Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARQ-ILM East Side Development Plan Set 073025
WATERFLOW 6-24 6-24 X Wilmington International Airport Wilmington International Airport CO CO X XX XX PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES Wilmington International Airport Wilmington International Airport X XX XX X XX X XX X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X XXXX XXXX X XXX X XXX X XX XXXX X XXX X X X X XXXX XX X XX XX X XXX XXXX X XXXX XX X X X X X X XX XX X XXX X XXX X XXX X X XXX X XXX X XXX X XXX X X XXX XXXX XXX X XXXX X XXX XXXX XX X X X X X X XXX X XXXX PROP. BIKERACK XXX XXX PROP. BIKERACK 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Phase 1 Cover CS - 1Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 DEVELOPER: OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 0'100'200'300' (IN FEET) 1 INCH = 100 FT ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 VICINITY MAP 1" = 2,000' PROJECT AREA NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. SITE NOTES: 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS AND DETAILS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES. 3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THIS SITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018. 4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TO THE CONTRACTOR UPON THEIR REQUEST. 5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BY MATRIX EAST, PLLC . SITE 0'100'200'300' (IN FEET) 1 INCH = 100 FT ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 RIVER BASIN: CAPE FEAR SMITH CREEK: CLASS-C;Sw 07/30/2025 Bart J. McClain PROJECT DATA PROJECT SEWER FLOW (gallons per day) PROPOSED BLDG GDP EMPLOYEES # SHIFT TOTAL BUILDING 1 25 50 1 1,250 gpd BUILDING 3 25 20 1 500 gpd HANGAR F 25 12 1 300 gpd HANGARS (44)25 1(Each)1 1,100 gpd TOTAL 3,150 gpd ____________________________________________________________________ NOTE: SEWER FLOW CALCULATIONS BASED ON @ 25 GALLON/EMPLOYEE/SHIFT. HANGAR FLOW BASED ON 1 EMPLOYEE PER HANGAR AND 44 PROPOSED INDIVIDUAL HANGARS. ARQ - ILM East Side Development Environmental Impact Permit Note: All impacts to the existing Non-Riparian Wetland and Non-Wetland Waters were obtained on September 25, 2024 under permit # SAW-2023-02065. Stormwater & BUA Note: The modified Post Construction Stormwater Management Permit SW8 050547 Application has been submitted to NCDEQ and review comments have been addressed. Once the ILM Master Plan Permit has been approved, an individual stormwater permit for ARQ-ILM East Side Development will be applied for. Swamp Forest Note: The project area of this site consists of 1.06 acres of swamp forest, less than 5 acres, therefore, this project is exempt from any Swamp Forest dedication or conservation. CS - 1 COVER SHEET NO.DESCRIPTION CS - 12 CS - 13 CS - 15 CS - 14 EXISTING CONDITIONS PLAN CS - 3 OVERALL SITE PLAN CS - 5 OVERALL UTILITY PLANCS - 6 OVERALL GRADING / DRAINAGE PLAN CS - 7 CS - 2 CS - 9 PRIVATE WATER & SS PLAN PROFILE #1 SITE DETAILS CHARTS & TABLES EROSION CONTROL DETAILS L-1 LANDSCAPE PLAN L-1.1 LANDSCAPE PLAN STAGE 1A OVERALL EROSION CONTROL PLAN STAGE 1C OVERALL EROSION CONTROL PLAN EROSION CONTROL DETAILS CS - 16 EDDB EAST-1A PLAN PROFILE CS - 17 EDDB EAST-1B PLAN PROFILE CS - 