HomeMy WebLinkAboutZ24-19 Planning Board Staff ReportZ24-19 Staff Report PB 9.5.2024 Page 1 of 16
STAFF REPORT FOR Z24-19
CONDITIONAL REZONING APPLICATION
APPLICATION SUMMARY
Case Number: Z24-19
Request:
Rezoning to a Conditional CS district
Applicant: Property Owner(s):
Cindee Wolf with Design Solutions Harry Wilson with H N Investments, LLC
Location: Acreage:
308 Hermitage Road 5.63
PID(s): Comp Plan Place Type:
R02500-002-034-000 Employment Center
Existing Land Use: Proposed Land Use:
Undeveloped Wholesale Nursery and Other Limited Uses
Current Zoning: Proposed Zoning:
(CZD) CS, Commercial Services (CZD) CS, Commercial Services
SURROUNDING AREA
LAND USE ZONING
North Single-Family Residential and Wooded Land R-20
East Undeveloped Land and Mixed Industrial Uses (CZD) CS & I-1
South Existing Wholesale Nursery and Undeveloped Land (CZD) CS & B-2
West NC State Horticultural Crops Research Station R-20
Z24-19 Staff Report PB 9.5.2024 Page 2 of 16
ZONING HISTORY
July 1, 1985 Initially zoned R-20 (Area Castle Hayne)
April 4, 2022 Z22-06 rezoned 30.41 acres for a flex space business park and existing
nursery
COMMUNITY SERVICES
Water/Sewer
Public water is available through CFPUA. Public sewer is not available in
the area. The project proposes a private septic system which must be
reviewed and approved by New Hanover County Environmental Health.
Fire Protection New Hanover County Fire Services, New Hanover County Northern Fire
District, New Hanover County Castle Hayne Fire Station
Schools Laney High School, Holly Shelter Middle School, Castle Hayne Elementary
School
Recreation Northern Regional Park
CONSERVATION, HISTORIC, & ARCHAEOLOGICAL RESOURCES
Conservation No known conservation resources
Historic No known historic resources
Archaeological No known archaeological resources
Z24-19 Staff Report PB 9.5.2024 Page 3 of 16
CURRENT APPROVED CONCEPTUAL PLAN
Includes Staff Markups
• April 4, 2022 the Board of Commissioners approved a 30.41 acre conditional rezoning at
308 and 312 Hermitage Road for the New Leaf Landing commercial business park. The
approved rezoning included 130,000 square feet of commercial flex space in addition to
an existing wholesale nursery operation.
• The project consisted of 11 flex commercial buildings, the existing nursery at the rear of the
site, and a shared stormwater pond along the western property line.
• The approved (CZD) CS district allowed all uses permitted in the CS district such as indoor
recreation, business service center, contractor office, general retail, and warehousing.
• The site included two points of access onto Hermitage Road which were approved as part
of a Traffic Impact Analysis (TIA) for the project.
Existing Nursery
Septic
Proposed
Nursery
Relocation
Flex Space Septic
St
o
r
m
w
a
t
e
r
Stormwater
Z24-19 Staff Report PB 9.5.2024 Page 4 of 16
• Public sewer is not available in the area and the approved concept plan included multiple
septic areas to support the development.
• The project has not begun construction and no improvements have been made to the
property since the rezoning approval in 2022.
• The area outlined in Blue on the approved concept plan above is the area under
consideration for the current rezoning request.
APPLICANT’S PROPOSED CONCEPTUAL PLAN
Includes Staff Markups
Hermitage Road
Ex
i
s
t
i
n
g
P
r
i
v
a
t
e
D
r
i
v
e
Septic
Stormwater
Office and
Warehouse
Outdoor
Bulk Storage
Outdoor
Plant
Storage
Outdoor
Plant
Storage
Pr
o
p
o
s
e
d
P
r
i
v
a
t
e
D
r
i
v
e
Z24-19 Staff Report PB 9.5.2024 Page 5 of 16
• The proposed rezoning shifts the location of the nursery from the southern portion of the site
to the northwestern portion of the site and proposes to remove the 5.17-acre parcel from
the master plan for the business park.
• Due to the proposed changes to the site design, access, stormwater, and the applicant’s
request to remove the parcel from the master plan for the business park, the current rezoning
request is required to be reviewed by the Planning Board and Board of Commissioners
through the rezoning process.
• The use of wholesale nursery is permitted in both the R-20 and the CS zoning districts. The
existing wholesale nursery has been operating from the property since 2021.
• The applicant subdivided 5.17 acres from the northwestern corner of the 30.41-acre
commercial park in 2023.
• The proposed concept plan for the wholesale nursery includes a 10,000 square foot office
and warehouse building with associated parking and a stormwater pond in the northwest
corner of the site.
