Loading...
HomeMy WebLinkAboutBond EstimateWaterstone Bond Estimate Phase B 3.13.24 Sidewalks — (327 Sq Yds at $30.00 per yd) $9,810 Final Asphalt — (2,445 Sq Yds of 1.5" at $9.25 per yd) $22,616.25 Street Signs — (2 at $190 each) $380 NCDOT Basic Letter $500.00 Contingency — (10%) $3,296.43 TOTAL $36,602.68 �c� 91