HomeMy WebLinkAbout04-SIA Narrative GORDON ROAD FIRE STATION STORMWATER IMPACT STATEMENT AUGUST 2, 2024 PREPARED BY: Will Altman, P.E. 5410 Trinity Road, Suite 102 Raleigh, North Carolina 27607 919.866.4938 phone 919.866.4951 fax william.altman@timmons.com www.timmons.com Gordon Road Fire Station Wilmington, NC Project Number: 56398 Table of Contents Section 1: Site Analysis and Narrative Project Data Project Descriptions Stormwater Drainage Narrative Calculation Method Summary of Results Pre/Post Summary Tables Section 2: Environmental Maps USGS Map Soil Map FEMA FIRM Map Section 3: Stormwater Calculations Pre/Post Calculations Bioretention Pond Calculations HGL Calculations Rip Rap Calculations Culvert Calculations Erosion Calculations Section 4: Stormwater Compliance Pre/Post Stormwater Maps Nutrient Loading Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Section 1: Site Analysis and Narrative Project Data Parcel Identification Number: R04300-008-346-000 River Basin: Cape Fear Ex. Impervious on-site and off-site: 0.00 Acres Post Project Impervious (Onsite): 1.28 Acres Post Project Impervious (Offsite): 0.50 Acres Post Project Impervious (Future offsite): 0.18 Acres Area of Land Disturbance (onsite): 2.77 Acres Area of Land Disturbance (offsite): 3.08 Acres Project Description The site is located at the intersection of Gordon Road and Harris Road in New Hanover County, NC. It contains approximately 2.77 acres of woods that are undeveloped and has no existing impervious surfaces. A driveway is proposed to access the site from Gordon Road. The proposed features include a fire station and associated parking areas. Most of the proposed impervious areas will be treated with a bioretention cell while the rest will be bypassed. The site is made up of one high density area and two low density areas, one of which is offsite. Most of the high-density drainage area A is treated using a bioretention cell that meets the relevant MDC set forth in rules .1050 through .1062. This drainage area is 1.93 acres, of which 1.19 acres is impervious. The 0.29 acres of drainage area A (0.07 acres of which is impervious) that is not treated by the bioretention cell is bypassed. The low-density drainage area B is 0.44 acres, of which 0.01 acres is impervious. Low-density drainage area C (offsite) is 3.37 acres, of which 0.5 acres are impervious. There is also expected to be another 0.18 acres of impervious area from the 3.37 acres for future road improvements by the NCDOT. The rest of the pervious area cannot be developed in the future in order to maintain the low-density area requirements. These densities are below the maximum density threshold set forth in the stormwater Rules .1017, .1019, and .1021 of 15A NCAC 02H .1003. The flow is dispersed using vegetative conveyances and culverts. Stormwater Drainage Narrative The site is in the Cape Fear River Basin. According to the USDA Web Soils Survey, the site is made up of primarily Ly, Se, and Kr soils. Soils on the site are mostly sandy soils, with a hydrologic soil group A and D, based upon the New Hanover County Stormwater Manual and the USGS Web Soils Survey. A review of Flood Hazard Areas based on the published maps and the NC Flood plain Mapping Information System indicate that the site is not in any flood zones. Calculation Method The hydraulic grade line (HGL) model was performed using Storm Sewers software, which utilizes Modified Rational methodology. Rainfall data was input based on NOAA’s rainfall data. Time of concentration was calculated using TR-55 segmented. The NRCS Unit hydrograph method was utilized for calculations of pre-development and post-development conditions including the routing of the bioretention pond. Calculations were performed for the 1-year, 2-year, 10-year, 25- year, and 100-year 24-hour storm event. Summary of Results There will be one bioretention pond onsite that captures and treats approximately 1.93 acres, of which 1.19 acres are impervious. The site is graded in a way to direct most of the water onsite into the bioretention pond with the assistance of storm pipes while the rest of the site and all the offsite work attempts to maintain similar flow patterns as before with the Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com use of ditches and culverts. The bioretention cell is utilized to meet the pre-development and post-development quantity requirements for both county and state, minimizing flow. Pre/Post Summary Tables Site Analysis Site Condition Storm Event 1 Year (cfs) 2 Year (cfs) 10 Year (cfs) 25 Year (cfs) 100 Year (cfs) Pre-Development Analysis Point A 1.13 1.81 4.29 6.25 10.16 Post-Development A1 Bioretention (High Density) 4.92 6.48 11.49 15.07 21.90 Post-Development A2 (Low Density) 0.12 0.25 0.79 1.25 2.21 Post-Analysis A Combined 0.12 0.25 3.77 5.37 8.69 Pre-Development B 0.69 1.41 4.51 7.13 12.63 Post-Development B 0.49 0.81 2.02 2.99 4.95 Pre-Development C 5.02 7.37 15.54 21.72 33.79 Post-Development C 6.75 9.34 17.92 24.20 36.27 Permit and Easement Requirements On the federal level, the US Army Corps of Engineers will be reviewing impact map permits. On the state level, the NCDEQ will be reviewing the sanitary sewer permit, water main permit, erosion control permit, and stormwater permit. The NCDOT will be reviewing the Driveway and Encroachment permit. On the local level, New Hanover County will be reviewing this stormwater permit and site permit. The sanitary sewer force main will require a 20’ private utility easement. Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Section 2: Environmental Maps SCALE: DATE: FIGURE NO. 1AS SHOWN 1/17/2024NHC Gordon Road Fire Station Wilmington, North Carolina Test Location Sketch C-1 C-3C-4 C-2 C-7 C-5 Legend CPT Sounding Hand Auger Boring Image Courtesy of Stewart Cooper Newell Architects C-6 C-8 P-1P-2 P-3P-4 P-5 P-6 P-7 P-8 P-9 P-10 C-9 C-10 A A’ PROJECT NO.: 23060170 SW-3 SW-2 SW-1 TOPSOIL - 2 Inches SILTY SAND (SM) - Gray and black, mostly fine sand, some low plasticity to non-plastic fines, moist. - - - Brown POORLY GRADED SAND WITH SILT (SP-SM) - Brown, mostly fine sand, few low plasticity to non-plastic fines, moist. Boring terminated at 6 ft Target Depth HAND AUGER BORING LOG: SW-1 DATE FINISHED: 23060170 DATE STARTED: Wilmington, North Carolina 1/15/24 1/15/24 S&ME/C. Anderson Not Encountered. Hand Auger WATER LEVEL: NHC Gordon Road Fire Station SAMPLING METHOD: PROJECT: PERFORMED BY: NOTES: Page 1 of 1 GR A P H I C LO G De p t h (f e e t ) 1 2 3 4 5 6 WA T E R LE V E L EL E V A T I O N (f e e t ) MATERIAL DESCRIPTION Elevation Unkown TOPSOIL - 1 Inch POORLY GRADED SAND WITH SILT (SP-SM) - Gray, mostly fine sand, few low plasticity to non-plastic fines, moist. SILTY SAND (SM) - Brown, mostly fine sand, some low plasticity to non-plastic fines, moist. POORLY GRADED SAND WITH SILT (SP-SM) - Brown, mostly fine sand, few low plasticity to non-plastic fines, moist. Boring terminated at 6 ft Target Depth HAND AUGER BORING LOG: SW-2 DATE FINISHED: 23060170 DATE STARTED: Wilmington, North Carolina 1/15/24 1/15/24 S&ME/C. Anderson Not Encountered. Hand Auger WATER LEVEL: NHC Gordon Road Fire Station SAMPLING METHOD: PROJECT: PERFORMED BY: NOTES: Page 1 of 1 GR A P H I C LO G De p t h (f e e t ) 1 2 3 4 5 6 WA T E R LE V E L EL E V A T I O N (f e e t ) MATERIAL DESCRIPTION Elevation Unkown TOPSOIL - 1 Inch POORLY GRADED SAND WITH SILT (SP-SM) - Very loose, gray, mostly fine sand, few low plasticity to non-plastic fines, moist. - - - Brown Boring terminated at 6 ft Target Depth HAND AUGER BORING LOG: SW-3 DATE FINISHED: 23060170 DATE STARTED: Wilmington, North Carolina 1/15/24 1/15/24 S&ME/C. Anderson Not Encountered. Hand Auger WATER LEVEL: NHC Gordon Road Fire Station SAMPLING METHOD: PROJECT: PERFORMED BY: NOTES: Page 1 of 1 GR A P H I C LO G De p t h (f e e t ) 1 2 3 4 5 6 WA T E R LE V E L EL E V A T I O N (f e e t ) MATERIAL DESCRIPTION Elevation Unkown Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com USGS Map Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Soil Map MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: New Hanover County, North Carolina Survey Area Data: Version 25, Sep 13, 2023 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 8, 2022—Dec 1, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Be Baymeade fine sand, 1 to 6 percent slopes 29.7 23.0% Kr Kureb sand, 1 to 8 percent slopes 34.4 26.6% Le Leon sand 9.7 7.5% Ly Lynn Haven fine sand 21.0 16.2% Mu Murville fine sand 6.7 5.2% Se Seagate fine sand 27.8 21.5% Totals for Area of Interest 129.3 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. Custom Soil Resource Report 11 5/9/24, 11:40 AM BookReaderImages.php (2626×4079) https://ia904701.us.archive.org/BookReader/BookReaderImages.php?zip=/28/items/usda-soil-survey-of-new-hanover-county-north-carolina-1906/usd…1/1 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com FEMA FIRM Map National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AREAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREENArea of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.The basemap shown complies with FEMA's basemapaccuracy standards The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 4/2/2024 at 5:32 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximatepoint selected by the user and does not representan authoritative property location. 1:6,000 77°51'41"W 34°16'30"N 77°51'4"W 34°16'N Basemap Imagery Source: USGS National Map 2023 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Section 3: Stormwater Calculations Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Pre/Post Calculations 1 2 3 4 56 7 8 9 Watershed Model Schematic Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Project: SCS-Gordon Road.gpw Tuesday, 07 / 23 / 2024 Hyd.Origin Description Legend 1 SCS Runoff Pre Analysis Point A 2 SCS Runoff Pre Analysis Point B 3 SCS Runoff Post Analysis Point A - High Density 4 SCS Runoff Post Analysis Point A - Low Density 5 SCS Runoff Post Analysis Point B 6 SCS Runoff Pre Analysis Point C 7 SCS Runoff Post Analysis Point C 8 Reservoir Bio 9 Combine Post Analysis A- Combined Hydraflow Table of Contents SCS-Gordon Road.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Watershed Model Schematic...................................................................................... 1 Hydrograph Return Period Recap............................................................................. 2 1 - Year Summary Report......................................................................................................................... 3 Hydrograph Reports................................................................................................................... 4 Hydrograph No. 1, SCS Runoff, Pre Analysis Point A.............................................................. 4 Hydrograph No. 2, SCS Runoff, Pre Analysis Point B.............................................................. 5 Hydrograph No. 3, SCS Runoff, Post Analysis Point A - High Density..................................... 6 Hydrograph No. 4, SCS Runoff, Post Analysis Point A - Low Density...................................... 7 Hydrograph No. 5, SCS Runoff, Post Analysis Point B............................................................ 8 Hydrograph No. 6, SCS Runoff, Pre Analysis Point C............................................................. 9 Hydrograph No. 7, SCS Runoff, Post Analysis Point C.......................................................... 10 Hydrograph No. 8, Reservoir, Bio........................................................................................... 11 Pond Report - Bio Retention.............................................................................................. 12 Hydrograph No. 9, Combine, Post Analysis A- Combined.....................................................14 2 - Year Summary Report....................................................................................................................... 15 Hydrograph Reports................................................................................................................. 