Loading...
HomeMy WebLinkAbout3930 US Hwy 421 - Wilmington Trade Center TRC Comments Compiled 3930 N. US Hwy 421 – Wilmington Trade Center – Commercial Site Plan – TRC Review Page | 1 To: Brian Beaver of WTC Land Company, LLC; bbeaver@edgewater-ventures.com; Chris Norvell of WTC Land Company, LLC; cnorvell@edgewater-ventures.com Brad Schuler of Paramounte Engineering; bschuler@paramounte-eng.com; Jeremy Blair of Paramounte Engineering; jblair@paramounte-eng.com From: Wendell E. Biddle & Zach Dickerson Development Review Associate Planner Date: July 3rd, 2024, TRC Review PID#: R02400-001-037-000 Egov# SITECN-24-000027 Subject: 3930 N. US Hwy 421 – Warehousing/Manufacturing – Commercial Site Plan – TRC Review The following comments have been received for the July 3rd, 2024, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Please note following the TRC meeting, a revised preliminary plan addressing each of the below items must be resubmitted prior to receiving preliminary plan approval. NHC Planning, W. E. Biddle 910-798-7068 & Zach Dickerson 1. General Comments – a. The scope of work is listed as ‘warehousing’ and ‘manufacturing.’ Please detail the specifics of the proposed manufacturing and how much of the site is dedicated to warehousing vs manufacturing. Also, please detail if there will be associated outdoor storage. b. The scope of this TRC review is for buildings 4 & 7. c. The proposed site plan is for two structures, each of which are to be 152,880 square feet. Please detail what these structures are to serve as. d. Please detail the existing total and the percentage increase of impervious ground cover proposed. 3930 N. US Hwy 421 – Wilmington Trade Center – Commercial Site Plan – TRC Review Page | 2 2. UDO Section 5.1 Parking and Loading a. Parking for warehousing is prescribed 1.5 units per 1,000 square feet of development. At a total of 305,760 square feet of proposed development, a total of 459 spaces are required for parking. b. Please provide the details of the proposed Alternative Parking Plan in accordance with UOD Section 5.1.3. c. Please detail type of manufacturing proposed and the square footage dedicated to it to detail minimum parking requirements necessary. d. Please detail loading berth quantity, locations, and dimensions. 3. UDO Section 5.2 Traffic, Access, and Connectivity a. Please show sight triangles at site access, preferably on landscape plan so we can ensure there are no plantings in the triangle. 4. UDO Section 5.3 Tree Retention a. The plot sampling methodology used is not exactly what is recommended in our manual, but it does sample at least 10% of the area which is recommended by the manual. b. This is something that I think we can iron out, but we’ll need to have a discussion about this, either during TRC or offline. c. Please note that properties along the US Hwy 421 corridor are not required to mitigate Significant & Specimen Trees within the development envelope of a project as long as existing tree coverage outside the development envelope is retained in accordance with Table 5.3.7.E in the UDO. d. It appears that the majority of the site is planned to be developed, but there may be some areas in which trees can be retained, potentially in the northwestern portion of the site. 5. UDO Section 5.4 Landscaping and Buffering a. Please provide a landscape plan that meets the specific requirements established in the UDO Section 5.4.2 General Standards. b. Please include street yard, foundation plantings and parking lot landscaping. c. Please confirm that the landscaping plantings will meet the 15 trees planted or retained/acre requirement. 