Loading...
HomeMy WebLinkAboutSite PlanU S 4 2 1 U S 4 2 1 VITA M I N D R I V E PHILLI P S C E N T E R L O O P EAS T V I T A M I N D R I V E P H I L L I P S C E N T E R L O O P PHILLIP S C E N T E R L O O P TOW I N G S Y S T E M S R O A D TOWING SYSTEMS ROAD PH I L L I P S C E N T E R L O O P TR A I N I N G C E N T E R L A N E SITE 421 PENDER CO U N T Y NEW HANOV E R C O U N T Y VITA M I N D R I V E NORTHEAST CAPE FEAR RIVER SEAN/CHRIS SEAN/CHRIS SCOTT 1501 NOT TO SCALE VICINITY MAP CAPE FEAR TOWNSHIP NEAR WILMINGTON, NORTH CAROLINA NEW HANOVER/PENDER COUNTIES INDEX OF DRAWINGS C1.0 - EXISTING CONDITIONS C1.1 - TREE SURVEY C2.0-C2.3 - SITE PLAN C3.0-C3.3 - GRADING AND EROSION PLAN C4.0-C4.3 - UTILITY PLAN C5.0-C5.5 - PROFILES C6.0 - SITE & EROSION DETAILS C6.1 - EROSION DETAILS C6.2 - WATER & SEWER DETAILS C6.3 - WATER DETAILS PHILLIPS CENTER OF WILMINGTON SITE DEVELOPMENT PLANS THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED EXISTING UTILITY OWNER WATER AND SEWER CAPE FEAR PUBLIC UTILITY AUTHORITY 235 Government Center Drive Wilmington, North Carolina 28403 910-332-6673 Contact: Jeff Thebridge OWNER/DEVELOPER PHILLIPS LEASING SYSTEMS, LLC 327 Alexander Street Fayetteville, North Carolina 910-323-9600 Contact: Mike Capps email: mcapps@phillipstowing.net SURVEYOR 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Jimmy Holland, PLS email: jholland@4dsitesolutions.com CIVIL ENGINEER 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Scott Brown, PE email: sbrown@4dsitesolutions.com Know what's below. before you dig.Call R SEAL L-4571 S E AN R .S E E V E R N O R T H CAROL I N A PR O F E SSIO N A L L A ND SU R V E Y OR SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C .SCOTT B R O W NENGINEER I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l 00 C S l 6. 1 4 . 2 0 2 4 1 0 : 4 5 : 2 5 A M PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE DATE RELEASED SEE SHEETS PROJECT NAME CLIENT PROJECT INFORMATION DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 ALONG HWY 421 NEAR WILMINGTON NORTH CAROLINA NEW HANOVER PID: RO1500-001-003-000 RO1500-001-002-001 RO1500-001-006-000 PENDER PIN: 3201-15-5184-000 U S 4 2 1 14 15 16 1 7 18 2 5 3 0 3 3 1 7 1 8 1 9 3 1 2 8 30 2 5 2 0 2025 30 2 2 2 3 2 4 2 2 2 3 2 3 2 3 2 2 2 1 2 0 2 3 25 27 2 4 2 2 20 1 9 1 8 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 6 10 1 0 5 2 1 2 6 5 3 13 1 4 1 5 16 17 1 8 1 9 20 2 1 16 18 2 0 25 3 0 35 37 2025 30 39 34 33 32 31 30 28 26 23232015 17 19 21 20 18 16 14 12 10 8 6 4 3 57 9 11 1 3 1 5 1 7 19 21 22 23 25 27 29 31 33 35 33 31 29 27 25 23 21 19 17 3 1 7 321 25 30 30 35 16 343230282624 23 25 2728 2 7 29 25 23 21 19 17 18 16 18 20 22 24 2 3 21 19 1 7 1 5 13 11 9 8 13 15 1 7 1 8 1 9 20 19 17 1 5 3 15 16 17 15 14 16 15 16 18 20 22 24 26 28 3 0 3 1 26 2 0 15 1 2 3 10 1 1 1 2 13 14 16 1 8 25 28 8 37 8 9 3 7 1 3 1 1 9 8 1 0 3 1820 2 5 22 20 22 2 4 20 15 10 5 3 2 1 1 2 3 4 2 2 3 4 1 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 1214 1618 2022 2426 28 31 11 1 0 9 8 7 6 5 4 4 22 10 9 8 7 6 5 4 3 4 5 6 6 54 3 3 3 5 4 6 5 4 4 4 3 3 2 2 222 2 2 2 2 2 3 3 3 3 4 4 3 2 2 3 2 2 44 3 4 4 4 4 5 4 4 45 4 5 4 5 5 4 4 5 5 4 3 3 43 1 5 1 0 5 3 31 25 20 30 1 5 15 20 25 30 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 SITE 421 PENDER CO U N T Y NEW HANOV E R C O U N T Y VITAM I N D R I V E NORTHEAST CAPE FEAR RIVER VICINITY MAP NOT TO SCALE I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C1 . 0 E X l 6. 1 4 . 2 0 2 4 1 0 : 4 6 : 4 6 A M EXISTING CONDITIONS PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE DATE SURVEYED HORIZONTAL: 1"=150' C-1.0 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SURVEYED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: AL SEAN JIMMY 1501 SEAL L-4571 S E AN R .S E E V E R N O R T H CAROL I N A PR O F E SSIO N A L L A N D SU R V E Y OR June 10, 2019 13 JUNE 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 13 JUNE 10 7 SEAL L-4571 S E AN R .S E E V E R N O R T H CAROL I N A PR O F E SSIO N A L L A N D SUR V E Y OR U S 4 2 1 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 SITE 421 PENDER CO U N T Y NEW HANOV E R C O U N T Y VITAM I N D R I V E NORTHEAST CAPE FEAR RIVER VICINITY MAP NOT TO SCALE I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C1 . 1 E X T R E E l 6. 1 4 . 2 0 2 4 1 0 : 5 3 : 5 7 A M TREE INVENTORY MAP PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE DATE DRAWN HORIZONTAL: 1"=150' C-1.1 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SURVEYED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: GFR TYLER JIMMY 1501 FEBRUARY 28, 2024 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 10 7 THIS MAP WAS PREPARED IN ACCORDANCE WITH THE NEW HANOVER TREE & LANDSCAPING MANUAL, DATED NOVEMBER 2022. THE DATA SHOWN HEREON WAS PROVIDED BY GELBERT, FULLBRIGHT & RANDOLPH FORESTRY CONSULTANTS AND TIMBER SALES AND COLLECTED BETWEEN APRIL & MAY 2023. IN ADDITION TO THIS MAP, A SPREADSHEET ENTITLED 'TREE INVENTORY REPORT' PROVIDES ADDITIONAL INFORMATION. SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER CURVE TABLE U S 4 2 1 U S 4 2 1 VITA M I N D R I V E PHILLIP S C E N T E R L O O P EAS T V I T A M I N D R I V E P H I L L I P S C E N T E R L O O P PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D TOWING SYSTEMS ROAD TR A I N I N G C E N T E R L A N E PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P VICINITY MAP NOT TO SCALE HORIZONTAL: 1"=150' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C2 . 