16 Hydrograph No. 1, SCS Runoff, Pre Analysis Point A............................................................ 16 Hydrograph No. 2, SCS Runoff, Pre Analysis Point B............................................................ 17 Hydrograph No. 3, SCS Runoff, Post Analysis Point A - High Density................................... 18 Hydrograph No. 4, SCS Runoff, Post Analysis Point A - Low Density.................................... 19 Hydrograph No. 5, SCS Runoff, Post Analysis Point B.......................................................... 20 Hydrograph No. 6, SCS Runoff, Pre Analysis Point C........................................................... 21 Hydrograph No. 7, SCS Runoff, Post Analysis Point C.......................................................... 22 Hydrograph No. 8, Reservoir, Bio........................................................................................... 23 Hydrograph No. 9, Combine, Post Analysis A- Combined.....................................................24 10 - Year Summary Report....................................................................................................................... 25 Hydrograph Reports................................................................................................................. 26 Hydrograph No. 1, SCS Runoff, Pre Analysis Point A............................................................ 26 Hydrograph No. 2, SCS Runoff, Pre Analysis Point B............................................................ 27 Hydrograph No. 3, SCS Runoff, Post Analysis Point A - High Density................................... 28 Hydrograph No. 4, SCS Runoff, Post Analysis Point A - Low Density.................................... 29 Hydrograph No. 5, SCS Runoff, Post Analysis Point B.......................................................... 30 Hydrograph No. 6, SCS Runoff, Pre Analysis Point C........................................................... 31 Hydrograph No. 7, SCS Runoff, Post Analysis Point C.......................................................... 32 Hydrograph No. 8, Reservoir, Bio........................................................................................... 33 Hydrograph No. 9, Combine, Post Analysis A- Combined.....................................................34 25 - Year Summary Report....................................................................................................................... 35 Hydrograph Reports................................................................................................................. 36 Hydrograph No. 1, SCS Runoff, Pre Analysis Point A............................................................ 36 Contents continued...SCS-Gordon Road.gpw Hydrograph No. 2, SCS Runoff, Pre Analysis Point B............................................................ 37 Hydrograph No. 3, SCS Runoff, Post Analysis Point A - High Density................................... 38 Hydrograph No. 4, SCS Runoff, Post Analysis Point A - Low Density.................................... 39 Hydrograph No. 5, SCS Runoff, Post Analysis Point B.......................................................... 40 Hydrograph No. 6, SCS Runoff, Pre Analysis Point C........................................................... 41 Hydrograph No. 7, SCS Runoff, Post Analysis Point C.......................................................... 42 Hydrograph No. 8, Reservoir, Bio........................................................................................... 43 Hydrograph No. 9, Combine, Post Analysis A- Combined.....................................................44 100 - Year Summary Report....................................................................................................................... 45 Hydrograph Reports................................................................................................................. 46 Hydrograph No. 1, SCS Runoff, Pre Analysis Point A............................................................ 46 Hydrograph No. 2, SCS Runoff, Pre Analysis Point B............................................................ 47 Hydrograph No. 3, SCS Runoff, Post Analysis Point A - High Density................................... 48 Hydrograph No. 4, SCS Runoff, Post Analysis Point A - Low Density.................................... 49 Hydrograph No. 5, SCS Runoff, Post Analysis Point B.......................................................... 50 Hydrograph No. 6, SCS Runoff, Pre Analysis Point C........................................................... 51 Hydrograph No. 7, SCS Runoff, Post Analysis Point C.......................................................... 52 Hydrograph No. 8, Reservoir, Bio........................................................................................... 53 Hydrograph No. 9, Combine, Post Analysis A- Combined.....................................................54 IDF Report.................................................................................................................. 55 Hydrograph Summary Report 3 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.127 2 724 3,768 ------ ------ ------ Pre Analysis Point A 2 SCS Runoff 0.689 2 726 3,132 ------ ------ ------ Pre Analysis Point B 3 SCS Runoff 4.915 2 724 14,709 ------ ------ ------ Post Analysis Point A - High Density 4 SCS Runoff 0.120 2 726 547 ------ ------ ------ Post Analysis Point A - Low Density 5 SCS Runoff 0.486 2 724 1,695 ------ ------ ------ Post Analysis Point B 6 SCS Runoff 5.015 2 724 15,550 ------ ------ ------ Pre Analysis Point C 7 SCS Runoff 6.747 2 724 20,278 ------ ------ ------ Post Analysis Point C 8 Reservoir 0.000 2 742 0 3 43.89 7,667 Bio 9 Combine 0.120 2 726 547 4, 8 ------ ------ Post Analysis A- Combined SCS-Gordon Road.gpw Return Period: 1 Year Friday, 07 / 12 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 1 Pre Analysis Point A Hydrograph type = SCS Runoff Peak discharge = 1.127 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 3,768 cuft Drainage area = 1.110 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.820 x 77) + (0.290 x 36)] / 1.110 4 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (min) Pre Analysis Point A Hyd. No. 1 -- 1 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 2 Pre Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 0.689 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 3,132 cuft Drainage area = 1.660 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.750 x 83) + (0.910 x 36)] / 1.660 5 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (min) Pre Analysis Point B Hyd. No. 2 -- 1 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 3 Post Analysis Point A - High Density Hydrograph type = SCS Runoff Peak discharge = 4.915 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 14,709 cuft Drainage area = 1.930 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.190 x 98) + (0.350 x 39) + (0.390 x 80)] / 1.930 6 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) Post Analysis Point A - High Density Hyd. No. 3 -- 1 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 4 Post Analysis Point A - Low Density Hydrograph type = SCS Runoff Peak discharge = 0.120 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 547 cuft Drainage area = 0.290 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.070 x 98) + (0.030 x 39) + (0.190 x 80)] / 0.290 7 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (min) Post Analysis Point A - Low Density Hyd. No. 4 -- 1 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 5 Post Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 0.486 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 1,695 cuft Drainage area = 0.560 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.320 x 80) + (0.230 x 39)] / 0.560 8 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (min) Post Analysis Point B Hyd. No. 5 -- 1 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 6 Pre Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 5.015 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 15,550 cuft Drainage area = 3.370 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 9 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (min) Pre Analysis Point C Hyd. No. 6 -- 1 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 7 Post Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 6.747 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 20,278 cuft Drainage area = 3.370 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.85 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 98) + (2.690 x 69)] / 3.370 10 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) Post Analysis Point C Hyd. No. 7 -- 1 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 1 yrs Time to peak = 742 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 43.89 ft Reservoir name = Bio Retention Max. Storage = 7,667 cuft Storage Indication method used. Exfiltration extracted from Outflow. 11 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) Bio Hyd. No. 8 -- 1 Year Hyd No. 8 Hyd No. 3 Total storage used = 7,667 cuft Pond Report 12 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Pond No. 1 - Bio Retention Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 43.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 43.00 7,767 0 0 1.00 44.00 9,523 8,629 8,629 2.00 45.00 11,354 10,424 19,053 3.00 46.00 13,243 12,285 31,338 3.50 46.50 14,208 6,861 38,199 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)= 10.00 Inactive 0.00 0.00 Span (in)= 10.00 36.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 39.42 44.50 0.00 0.00 Length (ft)= 100.00 0.00 0.00 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)= 16.00 20.00 0.00 0.00 Crest El. (ft)= 44.50 45.50 0.00 0.00 Weir Coeff.= 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr)= 2.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 43.00 0.00 0.00 --- --- 0.00 0.00 --- --- 0.000 --- 0.000 0.10 863 43.10 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.044 ---0.044 0.20 1,726 43.20 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.088 --- 0.088 0.30 2,589 43.30 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.132 --- 0.132 0.40 3,452 43.40 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.176 --- 0.176 0.50 4,315 43.50 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.220 --- 0.220 0.60 5,178 43.60 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.265 --- 0.265 0.70 6,040 43.70 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.309 --- 0.309 0.80 6,903 43.80 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.353 --- 0.353 0.90 7,766 43.90 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.397 --- 0.397 1.00 8,629 44.00 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.441 --- 0.441 1.10 9,672 44.10 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.449 --- 0.449 1.20 10,714 44.20 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.458 --- 0.458 1.30 11,756 44.30 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.466 --- 0.466 1.40 12,799 44.40 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.475 --- 0.475 1.50 13,841 44.50 3.38 oc 0.00 --- --- 0.00 0.00 --- --- 0.483 --- 0.483 1.60 14,884 44.60 3.38 oc 0.00 --- --- 1.68 0.00 --- --- 0.492 --- 2.176 1.70 15,926 44.70 4.12 oc 0.00 --- --- 4.12 s 0.00 --- --- 0.500 --- 4.624 1.80 16,968 44.80 4.20 oc 0.00 --- --- 4.20 s 0.00 --- --- 0.509 --- 4.705 1.90 18,011 44.90 4.25 oc 0.00 --- --- 4.25 s 0.00 --- --- 0.517 --- 4.764 2.00 19,053 45.00 4.29 oc 0.00 --- --- 4.27 s 0.00 --- --- 0.526 --- 4.801 2.10 20,282 45.10 4.33 oc 0.00 --- --- 4.32 s 0.00 --- --- 0.534 --- 4.857 2.20 21,510 45.20 4.37 oc 0.00 --- --- 4.36 s 0.00 --- --- 0.543 --- 4.900 2.30 22,739 45.30 4.41 oc 0.00 --- --- 4.36 s 0.00 --- --- 0.552 --- 4.911 2.40 23,967 45.40 4.45 oc 0.00 --- --- 4.41 s 0.00 --- --- 0.561 --- 4.975 2.50 25,196 45.50 4.49 oc 0.00 --- --- 4.36 s 0.00 --- --- 0.569 --- 4.932 2.60 26,424 45.60 4.53 oc 0.00 --- --- 4.46 s 1.64 --- --- 0.578 --- 6.685 2.70 27,653 45.70 4.57 oc 0.00 --- --- 4.41 s 4.65 --- --- 0.587 --- 9.645 