6. UDO Section 5.5 Exterior Lighting a. Please detail if there is to be any expansion or alteration of the lighted outdoor area. b. Please note that except for street lighting, all exterior lighting and indoor lighting visible from outside shall be designed and located so that the maximum illumination measured 3930 N. US Hwy 421 – Wilmington Trade Center – Commercial Site Plan – TRC Review Page | 3 in foot candles at ground level at a lot line shall not exceed the standards in Table 5.5.4.B: Maximum Illumination Levels. 7. The height of exterior light fixtures shall not exceed 25 feet. 8. UDO Section 5.6 Signs a. Please note that all signs are subject to Section 5.6 of the UDO. b. Please submit for sign permits prior to installation. 9. UDO Section 5.7 Conservation Resources a. Per the New Hanover County resource map, there are no detailed conservation resources on this site. NHC Fire Services, Ray Griswold 910-798-7448 1. Plan review for Buildings 4 & 7. 2. Fire finals required on all permits. 3. Portable fire extinguishers required per NFPA 10. 4. Fire Sprinkler Permits required. 5. A fire hydrant shall be placed within 100 feet of the FDC for each building. 6. Add a fire hydrant at the rear left/ southern corner of Building 7. 7. Will there be a looped system with the Final Build Out? Highly recommended. 8. Separate fire pumps shall be placed at each building if required. 9. Fire Alarm permits required. 10. Multiple KNOX boxes required at each door, front & back. 11. Section 510 testing is required per the NC Fire Code. 12. An Engineered Fire Flow Analysis is required. 13. No gates allowed unless approved by this office and the TRC. 14. Please review the TRC Plan Review topics for further explanation to J Blair of Paramounte Engineering. 15. All items are to be followed if pertinent to this project. 3930 N. US Hwy 421 – Wilmington Trade Center – Commercial Site Plan – TRC Review Page | 4 NHC Engineering, Galen Jamison 910-798-7072 1. A land disturbing and a stormwater permit issued by the County are required for this project. Please digitally submit the permit applications documentation with requisite review fees for County issued permit directly to gjamison@nhcgov.com. Application and forms can be found at https://www.nhcgov.com/251/Stormwater & at https://www.nhcgov.com/249/Sediment- Erosion-Control. 2. Please clarify Access Road B location and the TIA requirements for phase 1. It does not appear that the one ingress and two egress lanes are indicated in the plans. 3. Please contact the State for the stormwater permit modification requirements. It is assumed a high-density permit will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 1. Site plan reflects connection to public water and sewer. Proposed infrastructure does not violate setbacks to any adjacent properties’ well and septic systems. NHC Addressing, Katherine May 910-798-7443 1. Each building will need an individual address. 2. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan review required by CFPUA. 3. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan- Review-103. 4. CFPUA water is available. 5. CFPUA sewer available via a forcemain extension. 6. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 7. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 8. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority 3930 N. US Hwy 421 – Wilmington Trade Center – Commercial Site Plan – TRC Review Page | 5 NCDOT, Nick Drees 910-398-9100 1. Please see attachment. WMPO, Scott James 910-473-5130 1. Comments forthcoming Brad Shaver USACOE Brad.E.Shaver@usace.army.mil 1. A delineation has been completed and there are no aquatic resources on this tract. Comments not received at this time from: Emergency Services & E911, Steve Still NCDEQ, Chad Coburn New Hanover Soil & Water, Dru Harrison USACE, Rachel Capito NCDEMLR, Dan Sams DCM, Tanya Pietila STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.R. “JOEY”HOPKINS GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum To: New Hanover County Technical Review Committee Date: June 13, 2024 Subject: Wilmington Trade Center -Buildings 4&7 – 3930 US Hwy 421 ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx NCDOT Driveway Permit: An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. x Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). x It is recommended that you reach out to the NCDOT District Office prior to submitting plans to avoid a redesign of the proposed utilities. x Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Required Roadway Improvements: Roadway Improvements are required per the approved TIA. Refer to the NCDOT Roadway Design Manual for help with the design of any required roadway improvements. x Figure 8-10 Recommended Treatment for Turn Lanes (Included). Site Plan Comments: Submit plans that include the required improvements. You can coordinate with the district office with any questions 910-398-9100. September 13, 2023 Mr. Chase Smith, PE Ramey Kemp Associates 5808 Faringdon Place, Suite 100 Raleigh, NC 27609 RE: Approval with conditions of the Traffic Impact Analysis (TIA) associated with the proposed US 421 Industrial Park development in New Hanover County, NC. Dear Mr. Smith: The WMPO, NCDOT, and New Hanover County staff have reviewed the US 421 Industrial Park development TIA (sealed September 11, 2023). Based on the information provided and conversations held to date, it is our understanding that this development will be built in two (2) phases and consist of the following land uses: Phase 1 (build year 2024): o ITE Land Use Code 130 – 500,000 SF Industrial Park Full Build (build year 2033) o ITE Land Use Code 130 – 3,000,000 SF Industrial Park Based on review of the analysis provided in the TIA report, the following improvements are the responsibility of the developer: US 421 and I-140 EB Ramps (Existing Signalized Intersection) Phase 1 x No improvements are required. Full Build x Extend the existing eastbound I-140 Off-Ramp right turn lane to provide 300 feet of storage, and desirable full-width deceleration and taper. x Extend the northbound right turn lane on US 421 to provide 675 