Loading...
HomeMy WebLinkAboutNCDOT Preliminary TRC Comments STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.R. “JOEY” HOPKINS GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum To: New Hanover County Technical Review Committee Date: June 5, 2024 Subject: Sheetz Shade Tree Lane – 4915 Carolina Beach Road ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx NCDOT Driveway Permit: An NCDOT Driveway permit has been submitted to NCDOT for review. x Permit # D033-065-24-00079. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. x Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). x No private utilities are allowed to run parallel in the NCDOT right-of-way. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Required Roadway Improvements: Roadway improvements are required per the approved TIA (included): x The required roadway improvements can be incorporated into the driveway permit and will not require a separate encroachment agreement. Refer to the NCDOT Roadway Design Manual for help with the design of any required roadway improvements. x Figure 8-10 Recommended Treatment for Turn Lanes (Included). Site Plan Comments: Hydraulic calculations and associated plan sheets will need to be submitted for the site. x This will be reviewed by the NCDOT Hydraulics Unit. Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. x Sheet C7.4 The proposed driveways need to be designed accordingly to allow for the ingress and egress without any conflicts. The proposed pavement design and the limits of the final layer of asphalt will be reviewed during the driveway permit review. Sight Triangles and Sight Distance: x Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. x Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. o Reference table 3-1 below for design requirements. Label the internal protection stem length for the proposed driveway connection. x Measured from the right-of-way line. x These will need to meet the minimum requirements of the approved TIA. You can coordinate with the district office with any questions 910-398-9100. Mailing Address: NCDEPARTMENTOFTRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03COURIER Telephone:910-398-9100 CustomerService:1-877-368-4968 Website:ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 March 13, 2024 Mr. Jeff Hochanadel, PE, PTOE Timmons Group 5410 Trinity Road, Suite 102 Raleigh, NC 27607 RE: Approval with conditions for the Traffic Impact Analysis (TIA) associated with the Sheetz (Shade Tree) commercial development in New Hanover County, NC Dear Mr. Hochanadel, The WMPO, NCDOT and New Hanover County staffs have reviewed the Sheetz (Shade Tree)TIA (sealed January 23, 2024) and based on the information provided and conversations held to date, it is our understanding that the proposed development will be built in 2025 and consist of the following: ITE Land Use Code 945 – 6,139 SF of Convenience Store/Gas Station with 12 vehicle fueling positions The following improvements are required of this development: US 421 (Carolina Beach Rd) and SR 1262 (Horn Rd) (Left-in/Right-in/Right-out intersection) o No improvements are required. US 421 (Carolina Beach Rd) and SR 1197 (Silver Lake Rd)/SR 2361 (Shade Tree Lane)(Signalized intersection) o Extend the southbound left turn lane on US 421 (Carolina Beach Road) to provide 300 feet of storage, appropriate full-width deceleration, and taper. o Extend the northbound left turn lane on US 421 (Carolina Beach Road) to extend the full width storage by 100 feet. The existing 200-foot taper may be reduced to 100 feet in length to accommodate this improvement. US 421 (Carolina Beach Rd) and Site Access 1 (Right-in/Right-out intersection) o Construct a northbound right turn lane on US 421 (Carolina Beach Road) with 175 feet of storage, appropriate full width deceleration and taper. o Construct site access (westbound approach) with an internal protected stem of 100 feet, measured from the right-of-way line and configured as right-in/right-out operation. o Provide stop controls for westbound approach. NCDOT/WMPO Required Improvements Figure Sheetz - Shade Tree Legend Black - Existing Infrastructure Blue -Full build Improvements -Stop Control -Signal - Right-in/Right-out Extend the northbound left turn lane on US 421 (Carolina Beach Road) to extend the full width storage by 100 feet. The existing 200-foot taper may be reduced to 100 feet in length to accommodate this US 4 2 1 Site Access 1 Si t e A c c e s s 2 Secure Self Storage Driveway Horn Road US 4 2 1 30 0 ' s t o r a g e , de c e l e r a t i o n a n d 50 ' I P S 100' IPS 17 5 ' 20 0 ' s t o r a g e , 10 0 ' t a p e r Attachment JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - C 0 . 0 - C O V R . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 4 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C0.0 CO V E R S H E E T 332 P. BARBEAU P. BARBEAU NA D 8 3 VICINITY MAP NTS CIVIL ENGINEER: TIMMONS GROUP 5410 TRINITY ROAD SUITE 102 RALEIGH, NC 27607 PROJECT MANAGER: PATRICK BARBEAU, PE PATRICK.BARBEAU@TIMMONS.COM PH: (919) 866-4512 ENGINEER OF RECORD: PATRICK BARBEAU, P.E. PATRICK.BARBEAU@TIMMONS.COM PH: (919) 866-4512 WILMINGTON, NORTH CAROLINA 28412 NEW HANOVER COUNTY DEVELOPER: BRIAN DOWNS ENTITLEMENT MANAGER 5700 SIXTH AVENUE ALTOONA, PA 16602 PH: (919) 264-8593 BDOWNS@SHEETZ.COM POINT CLAN 1, LLC 4915 CAROLINA BEACH ROAD WILMINGTON, NC 28409 SITE PLAN REVIEW OWNER:SURVEYOR: CONVENIENCE ARCHITECTURE AND DESIGN P.C. 351 SHEETZ WAY CLAYSBURG PA 16625 PH: (814) 239-6013 TCOLUMBU@SHEETZ.COM ARCHITECT: SITE PLAN SUMMARY PROJECT: SHEETZ - SHADE TREE LANE OWNERS: POINT CLAN 1 LLC; 4915 CAROLINA BEACH ROAD WILMINGTON, NC 28409 PROJECT ADDRESS: 4915 CAROLINA BEACH ROAD PID #:R07100-003-024-000 DEED: DB 3687 PG 680 ZONING: B2 - BUSINESS DISTRICT EXISTING USE: LANDSCAPE NURSERY PROPOSED USE:CONVENIENCE STORE WITH GAS SALES AND RESTAURANT WITH SEATING AND DRIVE THRU FLOOD ZONE:NOT LOCATED IN FLOOD HAZARDS AREA PER FEMA MAP #3720313400K (EFFECTIVE 08/28/2018) TOTAL EXISTING TRACT AREA:4.40 AC PROPOSED TRACT AREA: PARCEL #1 (SHEETZ): 2.76 AC POST-ROW DEDICATION PARCEL #2: 1.55 AC POST-ROW DEDICATION DISTURBED AREA: 3.9 AC TOTAL ON-SITE: 2.95 AC OFF-SITE WITHIN PUBLIC ROW: 0.95 AC EXISTING IMPERVIOUS SURFACE AREA:25,526 SF PROPOSED IMPERVIOUS SURFACE AREA: 87,676 SF (62%) - INCLUDES 0.1 AC (4,356 SF) FUTURE IMPERVIOUS TYPE OF BUILDING CONSTRUCTION:V-B (NON-SPRINKLERED) TYPE OF CANOPY CONSTRUCTION:II-B VEHICLE PARKING SUMMARY: REQUIRED RESTAURANT: 6 SPACES PER 1000 SQUARE FEET OF GFA = 2,363 SF / 1000 * 6 = 14 SPACES REQUIRED RETAIL: 2.5 SPACES PER 100 SQUARE FEET OF GFA = 4,151 SF / 1000 * 2.5 = 10 SPACES PROVIDED TOTAL: 24 SPACES VEHICLE PARKING SUMMARY: PROVIDED 44 SPACES ON-SITE, ADA: 2 REQ'D; 2 PROV'D W/ 1 VAN ACCESSIBLE 1 LOADING SPACE SHEETZ - SHADE TREE LANE SITE C A R O L I N A B E A C H R D TIMMONS GROUP MARTIN WEBB, PLS 610 E MOREHEAD STREET SUITE 250 CHARLOTTE, NC PH: (919) 866-4952 MARTIN.WEBB@TIMMONS.COM GENERAL NOTE ALL CONTRACTORS SHALL VISIT THE PROJECT TO FAMILIARIZE THEMSELVES WITH SITE CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION. BY SUBMITTING A BID, THE CONTRACTOR AND HIS SUBCONTRACTORS ARE CONFIRMING THAT THEY HAVE VISITED THE SITE AND HAVE INCLUDED IN THEIR BID ANY ADDITIONAL ITEMS OF CONSTRUCTION THAT MAY BE REQUIRED DUE TO EXISTING SITE CONDITIONS. 