2.80 28,881 45.80 4.61 oc 0.00 --- --- 4.51 s 8.54 --- --- 0.596 --- 13.65 2.90 30,110 45.90 4.65 oc 0.00 --- --- 4.50 s 13.15 --- --- 0.604 --- 18.26 3.00 31,338 46.00 4.69 oc 0.00 --- --- 4.43 s 18.38 --- --- 0.613 --- 23.43 3.05 32,025 46.05 4.70 oc 0.00 --- --- 4.59 s 21.21 --- --- 0.618 --- 26.42 3.10 32,711 46.10 4.72 oc 0.00 --- --- 4.13 s 24.17 --- --- 0.622 --- 28.92 3.15 33,397 46.15 4.74 oc 0.00 --- --- 4.30 s 27.25 --- --- 0.627 --- 32.17 3.20 34,083 46.20 4.76 oc 0.00 --- --- 4.44 s 30.45 --- --- 0.631 --- 35.53 3.25 34,769 46.25 4.78 oc 0.00 --- --- 4.59 s 33.77 --- --- 0.635 --- 39.00 3.30 35,455 46.30 4.80 oc 0.00 --- --- 4.74 s 37.21 --- --- 0.640 --- 42.58 3.35 36,141 46.35 4.82 oc 0.00 --- --- 3.81 s 40.75 --- --- 0.644 --- 45.20 Continues on next page... 13 Bio Retention Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.40 36,827 46.40 4.83 oc 0.00 --- --- 3.92 s 44.40 --- --- 0.649 --- 48.97 3.45 37,513 46.45 4.85 oc 0.00 --- --- 4.04 s 48.15 --- --- 0.653 --- 52.84 3.50 38,199 46.50 4.87 oc 0.00 --- --- 4.30 s 52.00 --- --- 0.658 --- 56.96 ...End Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 9 Post Analysis A- Combined Hydrograph type = Combine Peak discharge = 0.120 cfs Storm frequency = 1 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 547 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 0.290 ac 14 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (min) Post Analysis A- Combined Hyd. No. 9 -- 1 Year Hyd No. 9 Hyd No. 4 Hyd No. 8 Hydrograph Summary Report 15 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 1.806 2 724 5,692 ------ ------ ------ Pre Analysis Point A 2 SCS Runoff 1.410 2 724 5,274 ------ ------ ------ Pre Analysis Point B 3 SCS Runoff 6.483 2 724 19,507 ------ ------ ------ Post Analysis Point A - High Density 4 SCS Runoff 0.246 2 724 921 ------ ------ ------ Post Analysis Point A - Low Density 5 SCS Runoff 0.810 2 724 2,612 ------ ------ ------ Post Analysis Point B 6 SCS Runoff 7.369 2 724 22,329 ------ ------ ------ Pre Analysis Point C 7 SCS Runoff 9.337 2 724 27,914 ------ ------ ------ Post Analysis Point C 8 Reservoir 0.000 2 1114 0 3 44.18 10,525 Bio 9 Combine 0.246 2 724 921 4, 8 ------ ------ Post Analysis A- Combined SCS-Gordon Road.gpw Return Period: 2 Year Friday, 07 / 12 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 1 Pre Analysis Point A Hydrograph type = SCS Runoff Peak discharge = 1.806 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 5,692 cuft Drainage area = 1.110 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.820 x 77) + (0.290 x 36)] / 1.110 16 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (min) Pre Analysis Point A Hyd. No. 1 -- 2 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 2 Pre Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 1.410 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 5,274 cuft Drainage area = 1.660 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.750 x 83) + (0.910 x 36)] / 1.660 17 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (min) Pre Analysis Point B Hyd. No. 2 -- 2 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 3 Post Analysis Point A - High Density Hydrograph type = SCS Runoff Peak discharge = 6.483 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 19,507 cuft Drainage area = 1.930 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.190 x 98) + (0.350 x 39) + (0.390 x 80)] / 1.930 18 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) Post Analysis Point A - High Density Hyd. No. 3 -- 2 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 4 Post Analysis Point A - Low Density Hydrograph type = SCS Runoff Peak discharge = 0.246 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 921 cuft Drainage area = 0.290 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.070 x 98) + (0.030 x 39) + (0.190 x 80)] / 0.290 19 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (min) Post Analysis Point A - Low Density Hyd. No. 4 -- 2 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 5 Post Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 0.810 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 2,612 cuft Drainage area = 0.560 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.320 x 80) + (0.230 x 39)] / 0.560 20 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (min) Post Analysis Point B Hyd. No. 5 -- 2 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 6 Pre Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 7.369 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 22,329 cuft Drainage area = 3.370 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 21 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (min) Pre Analysis Point C Hyd. No. 6 -- 2 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 7 Post Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 9.337 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 27,914 cuft Drainage area = 3.370 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 4.67 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 98) + (2.690 x 69)] / 3.370 22 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) Post Analysis Point C Hyd. No. 7 -- 2 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 0.000 cfs Storm frequency = 2 yrs Time to peak = 1114 min Time interval = 2 min Hyd. volume = 0 cuft Inflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 44.18 ft Reservoir name = Bio Retention Max. Storage = 10,525 cuft Storage Indication method used. Exfiltration extracted from Outflow. 23 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) Bio Hyd. No. 8 -- 2 Year Hyd No. 8 Hyd No. 3 Total storage used = 10,525 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 9 Post Analysis A- Combined Hydrograph type = Combine Peak discharge = 0.246 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 921 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 0.290 ac 24 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.05 0.05 0.10 0.10 0.15 0.15 0.20 0.20 0.25 0.25 0.30 0.30 0.35 0.35 0.40 0.40 0.45 0.45 0.50 0.50 Q (cfs) Time (min) Post Analysis A- Combined Hyd. No. 9 -- 2 Year Hyd No. 9 Hyd No. 4 Hyd No. 8 Hydrograph Summary Report 25 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 4.292 2 724 12,881 ------ ------ ------ Pre Analysis Point A 2 SCS Runoff 4.511 2 724 14,054 ------ ------ ------ Pre Analysis Point B 3 SCS Runoff 11.49 2 724 35,384 ------ ------ ------ Post Analysis Point A - High Density 4 SCS Runoff 0.788 2 724 2,455 ------ ------ ------ Post Analysis Point A - Low Density 5 SCS Runoff 2.023 2 724 6,099 ------ ------ ------ Post Analysis Point B 6 SCS Runoff 15.54 2 724 46,465 ------ ------ ------ Pre Analysis Point C 7 SCS Runoff 17.92 2 724 54,032 ------ ------ ------ Post Analysis Point C 8 Reservoir 3.443 2 740 7,864 3 44.67 15,635 Bio 9 Combine 3.769 2 738 10,319 4, 8 ------ ------ Post Analysis A- Combined SCS-Gordon Road.gpw Return Period: 10 Year Friday, 07 / 12 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 1 Pre Analysis Point A Hydrograph type = SCS Runoff Peak discharge = 4.292 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 12,881 cuft Drainage area = 1.110 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.820 x 77) + (0.290 x 36)] / 1.110 26 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) Pre Analysis Point A Hyd. No. 1 -- 10 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 2 Pre Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 4.511 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 14,054 cuft Drainage area = 1.660 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.750 x 83) + (0.910 x 36)] / 1.660 27 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) Pre Analysis Point B Hyd. No. 2 -- 10 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 3 Post Analysis Point A - High Density Hydrograph type = SCS Runoff Peak discharge = 11.49 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 35,384 cuft Drainage area = 1.930 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.190 x 98) + (0.350 x 39) + (0.390 x 80)] / 1.930 28 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Post Analysis Point A - High Density Hyd. No. 3 -- 10 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 4 Post Analysis Point A - Low Density Hydrograph type = SCS Runoff Peak discharge = 0.788 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 2,455 cuft Drainage area = 0.290 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.070 x 98) + (0.030 x 39) + (0.190 x 80)] / 0.290 29 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 0.10 0.10 0.20 0.20 0.30 0.30 0.40 0.40 0.50 0.50 0.60 0.60 0.70 0.70 0.80 0.80 0.90 0.90 1.00 1.00 Q (cfs) Time (min) Post Analysis Point A - Low Density Hyd. No. 4 -- 10 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 5 Post Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 2.023 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 6,099 cuft Drainage area = 0.560 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.320 x 80) + (0.230 x 39)] / 0.560 30 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (min) Post Analysis Point B Hyd. No. 5 -- 10 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 6 Pre Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 15.54 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 46,465 cuft Drainage area = 3.370 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 31 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Pre Analysis Point C Hyd. No. 6 -- 10 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 7 Post Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 17.92 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 54,032 cuft Drainage area = 3.370 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.26 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 98) + (2.690 x 69)] / 3.370 32 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Post Analysis Point C Hyd. No. 7 -- 10 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 3.443 cfs Storm frequency = 10 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 7,864 cuft Inflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 44.67 ft Reservoir name = Bio Retention Max. Storage = 15,635 cuft Storage Indication method used. Exfiltration extracted from Outflow. 33 0 120 240 360 480 600 720 840 960 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Bio Hyd. No. 8 -- 10 Year Hyd No. 8 Hyd No. 3 Total storage used = 15,635 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 9 Post Analysis A- Combined Hydrograph type = Combine Peak discharge = 3.769 cfs Storm frequency = 10 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 10,319 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 0.290 ac 34 0 120 240 360 480 600 720 840 960 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 Q (cfs) Time (min) Post Analysis A- Combined Hyd. No. 9 -- 10 Year Hyd No. 9 Hyd No. 4 Hyd No. 8 Hydrograph Summary Report 35 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 6.247 2 724 18,670 ------ ------ ------ Pre Analysis Point A 2 SCS Runoff 7.130 2 724 21,594 ------ ------ ------ Pre Analysis Point B 3 SCS Runoff 15.07 2 724 47,127 ------ ------ ------ Post Analysis Point A - High Density 4 SCS Runoff 1.246 2 724 3,772 ------ ------ ------ Post Analysis Point A - Low Density 5 SCS Runoff 2.991 2 724 8,944 ------ ------ ------ Post Analysis Point B 6 SCS Runoff 21.72 2 724 65,254 ------ ------ ------ Pre Analysis Point C 7 SCS Runoff 24.20 2 724 73,796 ------ ------ ------ Post Analysis Point C 8 Reservoir 4.290 2 740 16,874 3 45.03 19,432 Bio 9 Combine 5.374 2 724 20,647 4, 8 ------ ------ Post Analysis A- Combined SCS-Gordon Road.gpw Return Period: 25 Year Friday, 07 / 12 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 1 Pre Analysis Point A Hydrograph type = SCS Runoff Peak discharge = 6.247 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 18,670 cuft Drainage area = 1.110 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.820 x 77) + (0.290 x 36)] / 1.110 36 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 7.00 7.00 Q (cfs) Time (min) Pre Analysis Point A Hyd. No. 1 -- 25 