18 CS - 19 SITE & SEWER UTILITY DETAILS WATER UTILITY DETAILS STORM DRAINAGE DETAILS CS - 20 CS - 21 CS - 22 CS - 23 EDDB EAST-1C PLAN PROFILE NCG01 DETAILS CS - 24 EROSION CONTROL CALCS AND DETAILS PRIVATE WATER & SS PLAN PROFILE #2 STAGE 1A EROSION CONTROL PLAN (50 SCALE) CS - 4 SITE PLAN SOUTH (50 SCALE) SITE PLAN NORTH (50 SCALE) UTILITY PLAN SOUTH (50 SCALE) UTILITY PLAN NORTH (50 SCALE) GRADING / DRAINAGE PLAN SOUTH (50 SCALE) GRADING / DRAINAGE PLAN NORTH (50 SCALE) CS - 8 CS - 10 CS - 11 PRIVATE WATER PLAN PROFILE #3 CS - 25 CS - 26 CS - 27 CS - 28 CS - 29 STAGE 1B EROSION CONTROL PLAN (50 SCALE) CS - 30 L-1.2 LANDSCAPE DETAILS FEMA Floodplain Note: NO FEMA MAPPED 100 YR FLOOD HAZARD AREAS LOCATED WITHIN THE PROJECT AREA. FEMA MAP #3720313900K DATED AUGUST 28, 2018. Major Site Plan ARQ-ILM East Side Development SHEET INDEX KE R R A V E ( S R 1 1 7 5 ) 6-24 6-24 Wilmington International Airport Wilmington International Airport W W W W W W W W W FMO CO CO T A X I W A Y N O V E M B E R RUN W A Y 6 - 2 4 N. K E R R A V E N U E - S R 1 1 7 5 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 (10 0 ' P U B L I C R / W ) PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES Wilmington International Airport Wilmington International Airport S S S S S S EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA.CONCRETE MANHOLE EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING8-INCH DIA.GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING FIRE HYDRANT EXISTINGFIRE HYDRANT EXISTINGFIRE HYDRANT EXISTING 12-INCH WATER MAIN EXISTING12-INCH WATER MAIN EXISTING 2-INCH WATER SERVICE EXISTING WATER METER EXISTING BACKFLOW PREVENTER EXISTING BACKFLOW PREVENTER EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING FIRE HYDRANT TEE WITH MJ CAP EXISTING6-INCH SEWER SERVICE EXISTING6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING TEMPORARY FIRE HYDRANT PROP. BIKERACK SWAMP FOREST AREA IS COINCIDENT WITH FIELD LOCATED WETLANDS 1.06 ACRES. 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 07/30/2025 Bart J. McClain 1" = 100' Existing Conditions Plan CS - 2 July 30, 2025 DEVELOPER: 0'100'200'300' GRAPHIC SCALE (IN FEET) 1 INCH = 100 FT ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ - ILM East Side Development Existing Water Line by WK Dickson Existing Sewer Line by WK DicksonSSSSSSSSSS UTILITY LEGEND Existing Water and Sewer Utility Note: The existing water and sewer lines shown on this plan in blue and green are from approved ILM utility extension plans entitled 'Work Authorization 03 - ILM East Utility Expansion' by WK Dickson and approved by CFPUA on March 28, 2025. OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 Swamp Forest Note: The project area of this site consists of 1.06 acres of swamp forest, less than 5 acres, therefore, this project is exempt from any Swamp Forest dedication or conservation. PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD WATERFLOW 6-24 6-24 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport CO CO RUN W A Y 6 - 2 4 10 2 . 6 ' PROPOSEDCONTROLLED ACCESS GATE #7 PROPOSED HANGAR A (120'x100') 12,000 sf PROPOSED HANGAR B (120'x100') 12,000 sf EDDB EAST-1A CEMETERYACCESS PROPOSED8' SECURITYFENCE (TYP) PROPOSED HANGAR 1 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 24 . 