Coastal Millwork Supply Co. – 4100 Logistics Road – TRC Review
Page | 1
To: Brad Schuler, Paramounte Engineering, Inc. – bschuler@paramounte-eng.com
Jeremy Blair, Paramounte Engineering, Inc. – jblair@paramounte-eng.com
From: Love Ott – Development Review Planner
Date: May 1st TRC Review
PID#: R02600-002-017-000
Egov# SITECN-24-000008
Subject: 4100 Logistics Road – Coastal Millwork TRC Review
The following comments have been received for the May 1st, 2024, TRC meeting. Additional comments
may be made upon further review of subsequent revisions.
Please note: following the TRC meeting, a revised preliminary plan addressing each of the below items
must be resubmitted prior to receiving preliminary plan approval.
Planning, Love Ott 910-798-7444
1. General Comments
a. Please include the height and material of the retaining wall for screening the dumpster
area.
2. UDO Section 5.1, Parking and Offstreet Loading
a. Please provide a parking demand study for the reduction of parking spaces. A study was
not provided in the packet submitted.
3. UDO Section 5.2, Traffic, Access and Connectivity
a. Please confirm Logistics Road as public or private. NCDOT’s map shows the road as a
private right-of-way.
4. UDO Section 5.3, Tree Retention
a. For the trees planned to be removed, please submit a tree removal permit.
b. Link to permit here: https://www.nhcgov.com/DocumentCenter/View/1239/Tree-
Removal-Permit-PDF
5. UDO Section 5.4, Landscaping and Buffering
a. Please include landscape plan, one was not provided in the packet submitted. A
landscape plan is required prior to TRC approval.
Coastal Millwork Supply Co. – 4100 Logistics Road – TRC Review
Page | 2
6. UDO Section 5.5, Lighting
a. Is any lighting proposed for this development?
b. Please note a lighting plan is not required at time of TRC approval. See below excerpt from
Section 5.5.3:
i. Information about the exterior lighting for the site that demonstrates compliance
with the standards in this section shall be submitted in conjunction with an
application for site plan approval (Section 10.3.6, Site Plan) or zoning compliance
approval (Section 10.3.8, Zoning Compliance Approval), whichever comes first,
approved no later than at time of construction plan approval.
7. UDO Section 5.6, Signs
a. If there are any new signs proposed for this development, please apply for sign permits
prior to installation.
8. UDO Section 5.7, Conservation Resources
a. Per the New Hanover County Conservation Resource Overlay map, there are no
Conservation Resources on this portion of the site.
NHC Fire Services, Ray Griswold 910-798-7448
1. Building based on size and use requires 4 fire hydrants. You show one on the street. Not sure
where the rest of the street hydrants are going to be located, due to the fact this site is still
under development.
2. Require one on the far back corner of the driveway system.
3. One just left of the loading dock on the outskirts of the driveway system.
4. If one is not near the back driveway entrance, add one there on the Blue Clay side of the
entrance. Need one within 400 feet of that entrance. Check with CFPUA
5. Will High Piled Storage be used???
NHC Engineering, Galen Jamison 910-798-7072
1. A stormwater permit revision to STMW-22-0031 will be required. The permit review will be for
the County’s 25 year conveyance requirements.
2. A land disturbing permit issued by the County is required for this project. Please submit the
permit applications documentation with requisite review fees for County issued permit directly
to gjamison@nhcgov.com. Application and forms can be found at
https://www.nhcgov.com/249/Sediment-Erosion-Control.
3. All offsite roadway improvements identified in the business park’s TIA much be completed prior
to issuance of a CO.
NHC Environmental Health, Dustin Fenske 910-798-6732
1. Site Plan reflects connection to public sewer. Project infrastructure does not violate setbacks to
any surrounding properties septic systems.
NHC Addressing, Katherine May 910-798-7443
1. No Comments
Coastal Millwork Supply Co. – 4100 Logistics Road – TRC Review
Page | 3
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
1. CFPUA TRC Comments provided are preliminary comments only.
2. Utility Plan review required by CFPUA. CFPUA is moving toward becoming paperless. When
ready to submit plan review package, upload all documents to
https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103.
3. CFPUA water available through mainline extensions. No CFPUA sewer within 500’.
NCDOT, Nick Drees 910-343-3915
1. See attached appendix.
WMPO, Jamar Johnson 910-473-5130
1. See attached appendix.
Army Corps of Engineers, Brad Shaver 910-251-4611
1. Part of the County’s industrial park, and the Corps has already issued a permit for the park.
Provided the activity is not in conflict with the issued permit to the County there should be no
issue.
2. The Corps Action ID is SAW-2019-00891.