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 2 Pre Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 7.130 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 21,594 cuft Drainage area = 1.660 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.750 x 83) + (0.910 x 36)] / 1.660 37 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 Q (cfs) Time (min) Pre Analysis Point B Hyd. No. 2 -- 25 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 3 Post Analysis Point A - High Density Hydrograph type = SCS Runoff Peak discharge = 15.07 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 47,127 cuft Drainage area = 1.930 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.190 x 98) + (0.350 x 39) + (0.390 x 80)] / 1.930 38 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Post Analysis Point A - High Density Hyd. No. 3 -- 25 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 4 Post Analysis Point A - Low Density Hydrograph type = SCS Runoff Peak discharge = 1.246 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 3,772 cuft Drainage area = 0.290 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.070 x 98) + (0.030 x 39) + (0.190 x 80)] / 0.290 39 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 Q (cfs) Time (min) Post Analysis Point A - Low Density Hyd. No. 4 -- 25 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 5 Post Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 2.991 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 8,944 cuft Drainage area = 0.560 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.320 x 80) + (0.230 x 39)] / 0.560 40 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (min) Post Analysis Point B Hyd. No. 5 -- 25 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 6 Pre Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 21.72 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 65,254 cuft Drainage area = 3.370 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 41 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Pre Analysis Point C Hyd. No. 6 -- 25 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 7 Post Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 24.20 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 73,796 cuft Drainage area = 3.370 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 9.12 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 98) + (2.690 x 69)] / 3.370 42 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 28.00 28.00 Q (cfs) Time (min) Post Analysis Point C Hyd. No. 7 -- 25 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 4.290 cfs Storm frequency = 25 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 16,874 cuft Inflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 45.03 ft Reservoir name = Bio Retention Max. Storage = 19,432 cuft Storage Indication method used. Exfiltration extracted from Outflow. 43 0 120 240 360 480 600 720 840 960 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (min) Bio Hyd. No. 8 -- 25 Year Hyd No. 8 Hyd No. 3 Total storage used = 19,432 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 9 Post Analysis A- Combined Hydrograph type = Combine Peak discharge = 5.374 cfs Storm frequency = 25 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 20,647 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 0.290 ac 44 0 120 240 360 480 600 720 840 960 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 6.00 6.00 Q (cfs) Time (min) Post Analysis A- Combined Hyd. No. 9 -- 25 Year Hyd No. 9 Hyd No. 4 Hyd No. 8 Hydrograph Summary Report 45 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.16 2 724 30,582 ------ ------ ------ Pre Analysis Point A 2 SCS Runoff 12.63 2 724 37,765 ------ ------ ------ Pre Analysis Point B 3 SCS Runoff 21.90 2 724 70,077 ------ ------ ------ Post Analysis Point A - High Density 4 SCS Runoff 2.207 2 724 6,597 ------ ------ ------ Post Analysis Point A - Low Density 5 SCS Runoff 4.947 2 724 14,845 ------ ------ ------ Post Analysis Point B 6 SCS Runoff 33.79 2 724 103,100 ------ ------ ------ Pre Analysis Point C 7 SCS Runoff 36.27 2 724 112,934 ------ ------ ------ Post Analysis Point C 8 Reservoir 7.753 2 736 35,131 3 45.66 27,109 Bio 9 Combine 8.687 2 736 41,728 4, 8 ------ ------ Post Analysis A- Combined SCS-Gordon Road.gpw Return Period: 100 Year Friday, 07 / 12 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 1 Pre Analysis Point A Hydrograph type = SCS Runoff Peak discharge = 10.16 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 30,582 cuft Drainage area = 1.110 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.820 x 77) + (0.290 x 36)] / 1.110 46 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (min) Pre Analysis Point A Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 2 Pre Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 12.63 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 37,765 cuft Drainage area = 1.660 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.750 x 83) + (0.910 x 36)] / 1.660 47 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (min) Pre Analysis Point B Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 3 Post Analysis Point A - High Density Hydrograph type = SCS Runoff Peak discharge = 21.90 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 70,077 cuft Drainage area = 1.930 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.190 x 98) + (0.350 x 39) + (0.390 x 80)] / 1.930 48 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Post Analysis Point A - High Density Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 4 Post Analysis Point A - Low Density Hydrograph type = SCS Runoff Peak discharge = 2.207 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 6,597 cuft Drainage area = 0.290 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.070 x 98) + (0.030 x 39) + (0.190 x 80)] / 0.290 49 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (min) Post Analysis Point A - Low Density Hyd. No. 4 -- 100 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 5 Post Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 4.947 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 14,845 cuft Drainage area = 0.560 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.320 x 80) + (0.230 x 39)] / 0.560 50 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (min) Post Analysis Point B Hyd. No. 5 -- 100 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 6 Pre Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 33.79 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 103,100 cuft Drainage area = 3.370 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 51 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (min) Pre Analysis Point C Hyd. No. 6 -- 100 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 7 Post Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 36.27 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 2 min Hyd. volume = 112,934 cuft Drainage area = 3.370 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 98) + (2.690 x 69)] / 3.370 52 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (min) Post Analysis Point C Hyd. No. 7 -- 100 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 7.753 cfs Storm frequency = 100 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 35,131 cuft Inflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 45.66 ft Reservoir name = Bio Retention Max. Storage = 27,109 cuft Storage Indication method used. Exfiltration extracted from Outflow. 53 0 120 240 360 480 600 720 840 960 1080 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (min) Bio Hyd. No. 8 -- 100 Year Hyd No. 8 Hyd No. 3 Total storage used = 27,109 cuft Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Friday, 07 / 12 / 2024 Hyd. No. 9 Post Analysis A- Combined Hydrograph type = Combine Peak discharge = 8.687 cfs Storm frequency = 100 yrs Time to peak = 736 min Time interval = 2 min Hyd. volume = 41,728 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 0.290 ac 54 0 120 240 360 480 600 720 840 960 1080 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 Q (cfs) Time (min) Post Analysis A- Combined Hyd. No. 9 -- 100 Year Hyd No. 9 Hyd No. 4 Hyd No. 8 Hydraflow Table of Contents SCS-Gordon Road-Clogged.gpw Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 100 - Year Summary Report......................................................................................................................... 1 Hydrograph Reports................................................................................................................... 2 Hydrograph No. 1, SCS Runoff, Pre Analysis Point A.............................................................. 2 Hydrograph No. 2, SCS Runoff, Pre Analysis Point B.............................................................. 3 Hydrograph No. 3, SCS Runoff, Post Analysis Point A - High Density..................................... 4 Hydrograph No. 4, SCS Runoff, Post Analysis Point A - Low Density...................................... 5 Hydrograph No. 5, SCS Runoff, Post Analysis Point B............................................................ 6 Hydrograph No. 6, SCS Runoff, Pre Analysis Point C............................................................. 7 Hydrograph No. 7, SCS Runoff, Post Analysis Point C............................................................ 8 Hydrograph No. 8, Reservoir, Bio............................................................................................. 9 Pond Report - Bio Retention.............................................................................................. 10 Hydrograph No. 9, Combine, Post Analysis A- Combined.....................................................12 Hydrograph Summary Report 1 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval Peak volume hyd(s) elevation strge used Description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 10.16 2 724 30,582 ------ ------ ------ Pre Analysis Point A 2 SCS Runoff 12.63 2 724 37,765 ------ ------ ------ Pre Analysis Point B 3 SCS Runoff 21.90 2 724 70,077 ------ ------ ------ Post Analysis Point A - High Density 4 SCS Runoff 2.207 2 724 6,597 ------ ------ ------ Post Analysis Point A - Low Density 5 SCS Runoff 4.947 2 724 14,845 ------ ------ ------ Post Analysis Point B 6 SCS Runoff 33.79 2 724 103,100 ------ ------ ------ Pre Analysis Point C 7 SCS Runoff 36.27 2 724 112,934 ------ ------ ------ Post Analysis Point C 8 Reservoir 15.17 2 728 44,880 3 45.94 30,584 Bio 9 Combine 16.79 2 728 51,477 4, 8 ------ ------ Post Analysis A- Combined SCS-Gordon Road-Clogged.gpw Return Period: 100 Year Thursday, 07 / 25 / 2024 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 1 Pre Analysis Point A Hydrograph type = SCS Runoff Peak discharge = 10.16 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 30,582 cuft Drainage area = 1.110 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.820 x 77) + (0.290 x 36)] / 1.110 2 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 Q (cfs) Time (hrs) Pre Analysis Point A Hyd. No. 1 -- 100 Year Hyd No. 1 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 2 Pre Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 12.63 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 37,765 cuft Drainage area = 1.660 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.750 x 83) + (0.910 x 36)] / 1.660 3 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 2.00 2.00 4.00 4.00 6.00 6.00 8.00 8.00 10.00 10.00 12.00 12.00 14.00 14.00 Q (cfs) Time (hrs) Pre Analysis Point B Hyd. No. 2 -- 100 Year Hyd No. 2 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 3 Post Analysis Point A - High Density Hydrograph type = SCS Runoff Peak discharge = 21.90 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 70,077 cuft Drainage area = 1.930 ac Curve number = 84* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(1.190 x 98) + (0.350 x 39) + (0.390 x 80)] / 1.930 4 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Post Analysis Point A - High Density Hyd. No. 3 -- 100 Year Hyd No. 