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 SHAD E T R E E L A N E S P L I T R A I L D R SILV E R L A K E R D Sheet List Table Sheet Number Sheet Title C0.0 COVER SHEET C1.0 EXISTING CONDITIONS PLAN C1.1 EXISTING CONDITIONS PLAN C1.2 TREE CLEARING PLAN C1.3 TREE CLEARING PLAN C1.4 DEMOLITION PLAN C1.5 DEMOLITION PLAN C2.0 SITE PLAN C2.1 TURN LANE PLAN C2.2 TURN LANE PLAN C2.3 VEHICULAR CIRCULATION PLAN C2.4 VEHICULAR CIRCULATION PLAN C3.0 GRADING AND DRAINAGE PLAN C3.1 SCM DETAILS C3.2 SCM DETAILS C4.0 EROSION CONTROL PLAN - PHASE I C4.1 EROSION CONTROL PLAN - PHASE I C4.2 EROSION CONTROL PLAN - PHASE II C4.3 EROSION CONTROL PLAN - PHASE II C4.4 NPDES PLAN C4.5 NPDES AND NCG01 SPECIFICATIONS C5.0 UTILITY PLAN C5.1 UTILITY PLAN C5.2 LIGHTING PLAN C6.0 LANDSCAPE PLAN C6.1 LANDSCAPE DETAILS C7.0 NOTES AND DETAILS C7.1 NOTES AND DETAILS C7.2 NOTES AND DETAILS C7.3 NOTES AND DETAILS C7.4 NOTES AND DETAILS C7.5 NOTES AND DETAILS C7.6 NOTES AND DETAILS C7.7 NOTES AND DETAILS C7.8 NOTES AND DETAILS C7.9 NOTES AND DETAILS C7.10 NOTES AND DETAILS C7.11 NOTES AND DETAILS A1.0 EXTERIOR ELEVATIONS A1.1 EXTERIOR ELEVATIONS A1.2 FUEL CANOPY DETAILS PS1.0 PRIVATE LIFT STATION SITE LAYOUT PS1.1 PRIVATE LIFT STATION FORCE MAIN PLAN AND PROFILE PS1.2 PRIVATE LIFT STATION DETAILS PS1.3 PRIVATE LIFT STATION DETAILS MUNICIPAL CONTACT LIST GAS PIEDMONT NATURAL GAS 1321 SOUTH 10TH STREET, WILMINGTON, NC 28401 PHONE: 910-251-2814 JARRED GARRISON JARRED.GARRISON@DUKE-ENERGY.COM NEW HANOVER COUNTY ENGINEERING 230 GOVERNMENT CENTER DRIVE, SUITE 160 WILMINGTON, NC 28403 PHONE: 910-798-7117 TIM LOWE, PE TLOWE@NHCGOV.COM NEW HANOVER ZONING NEW HANOVER COUNTY ZONING 230 GOVERNMENT CENTER DRIVE, SUITE 110 WILMINGTON, NC 28403 PHONE: 910-798-7450 ZACHARY DICKERSON ZDICKERSON@NHCGOV.COM WATER AND SEWER CAPE FEAR PUBLIC UTILITY AUTHORITY 235 GOVERNMENT CENTER DRIVE WILMINGTON, NC 28403 PHONE: 910-332-6673 JEFF THEBERGE, PE BUILDING CODE OFFICIAL NEW HANOVER COUNTY BUILDING INSPECTIONS 230 GOVERNMENT CENTER DRIVE, SUITE 170 WILMINGTON, NC 28403 PHONE: 910-798-7308 ELECTRIC DUKE ENERGY 5700 HOLLY SHELTER ROAD CASTLE HAYNE, NC 28429 PHONE: 910-386-3232 AMY NEELEY AMY.NEELEY@DUKE-ENERGY.COM TELEPHONE/CABLE SPECTRUM 2321 SCIENTIFIC PARK DRIVE WILMINGTON, NC 28405 PHONE: 980-508-0794 ZACHARY WAHL ZACHARY.WAHL@CHARTER.NET DEPARTMENT OF PLANNING NEW HANOVER COUNTY PLANNING 230 GOVERNMENT CENTER DRIVE, SUITE 110 WILMINGTON, NC 28403 PHONE: 910-798-7450 ZACHARY DICKERSON ZDICKERSON@NHCGOV.COM NCDOT 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 PHONE: 910-398-9100 BEN HUGHES, PE BTHUGHES@NCDOT.GOV TC X X X X X X X X X X X X X X X X X X X X OH P OH P OH P OH P OH P OHPOHPOHP X X X X X X X X X X X X X X OH P OH P OH P X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X VA N ST O P STANDARD UST FIELD NEW SHEETZ STORE 6139 SQ. FT. FFE: 22.50' 25' FRONT BUILDING SETBACK AND STREETCAPE BUFFER 25' SIDE STREET BUILDING SETBACK 20' REAR BUILDING SETBACK 10' REAR LANDSCAPE BUFFER 10' SIDE LANDSCAPE BUFFER 32' 10' 65'27' 5' 32' 26' 60' 47.1' 60' 35' 48' 20' 30' 8' 10' 12' ±7.27' ANTICIPATED RIGHT-OF-WAY DEDICATION 3,764 SQFT 100' 58' 14' 19' 14' R25'R25' R25' R8' R3' R39' R3' R8' R39' R2' R2' R20' R3'R3'R10' R5' R20' R3' R3' R15' R15' R50' R5' R15'R15' R25' R40' R4'R15' R50'R50' R25' ZS01 ZS02 ZS03 ZS04 ZS05 ZS06 ZS13 ZS13 ZS18 ZS19 ZS20 ZS21ZS22 ZS24 ZS25 ZS26 ZS29 ZS30 ZS33 ZS34 ZS35 ZS36 ZS37 ZS37 ZS42 ZS46 R3' ZS48 ZS51 ZS52 ZS54 R3' ZS55 ZS56ZS56 R3'R3' ZS57 ZS57 ZS59 ZS60 ZS62 ZS62 ZS67 ZS68 ZS69 ZS705' ZS71 R3' 12.5' SECONDARY STREETYARD BUFFER 149.58' 12.33' S01 S02 S02 S02 S03 S04 S04 S05 S06 S07 S07 S07 S08 82' 6.16' 28' S09 R25' 175' FULL STORAGE 100' TAPER 2' PAVED SHOULDER S10 300' FULL STORAGE150' TAPER S04 S11 S12 12' N5 0 ° 1 1 ' 2 0 " E 20 8 . 3 6 ' S39°34'02"E 185.69'S39°34'02"E 329.71' 7.91' 10' 20' 10' 5' 20' 6.5' 10' 8' 20' 10' 8' 20' 20' 30' S13 ZS62 43.54' S14 S15 S15 S15 S15 S16 S16 2' PAVED SHOULDER ZS60 ZS60 ZS60 PARCEL 1PARCEL 2 20' 25'S16 S87 ° 2 1 ' 0 9 " E 229 . 6 7 ' SITE LAYOUT KEYNOTES NUMBER DESCRIPTION ZS01 C-STORE BUILDING; REFER TO ARCHITECTURAL AND MEP PLANS. ZS02 TRASH ENCLOSURE AND BOLLARDS; REFER TO SHEETZ TRASH ENCLOSURE DETAIL. ZS03 GAS CANOPY; REFER TO CANOPY PLANS BY OTHERS. ZS04 DISPENSER AND ISLAND; REFER TO UNDERGROUND STORAGE TANK SYSTEM PLANS. ZS05 UNDERGROUND STORAGE TANKS AND PAD; REFER TO UNDERGROUND STORAGE TANK SYSTEM PLANS. ZS06 UNDERGROUND STORAGE TANKS VENT STACK; REFER TO SHEETZ DETAIL 35 UNDERGROUND STORAGE TANK SYSTEM PLANS BY OTHERS. ZS13 MONUMENT SIGN. VERIFY EXACT LOCATION AND LOCATION BEFORE ROUGH-IN. PERMITTED BY OTHERS. ZS18 BRICK PAVER SIDEWALK; REFER TO A100 OF ARCHITECTURAL PLANS. ZS19 ROOF ACCESS LADDER AND CLEARANCE AREA; REFER TO ARCHITECTURAL PLANS. ZS20 PROPANE LOCKERS, BOLLARDS, AND CONCRETE PAD; REFER TO SHEETZ DETAIL 18 OR 19 AND ARCHITECTURAL PLANS. ZS21 ICE MERCHANDISER (TYP.). ZS22 AUTOMOTIVE RETAIL SALES DISPLAY. ZS24 PUSHPLATE BOLLARD; REFER TO A100 OF ARCHITECTURAL PLANS. ZS25 FENCE @ SEATING AREA (TYP.); REFER TO A100 OF ARCHITECTURAL PLANS. ZS26 OUTDOOR SEATING AREA AND TABLES; REFER TO REFER TO ARCHITECTURAL PLANS. OUTDOOR SEATING MUST NOT PROHIBIT ADA ACCESS. ZS29 24" WIDE CONCRETE BAND "ZERO REVEAL" FLUSH CURB; REFER TO ARCHITECTURAL PLANS. ZS30 24" CURB & GUTTER; REFER TO SHEETZ DETAIL 15. ZS33 STOREFRONT BUMPER POST, REFER TO SHEETZ DETAIL 01 (TYP.). PLACE ACCORDING TO SHEETZ DETAIL 07 AND/OR 08. ZS34 6" OR 8" BOLLARD(S); REFER TO SHEETZ DETAIL 17 AND UNDERGROUND STORAGE TANK SYSTEM PLANS FOR SIZE, LOCATION, AND COUNT (TYP.). ZS35 FLAGPOLE AND FLAGPOLE FOUNDATION; REFER TO SHEETZ DETAILS 11 AND 12. ZS36 FLAGPOLE LIGHT AND LIGHT FOUNDATION; REFER TO SHEETZ DETAILS 13 AND 14. ZS37 AIR MACHINE PAD AND BUMPER POSTS; REFER TO SHEETZ DETAIL 05. ZS41 EMERGENCY SHUT-OFF SWITCH, REFER TO ELECTRICAL, UNDERGROUND STORAGE TANK SYSTEM PLANS, AND SHEETZ DETAIL 29. ZS42 ELECTRIC TRANSFORMER PAD; GC TO COORDINATE LOCATION WITH LOCAL PROVIDER. LOCAL PROVIDER CAN SUPERSEDE THE PROPOSED TRANSFORMER PAD LOCATION. ZS43 24" DIA. LIGHT POLE BASE (TYPICAL - PER LIGHTING PLAN); REFER TO SHEETZ DETAIL 33 AND LIGHTING PLANS BY OTHERS. ZS44 24" DIA. FLUSH LIGHT POLE BASE (TYPICAL - PER LIGHTING PLAN); REFER TO SHEETZ DETAIL 34 AND LIGHTING PLANS BY OTHERS. ZS46 CONCRETE LOT PAVEMENT; REFER TO SHEETZ DETAIL 20. ZS48 ASPHALT LOT PAVEMENT; REFER TO SHEETZ DETAIL 20. ZS51 CONCRETE / ASPHALT PAVEMENT TRANSITION; REFER TO SHEETZ DETAIL 27. ZS52 CONCRETE / ASPHALT CHAMFER; REFER TO SHEETZ DETAIL 28. ZS54 ACCESSIBLE PARKING SIGN (TYPICAL - PER ADA AND LOCAL CODES) R7-8A (MUTCD). ZS55 VAN ACCESSIBLE PARKING SIGN (TYPICAL - PER ADA AND LOCAL REQUIREMENTS) R7-8A (MUTCD). ZS56 ADA ACCESSIBLE AISLE AND STRIPING, PER ADA AND LOCAL CODES. ZS57 ADA ACCESSIBLE PARKING SPACE AND SYMBOL STRIPING. PER ADA AND LOCAL CODES. ZS58 PAINTED ADA TRAVEL PATH STRIPING. ZS59 PAINTED 4" WIDE PARKING STRIPES (TYP.). ZS60 PAINTED DIRECTIONAL TRAFFIC ARROW (TYP.); PER LOCAL CODES. ZS61 PAINTED UNDERGROUND STORAGE TANK PAVEMENT MARKING. ZS62 30"x30" R1-1 "STOP" SIGN AND 24" WIDE "STOP" BAR. ZS67 DRIVE-THRU CANTILEVERED CLEARANCE BAR; REFER TO BAR DETAILS ON DT-1 AND DT-2. ZS68 DRIVE-THRU ORDER POINT; REFER TO ORDER POINT DETAILS ON DT-2. ZS69 DRIVE-THRU MENU BOARD; REFER TO MENU BOARD DETAIL ON DT-2. ZS70 DRIVE-THRU CURB AND PAD; REFER TO SHEETZ DETAIL 10. ZS71 DRIVE-THRU "PICK UP" PARKING SPACE; REFER TO PAINTING DETAIL ON DT-1. S01 RIGHT-OF-WAY (TYP.) S02 PROPERTY BOUNDARY (TYP.) S03 RIGHT-OF-WAY DEDICATION, VARIABLE WIDTH S04 EXISTING ROAD CENTERLINE S05 RIGHT IN / RIGHT OUT DRIVEWAY S06 ROAD WIDENING FOR RIGHT TURN LANE S07 10' X 70' SIGHT DISTANCE TRIANGLE (TYP.) S08 TURN LANE STRIPING PER NCDOT STD DETAIL 1205.05 S09 RELOCATED "ADOPT A HIGHWAY" SIGN S10 ROAD WIDENING FOR LEFT TURN LANE S11 RETAINING WALL WITH 42" MINIMUM SAFETY RAILING AT ALL AREAS TALLER THAN 30" (DESIGN BY OTHERS) S12 NCDOT GUARDRAIL PER NCDOT DETAIL 862.02 S13 SANITARY SEWER LIFT STATION, REFER TO LIFT STATION PLANS AND MEP PLANS BY OTHERS. S14 PROPOSED GRAVEL DRIVE WAY TO CONNECT TO EXISTING GRAVEL DRIVEWAY. 6" OF ABC GRAVEL S15 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCE EASEMENT S16 VARIABLE WIDTH PRIVATE SEWER EASEMENT JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - C 2 . 0 - S I T E . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 6 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C2.0 SI T E P L A N 332 P. BARBEAU P. BARBEAU N A D 8 3 0 SCALE 1"=30' 60'30' 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 SITE LAYOUT NOTES 1. CONTRACTOR SHALL REFER TO THE SHEETZ ARCHITECTURAL PLANS FOR THE EXACT LOCATION OF UTILITY ENTRANCES, BUILDING DIMENSIONS, ROOF LEADERS, EXIT DOORS, EXIT RAMPS AND PORCHES. 2. ALL DIMENSIONS ARE TO BUILDING FACE, FACE OF CURB, OR EDGE OF SIDEWALK UNLESS NOTED OTHERWISE. ALL ANGLES ARE 90 DEGREES UNLESS OTHERWISE NOTED. 3. CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS FOR THE INSTALLATION OF TRAFFIC SIGNAGE AND PAVEMENT MARKINGS AS SHOWN ON THE CONSTRUCTION PLANS. 4. ALL NON-LANDSCAPED ISLANDS SHALL BE PAINTED WITH STRIPES 4" WIDE, AT 45° AND 2 FEET O.C. 5. ALL STRIPING SHALL BE 4" WIDE UNLESS NOTED OTHERWISE. 6. CONTRACTOR SHALL COORDINATE FINAL LOCATION OF THE SHEETZ MAIN FREESTANDING SIGN WITH THE SHEETZ CONSTRUCTION MANAGER. 7. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. 8. ALL DIMENSIONS SHOWN ON THIS PLAN SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY SHEETZ REPRESENTATIVE AND DESIGN ENGINEER OF ANY DISCREPANCIES BETWEEN THE PLAN AND FIELD CONDITIONS. CONTRACTOR IS RESPONSIBLE FOR ALL DIMENSIONS AT THE PROJECT SITE. 9. SEE DETAILS SHEETS FOR ADDITIONAL CONSTRUCTION INFORMATION. 