Loading...
HomeMy WebLinkAboutPinnacle Townhomes WMPO Comments 11.6.2020 MEMORANDUM To: New Hanover County Technical Review Committee Date: 11/5/2020 Subject: The Pinnacle – Preliminary Plan/Site Plan (Energov: SUBPP-20-0010) Comments: NCDOT Projects: TIP Projects in the Area: U-4902D Project Description: US 17 (Market St) from SR 1403 (MIDDLE SOUND LOOP ROAD) TO SR 2290 (MENDEHNALL DRIVE)/ SR 2734 (MARSH OAKS DRIVE). Construction Date: Under construction TIP Projects in the Area: W-5803B Project Description: US US 17 BETWEEN NEW HANOVER / PENDER COUNTY LINE AND MILE POST 19.3 IN ONSLOW COUNTY. INSTALL SHOULDER RUMBLE STRIPS Construction Date: 2022 WMPO 2040 Projects: Projects in the Area: R-10 (TIP #U-4902 same as above) Project Description: US 17 (Market St) Access Management from Military Cutoff Rd to Porters Neck Rd Projects in the Area: BP-65 Project Description: Bike/ped improvements at US 17 (Market St) and Porters Neck Rd New Hanover County CTP: N/A TIA: A TIA will not be required based on the following trip generation: 2 Land Use Size Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Enter Exit Enter Exit LUC 220 Multifamily Housing (Low-Rise) 60 Dwelling Units 413 7 23 24 14 LUC 712 Small Office Building 4 1000 GFA 65 8 5 7 8 LUC 820 Shopping Center 4 1000 GLA 151 6 6 8 9