Loading...
HomeMy WebLinkAboutMaster Plan Narrative2022290.01 MPD Narrative.doc MASTER PLANNED DEVELOPMENT REPORT FOR PAWS4PEOPLE FOUNDATION Castle Hayne, North Carolina Prepared: March 2025 Prepared by: Becker Morgan Group, Inc. 3333 Jaeckle Dr, Suite #120 Wilmington, NC, 28403 (910) 341-7600 0 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION ...............................................................................................................Pg. 1 2.0 PROJECT NARRATIVE ....................................................................................................Pg. 1 3.0 TRAFFIC IMPACT .............................................................................................................Pg. 3 4.0 MASTER PLANNED DEVELOPMENT CONSIDERATIONS .....................................Pg. 4 5.0 COMMUNITY MEETING SUMMARY ...........................................................................Pg. 8 6.0 MASTER PLANNED DEVELOPMENT TERMS & CONDITIONS ............................Pg. 9 APPENDIX Appendix A: Master Plan Development Site Plan...................................................................................13 Appendix B: Neighborhood Meeting Document ....................................................................................14 Exhibit A: List of Notified Adjacent Property Owners..............................................................15 Exhibit B: Notice Given to Adjacent Property Owners..............................................................16 Exhibit C: List of Adjacent Property Owner Attendees.............................................................17 Appendix C: Project Parcel A & B Record Plat......................................................................................18 Appendix D: Wetland Delineation Report by Terrracon.........................................................................19 Appendix E: FEMA Flood Map ..............................................................................................................20 Appendix F: NRCS Soil Map..................................................................................................................21 Appendix G: Geotechnical Report by Terracon .....................................................................................22 1 1.0 INTRODUCTION This report is prepared to support the design of master planned development in accordance with New Hanover County (NHC) regulations & standards for the subject site known as paws4people Foundation – Assistance Dog Training Center. This project is a proposed assistance dog training facility expansion located at 5000 Transformation Lane, west of Blue Clay Road and 200’ north of Glazier Road in the census-designated place of Castle Hayne, located in New Hanover County, North Carolina. The project is under NHC’s jurisdictional limits. The project is located on two parcels further described by the NHC identification numbers below: •Project Parcel A # R01100-008-016-000 •Project Parcel B # R01100-008-039-000 paws4people Foundation is requesting to rezone the aforementioned property from its current zoning of Residential 15 (R-15) to a Planned Development District (PD) to allow a mixed use development including single family, multi-family, and community benefiting commercial development in accordance with NHC’s Unified Development Ordinance (UDO). The development will be an expansion of the existing paws4people Foundation. This report will demonstrate that the proposed project is in accordance and compliance with NHC unified Development Ordinance (UDO) Section 3.3 – Mixed Use Zoning Districts, Section 3.3.3 General Requirements for Mixed Use Zoning Districts, and Section 10.3.2.C – Zoning Map Amendments, and Section 10.3.4 Master Planned Development and will provide narrative information about site conditions. 2.0 PROJECT NARRATIVE Project Parcel A comprises a total of 10.57 acres +/-. Parcel Project B contains an existing residential home and comprises 0.67 acres. Furthermore, all proposed improvements will occur within Project Parcel A. Both Project Parcel A & B will be under the proposed Master Planned Development, as both parcels are owned by paws4people Foundation. A wetland delineation was performed by Terracon in September 2024, which determined that there are 0.88 acres of wetlands within the existing parcel. A copy of the wetland delineation report is included in Appendix D. Per FEMA Map Panel 3720324100K, the project falls in an area of Minimal Flood Hazard (Zone X). The predominant soil types within the parcel, as identified from the USDA / NRCS Custom Soil Resource Report are Le (Leon sand), Mu (Murville fine sand), and Ly (Lynn Haven fine sand). Furthermore, Terracon completed a geotechnical investigation of the project area in September of 2024. Please see Appendix G for Geotechnical Report. Project Parcel A currently consists of existing paws4people Foundation (applicant/owner) business buildings, residential facilities, training fields, roads, open grass spaces and wooded areas. The site is currently zoned as R-15 (Residential District) with Land Use Code 920-Charitable Services per NHC property records. The project is proposing a Master Planned Development (MPD) to rezone the site to PD (Planned Development). The site currently has the following buildings and locations from plan west to east: RILEY Administrative building, Chaney Dormitory & Dining facility, Brinkley Programming Facility, OATLIE K9 Training field, BRIELLE Puppy Development Center, and the WYATT K9 Training Field. These buildings are found on Sheet C-101 in Appendix A. A tree survey was conducted by the site surveyor: Port City Survey. This survey was focused on the Phase 1 project boundary (found on Sheet C-002 in Appendix A) and gave a description of the existing vegetation contained within the parcel. The site contains numerous tree species including crepe myrtle, pine, oak, magnolia, and maple trees. The above trees except for crepe myrtle are regulated trees per 2 NHC’s UDO Table 5.3.4.A: Regulated Trees. These trees fall under the regulated tree requirements and standards found in Section 5.3 of the NHC UDO. A subsequent tree removal permit will be required for the demolition and removal of any regulated trees on site. Furthermore, an effort to preserve existing vegetation on site has been made to maintain existing site appearance and align with NHC 2016 Comprehensive plan and provide community benefit. This master planned development for the site proposes three additional buildings & accompanying off street parking that will have commercial, residential, educational, and charitable applications. The first phase of the project is the 7,000 SF BRADIE Assistance Dog Training Center. The second phase is the 2,000 SF Whelping center, followed third by the 2,000 SF RIDGLEY K9 Water Training Center, each with their own associated parking areas and other site improvements. The current zoning of R-15 does not allow and permit the uses desired to best fit paws4people Foundation’s mission. The flexibility of the PD zoning district allows the site to contain both the existing and proposed site elements as well as their accompanying uses and benefits. The intention is so that in the future buildings may swap and slot in different uses allowed under the PD zoning. This unique zoning will set up paws4people Foundation to best achieve and accomplish their goals and objectives. paws4people Foundation’s mission is to educate and empower people to utilize Assistance Dogs to transform their lives. They provide highly trained, customized, and insured assistance dogs to people with disabilities. They also provide facility dogs who are trained, certified placed, and insured with a specific individual to use within their profession and daily activities to provide them with greater independence. They also look to increase the public’s knowledge about the importance of the roles that these dogs serve within society. Each building and facility on site allow for a necessary step in paws4people’s process. Each existing and proposed building leans towards a main use from NHC’s list of land uses and has an intended purpose. The RILEY administrative building has NHC’s Offices for Private Business and Professional Activities land use. The BRIELLE puppy development center, Whelping center & RIDGLEY K9 water training center all make use of NHC’s kennel land use. To further clarify, the NHC land use defines kennel as, “An establishment, including doggy day cares, the engages in the business, for a fee, or boarding, breeding, grooming, or training of more than three domesticated animals at any one time…” however the aforementioned building are intended to serve as the locations in which the assistance dogs are trained and housed indoors. The whelping center also falls under the veterinary service land use. The BRADIE assistance dog training center promotes educational opportunities for the community and paws4people clients and therefore falls under the vocational or trade school land use. This building also serves as the homes for dogs in the training program and therefore best fits NHC’s kennel use. However, Both the OATLEY & WYTATT K9 training fields fall under the outdoor recreation establishment use case. The CHANEY, BRIELLE, and BRINKLEY building all fall under the live/work or caretaker unit use. These buildings are intended for use by paws4people Foundation Foundation to stay overnight to train dogs over multiple day period and program sessions. The uses above are the main use for each existing and proposed building but are not limited to only these uses. All of these uses together create the ideal environment to efficiently and innovatively obtain the paws4people Foundation mission. This MPD is a high-level plan that identifies acceptable land uses, site layout, and identifies dimension standards for the development. This narrative along with the Master Plan Development site plans, community meeting summary, application, and master plan development terms & conditions document acts as the guideline for a high-quality mixed-use development that promotes greater opportunity for those affected by disabilities within our community, as well as informing the community about the important roles these dogs serve. This project, like any other, will require coordination with NCDOT, CPFUA, NHC, NCDEQ, and any other regulatory agency to ensure safe and viable development. With all the segments and pieces aligning, we believe this development presents the county, applicants, and community at large with a great opportunity. We appreciate your time and consideration for this proposed development. 3 3.0 TRAFFIC IMPACT Per NHC’s Master Plan Development Application the estimated number of trips generated for the project’s proposed maximum density and intensity was required to modeled to show the change in vehicle trips after full build out is complete. This was modeled per the most recent version of the Institute of Traffic Engineers (ITE) Trip Generation Manual. Based on the site uses proposed in this MPD, they were compared with the closest fitting land uses within the ITE manual. From this, it was determined that Office (712) best represents the CHANEY building found in the bottom left of the MPD plans. Mobile Home (240) best represents the existing home found in Parcel Project B. Lastly, Animal Hospital (640) best represents all proposed and existing buildings on the site. Trip generations were calculated based on the three different time periods: weekday, PM peak, and AM peak. The findings from this model are summarized below. Table 1: Trip Generation Summary PM Peak Hour Trips (vph) AM Peak Hour Trips (vph) Land Use (ITE CODE) Intensity Week Day Traffic (vpd) Enter Exit Enter Exit Office - 712 2, 740 S.F.39 4 5 4 3 Mobile Home - 240 1,568 S.F.7 0 1 0 0 Animal Hospital - 640 12,235 S.F.499 46 43 46 41 50 49 50 44Total Trips 545 99 94 The trip generations above were calculated based on the most appropriate land use within the ITE manual, however the Animal Hospital (640) may not be the most accurate representation of traffic flows for this particular project. Therefore, it was requested that the paws4people Foundation team provide trip information based on typical daily operational traffic flows. Typically, traffic flows to the following buildings on site. Firstly, traffic goes to the BRIELLE puppy development center with the main constituents being paws4people Foundation employees, University of North Carolin Wilmington students, interns, volunteers and clients. Secondly, the flow would go to the CHANEY site dormitory building with typical clients and paws4people Foundation employees. Third, would be the RILEY operations & office building with mostly paws4people Foundation empoyees, contractors and clients. Last, would be to the BRINKLEY building with paws4people Foundation employees and clients. The existing site vehicle traffic is summarized by paws4people Foundation as the following. On a normal, average day, the traffic to the site would be around 20 trips maximum. The most traffic on the site flows from Monday through Friday during traditional business hours. There are typically around 10 trips on average on weekend days. If there is a volunteer workday these number would increase, however these volunteer days typically occur on weekdays. The addition of the new BRADIE building is not anticipated to increase traffic to the site. Outside of larger training groups, which may occur twice a quarter or an event, on average occurring three to four times a year, under these circumstances traffic may spike up to 40-50 trips. This is not anticipated to have any negative impact on the community/neighbors around the paws4people Foundation facility. Furthermore, vehicular access for the MPD site from Blue Clay Road is gated for use only by emergency vehicles, paws4people staff & volunteers, & paws4people clients. The site is not open for public access. 4 Due to this, it is anticipated that the site trips will not reach the levels determined the ITE Trip Generation Table above. 4.0 MASTER PLANNED DEVELOPMENT CONSIDERATIONS 1. How would the requested change be consistent with the County’s policies for growth and development, as described in the 2016 Comprehensive Plan, applicable small area plans, etc. a. The 2016 Comprehensive Plan outlines and identifies NHC’s goals for development and growth in the future. This PD zoning development and MPD is consistent with the themes and objectives of the 2016 Comprehensive Plan, including the following: i. Livable Built Environment 1. This is to ensure that all elements of the built environment, including land use, transportation, housing, energy, and infrastructure work together to provide sustainable places for living, working, and recreation to produce a high quality of life. This development provides a mix of land uses including civic, residential, and open spaces with a focus on retaining trees and providing green spaces in accordance with the NHC UDO. ii. Harmony with Nature 1. This seeks to ensure the contributions of natural resources to human well-being are explicitly recognized and valued, and maintenance of nature. The MPD proposes a stormwater design to ensure that runoff is treated on site with an intentional focus on negating impacts on adjacent properties. Furthermore, an effort to maintain exiting vegetation has been made with the establishment of a 10’ landscape buffer around the site perimeter to maintain the existing treelined to screen any non-PD uses from the site. iii. Interwoven Equity 1. Seeks to ensure fairness and equity in providing for the housing, services, health, safety, and livelihood of its citizens. This project aims to provide paws4people foundation with greater capacity and ability to achieve their goals of educating the public on the importance of the roles assistance dog serves and provides highly trained and customed assistance dogs to transform individuals lives. iv. Resilient Economy 1. Ensures the community is prepared to deal with both positive and negative changes in its economic health and to initiate sustainable urban development and redevelopment strategies that foster business growth through technology and innovation and build reliance on local assets. This development aims to foster civic engagement, address social needs, provide volunteer & employment and strengthen the NHC community. 5 v. Healthy Community 1. Ensures that public health needs are recognized and addressed through a variety of provisions. paws4people Foundation seeks to aid in healthy community by supporting those affected by disabilities by providing assistance dogs customized to meet the needs of an individual. vi. Responsible Regionalism 1. Ensures all local proposal account for, connect with, and support the plans of adjacent jurisdictions and surrounding region. The City of Wilmington is the largest adjacent jurisdiction and will also be able to benefit from paws4people Foundation’s goals. Furthermore, other adjacent jurisdictions and the surrounding region also stand to benefit. b. paws4people trains and places assistance dogs with users to promote a better tomorrow. Their philosophy is that anyone with any kind of disability can be taught how to utilize an assistance dog to Control, Regulate, and Mitigate the effects of their disability. Assistance dogs provided by paws4people promotes a much greater independence and invaluable service to those affected by a disability. The proposed training complex allows them to provide more services and resources for the community at large. This aligns with NHC’s comprehensive plan goal that aims to, “support health promotion and disease prevention while minimizing debilitating effects of mental and physical disabilities.” This complex would also create a greater awareness and understanding of physical & mental health disabilities and how these dogs can assist. Lastly, paws4people’s facility will conserve and enhance NHC’s unique sense of place to attract individuals, companies, and organizations. 2. How would the requested change be consistent with the property’s classification on the 2016 Comprehensive Plan’s Future Land Use Map. a. The 2016 Comprehensive Plan identifies the project area in the General Residential place type. This designation promotes and incentivizes lower density housing and associated civic and commercial services. Firstly, the standards set forth in the MPD are based on the site’s current zoning of R-15 to match with typical residential standards and site characteristics. This is intended to maintain the existing appearance and strandardsof a residential zoning within the new PD zoning. Secondly, the site’s location in Castle Hayne is a less populated area and the site’s intended uses are not anticipated to have a significant increase in traffic or have an impact on neighboring areas, this will maintain the existing low traffic volume within the surrounding area. Further north on Blue Clay Road zoning changes from residential to industrial uses with existing construction stock yards and west of the site is an existing NCDOT complex. Therefore, the site is located in an area of the county that already has multiple uses & zonings within a small area. Existing vegetation on the site’s will be maintained to keep’s the sites natural beauty, promote environmentally responsible growth and will not separate the site’s appearance from the neighboring residential developments. The only proposed removal of vegation is around the proposed buildings and stormwater measures. A proposed 10’ landscape buffer is set forth to maintain visual screening from any non-PD zoning properties. The appearance of the master plan site is not anticipated to change from existing conditions to after the proposed site elements have been constructed. No drastic changes will occur to 6 the overall appearance of the site from its existing conditions. Furthermore, this proposed master plan development is designed to stay incorporated with the adjacent residential properties and separate from other non-residential uses in the immediate area. This MPD also sets out to achieve the following goals from the General Residential place type: i. Promote environmentally responsible growth. 