Loading...
HomeMy WebLinkAboutTIA Scope Approval August 8, 2024 REVISED September 10, 2024 Dylan Coley, PE Davenport 4600 Marriott Drive, Suite 340 Raleigh, NC 27612 RE: Approved Scope for the Traffic Impact Analysis (TIA) associated with the proposed Alexander Road Retail Development New Hanover County, NC Dear Mr. Coley: Based on the information provided, and conversations held to date, it is our understanding that the proposed development will consist of: • LUC 420, Marina – 56 boat/RV berths (spaces) • LUC 215, Townhomes – 14 dwelling units • LUC 937, Drive-thru Coffee Shop – 1,850 square feet • LUC 945, Convenience Store/Gas Station - 6,200 square feet of convenience store/gas station with 12 VFP Located on the corner of US 17 (Market Street) and Alexander Road (SR 1345) in New Hanover County, NC, North Carolina. The site plan, provided August 28, 2024, by Davenport, proposes access at the following points: • US 17 BUS (Market Street) and Site Access 1 (RI/RO, access to gas station and coffee shop only) • SR 1345 (Alexander Road) and Site Access 2 (full movement, access to gas station and coffee shop only) • SR 1345 (Alexander Road) and Site Access 2 (full movement, gated access to boat/RV storage only) • SR 1345 (Alexander Road) and Site Access 3 (full movement, access to eight townhomes only) • SR 1345 (Alexander Road) and Site Access 4 (full movement, access to six townhomes only) Below please find the scope to be used for the Traffic Impact Analysis: Page 2 of 3 1. Data Collection - Analysis Parameters: a. Study Intersections i. For existing intersections, provide turning movement counts for weekday AM (7:00am- 9:00am) and PM (4:00 pm - 6:00pm) peak periods, signal timing (if applicable), and lane geometry: 1. US 17 (Market Street) and Alexander Road (SR 1345) 2. US 17 (Market Street) Southbound-to-Northbound U-Turn 3. US 17 (Market Street) and Site Access 1 (right-in/right-out) 4. SR 1345 (Alexander Road) and Site Access 2 (full movement) 5. SR 1345 (Alexander Road) and Site Access 3 (full movement; gated access to boat/RV storage only) 6. SR 1345 (Alexander Road) and Site Access 3 (full movement, aligned with Abberly Wilmington Site Access A) 7. SR 1345 (Alexander Road) and Site Access 4 (full movement). b. Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions i. Site Trip Generation Estimate – use 11th Edition rates ii. Site Trip Distribution - To be submitted for approval and approved prior to use in the TIA. iii. Adjacent Development (approved (but as of yet to be built)) development including but limited to; 1. Abberly Wilmington – a proposed development consisting of 253 low-rise apartment units, with an expected build year of 2027. A TIA was submitted by DRMP on March 6, 2024, and was approved by the WMPO on May 7, 2024. iv. Planned Roadway Improvements 1. U-4902D – conversion of US 17 to a Restricted Crossing U-Turn (RCUT) corridor. A signalized southbound-to-northbound U-turn is proposed approximately 750’ south of the US 17 and Alexander Road (southern connection) intersection. 2. Abberly Wilmington – US 17 and Alexander Road (southern connection) - construct a southbound right turn lane on US 17 (Market Street) with 100 feet of storage, and appropriate full-width deceleration and taper. v. Background Traffic Assumptions • Build Year – 2027 • Growth rate – 1% per year vi. Other Information 2. Capacity Analysis: Weekday PM & Saturday Peak Hour (as listed and for locations per 1.a.i) a. Technical Analysis i. 2024 Existing Conditions ii. 2027 Future No-Build Conditions [existing + 1% background growth + adjacent development] Page 3 of 3 iii. 2027 Future Build Conditions [existing + 1% background growth + adjacent development + site trips] iv. 2027 Future Build Conditions with Improvements [existing + 1% background growth + adjacent development + site trips + improvements] 3. Final Report Submittal: a. Completed TIA Application b. Signed and sealed by a Professional Engineer c. Electronic copies to include PDF of TIA and Synchro files and Synchro analysis files in digital format 4. Notes: a. This scope shall remain valid for three months from the date of this letter. b. Please note that if any changes occur (including but not limited to; land use, intensity, phasing, and/or site access) additional analysis may be required. Please contact me at (910) 341-7890 with any questions regarding this scope. Sincerely, Abby Lorenzo, MPA Deputy Director Wilmington Urban Area MPO Attachments: Traffic Impact Analysis Supplemental Guidelines (dated September 28, 2022) Scoping request letter (provided by DAVENPORT, dated July 11, 2024) Abberly Wilmington TIA approval with conditions (dated May 7, 2024) Alexander Road Retail Concept Site Plan (received by WMPO from Davenport August 28, 2024) Cc: Ben Hughes, PE, District Engineer, NCDOT Jon Roan, Deputy District Engineer, NCDOT Frank Mike, Assistant District Engineer, NCDOT Michael Bass, Assistant District Engineer, NCDOT Stonewall Mathis, PE, Division Traffic Engineer, NCDOT Bryce Cox, Assistant Traffic Engineer, NCDOT Madi Lee, Assistant Traffic Engineer, NCDOT Robert Farrell, Development Review Supervisor, New Hanover County Bill McDow, Associate Planner, WMPO