HomeMy WebLinkAboutBond EstimateWaterstone Bond Estimate
Phase B
3.13.24
Sidewalks — (327 Sq Yds at $30.00 per yd) $9,810
Final Asphalt — (2,445 Sq Yds of 1.5" at $9.25 per yd) $22,616.25
Street Signs — (2 at $190 each) $380
NCDOT Basic Letter $500.00
Contingency — (10%) $3,296.43
TOTAL $36,602.68
�c� 91