10. CONTRACTOR SHALL NEATLY SAW-CUT ALL JOINTS WHERE THE PROPOSED CONSTRUCTION MEET EXISTING PAVEMENT AND CONCRETE. C2 . 2 MA T C H L I N E CTC OHU CT O H U O H U O H U OHU OHU 8'' W 8'' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8'' W D D UGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV G UCATV UCATV UCATVUGTUGT UGT UGT UCATV U C A T V UGT UGT UFOUGP UFO XXXXX X XXXXXX OH P OH P OH P OH P OHU OHU OHU OHU OHU OHUOHPOHPOHPOHPOHPOHPOHPOHP OHP X XXX O H P O H P O H P O H P UCATV UCATV UGT UG T UG T UG T UG T UG T UG T UC A T V UC A T V OH U OH U GGGGGGGGGGGGG UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV OHP OH P OH P OH P OH P U C A T V UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UGTUGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGT WWWWWWWWWW 8' ' W 8' ' W 8' ' W W EXISTING EDGE OF PAVEMENT EXISTING ROAD STRIPING EXISTING EDGE OF PAVEMENT EXISTING ROAD STRIPING ±7.27' ANTICIPATED RIGHT-OF-WAY DEDICATION 3,764 SQFT EXISTING CENTERLINE EXISTING CENTERLINE EXISTING SIGNALIZED INTERSECTION EXISTING RIGHT-IN, RIGHT-OUT DRIVEWAY CTC OHU CT O H U O H U O H U OHU OHU 8'' W 8'' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8'' W D D UGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV G UCATV UCATV UCATVUGTUGT UGT UGT UCATV U C A T V UGT UGT UFOUGP UFO OH P OH P OH P OH P OHU OHU OHU OHU OHU OHUOHPOHPOHPOHPOHPOHPOHPOHP OHP UCATV UCATV UGT UG T UG T UG T UG T UG T UG T UC A T V UC A T V OH U OH U GGGGGGGGGGGGG UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV OH P OH P OH P OH P U C A T VUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UGTUGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGT WWWWWWWWWW 8'' W 8' ' W 8'' W WW FM 20 16 17 18 19 20 1819 FE121 18" RCP FE120 EW20019181716 17181920 21 20 1918171820 20 16 17 18 19 20 1517 16 15 CTC C 8'' W 8'' W 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8'' W UFO UFO 8'' W 8'' W 8'' W 150' TAPER 12' 175' STORAGE 100' TAPER 12' T61 T4 T4 T20 T20 T21 T21 T71 T70 T71 PROPOSED EDGE OF PAVEMENT PROPOSED EDGE OF PAVEMENT PROPOSED EDGE OF PAVEMENT 30"X30" R1-1 "STOP" SIGN PROPOSED RELOCATED "ADOPT A HIGHWAY" SIGN PROPOSED RIGHT-IN, RIGHT-OUT DRIVEWAY PROPOSED RIGHT TURN LANE 300' STORAGE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - R D W Y . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 6 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C2.1 TU R N L A N E P L A N 332 P. BARBEAU P. BARBEAU N A D 8 3 0 SCALE 1"=30' 60'30' 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 CAROLINA BEACH ROAD - EXISTING CONDITIONS CAROLINA BEACH ROAD - PROPOSED WIDENING AND GRADING CAROLINA BEACH ROAD - PROPOSED STRIPING AND SIGNAGE TRAFFIC CONTROL KEYNOTES Symbol Description Material Linear Length Adjustment T4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo .25 T20 WHITE EDGELINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1 T21 WHITE SOLID LANE LINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1 T61 WHITE STOPBAR (24", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1 T70 LEFT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1 T71 RIGHT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1 PROPOSED HEAVY DUTY ASPHALT PAVEMENT SECTION PER NCDOT SPECIFICATIONS. SEE DETAIL BELOW. ROAD WIDENING NOTES POSTED SPEED LIMIT = 45 MPH DESIGN SPEED LIMIT = 50 MPH MILL AND REPLACE MIN. 1.5" S9.5C MATERIALS LEGEND 1. CONTRACTOR SHALL OBTAIN AND READ ALL NCDOT DRIVEWAY PERMITS AND ENCROACHMENTS. THEY SHALL BE A PART OF THESE PLANS. 2. ALL FINISHED SURFACES SHALL SLOPE TOWARDS DRAINAGE STRUCTURES AT POSITIVE SLOPE AND TO AVOID STANDING WATER. 3. CONTRACTOR SHALL COORDINATE ALL WORK IN R/W WITH NCDOT AND NEW HANOVER COUNTY INSPECTORS. 4. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE THE RELOCATION OF EXISTING UTILITIES AS NEEDED TO FUNCTION WITH THE PROPOSED IMPROVEMENTS. PAVEMENT MARKING NOTES 1. LOCATION OF PAVEMENT MARKINGS SHALL CONFORM TO NCDOT PAVEMENT MARKING STANDARDS. APPLICATION OF PAVEMENT MARKINGS SHALL BE DONE IN ACCORDANCE WITH SECTION 1205 OF THE N.C. DIVISION OF HIGHWAYS STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES HANDBOOK (2024 EDITION) WITH REVISION(S) THERETO. 2. ALL EXISTING PAVEMENT MARKINGS SHALL BE ERADICATED PER NCDOT SPECIFICATIONS PRIOR TO PLACEMENT OF MARKING SHOWN HEREIN. 3. THE CONTRACTOR SHALL BE REQUIRED TO PRE-MARK THE PAVEMENT PRIOR TO ACTUAL APPLICATION OF MARKINGS WITHIN THE NCDOT RIGHT OF WAY. THE CONTRACTOR SHALL SCHEDULE A PRE-MARKING INSPECTION REVIEW WITH THE NCDOT DISTRICT ENGINEER AT LEAST ONE WEEK PRIOR TO MARKING. PAVEMENT MARKINGS SHALL NOT BE INSTALLED UNTIL AFTER FIELD REVIEW AND APPROVAL BY THE NCDOT DISTRICT ENGINEER. 4. PAVEMENT MARKINGS SHALL MATCH TO AND ALIGN WITH EXISTING CONDITIONS AND MARKINGS. THE CONTRACTOR SHALL PROVIDE THERMOPLASTIC MARKINGS ON ROADWAYS . 5. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL THERMOPLASTIC MARKINGS AND RAISED REFLECTIVE PAVEMENT MARKERS FOR NEWLY CONSTRUCTED TURN LANES TO NCDOT SPECIFICATIONS AND DIMENSIONAL STANDARDS. RAISED PAVEMENT MARKERS TO BE APPROVED AND INSTALLED PER NCDOT STANDARDS. 6. ALL PAVEMENT MARKINGS WITHIN NCDOT RIGHT-OF-WAY SHALL BE LONG LIFE THERMOPLASTIC. 7. CONTACT NCDOT TRAFFIC SERVICES FOR PAVEMENT MARKING LAYOUT. 8. ALL DIMENSIONS ARE TO FACE OF CURB. 9. CONTRACTOR TO ADJUST ALL APPURTENANCES TO MATCH EXISTING GRADE. 10. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DRIVEWAYS AND DRIVEWAY PIPES THROUGHOUT CONSTRUCTION. MAINTAIN VEHICULAR ACCESS AT ALL TIMES. 11. CONTRACTOR TO PERFORM TRAFFIC CONTROL AND TEMPORARY LANE CLOSURES PER NCDOT AND NEW HANOVER COUNTY STANDARDS. 12. ALL CURB AND GUTTER INSIDE PUBLIC RIGHT-OF-WAY SHALL BE 30 INCHES WIDE PER NCDOT STANDARDS. NOTES: NCDOT ASPHALT PAVEMENT SECTION NOT TO SCALE COMPACTED SUBGRADE BASE COURSE TYPE B-25.0C BINDER COURSE SURFACE COURSE TYPE S-9.5C TYPE I19.0C 3-IN 4-IN 5-IN 1. PREPARING, GRADING, SHAPING, AND COMPACTION OF SUBGRADE SOILS SHOULD BE PERFORMED IN ACCORDANCE WITH DIVISION 5, SECTION 501 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (2006). PREPARING, GRADING, SHAPING, AND COMPACTION OF AGGREGATE BASE COURSE (CABC) STONE SHOULD BE PERFORMED IN ACCORDANCE WITH DIVISION 5, SECTION 520 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (2006). PLACEMENT AND COMPACTION OF THE BITUMINOUS CONCRETE SHOULD BE PERFORMED IN ACCORDANCE WITH DIVISION 6, SECTION 600 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (2006). PROPER SUBGRADE COMPACTION, ADHERENCE TO THE NCDOT SPECIFICATIONS, AND COMPLIANCE WITH PROJECT PLANS AND SPECIFICATIONS ARE CRITICAL TO THE PERFORMANCE OF THE CONSTRUCTED PAVEMENT. 2. THE CONTRACTOR MAY CHOOSE TO INSTALL INTERMEDIATE COURSES OF PAVEMENT TO STABILIZE THE SITE DURING CONSTRUCTION AT NO ADDITIONAL COST. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE ADEQUATE THICKNESS REQUIRED FOR INTERMEDIATE PAVING. INCREASES IN THE DESIGN PAVEMENT SECTION TO FACILITATE INTERMEDIATE PAVING SHALL BE PROVIDED AT NO ADDITIONAL COST. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGES TO SUBGRADE, INSTALLED BASE COURSE AND/OR INTERMEDIATE PAVING PRIOR TO PLACING SUBSEQUENT PAVEMENT LIFTS AT NO ADDITIONAL COST. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING PAVEMENT DURING ALL PHASES OF WORK. THE FINAL SURFACE OF PAVEMENT SHALL BE FREE OF ALL DEFECTS OR DAMAGE. COMPACTED SUBGRADE BASE COURSE AGGREGATE BINDER COURSE SURFACE COURSE TYPE S-9.5C TYPE I19.0C 3-IN 4-IN 10-IN PAVEMENT SECTION-WIDENING GREATER THAN 6' WIDTH * OVERLAY AREAS - 1.5" S9.5C PAVEMENT SECTION-WIDENING LESS THAN OR EQUAL TO 6' WIDTH 1.5" ASPHALT MILL & OVERLAY; 1.5' WIDE HEAVY DUTY NCDOT ASPHALT PAVEMENT; REFER TO PAVEMENT SECTION PROPOSED 2' PAVED SHOULDER PROPOSED 2' PAVED SHOULDER 10'' W10'' W10'' W10'' W OHU TC TC O H U O H U O H U O H U 8'' W C T CT C UGTOHP UCATVUCATVUCATVUCATV UGTUGT GGG X X X OHP OHP OHP O H P O H P O H P O H P O H P UGTUGT X X OHPOHP O H P O H P O H P O H P OH P OH P OH P OH P EXISTING ROAD STRIPING EXISTING CENTERLINE 10'' W10'' W10'' W10'' W OHU TC TC O H U O H U O H U O H U 8'' W C T CT C UGTOHP UCATVUCATVUCATVUCATV UGTUGT GGG X X X OHP OHP OHP O H P O H P O H P O H P O H P UGTUGT X X OHPOHP O H P O H P O H P O H P OH P OH P OH P OH P 18 18 TC TC 8'' W GGG X X X X X T20 T4 T70 209' EXISTING STORAGE 91' TAPER 12' EXISTING CENTERLINE PROPOSED EDGE OF PAVEMENT 100' FULL STORAGE PROPOSED 2' PAVED SHOULDER JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - R D W Y . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 6 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C2.2 TU R N L A N E P L A N 332 P. BARBEAU P. BARBEAU 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 CAROLINA BEACH ROAD - EXISTING CONDITIONS CAROLINA BEACH ROAD - PROPOSED WIDENING AND GRADING CAROLINA BEACH ROAD - PROPOSED STRIPING AND SIGNAGE TRAFFIC CONTROL KEYNOTES Symbol Description Material Linear Length Adjustment T4 3 FT. - 9 FT./SP WHITE MINISKIP (4", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo .25 T20 WHITE EDGELINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1 T21 WHITE SOLID LANE LINE (6", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1 T61 WHITE STOPBAR (24", 90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.01.Thermo 1 T70 LEFT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1 T71 RIGHT TURN ARROW (90 MIL); REFER TO NCDOT STANDARD DETAIL 1205.08.Thermo 1 PROPOSED HEAVY DUTY ASPHALT PAVEMENT SECTION PER NCDOT SPECIFICATIONS. SEE DETAIL BELOW. ROAD WIDENING NOTES POSTED SPEED LIMIT = 45 MPH DESIGN SPEED LIMIT = 50 MPH MILL AND REPLACE MIN. 1.5" S9.5C MATERIALS LEGEND 1. CONTRACTOR SHALL OBTAIN AND READ ALL NCDOT DRIVEWAY PERMITS AND ENCROACHMENTS. THEY SHALL BE A PART OF THESE PLANS. 2. ALL FINISHED SURFACES SHALL SLOPE TOWARDS DRAINAGE STRUCTURES AT POSITIVE SLOPE AND TO AVOID STANDING WATER. 3. CONTRACTOR SHALL COORDINATE ALL WORK IN R/W WITH NCDOT AND NEW HANOVER COUNTY INSPECTORS. 4. CONTRACTOR SHALL FIELD VERIFY AND COORDINATE THE RELOCATION OF EXISTING UTILITIES AS NEEDED TO FUNCTION WITH THE PROPOSED IMPROVEMENTS. PAVEMENT MARKING NOTES 1. LOCATION OF PAVEMENT MARKINGS SHALL CONFORM TO NCDOT PAVEMENT MARKING STANDARDS. APPLICATION OF PAVEMENT MARKINGS SHALL BE DONE IN ACCORDANCE WITH SECTION 1205 OF THE N.C. DIVISION OF HIGHWAYS STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES HANDBOOK (2024 EDITION) WITH REVISION(S) THERETO. 2. ALL EXISTING PAVEMENT MARKINGS SHALL BE ERADICATED PER NCDOT SPECIFICATIONS PRIOR TO PLACEMENT OF MARKING SHOWN HEREIN. 3. THE CONTRACTOR SHALL BE REQUIRED TO PRE-MARK THE PAVEMENT PRIOR TO ACTUAL APPLICATION OF MARKINGS WITHIN THE NCDOT RIGHT OF WAY. THE CONTRACTOR SHALL SCHEDULE A PRE-MARKING INSPECTION REVIEW WITH THE NCDOT DISTRICT ENGINEER AT LEAST ONE WEEK PRIOR TO MARKING. PAVEMENT MARKINGS SHALL NOT BE INSTALLED UNTIL AFTER FIELD REVIEW AND APPROVAL BY THE NCDOT DISTRICT ENGINEER. 4. PAVEMENT MARKINGS SHALL MATCH TO AND ALIGN WITH EXISTING CONDITIONS AND MARKINGS. THE CONTRACTOR SHALL PROVIDE THERMOPLASTIC MARKINGS ON ROADWAYS . 5. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL THERMOPLASTIC MARKINGS AND RAISED REFLECTIVE PAVEMENT MARKERS FOR NEWLY CONSTRUCTED TURN LANES TO NCDOT SPECIFICATIONS AND DIMENSIONAL STANDARDS. RAISED PAVEMENT MARKERS TO BE APPROVED AND INSTALLED PER NCDOT STANDARDS. 6. ALL PAVEMENT MARKINGS WITHIN NCDOT RIGHT-OF-WAY SHALL BE LONG LIFE THERMOPLASTIC. 7. CONTACT NCDOT TRAFFIC SERVICES FOR PAVEMENT MARKING LAYOUT. 8. ALL DIMENSIONS ARE TO FACE OF CURB. 9. CONTRACTOR TO ADJUST ALL APPURTENANCES TO MATCH EXISTING GRADE. 10. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING DRIVEWAYS AND DRIVEWAY PIPES THROUGHOUT CONSTRUCTION. MAINTAIN VEHICULAR ACCESS AT ALL TIMES. 11. CONTRACTOR TO PERFORM TRAFFIC CONTROL AND TEMPORARY LANE CLOSURES PER NCDOT AND NEW HANOVER COUNTY STANDARDS. 12. ALL CURB AND GUTTER INSIDE PUBLIC RIGHT-OF-WAY SHALL BE 30 INCHES WIDE PER NCDOT STANDARDS. NOTES: NCDOT ASPHALT PAVEMENT SECTION NOT TO SCALE COMPACTED SUBGRADE BASE COURSE TYPE B-25.0C BINDER COURSE SURFACE COURSE TYPE S-9.5C TYPE I19.0C 3-IN 4-IN 5-IN 1. PREPARING, GRADING, SHAPING, AND COMPACTION OF SUBGRADE SOILS SHOULD BE PERFORMED IN ACCORDANCE WITH DIVISION 5, SECTION 501 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (2006). PREPARING, GRADING, SHAPING, AND COMPACTION OF AGGREGATE BASE COURSE (CABC) STONE SHOULD BE PERFORMED IN ACCORDANCE WITH DIVISION 5, SECTION 520 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (2006). PLACEMENT AND COMPACTION OF THE BITUMINOUS CONCRETE SHOULD BE PERFORMED IN ACCORDANCE WITH DIVISION 6, SECTION 600 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES (2006). PROPER SUBGRADE COMPACTION, ADHERENCE TO THE NCDOT SPECIFICATIONS, AND COMPLIANCE WITH PROJECT PLANS AND SPECIFICATIONS ARE CRITICAL TO THE PERFORMANCE OF THE CONSTRUCTED PAVEMENT. 2. THE CONTRACTOR MAY CHOOSE TO INSTALL INTERMEDIATE COURSES OF PAVEMENT TO STABILIZE THE SITE DURING CONSTRUCTION AT NO ADDITIONAL COST. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE ADEQUATE THICKNESS REQUIRED FOR INTERMEDIATE PAVING. INCREASES IN THE DESIGN PAVEMENT SECTION TO FACILITATE INTERMEDIATE PAVING SHALL BE PROVIDED AT NO ADDITIONAL COST. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGES TO SUBGRADE, INSTALLED BASE COURSE AND/OR INTERMEDIATE PAVING PRIOR TO PLACING SUBSEQUENT PAVEMENT LIFTS AT NO ADDITIONAL COST. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING PAVEMENT DURING ALL PHASES OF WORK. THE FINAL SURFACE OF PAVEMENT SHALL BE FREE OF ALL DEFECTS OR DAMAGE. COMPACTED SUBGRADE BASE COURSE AGGREGATE BINDER COURSE SURFACE COURSE TYPE S-9.5C TYPE I19.0C 3-IN 4-IN 10-IN PAVEMENT SECTION-WIDENING GREATER THAN 6' WIDTH * OVERLAY AREAS - 1.5" S9.5C PAVEMENT SECTION-WIDENING LESS THAN OR EQUAL TO 6' WIDTH N A D 8 3 0 SCALE 1"=30' 60'30' 1.5" ASPHALT MILL & OVERLAY; 1.5' WIDE HEAVY DUTY NCDOT ASPHALT PAVEMENT; REFER TO PAVEMENT SECTION 10'' W10'' W TC TC O H U O H U O H U O H U O H U O H U OHU OHU 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W D D D X X X X X X X X UGP UG P UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UG P UGTUGT UGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV G G V UCATV OH P OH P OH P OH P OH P OHPOHPOHP UC A T V X X X X X X X X X X X X UCATVUCATVUCATVUCATVUCATVUCATV UG P UG P U G P U G P U G P UG P UG P UG P UGTUGTUGT UG T UG T UG T UG T UG T UG T U G T U G T UG T UG T UG T UG T UG T UC A T V UC A T V OH U OH U GGGGGGGGGGGGGGGGGG UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV X X X OHP O H P O H P O H P O H P OH P OH P OH P U C A T V UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UGTUGTUGTUGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATV UGP UGP UGP UG P UGP UG P X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X W W W WWWWWWWWWWWW 8' ' W 8' ' W 8' ' W W FM FM FM FM FM FMFM GG G G G G G W W W W W W W RD RD RD RD RD RD RD RD RD SAN VA N ST O P STANDARD UST FIELD NEW SHEETZ STORE 6139 SQ. FT. FFE: 22.50' G01 G02 G05 G07 G08 G09 G14 G16 G21 MA T C H L I N E - R E F E R T O I N S E T 20 19 20 21 22 21 21 20 21 22 20 20 18 18 19 19 17 17 20 19 20 20 17 18 19 21 22 2 1 21 18 19 20 21 15 20 16171819 11 1 010 1514 1617 18 19 2 0 20 19 21 21 20 2 1 20 2 0 20 2 1 21 20 17 17 18 18 19 21 22 21 22 20 19 21 19 21 21 21 21 21 2 1 2 0 20 1617 18 19 2021 1315 1 5 22 22 REVERSE CROWN RE V E R S E C R O W N CRO W N CROWN CROWN CR O W N CROW N CR O W N CR O W N CB107 CB101 CB103 FE300 CB105 CB104 CB102 CB106 FE121 FE120 FE301 EW200 15 " H D P E 18 " H D P E 18 " H D P E 15" HDPE 15" HDPE 18" RCP 15" HDPE 24" R C P 24" HDPE 15" H D P E 20 17 18 19 1717 17 17 19 18 2 1 18 18 16 1 5 " H D P E FE108 G01 G01 G02 G07 G08 G08 G08 G09 G14 G14 G14 G14 G14 G14 G14 JB400 G10 G21 G21 G22 G23 G24 GRADING & STORMWATER KEYNOTES NUMBER DESCRIPTION G01 24" CURB & GUTTER (TYP.) G02 FLUSH CONCRETE STRIP (FOR A.D.A.) G05 UNDERGROUND STORMWATER CONTROL MEASURE; REFER TO DETAILS G07 RIPRAP OUTLET PROTECTION; REFER TO SIZING CHART G08 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCE EASEMENT G09 ADA STALLS (MAX SLOPE 1:50) G10 20' PRIVATE SEWER EASEMENT G14 MATCH EXISTING PAVEMENT ELEVATION G16 CONVERT EXISTING STRUCTURE TO NCDOT TRAFFIC BEARING JUNCTION BOX; REFER TO STORM CHARTS G21 ROOF DRAIN (TYP.); MIN. COVER OF 2' AND MIN. SLOPE OF 1% G22 EXISTING 36" LIVE OAK TREE TO REMAIN UNDISTURBED G23 RETAINING WALL WITH 42" MINIMUM SAFETY RAILING AT ALL AREAS TALLER THAN 30" (DESIGN BY OTHERS) G24 NCDOT GUARDRAIL PER NCDOT DETAIL 862.02 10'' W10'' W10'' W C T CT C UCATVUCATV UGT G OHP OHP OHP O H P O H P O H P UGT OHPOHP O H P O H P O H P OH P OH P OH P 18 STORM STRUCTURE TABLE STR. # CB101 CB102 CB103 CB104 CB105 CB106 CB107 EW200 FE108 FE120 FE121 FE300 FE301 JB400 TOP 20.56' 19.54' 20.23' 19.79' 20.00' 19.29' 20.71' 12.57' 19.24' 18.09' 19.21' 17.88' 17.88' 20.26' INV. IN 14.70' (18" HDPE FROM CB102) 14.70' (18" HDPE FROM CB104) 15.00' (15" HDPE FROM CB103) 10.24' (24" RCP FROM ) 16.38' (18" RCP FROM FE121) 16.44' (15" HDPE FROM FE301) INV. OUT 14.50' (24" HDPE TO ) 15.30' (18" HDPE TO CB101) 16.00' (15" HDPE TO CB101) 15.25' (18" HDPE TO CB101) 14.00' (15" HDPE TO ) 14.00' (15" HDPE TO ) 16.90' (15" HDPE TO ) 17.80' (15" HDPE TO ) 17.50' (18" RCP TO FE120) 16.44' (15" HDPE TO FE300) DESCRIPTION NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 840.02 CONCRETE CATCH BASIN NCDOT 838.80 CONCRETE ENDWALL NCDOT ES-1 for 15 inch Pipe NCDOT ES-1 for 18 inch Pipe NCDOT ES-1 for 18 inch Pipe NCDOT ES-1 for 18 inch Pipe NCDOT ES-1 for 18 inch Pipe NCDOT 840.34 TRAFFIC BEARING JUNCTION BOX STORM PIPE TABLE FROM - TO - EW200 CB101 - CB102 - CB101 CB103 - CB101 CB104 - CB101 CB105 - CB106 - CB107 - FE108 - FE121 - FE120 FE301 - FE300 UPSTREAM INVERT 10.50' 14.50' 15.30' 16.00' 15.25' 14.00' 14.00' 16.90' 17.80' 17.50' 16.44' DOWNSTREAM INVERT 10.24' 13.00' 14.70' 15.00' 14.70' 13.50' 13.50' 13.50' 13.50' 16.38' 16.44' SLOPE 0.80% 0.70% 1.11% 1.59% 1.00% 4.25% 4.99% 4.41% 3.85% 1.00% 0.00% LENGTH 32.60 LF 214.48 LF 54.00 LF 62.87 LF 55.14 LF 11.77 LF 10.03 LF 77.08 LF 111.78 LF 111.82 LF 52.70 LF DIA. 24" 24" 18" 15" 18" 15" 15" 15" 15" 18" 15" MATERIAL RCP HDPE HDPE HDPE HDPE HDPE HDPE HDPE HDPE RCP HDPE DESCRIPTION CLASS III; SINGLE OFFSET O-RING 24" HDPE 18" HDPE 15" HDPE 18" HDPE 15" HDPE 15" HDPE 15" HDPE 15" HDPE CLASS IV 15" HDPE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - C 3 . 