
If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ
ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘
State of North Carolina | Department of Transportation | Division 3 | District 3
%DUEDGRV%OYG,&DVWOH+D\QH, NC 284
Form Updated/20(910) T NCDOT Permit #___________________
Y N n/a
Section 1: Required Documents (continued)
2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL
Ă͘Site Plans
Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement
details can be found in section 2 of this document.
ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ
^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ
Đ͘Performance and Indemnity Bond Amount
100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by
ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕
ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway
Rights of Way for acceptable bond types
Ě͘Radius Encroachment Letter (if applicable)
If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required
Ğ͘Hold Harmless Letter (if applicable)
If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill
be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ
Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below
Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways
ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown
ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable
ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address
ϰͿ Show Zͬt lines, highway control of access, and property lines
ϱͿ All existing utilities (including handholes) and easements
ϲͿ Rͬt width
ϳͿ Existing posted speed limit(s) and design speed limit(s)
ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of
the property lines of the proposed development
ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any
other relevant transportation facilities in the development area
ϭϬͿ Include a plan sheet showing full site build-out and land use
ϭϭͿ Buildings shown with “gross leasable area”
ϭϮͿ Width of property frontage
ϭϯͿ Distance from Rͬt to buildings and gasoline service islands
ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34)
ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc.
Section 3: Driveway Plan Requirements
|
All driveway plans shall include and show, at a minimum, the items listed below
ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů
ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ
ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘
ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways
ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ
ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ)
ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required
shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51)
In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ
In shoulder sections, show grades at the KW and centerline
ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31)
ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90°
allowed for right-in/right-out on a case-by-case basis) (page 51)
ϴͿ Driveway Wrofile (pages 42- 43)
Y N n/a Y N n/a
පප පපප ප
Y N n/a Y N n/a
Y N n/a Y N n/a
Section 3: Driveway Plan Requirements (continued)
ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW)
Asphalt: 8” ABC stone and 1.5” S9.5
Concrete: 6” of concrete
ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’
ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std.
ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31)
ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29)
ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41)
ϭϱͿ Distance between driveways being requested (if applicable; page 51)
ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33)
ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34)
ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ
|
Section ϲ: Roadway
Plan Requirements
If off-site improvements are required, roadway plans shall show, at a minimum, the items below
ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway)
ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders)
Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below
x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000
5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5
x Secondary Routes with AADT<ϭϬ,000
5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ
ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary
The grinding of pavement markings will not be allowed
ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ
ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ
ϲͿ Indicate existing roadway grade
ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78)
ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79)
See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details
ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services
ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ
ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ
ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic
Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ.
|
Section ϰ: Drainag e Requirements
All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below
Section ϱ: Internal Circ ulation Requirements
|All internal circulation details shall adhere to, at a minimum, the items listed below
ϭͿ Interior driveway channelization stems
Minimum 100’ from the RKW or at the discretion of the District Engineer
ϮͿ Traffic flow pattern
ϯͿ Traffic control devices
ϰͿ Pavement Markings
Y N n/a Y N n /a
Y N n/a Y N n/a
Y N n/a Y N n/a
Y N n/a Y N n/a
ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade)
High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”
ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ
WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ
ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ
WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů
WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ
ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ
ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ
ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown
;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ
ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline)
ϲͿ Provide grades and spot elevations for existing and proposed ditches
ϳͿ Show how drainage will be accommodated along property frontage
(District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ
Roadway Design Manual At Grade INTERSECTIONS
May 2023 Part I General Design Information | 8-22
Figure 8-10 Recommended Treatment for Turn Lanes
Note: Make every attempt possible to use the desirable deceleration length. It can be shortened as needed but shall not be less
than the minimum. Coordinate with NCDOT and get approval on anything less than the desirable deceleration length.
Symbol Description Material Transport Pay Item No.
Linear Length
Adjustment
T1 WHITE EDGELINE (4", 90 MIL) Thermo 4685000000-E 1
T2 WHITE SOLID LANE LINE (4", 90 MIL) Thermo 4685000000-E 1
T3 10 FT. WHITE SKIP (4", 90 MIL) Thermo 4685000000-E .25
T4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 90 MIL) Thermo 4685000000-E .25
T5 2 FT. - 6 FT./SP WHITE MINISKIP (4", 90 MIL) Thermo 4685000000-E .25
T9 WHITE RUMBLE STRIP (4", 240 MIL) Thermo 4687000000-E 1
T10 YELLOW EDGELINE (4", 90 MIL) Thermo 4685000000-E 1
T11 YELLOW SINGLE CENTER (4", 90 MIL) Thermo 4685000000-E 1
T12 10 FT. YELLOW SKIP (4", 90 MIL) Thermo 4685000000-E .25
T13 YELLOW DOUBLE CENTER (4", 90 MIL) Thermo 4685000000-E 2
T14 2 FT. - 6 FT./SP YELLOW MINISKIP (4", 90 MIL) Thermo 4685000000-E .25
T20 WHITE EDGELINE (6", 90 MIL) Thermo 4688000000-E 1
T21 WHITE SOLID LANE LINE (6", 90 MIL) Thermo 4688000000-E 1
T22 10 FT. WHITE SKIP (6", 90 MIL) Thermo 4688000000-E .25
T23 3 FT. - 9 FT./SP WHITE MINISKIP (6", 90 MIL) Thermo 4688000000-E .25
T24 2 FT. - 6 FT./SP WHITE MINISKIP (6", 90 MIL) Thermo 4688000000-E .25
T30 YELLOW EDGELINE (6", 90 MIL) Thermo 4688000000-E 1
T31 YELLOW SINGLE CENTER (6", 90 MIL) Thermo 4688000000-E 1
T32 10 FT. YELLOW SKIP (6", 90 MIL) Thermo 4688000000-E .25
T33 YELLOW DOUBLE CENTER (6", 90 MIL) Thermo 4688000000-E 2
T34 2 FT. - 6 FT./SP YELLOW MINISKIP (6", 90 MIL) Thermo 4688000000-E .25
T40 WHITE GORELINE (8", 90 MIL) Thermo 4695000000-E 1
T41 WHITE DIAGONAL (8", 90 MIL) Thermo 4695000000-E 1
T42 YELLOW DIAGONAL (8", 90 MIL) Thermo 4695000000-E 1
T43 WHITE SOLID LANE LINE (8", 90 MIL) Thermo 4695000000-E 1
T44 3 FT. - 9 FT./SP WHITE MINISKIP (8", 90 MIL) Thermo 4695000000-E .25
T45 3 FT. - 3 FT./SP WHITE MINISKIP (8", 90 MIL) (Roundabouts only) Thermo 4695000000-E .5
T46 WHITE CROSSWALK LINE (8", 90 MIL) Thermo 4695000000-E 1
T50 WHITE GORELINE (12", 90 MIL) Thermo 4700000000-E 1
T51 WHITE DIAGONAL (12", 90 MIL) Thermo 4700000000-E 1
T52 YELLOW DIAGONAL (12", 90 MIL) Thermo 4700000000-E 1
T53 WHITE SOLID LANE LINE (12", 90 MIL) Thermo 4700000000-E 1
T54 3 FT. - 9 FT./SP WHITE MINISKIP (12", 90 MIL) Thermo 4700000000-E .25
T55 3 FT. - 3 FT./SP WHITE MINISKIP (12", 90 MIL) (Roundabouts only) Thermo 4700000000-E .5
T60 WHITE LINE, RR X (16", 90 MIL) Thermo 4891000000-E 1
T61 WHITE STOPBAR (24", 90 MIL) Thermo 4891000000-E 1
T62 WHITE CROSSWALK LINE (24", 90 MIL) Thermo 4891000000-E 1
T70 LEFT TURN ARROW (90 MIL) Thermo 4725000000-E 1
T71 RIGHT TURN ARROW (90 MIL) Thermo 4725000000-E 1
T72 STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T73 COMBO. LEFT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T74 COMBO. RIGHT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T75 COMBO. LEFT/RIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T76 COMBO. LEFT/RIGHT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T77 U-TURN ARROW (90 MIL) Thermo 4725000000-E 1
T78 COMBO. LEFT/U-TURN ARROW (90 MIL) Thermo 4725000000-E 1
T79 MERGE ARROW (90 MIL) Thermo 4725000000-E 1
T80 WRONG-WAY RAMP ARROW (90 MIL) Thermo 4725000000-E 1
T81 ELONGATED STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
THERMOPLASTIC
11/20/2019 Page 1 of 10
T90 BICYCLE SYMBOL, HEATED-IN-PLACE (90 MIL) Thermo 4726110000-E 1
T91 BICYCLE STRAIGHT ARROW, HEATED-IN-PLACE (90 MIL) Thermo 4726110000-E 1
T92 BICYCLE LEFT ARROW, HEATED-IN-PLACE (90 MIL) Thermo 4726110000-E 1
T93 BICYCLE CHARACTER, HEATED-IN-PLACE (120 MIL) Thermo 4726100000-E 1
T94 SHARROW, HEATED-IN-PLACE (90 MIL) Thermo 4726110000-E 1
T95 BICYCLE LOOP DETECTOR, HEATED-IN-PLACE (90 MIL) Thermo 4726110000-E 1
T100 ALPHANUMERIC CHAR. (90 MIL) Thermo 4720000000-E 1
T101 HANDICAP PARKING (90 MIL) Thermo 4725000000-E 1
T102 12" YIELD LINE TRIANGLE (90 MIL) Thermo 4725000000-E 1
T103 24" YIELD LINE TRIANGLE (90 MIL) Thermo 4725000000-E 1
T104 ROUTE SHIELD 6 FT x 15 FT Thermo 4895000000-N 1
T105 ROUTE SHIELD 8 FT x 20 FT Thermo 4895000000-N 1
T110 FISH-HOOK STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T111 FISH-HOOK LEFT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T112 FISH-HOOK RIGHT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T113 FISH-HOOK LEFT/RIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T114 FISH-HOOK LEFT/RIGHT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T115 FISH-HOOK W/CIRCLE STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T116 FISH-HOOK W/CIRCLE LEFT ARROW (90 MIL) Thermo 4725000000-E 1
T117 FISH-HOOK W/CIRCLE LEFT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
T118 FISH-HOOK W/CIRCLE LEFT/RIGHT/STRAIGHT ARROW (90 MIL) Thermo 4725000000-E 1
11/20/2019 Page 2 of 10
Symbol Description Material Transport Pay Item No.
Linear Length
Adjustment
H1 WHITE EDGELINE, HRM (4", 90 MIL) Thermo 4890000000-E 1
H2 WHITE SOLID LANE LINE, HRM (4", 90 MIL) Thermo 4890000000-E 1
H3 10 FT. WHITE SKIP, HRM (4", 90 MIL) Thermo 4890000000-E .25
H4 3 FT. - 9 FT./SP WHITE MINISKIP, HRM (4", 90 MIL) Thermo 4890000000-E .25
H5 2 FT. - 6 FT./SP WHITE MINISKIP, HRM (4", 90 MIL) Thermo 4890000000-E .25
H10 YELLOW EDGELINE, HRM (4", 90 MIL) Thermo 4890000000-E 1
H11 YELLOW SINGLE CENTER, HRM (4", 90 MIL) Thermo 4890000000-E 1
H12 10 FT. YELLOW SKIP, HRM (4", 90 MIL) Thermo 4890000000-E .25
H13 YELLOW DOUBLE CENTER, HRM (4", 90 MIL) Thermo 4890000000-E 2
H14 2 FT. - 6 FT./SP YELLOW MINISKIP, HRM (4", 90 MIL) Thermo 4890000000-E .25
H20 WHITE EDGELINE, HRM (6", 90 MIL) Thermo 4890000000-E 1
H21 WHITE SOLID LANE LINE, HRM (6", 120 MIL) Thermo 4890000000-E 1
H22 10 FT. WHITE SKIP, HRM (6", 90 MIL) Thermo 4890000000-E .25
H23 3 FT. - 9 FT./SP WHITE MINISKIP, HRM (6", 90 MIL) Thermo 4890000000-E .25
H24 2 FT. - 6 FT./SP WHITE MINISKI, HRM (6", 90 MIL) Thermo 4890000000-E .25
H30 YELLOW EDGELINE, HRM (6", 90 MIL) Thermo 4890000000-E 1
H31 YELLOW SINGLE CENTER, HRM (6", 90 MIL) Thermo 4890000000-E 1
H32 10 FT. YELLOW SKIP, HRM (6", 90 MIL) Thermo 4890000000-E .25
H33 YELLOW DOUBLE CENTER, HRM (6", 90 MIL) Thermo 4890000000-E 2
H34 2 FT. - 6 FT./SP YELLOW MINISKIP, HRM (6", 90 MIL) Thermo 4890000000-E .25
H40 WHITE GORELINE, HRM (8", 90 MIL) Thermo 4890000000-E 1
H43 WHITE SOLID LANE LINE, HRM (8", 90 MIL) Thermo 4890000000-E 1
H44 3 FT. - 9 FT./SP WHITE MINISKIP, HRM (8", 90 MIL) Thermo 4890000000-E .25
H45 3 FT. - 3 FT./SP WHITE MINISKIP (8", 90 MIL) (Roundabouts only) Thermo 4890000000-E .5
H50 WHITE GORELINE, HRM (12", 90 MIL) Thermo 4890000000-E 1
H53 WHITE SOLID LANE LINE, HRM (12", 90 MIL) Thermo 4890000000-E 1
H54 3 FT. - 9 FT./SP WHITE MINISKIP, HRM (12", 90 MIL) Thermo 4890000000-E .25
H55 3 FT. - 3 FT./SP WHITE MINISKIP (12", 90 MIL) (Roundabouts only) Thermo 4890000000-E .5
THERMOPLASTIC – HIGHLY REFLECTIVE MEDIA
11/20/2019 Page 3 of 10
Symbol Description Material
Transport Pay Item No.
20 mil
Linear Length
Adjustment
V1 WHITE EDGELINE (4", 20 MIL) Polyurea 4847010000-E 1
V2 WHITE SOLID LANE LINE (4", 20 MIL) Polyurea 4847010000-E 1
V3 10 FT. WHITE SKIP (4", 20 MIL) Polyurea 4847010000-E .25
V4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 20 MIL) Polyurea 4847010000-E .25
V5 2 FT. - 6 FT./SP WHITE MINISKIP (4", 20 MIL) Polyurea 4847010000-E .25
V10 YELLOW EDGELINE (4", 20 MIL) Polyurea 4847010000-E 1
V11 YELLOW SINGLE CENTER (4", 20 MIL) Polyurea 4847010000-E 1
V12 10 FT. YELLOW SKIP (4", 20 MIL) Polyurea 4847010000-E .25
V13 YELLOW DOUBLE CENTER (4", 20 MIL) Polyurea 4847010000-E 2
V14 2 FT. - 6 FT./SP YELLOW MINISKIP (4", 20 MIL) Polyurea 4847010000-E .25
V20 WHITE EDGELINE (6", 20 MIL) Polyurea 4847030000-E 1
V21 WHITE SOLID LANE LINE (6", 20 MIL) Polyurea 4847030000-E 1
V22 10 FT. WHITE SKIP (6", 20 MIL) Polyurea 4847030000-E .25
V23 3 FT. - 9 FT./SP WHITE MINISKIP (6", 20 MIL) Polyurea 4847030000-E .25
V24 2 FT. - 6 FT./SP WHITE MINISKIP (6", 20 MIL) Polyurea 4847030000-E .25
V30 YELLOW EDGELINE (6", 20 MIL) Polyurea 4847030000-E 1
V31 YELLOW SINGLE CENTER (6", 20 MIL) Polyurea 4847030000-E 1
V32 10 FT. YELLOW SKIP (6", 20 MIL) Polyurea 4847030000-E .25
V33 YELLOW DOUBLE CENTER (6", 20 MIL) Polyurea 4847030000-E 2
V34 2 FT. - 6 FT./SP YELLOW MINISKIP (6", 20 MIL) Polyurea 4847030000-E .25
V40 WHITE GORELINE (8", 20 MIL)Polyurea 4847050000-E 1
V43 WHITE SOLID LANE LINE (8", 20 MIL) Polyurea 4847050000-E 1
V44 3 FT. - 9 FT./SP WHITE MINISKIP (8", 20 MIL) Polyurea 4847050000-E .25
V45 3 FT. - 3 FT./SP WHITE MINISKIP (8", 20 MIL) (Roundabouts only) Polyurea 4847050000-E .5
V50 WHITE GORELINE (12", 20 MIL) Polyurea 4847070000-E 1
V53 WHITE SOLID LANE LINE (12", 20 MIL) Polyurea 4847070000-E 1
V54 3 FT. - 9 FT./SP WHITE MINISKIP (12", 20 MIL) Polyurea 4847070000-E .25
V55 3 FT. - 3 FT./SP WHITE MINISKIP (12", 20 MIL) (Roundabouts only) Polyurea 4847070000-E .5
POLYUREA, 20 MIL
11/20/2019 Page 4 of 10
Symbol Description Material Transport Pay Item No.