feet of storage, and desirable full- width deceleration and taper. Approval with conditions of the US 421 Industrial Park TIA (New Hanover County) Page 2 of 3 US 421 and I-140 WB Ramps (Existing Signalized Intersection) Phase 1 x No improvements are required. Full Build x Extend the existing westbound I-140 Off-Ramp left turn lane to provide 400 feet of storage, and desirable full-width deceleration and taper. x Extend the existing westbound I-140 Off-Ramp right turn lane to provide 300 feet of storage, and desirable full-width deceleration and taper. x Extend the existing southbound right turn lane on US 421 to provide 300 feet of full-width storage, extended back to the existing South Atlantic Services driveway access. US 421 and Existing Access (Existing Unsignalized Intersection) Phase 1 x No improvements are required. Full Build x Install a traffic signal and incorporate it into the existing closed loop system. US 421 and Access B (Proposed Signalized Intersection) Phase 1 x Install a traffic signal and incorporate it into the existing closed loop system. x Construct Access B with one ingress lane and two egress lanes, configured as a left turn lane and a thru-right lane. x Provide an internal protected stem of 250 ft as measured from the right-of-way line. x Construct a northbound right turn lane on US 421 with 100 feet of storage, and desirable full- width deceleration and taper. Full Build x Reconfigure Access B as a left turn lane and a left-thru-right lane. x Extend the northbound right turn lane on US 421 to provide 200 feet of storage, and desirable full-width deceleration and taper. If changes are made to the proposed site driveways and/or use, the current trip distribution may need to be modified and would require a revised Traffic Impact Analysis to be submitted for review by the NCDOT, WMPO, and New Hanover County, in which instance this approval would become null and void. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal ŽĨŽŶĞĚŝŐŝƚĂůĐŽƉLJŽĨƚŚĞƉůĂŶƐ along with all other required documents. ůůWĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůŚƚƚƉƐ͗ͬͬĐŽŶŶĞĐƚ͘ŶĐĚŽƚ͘ŐŽǀͬƐŝƚĞͬWĞƌŵŝƚƐͬWĂŐĞƐͬĚĞĨĂƵůƚ͘ĂƐƉdž /ŶƚŚĞŶŽƚŝĨLJĞŵĂŝůƐĞĐƚŝŽŶŽĨƚŚĞƉŽƌƚĂůĂƉƉůŝĐĂƚŝŽŶƉůĞĂƐĞŝŶĐůƵĚĞƚŚĞŝƐƚƌŝĐƚKĨĨŝĐĞĞŵĂŝů;ŝǀϯŝƐƚϯΛŶĐĚŽƚ͘ŐŽǀͿ͘^ĞĞƚŚĞůĂƐƚƉĂŐĞƐĨŽƌĨƵƌƚŚĞƌŝŶƐƚƌƵĐƚŝŽŶ͘ Online resources: x NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf x NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx x Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) Ă͘Cover >etter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include ƚŚĞƉĂƌĐĞůŶƵŵďĞƌ;ƐͿ͕description of all phases of the development and future land uses to be served by the permit,ĂŶĚa description of the adjoining land owned or controlled by the applicant. ď͘NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc Đ͘$50.00 /nspection &eeWĞƌĐĐĞƐƐWŽŝŶƚ Attach to Permit Application form (not applicable for municipalities, churches, and schools) Ě͘NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc Ğ͘Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf Ĩ͘Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first)Additional site plan requirement details can be found in section 2 of this document. Ő͘ĞƐŝŐŶ PlanZĞƋƵŝƌĞŵĞŶƚƐ ĨŽƌƉƌŽũĞĐƚƐŝŶǀŽůǀŝŶŐƌŽĂĚǁĂLJŝŵƉƌŽǀĞŵĞŶƚƐ If roadway improvements are required as part of the permit, ƚŚĞŶroadway plans͕ƉĂǀĞŵĞŶƚŵĂƌŬŝŶŐƉůĂŶƐ͕ ƐŝŐŶŝŶŐƉůĂŶƐ͕ĂŶĚƚƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐǁŝůůďĞƌĞƋƵŝƌĞĚͲ^ĞĞ^ĞĐƚŝŽŶϲĨŽƌŵŽƌĞŝŶĨŽƌŵĂƚŝŽŶ Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all /ŶŝƚŝĂůƌŝǀĞway Application Submittals WůĞĂƐĞŶŽƚĞƚŚĂƚƚŚĞƐĞĂƌĞƚŚĞŵŝŶŝŵƵŵƌĞƋƵŝƌĞŵĞŶƚƐŽĨĂůůĚƌŝǀĞǁĂLJƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶƐ͘ ůůƌĞƋƵŝƌĞĚĚŽĐƵŵĞŶƚĂƚŝŽŶƐŚĂůůďĞƐƵďŵŝƚƚĞĚƚŚƌŽƵŐŚƚŚĞŽŶůŝŶĞƉŽƌƚĂůĂƐW&ĨŝůĞƐ͕ǁŝƚŚƚŚĞĞdžĐĞƉƚŝŽŶŽĨƚŚĞ WĞƌĨŽƌŵĂŶĐĞĂŶĚ/ŶĚĞŵŶŝƚLJŽŶĚĂŶĚƚŚĞΨϱϬ/ŶƐƉĞĐƚŝŽŶ&ĞĞ;ƐͿ͕ƚŚĞƐĞƐŚŽƵůĚďĞŵĂŝůĞĚŽƌĚĞůŝǀĞƌĞĚƚŽϱϱϬϭ ĂƌďĂĚŽƐůǀĚ͕ĂƐƚůĞ,ĂLJŶĞ͕EϮϴϰϮϵ͘ If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit͕ƚŚĞƌĞ ŵĂLJďĞĂĚĚŝƚŝŽŶĂůƐƵďŵŝƚƚĂůŵĂƚĞƌŝĂůƐƌĞƋƵŝƌĞĚ͘ State of North Carolina | Department of Transportation | Division 3 | District 3  %DUEDGRV%OYG,&DVWOH+D\QH, NC 284 Form Updated/20(910) T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL Ă͘Site Plans Kne (1) digital copy (PDF) unless otherwise requested bythe District Office. Additional site plan requirement details can be found in section 2 of this document. ď͘Performance and Indemnity Bond/ŶĨŽƌŵĂƚŝŽŶͬFormƐ ^ĞĞůĂƐƚƉĂŐĞŽĨĚŽĐƵŵĞŶƚĨŽƌďŽŶĚŝŶĨŽƌŵĂƚŝŽŶĂŶĚĨŽƌŵƐ Đ͘Performance and Indemnity Bond Amount 100% of ƚŚĞĐŽƐƚŽĨƚŚĞǁŽƌŬwithin NCDOT Zight-of-tay;ZͬtͿ based on ƚŚĞattached estimatedetermined by ƚŚĞĂƉƉůŝĐĂŶƚΖƐĞŶŐŝŶĞĞƌĂŶĚĂƉƉƌŽǀĞĚďLJƚŚĞDistrict Engineer. ŽŶĚŚŽůĚůĞƚƚĞƌƌĞƋƵŝƌĞĚĨŽƌĨŽƌŵƵŶŝĐŝƉĂůŝƚŝĞƐ͕ ĐŚƵƌĐŚĞƐ͕ĂŶĚƐĐŚŽŽůƐ͘See pages 101-105 in the Policies and ProceduresforAccommodatingUtilities on Highway Rights of Way for acceptable bond types Ě͘Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required Ğ͘Hold Harmless Letter (if applicable) If the Wermit is within ƚŚĞůŝŵŝƚƐŽĨĂŶ active NCDOT project, a Hold Harmless letter from the NCDOT contractorwill be required͘/ĨƚŚĞƉƌŽũĞĐƚŝƐŝŶƉƌĞĐŽŶƐƚƌƵĐƚŝŽŶ͕ĐŽŽƌĚŝŶĂƚĞǁŝƚŚƚŚĞĞƉĂƌƚŵĞŶƚΖƐWƌŽũĞĐƚĞǀĞůŽƉŵĞŶƚhŶŝƚ Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways ϭͿ Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown ϮͿ North arrow, vicinity map, date of plan, and date of most-recent revision if applicable ϯͿ Contact information of applicant and engineer, including mailing address, phone number, and email address ϰͿ Show Zͬt lines, highway control of access, and property lines ϱͿ All existing utilities (including handholes) and easements ϲͿ Rͬt width ϳͿ Existing posted speed limit(s) and design speed limit(s) ϴͿ Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development ϵͿ Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area ϭϬͿ Include a plan sheet showing full site build-out and land use ϭϭͿ Buildings shown with “gross leasable area” ϭϮͿ Width of property frontage ϭϯͿ Distance from Rͬt to buildings and gasoline service islands ϭϰͿ Distance from Rͬt to existing/proposed ĚŐĞŽĨWĂǀĞŵĞŶƚ;KWͿ (pages 32 & 34) ϭϱͿ All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below ϭͿ WƌŽǀŝĚĞĐŽŵƉƌĞŚĞŶƐŝǀĞƐƵƌǀĞLJǁŝƚŚŝŶƚŚĞĞdžŝƐƚŝŶŐZͬtŽŶďŽƚŚƐŝĚĞƐŽĨƚŚĞƌŽĂĚĨŽƌĂĚŝƐƚĂŶĐĞŽĨϱϬϬ͛ŝŶĂůů ĚŝƌĞĐƚŝŽŶƐĨƌŽŵƚŚĞĚĞǀĞůŽƉŵĞŶƚ͛ƐƉƌŽƉĞƌƚLJůŝŶĞƐ͘WƌŽǀŝĚĞĂĚĚŝƚŝŽŶĂůŚLJĚƌĂƵůŝĐƐƵƌǀĞLJĚĂƚĂƚŽƚŚĞŶĞĂƌĞƐƚƐƚŽƌŵ ǁĂƚĞƌŝŶůĞƚͬŽƵƚůĞƚŝŶĐůƵĚŝŶŐĚŝƚĐŚůŝŶĞƐĂŶĚƐƚŽƌŵǁĂƚĞƌƉŝƉĞƐ͕ŝĨůŽĐĂƚĞĚŽƵƚƐŝĚĞŽĨƚŚĞϱϬϬΖĚŝƐƚĂŶĐĞ͘ ϮͿ Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways ϯͿ All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximumͮǁŝƚŚŝƐůĂŶĚ͗ϭϰΖ ŝŶŐƌĞƐƐ͕ϭϴΖĞŐƌĞƐƐ) (pageƐϱϬΘϳϳ) ϰͿ ƌŝǀĞǁĂLJWƌŽĨŝůĞͲ/ŶƐŚŽƵůĚĞƌƐĞĐƚŝŽŶƐ͕ŵaintain minimum 2% fall from edge of travel way for required shoulder width ĚŝƐƚĂŶĐĞWƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ ϱͿ All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3)Ͳ;ƐĞĞĂƚƚĂĐŚĞĚͿ In shoulder sections, show grades at the KW and centerline ϲͿ No curbing is allowed within NCDOT RͬW along shoulder sections except as part of a driveway island(page 31) ϳͿ Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) ϴͿ Driveway Wrofile (pages 42- 43) Y N n/a Y N n/a පප පපප ප Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) ϵͿ Driveway Pavement Cross Section (to be in place from KW to edge of RͬW) Asphalt: 8” ABC stone and 1.5” S9.5 Concrete: 6” of concrete ϭϬͿ Driveway Offset (driveway KW to property line; page 75): Minimum: 20’ ϭϭ)Corner Clearance (radius point to radius point; page 52) Minimum: 50’ Desirable: 100’ or DƵŶŝĐŝƉĂů std. ϭϮͿ Minimum 10’x70’ sight triangles at driveways (measured from and along the Zͬt line) (page 31) ϭϯͿ Sight Distance (ůength of sight-distance in both directions shown for each driveway; pages 27-29) ϭϰͿ Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) ϭϱͿ Distance between driveways being requested (if applicable; page 51) ϭϲͿ Minimum internal storage areasǁŝƚŚƐƉĞĐŝĨŝĞĚƋƵĞƵĞƐ (pages 31-33) ϭϳͿ Minimum protected driveway stem(s) provided and indicated (pages 33-34) ϭϴͿ Indicate any gated entrances (100’ minimum setback from RͬW required)ͲƚƌĂĨĨŝĐƋƵĞƵŝŶŐƐƚƵĚLJŵĂLJďĞƌĞƋƵŝƌĞĚ | Section ϲ: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below ϭͿ Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) ϮͿ Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below x Primary Routes (US & NC) and Secondary Routes with ŶŶƵĂůǀĞƌĂŐĞĂŝůLJdƌĂĨĨŝĐ;AADTͿшϭϬ,000 5͘ϱ” B25.0, 3” I19.0, ϭ͘ϱ” S9.5; any overlay of existing pavement is to be a minimum of 1.5” S9.5 x Secondary Routes with AADT<ϭϬ,000 5͘ϱ” B25.0, ϭ͘ϱ” Sϵ͘ϱ; any overlay of existing pavement is to be a minimum of 1.5” Sϵ͘ϱ ϯͿ Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed ϰͿ Shoulder Widths (Paved + Unpaved)WƌŝŵĂƌLJ͗ϴ͛ŵŝŶŝŵƵŵͮ^ĞĐŽŶĚĂƌLJ͗ϲ͛ŵŝŶŝŵƵŵ ϱͿ ŝƚĐŚ^ůŽƉĞƐͲĨƌŽŶƚĂŶĚďĂĐŬƐůŽƉĞƐͲŵŝŶŝŵƵŵϯ͗ϭŽƌĨůĂƚƚĞƌ ϲͿ Indicate existing roadway grade ϳͿ All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page78) ϴͿ All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details ϵͿ Pavement markingĂŶĚƐŝŐŶŝŶŐ planƐ ĂƌĞƌĞƋƵŝƌĞĚͲplans must be approved by Division Traffic Services ϭϬͿ dƌĂĨĨŝĐĐŽŶƚƌŽůƉůĂŶƐĂƌĞƌĞƋƵŝƌĞĚͲĞƚĂŝůĞĚƉŚĂƐŝŶŐƉůĂŶƐŵĂLJďĞƌĞƋƵŝƌĞĚďĂƐĞĚŽŶƉƌŽũĞĐƚƚLJƉĞĂŶĚůŽĐĂƚŝŽŶ ϭϭͿ EĞǁĂŶĚͬŽƌƌĞǀŝƐĞĚƐŝŐŶĂůƉůĂŶƐŵƵƐƚďĞŝŶĐůƵĚĞĚĨŽƌŶĞǁŝŶƐƚĂůůĂƚŝŽŶƐĂŶĚŝĨƐŝŐŶĂůŵŽĚŝĨŝĐĂƚŝŽŶƐĂƌĞƌĞƋƵŝƌĞĚ ůůsignal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. ATraffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-ϮϮϬϬ. | Section ϰ: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section ϱ: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below ϭͿ Interior driveway channelization stems Minimum 100’ from the RKW or at the discretion of the District Engineer ϮͿ Traffic flow pattern ϯͿ Traffic control devices ϰͿ Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a