HomeMy WebLinkAbout01-Gordon Road Fire Station Stormwater Comment ResponseJuly 8, 2024 Timmons Group William Altman, PE 5410 Trinity Road, Suite 102 Raleigh, NC 27607 RE: Gordon Road Fire Station – Request for Additional Information Dear Will Altman: We have reviewed the permit application and submittal package for the above referenced project and offer comments requesting additional information that can be found in the summary of markups report from Bluebeam attached below. Please provide comment responses to each mark up in PDF with the resubmission. Please send, as individual PDF files, the comment responses, consolidated plans and narrative report from native PDF digitally with the resubmission. Please note, comments indicate as recommended or suggested are intended for the designer’s consideration and will have no bearing on the issuance of the stormwater permit. Please be advised, the area of disturbance will need a separate Sedimentation & Erosion Control Permit and a stormwater permit issued by the NC Department of Environmental Quality will also be required. If you have any questions regarding the foregoing information, please contact our office. Sincerely, Galen M Jamison, PE Chief Project Engineer New Hanover County Gordon Road Fire Station Plans 6-21-24_v1.pdf Markup Summary Subject: Text Box Page Label: [1] C0.0 COVERSHEET Author: gjamison Date: 7/5/2024 11:28:18 AM Status: Color: Layer: Space: Section 2.4.2 - missing certifications gjamison (17) Subject: Callout Page Label: [1] C1.0 EXISTING CONDITIONS Author: gjamison Date: 7/5/2024 11:32:02 AM Status: Color: Layer: Space: Table 2-4, item 4. are wetlands present? Indicate if not or add delineation to to plans. Subject: Callout Page Label: [1] C3.0 SITE PLAN Author: gjamison Date: 7/5/2024 11:34:44 AM Status: Color: Layer: Space: R series plans missing from set. include with resubmission Subject: Callout Page Label: [1] C3.0 SITE PLAN Author: gjamison Date: 7/5/2024 12:07:03 PM Status: Color: Layer: Space: doesn't match C4.3, please clarify Subject: Callout Page Label: [1] C4.0 GRADING PLAN Author: gjamison Date: 7/5/2024 11:41:19 AM Status: Color: Layer: Space: Suggestion: Roof drain connections to the storm sewer system results in a change of flow direction greater than 90 degrees. Reconfiguration of the roof/storm system is recommended to avoid this situation. Subject: Callout Page Label: [1] C4.0 GRADING PLAN Author: gjamison Date: 7/5/2024 11:54:42 AM Status: Color: Layer: Space: end treatments in ROW shall be NCDOT std parallel or cross pipe end sections. PROTECTED OR IF RELOCATION IS NEEDED IT WILL BE THE RESPONSIBILITY THE DEVELOPER TO RELOCATE IT WITH SURVEY ACCURACY.ALL NEW UTILITY LINES (POWER, CABLE, ETC.) MUST BE UNDERGROUND Section 2.4.2 - missing certifications W UNDERGROUND OR OVERHEAD CONTAIN THAT MAY AFFECT THE USE OR DEVELO 7.THE EXISTENCE OR NONEXISTENCE OF PROPERTY HAS NOT BEEN DETERMINED 8.SUBJECT TO TALL EASEMENTS, RIGHT O ENCUMBRANCES THAT MAY EFFECT THI D 8 3 Table 2-4, item 