Linear Length
Adjustment
W1 WHITE EDGELINE (4", 30 MIL) Polyurea 4847020000-E 1
W2 WHITE SOLID LANE LINE (4", 30 MIL) Polyurea 4847020000-E 1
W3 10 FT. WHITE SKIP (4", 30 MIL) Polyurea 4847020000-E .25
W4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 30 MIL) Polyurea 4847020000-E .25
W5 2 FT. - 6 FT./SP WHITE MINISKIP (4", 30 MIL) Polyurea 4847020000-E .25
W10 YELLOW EDGELINE (4", 30 MIL) Polyurea 4847020000-E 1
W11 YELLOW SINGLE CENTER (4", 30 MIL) Polyurea 4847020000-E 1
W12 10 FT. YELLOW SKIP (4", 30 MIL) Polyurea 4847020000-E .25
W13 YELLOW DOUBLE CENTER (4", 30 MIL) Polyurea 4847020000-E 2
W14 2 FT. - 6 FT./SP YELLOW MINISKIP (4", 30 MIL) Polyurea 4847020000-E .25
W20 WHITE EDGELINE (6", 30 MIL) Polyurea 4847040000-E 1
W21 WHITE SOLID LANE LINE (6", 30 MIL) Polyurea 4847040000-E 1
W22 10 FT. WHITE SKIP (6", 30 MIL) Polyurea 4847040000-E .25
W23 3 FT. - 9 FT./SP WHITE MINISKIP (6", 30 MIL) Polyurea 4847040000-E .25
W24 2 FT. - 6 FT./SP WHITE MINISKIP (6", 30 MIL) Polyurea 4847040000-E .25
W30 YELLOW EDGELINE (6", 30 MIL) Polyurea 4847040000-E 1
W31 YELLOW SINGLE CENTER (6", 30 MIL) Polyurea 4847040000-E 1
W32 10 FT. YELLOW SKIP (6", 30 MIL) Polyurea 4847040000-E .25
W33 YELLOW DOUBLE CENTER (6", 30 MIL) Polyurea 4847040000-E 2
W34 2 FT. - 6 FT./SP YELLOW MINISKIP (6", 30 MIL) Polyurea 4847040000-E .25
W40 WHITE GORELINE (8", 30 MIL) Polyurea 4847060000-E 1
W43 WHITE SOLID LANE LINE (8", 30 MIL) Polyurea 4847060000-E 1
W44 3 FT. - 9 FT./SP WHITE MINISKIP (8", 30 MIL) Polyurea 4847060000-E .25
V45 3 FT. - 3 FT./SP WHITE MINISKIP (8", 30 MIL) (Roundabouts only) Polyurea 4847060000-E .5
W50 WHITE GORELINE (12", 30 MIL) Polyurea 4847080000-E 1
W53 WHITE SOLID LANE LINE (12", 30 MIL) Polyurea 4847080000-E 1
W54 3 FT. - 9 FT./SP WHITE MINISKIP (12", 30 MIL) Polyurea 4847080000-E .25
W55 3 FT. - 3 FT./SP WHITE MINISKIP (12", 30 MIL) (Roundabouts only) Polyurea 4847080000-E .5
POLYUREA, 30 MIL
11/20/2019 Page 5 of 10
Symbol Description Material Transport Pay Item No.
