Loading...
HomeMy WebLinkAboutBRC Castle Hayne TIA - 2018This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. TRANSPORTATION IMPACT ANALYSIS November 28, 2018 BRC Castle Hayne Development New Hanover County, NC Prepared for Blue Ridge Companies Project #: 180243 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 1 BRC Castle Hayne – Transportation Impact Analysis Prepared for Blue Ridge Companies New Hanover County, NC November 28, 2018 Table of Contents 1.0 Introduction ............................................................................................................. 2 Figure 1 – Site Plan ..................................................................................................... 3 Figure 2 – Vicinity Map ................................................................................................ 4 2.0 Existing Conditions ................................................................................................ 5 2.1 Inventory ................................................................................................................ 5 2.2 Existing Traffic Volumes ........................................................................................ 5 Figure 3 – Existing Lane Geometry ............................................................................. 6 Figure 4 – 2018 Existing Traffic Volumes .................................................................... 7 3.0 Approved Developments and Committed Improvements ................................... 8 3.1 Approved Developments ........................................................................................ 8 3.2 Committed Improvements ...................................................................................... 8 4.0 Methodology ........................................................................................................... 9 4.1 Base Assumptions and Standards ......................................................................... 9 5.0 Capacity Analysis ................................................................................................. 10 5.1 Level of Service Evaluation Criteria ..................................................................... 10 6.0 2021 Phase 1 Build Conditions ........................................................................... 11 6.1 Trip Generation .................................................................................................... 11 6.2 Trip Distribution .................................................................................................... 11 6.3 2021 Future No Build Traffic ................................................................................ 11 6.4 2021 Phase 1 Build Total Traffic .......................................................................... 11 Figure 5 – Phase 1 Trip Distribution .......................................................................... 12 Figure 6 – 2021 Future No Build Volumes ................................................................. 13 Figure 7 – Phase 1 Site Trips .................................................................................... 14 Figure 8 – 2021 Phase 1 Build Volumes .................................................................... 15 6.5 Phase 1 Discussion of Results ............................................................................ 16 Figure 9 – Phase 1 Recommended Improvements.................................................... 18 7.0 2023 Full Build Conditions ................................................................................... 19 7.1 Trip Generation .................................................................................................... 19 7.2 Trip Distribution .................................................................................................... 19 7.3 2023 Future No Build Traffic ................................................................................ 19 7.4 2023 Full Build Total Traffic ................................................................................. 19 Figure 10 – Full Build Trip Distribution ....................................................................... 20 Figure 11 – 2023 Future No Build Volumes ............................................................... 21 Figure 12 – Full Build Site Trips ................................................................................. 22 Figure 13 – 2023 Full Build Volumes ......................................................................... 23 7.5 Full Build Discussion of Results ........................................................................... 24 8.0 Queueing Results ................................................................................................. 26 Figure 14 – Full Build Recommended Improvements ................................................ 28 9.0 Summary and Conclusion ................................................................................... 29 Appendix ...................................................................................................................... 30 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 2 BRC Castle Hayne – Transportation Impact Analysis Prepared for Blue Ridge Companies New Hanover County, NC November 28, 2018 1.0 Introduction The proposed BRC Castle Hayne development is to be located west of Castle Hayne Road on both the north and south sides of the planned Riverside Drive in New Hanover County, North Carolina. The development is planned to consist of 360 apartments in full build. The development will utilize four (4) access points on Riverside Drive, and one existing access on Castle Hayne Road. Figure 1 shows the site plan and Figure 2 shows the vicinity map. The BRC Castle Hayne development will be analyzed for two (2) phases: • Phase 1 will consist of the south side of the development, which is 216 apartment units. The build year for Phase 1 is assumed to be 2021. • Full Build, including Phase 1, will add 144 apartments to the north side of the development and will consist of 360 total apartment units. The build year for Full Build is assumed to be 2023. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. The following intersections were included in the study: • NC 133 (Castle Hayne Road) at North Kerr Avenue (west side of intersection is planned to be named Riverside Drive) • NC 133 (Castle Hayne Road) at Existing Site Access The above-mentioned intersections were analyzed for the following scenarios: • 2018 Existing Conditions • 2021 Future No Build Conditions • 2021 Phase 1 Build Conditions • 2021 Phase 1 Build Conditions with Improvements (as necessary) • 2023 Future No Build Conditions • 2023 Full Build Conditions • 2023 Full Build Conditions with Improvements (as necessary) The WMPO was contacted to obtain background information and to ascertain the elements to be covered in this Transportation Impact Analysis (TIA). The approved scope for this TIA is included in th e appendix. Information regarding the property was provided by Blue Ridge Companies and CPT Engineering and Surveying, Inc. FIGURE 1 SITE PLAN FIGURE 2 VICINITY MAP STUDY INTERSECTIONS BACKGROUND PROPOSED SITE SITE 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 5 2.0 Existing Conditions 2.1 Inventory A field investigation was conducted by DAVENPORT staff to determine the existing roadway conditions in the study area. Table 2.1 presents a summary of this review. Figure 3 illustrates the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # Typical Cross Section Pavement Width Speed Limit Maintained By Castle Hayne Road NC 133 Varies between 2-lane undivided and 2-lane with TWLTL Approx. 22’-36’ 45 MPH NCDOT North Kerr Avenue SR 1322 2-lane undivided Approx. 22’ 45 MPH NCDOT Existing Site Access N/A 2-lane undivided Approx. 22’ Not Posted Local 2.2 Existing Traffic Volumes Existing traffic volumes for this project were collected by DAVENPORT. Table 2.2 below contains the date the count was conducted. Schools were in session at the time of traffic counts. Figure 4 shows existing AM and PM peak hour volumes. The full reports for these volumes can be found in the appendix. Table 2.2 - Traffic Volume Data Count Location: Date Taken: NC 133 (Castle Hayne Road) at North Kerr Avenue 10/18/18 NC 133 (Castle Hayne Road) at Existing Site Access 10/18/18 *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 3EXISTING LANE GEOMETRY BLACK = EXISTING AADT 2017 VOLUME#### 15 0 ' 16 , 0 0 0 SPEED LIMIT 45 North Kerr Avenue ~4 5 0 ' SPEED LIMIT 458,500 16 , 0 0 0 Site Access Ca s t l e H a y n e Ro a d FU L L TW L T L TW L T L 47 5 ' FULL 27 5 ' FULL FULL Riverside Drive 200' 250' 275' internal stem SPEED LIMIT 25 *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 4 2018 EXISTING TRAFFIC VOLUMES 27 / 13 76 4 / 5 0 8 12 / 1 2 14 / 1 0 10 9 3 / 6 7 3 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 20 6 / 2 1 1 195 / 288 35 / 99 34 / 49 60 / 60 251 / 198 13 / 5 9 41 0 / 6 8 3 87 / 9 0 4 / 6 55 4 / 8 7 8 2 / 3 5 / 2 Riverside Drive 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 8 3.0 Approved Developments and Committed Improvements 3.1 Approved Developments Approved developments are developments that have been recently approved in the area, but not yet constructed. Per NCDOT staff, there is one (1) approved development in the vicinity of this project. This development is the Riverside development. Full Build of the development consists of 165 single family homes and 72 apartments. However, the 72 apartments are now a part of this BRC Castle Hayne development. Therefore, the full build of the Riverside development consists of 165 single family homes, with a build year of 2019. Trips due to this approved development have been incorporated in the analysis for both Phase 1 and Full Build. The trip distribution and trip generation for the Riverside development can be found in the appendix, along with Figure A Approved Development Trips. 3.2 Committed Improvements Committed Improvements are improvements that are planned by NCDOT, a local municipality, or a developer in the area, but not yet constructed. Per WMPO and NCDOT staff, there is one (1) committed improvement in the vicinity of this project. This committed improvement is due to the Riverside approved development. Part of the improvements were to construct eastbound and westbound right turn lanes for the Castle Hayne Road at North Kerr Avenue/Riverside Drive intersection, which have been completed. Additionally, the signal was to be modified to reflect the roadway changes. This signal modification has not been installed but is expected to be done prior to our Phase 1 build year. However, the signal plan has been completed and approved and was provided to us to use in analysis. The completed roadway plans and new signal plan can both be found in the appendix. 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 9 4.0 Methodology 4.1 Base Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. The following table contains a summary of the base assumptions: Table 4.1 - Assumptions Peak Hour Factor 0.90 Background Traffic Annual Growth Rate 1% per year for all roadways Analysis Software Synchro/SimTraffic Version 9.0 Signal Plans/Timings Provided by NCDOT/WMPO Lane widths 12-feet Truck percentages 2% A 2016 signal plan, which is currently in use, was used for existing analysis. The already constructed westbound and eastbound right turn lanes were also included in the analysis, even though the 2016 signal plan does not reflect these additional lanes. For all future analysis, the provided newly approved 2018 signal plan was used since it is expected to be utilized prior to this project’s Phase 1 build year. Both signal plans can be found in the appendix. 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 10 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes a term “level of service” to measure how traffic operates in intersections and on roadway segments. There are currently six levels of service ranging from A to F. Level of service “A” represents the best conditions and Level of Service “F” represents the worst. Synchro Traffic Modeling software was used to determine the level of service for studied intersections. Note for unsignalized intersection analysis, the level of service noted is for the worst approach of the intersection. This is typically the left turn movement for the side street approach, due to the number of opposing movements. All worksheet reports from the analyses can be found in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (sec) Level of Service Delay Range (sec) A  10 A  10 B  10 and  20 B  10 and  15 C  20 and  35 C  15 and  25 D  35 and  55 D  25 and  35 E  55 and  80 E  35 and  50 F  80 F  50 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 11 6.0 2021 Phase 1 Build Conditions Phase 1 consists of 216 apartment units in 2021. 6.1 Trip Generation Trips for this development were projected based on the 10th Edition of ITE Trip Generation Manual. Table 6.1 contains the results. Table 6.1 - ITE Trip Generation BRC Castle Hayne (Phase 1) Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Apartments 220 216 Dwelling Units Adjacent /Equation 1,592 23 76 74 43 Total Trips 1,592 23 76 74 43 6.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. These distributions were reviewed and approved by WMPO. The directional distributions for Phase 1 site trips are as follows: • 40% to and from the north on Castle Hayne Road • 40% to and from the south on Castle Hayne Road • 20% to and from the east on North Kerr Avenue The site trip distributions for Phase 1 are shown in Figure 5. 6.3 2021 Future No Build Traffic The 2021 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2018 existing traffic volumes and adding approved development traffic. Figure 6 shows the 2021 future no build traffic volumes for AM and PM peaks. 6.4 2021 Phase 1 Build Total Traffic The 2021 build-out traffic volumes were obtained by summing 2021 future no build volumes and Phase 1 site trips due to the proposed project. Phase 1 site trips are shown in Figure 7. The resulting Phase 1 build volume totals for AM and PM peaks are shown in Figure 8. