Loading...
HomeMy WebLinkAboutThe Pinnacle TRC Response Letter 7-28-210 Intracoastal Engineering PLLC July 28th, 2021 New Hanover County Engineering Department 23o Government Center Drive, Suite 170 Wilmington, NC 28403 Attn: Ms. Nicole Smith Re: The Pinnacle PN 2019-029 Dear Ms. Smith, Please find enclosed (2) Sets of Plans revised per TRC comment letter dated 7/6/21. Below are our responses to each comment. Please note that we have already submitted a separate comment response package to New Hanover County Engineering to address Stormwater Comments. Planning, Nicole Smith gio-798_7164 Civil plan: 1. We are requesting that the Open Space requirements be reviewed under the September 8, 2020 ordinance. 2. The existing fence at the rear of the property is proposed to be removed and is now labeled accordingly. Landscape Plan: 3. To our knowledge, foundation plantings are not required for a townhome project. 4. Fence to be a shadow box style fence. Label has been added to fence on landscape plan. 5. We are showing the buffer being reduced to lo' along part of this property line to allow for required maintenance of the stormwater facility in accordance with State and New Hanover County requirements. There has to be a lo' wide area at the top of bank of pond to allow for maintenance. There is now way to plant a buffer within this area and still adhere to stormwater requirements. 6. Additional trees are now provided on the landscape plan. 7. None required. Dimensions have been added to adjacent parking lots. 8. The angled parking bay is in compliance with Sec. 5.4.5•C• 9. Disturbed acreage of 6.4 acres is shown on the landscape plan along with the calculation for 15 trees / disturbed acre. 10. This is now provided on the landscape plan. 5725 Oleander Dr. Unit E-7 Wilmington, NC 28403 (91o)859-8983 Tree Removal Plan: 11. The tree removal permit application and plan was submitted on 3/2/2021. 12. The tree removal permit is being reviewed under the September 8, 2020 ordinance. 13. No trees are proposed to be removed within the streetyard. We have hatched the buffer area on the tree removal plan sheet. Please note that there are some trees located at the back of curb which will have be removed. 14. Mitigation is now shown on the landscape plan. Lighting Plan: 15. Revised lighting plan is enclosed. They have added shields to all the fixtures adjacent to residential (8 total). Please review for approval and contact us with any questions, comments or additional information needed. Sincerely, Intracoastal Engineering PLLC Charles D. Cazier, P.E