4. are wetlands present?Indicate if not or add delineation to toplans. RIES FORLANS R30' STO R series plans missing from set.include withresubmission SITE DATA TABLE PID:R04300-008-346-000 TOTAL SITE AREA:2.77 AC DISTURBED AREA 5.85 AC ZONING:R-15 RESIDENTIAL DIST WATERSHED:SMITH CREEK RIVER BASIN CAPE FEAR PROPOSED IMPERVIOUS ONSITE: 1.22 ACDRIVEWAY TO SITE: 0.5 MAXIMUM BUILDING HEIGHT:40' PROPOSED BUILDING HEIGHT 39' 11" MINIMUM BUILDING SETBACK FRONT: 25'SIDE (STREET): 15SIDE (INTERIOR): 10REAR: 20' PROVIDED BUILDING SETBACK FRONT: 25'SIDE: 20'REAR: 20'MINIMUM LANDSCAPEBUFFERS 10' TOTAL BUILDING FOOTPRINTAREA 14,461 SQFT PARKING REQUIREMENTS 20' SETBACK 7.NO SIGHT OBSTRUCTING OR PARTIALLY OBST FENCE, FOLIAGE, BERM, SIGN, PARKED VEHIC OBJECTS BETWEEN THE HEIGHTS OF TWO FE FEET ABOVE THE CURB LINE ELEVATION (OR T PAVEMENT IF NO CURB EXISTS) SHALL BE PLA SIGHT DISTANCE TRIANGLE.8.LOCATION OF STREET TREES & STREET LIGHT FIELD COORDINATED TO ELIMINATE CONFLICT doesn't match C4.3,please clarify WWW CB 1 484548 46 Suggestion: Roof drain connections to the stormsewer system results in a change of flow directiongreater than 90 degrees. Reconfiguration of theroof/storm system is recommended to avoid thissituation. REFER TO R-SERIES FORDRIVEWAY PLANS WW W W 40 41 43 46 4443 4244 47 REFER TO R-SERIES FORDRIVEWAY PLANS RIP RAP(RR-3) end treatments in ROW shall beNCDOT std parallel or cross pipe end sections. Subject: Text Box Page Label: [1] C4.0 GRADING PLAN Author: gjamison Date: 7/5/2024 11:56:30 AM Status: Color: Layer: Space: It is recommended additional spot elevations be added to the grading plan to indicate changes in grade, transition from catch to spill curb and edge of hard surfaces (parking lots, dumpster pads, along ADA complaint paths, between buildings, etc) to assist the grading contractor with ensuring all impervious areas are directed to the ponds. Subject: Area Measurement Page Label: [1] C4.0 GRADING PLAN Author: gjamison Date: 7/5/2024 1:42:48 PM Status: Color: Layer: Space: 5,926.31 sf Subject: Callout Page Label: [1] C4.0 GRADING PLAN Author: gjamison Date: 7/5/2024 2:05:18 PM Status: Color: Layer: Space: NCDOT min, RR-3 and 4 details indicate 12". Verify with DOT min pipe size. Subject: Callout Page Label: [1] C4.0 GRADING PLAN Author: gjamison Date: 7/5/2024 2:06:40 PM Status: Color: Layer: Space: pipe missing Subject: Callout Page Label: [1] C4.2 SCM DETAILS Author: gjamison Date: 7/5/2024 1:19:08 PM Status: Color: Layer: Space: Section 4.4.2, min pipe size is 15" Subject: Callout Page Label: [1] C4.2 SCM DETAILS Author: gjamison Date: 7/5/2024 1:46:37 PM Status: Color: Layer: Space: provide planting plan or specify sod type BY THE EROSION CONTROL INSPECTOR OR THE ENGINEER.16.THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR OFF-SITE DISPOSAL OF A CLEARING AND GRADING WASTE MATERIALS GENERATED DURING CONSTRUCTION OBTAINING ALL APPLICABLE PERMITS FOR OFF-SITE STOCKPILES AND/OR WASTE A 17.ALL CATCH BASINS MUST BE MARKED "DUMP NO WASTE DRAINS TO