0 S I l 6. 1 4 . 2 0 2 4 1 0 : 4 5 : 3 5 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER OVERALL SITE PLAN PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-2.0 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C2.1 C2.2 C2.3 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) SITE 421 PENDER COU N T Y NEW HANOV E R C O U N T Y VITAM I N D R I V E NORTHEAST CAPE FEAR RIVER 10 7 SITE DATA VITA M I N D R I V E PHILLIP S C E N T E R L O O P EAS T V I T A M I N D R I V E TOWING SYSTEMS ROAD HORIZONTAL: 1"=60' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C2 . 1 S I l 6. 1 4 . 2 0 2 4 1 0 : 4 5 : 4 2 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER DETAILED SITE PLAN PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-2.1 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C2.2 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 10 7 U S 4 2 1 U S 4 2 1 P H I L L I P S C E N T E R L O O P HORIZONTAL: 1"=60' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C2 . 2 S I l 6. 1 4 . 2 0 2 4 1 0 : 4 5 : 4 7 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER DETAILED SITE PLAN PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-2.2 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C2 . 3 C2.1 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 10 7 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D TR A I N I N G C E N T E R L A N E PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P HORIZONTAL: 1"=60' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C2 . 3 S I l 6. 1 4 . 2 0 2 4 1 0 : 4 5 : 5 6 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER SITE PLAN PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-2.3 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C2 . 2 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 10 7 U S 4 2 1 17 30 28 20 15 26 28 20 30 27 2 7 28 2 9 30 2022 2 0 2 0 18 2 2 1 7 2 0 9 11 10 5 7 85 67 10 1 0 11 12 13 1210 11 9 1 4 1 2 1 6 1 4 2 0 1 8 2 5 2 3 12 13 14 15 16 17 19 20 22 23 24 25 11 10 11 1 4 1 6 1 7 16 15 14 1 3 13 14 15 16 17 18 19 2021 22 19 21 1 8 17 15 16 17 1516 1 7 13 12 11 14 4 5 10 116 1 4 4 4 17 19 4 20 17 16 2 0 1 8 1 6 17 13 1917 16 15 1 4 1 3 1 1 1 0 1 6 1 4 20 18 1 3 1 2 1 5 1 6 1 7 1 8 1 9 27 1 1 1 2 7 1 4 9 13 11 313233 29 27 26 25 24 23 24 25 26 19 27 23 21 29 30 31 3 1 2 6 2 5 2 4 2 3 22 21 20 18 17 16 15 14 13 12 12 13 14 15 17 18 18 17 16 15 12 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 19 1 8 1 7 1 5 1 4 1 3 1 4 1 5 1 6 1 7 18 19 2021 22 23 23 2 2 1 9 2021 1 8 1 7 1 6 1 5 1 4 1 5 1 6 1 7 2 0 2 1 29 26 25 24 23 21 21 22 23 24 25 1 9 18 21 1 312 1 5 1 7 1 8 17 18 21 18 19 11 16 13 14 13 12 1 3 14 15 16 1 7 18 2 5 3 0 3 3 1 7 1 8 1 9 3 1 2 8 30 2 5 2 0 2025 30 2 2 2 3 2 4 2 2 2 3 2 3 2 3 2 2 2 1 2 0 2 3 25 27 2 4 2 2 20 1 9 1 8 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 6 10 1 0 5 2 1 2 6 5 3 13 1 4 1 5 16 1 7 1 8 1 9 20 2 1 16 18 2 0 25 3 0 35 37 2025 30 39 34 33 32 31 30 28 26 23232015 17 19 21 20 18 16 14 12 10 8 6 4 3 57 9 11 1 3 1 5 1 7 19 21 22 23 25 27 29 31 33 35 33 31 29 27 25 23 21 19 17 3 1 7 321 25 30 30 35 16 343230282624 23 25 2728 2 7 29 25 23 21 19 17 18 16 18 20 22 24 2 3 21 19 1 7 1 5 13 11 9 8 13 15 1 7 18 1 9 20 19 17 1 5 3 15 16 17 15 14 16 15 16 18 20 22 24 26 28 3 0 3 1 26 2 0 15 1 2 3 10 1 1 1 2 13 14 16 18 25 28 8 37 8 9 3 7 1 3 1 1 9 8 1 0 3 1820 25 22 20 22 2 4 20 15 10 5 3 2 1 1 2 3 4 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 1214 1618 2022 2426 28 31 11 1 0 9 8 7 6 5 4 22 10 9 8 7 6 5 4 3 6 54 3 3 3 5 4 6 5 4 4 4 3 3 2 2 222 2 2 2 2 2 3 3 3 1 5 1 0 5 3 31 25 20 30 1 5 15 20 25 30 U S 4 2 1 VITA M I N D R I V E PHILLIP S C E N T E R L O O P EAS T V I T A M I N D R I V E P H I L L I P S C E N T E R L O O P PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D TOWING SYSTEMS ROAD TR A I N I N G C E N T E R L A N E 1 8 15 16 17 1 1 13141516 1 7 13 12 11 14 4 413 411 6 10 512 4 1 3 4 12 5 10 116 1 4 4 4 17 19 4 20 1917 18 17 16 15 14 13 12 1 2 1 3 1 4 1 5 15 1 4 1312 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 18 19 11 16 5 3 2 1 1 2 3 4 2 2 3 4 1 4 33 31 29 23 25 3 10 5 1214 1618 2022 2426 28 31 11 1 0 9 8 7 6 5 4 4 22 10 9 8 7 6 5 4 3 4 5 6 6 54 3 5 4 6 5 4 4 4 3 3 2 2 222 2 2 2 3 3 3 3 4 4 3 2 2 3 2 2 44 3 4 4 4 4 5 4 4 45 4 5 4 5 5 4 4 5 5 4 3 3 43 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P VICINITY MAP THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C3 . 0 G & E C l 6. 1 4 . 