Linear Length
Adjustment
P1 WHITE EDGELINE (4") Paint 4810000000-E 1
P2 WHITE SOLID LANE LINE (4") Paint 4810000000-E 1
P3 10 FT. WHITE SKIP (4") Paint 4810000000-E .25
P4 3 FT. - 9 FT./SP WHITE MINISKIP (4") Paint 4810000000-E .25
P5 2 FT. - 6 FT./SP WHITE MINISKIP (4") Paint 4810000000-E .25
P10 YELLOW EDGELINE (4") Paint 4810000000-E 1
P11 YELLOW SINGLE CENTER (4") Paint 4810000000-E 1
P12 10 FT. YELLOW SKIP (4") Paint 4810000000-E .25
P13 YELLOW DOUBLE CENTER (4") Paint 4810000000-E 2
P14 2 FT. - 6 FT./SP YELLOW MINISKIP (4") Paint 4810000000-E .25
P20 WHITE EDGELINE (6") Paint 4815000000-E 1
P21 WHITE SOLID LANE LINE (6") Paint 4815000000-E 1
P22 10 FT. WHITE SKIP (6") Paint 4815000000-E .25
P23 3 FT. - 9 FT./SP WHITE MINISKIP (6") Paint 4815000000-E .25
P24 2 FT. - 6 FT./SP WHITE MINISKIP (6") Paint 4815000000-E .25
P30 YELLOW EDGELINE (6") Paint 4815000000-E 1
P31 YELLOW SINGLE CENTER (6") Paint 4815000000-E 1
P32 10 FT. YELLOW SKIP (6") Paint 4815000000-E .25
P33 YELLOW DOUBLE CENTER (6") Paint 4815000000-E 2
P34 2 FT. - 6 FT./SP YELLOW MINISKIP (6") Paint 4815000000-E .25
P40 WHITE GORELINE (8") Paint 4820000000-E 1
P41 WHITE DIAGONAL (8") Paint 4820000000-E 1
P42 YELLOW DIAGONAL (8") Paint 4820000000-E 1
P43 WHITE SOLID LANE LINE (8") Paint 4820000000-E 1
P44 3 FT. - 9 FT./SP WHITE MINISKIP (8") Paint 4820000000-E .25
P45 3 FT. - 3 FT./SP WHITE MINISKIP (8") (Roundabouts only) Paint 4820000000-E .5
P46 WHITE CROSSWALK LINE (8") Paint 4820000000-E 1
P50 WHITE GORELINE (12") Paint 4825000000-E 1
P51 WHITE DIAGONAL (12") Paint 4825000000-E 1
P52 YELLOW DIAGONAL (12") Paint 4825000000-E 1
P53 WHITE SOLID LANE LINE (12") Paint 4825000000-E 1
P54 3 FT. - 9 FT./SP WHITE MINISKIP (12") Paint 4825000000-E .25
P55 3 FT. - 3 FT./SP WHITE MINISKIP (12") (Roundabouts only) Paint 4825000000-E .5
P60 WHITE LINE, RR X (16") Paint 4830000000-E 1
P61 WHITE STOPBAR (24") Paint 4835000000-E 1
P62 WHITE CROSSWALK LINE (24") Paint 4835000000-E 1
P70 LEFT TURN ARROW Paint 4845000000-E 1
P71 RIGHT TURN ARROW Paint 4845000000-E 1
P72 STRAIGHT ARROW Paint 4845000000-E 1
P73 COMBO. LEFT/STRAIGHT ARROW Paint 4845000000-E 1
P74 COMBO. RIGHT/STRAIGHT ARROW Paint 4845000000-E 1
P75 COMBO. LEFT/RIGHT ARROW Paint 4845000000-E 1
P76 COMBO. LEFT/RIGHT/STRAIGHT ARROW Paint 4845000000-E 1
P77 U-TURN ARROW Paint 4845000000-E 1
P78 COMBO. LEFT/U-TURN ARROW Paint 4845000000-E 1
P79 MERGE ARROW Paint 4845000000-E 1
P80 WRONG-WAY RAMP ARROW Paint 4845000000-E 1
P81 ELONGATED STRAIGHT ARROW Paint 4845000000-E 1
P90 BICYCLE SYMBOL Paint 4845000000-E 1
P91 BICYCLE STRAIGHT ARROW Paint 4845000000-E 1
P92 BICYCLE LEFT ARROW Paint 4845000000-E 1
P93 BICYCLE CHARACTER Paint 4840000000-E 1
P94 SHARROW Paint 4845000000-E 1
P95 BICYCLE LOOP DETECTOR Paint 4845000000-E 1
PAINT
11/20/2019 Page 6 of 10
P100 ALPHANUMERIC CHARACTER Paint 4840000000-E 1
P101 HANDICAP PARKING Paint 4845000000-E 1
P102 12" YIELD LINE TRIANGLE Paint 4845000000-E 1
P103 24" YIELD LINE TRIANGLE Paint 4845000000-E 1
P110 FISH-HOOK STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
P111 FISH-HOOK LEFT/STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
P112 FISH-HOOK RIGHT/STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
P113 FISH-HOOK LEFT/RIGHT ARROW (90 MIL) Paint 4845000000-E 1
P114 FISH-HOOK LEFT/RIGHT/STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
P115 FISH-HOOK W/CIRCLE STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
P116 FISH-HOOK W/CIRCLE LEFT ARROW (90 MIL) Paint 4845000000-E 1
P117 FISH-HOOK W/CIRCLE LEFT/STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
P118 FISH-HOOK W/CIRCLE LEFT/RIGHT/STRAIGHT ARROW (90 MIL) Paint 4845000000-E 1
11/20/2019 Page 7 of 10
Symbol Description Material Transport Pay Item No.
