Loading...
HomeMy WebLinkAboutParsons Mill Farm Roadway Detail 4.14.2020NOTES: 1. SIDEWALK THICKNESS 5HAL L BE 4" UNLESS NOTED OTHERWISE. 2. CONTRACTION JOINTS C.J. SPACE SAME AS SIDEWALK WIDTH. ...::,,:::..... ,::,..,:,:. 3. THICKEN SIDEWALK TO 6" AT DRIVEW�4YS. 4. THICKEN SIDEWALK TO 6" IN LAST 3 WHERE IT ABUTS PAVEMENT WITH NO CURB. f 5. 1/2" EXPANSION JOINT (E.J.) REQUIRED AT 30' MAX. AT SIDEWALK 1/8"R TOOLED JUNCTIONS, AT STRUCTUR S AND AS NOTED ON SITE PLAN. JOINT 6. PROVIDE A LAYER OF 15 �LDG. FELT BETWEEN WALK AND ADJACENT PARALLELING CURB OR STRUCTURE. 7. REINFORCE w/6x6-10/10 W.W.M. _; 1/2" EXPANSION JOINT MATERIAL CURB 30' MAX. SPACING EXPANSION JOINT (E.J.) INSTALL N CONTROL MPETITION , 1/4"x1" DEEP w/, RADING. �1/8'R TOOLED JO 00 O CD -L rr i' j a w CONTRACTION JOINT (C.J.) J• 1-- 2� _ POND 2 & 3 OUTLET DEPTH= 4' MIN. 3 POND 8 OUTLET DEPTH= 2 MIN. OUTLET CHANNEL DITCH NTS [- 50' R/W --A PAVEMENT WIDTH TO MEET NEW HANOVER COUNTY MIN. STANDARDS DUTCH COVE CT. CUL-DE-SAC N.T.S. 1O ER)SION ST�PNE Irils 11 UK STONE SHALL NOT BLOCK OR IMPEDE PIPE FLOW 21m SIDEWALK JOINT DETAILS NTS NOT TO SCALE DITCH PLUG SHALL BE TEMP. SILT FENCE DITCH PLUG SIDE VIEW ANDDARD FABRRIICH I N !6C m� I � I3 ---- STEEL POST WIRE MESH FOR STANDARD FABRIC STANDARD OR EXTRA STRENGTH FLTER FABRIC DIRECTION OF WATER FLOW ANCHOR FABRIC SKIRT MIN. 8' DEEP & 4" WIDE. NOTES: 1. SYN. FENCE FABRIC SHALL BE MIN. OF 30' IN WIDTH WITH 30 LB IN TENSILE STRENGTH FOR STANDARD FABRIC AND LB/IN FOR EXTRA STRENGTH. 2. FABRIC SHALL. BE CONTINUOUS LENGTH. IF JOINTS ARE NECESSARY, LAP FABRIC POST TO POST. 3. STEEL POST SHALL BE MIN 4' IN HEIGHT AND BE OF THE SELF -FASTENER STEEL ANGLE TYPE. TEMPORARY SILT FENCE PIPE INSTALLATION THROUGH WETLANDS 1. REMOVE AND STOCKPILE ALL ORGANIC MATERIAL IN TRENCH AREA. 2. DIG TRENCH TO DEPTH PER PLANS. IF MINERAL SOIL IS ENCOUNTERED, STOCKPILE SEPARATELY FROM THE ORGANIC MATERIAL. 3. REMOVE ANY SOFT, ORGANIC SILT MATERIALS AND EXISTING BURIED CONSTRUCTION DEBRIS AS REQUIRED AND FILL TO SUBGRADE ELEVATIONS WITH A CLEAN SELECT -FILL COMPACTED AS SPECIFIED. 4. PLACE PIPE ON SUBGRADE. 5. BACKFILL FIRST WITH ANY STOCKPILED MINERAL SOIL, THEN PLACE STOCKPILED ORGANIC MATERIAL ON TOP. RESTORE TO ORIGINAL GRADE. 6. SEED DISTURBED AREA WITH A BLEND OF WETLAND PLANT SEEDS. CONSULT AN ENVIRONMENTAL SPECIALIST FOR WETLAND PLANT SEED MIXTURE AND PROPER PLACEMENT PROCEDURE. COARSE AGGREGATES TEMPORARY GRAVELLED CONSTRUCTION ENTRANCE NTS TEMPORARY/PERMANENT GRASS SPECIFICATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS. 2. RIP THE ENTIRE AREA TO A 6 INCH DEPTH. 3. REMOVE ALL ROCKS, ROOTS AND OTHER OBSTRUCTIONS LEAVING SURFACES SMOOTH AND UNIFORM. 4. APPLY AGRICULTURAL LIME AND FERTILIZER UNIFORMLY AND MIX WITH SOIL. LIME: 45 LBS. PER 1000 S.F. PHOSPHOROUS: 20 LBS PER 1000 S.F. FERTILIZER: 17 LBS. PER 1000 S.F. 5. CONTINUE TILLAGE UNTIL A WELL PULVERIZED, FIRM, UNIFORM SEED BED IS PREPARED 4-6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEED BED AND COVER SEED LIGHTLY. 