STREAM" OREQUIVALENT. It is recommended additional spot elevations be added to thegrading plan to indicate changes in grade, transition fromcatch to spill curb and edge of hard surfaces (parking lots,dumpster pads, along ADA complaint paths, betweenbuildings, etc) to assist the grading contractor with ensuring allimpervious areas are directed to the ponds. PROPOSED BUILDING14,461 SF WW W W W W W WW SAN CB 2 DI 1 CB 1 CB 4 CB 5 DI 2 FFE: 49.50 DOWNSPOUT NOTES1.TIE ALL DOWNSPOUTS UNDERGROUND WITH BOOTAND CLEANOUT 2' BELOW FFE2.ALL ROOF DRAINS SHALL BE 6" PVC PIPE @ 1.04%MIN SLOPE UNLESS OTHERWISE SPECIFIED3.CLEANOUTS TO BE ADDED EVERY 100' ON ALL ROOFDRAINS4.REFER TO PLUMBING PLANS. TIE ALL ROOF DRAINS,FLOOR DRAINS, AND DOWNSPOUTS TO CLOSESTOUTLET 5 46 4748 48 48 47 43 46 45 44 43 44 45 46 48 4848 48 49 49 49 48 48 49 48 47 46 45 44 4341 4347 44 BIO-RETENTION (3) 6" PERFORATEDUNDER DRAINS(REFER TO BIORETENTION DETAIL) RISER RIP RAP(RR-2) RIP RAP (RR-1) TOP OF DAM46.50 GENERAL NOTE 9.A PRE-CONSTRUCTION MEETING MUST BE SCHEDUL INSTALLATION OF EROSION CONTROL MEASURES.10.ALL HANDICAP PARKING SPACES AND STRIPED ACCE MORE THAN A 1:50 (2.0%) SLOPE IN ALL DIRECTIONS. THAN A 1:20 (5.0%) SLOPE FOR THE LENGTH OF THE S (2.0%) SLOPE FOR THE WIDTH OF THE SIDEWALK.11.CONTRACTOR TO IDENTIFY ALL NECESSARY SPILL C TO ENSURE POSITIVE DRAINAGE TO STORM STRUCT 12.IF CONTRACTOR NOTICES ANY DISCREPANCIES IN AN IS THE CONTRACTOR'S RESPONSIBILITY TO CONTAC CONCRETE SO THAT A SOLUTION CAN BE FOUND.13.SPOT ELEVATIONS ARE GIVEN AT THE MAJORITY OF SHOULD NOT BE ASSUMED THAT ALL NECESSARY SP SPACE LIMITATIONS, THERE MAY BE OTHER CRITICA TAKEN INTO CONSIDERATION. THE CONTRACTOR SH DETAIL AND SHALL ENSURE THAT ALL CRITICAL GRAD TO PROVIDE POSITIVE DRAINAGE.14.EXISTING VEGETATION WITHIN TREE PROTECTIVE AR UNLESS NOTED OTHERWISE. ANY AND ALL LANDSCA TO REMAIN WHICH ARE DAMAGED DURING DEMOLITI REPLACED BY THE CONTRACTOR USING A LICENSED ADDITIONAL COST TO THE OWNER.15.THE GRADING CONTRACTOR SHALL COMPLY WITH A EROSION CONTROL MEASURES BOTH ON AND OFF-S MAINTAIN ALL EROSION CONTROL DEVICES AFTER E BY THE EROSION CONTROL INSPECTOR OR THE ENG 16.THE GRADING CONTRACTOR SHALL BE RESPONSIBL CLEARING AND GRADING WASTE MATERIALS GENER OBTAINING ALL APPLICABLE PERMITS FOR OFF-SITE 17.ALL CATCH BASINS MUST BE MARKED "DUMP NO WA EQUIVALENT. 5,926.3 sf REFER TO R-SERIES FORDRIVEWAY PLANS WW WWW DI 1 CB 1 4041 43 46 44434244 47 REFER TO R-SERIES FORDRIVEWAY PLANS RIP RAP(RR-3) NCDOT min, RR-3and 4 details indicate12". Verify with DOTmin pipe size. 2 44 43 46 48 4848 45 44 43 41 4347 BIO-RETENTION RISER RIP RAP(RR-2) TOP OF DAM46.50 pipe missing 10" Ø O-RING RCP FLOW INV. SEE PROFILE SHEET 5.0' W X 5.0' L X 2.00' HCONCRETE ANTI-FLOTATION BALLAST WRAP OUTSIDE OF PIPE JOINTS WITHDOUBLE LAYER OF NON-WOVENGEOTEXTILE FILTER, COVER 2 FT. OFPIPE CENTERED ON JOINT. PVC TEE WITH WATER-TIGHTSCREW-ON CAP Section 4.4.2, min pipe size is 15" 30" OF BIORETENTION MEDIASEE SPECIFICATION DO NOT DRIVE HEAVY EQUIPMENT OVERBIORETENTION. DO