HomeMy WebLinkAboutTIA - Amberleigh South Amberleigh Shores Phase II – Traffic Impact Analysis i TABLE OF CONTENTS 1. INTRODUCTION .............................................................................................................. 1 1.1. Site Location and Study Area ................................................................................................1 1.2. Proposed Land Use and Site Access .....................................................................................2 1.3. Adjacent Land Uses ...............................................................................................................2 1.4. Existing Roadways ................................................................................................................2 2. EXISTING (2016) PEAK HOUR CONDITIONS ........................................................... 7 2.1. Existing (2016) Peak Hour Traffic ........................................................................................7 2.2. Analysis of Existing (2016) Peak Hour Traffic .....................................................................7 3. BACKGROUND (2018) PEAK HOUR CONDITIONS ................................................. 9 3.1. Ambient Traffic Growth ........................................................................................................9 3.2. Adjacent Development Traffic ..............................................................................................9 3.3. Future Roadway Improvements .............................................................................................9 3.4. Background (2018) Peak Hour Traffic Volumes ................................................................10 3.5. Analysis of Background (2018) Peak Hour Traffic Conditions ..........................................10 4. TRIP GENERATION ...................................................................................................... 12 4.1. Site Trip Distribution and Assignment ................................................................................12 5. COMBINED (2018) TRAFFIC CONDITIONS ............................................................ 17 5.1. Combined (2018) Peak Hour Traffic Volumes ...................................................................17 5.2. Analysis of Combined (2018) Peak Hour Traffic ...............................................................17 6. TRAFFIC ANALYSIS PROCEDURE ........................................................................... 20 6.1. Adjustments to Analysis Guidelines ...................................................................................21 7. CAPACITY ANALYSIS .................................................................................................. 22 7.1. Market Street and Marsh Oaks Drive / Mendenhall Drive .................................................22 7.2. Marsh Oaks Drive and Site Drive #1 ..................................................................................23 7.3. Market Street and Site Drive #2 ..........................................................................................24 7.4. Market Street and Alexander Road / Site Drive #3 .............................................................26 Amberleigh Shores Phase II – Traffic Impact Analysis ii 8. CONCLUSIONS ............................................................................................................... 28 9. RECOMMENDATIONS ................................................................................................. 30 Amberleigh Shores Phase II – Traffic Impact Analysis iii LIST OF FIGURES Figure 1 – Site Location Map ...................................................................................................... 4 Figure 2 – Preliminary Site Plan .................................................................................................. 5 Figure 3 – Existing Lane Configurations ..................................................................................... 6 Figure 4 – Existing (2016) Peak Hour Traffic ............................................................................. 8 Figure 5 – Background (2018) Peak Hour Traffic ..................................................................... 11 Figure 6a-b – Site Trip Distribution .......................................................................................... 13 Figure 7a-b – Site Trip Assignment ........................................................................................... 