Loading...
HomeMy WebLinkAboutTIA TPD# TFV2.00001 www.TrafficPD.com Alexander Road Retail Development Transportation Impact Analysis New Hanover County, NC For Submission To: WMPO and NCDOT 12-24-2024 Alexander Road Retail Development Transportation Impact Analysis FOR SUBMISSION TO: WMPO and NCDOT December 24, 2024 TPD # TFV2.00001 Prepared For: TFV2, LLC 7 Cedar Island Wilmington, NC 28409 Prepared By: TPD 80 Charlotte Street, Suite 40 Asheville, NC 28801 Phone: (828) 575-0133 E-mail: TPD@TPDinc.com Website: www.TPDinc.com NC Business License #C-4448 Colin Kinton, P.E. Project Manager North Carolina License Number PE-048897 12/24/2024 TABLE OF CONTENTS EXECUTIVE SUMMARY ......................................................................................................................................... 1 1.0 INTRODUCTION....................................................................................................................................... 3 2.0 EXISTING.................................................................................................................................................. 3 3.0 NEARBY DEVELOPMENTS ....................................................................................................................... 4 4.0 PLANNED ROADWAY IMPROVEMENTS ................................................................................................. 4 5.0 NO-BUILD ................................................................................................................................................ 5 6.0 BUILD ....................................................................................................................................................... 5 7.0 LEVELS OF SERVICE FOR INTERSECTION ................................................................................................. 7 8.0 CAPACITY ANALYSIS METHODOLOGY .................................................................................................... 7 9.0 LEVEL OF SERVICE IN THE STUDY AREA .................................................................................................. 9 10.0 AUXILIARY TURN LANE ANALYSIS ......................................................................................................... 11 11.0 SITE DISTANCE ANALYSIS ...................................................................................................................... 11 12.0 CONCLUSIONS ....................................................................................................................................... 11 13.0 RECOMMEDATIONS .............................................................................................................................. 11 TABLES 1-9 Table 1: Roadway Characteristics within Study Area Table 2: Manual Traffic Count Information Table 3: Trip Generation Data Table 4: Trip Generation Summary Table 5: Trip Distribution Percentages Table 6: Level of Service Criteria - Unsignalized and Signalized Intersections Table 7: Level of Service Summary Table 8: Queue Analysis Summary Table 9: Auxiliary Turn Lane Summary FIGURES 1-11 Figure 1: Site Location Map Figure 2: Site Plan Figure 3: Existing Lane Configuration Figure 4: 2024 Existing Vehicular Traffic Volumes Figure 5: Abberly Residential Vehicular Traffic Volumes Figure 6: 2027 No-Build Vehicular Traffic Volumes Figure 7A: Trip Distribution Percentages – Commercial Primary Figure 7B: Trip Distribution Percentages – Commercial Pass-By Figure 7C: Trip Distribution Percentages – Townhomes Primary Figure 8A: Trip Distribution – Commercial Primary Figure 8B: Trip Distribution – Commercial Pass-By Figure 8C: Trip Distribution – Townhomes Primary Figure 9: Total Site Trips Figure 10: 2027 Build Vehicular Traffic Volumes Figure 11: Recommended Geometry TECHNICAL APPENDICES Appendix A: Project Correspondence Appendix B: Manual Traffic Count Printouts Appendix C: Proposed Nearby Development Appendix D: Volume Development Worksheets Appendix E: Capacity Analysis Appendix F: NCDOT Signal Plans Appendix G: Turn Lane Warrants Appendix H: Site Distance Observations Page 1 www.TPDinc.com EXECUTIVE SUMMARY The purpose of this Traffic Impact Analysis (TIA) is to examine the potential traffic impacts for the proposed mixed-use development to be located at the northwest corner of Alexander Road (SR 1345) & Market Street (US 17) in New Hanover County, North Carolina. Based on this evaluation, the following conclusions were reached: » A project scoping request was submitted to NCDOT on July 11, 2024 by another professional engineering firm. Final scoping approval was received on September 10, 2024. Submission Step 1.A was approved December 4, 2024. » The study area intersections included in this TIA are illustrated on the appended figures and are as follows: o Market Street (US 17) & Alexander Road (SR 1345) (to be signalized) o Market Street (US 17) & Site Access 1 (right-in/right-out - unsignalized) o Alexander Road (SR 1345) & Site Access 2 (full access - unsignalized) o Alexander Road (SR 1345) & Site Access 3 (full access - unsignalized) o Alexander Road (SR 1345) & Site Access 4 (full access - unsignalized) » The proposed mixed-use development will include a 6,200 SF convenience store with 12 vehicle fueling positions, a 3,250 SF drive-through fast food, and 12 townhomes. » Access to the convenience store and fast food is provided via one right-in/right-out driveway on Market Street (US 17) and one full access driveway on Alexander Road (SR 1345). Access to the townhomes is provided via two full access driveways on Alexander Road (SR 1345). There is no interconnectivity between the convenience store and fast food with the townhomes. » Upon full build-out, the proposed site is expected to generate a total of 165 new vehicle-trips during the weekday AM peak hour and 137 new vehicle-trips during the weekday PM peak hour. » The Abberly Wilmington is a nearby proposed development consisting of 253 low-rise apartment units located on Alexander Road (SR 1345) approximately 600 feet west of Market Street (US 17) with an expected build year of 2027. » The Abberly Wilmington development is scheduled to construct a southbound right turn lane on market Street (US 17) at Alexander Drive (SR 1345) with 100 feet of storage and the appropriate full- width deceleration and taper. » The State Transportation Improvement Program (STIP) U-4902D includes signalization of the Market Street (US 17) & Alexander Road (SR 1345) intersection and a northbound left-turn lane with 375 feet of storage. A restricted Crossing U-Turn is also planned approximately 750 feet south of the Market Street (US 17) & Alexander Road (SR 1345) intersection. These improvements are currently under construction. » Site distance observations were conducted on Alexander Road for site access driveway locations. TPD has determined that due to the low residential site access volumes and low speeds on Alexander Road, site distance for the driveways are acceptable. » Under 2027 Build, all movements are expected to operate at LOS D or better during the weekday AM and PM peak hours. » Under 2027 Build, the following operation conditions are noted: Page 2 www.TPDinc.com Market Street (US 17) & Site Access 1 o The eastbound right-turn driveway queue is anticipated to exceed 100 feet. Between Site Access 1 and 2, traffic should distribute and balance, resulting in shorter queue lengths than projected. The following roadway network improvements are recommended: Market Street (US 17) & Site Access 1 » Proposed access configuration: o Right-in/Right-out o 25 ft wide o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane » Install a southbound right-turn lane with 125 feet of storage and an appropriate taper on Market Street (US 17). Based on spacing from Alexander Road, the planned right-turn lane for Market Street at Alexander Road should be extended through Site Access 1 as a continuous right-turn lane. Alexander Road (SR 1345) & Site Access 2 » Proposed access configuration: o Full Access o 25 ft wide o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane Alexander Road (SR 1345) & Site Access 3 » Proposed access configuration: o Full Access o 20 ft wide o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane Alexander Road (SR 1345) & Site Access 4 » Proposed access configuration: o Full Access o 20 ft wide o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane Page 3 www.TPDinc.com 1.0 INTRODUCTION TPD Inc. has completed a Traffic Impact Analysis (TIA) for a proposed mixed-use development to be located at the northwest corner of Alexander Road (SR 1345) & Market Street (US 17) in New Hanover County, North Carolina. Figure 1 provides the site location and vicinity map. Figure 2 illustrates the proposed 6,200 SF convenience store with 12 vehicle fueling positions, 3,250 SF fast food with drive-through, 12 townhomes, and proposed access points. This report has been prepared in accordance with NCDOT’s Policy on Street and Driveway Access to North Carolina Highways, 2003 and the NCDOT Congestion Management Capacity Analysis Guidelines, 2022. The project scope and study area extents were submitted to NCDOT. All relevant correspondence pertaining to this project has been included in Appendix A. 1.1 SITE ACCESS LOCATIONS Access to the convenience store and fast food is provided via one right-in/right-out driveway on Market Street (US 17) and one full access driveway on Alexander Road (SR 1345). Access to the townhomes is provided via two full access driveways on Alexander Road (SR 1345). There is no interconnectivity between the convenience store and fast food with the townhomes. 2.0 EXISTING 2.1 EXISTING ROADWAY NETWORK A field review of the existing roadway system in the study area was conducted. The existing roadway characteristics within the study area are summarized in Table 1. The existing lane configuration and intersection controls for the study area intersections are illustrated in Figure 3. TABLE 1 ROADWAY CHARACTERISTICS WITHIN STUDY AREA Roadway Roadway Maintenance Predominant Directional Orientation Posted Speed Limit Year 2023 AADT* Market Street (US 17) NCDOT North-South 45 mph 43,000 Alexander Road (SR 1345) NCDOT East-West 25 mph 700 *Source: NCDOT 2023 ArcGIS AADT Mapping Application 2.2 BICYCLE AND PEDESTRIAN FACILITIES Based on observations during field visits at the study area intersections, there are no bicycle accommodations present in the vicinity of the proposed development. Pedestrian sidewalk facilities are present on the west side of Market Street (US 17). Page 4 www.TPDinc.com 2.3 EXISTING TRAFFIC Manual Turning Movement Counts Manual traffic counts were conducted in 15-minute intervals during the weekday morning (7:00 to 9:00 AM), and weekday evening (4:00 to 6:00 PM) peak periods for study intersections. Data pertaining to heavy vehicles, pedestrians and transit vehicles were observed during the manual counts. Peak hours and count dates for the study area intersections is identified in Table 2. TABLE 2 MANUAL TRAFFIC COUNT INFORMATION Intersection Date(s) of Traffic Counts Time Period Intersection Peak Hour1 Market Street (US 17) & Alexander Road (SR 1345) Wednesday, October 23, 2024 Weekday AM 7:45 to 8:45 AM Weekday PM 5:00 to 6:00 PM 1Peak Hour consists of the four consecutive 15-minute intervals where the highest traffic volumes occur. Existing traffic volumes for the weekday AM and weekday PM peak hours are illustrated in Figure 4. For analysis purposes, any specific turning movement with a volume less than four vehicles have been adjusted in the analysis to have a volume equal to four vehicles. Traffic count data sheets are provided in Appendix B. 3.0 NEARBY DEVELOPMENTS The Abberly Wilmington is a proposed development consisting of 253 low-rise apartment units located on Alexander Road (SR 1345) approximately 600 feet west of Market Street (US 17) with an expected build year of 2027. The site generated trips developed by DRMP are illustrated in Figure 5. Documents associated with the approved TIA are provided in Appendix C. 4.0 PLANNED ROADWAY IMPROVEMENTS 4.1 PROGRAMMED IMPROVEMENTS – STIP U-4902D The State Transportation Improvement Program (STIP) U-4902D includes signalization of the Market Street (US 17) & Alexander Road (SR 1345) intersection and a northbound left-turn lane with 375 feet of storage. A restricted Crossing U-Turn is also planned approximately 750 feet south of the Market Street (US 17) & Alexander Road (SR 1345) intersection. These improvements are currently under construction. 