Loading...
HomeMy WebLinkAboutFinal Lendire Mixed Use Development-Congestion Management STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION TRANSPORTATION MOBILITY & SAFETY DIVISION 1561 MAIL SERVICE CENTER RALEIGH, NC 27699-1561 Telephone: (919) 814-5000 Fax: (919) 771-2745 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 750 N. GREENFIELD PARKWAY GARNER, NC 27529 October 21, 2022 Traffic Impact Analysis Review Report Congestion Management Section Clarence B. Bunting, IV, P.E. Regional Engineer Charles Sorrell, Project Design Engineer Lendire Mixed Use Development TIA Project: SC-2022-307 Division: 3 County: New Hanover Lendire Mixed Use Development TIA SC-2022-307 Wilmington New Hanover County Per your request, the Congestion Management Section (CMS) of the Transportation Mobility and Safety Division has completed a review of the subject site. The comments and recommendations contained in this review are based on data for background conditions presented in the Traffic Impact Analysis (TIA) and are subject to the approval of the local District Engineer’s Office and appropriate local authorities. Date Initially Received by CMS 10/18/22 Date of Site Plan 5/6/21 Date of Complete Information 10/19/22 Date of Sealed TIA 9/16/22 Proposed Development The TIA assumes the development is to be completed by 2024 and consist of the following: Land Use Land Use Code Size Apartments/Townhomes 221 694 units General Office 710 26,000 s.f. Medical Office 720 10,000 s.f. Retail 820 29,000 s.f.. High-Turnover (Sit-down) Restaurant 932 7,000 s.f. Fast Food Restaurant with Drive Thru 934 2,500 s.f. Trip Generation - Unadjusted Volumes During a Typical Weekday IN OUT TOTAL AM Peak Hour 251 282 533 PM Peak Hour 360 368 728 Daily Trips 7,473 General Reference For reference to various documents applicable to this review please reference the following link: https://connect.ncdot.gov/resources/safety/Pages/Congestion-Management.aspx Once the driveway permit has been approved and issued, a copy of the final driveway permit requirements should be forwarded to this office. If we can provide further assistance, please contact the Congestion Management Section. Signalization We defer to the District Engineer, the Division Traffic Engineer, and the Regional Traffic Engineer for final decisions regarding signalization. Improvements By Others The analysis includes background improvements by others. If these improvements are not in place at the time of construction, the site should provide these improvements or analysis demonstrating mitigation is not necessary. Scenarios The analysis includes two access scenarios. Scenario 1 aligns with the TIP Project vision for access, so recommendations for Scenario 1 are included in this document. SITE Loop Road Middle Sound Lendire Road P a r k D r i v e w a y O g d e n B u s i n e s s S i t e A c c e s s 3 Loop Road Middle Sound Site Access 1 Site Access 2 Lane WendoverDenny's Entrance (M a r k e t S t r e e t ) U S 1 7 50 10 0 I P S 1 7 5 2 5 0 100 IPS 100 Existing Signal Signal Proposed By Others XXX Drawing Not to Scale All Distances in Feet IPS <XXX> Storage Distance Between Intersections Internal Protected Stem NCDOT Recommendation Laneage Built By Others Recommended Laneage Existing Laneage SC-2022-307 Use Development Lendire Mixed XXX NCDOT Recommended Storage Developer Proposed Signal Monitor for Signal N Scenario 1 100 IPS