• The site will be accessed by a new separate full access driveway onto Hermitage Road and
does not propose access to the New Leaf Landing project.
• An outdoor storage area for rock, mulch and bulk materials is on the southeastern side of
the site away from Hermitage Road and adjacent to the existing private drive for the New
Leaf Landing project. A condition has been included guaranteeing the location of outdoor
storage is limited to the area shown on the concept plan for the Wholesale Nursery and
any other future use.
• Plant storage areas for the Wholesale Nursery are located on the north and western sides
of the property and provide additional visual and spatial buffers to Hermitage Road and
the neighboring NC State Horticultural Crops Research Station. If developed for a different
use in the future, a transitional buffer will be required along the western property line.
• In addition to the wholesale nursery use, the project proposes allowing most uses within the
CS district. A condition has been included prohibiting the following uses and use categories
listed in Table 4.2.1 Principal Use Table:
o Civic
o Educational Services
o Government Services
o Heath Care Services
o Food & Drink (including Bar / Nightclub)
o Convenience Store
o Food Market
o Grocery Store
o Pharmacy
o Bank and / or Financial Institution
o Carwash
o Commercial Recycling Facility, Large Collection, Small Collection, Processing, and
Processing and Collection
Z24-19 Staff Report PB 9.5.2024 Page 6 of 16
ZONING CONSIDERATIONS
• In April 2022 the parcel was rezoned as part of a 30.41-acre (CZD) CS rezoning for a
commercial park that also included an existing wholesale nursery operation.
• The CS district was established to accommodate a mixture of light manufacturing, wholesale,
storage, commercial service and repair, and distributive business type uses. It functions as a
support district to nearby industrial and commercial uses. The district is designed to act as a
transitional land use between intensive industrial and commercial development and less
intensive commercial, office, and institutional uses.
• If approved, the proposed (CZD) CS district for the nursery would be a separate district
distinct from the (CZD) CS district that applies to the New Leaf Landing project.
• Because the New Leaf Landing Business Park has not been developed, removal of the 5.17
acres from the business park site will impact the future site design of the park.
• An alternative site design for New Leaf Landing has not been proposed and future
development of New Leaf Landing will need to be evaluated by staff to determine if the
changes meet the criteria for a Minor Deviation under Section 10.3.3.C.7.b of the UDO. If
the future site design is not determined to be a minor deviation, the New Leaf Landing
Business Park conditional rezoning will need to be approved by the Board of Commissioners
through the rezoning public hearing process.
• The use of Wholesale Nursery is classified in Table 4.2.1 Principal Use Table as an
agricultural use. Agricultural uses are not required to provide transitional buffers when they
are adjacent to commercial or residential zoning districts.
• A Type A opaque buffer would be required along the western property line for any future
commercial or industrial use. The buffer requirement would be determined by staff through
the Change of Use permit review process.
• While transitional buffers are not required for the wholesale nursery, the project provides
areas for outdoor storage of trees and other plants along the property lines that could
serve a similar function as a landscaped buffer.
• The site will also be subject to the parking lot and street landscaping requirements of Section
5.4 of the UDO.
• The UDO contains controls on exterior lighting on the site. The maximum illumination levels
at the common property line with the residential properties to the west shall not exceed 0.5-
foot candles and 1.0-foot candles at the northern property line adjacent to the religious
institution.
• If approved, the project would be subject to Technical Review Committee (TRC) and zoning
compliance review processes to ensure full compliance with all ordinance requirements and
specific conditions included in the approval. Only minor deviations from the approved
conceptual plan, as defined by the UDO, would be allowed.
Z24-19 Staff Report PB 9.5.2024 Page 7 of 16
AREA DEVELOPMENTS
Z24-19 Staff Report PB 9.5.2024 Page 8 of 16
TRANSPORTATION
CURRENT CONDITIONS
Intensity of Current Zoning 21,000 square feet of the 130,000 square foot New Leaf
Landing business park
PROPOSED ACCESS
Primary Access Hermitage Road
EXISTING ROADWAY CHARACTERISTICS
Affected Roadway Hermitage Road Castle Hayne Road
Type of Roadway NCDOT secondary road NCDOT minor arterial
Roadway Planning Capacity
(AADT) 4,000 15,549
Z24-19 Staff Report PB 9.5.2024 Page 9 of 16
Latest Traffic Volume (AADT) 4,000 12,500
Latest WMPO Point-in-Time
Count (DT) 37,645
Castle Hayne Road between
Sondey and Crowatan Roads –
11,998
Current Level of Congestion Available Capacity Available capacity
Sources
Source of Planning Capacity: WMPO
Source of Latest Traffic Volume: NCDOT (2023)
Source of WMPO Point-in-Time County: WMPO (2023)
NEARBY NCDOT STIP ROADAWAY PROJECTS
No Nearby STIP Projects
TRAFFIC GENERATION
Traffic Generated
by Present
Designation
Traffic Generated by
Vehicle Service Station,
Minor – The Highest
Traffic Generating Use
Under Proposed
Designation
Potential
Impact of
Proposed
Designation
AM Peak Hour Trips 32 58 +26
PM Peak Hour Trips 37 87 +50
Assumptions
Typical Development with Existing Conditions – 21,000 sq ft of business
park
Proposed Development – 10,000 sq ft office and warehouse for an
approximately 5-acre wholesale nursery. Future uses limited to those
that do not trigger the ordinance requirement for a TIA.
