Farrell, Robert
From:Brad Schuler <bschuler@paramounte-eng.com>
Sent:Wednesday, July 10, 2024 4:08 PM
To:Farrell, Robert
Cc:Allison Engebretson
Subject:The Oasis - Revised MF Site Plan
Attachments:22208.PE The Oasis MF Site Plan.pdf
Follow Up Flag:Follow up
Flag Status:Completed
** External Email: Do not click links, open attachments, or reply until you know it is safe **
Robert,
We needed to revise the MF section of The Oasis project (Z23-12) to accommodate NCDOT and client
requirements/requests and wanted to verify with you that the modifications are considered minor.
NCDOT wanted us to align with the concrete plant’s southernmost driveway, so our entry road to the apartments
shifted and caused stormwater and buildings to shift slightly. Understanding the conditions and the client’s desire
to buffer as much as possible between the roads and the buildings, we created a larger buffer specifically at
the concrete and paver plant locations (corner at Blue Clay and all along Holly Shelter) . The client shifted
around units within the design to better cluster and create the buffer from industrial. We have 240 (was 243)
units now in 12-unit, 24-unit, and 36-unit buildings. The stormwater pond adjusted to preserve tree buffer and
accommodate the shifted entry road.
Overall, these changes appear to constitute minor modifications and are part of the design process as projects
move forward, but we wanted to check in with you as we gear up for a TRC submittal to you. If you see any
issues, please let us know.
Thanks,
Brad
Brad Schuler, AICP
Paramounte Engineering, Inc. | 122 Cinema Drive | Wilmington, NC 28403
Office: (910) 791-6707 | Cell: (252) 531-9971 | Fax: (910) 791-6760 | www.paramounte-eng.com