Linear Length
Adjustment
C1 WHITE EDGELINE (4") CAP 4770000000-E 1
C2 WHITE SOLID LANE LINE (4") CAP 4770000000-E 1
C3 10 FT. WHITE SKIP (4") CAP 4770000000-E .25
C4 3 FT. - 9 FT./SP WHITE MINISKIP (4") CAP 4770000000-E .25
C5 2 FT. - 6 FT./SP WHITE MINISKIP (4") CAP 4770000000-E .25
C10 YELLOW EDGELINE (4") CAP 4770000000-E 1
C11 YELLOW SINGLE CENTER (4") CAP 4770000000-E 1
C12 10 FT. YELLOW SKIP (4") CAP 4770000000-E .25
C13 YELLOW DOUBLE CENTER (4") CAP 4770000000-E 2
C14 2 FT. - 6 FT./SP YELLOW MINISKIP (4") CAP 4770000000-E .25
C20 WHITE EDGELINE (6") CAP 4775000000-E 1
C21 WHITE SOLID LANE LINE (6") CAP 4775000000-E 1
C22 10 FT. WHITE SKIP (6") CAP 4775000000-E .25
C23 3 FT. - 9 FT./SP WHITE MINISKIP (6") CAP 4775000000-E .25
C24 2 FT. - 6 FT./SP WHITE MINISKIP (6") CAP 4775000000-E .25
C30 YELLOW EDGELINE (6") CAP 4775000000-E 1
C31 YELLOW SINGLE CENTER (6") CAP 4775000000-E 1
C32 10 FT. YELLOW SKIP (6") CAP 4775000000-E .25
C33 YELLOW DOUBLE CENTER (6") CAP 4775000000-E 2
C34 2 FT. - 6 FT./SP YELLOW MINISKIP (6") CAP 4775000000-E .25
C40 WHITE GORELINE (8") CAP 4780000000-E 1
C41 WHITE DIAGONAL (8") CAP 4780000000-E 1
C42 YELLOW DIAGONAL (8") CAP 4780000000-E 1
C43 WHITE SOLID LANE LINE (8") CAP 4780000000-E 1
C44 3 FT. - 9 FT./SP WHITE MINISKIP (8") CAP 4780000000-E .25
C45 3 FT. - 3 FT./SP WHITE MINISKIP (8") (Roundabouts only) CAP 4780000000-E .5
C46 WHITE CROSSWALK LINE (8") CAP 4780000000-E 1
C50 WHITE GORELINE (12") CAP 4785000000-E 1
C51 WHITE DIAGONAL (12") CAP 4785000000-E 1
C52 YELLOW DIAGONAL (12") CAP 4785000000-E 1
C53 WHITE SOLID LANE LINE (12") CAP 4785000000-E 1
C54 3 FT. - 9 FT./SP WHITE MINISKIP (12") CAP 4785000000-E .25
C55 3 FT. - 3 FT./SP WHITE MINISKIP (12") (Roundabouts only) CAP 4785000000-E .5
C60 WHITE LINE, RR X (16") CAP 4790000000-E 1
C61 WHITE STOPBAR (24") CAP 4795000000-E 1
C62 WHITE CROSSWALK LINE (24") CAP 4795000000-E 1
C70 LEFT TURN ARROW CAP 4805000000-E 1
C71 RIGHT TURN ARROW CAP 4805000000-E 1
C72 STRAIGHT ARROW CAP 4805000000-E 1
C73 COMBO. LEFT/STRAIGHT ARROW CAP 4805000000-E 1
C74 COMBO. RIGHT/STRAIGHT ARROW CAP 4805000000-E 1
C75 COMBO. LEFT/RIGHT ARROW CAP 4805000000-E 1
C76 COMBO. LEFT/RIGHT/STRAIGHT ARROW CAP 4805000000-E 1
C77 U-TURN ARROW CAP 4805000000-E 1
C78 COMBO. LEFT/U-TURN ARROW CAP 4805000000-E 1
C79 MERGE ARROW CAP 4805000000-E 1
C80 WRONG-WAY RAMP ARROW CAP 4805000000-E 1
C81 ELONGATED STRAIGHT ARROW CAP 4805000000-E 1
C90 BICYCLE SYMBOL CAP 4805000000-E 1
C91 BICYCLE STRAIGHT ARROW CAP 4805000000-E 1
C92 BICYCLE LEFT ARROW CAP 4805000000-E 1
C93 BICYCLE CHARACTER CAP 4800000000-E 1
C94 SHARROW CAP 4805000000-E 1
C95 BICYCLE LOOP DETECTOR CAP 4805000000-E 1
COLD APPLIED PLASTIC
11/20/2019 Page 8 of 10
C100 ALPHANUMERIC CHARACTER CAP 4800000000-E 1
C101 HANDICAP PARKING CAP 4805000000-E 1
C102 12" YIELD LINE TRIANGLE CAP 4805000000-E 1
C103 24" YIELD LINE TRIANGLE CAP 4805000000-E 1
C110 FISH-HOOK STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
C111 FISH-HOOK LEFT/STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
C112 FISH-HOOK RIGHT/STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
C113 FISH-HOOK LEFT/RIGHT ARROW (90 MIL) CAP 4805000000-E 1
C114 FISH-HOOK LEFT/RIGHT/STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
C115 FISH-HOOK W/CIRCLE STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
C116 FISH-HOOK W/CIRCLE LEFT ARROW (90 MIL) CAP 4805000000-E 1
C117 FISH-HOOK W/CIRCLE LEFT/STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
C118 FISH-HOOK W/CIRCLE LEFT/RIGHT/STRAIGHT ARROW (90 MIL) CAP 4805000000-E 1
11/20/2019 Page 9 of 10
PAVEMENT MARKERS
Symbol Description Color Transport Pay Item No.