15 Figure 8a-b – Combined (2018) Peak Hour Traffic................................................................... 18 Figure 9a-b – Recommended Lane Configurations ................................................................... 32 Amberleigh Shores Phase II – Traffic Impact Analysis iv LIST OF TABLES Table 1: Trip Generation Summary ........................................................................................... 12 Table 2: Highway Capacity Manual – Levels-of-Service and Delay ........................................ 20 Table 3: Analysis Summary of Market Street and Marsh Oaks Drive / Mendenhall Drive ...... 22 Table 4: Analysis Summary of Marsh Oaks Drive and Site Drive #1 ....................................... 23 Table 5: Analysis Summary of Market Street and Site Drive #2 .............................................. 24 Table 6: Analysis Summary of Market Street and Alexander Road / Site Drive #3 ................. 26 Amberleigh Shores Phase II – Traffic Impact Analysis v TECHNICAL APPENDIX Appendix A: Approved Scoping Letter Appendix B: Traffic Counts Appendix C: Signal Plans Appendix D: TIP U-4902 Plans Appendix E: Capacity Calculations – Market Street and Mendenhall Drive / Marsh Oaks Drive Appendix F: Capacity Calculations – Marsh Oaks Drive and Site Drive 1 Appendix G: Capacity Calculations – Market Street and Site Drive 2 Appendix H: Capacity Calculations – Market Street and Alexander Drive / Site Drive 3 TRAFFIC IMPACT ANALYSIS REPORT AMBERLEIGH SHORES PHASE II WILMINGTON, NORTH CAROLINA 1. INTRODUCTION The contents of this report present the findings of the Traffic Impact Analysis (TIA) conducted for the proposed Amberleigh Shores Phase II to be located east of Market Street at its intersection with Alexander Road and south of Marsh Oaks Drive in Wilmington, North Carolina. This phase of the project is proposed to be adjacent to the already complete first phase of Amberleigh Shores. The purpose of this study is to determine the potential impacts to the surrounding transportation system created by traffic generated by the proposed development, as well as recommend improvements to mitigate the impacts. The proposed development is expected to consist of 288 apartment units and will have a future analysis year of 2018. The study analyzes traffic conditions during the weekday AM and PM peak hours for the following scenarios:  Existing (2016) Traffic Conditions  Background (2018) Traffic Conditions  Combined (2018) Traffic Conditions Two access scenarios are considered as a part of this study. The first is limiting the proposed site drive to a right-in / right-out (RIRO) driveway, and the second is considering the same driveway as an unsignalized left-over (LO). 1.1. Site Location and Study Area The development is proposed to be located east of Market Street and south of Marsh Oaks Drive in Wilmington, North Carolina. Refer to Figure 1 for the site location map. Amberleigh Shores Phase II – Traffic Impact Analysis 2 The study area for the TIA was determined through coordination with the North Carolina Department of Transportation (NCDOT) and the City of Wilmington (City) and consists of the following existing intersections:  Market Street and Alexander Road  Market Street and Marsh Oaks Drive / Mendenhall Drive  Market Street and Amberleigh Shores Phase 1 Site Drive  Marsh Oaks Drive and Amberleigh Shores Phase 1 Site Drive Scoping for the project was coordinated with the City through a scoping checklist. This, as well as the approved scoping letter, can be found in Appendix A. 1.2. Proposed Land Use and Site Access The proposed development, anticipated to be completed in 2018, is expected to consist of 288 apartment units. Access will be provided with a direct connection to Market Street, as well as interconnectivity with the completed phase 1. Two access alternatives are considered for the direct access to Market Street: a RIRO drive and a LO drive. 1.3. Adjacent Land Uses The proposed development is located south of the Amberleigh Shores Phase 1. The site is also surrounded primarily by wooded land and residential development. 