2 - 3 LBS PER 1000 S.F. (SEE MIXTURE BELOW) 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH. GRAIN STRAW & HAY AT 75 TO 100 LBS PER 1000 S.F. WOOD CHIPS AT 500 LBS. PER 1000 S.F. JUTE & MESH AS PER MANUFACTURER S. ASPHALT FOR ANCHORING MULCH SHALL BE TYPE SS-1 EMULSION AND APPLIED AT A RATE OF 1000 GAL. PER ACRE FOR SLOPE STABILIZATION, AND 150 GAL. PER TON OF STRAW FOR ANCHORING STRAW. 9. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEED WITHIN THE PLANTING SEASON, IF POSSIBLE. IF GRASS STAND SHOULD BE OVER 60% DAMAGED, REESTABLISH FOLLOWING ORIGINAL LIME, FERTILIZER AND SEEDING RATES. 10. CONSULT CONSERVATION INSPECTOR ON MAINTENANCE, TREATMENT, AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. 11. SEED FOR TEMPORARY AND PERMANENT APPLICATIONS SHALL BE: 20% CARPET GRASS 24% BERMUDA GRASS 20% TURF FESCUE 10% CREEPING RED FESCUE 24% ANNUAL RYE GRAIN *BERMUDA SEED SHALL BE HULLED FOR WARM WEATHER PLANTING. PURITY OF SEED SHALL BE A MIN. OF 98% AND GERMINATION SHALL BE A MIN. OF 85%. ALL DISTURBED AREA SHALL BE SEEDED WITHIN 15 DAYS OF THE COMPLETION OF GRADING. CONSULT CONSERVATION ENGINEER OR SOIL CONSERVATION SERVICE FOR ADDITIONAL INFORMATION CONCERNING OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS, OTHER SEEDING SCHEDULES MAY BE POSSIBLE. NPDES STABILIZATION TIMEFRAMES SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HQW ZONES NOTE: INSTALL EROSION CONTROL MATTING N--N AS SOON AS SWALE IS GRADED OUT, BEFORE A RAIN EVENT. 1116 EROSION CONTROL MATTING _ I I -I j I-' ' '-` ' '- -T -ALL ON -SITE SWALES ARE 3:1 SLOPE DOTES: TYPICAL GRASS SWALE . CONTRACTOR SHALL INSTALL THERMOPLASTIC PAVEMENT MARKINGS IN ACCORDANCE WITH N.T.S. NCDOT AND MUTCD SPECIFICATIONS UPON ROADWAY COMPLETION. 2. ALL ROADS SHALL BE PUBLIC AND BUILT TO NCDOT STANDARDS. 3. THERE SHALL BE NO ENCUMBRANCES WITHIN CIL THE NCDOT R/W. 4. ONLY NCDOT APPROVED MATERIALS SHALL BE 60' ACCSS AND USED WITHIN THE RIGHT-OF-WAY. THIS DESIGN IS LIMITED TO LOOP CIL UTILITY E SEMENT ROADS AND CUL-DE-SACS 0.2 I 3 MILE OR LESS IN LENGTH. ,� 50' ACC SS AND _ , I ' UTILITY SEMENT # 1 " SF9.5A 2'' - 1 /2"/ FT. // 2 y-- 1 /2„/ FT• fi 3:1 4 /� 4 /�• 3.1 1 SF9.5A „ 1/2"/ FT. 1/2"/ FT. 8 ABC 4'W SIDEWALK 3:1 4 /FT' 4 /FT' 3:1 MODIFIED 1 /4"/FT. MAX. VALLEY CURB (COLLECTOR ROAD 60') IED NCDOT 8 ABC 4'W,�SIDEWALK VALLEYCURB MODIFIED 1/4 /FT. MAX. TYPICAL STREET DETAIL VALLEY CURB (SUBDIVISION ROADS 50) NCDOT MODIFIED TYPICAL STREET DETAIL VALLEY CURB NOT TO SCALE TRAFFIC BEARING FRAME, GRATE & HOOD. NCDOT ROADWAY STANDARD NO. 840.03 OR APPROVED EQUAL. SECTION A - A ILMIRAF1160OX FILTER FABRIC OR APPROVED EQUAL NOTE FILTER FABRIC AND STONE SHALL BE TO€ ff END SECTION ENERGY DISSIFIATUH NTS VALLEY CURB TRANSITION NTS loop i �A � / 1 EXPANSION JOINT PAVEMENT WIDTH TO MEET NEW HANOVER COUNTY MIN. STANDARDS CRANBERRY DRIVE CUL-DE-SAC N.T.S. NOT TO SCALE 