Loading...
HomeMy WebLinkAboutConcept PlanDenise * Andre Ebbinkhuysen D.B. G448-2493 Courtney Dieter Motz D.B. 0002-145 Fabiola C Moreno D.B. G425-22G9 Austen Jones D.B. 072G-2948 Cape Fear Public Utility Authority D.B. 5330- 1 728 Zoning: R-1 5 Land Use: Public Utility Gil, e� �r \ Ile Chr15t5 5antified Holy Church D.B. 4937-805 Zoning: R-1 5 Land Use: Religious Institution Christs Santified Hnlv C:hiirr-:h Luthern Church Reconciliation D.B. 25GG-97 I Zoning: R-1 5 Land Use: Religious Institution Barbara Ann Jordan D.B. 1 1 38-873 Zoning: R- 15 Land Use: Residential Project No.: 25-03 Scale: 1"=30' Date: 04/01 /25 Revisons: Barbara Ann Jordan D.B. G090-2957 Zoning: R-1 5 Land Use: Vacant Development Notes: I . All development shall be in accordance with the New Hanover County Zoning Ordinance. 2. Project shall comply with all Federal, State � New Hanover County regulations. Wilmington Property Investment Group, LLC D.B. G74G-171 G Zoning: R-1 5 Land Use: Vacant Proposed Limitation of Uses: I . Banks and/or Financial Institution 2. Business Service Center 3. Offices for Private Business * Professional Activities 4. Instructional Services * Studios 5. Personal Services, General (no tattoo parlor permitted) G. Retail Sales, General Preliminary Development Data: Total Bldg. Area - 15,000 s.f. GFA± Bldg. Hgt. - 2-5tory / 40' Max. Parking Read. @ 2.5 / 1000 sf = 38 .. 4G spaces prov'd. "' Vicinity Map (No Scale) Utility Notes: I . Existing water and sanitary sewer services are currently available to the site from Cape Fear Public Utility Authority public mains. 2. All utility services, such as electric power, CATV, gas * telephone shall be installed underground. 3. All water * sewer utilities to be installed per CFPUA Technical Specifications * Standards. 4. Project shall comply with CFPUA Cross Connection Control requirements. Water meter(s) cannot be released until all requirements are met and N.C.D.E.N.R. has issued their "Final Approval." Call 343-39 10 for information. 5. Any backflow prevention devices required by the CFPUA will need to be on the list of approved devices by U5CFCCCHR or A55E. G. The contractor is responsible for the location and protection or existing utilities during construction. Call U-LOCO at 1-800-G32-4949. Contractor is responsible for the repair and replacement of any utilities, curb � gutter, pavement, etc. that may be be damaged during construction. Damaged items shall be repaired to at least the quality or workmanship found in the original item. 7. 5olid waste disposal will be by dumpster pickup by private contractor / hauler. Tree Preservation Notes: I . Tree Preservation / Removal Permit is required prior to clearing f- land disturbance. 2. Prior to any clearing, grading or construction activity, tree protection fencing will be installed around protected trees or groves of trees and no construction workers, tools, materials, or vehicles are permitted within the tree protection fencing. 3. Protective fencing is to be maintained throughout the duration of the project. Land clearing and construction contractors shall receive adequate instruction on tree protection requirements and methods. 4. Protective fencing will be labeled with signs to be placed every fifty (50) linear feet, or at least two (2) signs per area, in both English 4� 5pani5h - "Tree Protection Area / Do Not Enter." General Notes: I . New Hanover County Parcel No.: p/o 3 1 591 2.9G. 1 277 [PID R03G 14-005-002-0001 2. Total Tract Area: 53,952 s.f. (1 .24 ac.±) 3. Existing Zoning District: (CZD) B- I W 4. Comprehensive Plan Classification: Community Mixed -Use Graphic Scale 30 20 10 0 15 30 60 W 5