1.4. Existing Roadways Market Street is a five-lane roadway running in a north-south direction with a posted speed limit of 45 miles per hour (mph) within the study area. Based on the most recent data (2013) from the NCDOT, Market Street had an AADT volume of 32,000 vpd within the study area. It is worth noting that STIP project U-4902 is currently in the design process, and will convert Market Street to a four-lane median divided facility. Alexander Road is a two-lane roadway running in an east-west direction with no posted speed limit in the study area. For the purpose of this study, it was analyzed to have a speed limit of Amberleigh Shores Phase II – Traffic Impact Analysis 3 25 mph. Based on the most recent data (2013) from the NCDOT, Alexander Road had an AADT volume of 730 vpd within the study area. Marsh Oaks Drive / Mendenhall Drive are a two-lane roadway running in an east-west direction with no posted speed limit in the study area. For the purpose of this study, it was analyzed to have a speed limit of 35 mph. Based on the current traffic counts from 2016, and assuming that the peak hour volume is 10% of the average daily traffic, Marsh Oaks Drive has an AADT volume of approximately 2,600 vpd within the study area. Existing lane configurations (number of traffic lanes on each intersection approach), lane widths, storage capacities, and other intersection and roadway information was collected through field reconnaissance by Ramey Kemp & Associates, Inc. (RKA). Refer to Figure 3 for an illustration of the existing lane configurations within the study area. Scale: Not to Scale Amberleigh Shores Wilmington, NC N LEGEND Proposed Site Location Study Intersection Study Area Site Location Map Figure 1 4 Bayshore D r i v e PROPOSED SITE Mark e t S t r e e t Marsh Oa k s D r i v e Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 3 Existing Lane Configurations N LEGEND Signalized Intersection Unsignalized Intersection Existing Lane X'Storage (In Feet) TW L T L TW L T L TWLTL Two Way Left Turn Lane 6 TW L T L 50 0 ' TW L T L Right-In/Right-Out Intersection 17 5 ' Amberleigh Shores Phase II – Traffic Impact Analysis 7 2. EXISTING (2016) PEAK HOUR CONDITIONS 2.1. Existing (2016) Peak Hour Traffic Existing peak hour traffic volumes were determined based on traffic counts conducted at the study intersections listed below, in April of 2016 by RKA during a typical weekday AM (7:00 AM – 9:00 AM) and PM (4:00 PM – 6:00 PM) peak periods:  Market Street and Marsh Oaks Drive / Mendenhall Drive  Market Street and Amberleigh Shores Phase 1 Site Drive  Marsh Oaks Drive and Amberleigh Shores Phase 1 Site Drive  Market Street and Alexander Road Traffic volumes were balanced between intersections, where appropriate. Refer to Figure 4 for existing (2016) weekday AM and PM peak hour traffic volumes. A copy of the count data is located in Appendix B of this report. 2.2. Analysis of Existing (2016) Peak Hour Traffic The existing (2016) weekday AM and PM peak hour traffic volumes were analyzed to determine the current levels of service at the study intersections under existing roadway conditions. Signal information was obtained from NCDOT and the City of Wilmington and is included in Appendix C. The results of the analysis are presented in Section 7 of this report. Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 4 Existing (2016) Peak Hour Traffic N LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic 8 33/14 12 3 4 / 1 7 2 7 9/ 3 4 18 2 4 / 1 9 8 8 108/50 8/4 129/81 25 / 5 1 12 1 2 / 1 6 1 1 30 / 7 9 18/19 2/3 21/23 6/ 9 16 7 4 / 1 8 8 4 50 / 1 7 5 34 / 3 7 19 / 1 7 12 4 1 / 1 7 6 0 2/1 35/29 7/ 6 18 1 7 / 1 9 8 2 199/108 0/3 46 / 2 7 0/ 3 74/215 8/42 Right-In/Right-Out Intersection Amberleigh Shores Phase II – Traffic Impact Analysis 9 3. BACKGROUND (2018) PEAK HOUR CONDITIONS In order to account for growth of traffic and subsequent traffic conditions at a future year, background traffic projections are needed. Background traffic is the component of traffic due to the growth of the community and surrounding area that is anticipated to occur regardless of whether or not the proposed development is constructed. Background traffic is comprised of existing traffic growth within the study area and additional traffic created as a result of adjacent approved developments. 3.1. Ambient Traffic Growth Through coordination with the City and NCDOT, it was determined that an annual growth rate of 1% would be used to generate projected (2018) weekday AM and PM peak hour traffic volumes. 