HomeMy WebLinkAboutConcept PlanDenise * Andre
Ebbinkhuysen
D.B. G448-2493
Courtney
Dieter Motz
D.B. 0002-145
Fabiola C
Moreno
D.B. G425-22G9
Austen
Jones
D.B. 072G-2948
Cape Fear
Public Utility Authority
D.B. 5330- 1 728
Zoning: R-1 5
Land Use:
Public Utility
Gil,
e�
�r
\ Ile
Chr15t5 5antified
Holy Church
D.B. 4937-805
Zoning: R-1 5
Land Use:
Religious Institution
Christs Santified
Hnlv C:hiirr-:h
Luthern Church
Reconciliation
D.B. 25GG-97 I
Zoning: R-1 5
Land Use:
Religious Institution
Barbara Ann
Jordan
D.B. 1 1 38-873
Zoning: R- 15
Land Use:
Residential
Project No.:
25-03
Scale:
1"=30'
Date:
04/01 /25
Revisons:
Barbara Ann
Jordan
D.B. G090-2957
Zoning: R-1 5
Land Use:
Vacant
Development Notes:
I . All development shall be in accordance with
the New Hanover County Zoning Ordinance.
2. Project shall comply with all Federal, State � New
Hanover County regulations.
Wilmington Property
Investment Group, LLC
D.B. G74G-171 G
Zoning: R-1 5
Land Use:
Vacant
Proposed Limitation of Uses:
I . Banks and/or Financial Institution
2. Business Service Center
3. Offices for Private Business * Professional
Activities
4. Instructional Services * Studios
5. Personal Services, General (no tattoo parlor
permitted)
G. Retail Sales, General
Preliminary Development Data:
Total Bldg. Area - 15,000 s.f. GFA±
Bldg. Hgt. - 2-5tory / 40'
Max. Parking Read. @ 2.5 / 1000 sf = 38
.. 4G spaces prov'd. "'
Vicinity Map
(No Scale)
Utility Notes:
I . Existing water and sanitary sewer services are
currently available to the site from Cape Fear
Public Utility Authority public mains.
2. All utility services, such as electric power, CATV,
gas * telephone shall be installed underground.
3. All water * sewer utilities to be installed per
CFPUA Technical Specifications * Standards.
4. Project shall comply with CFPUA Cross
Connection Control requirements. Water meter(s)
cannot be released until all requirements are
met and N.C.D.E.N.R. has issued their "Final Approval."
Call 343-39 10 for information.
5. Any backflow prevention devices required by the CFPUA
will need to be on the list of approved devices by
U5CFCCCHR or A55E.
G. The contractor is responsible for the location
and protection or existing utilities during
construction. Call U-LOCO at 1-800-G32-4949.
Contractor is responsible for the repair and replacement
of any utilities, curb � gutter, pavement, etc. that may be
be damaged during construction. Damaged items shall be
repaired to at least the quality or workmanship found in
the original item.
7. 5olid waste disposal will be by dumpster pickup by
private contractor / hauler.
Tree Preservation Notes:
I . Tree Preservation / Removal Permit is required prior
to clearing f- land disturbance.
2. Prior to any clearing, grading or construction activity, tree
protection fencing will be installed around protected trees or
groves of trees and no construction workers, tools, materials,
or vehicles are permitted within the tree protection fencing.
3. Protective fencing is to be maintained throughout the duration
of the project. Land clearing and construction contractors
shall receive adequate instruction on tree protection
requirements and methods.
4. Protective fencing will be labeled with signs to be placed every
fifty (50) linear feet, or at least two (2) signs per area, in
both English 4� 5pani5h - "Tree Protection Area / Do Not Enter."
General Notes:
I . New Hanover County Parcel No.:
p/o 3 1 591 2.9G. 1 277
[PID R03G 14-005-002-0001
2. Total Tract Area: 53,952 s.f. (1 .24 ac.±)
3. Existing Zoning District: (CZD) B- I
W
4. Comprehensive Plan Classification:
Community Mixed -Use
Graphic Scale
30 20 10 0 15 30 60
W
5