2 0 2 4 1 0 : 4 7 : 5 0 A M HORIZONTAL: 1"=150' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER OVERALL GRADING AND EROSION CONTROL PLAN PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-3.0 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 SITE 421 PENDER COU N T Y NEW HANOV E R C O U N T Y VITAM I N D R I V E NORTHEAST CAPE FEAR RIVER 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 215 217 17 30 28 20 15 26 28 20 30 27 2 7 28 2 9 30 20 22 2 0 2 0 2 5 2 3 22 23 24 25 14 15 16 17 18 19 20 21 22 19 21 1 6 1 4 20 18 1 3 1 2 1 5 1 6 1 7 1 8 1 9 27 1 2 7 1 4 9 3132 33 29 27 26 25 24 23 24 25 26 19 27 23 21 29 30 31 3 1 2 6 2 5 2 4 1 4 1 5 1 6 1 7 18 19 2021 22 23 23 2 2 1 9 2021 1 8 1 7 1 6 1 5 1 4 1 5 1 6 1 7 2 0 2 1 29 26 25 24 23 21 21 22 23 24 25 1 3 14 15 16 1 7 18 2 5 3 0 3 3 1 7 1 8 1 9 3 1 2 8 30 2 5 2 0 20 25 30 2 2 2 3 2 4 2 2 2 3 2 3 2 3 2 2 2 1 2 0 2 3 25 27 2 4 2 2 20 1 9 37 20 25 30 39 34 33 32 31 30 28 26 2323 2015 17 19 21 20 18 16 14 12 10 8 6 4 3 5 7 9 11 1 3 1 5 1 7 19 21 22 23 25 27 29 31 33 35 33 31 29 27 25 23 21 19 17 3 1 7 321 25 30 30 35 34 3230282624 23 2528 2 7 29 VITA M I N D R I V E PHILLIP S C E N T E R L O O P EAS T V I T A M I N D R I V E TOWING SYSTEMS ROAD HORIZONTAL: 1"=60' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C3 . 1 G & E C l 6. 1 4 . 2 0 2 4 1 0 : 4 7 : 5 5 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-3.1 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C3.2 C3 . 3 4D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R DETAILED GRADING AND EROSION CONTROL PLAN 215 217 U S 4 2 1 18 2 2 1 7 2 0 9 11 10 5 7 85 67 10 1 0 11 12 13 12 10 11 9 1 4 1 2 1 6 1 4 2 0 1 8 12 13 14 15 16 17 19 20 11 10 11 1 3 13 1 1 1 0 2 3 22 21 20 18 17 16 15 14 13 12 12 13 14 1 3 1 9 18 21 13 12 1 8 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 6 10 1 0 5 2 1 2 6 5 3 13 1 4 1 5 16 1 7 1 8 1 9 20 2 1 16 18 2 0 25 3 0 35 20 25 16 25 27 28 25 23 21 19 17 18 16 18 20 22 24 2 3 2 1 19 1 7 1 5 13 11 9 8 13 15 1 7 18 1 9 15 14 16 18 20 3 1 3 10 1 1 1 2 13 14 16 1 8 8 3 7 8 9 3 7 1 3 1 1 9 8 1 0 31 25 20 30 1 5 15 20 25 30 U S 4 2 1 P H I L L I P S C E N T E R L O O P HORIZONTAL: 1"=60' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C3 . 2 G & E C l 6. 1 4 . 2 0 2 4 1 0 : 4 7 : 5 9 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-3.2 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C3 . 3 C3.1 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R DETAILED GRADING AND EROSION CONTROL PLAN 215 217 13 1 4 1 6 1 7 16 15 14 1 3 13 1 8 17 15 16 17 1 1 13 14 1516 1 7 13 12 11 14 4 4 13 411 6 10 12 4 1 3 4 12 5 10 11 6 1 4 4 4 17 19 4 20 17 16 2 0 1 8 1 6 17 13 19 17 16 15 1 4 1 3 1 1 13 11 14 15 17 18 18 17 16 15 14 13 12 1 2 1 3 1 4 1 5 15 1 4 13 12 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 19 1 8 1 7 1 5 1 4 1 3 13 1 5 1 7 1 8 17 18 21 18 19 11 16 13 14 13 12 1 9 20 19 17 1 5 3 15 16 17 16 15 16 18 20 22 24 26 28 3 0 3 1 26 2 0 15 1 2 16 18 25 28 3 1820 25 22 20 22 2 4 20 15 10 4 2 2 3 4 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 12 14 16 18 20 22 24 26 28 31 11 1 0 9 8 7 6 5 4 4 22 10 9 8 7 6 5 4 3 4 5 6 6 54 3 3 3 5 4 6 5 4 2 2 2 4 4 5 4 5 4 5 5 4 3 3 43 1 5 1 0 5 3 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P FUTURE DEVELOPENT FU T U R E D E V E L O P E N T TR A I N I N G C E N T E R L A N E 1 8 17 15 16 17 1 1 13 14 1516 1 7 13 12 11 14 4 4 13 411 6 10 5 12 4 1 3 4 12 5 10 11 6 1 4 4 4 17 19 4 20 17 2 0 1 8 17 13 19 17 16 15 13 11 18 18 17 16 15 14 13 12 1 2 1 3 1 4 1 5 15 1 4 13 12 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 19 1 8 1 7 18 21 18 19 11 16 13 2 0 15 1 2 3 1820 22 20 22 2 4 20 15 10 4 2 2 3 4 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 12 14 16 18 20 22 24 26 28 31 11 1 0 9 8 7 6 5 4 4 22 10 9 8 7 6 5 4 3 4 5 6 6 54 3 3 3 5 4 6 5 4 2 2 2 2 44 3 4 4 4 4 5 4 4 4 5 4 5 4 5 5 4 4 5 5 4 3 3 43 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P FUTURE DEVELOPENT FU T U R E D E V E L O P E N T HORIZONTAL: 1"=60' I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C3 . 3 G & E C l 6. 1 4 . 2 0 2 4 1 0 : 4 8 : 0 9 A M SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-3.3 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C3 . 2 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R GRADING AND EROSION CONTROL PLAN 215 217 17 30 28 20 15 26 28 20 30 27 2 7 28 2 9 30 2022 2 0 2 0 18 2 2 1 7 2 0 9 11 10 5 7 85 67 10 1 0 11 12 13 1210 11 9 1 4 1 2 1 6 1 4 2 0 1 8 2 5 2 3 12 13 14 15 16 17 19 20 22 23 24 25 11 10 11 1 4 1 6 1 7 16 15 14 1 3 13 14 15 16 17 18 19 2021 22 19 21 1 8 17 15 16 17 1516 1 7 13 12 11 14 4 5 10 116 1 4 4 4 17 19 4 20 17 16 2 0 1 8 1 6 17 13 1917 16 15 1 4 1 3 1 1 1 0 1 6 1 4 20 18 1 3 1 2 1 5 1 6 1 7 1 8 1 9 27 1 1 1 2 7 1 4 9 13 11 313233 29 27 26 25 24 23 24 25 26 19 27 23 21 29 30 31 3 1 2 6 2 5 2 4 2 3 22 21 20 18 17 16 15 14 13 12 12 13 14 15 17 18 18 17 16 15 12 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 19 1 8 1 7 1 5 1 4 1 3 1 4 1 5 1 6 1 7 18 19 2021 22 23 23 2 2 1 9 2021 1 8 1 7 1 6 1 5 1 4 1 5 1 6 1 7 2 0 2 1 29 26 25 24 23 21 21 22 23 24 25 1 9 18 21 1 312 1 5 1 7 1 8 17 18 21 18 19 11 16 13 14 13 12 1 3 14 15 16 1 7 18 2 5 3 0 3 3 1 7 1 8 1 9 3 1 2 8 30 2 5 2 0 2025 30 2 2 2 3 2 4 2 2 2 3 2 3 2 3 2 2 2 1 2 0 2 3 25 27 2 4 2 2 20 1 9 1 8 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 6 10 1 0 5 2 1 2 6 5 3 13 1 4 1 5 16 1 7 1 8 1 9 20 2 1 16 18 2 0 25 3 0 35 37 2025 30 39 34 33 32 31 30 28 26 23232015 17 19 21 20 18 16 14 12 10 8 6 4 3 57 9 11 1 3 1 5 1 7 19 21 22 23 25 27 29 31 33 35 33 31 29 27 25 23 21 19 17 3 1 7 321 25 30 30 35 16 343230282624 23 25 2728 2 7 29 25 23 21 19 17 18 16 18 20 22 24 2 3 21 19 1 7 1 5 13 11 9 8 13 15 1 7 18 1 9 20 19 17 1 5 3 15 16 17 15 14 16 15 16 18 20 22 24 26 28 3 0 3 1 26 2 0 15 1 2 3 10 1 1 1 2 13 14 16 18 25 28 8 