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 4 Post Analysis Point A - Low Density Hydrograph type = SCS Runoff Peak discharge = 2.207 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 6,597 cuft Drainage area = 0.290 ac Curve number = 57* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.070 x 98) + (0.030 x 39) + (0.190 x 80)] / 0.290 5 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 Q (cfs) Time (hrs) Post Analysis Point A - Low Density Hyd. No. 4 -- 100 Year Hyd No. 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 5 Post Analysis Point B Hydrograph type = SCS Runoff Peak discharge = 4.947 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 14,845 cuft Drainage area = 0.560 ac Curve number = 64* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.320 x 80) + (0.230 x 39)] / 0.560 6 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 1.00 1.00 2.00 2.00 3.00 3.00 4.00 4.00 5.00 5.00 Q (cfs) Time (hrs) Post Analysis Point B Hyd. No. 5 -- 100 Year Hyd No. 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 6 Pre Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 33.79 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 103,100 cuft Drainage area = 3.370 ac Curve number = 72 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 7 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 5.00 5.00 10.00 10.00 15.00 15.00 20.00 20.00 25.00 25.00 30.00 30.00 35.00 35.00 Q (cfs) Time (hrs) Pre Analysis Point C Hyd. No. 6 -- 100 Year Hyd No. 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 7 Post Analysis Point C Hydrograph type = SCS Runoff Peak discharge = 36.27 cfs Storm frequency = 100 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 112,934 cuft Drainage area = 3.370 ac Curve number = 78* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 12.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 * Composite (Area/CN) = [(0.680 x 98) + (2.690 x 69)] / 3.370 8 0 2 4 6 8 10 12 14 16 18 20 22 24 Q (cfs) 0.00 0.00 10.00 10.00 20.00 20.00 30.00 30.00 40.00 40.00 Q (cfs) Time (hrs) Post Analysis Point C Hyd. No. 7 -- 100 Year Hyd No. 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 8 Bio Hydrograph type = Reservoir Peak discharge = 15.17 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 44,880 cuft Inflow hyd. No. = 3 - Post Analysis Point A - High DensityMax. Elevation = 45.94 ft Reservoir name = Bio Retention Max. Storage = 30,584 cuft Storage Indication method used. 9 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 4.00 4.00 8.00 8.00 12.00 12.00 16.00 16.00 20.00 20.00 24.00 24.00 Q (cfs) Time (hrs) Bio Hyd. No. 8 -- 100 Year Hyd No. 8 Hyd No. 3 Total storage used = 30,584 cuft Pond Report 10 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Pond No. 1 - Bio Retention Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 43.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 43.00 7,767 0 0 1.00 44.00 9,523 8,629 8,629 2.00 45.00 11,354 10,424 19,053 3.00 46.00 13,243 12,285 31,338 3.50 46.50 14,208 6,861 38,199 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in)Inactive Inactive 0.00 0.00 Span (in)= 10.00 36.00 0.00 0.00 No. Barrels = 1 1 0 0 Invert El. (ft)= 39.42 44.50 0.00 0.00 Length (ft)= 100.00 0.00 0.00 0.00 Slope (%)= 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff.= 0.60 0.60 0.60 0.60 Multi-Stage = n/a Yes No No Crest Len (ft)Inactive 20.00 0.00 0.00 Crest El. (ft)= 44.50 45.50 0.00 0.00 Weir Coeff.= 3.33 2.60 3.33 3.33 Weir Type = 1 Broad --- --- Multi-Stage = Yes No No No Exfil.(in/hr)= 0.000 (by Contour) TW Elev. (ft)= 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 43.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.10 863 43.10 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.20 1,726 43.20 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.30 2,589 43.30 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.40 3,452 43.40 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.50 4,315 43.50 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.60 5,178 43.60 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.70 6,040 43.70 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.80 6,903 43.80 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 0.90 7,766 43.90 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.00 8,629 44.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.10 9,672 44.10 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.20 10,714 44.20 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.30 11,756 44.30 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.40 12,799 44.40 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.50 13,841 44.50 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.60 14,884 44.60 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.70 15,926 44.70 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.80 16,968 44.80 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 1.90 18,011 44.90 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.00 19,053 45.00 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.10 20,282 45.10 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.20 21,510 45.20 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.30 22,739 45.30 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.40 23,967 45.40 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.50 25,196 45.50 0.00 0.00 --- --- 0.00 0.00 --- --- --- --- 0.000 2.60 26,424 45.60 0.00 0.00 --- --- 0.00 1.64 --- --- --- --- 1.644 2.70 27,653 45.70 0.00 0.00 --- --- 0.00 4.65 --- --- --- --- 4.651 2.80 28,881 45.80 0.00 0.00 --- --- 0.00 8.54 --- --- --- --- 8.544 2.90 30,110 45.90 0.00 0.00 --- --- 0.00 13.15 --- --- --- --- 13.15 3.00 31,338 46.00 0.00 0.00 --- --- 0.00 18.38 --- --- --- --- 18.38 3.05 32,025 46.05 0.00 0.00 --- --- 0.00 21.21 --- --- --- --- 21.21 3.10 32,711 46.10 0.00 0.00 --- --- 0.00 24.17 --- --- --- --- 24.17 3.15 33,397 46.15 0.00 0.00 --- --- 0.00 27.25 --- --- --- --- 27.25 3.20 34,083 46.20 0.00 0.00 --- --- 0.00 30.45 --- --- --- --- 30.45 3.25 34,769 46.25 0.00 0.00 --- --- 0.00 33.77 --- --- --- --- 33.77 3.30 35,455 46.30 0.00 0.00 --- --- 0.00 37.21 --- --- --- --- 37.21 3.35 36,141 46.35 0.00 0.00 --- --- 0.00 40.75 --- --- --- --- 40.75 Continues on next page... 11 Bio Retention Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 3.40 36,827 46.40 0.00 0.00 --- --- 0.00 44.40 --- --- --- --- 44.40 3.45 37,513 46.45 0.00 0.00 --- --- 0.00 48.15 --- --- --- --- 48.15 3.50 38,199 46.50 0.00 0.00 --- --- 0.00 52.00 --- --- --- --- 52.00 ...End Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2023 Thursday, 07 / 25 / 2024 Hyd. No. 9 Post Analysis A- Combined Hydrograph type = Combine Peak discharge = 16.79 cfs Storm frequency = 100 yrs Time to peak = 12.13 hrs Time interval = 2 min Hyd. volume = 51,477 cuft Inflow hyds. = 4, 8 Contrib. drain. area = 0.290 ac 12 0 2 4 6 8 10 12 14 16 18 20 22 24 26 Q (cfs) 0.00 0.00 3.00 3.00 6.00 6.00 9.00 9.00 12.00 12.00 15.00 15.00 18.00 18.00 Q (cfs) Time (hrs) Post Analysis A- Combined Hyd. No. 9 -- 100 Year Hyd No. 9 Hyd No. 4 Hyd No. 8 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Bioretention Pond Calculations BIO-RETENTION AREA SIZING DATE AS-BUILT 28-Mar-24 PROJECT NAME PROJECT NO Gordon Road 56398 LOCATION BY WPA Estimate of Bio-Retention Area and Volume - Basin 1 Drainage Area, (DA) = 1.93 ac Impervious Area c=0.95 1.19 ac Pervious Area c= 0.15 0.74 ac Cc = 0.64 % Impervious = 61.7 % Temporary Water Quality Pool Design Storm Rainfall 1.50 in (Typically 1-in) Runoff Coeff. (Rv = 0.05 + 0.009 (% Imperv.)) = 0.60 ac/ac Required Volume (design rainfall)(Rv)(DA) = 6,357 cf Bio-Retention Design Depth of Storage= 12 in Surface Area Req.= 6,357 sf Surface Area Provided= 7,767 sf Underdrain Design Soil Mix Hyd. Conductivity, K = 2.0 in/hr = 4.63E-05 fps Surface Area, A = 7767 sf Flow through Soil Mix, (K x A) 0.360 cfs Safety Factor = 3.5 Design Flow, Q = 1.259 cfs Req'd Underdrain Pipe Diameter, D = 8.68 in D = 16 [(Q x n) / S 0.5 ]3/8 S = Underdrain Slope = 0.5% n = 0.011 (smooth PVC) Number of Pipes Required in Underdrain (per Tbl 5-1, NCDENR BMP Manual) If D is < # 4" Pipes # 6" Pipes 5.13 2 2 5.95 3 3 6.66 4 4 7.22 5 11.03 5 7.75 6 11.82 6 8.20 7 12.45 7 13.09 8 9.11 10.13 If D is < 7.84 s:\1319\0001\calcs\Bioretention Sizing printed: 7/19/2024 3:49 PM Page 1 of 3 BIO-RETENTION AREA SIZING DATE 13.68 9 14.23 10 Underdrains Provided Diameter = 6 in Quantity = 3 Water Quality Volume Percent Impervious, I 62% Rv = 0.05 + 0.009(I) 0.60 1.5 inch Runoff volume (Required) Runoff Volume, S = (Design Rainfall) (Rv) (Drainage Area) Design Rainfall = 1.5 in Drainage Area = 1.93 ac Storage Required =6357 cf Stage Storage 42.72 Weir Elevation =44.50 31411.00 38273.75 WQV Elevation = Area (sqft) Inc. Storage (cf) 7767 9523 13243 14208 Elevation (ft) 43 44 46 46.5 45 11354 6862.75 8645 22766 10438.5 10438.50 Total Storage (cf) 8645.00 s:\1319\0001\calcs\Bioretention Sizing printed: 7/19/2024 3:49 PM Page 2 of 3 CONTROL STRUCTURE NAME CONTROL STRUCTURE CALCULATED BY W Altman 5.00 ft 5.00 ft 0.5 ft 44.50 ft 39.42 ft 1.5 ft 6.58 ft 83.22 Cu-ft 0.00 ft^2 0.00 ft^2 0.00 ft^2 0.00 Cu-ft 15.00 inches 0.61 Cu-ft 164.5 Cu-ft 10264.8 lbs 1.15 FS 11804.52 lbs 12483 lbs 0 lbs 92 lbs 12391 lbsTotal Weight of Control Structure (Weight of Concrete Riser - Void Weight of Weirs - Void Weight of Pipes) Total Weight > Displaced Water Weight? OK If Total Weight < Water Weight (Increase Base Height / Increase Wall Thickness) Weight of Concrete Riser (Weight = Volume (Vr) * unit weight of concrete 150 lbs/ft^3) Void Weight of Weirs (Void Weight = Volume (Vw) * unit weight of concrete 150 lbs/ft^3) Void Weight of Pipes (Void Weight = Volume (Vp) * unit weight of concrete 150 lbs/ft^3) Weight of Displaced Water (Weight = Volume (Vwat) * unit weight of water 62.4 lbs/ft^3) Factor of Safety Factor Resultant Weight of Displaced Water TOTAL WEIGHT OF THE CONTROL STRUCTURE Outlet Pipe Diameter (Obtained from Hydrographs) Void Volume of Pipe (Vp) DISPLACED VOLUME OF WATER Volume of Displaced Water (Vwat)(Control Structure Length (L) * Width (W) * Height (H)) Area of Weir 2 (Obtained from Hydrographs) Area of Weir 3 (Obtained from Hydrographs) Void Volume of Weirs (Vw) AREA OF OUTLET PIPE Height of Resultant Riser (H)(Top of Riser Elevation - Invert Out of Outlet Pipe - Base Height) Volume of Riser and Base (Vr) AREA OF CONTROL STRUCTURE WEIRS Area of Weir 1 (Obtained from Hydrographs) Top of Riser Elevation (Obtained from Hydrographs) Invert Out of Outlet Pipe (Obtained from Hydrographs) Concrete / Non-shrink Grout Base Height (1.5' minumum. Engineer to ensure base is deeper than toe of slope) DIMENSIONS OF CONTROL STRUCTURE NOTES & FORMULAS Length of the Riser Exterior (L) Width of the Riser Exterior (W) Wall Thickness of the Riser (WT)(Typically 6" (0.5 ft) to 8" (0.67 ft) thickness) PROJECT NAME Gordon Road PROJECT NUMBER 56398 ANTI-BOUYANCY CALCULATIONS s:\1319\0001\calcs\Bioretention Sizing printed: 7/19/2024 3:49 PM Page 3 of 3 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Drainage Area Calculations Project: Gordon Road Fire Station Project No.: 56398 Calculated By: A Chaloupecky Date:7/19/2024 Curve Number Value - Pre-Development CN Ai (Ac)CNi x Ai 77.00 0.82 63.03 36.00 0.29 10.56 83.00 0.00 0.00 1.11 73.588499 ∑ (CNi x Ai) ∑ Ai CN Ai (Ac)CNi x Ai 77.00 0.00 0.00 36.00 0.91 32.87 83.00 0.75 62.02 1.66 94.886387 ∑ (CNi x Ai) ∑ Ai CN Ai (Ac)CNi x Ai 77.00 2.95 227.50 36.00 0.42 15.07 83.00 0.00 0.00 3.37 242.56683 ∑ (CNi x Ai) ∑ Ai Woods (HSG D) - Good Woods (HSG A) - Fair Woods (HSG D) - Poor CN = = 72 CN = = 57 Pre Development C Category Pre Development B Category Woods (HSG D) - Good Woods (HSG A) - Fair Woods (HSG D) - Poor CN = = 66 Woods (HSG D) - Good TIMMONS GROUP Pre Development A Category Woods (HSG A) - Fair Woods (HSG D) - Poor CN Ai (Ac)CNi x Ai 98.00 1.19 116.22 39.00 0.35 13.53 80.00 0.39 31.49 1.93 161.24 ∑ (CNi x Ai) ∑ Ai CN Ai (Ac)CNi x Ai 98.00 0.07 6.78 39.00 0.19 7.43 80.00 0.03 2.41 0.29 16.62 ∑ (CNi x Ai) ∑ Ai CN Ai (Ac)CNi x Ai 98.00 0.01 1.40 39.00 0.23 8.80 80.00 0.32 25.24 0.56 35.44 ∑ (CNi x Ai) ∑ Ai CN Ai (Ac)CNi x Ai 98.00 0.50 48.85 36.00 0.08 2.75 77.00 1.20 92.08 39.00 0.24 9.50 