Loading...
HomeMy WebLinkAboutRM_Fill in flood zone_____________________________________________________________________________________________________________________________________ 3805 Cherry Avenue ‐ Wilmington, NC 28403 ‐ 910 791 4441 ‐ www.csd‐engineering.com – License # C‐2710      February 4, 2022      Ron Meredith  Current Planner  New Hanover County Planning  230 Government Center Dr.  Suite 110  Wilmington, NC 28403      Re: Letter to address fill within FEMA Zones  Sunset Towns Plan      Dear Ron:    In addressing item 2.b of your 1‐14‐22 TRC comments concerning meeting the requirements of Sections 9.8.2.E or  9.8.6.I, CSD Engineering has performed a volume calculation to determine the potential impact of proposed fill in the  Sunset Towns development within the FEMA floodplain. The site is currently within Zone AE (EL 9) as shown on FEMA  National Flood Insurance Program Map Number 372032100k, latest revision dated 8/28/2018.  For the purposes of  these calculations, this analysis studied an area of Zone AE (EL 9) along the Cape Fear River ½ mile upstream and ½ mile  downstream of the Sunset Towns site, and was further limited to a portion of Zone AE (EL 9) that is onsite and outside of  the 75 ft CAMA buffer where development would be constructed.  LIDAR topographic data was utilized to calculate the  total available flood plain volume from elevation 4 to elevation 9 within the subject flood zone area.  The contours  below elevation 4 were not very defined in the LIDAR file and therefore were not utilized in the volume calculation.   Total proposed fill volume was calculated comparing existing ground elevations to a proposed elevation of 9.5 which  would put the area above the flood elevation of 9.0.  The results were as follows:       Total Flood Zone AE (EL 9) Available Flood Volume = 122,360,419 cubic feet   Proposed Volume of Fill Within the flood plain = 4,568 cubic feet      Based upon this analysis, the total proposed onsite fill volume equates to roughly 0.004% of total available flood water  capacities within the analyzed area of Zone AE (EL 9).  Additionally, the total displaced water from the proposed fill  translates to approximately a 0.0021 inch of increased flood elevation within the analyzed area of Zone AE (EL 9).  Since  the actual size of Zone AE (EL 9) is exponentially larger than the areas analyzed and considering the limited fill placement  proposed within the subject site, the calculated effect of the proposed fill on available flood waters is extremely small.   As such, it is my opinion that placement of the proposed fill on the Sunset Towns site will not adversely impact adjacent  properties.  Attached for your reference please find the Fill/Flood Plain Volume Displacement Calculations and Flood  Plain/Base Flood Impact Overall Map.    Sunset Towns Site Fill / Flood Plain Volume Displacement Calculations Flood Zone AE (EL 9) Volume Determination (contours taken from Q2 Lidar) INCREMENTAL ELEVATION AREA VOLUME STORAGE (FT) (SF) (cf) (cf) 4 23,619,409 - 5 24,024,457 23,821,933 23,821,933 6 24,220,848 24,122,653 47,944,586 7 24,439,489 24,330,169 72,274,755 8 25,041,763 24,740,626 97,015,381 "Base flood EL" 9 25,648,312 25,345,038 122,360,419 Total Basin Flood Volume as Analyzed = 122,360,419 cf (0.5 Mile Upstream/Downstream FloodWay Volume to be effected) Proposed Fill Volume / Flood Zone Displacement = 4,568 cf (Amount of Fill within Flood Zone Line to reach Elev. 9) Percent Volume Impacted = 0.004 % ((Proposed Fill / Total Basin Volume) x 100) (( 4,568 CF / 122,360,419 SF) 100) Flood Impact above Base Flood EL = 0.0021 Inches ((Fill Amount / Base Flood EL SA) x 12) (( 4,568 CF / 25,648,312 SF) 12) CSD ENGINEERING PO BOX 4041 WILMINGTON, NC 28406