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. BLACK = EXISTING 1% DESTINATION NODE% FIGURE 5PHASE 1TRIP DISTRIBUTION North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d Riverside Drive 40% 20% 40% 30 % I N 30 % I N 20% IN 30% OUT 40% OUT 20% OUT 10 % I N 10 % O U T 10 % I N 10% OUT 10 % I N 10 % I N *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 6 2021 FUTURE NO BUILD VOLUMES 66 / 37 78 7 / 5 2 3 21 / 4 3 14 / 1 0 11 6 4 / 7 1 7 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 2 / 2 1 7 201 / 297 64 / 120 63 / 68 71 / 93 259 / 204 25 / 1 0 3 42 2 / 7 0 4 90 / 9 3 4 / 6 58 3 / 9 4 7 2 / 3 5 / 2 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 7 PHASE 1 SITE TRIPS 8 / 4 2 / 7 7 / 2 2 2 / 7 8 / 4 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 0 / 0 0 / 0 30 / 17 15 / 9 5 / 15 0 / 0 2 / 7 0 / 0 0 / 0 7 / 2 2 2 / 7 0 / 0 23 / 13 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 8 2021 PHASE 1 BUILD VOLUMES 73 / 42 78 9 / 5 3 0 28 / 6 5 16 / 1 7 11 7 1 / 7 2 2 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 2 / 2 1 7 201 / 297 95 / 138 78 / 77 76 / 108 259 / 204 28 / 1 1 0 42 2 / 7 0 4 90 / 9 3 11 / 2 8 58 6 / 9 5 4 2 / 3 28 / 15 Riverside Drive 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 16 6.5 Phase 1 Discussion of Results The following section discusses 2021 Phase 1 level of service for each intersection. NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive This signalized intersection currently operates at LOS C during the AM and PM peaks. In 2021 future no build conditions, it is expected to operate at LOS D during the AM peak and LOS E during the PM peak. In 2021 Phase 1 build conditions, it is expected to operate at LOS E during the AM and PM peaks. It is recommended to re-stripe the northbound left turn lane to extend the storage from 150 feet to 250 feet with appropriate taper. Additionally, it is recommended to provide “time of day” timings for both the AM and PM peaks. With this recommendation in place, this intersection is expected to operate at LOS D during the AM peak and LOS E during the PM peak. Table 6.2 - NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2018 Existing C (26.7) L T R L T R L T R L T R C (27.7) C (27.0) C (27.2) D (45.8) C (27.4) B (18.0) A (9.1) C (27.2) C (27.2) B (13.2) C (26.3) B (13.2) C (27.3) C (32.9) C (26.8) C (23.4) 2021 Future No Build D (50.7) L T R L T R L T R L T R E (63.7) E (59.5) D (44.4) F (123.1) D (54.8) D (39.1) E (62.5) C (28.2) C (28.2) F (94.4) C (31.7) A (6.5) E (55.7) F (82.2) C (29.8) D (44.3) 2021 Phase 1 Build E (60.3) L T R L T R L T R L T R E (68.8) E (61.7) D (44.1) F (157.8) E (57.4) D (42.1) E (64.6) C (29.1) C (29.1) F (118.4) D (39.8) A (6.4) E (59.3) F (100.3) C (30.9) E (55.1) 2021 Phase 1 Build with Improvements D (47.0) L T R L T R L T R L T R E (61.7) E (72.9) D (46.1) E (66.8) D (48.4) C (30.0) E (60.2) D (39.6) D (39.6) E (70.3) D (39.9) A (6.3) E (60.7) D (50.4) D (40.7) D (45.3) PM Peak Hour 2018 Existing C (32.6) L T R L T R L T R L T R D (40.0) C (34.2) C (32.6) E (58.9) C (34.7) C (28.6) A (7.7) D (37.2) D (37.2) D (38.7) B (16.7) B (12.3) D (37.7) D (40.2) D (35.1) C (23.0) 2021 Future No Build E (66.8) L T R L T R L T R L T R F (84.8) E (66.3) D (43.8) F (136.4) E (68.4) E (64.0) F (80.5) D (46.6) D (46.6) F (180.2) C (24.3) A (7.8) E (72.5) F (89.6) D (50.5) E (66.6) 2021 Phase 1 Build E (68.9) L T R L T R L T R L T R F (90.9) E (65.9) D (43.5) F (142.2) E (71.0) E (64.6) F (84.1) D (48.2) D (48.2) F (188.8) C (25.5) A (8.4) E (75.6) F (91.8) D (52.6) E (67.8) 2021 Phase 1 Build with Improvements E (57.6) L T R L T R L T R L T R F (93.4) F (81.7) D (37.6) F (98.6) E (73.1) D (51.1) E (64.1) E (55.3) E (55.3) F (96.7) C (23.2) A (7.5) F (80.7) E (70.9) E (56.4) D (41.6) 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 17 NC 133 (Castle Hayne Road) at Existing Site Access This unsignalized intersection currently operates at LOS C during the AM and PM peaks. In 2021 future no build conditions, it is expected to remain the same. In 2021 Phase 1 build conditions, it is expected to operate at LOS D during the AM peak and LOS C during the PM peak. While the LOS in the AM peak does increase by a letter, it is only due to a 3 second increase in delay that is not expected to cause issues. Therefore, no improvements are recommended to accommodate Phase 1 traffic. Based on NCDOT turn lane warrant charts, no turn lanes are warranted. Table 6.3 - NC 133 (Castle Hayne Road) at Site Access Scenario LOS of Worst Approach Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2018 Existing C (22.4) EB Approach L T R L T R L T R L T R C (22.4) C (22.4) B (11.3) A (0.0) A (0.0) A (0.0) C (22.4) A (0.1) A (0.0) 2021 Future No Build C (24.3) EB Approach L T R L T R L T R L T R C (24.3) C (24.3) B (11.8) A (0.0) A (0.0) A (0.0) C (24.3) A (0.1) A (0.0) 2021 Phase 1 Build D (27.1) EB Approach L T R L T R L T R L T R D (27.1) D (27.1) B (11.9) A (0.0) A (0.0) A (0.0) D (27.1) A (0.2) A (0.0) PM Peak Hour 2018 Existing C (18.3) EB Approach L T R L T R L T R L T R C (18.3) C (18.3) A (9.2) A (0.0) A (0.0) A (0.0) C (18.3) A (0.1) A (0.0) 2021 Future No Build C (19.6) EB Approach L T R L T R L T R L T R C (19.6) C (19.6) A (9.4) A (0.0) A (0.0) A (0.0) C (19.6) A (0.1) A (0.0) 2021 Phase 1 Build C (16.8) EB Approach L T R L T R L T R L T R C (16.8) C (16.8) A (9.6) A (0.0) A (0.0) A (0.0) C (16.8) A (0.3) A (0.0) *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 9PHASE 1 RECOMMENDED IMPROVEMENTS 25 0 ' r e - s t r i p e SPEED LIMIT 45 North Kerr Avenue SPEED LIMIT 45 Site Access Ca s t l e H a y n e Ro a d FU L L TW L T L TW L T L 47 5 ' FULL 27 5 ' FULL FULL Riverside Drive 200' 250' SPEED LIMIT 25 BLACK = EXISTING GREEN = COMMITTED BLUE = PROPOSED IN PHASE 1 New signal plan to be installed prior to Phase 1 Provide AM/PM peak "time of day" timings 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 19 7.0 2023 Full Build Conditions Full Build consists of 360 apartment units in 2023. 7.1 Trip Generation Trips for this development were projected based on the 10th Edition of ITE Trip Generation Manual. Table 7.1 contains the results. Table 7.1 - ITE Trip Generation BRC Castle Hayne (Full Build) Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak Hour Two-Way Land Use ITE Land Code Size Data Source Volume Enter Exit Enter Exit Apartments 220 360 Dwelling Units Adjacent /Equation 2,681 37 124 116 68 Total Trips 2,681 37 124 116 68 7.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. These distributions were reviewed and approved by WMPO. The directional distributions for Full Build site trips are as follows: • 40% to and from the north on Castle Hayne Road • 40% to and from the south on Castle Hayne Road • 20% to and from the east on North Kerr Avenue The site trip distributions for Full Build are shown in Figure 10. 7.3 2023 Future No Build Traffic The 2023 future no build traffic volumes were computed by applying a 1.0% compounded annual growth rate to the 2018 existing traffic volumes and adding the approved development trips. Figure 11 shows the 2023 future no build traffic volumes for AM and PM peaks. 7.4 2023 Full Build Total Traffic The 2023 Full Build traffic volumes were obtained by summing 2023 future no build volumes and Full Build site trips due to the proposed development. Full Build site trips are shown in Figure 12. The resulting Full build volume totals for AM and PM peaks are shown in Figure 13. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. BLACK = EXISTING 1% DESTINATION NODE% FIGURE 10FULL BUILDTRIP DISTRIBUTION North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d Riverside Drive 40% 20% 40% 20 % I N 30 % I N 20% IN 20% OUT 40% OUT 20% OUT 20 % I N 20 % I N 20% OUT 20 % O U T 10 % I N 10 % I N *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 11 2023 FUTURE NO BUILD VOLUMES 66 / 38 80 3 / 5 3 4 22 / 4 4 15 / 1 1 11 8 7 / 7 3 1 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 7 / 2 2 2 205 / 303 65 / 122 64 / 69 72 / 94 264 / 208 26 / 1 0 4 43 1 / 7 1 8 91 / 9 5 4 / 6 59 4 / 9 6 5 2 / 3 5 / 2 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 12 FULL BUILD SITE TRIPS 25 / 14 4 / 1 2 11 / 3 5 4 / 1 2 25 / 1 4 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 0 / 0 0 / 0 50 / 27 25 / 14 7 / 23 0 / 0 7 / 2 3 0 / 0 0 / 0 7 / 2 3 7 / 2 3 0 / 0 25 / 14 Riverside Drive *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 13 2023 FULL BUILD VOLUMES 90 / 52 80 7 / 5 4 6 33 / 7 9 19 / 2 3 12 1 1 / 7 4 5 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 21 7 / 2 2 2 205 / 303 115 / 150 89 / 83 80 / 117 264 / 208 34 / 1 2 7 43 1 / 7 1 8 91 / 9 5 11 / 2 9 60 2 / 9 8 8 2 / 3 30 / 16 Riverside Drive 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 24 7.5 Full Build Discussion of Results The following section discusses 2023 Full Build level of service for each intersection. NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive In 2023 future no build conditions, this intersection is expected to operate at LOS D in the AM peak and LOS E during the PM peak. In 2023 full build conditions, it is expected to remain unchanged. Therefore, no improvements are recommended to accommodate full build traffic. Table 7.2 - NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive Scenario Overall LOS Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2023 Future No Build D (53.4) L T R L T R L T R L T R E (65.4) E (60.9) D (45.5) F (136.4) E (56.3) D (40.7) E (63.8) C (27.9) C (27.9) F (104.6) C (32.0) A (6.4) E (57.2) F (89.4) C (29.6) D (46.6) 2023 Full Build D (50.7) L T R L T R L T R L T R D (54.7) F (85.9) D (47.9) E (71.2) D (52.3) D (35.1) E (63.6) D (38.2) D (38.2) E (75.1) D (46.5) A (6.2) E (62.1) D (54.9) D (39.8) D (51.1) PM Peak Hour 2023 Future No Build E (71.1) L T R L T R L T R L T R F (87.7) E (67.3) D (44.5) F (150.9) E (70.2) E (68.9) F (83.2) D (47.1) D (47.1) F (203.5) C (24.3) A (7.8) E (74.4) F (97.3) D (51.2) E (73.2) 2023 Full Build E (61.4) L T R L T R L T R L T R F (108.4) F (88.2) D (37.8) F (105.7) F (81.2) D (53.6) E (67.9) E (57.6) E (57.6) F (105.8) C (24.0) A (7.7) F (89.6) E (76.0) E (59.0) D (43.9) 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 25 NC 133 (Castle Hayne Road) at Existing Site Access In 2023 future no build conditions, this intersection is expected to operate at LOS D in the AM peak and LOS C in the PM peak. In 2023 full build conditions, it is expected to remain the same. Therefore, no improvements are recommended to accommodate full build traffic. Based on NCDOT turn lane warrant charts, no turn lanes are warranted. Table 7.3 - NC 133 (Castle Hayne Road) at Site Access Scenario LOS of Worst Approach Level of Service by Approach (Delay in sec/veh) Eastbound Westbound Northbound Southbound AM Peak Hour 2023 Future No Build D (25.0) EB Approach L T R L T R L T R L T R D (25.0) D (25.0) B (11.9) A (0.0) A (0.0) A (0.0) D (25.0) A (0.1) A (0.0) 2023 Full Build D (29.2) EB Approach L T R L T R L T R L T R D (29.2) D (29.2) B (12.2) A (0.0) A (0.0) A (0.0) D (29.2) A (0.2) A (0.0) PM Peak Hour 2023 Future No Build C (19.9) EB Approach L T R L T R L T R L T R C (19.9) C (19.9) A (9.5) A (0.0) A (0.0) A (0.0) C (19.9) A (0.1) A (0.0) 2023 Full Build C (17.2) EB Approach L T R L T R L T R L T R C (17.2) C (17.2) A (9.7) A (0.0) A (0.0) A (0.0) C (17.2) A (0.3) A (0.0) 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 26 8.0 Queueing Results Below in Table 8.1 are the queue results for all exclusive turn lanes. Full Build recommended improvements are illustrated in Figure 14. Table 8.1 - Queue Results AM Peak Hour Queues Scenario NC 133 (Castle Hayne Road) at North Kerr Avenue NC 133 (Castle Hayne Road) at Site Access 2018 Existing EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 74 52 205 184 174 299 15 0 95th Percentile Queue (ft) 47 38 276 146 12 111 15 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 118 96 448 174 175 300 41 0 95th Percentile Queue (ft) 118 105 573 280 60 469 15 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 180 96 395 208 175 300 42 0 95th Percentile Queue (ft) 167 115 581 134 65 474 19 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build + Imps EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 136 135 267 236 250 300 61 95th Percentile Queue (ft) 137 105 367 208 57 305 16 Storage Bay (ft) FULL FULL FULL 200 250 275 475 2023 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 96 137 326 245 175 299 15 0 95th Percentile Queue (ft) 121 105 587 288 62 481 16 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2023 Full Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 131 156 381 220 249 299 40 0 95th Percentile Queue (ft) 161 125 375 213 66 315 19 0 Storage Bay (ft) FULL FULL FULL 200 250 275 475 FULL 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 27 PM Peak Hour Queues Scenario NC 133 (Castle Hayne Road) at North Kerr Avenue NC 133 (Castle Hayne Road) at Site Access 2018 Existing EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 336 52 203 250 174 189 39 0 95th Percentile Queue (ft) 118 24 230 246 35 222 15 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 286 118 584 250 175 300 42 0 95th Percentile Queue (ft) 244 66 461 467 196 509 30 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 222 93 549 250 175 300 41 0 95th Percentile Queue (ft) 299 73 470 444 220 516 43 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2021 Phase 1 Build + Imps EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 242 118 351 250 250 299 42 95th Percentile Queue (ft) 241 62 337 366 153 351 36 Storage Bay (ft) FULL FULL FULL 200 250 275 475 2023 Future No Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 286 118 699 250 175 300 700 0 95th Percentile Queue (ft) 251 67 472 481 201 524 31 0 Storage Bay (ft) FULL FULL FULL 200 150 275 475 FULL 2023 Full Build EBL EBR WBL WBR NBL SBL SBR SBR Max Queue (ft) 304 115 608 245 250 300 61 0 95th Percentile Queue (ft) 268 73 343 378 174 362 43 0 Storage Bay (ft) FULL FULL FULL 200 250 275 475 FULL *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE 14FULL BUILD RECOMMENDED IMPROVEMENTS 25 0 ' r e - s t r i p e SPEED LIMIT 45 North Kerr Avenue SPEED LIMIT 45 Site Access Ca s t l e H a y n e Ro a d FU L L TW L T L TW L T L 47 5 ' FULL 27 5 ' FULL FULL Riverside Drive 200' 250' SPEED LIMIT 25 BLACK = EXISTING GREEN = COMMITTED BLUE = PROPOSED IN PHASE 1 PURPLE = PROPOSED IN FULL BUILD New signal plan to be installed prior to Phase 1 No additional improvements recommended for Full Build Provide AM/PM peak "time of day" timings 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 29 9.0 Summary and Conclusion The proposed BRC Castle Hayne development is to be located west of Castle Hayne Road on both the north and south sides of the planned Riverside Drive in New Hanover County, North Carolina. The development is planned to consist of 360 apartments in full build. The development will utilize four (4) access points on Riverside Drive, and one existing access on Castle Hayne Road. The trip generation indicates that the proposed development is expected to generate 1,592 daily trips, 99 trips in the AM peak, and 117 trips in the PM peak for Phase 1 Build. The trip generation indicates that the proposed development is expected to generate 2,681 daily trips, 161 trips in the AM peak, and 184 trips in the PM peak for Full Build. DAVENPORT was retained to determine the potential traffic impacts of this development and to identify transportation improvements that may be required to accommodate the impacts of both background traffic and new development traffic. It is recommended in Phase 1 to re-stripe the northbound left turn lane for the Castle Hayne Road at North Kerr Avenue/Riverside Drive intersection from 150 feet to 250 feet of storage with appropriate taper. Additionally, it is recommended to implement “time of day” timings for both the AM and PM peaks. There are no additional recommended improvements to accommodate the full build. In conclusion, this study has reviewed the impacts of both background traffic and proposed development traffic and has provided recommendations to accommodate future traffic. Please note the proposed site accesses should be designed according to NCDOT standards. 