8 ' 25.4' 99 . 0 ' EDDB EAST-1C (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROPOSED HANGAR 5 PROPOSED HANGAR 4 PROPOSED HANGAR 3 PROPOSED HANGAR E (120'x100') 12,000 sf HANGAR (12,000 SF) 100 EDDB EAST-1B PROPOSEDDUMPSTERSW/ SCREEN WALL 18 '9' BUILDING #1 T A X I W A Y N O V E M B E R JET BLAST DEFLECTOR8' HIGH PROPOSEDRETAINING WALL HANGAR D OFFICE3,250 SF PROPOSED HANGAR C (120'x100') 12,000 sf PROPOSED HANGAR D (120'x100') 12,000 sf PROPOSEDCHARGEPOINT 6000EV CHARGINGSTATION SELF SERVE FUEL STATIONAREA 11 0 . 0 ' 79 . 0 ' 79 . 0 ' 3 5 . 0 ' 158 . 0 ' ADGII ADGIII ADGII PRO P E O C ( 1 ' O U T S I D E P 7 7 L I N E ) PRO P E O C 110 . 0 ' 58. 0 ' PROPOSEDDUMPSTERSW/ SCREEN WALL X X X X X X X X X X X X PROPOSED 2-STORY RETAIL (9,600 SF) OFFICE (9,600 SF) (19,200 SF TOTAL) BUILDING #3 PROPOSED CONTROLLED ACCESS GATE #4 PROPOSEDCONTROLLEDACCESS GATE #2X X X X X X X X PROPOSED GSE BLDG. (89.33'x50.67') 4,525 sf PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROPOSED CONCRETE 3" S9.5B 8" CABC 3" S9.5B 8" CABC 3" S9.5B 8" CABC 3" S9.5B 8" CABC GRASSED SWALE EAST-1A FROM EDDB EAST-1A GRASSED SWALE EAST-1B FROM EDDB EAST-1B GRASSED SWALE EASE-1C FROM EDDB EAST-1C PROPOSEDRETAININGWALL PROPOSEDCHARGEPOINT 6000EV CHARGINGSTATION PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED FUEL STORAGE TANKS PROPOSED ACCESSSCANNER W/ KEYPAD WITHIN 2'x10'x6" RAISEDCONCRETE ISLAND PROPOSEDFUEL PUMP CABINET X X X X X X X X PROPOSED CONTROLLEDACCESS GATE #1 PROPOSEDCONTROLLED ACCESS GATE #3 PROPOSED CONTROLLED ACCESS GATE #6 X X X PROPOSED CONCRETE 6 9 . 0 ' 1 0 5 . 0 ' PRO P E O C JET BLASTDEFLECTOR8' HIGH 79. 0 ' PROP. 6" SOLIDYELLOW LINE W/ 6" BLACKOUTLINE PROP. 12" SOLID YELLOW LINEW/ 6" BLACKOUTLINE PROP. 12" SOLIDYELLOW LINEW/ 6" BLACK OUTLINE PROP. 12" SOLID YELLOW LINEW/ 6" BLACK OUTLINE PROP. NON-MOVEMENT AREA MARKING6" SOLID YELLOW3'x6" YELLOW DASH W/ 3' GAP W/ 6"BLACK OUTLINE PROP. NON-MOVEMENT AREA MARKING6" SOLID YELLOW3'x6" YELLOW DASH W/ 3' GAP W/ 6"BLACK OUTLINE PROP. 6" SOLID YELLOW LINEW/ 6" BLACKOUTLINE PROP. 6" SOLIDYELLOW LINE PROP. 6" SOLIDYELLOW LINE PROP. NON-MOVEMENTAREA MARKING 6" SOLID YELLOW3'x6" YELLOW DASHW/ 3' GAP W/ 6" BLACK OUTLINE PROPOSED GRASS AREA PROPOSED CONCRETE PROPOSED CONCRETE PROPOSEDFENCE 3 5 . 0 ' PROPOSED GRASS AREA PRO P E O C TIE TO EX. FENCE PROPOSED GRASS AREA PROPOSED 8' SECURITYFENCE (TYP) PROPOSED8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) PROPOSED8' SECURITY FENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) PROPOSED8' SECURITY FENCE (TYP) PROPOSED8' SECURITY FENCE (TYP)PROPOSED8' SECURITYFENCE (TYP) PRO P E O C PRO P E O C PRO P E O C P R O P E O C PROP. PATTERN C INTERMEDIATEHOLDING POSITION MARKING3'x1' YELLOW DASH W/ 6" BLACK OUTLINE X X X X X X X X X X PROPOSED CONCRETE 30.0 ' PROP. 6" SOLIDYELLOW LINE W/ 6" BLACKOUTLINE PROP. 6" SOLIDYELLOW LINE W/ 6" BLACK OUTLINE HANGAR E OFFICE 3,570 SF PROPOSED HANGAR F (120'x100') 12,000 sf HANGAR FOFFICE PROPOSED HANGAR G (120'x100') 12,000 sf 7 9 . 0 ' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport PROPHC PKNGSIGNS PROPOSEDHC PARKINGSIGNS (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" SPILL CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" STD.CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" STD.CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" STD.CURB (TYP) PROPOSED24" STD.CURB (TYP) PROPOSED4' CONCRETEFLUME PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP)PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED24" STD.CURB (TYP) PROPOSED24" STD.CURB (TYP) END 24"CURB PROPOSED24" SPILLCURB (TYP)PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED24" STD.CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSED2' CONCRETEFLUME PROPOSED2' CONCRETEFLUME PROPOSED2' CONCRETEFLUME W/NEENAH SOLIDCOVER PROPOSED2' CONCRETEFLUME W/NEENAH SOLIDCOVER PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BAR PROPOSEDSTOP BAR PROPOSEDSTOP BAR PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BARAND SIGN PROP. 4" 4,500 PSICONCRETE REINFORCEDW/ #4 REBAR 12" O.C. EACHWAY ON 4" CABC PROP. 4" 4,500 PSICONCRETE REINFORCEDW/ #4 REBAR 12" O.C. EACHWAY ON 4" CABC 25.0 ' 25 . 0 ' 37 . 0 ' TIE TOEX. PAVE TIE TOEX. PAVE PROP. PATTERN C INTERMEDIATE HOLDING POSITION MARKING 3'x1' YELLOW DASH W/ 6"BLACK OUTLINE PROPOSED24" SPILLCURB (TYP) PROPOSED3' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) BUILDING 1 OFFICES/SCHOOL14,830 SF PROPOSED 24" SPILLCURB (TYP)17 GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSEDHC PARKINGSIGNS (TYP) 32' R 32' R 20' R 20' R 30' R 30' R 20' R 20' R 95' R 120' R 200.5' R 225' R 200' R 225' R 45' R 70' R PROPOSEDHC PARKINGSIGN (TYP) X X X X X X X X X FOREBAY FOREBAY FOREBAY FOREBAY FOREBAY X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X PROPOSED8'x12' CONC.GENERATOR PADBUILDING 3 PROPOSED8'x12' CONC.GENERATOR PADHANGAR E PRO P . P H 1 C O N C R E T E L I M I T S PROPOSED8'x12' CONC.GENERATOR PADHANGAR F PROP. BIKERACK 5 5 . 0 ' 50' R 35' TAPER END 24"CURB PROPOSED HANGAR 2 48 . 5 ' 75 . 5 ' PROPOSEDCONTROLLED ACCESS GATE X X X X X X PROPOSEDRETAINING WALL PROP. NCDOT STD GUARDRAIL PROPOSED8' SECURITYFENCE (TYP) 52.8' PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD 23 PROPOSEDCHARGEPOINT 6000EV CHARGINGSTATION 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Overall Site Plan CS - 3Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 DEVELOPER: OWNER: Wilmington International Airport 1740 Airport Blvd. - Suite 12 Wilmington, NC 28405 910-341-4333 ext: 1000 ARQ - ILM East Side Development 0'100'200'300' GRAPHIC SCALE (IN FEET) 1 INCH = 100 FT ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 PAVEMENT/CONCRETE DESIGN LEGEND DRIVE AISLES (HEAVY DUTY) PARKING SPACES (LIGHT DUTY) (8" CABC & 3" S9.5B) (6" CABC & 3" S9.5B) TAXILANE - ADG I (8" CABC & 3" S9.5B) TAXILANE/APRON - ADG II & III TRAFFIC SIGN NOTE ALL SIGNS WILL USE PRISMATIC SHEETING AND WILL ADHERE TO THE RETROREFLECTIVITY STANDARDS FOUND IN THE LATEST EDITION OF THE MUTCD. 07/30/2025 Bart J. McClain PUBLIC AREA STRIPING & SIGNAGE NOTES 1. ALL ONSITE PAVEMENT MARKINGS TO BE 4" WHITE PAINT, UNLESS OTHERWISE NOTED. 2. STOP BAR AT N KERR AVE. TO BE 24" WHITE THERMOPLASTIC. 3. STOP BARS INTERNAL TO SITE TO BE 24" WHITE PAINT. 4. STOP SIGN AT N KERR AVE. TO BE MUTCD R1-1 36"x36". 5. INTERNAL STOP SIGNS ARE TO BE MUTCD R1-1 30"x30". 