5'R REQ. STORMDRAIN PIPE R1 WATER WATER & SANITARY SEWER INTERSECTION N.T.S. 20 LF DUCTILE IRON SEWER - PIPE CENTERED UNDER STORM DRAIN PIPE. V MINIMUM SEPARATION. IF LESS THAN 1' SEPARATION, SEWER PIPE MUST BE DUCTILE IRON. SANITARY SEWER AND STORMDRAIN INTERSECTION N.T.S. PROPOSED STORMDRAIN PIPE FINISHED GRADE 5' 0 5' 5' S' r�i 0 M M 3/4" STAINLESS STEEL Z RODS (TYP.) THRUST COLLAR 3" DIP 3" 45 DEGREE M.J. 1/4" STAINLESS STEEL BEND. (TYP.) PLATE 3" 3" PAVEMENT WIDTH TO MEET NEW HANOVER COUNTY MIN. STANDARDS CUL-DE-SAC DETAIL 50' NOT TO SCALE "-CONCRETE THRUST BLOCK (TYP.) TYPICAL STOMDRAIN PIPE CROSSING WATERMAIN NTS SITE WORK NOTES: 1. THE CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIAR WITH FIELD CONSTRUCTION CONDITIONS. 2. CONTRACTOR SHALL COORDINATE WORK WITHIN NCDOT AND LOCAL RIGHT OF WAYS WITH PROPER AUTHORITIES AND SHALL MEET ANY REQUIREMENTS AS TO TRAFFIC CONTROL AND CONNECTION TO EXISTING STREETS. 3. CLEARING AND GRUBBING: REMOVE ALL TREES AS REQUIRED UNLESS OTHERWISE NOTED TO REMAIN, STUMPS, ROOTS, SHRUBBERY, ASPHALT, CONCRETE, STRUCTURES, BURIED UTILITIES, STORAGE TANKS, ETC. WITHIN LIMITS OF CONSTRUCTION. 4. STRIPPING: BEFORE EXCAVATING OR FILLING, REMOVE ALL TOPSOIL, WOOD, LEAVES, AND ANY OTHER UNSUITABLE MATERIAL. 5. MUCKING: REMOVE ANY SOFT, ORGANIC SILT MATERIALS AND EXISTING BURIED CONSTRUCTION DEBRIS AS REQUIRED AND FILL TO SUBGRADE ELEVATIONS WITH A CLEAN SELECT -FILL COMPACTED AS SPECIFIED. 6. DISPOSAL: CLEARED, GRUBBED, STRIPPED OR EXCAVATED SPOIL SHALL BE REMOVED FROM SITE AND DISPOSED OF IN ACCORDANCE WITH ALL APPLICABLE LOCAL AND STATE CODES. 7. BORROW MATERIAL: THE CONTRACTOR SHALL FURNISH BORROW MATERIAL REQUIRED FROM OFF SITE AND OBTAIN ALL REQUIRED PERMITS ASSOCIATED WITH BORROW OPERATIONS. 8. FILL AND COMPACTION: AFTER STRIPPING THOSE AREAS DESIGNATED TO RECEIVE FILL SHOULD BE PROOFROLLED. THE TOP 8" OF SUBGRADE SHALL BE COMPACTED TO AT LEAST 98% OF MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT. ANY AREA WHICH PUMPS OR RUTS EXCESSIVELY SHOULD BE UNDERCUT AND REPLACED WITH A CLEAN, SILTY OR CLAYEY SAND HAVING A UNIFIED SOIL CLASSIFICATION OF SP, SM, OR SC. FILL MATERIAL 5" OUTSIDE OF BUILDING AREAS SHALL THEN BE PLACED IN LAYERS NOT TO EXCEED 8" AND COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH THE UPPER 12 INCHES OF SUBGRADE BEING COMPACTED TO 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. FILL MATERIALS WITHIN BUILDING AREAS TO A LINE OUTSIDE THE BUILDING AREAS SHALL BE PLACED IN LAYERS NOT TO EXCEED 8" AND COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698) WITH THE UPPER 12 INCHES OF SUBGRADE BEING COMPACTED IN 6 INCH LAYERS TO 100% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. IN AREAS WHERE NO STRUCTURAL FILL IS TO BE PLACED THE UPPER 12 INCHES OF IN -PLACE SUBGRADE SHOULD BE COMPACTED TO AT LEAST 98% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. IF THE MATERIAL IS TOO DRY TO COMPACT TO THE REQUIRED DENSITY EACH LAYER SHALL BE WETTED IN ACCORDANCE WITH COMPACTION REQUIREMENTS. IF THE MATERIAL IS TOO WET TO SECURE PROPER COMPACTION, IT SHALL BE HARROWED REPEATEDLY OR OTHERWISE AERATED WITH SUITABLE EQUIPMENT UNTIL OPTIMUM MOISTURE CONTENT IS OBTAINED. FILL SHALL BE PLACED IN SUCH A MANNER THAT THE SURFACE WILL DRAIN READILY AT ALL TIMES. SEE STRUCTURAL NOTES AND SOILS REPORT FOR ADDITIONAL REQUIREMENTS. 