0 - G R A D . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 7 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C3.0 GR A D I N G A N D D R A I N A G E P L A N 332 P. BARBEAU P. BARBEAU 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 GRADING AND STORMWATER MANAGEMENT NOTES 1. ALL SITE WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANS PREPARED BY TIMMONS GROUP, THE CURRENT REQUIREMENTS OF NEW HANOVER COUNTY, THE APPLICABLE SECTIONS OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADWAY CONSTRUCTION, AND ALL OTHER PERTINENT FEDERAL AND STATE LAWS. 2. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES GOVERNING SAFETY AND HEALTH. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIOR TO THE SUBMISSION OF A BID. SUBMISSION OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND CONSTRAINTS OF THE SITE. IF DISCREPANCIES BETWEEN FIELD CONDITIONS AND DESIGN PLANS ARE DISCOVERED, CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY. 4. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFY NC 811. THE LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES. 5. ALL EXISTING TREES, VEGETATION, PAVEMENTS, CONCRETE FOUNDATIONS, STRUCTURES AND ORGANIC TOPSOIL SHALL BE STRIPPED AND REMOVED FROM NEW CONSTRUCTION AREAS UNLESS NOTED OTHERWISE. 6. ALL SLOPES SHALL BE 2:1 (HORIZONTAL: VERTICAL) MAXIMUM UNLESS NOTED OTHERWISE. ALL SLOPES 3:1 OR GREATER SHALL BE PERMANENTLY STABILIZED WITH VEGETATION. 7. AN AS-BUILT DRAWING OF NEW UTILITY SERVICES MUST BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OF THE PROJECT. 8. ALL AREAS NOT PAVED SHALL BE TOP SOILED, SEEDED, SODDED, MULCHED AND/OR LANDSCAPE UNLESS OTHERWISE NOTED IN THE CONSTRUCTION DRAWINGS, SITE SPECIFICATIONS OR INSTRUCTED BY THE OWNER. 9. CONTRACTOR SHALL REFER TO THE GEOTECHNICAL REPORT PREPARED BY GEOTECHNOLOGIES, INC PRIOR TO INITIATION OF ANY EARTHWORK ACTIVITY. 10. ALL ELEVATIONS SHOWN ARE REFERENCED TO BENCHMARKS ON THE PROJECT SURVEY AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR AT GROUNDBREAKING. 11. ALL SPOT ELEVATIONS ARE REFERENCED TO THE FINISHED GROUND SURFACE UNLESS NOTED OTHERWISE. 12. CONTRACTOR SHALL REFERENCE DETAILED BUILDING PLANS FOR EXACT BUILDING DIMENSIONS, ELEVATIONS, AND UTILITY CONNECTION POINTS. 13. CONTRACTOR SHALL COORDINATE FUEL ISLAND CANOPY DRAINS CONNECTION TO THE MAIN COLLECTOR PIPE WITH THE SHEETZ CONSTRUCTION MANAGER AND PROVIDE ALL NECESSARY FITTINGS TO MAKE THE CONNECTION TO THE MAIN COLLECTOR PIPE. 14. CONTRACTOR TO PROVIDE SHOP DRAWINGS ON ALL STORM SEWER PIPE, MANHOLES, AND INLETS TO THE SHEETZ CONSTRUCTION MANAGER FOR APPROVAL. 15. AN AS-BUILT DRAWING OF NEW UTILITY SERVICES SHALL BE PROVIDED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OF THE PROJECT. 16. ALL STORM PIPE SHALL BE AS SPECIFIED. ALL JOINTS SHALL BE WATERTIGHT. 17. ALL STORM STRUCTURES ADJACENT TO CURBS SHALL BE NCDOT STANDARD.. 18. ALL STORM STRUCTURES DIRECTLY DOWN GRADIENT OF THE FUEL PUMP PAD OR UNDERGROUND STORAGE TANKS SHALL HAVE A SUMP AND BMP FEATURE (FOR EXAMPLE 'SNOUT') INSTALLED ON THE OUTFLOW PIPE. 19. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. N A D 8 3 0 SCALE 1"=30' 60'30' INSET - SCALE 1" = 30' NOTES: 1. TOP REFERS TO: 1.1. CATCH BASIN: TOP OF CURB 1.2. YARD INLET / DROP INLET: SILL RIPRAP SIZING CHART x FE120 CLASS 'A' 6'L X 4.5'W X 12"D x FE300 CLASS 'A' 5'L X 3.8'W X 12"D U07 VA N ST O P STANDARD UST FIELD NEW SHEETZ STORE 6139 SQ. FT. FFE: 22.50' O H U O H U O H U OHU D D D UGP UGP UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATV UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UCA T V UC A T V U UCATV UG P UG P UG P UG P U G P U G P U G P U G P UG P UG P UG T UG T U G T U G T U G T U G T UG T UG T UG T UC A T V UC A T V HU OH U OH U GGGGGGGGGGGGGGGGG UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV OH P OH P OH P OH P P UC A T V UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UGT UGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UGP UGP UGP UGP UGP UG P UG P X X X X X X X X X X X X X X X X X W WWWWWWWWWWWWWW 8' ' W 8' ' W 8' ' W FM FM FM FM FM FM FM M GGGG G G G G G G G W W W W W W W W W W W W RD RD RD RD RD RD RD RD RD RD RD RD RD SANSAN S A N ATV UCATVUCCA GT INV IN 18.00 INV OUT 17.75 CO-02 TOP 21.71 INV OUT 17.23 6" P V C CO-01 TOP 21.31 INV OUT 16.55 6" PVC 6" PVC CO-03 TOP 21.50 INV OUT 17.80 6" P V C CO-04 TOP 22.44 INV OUT 18.20 6" PVC 6" PVC 6" P V C 6" P V C U03 ZU40 ZU53 ZU40 ZU39 ZU39 ZU36 ZU36ZU37 ZU32 ZU28 ZU01 ZU50 ZU01 U52 U19 ZU05 ZU06 ZU04 ZU07 ZU10 ZU14 ZU12 ZU22 ZU22 ZU23 ZU24 ZU25 ZU26 ZU52 U23 U21U16U16 U08 U09 U10 U10 U14 U37 U14 U20 6" PVC CO-06 TOP 19.37 INV OUT 18.10 CO-05 TOP 18.93 INV OUT 17.70 U27 INV: 18.33 INV: 18.33 INV: 18.33 3" PVC U34 U34 20' 20' UTILITY KEYNOTES NUMBER DESCRIPTION U01 EXISTING 8" PVC WATER MAIN PER CFPUA GIS U03 EXISTING 10" WATER MAIN; LOCATION BASED ON PHOTOMETRIC DATA. CONTRACTOR TO CONFIRM LOCATION AND DEPTH PRIOR TO CONSTRUCTION. U05 EXISTING SANITARY SEWER MANHOLE (TYP.) U06 EXISTING 8" SANITARY SEWER MAIN (TYP.) U07 EXISTING UTILITY POLE (TYP.) U08 EXISTING OVERHEAD UTILITY LINE (TYP.) U09 EXISTING UNDERGROUND TELEPHONE (TYP.) U10 EXISTING UNDERGROUND CABLE TV LINE (TYP.) U14 EXISTING GUY WIRE TO REMAIN U16 EXISTING GAS MAIN TO REMAIN U19 8"x2" TAPPING SLEEVE & VALVE U20 8"x6" TAPPING SLEEVE & VALVE U21 6" DIP WATER LINE U23 FIRE HYDRANT ASSEMBLY (TYP.) U27 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCE EASEMENT U34 PROPOSED PRIVATE SEWER EASEMENT U36 CONNECT TO EXISTING SANITARY SEWER MANHOLE. CORE DRILL AND INSTALL FLEXIBLE RUBBER BOOT. (CONTRACTOR TO FIELD VERIFY LOCATION AND ELEVATION) U37 FORCE MAIN; REFER TO PUMP STATION PLANS BY TIMMONS GROUP. U47 EXISTING 1" WATER METER TO REMAIN U52 COORDINATE WITH WATER DEPARTMENT TO ENSURE THAT SERVICE IS NOT INTERRUPTED AT ANY TIME. U53 CONNECT TO EXISTING SANITARY SERVICE. CONTRACTOR TO FIELD VERIFY LOCATION, SIZE, CONDITION, AND INVERT PRIOR TO ANY CONSTRUCTION. COORDINATE WITH UTILITY PROVIDER. CONTRACTOR SHALL HAVE EXISTING LINE JETTED AND A CAMERA RUN THROUGH IT TO VERIFY PRIOR TO ANY CONSTRUCTION. U60 6" PVC SANITARY SEWER SERVICE (TYP.) ZU01 CONTRACTOR TO VERIFY EXISTING UTILITY LOCATIONS PRIOR TO START OF CONSTRUCTION. IMMEDIATELY NOTIFY SHEETZ AND CIVIL ENGINEER OF RECORD IF DISCREPANCIES OR CONFLICTS ARE FOUND. ZU02 DOMESTIC WATER SERVICE POINT OF CONNECTION. ZU04 2" TYPE "K" SOFT COPPER DOMESTIC WATER SERVICE. SERVICE LINE SHALL HAVE 3' MINIMUM COVER. ZU05 2" DOMESTIC WATER METER. ZU06 2" DOMESTIC RPZ BACKFLOW PREVENTER (PER LOCAL REQUIREMENTS) DOWNSTREAM OF THE DOMESTIC WATER METER. PROVIDE POWER TO HOT BOX. ZU07 WATER LINE POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. ZU10 IRRIGATION WATER SERVICE POINT OF CONNECTION. ZU12 1" TYPE "K" COPPER IRRIGATION WATER SERVICE. SERVICE LINE SHALL HAVE 3' MINIMUM COVER. INSTALL IRRIGATION SLEEVES UNDER PAVEMENT. REFER TO IRRIGATION PLANS FOR QUANTITIY, SIZE, MATERIAL, AND LOCATIONS. VERIFY EXACT LOCATION WITH SHEETZ CONSTRUCTION MANAGER PRIOR TO PLACING PAVEMENT. ZU14 1" RPZ IRRIGATION BACKFLOW PREVENTER (PER LOCAL REQUIREMENTS) DOWNSTREAM OF THE IRRIGATION WATER METER. PROVIDE POWER TO HOT BOX. ZU20 SANITARY SEWER POINT OF CONNECTION. ZU22 6" PVC SANITARY SEWER SERVICE @ 1/8" PER LF MIN. SLOPE, 4' MIN. COVER (TYP.). ALL PVC SEWER PIPING SHALL HAVE TRACER WIRE PER NC PLUMBING CODE SECTION 306.2.4. ZU23 SANITARY SEWER CLEANOUT. TRAFFIC RATED IF WITHIN PAVEMENT (TYP.). ZU24 2,000 GALLON GREASE TRAP; REFER TO SHEETZ DETAIL 21 AND MEP PLANS FOR VENTING DETAILS. ZU25 SANITARY SEWER POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. ZU26 GREASE SERVICE POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. ZU28 SANITARY SEWER LIFT STATION; REFER TO LIFT STATION PLANS AND MEP PLANS BY OTHERS. ZU32 ELECTRIC TRANSFORMER PAD LOCATION. COORDINATE WITH LOCAL PROVIDER. LOCAL PROVIDER CAN SUPERSEDE THE PROPOSED TRANSFORMER PAD LOCATION. PROVIDE TWO (2) 6" __MATERIAL__ CONDUITS BETWEEN POINT OF CONNECTION AND TRANSFORMER. 