NOT MECHANICALLYCOMPACT THE BIORETENTION MEDIA. DONOT WATER OR WALK ON THE MEDIA AS ITIS PLACED. WATER-TIGHT CLEANOUT WITHWATER-TIGHT SCREW-ON CAPELEVATED 27" MIN. ABOVE GRADE ETENTION MEDIA ELEV = 43.00 100 YEAR WSE = 45.88 RADE provide planting planor specify sod type Subject: Callout Page Label: [1] C4.3 SW COMPLIANCE PLAN Author: gjamison Date: 7/5/2024 12:06:51 PM Status: Color: Layer: Space: doesn't match C3.0, please clarify Subject: Callout Page Label: [1] C5.6 NOTES AND DETAILS Author: gjamison Date: 7/5/2024 12:01:19 PM Status: Color: Layer: Space: air gap recommended Subject: Callout Page Label: [1] C5.7 NOTES AND DETAILS Author: gjamison Date: 7/5/2024 12:02:34 PM Status: Color: Layer: Space: please clarify Subject: Callout Page Label: [1] C5.10 NOTES AND DETAILS Author: gjamison Date: 7/5/2024 2:04:35 PM Status: Color: Layer: Space: min pipe size is 15" Subject: Callout Page Label: [1] L1.0 PLANTING PLAN Author: gjamison Date: 7/5/2024 11:27:09 AM Status: Color: Layer: Space: inlet within trip line isn't recommended PRE DEVELOPMENT ONSITE IMPERVIOUS SURFACES = 0.00 ACRES POST DEVELOPMENT ONSITE IMPERVIOUS SURFACES = 1.28 ACRES POST DEVELOPMENT OFFSITE IMPERVIOUS SURFACES = 0.50 ACRES POST DEVELOPMENT FUTURE OFFSITE IMPERVIOUS SURFACES = 0.18 ACRE IMPERVIOUS AREA BEING TREATED BY BIORETENTION CELL = 1.19 ACRES STORMWATER QUALITY CALCULATIONS ANALYSIS POINT A DRAINAGEAREA(Acres)(CN) PRE-DEVELOPMENT 1.11 Q1 66 POST-DEVELOPMENTA1 (BIO RETENTION)1.93 84POST-DEVELOPMENTA2 (BYPASS)POST-DEVELOPMENTA (COMBINED) 0.85 69 2.78 Q2 Q10 Q25 Q100 1.85 7.23 0.23 0.23 2.84 9.49 0.43 0.43 6.39 16.71 1.23 5.14 9.22 21.86 1.88 6.17 14.88 31.68 3.26 18.24 doesn't match C3.0,please clarify air gap recommended I.E., TREATMENT WITH ONCRETE, ETC.) MAY BE IN THE SCM'S STAN TOP OF RISER EL. = 237.75 5 12" SIDE RECTANGULAR WEIR (WEST) = 237.25 6" SIDE RECTANGULAR WEIR (EAST) = 237.25 please clarify FOUNDATION.4. MAINTAIN ENERGY DISSIPATERS INSTALLEDDURING EARLY SITE WORK THROUGHOUT THECONSTRUCTION AREA.SECTION 'A-A'FILTERFABRIC ERGY DISSIPATER SCHEDULE PIPE SIZEW1 (FT)W2 (FT)LENGTH(FT)THICKNESS(IN). (d)STONECLASSD50 SIZE(IN.) 15"8.8SKIMMER 3.8 7.5 12 3 A RIPRAP OUTLET PROTECTIONNO SCALE 18"10.5RR-1 4.5 9.0 12 3 A18"10.5RR-2 4.5 9.0 12 3 A 12"7.0RR-4 3.0 6.0 12 3 A12"7.0RR-3 3.0 6.0 12 3 A ALL NOTES APPLY TO ALL DRAWINGS AND ALL TRADES. IT IS THE RESPONSIBILITY OF ALL CONTRACTORS A TRADES TO COORDINATE THE INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY ALL OTH CONTRACTORS AND TRADES. THE REQUIREMENTS OF THE DRAWINGS, GENERAL REQUIREMENTS AND ALL I OF THE CONTRACT DOCUMENTS ARE EQUALLY BINDING ON ALL CONTRACTORS AND TRADES. EACHCONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS OF THE CONTRACT DOCUMENTS FOR HIS EMPLOYEES ON THE PROJECT TO ASSURE THAT ALL WORK IS PROPERLY COORDINATED AND INSTALLED WITH THE WOR GENERAL NOTE min pipe size is 15" 48 49 48 47 inlet within trip lineisn't recommended NARR & CALCS 6-21-24_v1.pdf Markup Summary Subject: Callout Page