Sources Source of Trip Generation: ITE Trip Generation Manual, 11th Ed.
TRAFFIC IMPACT ANALYSIS (TIA)
The estimated traffic generated from the site is under the 100 peak hour threshold that triggers the
ordinance requirement for a Traffic Impact Analysis (TIA).
SUMMARY
The project is on a local road that currently has capacity. Castle Hayne Road at the Hermitage Road
intersection also currently has capacity. A TIA for the New Leaf Landing business park was approved
by the WMPO and NCDOT in 2021. The TIA required new turn lanes at the intersections of Castle
Hayne and Hermitage Road, and Castle Hayne and Crowatan Road. The project under consideration
requests to be removed from the New Leaf Landing business park and the TIA that applies to that
project. In addition to the Wholesale Nursery, the applicant is proposing most of the other uses
allowed in the CS district. The applicant has included a condition limiting the future uses to those that
typically generate less traffic to reduce traffic impacts. The project has also received approval from
NCDOT for the proposed driveway. If a TIA is required by a future use, it will require additional
review and approval by the Board of Commissioners. Additionally, a proposed Planned Development
(PD) is also under consideration in the area. The TIA for that project includes a new traffic signal and
other improvements to Castle Hayne Road in the general vicinity of the site.
Z24-19 Staff Report PB 9.5.2024 Page 10 of 16
ENVIRONMENTAL
• The property is not within a Natural Heritage Area or the Special Flood Hazard Area.
• The property is within the Prince George Creek watershed.
• Per the Classification of Soils in New Hanover County for Septic Tank Suitability, soils on the
property consist of Class II (Moderate Limitation) and Class III (Severe Limitation) soils. The
proposed septic system must be reviewed and approved by New Hanover County
Environmental Health.
OTHER CONSIDERATIONS
New Hanover County Strategic Plan
On July 17, 2023, the Board of Commissioners adopted a new strategic plan for Fiscal Years 2024-
2028. This plan focuses on three core areas: workforce and economic development, community
safety and well-being, and sustainable land use and environmental stewardship.
Strategic Plan Outcomes
Relevant to Proposal
Analysis
A business-friendly environment
that promotes growth, agility,
and collaboration.
The plan aims to prepare for the long-term needs of
businesses and to maintain new business growth within 2.5%
of the state. The proposed commercial zoning district will
enable the expansion of an existing business.
Z24-19 Staff Report PB 9.5.2024 Page 11 of 16
Representative Developments
Representative Developments of Flex Commercial:
Exchange Drive
Old Wrightsboro Industrial Park
Z24-19 Staff Report PB 9.5.2024 Page 12 of 16
Representative Developments of Wholesale & Retail Nursery:
Tinga Nursery – Castle Hayne Road
Five Oaks Nursery – Old Winter Park Road
Z24-19 Staff Report PB 9.5.2024 Page 13 of 16
Context and Compatibility
• The subject parcel was included as part of the New Leaf Landing commercial business park
conditional CS rezoning in 2022 which was found to be generally consistent with the 2016
Comprehensive Plan because the park would allow the types of commercial uses
encouraged in the Employment Center place type. The existing CZD CS was also found to
provide an appropriate transition between the existing industrial development to the east
and lower intensity residential and agricultural development to the west.
• The proposed rezoning shifts the location of the nursery from the southern portion of the site
to the northern portion of the site and establishes a new driveway access for the nursery
and a reduced set of potential future uses allowed in the CS district.
• The proposed rezoning will result in changes to the currently approved business park. The
developer of the business park will be required to address the removal of the project site
and re-design all or a portion of the business park. As that re-design has not been done,
staff is unable to provide an analysis of whether the site would be required to obtain any
additional rezoning approvals before development may begin.
• The property and the existing nursery are both adjacent to the NC State Horticultural Crops
Research Station. The station engages in agricultural research through growing plants
including different types of crops and ornamental flowering plants, trees, and grasses used
in landscaping and other nursery products.