37 8 9 3 7 1 3 1 1 9 8 1 0 3 1820 25 22 20 22 2 4 20 15 10 5 3 2 1 1 2 3 4 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 1214 1618 2022 2426 28 31 11 1 0 9 8 7 6 5 4 22 10 9 8 7 6 5 4 3 6 54 3 3 3 5 4 6 5 4 4 4 3 3 2 2 222 2 2 2 2 2 3 3 3 1 5 1 0 5 3 31 25 20 30 1 5 15 20 25 30 U S 4 2 1 VITA M I N D R I V E PHILLIP S C E N T E R L O O P EAS T V I T A M I N D R I V E P H I L L I P S C E N T E R L O O P PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D TOWING SYSTEMS ROAD TR A I N I N G C E N T E R L A N E 1 8 15 16 17 1 1 13141516 1 7 13 12 11 14 4 413 411 6 10 512 4 1 3 4 12 5 10 116 1 4 4 4 17 19 4 20 1917 18 17 16 15 14 13 12 1 2 1 3 1 4 1 5 15 1 4 1312 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 18 19 11 16 5 3 2 1 1 2 3 4 2 2 3 4 1 4 33 31 29 23 25 3 10 5 1214 1618 2022 2426 28 31 11 1 0 9 8 7 6 5 4 4 22 10 9 8 7 6 5 4 3 4 5 6 6 54 3 5 4 6 5 4 4 4 3 3 2 2 222 2 2 2 3 3 3 3 4 4 3 2 2 3 2 2 44 3 4 4 4 4 5 4 4 45 4 5 4 5 5 4 4 5 5 4 3 3 43 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P VICINITY MAP NOT TO SCALE THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C4 . 0 U T l 6. 1 4 . 2 0 2 4 1 0 : 5 0 : 0 5 A M HORIZONTAL: 1"=150' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER OVERALL UTILITY PLAN NEW HANOVER PID: RO1500-001-003-000 RO1500-001-002-001 RO1500-001-006-000 PENDER PIN: 3201-15-5184-000 PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-4.0 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) SITE 421 PENDER COU N T Y NEW HANOV E R C O U N T Y VITAM I N D R I V E NORTHEAST CAPE FEAR RIVER 215 217 17 30 28 20 15 26 28 20 30 27 2 7 28 2 9 30 20 22 2 0 2 0 18 2 2 2 5 2 3 22 23 24 25 14 15 16 17 18 19 20 21 22 19 21 1 6 1 4 20 18 1 3 1 2 1 5 1 6 1 7 1 8 1 9 27 1 2 7 1 4 9 3132 33 29 27 26 25 24 23 24 25 26 19 27 23 21 29 30 31 3 1 2 6 2 5 2 4 2 3 1 3 1 4 1 5 1 6 1 7 18 19 2021 22 23 23 2 2 1 9 2021 1 8 1 7 1 6 1 5 1 4 1 5 1 6 1 7 2 0 2 1 29 26 25 24 23 21 21 22 23 24 25 21 1 3 14 15 16 1 7 18 2 5 3 0 3 3 1 7 1 8 1 9 3 1 2 8 30 2 5 2 0 20 25 30 2 2 2 3 2 4 2 2 2 3 2 3 2 3 2 2 2 1 2 0 2 3 25 27 2 4 2 2 20 1 9 1 8 35 37 20 25 30 39 34 33 32 31 30 28 26 2323 2015 17 19 21 20 18 16 14 12 10 8 6 4 3 5 7 9 11 1 3 1 5 1 7 19 21 22 23 25 27 29 31 33 35 33 31 29 27 25 23 21 19 17 3 1 7 321 25 30 30 35 16 34 3230282624 23 25 27 28 2 7 29 VITA M I N D R I V E PHILLIP S C E N T E R L O O P EAS T V I T A M I N D R I V E TOWING SYSTEMS ROAD THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C4 . 1 U T l 6. 1 4 . 2 0 2 4 1 0 : 5 0 : 1 1 A M HORIZONTAL: 1"=60' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER UTILITY PLAN PID: RO1500-001-003-000 RO1500-001-002-001 RO1500-001-006-000 PENDER PIN: 3201-15-5184-000 PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-4.1 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) C4.2 215 217 18 2 2 1 7 2 0 9 11 10 5 7 85 67 10 1 0 11 12 13 12 10 11 9 1 4 1 2 1 6 1 4 2 0 1 8 12 13 14 15 16 17 19 20 11 10 11 1 3 13 1 1 1 0 2 3 22 21 20 18 17 16 15 14 13 12 12 13 14 1 3 1 9 18 21 13 12 1 8 1 7 1 6 1 5 1 4 1 3 1 2 1 1 1 0 6 10 1 0 5 2 1 2 6 5 3 13 1 4 1 5 16 1 7 1 8 1 9 20 2 1 16 18 2 0 25 3 0 35 20 16 25 27 28 25 23 21 19 17 18 16 18 20 22 24 2 3 21 19 1 7 1 5 13 11 9 8 13 15 1 7 18 1 9 15 14 16 18 3 1 3 10 1 1 1 2 13 14 16 1 8 8 3 7 8 9 3 7 1 3 1 1 9 8 1 0 31 25 20 30 1 5 15 20 25 30 U S 4 2 1 P H I L L I P S C E N T E R L O O P THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C4 . 2 U T l 6. 1 4 . 2 0 2 4 1 0 : 5 0 : 1 7 A M HORIZONTAL: 1"=60' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER UTILITY PLAN PID: RO1500-001-003-000 RO1500-001-002-001 RO1500-001-006-000 PENDER PIN: 3201-15-5184-000 PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-4.2 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C4 . 3 C4.1 4 D S I T E S O L UT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 215 217 13 1 4 1 6 1 7 16 15 14 1 3 13 1 8 17 15 16 17 1516 1 7 13 12 11 14 4 5 10 11 6 1 4 4 4 17 19 4 20 17 16 2 0 1 8 1 6 17 13 19 17 16 15 1 4 1 3 1 1 13 11 14 15 17 18 18 17 16 15 12 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 19 1 8 1 7 1 5 1 4 1 3 13 1 5 1 7 1 8 17 18 21 18 19 11 16 13 14 13 12 1 9 20 19 17 1 5 3 15 16 17 16 15 16 18 20 22 24 26 28 3 0 3 1 26 2 0 15 1 2 16 18 25 28 3 1820 25 22 20 22 2 4 20 15 10 4 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 12 14 16 18 20 22 24 26 28 31 11 1 0 9 8 7 6 5 4 22 10 9 8 7 6 5 4 3 6 54 3 3 3 5 4 6 5 4 2 2 2 3 1 5 1 0 5 3 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D TR A I N I N G C E N T E R L A N E 1 8 17 15 16 17 1 1 13 14 1516 1 7 13 12 11 14 4 4 13 411 6 10 5 12 4 1 3 4 12 5 10 11 6 1 4 4 4 17 19 4 20 17 2 0 1 8 17 13 19 17 16 15 13 11 18 18 17 16 15 14 13 12 1 2 1 3 1 4 1 5 15 1 4 13 12 12 13 14 15 16 17 18 19 20 21 2 0 1 9 1 8 20 19 1 8 1 7 18 21 18 19 11 16 13 2 0 15 1 2 3 1820 22 20 22 2 4 20 15 10 4 2 2 3 4 4 33 31 29 27 25 23 21 19 17 15 23 25 3 10 5 12 14 16 18 20 22 24 26 28 31 11 1 0 9 8 7 6 5 4 4 22 10 9 8 7 6 5 4 3 4 5 6 6 54 3 3 3 5 4 6 5 4 2 2 2 2 44 3 4 4 4 4 5 4 4 4 5 4 5 4 5 5 4 4 5 5 4 3 3 43 PHILLI P S C E N T E R L O O P TOW I N G S Y S T E M S R O A D PH I L L I P S C E N T E R L O O P THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED Know what's below. before you dig.Call R I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C4 . 