3.2. Adjacent Development Traffic Through coordination with the City, it was determined that no adjacent developments are located within the study area. 3.3. Future Roadway Improvements Based on coordination with the NCDOT and the City, the TIP Project (U-4902 D along the Market Street corridor), is to be considered as a future roadway improvement. As part of the project, a median will be constructed, restricting some movements to a right-in/right-out, while others will be provided with a median cross-over in order to make a left turn from Market Street will still restricting the side streets to right turns only onto Market Street. It is worth noting, according to the plans acquired; the signalized full movement intersection of Market Street with Mendenhall Drive and Marsh Oaks Drive is proposed to remain a full movement signalized intersection. A median cross-over is currently planned for the intersection of Alexander Road and Market Street in the study area, converting this intersection from an unsignalized full movement intersection to an unsignalized LO intersection. Amberleigh Shores Phase II – Traffic Impact Analysis 10 Refer to Appendix D for the TIP plans through the study area. 3.4. Background (2018) Peak Hour Traffic Volumes The background (2018) traffic volumes were determined by projecting the existing (2016) peak hour traffic to the year 2018. Refer to Figure 5 for an illustration of the background (2018) peak hour traffic volumes at the study intersections. 3.5. Analysis of Background (2018) Peak Hour Traffic Conditions The background (2018) AM and PM peak hour traffic volumes at the study intersections were analyzed with future geometric roadway conditions and traffic control. The analysis results are presented in Section 7 of this report. Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 5 Background (2018) Peak Hour Traffic 11 N LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic 34/14 12 5 9 / 1 7 6 2 9/ 3 5 18 6 1 / 2 0 2 8 110/51 8/4 132/83 26 / 5 2 12 3 6 / 1 6 4 3 31 / 8 1 18/19 2/3 21/23 6/ 9 17 0 8 / 1 9 2 2 51 / 1 7 9 35 / 3 8 19 / 1 7 12 6 6 / 1 7 9 5 2/1 36/30 7/ 6 18 5 4 / 2 0 2 2 203/110 0/3 47 / 2 8 0/ 3 75/219 8/43 Right-In/Right-Out Intersection Amberleigh Shores Phase II – Traffic Impact Analysis 12 4. TRIP GENERATION The proposed development is expected to consist of approximately 288 apartment units. Average weekday daily, AM peak hour, and PM peak hour trips for the proposed development were estimated using methodology contained within the ITE Trip Generation Manual, 9th Edition. Table 1 provides a summary of the trip generation results for the site. Table 1: Trip Generation Summary Land Use (ITE Code) Intensity Daily Traffic (vpd) AM Peak Hour Trips (vph) PM Peak Hour Trips (vph) Enter Exit Enter Exit Apartments (220) 288 dwellings 1,900 29 116 114 62 It is estimated that the proposed development will generate 1,900 total site trips on the roadway network during a typical 24-hour weekday period. Of the daily traffic volume, it is anticipated that 145 trips (29 entering and 116 exiting) will occur during the AM peak hour and 176 (114 entering and 62 exiting) will occur during the PM peak hour. 4.1. Site Trip Distribution and Assignment Trip distribution percentages used in assigning site traffic for this development were estimated based on a combination of existing traffic patterns, population centers adjacent to the study area, and engineering judgment. It is estimated that residential trips will be distributed as follows:  40% to/from the north via Market Street  60% to/from the south via Market Street The trip distribution is shown in Figures 6a and 6b for the two analysis scenarios. The total site trips are shown in Figures 7a and 7b. Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 6a Site Trip Distribution Alternative 1 X% (Y%) XX% Entering Trip Distribution Exiting Trip Distribution Regional Trip Distribution N LEGEND Signalized Intersection Unsignalized Intersection Site Right-In/Right-Out Intersection 13 60% 40% (5%) (5 0 % ) (3 5 % ) 5% (1 0 % ) (10%) (4 0 % ) 40 % 5% 55 % (6 0 % ) (1 0 % ) 40% (85%) Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 6b Site Trip Distribution Alternative 2 X% (Y%) XX% Entering Trip Distribution Exiting Trip Distribution Regional Trip Distribution N LEGEND Signalized Intersection Unsignalized Intersection Site Right-In/Right-Out Intersection 14 60% 40% (5%) (5 0 % ) (3 5 % ) 5% 30 % ( 1 0 % ) (10%) (4 0 % ) 30 % 10 % 5% 55 % (6 0 % ) 30 % (1 0 % ) 10% (85%) Left-Over Intersection Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 7a Primary Site Trip Assignment Alternative 1 N LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic Right-In/Right-Out Intersection 15 Site 6/3 57 / 3 1 41 / 2 2 1/ 6 12 / 6 12/6 47 / 2 5 12 / 4 6 1/ 6 16 / 6 2 69 / 3 7 12 / 6 12/46 98/53 Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 7b Primary Site Trip Assignment Alternative 2 N LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Site Trips Right-In/Right-Out Intersection 16 Site 6/3 57 / 3 1 41 / 2 2 1/ 6 20 / 4 0 12/6 47 / 2 5 9/ 3 4 3/ 1 2 1/ 6 16 / 6 2 69 / 3 7 9/ 3 4 12 / 6 3/12 98/53 Left-Over Intersection Amberleigh Shores Phase II – Traffic Impact Analysis 17 5. COMBINED (2018) TRAFFIC CONDITIONS 5.1. Combined (2018) Peak Hour Traffic Volumes To estimate traffic conditions with the residential site developed, the total site trips for the residential site were added to the background (2018) traffic volumes to determine the combined (2018) traffic volumes. Refer to Figures 8a and 8b for an illustration of the combined (2018) peak hour traffic volumes with the proposed Residential Phase developed. 