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis 30 Appendix 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Level of Service Analysis 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis NC 133 (Castle Hayne Road) at North Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM Exist C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 35 34 27 251 60 195 13 410 87 206 764 12 Future Volume (vph) 35 34 27 251 60 195 13 410 87 206 764 12 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.974 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Flt Permitted 0.713 0.732 0.138 0.243 Satd. Flow (perm) 1328 1863 1583 1364 1863 1583 257 1814 0 453 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 39 38 30 279 67 217 14 456 97 229 849 13 Shared Lane Traffic (%) Lane Group Flow (vph) 39 38 30 279 67 217 14 553 0 229 849 13 Turn Type Perm NA Perm Perm NA pm+ov pm+pt NA pm+pt NA Perm Protected Phases 4 8152 16 Permitted Phases 4 4 8 8 2 6 6 Detector Phase 44488152 166 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 12.0 7.0 12.0 12.0 Minimum Split (s) 12.4 12.4 12.4 12.5 12.5 11.9 13.2 18.2 11.9 18.2 18.2 Total Split (s) 30.0 30.0 30.0 40.0 40.0 20.0 20.0 60.0 20.0 60.0 60.0 Total Split (%) 25.0% 25.0% 25.0% 33.3% 33.3% 16.7% 16.7% 50.0% 16.7% 50.0% 50.0% Maximum Green (s) 24.6 24.6 24.6 34.5 34.5 15.1 13.8 53.8 15.1 53.8 53.8 Yellow Time (s) 3.2 3.2 3.2 4.5 4.5 3.0 3.0 4.5 3.0 4.5 4.5 All-Red Time (s) 2.2 2.2 2.2 1.0 1.0 1.9 3.2 1.7 1.9 1.7 1.7 Lost Time Adjust (s) -0.4 -0.4 -0.4 -0.5 -0.5 0.1 -1.2 -1.2 0.1 -1.2 -1.2 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 40.0 Recall Mode None None None None None None None Min None Min Min Act Effct Green (s) 23.7 23.7 23.7 23.7 23.7 39.2 46.9 38.2 53.6 49.6 49.6 Actuated g/C Ratio 0.27 0.27 0.27 0.27 0.27 0.45 0.53 0.43 0.61 0.56 0.56 v/c Ratio 0.11 0.08 0.07 0.76 0.13 0.31 0.05 0.70 0.53 0.81 0.01 Control Delay 27.7 27.0 27.2 45.8 27.4 18.0 9.1 27.2 13.2 26.3 13.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 27.7 27.0 27.2 45.8 27.4 18.0 9.1 27.2 13.2 26.3 13.2 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM Exist C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS CCCDCBAC BCB Approach Delay 27.3 32.9 26.8 23.4 Approach LOS CCCC Queue Length 50th (ft) 15 15 12 132 26 69 3 228 48 286 2 Queue Length 95th (ft) 47 45 38 276 70 146 12 460 111 #842 15 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 556 780 662 571 780 804 425 1193 513 1226 1042 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.07 0.05 0.05 0.49 0.09 0.27 0.03 0.46 0.45 0.69 0.01 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 88 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.81 Intersection Signal Delay: 26.7 Intersection LOS: C Intersection Capacity Utilization 79.1% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 FNB C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 64 63 66 259 71 201 25 422 90 212 787 21 Future Volume (vph) 64 63 66 259 71 201 25 422 90 212 787 21 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.974 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 71 70 73 288 79 223 28 469 100 236 874 23 Shared Lane Traffic (%) Lane Group Flow (vph) 71 70 73 288 79 223 28 569 0 236 874 23 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 30.0 20.0 20.0 30.0 20.0 20.0 90.0 20.0 90.0 20.0 Total Split (%) 12.5% 18.8% 12.5% 12.5% 18.8% 12.5% 12.5% 56.3% 12.5% 56.3% 12.5% Maximum Green (s) 14.2 22.9 13.8 14.9 22.9 14.9 13.8 83.8 14.9 83.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 10.6 11.8 21.3 17.1 16.9 38.3 8.2 51.2 16.1 62.7 78.6 Actuated g/C Ratio 0.09 0.10 0.19 0.15 0.15 0.34 0.07 0.46 0.14 0.56 0.70 v/c Ratio 0.43 0.36 0.24 1.07 0.28 0.41 0.22 0.69 0.94 0.84 0.02 Control Delay 63.7 59.5 44.4 123.1 54.8 39.1 62.5 28.2 94.4 31.7 6.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 63.7 59.5 44.4 123.1 54.8 39.1 62.5 28.2 94.4 31.7 6.5 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 FNB C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS E E D F D D E C F C A Approach Delay 55.7 82.2 29.8 44.3 Approach LOS E F C D Queue Length 50th (ft) 50 49 45 ~253 53 131 20 320 ~185 552 5 Queue Length 95th (ft) 118 115 105 #573 127 280 60 469 #469 856 15 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 252 443 409 269 443 539 252 1384 252 1421 1207 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.28 0.16 0.18 1.07 0.18 0.41 0.11 0.41 0.94 0.62 0.02 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 112.4 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.07 Intersection Signal Delay: 50.7 Intersection LOS: D Intersection Capacity Utilization 79.1% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 95 78 73 259 76 201 28 422 90 212 789 28 Future Volume (vph) 95 78 73 259 76 201 28 422 90 212 789 28 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.974 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 106 87 81 288 84 223 31 469 100 236 877 31 Shared Lane Traffic (%) Lane Group Flow (vph) 106 87 81 288 84 223 31 569 0 236 877 31 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 30.0 20.0 20.0 30.0 20.0 20.0 90.0 20.0 90.0 20.0 Total Split (%) 12.5% 18.8% 12.5% 12.5% 18.8% 12.5% 12.5% 56.3% 12.5% 56.3% 12.5% Maximum Green (s) 14.2 22.9 13.8 14.9 22.9 14.9 13.8 83.8 14.9 83.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 12.3 12.7 26.2 16.5 15.9 36.6 8.3 54.6 15.5 61.8 79.3 Actuated g/C Ratio 0.10 0.11 0.22 0.14 0.13 0.31 0.07 0.46 0.13 0.52 0.67 v/c Ratio 0.58 0.44 0.23 1.17 0.34 0.46 0.25 0.68 1.03 0.91 0.03 Control Delay 68.8 61.7 44.1 157.8 57.4 42.1 64.6 29.1 118.4 39.8 6.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 68.8 61.7 44.1 157.8 57.4 42.1 64.6 29.1 118.4 39.8 6.4 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS EEDFEDEC FDA Approach Delay 59.3 100.3 30.9 55.1 Approach LOS E F C E Queue Length 50th (ft) 77 63 51 ~267 60 140 23 327 ~197 575 7 Queue Length 95th (ft) 167 138 115 #581 134 282 65 474 #474 879 19 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 230 404 443 246 404 486 230 1339 230 1375 1097 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.46 0.22 0.18 1.17 0.21 0.46 0.13 0.42 1.03 0.64 0.03 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 119 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.17 Intersection Signal Delay: 60.3 Intersection LOS: E Intersection Capacity Utilization 79.2% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build + Imps C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 95 78 73 259 76 201 28 422 90 212 789 28 Future Volume (vph) 95 78 73 259 76 201 28 422 90 212 789 28 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 250 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.974 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 106 87 81 288 84 223 31 469 100 236 877 31 Shared Lane Traffic (%) Lane Group Flow (vph) 106 87 81 288 84 223 31 569 0 236 877 31 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 13.0 12.0 27.0 20.0 25.0 12.0 55.0 25.0 68.0 20.0 Total Split (%) 16.7% 10.8% 10.0% 22.5% 16.7% 20.8% 10.0% 45.8% 20.8% 56.7% 16.7% Maximum Green (s) 14.2 5.9 5.8 21.9 12.9 19.9 5.8 48.8 19.9 61.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 11.5 8.3 20.4 21.0 20.1 42.8 6.9 42.3 17.5 56.1 72.7 Actuated g/C Ratio 0.11 0.08 0.19 0.19 0.18 0.39 0.06 0.39 0.16 0.52 0.67 v/c Ratio 0.57 0.62 0.27 0.84 0.24 0.36 0.27 0.81 0.83 0.91 0.03 Control Delay 61.7 72.9 46.1 66.8 48.4 30.0 60.2 39.6 70.3 39.9 6.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 61.7 72.9 46.1 66.8 48.4 30.0 60.2 39.6 70.3 39.9 6.3 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build + Imps C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS EEDEDCED EDA Approach Delay 60.7 50.4 40.7 45.3 Approach LOS E D D D Queue Length 50th (ft) 80 67 56 217 59 129 24 368 178 587 7 Queue Length 95th (ft) 137 #148 105 #367 112 208 57 514 #305 #872 16 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 250 275 475 Base Capacity (vph) 252 141 300 386 344 668 117 861 336 1114 1117 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.42 0.62 0.27 0.75 0.24 0.33 0.26 0.66 0.70 0.79 0.03 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 108.7 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 47.0 Intersection LOS: D Intersection Capacity Utilization 79.2% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2023 FNB C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 65 64 66 264 72 205 26 431 91 217 803 22 Future Volume (vph) 65 64 66 264 72 205 26 431 91 217 803 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.974 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 72 71 73 293 80 228 29 479 101 241 892 24 Shared Lane Traffic (%) Lane Group Flow (vph) 72 71 73 293 80 228 29 580 0 241 892 24 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 30.0 20.0 20.0 30.0 20.0 20.0 90.0 20.0 90.0 20.0 Total Split (%) 12.5% 18.8% 12.5% 12.5% 18.8% 12.5% 12.5% 56.3% 12.5% 56.3% 12.5% Maximum Green (s) 14.2 22.9 13.8 14.9 22.9 14.9 13.8 83.8 14.9 83.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 10.7 11.9 21.4 17.1 16.9 38.3 8.3 53.6 16.1 65.0 81.1 Actuated g/C Ratio 0.09 0.10 0.19 0.15 0.15 0.33 0.07 0.47 0.14 0.57 0.71 v/c Ratio 0.44 0.37 0.25 1.11 0.29 0.43 0.23 0.69 0.98 0.85 0.02 Control Delay 65.4 60.9 45.5 136.4 56.3 40.7 63.8 27.9 104.6 32.0 6.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 65.4 60.9 45.5 136.4 56.3 40.7 63.8 27.9 104.6 32.0 6.4 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne AM 2023 FNB C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS EEDFEDEC FCA Approach Delay 57.2 89.4 29.6 46.6 Approach LOS E F C D Queue Length 50th (ft) 53 52 47 ~275 56 141 21 330 ~205 579 6 Queue Length 95th (ft) 121 116 105 #587 129 288 62 482 #481 894 16 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 247 433 401 263 433 528 247 1356 247 1393 1213 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.29 0.16 0.18 1.11 0.18 0.43 0.12 0.43 0.98 0.64 0.02 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 114.9 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.11 Intersection Signal Delay: 53.4 Intersection LOS: D Intersection Capacity Utilization 80.2% ICU Level of Service D Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne AM 2023 Build C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 115 89 90 264 80 205 34 431 91 217 807 33 Future Volume (vph) 115 89 90 264 80 205 34 431 91 217 807 33 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 250 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.974 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1814 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 128 99 100 293 89 228 38 479 101 241 897 37 Shared Lane Traffic (%) Lane Group Flow (vph) 128 99 100 293 89 228 38 580 0 241 897 37 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 13.0 12.0 27.0 20.0 25.0 12.0 55.0 25.0 68.0 20.0 Total Split (%) 16.7% 10.8% 10.0% 22.5% 16.7% 20.8% 10.0% 45.8% 20.8% 56.7% 16.7% Maximum Green (s) 14.2 5.9 5.8 21.9 12.9 19.9 5.8 48.8 19.9 61.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 17.5 8.1 20.0 21.6 14.2 34.1 6.9 46.3 18.0 57.4 80.0 Actuated g/C Ratio 0.15 0.07 0.18 0.19 0.13 0.30 0.06 0.41 0.16 0.51 0.71 v/c Ratio 0.47 0.74 0.36 0.87 0.38 0.48 0.36 0.78 0.86 0.95 0.03 Control Delay 54.7 85.9 47.9 71.2 52.3 35.1 63.6 38.2 75.1 46.5 6.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 54.7 85.9 47.9 71.2 52.3 35.1 63.6 38.2 75.1 46.5 6.2 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne AM 2023 Build C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS DFDEDDED EDA Approach Delay 62.1 54.9 39.8 51.1 Approach LOS E D D D Queue Length 50th (ft) 96 77 70 222 64 135 29 379 182 613 8 Queue Length 95th (ft) 161 #174 125 #375 118 213 66 527 #315 #904 19 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 250 275 475 Base Capacity (vph) 289 133 282 364 264 509 110 810 316 1049 1131 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.44 0.74 0.35 0.80 0.34 0.45 0.35 0.72 0.76 0.86 0.03 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 113.