4.2 PROGRAMMED IMPROVEMENTS – ABBERLY WILMINGTON The Abberly Wilmington development is scheduled to construct a southbound right-turn lane on Market Street (US 17) at Alexander Drive (SR 1345) with 100 feet of storage and the appropriate full-width deceleration and taper. Page 5 www.TPDinc.com 5.0 NO-BUILD 5.1 ANNUAL BACKGROUND GROWTH Background growth factors for the roadways in the study area were developed during scoping and approved by NCDOT. A background growth trend factor of 1.0% per year has been utilized to apply three years of growth for the Year 2027 projected build-out. The additional traffic volumes due to background growth and the proposed Abberly Wilmington Development volumes have been added to the existing traffic data to produce the 2027 No-Build traffic volumes which are illustrated in Figure 6. 6.0 BUILD 6.1 TRIP GENERATION The trip generation rates for the proposed development were obtained from the manual Trip Generation, 11th Edition, 2021, an Institute of Transportation Engineers (ITE) Informational Report. For the proposed development, Land Use Codes 945 (Convenience Store w/Gas Station), 215 (Single Family Attached), and 934 (Fast Food w/ Drive Through) were used to calculate the number of vehicular trips the development is anticipated to generate during the following time periods: (1) average weekday; (2) weekday AM peak hour; and (3) weekday PM peak hour. Table 3 provides the rates/equations and directional percentages for the analyzed time periods. TABLE 3 ITE TRIP GENERATION DATA Land Use ITE # Size (X) Time Period Equations/Rates Pass-By % Entering % Super Convenience Market w/ Gas Station 945 12 VFP Weekday AM Peak Hour T = 31.60*(X) 76% 50% Weekday PM Peak Hour T = 26.90*(X) 75% 50% Weekday T = 345.75*(X) 75% 50% Single Family Attached 215 12 DU Weekday AM Peak Hour T = 0.52*(X) - 5.70 -- 25% Weekday PM Peak Hour T = 0.60*(X) - 3.93 -- 59% Weekday T = 7.62*(X) - 50.48 -- 50% Fast Food w/ Drive Through 934 3.25 KSF Weekday AM Peak Hour T = 44.61*(X) 49% 51% Weekday PM Peak Hour T = 33.03*(X) 50% 52% Weekday T = 467.48*(X) 50% 50% T = number of site-generated vehicular trips X = Independent Variable (VFP - Vehicle Fueling Positions / DU - Dwelling Units / KSF – 1000 Square Feet) Page 6 www.TPDinc.com The calculated trip generation for the proposed and existing development are shown in Table 4. TABLE 4 TRIP GENERATION SUMMARY Land Use – ITE # Size (X) External Trips Pass-By Trips New Trips Total Enter Exit Total Enter Exit Total Enter Exit Weekday AM Peak Hour Convenience Market w/ Gas - 945 12 VFP 379 190 189 284 142 142 95 48 47 Single Family Attached - 215 12 KSF 1 0 1 -- -- -- 1 0 1 Fast Food w/ Drive Through - 934 3.25 KSF 145 74 71 76 38 38 69 36 33 Net Trips 525 264 261 360 180 180 165 84 81 Weekday PM Peak Hour Convenience Market w/ Gas - 945 12 VFP 323 161 162 244 122 122 79 39 40 Single Family Attached - 215 12 KSF 3 2 1 -- -- -- 3 2 1 Fast Food w/ Drive Through - 934 3.25 KSF 107 56 51 52 26 26 55 30 25 Net Trips 433 219 214 296 148 148 137 71 66 Weekday Convenience Market w/ Gas - 945 12 VFP 4149 2075 2074 3112 1556 1556 1037 519 518 Single Family Attached - 215 12 KSF 41 21 20 -- -- -- 41 21 20 Fast Food w/ Drive Through - 934 3.25 KSF 1519 759 760 760 380 380 759 379 380 Net Trips 5709 2855 2854 3872 1936 1936 1837 919 918 X = Independent Variable (VFP - Vehicle Fueling Positions / DU – Dwelling Units / KSF – 1000 Square Feet) 1 = No ITE Data for the Average Weekday Pass-By Rate, however, pass-by trips are anticipated at the same rate as the peak hour rate (75%) Upon full buildout, the proposed development is expected to generate 165 net new vehicle-trips during the AM peak hour and 137 net new vehicle-trips trips during the PM peak hour. 6.2 TRIP DISTRIBUTION The distribution of trips generated by the proposed development were based on the local road network, the existing traffic patterns, the proposed use of the site, and the site driveway locations. Primary trips distributions were organized into two categories or groups: 1. Commercial (Convenience Market w/ Gas + Fast Food w/ Drive Thru) 2. Townhomes (Single Family Attached) The new trips for the proposed development were distributed to the local roadway network based on the percentages shown in Table 5. TABLE 5 TRIP DISTRIBUTION PERCENTAGES Direction (To/From) Assignment (To/From) Distribution Percent Commercial North Market Street (US 17) 60% South Market Street (US 17) 40% Townhomes North Market Street (US 17) 30% South Market Street (US 17) 70% Page 7 www.TPDinc.com Distribution percentages for the Commercial new primary and pass-by trips are illustrated in Figure 7A and 7B, respectively. Distribution percentages for the Townhomes new primary trips are illustrated in Figure 7C. The assignment of site-generated Commercial new primary trips and pass-by trips during the weekday AM and PM peak hours are illustrated in Figure 8A and 8B, respectively. The assignment of site-generated Townhomes new primary trips during the weekday AM and PM peak hours are illustrated in Figure 8C. The total site trips are illustrated in Figure 9. 6.3 BUILD TRAFFIC VOLUMES The calculated site-generated trips for the proposed development were added to the 2027 No-Build traffic volumes to develop the 2027 Build traffic volumes. The 2027 Build traffic volumes for the weekday AM and PM peak hours are illustrated in Figure 10. Traffic volume development worksheets are contained in Appendix D. 7.0 LEVELS OF SERVICE FOR INTERSECTION For analysis of intersections, level of service is defined in terms of delay, which is a measure of driver discomfort and frustration, fuel consumption, and lost travel time. LOS criteria are stated in terms of control delay per vehicle for a one-hour analysis period. Control delay includes initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. The criteria are shown in Table 6. Delay, as it relates to level of service, is a complex measure and is dependent upon a number of variables. For signalized intersections, these variables include the quality of vehicle progression, the cycle length, the green time ratio, and the volume/capacity ratio for the lane group in question. For unsignalized intersections, delay is related to the availability of gaps in the flow of traffic on the major street and the driver’s discretion in selecting an appropriate gap for a particular movement from the minor street (straight across, left or right turn). TABLE 6 LEVEL OF SERVICE CRITERIA UNSIGNALIZED AND SIGNALIZED INTERSECTIONS1 Level of Service Control Delay Per Vehicle (Seconds) Signalized Unsignalized A < 10 < 10 B > 10 and < 20 > 10 and < 15 C > 20 and < 35 > 15 and < 25 D > 35 and < 55 > 25 and < 35 E > 55 and < 80 > 35 and < 50 F > 80 or v/c > 1.0 > 50 or v/c > 1.0 1Obtained from Exhibits 19-8 and 20-2 of the Transportation Research Board’s Highway Capacity Manual 6th Edition 8.0 CAPACITY ANALYSIS METHODOLOGY Capacity analyses were conducted for the weekday AM and PM peak hours at the study area intersections. These analyses were conducted according to the methodologies contained in the Highway Capacity Manual (HCM) 6th Edition, using Synchro 11 software, a Trafficware product. The following scenarios were analyzed, as applicable: » 2024 Existing; » 2027 No-Build (existing + 1% background growth for 3 years + adjacent development) Page 8 www.TPDinc.com » 2027 Build (existing + 1% background growth for 3 years + adjacent development + site generated trips) In accordance with NCDOT’s Policy on Street and Driveway Access to North Carolina Highways, the analysis was modified as follows: » The right-turns on red (RTOR) option has not been utilized at signalized intersections under any conditions. » Signal timing settings indicated on NCDOT record traffic signal plans were utilized. » Yellow and all red timings are equal to 7 seconds (5 seconds for yellow, 2 seconds for red), per NCDOT guidelines. » Total lost time for all conditions is equal to 5 seconds; the lost time adjust is calculated based on the corresponding yellow + all red timing and a startup lost time of 2 seconds. » Where signalized intersections have left-turn signal phasing, all future analyses have assumed phasing to be protected only. » Peak hour factors have been adjusted to 0.90 at all study area intersections. » Truck percentages were increased as necessary to show a minimum of 2% trucks. NCDOT’s Transportation Impact Study Guidelines outlined in NCDOT’s Policy on Street and Driveway Access to North Carolina Highways, dated July 2003 contain the following criteria regarding levels of service: » Page 21-22 of the Guidelines state that the applicant will be required to identify mitigation improvements to the roadway network if at least one of the following conditions exists when comparing No-Build network to Build: » The total average delay at an intersection or individual approach increases by 25% or greater, while maintaining the same level of service; » The Level of Service degrades by at least one level; » Level of Service is “F”; and » Page 22 of the Guidelines state that for turning lanes, improvements shall be identified when the analysis indicates that 95th percentile queue exceeds the storage capacity of the existing lane. In addition, capacity analyses were conducted at the proposed site driveways under the year 2027 Build condition. The capacity analysis worksheets are included in Appendix E. Existing NCDOT traffic signal plans are included in Appendix F Page 9 www.TPDinc.com 9.0 LEVEL OF SERVICE IN THE STUDY AREA Level of service (LOS) analysis for the study area intersections are shown in Table 7. TABLE 7 LEVEL OF SERVICE SUMMARY Movement/Approach 2024 Existing 2027 No-Build 2027 Build % Change2 LOS Delay1 LOS Delay1 LOS Delay1 Weekday AM Peak Hour Market Street (US 17) & Alexander Road (SR 1345) EB R C 19.0 C 30.7 C 34.0 10.8% NB L C 18.6 C 29.0 C 30.6 5.2% SB T -- -- B 11.4 B 12.9 12.2% SB R -- -- A 5.8 A 6.0 3.5% ILOS -- -- A 8.6 B 10.3 19.8% Market Street (US 17) & Site Access 1 EB R -- -- -- -- D 31.0 -- Alexander Road (SR 1345) & Site Access 2 EB LT -- -- -- -- A 7.7 -- SB LR -- -- -- -- B 11.5 -- Alexander Road (SR 1345) & Site Access 3 WB LR -- -- -- -- B 10.0 -- SB TL -- -- -- -- A 7.6 -- Alexander Road (SR 1345) & Site Access 4 WB LR -- -- -- -- A 9.6 -- SB LT -- -- -- -- A 7.6 -- Weekday PM Peak Hour Market Street (US 17) & Alexander Road (SR 1345) EB R C 17.9 C 25.8 C 27.8 7.8% NB L C 17.4 C 27.4 C 29.1 6.2% SB T -- -- B 12.8 B 13.9 8.6% SB R -- -- A 5.8 A 6.0 3.5% ILOS -- -- A 7.7 A 8.8 14.3% Market Street (US 17) & Site Access 1 EB R -- -- -- -- D 29.7 -- Alexander Road (SR 1345) & Site Access 2 EB LT -- -- -- -- A 7.7 -- SB LR -- -- -- -- B 10.5 -- Alexander Road (SR 1345) & Site Access 3 WB LR -- -- -- -- A 9.5 -- SB LT -- -- -- -- A 7.5 -- Alexander Road (SR 1345) & Site Access 4 WB LR -- -- -- -- A 9.1 -- SB LT -- -- -- -- A 7.4 -- 1 Seconds of delay 2 Percent increase in delay from No-Build to Build As shown in Table 7, under 2027 Build weekday AM and PM peak hour, all movements operate at LOS D or better. Page 10 www.TPDinc.com 9.1 QUEUE ANALYSIS Queue analyses were conducted at the study area intersections using Synchro 11 software. For this analysis, both the 95th percentile Synchro queue and the maximum SimTraffic queue were evaluated and reported in Table 8. TABLE 8 QUEUE ANALYSIS Movement /Approach Storage Feet 2024 Existing1 2027 No-Build1 2027 Build1 Weekday AM Peak Hour Market Street (US 17) & Alexander Road (SR 1345) EB R -- <25/93 120/204 166/315 NB L 375 38/94 114/160 151/197 SB T -- -- 355/206 375/238 SB R 100 -- <12/[124] <25/[125] Market Street (US 17) & Site Access 1 EB R -- -- -- 103/122 Alexander Road (SR 1345) & Site Access 2 EB LT -- -- -- <25/<25 SB LR -- -- -- <25/53 Alexander Road (SR 1345) & Site Access 3 WB LR -- -- -- <25/31 SB LT -- -- -- <25/30 Alexander Road (SR 1345) & Site Access 4 WB LR -- -- -- <25/31 SB LT -- -- -- <25/<25 Weekday PM Peak Hour Market Street (US 17) & Alexander Road (SR 1345) EB R -- <25/67 71/218 106/178 NB L 375 <25/74 101/118 132/151 SB T -- -- 396/266 413/232 SB R 100 -- <25/[125] <25/116 Market Street (US 17) & Site Access 1 EB R -- -- -- 83/106 Alexander Road (SR 1345) & Site Access 2 EB LT -- -- -- <25/30 SB LR -- -- -- <25/53 Alexander Road (SR 1345) & Site Access 3 WB LR -- -- -- <25/31 SB LT -- -- -- <25/31 Alexander Road (SR 1345) & Site Access 4 WB LR -- -- -- <25/52 SB LT -- -- -- <25/<25 Red text highlights queue exceeding available storage 1 Synchro 95th Percentile Queue / SimTraffic Maximum Queue (feet) [#] = SimTraffic queue default to storage length + taper As shown in Table 8, during the weekday AM and PM peak hour, the following queuing concerns are anticipated: Market Street (US 17) & Site Access 1 » The eastbound right-turn driveway queue is anticipated to exceed 100 feet. Between Site Access 1 and 2, the traffic is expected to distribute and balance, resulting in shorter queue lengths than projected. Page 11 www.TPDinc.com 10.0 AUXILIARY TURN LANE ANALYSIS 10.1 FINDINGS TPD evaluated auxiliary turn lane warrants at the proposed site access intersections in accordance with NCDOT’s Policy on Street and Driveway Access to North Carolina Highways Warrant for Left and Right-Turn Lanes figure. Table 9 summarizes the results of the auxiliary turn lane analysis at the site driveway intersections. The calculations for the auxiliary turn lane warrants are included in Appendix G. TABLE 9 AUXILIARY TURN LANE ANALYSIS SUMMARY Intersection Auxiliary Lane Warrant Satisfied? Driveway Turn Lane Length Market Street (US 17) & Alexander Road (SR 1345) SB Right Turn Lane Yes 125’ Alexander Road (SR 1345) & Site Access 2 EB Left Turn Lane No -- WB Right Turn Lane No -- Alexander Road (SR 1345) & Site Access 3 EB Left Turn Lane No -- WB Right Turn Lane No -- Alexander Road (SR 1345) & Site Access 4 NB Right Turn Lane No -- SB Left Turn Lane No -- 11.0 SITE DISTANCE ANALYSIS 11.1 FINDINGS Alexander Road currently operates as a 2-lane minor arterial roadway with a posted speed limit of 25 mph. There is a 90-degree bend roughly 450 feet west of Market Street (US 17) reducing site distance for vehicles existing the site driveways. Site distance observations were conducted on Alexander Road for the site access driveways. TPD has determined that due to the low driveway volumes at the residential site accesses and low vehicle speeds on Alexander Road, site distance for the driveways is acceptable. Clearing of scrub plant growth along the inside of the ninety-degree curve on Alexander Road and managing low growth plant back of landscaping will further minimize site distance obstructions. Site distance observations are illustrated in Appendix H. 12.0 CONCLUSIONS Based on the results of the transportation impact analysis, TPD offers the following conclusions: » The purpose of this Traffic Impact Analysis (TIA) is to examine the potential traffic impacts associated with the proposed retail development at the northwest corner of Alexander Road (SR 1345) & Market Street (US 17) in Wilmington, New Hanover County, North Carolina. » The proposed mixed-use development will include a 6,200 SF convenience store with 12 vehicle fueling positions, an 3,250 SF drive-through fast food, and 12 attached townhomes. » Access to the convenience store and fast food is provided via one right-in/right-out driveway on Market Street (US 17) and one full access driveway on Alexander Road (SR 1345). Access to the Page 12 www.TPDinc.com townhomes is provided via two full access driveways on Alexander Road (SR 1345). There is no interconnectivity between the convenience store and fast food with the townhomes. » Upon full build-out, the proposed site is expected to generate a total of 165 new vehicle-trips during the weekday AM peak hour and 137 new vehicle-trips during the weekday PM peak hour. » The Abberly Wilmington is a nearby proposed development consisting of 253 low-rise apartment units located on Alexander Road (SR 1345) approximately 600 feet west of Market Street (US 17) with an expected build year of 2027. » The Abberly Wilmington development is scheduled to construct a southbound right-turn lane on market Street (US 17) at Alexander Drive (SR 1345) with 100 feet of storage and the appropriate full- width deceleration and taper. » The State Transportation Improvement Program (STIP) U-4902D includes signalization of the Market Street (US 17) & Alexander Road (SR 1345) intersection and a northbound left-turn lane with 375 feet of storage. A restricted Crossing U-Turn is also planned approximately 750 feet south of the Market Street (US 17) & Alexander Road (SR 1345) intersection. These improvements are currently under construction. » Site distance observations were conducted on Alexander Road for site access driveway locations. TPD has determined that due to the low residential site access volumes and low vehicle speeds on Alexander Road, site distance for the driveways are acceptable. » Under 2027 Build, all movements are expected to operate at LOS D or better during the weekday AM and PM peak hours. » Under 2027 Build, the following operation conditions are noted: Market Street (US 17) & Site Access 1 o The eastbound right-turn driveway queue is anticipated to exceed 100 feet. Between Site Access 1 and 2, traffic should distribute and balance, resulting in shorter queue lengths than expected. 13.0 RECOMMEDATIONS The following roadway network improvements are recommended: Market Street (US 17) & Site Access 1 » Proposed access configuration: o Right-in/Right-out o 25 ft width o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane » Install a southbound right-turn lane with 125 feet of storage and an appropriate taper on Market Street (US 17). Based on spacing from Alexander Road, the planned right-turn lane for Market Street at Alexander Road should be extended through Site Access 1 as a continuous right-turn lane. Page 13 www.TPDinc.com Alexander Road (SR 1345) & Site Access 2 » Proposed access configuration: o Full Access o 25 ft width o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane Alexander Road (SR 1345) & Site Access 3 » Proposed access configuration: o Full Access o 20 ft width o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane Alexander Road (SR 1345) & Site Access 4 » Proposed access configuration: o Full Access o 20 ft width o 50 ft stem length measured from the right-of-way o One entering lane & one exiting lane The recommended lane geometry for the Alexander Road Mixed-use development is illustrated in Figure 11. FIGURES: 1-11 N c:\pwworking\projectwise\jhadid\d2520032\8.5x11 Figures Seed.dgn 11/6/2024 11:58:23 AM jhadid 1 info@TPDinc.com www.TPDinc.com 1.877.873.9739 SITE LOCATION MAP FIGURE 1 SITE PROPOSED N c:\pwworking\projectwise\dkearns\d2520032\8.5x11 Figures Seed.dgn 12/20/2024 10:24:31 AM dkearns 2 - Copy-1 info@TPDinc.com www.TPDinc.com 1.877.873.9739 SITE PLAN FIGURE 2 51 ' - 0 " 52'-0" 6 0 ' - 0 " 1 0 0 ' - 0 " 227'-0" N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 9 / 2 0 2 4 2:5 0 : 3 1 P M dk e a r n s 3 info@TPDinc.com www.TPDinc.com 1.877.873.9739 EXISTING LANE CONFIGURATION FIGURE 3 Proposed Site SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY STOP CONTROLLED KEY: 37 5 ' Site Access 3 N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 1 0 / 2 0 2 4 11 : 2 6 : 0 9 A M dk e a r n s 4 info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 4 2024 EXISTING VEHICULAR TRAFFIC VOLUMES Proposed Site 1 4 3 4 ( 1 5 1 2 ) 1 9 ( 8 ) 68 (31) 1 2 3 ( 7 6 ) 1 1 4 5 ( 1 5 6 5 ) 1 4 5 3 ( 1 5 2 0 ) 1 1 4 5 ( 1 5 6 5 ) 68 (31) 142 (84) 6 8 ( 3 1 ) 1 4 2 ( 8 4 ) WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY STOP CONTROLLED KEY: Site Access 3 1 4 2 ( 8 4 ) 6 8 ( 3 1 ) N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 1 0 / 2 0 2 4 11 : 2 8 : 4 6 A M dk e a r n s 5 info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 5 ABBERLY RESIDENTIAL VEHICULAR TRAFFIC VOLUMES Proposed Site 2 ( 8 ) 77 (48) 1 4 ( 4 5 ) 3 5 ( 2 2 ) 2 ( 8 ) 3 5 ( 2 2 ) 77 (48) 16 (53) 6 ( 2 0 ) WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY STOP CONTROLLED KEY: Site Access 3 7 7 ( 4 8 ) 1 6 ( 5 3 ) N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 9 / 2 0 2 4 3:4 8 : 5 3 P M dk e a r n s 6 info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 6 2027 NO-BUILD VEHICULAR TRAFFIC VOLUMES Proposed Site 1 4 7 7 ( 1 5 5 8 ) 2 2 ( 1 6 ) 147 (80) 1 4 1 ( 1 2 3 ) 1 2 1 5 ( 1 6 3 4 ) 1 4 9 9 ( 1 5 7 4 ) 1 2 1 5 ( 1 6 3 4 ) 147 (80) 162 (140) 7 6 ( 5 2 ) 1 4 6 ( 8 7 ) WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: Signalization NCDOT STIP U-4902D Site Access 3 1 4 7 ( 8 0 ) 1 6 2 ( 1 4 0 ) N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 1 0 / 2 0 2 4 11 : 4 1 : 2 0 A M dk e a r n s 7A info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 7A TRIP DISTRIBUTION PERCENTAGES COMMERCIAL - PRIMARY Proposed Site 40% 60% 1 0 % 5 0 % (50%) ( 6 0 % ) ENTER % (EXIT %) SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: ( 5 0 % ) 1 0 % (50%) 4 0 % ( 6 0 % ) 50% ( 5 0 % ) Site Access 3 N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 1 0 / 2 0 2 4 11 : 5 1 : 0 6 A M dk e a r n s 7B info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 7B TRIP DISTRIBUTION PERCENTAGES COMMERCIAL - PASSBY Proposed Site - 9 0 % 9 0 % (90%) (10%) 1 0 % - 1 0 % ENTER % (EXIT %) SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: 10% ( 1 0 % ) Site Access 3 N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 9 / 2 0 2 4 4:2 4 : 4 7 P M dk e a r n s 7C info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 7C TRIP DISTRIBUTION PERCENTAGES TOWNHOMES - PRIMARY Proposed Site 70% 30% 3 0 % (100%) 7 0 % ( 3 0 % ) 3 0 % ( 3 0 % ) (100%) 100% 4 0 % (40%) ENTER % (EXIT %) SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: Site Access 3 (60%) ( 4 0 % ) 6 0 % 4 0 % N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 2 0 / 2 0 2 4 3:4 3 : 5 6 P M dk e a r n s 8A