Loading...
HomeMy WebLinkAboutBond EstimateSidbury Station, Phase 2B Engineer's Bond Estimate 63 Lots 3/18/2025 vj MCKIM&CREED Item Unit Qty Unit Cost Cost Sidewalks SF 20210 $6 $121,260.00 ADA Mats EA 16 $325 $5,200.00 Street Trees EA 108 $250 $27,000.00 Street Signs EA 1 $8,000 $8,000.00 Utilities - Pump Station Startup EA 1 $10,000 $10,000.00 Erosion Control - Seeding AC 5 $3,200 $16,000.00 Asphalt SY 10783 11.68 $125,945.44 Sub -Total $313,405.44 10% Contingency $31,340.54 Total $344,745.98 SEAL 25503 ,•r�tH7r1111iit5►