Label: 3 Author: gjamison Date: 7/5/2024 1:22:31 PM Status: Color: Layer: Space: indicate in plan view and how will this impact future development? gjamison (23) Subject: Callout Page Label: 3 Author: gjamison Date: 7/5/2024 1:23:47 PM Status: Color: Layer: Space: C3.0 indicates otherwise Subject: Arrow Page Label: 3 Author: gjamison Date: 7/5/2024 1:23:44 PM Status: Color: Layer: Space: Subject: Callout Page Label: 3 Author: gjamison Date: 7/5/2024 1:24:28 PM Status: Color: Layer: Space: 2 year Subject: Text Box Page Label: 3 Author: gjamison Date: 7/5/2024 1:26:26 PM Status: Color: Layer: Space: Table 2-5, item 11 and 12 are missing from the narrative Subject: Callout Page Label: 3 Author: gjamison Date: 7/5/2024 1:52:16 PM Status: Color: Layer: Space: NRCS Unit hydrograph method used in calcs, please clarify Gordon Road Fire Station Wilmington, NC Project Number: 56398 and Narrative dentification Number: R04300-008-346-000 River Basin: Cape Fear s on-site and off-site: 0.00 Acres Impervious (Onsite): 1.28 Acres Impervious (Offsite): 0.50 Acres vious (Future offsite): 0.18 Acres Disturbance (onsite): 2.77 Acres Disturbance (offsite): 3.08 Acres of Gordon Road and Harris Road in New Hanover County, NC. It contains hat are undeveloped and has no existing impervious surfaces. A driveway is rdon Road. The proposed features include a fire station and associated parking ous areas will be treated with a bioretention cell while the rest will be bypassed. sity area and two low density areas, one of which is offsite. Most of the high-density oretention cell that meets the relevant MDC set forth in rules .1050 through .1062. which 1.19 acres is impervious. The 0.29 acres of drainage area A (0.07 acres of ed by the bioretention cell is bypassed. The low-density drainage area B is 0.44 ous. Low-density drainage area C (offsite) is 3.37 acres, of which 0.5 acres are o be another 0.18 acres of impervious area from the 3.37 acres for future road below the maximum density threshold set forth in the stormwater Rules .1017, .1019, The flow is dispersed using vegetative conveyances and culverts. indicate in plan viewand how will thisimpact futuredevelopment? Section 1: Site Analysis and Narrative Project Data Parcel Identification Number: R04300-008-34 River Basin: Cape Fear Ex. Impervious on-site and off-site: 0.00 Acres Post Project Impervious (Onsite): 1.28 Acres Post Project Impervious (Offsite): 0.50 Acres Post Project Impervious (Future offsite): 0.18 Acres Area of Land Disturbance (onsite): 2.77 Acres Area of Land Disturbance (offsite): 3.08 Acres C3.0 indicatesotherwise Analysis and Narrative Parcel Identification Number: R04300-008-346-00 River Basin: Cape Fear Ex. Impervious on-site and off-site: 0.00 Acres Post Project Impervious (Onsite): 1.28 Acres Post Project Impervious (Offsite): 0.50 Acres Project Impervious (Future offsite): 0.18 Acres ate that the site is not in any flood zones. software, which utilizes Modified Rational of concentration was calculated using TR-55 