1. This MPD seeks to maintain as much vegetation as possible on site and treat runoff on site and avoid any impacts on adjacent properties. ii. Increase physical activity and promote health, active lifestyles. 1. paws4people Foundation supports dogs affected by disabilities by providing assistance dogs customized to meet the needs of an individual and promote healthy lifestyles. iii. Conserve and enhance our unique sense of plate to attract individuals, companies, and organizations. 1. paws4people Foundation operates programs that connects volunteers, trainers, and clients thus strengthening community ties. Their work with local organizations aids in fostering a culture of service and compassion, this makes the county more attractive to individuals and business that value social responsibility. iv. Actively promote high quality educational and diverse cultural opportunities for New Hanover County residents and visitors. 1. paws4people actively promotes high quality education and diverse cultural opportunities for NHC residents and visitors through the aforementioned training dog programs, community outreach, and partnerships with local institutions. 3. How does the proposed master planned development meet the required elements and intent of the proposed zoning district. a. The NHC UDO establishes the following primary objectives for PD zoning and the following apply to this site: 1. Reducing the inflexibility of zoning district standards that sometimes result from strict application of the base district, and development standards. 2. Allowing greater flexibility in selecting: the form and design of development, the ways by which pedestrians and traffic circulate, how the development is located and designed to respect the natural features of the land and protect the environment, the location, and integration of open space and civic space into the development, and design amenities. 3. Encouraging a greater mix of land uses within the same development. 4. Allowing more efficient use of land. 5. Promoting development forms and patterns that respect the character of established surrounding neighborhoods and other types of land uses. 7 ii. The applicant proposes a multi-faceted complex that is tailor made to achieve paws4people’s goal of educating and empowering people to utilize assistance dogs to transform their lives. The proposed MPD provides a diverse mix of land uses, open spaces, facilities & services that incorporated together in an efficient manner provides an innovative facility for the training of assistance dogs and the people who utilize them. The PD zoning district allows for much greater flexibility than that of a typical base zoning district. It also allows for a more efficient use of land as otherwise to achieve the same goals, multiple parcels with different zoning would be necessary. All proposed uses previously discussed for the site in Section 2.0 – Project Narrative are permitted by the PD zoning district. The MPD also provides the following community benefits: improved design, natural preservation, and mixed-use development. The architectural design of the proposed BRADIE, Whelping, and RIDGLEY centers exceeds that of any minimum standards found in the NHC UDO & other county regulations. Native vegetation, habitats, features, and trees that will not be disturbed by the proposed site additions will be preserved to maintain the natural beauty and ecosystem benefits currently found on the existing site, furthermore a 10’ landscape buffer has been set forth to respect the character of the stablished surrounding residential neighborhoods. Lastly, the diversity of uses on the site from residential, civic, and other non-residential uses will create an innovative, integrated, and efficient mixed-use development. 8 5.0 COMMUNITY MEETING SUMMARY Written notice of a community meeting for the above referenced Master Plan project was given out via USPS mail to all property owners within five hundred feet (500’) of the subject property. A list of all adjacent property owners to whom written notice was mailed is Exhibit A. A copy of the notice given out is Exhibit B. A list of those who attended is attached as Exhibit C. paws4people and Becker Morgan Group held a Community Meeting on March 25, 2025 at paws4people’s CHANEY facility at 5:30 pm. All discussions were completed by 6:00pm. The meeting was recorded and shared with anyone requesting a copy. An aerial image of the proposed site Master plan was presented. The site is being rezoned from R-15 to PD. The following issues and concerns were brought up during the community meeting: •Stormwater management •Sewer connection easement •Aesthetic changes to existing vegetation To expand further on the topics above the following concerns are detailed: •Regarding stormwater management, there were concerns about water runoff on site. An existing ditch and wetland area borders the northern portion of the site. There was concern expressed about how this development may impact this area. The existing ditch within the property area however drains south and is not anticipated to have any impact on the area discussed. Every effort will be made to control the flow through the existing ditches and proposed stormwater outfall to avoid downstream erosion and impact. Furthermore, a proposed stormwater management wet pond will further alleviate any potential for increased runoff and this effort will focus on maintaining the lack of stormwater impacts on adjacent properties. •A neighboring resident also expressed interest in the possibility of a sewer easement to allow their parcel north of the site to gain sewer access. A verbal agreement may have been reached between the adjacent property owner and the site owners prior to paws4people’s acquisition of the property. •A concern about the removal of perimeter vegetation was discussed. Intentional consideration and planning have taken place in order to maintain as much of the existing vegetation on site as possible. Furthermore, a 10’ landscape buffer is set forth in this document around the border of any non-PD zoning areas and mature landscaping buffers including existing significant tree coverage all the perimeter of the property will not be disturbed as to limit visual, light, and sound impacts from the property. •A comment was made about potential noise the training dogs would make. This was after discussion of one of the NHC uses that best fit the project was kennel. However, the training dogs are housed indoors and should not have an impact on noise to adjacent parcels. 9 6.0 MASTER PLANNED DEVELOPMENT TERMS & CONDITIONS 1. Conditions related to approval of the application for the planned development zoning district classification: a. Development within the PD District will comply with the use types, buffer requirements, setback requirements, and dimensional standards as shown on the MPD Master Plan and documented below. b. The development and uses of the project area shall comply with all applicable regulations and requirements imposed by the New Hanover County Unified Development Ordinance (UDO), and any other applicable federal, state, or local law. c. Approval of this rezoning does not constitute technical approval of the site plan. Issuance of all required permits must occur prior to construction commencing. d. The uses allowed shall include all of the permitted in the PD District as specified in NHD UDO Table 4.2.1, except that the following uses will be prohibited: i. The following Residential Uses: 1. Mobile Home Park 2. Mobile Home Subdivision ii. The following Commercial Uses: 1. Adult Entertainment Establishment 2. Bar/Nightclub 3. Electronic Gaming Operation 4. Outdoor Shooting Range 5. Bank and/or Financial Institution 6. Repair Shop 7. Auction House 8. Convenience Store 9. Food Market 10. Grocery Store 11. Oil or Gas Dealer, Retail 12. Pharmacy 13. Boat Dealer 14. Car Wash 15. Fuel Sales 16. Mobile Home and Prefab Building Sales 17. Transportation Vehicle Service and Storage Facility 18. Vehicle Rentals 19. Vehicle Sales 20. Vehicle Service Station, Large Vehicles 21. Vehicle Service Station, Minor 22. Vehicle Service Station, Major 23. Vehicle Towing Service and Storage Yard 2. The MPD Master Plan, including, dimensional standards, and development standards established in the MPD Master Plan: 10 a. Maximum height for all structures is limited = 40 feet b. Setbacks for the PD zoning are as follows: i. Front setback = 25 feet ii. Side setback = 15 feet iii. Rear setback = 20 feet c. Landscape buffer along non-PD zoning districts is 10 feet. 3. Conditions related to the approval of the MPD Master Plan, including any conditions related to the form and design of development sown in the MPD Master Plan: a. Vehicular access for the master planned development site from Blue Clay Road is gated for use only by emergency vehicles, paws4people staff & volunteers, & paws4people clients. The site is not open for public access. b. Existing perimeter vegetation is to remain, as per standards set forth in this MPD and seen in Exhibit A. Additional vegetation will be added as required for each development phase to meet NHC landscaping standards. 4. Provisions addressing how transportation, potable water, wastewater, stormwater management, and other infrastructure will be provided to accommodate the proposed development: a. Transportation will be provided by access to public rights of way. An NCDOT driveway or encroachment permit is not anticipated due to no entrance improvements or additional site access points. b. Potable water and wastewater services has been provided to the existing site by Cape Fear Public Utility Authority (CFPUA). Any extension of water or sewer utilities for each phase of the MPD will be the responsibility of the owner. Permitting through CFPUA for any extensions or modifications is anticipated. c. Stormwater will be managed on site in accordance with NCDEQ standards for quality and NHC for quantity standards and regulations, furthermore stormwater control measures will comply with all County and State regulations, and appropriate permits will be acquired for the project site. d. Infrastructure will be designed in accordance with the North Carolina building code, all other applicable government regulations, laws, and ordinances, and developed consistently with the approved Master Planned Development. 5. Provisions related to environmental protection and monitoring: a. Any 404 wetlands determined to exist on the site will be delineated and handled in accordance with all applicable government regulations, laws, and ordinances including Army Corp. of Engineers requirements. The property will comply with all applicable regulations, laws, and ordinances from local, state, and federal sources with jurisdiction over the site. 6. Compensating community benefits as identified by the PD zoning district in the NHC UDO may include but are not limited to, improved design, natural preservation, improved connectivity for 11 pedestrians and/or vehicles, mixed-use development, green building practices, and dedication of land or in-lieu fee contribution. The project’s proposed compensating community benefits are as follows: a.Improved design: The use of architectural design that exceeds any minimum standards established in the NHC UDO or any other County regulation, or the use of site design incorporating principles of walkable urbanism and traditional neighborhood development, compatible with the comprehensive plan and other adopted County Plans. i.The architectural design of the proposed BRADIE, Whelping, and RIDGLEY centers will exceed that of any minimum standards found in the NHC UDO & other county regulations. Improving and expanding the current site design will increase the capacity of paws4people foundation to train more assistance dogs and increase their capabilities for a wider range of uses and training methods. This will allow for more volunteers to train and greater exposure and potential to educate the public on how important assistance dogs can be on people’s lives and the benefits for overall public well being. Furthermore, the addition and redesign of parking lots for each of these buildings will improve site flow and access. Increased parking counts will allow for more capacity as mentioned above and improvements to these areas allow for easier and more efficient traffic circulation on site. b.Natural Preservation: The preservation of sensitive lands such as natural habitats, natural features, or trees that exceed the requirements of this UDO, when they are located on the site. i.Unless required for necessary infrastructure or required by the county’s land use and building regulations, existing vegetation that serves as a buffer between the development site and adjacent uses will be left in place. The design of the proposed site elements are located to best preserve the existing vegetation and natural elements. Existing perimeter site vegetation is also kept in place to create a visual buffer from neighboring existing residential parcels. Native vegetation, habitats, features, and trees that will not be disturbed by the proposed site improvements will be preserved to maintain the current natural beauty of the site as well as any ecosystem benefits. This intended preservation will exceed the minimum standards found in NHC UDO Section 5.3 Tree Retention. c. Any other community benefit that would provide benefits to the development site and the citizen of the County, Generally: i.The expansion of the facility provides benefit to both the paws4people Foundation and the citizens of the county. Firstly, this project would allow for increased capacity to train more assistance dogs and therefore place more assistance dogs with those in need. The expansion would allow for enhanced training with more specialized areas and greater research opportunities with partnerships the foundation has made. It would also allow for community programs with greater opportunities for employment, internships and volunteer work. There would also be greater opportunities for fundraising and awareness within the community. A larger facility could attract more interested parties and strengthen NHC’s reputation for community service and innovation. It could also become a destination for those interested in animal assistance and nonprofit 12 work. Lastly, paws4people Foundation increased presence would reinforce NHC as a compassion, service oriented, and forward-thinking community. 13 Appendix A MASTER PLAN DEVELOPMENT SITE PLAN paws4people Foundation Castle Hayne, NC 2, 0 0 0 S . F . PR O P O S E D BU I L D I N G 8 6 6 STORMWATER MANAGEMENT AREA 2,000 S.F. PROPOSED BUILDING 10 77 12 7 7, 0 0 0 S . F . PR O P O S E D B U I L D I N G XXXXX XX X X XXXXXXXXXXXXXXXXXXXXX X X X X X X X X XX X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X XXX X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXX EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EX I S T I N G B U I L D I N G GLAZIER ROAD 60' PUBLIC RIGHT-OF-WAY S.R . 1 3 1 8 , 6 0 ' P U B L I C R I G H T O F W A Y BL U E C L A Y R O A D TRANSFORMATION LANE 30' PRIVATE ACCESS & UTILITY EASEMENT STORMWATER MANAGEMENT AREA PROJECT PARCEL B PROJECT PARCEL A 2,740 SF.3,266 SF. 5,407 SF. 3,562 SF. PAWS4PEOPLE 5000 TRANSFORMATION LANE CASTLE HAYNE NEW HANOVER COUNTY, NC DOG TRAINING CENTER ASSISTANCE 06/25/2024 2022290.01 C-001 1" = 50' A E R N C G H I I N T E E E C R T I U N G R E North Carolina Dover 302.734.7950 Salisbury 410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600 Wilmington Newark 302.369.3700 980.270.9100 Charlotte 919.243.1332 Raleigh NC License #: C-4743 .PDF J.P.G.THMS SITE PLAN . . . ... . F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Apr 01, 2025 - 4:37pm 2025-04-01 DRAWN BY: DATE: PROJECT NO.: COPYRIGHT 2023 MARK DATE DESCRIPTION ISSUE BLOCK PROJECT TITLE SHEET TITLE SCALE: SHEET PROJ. MGR.: [MP] C-001LAYER STATE: 0 SCALE: 1" = 50' 25 50 100 N . 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x36 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 SITE DATA 1. 5000 TRANSFORMATION LANE CASTLE HAYNE, NORTH CAROLINA 28429 1-888-762-PAWS 2. CASTLE HAYNE, NORTH CAROLINA 28429 3. 3333 JAECKLE DRIVE, SUITE 120 WILMINGTON, NC 28403 910-341-7600 4. 5. PROPOSED: 6. 7. 8. 9. 10.PROJECT PARCEL A: 10.57 ACRES 14. FRONT: SIDE: REAR: 17. 18. 19. 20. OWNER OF RECORD:PAWS4PEOPLE FOUNDATION PREMISES ADDRESS:5000 TRANSFORMATION LANE ENGINEER / SURVEYOR:BECKER MORGAN GROUP INC. PROPERTY MAP NUMBER:R01100-008-016-000 & R01100-008-039-000 ZONING CLASSIFICATION: EXISTING: PD PLANNED DEVELOPMENT / NEW HANOVER COUNTY R-15 RESIDENITAL DISTRICT / NEW HANOVER COUNTY DEED SUMMARY:BOOK 6144, PAGE 1443 PLAT REFERENCE:BOOK 6, PAGE 90 PRESENT USE:920 - CHARITABLE SERVICES PROPOSED USE:920 - CHARITABLE SERVICES TOTAL PARCEL AREA: SETBACKS:PD PLANNED DEVELOPMENT 25 FT. 15 FT. 20 FT. SOURCE OF WATER:CAPE FEAR PUBLIC UTILITY AUTHORITY SOURCE OF SEWER:CAPE FEAR PUBLIC UTILITY AUTHORITY SOURCE OF GAS:PIEDMONT NATURAL GAS SOURCE OF ELECTRIC:DUKE ENERGY 11.PHASE 1 BUILDING: 7,000 S.F.PROPOSED BUILDING: 12.PHASE 1 EXISTING: 8,800 S.F. (0.20 ACRES)IMPERVIOUS COVERAGE: PHASE 1 PROPOSED: 23,056 S.F. (0.53 ACRES) 15.LOT COVERAGE:PERMITTED: 50% (NEW HANOVER COUNTY) 16.BUILDING HEIGHT:PERMITTED: 40 FT. PROPOSED: 40 FT. PHASE 2 BUILDING: 2,000 S.F. PHASE 3 BUILDING: 2,000 S.F. PHASE 2 EXISTING: 6,683 S.F. (0.15 ACRES) PHASE 2 PROPOSED: 9,990 S.F. (0.23 ACRES) PHASE 3 EXISTING: 1,055 S.F. (0.02 ACRES) PHASE 3 PROPOSED: 9,600 S.F. (0.22 ACRES) PROJECT PARCEL B: 0.67 ACRES 15. PERIMETER BUFFER ALONG NON-PD ZONING: 10 FT. LANDSCAPE BUFFER:PD PLANNED DEVELOPMENT TOTAL IMPEVIOUS: 42,646 S.F. (0.22 ACRES) VICINITY MAP SCALE: 1" = 2000' PAWS4PEOPLE MASTER PLAN. NEW HANOVER COUNTY, NC N SITE BL U E C L A Y R D . GLAZIER RD. BROOKDALE DR. SHEET INDEX C-001 COVER SHEET C-101 EXISTING CONDITIONS PLAN COVER SHEET EXISTING CONDITIONS PLANS C-201 SITE PLAN SITE PLANS C-002 PHASING PLAN GENERAL NOTES: 1. TOPOGRAPHIC SURVEY DATA SHOWN HERON WAS PREPARED BY PORT CITY LAND SURVEYING, PLLC ON 12-10-2024, VERTICAL DATUM IS BASED ON NAD '83. A TREE INVNEOTRY OF THE SITE WAS CONDUCTED WITH THE 2. THE EXISTING UTILITIES SHOWN WERE TAKEN FROM THE BEST AVAILABLE RECORDS. THE CONTRACTOR SHALL CONTACT NORTH CAROLINA 811 (1-800-632-4949) TO VERIFY THEIR EXACT LOCATION PRIOR TO START OF ANY CONSTRUCTION. ANY DAMAGE INCURRED TO ANY UTILITIES SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTORS EXPENSE. IF THE CONTRACTOR RELIES ON THE UTILITY LOCATION SHOWN HEREON, THEY DO SO AT THEIR OWN RISK AND WILL NOT BE ENTITLED TO ADDITIONAL COMPENSATION DUE TO TIME DELAYS FROM SAID RELIANCE. 3. THIS AREA OF DEVELOPMENT IS NOT IMPACTED BY THE 100 YEAR FLOOD PLAIN AS SHOWN ON FIRM 3720324100K AND 4. A WETLAND DELINATION WAS COMPLETED BY TERRACON IN SEPTEMBER OF 2024 AND DETERMINED THAT THERE ARE AREAS OF WETLANDS WITHIN THE EXISTING PARCEL. 5. ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE NOT INTENDED FOR DEDICATION. 