5.2. Analysis of Combined (2018) Peak Hour Traffic Study intersections were analyzed with the combined (2018) traffic volumes using the same methodology previously discussed for existing and background traffic conditions. Intersections were analyzed with improvements necessary to accommodate future traffic volumes. The results of the capacity analysis for each intersection are presented in Section 7 of this report. Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 8a Combined (2018) Peak Hour Traffic Alternative 1 N 18 LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic Right-In/Right-Out Intersection 40/17 57 / 3 1 13 0 0 / 1 7 8 4 10 / 4 1 18 7 3 / 2 0 3 4 110/51 8/4 144/89 26 / 5 2 12 8 3 / 1 6 6 8 31 / 8 1 18/19 2/3 21/23 6/ 9 17 0 8 / 1 9 2 2 63 / 2 2 5 35 / 3 8 19 / 1 7 12 6 7 / 1 8 0 1 16 / 6 2 2/1 36/30 7/ 6 19 2 3 / 2 0 5 9 203/110 0/3 59 / 3 4 0/ 3 75/219 20/89 Site 98/53 Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 8b Combined (2018) Peak Hour Traffic Alternative 2 N 19 LEGEND Signalized Intersection Unsignalized Intersection X / Y AM / PM Peak Hour Traffic Right-In/Right-Out Intersection 40/17 57 / 3 1 13 0 0 / 1 7 8 4 10 / 4 1 18 8 1 / 2 0 6 8 110/51 8/4 144/89 26 / 5 2 12 8 3 / 1 6 6 8 31 / 8 1 18/19 2/3 21/23 6/ 9 17 1 7 / 1 9 5 6 54 / 1 9 1 35 / 3 8 19 / 1 7 12 6 7 / 1 8 0 2 16 / 6 2 2/1 36/30 7/ 6 19 2 3 / 2 0 5 9 9/ 3 4 203/110 0/3 59 / 3 4 0/ 3 76/220 11/55 Site 98/53 Left-Over Intersection Amberleigh Shores Phase II – Traffic Impact Analysis 20 6. TRAFFIC ANALYSIS PROCEDURE Study intersections were analyzed using the methodology outlined in the 2010 Highway Capacity Manual (HCM) published by the Transportation Research Board. Capacity and level of service are the design criteria for this traffic study. A computer software package, Synchro (Version 9.1), was used to complete the analyses for most of the study area intersections. Please note that the unsignalized capacity analysis does not provide an overall level of service for an intersection; only delay for an approach with a conflicting movement. The HCM defines capacity as “the maximum hourly rate at which persons or vehicles can reasonably be expected to traverse a point or uniform section of a lane or roadway during a given time period under prevailing roadway, traffic, and control conditions.” Level of service (LOS) is a term used to represent different driving conditions, and is defined as a “qualitative measure describing operational conditions within a traffic stream, and their perception by motorists and/or passengers.” Level of service varies from Level “A” representing free flow, to Level “F” where breakdown conditions are evident. Refer to Table 2 for HCM levels of service and related average control delay per vehicle for both signalized and unsignalized intersections. Control delay as defined by the HCM includes “initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay”. An average control delay of 50 seconds at a signalized intersection results in LOS “D” operation at the intersection. Table 2: Highway Capacity Manual – Levels-of-Service and Delay UNSIGNALIZED INTERSECTION SIGNALIZED INTERSECTION LEVEL OF SERVICE AVERAGE CONTROL DELAY PER VEHICLE (SECONDS) LEVEL OF SERVICE AVERAGE CONTROL DELAY PER VEHICLE (SECONDS) A B C D E F 0-10 10-15 15-25 25-35 35-50 >50 A B C D E F 0-10 10-20 20-35 35-55 55-80 >80 Amberleigh Shores Phase II – Traffic Impact Analysis 21 6.1. Adjustments to Analysis Guidelines Capacity analysis at all study intersections was completed according to the City’s UDO and NCDOT Congestion Management Guidelines, with one exception. It should be noted that the signalized intersection of Market Street with Mendenhall Drive and Marsh Oaks Drive is part of the Wilmington Signal System. Being a part of a coordinated system, a recall setting is utilized to indicate to the signal system how much green time to default to once returning to the coordinated phases. According to the signal plans, the signal is to be set to the minimum recall (C-Min). However, the signal system was analyzed