MEMORANDUM
To: New Hanover County Technical Review Committee
Date: March 20, 2025
Subject: Bayshore Townhomes (SUBPP-25-0020)
NCDOT Projects:
• U-4902D construction occurring within a mile of the proposed site location. Per the
project update information received by the WMPO in March 2025, the project is 77%
complete with an anticipated completion date of August 2025.
WMPO 2045 MTP Projects:
• RW-99: Murrayville Road Widening and Extension from US 117/NC 132/College Road to
US 17/Market Street. This project is proposed to connect with US 17/ Market Street via
the existing Hays Lane within a quarter of a mile from the proposed site location.
New Hanover County Projects:
• N/A
TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required.
Land Use (ITE Code) Intensity Unit 24 Hour
Volumes
AM Peak
Hour Trips
PM Peak
Hour Trips
Single Family Attached
Housing (215) 72 DUs 498 32 39