info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 8A TRIP DISTRIBUTION COMMERCIAL - PRIMARY Exit: 80 (65) Enter: 84 (69) Total: 164 (134) Proposed Site 4 0 ( 3 3 ) 8 ( 7 ) 40 (32) 3 ( 2 8 ) 4 8 ( 3 9 ) 8 ( 7 ) 4 2 ( 3 4 ) 40 (33) 4 8 ( 3 9 ) 4 0 ( 3 2 ) 42 (35) Site Access 3 WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: 4 8 N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 2 0 / 2 0 2 4 3:4 9 : 2 4 P M dk e a r n s 8B info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 8B TRIP DISTRIBUTION COMMERCIAL - PASSBY Exit: 180 (148) Enter: 180 (148) Total: 360 (296) Proposed Site 18 (15) 1 8 ( 1 5 ) - 1 6 2 ( - 1 3 3 ) 1 6 2 ( 1 3 3 ) 162 (133) 1 8 ( 1 5 ) 18 (15) Site Access 3 WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 2 0 / 2 0 2 4 3:5 8 : 2 5 P M dk e a r n s 8C info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 8C TRIP DISTRIBUTION TOWNHOMES - PRIMARY Exit: 1 (1) Enter: 0 (2) Total: 1 (3) Proposed Site 0 ( 1 ) 1 (1) 0 ( 1 ) 0 ( 0 ) 0 ( 1 ) 0 ( 0 ) 1 (1) 0 (2) 0 ( 1 ) 0 (0) WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: Site Access 3 1 (1) 0 ( 1 ) 0 ( 1 ) 0 ( 0 ) N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 2 0 / 2 0 2 4 4:0 8 : 1 9 P M dk e a r n s 9 info@TPDinc.com www.TPDinc.com 1.877.873.9739 TOTAL SITE TRIPS FIGURE 9 Exit: 261 (214) Enter: 264 (219) Total: 525 (433) Proposed Site 4 0 ( 3 3 ) 8 ( 8 ) 59 (48) 5 ( 4 4 ) 4 8 ( 3 9 ) - 1 5 4 ( - 1 2 5 ) 2 0 4 ( 1 6 7 ) 202 (166) 4 8 ( 3 9 ) 5 8 ( 4 7 ) 1 (1) 0 (2) 60 (50) 0 ( 1 ) 0 (0) WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: Site Access 3 1 (1) 0 ( 0 ) 0 ( 1 ) 0 ( 1 ) 2 0 N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 2 0 / 2 0 2 4 4:1 3 : 0 7 P M dk e a r n s 10 info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 10 2027 BUILD VEHICULAR TRAFFIC VOLUMES Proposed Site 1 5 1 7 ( 1 5 9 1 ) 3 0 ( 2 4 ) 206 (128) 1 9 ( 1 6 7 ) 1 2 6 3 ( 1 6 7 3 ) 1 3 4 5 ( 1 4 4 9 ) 2 0 4 ( 1 6 7 ) 202 (166) 1 2 6 3 ( 1 6 7 3 ) 5 8 ( 4 7 ) 148 (81) 162 (142) 60 (50) 7 6 ( 5 2 ) 1 4 6 ( 8 7 ) 0 ( 1 ) 0 (0) WEEKDAY AM (PM) PEAK HOUR SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: Site Access 3 1 (1) 0 ( 1 ) 1 6 2 ( 1 4 1 ) 1 4 7 ( 8 0 ) NOTE: Turning movement volumes illustrated at less than 4 vehicles have been analyzed utilizing a minimum volume of 4 vehicles. 6 3 N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ d k e a r n s \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 12 / 1 0 / 2 0 2 4 2:0 0 : 2 7 P M dk e a r n s 11 info@TPDinc.com www.TPDinc.com 1.877.873.9739 RECOMMENDED GEOMETRY FIGURE 11 Proposed Site SCHEMATIC DRAWING:NOT TO SCALE PROPOSED DRIVEWAY SIGNALIZED INTERSECTION STOP CONTROLLED KEY: 37 5 ' 10 0 ' Full Access One entering/one exiting lane 25' driveway width 50' stem length Full Access One entering/one exiting lane 20' driveway width 30' stem length Right-in/right-out One entering/one exiting lane 25' driveway width 50' stem length Abberly Development 100' SB right turn lane NCDOT Signalization STIP U-4902D PROPOSED LANE CONFIGURATION NCDOT Signalization STIP U-4902D southbound right-turn lane with appropriate taper 50' Site Access 3 Full Access One entering/one exiting lane 20' driveway width 50' stem length 125' 12 5 ' Project Correspondence Appendix A August 8, 2024 REVISED September 10, 2024 Dylan Coley, PE Davenport 4600 Marriott Drive, Suite 340 Raleigh, NC 27612 RE: Approved Scope for the Traffic Impact Analysis (TIA) associated with the proposed Alexander Road Retail Development New Hanover County, NC Dear Mr. Coley: Based on the information provided, and conversations held to date, it is our understanding that the proposed development will consist of: • LUC 420, Marina – 56 boat/RV berths (spaces) • LUC 215, Townhomes – 14 dwelling units • LUC 937, Drive-thru Coffee Shop – 1,850 square feet • LUC 945, Convenience Store/Gas Station - 6,200 square feet of convenience store/gas station with 12 VFP Located on the corner of US 17 (Market Street) and Alexander Road (SR 1345) in New Hanover County, NC, North Carolina. The site plan, provided August 28, 2024, by Davenport, proposes access at the following points: • US 17 BUS (Market Street) and Site Access 1 (RI/RO, access to gas station and coffee shop only) • SR 1345 (Alexander Road) and Site Access 2 (full movement, access to gas station and coffee shop only) • SR 1345 (Alexander Road) and Site Access 2 (full movement, gated access to boat/RV storage only) • SR 1345 (Alexander Road) and Site Access 3 (full movement, access to eight townhomes only) • SR 1345 (Alexander Road) and Site Access 4 (full movement, access to six townhomes only) Below please find the scope to be used for the Traffic Impact Analysis: Page 2 of 3 1. Data Collection - Analysis Parameters: a. Study Intersections i. For existing intersections, provide turning movement counts for weekday AM (7:00am- 9:00am) and PM (4:00 pm - 6:00pm) peak periods, signal timing (if applicable), and lane geometry: 1. US 17 (Market Street) and Alexander Road (SR 1345) 2. US 17 (Market Street) Southbound-to-Northbound U-Turn 3. US 17 (Market Street) and Site Access 1 (right-in/right-out) 4. SR 1345 (Alexander Road) and Site Access 2 (full movement) 5. SR 1345 (Alexander Road) and Site Access 3 (full movement; gated access to boat/RV storage only) 6. SR 1345 (Alexander Road) and Site Access 3 (full movement, aligned with Abberly Wilmington Site Access A) 7. SR 1345 (Alexander Road) and Site Access 4 (full movement). b. Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions i. Site Trip Generation Estimate – use 11th Edition rates ii. Site Trip Distribution - To be submitted for approval and approved prior to use in the TIA. iii. Adjacent Development (approved (but as of yet to be built)) development including but limited to; 1. Abberly Wilmington – a proposed development consisting of 253 low-rise apartment units, with an expected build year of 2027. A TIA was submitted by DRMP on March 6, 2024, and was approved by the WMPO on May 7, 2024. iv. Planned Roadway Improvements 1. U-4902D – conversion of US 17 to a Restricted Crossing U-Turn (RCUT) corridor. A signalized southbound-to-northbound U-turn is proposed approximately 750’ south of the US 17 and Alexander Road (southern connection) intersection. 2. Abberly Wilmington – US 17 and Alexander Road (southern connection) - construct a southbound right turn lane on US 17 (Market Street) with 100 feet of storage, and appropriate full-width deceleration and taper. v. Background Traffic Assumptions • Build Year – 2027 • Growth rate – 1% per year vi. Other Information 2. Capacity Analysis: Weekday PM & Saturday Peak Hour (as listed and for locations per 1.a.i) a. Technical Analysis i. 2024 Existing Conditions ii. 2027 Future No-Build Conditions [existing + 1% background growth + adjacent development] Page 3 of 3 iii. 2027 Future Build Conditions [existing + 1% background growth + adjacent development + site trips] iv. 2027 Future Build Conditions with Improvements [existing + 1% background growth + adjacent development + site trips + improvements] 3. Final Report Submittal: a. Completed TIA Application b. Signed and sealed by a Professional Engineer c. Electronic copies to include PDF of TIA and Synchro files and Synchro analysis files in digital format 4. Notes: a. This scope shall remain valid for three months from the date of this letter. b. Please note that if any changes occur (including but not limited to; land use, intensity, phasing, and/or site access) additional analysis may be required. Please contact me at (910) 341-7890 with any questions regarding this scope. Sincerely, Abby Lorenzo, MPA Deputy Director Wilmington Urban Area MPO Attachments: Traffic Impact Analysis Supplemental Guidelines (dated September 28, 2022) Scoping request letter (provided by DAVENPORT, dated July 11, 2024) Abberly Wilmington TIA approval with conditions (dated May 7, 2024) Alexander Road Retail Concept Site Plan (received by WMPO from Davenport August 28, 2024) Cc: Ben Hughes, PE, District Engineer, NCDOT Jon Roan, Deputy District Engineer, NCDOT Frank Mike, Assistant District Engineer, NCDOT Michael Bass, Assistant District Engineer, NCDOT Stonewall Mathis, PE, Division Traffic Engineer, NCDOT Bryce Cox, Assistant Traffic Engineer, NCDOT Madi Lee, Assistant Traffic Engineer, NCDOT Robert Farrell, Development Review Supervisor, New Hanover County Bill McDow, Associate Planner, WMPO Concept site plan submitted to WMPO by DAVENPORT on 08/28/2024. Proposed Trip Generation Trip Generation Comparison Future No Build Synchro Review TIA Name and date: Alexander Road Retail 11/6/24 Reviewer: MBL Date Reviewed: 12/2/24 Check parameters of study against the approved TIA Scope and Congestion Management guidelines. Use Blue ink for items that check off and Red ink for items that potentially need correction/revision or determine the TIA to be invalid and a resubmittal necessary. Intersections 1. US 17 and Alexander Road: Lane Settings • Are all entered volumes a minimum of 4 vph? (There should be no values of 0, 1, 2, or 3 for the most accurate calculations) o Yes • Is the model showing the correct lane configuration at each approach? o There should be a SBR turn lane with 100 feet of storage based on requirements from Abberly Wilmington as outlined in the scope. • If entered, is the grade correct for each approach? o Yes • Are the correct number of storage lanes entered and are they the correct lengths? o See comment above • Is the right turn set to channelized where necessary? o N/A • Is Right Turn on Red (RTOR) used? Eliminate all RTOR phasing (existing and future). Congestion Management guidelines state “do not analyze right turn on red at any proposed intersection approaches to ensure that adequate storage is provided.” o No RTOR used Timing Settings • Are the turn types correct and associated with the correct phases? Eliminate all PT+PM left-turn phasing in future conditions. Congestion Management guidelines state that analysis of Protected-only phasing in future conditions will identify required storage in the event that Protected-only phasing is necessary. Existing Permissive left-turn phasing should remain Permissive in future conditions, except where Protected-only phasing is being analyzed as an improvement to the intersection in Future + Improvement condition. o Yes • Is the lost time greater than or equal to 5 seconds? o Yes [Corrected - No-Build & Build Synchro] [Corrected] • Check for Recall Mode on Signalized Intersection. If simulating ‘free run’ operation (actuated-uncoordinated), use Min Recall on main street phase. If simulating ‘Coordinated Mode’ (Actuated-Coordinate), use C-Max.” o Coordinated, C-Max Phasing Settings • Is the control type correct? o Yes • Is the cycle length correct? o Please use a 78 cycle • Is the offset correct? o Yes • Check “Referenced to” and “Reference Phase.” o Yes • Check the times for minimum initial, maximum split, yellow time, all-red time, vehicle extension, minimum gap, time before reduce, time to reduce, walk time, and flash don’t walk. Yellow times should either match the signal plans or be entered as a default of Y=5 s. All-Red times should either match the signal plans or be entered as a default of R=2 s. o Correct other than max splits which will be updated when optimized for the new cycle length • Are the correct phases marked as pedestrian phases? o None Detector Settings • Do the size and distance from the stop bar match the included signal plans? o EBR detector should have a size of 40’. o NBL detector should