with the recall mode set to the maximum recall (C-Max), in accordance with the City’s analysis guidance. Typically, the level of service and delay calculated for the signal operation are very similar, with the delay calculations differing by as little as fractions of a second to as much as a few seconds. Due to the capacity analysis results, found in Section 7, this is not expected to cause a large increase in the delay calculations. Amberleigh Shores Phase II – Traffic Impact Analysis 22 7. CAPACITY ANALYSIS 7.1. Market Street and Marsh Oaks Drive / Mendenhall Drive The signalized intersection of Market Street and Marsh Oaks Drive / Mendenhall Drive was analyzed under existing conditions with existing lane configurations and traffic control. Background and combined scenarios were analyzed with background lane improvements planned as part of the TIP Project. Refer to Table 4 for a summary of the analysis results. Refer to Appendix E for the Synchro capacity analysis reports. Table 3: Analysis Summary of Market Street and Marsh Oaks Drive / Mendenhall Drive ANALYSIS SCENARIO A P P R O A C H LANE CONFIGURATIONS WEEKDAY AM PEAK HOUR LEVEL OF SERVICE WEEKDAY PM PEAK HOUR LEVEL OF SERVICE Approach Overall (sec) Approach Overall (sec) Existing (2016) Conditions EB WB NB SB 1 LT-TH, 1 RT 1 LT-TH, 1 RT 1 LT, 2 TH, 1 RT 1 LT, 1 TH, 1 TH-RT D (47) E (62) B (17) B (18) C (21) D (53) E (64) C (26) C (21) C (25) Background (2018) Conditions EB WB NB SB 1 LT-TH, 1 RT 1 LT-TH, 1 RT 1 LT, 2 TH, 1 RT 1 LT, 1 TH, 1 TH-RT D (46) E (62) B (18) B (19) C (22) D (53) E (63) C (27) C (23) C (26) Combined (2018) Conditions - RIRO EB WB NB SB 1 LT-TH, 1 RT 1 LT-TH, 1 RT 1 LT, 2 TH, 1 RT 1 LT, 1 TH, 1 TH-RT D (45) E (62) B (20) C (21) C (24) D (52) E (64) C (28) C (26) C (28) Combined (2018) Conditions - LO EB WB NB SB 1 LT-TH, 1 RT 1 LT-TH, 1 RT 1 LT, 2 TH, 1 RT 1 LT, 1 TH, 1 TH-RT D (45) E (62) B (20) C (21) C (24) D (52) E (64) C (28) C (24) C (28) Capacity analysis indicates the existing signalized intersection currently operates at LOS C during both the AM and PM peak hours. This is expected to continue for all analysis scenarios. Amberleigh Shores Phase II – Traffic Impact Analysis 23 7.2. Marsh Oaks Drive and Site Drive #1 The existing unsignalized intersection of Marsh Oaks Drive and Site Drive #1 (constructed as part of Amberleigh Shores Phase 1) was analyzed under existing and background traffic conditions with existing lane configurations and traffic control. Combined traffic conditions were analyzed with the addition of the proposed lane configurations. Refer to Table 5 for a summary of the analysis results. Refer to Appendix F for the Synchro capacity analysis reports. Table 4: Analysis Summary of Marsh Oaks Drive and Site Drive #1 ANALYSIS SCENARIO A P P R O A C H LANE CONFIGURATIONS WEEKDAY AM PEAK HOUR LEVEL OF SERVICE WEEKDAY PM PEAK HOUR LEVEL OF SERVICE Approach Overall (sec) Approach Overall (sec) Existing (2016) Conditions EB WB NB 1 TH-RT 1 LT-TH 1 LT-RT -- A2 B1 N/A -- A2 B1 N/A Background (2018) Conditions EB WB NB 1 TH-RT 1 LT-TH 1 LT-RT -- A2 B1 N/A -- A2 B1 N/A Combined (2018) Conditions - RIRO EB WB NB 1 TH-RT 1 LT-TH 1 LT-RT -- A2 B1 N/A -- A2 B1 N/A Combined (2018) Conditions - LO EB WB NB 1 TH-RT 1 LT-TH 1 LT-RT -- A2 B1 N/A -- A2 B1 N/A 1. Level of service for minor-street approach. 2. Level of service for major-street left-turn movement. Improvements shown in bold. Analysis indicates all approaches for the unsignalized intersection are expected to operate at LOS B or better for all analysis scenarios. Amberleigh Shores Phase II – Traffic Impact Analysis 24 7.3. Market Street and Site Drive #2 The intersection of Market Street and Site Drive #2 (constructed as part of Amberleigh Shores Phase 1) was analyzed under existing traffic conditions with existing lane configurations and traffic control. For background and combined traffic conditions, the intersection was analyzed with TIP improvements. Refer to Tables 6 for a summary of the analysis results. Refer to Appendix G for the Synchro capacity analysis reports. Table 5: Analysis Summary of Market Street and Site Drive #2 ANALYSIS SCENARIO A P P R O A C H LANE CONFIGURATIONS WEEKDAY AM PEAK HOUR LEVEL OF SERVICE WEEKDAY PM PEAK HOUR LEVEL OF SERVICE Approach Overall (sec) Approach Overall (sec) Existing (2016) Conditions WB NB SB 1 RT 2 TH, 1 RT 2 TH C1 -- -- N/A C1 -- -- N/A Background (2018) Conditions WB NB SB 1 RT 2 TH, 1 RT 2 TH C1 -- -- N/A C1 -- -- N/A Combined (2018) Conditions - RIRO WB NB SB 1 RT 1 UT*, 2 TH, 1 RT 2 TH C1 C2 -- N/A C1 C2 -- N/A Combined (2018) Conditions - LO WB NB SB 1 RT 1 UT*, 2 TH, 1 RT 2 TH C1 C2 -- N/A C1 C2 -- N/A 1. Level of service for minor-street approach. 