3 U T l 6. 1 4 . 2 0 2 4 1 0 : 5 0 : 2 8 A M HORIZONTAL: 1"=60' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER UTILITY PLAN PID: RO1500-001-003-000 RO1500-001-002-001 RO1500-001-006-000 PENDER PIN: 3201-15-5184-000 PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-4.3 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 C4 . 2 4 D S I T E S O LUT I O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 215 217 30 2 8 27 27 28 29 30 2022 20 20 1 8 22 17 20 14 1216 14 20 18 25 23 1 4 1 5 1 6 1 7 1 9 2 0 2 2 2 3 2 4 2 5 31 32 33 29 27 29 30 31 31 26 25 24 23 22 21 20 18 17 16 26 25 24 23 2 1 21 22 23 24 25 19 1 8 2 1 25 30 33 19 31 28 3 0 25 20 2 0 2 5 30 22 23 24 22 23 16 18 20 23 2 5 2 7 2 8 27 29 25 23 21 19 17 18 1 6 1 8 2 0 2 2 2 4 23 17 PHI L L I P S C E N T E R L O O P PHILLIPS CENTER LOOP 50' R/W (PUBLIC STREET) ROADWAY PROFILE 9+50 TO 27+50 PHILLIPS CENTER 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C5 . 0 P R O l 6. 1 4 . 2 0 2 4 1 0 : 5 0 : 3 6 A M HORIZONTAL: 1"=60' VERTICAL: 1"=6' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER ROAD A PROFILE PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE C-5.0 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4 D S I T E S O L U T I O NS N C G R I D N A D 8 3 ( 2 0 1 1 ) 9 11 10 5 7 85 67 10 1 0 11 12 13 12 10 11 9 1 4 1 2 12 11 10 11 1 4 1 6 1 7 17 16 17 2 0 1 8 1 6 15 14 13 12 12 13 14 15 17 18 18 17 16 2 0 1 9 1 8 1 3 12 1 5 1 7 1 8 21 18 19 11 16 22 24 26 28 3 0 3 1 26 2 0 1 5 1 2 3 10 1 1 1 2 13 14 16 18 25 28 8 8 1 0 3 1820 2 5 22 20 22 2 4 20 15 10 4 29 27 25 23 21 19 17 15 12 14 16 18 20 22 24 26 11 1 0 31 25 20 30 1 5 PHILLIP S C E N T E R L O O P TR A I N I N G C E N T E R L A N E 50' R/W (PUBLIC STREET) ROADWAY PROFILE 27+50 TO 45+50 PHILLIPS CENTER 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C5 . 1 P R O l 6. 1 4 . 2 0 2 4 1 0 : 5 0 : 4 4 A M HORIZONTAL: 1"=60' VERTICAL: 1"=6' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER ROAD A PROFILE PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE C-5.1 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4D S I T E S OLUTI O N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 50' R/W (PUBLIC STREET) ROADWAY PROFILE 45+50 TO 48+00 PHILLIPS CENTER 50' R/W (PUBLIC STREET) ROADWAY PROFILE 71+00 TO 76+50 PHILLIPS CENTER 14 4 16 15 4 15 16 14 4 16 15 11 1 0 9 8 7 6 5 4 18 1 5 16 17 14 19 4 2 0 19 17 1 7 1 6 20 21 20 19 18 20 1 8 1 9 11 16 33 31 23 2 5 3 10 5 12 1 4 1 6 1 8 2 0 2 2 2 4 2 6 2 8 3 1 11 10 9 22 10 9 8 50' R/W (PUBLIC STREET) ROADWAY PROFILE 9+00 TO 16+00 TRAINIING CENTER 14 16 17 16 15 1 4 17 1 6 18 16 16 15 14 13 11 15 17 18 17 15 15 171817 13 14 1 5 1 6 17 1 6 15 22 24 26 28 30 26 20 15 12 25 2 8 3 18 20 25 22 20 15 10 TRAINING CENTER LANE 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C5 . 2 P R O l 6. 1 4 . 2 0 2 4 1 0 : 5 1 : 0 7 A M HORIZONTAL: 1"=60' VERTICAL: 1"=6' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER ROADWAY PROFILES PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE C-5.2 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4D S I T E S OLUTI O N S NC GRID NAD 83 ( 2 0 1 1 ) 4D S I T E S O LUT IO N S NC GRID NAD 8 3 ( 2 0 1 1 ) 4D S I T E S OLUT I O N S NC G R I D N A D 8 3 ( 2 0 1 1 ) 13 1 4 1 5 16 17 18 1 9 2 0 2 1 2 2 19 21 11 10 16 14 20 18 16 17 18 19 11 12 7 2 3 21 13 14 15 16 17 18 19 20 21 22 23 23 22 19 20 21 18 17 16 16 17 20 21 13 1 7 1 9 21 17 19 21 22 23 25 27 29 3 1 3 3 35 1 7 1 7 3 2 1 25 3 0 30 3 5 TOW I N G S Y S T E M S R O A D 50' R/W (PUBLIC STREET) ROADWAY PROFILE 9+50 TO 23+00 TOWING SYSTEMS 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C5 . 3 P R O l 6. 1 4 . 2 0 2 4 1 0 : 5 1 : 1 5 A M HORIZONTAL: 1"=60' VERTICAL: 1"=6' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER ROAD B PROFILE PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE C-5.3 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 18 22 17 20 20 18 20 22 23 24 23 22 21 19 21 21 2 3 25 27 28 27 2 5 2 3 2 119 1 7 15 14 1 3 13 1 9 4 20 1716 17 13 19 17 16 15 14 13 11 10 11 13 11 20 2 1 20 19 20 19 18 17 1 5 14 1 3 17 18 18 19 13 14 13 12 17 18 19 20 19 17 15 3 15 16 17 3 3 3 1 2 9 15 23 25 3 10 5 12 14 16 18 2022 2426 28 31 2 2 3 5 6 15 10 5 3 TOWING SY S T E M S R O A D 50' R/W (PUBLIC STREET) ROADWAY PROFILE 23+00 TO 34+00 TOWING SYSTEMS 50' R/W (PUBLIC STREET) ROADWAY PROFILE -0+50 TO 2+00 MH 23 TO EX MH 5 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C5 . 4 P R O l 6. 1 4 . 2 0 2 4 1 0 : 5 1 : 2 8 A M HORIZONTAL: 1"=60' VERTICAL: 1"=6' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER ROAD B & SEWER PROFILE PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE C-5.4 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4 D S IT E S O L U T IO N S N C G R I D N A D 8 3 ( 2 0 1 1 ) 4 D SIT E S O L UT IONS NC G R I D N A D 8 3 ( 2 0 1 1 ) 28 2 0 27 2 0 2 2 2 0 20 25 23 25 22 19 21 16 1 71 81 9 29 27 26 25 24 23 27 23 21 2 9 3 0 26 2 2 2 3 23 22 1 9 2 0 2 1 18 17 16 1 5 20 21 26 252423 21 2 1 2 2 2 3 2 4 2 5 2 0 20 25 3 0 2 3 20 15 17 19 1 3 1 5 1 7 1 9 21 2 2 EAST VITAMIN DRIVE 50' R/W (PUBLIC STREET) ROADWAY PROFILE 9+00 TO 20+50 EAST VITAMIN WATER MAIN -0+50 TO 1+50 WATER TIE @ HWY 421 16 14 19 2 0 1 8 1 7 18 1 6 1 7 1 8 1 6 18 1 8 16 18 US 4 2 1 PH I L L I P S C E N T E R L O O P 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C5 . 