have a size of 40’. o SBT detectors should have a position of 300’. o NBT should not have detectors • Are the leading and trailing detectors correct? o Will update when the above changes are made. • Is the detector type correct? o Yes • Are the detector channels, extend, and queue correct? o Yes • Are the detector delays correct? o EBR detector should have a delay of 15s. o NBL detector should have a delay of 10s. Roads 1. US 17: • Is the speed limit correct? o SB approach is correct o NB approach should be 45mph. [Corrected - 78 second cycle length. Optimized splits = + 8 seconds to 6 movement] [Corrected] [Corrected] [Corrected] [Corrected] [Corrected] [Corrected] [Corrected] [Corrected] • If this road is a Y line, is it at least 1000 feet? o Yes 2. Alexander Road: • Is the speed limit correct? o Yes • If this road is a Y line, is it at least 1000 feet? o Yes N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ j h a d i d \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 11 / 6 / 2 0 2 4 12 : 2 1 : 4 5 P M jh a d i d 7A - info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 7A PRIMARY TRIP DISTRIBUTION COMMERCIAL Proposed Site S i t e A c c e s s 3 ( 5 0 % ) 1 0 % (45%) 4 5 % ( 5 0 % ) 1 0 % 4 0 % (50%) ( 5 0 % ) ( 4 5 % ) ( 5 % ) 5% 55% 5% (5%) 5 % ( 5 % ) 45% 50%5% SCHEMATIC DRAWING:NOT TO SCALE SIGNALIZED INTERSECTION STOP CONTROLLED KEY: 0% 40% 60% N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ j h a d i d \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 11 / 6 / 2 0 2 4 12 : 2 4 : 0 6 P M jh a d i d 7B - info@TPDinc.com www.TPDinc.com 1.877.873.9739 COMMERCIAL PASS-BY TRIP DISTRIBUTION FIGURE 7B Proposed Site S i t e A c c e s s 3 (40%) 4 0 % - 6 0 % 6 0 % (60%) ( 4 0 % ) 40% SCHEMATIC DRAWING:NOT TO SCALE SIGNALIZED INTERSECTION STOP CONTROLLED KEY: 90% 10% N ( U S 1 7 ) M a r k e t S t r e e t ( S R 1 3 4 5 ) A l e x a n d e r R o a d Site Access 1 S i t e A c c e s s 2 Site Access 4 c:\ p w w o r k i n g \ p r o j e c t w i s e \ j h a d i d \ d 2 5 2 0 0 3 2 \ 8 . 5 x 1 1 F i g u r e s S e e d . d g n 11 / 6 / 2 0 2 4 12 : 2 9 : 1 8 P M jh a d i d 7C - info@TPDinc.com www.TPDinc.com 1.877.873.9739 FIGURE 7C PRIMARY TRIP DISTRIBUTION TOWNHOMES Proposed Site S i t e A c c e s s 3 65% 25%10% 2 5 % (90%) 6 5 % ( 2 5 % ) 2 5 % ( 2 5 % ) (90%) 90% ( 5 0 % ) ( 5 % ) 5% (40%) 40% 50% 5 % 5 % ( 5 % ) 4 0 % (40%) (5%) SCHEMATIC DRAWING:NOT TO SCALE SIGNALIZED INTERSECTION STOP CONTROLLED KEY: 0%30% 70% Proposed Trip Generation Trip Generation Comparison ITE Equation 3.25 12 1 1 2 341 1519 74 71 145 56 51 107 5,709 264 261 525 219 214 433 360180180 148 148 296 84 81 165 1377166 74 71 145 56 51 1073.25 Appendix BManual Traffic Count Printouts Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Market St -- Alexander Rd QC JOB #: QC JOB #: 16769301 CITY/STATE: CITY/STATE: Bayshore, NC DATE: DATE: Wed, Oct 23 2024 1455 1160 19 1436 0 89 0 15 15 0 0.960.96 0 68 68 0 16 123 1145 16 1557 1284 Peak-Hour: 7:45 AM -- 8:45 AMPeak-Hour: 7:45 AM -- 8:45 AM Peak 15-Min: 8:30 AM -- 8:45 AMPeak 15-Min: 8:30 AM -- 8:45 AM 1.6 4.5 5.3 1.5 0 1.1 0 13.3 13.3 0 0 2.9 2.9 0 6.3 0 4.4 6.3 1.5 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Market StMarket St (Northbound)(Northbound) Market StMarket St (Southbound)(Southbound) Alexander RdAlexander Rd (Eastbound)(Eastbound) Alexander RdAlexander Rd (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 7:00 AM 0 199 7 6 0 327 1 0 0 0 7 0 0 0 1 0 548 7:15 AM 5 245 4 8 0 394 1 0 0 0 8 0 0 0 0 0 665 7:30 AM 7 305 6 9 0 376 4 0 0 0 10 0 0 0 2 0 719 7:45 AM 4 311 8 10 0 376 2 0 0 0 7 0 0 0 4 0 722 2654 8:00 AM 10 252 2 22 0 345 2 0 0 0 12 0 0 0 9 0 654 2760 8:15 AM 34 280 3 11 0 353 11 0 0 0 14 0 0 0 2 0 708 2803 8:30 AM 22 302 3 10 0 362 4 0 0 0 35 0 0 0 0 0 738 2822 8:45 AM 5 284 4 6 0 366 0 0 0 0 12 0 0 0 5 0 682 2782 Peak 15-MinPeak 15-MinFlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 88 1208 12 40 0 1448 16 0 0 0 140 0 0 0 0 0 2952 Heavy Trucks 0 68 0 0 24 4 0 0 0 0 0 0 96 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/30/2024 11:43 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Type of peak hour being reported: Intersection Peak Method for determining peak hour: Total Entering Volume LOCATION: LOCATION: Market St -- Alexander Rd QC JOB #: QC JOB #: 16769302 CITY/STATE: CITY/STATE: Bayshore, NC DATE: DATE: Wed, Oct 23 2024 1520 1582 8 1512 0 40 0 17 17 0 0.950.95 0 31 31 0 7 76 1565 7 1587 1648 Peak-Hour: 5:00 PM -- 6:00 PMPeak-Hour: 5:00 PM -- 6:00 PM Peak 15-Min: 5:15 PM -- 5:30 PMPeak 15-Min: 5:15 PM -- 5:30 PM 0.9 0.8 0 0.9 0 2.5 0 0 0 0 0 9.7 9.7 0 42.9 1.3 0.8 42.9 1.1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 N/A N/A N/A N/A N/A N/A N/A N/A 15-Min Count15-Min CountPeriod Period Beginning AtBeginning At Market StMarket St (Northbound)(Northbound) Market StMarket St (Southbound)(Southbound) Alexander RdAlexander Rd (Eastbound)(Eastbound) Alexander RdAlexander Rd (Westbound)(Westbound)TotalTotal HourlyHourlyTotalsTotalsLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU 4:00 PM 2 390 2 18 0 351 0 0 0 0 4 0 0 0 4 0 771 4:15 PM 5 399 0 14 0 384 0 0 0 0 4 0 0 0 6 0 812 4:30 PM 6 409 2 16 0 360 0 0 0 0 8 0 0 0 2 0 803 4:45 PM 9 370 1 11 0 333 1 0 0 0 3 0 0 0 4 0 732 3118 5:00 PM 5 386 5 17 0 377 1 0 0 0 16 0 0 0 2 0 809 3156 5:15 PM 11 410 1 16 0 391 2 0 0 0 5 0 0 0 7 0 843 3187 5:30 PM 8 390 1 7 0 373 2 0 0 0 3 0 0 0 4 0 788 3172 5:45 PM 8 379 0 4 0 371 3 0 0 0 7 0 0 0 4 0 776 3216 Peak 15-MinPeak 15-Min FlowratesFlowrates NorthboundNorthbound SouthboundSouthbound EastboundEastbound WestboundWestbound TotalTotalLeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUULeftLeftThruThruRightRightUU All Vehicles 44 1640 4 64 0 1564 8 0 0 0 20 0 0 0 28 0 3372 Heavy Trucks 4 16 0 0 16 0 0 0 8 0 0 0 44 Buses Pedestrians 0 0 0 0 0 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 Scooters Comments: Report generated on 10/30/2024 11:43 AM SOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212 Page 1 of 1 Appendix CProposed Nearby Development Abberly Wilmington Wilmington, NC Scale: Not to Scale N Alexander Road Avery Drive U-Haul/Chiropractor Driveway 17 N SITE Site Access B Site Access A Site Trip Assignment Figure 9 16 2/ 8 77/48 14 / 4 5 35 / 2 2 8/ 2 8 2/ 8 35 / 2 2 2/ 8 6/ 2 0 6/ 2 0 77/48 16 / 5 3 Signalized Intersection Unsignalized Intersection Weekday AM / PM Peak Hour Site TripsX / Y LEGEND Right-In/Right-Out Intersection Left-Over Intersection Abberly Wilmington Wilmington, NC Scale: Not to Scale Figure E-1 Recommended Lane Configurations vi Alexander Road Avery Drive U-Haul/Chiropractor Driveway 17 SITE Site Access B Site Access A 37 5 ' 10 0 ' 37 5 ' Signalized Intersection Unsignalized Intersection Existing Lane Storage (In Feet) X' Right-In / Right-Out Intersection Signal Installation by STIP U-4902D Improvements by STIP U-4902D New Movements by Developer LEGEND Left-Over Intersection Appendix DVolume Development Worksheets TPD Job # Existing Year Entering Exiting Total AM Entering Exiting Total PM Phase 1 Build Year 84 80 164 69 65 134 Phase 2 Build Year 180 180 360 148 148 296 0 1 1 2 1 3 Growth Rate 0 0 0 0 Peak Hour Factor 0 TPD Volume Development Worksheet Project-Specific Information TFV2 Phase 1 Primary Trips Residential Pass-By Trips AM Peak Hour 2027 Primary Trips Commercial Trip Type2024Trip Type Primary Trips Commercial Pass-By Trips PM Peak Hour 0.90 Phase 1 Primary Trips Residential 1%0 Is this development being constructed in 2 phases? 12/24/2024 Traffic Volumes Worksheet Intersection: Synchro Node: 1 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts 68 123 1145 1434 19 2789 Balancing 2024 Existing Volumes (Balanced)68 123 1145 1434 19 2789 Background Development (Abberly Wilmington)77 14 35 2 128 Phase 1 Growth (1% compounded for 3 yr)2 4 35 43 1 85 2027 No-Build Volumes 147 141 1215 1477 22 3002 Trip Assignment % - Primary Trips Commercial Enter 40% 10%-- Trip Assignment % - Primary Trips Commercial Exit 50% 60% 50%-- Trip Assignment % - Pass-By Trips Enter 10%-- Trip Assignment % - Pass-By Trips Exit 10%-- Trip Assignment % - Primary Trips Residential Enter 70% 30%-- Trip Assignment % - Primary Trips Residential Exit 100% 30%-- Primary Trips Commercial 40 34 48 40 8 170 Pass-By Trips 18 18 36 Primary Trips Residential 1 1 Total Phase 1 New Trips 59 52 48 40 8 207 2027 Build Volumes 206 193 1263 1517 30 3209 Time Period: Weekday P.M. Peak Hour 5:00 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts 31 76 1565 1512 8 3192 Balancing 2024 Existing Volumes (Balanced)31 76 1565 1512 8 3192 Background Development (Abberly Wilmington)48 45 22 8 123 Phase 1 Growth (1% compounded for 3 yr)1 2 47 46 96 2027 No-Build Volumes 80 123 1634 1558 16 3411 Trip Assignment % - Primary Trips Commercial Enter 40% 10%-- Trip Assignment % - Primary Trips Commercial Exit 50% 60% 50%-- Trip Assignment % - Pass-By Trips Enter 10%-- Trip Assignment % - Pass-By Trips Exit 10%-- Trip Assignment % - Primary Trips Residential Enter 70% 30%-- Trip Assignment % - Primary Trips Residential Exit 100% 30%-- Primary Trips Commercial 32 28 39 33 7 139 Pass-By Trips 15 15 30 Primary Trips Residential 1 1 1 3 Total Phase 1 New Trips 48 44 39 33 8 172 2027 Build Volumes 128 167 1673 1591 24 3583 No-Build Trip Distribution Build Existing TFV2 Market Street (US 17) & Alexander Road (SR 1345) AM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Existing PM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound No-Build Trip Distribution Build 12/24/2024 1:13 PM 12/20/2024 Traffic Volumes Worksheet Intersection: Synchro Node: 2 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 1145 1453 2598 2024 Existing Volumes (Balanced)1145 1453 2598 Background Development (Abberly Wilmington)35 2 37 Phase 1 Growth (1% compounded for 3 yr)35 44 79 2027 No-Build Volumes 1215 1499 2714 Trip Assignment % - Primary Trips Commercial Enter 10% 50%-- Trip Assignment % - Primary Trips Commercial Exit 50% 60%-- Trip Assignment % - Pass-By Trips Enter -90% 90%-- Trip Assignment % - Pass-By Trips Exit 90%-- Trip Assignment % - Primary Trips Residential Enter 30%-- Trip Assignment % - Primary Trips Residential Exit 30%-- Primary Trips Commercial 40 48 8 42 138 Pass-By Trips 162 -162 162 162 Primary Trips Residential Total Phase 1 New Trips 202 48 -154 204 300 2027 Build Volumes 202 1263 1345 204 3014 Time Period: Weekday P.M. Peak Hour 5:00 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 1565 1520 3085 2024 Existing Volumes (Balanced)1565 1520 3085 Background Development (Abberly Wilmington)22 8 30 Phase 1 Growth (1% compounded for 3 yr)47 46 93 2027 No-Build Volumes 1634 1574 3208 Trip Assignment % - Primary Trips Commercial Enter 10% 50%-- Trip Assignment % - Primary Trips Commercial Exit 50% 60%-- Trip Assignment % - Pass-By Trips Enter -90% 90%-- Trip Assignment % - Pass-By Trips Exit 90%-- Trip Assignment % - Primary Trips Residential Enter 30%-- Trip Assignment % - Primary Trips Residential Exit 30%-- Primary Trips Commercial 33 39 7 34 113 Pass-By Trips 133 -133 133 133 Primary Trips Residential 1 1 Total Phase 1 New Trips 166 39 -125 167 247 2027 Build Volumes 166 1673 1449 167 3455 Existing No-Build Trip Distribution TFV2 Market Street (US 17) & Site Access 1 AM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Build PM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Existing No-Build Trip Distribution Build 12/24/2024 8:18 AM 12/20/2024 Traffic Volumes Worksheet Intersection: Synchro Node: 3 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 