2. Level of service for major-street U-turn movement. Improvements shown in bold. * U-turn modeled as a left turn for analysis purposes. Analysis indicates site drive 2 (constructed as part of Phase 1 of the Amberleigh Shores development) currently operates at LOS C during both the AM and PM peak hours for all analysis scenarios. Amberleigh Shores Phase II – Traffic Impact Analysis 25 For the combined analysis, a u-turn lane and bulb out are proposed south of the existing site drive 2. This would provide a location for site traffic to perform the u-turn while not impacting the signal operations. It is worth noting this movement was analyzed as a left turn. This u-turn is expected to operate at LOS C during both the AM and PM peak hour for both the RIRO and LO analysis scenarios. This location would also benefit from breaks in the traffic flow provided by the signal operations at the intersection of Market Street and Mendenhall Drive and Marsh Oaks Drive. Amberleigh Shores Phase II – Traffic Impact Analysis 26 7.4. Market Street and Alexander Road / Site Drive #3 The intersection of Market Street and Alexander Road / Site Drive #3 was analyzed under existing traffic conditions with existing lane configurations and traffic control. For background and combined traffic conditions, the intersection was analyzed with TIP improvements, which limit Alexander Road to LO access. In the combined traffic conditions, the proposed Site Drive #3 was added as a westbound approach. Refer to Table 6 for a summary of the analysis results. Refer to Appendix H for the Synchro capacity analysis reports. Table 6: Analysis Summary of Market Street and Alexander Road / Site Drive #3 ANALYSIS SCENARIO A P P R O A C H LANE CONFIGURATIONS WEEKDAY AM PEAK HOUR LEVEL OF SERVICE WEEKDAY PM PEAK HOUR LEVEL OF SERVICE Approach Overall (sec) Approach Overall (sec) Existing (2016) Conditions EB NB SB 1 LT-RT 1 LT, 2 TH 1 TH, 1 TH-RT D1 C2 -- N/A D1 C2 -- N/A Background (2018) Conditions EB NB SB 1 RT 1 LT, 2 TH 1 TH, 1 TH-RT C1 C2 -- N/A D1 C2 -- N/A Combined (2018) Conditions - RIRO EB WB NB SB 1 RT 1 RT 1 LT, 2 TH, 1 RT 1 TH, 1 TH-RT D1 C1 C2 -- N/A D1 C1 C2 -- N/A Combined (2018) Conditions - LO EB WB NB SB 1 RT 1 RT 1 LT, 2 TH, 1 RT 1 LT, 1 TH, 1 TH-RT D1 C1 C2 B2 N/A D1 C1 C2 C2 N/A 1. Level of service for minor-street approach. 2. Level of service for major-street left-turn lane movement. TIP improvements underlined. Proposed improvements shown in bold. Analysis indicates the minor street approach currently operates at LOS D during both the AM and PM peak hours. The main street left turns are expected to operate at LOS C during both the AM and PM peak hours. With the improvements associated with the TIP project, the eastbound approach is expected to improve slightly. Should site drive 3 be limited to right-in / right-out access, it is expected to operate at LOS C Amberleigh Shores Phase II – Traffic Impact Analysis 27 during both the AM and PM peak hours. Should site drive 3 be limited to left-in / right-in / right-out access, the minor street approach is expected to operate at LOS C during both the AM and PM peak hours. The left turn in the site is expected to operate at LOS B during the AM peak hour and LOS C during the PM peak hour. A left-in location is not currently included as part of the TIP project. However, it appears that a median break in order to construct the left turn would be possible while also maintaining the planned median break to serve Alexander Road. Amberleigh Shores Phase II – Traffic Impact Analysis 28 8. CONCLUSIONS The contents of this report present the findings of the Traffic Impact Analysis conducted for the proposed Amberleigh Shores Phase II, to be located east of Market Street at its intersection with Alexander Road and south of Marsh Oaks Drive in Wilmington, North Carolina. The proposed development is expected to consist of 288 apartment units and will have a future analysis year of 2018. The study analyzes traffic conditions during the weekday AM and PM peak hours for the following scenarios:  Existing (2016) Traffic Conditions  Background (2018) Traffic Conditions  Combined (2018) Traffic Conditions Two access scenarios are considered as a part of this study. The first is limiting the proposed site drive to a right-in / right-out driveway, and the second is considering the same driveway as an unsignalized left-over. It is estimated that the proposed development will