5 P R O l 6. 1 4 . 2 0 2 4 1 0 : 5 1 : 4 1 A M HORIZONTAL: 1"=60' VERTICAL: 1"=6' SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER ROADWAY AND WATER TIE PROFILES PHILLIPS CENTER OF WILMINGTON REVISIONS DRAWING SCALE C-5.5 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 4 D S I T E S O L U T I O NS NC G R I D N A D 8 3 ( 2 0 1 1 ) 4 D S I T E S O L U T I O NS NC G R I D N A D 8 3 ( 2 0 1 1 ) 1 4 6 10 11 7 2 3 5 8 9 1312 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C6 . 0 D E T l 6. 1 4 . 2 0 2 4 1 0 : 4 5 : 5 9 A M NOT TO SCALE SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER SITE & EROSION CONTROL DETAILS PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-6.0 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 24" CONCRETE BAND NTS PRELIMINARY VERIFY WITH GEOTECH ROADWAY TYPICAL SECTION (WITH DITCH) NTS GENERAL EROSION AND SEDIMENT CONTROL NOTES 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS, STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF-PRODUCING EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON-PAVED AREA. 13. WHEN CROSSING CREEK OR DRAINAGE-WAY, THE CONTRACTOR SHALL RIP-RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) GERMAN MILLET 40 A SMALL-STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. SEEDING DATES: MAY 1 - AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 SEEDING DATES: AUGUST 15 - DECEMBER 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 ANNUAL KOBE LESPEDEZA 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE. SEEDING DATES: JANUARY 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING SPECIFICATIONS TYPICAL RIP RAP DISSIPATER NTS SECTION A-A PLAN PERMANENT SEEDING SPECIFICATIONS SEEDING SPECIFICATIONS SEEDING MIXTURES: SPECIES RATE (LBS./ACRE) TALL FESCUE 80 PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES: 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. NURSE PLANTS: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN). SEEDING DATES: BEST POSSIBLE EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30 FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR TOP DRESS WITH 500 LB./ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SEEDING SPECIFICATIONS SEEDING MIXTURE: SPECIES RATE (LB./ACRE) COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FT²) SEEDING DATES: COASTAL PLAIN: APR. - JULY SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB./ACRE 10-10-10 FERTILIZER. MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN. MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. TEMPORARY DIVERSION KEY NOTES: 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE FOR LESS THAN 30 DAYS. TEMPORARY DIVERSION BERM NTS SILT FENCE A A #9 WIRE STAPLES 1-1/2" LONG MIN. 12-1/2 GA. LINE WIRES MIN. 12-1/2 GA STAY WIRES MIN. 10 GA. WIRE TOP & BOTTOM STRAND ATTACH WIRE FENCE TO POSTS AND EXTENDDRIVE STEEL POSTS 18" INTO THE GROUND STEP 2 FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. FIRMLY TO ANCHOR THE BOTTOM OF THE SILT BACKFILL THE TRENCH AND COMPACT THE SOIL EXCAVATED TRENCH AND TURNED OUT THE BOTTOM OF THE FENCE 8" INTO THE STEP 4 EXCAVATED TRENCH & TURNED BOTTOM OF WIRE FENCE AND FILTER FABRIC BURIED 8" IN WIRE FENCE "HOG WIRE" FILTER FABRIC POSTS MAX 8' O.C. STEP 1 STEP 3 EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE TRENCH AND TURNED OUT 4" IN THE TRENCH. ATTACH THE FILTER FABRIC TO THE WIRE FENCE, TRENCH UPHILL ALONG THE LINE OF POSTS. MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8" FLOW SECTION A-A STEEL POST DRIVEN 24" INTO GROUND HE I G H T M A X 1 8 " STEEL POSTS OUT 4" IN THE TRENCH 4" IN THE TRENCH. NOTES: 1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH AND SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH #9 WIRE STAPLES 1-1/2" LONG. FABRIC THAT DETERIORATES TO SUCH EXTENT THAT IT'S EFFECTIVENESS IS REDUCED SHALL BE REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. 3. STEEL POSTS SHALL BE A MIN. OF 5' HEIGHT AND SHALL BE THE SELF FASTENER ANGLE STEEL TYPE. 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK AND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARY REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF THE DEVICE SHALL BE MADE IMMEDIATELY. 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE PRESSURE ON THE FENCE AS NEEDED. 5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS STABLE. MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. NTS MAINTENANCE MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL 2-3" COURSE MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. REQUIRED FOR STAGING AND/OR BORROW AREAS AND CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS PUB L I C R O A D 6" MIN. THICKNESS ACCEPTANCE. 12' m i n . 50' mi n . 