• Due to the lack of public sewer, residential development in the Castle Hayne area has
remained predominately low density. However, the area’s location between Holly Shelter
Road and the I-40 interchange to the north and the Castle Hayne Road and I-140
interchange to the south has led to increased commercial and industrial activity in the Castle
Hayne Road corridor.
• Nearby rezoning approvals include a (CZD) CS district rezoning immediately north of the
intersection of Castle Hayne Road and Hermitage Road, and an application for a mixed
use Planned Development southwest of the I-140 interchange.
• Continued interest in commercial development in the vicinity of the I-140 corridor and
proximity to the GE campus indicates the general area may transition into a future service
node.
2016 COMPREHENSIVE PLAN
The New Hanover County Future Land Use Map provides a general representation of the vision for
New Hanover County’s future land use, as designated by place types describing the character and
function of the different types of development that make up the community. These place types are
intended to identify general areas for particular development patterns and should not be
interpreted as being parcel specific.
Z24-19 Staff Report PB 9.5.2024 Page 14 of 16
Future Land Use
Map Place Type Employment Center
Place Type
Description
Serves as an employment and production hub where office and light
industrial uses predominate. It can also include residential, civic, and
recreational uses, but should be clearly delineated from rural and
conservation areas. Commercial uses designed to serve the needs of the
employment center are appropriate.
Analysis
The Comprehensive Plan designates this property as Employment Center, a
land use classification that promotes office, industrial, commercial, and retail
development. The Comprehensive Plan also specifically designates the
Hermitage Road area, along with Dutch Square and Northchase as areas
applicable for the place type.
The area’s location between Holly Shelter Road and the I-40 interchange
to the north and the Castle Hayne Road and I-140 interchange to the south
has led to increased commercial and industrial activity in the Castle Hayne
Road corridor.
Continued interest in commercial development in the vicinity of the I-140
corridor and proximity to the GE campus indicates the general area will
likely transition into a future service node.
Both the CS district and the Employment Center place type are designed to
foster economic growth, provide job opportunities, and ensure development
is compatible with surrounding areas and infrastructure.
Consistency
Recommendation
The proposed rezoning request is generally CONSISTENT with the 2016
Comprehensive Plan because the district provides an appropriate transition
between the existing industrial development to the east and lower intensity
residential and agricultural development to the east.
Z24-19 Staff Report PB 9.5.2024 Page 15 of 16
STAFF RECOMMENDATION
Staff’s recommendation is based on the policy guidance of the 2016 Comprehensive Plan, zoning
considerations, technical review. The subject parcel was included as part of the New Leaf Landing
commercial business park conditional CS rezoning in 2022 which was found to be generally
consistent with the 2016 Comprehensive Plan because the park would allow the types of commercial
uses encouraged in the Employment Center place type. While the site remains generally consistent
with the 2016 Comprehensive Plan and provides an appropriate transition between the existing
industrial development to the east and lower intensity residential and agricultural development to
the east., the impacts to the remaining business park are not known currently. Staff would have
preferred additional coordination with the business park landowner to modify the TIA and rezoning
of the entire 30-acre business park site to fully analyze the overall site and any additional potential
impacts to the area.
As a result, Staff recommends denial of the request and suggests the following motion:
I move to recommend DENIAL the proposed rezoning. While I find it to be generally
CONSISTENT with the purposes and intent of the Comprehensive Plan because the
project allows the types of commercial uses encouraged in the Employment Center
place type. I find recommending DENIAL of the rezoning request is reasonable and in
the public interest because the project may impact the future development of an
approved commercial business park.
Alternative Motion for Approval (If based on information presented at the public hearing or other
consideration beyond the scope of staff review, the board finds approval appropriate.)
I move to recommend APPROVAL of the proposed rezoning. I find it to be generally
CONSISTENT with the purposes and intent of the Comprehensive Plan because the
project allows the types of commercial uses encouraged in the Employment Center
place type. I find recommending APPROVAL of the rezoning request is reasonable
and in the public interest because the rezoning allows the relocation of an existing
business that would support the area’s transition into a service node.
Proposed Conditions:
1. All uses in the CS district are permitted except for the following uses and use
categories listed in Table 4.2.1 Principal Use Table:
o Civic
o Educational Services
o Government Services
o Heath Care Services
o Food & Drink (including Bar / Nightclub)
o Convenience Store
o Food Market
o Grocery Store
o Pharmacy
o Bank and / or Financial Institution
o Carwash
Z24-19 Staff Report PB 9.5.2024 Page 16 of 16
o Commercial Recycling Facility, Large Collection, Small Collection,
Processing, and Processing and Collection
2. Outdoor storage, except for plants, for the Wholesale Nursery and any future uses
is restricted to the Rock & Mulch / Bulk Materials area as shown in the southeastern
corner of the concept plan.