ϭͿ Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): Ϯϰ” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” ϮͿ WŝƉĞŶĚdƌĞĂƚŵĞŶƚ;ƐĞĞZŽĂĚǁĂLJĞƐŝŐŶDĂŶƵĂůϱͲϮϬ͕ͲϮͿ WŝƉĞƐчϮϰΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞWĂƌĂůůĞůWŝƉĞŶĚ^ĞĐƚŝŽŶƐ^ĞĞϯϭϬ͘ϬϮĂŶĚ ϯϭϬ͘ϬϰŽĨƚŚĞZŽĂĚǁĂLJ^ƚĂŶĚĂƌĚƌĂǁŝŶŐƐĨŽƌĚĞƚĂŝůƐ WŝƉĞƐхϯϬΗŽŶŵƵůƚŝůĂŶĞŚŝŐŚǁĂLJƐƉŽƐƚĞĚĂďŽǀĞϰϱŵƉŚƌĞƋƵŝƌĞŐƵĂƌĚƌĂŝů WŝƉĞƐшϯϲΗƌĞƋƵŝƌĞĂŶĞŶĚǁĂůůŽŶƚŚĞŝŶůĞƚĞŶĚ ϯͿ ůůƉƌŽƉŽƐĞĚƌĂŝŶĂŐĞŝƐƚŽďĞƉƌŽǀŝĚĞĚŝŶƐŝĚĞĞdžŝƐƚŝŶŐZͬt͘KƚŚĞƌǁŝƐĞ͕ĂĚĚŝƚŝŽŶĂůZͬtŽƌĂƉĞƌŵĂŶĞŶƚůLJ ĚĞĚŝĐĂƚĞĚĚƌĂŝŶĂŐĞĞĂƐĞŵĞŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽĂĐĐŽŵŵŽĚĂƚĞƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚĚƌĂŝŶĂŐĞ ϰͿ All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown ;ƐĞĞ^ĞĐ͘ϯηϭĨŽƌƐƵƌǀĞLJƌĞƋƵŝƌĞŵĞŶƚƐͿ ϱͿ Provide spot elevations along frontage of driveway (at EKW and centerline) ϲͿ Provide grades and spot elevations for existing and proposed ditches ϳͿ Show how drainage will be accommodated along property frontage (District Engineer may require applicant to provide drainage calculations whĞŶǁĂƌƌĂŶƚĞĚͿ Roadway Design Manual At Grade INTERSECTIONS May 2023 Part I General Design Information | 8-22 Figure 8-10 Recommended Treatment for Turn Lanes Note: Make every attempt possible to use the desirable deceleration length. It can be shortened as needed but shall not be less than the minimum. Coordinate with NCDOT and get approval on anything less than the desirable deceleration length. US H W Y 4 2 1 I-140 SUTTON L A K E R D CS X R A I L R O A D RALEIGH, NC 27612 BUILDINGS 4 & 7 NOTICE REQUIRED ALL EXISTING UNDERGROUND UTILITIES SHALL BE PHYSICALLY LOCATED PRIOR TO THE BEGINNING OF ANYCONSTRUCTION IN THE VICINITY OF SAID UTILITIES. CONTRACTORS SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSEDEXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS PRIOR TO COMMENCEMENTOF EXCAVATION OR DEMOLITION. CONTRACTORS SHALL CONTACT OVERHEAD ELECTRIC PROVIDER TO COMPLY WITH FEDERAL OSHA 1910.333 MINIMUMAPPROACH DISTANCE TO ENERGIZED POWERLINES AND OSH 29 CFR 1926.1407-1411 MUST BE FOLLOWED. CONTACT THESE UTILITIES NEW HANOVER COUNTY PLANNINGPH: 910-798-7165 ENGINEERING PH: 910-798-7139 PIEDMONT NATURAL GAS ATTN: PAUL GONKAPH: 910-251-2810 EMERGENCY DIAL 911 POLICE - FIRE - RESCUE CAPE FEAR PUBLIC UTILITY AUTHORITY (WATER & SEWER) ENGINEERING/INSPECTIONSPH: 910-332-6560 OPERATIONS/MAINTENANCE PH: 910-322-6550 DUKE ENERGY PROGRESS DISTRIBUTION CONSTRUCTION SERVICE PH: 910-256-7258DEP CSC PH: 1-800-452-2777 AT&T/BELL SOUTH ATTN: CHRISSY COSTONPH: 910-341-7664 TIME WARNER CABLEPH: 910-763-4638 NEW HANOVER COUNTY SHEET INDEX JUNE 2024 C-0.0 COVER SHEET APPROVALS:CONSULTANTS: LANDSCAPE ARCHITECT: NEW HANOVER COUNTY, NORTH CAROLINA WTC LAND COMPANY, LLC3105 GLENWOOD AVE, SUITE 105 RALEIGH, NC 27612 PARAMOUNTE ENGINEERING, INC. 122 CINEMA DRIVEWILMINGTON, NORTH CAROLINA 28403P: (910) 791-6707ATTN: JEREMY BLAIR, PE (ENGINEERING) ATTN: ALLISON ENGEBRETSON (LANDSCAPE) PARAMOUNTE ENGINEERING, INC.122 CINEMA DRIVE WILMINGTON, NORTH CAROLINA 28403P: (910) 791-6707ATTN: JOSH TAYLOR, PLS PROJECT # 22272.PE APPLICANT: ENGINEER / SURVEYOR : PREPARED BY: PR E L I M I N A R Y D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N 122 Cinema Drive Wilmington, North Carolina 28403 (910) 791-6707 (O) (910) 791-6760 (F) NC