6. DIRECTIONAL ARROWS TO BE WHITE PAINT. CURB RAMP NOTE Curb ramp locations are approximate only. Curb ramps should be located and constructed in accordance with the Town of Cary and NCDOT standards after the locations of the propsed stop bars and/or pedestrian crosswalks have been staked out. (6" P-209 CRUSHED AGGREGATE & 7" P-501 PCC 4,500 PSI) NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. SITE NOTES: 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS AND DETAILS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES. 3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THIS SITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018. 4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TO THE CONTRACTOR UPON THEIR REQUEST. 5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BY MATRIX EAST, PLLC . NOTE: FOR 50 SCALE SITE BLOWUPS, SEE SHEETS CS-4 AND CS-5 THIS SET. X W W W W W W F MO CO CO 10 2 . 6 ' PROPOSED CONTROLLED ACCESS GATE #7 PROPOSED HANGAR 1 24 . 8 ' 25.4' 99 . 0 ' EDDB EAST-1C (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROPOSED HANGAR 5 PROPOSED HANGAR 4 PROPOSED HANGAR 3 PROPOSED DUMPSTERSW/ SCREEN WALL 18 ' 9' SELF SERVE FUEL STATION AREA 11 0 . 0 ' 79 . 0 ' 79 . 0 ' ADGII X X X X X X X X X X X X PROPOSED CONTROLLED ACCESS GATE #4 PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES 3" S9.5B 8" CABC 3" S9.5B 8" CABC 3" S9.5B 8" CABC 3" S9.5B 8" CABC GRASSED SWALE EASE-1C FROM EDDB EAST-1C WALL PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED FUEL STORAGE TANKS PROPOSED ACCESS SCANNER W/ KEYPAD WITHIN 2'x10'x6" RAISED CONCRETE ISLAND PROPOSED FUEL PUMP CABINET X X X X X X X X PROPOSED CONTROLLED ACCESS GATE #6 X X X PROPOSED CONCRETE PROP. 12" SOLID YELLOW LINE W/ 6" BLACK OUTLINE AREA MARKING 6" SOLID YELLOW 3'x6" YELLOW DASH W/ 3' GAP W/ 6" BLACK OUTLINE PROP. 6" SOLID YELLOW LINE W/ 6" BLACK OUTLINE PROP. 6" SOLID YELLOW LINE PROP. 6" SOLID YELLOW LINE PROPOSED FENCE PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) X X X X X X X X X X X X X X X X X X X PROP HC PKNG SIGNS PROPOSED 24" STD.CURB (TYP) PROPOSED 24" STD. CURB (TYP) PROPOSED 4' CONCRETE FLUME PROPOSED 24" SPILL CURB (TYP) PROPOSED 24" SPILL CURB (TYP)PROPOSED 24" SPILL CURB (TYP) PROPOSED 24" SPILL CURB (TYP) PROPOSED24" SPILL CURB (TYP) PROPOSED24" STD. CURB (TYP) PROPOSED 24" STD. CURB (TYP) END 24" CURB PROPOSED 24" SPILL CURB (TYP)PROPOSED 24" SPILL CURB (TYP) PROPOSED 24" SPILL CURB (TYP) PROPOSED 24" STD. CURB (TYP) PROPOSED 5' CONCRETE SIDEWALK (TYP) PROPOSED 2' CONCRETE FLUME PROPOSED 2' CONCRETE FLUME W/ NEENAH SOLID COVER PROPOSED STOP BAR AND SIGN PROPOSEDSTOP BAR AND SIGN PROPOSED STOP BAR AND SIGN PROPOSED STOP BAR AND SIGN PROPOSED STOP BAR AND SIGN PROP. 4" 4,500 PSI CONCRETE REINFORCED W/ #4 REBAR 12" O.C. EACH WAY ON 4" CABC 25. 0 ' 2 5 . 0 ' 37 . 0 ' TIE TO EX. PAVE TIE TO EX. PAVE PROP. PATTERN C INTERMEDIATE HOLDING POSITION MARKING 3'x1' YELLOW DASH W/ 6" BLACK OUTLINE PROPOSED 24" SPILL CURB (TYP)17 32' R 32' R 20' R 20' R 30' R 30' R 20' R 20' R 95' R 120' R 200.5' R 225' R 200' R 225' R 45' R 70' R PROPOSED HC PARKING SIGN (TYP) FOREBAY FOREBAY FOREBAY X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX END 24" CURB PROPOSED HANGAR 2 48 . 5 ' 75 . 