24" MINIMUM BURY DEPTH WITH 18" OF VERTICAL SEPARATION AT WATER AND SEWER CROSSINGS. ZU36 PROVIDE POWER TO EMERGENCY SHUT-OFF SWITCH; REFER TO ELECTRICAL, UNDERGROUND STORAGE TANK SYSTEM PLANS, AND SHEETZ DETAIL 29. ZU37 PROVIDE POWER TO LIGHTED BOLLARD (TYP.). ZU39 PROVIDE POWER TO AIR AND VACUUM MACHINES. ZU40 PROVIDE POWER TO MID SIGN; WIRED BY BUILDING ELECTRICAL CONTRACTOR. VERIFY EXACT LOCATION AND DESIGN BEFORE ROUGH-IN. PERMITTED BY OTHERS. ZU50 NATURAL GAS SERVICE POINT OF CONNECTION. ZU52 NATURAL GAS SERVICE CONSTRUCTED BY LOCAL PROVIDER. ZU53 NATURAL GAS SERVICE METER LOCATION AND POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - C 5 . 0 - U T I L . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 9 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C5.0 UT I L I T Y P L A N 332 P. BARBEAU P. BARBEAU N A D 8 3 0 SCALE 1"=20' 40'20' 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 C5 . 0 IN S E T A MA T C H L I N E C 5 . 1 UTILITY NOTES 1. ALL SITE WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANS PREPARED BY TIMMONS GROUP, THE CURRENT REQUIREMENTS OF NEW HANOVER COUNTY AND CAPE FEAR PUBLIC UTILITY AUTHORITY (CFPUA), THE APPLICABLE SECTIONS OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADWAY CONSTRUCTION, AND ALL OTHER PERTINENT FEDERAL AND STATE LAWS. 2. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES GOVERNING SAFETY AND HEALTH. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIOR TO THE SUBMISSION OF A BID. SUBMISSION OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND CONSTRAINTS OF THE SITE. IF DISCREPANCIES BETWEEN FIELD CONDITIONS AND DESIGN PLANS ARE DISCOVERED, CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY. 4. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFY NC "ONE CALL" AT 811. THE LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BID AND PERFORM ALL UTILITY WORK IN COMPLIANCE TO ALL APPLICABLE LOCAL AND STATE CODES AND REGULATIONS. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES ASSOCIATED WITH THE INSTALLATION, INSPECTING, TESTING AND FINAL ACCEPTANCE OF ALL PROPOSED UTILITY CONSTRUCTION UNLESS OTHERWISE COORDINATED BEFOREHAND WITH SHEETZ. 7. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY COMPANY ON THE ADDITION, REMOVAL AND/OR RELOCATION OF UTILITIES AND UTILITY POLES AND THE EXTENSION OF ALL PROPOSED UTILITIES TO THE SHEETZ PROJECT STRUCTURES. 8. ALL UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE RESPECTIVE UTILITY COMPANY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL UTILITIES ARE INSTALLED CORRECTLY TO MEET PROJECT REQUIREMENTS WHETHER PERFORMED BY THE CONTRACTOR OR NOT. 9. AN AS-BUILD DRAWING OF NEW UTILITY SERVICES SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OF THE PROJECT. 10. UTILITY COMPANIES AND CONTACTS ARE LISTED ON SHEET C0.0. 11. CONDUIT LOCATIONS TO FREESTANDING SIGNS AND SITE LIGHT POLES TO BE COORDINATED WITH SHEETZ CONSTRUCTION MANAGER. 12. CONTRACTOR SHALL COORDINATE AND VERIFY WITH SHEETZ CONSTRUCTION MANAGER ON LOCATION AND SIZE OF THE STORE GREASE TRAP. GREASE TRAP SHALL BE PROVIDED WITH "T" PIPE IN OUTFLOW CHAMBER. ALL SANITARY SEWER PIPE SHALL BE THE SDR-35 PVC UNLESS OTHERWISE NOTED. 13. CONTRACTOR SHALL COORDINATE WITH SHEETZ CONSTRUCTION MANAGER AND SHEETZ IT DEPARTMENT ON THE CONDUIT ROUTE TO STORE FOR TELE/COMMUNICATION SERVICES. 14. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. TT T C T 8'' 8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W8'' W 8'' W UGP8'' S A N 8'' SAN8'' SAN8'' SAN TC T S UGTUGTUGT UGTUGTUGT UGTUGTUGT UGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGT UGT UCAUCATVUCATVUCATVUCATVUCATV UCATV UCATV UCATV UG TUGTUGTUGT G G G OH P OH P OH P OH P OH P OH P UCATVUCATVUCATVUGTUGTUGT UCATV OHPOHPOHPOHPOHPOHPOHPOHPOHPOHUOHUOHUOHUOHUOHU OH U OHP OHP OH P OH P OH P OH P OH P OHPOHPOHP GGGGGGGGGG UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UGUGTUGTUGTUGTUGTUGT UFO UFO UFO UG PUGPUCA T V UCATV UCATV UCATV UCATV UCATV UCATV UGTUGT UGTUGTUCATVUCATVUCATV UGTUGTUGTUGT UCATVUCATVUCATV UGT UGT UFO UFO G UGP UG P UCA T V UG TUF OUGP OH U OH U OH U OH P X UGP UGP UGP UGP G G X X X X X X WWWWWWWWWWWWWW FM FM FMFMFMFMFMFM U05 U36 ZU01 ZU20 U06 U16 U37 U14 U3420' U34 25' UTILITY KEYNOTES NUMBER DESCRIPTION U01 EXISTING 8" PVC WATER MAIN PER CFPUA GIS U03 EXISTING 10" WATER MAIN; LOCATION BASED ON PHOTOMETRIC DATA. CONTRACTOR TO CONFIRM LOCATION AND DEPTH PRIOR TO CONSTRUCTION. U05 EXISTING SANITARY SEWER MANHOLE (TYP.) U06 EXISTING 8" SANITARY SEWER MAIN (TYP.) U07 EXISTING UTILITY POLE (TYP.) U08 EXISTING OVERHEAD UTILITY LINE (TYP.) U09 EXISTING UNDERGROUND TELEPHONE (TYP.) U10 EXISTING UNDERGROUND CABLE TV LINE (TYP.) U14 EXISTING GUY WIRE TO REMAIN U16 EXISTING GAS MAIN TO REMAIN U19 8"x2" TAPPING SLEEVE & VALVE U20 8"x6" TAPPING SLEEVE & VALVE U21 6" DIP WATER LINE U23 FIRE HYDRANT ASSEMBLY (TYP.) U27 VARIABLE WIDTH PRIVATE SCM ACCESS & MAINTENANCE EASEMENT U34 PROPOSED PRIVATE SEWER EASEMENT U36 CONNECT TO EXISTING SANITARY SEWER MANHOLE. CORE DRILL AND INSTALL FLEXIBLE RUBBER BOOT. (CONTRACTOR TO FIELD VERIFY LOCATION AND ELEVATION) U37 FORCE MAIN; REFER TO PUMP STATION PLANS BY TIMMONS GROUP. U47 EXISTING 1" WATER METER TO REMAIN U52 COORDINATE WITH WATER DEPARTMENT TO ENSURE THAT SERVICE IS NOT INTERRUPTED AT ANY TIME. U53 CONNECT TO EXISTING SANITARY SERVICE. CONTRACTOR TO FIELD VERIFY LOCATION, SIZE, CONDITION, AND INVERT PRIOR TO ANY CONSTRUCTION. COORDINATE WITH UTILITY PROVIDER. CONTRACTOR SHALL HAVE EXISTING LINE JETTED AND A CAMERA RUN THROUGH IT TO VERIFY PRIOR TO ANY CONSTRUCTION. U60 6" PVC SANITARY SEWER SERVICE (TYP.) ZU01 CONTRACTOR TO VERIFY EXISTING UTILITY LOCATIONS PRIOR TO START OF CONSTRUCTION. IMMEDIATELY NOTIFY SHEETZ AND CIVIL ENGINEER OF RECORD IF DISCREPANCIES OR CONFLICTS ARE FOUND. ZU02 DOMESTIC WATER SERVICE POINT OF CONNECTION. ZU04 2" TYPE "K" SOFT COPPER DOMESTIC WATER SERVICE. SERVICE LINE SHALL HAVE 3' MINIMUM COVER. ZU05 2" DOMESTIC WATER METER. ZU06 2" DOMESTIC RPZ BACKFLOW PREVENTER (PER LOCAL REQUIREMENTS) DOWNSTREAM OF THE DOMESTIC WATER METER. PROVIDE POWER TO HOT BOX. ZU07 WATER LINE POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. ZU10 IRRIGATION WATER SERVICE POINT OF CONNECTION. ZU12 1" TYPE "K" COPPER IRRIGATION WATER SERVICE. SERVICE LINE SHALL HAVE 3' MINIMUM COVER. INSTALL IRRIGATION SLEEVES UNDER PAVEMENT. REFER TO IRRIGATION PLANS FOR QUANTITIY, SIZE, MATERIAL, AND LOCATIONS. VERIFY EXACT LOCATION WITH SHEETZ CONSTRUCTION MANAGER PRIOR TO PLACING PAVEMENT. ZU14 1" RPZ IRRIGATION BACKFLOW PREVENTER (PER LOCAL REQUIREMENTS) DOWNSTREAM OF THE IRRIGATION WATER METER. PROVIDE POWER TO HOT BOX. ZU20 SANITARY SEWER POINT OF CONNECTION. ZU22 6" PVC SANITARY SEWER SERVICE @ 1/8" PER LF MIN. SLOPE, 4' MIN. COVER (TYP.). ALL PVC SEWER PIPING SHALL HAVE TRACER WIRE PER NC PLUMBING CODE SECTION 306.2.4. ZU23 SANITARY SEWER CLEANOUT. TRAFFIC RATED IF WITHIN PAVEMENT (TYP.). ZU24 2,000 GALLON GREASE TRAP; REFER TO SHEETZ DETAIL 21 AND MEP PLANS FOR VENTING DETAILS. ZU25 SANITARY SEWER POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. ZU26 GREASE SERVICE POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. ZU28 SANITARY SEWER LIFT STATION; REFER TO LIFT STATION PLANS AND MEP PLANS BY OTHERS. ZU32 ELECTRIC TRANSFORMER PAD LOCATION. COORDINATE WITH LOCAL PROVIDER. LOCAL PROVIDER CAN SUPERSEDE THE PROPOSED TRANSFORMER PAD LOCATION. PROVIDE TWO (2) 6" __MATERIAL__ CONDUITS BETWEEN POINT OF CONNECTION AND TRANSFORMER. 24" MINIMUM BURY DEPTH WITH 18" OF VERTICAL SEPARATION AT WATER AND SEWER CROSSINGS. ZU36 PROVIDE POWER TO EMERGENCY SHUT-OFF SWITCH; REFER TO ELECTRICAL, UNDERGROUND STORAGE TANK SYSTEM PLANS, AND SHEETZ DETAIL 29. ZU37 PROVIDE POWER TO LIGHTED BOLLARD (TYP.). ZU39 PROVIDE POWER TO AIR AND VACUUM MACHINES. ZU40 PROVIDE POWER TO MID SIGN; WIRED BY BUILDING ELECTRICAL CONTRACTOR. VERIFY EXACT LOCATION AND DESIGN BEFORE ROUGH-IN. PERMITTED BY OTHERS. ZU50 NATURAL GAS SERVICE POINT OF CONNECTION. ZU52 NATURAL GAS SERVICE CONSTRUCTED BY LOCAL PROVIDER. ZU53 NATURAL GAS SERVICE METER LOCATION AND POINT OF ENTRY TO BUILDING; REFER TO MEP PLANS BY OTHERS. JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - C 5 . 