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.95 Intersection Signal Delay: 50.7 Intersection LOS: D Intersection Capacity Utilization 80.4% ICU Level of Service D Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM Exist C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 99 49 13 198 60 288 59 683 90 211 508 12 Future Volume (vph) 99 49 13 198 60 288 59 683 90 211 508 12 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.983 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Flt Permitted 0.713 0.722 0.379 0.087 Satd. Flow (perm) 1328 1863 1583 1345 1863 1583 706 1831 0 162 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 110 54 14 220 67 320 66 759 100 234 564 13 Shared Lane Traffic (%) Lane Group Flow (vph) 110 54 14 220 67 320 66 859 0 234 564 13 Turn Type Perm NA Perm Perm NA pm+ov pm+pt NA pm+pt NA Perm Protected Phases 4 8152 16 Permitted Phases 4 4 8 8 2 6 6 Detector Phase 44488152 166 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 12.0 7.0 12.0 12.0 Minimum Split (s) 12.4 12.4 12.4 12.5 12.5 11.9 13.2 18.2 11.9 18.2 18.2 Total Split (s) 30.0 30.0 30.0 40.0 40.0 20.0 20.0 60.0 20.0 60.0 60.0 Total Split (%) 25.0% 25.0% 25.0% 33.3% 33.3% 16.7% 16.7% 50.0% 16.7% 50.0% 50.0% Maximum Green (s) 24.6 24.6 24.6 34.5 34.5 15.1 13.8 53.8 15.1 53.8 53.8 Yellow Time (s) 3.2 3.2 3.2 4.5 4.5 3.0 3.0 4.5 3.0 4.5 4.5 All-Red Time (s) 2.2 2.2 2.2 1.0 1.0 1.9 3.2 1.7 1.9 1.7 1.7 Lost Time Adjust (s) -0.4 -0.4 -0.4 -0.5 -0.5 0.1 -1.2 -1.2 0.1 -1.2 -1.2 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 3.0 2.0 3.0 3.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 15.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 40.0 Recall Mode None None None None None None None Min None Min Min Act Effct Green (s) 22.0 22.0 22.0 22.0 22.0 39.5 63.9 55.5 72.6 62.6 62.6 Actuated g/C Ratio 0.21 0.21 0.21 0.21 0.21 0.38 0.61 0.53 0.69 0.60 0.60 v/c Ratio 0.40 0.14 0.04 0.78 0.17 0.54 0.13 0.89 0.77 0.51 0.01 Control Delay 40.0 34.2 32.6 58.9 34.7 28.6 7.7 37.2 38.7 16.7 12.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 40.0 34.2 32.6 58.9 34.7 28.6 7.7 37.2 38.7 16.7 12.3 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM Exist C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS D C C E C C A D D B B Approach Delay 37.7 40.2 35.1 23.0 Approach LOS DDDC Queue Length 50th (ft) 65 30 8 143 38 164 13 514 84 221 4 Queue Length 95th (ft) 118 63 24 230 75 246 35 #927 #222 399 15 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 446 625 531 451 625 635 623 966 343 1110 943 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.25 0.09 0.03 0.49 0.11 0.50 0.11 0.89 0.68 0.51 0.01 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 105.1 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 32.6 Intersection LOS: C Intersection Capacity Utilization 83.2% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 FNB C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 120 68 37 204 93 297 103 704 93 217 523 43 Future Volume (vph) 120 68 37 204 93 297 103 704 93 217 523 43 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.983 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 133 76 41 227 103 330 114 782 103 241 581 48 Shared Lane Traffic (%) Lane Group Flow (vph) 133 76 41 227 103 330 114 885 0 241 581 48 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 30.0 20.0 20.0 30.0 20.0 20.0 90.0 20.0 90.0 20.0 Total Split (%) 12.5% 18.8% 12.5% 12.5% 18.8% 12.5% 12.5% 56.3% 12.5% 56.3% 12.5% Maximum Green (s) 14.2 22.9 13.8 14.9 22.9 14.9 13.8 83.8 14.9 83.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 14.0 13.9 32.3 16.3 15.2 35.6 13.3 70.4 15.3 72.4 91.5 Actuated g/C Ratio 0.10 0.10 0.24 0.12 0.11 0.26 0.10 0.52 0.11 0.54 0.68 v/c Ratio 0.73 0.40 0.11 1.07 0.49 0.79 0.66 0.93 1.21 0.58 0.04 Control Delay 84.8 66.3 43.8 136.4 68.4 64.0 80.5 46.6 180.2 24.3 7.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 84.8 66.3 43.8 136.4 68.4 64.0 80.5 46.6 180.2 24.3 7.8 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 FNB C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FEDFEEFD FCA Approach Delay 72.5 89.6 50.5 66.6 Approach LOS E F D E Queue Length 50th (ft) 118 65 29 ~236 90 286 100 698 ~274 344 13 Queue Length 95th (ft) #244 126 66 #461 162 #467 #196 #1014 #509 494 30 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 200 351 400 213 351 416 200 1173 200 1193 1086 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.67 0.22 0.10 1.07 0.29 0.79 0.57 0.75 1.21 0.49 0.04 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 135.3 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.21 Intersection Signal Delay: 66.8 Intersection LOS: E Intersection Capacity Utilization 85.2% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 138 77 42 204 108 297 110 704 93 217 530 65 Future Volume (vph) 138 77 42 204 108 297 110 704 93 217 530 65 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.983 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 153 86 47 227 120 330 122 782 103 241 589 72 Shared Lane Traffic (%) Lane Group Flow (vph) 153 86 47 227 120 330 122 885 0 241 589 72 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 30.0 20.0 20.0 30.0 20.0 20.0 90.0 20.0 90.0 20.0 Total Split (%) 12.5% 18.8% 12.5% 12.5% 18.8% 12.5% 12.5% 56.3% 12.5% 56.3% 12.5% Maximum Green (s) 14.2 22.9 13.8 14.9 22.9 14.9 13.8 83.8 14.9 83.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 14.9 15.4 34.1 16.3 15.7 36.1 13.6 71.3 15.3 72.9 92.9 Actuated g/C Ratio 0.11 0.11 0.25 0.12 0.11 0.26 0.10 0.52 0.11 0.53 0.68 v/c Ratio 0.80 0.42 0.12 1.08 0.57 0.80 0.70 0.93 1.23 0.60 0.07 Control Delay 90.9 65.9 43.5 142.2 71.0 64.6 84.1 48.2 188.8 25.5 8.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 90.9 65.9 43.5 142.2 71.0 64.6 84.1 48.2 188.8 25.5 8.4 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FEDFEEFD FCA Approach Delay 75.6 91.8 52.6 67.8 Approach LOS E F D E Queue Length 50th (ft) 141 75 34 ~245 107 290 110 715 ~284 360 21 Queue Length 95th (ft) #299 139 73 #470 184 #444 #220 #1088 #516 517 43 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 196 345 411 210 345 415 196 1153 196 1173 1073 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.78 0.25 0.11 1.08 0.35 0.80 0.62 0.77 1.23 0.50 0.07 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 137.6 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.23 Intersection Signal Delay: 68.9 Intersection LOS: E Intersection Capacity Utilization 85.2% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build + Imps C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 138 77 42 204 108 297 110 704 93 217 530 65 Future Volume (vph) 138 77 42 204 108 297 110 704 93 217 530 65 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 250 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.983 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1831 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 153 86 47 227 120 330 122 782 103 241 589 72 Shared Lane Traffic (%) Lane Group Flow (vph) 153 86 47 227 120 330 122 885 0 241 589 72 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 17.0 13.0 21.0 20.0 16.0 22.0 21.0 65.0 22.0 66.0 17.0 Total Split (%) 14.2% 10.8% 17.5% 16.7% 13.3% 18.3% 17.5% 54.2% 18.3% 55.0% 14.2% Maximum Green (s) 11.2 5.9 14.8 14.9 8.9 16.9 14.8 58.8 16.9 59.8 11.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 11.8 8.0 26.2 16.0 11.2 33.2 13.2 58.6 17.0 62.4 79.2 Actuated g/C Ratio 0.10 0.07 0.22 0.13 0.09 0.28 0.11 0.49 0.14 0.53 0.67 v/c Ratio 0.86 0.69 0.13 0.95 0.69 0.74 0.62 0.98 0.95 0.60 0.07 Control Delay 93.4 81.7 37.6 98.6 73.1 51.1 64.1 55.3 96.7 23.2 7.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 93.4 81.7 37.6 98.6 73.1 51.1 64.1 55.3 96.7 23.2 7.5 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build + Imps C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS F F D F E D E E F C A Approach Delay 80.7 70.9 56.4 41.6 Approach LOS F E E D Queue Length 50th (ft) 119 66 29 177 92 235 91 643 188 305 18 Queue Length 95th (ft) #241 #147 62 #337 #180 #366 153 #935 #351 439 36 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 250 275 475 Base Capacity (vph) 179 125 387 239 175 443 239 926 253 980 1059 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.85 0.69 0.12 0.95 0.69 0.74 0.51 0.96 0.95 0.60 0.07 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 118.6 Natural Cycle: 110 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.98 Intersection Signal Delay: 57.6 Intersection LOS: E Intersection Capacity Utilization 85.2% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2023 FNB C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 122 69 38 208 94 303 104 718 95 222 534 44 Future Volume (vph) 122 69 38 208 94 303 104 718 95 222 534 44 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 150 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.982 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1829 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1829 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 136 77 42 231 104 337 116 798 106 247 593 49 Shared Lane Traffic (%) Lane Group Flow (vph) 136 77 42 231 104 337 116 904 0 247 593 49 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 20.0 30.0 20.0 20.0 30.0 20.0 20.0 90.0 20.0 90.0 20.0 Total Split (%) 12.5% 18.8% 12.5% 12.5% 18.8% 12.5% 12.5% 56.3% 12.5% 56.3% 12.5% Maximum Green (s) 14.2 22.9 13.8 14.9 22.9 14.9 13.8 83.8 14.9 83.8 14.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 14.2 14.2 32.7 16.3 15.2 35.6 13.4 73.4 15.2 75.2 94.5 Actuated g/C Ratio 0.10 0.10 0.24 0.12 0.11 0.26 0.10 0.53 0.11 0.54 0.68 v/c Ratio 0.75 0.40 0.11 1.11 0.51 0.83 0.68 0.93 1.27 0.59 0.05 Control Delay 87.7 67.3 44.5 150.9 70.2 68.9 83.2 47.1 203.5 24.3 7.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 87.7 67.3 44.5 150.9 70.2 68.9 83.2 47.1 203.5 24.3 7.8 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/15/2018 180243 BRC Castle Hayne PM 2023 FNB C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FEDFEEFD FCA Approach Delay 74.4 97.3 51.2 73.2 Approach LOS E F D E Queue Length 50th (ft) 127 69 31 ~261 95 310 107 730 ~305 355 14 Queue Length 95th (ft) #251 127 67 #472 164 #481 #201 #1107 #524 508 31 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 150 275 475 Base Capacity (vph) 195 342 394 208 342 406 195 1142 195 1163 1092 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.70 0.23 0.11 1.11 0.30 0.83 0.59 0.79 1.27 0.51 0.04 Intersection Summary Area Type: Other Cycle Length: 160 Actuated Cycle Length: 138.4 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 1.27 Intersection Signal Delay: 71.1 Intersection LOS: E Intersection Capacity Utilization 86.5% ICU Level of Service E Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne PM 2023 Full Build C. Steiss Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 150 83 52 208 117 303 127 718 95 222 546 79 Future Volume (vph) 150 83 52 208 117 303 127 718 95 222 546 79 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 200 250 0 275 475 Storage Lanes 1 1 1 2 1 0 1 1 Taper Length (ft) 25 25 25 25 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.850 0.850 0.982 0.850 Flt Protected 0.950 0.950 0.950 0.950 Satd. Flow (prot) 1770 1863 1583 1770 1863 1583 1770 1829 0 1770 1863 1583 Flt Permitted 0.950 0.950 0.950 0.950 Satd. Flow (perm) 1770 1863 1583 1770 1863 1583 1770 1829 0 1770 1863 1583 Right Turn on Red No No No No Satd. Flow (RTOR) Link Speed (mph) 25 45 45 45 Link Distance (ft) 409 1017 454 884 Travel Time (s) 11.2 15.4 6.9 13.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 167 92 58 231 130 337 141 798 106 247 607 88 Shared Lane Traffic (%) Lane Group Flow (vph) 167 92 58 231 130 337 141 904 0 247 607 88 Turn Type Prot NA pm+ov Prot NA pm+ov Prot NA Prot NA pm+ov Protected Phases 74538152 167 Permitted Phases 4 8 6 Detector Phase 74538152 167 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 12.0 5.0 12.0 5.0 Minimum Split (s) 10.8 12.1 11.2 10.1 12.1 10.1 11.2 18.2 10.1 18.2 10.8 Total Split (s) 17.0 13.0 21.0 20.0 16.0 22.0 21.0 65.0 22.0 66.0 17.0 Total Split (%) 14.2% 10.8% 17.5% 16.7% 13.3% 18.3% 17.5% 54.2% 18.3% 55.0% 14.2% Maximum Green (s) 11.2 5.9 14.8 14.9 8.9 16.9 14.8 58.8 16.9 59.8 11.2 Yellow Time (s) 3.0 4.5 3.0 3.0 4.5 3.0 3.0 4.5 3.0 4.5 3.0 All-Red Time (s) 2.8 2.6 3.2 2.1 2.6 2.1 3.2 1.7 2.1 1.7 2.8 Lost Time Adjust (s) -0.8 -2.1 -1.2 -1.1 -2.1 -0.1 -1.2 -1.2 -0.1 -1.2 -0.8 Total Lost Time (s) 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lead Lag Lead Lead Lag Lead Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 6.0 2.0 5.5 2.0 Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15.0 0.0 15.0 0.0 Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 40.0 0.0 40.0 0.0 Recall Mode None None None None None None None Min None Min None Act Effct Green (s) 12.0 8.0 26.9 16.0 11.0 33.0 13.9 60.0 17.0 63.1 80.1 Actuated g/C Ratio 0.10 0.07 0.22 0.13 0.09 0.28 0.12 0.50 0.14 0.53 0.67 v/c Ratio 0.94 0.74 0.16 0.98 0.76 0.77 0.69 0.99 0.99 0.62 0.08 Control Delay 108.4 88.2 37.8 105.7 81.2 53.6 67.9 57.6 105.8 24.0 7.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 108.4 88.2 37.8 105.7 81.2 53.6 67.9 57.6 105.8 24.0 7.7 Lanes, Volumes, Timings 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/20/2018 180243 BRC Castle Hayne PM 2023 Full Build C. Steiss Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR LOS FFDFFDEE FCA Approach Delay 89.6 76.0 59.0 43.9 Approach LOS F E E D Queue Length 50th (ft) 131 71 36 181 100 241 105 671 193 326 23 Queue Length 95th (ft) #268 #158 73 #343 #201 #378 174 #968 #362 458 43 Internal Link Dist (ft) 329 937 374 804 Turn Bay Length (ft) 200 250 275 475 Base Capacity (vph) 177 124 382 236 170 435 236 914 250 979 1055 Starvation Cap Reductn 00000000 000 Spillback Cap Reductn 00000000 000 Storage Cap Reductn 00000000 000 Reduced v/c Ratio 0.94 0.74 0.15 0.98 0.76 0.77 0.60 0.99 0.99 0.62 0.08 Intersection Summary Area Type: Other Cycle Length: 120 Actuated Cycle Length: 120 Natural Cycle: 120 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.99 Intersection Signal Delay: 61.4 Intersection LOS: E Intersection Capacity Utilization 86.5% ICU Level of Service E Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis NC 133 (Castle Hayne Road) at Existing Site Access HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM Exist C. Steiss Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 5 4 554 1093 14 Future Vol, veh/h 2 5 4 554 1093 14 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 2 6 4 616 1214 16 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1838 1214 1214 0 - 0 Stage 1 1214 ----- Stage 2 624 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 83 221 575 - - - Stage 1 281 ----- Stage 2 534 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 82 221 575 - - - Mov Cap-2 Maneuver 200 ----- Stage 1 281 ----- Stage 2 528 ----- Approach EB NB SB HCM Control Delay, s 22.4 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 575 - 215 - - HCM Lane V/C Ratio 0.008 - 0.036 - - HCM Control Delay (s) 11.3 0 22.4 - - HCM Lane LOS B A C - - HCM 95th %tile Q(veh) 0 - 0.1 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM 2021 FNB C. Steiss Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 5 4 583 1164 14 Future Vol, veh/h 2 5 4 583 1164 14 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 2 6 4 648 1293 16 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1950 1293 1293 0 - 0 Stage 1 1293 ----- Stage 2 657 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 71 199 536 - - - Stage 1 257 ----- Stage 2 516 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 70 199 536 - - - Mov Cap-2 Maneuver 184 ----- Stage 1 257 ----- Stage 2 510 ----- Approach EB NB SB HCM Control Delay, s 24.3 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 536 - 194 - - HCM Lane V/C Ratio 0.008 - 0.04 - - HCM Control Delay (s) 11.8 0 24.3 - - HCM Lane LOS B A C - - HCM 95th %tile Q(veh) 0 - 0.1 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM 2021 Ph1 Build C. Steiss Page 4 Intersection Int Delay, s/veh 0.