6. NORTH CAROLINA REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREES AND STUMPS ON CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING EXCAVATION MUST BE REMOVED AND PROPERLY DISCARDED. 7. ALL HANDICAPPED PARKING DEMARCATION, STALLS, AND BUILDING ACCESSIBLE ROUTES SHALL COMPLY WITH THE "AMERICAN WITH DISABILITIES ACT". 8. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENT FOR CONSTRUCTION SAFETY. ALL CONSTRUCTION MUST BE DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES AND REGULATION THERETO APPURTENANT. 9. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALS FROM NEW HANOVER COUNTY (NHC), CAPE FEAR PUBLIC UTILITY AUTHORITY (CFPUA), NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ) AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT). 10. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO NEW HANOVER COUNTY AND STATE OF NORTH CAROLINA STANDARDS AND ANY OTHER APPLICABLE STATE AND LOCAL CODES. 11. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND TO RECEIVING STRUCTURES. ROOF DRAIN DOWNSPOUTS TO BE CONNECTED TO STORM DRAINAGE OR DIRECTED TO STREET AND/OR PARKING AREAS. 12. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, REALIGNMENTS, DISCONNECTIONS, OR CONNECTIONS OF EXISTING UTILITIES WITH APPLICABLE AUTHORITIES. 13. CONTRACTOR AND BUILDER ARE RESPONSIBLE FOR COORDINATING FINISHED FLOOR ELEVATIONS OF ALL BUILDINGS WITH THE OWNER. 14. MINIMUM SEPARATION OF UTILITIES SHALL BE MAINTAINED AS FOLLOWS: 14.1. HORIZONTAL SEPARATION OF TEN (10) FEET BETWEEN SANITARY SEWER AND WATER MAINS AND STORM SEWER. 14.2. WHERE VERTICAL CLEARANCE IS LESS THAN TWENTY-FOUR (24) INCHES BETWEEN SANITARY SEWER AND STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10 FEET EITHER SIDE OF CROSSING. 14.3. WHERE VERTICAL CLEARANCE IS LESS THAN TWELVE (12) INCHES BETWEEN SANITARY SEWER AND STORM DRAIN, SANITARY SEWER SHALL BE DUCTILE IRON PIPE FOR A MINIMUM OF 10 FEET EITHER SIDE OF THE CROSSING, AND BRIDGING SHALL BE INSTALLED PER APPLICABLE UTILITY AUTHORITY'S DETAILS. 14.4. IN NO CASE SHALL THERE BE LESS THAN EIGHTEEN (18) INCHES OF SEPARATION BETWEEN OUTSIDE OF WATER MAIN AND OUTSIDE OF SEWER OR STORM SEWER. 14.5. MINIMUM COVER OF THIRTY-SIX (36) INCHES SHALL BE PROVIDED FOR ALL BURIED WATER MAINS AND SANITARY SEWER MAINS. 15. ALL SANITARY SEWER MAINS TO BE 8 INCHES UNLESS OTHERWISE INDICATED. 16. ALL WATER MAINS TO BE 8 INCHES UNLESS OTHERWISE INDICATED. 17. TWO VALVES ARE REQUIRED AT "T" INTERSECTIONS AND ONE VALVE ON THE WATER LINE TO FIRE HYDRANTS. 18. A BLOW-OFF VALVE IS REQUIRED AT THE TERMINUS OF ALL "DEAD END" WATER LINES. FIRM 3720323100K. AFOREMENTIONED SURVEY. CONCRETE CURB & GUTTER CONCRETE SIDEWALK, SLAB / PAVING IMPERVIOUS SURFACED ROAD, DRIVE INDIVIDUAL TREE OR BUSH STRUCTURE (CONCRETE, WOOD, DRAINAGE DITCH OR SWALE WETLAND BOUNDARY LINE ELEVATION SPOT SHOT PROPERTY OR RIGHT-OF-WAY LINE LIGHT POLE CENTERLINE BENCH MARK METAL, ETC.) CONTOUR OR PARKING LOT WIRE FENCE 49 EVERGREEN DECIDUOUS N/A N/A X X X CHAINLINK FENCE STOCKADE FENCE 43.55 X X X 55 25.15 B.C.25.00 T.C.25.50 V V V N/A ITEM WATER MAIN & SIZE PROPOSED LEGEND EXISTING EX. 10" F.M. EX. 10"S EX. 10" W U.E. U.T. EX. 2" G 10" S 12" F.M. 12" W U.E. U.T. 2" G SANITARY GRAVITY SEWER LINE (S) SIZE & FLOW DIRECTION C-1-Notes-Legend-Portrait SANITARY SEWER CLEANOUT (C.O.) WATER VALVE (W.V.) OR METER (W.M.) FIRE HYDRANT (F.H.) SANITARY SEWER MANHOLE (S.S.M.H.) STORM DRAIN MANHOLE (S.D.M.H.) CATCH BASIN (C.B.) STORM DRAIN LINE (CMP, RCP, HDPE) SANITARY SEWER FORCE MAIN (F.M.) SIZE & FLOW DIRECTION UNDERGROUND ELECTRIC (U.E.) UNDERGROUND TELEPHONE (U.T.) UNDERGROUND GAS MAIN (G) UTILITY POLE W/ OVERHEAD SERVICE (TELEPHONE (O.T.), ELECTRIC (O.E.) F.H. W.V.W.M.W.M.W.V. F.H. TAX PARCEL: R01100-008-016-000 CAPE FEAR RIVER BASIN NEW HANOVER COUNTY, NORTH CAROLINA PAWS4PEOPLE MASTER PLAN CAPE FEAR RIVER BASIN MASTER PLANNED DEVELOPMENT PLANS GLAZIER ROAD 60' PUBLIC RIGHT-OF-WAY S.R . 1 3 1 8 , 6 0 ' P U B L I C R I G H T O F W A Y BL U E C L A Y R O A D 2, 0 0 0 S . F . PR O P O S E D BU I L D I N G 8 6 6 STORMWATER MANAGEMENT AREA 2,000 S.F. PROPOSED BUILDING 10 77 12 7 7, 0 0 0 S . F . PR O P O S E D B U I L D I N G XXXXX XX X X XXXXXXXXXXXXXXXXXXXXX X X X X X X X X XX X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X XXX X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXX EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EX I S T I N G B U I L D I N G PHASE 2 PHASE 1 PHASE 3 TRANSFORMATION LANE 30' PRIVATE ACCESS & UTILITY EASEMENT STORMWATER MANAGEMENT AREA PROJECT PARCEL B PROJECT PARCEL A 2,740 SF.3,266 SF. 5,407 SF. 3,562 SF. PAWS4PEOPLE DOG TRAINING CENTER ASSISTANCE 06/25/2024 2022290.01 C-002 1" = 50' A E R N C G H I I N T E E E C R T I U N G R E North Carolina Dover 302.734.7950 Salisbury 410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600 Wilmington Newark 302.369.3700 980.270.9100 Charlotte 919.243.1332 Raleigh NC License #: C-4743 .PDF J.P.G.THMS PHASING PLAN . . . ... . F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Apr 01, 2025 - 4:38pm 2025-04-01 DRAWN BY: DATE: PROJECT NO.: COPYRIGHT 2023 MARK DATE DESCRIPTION ISSUE BLOCK PROJECT TITLE SHEET TITLE SCALE: SHEET PROJ. MGR.: [MP] C-002LAYER STATE: 0 SCALE: 1" = 50' 25 50 100 N . 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x36 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 VICINITY MAP SCALE: 1" = 2000' PAWS4PEOPLE MASTER PLAN. NEW HANOVER COUNTY, NC N SITE BL U E C L A Y R D . GLAZIER RD. BROOKDALE DR. 5000 TRANSFORMATION LANE CASTLE HAYNE NEW HANOVER COUNTY, NC IMPERVIOUS PHASING TABLE PHASE PROPOSED (SF) PHASE 1 23,056 S.F.± (0.53 AC.±) EXISTING (SF) 8,800 S.F.± (0.20 AC.±) PHASE 2 6,683 S.F.± (0.15 AC.±) PHASE 3 1,055 S.F.± (0.22 AC.±) 9,990 S.F.± (0.23 AC.±) 9,600 S.F.± (0.22 AC.±) TOTAL 16,538 S.F.± (0.38 AC.±)42,646 S.F.± (0.98 AC.±) SS OE OE OE 24 24 24 24 24 24 24 24 24 18 18 18 18 18 18 18 18 18 18 18 18 T T T OE OE SSSS SS SS SS SS SS SS XXXXX XX X X XXXXXXXXXXXXXXXXXXXXX X X X X X X X X XX X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X XXX X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXX EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EX I S T I N G B U I L D I N G EX. 24" RCP 27 27 2 7 2 7 28 28 28 28 27 28 27 2828 28 28 28 28 2 8 27 2 8 27 2 7 27 26 2 7 27 27 28 29 30 29 28 2627 27 26 30292827 2 7 2 6 25 24 23 22 23 24 25 26 27 30 25 27 27 2 6 23 24 25 27 26 26 25 24 2425 26 27 28 26 28 28 27 25 25 24 28 26 30 29 27 24 24 24 24 24 F.H. 27 26 28 28 27 LANDS N/F COLEMAN, MARTIN H PIN: R01100-008-003-001 TRACT 2 DEED REF. 1415-957 ZONING - R-15 LANDS N/F COLEMAN, MARTIN H PIN: R01100-008-003-001 TRACT 1 DEED REF. 1415-957 ZONING - R-15 LANDS N/F WILLIAMS, JAMES S III PIN: R01100-008-003-003 DEED REF. 6042-1557 ZONING - R-15 LANDS N/F WILLIAMS, JAMES S JR. PIN: R01100-008-003-000 DEED REF. 1415-628 ZONING - R-15 LANDS N/F STATE OF NORTH CAROLINA PIN: R01100-008-001-000 DEED REF. 2618-0149 ZONING - B-2 GLAZIER ROAD 60' PUBLIC RIGHT-OF-WAY S.R . 1 3 1 8 , 6 0 ' P U B L I C R I G H T O F W A Y BL U E C L A Y R O A D TRANSFORMATION LANE 30' PRIVATE ACCESS & UTILITY EASEMENT 15' DRAINAGE EASEMENT 60' UTILITY AND ACCESS EASEMENT, M.B. 37 PG 343 25' SETBACK 20' SETBACK 20 ' D R A I N A G E EA S E M E N T 60 ' 30' 30' UTILITY AND ACCESS EASEMENT, M.B. 37 PG 343 15' DRAINAGE EASEMENT BENCH MARK NAIL SET ELEV.: 27.56'BENCH MARK NAIL SET ELEV.: 24.84' BENCH MARK NAIL SET ELEV.: 28.00' F.H. W.M.W.M. W.M. W.M.W.V. B.F.P. W.V. W.V. W.M. W.M. T 20 ' D R A I N A G E EA S E M E N T 30' PRIVATE ACCESS AND UTILITY EASEMENT 2,740 SF.3,266 SF. 5,407 SF. 3,562 SF. PAWS4PEOPLE DOG TRAINING CENTER ASSISTANCE 06/25/2024 2022290.01 C-101 1" = 50' A E R N C G H I I N T E E E C R T I U N G R E North Carolina Dover 302.734.7950 Salisbury 410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600 Wilmington Newark 302.369.3700 980.270.9100 Charlotte 919.243.1332 Raleigh NC License #: C-4743 .PDF J.P.G.THMS EXISTING CONDITIONS PLAN . . ... . F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Apr 01, 2025 - 4:38pm 2025-04-01 DRAWN BY: DATE: PROJECT NO.: COPYRIGHT 2023 MARK DATE DESCRIPTION ISSUE BLOCK PROJECT TITLE SHEET TITLE SCALE: SHEET PROJ. MGR.: [MP] C-101LAYER STATE: 0 SCALE: 1" = 50' 25 50 100 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x36 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 N . VICINITY MAP SCALE: 1" = 2000' PAWS4PEOPLE MASTER PLAN. NEW HANOVER COUNTY, NC N SITE BL U E C L A Y R D . GLAZIER RD. BROOKDALE DR. 5000 TRANSFORMATION LANE CASTLE HAYNE NEW HANOVER COUNTY, NC OE OE OE OE OE 2, 0 0 0 S . F . PR O P O S E D BU I L D I N G 8 6 6 STORMWATER MANAGEMENT AREA 2,000 S.F. PROPOSED BUILDING 10 77 12 7 7, 0 0 0 S . F . PR O P O S E D B U I L D I N G XXXXX XX X X XXXXXXXXXXXXXXXXXXXXX X X X X X X X X XX X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X XXX X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXX EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EXISTING BUILDING EX I S T I N G B U I L D I N G NHC LAND USE: KENNEL NHC LAND USE: LIVE/WORK NHC LAND USE: VOCATIONAL OR TRADE SCHOOL NHC LAND USE: LODGING NHC LAND USE: KENNEL NHC LAND USE: KENNEL NHC LAND USE: LIVE/WORK NHC LAND USE: OFFICE FOR PRIVATE BUSINESS AND PROFESSIONAL ACTIVITIES NHC LAND USE: OUTDOOR RECREATION ESTABLISHMENT NHC LAND USE: OUTDOOR RECREATION ESTABLISHMENT EXISTING TREE LINE LANDS N/F COLEMAN, MARTIN H PIN: R01100-008-003-001 TRACT 2 DEED REF. 1415-957 ZONING - R-15 LANDS N/F COLEMAN, MARTIN H PIN: R01100-008-003-001 TRACT 1 DEED REF. 1415-957 ZONING - R-15 LANDS N/F WILLIAMS, JAMES S III PIN: R01100-008-003-003 DEED REF. 6042-1557 ZONING - R-15 LANDS N/F WILLIAMS, JAMES S JR. PIN: R01100-008-003-000 DEED REF. 1415-628 ZONING - R-15 LANDS N/F STATE OF NORTH CAROLINA PIN: R01100-008-001-000 DEED REF. 2618-0149 ZONING - B-2 GLAZIER ROAD 60' PUBLIC RIGHT-OF-WAY S.R . 1 3 1 8 , 6 0 ' P U B L I C R I G H T O F W A Y BL U E C L A Y R O A D TRANSFORMATION LANE 30' PRIVATE ACCESS & UTILITY EASEMENT 15' DRAINAGE EASEMENT 60' UTILITY AND ACCESS EASEMENT, M.B. 37 PG 343 25' SETBACK 20' SETBACK 20 ' D R A I N A G E EA S E M E N T 60 ' 30' 30' UTILITY AND ACCESS EASEMENT, M.B. 37 PG 343 15' DRAINAGE EASEMENT 9' 18 ' 8' 18 ' 9' 18' 9' 18' 9' 18'8' 8'8' 21' 12.6' 21' 22'22' 22 ' 22 ' 22'STORMWATER MANAGEMENT AREA PROJECT PARCEL B PROJECT PARCEL A 20 ' D R A I N A G E EA S E M E N T 30' PRIVATE ACCESS AND UTILITY EASEMENT 2,740 SF.3,266 SF. 5,407 SF. 3,562 SF. PROPOSED TREE LINE PAWS4PEOPLE DOG TRAINING CENTER ASSISTANCE 06/25/2024 2022290.01 C-201 1" = 50' A E R N C G H I I N T E E E C R T I U N G R E North Carolina Dover 302.734.7950 Salisbury 410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600 Wilmington Newark 302.369.3700 980.270.9100 Charlotte 919.243.1332 Raleigh NC License #: C-4743 .PDF J.P.G.THMS SITE PLAN . . . ... . F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Apr 01, 2025 - 4:39pm 2025-04-01 DRAWN BY: DATE: PROJECT NO.: COPYRIGHT 2023 MARK DATE DESCRIPTION ISSUE BLOCK PROJECT TITLE SHEET TITLE SCALE: SHEET PROJ. MGR.: [MP] C-201LAYER STATE: 0 SCALE: 1" = 50' 25 50 100 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x36 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24 x 3 6 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 THE USES LISTED PER BUILDING ARE REPRESENTAITVE OF THE MAIN USE OF EACH BUILDING. THE BUILDINGS ARE NOT 1. MASTER PLAN LAND USE NOTES: RESTRICTED TO ONLY THE LISTS DOCUMENTED ON THIS SHEET. ANY ALLOWABLE LAND USE PER THE MASTER PLAN DEVELOPMENT'S TERM AND CONDITION DOCUMENT SHALL BE ALLOWABLE WITHIN THE PD ZONING DISTRICT. N . VICINITY MAP SCALE: 1" = 2000' PAWS4PEOPLE MASTER PLAN. NEW HANOVER COUNTY, NC N SITE BL U E C L A Y R D . GLAZIER RD. BROOKDALE DR. VICINITY MAP SCALE: 1" = 2000' PAWS4PEOPLE MASTER PLAN. NEW HANOVER COUNTY, NC N SITE BL U E C L A Y R D . GLAZIER RD. BROOKDALE DR. VICINITY MAP SCALE: 1" = 2000' PAWS4PEOPLE MASTER PLAN. NEW HANOVER COUNTY, NC N SITE BL U E C L A Y R D . GLAZIER RD. BROOKDALE DR. 5000 TRANSFORMATION LANE CASTLE HAYNE NEW HANOVER COUNTY, NC 14 Appendix B NEIGHBORHOOD MEETING DOCUMENTS paws4people Foundation Castle Hayne, NC 15 Exhibit A LIST OF NOTIFIED ADJACENT PROPERTY OWNERS paws4people Foundation – Community Meeting Castle Hayne, NC Community Meeting - Paws4People Count 41 Owner Owner_Address Owner_City BERMAN JOHN J ETAL 3717 SAINT JOHNS CT UNIT B WILMINGTON, NC 28403 BORDEAUX RUSELL C SHANDA W 5449 BLUE CLAY RD CASTLE HAYNE, NC 28429 BRAUNFELD REINARIA 5320 BLUE CLAY RD CASTLE HAYNE, NC 28429 COLE DIANE M 5336 BLUE CLAY RD CASTLE HAYNE, NC 28429 COLEMAN MARTIN H 5401 BLUE CLAY RD CASTLE HAYNE, NC 28429 ESPINOSA MIGUEL A AMELIA H CHAVEZ 5006 GLAZIER RD CASTLE HAYNE, NC 28429 FOGELMAN ANGELIA DAWN 5328 BLUE CLAY RD CASTLE HAYNE, NC 28429 FOXBOWER JERRY GRANT LINDA L 5325 RIDGEWOOD HEIGHTS DR WILMINGTON, NC 28403 FRENSON DIANE MARIE 5336 BLUE CLAY RD CASTLE HAYNE, NC 28429 GEORGE AHARON 5324 BLUE CLAY RD CASTLE HAYNE, NC 28429 GONZALEZ LUIS F ET UX 719 MIDDLE SOUND LOOP RD WILMINGTON, NC 28411 GRAHAM MERLE BRENDA T 5332 BLUE CLAY RD CASTLE HAYNE, NC 28429 IANNICELLI STEVEN REBECCA 21 AUSTIN DR EDGEWATER, MD 21037 JONES PAUL ETAL PO BOX 12986 WILMINGTON, NC 28405 KEITH MICHAEL E TONYA R 5331 BLUE CLAY RD CASTLE HAYNE, NC 28429 LEWIS GEORGE F JR 4410 PARK AVE WILMINGTON, NC 28403 MEARES CATHERINE D 405 HERMITAGE DR CASTLE HAYNE, NC 28429 NC STATE OF 1321 MAIL SERVICE CTR RALEIGH, NC 27699 PARKER SHERRI P 5400 BLUE CLAY RD CASTLE HAYNE, NC 28429 PAWS4PEOPLE INC 1121 MILITARY CUTOFF RD SUITE C-324 WILMINGTON, NC 28405 PELMEAR ANGELA D ET VIR 5316 BLUE CLAY RD CASTLE HAYNE, NC 28429 PENSCO TRUST CO CUSTODIAN PO BOX 981012 BOSTON, MA 2298 POLIZZI LUCILLE D ETAL 5324 BLUE CLAY RD CASTLE HAYNE, NC 28429 PROSPER GUY W JR ELIZABETH D 5305 SUNRAY RD CASTLE HAYNE, NC 28429 SAUNDERS JERRY R 5301 BLUE CLAY RD CASTLE HAYNE, NC 28429 SAUNDERS JERRY RAY BETTY R 5301 BLUE CLAY RD CASTLE HAYNE, NC 28429 SHARPE JOHN ROYCE PO BOX 283 CASTLE HAYNE, NC 28429 STRICKLAND KAYLA A 5304 BLUE CLAY RD CASTLE HAYNE, NC 28429 TDF PROPERTIES 118 CARDINAL DR N SUITE 103 WILMINGTON, NC 28405 THORPE WOODUS E JR PO BOX 1054 BURGAW, NC 28425 TUCKER TWILA T 3224 COLLEGE RD N 121 WILMINGTON, NC 28405 WATKINS BENJAMIN D 5309 BLUE CLAY RD CASTLE HAYNE, NC 28429 WATKINS BENJAMIN DARIN 5309 BLUE CLAY RD CASTLE HAYNE, NC 28429 WATKINS CRAIG ALLEN 4809 BLUE CLAY RD CASTLE HAYNE, NC 28429 WATKINS MYRTLE M 5300 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES III REV LIV TR 5441 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES S III 5441 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES S JR GEORGIA 5433 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES S JR GEORGIA W 5433 BLUE CLAY RD CASTLE HAYNE, NC 28429 WRIGHT JO Z 510 HERMITAGE DR CASTLE HAYNE, NC 28429 ZACHRY BETTY JO 510 HERMITAGE DR CASTLE HAYNE, NC 28429 16 Exhibit B NOTICE GIVEN TO ADJACENT PROPERTY OWNERS paws4people Foundation – Community Meeting Castle Hayne, NC Assistance Dogs transforming lives. 1121C-324 Military Cutoff Road, Wilmington NC 28405-3641 | paws4people.org | 888.762.PAWS paws4people, Inc. is a Virginia Nonstock Corporation and a 501(c)(3) Public Charity (EIN: 54-1948479) operating under the registered dbas: paws4people foundation, paws4vets, and paws4prisons. March 11, 2025 To Whom It May Concern: This is a notice for a community information meeting for an upcoming request by Danielle Cockerham, on behalf of paws4people® Inc., property owner, for a Mixed-Use Rezoning from current zoning district R-15 (Residential) to PD (Planned Use Development) for the addition of a building utilized as training space for Service Dogs and their recipients who may be Military Veterans, Children, Sexual Trauma Survivors, and more. The subject property is approximately 11 acres and is located at 5000 Transformation Lane and is identified as PID R01100-008-016-000 and R01100-008-039-000. The purpose of the community information meeting is to explain the proposal and answer questions from meeting attendees. This meeting will be held at 5103 Transformation Lane and begin at 5:30pm on Tuesday March 25th. For directions or further information, please contact Danielle Cockerham at 888.762.PAWS or danielle@paws4people.org A one pager informational flyer on paws4people is attached as a page two to this mailer. Thank you for your time, Danielle Cockerham, on behalf of paws4people® Inc. Deputy Executive Director, Operations & IT 888.762.PAWS danielle@paws4people.org 17 Exhibit C LIST OF ADJACNET PROPERTY OWNER ATTENDEES paws4people Foundation – Community Meeting Castle Hayne, NC Community Meeting - Paws4People Count 41 Owner Owner_Address Owner_City BERMAN JOHN J ETAL 3717 SAINT JOHNS CT UNIT B WILMINGTON, NC 28403 BORDEAUX RUSELL C SHANDA W 5449 BLUE CLAY RD CASTLE HAYNE, NC 28429 BRAUNFELD REINARIA 5320 BLUE CLAY RD CASTLE HAYNE, NC 28429 COLE DIANE M 5336 BLUE CLAY RD CASTLE HAYNE, NC 28429 COLEMAN MARTIN H 5401 BLUE CLAY RD CASTLE HAYNE, NC 28429 ESPINOSA MIGUEL A AMELIA H CHAVEZ 5006 GLAZIER RD CASTLE HAYNE, NC 28429 FOGELMAN ANGELIA DAWN 5328 BLUE CLAY RD CASTLE HAYNE, NC 28429 FOXBOWER JERRY GRANT LINDA L 5325 RIDGEWOOD HEIGHTS DR WILMINGTON, NC 28403 FRENSON DIANE MARIE 5336 BLUE CLAY RD CASTLE HAYNE, NC 28429 GEORGE AHARON 5324 BLUE CLAY RD CASTLE HAYNE, NC 28429 GONZALEZ LUIS F ET UX 719 MIDDLE SOUND LOOP RD WILMINGTON, NC 28411 GRAHAM MERLE BRENDA T 5332 BLUE CLAY RD CASTLE HAYNE, NC 28429 IANNICELLI STEVEN REBECCA 21 AUSTIN DR EDGEWATER, MD 21037 JONES PAUL ETAL PO BOX 12986 WILMINGTON, NC 28405 KEITH MICHAEL E TONYA R 5331 BLUE CLAY RD CASTLE HAYNE, NC 28429 LEWIS GEORGE F JR 4410 PARK AVE WILMINGTON, NC 28403 MEARES CATHERINE D 405 HERMITAGE DR CASTLE HAYNE, NC 28429 NC STATE OF 1321 MAIL SERVICE CTR RALEIGH, NC 27699 PARKER SHERRI P 5400 BLUE CLAY RD CASTLE HAYNE, NC 28429 PAWS4PEOPLE INC 1121 MILITARY CUTOFF RD SUITE C-324 WILMINGTON, NC 28405 PELMEAR ANGELA D ET VIR 5316 BLUE CLAY RD CASTLE HAYNE, NC 28429 PENSCO TRUST CO CUSTODIAN PO BOX 981012 BOSTON, MA 2298 POLIZZI LUCILLE D ETAL 5324 BLUE CLAY RD CASTLE HAYNE, NC 28429 PROSPER GUY W JR ELIZABETH D 5305 SUNRAY RD CASTLE HAYNE, NC 28429 SAUNDERS JERRY R 5301 BLUE CLAY RD CASTLE HAYNE, NC 28429 SAUNDERS JERRY RAY BETTY R 5301 BLUE CLAY RD CASTLE HAYNE, NC 28429 SHARPE JOHN ROYCE PO BOX 283 CASTLE HAYNE, NC 28429 STRICKLAND KAYLA A 5304 BLUE CLAY RD CASTLE HAYNE, NC 28429 TDF PROPERTIES 118 CARDINAL DR N SUITE 103 WILMINGTON, NC 28405 THORPE WOODUS E JR PO BOX 1054 BURGAW, NC 28425 TUCKER TWILA T 3224 COLLEGE RD N 121 WILMINGTON, NC 28405 WATKINS BENJAMIN D 5309 BLUE CLAY RD CASTLE HAYNE, NC 28429 WATKINS BENJAMIN DARIN 5309 BLUE CLAY RD CASTLE HAYNE, NC 28429 WATKINS CRAIG ALLEN 4809 BLUE CLAY RD CASTLE HAYNE, NC 28429 WATKINS MYRTLE M 5300 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES III REV LIV TR 5441 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES S III 5441 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES S JR GEORGIA 5433 BLUE CLAY RD CASTLE HAYNE, NC 28429 WILLIAMS JAMES S JR GEORGIA W 5433 BLUE CLAY RD CASTLE HAYNE, NC 28429 WRIGHT JO Z 510 HERMITAGE DR CASTLE HAYNE, NC 28429 ZACHRY BETTY JO 510 HERMITAGE DR CASTLE HAYNE, NC 28429 WILLIAMS JAMES III REV LIV TR 5441 BLUE CLAY RD 5441 BLUE CLAY RD CASTLE HAYNE, NC 28429 CASTLE HAYNE, NC 28429WILLIAMS JAMES S III - Attendees 2 18 Appendix C PROJECT PARCEL A TITLE & DEED paws4people Foundation Castle Hayne, N 19 Appendix D WETLAND DELINATION REPORT paws4people Foundation Castle Hayne, NC 20 Appendix E FEMA FLOOD MAP paws4people Foundation Castle Hayne, NC National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOOD HAZARD AREAS Without Base Flood Elevation (BFE) Zone A, V, A99 With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areas of 1% annual chance flood with average depth less than one foot or with drainage areas of less than one square mile Zone X Future Conditions 1% Annual Chance Flood Hazard Zone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to Levee Zone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from the authoritative NFHL web services provided by FEMA. This map was exported on 3/3/2025 at 2:56 PM and does not reflect changes or amendments subsequent to this date and time. The NFHL and effective information may change or become superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. 