0 - U T I L . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 9 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C5.1 UT I L I T Y P L A N 332 P. BARBEAU P. BARBEAU N A D 8 3 0 SCALE 1"=30' 60'30' 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 UTILITY NOTES 1. ALL SITE WORK SHALL BE DONE IN ACCORDANCE WITH THE PLANS PREPARED BY TIMMONS GROUP, THE CURRENT REQUIREMENTS OF NEW HANOVER COUNTY AND CAPE FEAR PUBLIC UTILITY AUTHORITY (CFPUA), THE APPLICABLE SECTIONS OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADWAY CONSTRUCTION, AND ALL OTHER PERTINENT FEDERAL AND STATE LAWS. 2. THE CONTRACTOR SHALL COMPLY AT ALL TIMES WITH APPLICABLE FEDERAL, STATE AND LOCAL LAWS, PROVISIONS, AND POLICIES GOVERNING SAFETY AND HEALTH. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXAMINING THE AREAS AND CONDITIONS UNDER WHICH THE PROJECT IS TO BE CONSTRUCTED PRIOR TO THE SUBMISSION OF A BID. SUBMISSION OF A BID SHALL BE CONSTRUED TO MEAN THE CONTRACTOR HAS REVIEWED THE SITE AND IS FAMILIAR WITH CONDITIONS AND CONSTRAINTS OF THE SITE. IF DISCREPANCIES BETWEEN FIELD CONDITIONS AND DESIGN PLANS ARE DISCOVERED, CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER IMMEDIATELY. 4. BEFORE EXCAVATION, ALL UNDERGROUND UTILITIES SHALL BE LOCATED IN THE FIELD BY THE PROPER AUTHORITIES. THE CONTRACTOR SHALL NOTIFY NC "ONE CALL" AT 811. THE LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES ARE APPROXIMATE AND MAY NOT ALL BE SHOWN. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE EXISTENCE AND EXACT LOCATION OF ALL UTILITIES AND UNDERGROUND STRUCTURES. 5. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BID AND PERFORM ALL UTILITY WORK IN COMPLIANCE TO ALL APPLICABLE LOCAL AND STATE CODES AND REGULATIONS. 6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES ASSOCIATED WITH THE INSTALLATION, INSPECTING, TESTING AND FINAL ACCEPTANCE OF ALL PROPOSED UTILITY CONSTRUCTION UNLESS OTHERWISE COORDINATED BEFOREHAND WITH SHEETZ. 7. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE UTILITY COMPANY ON THE ADDITION, REMOVAL AND/OR RELOCATION OF UTILITIES AND UTILITY POLES AND THE EXTENSION OF ALL PROPOSED UTILITIES TO THE SHEETZ PROJECT STRUCTURES. 8. ALL UTILITIES SHALL BE INSTALLED IN ACCORDANCE WITH THE SPECIFICATIONS OF THE RESPECTIVE UTILITY COMPANY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL UTILITIES ARE INSTALLED CORRECTLY TO MEET PROJECT REQUIREMENTS WHETHER PERFORMED BY THE CONTRACTOR OR NOT. 9. AN AS-BUILD DRAWING OF NEW UTILITY SERVICES SHALL BE PREPARED BY THE CONTRACTOR AND SUBMITTED TO THE OWNER UPON COMPLETION OF THE PROJECT. 10. UTILITY COMPANIES AND CONTACTS ARE LISTED ON SHEET C7.8. 11. CONDUIT LOCATIONS TO FREESTANDING SIGNS AND SITE LIGHT POLES TO BE COORDINATED WITH SHEETZ CONSTRUCTION MANAGER. 12. CONTRACTOR SHALL COORDINATE AND VERIFY WITH SHEETZ CONSTRUCTION MANAGER ON LOCATION AND SIZE OF THE STORE GREASE TRAP. GREASE TRAP SHALL BE PROVIDED WITH "T" PIPE IN OUTFLOW CHAMBER. ALL SANITARY SEWER PIPE SHALL BE THE SDR-35 PVC UNLESS OTHERWISE NOTED. 13. CONTRACTOR SHALL COORDINATE WITH SHEETZ CONSTRUCTION MANAGER AND SHEETZ IT DEPARTMENT ON THE CONDUIT ROUTE TO STORE FOR TELE/COMMUNICATION SERVICES. 14. CONTRACTOR SHALL REFER TO OTHER PLANS WITHIN THIS CONSTRUCTION SET FOR OTHER PERTINENT INFORMATION. C5 . 0 MA T C H L I N E C 5 . 1 REMOVE AND REPLACE ASPHALT PAVEMENT AND CURB AND GUTTER TO INSTALL FORCE MAIN REMOVE AND REPLACE GRAVEL DRIVEWAY TO INSTALL FORCE MAIN VA N ST O P STANDARD UST FIELD NEW SHEETZ STORE 6139 SQ. FT. FFE: 22.50' O H U O H U OHU OHU 8' ' W 8' ' W 8' ' W 8' ' W 8' ' W D D D D X X X X X X X X X X X X X X X X X X X X UGP UG P UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UC A T V UG P UG P UGTUGT UGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV G G V UCATV OH P OH P OH P OH P OH P OHPOHPOHP UC A T V X X X X X X X X X X X X X UCATV UCATV UG P UG P U G P U G P U G P UG P UG P UG P UGT UG T UGT UG T UG T UG T UG T U G T U G T UG T UG T UG T UG T UG T UC A T V UC A T V OH U OH U GGGGGGGGGGGGGGGG UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV OH P OH P OH P U C A T V UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATV UGTUGTUGT UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGT UCATV UGP UGP UGP UG P UGP UG P X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X W W W WWWWWWWWWWWW 8' ' W 8' ' W 8' ' W W FM FM FM FM FM FMFM GG G G G G G W W W W W W W RD RD RD RD RD RD RD RD RD SAN CACACATV U C A T V TVTV V G TVTTTTVTTVV QL (1)QL (1)QL (1) QL (1) QL (1) QL (1) QL (1) QL (1) QL (1) NS (6)NS (2)NS (3) NS (1) NS (1) NS (1) NS (1) ND (3) ND (3) ND (3) ND (3) LC (23)LC (11)LC (2) IC (11)IC (2)IC (23) LC (6) IC (6) IEB (14) LM (20)LM (16) LM (39)LM (40) SEED SEED SOD SOD SOD SOD SODSEED LG (1) LG (1) EXISTING FENCE EXISTING TREE LINE IEB (3) LM (13)LM (19) SOD JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BY DA T E DRAWN BY DATE RE V I S I O N D E S C R I P T I O N Th e s e p l a n s a n d a s s o c i a t e d d o c u m e n t s a r e t h e e x c l u s i v e p r o p e r t y o f T I M M O N S G R O U P a n d m a y n o t b e r e p r o d u c e d i n w h o l e o r i n p a r t an d s h a l l n o t b e u s e d f o r a n y p u r p o s e w h a t s o e v e r , i n c l u s i v e , b u t n o t li m i t e d t o c o n s t r u c t i o n , b i d d i n g , a n d / o r c o n s t r u c t i o n s t a k i n g w i t h o u t t h e e x p r e s s w r i t t e n c o n s e n t o f T I M M O N S G R O U P . NO R T H C A R O L I N A L I C E N S E N O . C - 1 6 5 2 AS SHOWN S: \ 3 3 2 \ 6 4 2 5 0 - S h e e t z \ 0 0 2 - 3 3 2 - S h a d e T r e e L n \ D W G \ S h e e t \ C D \ 6 4 2 5 0 . 0 0 2 - C 6 . 0 - P L N T . d w g | P l o t t e d o n 5 / 1 5 / 2 0 2 4 4 : 3 9 P M | b y J a c o b F r e n c h ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL NEW HANOVER COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS PRELIMINARY - NOT RELEASED FOR CONSTRUCTION 05/15/2024 C6.0 LA N D S C A P E P L A N 332 P. BARBEAU P. BARBEAU 05/15/2024 SH E E T Z - S H A D E T R E E L A N E WI L M I N G T O N - N E W H A N O V E R C O U N T Y - N O R T H C A R O L I N A 64250.002 LANDSCAPE NOTES: PRE-CONSTRUCTION x PRIOR TO CONSTRUCTION LOCATE ALL UNDERGROUND UTILITIES WITHIN AND ADJACENT TO THE WORK AREA. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. PROTECT ALL UTILITIES. REPAIR ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF CONSTRUCTION. x CONTRACTOR ENGAGED IN LANDSCAPE IMPLEMENTATION SHALL BE A LANDSCAPE CONTRACTOR REGISTERED IN THE STATE OF NORTH CAROLINA. x VERIFY ALL PLANT MATERIAL QUANTITIES ON PLANS PRIOR TO BIDDING. PLANT LIST TOTALS ARE FOR CONVENIENCE ONLY AND MUST BE VERIFIED. x PLANT MATERIAL SUBSTITUTIONS CAN ONLY OCCUR WITH PRIOR WRITTEN APPROVAL BY LANDSCAPE ARCHITECT. x PRIOR TO THE COMMENCEMENT OF ANY ACTIVITIES REQUIRING A BUILDING OR ZONING PERMIT AN ON-SITE PRE-CONSTRUCTION CONFERENCE SHALL TAKE PLACE WITH THE DEVELOPER AND THE ADMINISTRATOR TO REVIEW PROCEDURES FOR THE PROTECTION AND MANAGEMENT OF ALL LANDSCAPE ELEMENTS TO REMAIN. x ALL PLANT MATERIALS ARE SUBJECT TO LANDSCAPE ARCHITECT APPROVAL BEFORE, DURING, AND AFTER INSTALLATION. o ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TO SUBSTANTIAL COMPLETION) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE. x ALL PLANT MATERIALS AND INSTALLATION SHALL COMPLY WITH RECOMMENDATIONS AND REQUIREMENTS OF ANSI Z60.1 "AMERICAN STANDARD FOR NURSERY STOCK". o ALL PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. o ALL PLANT MATERIAL SHALL BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE PLANT LIST. o ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD. CONSTRUCTION/INSTALLATION x CONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING IN STAGES FOR SOIL STABILIZATION AS AREAS ARE COMPLETED AFTER GRADING. THIS PLAN DOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN. x CONTRACTOR SHALL TAKE 3 REPRESENTATIVE SOIL SAMPLES OF EACH PROPOSED PLANT BED AND SUBMIT COPIES OF THE RESULTS TO THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING WORK. x STUMPS LABELED FOR REMOVAL SHALL BE EXCAVATED, NOT GROUND. REMOVE ALL DEBRIS FROM THE HOLE. FILL WITH TOP SOIL, COMPACT, AND RAKE SMOOTH PRIOR TO INSTALLING NEW PLANT MATERIAL. x CONTRACTOR IS RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTECTION BETWEEN DELIVERY AND PLANTING TO MAINTAIN HEALTHY PLANT CONDITIONS. x ALL LANDSCAPED AND LAWN AREAS ARE TO RECEIVE A MINIMUM OF 4” OF TOPSOIL. x ALL LANDSCAPE ISLANDS SHALL BE GRADED FOR POSITIVE DRAINAGE WITH NO LOW SPOTS ALLOWING WATER TO BE TRAPPED. x INSTALL LANDSCAPE PLANTINGS AT ENTRANCES/EXITS AND PARKING AREAS ACCORDING TO PLANS SO MATERIAL WILL NOT INTERFERE WITH SIGHT DISTANCES. x THE SIZE OF THE PLANTING AREA AND SIZE OF PLANT MATERIAL AT MATURITY SHALL ALLOW FOR A 2.5' BUMPER OVERHANG FROM THE BACK OF CURB. x ALL TREES MUST BE GUYED OR STAKED AS DETAILED. x AREAS DAMAGED FROM PLANT RELOCATION OR OTHER ACTIVITIES OF LANDSCAPE CONTRACTOR TO BE RESEEDED AND ESTABLISHED AT NO ADDITIONAL COST TO THE OWNER. x CONTRACTOR IS RESPONSIBLE FOR WATERING ALL PLANT MATERIAL DURING INSTALLATION AND UNTIL FINAL INSPECTION AND ACCEPTANCE BY OWNER. CONTRACTOR SHALL NOTIFY OWNER OF CONDITIONS WHICH AFFECTS THE GUARANTEE. IT MAY BE NECESSARY TO TRUCK IN NON-CITY WATER TO MEET PLANT NEEDS. x USE HERBICIDES, PESTICIDES, AND FERTILIZER IN A MANNER CONSISTENT WITH THE FEDERAL INSECTICIDE, FUNGICIDE, AND RODENTICIDE ACT AND IN ACCORDANCE WITH LABEL RESTRICTIONS. x ALL LAWN AREAS TO BE SEEDED SHALL USE A LOCALLY GROWN COMMERCIAL MIX MEETING LATEST STATE OF NORTH CAROLINA AGRICULTURE STANDARDS FOR SEED AND PLANT CERTIFICATION. x SEEDING AND STRAW NOTES FOR LAWN AREAS: o RIP THE ENTIRE AREA TO DEPTH OF NOT LESS THAN 6”. o REMOVE ALL LOOSE ROCKS, ROOTS, AND OTHER OBSTRUCTIONS LEAVING SURFACE SMOOTH AND UNIFORM. DISPOSE OF WASTE MATERIAL OFF-SITE. o CHISEL COMPACTED AREAS AND SPREAD TOPSOIL TO SPECIFIED DEPTH. o APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPER PHOSPHATE UNIFORMLY AND MIX WITH SOIL. APPLY SOIL AMENDMENTS PER REQUIRED SOIL ANALYSIS RECOMMENDATIONS. o CONTINUE TILAGE UNTIL A WELL PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED. o SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. o MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. o INSPECT ALL SEEDED AREAS AND IF POSSIBLE, MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON. IF GRANDSTAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER, AND SEEDING RATES. o ANCHOR TACK WITH LIQUID ASPHALT AT 400 GAL/ACRE OR EMULSIFIED ASPHALT AT 300 GAL/ACRE. x PLANTING BEDS TO BE COMPLETELY COVERED WITH A MINIMUM 4" DEPTH OF MATERIAL FROM A LOCAL SOURCE HARVESTED IN A SUSTAINABLE MANNER. REFER TO LANDSCAPE SCHEME FOR MATERIAL SPECIFICATIONS. x MULCH ALL PLANT BEDS AND TREE RINGS WITH FRESH, CLEAN MATERIAL PER SPECIFICATIONS. ALL MULCH EDGES SHALL BE NEATLY TUCKED. ALL STRING AND/OR BAILING WIRE SHALL BE REMOVED. DUST SHRUBS AND GROUND COVER AFTER MULCHING TO REMOVE LOOSE MATERIAL FROM PLANTS. DO NOT PLACE MULCH IN CONTACT WITH THE TREE TRUNK: KEEP A MINIMUM OF 4" AWAY FROM TREE TRUNK OR BASE OF PLANT. x MULCH AND NO-MOW MIXES SHALL BE REPLENISHED AS NEEDED, ESPECIALLY AFTER HEAVY RAIN EVENTS. IF NO-MOW MIX GERMINATES AT A RATE OF LESS THAN 90%, THEN REMOVE OTHER SPECIES AND RESEED. TEMPORARY IRRIGATION x CONTRACTOR TO PROVIDE AND MAINTAIN TEMPORARY IRRIGATION FOR SOD WITHIN THE STORMWATER CONTROL MEASURE UNTIL SOD BECOMES ESTABLISHED. INSPECTIONS/GUARANTEE x LANDSCAPE CONTRACTOR SHALL NOTIFY GENERAL CONTRACTOR UPON COMPLETION OF LANDSCAPE INSTALLATION. CONTRACTOR WILL VERIFY COMPLETENESS INCLUDING THE REPLACEMENT OF ALL DEAD PLANT MATERIAL. CONTRACTOR IS RESPONSIBLE FOR SCHEDULING A FINAL INSPECTION BY LANDSCAPE ARCHITECT. x PLANT MATERIAL QUANTITIES AND SIZES WILL BE INSPECTED FOR COMPLIANCE WITH APPROVED PLANS BY A SITE PLAN REVIEW AGENT PRIOR TO THE RELEASE OF THE CERTIFICATE OF OCCUPANCY. x CONTRACTOR TO GUARANTEE ALL PLANT MATERIALS FOR ONE FULL YEAR AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH. WARRANTY PERIOD SHALL BEGIN UPON CERTIFICATE OF OCCUPANCY OR WHEN THE OWNER TAKES OVER MAINTENANCE, WHICHEVER COMES FIRST. N A D 8 3 0 SCALE 1"=30' 60'30' NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all other required documents. ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž /ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘ Online resources: x NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx x Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) Ă͘Cover >etter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant. ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ Attach to Permit Application form (not applicable for municipalities, churches, and schools) Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional site plan requirement details can be found in section 2 of this document. Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕ ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘ ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘ If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘ State of North Carolina | Department of Transportation | Division 3 | District 3  %DUEDGRV%OYG,&DVWOH+D\QH, NC 284 Form Updated /20(910) T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL Ă͘Site Plans Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement details can be found in section 2 of this document. ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ ^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ Đ͘Performance and Indemnity Bond Amount 100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕ ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway Rights of Way for acceptable bond types Ě͘Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required Ğ͘Hold Harmless Letter (if applicable) If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address ϰͿ Show Zͬt lines, highway control of access, and property lines ϱͿ All existing utilities (including handholes) and easements ϲͿ Rͬt width ϳͿ Existing posted speed limit(s) and design speed limit(s) ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area ϭϬͿ Include a plan sheet showing full site build-out and land use ϭϭͿ Buildings shown with “gross leasable area” ϭϮͿ Width of property frontage ϭϯͿ Distance from Rͬt to buildings and gasoline service islands ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34) ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘ ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ) ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ In shoulder sections, show grades at the KW and centerline ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31) ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) ϴͿ Driveway Wrofile (pages 42- 43) Y N n/a Y N n/a පප පපප ප Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW) Asphalt: 8” ABC stone and 1.5” S9.5 Concrete: 6” of concrete ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’ ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std. ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31) ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29) ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) ϭϱͿ Distance between driveways being requested (if applicable; page 51) ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33) ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34) ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ | Section ϲ: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000 5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5 x Secondary Routes with AADT<ϭϬ,000 5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ ϲͿ Indicate existing roadway grade ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78) ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ. | Section ϰ: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section ϱ: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below ϭͿ Interior driveway channelization stems Minimum 100’ from the RKW or at the discretion of the District Engineer ϮͿ Traffic flow pattern ϯͿ Traffic control devices ϰͿ Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown ;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline) ϲͿ Provide grades and spot elevations for existing and proposed ditches ϳͿ Show how drainage will be accommodated along property frontage (District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ Roadway Design Manual At Grade INTERSECTIONS May 2023 Part I General Design Information | 8-22 Figure 8-10 Recommended Treatment for Turn Lanes Note: Make every attempt possible to use the desirable deceleration length. It can be shortened as needed but shall not be less than the minimum. Coordinate with NCDOT and get approval on anything less than the desirable deceleration length.