generate 1,900 total site trips on the roadway network during a typical 24-hour weekday period. Of the daily traffic volume, it is anticipated that 145 trips (29 entering and 116 exiting) will occur during the AM peak hour and 176 (114 entering and 62 exiting) will occur during the PM peak hour. Capacity analysis indicates all intersections are expected to operate at an acceptable level of service for all analysis scenarios during both the AM and PM peak hour. A u-turn location was considered in order to accommodate vehicles exiting site drive 3 with the goal of ultimately heading south of the study area. This will prevent a large number of u- turns at the existing signal at the intersection of Market Street and Mendenhall Drive / Marsh Oaks Drive. The other alternative is for these vehicles to travel through the adjacent residential development in order to make a left turn at this signal. The existing signal would provide breaks in the southbound traffic on Market Street, facilitating the u-turn movement. Amberleigh Shores Phase II – Traffic Impact Analysis 29 The two alternatives for site access function similarly, with all movements operating at an acceptable level of service. The left-in to the sight, provided as a part of the left-over scenario, would prevent traffic from turning left at the signalized intersection and traveling through the adjacent residential properties. While the current STIP project U-4902 plans show a median break to allow left turns onto Alexander Road, one is not currently provided for the location of the proposed site drive. However, it does appear possible to construct a median break for the site access without compromising the left turn onto Alexander Road. Amberleigh Shores Phase II – Traffic Impact Analysis 30 9. RECOMMENDATIONS Based on the findings of this study, geometric roadway improvements will only be needed at the Site Driveways. See a more detailed description of the recommended improvements below. Refer to Figure 9 for an illustration of the recommended lane configuration for the proposed development. Improvements by TIP Project Market Street and Marsh Oaks Drive / Mendenhall Drive  Extend the northbound left turn lane to 500 feet of full width storage and adequate taper.  Extend the northbound right turn lane to Site Drive 2. Market Street and Alexander Road  Construct a northbound left turn lane with 375 feet of full width storage and appropriate taper.  Construct a northbound right turn lane with 200 feet of full width storage and appropriate taper. Amberleigh Shores Phase II – Traffic Impact Analysis 31 Improvements Recommended by Developer – Left-over Market Street and Site Drive 2  Construct a northbound u-turn lane with 300 feet of full storage and adequate taper. Construct a bulb out to accommodate vehicles. Market Street and Alexander Road / Site Drive #3  Construct a southbound left turn lane with 300 feet of full storage and adequate taper.  Extend the northbound right turn lane for the adjacent property to serve the site drive.  Construct the site access with one ingress and one egress lane, allowing only right turns exiting the site.  Provide stop control for the site drive. Improvements Recommended by Developer – Right-in / Right-out Market Street and Site Drive 2  Construct a northbound u-turn lane with 300 feet of full storage and adequate taper. Construct a bulb out to accommodate vehicles. Market Street and Alexander Road / Site Drive #3  Extend the northbound right turn lane for the adjacent property to serve the site drive.  Construct the site access with one ingress and one egress lane, allowing only right turns exiting the site.  Provide stop control for the site drive. Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 9a Recommended Lane Configurations Alternative 1 N LEGEND Signalized Intersection Unsignalized Intersection Existing Lane X'Storage (In Feet) Improvement by Developer 32 TIP U4902 Improvement Right-In/Right-Out Intersection TWLTL Two Way Left Turn Lane 50 0 ' TW L T L 37 5 ' 20 0 ' 30 0 ' 17 5 ' 75' Left-Over Intersection Site Ma r k e t S t r e e t Alexander Road Mendenhall Drive Marsh Oaks Drive Si t e D r i v e # 1 Site Drive #3 Site Drive #2 Scale: Not to Scale Amberleigh Shores Wilmington, NC Figure 9b Recommended Lane Configurations Alternative 2 N LEGEND Signalized Intersection Unsignalized Intersection Existing Lane X'Storage (In Feet) Improvement by Developer 33 TIP U4902 Improvement Right-In/Right-Out Intersection TWLTL Two Way Left Turn Lane 50 0 ' TW L T L 37 5 ' 20 0 ' 30 0 ' 17 5 ' 75' Left-Over Intersection Site 30 0 '