MA PERMANENT RAISED MARKER Yellow & Yellow 4900000000-N
MB PERMANENT RAISED MARKER Crystal & Red 4900000000-N
MC PERMANENT RAISED MARKER Yellow & Red 4900000000-N
MD PERMANENT RAISED MARKER Yellow 4900000000-N
ME SNOWPLOWABLE MARKER Yellow & Yellow 4905000000-N
MF SNOWPLOWABLE MARKER Crystal & Red 4905000000-N
MG SNOWPLOWABLE MARKER Yellow & Red 4905000000-N
ML PERMANENT RAISED MARKER Crystal & Crystal 4900000000-N
MO SNOWPLOWABLE MARKER Crystal & Crystal 4905000000-N
11/20/2019 Page 10 of 10
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: 6/11/2024
Subject: Blue Bay Townhomes
Comments:
• The project is subject to Castle Hayne Residential TIA Approval with Conditions, dated
April 12, 2023. The project will be required to build the TIA improvements in the Approval.
• Please include sheet(s) showing required TIA improvements within the plan set.
• Driveway will be subject to NCDOT review.
• Private Streets are required to be constructed to NCDOT standards.
• Proposed 90-degree parking is too close to intersections and horizontal curves. Please
revise to minimize/remove backing maneuvers into intersections and along horizontal
curves.
• Please show the dimensions of parking spaces at residential townhomes. Parking shall
not block the public sidewalks.
• Please show ADA accessible route(s) dedicated parking and to amenity areas.
• Provide regulatory signs per MUTCD and NCDOT requirements. Include sign schedule in
plan set.
NCDOT Projects:
TIP Projects in the Area: N/A
WMPO 2045 Projects: N/A
New Hanover County CTP: N/A
TIA: The project is within scope of Castle Hayne Residential TIA and subject to approval
with conditions letter (attached).
April 12, 2023
Mr. Jonathan Guy, PE, PTOE, AICP
Kimley Horn Associates
115 Fairchild Street, Suite 250
Charleston, SC 29492
RE: Approval with conditions of the Traffic Impact Analysis (TIA) associated with the proposed
Castle Hayne Residential development located in New Hanover County, NC.
Dear Mr. Guy:
The WMPO, NCDOT and New Hanover County staffs have reviewed the Blue Clay Residential TIA (sealed February 16, 2023) and based on the information provided and conversations held to date, it is our understanding that the proposed development has a build out year of 2026 and will consist of:
o ITE Land Use Code 210 – Single Family detached housing 57 DU
o ITE Land Use Code 215 – Single Family attached housing (duplexes) 231 DU
o ITE Land Use Code 221 – Multi-family (mid-rise) housing 240 DU
Based upon the review of the analysis provided, the following improvements are required of this development:
I-40 Eastbound Ramp and SR 1002 (Holly Shelter Road) (Stop-controlled intersection)
• Signalize the intersection. I-40 Westbound Ramp and SR 1002 (Holly Shelter Road) (Stop-controlled intersection) Option 1 (Recommended) Signalize the intersection and provide necessary coordination. Option 2 Construct an exclusive northbound right turn lane on I-40 westbound ramps, with 400 feet of storage, appropriate deceleration, and taper.
Approval with conditions of the Castle Hayne Residential (New Hanover County) Traffic Impact Analysis
Page 2 of 3
SR 1002 (Holly Shelter Road) and SR 2181 (Blue Clay Road) (Stop-controlled intersection)
• Construct an eastbound right turn lane on SR 1002 (Holly Shelter Road) with 100 feet of storage, appropriate deceleration and taper.
• Construct an exclusive northbound right turn lane on SR 2181 (Blue Clay Road) with 100 feet of storage, appropriate deceleration and taper. SR 2181 (Dairy Farm Road) and SR 1336 (Sidbury Road) (Stop-controlled intersection)
• No improvements are required. SR 1002 (Holly Shelter Road) and Site Access 1 (Proposed stop-controlled intersection)
• Construct an eastbound right turn taper of 200 feet on SR 1002 (Holly Shelter Road).
• Construct site access (northbound approach) with an internal protected stem of 50 feet, measured from the right-of-way and with one ingress lane and one egress lane.
• Provide stop controls for northbound approach. SR 2181 (Blue Clay Road) and Concrete Plant Driveway/Site Access 2 (Stop-controlled intersection)
• Construct site access (eastbound approach) with an internal protected stem of 50 feet measured from the right-of-way, and with one ingress lane and one egress lane.
• Provide stop controls for eastbound approach. SR 2181 (Blue Clay Road) and Kerry Drive/Site Access 3 (Stop-controlled intersection)
• Construct site access (eastbound approach) with an internal protected stem of 50 feet measured from
the right-of-way, and with one ingress lane and one egress lane.
• Provide stop controls for eastbound approach.
SR 2181 (Blue Clay Road) and Site Access 4 (Proposed stop-controlled intersection)
• Construct site access (eastbound approach) with an internal protected stem of 75 feet measured from the right-of-way, and with one ingress lane and one egress lane.
• Provide stop controls for eastbound approach.
If changes are made to the proposed site driveways and/or land uses, the current trip distribution may need to be modified and would require a revised Traffic Impact Analysis to be submitted for review by the NCDOT, WMPO, and New Hanover County, in which instance this approval would become null and void. The applicant is required to obtain all applicable New Hanover County and NCDOT permits for access to the road network. A copy of this TIA approval shall be included with any NCDOT driveway permit application. All applicable NCDOT and New Hanover County technical standards and policies shall apply.