pment and post-development conditions for the 10-year, 25-year, and 100-year 24-hour mately 1.93 acres, of which 1.19 acres are to the bioretention pond with the assistance of intain similar flow patterns as before with the -development and post-development quantity 2 year pond onsite that captures and treats approximately 1.93 acres, of wh in a way to direct most of the water onsite into the bioretention pond e site and all the offsite work attempts to maintain similar flow patter e bioretention cell is utilized to meet the pre-development and post-d nd state, minimizing flow. Table 2-5, item 11 and 12 are missing from the narrative Calculation Method The hydraulic grade line (HGL) model was performed using Stor methodology. Rainfall data was input based on NOAA’s rainfall d segmented. The rational method was utilized for calculations of including the routing of the bioretention pond. Calculations were storm event. Summary of Results There will be one bioretention pond onsite that captures and trea impervious. The site is graded in a way to direct most of the wat storm pipes while the rest of the site and all the offsite work atte use of ditches and culverts. The bioretention cell is utilized to me requirements for both county and state, minimizing flow. NRCS Unithydrograph method used in calcs, pleaseclarify Subject: Callout Page Label: 4 Author: gjamison Date: 7/5/2024 1:25:34 PM Status: Color: Layer: Space: not shown on C4.3. Please clarify. Subject: Text Box Page Label: 17 Author: gjamison Date: 7/8/2024 7:53:26 AM Status: Color: Layer: Space: provide schematic of subcatchment areas with reaches and reservoir Subject: Callout Page Label: 18 Author: gjamison Date: 7/5/2024 1:55:01 PM Status: Color: Layer: Space: Section 3.6.3, use Type III rainfall disturbtion Subject: Callout Page Label: 26 Author: gjamison Date: 7/5/2024 1:37:57 PM Status: Color: Layer: Space: provide documentation to support this infiltration rate a 2' separation to SHWT provided. Subject: Callout Page Label: 26 Author: gjamison Date: 7/8/2024 7:53:53 AM Status: Color: Layer: Space: DEQ recommended 1 CO/1000 SF, but only 2 shown in section. Please clarify and add locations to plan view Subject: Callout Page Label: 57 Author: gjamison Date: 7/5/2024 1:34:23 PM Status: Color: Layer: Space: Section 5.3.2, 0.5' freeboard not provided to emergency spillway. Please submit a variance request or re-design B ost-Development B 0.75 1.30 3.04 re-Development C 7.77 11.14 22.90 ost-Development C 10.07 13.81 26.22 not shown on C4.3. Please clarify. 000 2 894 0 3 43.92 229 2 718 547 4, 8 ------ provide schematic of subcatchment areas with reaches and reservoir nt A = SCS Runoff Peak discharge = 1.849 cfs= 1 yrs Time to peak = 718 min= 2 min Hyd. volume = 3,768 cuft= 1.110 ac Curve number = 66* = 0.0 % Hydraulic length = 0 ft = User Time of conc. (Tc) = 5.00 min= 3.85 in Distribution = Type II= 24 hrs Shape factor = 484 [(0.820 x 77) + (0.290 x 36)] / 1.110 2.00 Q (cf Pre Analysis Point A Hyd. No. 1 -- 1 