6" AGGREGATE SIZE - USE 2-3 INCH WASHED STONE WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS POINTS OF THE VEHICULAR ENTRANCE AND EXIT LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL GRAVEL CONSTRUCTION ENTRANCE DIMENSION OF GRAVEL PAD THICKNESS - 6 INCHES MINIMUM AREA, WHICHEVER IS GREATER LENGTH - 50 FT. MINIMUM. WITH 20 FOOT RADIUS AT EXISTING IN LENGTH AND 12 FEET IN WIDTH GRAVEL ENTRANCE SHALL BE 50 FEET DESIGN CRITERIA FILTER FABRIC ROADWAY 36'-0" MIN 2-3" WASHED STONE 4'-0"10'-0" AGGREGATE TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NTS CHECK DAM WITH WEIR NTS SECTION A-A MAINTENANCE 1. INSPECT THE CHECK DAMS AFTER EACH RAINFALL BUT IN NO CASE LESS THAN ONCE PER WEEK 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. TAKE CARE TO AVOID UNDERMINING THE DAM DURING CLEANOUT. 3. CLEAN OR REPLACE THE STONE WHEN IT SHOWS SIGNS OF CLOGGING OR OTHERWISE DOES NOT PERFORM CORRECTLY 4. WEIR SECTION MUST BE 9" LOWER THAN ABUTMENTS 5. DOWNSTREAM APRON LENGTH SHOULD BE 3 TIMES THE HEIGHT OF THE WEIR. ROCK PIPE INLET PROTECTION NTS FLO W FLO W FL O W #57 WASHED STONE 1' THICK X 3' HIGH MIN. CLASS 1 RIP RAP HEADWALL CLASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE AREA OF ALL DEBRIS. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI-CIRCLE AROUND THE PIPE INLET. 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE HORSESHOE 18" BELOW NATURAL GRADE. 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT, AND STABILIZE WITH GROUND COVER. SEDIMENT STORAGE FLOOD STORAGE ZONE PIPE INVERT RIP RAP HEADWALL NATURAL GROUND FILTER FABRIC MAX. SEDIMENT DEPTH (CLEAN OUT POINT) #57 WASHED STONE CLASS 1 RIP-RAP SECTION THRU BASIN, FILTER, & CULVERT PIPE NOT TO SCALE SEDIMENT STORAGE AREA PERSPECTIVE VIEW NOT TO SCALE FLOW FLOW MAINTENANCE: INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. GROUND STABILIZATION CHART NTS HEAVY DUTY PAVEMENT NTS 1 8 9 2 3 54 6 7 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C6 . 1 D E T l 6. 1 4 . 2 0 2 4 1 0 : 4 6 : 0 4 A M NOT TO SCALE SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER EROSION CONTROL DETAILS PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-6.1 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 BOTTOM OF FABRIC BURIED 8" IN EXCAVATED TRENCH & TURNED OUT 4" IN THE TRENCH, OR PINNED WITH 8" EROSION CONTROL MATTING STAPLES. SUPPORT WIRE OR ROPE BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. THE TOP OF THE FABRIC SHALL BE 6" HIGHER THAN THE WEIR. ATTACH THE JUTE NETTING OR OTHER FABRIC APPROVED BY THE ENGINEER TO THE STAY WIRE AND POSTS, EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE TRENCH AND TURNED OUT 4" IN THE TRENCH OR USE 8" EROSION CONTROL MATTING STAPLES. ATTACH WIRE FENCE TO POSTS AND EXTEND THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH AND TURNED OUT 4" IN THE TRENCH. DRIVE POSTS 24" INTO THE GROUND MAXIMUM 4' O.C. AND EXCAVATE A 4" X 8" TRENCH UPHILL ALONG THE LINE OF POSTS. NOTES: 1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL 2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN. BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN. 3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECE ACCROSS THE BASIN OR TRAP. 4. POSTS FOR THE BAFFLES SHALL BE 4' OC. MAINTENANCE 1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT IN NO CASE LESS THAN ONCE PER WEEK AND AFTER EACH RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY. 2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASURE REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THE BAFFLES WHEN THE SEDIMENT IS REMOVED. 3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS STABLE. 4. PLACEMENT OF BAFFLES: INLET ZONE- 35% OF LENGTH FROM ENTRY POINT FIRST CELL - 25% OF LENGTH FROM INLET ZONE SECOND CELL - 25% OF LENGTH FROM FIRST CELL OUTLET ZONE - 15% OF LENGTH FROM SECOND CELL STEEL POSTS HE I G H T M A X 1 8 " 24" INTO GROUND STEEL POST DRIVEN SECTION A-A FLOW STEP 3 STEP 1 POSTS MAX 4' O.C. JUTE NETTING OR EQUIVILENT TOP STAY WIRE OR ROPE STEP 4 STEP 2 A A PERSPECTIVE VIEW POROUS BAFFLES NTS 4.00' [1.22M] 4.00' [1.22M] 2.00' [0.61M] 8.00' [2.44M] 4.00' [1.22M]3.00' [0.91M] 3.00' [0.91M] 1.50' [0.46M] 2.00' [0.61M] 4.00' [1.22M] 2.00' [0.61M] 2.00' [0.61M] 4.00' [1.22M] 1.00' [0.30M] 2.00' [0.61M] 1.50' [0.46M] 3.00' [0.91M] 1.50' [0.46M] 2.00' [0.61M] 4.00' [1.22M]1.00' [0.30M] 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) 1.3 STAPLES PER SQ. YD. (1.5 STAPLES PER SQ. M) 1.7 STAPLES PER SQ. YD. (2.0 STAPLES PER SQ. M) 3.4 STAPLES PER SQ. YD. (4.1 STAPLES PER SQ. M) 3.6 STAPLES PER SQ. YD. (4.3 STAPLES PER SQ. M) STAPLE PATTERN FOR 8' ROLLS NTS EROSION CONTROL BLANKET INSTALLATION NTS MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE REINSTALLED. 1 3B 3A 4 5 2 FAIRCLOTH SKIMMER NTS SILT FENCE OUTLET NTS SECTION VIEW MAINTENANCE NOTES: 1. REMOVE THE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE/OUTLET. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE & REPLACE STONE AS NECESSARY AS IT BECOMES CLOGGED WITH SEDIMENT. 2. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. FRONT VIEW NOTES: 1. INSTALL SILT FENCE PER STD. SILT FENCE DETAIL. 2. LOCATE REINFORCED OUTLET AT LOW POINTS OF SILT FENCE BARRIER. 3. PLACE RIP RAP WITH CARE. DO NOT TEAR SILT FENCE FABRIC. TYPICAL SWALE CROSS SECTION NTS GRASSED OR RIP RAP LINED SWALE MAINTENANCE & CONSTRUCTION: 1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS. 3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE. 4. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES. CONSTRUCTION SPECIFICATIONS: 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. 