Laydown Yard – 4720 N College Rd – TRC Review
Page | 1
To: Mark Hargrove, Port City Consulting Engineering – mhargrove@ec.rr.com
From: Zach Dickerson – Senior Planner
Date: June 19th TRC Review
PID#: R01800-002-002-000
Egov# SITECN-24-000023
Subject: 4720 N College Road – Construction Office and Laydown Yard - TRC Review
The following comments have been received for the June 19th, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
Planning, Zachary Dickerson 910-798-7450
1. General Comments
a. Zoning is I-2
i. There are no new proposed structures on the site, so no setbacks are necessary
beyond those shown on the cover sheet.
b. Proposed use:
i. Expansion of current laydown yard.
ii. The application listed “office and laydown yard” as uses, though on the new site
plan I only noted the expansion of the laydown yard use. Please confirm.
2. UDO Section 5.1, Parking and Loading
a. Please confirm that no new parking will be added for the expansion.
3. UDO Section 5.3, Tree Retention
a. Please submit for a Tree Removal Permit for the rear part of the site where the new
laydown yard is proposed.
b. Tree Removal Permit link: https://www.nhcgov.com/DocumentCenter/View/1239/Tree-
Removal-Permit-PDF
c. Please refer to Section 5.3 of the UDO for Tree Removal and Retention Standards.
Laydown Yard – 4720 N College Rd – TRC Review
Page | 2
4. UDO Section 5.4, Landscaping and Buffering
a. The existing treeline can be used as a transitional buffer to the adjacent R-15 and R-10
parcels provided it meets the transitional buffer standards.
b. No new street yard is required.
c. If no new parking is provided, no further landscaping is required.
d. Please note that 15 trees are required to be planted or retained per acre disturbed.
i. The application states the total acreage of the parent parcel and doesn’t note
acres disturbed, which would allow us to calculate how many trees are needed to
meet this requirement. My hunch is that retention of the existing treeline for a
transitional buffer will satisfy a large chunk of this.
5. UDO Section 5.5, Lighting
a. Is any new lighting proposed for the site?
6. UDO Section 5.6, Signs
a. If there are any new signs proposed for this development, please apply for sign permits
prior to installation.
7. UDO Section 5.7, Conservation Resources
a. Per the New Hanover County Conservation Resource Overlay map, there is existing
swamp forest conservation resource on this parcel. However, wetlands are noted on the
site plan and are not being disturbed.
NHC Fire Services, Ray Griswold 910-798-7448
1. Fire final required.
2. Gate permits required.
3. Any fuel tanks shall be permitted through this office.
NHC Engineering, Galen Jamison 910-798-7072
1. A revision to land disturbing (GP#42-19/ LNDP 19-00158) and a revision to stormwater permit
(STMW-19-0054 ) issued by the County are required for this project. Please submit the permit
revision applications documentation with requisite review fees for County issued permit directly
to gjamison@nhcgov.com. Application and forms can be found at
https://www.nhcgov.com/251/Stormwater and https://www.nhcgov.com/249/Sediment-
Erosion-Control.
2. It appears additional grading is needed to at the existing 4.5:1 slope at the western edge of the
laydown yard.
3. Please contact the State for their stormwater permitting requirements. It is anticipated a major
modification to the high density permit (SW8191105) will be necessary.
Laydown Yard – 4720 N College Rd – TRC Review
Page | 3
NHC Environmental Health, Dustin Fenske 910-798-6732
1. Well head must be protected during all improvements and maintain 50’ from any stormwater
ponds.
2. Septic system was permitted for no more than 15 employees. Adhere to employee number and
maintain septic system area so as not to compact the soil area for the initial system and repair
area.
NHC Addressing, Katherine May 910-798-7443
1. Current address is acceptable, no changes necessary.
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
1. No CFPUA water or gravity sewer available.
NCDOT, Nick Drees 910-343-3915
1. No comments.
WMPO, Scott James 910-473-5130
1. See attachment.
Army Corps of Engineers, Brad Shaver 910-251-4611
1. Our office completed a jurisdictions determination on this tract in 2016 and the current
disturbance visible on google earth looks like there may already be impacts. I would get the old
delineation at minimum displayed on any plans submitted by the applicant to make sure no
further impacts are completed without necessary permitting.
2. Our file number for this was SAW-2016-01681
Comments not received at this time from:
Emergency Services & E911, Steve Still
NCDEQ, Chad Coburn
New Hanover Soil & Water, Dru Harrison
USACE, Rachel Capito
NCDEMLR, Dan Sams
DCM, Tanya Pietila
MEMORANDUM
To: New Hanover County Technical Review Committee
Date: 6/11/24
Subject: 4720 North College Road, HCS Office Phase II
Comments:
• Site access subject to NCDOT review.
NCDOT Projects: N/A
TIP Projects in the Area: N/A
WMPO 2045 Projects: N/A
New Hanover County CTP: N/A
TIA: The project will not require a TIA.
Land Use (ITE Code) Intensity 24 Hour
Volumes
AM Peak
Hour Trips
PM Peak
Hour Trips
Specialty Contractor, (181) 14,858 SF 146 52 29