License #: C-2846 WILMINGTON TRADE CENTER SHEET NUMBER SHEET TITLE TREE SURVEYEX-B JUNE 2024 FOR TRC DESIGN DOCUMENTS 3930 US HWY 421 N WTC LAND COMPANY, LLC 3105 GLENWOOD AVE, SUITE 105 VICINITY MAP SCALE: 1" = 1,000' US H W Y 4 2 1 S H W Y 4 2 LR O A D LR O A SITE EXISTING CONDITIONSEX-A OVERALL SITE PLANC-2.0 SITE PLANC-2.1 WILMINGTON TRADE CENTER W TR WELL HEAD WELL HEAD X OHEOHEOHEOHEOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E O H E OH E OHE OH E OH E OH E O H E OH E OH E OH E OH E OH E OH E O H E O H E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E O H E OH E XX X X X X X X X X X X X X X X FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFOFOFO UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UG UGUGUGUG FO FO FO FOOHE OHE OHE OHE OH E OHE OH E OHE OH E OHE OHE OH E OHE OH E OHE OHE OH E OHE OHE OHEOHE OHE OHE OHE UGT UGGASMARKERUGUGUGUGUGUG R 10 0 - Y R 100 - Y R 100-Y R 100 - Y R 10 0 - Y R 100- Y R 10 0 - Y R 10 0 - Y R 100 - Y R 100 - Y R 100- Y R 10 0 - Y R 100 - Y R 10 0 - Y R 100 - Y R 10 0 - Y R SEAMISTPROPERTIES LLCPARCEL 1C-RM.B. 71, PG. 367 WTC 2 PARTNERS LLCR02400-001-051-000PARCEL 1BM.B. 69, PG. 97 WTC 2 PARTNERS LLCPARCEL 1AR02400-001-041-000M.B. 69, PG. 97 BG M P R O P E R T I E S , L L C R0 2 4 0 0 - 0 0 1 - 0 0 7 DB 5 1 6 6 , P G 2 7 3 8 PB 5 1 , P G 5 4 FO FO 35 35 35 35 35 35 35 35 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 30 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 25 2525 25 25 25 25 25 25 25 25 25 25 2525 25 25 25 25 25 25 25 25 252525 25 25 25 25 25 25 25 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 2020 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 2020 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 15 15 15 15 15 15 15 15 15 1515 15 15 15 15 15 15 15 15 15 1515 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 1515 1515 15 15 1515 15 15 151515 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 151515 1515 15 15 15 15 15 15 15 15 15 15 1515 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 151515 15 15 15 15 15 15 1515 15 15 15 15 15 15 15 15 15 15 15 1515 15 15 15 15 1515 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 1515 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 10 10 10 10 1010 1010 10 10 10 10 10 10 10 10 10 10 10 10 MARITIME WESTDEVELOPMENT LLC.R02400-048-000D.B. 6154, PG. 2247M.B.65, PG. 3 DILLON SUPPLYCOMPANYR02400-001-050D.B. 4971, PG. 2250M.B. 71, PG. 367 3820 WILMINGTON LLCR02400-001-049D.B. 6602, PG. 1476M.B. 71, PG. 367 STEPAN COMPANYR02400-001-001D.B. 6409, PG. 186 STEPAN COMPANYR02400-001-001D.B. 6409, PG. 186 STEPAN COMPANYR02400-001-001D.B. 6409, PG. 186 18" R C P GRAVEL DRIVE DLH HOLDINGS, LLCR02400-001-061-000M.B. 71, PG. 367 DLH HOLDINGS, LLCR02400-001-062-000M.B. 71, PG. 367 DLH HOLDINGS, LLCR02400-001-063-000M.B. 71, PG. 367 8W 8W 8W 8W 8W 8W SS SS SS SSSSSSSSSSSSSSSS SS 5ž'ž WAREHOUSE100 DUMPSTER- 9 9 FM FM FM FM FM FM FM FM FM FM FM FM 12 W 12 W 12 W 12W 12W 12W 12W 12 W 12 W 12W 12W 12W 12W X PP W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FMWWWWWWWWWWWWWWWWWWWWWWWWWWUGUGFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUTUT FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUGUG VAN VAN TT TT VAN VAN VAN VAN VAN VAN VANVANVANVAN