68 142 210 2024 Existing Volumes (Balanced)68 142 210 Background Development (Abberly Wilmington)77 16 93 Phase 1 Growth (1% compounded for 3 yr)2 4 6 2027 No-Build Volumes 147 162 309 Trip Assignment % - Primary Trips Commercial Enter 50%-- Trip Assignment % - Primary Trips Commercial Exit 50%-- Trip Assignment % - Pass-By Trips Enter 10%-- Trip Assignment % - Pass-By Trips Exit 10%-- Trip Assignment % - Primary Trips Residential Enter 100%-- Trip Assignment % - Primary Trips Residential Exit 100%-- Primary Trips Commercial 42 40 82 Pass-By Trips 18 18 36 Primary Trips Residential 1 1 Total Phase 1 New Trips 1 60 58 119 2027 Build Volumes 148 162 60 58 428 Time Period: Weekday P.M. Peak Hour 5:00 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 31 84 115 2024 Existing Volumes (Balanced)31 84 115 Background Development (Abberly Wilmington)48 53 101 Phase 1 Growth (1% compounded for 3 yr)1 3 4 2027 No-Build Volumes 80 140 220 Trip Assignment % - Primary Trips Commercial Enter 50%-- Trip Assignment % - Primary Trips Commercial Exit 50%-- Trip Assignment % - Pass-By Trips Enter 10%-- Trip Assignment % - Pass-By Trips Exit 10%-- Trip Assignment % - Primary Trips Residential Enter 100%-- Trip Assignment % - Primary Trips Residential Exit 100%-- Primary Trips Commercial 35 32 67 Pass-By Trips 15 15 30 Primary Trips Residential 1 2 3 Total Phase 1 New Trips 1 2 50 47 100 2027 Build Volumes 81 142 50 47 320 Existing No-Build Trip Distribution TFV2 Alexander Road (SR 1345) & Site Access 2 AM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Build PM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Existing No-Build Trip Distribution Build 12/24/2024 8:18 AM 12/20/2024 Traffic Volumes Worksheet Intersection: Synchro Node: 4 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 68 142 210 2024 Existing Volumes (Balanced)68 142 210 Background Development (Abberly Wilmington)77 16 93 Phase 1 Growth (1% compounded for 3 yr)2 4 6 2027 No-Build Volumes 147 162 309 Trip Assignment % - Primary Trips Commercial Enter -- Trip Assignment % - Primary Trips Commercial Exit -- Trip Assignment % - Pass-By Trips Enter -- Trip Assignment % - Pass-By Trips Exit -- Trip Assignment % - Primary Trips Residential Enter 40% 60%-- Trip Assignment % - Primary Trips Residential Exit 40% 60%-- Primary Trips Commercial Pass-By Trips Primary Trips Residential 1 1 Total Phase 1 New Trips 1 1 2027 Build Volumes 147 162 1 310 Time Period: Weekday P.M. Peak Hour 5:00 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 31 84 115 2024 Existing Volumes (Balanced)31 84 115 Background Development (Abberly Wilmington)48 53 101 Phase 1 Growth (1% compounded for 3 yr)1 3 4 2027 No-Build Volumes 80 140 220 Trip Assignment % - Primary Trips Commercial Enter -- Trip Assignment % - Primary Trips Commercial Exit -- Trip Assignment % - Pass-By Trips Enter -- Trip Assignment % - Pass-By Trips Exit -- Trip Assignment % - Primary Trips Residential Enter 40% 60%-- Trip Assignment % - Primary Trips Residential Exit 40% 60%-- Primary Trips Commercial Pass-By Trips Primary Trips Residential 1 1 1 3 Total Phase 1 New Trips 1 1 1 3 2027 Build Volumes 80 141 1 1 223 Existing No-Build Trip Distribution TFV2 Alexander Road (SR 1345) & Site Access 3 AM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Build PM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Existing No-Build Trip Distribution Build 12/24/2024 8:18 AM 12/20/2024 Traffic Volumes Worksheet Intersection: Synchro Node: 5 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 142 68 210 2024 Existing Volumes (Balanced)142 68 210 Background Development (Abberly Wilmington)6 6 Phase 1 Growth (1% compounded for 3 yr)4 2 6 2027 No-Build Volumes 146 76 222 Trip Assignment % - Primary Trips Commercial Enter -- Trip Assignment % - Primary Trips Commercial Exit -- Trip Assignment % - Pass-By Trips Enter -- Trip Assignment % - Pass-By Trips Exit -- Trip Assignment % - Primary Trips Residential Enter 40%-- Trip Assignment % - Primary Trips Residential Exit 40%-- Primary Trips Commercial Pass-By Trips Primary Trips Residential Total Phase 1 New Trips 2027 Build Volumes 146 76 222 Time Period: Weekday P.M. Peak Hour 5:00 Intersection left thru right left thru right left thru right left thru right Volume Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 -- Heavy Vehicle Percentages 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% -- 2024 Existing Counts Balancing 84 31 115 2024 Existing Volumes (Balanced)84 31 115 Background Development (Abberly Wilmington)20 20 Phase 1 Growth (1% compounded for 3 yr)3 1 4 2027 No-Build Volumes 87 52 139 Trip Assignment % - Primary Trips Commercial Enter -- Trip Assignment % - Primary Trips Commercial Exit -- Trip Assignment % - Pass-By Trips Enter -- Trip Assignment % - Pass-By Trips Exit -- Trip Assignment % - Primary Trips Residential Enter 40%-- Trip Assignment % - Primary Trips Residential Exit 40%-- Primary Trips Commercial Pass-By Trips Primary Trips Residential 1 1 Total Phase 1 New Trips 1 1 2027 Build Volumes 87 1 52 140 TFV2 Alexander Road (SR 1345) & Site Access 4 AM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Existing No-Build Trip Distribution Build PM PEAK HOUR VOLUMES Eastbound Westbound Northbound Southbound Existing No-Build Trip Distribution Build 12/24/2024 8:18 AM Appendix ECapacity Analyses 2024 Existing Existing AM 1: US 17 & Alexander Road 12/24/2024 Existing AM 12:46 pm 10/22/2024 Baseline HCM Page 1 Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 68 123 1145 1434 19 Future Vol, veh/h 0 68 123 1145 1434 19 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 375 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % -1 - - -1 1 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 76 137 1272 1593 21 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 807 1614 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.84 4.14 - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.32 2.22 - - - Pot Cap-1 Maneuver 0 332 400 - - - Stage 1 0 - - - - - Stage 2 0 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 332 400 - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 19 1.8 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 400 - 332 - - HCM Lane V/C Ratio 0.342 - 0.228 - - HCM Control Delay (s) 18.6 - 19 - - HCM Lane LOS C - C - - HCM 95th %tile Q(veh) 1.5 - 0.9 - - Existing AM Queuing and Blocking Report 12/24/2024 Existing AM SimTraffic Report Page 1 Intersection: 1: US 17 & Alexander Road Movement EB NB Directions Served R L Maximum Queue (ft) 93 94 Average Queue (ft) 35 45 95th Queue (ft) 70 78 Link Distance (ft) 2245 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 Existing PM 1: US 17 & Alexander Road 12/24/2024 Existing PM 4:05 pm 11/04/2024 HCM Page 1 Intersection Int Delay, s/veh 0.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 31 76 1565 1512 8 Future Vol, veh/h 0 31 76 1565 1512 8 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 375 - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % -1 - - -1 1 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 34 84 1739 1680 9 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 845 1689 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.84 4.14 - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.32 2.22 - - - Pot Cap-1 Maneuver 0 313 374 - - - Stage 1 0 - - - - - Stage 2 0 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 313 374 - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 17.9 0.8 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 374 - 313 - - HCM Lane V/C Ratio 0.226 - 0.11 - - HCM Control Delay (s) 17.4 - 17.9 - - HCM Lane LOS C - C - - HCM 95th %tile Q(veh) 0.9 - 0.4 - - Existing PM Queuing and Blocking Report 12/24/2024 Existing PM SimTraffic Report Page 1 Intersection: 1: US 17 & Alexander Road Movement EB NB Directions Served R L Maximum Queue (ft) 67 74 Average Queue (ft) 26 34 95th Queue (ft) 56 67 Link Distance (ft) 2245 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 2026 No-Build No-Build AM 1: US 17 & Alexander Road 12/24/2024 No-Build AM 12:46 pm 10/22/2024 Baseline Synchro 11 Report Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 147 141 1215 1477 22 Future Volume (vph) 0 147 141 1215 1477 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -1% -1% 1% Storage Length (ft) 0 0 375 100 Storage Lanes 0 1 1 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1619 1778 3557 3522 1575 Flt Permitted 0.950 Satd. Flow (perm) 0 1619 1778 3557 3522 1575 Right Turn on Red No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 Link Distance (ft) 2297 2067 2537 Travel Time (s) 62.6 31.3 38.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 163 157 1350 1641 24 Shared Lane Traffic (%) Lane Group Flow (vph) 0 163 157 1350 1641 24 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 0.99 0.99 0.99 0.99 1.01 1.01 Turning Speed (mph) 15 9 15 9 Turn Type Perm custom NA NA Perm Protected Phases 3 3 6 6 Permitted Phases 3 3 6 Detector Phase 3 3 3 6 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 12.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 53.0 53.0 Total Split (%) 32.1% 32.1% 67.9% 67.9% Maximum Green (s) 18.0 18.0 46.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 3.0 3.0 No-Build AM 1: US 17 & Alexander Road 12/24/2024 No-Build AM 12:46 pm 10/22/2024 Baseline Synchro 11 Report Page 2 Lane Group EBL EBR NBL NBT SBT SBR Time Before Reduce (s) 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 30.0 30.0 Recall Mode None None C-Max C-Max Act Effct Green (s) 16.7 16.7 78.0 51.3 51.3 Actuated g/C Ratio 0.21 0.21 1.00 0.66 0.66 v/c Ratio 0.47 0.41 0.38 0.71 0.02 Control Delay 30.7 29.0 0.3 11.4 5.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 30.7 29.0 0.3 11.4 5.8 LOS C C A B A Approach Delay 30.7 3.3 11.3 Approach LOS C A B Queue Length 50th (ft) 68 65 0 243 4 Queue Length 95th (ft) 120 114 0 355 12 Internal Link Dist (ft) 2217 1987 2457 Turn Bay Length (ft) 375 100 Base Capacity (vph) 415 455 3532 2318 1036 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.39 0.35 0.38 0.71 0.02 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 0 (0%), Referenced to phase 2: and 6:NBSB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay: 8.6 Intersection LOS: A Intersection Capacity Utilization 58.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: US 17 & Alexander Road No-Build AM Queuing and Blocking Report 12/24/2024 No-Build AM SimTraffic Report Page 1 Intersection: 1: US 17 & Alexander Road Movement EB NB SB SB SB Directions Served R L T T R Maximum Queue (ft) 204 160 202 206 124 Average Queue (ft) 93 91 130 118 9 95th Queue (ft) 158 137 189 191 48 Link Distance (ft) 2240 2516 2516 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 100 Storage Blk Time (%) 8 Queuing Penalty (veh) 2 Network Summary Network wide Queuing Penalty: 2 No-Build PM 1: US 17 & Alexander Road 12/24/2024 No-Build PM 4:05 pm 11/04/2024 Synchro 11 Report Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 80 123 1634 1558 16 Future Volume (vph) 0 80 123 1634 1558 16 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -1% -1% 1% Storage Length (ft) 0 0 375 100 Storage Lanes 0 1 1 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1619 1778 3557 3522 1575 Flt Permitted 0.950 Satd. Flow (perm) 0 1619 1778 3557 3522 1575 Right Turn on Red No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 Link Distance (ft) 2297 2067 2537 Travel Time (s) 62.6 31.3 38.