2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY. MAINTENANCE INSPECT TEMPORARY SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE RISER AND POOL AREA. TEMPORARY SEDIMENT BASIN NTS CONSTRUCTION SPECIFICATIONS 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. DELAY CLEARING THE POOL AREA UNTIL THE DAM IS COMPLETE AND THEN REMOVE BRUSH, TREES, AND OTHER OBJECTIONABLE MATERIALS TO FACILITATE SEDIMENT CLEANOUT. STOCKPILE ALL TOPSOIL OR SOIL CONTAINING ORGANIC MATTER FOR USE ON THE OUTER SHELL OF THE EMBANKMENT TO FACILITATE VEGETATIVE ESTABLISHMENT. PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. EXCAVATE CUT-0FF TRENCH ALONG THE CENTER LINE OF THE EARTH FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL, BUT IN NO CASE MAKE IT LESS THAN 2 FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. MAKE THE MINIMUM BOTTOM WIDTH WIDE ENOUGH TO PERMIT OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT, BUT IN NO CASE LESS THAN 2 FEET. MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. COMPACTION REQUIREMENTS ARE THE SAME AS THOSE FOR THE EMBANKMENT. KEEP THE TRENCH DRY DURING BACKFILLING AND COMPACTION OPERATIONS. 3. EMBANKMENT - TAKE FILL MATERIAL FROM THE APPROVED AREAS SHOWN ON THE PLANS. IT SHOULD BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL. SCARIFY AREAS ON WHICH FILL IS TO BE PLACED BEFORE PLACING FILL. THE FILL MATERIAL MUST CONTAIN SUFFICIENT MOISTURE SO IT CAN BE FORMED BY HAND INTO A BALL WITHOUT CRUMBLING. IF WATER CAN BE SQUEEZED OUT OF THE BALL, IT IS TOO WET FOR PROPER COMPACTION. PLACE FILL MATERIAL IN 6 TO 8 INCH CONTINUOUS LAYERS OVER THE ENTIRE LENGTH OF THE FILL AREA AND COMPACT IT. COMPACTION MAY BE OBTAINED BY ROUTING THE CONSTRUCTION HAULING EQUIPMENT OVER THE FILL SO THAT THE ENTIRE SURFACE OF EACH LAYER IS TRAVERSED BY AT LEAST ONE WHEEL OR TREAD TRACK OF HEAVY EQUIPMENT, OR A COMPACTOR MAY BE USED. CONSTRUCT THE EMBANKMENT TO AN ELEVATION 10% HIGHER THAN THE DESIGN HEIGHT TO ALLOW FOR SETTLING. 4. SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATERTIGHT STRUCTURAL CONNECTION. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. PLACE THE BARREL AND RISER ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, OR CRUSHED STONE AS BACKFILL AROUND THE PIPE OR ANTISEEP COLLARS. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS, AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETE OR OTHER SATISFACTORY MEANS TO PREVENT FLOTATION. IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 5. INSTALL THE EMERGENCY SPILLWAY IN UNDISTURBED SOIL. THE ACHIEVEMENT OF PLANNED ELEVATIONS, GRADE, DESIGN WIDTH, AND ENTRANCE AND EXIT CHANNEL SLOPES ARE CRITICAL TO THE SUCCESSFUL OPERATION OF THE EMERGENCY SPILLWAY. 6. DISCHARGE THE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT-LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE TRAP EFFICIENCY. 7. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. 8. INSTALL POROUS BAFFLES AS SPECIFIED. 9. AVOID STEEP SIDE SLOPES, AND FENCE AND MARK BASINS WITH WARNING SIGNS IF TRESPASSING IS LIKELY. FOLLOW ALL STATE AND LOCAL REQUIREMENTS. NOTES 1. SEED AND PLACE MATITNG FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT 1 FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT CONTROLS. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE-ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF THE SKIMMER IS NOT CLOGGED; IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE SKIMMER AND POOL AREAS. TEMPORARY SKIMMER BASIN CONSTRUCTION SPECIFICATIONS 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, WOOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL IN LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT. OVER FILL THE EMBANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS. 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. 7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8 INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER THE FABRIC. 8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. 9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. 10. INSTALL POROUS BAFFLES AS SPECIFIED. 11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. NTS EROSION CONTROL BLANKET INSTALLATION NTS MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE REINSTALLED. 1. 6. 7. 2. 5. 4.8. 3. I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C6 . 2 D E T l 6. 1 4 . 2 0 2 4 1 0 : 4 6 : 1 1 A M NOT TO SCALE SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER WATER & SEWER DETAILS PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-6.2 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024 I: \ P h i l l i p ' s L e a s i n g S y s t e m s \ 1 5 0 1 W i l m i n g t o n M a s t e r p l a n \ C I V I L 3 D \ D W G \ 1 5 0 1 - D E S I G N . d w g l C6 . 3 D E T l 6. 1 4 . 2 0 2 4 1 0 : 4 6 : 1 7 A M NOT TO SCALE SEAL 027452 N O R T H CAROL I N A PR O F E SSIO N A L C . SCOTT B R O W NENGINEER WATER DETAILS PHILLIPS CENTER OF WILMINGTON 327 Alexander Street Fayetteville, North Carolina 28301 Phone: (910) 323-9600 Fax: (910) 485-1035 REVISIONS DRAWING SCALE C-6.3 SHEET NUMBER PROJECT NAME CLIENT PROJECT INFORMATION SEAN/CHRIS SEAN/CHRIS SCOTT 1501 DATE RELEASED DESIGNED BY: DRAWN BY: CHECKED BY: PROJECT NUMBER: JUNE 13, 2024