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 28 11 586 1171 16 Future Vol, veh/h 2 28 11 586 1171 16 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 2 31 12 651 1301 18 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1977 1301 1301 0 - 0 Stage 1 1301 ----- Stage 2 676 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 68 197 532 - - - Stage 1 255 ----- Stage 2 505 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 66 197 532 - - - Mov Cap-2 Maneuver 179 ----- Stage 1 255 ----- Stage 2 487 ----- Approach EB NB SB HCM Control Delay, s 27.1 0.2 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 532 - 196 - - HCM Lane V/C Ratio 0.023 - 0.17 - - HCM Control Delay (s) 11.9 0 27.1 - - HCM Lane LOS B A D - - HCM 95th %tile Q(veh) 0.1 - 0.6 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne AM 2023 FNB C. Steiss Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 5 4 594 1187 15 Future Vol, veh/h 2 5 4 594 1187 15 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 2 6 4 660 1319 17 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1988 1319 1319 0 - 0 Stage 1 1319 ----- Stage 2 669 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 67 192 524 - - - Stage 1 250 ----- Stage 2 509 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 66 192 524 - - - Mov Cap-2 Maneuver 178 ----- Stage 1 250 ----- Stage 2 503 ----- Approach EB NB SB HCM Control Delay, s 25 0.1 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 524 - 188 - - HCM Lane V/C Ratio 0.008 - 0.041 - - HCM Control Delay (s) 11.9 0 25 - - HCM Lane LOS B A D - - HCM 95th %tile Q(veh) 0 - 0.1 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/20/2018 180243 BRC Castle Hayne AM 2023 Build C. Steiss Page 4 Intersection Int Delay, s/veh 0.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 2 30 11 602 1211 19 Future Vol, veh/h 2 30 11 602 1211 19 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 2 33 12 669 1346 21 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2039 1346 1346 0 - 0 Stage 1 1346 ----- Stage 2 693 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 62 185 512 - - - Stage 1 242 ----- Stage 2 496 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 60 185 512 - - - Mov Cap-2 Maneuver 171 ----- Stage 1 242 ----- Stage 2 478 ----- Approach EB NB SB HCM Control Delay, s 29.2 0.2 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 512 - 184 - - HCM Lane V/C Ratio 0.024 - 0.193 - - HCM Control Delay (s) 12.2 0 29.2 - - HCM Lane LOS B A D - - HCM 95th %tile Q(veh) 0.1 - 0.7 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM Exist C. Steiss Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 3 2 6 878 673 10 Future Vol, veh/h 3 2 6 878 673 10 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 3 2 7 976 748 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1737 748 748 0 - 0 Stage 1 748 ----- Stage 2 989 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 96 412 861 - - - Stage 1 468 ----- Stage 2 360 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 94 412 861 - - - Mov Cap-2 Maneuver 226 ----- Stage 1 468 ----- Stage 2 354 ----- Approach EB NB SB HCM Control Delay, s 18.3 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 861 - 276 - - HCM Lane V/C Ratio 0.008 - 0.02 - - HCM Control Delay (s) 9.2 0 18.3 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.1 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM 2021 FNB C. Steiss Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 3 2 6 947 717 10 Future Vol, veh/h 3 2 6 947 717 10 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 3 2 7 1052 797 11 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1863 797 797 0 - 0 Stage 1 797 ----- Stage 2 1066 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 80 387 825 - - - Stage 1 444 ----- Stage 2 331 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 78 387 825 - - - Mov Cap-2 Maneuver 205 ----- Stage 1 444 ----- Stage 2 324 ----- Approach EB NB SB HCM Control Delay, s 19.6 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 825 - 252 - - HCM Lane V/C Ratio 0.008 - 0.022 - - HCM Control Delay (s) 9.4 0 19.6 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.1 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM 2021 Ph1 Build C. Steiss Page 4 Intersection Int Delay, s/veh 0.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 3 15 28 954 722 17 Future Vol, veh/h 3 15 28 954 722 17 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 3 17 31 1060 802 19 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1924 802 802 0 - 0 Stage 1 802 ----- Stage 2 1122 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 73 384 822 - - - Stage 1 441 ----- Stage 2 311 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 66 384 822 - - - Mov Cap-2 Maneuver 185 ----- Stage 1 441 ----- Stage 2 282 ----- Approach EB NB SB HCM Control Delay, s 16.8 0.3 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 822 - 326 - - HCM Lane V/C Ratio 0.038 - 0.061 - - HCM Control Delay (s) 9.6 0 16.8 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.2 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/15/2018 180243 BRC Castle Hayne PM 2023 FNB C. Steiss Page 4 Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 3 2 6 965 731 11 Future Vol, veh/h 3 2 6 965 731 11 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 3 2 7 1072 812 12 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1898 812 812 0 - 0 Stage 1 812 ----- Stage 2 1086 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 76 379 814 - - - Stage 1 437 ----- Stage 2 324 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 74 379 814 - - - Mov Cap-2 Maneuver 200 ----- Stage 1 437 ----- Stage 2 317 ----- Approach EB NB SB HCM Control Delay, s 19.9 0.1 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 814 - 247 - - HCM Lane V/C Ratio 0.008 - 0.022 - - HCM Control Delay (s) 9.5 0 19.9 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0 - 0.1 - - HCM 2010 TWSC 200: Castle Hayne Road & Site Access 11/20/2018 180243 BRC Castle Hayne PM 2023 Full Build C. Steiss Page 4 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 3 16 29 988 745 23 Future Vol, veh/h 3 16 29 988 745 23 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 3 18 32 1098 828 26 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1990 828 828 0 - 0 Stage 1 828 ----- Stage 2 1162 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 67 371 803 - - - Stage 1 429 ----- Stage 2 298 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 60 371 803 - - - Mov Cap-2 Maneuver 176 ----- Stage 1 429 ----- Stage 2 268 ----- Approach EB NB SB HCM Control Delay, s 17.2 0.3 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h) 803 - 316 - - HCM Lane V/C Ratio 0.04 - 0.067 - - HCM Control Delay (s) 9.7 0 17.2 - - HCM Lane LOS A A C - - HCM 95th %tile Q(veh) 0.1 - 0.2 - - 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Queueing and Blocking Reports Queuing and Blocking Report AM Exist 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 74 53 52 205 76 184 174 388 299 484 15 Average Queue (ft) 24 21 13 115 26 70 37 262 82 181 4 95th Queue (ft) 60 54 41 175 60 118 140 420 188 361 14 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 1 Queuing Penalty (veh) 8 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 0 0 31 1 Queuing Penalty (veh)1043 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 42 322 Average Queue (ft) 5 32 95th Queue (ft) 23 144 Link Distance (ft) 309 469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 16 Queuing and Blocking Report AM 2021 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 118 96 96 448 300 174 175 390 300 372 41 Average Queue (ft) 52 54 51 186 85 99 27 267 159 217 6 95th Queue (ft) 97 95 86 332 234 163 96 409 270 342 21 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 2 Queuing Penalty (veh) 10 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 12 32 1 4 Queuing Penalty (veh) 33 8 8 8 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 42 154 Average Queue (ft) 6 17 95th Queue (ft) 24 80 Link Distance (ft) 309 469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 68 Queuing and Blocking Report AM 2021 Ph1 Build 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 180 116 96 395 300 208 175 381 300 656 42 Average Queue (ft) 79 65 57 197 72 101 30 245 194 291 9 95th Queue (ft) 147 111 93 321 213 185 104 406 315 514 30 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 1 Queuing Penalty (veh) 4 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 20 0 1 25 2 8 Queuing Penalty (veh) 55 1 1 7 13 18 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 64 416 Average Queue (ft) 20 52 95th Queue (ft) 44 223 Link Distance (ft) 309 469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 99 Queuing and Blocking Report AM 2021 Ph1 Build + Imps 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 136 135 135 267 118 236 250 385 300 590 61 Average Queue (ft) 70 68 64 163 48 109 43 267 178 285 7 95th Queue (ft) 124 116 116 235 95 184 161 387 314 465 27 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 1 Queuing Penalty (veh) 4 Storage Bay Dist (ft) 200 200 225 275 475 Storage Blk Time (%) 5 1 17 0 9 Queuing Penalty (veh) 13 4 5 0 21 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB SB Directions Served LR LT R Maximum Queue (ft) 44 293 20 Average Queue (ft) 22 37 1 95th Queue (ft) 45 159 6 Link Distance (ft) 309 469 374 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 47 Queuing and Blocking Report AM 2023 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 96 96 137 326 300 245 175 377 299 616 15 Average Queue (ft) 54 57 52 176 54 110 33 253 184 243 4 95th Queue (ft) 96 96 97 269 142 183 115 403 317 435 15 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 0 Queuing Penalty (veh) 2 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 7 1 29 4 5 Queuing Penalty (veh) 20 2 8 31 12 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 42 125 Average Queue (ft) 7 13 95th Queue (ft) 25 69 Link Distance (ft) 309 469 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 74 Queuing and Blocking Report AM 2023 Build 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 131 163 156 381 300 220 249 389 299 558 40 Average Queue (ft) 72 79 68 160 76 109 31 231 182 298 7 95th Queue (ft) 120 133 123 273 196 200 107 365 313 494 24 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 2 Queuing Penalty (veh) 13 Storage Bay Dist (ft) 200 200 225 275 475 Storage Blk Time (%) 7 0 1 10 0 10 Queuing Penalty (veh) 20 0 2 3 0 24 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 70 484 Average Queue (ft) 16 61 95th Queue (ft) 43 264 Link Distance (ft) 309 469 Upstream Blk Time (%) 1 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 62 Queuing and Blocking Report PM Exist 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 336 53 52 203 278 250 174 391 189 210 39 Average Queue (ft) 172 25 10 131 63 142 63 386 100 121 3 95th Queue (ft) 317 56 35 198 166 226 177 392 158 195 17 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 31 Queuing Penalty (veh) 274 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 1 0 3 50 Queuing Penalty (veh) 2 0 5 29 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 86 521 Average Queue (ft) 31 372 95th Queue (ft) 76 612 Link Distance (ft) 309 469 Upstream Blk Time (%) 30 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 310 Queuing and Blocking Report PM 2021 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 286 141 118 584 300 250 175 392 300 870 42 Average Queue (ft) 124 67 46 262 180 190 109 366 215 288 8 95th Queue (ft) 221 129 98 502 353 272 191 452 329 616 29 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 18 3 Queuing Penalty (veh) 172 0 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 17 3 20 4 37 11 3 Queuing Penalty (veh) 66 5 41 33 39 63 8 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 40 484 Average Queue (ft) 8 258 95th Queue (ft) 29 575 Link Distance (ft) 309 469 Upstream Blk Time (%) 7 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 427 Queuing and Blocking Report PM 2021 Ph1 Build 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 222 151 93 549 300 250 175 390 300 542 41 Average Queue (ft) 125 69 36 251 186 182 109 372 208 246 10 95th Queue (ft) 209 126 80 457 345 246 201 435 318 420 31 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 12 Queuing Penalty (veh) 117 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 18 2 10 2 36 2 5 Queuing Penalty (veh) 74 4 19 16 39 14 13 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 66 484 Average Queue (ft) 16 206 95th Queue (ft) 44 466 Link Distance (ft) 309 469 Upstream Blk Time (%) 4 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 296 Queuing and Blocking Report PM 2021 Ph1 Build + Imps 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 242 162 118 351 300 250 250 390 299 411 42 Average Queue (ft) 106 80 40 202 131 176 144 383 166 189 9 95th Queue (ft) 174 145 86 323 283 230 305 392 264 335 30 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 26 Queuing Penalty (veh) 245 Storage Bay Dist (ft) 200 200 225 275 475 Storage Blk Time (%) 15 2 6 0 41 0 2 Queuing Penalty (veh) 60 5 12 3 45 0 7 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 212 508 Average Queue (ft) 55 399 95th Queue (ft) 146 647 Link Distance (ft) 309 469 Upstream Blk Time (%) 32 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 378 Queuing and