1:6,000 77°52'37"W 34°20'54"N 77°52'W 34°20'25"N Basemap Imagery Source: USGS National Map 2023 21 Appendix F NRCS SOIL MAP paws4people Foundation Castle Hayne, NC Hydrologic Soil Group—New Hanover County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/3/2025 Page 1 of 4 38 0 3 5 0 0 38 0 3 6 0 0 38 0 3 7 0 0 38 0 3 8 0 0 38 0 3 9 0 0 38 0 4 0 0 0 38 0 4 1 0 0 38 0 4 2 0 0 38 0 4 3 0 0 38 0 4 4 0 0 38 0 4 5 0 0 38 0 3 5 0 0 38 0 3 6 0 0 38 0 3 7 0 0 38 0 3 8 0 0 38 0 3 9 0 0 38 0 4 0 0 0 38 0 4 1 0 0 38 0 4 2 0 0 38 0 4 3 0 0 38 0 4 4 0 0 235100 235200 235300 235400 235500 235600 235700 235800 235900 236000 236100 236200 236300 236400 236500 236600 235100 235200 235300 235400 235500 235600 235700 235800 235900 236000 236100 236200 236300 236400 236500 236600 34° 20' 53'' N 77 ° 5 2 ' 4 8 ' ' W 34° 20' 53'' N 77 ° 5 1 ' 4 6 ' ' W 34° 20' 19'' N 77 ° 5 2 ' 4 8 ' ' W 34° 20' 19'' N 77 ° 5 1 ' 4 6 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 350 700 1400 2100 Feet 0 100 200 400 600 Meters Map Scale: 1:7,290 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: New Hanover County, North Carolina Survey Area Data: Version 26, Sep 9, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 8, 2022—Dec 1, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—New Hanover County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/3/2025 Page 2 of 4 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI JO Johnston soils A/D 2.0 0.8% Ke Kenansville fine sand, 0 to 3 percent slopes A 2.6 1.0% Le Leon sand A/D 125.9 48.2% Ls Lynchburg fine sandy loam, 0 to 2 percent slopes, Atlantic Coast Flatwoods B/D 0.0 0.0% Ly Lynn Haven fine sand A/D 15.2 5.8% Mu Murville fine sand A/D 94.3 36.1% Pn Pantego loam B/D 2.2 0.8% Se Seagate fine sand B 13.8 5.3% St Stallings fine sand A/D 5.2 2.0% Totals for Area of Interest 261.3 100.0% Hydrologic Soil Group—New Hanover County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/3/2025 Page 3 of 4 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—New Hanover County, North Carolina Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 3/3/2025 Page 4 of 4 22 Appendix G GEOTECHNICAL REPORT BY TERRACON paws4people Foundation Castle Hayne, NC Report Cover Page Bradie K9 Training Center Geotechnical Engineering Report Cottage View and Lamb’s Path Way , Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Prepared for: Paws4People Foundation 1121C-324 Military Cutoff Road Wilmington, North Carolina 28405 2108 Capital Drive Wilmington, North Carolina 28405 P (910) 478-9915 North Carolina Registered Firm: F-0869 Terracon.com Facilities | Environmental | Geotechnical | Materials Report Cover Letter to Sign September 30, 2024 Paws4People Foundation 1121C-324 Military Cutoff Road Wilmington, North Carolina 28405 Attn: Mr. Terry Henry – Deputy Executive Director Re: Geotechnical Engineering Report Bradie K9 Training Center Cottage View and Lamb’s Path Way Castle Hayne, North Carolina Terracon Project No. K6245072 Dear Mr. Henry: We have completed the scope of Geotechnical Engineering services for the above referenced project in general accordance with Terracon Proposal No. PK6245072 R1 dated August 22, 2024 . This report presents the findings of the subsurface exploration and provides geotechnical recommendations concerning earthwork and the design and construction of foundations , floor slabs, pavements, and stormwater control measures (SCMs) for the proposed project. We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us. Sincerely, Terracon Michael P. Delaney, P.E. Tom Schipporeit, P.E., BC.GE Senior Staff Engineer Senior Geotechnical Engineer Registered, NC 056487 09/30/2024 Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials i Table of Contents Introduction .................................................................................................... 1 Project Description .......................................................................................... 2 Site Conditions ................................................................................................ 3 Geotechnical Characterization ......................................................................... 3 Seismic Considerations .................................................................................... 5 Geotechnical Overview .................................................................................... 6 Earthwork ....................................................................................................... 7 Shallow Foundations ..................................................................................... 14 Floor Slabs .................................................................................................... 17 Pavements .................................................................................................... 18 Stormwater Control Measures ........................................................................ 19 General Comments ........................................................................................ 20 Figures GeoModel Attachments Exploration and Testing Procedures Site Location and Exploration Plans Exploration and Laboratory Results Supporting Information Note: This report was originally delivered in a web -based format. Blue Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com . Refer to each individual Attachment for a listing of contents. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 1 Introduction This report presents the results of our subsurface exploration and Geotechnical Engineering services performed for the proposed facilities to be located off of Blue Clay Road in Castle Hayne, North Carolina . The purpose of these services was to provide information and geotechnical engineering recommendations relative to: ■ Exploration logs with field and laboratory data ■ Stratification based on visual soil classification and published correlations ■ Groundwater levels observed during and/or after the completion of drilling ■ Site location and exploration plans ■ Subsurface exploration procedures ■ Description of subsurface conditions ■ Recommended foundation options and engineering design parameters for the training facility ■ Estimated settlement of foundations for the training facility ■ Recommendations for design and construction of interior floor slabs for the training facility ■ Seismic site classification ■ Liquefaction potential ■ Earthwork recommendations include site and subgrade preparation ■ Recommended pavement options and design parameters for the training facility pavements ■ Stormwater management considerations ■ Preliminary foundation and earthwork recommendations for the future buildings and associated pavements The geotechnical engineering Scope of Services for this project included the advancement of electronic Cone Penetrometer Test (CPT) soundings and soil sampling via solid-stem auger , laboratory testing, engineering analysis, and preparation of this report. Drawings showing the site and exploration locations are shown on the Site Location and Exploration Plan , respectively. The results of the laboratory testing performed on soil samples obtained from the site during our field exploration are included on the exploration logs and as separate graphs in the Exploration and Laboratory Results section. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 2 Project Description Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows: Item Description Information Provided Project information was obtained via email correspondence on August 9, 2024, and telephone communication on August 12, 2024. The following attachments were provided to Terracon: ■ 2022290.01 -SOILBORING -C3D21-NC-SOIL BORING.pdf ■ Composite Aerial -SITE SURVEY.pdf Additional project team communication occurred throughout the duration of the project. Project Description Plans for the project include the construction of a new dog training facility with associated parking and drives. Two additional buildings on the east and west sides of the site will be constructed in the future. Proposed Structure s ■ Training Facility: Single-story, approximately 7,000 square-foot building ■ Future buildings: Single -story, approximately 2,000 square-feet Building Construction Anticipated to be metal - or wood-framed with slab-on-grade Finished Floor Elevation Not provided, assumed to be within 2 feet of existing grade Maximum Loads In the absence of information provided by the design team, we have assumed the following loads in estimating settlement based on our experience with similar projects. ■ Columns: Up to 50 kips ■ Walls: Up to 2 kips per linear foot (klf) ■ Slabs: Up to 100 pounds per square foot Grading/Slopes Less than 2 feet of cut or fill is anticipated to develop final grade, excluding remedial grading requirements. Less than 5 feet of cut will be required for the proposed Stormwater Control Measures (SCMs). Pavements We assume primarily flexible (asphalt) pavement sections will be constructed. Other Structures None Building Code 2018 or 2024 North Carolina State Building Code Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 3 Terracon should be notified if any of the above information is inconsistent with the planned construction, especially the grading limits, as modifications to our recommendations may be necessary. Site Conditions The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps. Item Description Parcel Information The project is located along Lamb’s Path Was in Castle Hayne, North Carolina. The site spans approximately 11 acres over 2 parcels. New Hanover County Parcel Identification No s. (PIDs): ■ R01100 -008-016-000 ■ R01100 -008-039-000 Approximate coordinates: ■ 34° 20' 39.56" N, 77° 52' 20.57" W See Site Location Existing Improvements The site is located on the western portion of the Paws4People campus. An existing sand volleyball court and parking lot are present in the proposed construction area for the training facility. Current Ground Cover Asphalt, sand, grass, wooded areas Existing Topography Based on the provided topographic survey, the site is relatively flat with elevations ranging from 25 feet to 27 feet MSL. Drainage ditches approximately 2 to 3 feet deep are located to the north and west of the proposed training facility building area. Geotechnical Characterization Geologic Setting The project site is located within the Atlantic Coastal Plain physiographic province. Bedrock of the Late Mesozoic age is present at depths of greater than 1,000 ft, and is overlain by Lower and Upper Cretaceous, Tertiary, Pleistocene and Recent Sediments. The Coastal Plain soils consist mainly of marine sediments that were deposited during Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 4 successive periods of fluctuating sea level and moving shoreline. The soils include sands, silts, and clays with irregular deposits of shells, which are typical of those lain down in a shallow sloping sea bottom. Recent alluvial sands, silts, and clays are typically present near rivers and creeks. According to USGS Mineral Resources On -Line Spatial Data based on the 1998 digital equivalent of the 1985 Geologic Map of North Carolina, the Castle Hayne Formation (Tertiary) underlies the site , and is estimated to be 20 feet thick, occurring between elevations of 0 feet and 10 feet MSL based on published geologic information . The Castle Hayne Formation varies lithologically, consisting of shell, marl, sand, and limestone. Soil Profile We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. This characterization, termed GeoModel, forms the basis o f our geotechnical calculations and evaluation of the site. Conditions observed at each exploration point are indicated on the individual logs. The individual logs can be found in the Exploration and Laboratory Results and the GeoModel can be found in the Figures attachment of this report. As part of our analyses, we identified the following model layers within the subsurface profile. For a more detailed view of the model layer depths at each boring location, refer to the GeoModel. Surficial materials (topsoil, asphalt, etc.) are not included in the GeoModel. Model Layer Layer Name General Description 1 Existing Fill Poorly graded sand 2 Loose to Medium Dense Sand Sand with varying amounts of silt and clay 3 Very Soft Clay and Very Loose Clayey Sand Sandy clay and clayey sand, varying amounts of silt and organics, sand lenses at varying depths 4 Very Loose to Loose Sand Sand with varying amounts of silt and clay, clay lenses at varying depths 5 Castle Hayne Formation CPT Refusal on Very Dense Sand and/or Limestone Topsoil thicknesses ranged from 4 inches to 8 inches at the CPT locations. However, based on our experience with construction on similar sites, rootmat in wooded areas likely extends down through the topsoil into the underlying soils to an average depth of approximately 12 inches to 18 inches. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 5 Groundwater Conditions Groundwater was measured at depths ranging from 1 foot to 3 feet below the existing ground surface during the field exploration. Groundwater conditions may be different at the time of construction. The Stormwater Soil Evaluations Report (within Supporting Information ) prepared by Terrain Environmental Consulting shows the seasonal -high water levels as determined by a soil scientist licensed in the State of North Carolina. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the soundings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the explorati on logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project . Seismic Considerations Seismic Site Classification The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure. The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE 7 and the International Building Code (IBC). Based on the soil properties observed at the site and as described on the exploration logs and results, our professional opinion is for that a Seismic Site Classification of D be considered for the project. Subsurface explorations at this site were extended to a maximum depth of 18.4 feet. The site properties below the exploration depth to 100 feet were estimated based on our experience and knowledge of geologic conditions of the general area. Liquefaction Liquefaction occurs when a rapid buildup in water pressure, caused by ground motion, pushes sand particles apart, resulting in a loss of strength and later densification as the water pressure dissipates. This loss of strength can cause bearing capacity fai lure while the densification of liquefied layers after the earthquake can cause excessive settlement of the ground surface and structures. The liquefaction potential of a site depends on the design earthquake’s peak ground acceleration, which depends on the design earthquake’s magnitude and the distance Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 6 from the site to the design seismic event. The liquefaction potential also depends on the presence of granular soils below the water table, the relative densities of the granular soils, the percent fines of the soils, and the geologic ages of the soil dep osits. The amount of ground surface settlement is dependent on the initial relative densities of the soils which liquefy due to the earthquake. Based on the relatively mild ground motions associated with the design earthquake as indicated by the ASCE 7 -22 Hazard Tool , the potential for liquefaction is negligible at this site. Geotechnical Overview Based upon the geotechnical conditions observed in the CPT soundings, the site generally appears suitable for the proposed construction, provided that the recommendations given herein are implemented in the design and construction phases of this project. Our earthwork recommendations include rolling the subgrade and remediation of soils that are not improved. Once the site has been prepared as discussed herein, the proposed structures may be supported on conventional shallow foundations. Effective drainage should be completed early in the construction sequence and maintained throughout the life of the proposed development to avoid potential issues associated with a wet subgrade . If possible, the grading should be performed during the warmer and drier times of the year. If grading is performed during the winter months, an increased risk for possible undercutting and replacement of unstable subgrade will persist. Further details are provided in the Earthwork section of this report. Proposed grading information was not available at the time of this report. Permanent dewatering (such as French drains or blanket drains) could be required for foundations, slabs, or pavements that bear at or near existing grade. Raising grades in the proposed building and pavement footprints could eliminate the need for permanent dewatering by promoting drainage and creating vertical separation between finished elevations and groundwater/soft soils. However, greater fills have potential to induce excessive settlement on the underlying soils. A settlement monitoring program should be implemented in areas proposed to receive more than 3 feet of structural fill. The recommendations contained in this report are based upon the results of field and laboratory testing (presented in the Exploration and Laboratory Results ), engineering analyses, and our current understanding of the proposed project. The General Comments section provides an understanding of the report limitations . Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 7 Earthwork Earthwork is anticipated to include demolition, clearing and grubbing, excavations, and engineered fill placement. The following sections provide recommendations for use in the preparation of specifications for the work. Recommendations include critical quality criteria, as necess ary, to render the site in the state considered in our geotechnical engineering evaluation for foundations, floor slabs, and pavements. Existing Fill As noted in Geotechnical Characterization , B-04 and B-04A encountered existing fill to a depth of 3 feet. We have no records to indicate the degree of control used when the existing fill was placed, and consequently the fill is undocumented. Existing fill could be present in other areas of the site based on the existing site improvements. For planning purposes, the existing fill should be excavated and replaced with structural fill. Test pits could be excavated in areas of existing fill to further evaluate it and evaluate risk if the existing fill is not completely excavated and replaced. If the owner elects to construct the buildings and pavements on the existing fill to reduce initial construction costs in exchange for increased potential longer-term distress, the following protocol should be followed. Once the planned subgrade elevation has been reached in cut areas and prior to fill placement in fill areas , the construction areas should be proofrolled with heavy rubber tire construction equipment to aid in delineating areas of loose, soft, or otherwise unsuitable soil. The contractor could also excavate test pits in the existing fill to evaluate it for debris and other unsuitable materials. Areas of very soft to soft soil, very loose to loose soil, debris, or unsuitable material should be undercut and replaced with structural fill. However, even with the recommended construction procedures, inherent risk exists for the owner that compressible fill or unsuitable material, within or buried by the fill , will not be discovered. This risk of unforeseen conditions cannot be eliminated without completely removing the existing fill but can be reduced by following the recommendations contained in this report. Demolition Site preparation should begin with the demolition of the existing structures/pavements and debris removal. As part of the demolition, buried utilities and/or concrete foundations should also be removed. Existing utilities that are to be abandoned should be removed or filled with grout. The excavations resulting from foundation and utility removal should be properly backfilled with compacted structural fill as described in the following subsections. Utilities that are to remain in service should be accuratel y located horizontally and vertically to minimize conflict with new foundation construction. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 8 Site Preparation Prior to placing fill, existing vegetation, topsoil, and root mats should be removed. Complete stripping of the topsoil should be performed in the proposed building and parking/driveway areas. Mature trees are located within or near the footprint of some of the proposed buildings, which will require removal at the onset of construction. Tree root systems can remove substantial moisture from surrounding soils. Where trees are removed, the full ro ot ball and all associated dry and desiccated soils should be removed. The soil materials which contain less than 5 percent organics can be reused as engineered fill provided the material is moisture conditioned and properly compacted. Although no evidence of underground facilities (such as septic tanks, cesspools, basements, and utilities) was observed during the exploration and site reconnaissance, such features could be encountered during construction. If unexpected fills or underground facilities are encountered, such features should be removed, and the excavation thoroughly cleaned prior to backfill placement and/or construction. Subgrade Preparation After stripping and removing topsoil and once any areas of cut have been excavated to proposed subgrade elevation, the exposed subgrade soils in the building and pavement footprints should be densified in place using a medium weight vibratory roller. The purpose of the vibratory rolling is to densify the exposed subgrade soils for floor slab and pavement support and to potentially improve the foundation bearing soils. The roller should make at least six passes across the site, with the second set of three p asses perpendicular to the first set of three passes with intermittent vibration activated. If water is brought to the surface by the vibratory rolling, the operation should be discontinued until the water subsides. Vibratory rolling should be completed during dry weather. Static rolling and additional repairs should be anticipated for areas too wet for vibratory rolling. After the vibratory rolling, pore pressures should be allowed to dissipate . After the waiting period , proofrolling should be performed on the exposed subgrade soils in areas to receive fill or at the subgrade elevation with a loaded, tandem -axle dump truck (15 to 20 ton total vehicle weight) or similar rubber -tired construction equipment. Proofrolling is recommended as a means of detecting areas of soft or unstable subgrade soils. The proofrolling should be performed during a perio d of dry weather to avoid degrading an otherwise suitable subgrade. The proofrolling operations should be observed by a representative of the geotechnical engineer. Subgrade soils that exhibit excessive rutting or deflection during proofrolling should be r epaired as directed by the field representative. Typical repairs include overexcavation followed by replacement with Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 9 either properly compacted fill or by a subgrade stabilization fabric in conjunction with a sand fill or crushed stone. If subgrade soils are unsuitable, they will require removal and replacement; however, if they are unstable due to excessive moisture, the most economical solution for remediation may be to scarify, dry and recompact the material. This remediation is most effective during the typically hotter months of the year (May to October). If construction is performed during the cooler period of the year, the timeline for scarifying, drying, and recompacting typically increases considerably and may lead to alternative remediation solutions. These solutions can include overexcavation of some or all of the unstable material to be backfilled with either approved structural fill or geotextile and ABC Stone. Potential undercutting can be reduced if the site preparation work is performed during a period of dry weather and if construction traffic is kept to a minimum on prepared subgrades. Excavation Considerations We anticipate that excavations for the proposed construction can generally be accomplished with conventional earthmoving equipment. Excavation Safety: As a minimum, excavations should be performed in accordance with OSHA 29 CFR, Part 1926, Subpart P, “Excavations” and its appendices, and in accordance with any applicable local and/or state regulations. Excavations or other activities resulting in ground disturbance have the potential to affect nearby structures , pavements, and utilities . Our scope of services does not include review of available final grading information or consider potential temporary grading performed by the contractor for potential effects such as ground movement beyond the project limits. A preconstruction/ precondit ion survey should be conducted to document nearby property/infrastructure prior to any site development activity. Excava tion or ground disturbance activities should be monitored or instrumented for potential ground movements that could negatively affect nearby structures, pavements, and utilities . E xcavation should not be conducted below a downward 1:1 projection from existing foundations without engineering review of shoring requirements and geotechnical observation during construction. Construction site safety is the sole responsibility of the contractor who controls the means, methods, and sequencing of construction operations. Under no circumstances shall the information provided herein be interpreted to mean Terracon is assuming responsibility for construction site safety or the contractor's activities; such responsibility shall neither be implied nor inferred. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 10 Construction Dewatering: Typical temporary dewatering measures used in the project area consist of temporary ditches, sump excavations, sump pumps, well points, wells, and/or sheetpile cutoff walls. The groundwater table could affect excavation efforts, especially for overexcavation and replacement of lower strength soils , if needed. A temporary dewatering system consisting of sumps with pumps may be necessary to achieve the recommended depth of excavation depending on groundwater conditions at the time of construction. Backfill consisting of clean gravel (such as AASHTO Size No. 57 stone) wrapped in geotextile fabric is often most suitable for undercut depths exceeding that of the water table. The responsibility for dewatering of construction excavations and preventing excessive damage of existing and new buildings, structures, utilities, and other site improvements due to dewatering should lie solely with the contractor. This information is provided only as a service and under no circumstance should Terracon be assumed to be responsible for the effectiveness of the construction dewatering method(s) selected by the contractor. Permanent Site Dewatering Since design grades are not known at this time, permanent site dewatering of the shallow groundwater in the proposed building and pavement areas may or may not be necessary. Raising site grades in the proposed building and pavement areas above the existing ground surface could eliminate the need for permanent dewatering measures. Once a preliminary grading plan has been prepared, it should be provided to Terracon for review and comment regarding the need for permanent dewatering of the shallow groundwater at the site. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 11 Fill Material Types Fill required to achieve design grade should be classified as structural fill and general fill. Structural fill is material used below or within 10 feet of structures, pavements , site retaining walls, stormwater control measures, or constructed slopes. General fill is material used to achieve grade outside of these areas. Material property requirements for on -site soil for use as general fill and structural fill are noted in the table below: Property General Fill Structural Fill Composition Free of deleterious material Free of deleterious material Maximum particle size 6 inches (or 2/3 of the lift thickness) 3 inches Fines content Not limited 50 percent Plasticity Not limited Maximum liquid limit of 50 Maximum plasticity index of 20 Earthen materials used for structural or general fill should meet the following material property requirements: Soil Type1 USCS Classification Acceptable Location for Placement Imported Soil GW, GP, GM, GC, SM, SP, SP-SM, SP-SC, SC-SM All locations and elevations On-Site Soils SP, SP-SM, SM (LL<50 or PI<20) All locations and elevations 1. Structural fill should consist of approved materials free of organic matter and debris. Frozen materials should not be used, and fill should not be placed on frozen subgrade. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation prior to use on this site. 2. Reuse of clayey sand (SC) material could lead to delays in construction depending on moisture conditions at the site at that time. 3. Fine -grained soils such as clays and silts should not be reused as structural fill due to their moisture sensitivity when compared to the sandier soils available. 4. Soils excavated during the construction of the proposed SCM may be used as structural fillbut will likely require moisture conditioning (drying). Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 12 Fill Placement and Compaction Requirements Structural and general fill should meet the following compaction requirements. Item Structural Fill General Fill Maximum Lift Thickness 8 inches or less in loose thickness when heavy, self -propelled compaction equipment is used 4 to 6 inches in loose thickness when hand - guided equipment (i.e. trench roller, jumping jack , or plate compactor) is used Same as structural fill Minimum Compaction Requirements 1,2,3 95% of maximum 98% of maximum in upper 1 foot of structural fill 92% of max. Water Content Range 1, 3 Within 3 percent of optimum moisture content As required to achieve min. compaction requirements 1. Fill should be tested for moisture content and compaction during placement. If in -place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the tests should be reworked and retested as required until the specified moisture and compaction requirements are achieved. 2. It is not necessary to achieve 95% compaction on the existing ground prior to placing fill or beginning construction. However, the subgrade should be evaluated by the Geotechnical Engineer prior to placing fill or beginning construction. 3. Maximum density and optimum water content as determined by the standard Proctor test (ASTM D 698). 4. Materials not amenable to density testing should be placed and compacted to a stable condition observed by the Geotechnical Engineer or representative. Pipe Bedding and Trench Backfill Pipe bedding and trench backfill should be in accordance with the applicable public works standard details and specifications for the type of pipe to be supported. (For example, the NCDOT has published standard pipe bedding and backfilling details for flex ible and rigid pipe for normal earth foundation, rock foundation, and unsuitable material foundation conditions.) Backfill materials, placement, and testing should be in accordance with the publics works requirements or the earthwork recommendations given in this report, whichever are more stringent. If open -graded materials, such as No. 78 or No. 57 stone, are used, they should be completely wrapped in a woven geotextile that can be used for both separation and filtration (e.g., Mirafi HP270). Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 13 Subgrade Protection Upon completion of filling and grading, care should be taken to maintain the subgrade water content prior to construction of grade -supported improvements such as floor slabs and pavements. Construction traffic over the completed subgrades should be avoided. The site should also be graded to prevent surface water from ponding on the prepared subgrades or in excavations. Water collecting over or adjacent to construction areas should be removed. If the subgrade freezes, desiccates, saturates, or is disturbed, the affected material should be removed, or the materials should be scarified, moisture conditioned, and recompacted prior to floor slab construction. All grades must provide effective drainage away from the building s during and after construction and should be maintained throughout the life of the structure. Water retained next to the buildings can result in soil movements greater than those discussed in this report. Greater movements can result in unacceptable differential floor slab and/or foundation movements, cracked slabs and walls, and roof leaks. The roof should have gutters/drains with downspouts that discharge onto splash blocks at a distance of at least 10 feet from the building s. Construction Observation and Testing The earthwork efforts should be observed by the Geotechnical Engineer (or others under their direction). Observation should include documentation of adequate removal of surficial materials (vegetation, topsoil, and pavements), evaluation and remediation of existing fill materials, as well as proofrolling and mitigation of unsuitable areas delineated by the proofroll. Each lift of compacted fill should be tested, evaluated, and reworked, as necessary, as recommended by the Geotechnical Engineer prior to placement of additional lifts. Each lift of fill should be tested for density and water content at a frequency of at l east one test for every 2,500 square feet of compacted fill in the building areas and 5,000 square feet in pavement areas. Where not specified by local ordinance, one density and water content test should be performed for every 100 linear feet of compacted utility trench backfill and a minimum of one test performed for every 12 vertical inches of compacted backfill . In areas of foundation excavations, the bearing subgrade should be evaluated by the Geotechnical Engineer. The bottom of footings should be checked with hand augers and Dynamic Cone Penetrometer (DCP) testing that extend through any new or existing fill material. If unanticipated conditions are observed, the Geotechnical Engineer should prescribe mitigation options. In addition to the documentation of the essential parameters necessary for construction, the continuation of the Geotechnical Engineer into the construction phase of the project Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 14 provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes. Shallow Foundations If the site has been prepared in accordance with the requirements noted in Earthwork, the following design parameters are applicable for shallow foundations for the proposed training facility . Design Parameters – Compressive Loads Item Description Maximum Net Allowable Bearing Pressure 1, 2 2,000 psf Required Bearing Stratum 3 Approved existing soils or structural fill Minimum Foundation Dimensions Per NC Building Code: Columns: 24 inches Continuous: 16 inches Sliding Resistance 4 0.35 ultimate coefficient of friction - granular material Minimum Embedment below Finished Grade 5 12 inches Estimated Total Settlement from Structural Loads 2 Less than about 1 inch Estimated Differential Settlement 2, 6 About 1/2 of total settlement 1. The maximum net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation. Values assume that exterior grades are no steeper than 20% within 10 feet of structure. The allowable bearing pressure can be increased by ⅓ for use with the alternative load combinations given in Section 1605.3.2 of the 2018 North Carolina Building Code. Please note, however, that additional foundation settlement will occur under these load combinations. 2. Values provided are for maximum loads noted in Project Description. Additional geotechnical consultation will be necessary if higher loads are anticipated. 3. Unsuitable or soft soils should be overexcavated and replaced per the recommendations presented in Earthwork. 4. Can be used to compute sliding resistance where foundations are placed on suitable soil/materials. Frictional resistance for granular materials is dependent on the bearing pressure which may vary due to load combinations. For fine -grained materials, latera l resistance using cohesion should not exceed ½ the dead load. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 15 Item Description 5. Embedment necessary to minimize the effects of frost and to achieve recommended allowable bearing pressure with a factor of safety of at least 2.5. For sloping ground, maintain depth below the lowest adjacent exterior grade within 5 horizontal feet of the structure. 6. Differential settlements are noted for equivalent -loaded foundations and bearing elevation as measured over a span of 50 feet. Design Parameters – Overturning and Uplift Loads Shallow foundations subjected to overturning loads should be proportioned such that the resultant eccentricity is maintained in the center -third of the foundation (e.g., e < b/6, where b is the foundation width). This requirement is intended to keep the en tire foundation area in compression during the extreme lateral/overturning load event. Foundation oversizing may be required to satisfy this condition. Uplift resistance of spread footings can be developed from the effective weight of the footing and the overlying soils with consideration to the IBC basic load combinations. Foundation Construction Considerations The foundation bearing materials should be evaluated at the time of the foundation excavation. This is an essential part of the construction process. A representative of the geotechnical engineer should use a combination of hand auger borings and dynamic c one penetrometer (DCP) testing to determine the suitability of the bearing materials for the design bearing pressure. DCP testing should be performed to a depth of 3 to 5 feet below the bottom of foundation excavation and through newly placed or existing fill soils. Excessively soft, loose, or wet bearing soils should be over excavated to a depth recommended by the geotechnical engineer. The excavated soils should be replaced with structural fill or washed, crushed stone (NCDOT No. 57) wrapped in a geotextile fabric (Mirafi HP270 or equivalent). The need for the geotextile fabric with the crushed stone should be determined by the Geotechnical Engineer during construction based on Item Description Soil Moist Unit Weight 110 pcf Soil Effective Unit Weight 1 48 pcf Soil weight included in uplift resistance Soil included within the prism extending up from the top perimeter of the footing at an angle of 15 degrees from vertical to ground surface 1. Effective (or buoyant) unit weight should be used for soil above the foundation level and below a water level. The high groundwater level should be used in uplift design as applicable. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 16 sloughing/caving soils and excavation observations. However, footings could bear directly on the soils after over excavation if approved by the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Should the soils at bearing level become excessively disturbed or s aturated, the affected soil should be removed prior to placing concrete . Overexcavation for structural fill placement below footings should be conducted as shown below. The overexcavation should be backfilled up to the footing base elevation, with structural fill placed, as recommended in the Earthwork section or washed crushed stone (NCDOT No. 57) wrapped in a woven geotextile that can be used for both separation and filtration (e.g., Mirafi HP270). Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 17 Floor Slabs Design parameters for floor slabs assume the requirements for Earthwork have been followed. Specific attention should be given to positive drainage away from the structure and positive drainage of the aggregate base beneath the floor slab. Floor Slab Design Parameters Item Description Floor Slab Support 1 Suitable existing soils or new structural fill compacted in accordance with Earthwork section of this report. Estimated Modulus of Subgrade Reaction2 150 pounds per square inch per inch (psi/in) for point loads Aggregate Base Course/Capillary Break3 Minimum 4 inches of free -draining granular material (less than 5% passing the U.S. No. 200 sieve) 1. Floor slabs should be structurally independent of building footings or walls to reduce the possibility of floor slab cracking caused by differential movements between the slab and foundation. 2. Modulus of subgrade reaction is an estimated value based upon our experience with the subgrade condition, the requirements noted in Earthwork , and the floor slab support as noted in this table. It is provided for point loads. For large area loads the modulus of subgrade reaction would be lower. 3. Free-draining granular material should have less than 5% fines (material passing the No. 200 sieve). Other design considerations such as cold temperatures and condensation development could warrant more extensive design provisions. The use of a vapor retarder should be considered beneath concrete slabs on grade covered with wood, tile, carpet, or other moisture sensitive or impervious coverings, when the project includes humidity -controlled areas, or when the slab will support equipment sensitive to moisture. When conditions warrant the use of a vapor retarder, the slab designer should refer to ACI 302 and/or ACI 360 for procedures and cautions regarding the use and placement of a vapor retarder. Saw-cut contraction joints should be placed in the slab to help control the location and extent of cracking. For additional recommendations, refer to the ACI Design Manual. Joints or cracks should be sealed with a waterproof, non -extruding compressible com pound specifically recommended for heavy duty concrete pavement and wet environments. Where floor slabs are tied to perimeter walls or turn -down slabs to meet structural or other construction objectives, our experience indicates differential movement between Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 18 the walls and slabs will likely be observed in adjacent slab expansion joints or floor slab cracks beyond the length of the structural dowels. The Structural Engineer should account for potential differential settlement through use of sufficient control jo ints, appropriate reinforcing or other means. Floor Slab Construction Considerations On most project sites, the site grading is generally accomplished early in the construction phase. However, as construction proceeds, the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, rainfall, etc. As a result, t he floor slab subgrade may not be suitable for placement of base stone and concrete and corrective action will be required to repair the damaged areas. Finished subgrade, within and for at least 10 feet beyond the floor slab, should be protected from traffic, rutting, or other disturbance and maintained in a relatively moist condition until floor slabs are constructed. If the subgrade should become damage d or desiccated prior to construction of floor slabs, the affected material should be removed, and structural fill should be added to replace the resulting excavation. Final conditioning of the finished subgrade should be performed immediately prior to pla cement of the floor slab support course. The Geotechnical Engineer should observe the condition of the floor slab subgrades immediately prior to placement of the floor slab support course, reinforcing steel, and concrete. Attention should be paid to high traffic areas that were rutted and disturb ed earlier, and to areas where backfilled trenches are located. Pavements Pavement Subgrade Support Characteristics Sufficient information is not available for us to provide an opinion of minimum pavement thickness for the project. For pavement design by others, we recommend that a subgrade California Bearing Ratio, CBR, of 7 percent be used for the asphaltic concrete pavement designs. We recommend that a modulus of subgrade reaction of 1 50 pci be used for the Portland cement concrete pavement designs. These values were empirically derived based upon our experience with the clayey subgrade soils and our expectation of the quality of the subgrade as prescribed by the Site Preparation conditions as outlined in Earthwork . Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 19 Stormwater Control Measures We understand that a stormwater sontrol measures (SCM) will be constructed for the project. The SCM should be designed, constructed, and maintained in accordance with the NCDEQ Stormwater Design Manual 1. Determining the elevation of the seasonal high water table (SHWT) is also an important step in the hydrogeologic design process for SCMs. To function properly, some SCMs (e.g., infiltration systems, permeable pavements, and bioretention basins) require a minimum separation of 2 feet from the bottom of the SCM down to the SHWT elevation. The soil composition of many SCMs is vital to achieving their intended purpose. Soil permeability is an important design factor for SCMs. The infiltration rate of in -situ soils is required for design of infiltration devices and permeable pavement. It is also advantageous and sometimes necessary to have low permeability in -situ soil for systems where permanent ponded water is required (e.g., stormwater wetlands and wet ponds). The attached report by Terrain Environmental Consulting in Supporting Information provides a summary of the seasonal high water table depths and infiltration rates at the locations evaluated. Also, please note that the ground surface elevations at the boring locations were interpolated from site topographic drawings provided to us and are not based on measurements by a surveying instrument. Many SCMs will include some volume of water storage for water treatment and/or water quantity control. The most common type of storage facility is the earthen impoundment. These structures sometimes are simply excavated from existing soil and rock and ar e below grade, but others include fill material and dams. Embankments should have slopes no steeper than 3H:1V to allow maintenance equipment and to maintain ground cover. Without performing detailed slope stability analyses, cut slopes and fill slopes, should also be no steeper than 3H:1V due to potential slope stability considerations. 1 https://www.deq.nc.gov/about/divisions/energy -mineral-and -land -resources/stormwater/stormwater - program/stormwater -design-manual Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 20 General Comments Our analysis and opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Variations will occur between exploration point locations or due to the modifying effects o f construction or weather. The nature and extent of such variations may not become evident until during or after construction. Terracon should be retained as the Geotechnical Engineer, where noted in this report, to provide observation and testing services during pertinent construction phases. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on -site, we should be immediately notified so th at we can provide evaluation and supplemental recommendations. Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. Our services and any correspondence are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no th ird- party beneficiaries intended. Any third -party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client. Reliance upon the services and any work product is limited to our client a nd is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made. Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly effect excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing. Site safety and cost estimating including excavation support and dewatering requirements/design are the responsibility of others. Construction and site development have the potential to affect adjacent prop erties. Such impacts can include damages due to vibration, modification of groundwater/surface water flow during construction, foundation movement due to undermining or subsidence from excavation , as well as noise or air quality concerns. Evaluation of these items on nearby properties are commonly associated with contractor means and methods and are not addressed in this report. The owner and contractor should consider a preconstruction/precondition survey of surrounding development. If changes in the nature, design, or location of the project are planned, our conclusions and Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials 21 recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Figures Contents: GeoModel (2 pages) 8 10 12 14 16 18 20 22 24 26 28 EL E V A T I O N ( M S L ) ( f e e t ) Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project. Numbers adjacent to soil column indicate depth below ground surface. NOTES: B-01 B-02A B-02 B-03 B-04A B-04 B-05A B-05 Legend This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions. GeoModel Cottage View | Wilmington, NC Terracon Project No. K6245072 Bradie K9 Training Center 2108 Capital Dr, Ste 103 Wilmington, NC First Water Observation Groundwater levels are temporal. The levels shown are representative of the date and time of our exploration. Significant changes are possible over time. Water levels shown are as measured during and/or after drilling. In some cases, boring advancement methods mask the presence/absence of groundwater. See individual logs for details. Topsoil Poorly-graded Sand with Silt Silty Sand Poorly-graded Sand Soil Behavior Type (SBT) 8 Very stiff sand to clayey sand7 Gravelly sand to dense sand 1 Sensitive, fine grained 4 Silt mixtures - clayey silt to silty clay 5 Sand mixtures - silty sand to sandy silt 2 Organic soils - clay 9 Very stiff fine grained 6 Sands - clean sand to silty sand 3 Clay - silty clay to clay Model Layer Layer Name General Description 1 Poorly graded sand 3 Sandy clay and clayey sand, varying amounts of silt and organics, sand lenses at varying depths 4 Sand with varying amounts of silt and clay, clay lenses at varying depths 2 Sand with varying amount of silt and clay 5 CPT Refusal on Very Dense Sand and/or Limestone CPT Assumed Water Depth Existing Fill Very Soft Clay and Very Loose Clayey Sand Very Loose to Loose Sand Loose to Medium Dense Sand Castle Hayne Formation 2 3 4 3 5 7 9.5 12 16.9 17.5 2 2 3.5 5 2 3 4 3 5 7.5 9 13 17.5 18 3.5 2 3 4 3 5 7 8.5 12 16.7 17 3 1 2 1 3 5 1 2 4 3 5 3 6 12 16.6 17 1 23 5 2 5.1 3 8 10 12 14 16 18 20 22 24 26 28 EL E V A T I O N ( M S L ) ( f e e t ) Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project. Numbers adjacent to soil column indicate depth below ground surface. NOTES: B-06A B-06 B-07A B-07 B-08 B-09 B-10A B-10 B-11 Legend This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions. GeoModel Cottage View | Wilmington, NC Terracon Project No. K6245072 Bradie K9 Training Center 2108 Capital Dr, Ste 103 Wilmington, NC First Water Observation Groundwater levels are temporal. The levels shown are representative of the date and time of our exploration. Significant changes are possible over time. Water levels shown are as measured during and/or after drilling. In some cases, boring advancement methods mask the presence/absence of groundwater. See individual logs for details. Topsoil Poorly-graded Sand with Silt Silty Sand Soil Behavior Type (SBT) 8 Very stiff sand to clayey sand7 Gravelly sand to dense sand 1 Sensitive, fine grained 4 Silt mixtures - clayey silt to silty clay 5 Sand mixtures - silty sand to sandy silt 2 Organic soils - clay 9 Very stiff fine grained 6 Sands - clean sand to silty sand 3 Clay - silty clay to clay Model Layer Layer Name General Description 1 Poorly graded sand 3 Sandy clay and clayey sand, varying amounts of silt and organics, sand lenses at varying depths 4 Sand with varying amounts of silt and clay, clay lenses at varying depths 2 Sand with varying amount of silt and clay 5 CPT Refusal on Very Dense Sand and/or Limestone CPT Assumed Water Depth Existing Fill Very Soft Clay and Very Loose Clayey Sand Very Loose to Loose Sand Loose to Medium Dense Sand Castle Hayne Formation 23 5 2 5.1 3 22.3 5 2 4 5 10.1 2.3 4 2 3 5 4 9 13.7 14 1.5 2 5.1 3 4 2 3 3 5 4 2 3 5 3 12 18.4 19 3 4 2 3 5 2 Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Attachments Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Exploration and Testing Procedures Field Exploration Number of Soundings Approximate Sounding Depth (feet) 1 Location 4 (B -01 through B -04) 17 to 18 Proposed Training Facility 2 (B-05, B -06) 5 Proposed Pavement 1 (B-07) 10 Proposed SCM 2 (B-08, B -10) 14 to 18 Future Building 2 (B-09, B -11) 5 Future Pavement 5 (SCM-01 through SCM-05) Up to 6 (hand auger borings) Proposed and potential SCM 1. Referenced from existing ground surface. Exploration Layout and Elevations: Terracon personnel provided the exploration layout using handheld GPS equipment (estimated horizontal accuracy of about ±15 feet) and referencing existing site features. Approximate ground surface elevations were obtained by interpolation from the provided topographic survey . If elevations and a more precise exploration layout are desired, we recommend our locations be surveyed. Subsurface Exploration Procedures: The subsurface exploration was performed by a track mounted power drilling rig utilizing direct push, cone penetration testing (CPT) to advance into the subsurface. Additionally, six solid-stem auger borings were advanced to depths of 5 feet below existing grades to obtain laboratory samples and visually classify near -surface soils. Samples were tagged for identification, sealed to reduce moisture loss, and taken to our laboratory for further examination, testing, and classification. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Cone Penetration Testing (CPT): The CPT hydraulically pushes an instrumented cone through the soil while nearly continuous readings are recorded to a portable computer. The cone is equipped with electronic load cells to measure tip resistance and sleeve resistance and a pressure transducer to measure the generated ambient pore pressure. The face of the cone has an apex angle of 60° and an area of 10 cm 2. Digital data representing the tip resistance, friction resistance, pore water pressure, and probe inclin ation angle are recorded about every 2 centimeters while advancing through the ground at a rate between 1½ and 2½ centimeters per second. These measurements are correlated to various soil properties used for geotechnical design. No soil samples are gathered through this subsurface investigation technique. CPT testing is conducted in general accordance with ASTM D5778 "Standard Test Method for Performing Electronic Friction Cone and Piezocone Penetration Testing of Soils." Upon completion, the data collected was downloaded and processed by the project engineer. Shear wave velocity testing is a supplement to the CPT with added instrumentation used to determine shear wave velocity with depth. This additional information is collected via an accelerometer placed above the instrumented cone. A shear wave is generated at the ground surface, such as a hammer striking a steel plate on the end, which propagates through the soil and is recorded by the accelerometer at selected intervals (typically 1 meter). From this data, the interval shear wave velocities of the soil are calculated. These interval velocities can be used to develop the shear wave velocity profile for the site and can be used to determine a seismic site classification. Laboratory Testing The project engineer reviewed the field data and assigned laboratory tests. The laboratory testing program included the following types of tests: ■ Moisture Content ■ Grain -Size Analysis ■ Atterberg Limits The laboratory testing program often included examination of soil samples by an engineer. Based on the results of our field and laboratory programs, we described and classified the soil samples in accordance with the Unified Soil Classification System. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Site Location and Exploration Plans Contents: Site Location and Nearby Geotechnical Data Exploration Plan Note: All attachments are one page unless noted above. Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page. Site Location and Nearby Geotechnical Data DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY USGS, 2020 Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image. When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table. The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page. Exploration Plan DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES SITE PLAN PROVIDED BY CLIENT, MAP PROVIDED BY MICROSOFT BING MAPS Exploration and Laboratory Results Contents: CPT Sounding and Soil Boring Logs -B-01 through B -11 Summary of Laboratory Results Grain Size Distribution Note: All attachments are one page unless noted above. Depth (ft) 0 5 10 15 20 CPT Sounding ID B-01 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure Tip Refusal at 16.9 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan Topsoil Thickness: 6 inches Cave In Depth: 2 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3447° Longitude: -77.8729° CPT Completed: 9/5/2024 2 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/5/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation Depth (ft) 0 5 10 15 20 CPT Sounding ID B-02 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure Tip Refusal at 17.5 Feet >>>>>>>>>> 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan See B-02A for the adjacent test's full details. Topsoil Thickness: 7 inches Cave In Depth: 3.5 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3447° Longitude: -77.8727° CPT Completed: 9/5/2024 3.5 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/5/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation B- 0 2 A M a t e r i a l De s c r i p t i o n 26.4 24 22 TOPSOIL, 7 inches POORLY GRADED SAND WITH SILT (SP-SM), fine to medium, gray and brown SILTY SAND (SM), trace clay, fine to medium, brown Boring Terminated at 5 Feet Boring Log No. B-02A Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 1 2 3 4 5 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 9.0 14.5 0.6 3.0 5.0 Cottage View | Wilmington, NC Terracon Project No. K6245072 Wilmington, NC 2108 Capital Dr, Ste 103 Drill Rig Geoprobe 3126GT Hammer Type N/A Driller T. Whitehead Logged by Z. Burt Boring Started 09-05-2024 Boring Completed 09-05-2024 Abandonment Method Test hole backfilled upon completion Advancement Method Solid Stem Auger Notes Water Level Observations Cave In (dry) Estimated based on CPT data and cave in depths See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Boring advanced adjacent to CPT location B-02 Bradie K9 Training Center Sa m p l e T y p e Pe r c e n t Fi n e s Wa t e r Co n t e n t ( % ) Elevation: 27 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.3447° Longitude: -77.8727° Depth (Ft.) 2 Depth (ft) 0 5 10 15 20 CPT Sounding ID B-03 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure Tip Refusal at 16.7 Feet >> 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan Topsoil Thickness: 6 inches Cave In Depth: 3 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 26 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3444° Longitude: -77.8729° CPT Completed: 9/5/2024 3 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/5/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation Depth (ft) 0 5 10 15 20 CPT Sounding ID B-04 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Shear Wave Velocity, Vs(ft/sec) 140 280 420 560 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure Tip Refusal at 16.6 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan See B-04A for the adjacent test's full details. Topsoil Thickness: 4 inches Cave In Depth: 1 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3444° Longitude: -77.8727° CPT Completed: 9/6/2024 1 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/6/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation B- 0 4 A M a t e r i a l De s c r i p t i o n 26.7 24 22 TOPSOIL, 4 inches FILL - POORLY GRADED SAND, fine to medium, tan SILTY SAND (SM), fine to medium, brown and gray Boring Terminated at 5 Feet Boring Log No. B-04A Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 1 2 3 4 5 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 13.1 18.7 NP 0.3 3.0 5.0 Cottage View | Wilmington, NC Terracon Project No. K6245072 Wilmington, NC 2108 Capital Dr, Ste 103 Drill Rig Geoprobe 3126GT Hammer Type N/A Driller T. Whitehead Logged by Z. Burt Boring Started 09-06-2024 Boring Completed 09-06-2024 Abandonment Method Test hole backfilled upon completion Advancement Method Solid Stem Auger Notes Water Level Observations Cave In (dry) Estimated based on CPT data and cave in depths See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Boring advanced adjacent to CPT location B-04 Bradie K9 Training Center Sa m p l e T y p e Pe r c e n t Fi n e s Depth (Ft.) Wa t e r Co n t e n t ( % ) Elevation: 27 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.3444° Longitude: -77.8727° 1 2 Depth (ft) 0 5 10 15 20 CPT Sounding ID B-05 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure CPT Terminated at 5.1 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan See B-05A for the adjacent test's full details. Topsoil Thickness: 6 inches Cave In Depth: 3 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3446° Longitude: -77.8726° CPT Completed: 9/5/2024 3 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/5/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation B- 0 5 A M a t e r i a l De s c r i p t i o n 26.5 22 TOPSOIL, 6 inches SILTY SAND (SM), fine to medium, brown and tan Boring Terminated at 5 Feet Boring Log No. B-05A Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 1 2 3 4 5 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 15.9 17.4 0.5 5.0 Cottage View | Wilmington, NC Terracon Project No. K6245072 Wilmington, NC 2108 Capital Dr, Ste 103 Drill Rig Geoprobe 3126GT Hammer Type N/A Driller T. Whitehead Logged by Z. Burt Boring Started 09-05-2024 Boring Completed 09-05-2024 Abandonment Method Test hole backfilled upon completion Advancement Method Solid Stem Auger Notes Water Level Observations Cave In (dry) Estimated based on CPT data and cave in depths See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Boring advanced adjacent to CPT location B-05 Bradie K9 Training Center Sa m p l e T y p e Pe r c e n t Fi n e s Wa t e r Co n t e n t ( % ) Elevation: 27 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.3446° Longitude: -77.8726° Depth (Ft.) 2 Depth (ft) 0 5 10 15 20 CPT Sounding ID B-06 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure CPT Terminated at 5.1 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan See B-06A for the adjacent test's full details. Topsoil Thickness: 6 inches Cave In Depth: 3 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3444° Longitude: -77.8724° CPT Completed: 9/6/2024 3 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/6/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation B- 0 6 A M a t e r i a l De s c r i p t i o n 26.5 24 22 TOPSOIL, 6 inches POORLY GRADED SAND WITH SILT (SP-SM), fine to medium, gray and brown SILTY SAND (SM), fine to medium, dark brown Boring Terminated at 5 Feet Boring Log No. B-06A Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 1 2 3 4 5 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 10.6 15.8 0.5 3.0 5.0 Cottage View | Wilmington, NC Terracon Project No. K6245072 Wilmington, NC 2108 Capital Dr, Ste 103 Drill Rig Geoprobe 3126GT Hammer Type N/A Driller T. Whitehead Logged by Z. Burt Boring Started 09-06-2024 Boring Completed 09-06-2024 Abandonment Method Test hole backfilled upon completion Advancement Method Solid Stem Auger Notes Water Level Observations Cave In (dry) Estimated based on CPT data and cave in depths See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Boring advanced adjacent to CPT location B-06 Bradie K9 Training Center Sa m p l e T y p e Pe r c e n t Fi n e s Wa t e r Co n t e n t ( % ) Elevation: 27 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.3444° Longitude: -77.8724° Depth (Ft.) 2 Depth (ft) 0 5 10 15 20 CPT Sounding ID B-07 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure CPT Terminated at 10.1 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan See B-07A for the adjacent test's full details. Topsoil Thickness: 7 inches Cave In Depth: 2.3 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 26 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3442° Longitude: -77.8729° CPT Completed: 9/5/2024 2.3 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/5/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation B- 0 7 A M a t e r i a l De s c r i p t i o n 25.4 21 TOPSOIL, 7 inches SILTY SAND (SM), fine to medium, dark brown -Color change to gray Boring Terminated at 5 Feet Boring Log No. B-07A Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 1 2 3 4 5 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 2013.3 15.8 NP 0.6 5.0 Cottage View | Wilmington, NC Terracon Project No. K6245072 Wilmington, NC 2108 Capital Dr, Ste 103 Drill Rig Geoprobe 3126GT Hammer Type N/A Driller T. Whitehead Logged by Z. Burt Boring Started 09-05-2024 Boring Completed 09-05-2024 Abandonment Method Test hole backfilled upon completion Advancement Method Solid Stem Auger Notes Water Level Observations Cave In (dry) Estimated based on CPT data and cave in depths See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Boring advanced adjacent to CPT location B-07 Bradie K9 Training Center Sa m p l e T y p e Pe r c e n t Fi n e s Wa t e r Co n t e n t ( % ) Elevation: 26 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.3442° Longitude: -77.8729° Depth (Ft.) 2 Depth (ft) 0 5 10 15 20 CPT Sounding ID B-08 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure Tip Refusal at 13.7 Feet >>>> 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan Topsoil Thickness: 6 inches Cave In Depth: 1.5 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 26 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3447° Longitude: -77.8740° CPT Completed: 9/6/2024 1.5 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/6/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation Depth (ft) 0 5 10 15 20 CPT Sounding ID B-09 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure CPT Terminated at 5.1 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan Topsoil Thickness: 5 inches Cave In Depth: 3 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 26 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3444° Longitude: -77.8737° CPT Completed: 9/6/2024 3 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/6/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation Depth (ft) 0 5 10 15 20 CPT Sounding ID B-10 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure Tip Refusal at 18.4 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan See B-10A for the adjacent test's full details. Topsoil Thickness: 5 inches Cave In Depth: 3 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3446° Longitude: -77.8711° CPT Completed: 9/6/2024 3 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/6/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation B- 1 0 A M a t e r i a l De s c r i p t i o n 26.6 24 22 TOPSOIL, 5 inches POORLY GRADED SAND WITH SILT (SP-SM), fine to medium, tannish gray SILTY SAND (SM), fine to medium, dark brown Boring Terminated at 5 Feet Boring Log No. B-10A Wa t e r L e v e l Ob s e r v a t i o n s De p t h ( F t . ) 1 2 3 4 5 Facilities | Environmental | Geotechnical | Materials Gr a p h i c L o g Mo d e l L a y e r 914.4 19.9 NP 0.4 3.0 5.0 Cottage View | Wilmington, NC Terracon Project No. K6245072 Wilmington, NC 2108 Capital Dr, Ste 103 Drill Rig Geoprobe 3126GT Hammer Type N/A Driller T. Whitehead Logged by Z. Burt Boring Started 09-06-2024 Boring Completed 09-06-2024 Abandonment Method Test hole backfilled upon completion Advancement Method Solid Stem Auger Notes Water Level Observations Cave In (dry) Estimated based on CPT data and cave in depths See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any). See Supporting Information for explanation of symbols and abbreviations. Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Boring advanced adjacent to CPT location B-10 Bradie K9 Training Center Sa m p l e T y p e Pe r c e n t Fi n e s Wa t e r Co n t e n t ( % ) Elevation: 27 (Ft.) +/- Atterberg Limits LL-PL-PI See Exploration PlanLocation: Latitude: 34.3446° Longitude: -77.8711° Depth (Ft.) 4 2 Depth (ft) 0 5 10 15 20 CPT Sounding ID B-11 Approx. Elev. (ft) 25 20 15 10 10 20 30 40 Tip Resistance, qt(tsf) 100 200 300 400 Facilities | Environmental | Geotechnical | Materials Friction Ratio, Fr(%) 2 4 6 8 Sleeve Friction, fs(tsf) 0.5 1.0 1.5 2.0 0.05 0.10 0.15 0.20 Material Description Normalized CPT Soil Behavior Type 1 2 3 4 5 6 7 8 Pore Pressure, u2(tsf) 0 1 2 3 Hydrostatic Pressure CPT Terminated at 5 Feet 1 Sensitive, fine grained Normalized Soil Behavior Type (Robertson 1990) See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data, if any. See Supporting Information for explanation of symbols and abbreviations. Bradie K9 Training Center Cottage View | Wilmington, NC Notes Test Location: See Exploration Plan Topsoil Thickness: 4 inches Cave In Depth: 2 feet (dry) Elevation Reference: Approximate elevations were interpolated from the provided topographic site plan Elevation: 27 (ft) +/- CPT Equipment Terracon Project No. K6245072 3 Clay - silty clay to clay 2 Organic soils - clay Auger anchors used as reaction force CPT sensor calibration reports available upon request Probe No. 5632 with net area ratio of 0.85 U2 pore pressure transducer location Manufactured by Geoprobe Systems- Calibrated 8/5/2024 Tip and sleeve areas of 15 cm2 and 225 cm2 Ring friction reducer with O.D. of 1.72 in Latitude: 34.3441° Longitude: -77.8711° CPT Completed: 9/6/2024 2 ft estimated water depth (used in normalizations and correlations) CPT Started: 9/6/2024 9 Very stiff fine grained 4 Silt mixtures - clayey silt to silty clay 8 Very stiff sand to clayey sand 7 Gravelly sand to dense sand 6 Sands - clean sand to silty sand 5 Sand mixtures - silty sand to sandy silt Operator: T. Whitehead CPT Rig: Geoprobe 3126GT 2108 Capital Dr, Ste 103 Wilmington, NC Water Level Observation Facilities | Environmental | Geotechnical | Materials B-02A 1-2.5 9.0 B-02A 3.5-5 14.5 B-04A 1-2.5 POORLY GRADED SAND(SP)3.1 NP NP NP 0.5 B-04A 3.5-5 18.7 B-05A 1-2.5 15.9 B-05A 3.5-5 17.4 B-06A 1-2.5 10.6 B-06A 3.5-5 15.8 B-07A 1-2.5 SILTY SAND(SM)13.3 NP NP NP 20.1 B-07A 3.5-5 15.8 B-10A 1-2.5 POORLY GRADED SAND with SILT(SP-SM)14.4 NP NP NP 9.0 B-10A 3.5-5 19.9 Soil Classification USCSDepth (Ft.) Summary of Laboratory Results Water Content (%) Liquid Limit Plastic Limit Plasticity Index BORING ID % Fines Wilmington, NC Bradie K9 Training Center Cottage View | Wilmington, NC Terracon Project No. K6245072 2108 Capital Dr, Ste 103 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 0.0010.010.1110100 1.5 8 1 140 HydrometerU.S. Sieve Opening in Inches Grain Size Distribution 3/4 1/23/8 D30 0.225 0.109 0.116 Pe r c e n t F i n e r b y W e i g h t Grain Size (mm) 30 403 60 U.S. Sieve Numbers 16 20 100 90 80 70 60 50 40 30 20 10 044100632 10 14 506 200 Sand Silt or ClayCobblescoarse fine coarse finemedium Gravel Pe r c e n t F i n e r b y W e i g h t Pe r c e n t C o a r s e r b y W e i g h t ASTM D422 / ASTM C136 / AASHTO T27 Boring ID Facilities | Environmental | Geotechnical | Materials 2.55 2.14 D60 0.34 0.166 0.165 1.12 1.06 CU Sieve % FinerSieve% Finer Sieve% Finer #4 #10 #20 #40 #60 #140 #200 100.0 99.88 99.66 98.67 95.36 22.41 9.0 #4 #10 #20 #40 #60 #140 #200 100.0 99.93 98.92 89.2 28.25 20.13 99.5 79.9 91.0 % Fines Grain Size D10 0.133 0.077 Coefficients CC Remarks #10 #20 #40 #60 #140 #200 100.0 99.99 98.44 79.0 33.94 1.23 0.5 0.0 0.0 0.0 % Cobbles % Gravel % Sand % Clay 0.0 0.0 0.0 % Silt 0.5 20.1 9.0 POORLY GRADED SAND SILTY SAND POORLY GRADED SAND with SILT Description 1 - 2.5 1 - 2.5 1 - 2.5 Depth B-04A B-07A B-10A 2108 Capital Dr, Ste 103 Wilmington, NCTerracon Project No. K6245072 Cottage View | Wilmington, NC Bradie K9 Training Center USCS SP SM SP-SM Supporting Information Contents: General Notes Unified Soil Classification System CPT General Notes Stormwater Soils Evaluation Report Note: All attachments are one page unless noted above. Grab Sample Facilities | Environmental | Geotechnical | Materials > 4.00 2.00 to 4.00 1.00 to 2.00 0.50 to 1.00 0.25 to 0.50 less than 0.25 Unconfined Compressive Strength Qu (tsf) Bradie K9 Training Center Cottage View | Wilmington, NC Terracon Project No. K6245072 2108 Capital Dr, Ste 103 Wilmington, NC N (HP) (T) (DCP) UC (PID) (OVA) Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Unconfined Compressive Strength Photo-Ionization Detector Organic Vapor Analyzer Water Level After a Specified Period of Time Water Level After a Specified Period of Time Cave In Encountered Water Level Field Tests Water Initially Encountered Sampling Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. General Notes Location And Elevation Notes Exploration point locations as shown on the Exploration Plan and as noted on the soil boring logs in the form of Latitude and Longitude are approximate. See Exploration and Testing Procedures in the report for the methods used to locate the exploration points for this project. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Soil classification as noted on the soil boring logs is based Unified Soil Classification System. Where sufficient laboratory data exist to classify the soils consistent with ASTM D2487 "Classification of Soils for Engineering Purposes" this procedure is used. ASTM D2488 "Description and Identification of Soils (Visual-Manual Procedure)" is also used to classify the soils, particularly where insufficient laboratory data exist to classify the soils in accordance with ASTM D2487. In addition to USCS classification, coarse grained soils are classified on the basis of their in-place relative density, and fine-grained soils are classified on the basis of their consistency. See "Strength Terms" table below for details. The ASTM standards noted above are for reference to methodology in general. In some cases, variations to methods are applied as a result of local practice or professional judgment. Exploration/field results and/or laboratory test data contained within this document are intended for application to the project as described in this document. Use of such exploration/field results and/or laboratory test data should not be used independently of this document. Relevance of Exploration and Laboratory Test Results Descriptive Soil Classification > 30 15 - 30 8 - 15 4 - 8 2 - 4 Hard > 50 Very Stiff Stiff Medium Stiff Soft Very Soft 30 - 50 10 - 29 4 - 9 0 - 3Very Loose Loose Medium Dense Dense Very Dense Relative Density of Coarse-Grained Soils (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance Consistency of Fine-Grained Soils (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance 0 - 1 Relative Density ConsistencyStandard Penetration or N-Value (Blows/Ft.) Standard Penetration or N-Value (Blows/Ft.) Strength Terms Geotechnical Engineering Report Bradie K9 Training Center | Castle Hayne, North Carolina September 30, 2024 | Terracon Project No. K6245072 Facilities | Environmental | Geotechnical | Materials Unified Soil Classification System Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse-Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu≥4 and 1≤Cc≤3 E GW Well-graded gravel F Cu<4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F, G, H Fines classify as CL or CH GC Clayey gravel F, G, H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu≥6 and 1≤Cc≤3 E SW Well-graded sand I Cu<6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G, H, I Fines classify as CL or CH SC Clayey sand G, H, I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic: PI > 7 and plots above “A” line J CL Lean clay K, L, M PI < 4 or plots below “A” line J ML Silt K, L, M Organic: 𝐿𝐿 𝑛𝑣𝑑𝑛 𝑑𝑟𝑖𝑑𝑑 𝐿𝐿 𝑛𝑛𝑡 𝑑𝑟𝑖𝑑𝑑<0.75 OL Organic clay K, L, M, N Organic silt K, L, M, O Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above “A” line CH Fat clay K, L, M PI plots below “A” line MH Elastic silt K, L, M Organic: 𝐿𝐿 𝑛𝑣𝑑𝑛 𝑑𝑟𝑖𝑑𝑑 𝐿𝐿 𝑛𝑛𝑡 𝑑𝑟𝑖𝑑𝑑<0.75 OH Organic clay K, L, M, P Organic silt K, L, M, Q Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3 -inch (75-mm) sieve. B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. C Gravels with 5 to 12% fines require dual symbols: GW -GM well- graded gravel with silt, GW -GC well -graded gravel with clay, GP -GM poorly graded gravel with silt, GP -GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW -SM well- graded sand with silt, SW -SC well -graded sand with clay, SP -SM poorly graded sand with silt, SP -SC poorly graded sand with clay. E Cu = D60/D10 Cc = F If soil contains ≥ 15% sand, add “with sand” to group name. G If fines classify as CL -ML, use dual symbol GC -GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains ≥ 15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains ≥ 30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains ≥ 30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI ≥ 4 and plots on or above “A” line. O PI < 4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. 6010 2 30 DxD )(D Facilities | Environmental | Geotechnical | Materials Kulhawy, F.H., Mayne, P.W., (1997). "Manual on Estimating Soil Properties for Foundation Design," Electric Power Research Institute, Palo Alto, CA. Mayne, P.W., (2013). "Geotechnical Site Exploration in the Year 2013," Georgia Institue of Technology, Atlanta, GA. Robertson, P.K., Cabal, K.L. (2012). "Guide to Cone Penetration Testing for Geotechnical Engineering," Signal Hill, CA. Schmertmann, J.H., (1970). "Static Cone to Compute Static Settlement over Sand,"Journal of the Soil Mechanics and Foundations Division,96(SM3), 1011-1043. 