Loading...
HomeMy WebLinkAboutBayshore Townhomes WMPO TRC Comments MEMORANDUM To: New Hanover County Technical Review Committee Date: March 20, 2025 Subject: Bayshore Townhomes (SUBPP-25-0020) NCDOT Projects: • U-4902D construction occurring within a mile of the proposed site location. Per the project update information received by the WMPO in March 2025, the project is 77% complete with an anticipated completion date of August 2025. WMPO 2045 MTP Projects: • RW-99: Murrayville Road Widening and Extension from US 117/NC 132/College Road to US 17/Market Street. This project is proposed to connect with US 17/ Market Street via the existing Hays Lane within a quarter of a mile from the proposed site location. New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required. Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Single Family Attached Housing (215) 72 DUs 498 32 39