Blocking Report PM 2023 FNB 11/15/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 286 160 118 699 300 250 175 392 300 870 700 Average Queue (ft) 132 70 32 382 227 193 109 349 255 425 75 95th Queue (ft) 248 135 80 683 392 283 196 444 354 881 416 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 14 7 Queuing Penalty (veh) 133 0 Storage Bay Dist (ft) 200 200 150 275 475 Storage Blk Time (%) 42 4 27 7 35 26 2 Queuing Penalty (veh) 167 8 55 60 36 148 6 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 22 503 Average Queue (ft) 4 201 95th Queue (ft) 16 511 Link Distance (ft) 309 469 Upstream Blk Time (%) 6 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 614 Queuing and Blocking Report PM 2023 Full Build 11/16/2018 180243 BRC Castle Hayne SimTraffic Report C. Steiss Page 1 Intersection: 100: Castle Hayne Road & Riverside Drive/N Kerr Avenue Movement EB EB EB WB WB WB NB NB SB SB SB Directions Served L T R L T R L TR L T R Maximum Queue (ft) 304 162 115 608 300 245 250 391 300 427 61 Average Queue (ft) 139 82 47 201 125 176 142 382 202 220 11 95th Queue (ft) 258 141 99 397 236 236 275 391 310 382 32 Link Distance (ft) 362 362 362 981 374 836 Upstream Blk Time (%) 28 Queuing Penalty (veh) 282 Storage Bay Dist (ft) 200 200 225 275 475 Storage Blk Time (%) 11 1 7 0 44 1 4 Queuing Penalty (veh) 47 2 15 0 56 5 14 Intersection: 200: Castle Hayne Road & Site Access Movement EB NB Directions Served LR LT Maximum Queue (ft) 65 532 Average Queue (ft) 13 477 95th Queue (ft) 38 552 Link Distance (ft) 309 469 Upstream Blk Time (%) 49 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 421 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Trip Generation 24 Hour Two-Way Land Use ITE Land Code Data Source Volume Enter Exit Enter Exit Apartments 220 216 Dwelling Units Adjacent /Equation 1,592 23 76 74 43 1,592 23 76 74 43 24 Hour Two-Way Land Use ITE Land Code Data Source Volume Enter Exit Enter Exit Apartments 220 360 Dwelling Units Adjacent /Equation 2,681 37 124 116 68 2,681 37 124 116 68 ITE Trip Generation Size Average Weekday Driveway Volumes Total Trips BRC Castle Hayne (Phase 1) AM Peak Hour PM Peak Hour Total Trips ITE Trip Generation BRC Castle Hayne (Full Build) Average Weekday Driveway Volumes AM Peak Hour PM Peak Hour Size 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Traffic Volume Data 100 AM Peak 2018 TMC Balancing 2018 Existing 2021 Projected Appd Dev 2021 Future No Build Phase 1 Site Trips 2021 Phase 1 Build 2023 Projected Appd Dev 2023 Future No Build Full Build Site Trips 2023 Full Build EBL 35 35 36 28 64 30 95 37 28 65 50 115 EBT 34 34 35 28 63 15 78 36 28 64 25 89 EBR 27 27 28 38 66 8 73 28 38 66 25 90 WBL 251 251 259 259 259 264 264 264 WBT 60 60 62 9 71 5 76 63 9 72 7 80 WBR 195 195 201 201 201 205 205 205 NBL 13 13 13 12 25 2 28 14 12 26 7 34 NBT 410 410 422 422 422 431 431 431 NBR 87 87 90 90 90 91 91 91 SBL 206 206 212 212 212 217 217 217 SBT 764 764 787 787 2 789 803 803 4 807 SBR 12 12 12 9 21 7 28 13 9 22 11 33 Total 2094 0 2094 2157 125 2282 69 2351 2202 125 2327 129 2456 200 AM Peak 2018 TMC Balancing 2018 Existing 2021 Projected Appd Dev 2021 Future No Build Phase 1 Site Trips 2021 Phase 1 Build 2023 Projected Appd Dev 2023 Future No Build Full Build Site Trips 2023 Full Build EBL 2 2 2 2 2 2 2 2 EBT 0 0 0 0 0 0 0 0 EBR 5 5 5 5 23 28 5 5 25 30 WBL 0 0 0 0 0 0 0 0 WBT 0 0 0 0 0 0 0 0 WBR 0 0 0 0 0 0 0 0 NBL 4 4 4 4 7 11 4 4 7 11 NBT 554 554 571 12 583 2 586 582 12 594 7 602 NBR 0 0 0 0 0 0 0 0 SBL 0 0 0 0 0 0 0 0 SBT 1093 1093 1126 38 1164 8 1171 1149 38 1187 25 1211 SBR 14 14 14 14 2 16 15 15 4 19 Total 1672 0 1672 1722 50 1772 42 1814 1757 50 1807 68 1875 NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive NC 133 (Castle Hayne Road) at Site Access 100 PM Peak 2018 TMC Balancing 2018 Existing 2021 Projected Appd Dev 2021 Future No Build Phase 1 Site Trips 2021 Phase 1 Build 2023 Projected Appd Dev 2023 Future No Build Full Build Site Trips 2023 Full Build EBL 99 99 102 18 120 17 138 104 18 122 27 150 EBT 49 49 50 18 68 9 77 51 18 69 14 83 EBR 13 13 13 24 37 4 42 14 24 38 14 52 WBL 198 198 204 204 204 208 208 208 WBT 60 60 62 31 93 15 108 63 31 94 23 117 WBR 288 288 297 297 297 303 303 303 NBL 59 59 61 42 103 7 110 62 42 104 23 127 NBT 683 683 704 704 704 718 718 718 NBR 90 90 93 93 93 95 95 95 SBL 211 211 217 217 217 222 222 222 SBT 508 508 523 523 7 530 534 534 12 546 SBR 12 12 12 31 43 22 65 13 31 44 35 79 Total 2270 0 2270 2338 165 2503 82 2585 2387 165 2552 147 2699 200 PM Peak 2018 TMC Balancing 2018 Existing 2021 Projected Appd Dev 2021 Future No Build Phase 1 Site Trips 2021 Phase 1 Build 2023 Projected Appd Dev 2023 Future No Build Full Build Site Trips 2023 Full Build EBL 3 3 3 3 3 3 3 3 EBT 0 0 0 0 0 0 0 0 EBR 2 2 2 2 13 15 2 2 14 16 WBL 0 0 0 0 0 0 0 0 WBT 0 0 0 0 0 0 0 0 WBR 0 0 0 0 0 0 0 0 NBL 6 6 6 6 22 28 6 6 23 29 NBT 878 878 905 42 947 7 954 923 42 965 23 988 NBR 0 0 0 0 0 0 0 0 SBL 0 0 0 0 0 0 0 0 SBT 673 673 693 24 717 4 722 707 24 731 14 745 SBR 10 10 10 10 7 17 11 11 12 23 Total 1572 0 1572 1619 66 1685 54 1739 1652 66 1718 85 1803 NC 133 (Castle Hayne Road) at North Kerr Avenue/Riverside Drive NC 133 (Castle Hayne Road) at Site Access File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 1 Counted By: N. Baskett Weather: Clear Groups Printed- Cars - Trucks and Buses - Bicycles NC 133 (Castle Hayne Road) Southbound N Kerr Avenue Westbound NC 133 (Castle Hayne Road) Northbound N Kerr Avenue Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total 07:00 AM 7 187 46 0 240 47 2 34 0 83 21 73 5 0 99 3 9 4 0 16 0 438 438 07:15 AM 5 233 55 0 293 72 11 59 0 142 28 92 2 0 122 6 16 12 0 34 0 591 591 07:30 AM 2 160 39 0 201 30 11 59 0 100 26 92 7 0 125 4 9 11 0 24 0 450 450 07:45 AM 1 186 62 0 249 57 10 85 0 152 23 101 2 0 126 4 6 14 0 24 0 551 551 Total 15 766 202 0 983 206 34 237 0 477 98 358 16 0 472 17 40 41 0 98 0 2030 2030 08:00 AM 3 188 48 0 239 51 15 47 0 113 21 100 1 0 122 5 11 7 0 23 0 497 497 08:15 AM 3 226 39 0 268 35 14 45 0 94 29 104 2 0 135 12 12 7 0 31 0 528 528 08:30 AM 5 164 57 0 226 52 21 74 0 147 14 105 8 0 127 6 5 7 0 18 0 518 518 08:45 AM 5 206 38 0 249 52 11 56 0 119 24 101 4 0 129 4 10 18 0 32 0 529 529 Total 16 784 182 0 982 190 61 222 0 473 88 410 15 0 513 27 38 39 0 104 0 2072 2072 ***BREAK*** 04:00 PM 1 128 62 0 191 44 14 29 0 87 19 146 8 0 173 11 8 21 0 40 0 491 491 04:15 PM 3 123 41 0 167 64 10 45 0 119 16 142 18 0 176 15 15 28 0 58 0 520 520 04:30 PM 2 150 43 0 195 95 12 42 0 149 26 188 19 0 233 5 11 22 0 38 0 615 615 04:45 PM 3 102 24 0 129 44 12 40 0 96 11 116 13 0 140 10 12 31 0 53 0 418 418 Total 9 503 170 0 682 247 48 156 0 451 72 592 58 0 722 41 46 102 0 189 0 2044 2044 05:00 PM 2 147 57 0 206 78 11 57 0 146 34 170 15 0 219 2 7 17 0 26 0 597 597 05:15 PM 5 135 41 0 181 78 20 55 0 153 20 178 9 0 207 6 12 35 0 53 0 594 594 05:30 PM 2 125 47 0 174 70 14 45 0 129 18 178 18 0 214 2 13 17 0 32 0 549 549 05:45 PM 3 101 66 0 170 62 15 41 0 118 18 157 17 0 192 3 17 30 0 50 0 530 530 Total 12 508 211 0 731 288 60 198 0 546 90 683 59 0 832 13 49 99 0 161 0 2270 2270 Grand Total 52 2561 765 0 3378 931 203 813 0 1947 348 2043 148 0 2539 98 173 281 0 552 0 8416 8416 Apprch %1.5 75.8 22.6 47.8 10.4 41.8 13.7 80.5 5.8 17.8 31.3 50.9 Total %0.6 30.4 9.1 40.1 11.1 2.4 9.7 23.1 4.1 24.3 1.8 30.2 1.2 2.1 3.3 6.6 0 100 Cars 50 2477 739 3266 896 203 773 1872 326 1990 146 2462 94 171 273 538 0 0 8138 % Cars 96.2 96.7 96.6 0 96.7 96.2 100 95.1 0 96.1 93.7 97.4 98.6 0 97 95.9 98.8 97.2 0 97.5 0 0 96.7 Trucks and Buses 2 84 26 112 35 0 40 75 22 53 2 77 4 2 8 14 0 0 278 % Trucks and Buses 3.8 3.3 3.4 0 3.3 3.8 0 4.9 0 3.9 6.3 2.6 1.4 0 3 4.1 1.2 2.8 0 2.5 0 0 3.3 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 ** PDF file created with demo version of the ComponentOne VSPDF8 control. ** File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 2 NC 133 (Castle Hayne Road) N K e r r A v e n u e N K e r r A v e n u e NC 133 (Castle Hayne Road) Right 50 2 0 52 Thru 2477 84 0 2561 Left 739 26 0 765 InOut Total 3159 3266 6425 96 112 208 0 0 0 3255 6633 3378 Ri g h t 89 6 35 0 93 1 Th r u 20 3 0 0 20 3 Le f t 77 3 40 0 81 3 Ou t To t a l In 12 3 6 18 7 2 31 0 8 50 75 12 5 0 0 0 12 8 6 32 3 3 19 4 7 Left 146 2 0 148 Thru 1990 53 0 2043 Right 326 22 0 348 Out TotalIn 3344 2462 5806 128 77 205 0 0 0 3472 6011 2539 Le f t 27 3 8 0 28 1 Th r u 17 1 2 0 17 3 Ri g h t 94 4 0 98 To t a l Ou t In 39 9 53 8 93 7 4 14 18 0 0 0 40 3 95 5 55 2 10/18/2018 07:00 AM 10/18/2018 05:45 PM Cars Trucks and Buses Bicycles North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 3 NC 133 (Castle Hayne Road) Southbound N Kerr Avenue Westbound NC 133 (Castle Hayne Road) Northbound N Kerr Avenue Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:00 AM to 11:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 1 186 62 249 57 10 85 152 23 101 2 126 4 6 14 24 551 08:00 AM 3 188 48 239 51 15 47 113 21 100 1 122 5 11 7 23 497 08:15 AM 3 226 39 268 35 14 45 94 29 104 2 135 12 12 7 31 528 08:30 AM 5 164 57 226 52 21 74 147 14 105 8 127 6 5 7 18 518 Total Volume 12 764 206 982 195 60 251 506 87 410 13 510 27 34 35 96 2094 % App. Total 1.2 77.8 21 38.5 11.9 49.6 17.1 80.4 2.5 28.1 35.4 36.5 PHF .600 .845 .831 .916 .855 .714 .738 .832 .750 .976 .406 .944 .563 .708 .625 .774 .950 Cars 11 729 195 935 185 60 239 484 82 387 13 482 24 34 35 93 1994 % Cars 91.7 95.4 94.7 95.2 94.9 100 95.2 95.7 94.3 94.4 100 94.5 88.9 100 100 96.9 95.2 Trucks and Buses 1 35 11 47 10 0 12 22 5 23 0 28 3 0 0 3 100 % Trucks and Buses 8.3 4.6 5.3 4.8 5.1 0 4.8 4.3 5.7 5.6 0 5.5 11.1 0 0 3.1 4.8 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NC 133 (Castle Hayne Road) N K e r r A v e n u e N K e r r A v e n u e NC 133 (Castle Hayne Road) Right 11 1 0 12 Thru 729 35 0 764 Left 195 11 0 206 InOut Total 607 935 1542 33 47 80 0 0 0 640 1622 982 Ri g h t 18 5 10 0 19 5 Th r u 60 0 0 60 Le f t 23 9 12 0 25 1 Ou t To t a l In 31 1 48 4 79 5 16 22 38 0 0 0 32 7 83 3 50 6 Left 13 0 0 13 Thru 387 23 0 410 Right 82 5 0 87 Out TotalIn 992 482 1474 50 28 78 0 0 0 1042 1552 510 Le f t 35 0 0 35 Th r u 34 0 0 34 Ri g h t 24 3 0 27 To t a l Ou t In 84 93 17 7 1 3 4 0 0 0 85 18 1 96 Peak Hour Begins at 07:45 AM Cars Trucks and Buses Bicycles Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at North Kerr Avenue Site Code : 00180243 Start Date : 10/18/2018 Page No : 4 NC 133 (Castle Hayne Road) Southbound N Kerr Avenue Westbound NC 133 (Castle Hayne Road) Northbound N Kerr Avenue Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 12:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 2 147 57 206 78 11 57 146 34 170 15 219 2 7 17 26 597 05:15 PM 5 135 41 181 78 20 55 153 20 178 9 207 6 12 35 53 594 05:30 PM 2 125 47 174 70 14 45 129 18 178 18 214 2 13 17 32 549 05:45 PM 3 101 66 170 62 15 41 118 18 157 17 192 3 17 30 50 530 Total Volume 12 508 211 731 288 60 198 546 90 683 59 832 13 49 99 161 2270 % App. Total 1.6 69.5 28.9 52.7 11 36.3 10.8 82.1 7.1 8.1 30.4 61.5 PHF .600 .864 .799 .887 .923 .750 .868 .892 .662 .959 .819 .950 .542 .721 .707 .759 .951 Cars 12 496 203 711 284 60 190 534 82 681 59 822 13 48 93 154 2221 % Cars 100 97.6 96.2 97.3 98.6 100 96.0 97.8 91.1 99.7 100 98.8 100 98.0 93.9 95.7 97.8 Trucks and Buses 0 12 8 20 4 0 8 12 8 2 0 10 0 1 6 7 49 % Trucks and Buses 0 2.4 3.8 2.7 1.4 0 4.0 2.2 8.9 0.3 0 1.2 0 2.0 6.1 4.3 2.2 Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 NC 133 (Castle Hayne Road) N K e r r A v e n u e N K e r r A v e n u e NC 133 (Castle Hayne Road) Right 12 0 0 12 Thru 496 12 0 508 Left 203 8 0 211 InOut Total 1058 711 1769 12 20 32 0 0 0 1070 1801 731 Ri g h t 28 4 4 0 28 8 Th r u 60 0 0 60 Le f t 19 0 8 0 19 8 Ou t To t a l In 33 3 53 4 86 7 17 12 29 0 0 0 35 0 89 6 54 6 Left 59 0 0 59 Thru 681 2 0 683 Right 82 8 0 90 Out TotalIn 699 822 1521 20 10 30 0 0 0 719 1551 832 Le f t 93 6 0 99 Th r u 48 1 0 49 Ri g h t 13 0 0 13 To t a l Ou t In 13 1 15 4 28 5 0 7 7 0 0 0 13 1 29 2 16 1 Peak Hour Begins at 05:00 PM Cars Trucks and Buses Bicycles Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 1 Counted By: N. Baskett Weather: Clear Groups Printed- Cars - Trucks and Buses - Bikes (NC 133) Castle Hayne Road Southbound N/A Westbound (NC 133) Castle Hayne Road Northbound Dollar General Driveway Eastbound Start Time Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Right Thru Left Peds App. Total Exclu. Total Inclu. Total Int. Total 07:00 AM 0 225 0 0 225 0 0 0 0 0 0 123 1 0 124 1 0 0 0 1 0 350 350 07:15 AM 0 276 0 0 276 0 0 0 0 0 0 124 1 0 125 0 0 0 0 0 0 401 401 07:30 AM 2 249 0 0 251 3 0 0 0 3 0 136 1 0 137 0 0 0 0 0 0 391 391 07:45 AM 2 284 0 0 286 0 0 1 2 1 0 155 1 0 156 0 0 1 0 1 2 444 446 Total 4 1034 0 0 1038 3 0 1 2 4 0 538 4 0 542 1 0 1 0 2 2 1586 1588 08:00 AM 4 274 0 0 278 0 0 0 0 0 0 130 2 0 132 2 0 0 0 2 0 412 412 08:15 AM 4 283 0 0 287 0 0 0 0 0 0 138 0 0 138 1 0 1 0 2 0 427 427 08:30 AM 4 252 0 0 256 0 0 1 0 1 0 131 1 0 132 2 0 0 0 2 0 391 391 08:45 AM 2 255 0 0 257 0 0 1 0 1 0 119 1 1 120 1 0 2 0 3 1 381 382 Total 14 1064 0 0 1078 0 0 2 0 2 0 518 4 1 522 6 0 3 0 9 1 1611 1612 ***BREAK*** 04:00 PM 2 170 0 0 172 0 0 2 0 2 0 175 1 0 176 4 0 0 0 4 0 354 354 04:15 PM 3 178 0 0 181 0 0 0 0 0 0 171 8 0 179 1 0 1 0 2 0 362 362 04:30 PM 2 141 0 0 143 0 0 0 0 0 0 196 6 0 202 1 0 1 0 2 0 347 347 04:45 PM 2 181 0 0 183 0 0 0 0 0 0 226 1 0 227 0 0 1 0 1 0 411 411 Total 9 670 0 0 679 0 0 2 0 2 0 768 16 0 784 6 0 3 0 9 0 1474 1474 05:00 PM 3 220 0 0 223 0 0 0 0 0 0 252 1 0 253 0 0 1 0 1 0 477 477 05:15 PM 2 166 0 0 168 0 0 0 0 0 0 213 2 0 215 1 0 0 0 1 0 384 384 05:30 PM 0 146 0 0 146 0 0 0 0 0 0 207 0 0 207 0 0 1 0 1 0 354 354 05:45 PM 5 141 0 0 146 0 0 0 0 0 0 206 3 0 209 1 0 1 0 2 0 357 357 Total 10 673 0 0 683 0 0 0 0 0 0 878 6 0 884 2 0 3 0 5 0 1572 1572 Grand Total 37 3441 0 0 3478 3 0 5 2 8 0 2702 30 1 2732 15 0 10 0 25 3 6243 6246 Apprch %1.1 98.9 0 37.5 0 62.5 0 98.9 1.1 60 0 40 Total %0.6 55.1 0 55.7 0 0 0.1 0.1 0 43.3 0.5 43.8 0.2 0 0.2 0.4 0 100 Cars 37 3326 0 3363 3 0 5 10 0 2621 30 2652 14 0 10 24 0 0 6049 % Cars 100 96.7 0 0 96.7 100 0 100 100 100 0 97 100 100 97 93.3 0 100 0 96 0 0 96.8 Trucks and Buses 0 115 0 115 0 0 0 0 0 81 0 81 1 0 0 1 0 0 197 % Trucks and Buses 0 3.3 0 0 3.3 0 0 0 0 0 0 3 0 0 3 6.7 0 0 0 4 0 0 3.2 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 2 (NC 133) Castle Hayne Road D o l l a r G e n e r a l D r i v e w a y N / A (NC 133) Castle Hayne Road Right 37 0 0 37 Thru 3326 115 0 3441 