Open Space/lawn- good condition (HSG D) 80.00 1.36 108.68 3.37 261.85 CN = ∑ (CNi x Ai)= 78 ∑ Ai Impervious Open Space/lawn- good condition (HSG A) Woods - good condition (HSG D) Woods - fair condition (HSG A) CN = = 64 Post Development C Category Post Development B Category Impervious Open Space/lawn- good condition (HSG A) Open Space/lawn- good condition (HSG D) Post Development A - Bioretention Pond Category Impervious Open Space/lawn- good condition (HSG D) CN = = 84 CN = = 57 Open Space/lawn- good condition (HSG A) Post Development A - Bypass Category Impervious Open Space/lawn- good condition (HSG A) Open Space/lawn- good condition (HSG D) Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com HGL Calculations Project: Gordon Road Fire Station Project No.: 56398 Calculated By: A Chaloupecky Date:7/19/2024 Rational C Value - Post-Development- 10 year (Frequency Factor= 1.0) C Value Ai (Ac)CNi x Ai 0.95 0.13 0.13 0.20 0.01 0.00 0.30 0.01 0.00 0.16 0.13 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 0.14 0.14 0.30 0.00 0.00 0.15 0.14 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 0.18 0.17 0.30 0.02 0.01 0.20 0.18 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 0.13 0.12 0.30 0.00 0.00 0.13 0.12 ∑ (Ci x Ai) ∑ Ai DA - CB 1 Category Impervious Open Space/lawn- good condition (HSG A) TIMMONS GROUP Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.84 DA - CB 2 Impervious Category Open Space/lawn- good condition (HSG D) Cc = = 0.94 DA - CB 3 Category Open Space/lawn- good condition (HSG D) Cc = = 0.89 DA - CB 4B Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.95 DA - CB 5B C Value Ai (Ac)CNi x Ai 0.95 0.34 0.32 0.20 0.01 0.00 0.30 0.01 0.00 0.36 0.33 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 0.15 0.14 0.20 0.02 0.00 0.30 0.07 0.02 0.24 0.16 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 0.12 0.11 0.20 0.15 0.03 0.30 0.02 0.01 0.28 0.15 ∑ (Ci x Ai) ∑ Ai Cc = = 0.69 Category Impervious Open Space/lawn- good condition (HSG A) Open Space/lawn- good condition (HSG D) Cc = = 0.90 DA - DI 1 Category Impervious Open Space/lawn- good condition (HSG A) Open Space/lawn- good condition (HSG D) DA - DI 2 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.52 Open Space/lawn- good condition (HSG A) Project: Gordon Road Fire Station Project No.: 56398 Calculated By: A Chaloupecky Date: Rational C Value - Post-Development- 25 year (Frequency Factor= 1.1) C Value C-Value w/Cf of 1.1 Ai (Ac)CNi x Ai 0.95 1.00 0.13 0.13 0.20 0.22 0.01 0.00 0.30 0.33 0.01 0.00 0.16 0.14 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.14 0.14 0.30 0.33 0.00 0.00 0.15 0.14 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.18 0.18 0.30 0.33 0.02 0.01 0.20 0.19 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.13 0.13 0.30 0.33 0.00 0.00 0.13 0.13 ∑ (Ci x Ai) ∑ Ai Cc = = 0.89 Open Space/lawn- good condition (HSG A) TIMMONS GROUP DA - CB 1 Category Impervious Open Space/lawn- good condition (HSG D) DA - CB 2 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.99 DA - CB 3 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.94 DA - CB 4B Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 1.00 DA - CB 5B C Value Ai (Ac)CNi x Ai 0.95 1.00 0.34 0.34 0.20 0.22 0.01 0.00 0.30 0.33 0.01 0.00 0.36 0.34 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.15 0.15 Open Space/lawn- good condition (HSG A) 0.20 0.22 0.02 0.00 0.30 0.33 0.07 0.02 0.24 0.17 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.12 0.12 0.20 0.22 0.15 0.03 0.30 0.33 0.02 0.01 0.28 0.16 ∑ (Ci x Ai) ∑ Ai Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.95 Open Space/lawn- good condition (HSG A) DA - DI 1 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.74 DA - DI 2 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.55 Open Space/lawn- good condition (HSG A) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 25 2024 CB1 Gutter Spread Gutter Cross Sl, Sx (ft/ft) = 0.015 Cross Sl, Sw (ft/ft) = 0.083 Gutter Width (ft) = 1.00 Invert Elev (ft) = 48.01 Slope (%) = 1.48 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 2.31 Highlighted Depth (ft) = 0.22 Q (cfs) = 2.310 Area (sqft) = 0.76 Velocity (ft/s) = 3.03 Wetted Perim (ft) = 10.14 Crit Depth, Yc (ft) = 0.27 Spread Width (ft) = 9.92 EGL (ft) = 0.36 0 5 10 15 20 25 30 35 40 Elev (ft)Depth (ft)Section 47.75 -0.26 48.00 -0.01 48.25 0.24 48.50 0.49 48.75 0.74 49.00 0.99 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 25 2024 CB2 Gutter Spread Gutter Cross Sl, Sx (ft/ft) = 0.015 Cross Sl, Sw (ft/ft) = 0.083 Gutter Width (ft) = 1.00 Invert Elev (ft) = 47.92 Slope (%) = 0.80 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 1.62 Highlighted Depth (ft) = 0.21 Q (cfs) = 1.620 Area (sqft) = 0.73 Velocity (ft/s) = 2.23 Wetted Perim (ft) = 9.82 Crit Depth, Yc (ft) = 0.24 Spread Width (ft) = 9.60 EGL (ft) = 0.29 0 5 10 15 20 25 30 35 40 Elev (ft)Depth (ft)Section 47.00 -0.92 47.50 -0.42 48.00 0.08 48.50 0.58 49.00 1.08 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 25 2024 CB3 Gutter Spread Gutter Cross Sl, Sx (ft/ft) = 0.022 Cross Sl, Sw (ft/ft) = 0.083 Gutter Width (ft) = 1.00 Invert Elev (ft) = 47.76 Slope (%) = 1.53 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 2.05 Highlighted Depth (ft) = 0.22 Q (cfs) = 2.050 Area (sqft) = 0.62 Velocity (ft/s) = 3.32 Wetted Perim (ft) = 7.59 Crit Depth, Yc (ft) = 0.28 Spread Width (ft) = 7.36 EGL (ft) = 0.39 0 5 10 15 20 25 30 35 Elev (ft)Depth (ft)Section 47.00 -0.76 47.50 -0.26 48.00 0.24 48.50 0.74 49.00 1.24 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 25 2024 CB4 Gutter Spread Gutter Cross Sl, Sx (ft/ft) = 0.012 Cross Sl, Sw (ft/ft) = 0.083 Gutter Width (ft) = 1.00 Invert Elev (ft) = 47.83 Slope (%) = 1.03 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 1.42 Highlighted Depth (ft) = 0.19 Q (cfs) = 1.420 Area (sqft) = 0.63 Velocity (ft/s) = 2.25 Wetted Perim (ft) = 10.33 Crit Depth, Yc (ft) = 0.22 Spread Width (ft) = 10.14 EGL (ft) = 0.27 0 5 10 15 20 25 30 35 40 45 50 Elev (ft)Depth (ft)Section 47.00 -0.83 47.50 -0.33 48.00 0.17 48.50 0.67 49.00 1.17 Reach (ft) Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Thursday, Jul 25 2024 CB5 Gutter Spread Gutter Cross Sl, Sx (ft/ft) = 0.010 Cross Sl, Sw (ft/ft) = 0.083 Gutter Width (ft) = 1.00 Invert Elev (ft) = 46.78 Slope (%) = 0.90 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 3.73 Highlighted Depth (ft) = 0.24 Q (cfs) = 3.730 Area (sqft) = 1.46 Velocity (ft/s) = 2.55 Wetted Perim (ft) = 17.15 Crit Depth, Yc (ft) = 0.28 Spread Width (ft) = 16.90 EGL (ft) = 0.34 0 5 10 15 20 25 30 35 40 45 50 55 Elev (ft)Depth (ft)Section 46.00 -0.78 46.50 -0.28 47.00 0.22 47.50 0.72 48.00 1.22 Reach (ft) Project: Gordon Road Fire Station Project No.: 56398 Calculated By: A Chaloupecky Date: Rational C Value - Post-Development- 100 year (Frequency Factor= 1.25) C Value C-Value w/Cf of 1.1 Ai (Ac)CNi x Ai 0.95 1.00 0.13 0.13 0.20 0.25 0.01 0.00 0.30 0.38 0.01 0.01 0.16 0.14 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.14 0.14 0.30 0.38 0.00 0.00 0.15 0.14 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.18 0.18 0.30 0.38 0.02 0.01 0.20 0.19 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.13 0.13 0.30 0.38 0.00 0.00 0.13 0.13 ∑ (Ci x Ai) ∑ Ai Cc = = 0.89 Open Space/lawn- good condition (HSG A) TIMMONS GROUP DA - CB 1 Category Impervious Open Space/lawn- good condition (HSG D) DA - CB 2 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.99 DA - CB 3 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.94 DA - CB 4B Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 1.00 DA - CB 5B C Value Ai (Ac)CNi x Ai 0.95 1.00 0.34 0.34 0.20 0.25 0.01 0.00 0.30 0.38 0.01 0.00 0.36 0.34 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.15 0.15 0.20 0.25 0.02 0.00 0.30 0.38 0.07 0.03 0.24 0.18 ∑ (Ci x Ai) ∑ Ai C Value Ai (Ac)CNi x Ai 0.95 1.00 0.12 0.12 0.20 0.25 0.15 0.04 0.30 0.38 0.02 0.01 0.28 0.16 ∑ (Ci x Ai) ∑ Ai Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.95 Open Space/lawn- good condition (HSG A) DA - DI 1 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.75 Open Space/lawn- good condition (HSG A) DA - DI 2 Category Impervious Open Space/lawn- good condition (HSG D) Cc = = 0.57 Open Space/lawn- good condition (HSG A) Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Rip Rap Calculations OUTLET PROTECTION DATE DESIGN PROJECT NAME PROJECT NO Gordon Road Fire Station LOCATION BY New Hanover County, NC AC Rip Rap Energy Dissipator RR-SKIMMER Pipe Diameter:18.00 in Upper Invert:39.42 Lower Invert:39.00 Pipe Length:83.55 ft *Discharge from Storm Sewers Pipe Slope:0.50% Discharge: 5.68 cfs Pipe Material:RCP Q25 =5.68 cfs Q25/Qfull =0.76 Qfull = 7.46 cfs V/Vfull = 1.10 Vfull = 4.22 fps V = 4.63 fps Dissipator Dimensions * Zone = 1 Stone Filling Class = A Entry Width ( 3 X D0 ) = 4.5 ft Length ( 6 X D0 ) = 9.0 ft Width (La + D0) = 10.5 ft Min. Thickness = 12 inches Stone Diameter (D50)= 3 inches 4.5 10.5 * All units are in feet ** Dissipator pad designed for full flow of pipe 9.0 7/25/2024 56398 Rip Rap Calcs 7/25/2024 Page 1 of 12 OUTLET PROTECTION DATE DESIGN PROJECT NAME PROJECT NO Gordon Road Fire Station LOCATION BY New Hanover County, NC AC Rip Rap Energy Dissipator RR-1 Pipe Diameter:18.00 in Upper Invert:43.27 Lower Invert:43.00 Pipe Length:33.39 ft *Discharge from Storm Sewers Pipe Slope:0.81% Discharge: 8.19 cfs Pipe Material:RCP Q25 =8.19 cfs Q25/Qfull =0.87 Qfull = 9.46 cfs V/Vfull = 1.12 Vfull = 5.35 fps V = 6.01 fps Dissipator Dimensions * Zone = 1 Stone Filling Class = A Entry Width ( 3 X D0 ) = 4.5 ft Length ( 6 X D0 ) = 9.0 ft Width (La + D0) = 10.5 ft Min. Thickness = 12 inches Stone Diameter (D50)= 3 inches 4.5 10.5 * All units are in feet ** Dissipator pad designed for full flow of pipe 9.0 7/25/2024 56398 Rip Rap Calcs 7/25/2024 Page 2 of 12 OUTLET PROTECTION DATE DESIGN PROJECT NAME PROJECT NO Gordon Road Fire Station LOCATION BY New Hanover County, NC AC Rip Rap Energy Dissipator RR-2 Pipe Diameter:18.00 in Upper Invert:43.09 Lower Invert:43.00 Pipe Length:18.65 ft *Discharge from Storm Sewers Pipe Slope:0.48% Discharge: 4.80 cfs Pipe Material:RCP Q25 =4.80 cfs Q25/Qfull =0.66 Qfull = 7.31 cfs V/Vfull = 1.07 Vfull = 4.14 fps V = 4.40 fps Dissipator Dimensions * Zone = 1 Stone Filling Class = A Entry Width ( 3 X D0 ) = 4.5 ft Length ( 6 X D0 ) = 9.0 ft Width (La + D0) = 10.5 ft Min. Thickness = 12 inches Stone Diameter (D50)= 3 inches 4.5 10.5 * All units are in feet ** Dissipator pad designed for full flow of pipe 9.0 7/25/2024 56398 Rip Rap Calcs 7/25/2024 Page 3 of 12 OUTLET PROTECTION DATE DESIGN PROJECT NAME PROJECT NO Gordon Road Fire Station LOCATION BY New Hanover County, NC AC Rip Rap Energy Dissipator RR-3 Pipe Diameter:15.00 in Upper Invert:41.36 Lower Invert:39.83 Pipe Length:110.00 ft *Discharge from Storm Sewers Pipe Slope:1.39% Discharge: 1.43 cfs Pipe Material:RCP Q25 =1.43 cfs Q25/Qfull =0.19 Qfull = 7.63 cfs V/Vfull = 0.75 Vfull = 6.22 fps V = 4.68 fps Dissipator Dimensions * Zone = 1 Stone Filling Class = A Entry Width ( 3 X D0 ) = 3.8 ft Length ( 6 X D0 ) = 7.5 ft Width (La + D0) = 8.8 ft Min. Thickness = 12 inches Stone Diameter (D50)= 3 inches 3.8 8.8 * All units are in feet ** Dissipator pad designed for full flow of pipe 7.5 7/25/2024 56398 Rip Rap Calcs 7/25/2024 Page 4 of 12 OUTLET PROTECTION DATE DESIGN PROJECT NAME PROJECT NO Gordon Road Fire Station LOCATION BY New Hanover County, NC AC Rip Rap Energy Dissipator RR-4 Pipe Diameter:15.00 in Upper Invert:39.61 Lower Invert:39.15 Pipe Length:92.00 ft *Discharge from Storm Sewers Pipe Slope:0.50% Discharge: 1.83 cfs Pipe Material:RCP Q25 =1.83 cfs Q25/Qfull =0.40 Qfull = 4.57 cfs V/Vfull = 0.94 Vfull = 3.73 fps V = 3.52 fps Dissipator Dimensions * Zone = 1 Stone Filling Class = A Entry Width ( 3 X D0 ) = 3.8 ft Length ( 6 X D0 ) = 7.5 ft Width (La + D0) = 8.8 ft Min. Thickness = 12 inches Stone Diameter (D50)= 3 inches 3.8 8.8 * All units are in feet ** Dissipator pad designed for full flow of pipe 7.5 7/25/2024 56398 Rip Rap Calcs 7/25/2024 Page 5 of 12 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Culvert Calculations Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 Culvert 10 Yr. Invert Elev Dn (ft) = 36.93 Pipe Length (ft) = 64.00 Slope (%) = 0.50 Invert Elev Up (ft) = 37.25 Rise (in) = 19.0 Shape = Elliptical Span (in) = 30.0 No. Barrels = 2 n-Value = 0.012 Culvert Type = Horizontal Ellipse Concrete Culvert Entrance = Square edge w/headwall (H) Coeff. K,M,c,Y,k = 0.01, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 41.32 Top Width (ft) = 46.