1 Sensitive, fine grained 2 Organic soils - clay 3 Clay - silty clay to clay DESCRIPTION OF GEOTECHNICAL CORRELATIONS RELATIVE RELIABILITY OF CPT CORRELATIONS WATER LEVEL CONE PENETRATION SOIL BEHAVIOR TYPE REFERENCES Unit Weight, Relative Density, Dr Constrained Modulus, M Permeability, k Effective Friction Angle, ' Low Reliability High Reliability 10.1 10 NORMALIZED FRICTION RATIO, Fr NO R M A L I Z E D C O N E R E S I S T A N C E , q t / a t m 1 100 10 1000 DESCRIPTION OF MEASUREMENTS AND CALIBRATIONS improves with seismic Vs measurements Reliability of CPT-predicted N60 values as commonly measured by the Standard Penetration Test (SPT) is not provided due to the inherent inaccuracy associated with the SPT test procedure. Small Strain Modulus, G0* and Elastic Modulus, Es* CPT GENERAL NOTES 4 Silt mixtures - clayey silt to silty clay 5 Sand mixtures - silty sand to sandy silt 6 Sands - clean sand to silty sand 7 Gravelly sand to dense sand 8 Very stiff sand to clayey sand 9 Very stiff fine grained atm = atmospheric pressure = 101 kPa = 1.05 tsf REPORTED PARAMETERS Sensitivity, St Undrained Shear Strength, Su Over Consolidation Ratio, OCR CPT logs as provided, at a minimum, report the data as required by ASTM D5778 and ASTM D7400 (if applicable). This minimum data include qt, fs, and u. Other correlated parameters may also be provided. These other correlated parameters are interpretations of the measured data based upon published and reliable references, but they do not necessarily represent the actual values that would be derived from direct testing to determine the various parameters. To this end, more than one correlation to a given parameter may be provided. The following chart illustrates estimates of reliability associated with correlated parameters based upon the literature referenced below. Over Consolidation Ratio, OCR OCR (1) = 0.25(Qtn)1.25 OCR (2) = 0.33(Qtn) Undrained Shear Strength, Su Su = Qtn x 'V0/Nkt Nkt is a soil-specific factor (shown on Su plot) Sensitivity, St St = (qt - V0/Nkt) x (1/fs) Unit Weight, = (0.27[log(Fr)]+0.36[log(qt/atm)]+1.236) x water V0 is taken as the incremental sum of the unit weights Small Strain Shear Modulus, G0 G0 (1) = Vs 2 G0 (2) = 0.015 x 10(0.55Ic + 1.68)(qt - V0)Relative Density, Dr Dr = (Qtn / 350)0.5 x 100 Constrained Modulus, M M = M(qt - V0) For Ic > 2.2 (fine-grained soils) M = Qtn with maximum of 14 For Ic < 2.2 (coarse-grained soils) M = 0.0188 x 10(0.55Ic + 1.68) Hydraulic Conductivity, k For 1.0 < Ic < 3.27 k = 10(0.952 - 3.04Ic) For 3.27 < Ic < 4.0 k = 10(-4.52 - 1.37Ic) Es (1) = 2.6 G0 where = 0.56 - 0.33logQtn,clean sand Es (2) = G0 Es (3) = 0.015 x 10(0.55Ic + 1.68)(qt - V0) Es (4) = 2.5qt Soil Behavior Type Index, Ic Ic = [(3.47 - log(Qtn))2 + (log(Fr) + 1.22)2]0.5 SPT N60 N60 = (qt/atm) / 10(1.1268 - 0.2817Ic) Elastic Modulus, Es (assumes q/qultimate ~ 0.3, i.e. FS = 3) Shear Wave Velocity, Vs Measured in a Seismic CPT and provides direct measure of soil stiffness To be reported per ASTM D7400, if collected: Normalized Friction Ratio, Fr The ratio as a percentage of fs to qt, accounting for overburden pressure Sleeve Friction, fs Frictional force acting on the sleeve divided by its surface area Pore Pressure, u Pore pressure measured during penetration u1 - sensor on the face of the cone u2 - sensor on the shoulder (more common) Where a is the net area ratio, a lab calibration of the cone typically between 0.70 and 0.85 Corrected Tip Resistance, qt Cone resistance corrected for porewater and net area ratio effects qt = qc + u2(1 - a) Uncorrected Tip Resistance, qc Measured force acting on the cone divided by the cone's projected area To be reported per ASTM D5778: Normalized Tip Resistance, Qtn Qtn = ((qt - V0)/Pa)(Pa/ 'V0)n n = 0.381(Ic) + 0.05( 'V0/Pa) - 0.15 The groundwater level at the CPT location is used to normalize the measurements for vertical overburden pressures and as a result influences the normalized soil behavior type classification and correlated soil parameters. The water level may either be "measured" or "estimated:" Measured - Depth to water directly measured in the field Estimated - Depth to water interpolated by the practitioner using pore pressure measurements in coarse grained soils and known site conditions While groundwater levels displayed as "measured" more accurately represent site conditions at the time of testing than those "estimated," in either case the groundwater should be further defined prior to construction as groundwater level variations will occur over time. Clay and Silt Sand Sand Clay and Silt Sand Clay and Silt Clay and Silt Sand Clay and Silt Sand Sand Clay and Silt Clay and Silt Clay and Silt Sand 3 2 4 1 5 6 9 87 Typically, silts and clays have high Fr values and generate large excess penetration porewater pressures; sands have lower Fr's and do not generate excess penetration porewater pressures. The adjacent graph (Robertson et al.) presents the soil behavior type correlation used for the logs. This normalized SBT chart, generally considered the most reliable, does not use pore pressure to determine SBT due to its lack of repeatability in onshore CPTs. The estimated stratigraphic profiles included in the CPT logs are based on relationships between corrected tip resistance (qt), friction resistance (fs), and porewater pressure (u2). The normalized friction ratio (Fr) is used to classify the soil behavior type. Effective Friction Angle, ' ' (1) = tan-1(0.373[log(qc/ 'V0) + 0.29]) ' (2) = 17.6 + 11[log(Qtn)] for Ic<2.2 September 25, 2024 Terracon Consultants, Inc. 2108 Capital Drive, Suite 103 Wilmington, NC 28405 Attention: Mr. Justin DeNicola, P.E. Subject: Stormwater Soil Evaluations Project No. 24-040-SS Lamb’s Path Way Castle Hayne, NC Dear Mr. DeNicola: Terrain Environmental Consulting, PLLC (TEC) appreciates the opportunity to provide you with this report for stormwater soil evaluation services associated with the design of stormwater control measures (SCM) at the above referenced project site. The results of the testing are presented below. PROJECT BACKGROUND TEC was contracted by Terracon to perform stormwater soil evaluation services, specifically seasonal high water table (SHWT) evaluations and hydraulic conductivity (Ksat) testing, to assist with the future design of SCMs at the above referenced project site. An aerial photograph showing the locations (SCM-01 through SCM-05) was provided and the test locations were marked in the field prior to our mobilization. Review of the Web Soil Survey showed the areas at test locations being mapped with the Leon soil series. This soil series is generally described as poorly drained soils formed in marine sediments on flats, depressions, stream terraces and tidal areas with an expected SHWT between 6 to 18 inches below the ground surface. This series typically has diagnostic spodic horizons (hardpans and/or organic pans). RESULTS Seasonal High Water Table Evaluation The SHWT evaluations were performed on September 23, 2024 by advancing hand auger borings at the test locations, as shown on the attached Stormwater Soil Evaluations sketch (Figure 1). The hand auger borings were advanced to depths ranging from approximately 26 to 45 inches below the existing ground surface. Soils were evaluated by a Licensed Soil Scientist for evidence of SHWT influence. This evaluation involved looking at the actual moisture content in the soil and observing the matrix and mottle colors. Depending on the soil texture, the soil color will indicate Terrain Environmental Consulting Project 24-040-SS September 25, 2024 Lamb’s Path Way, Castle Hayne, NC 2 processes that are driven by SHWT fluctuations such as iron reduction and oxidation and organic matter staining. Soils at the test locations consisted primarily of fine sand to sandy loam surface horizons underlain by an eluviated fine sand to loamy sand horizon with non- cemented, spodic horizons (organic pans). Nearby drainage features appeared to be affecting SHWT depths at locations SCM-01 through -03, as discussed below. The SHWT was estimated to range between 9 to 28 inches below the ground surface. The Observed Water Table (OWT), measured at time of boring, ranged from 18 to 38 inches below the ground surface. A Soil Profile Description sheet, which provides a description of the observed soil horizons and the estimated SHWT depths, has also been included with this report. Ksat Testing TEC personnel performed in-situ saturated hydraulic conductivity (Ksat) testing at the test locations after the SHWT evaluations were complete. Specifically, the constant- head well permeameter technique (also known as shallow well pump-in technique and bore hole permeameter method) was used. This procedure is described in Methods of Soil Analysis, Part 1., Chapter 29 – Hydraulic Conductivity of Saturated Soils: Field Methods, 29 – 3.2 Shallow Well Pump In Method, pp. 758-763 and in the Soil Science Society of America Journal, Vol. 53, no. 5, Sept. – Oct. 1989, “A Constant-head Permeameter for Measuring Saturated Hydraulic Conductivity of the Vadose Zone” and “Comparison of the Glover Solution with the Simultaneous – Equations Approach for Measuring Hydraulic Conductivity.” This method involves allowing a measured volume of water to percolate through the soil until a steady rate of flow is achieved. The steady state rate is used to calculate the Ksat of the soil horizon using the Glover equation. Due to the shallow nature of the SHWT across the site and the surface being the most hydraulically-liminting horizon above the SHWT, the Ksat tests were performed immediately below the surface. The Ksat rates were calculated to range from 0.09 to 0.51 inches per hour. See Table 1 below for a summary of the soil evaluation results. TABLE 1 TEST LOCATION SHWT (inches below ground surface) OWT (inches below ground surface) Ksat Testing Interval (inches below ground surface) Ksat RATE (inches per hour) SCM-01 25 inches 32 inches 2 to 8 inches 0.27 in/hr SCM-02 18 inches 31 inches 2 to 8 inches 0.51 in/hr SCM-03 28 inches 38 inches 2 to 8 inches 0.09 in/hr SCM-04 9 inches 18 inches 2 to 8 inches 0.11 in/hr SCM-05 9 inches 23 inches 2 to 8 inches 0.51 in/hr Terrain Environmental Consulting Project 24-040-SS September 25, 2024 Lamb’s Path Way, Castle Hayne, NC 3 DISCUSSION Soil morphology at locations SCM-01 through SCM-03 indicated the potential for SHWT depths to range from 11 to 13 inches at these locations, whereas we estimated SWHT depths to range from 18 to 28 inches. As mentioned above, drainage features were observed on the site. Those included an approximately 3-foot deep ditch approximatley 25 to 30 feet north of SCM-01 and SCM-02, a 1 to 2-foot deep swale adjacent to SCM-02, and a 3 to 4-foot deep modified (deepened and straightened) stream channel approximately 50 feet west of SCM-03. No ordinary high water marks (OHWM) were observed in the ditch or swale, which indicates that water depths do not typically rise above the bottoms of these features. Shallow water that appeared to coincide with the OHWM was observed in the modified stream. Visual evidence of drainage was observed in the form of uncoated sand grains in spodic horizons at these locations, and distinct boundaries between the soil matrix and possible redox features in sandy horizons overlying spodic horizons which suggests these are relict redox features not indicative of current water table influence. Additionally, to assess the likelihood for soils at/near these test location being affected by the drainage features, we used Lateral Effect version 2.8.1 software developed and published by Phillips, Skaggs and Chescheir at NC State University. Drainage modeling simulations were run for 2 and 3-foot deep ditches in the Leon soil series. The simulation results showed a lateral effect of 130 to 174 feet which would put each of these locations within the zones of influence of the ditch and/or modified stream channel. Lastly, OWT depths at SCM-01 through SCM-03 were much deeper than those observed at SCM- 04 and -05 (which were further away from any drainage features). The visual observations, drainage simulations, and OWT depths are the basis for our SHWT estimated depths at SCM-01 through -03. CLOSING We appreciate the opportunity to provide stormwater soil evaluation services. If you have any questions, please do not hesitate to contact me. Sincerely, Paul Masten, LSS, PWS President/Owner Attachments Figure 1 – Stormwater Soil Evaluations Soil Profile Descriptions Lateral Effect results Stormwater Soil Evaluations Lamb’s Path Way Castle Hayne, NC Project Number 24-040-SS Figure 1 Site plan provided by Terracon SOIL PROFILE DESCRIPTIONS Lamb’s Path Way Site Castle Hayne, NC Location Horizon Depth (inches) Matrix Mottles Texture, Structure, Consistence SCM-1 Fill 0-4 10YR 3/2 10YR 4/2 Very dark grayish brown fine sand, single grain, loose; dark grayish brown streaks Ab 4-11 10YR 2/1 Black sandy loam, weak, fine sub- angular blocky; buried roots and organic debris present AE 11-15 10YR 3/1 10YR 4/1 Very dark gray loamy sand, granular, very friable; dark gray streaks E 15-25 10YR 4/1 10YR 5/1 Dark gray fine sand, single grain, loose; gray streaks Bh1 25-33 10YR 2/1 10YR 3/1 Black sandy loam, weak, medium angular blocky, friable; dark gray streaks Bh2 33-37 10YR 3/2 10YR 3/1 Very dark grayish brown loamy sand, weak, medium sub-angular blocky, friable; very dark gray organic accumulations Seasonal High Water Table = 25 inches below the existing ground surface. Water table observed at 32 inches below the ground surface. SCM-2 A 0-4 10YR 3/1 Very dark gray sandy loam, weak, medium angular blocky, friable E 4-12 10YR 5/1 Gray fine sand, single grain, loose Bh1 12-18 7.5YR 2.5/1 10YR 5/2 Black sandy loam, moderate, medium sub-angular blocky, firm; grayish brown sandy seams Bh2 18-34 10YR 4/3 10YR 3/2 10YR 3/1 Brown sandy loam, moderate, medium angular blocky, firm; very dark gray to very dark grayish brown organic accumulations Bh3 34-40 10YR 3/2 Very dark grayish brown loamy sand, weak, medium sub-angular blocky, friable Seasonal High Water Table = 18 inches below the existing ground surface. Water table observed at 31 inches below the ground surface. SOIL PROFILE DESCRIPTIONS Lamb’s Path Way Site Page 2 Location Horizon Depth (inches) Matrix Mottles Texture, Structure, Consistence SCM-3 A 0-6 10YR 3/1 10YR 5/1 Very dark gray fine sand, single grain, loose; gray streaks AE 6-13 10YR 4/1 Dark gray loamy sand, weak, medium sub-angular blocky, very friable E 13-28 10YR 5/1 10YR 6/1 Gray fine sand, single grain, loose; gray streaks Bh1 28-37 10YR 3/1 10YR 5/1 10YR 2/1 Very dark gray loamy sand, moderate, coarse sub-angular blocky, friable; gray streaks and black organic accunulations Bh2 37-45 10YR 2/1 Black sandy loam, moderate, medium sub-angular blocky, firm Seasonal High Water Table = 28 inches below the existing ground surface. Water table observed at 38 inches below the ground surface. SCM-4 A 0-4 10YR 3/1 Very dark gray loamy sand, granular, very friable E 4-9 10YR 4/1 10YR 5/1 Dark gray fine sand, single grain, loose; gray streaks Bh1 9-30 10YR 2/1 10YR 4/2 Black sandy loam, weak, medium sub-angular blocky, friable; dark grayish brown sandy seams Seasonal High Water Table = 9 inches below the existing ground surface. Water table observed at 18 inches below the ground surface. SCM-5 A 0-6 10YR 3/1 Very dark gray loamy sand, granular, very friable E 6-9 10YR 5/2 Grayish brown fine sand, single grain, loose; gray streaks Bh 9-17 10YR 3/1 Very dark gray sandy loam, moderate, medium angular blocky, slightly sticky, non-plastic, firm Bg 17-26 10YR 4/2 10YR 5/2 Dark grayish brown sandy loam, moderate, medium sub-angular blocky, friable; grayish brown redox depletions Seasonal High Water Table = 9 inches below the existing ground surface. Water table observed at 23 inches below the ground surface. ******************************************************************************** ----Lateral Effect Program Summary---- Application of Skaggs Method Copyright 2006-2014. Brian D Phillips, R Wayne Skaggs, G M Chescheir North Carolina State University Dept of Biological & Agricultural Engineering Version: 2.8.1.0 Project Run Date and Time: 9/24/2024 2:35:21 PM Output Filename: C:\LateralEffect\outputs\Lateral_Effect_Summary.txt ******************************************************************************** Project Information ------------------------------------------------------------------ Project : Lamb's Path Way User: Paul Masten Company / Agency: Terrain Environmental Consulting Department: Project Location: Castle Hayne Project Coordinates: Soil ID: Leon Notes: Site Parameters ------------------------------------------------------------------ State: North_Carolina County / Parish: Pender Surface Storage: 1_inch_(2.5_cm) Ditch Depth or Depth to Water Surface: 2 ft Depth to Restrictive Layer: 7.92 ft Drainable Porosity: 0.04 Hydroperiod: 14 days User defined T25 or Default T25: DEFAULT T25 value: 8.2 days User Conductivity or Soil Survey Conductivity: SOIL SURVEY Weighted Hydraulic Conductivity: 4.8259 in/hr Hydraulic Conductivity Data by Layer for Soil: LnA__Leon Weighted Hydraulic Conductivity Calculated Using: Average K Values Bottom Depth in Low K in/hr High K in/hr Average K in/hr Layer 1 5.00 5.95 19.98 12.968478 Layer 2 17.00 5.95 19.98 12.968478 Layer 3 51.00 0.57 5.95 3.259836 Layer 4 59.00 1.98 19.98 10.98423 Layer 5 95.00 0.20 1.98 1.0913364 Layer 6 0.00 0.00 0.00 0.00 Layer 7 0.00 0.00 0.00 0.00 Layer 8 0.00 0.00 0.00 0.00 ---------------------------------------------- Lateral Effect: 130.6 ft ---------------------------------------------- ******************************************************************************** ----Lateral Effect Program Summary---- Application of Skaggs Method Copyright 2006-2014. Brian D Phillips, R Wayne Skaggs, G M Chescheir North Carolina State University Dept of Biological & Agricultural Engineering Version: 2.8.1.0 Project Run Date and Time: 9/24/2024 2:29:19 PM Output Filename: C:\LateralEffect\outputs\Lateral_Effect_Summary.txt ******************************************************************************** Project Information ------------------------------------------------------------------ Project : Lamb's Path Way User: Paul Masten Company / Agency: Terrain Environmental Consulting Department: Project Location: Castle Hayne Project Coordinates: Soil ID: Leon Notes: Site Parameters ------------------------------------------------------------------ State: North_Carolina County / Parish: Pender Surface Storage: 1_inch_(2.5_cm) Ditch Depth or Depth to Water Surface: 3 ft Depth to Restrictive Layer: 7.92 ft Drainable Porosity: 0.04 Hydroperiod: 14 days User defined T25 or Default T25: DEFAULT T25 value: 8.7 days User Conductivity or Soil Survey Conductivity: SOIL SURVEY Weighted Hydraulic Conductivity: 4.8259 in/hr Hydraulic Conductivity Data by Layer for Soil: LnA__Leon Weighted Hydraulic Conductivity Calculated Using: Average K Values Bottom Depth in Low K in/hr High K in/hr Average K in/hr Layer 1 5.00 5.95 19.98 12.968478 Layer 2 17.00 5.95 19.98 12.968478 Layer 3 51.00 0.57 5.95 3.259836 Layer 4 59.00 1.98 19.98 10.98423 Layer 5 95.00 0.20 1.98 1.0913364 Layer 6 0.00 0.00 0.00 0.00 Layer 7 0.00 0.00 0.00 0.00 Layer 8 0.00 0.00 0.00 0.00 ---------------------------------------------- Lateral Effect: 173.6 ft ----------------------------------------------