Left 0 0 0 0 InOut Total 2634 3363 5997 81 115 196 0 0 0 2715 6193 3478 Ri g h t 3 0 0 3 Th r u 0 0 0 0 Le f t 5 0 0 5 Ou t To t a l In 0 8 8 0 0 0 0 0 0 0 8 8 Left 30 0 0 30 Thru 2621 81 0 2702 Right 0 0 0 0 Out TotalIn 3345 2651 5996 116 81 197 0 0 0 3461 6193 2732 Le f t 10 0 0 10 Th r u 0 0 0 0 Ri g h t 14 1 0 15 To t a l Ou t In 67 24 91 0 1 1 0 0 0 67 92 25 10/18/2018 07:00 AM 10/18/2018 05:45 PM Cars Trucks and Buses Bikes North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 3 (NC 133) Castle Hayne Road Southbound N/A Westbound (NC 133) Castle Hayne Road Northbound Dollar General Driveway Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 07:45 AM to 08:30 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 2 284 0 286 0 0 1 1 0 155 1 156 0 0 1 1 444 08:00 AM 4 274 0 278 0 0 0 0 0 130 2 132 2 0 0 2 412 08:15 AM 4 283 0 287 0 0 0 0 0 138 0 138 1 0 1 2 427 08:30 AM 4 252 0 256 0 0 1 1 0 131 1 132 2 0 0 2 391 Total Volume 14 1093 0 1107 0 0 2 2 0 554 4 558 5 0 2 7 1674 % App. Total 1.3 98.7 0 0 0 100 0 99.3 0.7 71.4 0 28.6 PHF .875 .962 .000 .964 .000 .000 .500 .500 .000 .894 .500 .894 .625 .000 .500 .875 .943 Cars 14 1039 0 1053 0 0 2 2 0 526 4 530 5 0 2 7 1592 % Cars 100 95.1 0 95.1 0 0 100 100 0 94.9 100 95.0 100 0 100 100 95.1 Trucks and Buses 0 54 0 54 0 0 0 0 0 28 0 28 0 0 0 0 82 % Trucks and Buses 0 4.9 0 4.9 0 0 0 0 0 5.1 0 5.0 0 0 0 0 4.9 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (NC 133) Castle Hayne Road D o l l a r G e n e r a l D r i v e w a y N / A (NC 133) Castle Hayne Road Right 14 0 0 14 Thru 1039 54 0 1093 Left 0 0 0 0 InOut Total 528 1053 1581 28 54 82 0 0 0 556 1663 1107 Ri g h t 0 0 0 0 Th r u 0 0 0 0 Le f t 2 0 0 2 Ou t To t a l In 0 2 2 0 0 0 0 0 0 0 2 2 Left 4 0 0 4 Thru 526 28 0 554 Right 0 0 0 0 Out TotalIn 1046 530 1576 54 28 82 0 0 0 1100 1658 558 Le f t 2 0 0 2 Th r u 0 0 0 0 Ri g h t 5 0 0 5 To t a l Ou t In 18 7 25 0 0 0 0 0 0 18 25 7 Peak Hour Begins at 07:45 AM Cars Trucks and Buses Bikes Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 File Name : 180243 NC 133 at Dollar General Driveway Site Code : 00180243 Start Date : 10/18/2018 Page No : 4 (NC 133) Castle Hayne Road Southbound N/A Westbound (NC 133) Castle Hayne Road Northbound Dollar General Driveway Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 05:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 3 220 0 223 0 0 0 0 0 252 1 253 0 0 1 1 477 05:15 PM 2 166 0 168 0 0 0 0 0 213 2 215 1 0 0 1 384 05:30 PM 0 146 0 146 0 0 0 0 0 207 0 207 0 0 1 1 354 05:45 PM 5 141 0 146 0 0 0 0 0 206 3 209 1 0 1 2 357 Total Volume 10 673 0 683 0 0 0 0 0 878 6 884 2 0 3 5 1572 % App. Total 1.5 98.5 0 0 0 0 0 99.3 0.7 40 0 60 PHF .500 .765 .000 .766 .000 .000 .000 .000 .000 .871 .500 .874 .500 .000 .750 .625 .824 Cars 10 662 0 672 0 0 0 0 0 870 6 876 2 0 3 5 1553 % Cars 100 98.4 0 98.4 0 0 0 0 0 99.1 100 99.1 100 0 100 100 98.8 Trucks and Buses 0 11 0 11 0 0 0 0 0 8 0 8 0 0 0 0 19 % Trucks and Buses 0 1.6 0 1.6 0 0 0 0 0 0.9 0 0.9 0 0 0 0 1.2 Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Bikes 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (NC 133) Castle Hayne Road D o l l a r G e n e r a l D r i v e w a y N / A (NC 133) Castle Hayne Road Right 10 0 0 10 Thru 662 11 0 673 Left 0 0 0 0 InOut Total 873 672 1545 8 11 19 0 0 0 881 1564 683 Ri g h t 0 0 0 0 Th r u 0 0 0 0 Le f t 0 0 0 0 Ou t To t a l In 0 0 0 0 0 0 0 0 0 0 0 0 Left 6 0 0 6 Thru 870 8 0 878 Right 0 0 0 0 Out TotalIn 664 876 1540 11 8 19 0 0 0 675 1559 884 Le f t 3 0 0 3 Th r u 0 0 0 0 Ri g h t 2 0 0 2 To t a l Ou t In 16 5 21 0 0 0 0 0 0 16 21 5 Peak Hour Begins at 05:00 PM Cars Trucks and Buses Bikes Peak Hour Data North DAVENPORT 119 Brookstown Ave., Suite PH1, Winston Salem NC, 27101 Ph:(336)744-1636 11/28/2018 180243 BRC Castle Hayne – Transportation Impact Analysis Supporting Documentation e x e x e x e x e x e x ex e x 4A 4B 5A 2A 8B8A 1A SHEET NO.PROJECT REFERENCE NO. SEAL PREPARED BY: SIG. INVENTORY NO. SCALE REVISIONS INIT.DATE REVIEWED BY: DATESIGNATURE PLAN DATE: 0 Division 3 1"=40' 40 Signal Upgrade N Directional Arrow Controller & Cabinet Signal Pole with Guy With Push Button & Sign Signal Pole with Sidewalk Guy Inductive Loop Detector Traffic Signal Head Pedestrian Signal Head 2-in Underground Conduit LEGEND PROPOSED EXISTING Sign Modified Signal Head N/A Junction Box N/A Right of Way T N T T I N D E P A R T ME N OF TR A SPORT A O N S T A E OF NORTH C AROL A 750 N. Greenfield Pkwy, Garner, NC 27529 WJ Hamilton RKA PROJ. NO: Prepared For: PEDESTRIAN MOVEMENT UNSIGNALIZED MOVEMENT UNDETECTED MOVEMENT (OVERLAP) DETECTED MOVEMENT PHASING DIAGRAM DETECTION LEGEND PHASING DIAGRAM 02+6 02+5 01+6 01+5 04+8 SIGNAL FACE I.D. All Heads L.E.D. R Y F Y 12" R Y G 12" 51 11 R Y F Y 12" 81 41 R R RGG Y TABLE OF OPERATION FACE SIGNAL PHASE F L A S H 0 1 + 6 0 1 + 5 0 2 + 5 0 2 + 6 0 4 + 8 R R R YGG R R R R RG 11 21,22 51 61,62 YF Y F Y R YRF Y F Y 81 R R R R RF Y R R R R RG42,43 41 R R R R RF Y TURNS INDUCTIVE LOOPS PHASE DETECTOR PROGRAMMING LOOP TIME DELAY (FT) STOPBAR FROM DISTANCE (FT) SIZE TIME STRETCH N E W C A R D N E W LO O P S Y S T E M L O O P - - - 1 2 Y Y Y Y Y Y - - - - - - - - - - -Y Y -- 6 Y Y --- 5A -5 Y Y -- 2 Y Y -- F U L L T I M E D E L A Y E X T E N S I O N C A L LI N G -Y Y -- -6 Y Y --- -Y Y --- OASIS 2070 LOOP & DETECTOR INSTALLATION CHART 6x40 6X6 4A 4 6X404B 4 6X40 6X6 6X408A 82-4-2 8B 8 2A 1A 15 15 0 NOTES https://connect.ncdot.gov/resources/safety/pages/its-and-signals.aspx FEATURE PHASE 1 2 4 5 6 8 MIN RECALL MIN RECALL YELLOW YELLOW ON ON --- --- ---- ---- ---- --ON --ON ---- ---- ON ON ON ON Min Green 1 * Extension 1 * Max Green 1 * Yellow Clearance Red Clearance Walk 1 * Don't Walk 1 Seconds Per Actuation * Max Variable Initial * Time Before Reduction * Time To Reduce * Minimum Gap Recall Mode Vehicle Call Memory Dual Entry Simultaneous Gap ---- ---- OASIS 2070 TIMING CHART is shown. Min Green for all other phases should not be lower than 4 seconds. * These values may be field adjusted. Do not adjust Min Green and Extension times for phases 2 and 6 lower than what 7 7 7 7 3.0 3.0 2.02.02.02.0 20 60 60 403020 3.0 3.0 RAMEY KEMP Transportation Engineers www.rameykemp.com 919-872-5115 Tel. 919-878-5416 Fax. Raleigh, North Carolina 27609 5808 Faringdon Place, Suite 100 ASSOCIATES, INC. & Prepared in the offices of: Sig-1 +5 Division of Highways NC Dept of Transportation Final Drawing Date: ITS & Signals Unit I REENGN E FES IO S SEAL PR O NA L N ORTH CARO LINA 32396 NOTLIMAH .J M A IL LIW 03-0191 SR 1322 (North Kerr Avenue) at NC 133 (Castle Hayne Road) New Hanover County Wilmington Isolated Fully Actuated 5 Phase 82 42,43 61,62 21,22 R Y Y G 12" 83 R R RG 82 83 R R TS Popelka 300 - 6X60 +5 - - +5 3 10 - 3 +5 - -300 -Y Y --102-4-21B 6X40 6X40 0 Y Y Y 3 - DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ex e x 1.9 4.5 1.7 2.2 3.2 4.5 1.7 4.5 - - - - - - 3.2 1.0 July 2016 62 61 11 81 82 83 51 21 22 414243 0 2-4-2 - - - - Y 1B O a k b o r o S h o p p i n g C e n t e r E n t r a n c e t o NC 133 (Castle Hayne Road) 45 MPH 0% Grade NC 133 (Castle Hayne Road) 45 MPH 0% Grade S R 1 3 2 2 ( N . K e r r A v e . ) 4 5 MP H 0 % G r a d e 2 5 MP H 0 % G r a d e 2-4-2 2-4-2 2-4-2 2-4-2 1 Y Y D E P A R T ME N T OF TR A NSPORT A T IO N S T A T E OF NORTH C AROLI N A T r a ffic E n gineering and Sa fet y Systems B r a n c h Signals M anagement Section 36249.3618 - - 12 12 e x 6A 4 4 6A Abandon Existing Loop Abandon Existing Loop 14255.02 (040) 2.5 2.5 34 34 15 40 15 40 3.0 3.0 10. Relabel existing loop 6B as 6A. 9. Relabel existing signal heads 41 as 42 and 42 as 43. 8. Pavement markings are existing unless otherwise shown. Signal Design Section. Signals Design Manual and submit a of Plan of Record to the 7. In the event of loop replacement, refer to the current ITS and 6. Set all detector units to presence mode. 5. Reposition existing signal heads numbered 21, 42, 43, 61, and 82. 4. Phase 1 and/or phase 5 may be lagged. 3. Disable backup protect for phases 2 and 6. otherwise directed by the Engineer. 2. Do not program signal for late night flashing operation unless following website: generic Project Special Provisions. The PSP can be accessed at the January 2012 and all applicable sections of the latest verson of the "Standard Specifications for Roads and Structures" dated 1. Refer to "Roadway Standard Drawings NCDOT" dated January 2012, DocuSign Envelope ID: 99A18306-3BCA-4C38-BBBA-D4BE6C6942E3 7/13/2016 7/13/2016   DocuSign Envelope ID: 84B4EFFA-7F9E-4B68-8C4C-5F1856A093F0  B - 1 B - 1 B - 1 B - 1 A - 2 A - 2 A - 2 A - 2 B - 1 B - 1 B - 1 B - 1 A - 2 A - 2 A - 2 A - 2 B-1 B-1 B-1 B-1 A-2 A-2 A-2 A-2 C-1 C-1 C-1 A-1A-1 A-1A-1 C-1 B - 3 B - 3 B - 3 B - 3 A - 2 A - 2 A - 2 A - 2 C-1 C-1 C-1 A-1A-1 A-1A-1 C-1 B-3 B-3 B-3 B-3 A-2 A-2 A-2 A-2 TY P E 2 4 2 6 24 U N I T S 3 S T O R Y BL D G H T : 3 6 ' - 7 " 12 - 1 B E D R O O M S 12 - 2 B E D R O O M S TYPE 2440 24 UNITS 3 STORY BLDG HT: 36'-7" 12 - 1 BEDROOMS 12 - 3 BEDROOMS T Y P E 2 4 2 6 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 1 2 - 1 B E D R O O M S 1 2 - 2 B E D R O O M S 1 2 - 1 B E D R O O M S 1 2 - 2 B E D R O O M S T Y P E 2 4 2 2 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 1 2 - 1 B E D R O O M S 1 2 - 2 B E D R O O M S T Y P E 2 4 2 2 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 24 - 2 B E D R O O M S T Y P E 2 4 6 8 24 U N I T S 3 S T O R Y 12 - 1 BEDRO O M S 12 - 3 BEDRO O M S TYPE 2440 24 UNITS 3 STORY BLDG HT: 36'- 7 " 12 - 1 BEDRO O M S 12 - 2 BEDRO O M S TYPE 2422 24 UNITS 3 STORY BLDG HT: 36'- 7 " 2 4 - 2 B E D R O O M S T Y P E 2 4 6 8 2 4 U N I T S 3 S T O R Y PO O L CL U B H O U S E 20' E A S E M E N T 20' E A S E M E N T 3 0 ' E A S E M E N T 3 0 ' E A S E M E N T 10' UTILITY E A S E M E N T 10' UTILITY E A S E M E N T DRAINAGE & U T I L E A S E M E N T 3 8 ' D R A I N A G E & U T I L E A S E M E N T 3 8 ' D R A I N A G E & U T I L E A S E M E N T 2 0 ' E A S E M E N T 2 0 ' E A S E M E N T 20' EA S E M E N T 20' EA S E M E N T D.E. MB 32 PG 2 5 9 D . E . M B 3 2 P G 2 5 9 D . E . M B 3 2 P G 2 5 9 D . E . M B 3 2 P G 2 5 9 D.E. MB 32 PG 2 5 9 D.E. MB 32 PG 2 5 9 D . E . M B 3 2 P G 2 5 9 B - 3 B - 3 B - 3 B - 3 A - 2 A - 2 A - 2 A - 2 T Y P E 2 4 2 6 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 1 2 - 1 B E D R O O M S 1 2 - 2 B E D R O O M S B - 3 B - 3 B - 3 B - 3 A - 2 A - 2 A - 2 A - 2 T Y P E 2 4 2 6 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " 1 2 - 1 B E D R O O M S 1 2 - 2 B E D R O O M S B - 1 B - 1 B - 1 B - 1 A - 2 A - 2 A - 2 A - 2 1 2 - 1 B E D R O O M S 1 2 - 2 B E D R O O M S T Y P E 2 4 2 2 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " B-1 B-1 B-1 B-1 A-2 A-2 A-2 A-2 12 - 1 BEDRO O M S 12 - 2 BEDRO O M S TYPE 2422 24 UNITS 3 STORY BLDG HT: 36'- 7 " 24 - 2 BEDRO O M S TYPE 2468 24 UNITS 3 STORY C - 1 C - 1 C - 1 A - 1 A - 1 A - 1 A - 1 C - 1 1 2 - 1 B E D R O O M S 1 2 - 3 B E D R O O M S T Y P E 2 4 4 0 2 4 U N I T S 3 S T O R Y B L D G H T : 3 6 ' - 7 " N SIG N A L I Z E D INT E R S E C T I O N UNS I G N A L I Z E D INT E R S E C T I O N TRA F F I C MOV E M E N T BL A C K = EX I S T I N G GR E Y = UN A N A L Y Z E D BL U E = PR O P O S E D ROA D W A Y LE G E N D DE S T I N A T I O N NO D E % 30 % 30 % I N 5% IN 5% 20 % I N 30% IN SR 1 3 2 2 ( N o r t h K e r r A v e n u e ) 20 % ** * N O T T O S C A L E * * * PRO J E C T NUM B E R 15 - 2 2 2 RIV E R S I D E DEV E L O P M E N T Th i s d o c u m e n t , t o g e t h e r w i t h t h e c o n c e p t s a n d d e s i g n s p r e s e n t e d h e r e i n , i s in t e n d e d o n l y f o r t h e s p e c i f i c p u r p o s e a n d c l i e n t f o r w h i c h i t w a s p r e p a r e d . Re u s e o f , o r i m p r o p e r r e l i a n c e o n , t h i s d o c u m e n t b y o t h e r s w i t h o u t w r i t t e n au t h o r i z a t i o n a n d a d a p t a t i o n b y D A V E N P O R T s h a l l b e w i t h o u t l i a b i l i t y t o DA V E N P O R T a n d s h a l l b e a v i o l a t i o n o f t h e a g r e e m e n t b e t w e e n D A V E N P O R T an d t h e c l i e n t . FI G U R E 5 TR I P D I S T R I B U T I O N 5% 40 % 30 % O U T 40% IN 5% IN 30 % O U T 40 % O U T NC 133 (Castle Hayne Road) SR 1310 (Blue Clay Road) 20 % O U T 5% O U T 5% O U T 6/12/15 15-222 Riverside Development – Transportation Impact Analysis 19 8.0Full Build Conditions Full Build considers the development to include a total of 165 single family homes and 72 apartments. This phase of development is envisioned to be completed in 2019. 8.1 Trip Generation Trips for this development were projected using TripGen 2013 software, based on the 9th edition of ITE Trip Generation Manual. Table 8.1 contains the results. Table 8.1 - ITE Trip Generation Riverside Development - Full Build Average Weekday Driveway Volumes 24 Hour AM Peak Hour PM Peak HourTwo-Way Land Use ITE Land Code Size Volume Enter Exit Enter Exit Single Family Homes 210 165 Dwelling Units 1,665 31 94 104 61 Apartments 220 72 Dwelling Units 560 8 31 37 20 Total Trips 2,225 39 125 141 81 8.2 Trip Distribution Site trips for this proposed development were distributed based on the existing traffic patterns and engineering judgment. The Full Build distribution for site trips is the same as Phase 1, shown in Figure 5. 8.3 2019 Future No Build Traffic The 2019 background volumes were obtained by applying a 2.0% compounded annual growth rate to the 2015 existing traffic volumes and adding approved development trips and Phase 1 trips associated with the proposed development. Figure 9 shows the 2019 future no build traffic volumes for AM and PM peaks. 