Year Section 3.6.3, useType III rainfalldisturbtion [A] [B] [C] [D] ft)= 16.00 20.00 0.00 0.00 )= 44.50 45.50 0.00 0.00 = 3.33 2.60 3.33 3.33 = 1 Broad --- --- = Yes No No No = 2.000 (by Contour) t)= 0.00 d outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Wr A Wr B Wr C Wr D Exfil User Total cfs cfs cfs cfs cfs cfs cfs 0.00 0.00 --- --- 0.000 --- 0.0000.00 0.00 --- --- 0.044 ---0.0440.00 0.00 --- --- 0.088 --- 0.0880.00 0.00 --- --- 0.132 --- 0.1320.00 0.00 --- --- 0.176 --- 0.1760.00 0.00 --- --- 0.220 --- 0.220 providedocumentation to support this infiltrationrate a 2' separation to SHWT provided. odesk® Civil 3D® by Autodesk, Inc. v2023 onic method used for volume calculation. Begining Elevation = 43.00 ft Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 7,767 0 09,523 8,629 8,62911,354 10,424 19,05313,243 12,285 31,33814,208 6,861 38,199 DEQ recommended 1 CO/1000 SF, but only 2 shown in section. Please clarify and add locations to plan view Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 06 / 18 / 202 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 4.359 cfsStorm frequency = 25 yrs Time to peak = 724 minTime interval = 2 min Hyd. volume = 16,767 cuftInflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 45.27 ftReservoir name = Bio Retention Max. Storage = 22,332 cuft Storage Indication method used. Exfiltration extracted from Outflow. 41 Q (cfs) 20.00 20.0 24.00 24.0 Q (c BioHyd. No. 8 -- 25 Year Section 5.3.2, 0.5' freeboard notprovided to emergency spillway.Please submit a variance request orre-design Subject: Callout Page Label: 77 Author: gjamison Date: 7/5/2024 1:35:33 PM Status: Color: Layer: Space: Section 5.3.2, 1' freeboard to top of dam not provided. Submit variance request of redesign. Subject: Callout Page Label: 78 Author: gjamison Date: 7/5/2024 1:32:14 PM Status: Color: Layer: Space: Table 2-10, item 6, infiltration not functioning either Subject: Callout Page Label: 86 Author: gjamison Date: 7/5/2024 1:50:51 PM Status: Color: Layer: Space: Section 3.6.1, A/D and B/D soils should be assumed to be D soils. Subject: Text Box Page Label: 90 Author: gjamison Date: 7/5/2024 1:58:50 PM Status: Color: Layer: Space: Table 2-6 item 3, Spead circulations at 4 in/hr not found. Subject: Callout Page Label: 141 Author: gjamison Date: 7/5/2024 2:01:33 PM Status: Color: Layer: Space: plans indicate 10" Subject: Callout Page Label: 141 Author: gjamison Date: 7/5/2024 2:02:31 PM Status: Color: Layer: Space: Flow should be 25 year from SCM Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Tuesday, 06 / 18 / 2 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 18.35 cfsStorm frequency = 100 yrs Time to peak = 12.03 hrsTime interval = 2 min Hyd. volume = 22,250 cuftInflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 46.00 ftReservoir name = Bio Retention Max. Storage = 31,331 cuft Storage Indication method used. Exfiltration extracted from Outflow. Q (cfs) 25.00 25 30.00 30 35.00 35 Q BioHyd. No. 8 -- 100 Year Section 5.3.2, 