9. LAYOUT: THE CONTRACTOR SHALL PROVIDE ALL LAYOUT REQUIRED TO CONSTRUCT HIS WORK. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE LOCATION AND PROTECTION OF EXISTING UTILITIES DURING CONSTRUCTION. 11. EXISTING BOUNDARY AND TOPOGRAPHIC INFORMATION FROM SURVEY BY NORRIS & WARD AND PROVIDED BY OWNER. 12. THE CONTRACTOR SHALL VERIFY DIMENSIONS AT JOBSITE. 13. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF RELOCATION OR DISCONNECTION OF ALL EXISTING UTILITIES WITH APPLICABLE AGENCIES AND AUTHORITIES. 14. ALL PAVEMENT AND BASE MATERIALS AND WORKMANSHIP SHALL CONFORM TO NCDOT STANDARDS. 15. WATER AND SEWER SERVICES SHALL BE INSTALLED TO MEET LOCAL AND STATE PLUMBING CODES. METER AND TAPS SHALL MEET ALL LOCAL REQUIREMENTS. 16. ALL AREAS SHALL BE GRADED FOR POSITIVE DRAINAGE. 17. SEE TERRACON GEOTECHNICAL REPORT DATED MAY 22, 2014 FOR ADDITIONAL REQUIREMENTS. 18. CONTRACTOR SHALL NOTE THAT EARTHWORK QUANTITIES ARE HIS RESPONSIBILITY. PLANS DO NOT REPRESENT A BALANCED EARTHWORK CONDITION. 19. REINF. CONC. PIPE SHALL BE CLASS III W/RUBBER GASKETED JOINT OR "RAM NECK". INSTALL PER MANUFACTURER'S REQUIREMENTS. 20. USE WHITE LANE MARKING PAINT FOR ALL PAVEMENT MARKINGS. PAINT SHALL BE A CHLORINATED RUBBER ALKYD, FS TT-P-115, TYPE III, FACTORY MIXED, QUICK DRYING, NON -BLEEDING. 21. REFER TO THE PLUMBING DRAWINGS FOR LOCATION AND INVERTS OF NEW WASTE AND WATER LINES. 22. SEE PLUMBING SHEETS FOR LOCATION AND INVERTS OF CONDENSATE AND ROOF DRAINS. THE GENERAL CONTRACTOR IS RESPONSIBLE TO CONNECT THESE LINES TO THE UNDERGROUND DOWNSPOUT DRAIN AT THE REQUIRED DEPTH TO DRAIN. ALL UNDERGROUND DOWNSPOUT DRAINS SHALL HAVE A MINIMUM SLOPE OF 1 % AND BE SCH 40 PVC PIPE AS FOLLOWS: USE 6" PIPE FOR UP TO 2 DOWNSPOUT CONNECTIONS, 8" PIPE FOR 3 TO 5 DOWNSPOUT CONNECTIONS AND 12" PIPE FOR 6 OR MORE CONNECTIONS. 23. THE FINISHED GROUND ELEVATION AT THE BUILDING PERIMETER SHALL BE A MINIMUM OF 6 INCHES BELOW THE BUILDING FINISH FLOOR ELEVATION EXCEPT AT ENTRANCES AND ENTRANCE TRANSITIONS. EROSION CONTROL NOTES AND MAINTENANCE PLAN 1. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL, BUT IN NO CASE, LESS THAN ONCE EVERY WEEK AND WITHIN 24 HOURS OF EVERY HALF -INCH RAINFALL. 2. ALL POINTS OF EGRESS WILL HAVE CONSTRUCTION ENTRANCES THAT WILL BE PERIODICALLY TOP -DRESSED WITH AN ADDITIONAL 2 INCHES OF #4 STONE TO MAINTAIN PROPER DEPTH. THEY WILL BE MAINTAINED IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE SITE. IMMEDIATELY REMOVE OBJECTIONABLE MATERIAL SPILLED WASHED OR TRACKED ONTO THE CONSTRUCTION ENTRANCE OR ROADWAYS. 