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 16.20 Qmax (cfs) = 16.20 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 16.20 Qpipe (cfs) = 16.20 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 3.12 Veloc Up (ft/s) = 4.45 HGL Dn (ft) = 38.10 HGL Up (ft) = 38.14 Hw Elev (ft) = 38.53 Hw/D (ft) = 0.81 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 Culvert 25 Yr. Invert Elev Dn (ft) = 36.93 Pipe Length (ft) = 64.00 Slope (%) = 0.50 Invert Elev Up (ft) = 37.25 Rise (in) = 19.0 Shape = Elliptical Span (in) = 30.0 No. Barrels = 2 n-Value = 0.012 Culvert Type = Horizontal Ellipse Concrete Culvert Entrance = Square edge w/headwall (H) Coeff. K,M,c,Y,k = 0.01, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 41.32 Top Width (ft) = 46.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 18.53 Qmax (cfs) = 18.53 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 18.53 Qpipe (cfs) = 18.53 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 3.57 Veloc Up (ft/s) = 5.09 HGL Dn (ft) = 38.10 HGL Up (ft) = 38.14 Hw Elev (ft) = 38.69 Hw/D (ft) = 0.91 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 DWLT Invert Elev Dn (ft) = 41.85 Pipe Length (ft) = 110.00 Slope (%) = 2.13 Invert Elev Up (ft) = 44.19 Rise (in) = 15.0 Shape = Circular Span (in) = 15.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 46.00 Top Width (ft) = 90.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 1.43 Qmax (cfs) = 1.43 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 1.43 Qpipe (cfs) = 1.43 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 1.59 Veloc Up (ft/s) = 3.36 HGL Dn (ft) = 42.71 HGL Up (ft) = 44.66 Hw Elev (ft) = 44.84 Hw/D (ft) = 0.52 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 DWRT Invert Elev Dn (ft) = 39.14 Pipe Length (ft) = 95.00 Slope (%) = 1.66 Invert Elev Up (ft) = 40.72 Rise (in) = 15.0 Shape = Circular Span (in) = 15.0 No. Barrels = 1 n-Value = 0.012 Culvert Type = Circular Concrete Culvert Entrance = Square edge w/headwall (C) Coeff. K,M,c,Y,k = 0.0098, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 43.00 Top Width (ft) = 80.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 1.83 Qmax (cfs) = 1.83 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 1.83 Qpipe (cfs) = 1.83 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 1.95 Veloc Up (ft/s) = 3.63 HGL Dn (ft) = 40.03 HGL Up (ft) = 41.26 Hw Elev (ft) = 41.47 Hw/D (ft) = 0.60 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 Culvert 100 Yr. Invert Elev Dn (ft) = 36.93 Pipe Length (ft) = 64.00 Slope (%) = 0.50 Invert Elev Up (ft) = 37.25 Rise (in) = 19.0 Shape = Elliptical Span (in) = 30.0 No. Barrels = 2 n-Value = 0.012 Culvert Type = Horizontal Ellipse Concrete Culvert Entrance = Square edge w/headwall (H) Coeff. K,M,c,Y,k = 0.01, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 41.32 Top Width (ft) = 46.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 22.10 Qmax (cfs) = 22.10 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 22.10 Qpipe (cfs) = 22.10 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.09 Veloc Up (ft/s) = 6.08 HGL Dn (ft) = 38.13 HGL Up (ft) = 38.14 Hw Elev (ft) = 38.92 Hw/D (ft) = 1.06 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 Culvert 500 Yr. Invert Elev Dn (ft) = 36.93 Pipe Length (ft) = 64.00 Slope (%) = 0.50 Invert Elev Up (ft) = 37.25 Rise (in) = 19.0 Shape = Elliptical Span (in) = 30.0 No. Barrels = 2 n-Value = 0.012 Culvert Type = Horizontal Ellipse Concrete Culvert Entrance = Square edge w/headwall (H) Coeff. K,M,c,Y,k = 0.01, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 41.32 Top Width (ft) = 46.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 26.34 Qmax (cfs) = 26.34 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 26.34 Qpipe (cfs) = 26.34 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 4.87 Veloc Up (ft/s) = 6.05 HGL Dn (ft) = 38.20 HGL Up (ft) = 38.26 Hw Elev (ft) = 39.05 Hw/D (ft) = 1.13 Flow Regime = Inlet Control Culvert Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Tuesday, Jul 16 2024 Culvert Overtopping Invert Elev Dn (ft) = 36.93 Pipe Length (ft) = 64.00 Slope (%) = 0.50 Invert Elev Up (ft) = 37.25 Rise (in) = 19.0 Shape = Elliptical Span (in) = 30.0 No. Barrels = 2 n-Value = 0.012 Culvert Type = Horizontal Ellipse Concrete Culvert Entrance = Square edge w/headwall (H) Coeff. K,M,c,Y,k = 0.01, 2, 0.0398, 0.67, 0.5 Embankment Top Elevation (ft) = 41.32 Top Width (ft) = 46.00 Crest Width (ft) = 0.10 Calculations Qmin (cfs) = 54.25 Qmax (cfs) = 54.25 Tailwater Elev (ft) = (dc+D)/2 Highlighted Qtotal (cfs) = 54.25 Qpipe (cfs) = 54.25 Qovertop (cfs) = 0.00 Veloc Dn (ft/s) = 9.09 Veloc Up (ft/s) = 8.73 HGL Dn (ft) = 38.39 HGL Up (ft) = 39.24 Hw Elev (ft) = 41.34 Hw/D (ft) = 2.58 Flow Regime = Inlet Control Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Erosion Control Calculations 1 Area (A) =0.32 (Acres) Coef. (C) = 0.35 (Dimensionless) Inte. (I) =9.70 (in/hr) Flow (Q10) =1.1 (cfs) Line channel with:6 " rip-rap (Assume 6" even if using grass) Manning n =0.030 (Dimensionless) Ditch Length = 446 LF Slope = 0.013 (ft/ft) Highest Elevation = 44 Z Required = 0.19 Ratio Lowest Elevation = 38 Side Slope (M) =3 :1 Flow Depth (Y) =1.00 ft 12.0 in Bottom Width (B) =0.00 ft 0.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.84 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) LB/SF Jute Net 0.45 LB/SF Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II (18"@30"THK) 7.50 P300 8.00 New A = 3.00 SF New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual =1.82 Must be greater than z required=>0.19 Okay New V = 3.50 fps Liner:1.55 LB/SF > 0.84 LB/SF Okay Min. Ditch Depth = 1.5 ft 3 1 Side Slope 3:1 *RED IS USER INPUT Ditch Liner Curled Mat Min. Ditch Depth (ft) Bottom Width (ft) Flow Depth (ft) Top Width (ft) 1.50 0.00 1.00 9 Ditch Geometry Variable Quantities (Ditch Width & Depth) Compute Tractive Force General Lining North American Green Lining Determine If Z Actual Is Greater Than Z Required Minimum Design Geometry Curled Mat Top Width = 9 ft Flow Depth (Y) = 1 ft Bottom Width (B) = 0 ft Known Quantities DITCH NAME PROJECT NAME Gordon Road Fire Station CALCULATED BY PROJECT NUMBER Andrew Chaloupecky 56389 Drainage Ditch Design (Velocity Constraint) TEMPORARY DIVERSION DITCH: 1 This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data LATEST REVISION: 7/30/2024 6:09 PM CALCULATED BY Andrew Chaloupecky Velocity =3.50 fps From Fig. 8.06.c:ZONE =1 Top Width =9 ft Ditch Area = 3 sf Rip Rap Class = A Equivalent Pipe Diameter = 23.45 in Apron Thickness = 12 in Equivalent Pipe Diameter =24 in Apron Length = 8.0 ft Apron Width = Top Width.= 9.0 ft From Fig. 8.06.e: Ditch Name: 1 PROJECT NAME Gordon Road Fire Station PROJECT NUMBER 56389 Ditch Outlet Protection (NCDOT Method) LATEST REVISION: 7/30/2024 6:09 PM 2 Area (A) =0.41 (Acres) Coef. (C) = 0.35 (Dimensionless) Inte. (I) =9.70 (in/hr) Flow (Q10) =1.4 (cfs) Line channel with:6 " rip-rap (Assume 6" even if using grass) Manning n =0.030 (Dimensionless) Ditch Length = 308 LF Slope = 0.009 (ft/ft) Highest Elevation = 40.9 Z Required = 0.29 Ratio Lowest Elevation = 38 Side Slope (M) =3 :1 Flow Depth (Y) =1.00 ft 12.0 in Bottom Width (B) =0.00 ft 0.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.59 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) LB/SF Jute Net 0.45 LB/SF Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II (18"@30"THK) 7.50 P300 8.00 New A = 3.00 SF New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual =1.82 Must be greater than z required=>0.29 Okay New V = 2.93 fps Liner:1.55 LB/SF > 0.59 LB/SF Okay Min. Ditch Depth = 1.5 ft 3 1 Side Slope 3:1 *RED IS USER INPUT Ditch Liner Curled Mat Min. Ditch Depth (ft) Bottom Width (ft) Flow Depth (ft) Top Width (ft) 1.50 0.00 1.00 9 Ditch Geometry Variable Quantities (Ditch Width & Depth) Compute Tractive Force General Lining North American Green Lining Determine If Z Actual Is Greater Than Z Required Minimum Design Geometry Curled Mat Top Width = 9 ft Flow Depth (Y) = 1 ft Bottom Width (B) = 0 ft Known Quantities DITCH NAME PROJECT NAME Gordon Road Fire Station CALCULATED BY PROJECT NUMBER Andrew Chaloupecky 56389 Drainage Ditch Design (Velocity Constraint) TEMPORARY DIVERSION DITCH: 2 This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data LATEST REVISION: 7/30/2024 6:09 PM CALCULATED BY Andrew Chaloupecky Velocity =2.93 fps From Fig. 8.06.c:ZONE =1 Top Width =9 ft Ditch Area = 3 sf Rip Rap Class = A Equivalent Pipe Diameter = 23.45 in Apron Thickness = 12 in Equivalent Pipe Diameter =24 in Apron Length = 8.0 ft Apron Width = Top Width.= 9.0 ft From Fig. 8.06.e: Ditch Name: 2 PROJECT NAME Gordon Road Fire Station PROJECT NUMBER 56389 Ditch Outlet Protection (NCDOT Method) LATEST REVISION: 7/30/2024 6:09 PM 3 Area (A) =0.50 (Acres) Coef. (C) = 0.35 (Dimensionless) Inte. (I) =9.70 (in/hr) Flow (Q10) =1.7 (cfs) Line channel with:6 " rip-rap (Assume 6" even if using grass) Manning n =0.030 (Dimensionless) Ditch Length = 403 LF Slope = 0.018 (ft/ft) Highest Elevation = 45.1 Z Required = 0.26 Ratio Lowest Elevation = 38 Side Slope (M) =3 :1 Flow Depth (Y) =1.00 ft 12.0 in Bottom Width (B) =0.00 ft 0.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 1.10 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) LB/SF Jute Net 0.45 LB/SF Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II (18"@30"THK) 7.50 P300 8.00 New A = 3.00 SF New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual =1.82 Must be greater than z required=>0.26 Okay New V = 4.01 fps Liner:1.55 LB/SF > 1.1 LB/SF Okay Min. Ditch Depth = 1.5 ft 3 1 Side Slope 3:1 *RED IS USER INPUT Ditch Liner Curled Mat Min. Ditch Depth (ft) Bottom Width (ft) Flow Depth (ft) Top Width (ft) 1.50 0.00 1.00 9 Ditch Geometry Variable Quantities (Ditch Width & Depth) Compute Tractive Force General Lining North American Green Lining Determine If Z Actual Is Greater Than Z Required Minimum Design Geometry Curled Mat Top Width = 9 ft Flow Depth (Y) = 1 ft Bottom Width (B) = 0 ft Known Quantities DITCH NAME PROJECT NAME Gordon Road Fire Station CALCULATED BY PROJECT NUMBER Andrew Chaloupecky 56389 Drainage Ditch Design (Velocity Constraint) TEMPORARY DIVERSION DITCH: 3 This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data LATEST REVISION: 7/30/2024 6:09 PM CALCULATED BY Andrew Chaloupecky Velocity =4.01 fps From Fig. 8.06.c:ZONE =1 Top Width =9 ft Ditch Area = 3 sf Rip Rap Class = A Equivalent Pipe Diameter = 23.45 in Apron Thickness = 12 in Equivalent Pipe Diameter =24 in Apron Length = 8.0 ft Apron Width = Top Width.= 9.0 ft From Fig. 8.06.e: Ditch Name: 3 PROJECT NAME Gordon Road Fire Station PROJECT NUMBER 56389 Ditch Outlet Protection (NCDOT Method) LATEST REVISION: 7/30/2024 6:09 PM 4 Area (A) =0.24 (Acres) Coef. (C) = 0.35 (Dimensionless) Inte. (I) =9.70 (in/hr) Flow (Q10) =0.8 (cfs) Line channel with:6 " rip-rap (Assume 6" even if using grass) Manning n =0.030 (Dimensionless) Ditch Length = 297 LF Slope = 0.013 (ft/ft) Highest Elevation = 42 Z Required = 0.14 Ratio Lowest Elevation = 38 Side Slope (M) =3 :1 Flow Depth (Y) =1.00 ft 12.0 in Bottom Width (B) =0.00 ft 0.