8.4 2019 Full Build Traffic Full build-out traffic volumes were obtained as the sum of 2019 future no build volumes and site trips due to Full Build. Full Build site trips are shown in Figure 10. The 2019 Full Build future build volumes are shown for AM and PM peaks in Figure 8. More information can be found in the Traffic Volume Data section of the appendix. *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. FIGURE A APPROVED DEVELOPMENT TRIPS 38 / 24 0 / 0 9 / 3 1 0 / 0 38 / 2 4 SIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND BLACK = EXISTING UNSIGNALIZED INTERSECTION AM / PM PEAKS North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d 0 / 0 0 / 0 28 / 18 28 / 18 9 / 31 0 / 0 12 / 4 2 0 / 0 0 / 0 0 / 0 12 / 4 2 0 / 0 0 / 0 Riverside Drive LEGEND AM PEAK HOUR, VL PM PEAK HOUR, VL AM PEAK HOUR, VR PM PEAK HOUR, VR TURN LANE WARRANT SUMMARY Phase 1 Castle Hayne Road at Site Access Peak Hour Volumes Opposing Lefts AM 1187 11 PM 739 28 Peak Hour Volumes Opposing Rights LEGEND AM PEAK HOUR, VL PM PEAK HOUR, VL AM PEAK HOUR, VR PM PEAK HOUR, VR TURN LANE WARRANT SUMMARY Full Build Castle Hayne Road at Site Access Peak Hour Volumes Opposing Lefts AM 1230 11 PM 768 29 Peak Hour Volumes Opposing Rights November 7, 2018 Mr. Dan Cumbo, PE Davenport Transportation Consultants 3722 Shipyard Blvd, Suite E Wilmington, NC 28403 RE: Revised Phasing and Landuse Intensity - Approved Scope for the Traffic Impact Analysis (TIA) associated with the proposed BRC Castle Hayne Development New Hanover County, NC Dear Mr. Cumbo Based on the revised information provided, and conversations held to date, it is our understanding that the proposed development will consist of:  Phase 1: 216 multi-family dwelling units  Full Build: 360 multi-family dwelling units (north side of Riverside Drive) The site plan provided proposes access at the following points:  NC 133 (Castle Hayne Road) and Site Access #1 Below please find the scope to be used for the Traffic Impact Analysis: 1. Data Collection - Analysis Parameters: a) Study Intersections i. For existing intersections, provide turning movement counts for weekday during school (T,W,TH) AM (7:00am-9:00am) and PM (4:00pm-6:00pm) peak periods, signal timing (if applicable), and lane geometry:  NC 133 (Castle Hayne Road) at SR-1322 (North Kerr Avenue)  NC 133 (Castle Hayne Road) at Site Access #1 (full access) ii. Signal plans may be acquired by sending an email request to NCDOT Traffic Services: Ross Kimbro, rkimbro@ncdot.gov or by calling (910) 341-0300 b) Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions i. Site Trip Generation Estimate Page 2 of 3  Trip Generation (approved revised as attached) ii. Site Trip Distribution  Approved per attached Figure 5 &10 comments. iii. Adjacent Development (approved but not yet built):  Riverside – Phase 2 of BRC Castle Hayne Development was originally studied as a part of the Riverside Development. Remove the Trip Generation associated with the 72 apartments from the TIA but include the required improvements. iv. Planned Roadway Improvements  n/a v. Background Traffic Assumptions  Phase 1 2021  Full Build 2023  Growth rate – 1% per year 2. Capacity Analysis: Week day AM & PM Peak Hour (as listed and for locations per 1-a-i) a) Technical Analysis i. 2018 Existing Conditions Phase 1 ii. 2021 Future No-Build [Existing + 1% background growth + approved development trips] iii. 2021 Phase 1 Build Conditions [Existing + 1% background growth + approved development trips + site trips] iv. 2021 Phase 1 Build Conditions + improvements Full Build v. 2023 Future No-Build [Existing + 1% background growth + approved development trips + Phase 1 trips] vi. 2023 Full Build Conditions [Existing + 1% background growth + approved development trips + Phase 1 trips + site trips] vii. 2023 Full Build Conditions + improvements 3. Final Report Submittal: a) Completed TIA Application b) Signed and sealed by a Professional Engineer c) Four bound copies d) Four Electronic copies to include PDF of TIA and Synchro output files and Synchro analysis files in digital format 4. Notes: a) This scope shall remain valid for three months from the date of this letter. b) Please note that if any changes occur (including but not limited to; land use, intensity, phasing, and/or site access) additional analysis may be required. Please contact me at 910-772-4170 with any questions regarding this scope. Sincerely, Page 3 of 3 Fred Royal, PE, CFM Project Engineer Wilmington Metropolitan Planning Organization Attachments: Trip Generation Summary (approved as attached) Traffic Impact Analysis Supplemental Guidelines Site Map (provided by Davenport) Trip Distribution (approved per comments attached) ec: Ben Hughes, PE, District Engineer, NCDOT Alex Stewart, PE, Deputy District Engineer, NCDOT Madi Lee, EI, Development Review Engineer, NCDOT Jon Roan, Assistant District Engineer, NCDOT Jessi Leonard, PE, Division Traffic Engineer, NCDOT Kirsten Spirakis, PE, Sr. Assistant Traffic Engineer, Division 3, NCDOT Brad Shuler, Planner, New Hanover County Sam Burgess, Senior Planner, New Hanover County Mike Kozlosky, Executive Director, WMPO Amy Kimes, PE, Senior Project Engineer, WMPO Bill McDow, Transportation Planner, WMPO +RXU 7ZR:D\ /DQG8VH ,7(/DQG &RGH 'DWD 6RXUFH 9ROXPH (QWHU ([LW (QWHU ([LW $SDUWPHQWV   'ZHOOLQJ 8QLWV $GMDFHQW (TXDWLRQ           +RXU 7ZR:D\ /DQG8VH ,7(/DQG &RGH 'DWD 6RXUFH 9ROXPH (QWHU ([LW (QWHU ([LW $SDUWPHQWV   'ZHOOLQJ 8QLWV $GMDFHQW (TXDWLRQ           ,7(7ULS*HQHUDWLRQ 6L]H $YHUDJH:HHNGD\'ULYHZD\9ROXPHV 7RWDO7ULSV %5&&DVWOH+D\QH 3KDVH $03HDN +RXU 303HDN +RXU 7RWDO7ULSV ,7(7ULS*HQHUDWLRQ %5&&DVWOH+D\QH )XOO%XLOG $YHUDJH:HHNGD\'ULYHZD\9ROXPHV $03HDN +RXU 303HDN +RXU 6L]H FI G U R E 2 VI C I N I T Y M A P ST U D Y I N T E R S E C T I O N S BA C K G R O U N D PR O P O S E D SI T E SI T E *** NOT TO SCALE *** PROJECT NUMBER 180243 BRC CASTLE HAYNE SIGNALIZED INTERSECTION UNSIGNALIZED INTERSECTION TRAFFIC MOVEMENT ROADWAY LEGEND This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. BLACK = EXISTING 1% DESTINATION NODE% FIGURE 5PHASE 1TRIP DISTRIBUTION North Kerr Avenue Site Access Ca s t l e H a y n e Ro a d Riverside Drive 30% 30% 40% 30 % I N 30 % I N 30% IN 30% OUT 30% OUT 30% OUT 10 % I N 10 % O U T 10 % I N 10% OUT Traffic Impact Analysis Supplemental Guidelines Developed by: NCDOT Division 3 Page 1 of 2 Updated: 10/10/2018 Submittal Framework for TIAs Step 1: Scoping Document - The documents to include for review and approval are: 1. Site Plan/Vicinity Map 2. Proposed Land Uses and Trip Generation 3. Proposed Study Intersections and Types of Accesses 4. Proposed Annual Growth Rate 5. Proposed Build Out Year 6. Study Method for Capacity Analysis – peak periods and conditions 7. Approved Developments 8. Committed Improvements If the proposed development is to be phased, then land uses, trip generation, build out year, roadway improvements and analysis must reflect the proposed phasing. The phase breakdown must be submitted for approval prior to use in the TIA. Step 2: Trip Generation with Pass-by and Internal Capture, Trip Distribution, and Proposed Volume Balancing 1. Traffic counts must be performed prior to submittal of this step. Step 3: Draft TIA Report for Input Verification - A digital copy to include the following: 1. All previously approved information from prior stages of submittal. 2. All diagrams – Existing Traffic Volumes, Future No Build Volumes, and Future Build Volumes 3. Synchro / Sidra Network Model Framework – Submit the framework for the Future No Build analysis. This Synchro / Sidra model can be modified for Existing analysis. Step 4: Final Sealed TIA Report - This is to be a hardcopy submittal of the completed document Direction for the Congestion Management Guidelines Site Trip Generation, Site Trip Distribution, and Background Traffic Assumptions 1. Peak Hour Determination – In efforts to establish a consistent peak hour that will be reported and studied, the peak hour for the controlling intersection shall be determined. Once determined, that peak hour timeframe shall be used for all other intersections. To further clarify: a) Analyze all study intersection volumes and determine the controlling intersection (intersection with highest total volume). b) Identify relevant peak hour for the controlling intersection. c) Use the same peak hour for all intersections in the study. 2. Site Trip Generation: a) Unadjusted Trips – Use the appropriate Land Use Code in the current ITE Trip Generation Manual (currently the 10th Edition). The NCDOT Congestion Management Rate vs. Equation Spreadsheet (currently July 1, 2018) specifies the variable, peak hour type, and type of trip calculation method to use. b) Internal Capture - The Congestion Management Guidelines state that “reductions for internal capture should be limited to the land use categories and time periods included in the current Handbook.” The current ITE Trip Generation Handbook is the 3rd Edition. It does not provide internal capture data for Saturdays, therefore none should be used. The Congestion Management Guidelines also state that “internal capture rates may be estimated using the NCHRP 684 spreadsheet procedure referenced in the current Handbook.” The current Handbook now uses this spreadsheet as the only method for determining internal capture. The Congestion Management Guidelines give guidance on using the spreadsheet: “When using this spreadsheet, transit or non-motorized splits should not be used unless otherwise justified and approved. Vehicle occupancy should be “1.1” in accordance with North Carolina averages. The Walking Distances between land uses should be 4000’ or the calculated maximum distance between a given pair of land use categories in the proposed site.” To determine the internal capture entering and exiting per Land Use, use the percentages in Table 6-P: Internal Capture Percentages by Land Use with the “Estimated Vehicle-Trips” in Table 1-P: Base Vehicle-Trip Generation The NCDOT Congestion Management Capacity Analysis Guidelines shall be the basis for the development of all TIA reports. This Supplement provides a submittal framework for TIAs, as well as direction on certain items within the Congestion Management Guidelines. Any deviations from the Congestion Management Guidelines or this supplement must be approved prior to preparation of the TIA. Developed by: NCDOT Division 3 Page 2 of 2 Updated: 10/10/2018 Estimates. (Tables found in the NCHRP 684 Internal Trip Capture Estimation Tool.) c) Pass-by – The Congestion Management Guidelines state that “pass-by percentages should be obtained from the ITE Trip Generation Handbook.” The current ITE Trip Generation Handbook is the 3rd Edition. The calculation of the trips should be based on the total peak hour trips with a 50/50 entering/exiting split; they are pass-by trips which means they enter and exit along the same path, in the same direction, within the same hour. 3. Site Trip Distribution – To be determined based on collected traffic count data. Both site trip distribution and pass-by trip distribution shall be submitted for approval prior to use in the TIA. Signal Analysis 1. For existing signals, the size and position of the detector loops and the signal timings set in Synchro must match the existing signal plans. 2. For proposed signals, size and place the detector loops in Synchro according to Part 1, Section 4 of the NCDOT Signal Design Manual. 3. Existing signal timings shall be “locked” for all scenarios unless phase changes are recommended as an improvement. 4. Check for Recall Mode on Signalized Intersection. If simulating ‘free run’ operation (actuated-uncoordinated), use Min Recall on main street phase. If simulating ‘Coordinated Mode’ (Actuated-Coordinate), use C-Max. 5. Use the Guidelines for Signalization of Intersections with Two or Three Approaches (ITRE report dated December 31, 2017) where applicable, to determine possible signalization. Synchro Analysis and Data Reports 1. Any “Field Condition” analysis that the engineer wishes to include is supplemental to that which is required by the approved scope and Congestion Management Guidelines. a) Congestion Management Guidelines state that right-turn-on-red (RTOR) is not to be used in existing or future conditions. b) Congestion Management Guidelines state that analysis of protected-only phasing in future conditions will identify required storage in the event that protected-only phasing is necessary. Existing permissive left-turn phasing should remain permissive in future conditions, except where protected-only phasing is being analyzed as an improvement to the intersection in the Future + Improvement condition. 2. The “Future No-Build” and “Future Build” analysis conditions should only include improvements that are currently a requirement of another approved development or a State/Municipal project to be constructed in the build year for the proposed development. Any other capacity gained from lane improvements shown in the analysis is assumed to be proposed by the developer and should only be included in the “Future Build+Improvements” analysis condition. 3. The TIA shall include a chart that shows the “Level of Service” and “Delay” for each movement, approach, and overall intersection, for every access alternative and build scenario. 4. A SimTraffic “Queuing and Blocking Report” for the network shall be included for review. 5. A comparison chart listing the Synchro 95th Percentile Queues and the SimTraffic Maximum Queues shall be provided for all exclusive turn lanes. Recommendations of the TIA Report 1. The NCDOT Policy On Street And Driveway Access to North Carolina Highways (p. 21-22) states, “The applicant shall be required to identify mitigation improvements to the roadway network if at least one of the following conditions exists when comparing base network conditions to project conditions: a) The total average delay at an intersection or individual approach increases by 25% or greater, while maintaining the same level of service, b) The Level of Service degrades by at least one level, or c) Level of Service is “F.” 2. The Congestion Management Guidelines state “when performing analyses, providing an adequate overall intersection LOS alone is not sufficient. Items such as queuing, individual movement level of service, and volume-to-capacity ratio should be evaluated and addressed.” The information in the charts listed under “Synchro Analysis and Data Reports” in the previous section, should be used when determining the improvements to address the impacts of site-generated traffic. 3. Recommended storage lane lengths shall be provided for all exclusive turn lanes and based on the Synchro 95th Percentile Queue or the SimTraffic Maximum Queue, whichever is larger. 4. If phase changes are recommended as an improvement, then a Synchro analysis for “Future Build+Improvements” shall be included in the TIA. 5. Signal timing adjustments and/or Signal Optimization in Synchro (i.e. “Optimize Splits”) shall not be used unless phase changes are recommended as an improvement. Signal timing adjustment and/or Signal Optimization as a sole “improvement” to mitigate the impacts of site-generated traffic will not be permitted.