3. SEDIMENT WILL BE REMOVED FROM HARDWARE CLOTH AND GRAVEL INLET PROTECTION, BLOCK AND GRAVEL INLET PROTECTION, ROCK DOUGHNUT INLET PROTECTION AND ROCK PIPE INLET PROTECTION WHEN THE DESIGNED STORAGE CAPACITY HAS BEEN HALF FILLED WITH SEDIMENT. ROCK WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS AS DESIGNED. DEBRIS WILL BE REMOVED FROM THE ROCK AND HARDWARE CLOTH TO ALLOW PROPER DRAINAGE. SILT SACKS WILL BE EMPTIED ONCE A WEEK AND AFTER EVERY RAIN EVENT. SEDIMENT WILL BE REMOVED FROM AROUND BEAVER DAMS, DANDY SACKS AND SOCKS ONCE A WEEK AND AFTER EVERY RAIN EVENT. (IF APPLICABLE) 4. DIVERSION DITCHES WILL BE CLEANED OUT IMMEDIATELY TO REMOVE SEDIMENT OR OBSTRUCTIONS FROM THE FLOW AREA. THE DIVERSION RIDGES WILL ALSO BE REPAIRED. SWALES MUST BE TEMPORARILY STABILIZED WITHIN 21 CALENDAR DAYS OF CEASE OF ANY PHASE OF ACTIVITY ASSOCIATED WITH A SWALE. (IF APPLICABLE) 5. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES HALF FILLED. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. STAKES MUST BE STEEL. STAKE SPACING WILL BE 6 FEET MAX. WITH THE USE OF EXTRA STRENGTH FABRIC, WITHOUT WIRE BACKING. STAKE SPACING WILL BE 8 FEET MAX. WHEN STANDARD STRENGTH FABRIC AND WIRE BACKING ARE USED. IF ROCK FILTERS ARE DESIGNED AT LOW POINTS IN THE SEDIMENT FENCE, THE ROCK WILL BE REPAIRED OR REPLACED IF IT BECOMES HALF -FULL OF SEDIMENT, NO LONGER DRAINS AS DESIGNED OR IS DAMAGED. LAND QUALITY REQUIRES 6. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED, ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN, TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL SLOPES WILL BE STABILIZED WITHIN 21 CALENDAR DAYS. ALL OTHER AREAS WILL BE STABILIZED WITHIN 15 WORKING DAYS. : WATER QUALITY REQUIRES ALL SEEDED AREAS BE FERTILIZED, RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL PERIMETER DIKES, SWALES, HORIZONTAL TO DITCHES, PERIMETER SLOPES, ALL SLOPES STEEPER THAN (3:1) VERTICAL AND ALL HIGH QUALITY WATER (HQW) ZONES SHALL PROVIDE TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN SEVEN (7) CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL PROVIDE TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICAL BUT IN ANY EVENT WITHIN FOURTEEN (14) CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. 7. FLOCCULANTS WILL BE USED TO ADDRESS TURBIDITY ISSUES. THE PUMPS, TANKS, HOSES AND INJECT SYSTEMS WILL BE CHECKED FOR PROBLEMS OR TURBID DISCHARGES DAILY. 8. BASIN OUTLET STRUCTURES AND SKIMMERS SHALL WITHDRAW WATER FROM THE SURFACE. J Q w 0 Q cn Z O J Ld in w U wp N Z O F- V r� O Z � w ff) O o Q O 0 '.. z J O mLLJ N O Q J V Q -, m z Z > o Q O (f� Z Q U W O O w oC Z m z z co a 0c o OD 0 N U d � a Z z ° z o 0 Z O z 59- 0 a x m O:2o a: Z rn 2 n 3 rn In d- U Lo 0 rn rn I I 0 0 h-H 0) a: Ww y Z F/--i O x O O W�t (h w o ►° Q 00 I Y N U � U Z z w cif Z Z w O O U O Z _I U "�~ � Z 13017 DES. JST CKD. JPN DRWN. NKS DATE 8/22/ 13 010,000 G, lll,��", wx � S k a C16