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 89 137 1816 1731 18 Shared Lane Traffic (%) Lane Group Flow (vph) 0 89 137 1816 1731 18 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 0.99 0.99 0.99 0.99 1.01 1.01 Turning Speed (mph) 15 9 15 9 Turn Type Perm custom NA NA Perm Protected Phases 3 3 6 6 Permitted Phases 3 3 6 Detector Phase 3 3 3 6 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 12.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 53.0 53.0 Total Split (%) 32.1% 32.1% 67.9% 67.9% Maximum Green (s) 18.0 18.0 46.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 3.0 3.0 No-Build PM 1: US 17 & Alexander Road 12/24/2024 No-Build PM 4:05 pm 11/04/2024 Synchro 11 Report Page 2 Lane Group EBL EBR NBL NBT SBT SBR Time Before Reduce (s) 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 30.0 30.0 Recall Mode None None C-Max C-Max Act Effct Green (s) 17.3 17.3 78.0 50.7 50.7 Actuated g/C Ratio 0.22 0.22 1.00 0.65 0.65 v/c Ratio 0.25 0.35 0.51 0.76 0.02 Control Delay 25.8 27.4 0.5 12.8 5.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 25.8 27.4 0.5 12.8 5.8 LOS C C A B A Approach Delay 25.8 2.4 12.7 Approach LOS C A B Queue Length 50th (ft) 35 56 0 273 3 Queue Length 95th (ft) 71 101 0 396 10 Internal Link Dist (ft) 2217 1987 2457 Turn Bay Length (ft) 375 100 Base Capacity (vph) 415 455 3523 2288 1023 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.21 0.30 0.52 0.76 0.02 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 0 (0%), Referenced to phase 2: and 6:NBSB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.76 Intersection Signal Delay: 7.7 Intersection LOS: A Intersection Capacity Utilization 58.2% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: US 17 & Alexander Road No-Build PM Queuing and Blocking Report 12/24/2024 No-Build PM SimTraffic Report Page 1 Intersection: 1: US 17 & Alexander Road Movement EB NB SB SB SB Directions Served R L T T R Maximum Queue (ft) 218 118 226 266 125 Average Queue (ft) 68 65 125 127 8 95th Queue (ft) 138 110 201 221 47 Link Distance (ft) 2240 2516 2516 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 100 Storage Blk Time (%) 8 Queuing Penalty (veh) 1 Network Summary Network wide Queuing Penalty: 1 2026 Build Build AM 1: US 17 & Alexander Road 12/24/2024 Build AM 12:46 pm 10/22/2024 Baseline Synchro 11 Report Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 206 193 1263 1517 30 Future Volume (vph) 0 206 193 1263 1517 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -1% -1% 1% Storage Length (ft) 0 0 375 100 Storage Lanes 0 1 1 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1619 1778 3557 3522 1575 Flt Permitted 0.950 Satd. Flow (perm) 0 1619 1778 3557 3522 1575 Right Turn on Red No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 Link Distance (ft) 403 2067 320 Travel Time (s) 11.0 31.3 4.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 229 214 1403 1686 33 Shared Lane Traffic (%) Lane Group Flow (vph) 0 229 214 1403 1686 33 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 0.99 0.99 0.99 0.99 1.01 1.01 Turning Speed (mph) 15 9 15 9 Turn Type Perm custom NA NA Perm Protected Phases 3 3 6 6 Permitted Phases 3 3 6 Detector Phase 3 3 3 6 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 12.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 53.0 53.0 Total Split (%) 32.1% 32.1% 67.9% 67.9% Maximum Green (s) 18.0 18.0 46.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 3.0 3.0 Build AM 1: US 17 & Alexander Road 12/24/2024 Build AM 12:46 pm 10/22/2024 Baseline Synchro 11 Report Page 2 Lane Group EBL EBR NBL NBT SBT SBR Time Before Reduce (s) 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 30.0 30.0 Recall Mode None None C-Max C-Max Act Effct Green (s) 18.1 18.1 78.0 49.9 49.9 Actuated g/C Ratio 0.23 0.23 1.00 0.64 0.64 v/c Ratio 0.61 0.52 0.39 0.75 0.03 Control Delay 34.0 30.6 0.3 12.9 6.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 34.0 30.6 0.3 12.9 6.0 LOS C C A B A Approach Delay 34.0 4.3 12.7 Approach LOS C A B Queue Length 50th (ft) 96 88 0 284 6 Queue Length 95th (ft) 166 151 0 375 15 Internal Link Dist (ft) 323 1987 240 Turn Bay Length (ft) 375 100 Base Capacity (vph) 415 455 3535 2254 1008 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.55 0.47 0.40 0.75 0.03 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 0 (0%), Referenced to phase 2: and 6:NBSB, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay: 10.3 Intersection LOS: B Intersection Capacity Utilization 63.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: US 17 & Alexander Road Build AM 2: US 17 & Site Access 1 12/24/2024 Build AM 12:46 pm 10/22/2024 Baseline HCM Page 1 Intersection Int Delay, s/veh 2.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 202 0 1263 1345 204 Future Vol, veh/h 0 202 0 1263 1345 204 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 125 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 1 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 224 0 1403 1494 227 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 747 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.94 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.32 - - - - Pot Cap-1 Maneuver 0 355 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 355 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 31 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 355 - - HCM Lane V/C Ratio - 0.632 - - HCM Control Delay (s) - 31 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 4.1 - - Build AM 3: Alexander Road & Site Access 2 12/24/2024 Build AM 12:46 pm 10/22/2024 Baseline HCM Page 2 Intersection Int Delay, s/veh 1.7 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 4 148 162 60 58 4 Future Vol, veh/h 4 148 162 60 58 4 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - -1 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 164 180 67 64 4 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 247 0 - 0 386 214 Stage 1 - - - - 214 - Stage 2 - - - - 172 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1319 - - - 617 826 Stage 1 - - - - 822 - Stage 2 - - - - 858 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1319 - - - 615 826 Mov Cap-2 Maneuver - - - - 615 - Stage 1 - - - - 820 - Stage 2 - - - - 858 - Approach EB WB SB HCM Control Delay, s 0.2 0 11.5 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1319 - - - 625 HCM Lane V/C Ratio 0.003 - - - 0.11 HCM Control Delay (s) 7.7 0 - - 11.5 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.4 Build AM 4: Alexander Road & Site Access 3 12/24/2024 Build AM 12:46 pm 10/22/2024 Baseline HCM Page 3 Intersection Int Delay, s/veh 0.3 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 4 162 4 4 147 Future Vol, veh/h 4 4 162 4 4 147 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - -1 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 4 180 4 4 163 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 353 182 0 0 184 0 Stage 1 182 - - - - - Stage 2 171 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 645 861 - - 1391 - Stage 1 849 - - - - - Stage 2 859 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 643 861 - - 1391 - Mov Cap-2 Maneuver 643 - - - - - Stage 1 849 - - - - - Stage 2 856 - - - - - Approach WB NB SB HCM Control Delay, s 10 0 0.2 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 736 1391 - HCM Lane V/C Ratio - - 0.012 0.003 - HCM Control Delay (s) - - 10 7.6 0 HCM Lane LOS - - B A A HCM 95th %tile Q(veh) - - 0 0 - Build AM 5: Alexander Road & Site Access 4 12/24/2024 Build AM 12:46 pm 10/22/2024 Baseline HCM Page 4 Intersection Int Delay, s/veh 0.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 4 146 4 4 76 Future Vol, veh/h 4 4 146 4 4 76 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - -1 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 4 162 4 4 84 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 256 164 0 0 166 0 Stage 1 164 - - - - - Stage 2 92 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 733 881 - - 1412 - Stage 1 865 - - - - - Stage 2 932 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 731 881 - - 1412 - Mov Cap-2 Maneuver 731 - - - - - Stage 1 865 - - - - - Stage 2 929 - - - - - Approach WB NB SB HCM Control Delay, s 9.6 0 0.4 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 799 1412 - HCM Lane V/C Ratio - - 0.011 0.003 - HCM Control Delay (s) - - 9.6 7.6 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0 0 - Build AM Queuing and Blocking Report 12/24/2024 Build AM SimTraffic Report Page 1 Intersection: 1: US 17 & Alexander Road Movement EB NB SB SB SB Directions Served R L T T R Maximum Queue (ft) 315 197 223 238 125 Average Queue (ft) 112 116 150 145 20 95th Queue (ft) 231 172 228 228 87 Link Distance (ft) 313 266 266 Upstream Blk Time (%) 1 Queuing Penalty (veh) 1 Storage Bay Dist (ft) 375 100 Storage Blk Time (%) 11 0 Queuing Penalty (veh) 3 0 Intersection: 2: US 17 & Site Access 1 Movement EB Directions Served R Maximum Queue (ft) 122 Average Queue (ft) 70 95th Queue (ft) 112 Link Distance (ft) 1262 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Alexander Road & Site Access 2 Movement SB Directions Served LR Maximum Queue (ft) 53 Average Queue (ft) 25 95th Queue (ft) 49 Link Distance (ft) 1604 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Build AM Queuing and Blocking Report 12/24/2024 Build AM SimTraffic Report Page 2 Intersection: 4: Alexander Road & Site Access 3 Movement WB SB Directions Served LR LT Maximum Queue (ft) 31 30 Average Queue (ft) 6 1 95th Queue (ft) 26 10 Link Distance (ft) 1382 138 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Alexander Road & Site Access 4 Movement WB Directions Served LR Maximum Queue (ft) 31 Average Queue (ft) 7 95th Queue (ft) 28 Link Distance (ft) 1378 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 5 Build PM 1: US 17 & Alexander Road 12/24/2024 Build PM 4:05 pm 11/04/2024 Synchro Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 0 128 167 1673 1591 24 Future Volume (vph) 0 128 167 1673 1591 24 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Grade (%) -1% -1% 1% Storage Length (ft) 0 0 375 100 Storage Lanes 0 1 1 1 Taper Length (ft) 25 25 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 Frt 0.865 0.850 Flt Protected 0.950 Satd. Flow (prot) 0 1619 1778 3557 3522 1575 Flt Permitted 0.950 Satd. Flow (perm) 0 1619 1778 3557 3522 1575 Right Turn on Red No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 Link Distance (ft) 403 2067 320 Travel Time (s) 11.0 31.3 4.8 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 142 186 1859 1768 27 Shared Lane Traffic (%) Lane Group Flow (vph) 0 142 186 1859 1768 27 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 12 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 0.99 0.99 0.99 0.99 1.01 1.01 Turning Speed (mph) 15 9 15 9 Turn Type Perm custom NA NA Perm Protected Phases 3 3 6 6 Permitted Phases 3 3 6 Detector Phase 3 3 3 6 6 6 Switch Phase Minimum Initial (s) 5.0 5.0 12.0 12.0 Minimum Split (s) 25.0 25.0 25.0 25.0 Total Split (s) 25.0 25.0 53.0 53.0 Total Split (%) 32.1% 32.1% 67.9% 67.9% Maximum Green (s) 18.0 18.0 46.0 46.0 Yellow Time (s) 5.0 5.0 5.0 5.0 All-Red Time (s) 2.0 2.0 2.0 2.0 Lost Time Adjust (s) -2.0 -2.0 -2.0 -2.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 2.0 2.0 6.0 6.0 Minimum Gap (s) 2.0 2.0 3.0 3.0 Build PM 1: US 17 & Alexander Road 12/24/2024 Build PM 4:05 pm 11/04/2024 Synchro Page 2 Lane Group EBL EBR NBL NBT SBT SBR Time Before Reduce (s) 0.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 30.0 30.0 Recall Mode None None C-Max C-Max Act Effct Green (s) 18.0 18.0 78.0 50.0 50.0 Actuated g/C Ratio 0.23 0.23 1.00 0.64 0.64 v/c Ratio 0.38 0.45 0.52 0.78 0.03 Control Delay 27.8 29.1 0.6 13.9 6.