1' freeboard totop of dam not provided.Submit variance request ofredesign. [A] [B] [C] [D] t)Inactive 20.00 0.00 0.00 = 44.50 45.50 0.00 0.00 = 3.33 2.60 3.33 3.33 = 1 Broad --- --- = Yes No No No = 2.000 (by Contour) = 0.00 outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Wr A Wr B Wr C Wr D Exfil User Totalcfs cfs cfs cfs cfs cfs cfs 0.00 0.00 --- --- 0.000 --- 0.0000.00 0.00 --- --- 0.044 --- 0.044 Table 2-10, item 6, infiltration not functioning either Curve Number Value - Pre-Development CN Ai (Ac)CNi x Ai77.00 0.82 63.0336.00 0.29 10.5683.00 0.00 0.001.11 73.588499 ∑ (CNi x Ai)∑ Ai CN Ai (Ac)CNi x Ai77.00 0.00 0.0036.00 0.91 32.8783.00 0.75 62.021.66 94.886387 ∑ (CNi x Ai)∑ Ai CN Ai (Ac)CNi x Ai77.00 2.95 227.5036.00 0.42 15.0783.00 0.00 0.003.37 242.56683 ∑ (CNi x Ai)∑ Ai Woods (HSG D) - GoodWoods (HSG A) - FairWoods (HSG D) - Poor CN = = 72 CN = = 57 Pre Development CCategory Pre Development BCategoryWoods (HSG D) - GoodWoods (HSG A) - FairWoods (HSG D) - Poor CN = = 66 Woods (HSG D) - Good Pre Development ACategory Woods (HSG A) - FairWoods (HSG D) - Poor Section 3.6.1, A/Dand B/D soils shouldbe assumed to be Dsoils. Table 2-6 item 3, Spead circulations at 4 in/hr not found. PROJECT NO BY AC RR-SKIMMER 15.00 in 39.42 39.00 83.55 ft *Discharge from Storm Sewers0.50% Discharge: 0.00 cfsRCP 0.00 cfs Q25/Qfull =0 4.59 cfs V/Vfull = 0 6/19/2024 56398 plans indicate 10" Sewers 0.00 cfs 5/Qfull =0.00 Vfull = 0.00 = 0.00 fps Flow should be 25 year from SCM Subject: Callout Page Label: 143 Author: gjamison Date: 7/5/2024 2:08:01 PM Status: Color: Layer: Space: 4.66 in pipe calcs Subject: Callout Page Label: 144 Author: gjamison Date: 7/5/2024 2:08:37 PM Status: Color: Layer: Space: how determined Subject: Callout Page Label: 148 Author: gjamison Date: 7/5/2024 2:09:25 PM Status: Color: Layer: Space: could not be found in the plans Subject: Text Box Page Label: 148 Author: gjamison Date: 7/5/2024 2:10:34 PM Status: Color: Layer: Space: Table 2-8, item 1 missing. Need calcs for 10, 100, overtopping and 500 year for each cuilvert Subject: Callout Page Label: 149 Author: gjamison Date: 7/5/2024 2:09:41 PM Status: Color: Layer: Space: DOT min size BY AC in ft *Discharge from Storm Sewers Discharge: 4.63 cfs 63 cfs Q25/Qfull =0 87 cfs V/Vfull = 1 76 fps V = 3 4.66 in pipe calcs charge from Storm Sewers harge: 1.43 cfs how determined todesk® Civil 3D® by Autodesk, Inc. = 36.93= 64.00= 0.50= 37.25= 19.0= Elliptical= 30.0= 2= 0.012= Horizontal Ellipse Concrete= Square edge w/headwall (H)= 0.01, 2, 0.0398, 0.67, 0.5 CalculationsQmin (cfs) Qmax (cfs) Tailwater Elev (ft) HighlightedQtotal (cfs) Qpipe (cfs) Qovertop (cfs) Veloc Dn (ft/s) Veloc Up (ft/s) HGL Dn (ft) could not be found inthe plans Table 2-8, item 1 missing. Need calcs for 10, 100, overtopping and 500 year for each cuilvert desk® Civil 3D® by Autodesk, Inc. = 39.83= 110.00 = 1.39 = 41.36 = 12.0 = Circular = 12.0= 1= 0.012 Calculat Qmin (cfs Qmax (cf Tailwater Highligh Qtotal (cf Qpipe (cf Qovertop DOT min size