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.84 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) LB/SF Jute Net 0.45 LB/SF Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II (18"@30"THK) 7.50 P300 8.00 New A = 3.00 SF New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual =1.82 Must be greater than z required=>0.14 Okay New V = 3.51 fps Liner:1.55 LB/SF > 0.85 LB/SF Okay Min. Ditch Depth = 1.5 ft 3 1 Side Slope 3:1 *RED IS USER INPUT Ditch Liner Curled Mat Min. Ditch Depth (ft) Bottom Width (ft) Flow Depth (ft) Top Width (ft) 1.50 0.00 1.00 9 Ditch Geometry Variable Quantities (Ditch Width & Depth) Compute Tractive Force General Lining North American Green Lining Determine If Z Actual Is Greater Than Z Required Minimum Design Geometry Curled Mat Top Width = 9 ft Flow Depth (Y) = 1 ft Bottom Width (B) = 0 ft Known Quantities DITCH NAME PROJECT NAME Gordon Road Fire Station CALCULATED BY PROJECT NUMBER Andrew Chaloupecky 56389 Drainage Ditch Design (Velocity Constraint) TEMPORARY DIVERSION DITCH: 4 This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data LATEST REVISION: 7/30/2024 6:09 PM CALCULATED BY Andrew Chaloupecky Velocity =3.51 fps From Fig. 8.06.c:ZONE =1 Top Width =9 ft Ditch Area = 3 sf Rip Rap Class = A Equivalent Pipe Diameter = 23.45 in Apron Thickness = 12 in Equivalent Pipe Diameter =24 in Apron Length = 8.0 ft Apron Width = Top Width.= 9.0 ft From Fig. 8.06.e: Ditch Name: 4 PROJECT NAME Gordon Road Fire Station PROJECT NUMBER 56389 Ditch Outlet Protection (NCDOT Method) LATEST REVISION: 7/30/2024 6:09 PM 5 Area (A) =0.60 (Acres) Coef. (C) = 0.35 (Dimensionless) Inte. (I) =9.70 (in/hr) Flow (Q10) =2.0 (cfs) Line channel with:6 " rip-rap (Assume 6" even if using grass) Manning n =0.030 (Dimensionless) Ditch Length = 211 LF Slope = 0.007 (ft/ft) Highest Elevation = 44.5 Z Required = 0.49 Ratio Lowest Elevation = 43 Side Slope (M) =3 :1 Flow Depth (Y) =1.00 ft 12.0 in Bottom Width (B) =0.00 ft 0.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.44 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) LB/SF Jute Net 0.45 LB/SF Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II (18"@30"THK) 7.50 P300 8.00 New A = 3.00 SF New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual =1.82 Must be greater than z required=>0.49 Okay New V = 2.55 fps Liner:0.45 LB/SF > 0.45 LB/SF Okay Min. Ditch Depth = 1.5 ft 3 1 Side Slope 3:1 *RED IS USER INPUT 0.00 1.00 9 TEMPORARY DIVERSION DITCH: 5 Top Width = 9 ft Variable Quantities (Ditch Width & Depth) This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data Known Quantities Compute Tractive Force Drainage Ditch Design (Velocity Constraint) PROJECT NAME PROJECT NUMBER 56389 DITCH NAME CALCULATED BY Andrew Chaloupecky Gordon Road Fire Station Ditch Liner Jute Net Jute Net General Lining North American Green Lining Determine If Z Actual Is Greater Than Z Required Minimum Design Geometry Min. Ditch Depth (ft) 1.50 Bottom Width (ft) Flow Depth (Y) = 1 ft Ditch Geometry Bottom Width (B) = 0 ft Top Width (ft)Flow Depth (ft) LATEST REVISION: 7/30/2024 6:09 PM CALCULATED BY Andrew Chaloupecky Velocity =2.55 fps From Fig. 8.06.c:ZONE =1 Top Width =9 ft Ditch Area = 3 sf Rip Rap Class = A Equivalent Pipe Diameter = 23.45 in Apron Thickness = 12 in Equivalent Pipe Diameter =24 in Apron Length = 8.0 ft Apron Width = Top Width.= 9.0 ft From Fig. 8.06.e: Ditch Name: 5 PROJECT NAME Gordon Road Fire Station PROJECT NUMBER 56389 Ditch Outlet Protection (NCDOT Method) LATEST REVISION: 7/30/2024 6:09 PM 6 Area (A) =0.50 (Acres) Coef. (C) = 0.35 (Dimensionless) Inte. (I) =9.70 (in/hr) Flow (Q10) =1.7 (cfs) Line channel with:6 " rip-rap (Assume 6" even if using grass) Manning n =0.030 (Dimensionless) Ditch Length = 312 LF Slope = 0.005 (ft/ft) Highest Elevation = 44.5 Z Required = 0.49 Ratio Lowest Elevation = 43 Side Slope (M) =3 :1 Flow Depth (Y) =1.00 ft 12.0 in Bottom Width (B) =0.00 ft 0.0 in Freeboard = 0.50 ft 6.0 in T=YxDxS Y = Weight of water (62.4 LB/CUFT) T = 0.30 LB/SF D=Depth of flow in channel (ft) S=Slope of channel (ft/ft) LB/SF Jute Net 0.45 LB/SF Curled Mat 1.55 S75 1.55 Class A (4"@9"THK) 2.00 S150 1.75 Class B (8"@18"THK) 3.50 SC150 2.10 Class I (12"@22"THK) 5.00 C125 2.25 Class II (18"@30"THK) 7.50 P300 8.00 New A = 3.00 SF New P = 6.32 Wetted perimeter New R = 0.47 Hydraulic radius Z Actual =1.82 Must be greater than z required=>0.49 Okay New V = 2.09 fps Liner:0.45 LB/SF > 0.3 LB/SF Okay Min. Ditch Depth = 1.5 ft 3 1 Side Slope 3:1 *RED IS USER INPUT Ditch Liner Jute Net Min. Ditch Depth (ft) Bottom Width (ft) Flow Depth (ft) Top Width (ft) 1.50 0.00 1.00 9 Ditch Geometry Variable Quantities (Ditch Width & Depth) Compute Tractive Force General Lining North American Green Lining Determine If Z Actual Is Greater Than Z Required Minimum Design Geometry Jute Net Top Width = 9 ft Flow Depth (Y) = 1 ft Bottom Width (B) = 0 ft Known Quantities DITCH NAME PROJECT NAME Gordon Road Fire Station CALCULATED BY PROJECT NUMBER Andrew Chaloupecky 56389 Drainage Ditch Design (Velocity Constraint) TEMPORARY DIVERSION DITCH: 6 This worksheet is designed to determine channel lining based on flow and ditch geometry (base width, side slope, & channel slope). This program determines depth of flow, velocity and tractive force assuming n=0.03 for grass or rip rap (n can be varied if desired). (Vary depth until z actual equals z required; v & t will be correct; select appropriate lining based on tractive force) Watershed Data LATEST REVISION: 7/30/2024 6:09 PM CALCULATED BY Andrew Chaloupecky Velocity =2.09 fps From Fig. 8.06.c:ZONE =1 Top Width =9 ft Ditch Area = 3 sf Rip Rap Class = A Equivalent Pipe Diameter = 23.45 in Apron Thickness = 12 in Equivalent Pipe Diameter =24 in Apron Length = 8.0 ft Apron Width = Top Width.= 9.0 ft From Fig. 8.06.e: Ditch Name: 6 PROJECT NAME Gordon Road Fire Station PROJECT NUMBER 56389 Ditch Outlet Protection (NCDOT Method) LATEST REVISION: 7/30/2024 6:09 PM LENGTH DA ACCUM. DA I10 Q10 SLOPE V SHEAR FLOW DEPTH FLOW AREA Wp R SWALE DEPTH SIDE SLOPE (FT) (AC) (AC) (IN/HR) (CFS) (%) (FT/S) (PSF) (FT) (FT^2) (FT) (FT) (IN) (H:V) DITCH 1 265 0.51 2.44 0.64 9.70 15.15 2.87% 0.033 4.76 1.86 1.04 3.25 6.58 0.49 24 3:1 GRASS DITCH 2 280 0.44 0.40 9.70 1.71 0.90% 0.037 1.65 0.34 0.60 1.08 3.79 0.28 24 3:1 GRASS DITCH 3 385 0.53 0.63 9.70 3.24 1.61% 0.037 2.42 0.69 0.69 1.43 4.36 0.33 24 3:1 GRASS DITCH 4 280 0.37 0.49 9.70 1.76 0.88% 0.037 1.65 0.33 0.61 1.12 3.86 0.29 24 3:1 GRASS 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 0.50 9.70 0.00 #DIV/0! 0.00 #DIV/0! 24 3:1 NAG P550 NAME PERMANENT CHANNEL SCHEDULE (Chapter 8.05 of the NCDEQ E&SC Planning and Design Manual) C N VALUE PERMANENT LINING 2 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Section 4: Stormwater Compliance Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Pre/Post Stormwater Maps PRO P O S E D R I G H T O F W A Y 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 8'' W 8'' W 8'' W W W W W W W G O R D O N R O A D 60' P U B L I C R / W 42 4243434442 424344 45444546 41 41 41 41 41424243 4040 40 40 40 40 414041 4039 40 3838 4445 42 41 4544 39 4039 39 41 4039 3939 3839 3839 41 42 4041 40 4040 40 4039 41 41 42 4142 39 39 39 4039 39 39 39 403939 39 38 3838 38 3838 40 3839 42 42 PROPOSED BUILDING 14,461 SF REFER TO R-SERIES FOR DRIVEWAY PLANS 10'x70' SIGHT VISIBILITY TRIANGLE 10'x70' SIGHT VISIBILITY TRIANGLE B C 48 47 49 46 45 44 44 45 46 4748 43 46 45 44 43 44 45 46 48 48 47 4 6 45 42424346 45 44 45 48 46 49 49 49 49 48 49 48 47 46 45 44 4341 4 3 47 4443 1. 7 9 %A PRO P O S E D R I G H T O F W A Y 16 ' ' W 16 ' ' W 16 ' ' W 16 ' ' W 8'' W 8'' W 8'' W W W W W W W G O R D O N R O A D 60' P U B L I C R / W 10'x70' SIGHT VISIBILITY TRIANGLE 10'x70' SIGHT VISIBILITY TRIANGLE B C A A1 B LOW DENSITY DRAINAGE AREA HIGH DENSITY DRAINAGE AREA Project No. 56398 Date: Sheet No. GO R D O N R O A D F I R E S T A T I O N NE W H A N O V E R C O U N T Y F I R E D E P A R T M E N T Drawn by: Checked by: Revisions: ALL NOTES APPLY TO ALL DRAWINGS AND ALL TRADES. IT IS THE RESPONSIBILITY OF ALL CONTRACTORS AND TRADES TO COORDINATE THE INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY ALL OTHER CONTRACTORS AND TRADES. THE REQUIREMENTS OF THE DRAWINGS, GENERAL REQUIREMENTS AND ALL ITEMS OF THE CONTRACT DOCUMENTS ARE EQUALLY BINDING ON ALL CONTRACTORS AND TRADES. EACH CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS OF THE CONTRACT DOCUMENTS FOR HIS EMPLOYEES USE ON THE PROJECT TO ASSURE THAT ALL WORK IS PROPERLY COORDINATED AND INSTALLED WITH THE WORK OF OTHER CONTRACTORS AND TRADES. WHENEVER THERE ARE DISCREPANCIES BETWEEN DRAWINGS, OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR CONFLICTS WITHIN THE SPECIFICATIONS AND/OR DRAWINGS, AND SUCH DISCREPANCY IS NOT CALLED TO THE ARCHITECT'S ATTENTION IN TIME TO PERMIT CLARIFICATION BY ADDENDUM, THE CONTRACTOR SHALL BASE HIS BID UPON PROVIDING THE BETTER QUALITY OR GREATER OF WORK OR MATERIAL CALLED FOR, SHALL SUBMIT A WRITTEN STATEMENT WITH HIS PROPOSAL NOTING SUCH DISCREPANCIES, AND SHALL SO FURNISH AND INSTALL SUCH BETTER QUALITY OR GREATER QUANTITY UNLESS OTHERWISE ORDERED IN WRITING. GENERAL NOTE 03/29/2024 A CHALOUPECKY W ALTMAN Addendum 02 5/10/2024 ww w . s c n - a r c h i t e c t s . c o m 1. 8 0 0 . 6 7 1 . 0 6 2 1 71 9 E a s t S e c o n d A v e n u e Ga s t o n i a , N C 2 8 0 5 4 Ph o n e : 7 0 4 . 8 6 5 . 6 3 1 1 Fa x : 7 0 4 . 8 6 5 . 0 0 4 6 5410 Trinity Road, Suite 102Raleigh, NC 27607TEL 919.866.4951 FAX 919.859.5663 www.timmons.com YOUR VISION ACHIEVED THROUGH OURS. VIRGINIA NORTH CAROLINA Site Development Residential Infrastructure Technology THIS DRAWING PREPARED AT THE RALEIGH OFFICE 56398-333 North Carolina License No. C-1652 2nd Submittal NHC 8/02/2024 NA D 8 3 NA D 8 3 0 SCALE 1"=80' 160'80'0 SCALE 1"=80' 160'80' PRE-DEVELOPED SITE LEGEND IMPERVIOUS AREA PRE DEVELOPMENT ONSITE IMPERVIOUS SURFACES = 0.00 ACRES POST DEVELOPMENT ONSITE IMPERVIOUS SURFACES = 1.28 ACRES POST DEVELOPMENT OFFSITE IMPERVIOUS SURFACES = 0.50 ACRES POST DEVELOPMENT FUTURE OFFSITE IMPERVIOUS SURFACES = 0.18 ACRES IMPERVIOUS AREA BEING TREATED BY BIORETENTION CELL = 1.19 ACRES STORMWATER QUALITY CALCULATIONS POST-DEVELOPED SITE ANALYSIS POINT A DRAINAGE AREA (Acres) (CN) PRE-DEVELOPMENT 1.11 Q1 66 1.13 POST-DEVELOPMENT A1 (BIO RETENTION)1.93 84 4.92 POST-DEVELOPMENT A2 (BYPASS) POST-DEVELOPMENT A (COMBINED) 0.29 57 0.12 2.22 0.12 Q2 1.81 6.48 0.25 0.25 Q10 4.29 11.49 0.79 3.77 C4.3 SW C O M P L I A N C E P L A N A2 C ANALYSIS POINT B DRAINAGE AREA (Acres) (CN) PRE-DEVELOPMENT 1.66 Q1 57 0.69 Q2 1.41 Q10 4.51 POST-DEVELOPMENT 0.56 64 0.49 0.81 2.02 Q25 6.25 15.07 1.25 5.37 Q100 10.16 21.90 2.21 8.69 Q25 7.13 Q100 12.63 2.99 4.95 ANALYSIS POINT C DRAINAGE AREA (Acres) (CN) PRE-DEVELOPMENT 3.37 Q1 72 5.02 Q2 7.37 Q10 15.54 POST-DEVELOPMENT 3.37 78 6.75 9.34 17.92 Q25 21.72 Q100 33.79 24.20 36.27 Gordon Road Fire Station Wilmington, NC Project Number: 56398 www.timmons.com Nutrient Loading Project: Gordon Road Fire Station Project No.: 56398 Calculated By: Andrew Chaloupecky Date: 06/20/2024 NITROGEN EXPORT WORKSHEET Apportioned Open Space Calculation = (New Impervious Area/Total Impervious Area) X (Remaining Open Space) ** Apportioned Open Space Calculation** = (1.28 ac - 0 ac) / 1.28 ac X (1.49 ac) = 1.49 ac Final Impervious 1.28 Existing Impervious 0.00 Total Drainage Area 2.77 Final Open Space 1.49 Undisturbed Riparian Buffer Area 0.00 (From Section 3.1.2.1 City of Raleigh Stormwater Manual) Site Area (ac) TN Export By Use (lbs/yr) TN Export From Site (lbs/ac/yr) 0.00 0.00 1.49 1.79 1.28 27.14 2.77 28.92 10.44 Site Area (ac) TN Export By Use (lbs/yr) TN Export From Site (lbs/ac/yr) 0.00 0.00 0.74 0.89 1.19 25.23 1.93 26.12 BMP Proposed Area Treated by BMP (ac) Treated TN Export TN Export (lbs/ac/yr) Bioretention 1.93 26.12 6.67 (Site Export -3.6) X (Site Area) X (30 YEARS) = Pounds of TN Exported (Site Export -3.6) X (Site Area) X ($655.80) = Buy Down TIMMONS GROUP POST DEVELOPMENT NITROGEN LOADING Type of Land Cover TN Export Coeff. (lbs/ac/yr) PERMANENTLY PRESERVED UNDISTURBED OPEN SPACE RIPARIAN BUFFER AREA 0.60 APPORTIONED OPEN SPACE 1.20 NEW IMPERVIOUS SURFACES 21.20 Total Average for Site TN EXPORT TREATED BY BMP (ONSITE & OFFSITE) Type of Land Cover TN Export Coeff. (lbs/ac/yr) PERMANENTLY PRESERVED UNDISTURBED OPEN SPACE 0.60 PERMANENTLY PRESERVED MANAGED OPEN SPACE 1.20 IMPERVIOUS SURFACES 21.20 Total POST DEVELOPMENT NITROGEN LOADING AFTER BMP TREATMENT TN Reduction (%) TN Reduction (lbs/yr) 40%10.45 Total (TN EXPORT -TN REDUCTION) / SITE AREA ESTIMATED BUY DOWN (6.67 - 3.6) X (2.77) X ($655.80)7,233$ POUNDS OF NITROGEN EXPORTED (6.67 - 3.6) X (2.77) X (30 YEARS)255