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 Total Delay 27.8 29.1 0.6 13.9 6.0 LOS C C A B A Approach Delay 27.8 3.1 13.7 Approach LOS C A B Queue Length 50th (ft) 56 75 0 311 5 Queue Length 95th (ft) 106 132 0 413 14 Internal Link Dist (ft) 323 1987 240 Turn Bay Length (ft) 375 100 Base Capacity (vph) 415 455 3540 2258 1010 Starvation Cap Reductn 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 Reduced v/c Ratio 0.34 0.41 0.53 0.78 0.03 Intersection Summary Area Type: Other Cycle Length: 78 Actuated Cycle Length: 78 Offset: 0 (0%), Referenced to phase 2: and 6:NBSB, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.78 Intersection Signal Delay: 8.8 Intersection LOS: A Intersection Capacity Utilization 61.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: US 17 & Alexander Road Build PM 2: US 17 & Site Access 1 12/24/2024 Build PM 4:05 pm 11/04/2024 HCM Page 1 Intersection Int Delay, s/veh 1.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 166 0 1673 1449 167 Future Vol, veh/h 0 166 0 1673 1449 167 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - 125 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 1 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 184 0 1859 1610 186 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 805 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 6.94 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.32 - - - - Pot Cap-1 Maneuver 0 325 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, % - - - Mov Cap-1 Maneuver - 325 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 29.7 0 0 HCM LOS D Minor Lane/Major Mvmt NBTEBLn1 SBT SBR Capacity (veh/h) - 325 - - HCM Lane V/C Ratio - 0.568 - - HCM Control Delay (s) - 29.7 - - HCM Lane LOS - D - - HCM 95th %tile Q(veh) - 3.3 - - Build PM 3: Alexander Road & Site Access 2 12/24/2024 Build PM 4:05 pm 11/04/2024 HCM Page 2 Intersection Int Delay, s/veh 1.7 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 4 81 142 50 47 4 Future Vol, veh/h 4 81 142 50 47 4 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - -1 0 - 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 90 158 56 52 4 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 214 0 - 0 284 186 Stage 1 - - - - 186 - Stage 2 - - - - 98 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1356 - - - 706 856 Stage 1 - - - - 846 - Stage 2 - - - - 926 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1356 - - - 704 856 Mov Cap-2 Maneuver - - - - 704 - Stage 1 - - - - 843 - Stage 2 - - - - 926 - Approach EB WB SB HCM Control Delay, s 0.4 0 10.5 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h) 1356 - - - 714 HCM Lane V/C Ratio 0.003 - - - 0.079 HCM Control Delay (s) 7.7 0 - - 10.5 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.3 Build PM 4: Alexander Road & Site Access 3 12/24/2024 Build PM 4:05 pm 11/04/2024 HCM Page 3 Intersection Int Delay, s/veh 0.5 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 4 141 4 4 80 Future Vol, veh/h 4 4 141 4 4 80 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - -1 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 4 157 4 4 89 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 256 159 0 0 161 0 Stage 1 159 - - - - - Stage 2 97 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 733 886 - - 1418 - Stage 1 870 - - - - - Stage 2 927 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 731 886 - - 1418 - Mov Cap-2 Maneuver 731 - - - - - Stage 1 870 - - - - - Stage 2 924 - - - - - Approach WB NB SB HCM Control Delay, s 9.5 0 0.4 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 801 1418 - HCM Lane V/C Ratio - - 0.011 0.003 - HCM Control Delay (s) - - 9.5 7.5 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0 0 - Build PM 5: Alexander Road & Site Access 4 12/24/2024 Build PM 4:05 pm 11/04/2024 HCM Page 4 Intersection Int Delay, s/veh 0.7 Movement WBL WBR NBT NBR SBL SBT Lane Configurations Traffic Vol, veh/h 4 4 87 4 4 52 Future Vol, veh/h 4 4 87 4 4 52 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - -1 Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 4 4 97 4 4 58 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 165 99 0 0 101 0 Stage 1 99 - - - - - Stage 2 66 - - - - - Critical Hdwy 6.42 6.22 - - 4.12 - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 - - 2.218 - Pot Cap-1 Maneuver 826 957 - - 1491 - Stage 1 925 - - - - - Stage 2 957 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 824 957 - - 1491 - Mov Cap-2 Maneuver 824 - - - - - Stage 1 925 - - - - - Stage 2 954 - - - - - Approach WB NB SB HCM Control Delay, s 9.1 0 0.5 HCM LOS A Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 886 1491 - HCM Lane V/C Ratio - - 0.01 0.003 - HCM Control Delay (s) - - 9.1 7.4 0 HCM Lane LOS - - A A A HCM 95th %tile Q(veh) - - 0 0 - Build PM Queuing and Blocking Report 12/24/2024 Build PM SimTraffic Report Page 1 Intersection: 1: US 17 & Alexander Road Movement EB NB SB SB SB Directions Served R L T T R Maximum Queue (ft) 178 151 179 232 116 Average Queue (ft) 88 83 126 130 9 95th Queue (ft) 170 141 205 228 46 Link Distance (ft) 313 265 265 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) 375 100 Storage Blk Time (%) 10 0 Queuing Penalty (veh) 2 0 Intersection: 2: US 17 & Site Access 1 Movement EB Directions Served R Maximum Queue (ft) 106 Average Queue (ft) 58 95th Queue (ft) 91 Link Distance (ft) 1222 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Alexander Road & Site Access 2 Movement EB SB Directions Served LT LR Maximum Queue (ft) 30 53 Average Queue (ft) 1 26 95th Queue (ft) 10 47 Link Distance (ft) 190 1604 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Build PM Queuing and Blocking Report 12/24/2024 Build PM SimTraffic Report Page 2 Intersection: 4: Alexander Road & Site Access 3 Movement WB SB Directions Served LR LT Maximum Queue (ft) 31 31 Average Queue (ft) 7 2 95th Queue (ft) 29 15 Link Distance (ft) 1358 139 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Alexander Road & Site Access 4 Movement WB Directions Served LR Maximum Queue (ft) 52 Average Queue (ft) 9 95th Queue (ft) 33 Link Distance (ft) 1378 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 2 Appendix FNCDOT Signal Plans N New Installation 300 1"=30' Wilmington Signal System Fully Actuated 2 Phase 3A 3B 31 61 62 33 32 6B 6A R/W R/WR/W R/W R / W R / W ( A l e x a n d e r R o a d ) S R 1 3 4 5 03-1129 45 MPH -1% Grade 45 MPH +1% Grade 2 5 MP H - 1 % G r a d e Sig. 9.0 SIGNAL FACE I.D. All Heads L.E.D. R Y G 12" R Y F Y 12" 61,62 31 32,33 R Y F Y 12" PHASING DIAGRAM DETECTION LEGEND PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT Directional Arrow 2-in Underground Conduit N/A Right of Way Controller & Cabinet With Push Button & Sign Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head LEGEND PROPOSED EXISTING Sign Junction Box N/ADirectional Drill Metal Pole with Mastarm existing existing Wheelchair Ramp A ARight Arrow "ONLY" Sign (R3-5R) B B TO U-TURN" Sign "RIGHT TURN MUST YIELD 0 0 F L A S H FACE SIGNAL PHASE G R Y F Y Y 61,62 31 32,33 36 F YR R TABLE OF OPERATION DEFAULT PHASING 0 0 F L A S H FACE SIGNAL PHASE G R Y Y 61,62 31 32,33 36 F YR R TABLE OF OPERATION ALTERNATE PHASING R 06 03 ALTERNATE PHASING DIAGRAMDEFAULT PHASING DIAGRAM 06 03 SR 1345 (Alexander Road) at US 17 (Market Street) US 17 (Market Street) US 17 (Market Street) Sidewalk Sidewalk FEATURE PHASE MIN RECALL YELLOW ON - - 5 12 3.0 1.5 - - - - -15 34 2.0 6.0 - ON - - Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap 30 20 90 OASIS 2070 TIMING CHART 63 - for all other phases should not be lower than 4 seconds. Extension times for phase 6 lower than what is shown. Min Green * These values may be field adjusted. Do not adjust Min Green and 3.0 2.1 4.4 1.0 7 9 * TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W L O O P F U LL T I M E D E LA Y E X T E N S I O N C A LL I N G S Y S T E M LO O P OASIS 2070 LOOP & DETECTOR INSTALLATION CHART Y Y --- Y Y --- Y Y --- 6X40 0 0 15Y6X40 - 2-4-2 6X6 Y 2-4-2 Y Y ----6X6 Y 4 4 300 300 3A 3B Y Y Y Y Y 3 3 6A 6B 6 6 10 phasing operation. * Reduce delay to 0 seconds during alternate Multiuse Path Multiuse Path P61,P62 DRKDWW P61,P62 DRKDWW 16" P61,P62 P61 P62 exType II Signal Pedestal NOTES Controller Asset #1129 10. Signal system data: supersede these values. signal system timing values operation only. Coordinated chart are for free-run 9. Maximum times shown in timing for each phasing plan. determine the hours of use 8. The Division Traffic Engineer will installation. Division Traffic Engineer before located in the field by the 7. All pedestrian pushbuttons shall be "DON'T WALK" time only. countdown the flashing 6. Program pedestrian heads to with no pedestrian calls. 5. Omit "WALK" and flashing "DON'T WALK" vehicles turning right on red. to obstruct sight distance of 4. Locate new cabinet so as not presence mode. 3. Set all detector units to the Engineer. unless otherwise directed by night flashing operation 2. Do not program signal for late Structures" dated January 2018. Specifications for Roads and 2018 and "Standard Drawings NCDOT" dated January 1. Refer to "Roadway Standard Type I Pushbutton Post SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. REVISIONS REVIEWED BY: INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: SCALE T N T T I N D E P A R T ME N OF TR A SPORT A I O N S T A E OF NORTH C ARO L A n oi s i v i D y tefaS dn a ytiliboM noitatro p s n a r T noitceS ngiseD la n giS 750 N. Greenfield Pkwy, Garner, NC 27529 Prepared for: Division 03 New Hanover Co.Wilmington February 2018 A.D. Klinksiek A.H. Thornburg N.R. Simmons U-4902D DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED (919) 546-8997 NC License No: C-1554 Raleigh, North Carolina 27609 343 E. Six Forks Road, Suite 200 HNTB NORTH CAROLINA, P.C. A N CRT O H L O RA NIRAPL SEOF N I S O G NI E N E RE 031464 SEAL S N OMMIS .R A H S AT A N 62' Lt +/- Sta. 268+72 +/- -L- Metal Pole with Mast Arm #1 Sta. 269+37 +/- -L- Signal Pedestal #1 B A DocuSign Envelope ID: C2D054F2-78FA-4233-A30C-1586102816A2 8/1/2018 Appendix GAuxiliary Turn Lane Warrant Chart INTERSECTION: Market Street & Site Access 1 MOVEMENT: SB Right SCENARIO Turning Volume (Vi or Vj)Opposing Volume (Vo) Symbol AM Build 204 100 PM Build 167 100 167.0% TURN LANE WARRANT REVIEW Alexander Road Retail Development Turning Vol/Opposing 204.0% PM Build AM Build ` ` INTERSECTION: Alexander Road & Site Access 2 MOVEMENT: WB Right SCENARIO Turning Volume (Vi or Vj)Opposing Volume (Vo) Symbol AM Build 60 100 PM Build 50 100 Alexander Road Retail Development TURN LANE WARRANT REVIEW Turning Vol/Opposing 60.0% 50.0% PM Build AM Build ` ` INTERSECTION: Alexander Road & Site Access 3 MOVEMENT: WB Right SCENARIO Turning Volume (Vi or Vj)Opposing Volume (Vo) Symbol AM Build 0 100 PM Build 1 100 Alexander Road Retail Development TURN LANE WARRANT REVIEW Turning Vol/Opposing 0.0% 1.0% PM Build AM Build ` ` INTERSECTION: Alexander Road & Site Access 4 MOVEMENT: NB Right SCENARIO Turning Volume (Vi or Vj)Opposing Volume (Vo) Symbol AM Build 0 100 PM Build 1 100 Alexander Road Retail Development TURN LANE WARRANT REVIEW Turning Vol/Opposing 0.0% 1.0% PM Build AM Build ` ` Appendix HSite Distance Observations Alexander Road Retail Development Site Access Site Distance Observations S 51 ' - 0 " 52'-0" 6 0 ' - 0 " 1 0 0 ' - 0 " 227'-0" Site Access 1 Site Access 2 Site Access 3 Site Access 4 Site Access 3 & 4 Site Access 2