5 ' PROPOSED CONTROLLED ACCESS GATE X X X XXXXXXXXX X X X XXXXXXXXX PROPOSED RETAINING WALL 52.8' PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD 23 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' Site Plan South Side CS - 4Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 TRAFFIC SIGN NOTE ALL SIGNS WILL USE PRISMATIC SHEETING AND WILL ADHERE TO THE RETROREFLECTIVITY STANDARDS FOUND IN THE LATEST EDITION OF THE MUTCD. MATCHLINE SHEET CS-5 July 30, 2025 07/30/2025 Bart J. McClain PUBLIC AREA STRIPING & SIGNAGE NOTES 1. ALL ONSITE PAVEMENT MARKINGS TO BE 4" WHITE PAINT, UNLESS OTHERWISE NOTED. 2. STOP BAR AT N KERR AVE. TO BE 24" WHITE THERMOPLASTIC. 3. STOP BARS INTERNAL TO SITE TO BE 24" WHITE PAINT. 4. STOP SIGN AT N KERR AVE. TO BE MUTCD R1-1 36"x36". 5. INTERNAL STOP SIGNS ARE TO BE MUTCD R1-1 30"x30". 6. DIRECTIONAL ARROWS TO BE WHITE PAINT. PAVEMENT/CONCRETE DESIGN LEGEND DRIVE AISLES (HEAVY DUTY) PARKING SPACES (LIGHT DUTY) (8" CABC & 3" S9.5B) (6" CABC & 3" S9.5B) TAXILANE - ADG I (8" CABC & 3" S9.5B) TAXILANE/APRON - ADG II & III (6" P-209 CRUSHED AGGREGATE & 7" P-501 PCC 4,500 PSI) ARQ - ILM East Side Development NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. SITE NOTES: 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS AND DETAILS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES. 3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THIS SITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018. 4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TO THE CONTRACTOR UPON THEIR REQUEST. 5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BY MATRIX EAST, PLLC . OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 PROPOSED 8.0'x8.67' CONC. TRANSFORMER PAD WATERFLOWWilmington International Airport W W W PROPOSED HANGAR A (120'x100') 12,000 sf PROPOSED HANGAR B (120'x100') 12,000 sf EDDB EAST-1A CEMETERY ACCESS PROPOSED 8' SECURITY FENCE (TYP) (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROPOSED HANGAR E (120'x100') 12,000 sf HANGAR (12,000 SF) 100 EDDB EAST-1B BUILDING #1 T A X I W A Y N O V E M B E R JET BLAST DEFLECTOR 8' HIGH PROPOSED RETAINING WALL HANGAR D OFFICE 3,250 SF PROPOSED HANGAR C (120'x100') 12,000 sf PROPOSED HANGAR D (120'x100') 12,000 sf PROPOSED CHARGEPOINT 6000 EV CHARGING STATION 3 5 . 0 ' 15 8 . 0 ' ADGIII ADGII PRO P E O C ( 1 ' O U T S I D E P 7 7 L I N E ) PRO P E O C 11 0 . 0 ' 58 . 0 ' PROPOSED DUMPSTERS W/ SCREEN WALL PROPOSED 2-STORY RETAIL (9,600 SF) OFFICE (9,600 SF) (19,200 SF TOTAL) BUILDING #3 PROPOSED CONTROLLED ACCESS GATE #2 PROPOSED GSE BLDG. (89.33'x50.67') 4,525 sf PROJECT AREA 36.20 ACRES PROPOSED CONCRETE GRASSED SWALE EAST-1A FROM EDDB EAST-1A GRASSED SWALE EAST-1B FROM EDDB EAST-1B PROPOSED RETAINING WALL PROPOSED CHARGEPOINT 6000 EV CHARGING STATION PROPOSED CONCRETE PROPOSED CONCRETE PROPOSED CONTROLLED ACCESS GATE #1 PROPOSED CONTROLLED ACCESS GATE #3 6 9 . 0 ' 1 0 5 . 0 ' PR O P E O C JET BLAST DEFLECTOR 8' HIGH 79 . 0 ' PROP. 6" SOLID YELLOW LINE W/ 6" BLACK OUTLINE PROP. 12" SOLID YELLOW LINE W/ 6" BLACK OUTLINE PROP. 12" SOLID YELLOW LINE W/ 6" BLACK OUTLINE PROP. NON-MOVEMENT AREA MARKING PROP. NON-MOVEMENT AREA MARKING 6" SOLID YELLOW 3'x6" YELLOW DASH W/ 3' GAP W/ 6" BLACK OUTLINE PROP. NON-MOVEMENT AREA MARKING 6" SOLID YELLOW 3'x6" YELLOW DASH W/ 3' GAP W/ 6" BLACK OUTLINE PROPOSED GRASS AREA PROPOSED CONCRETE PROPOSED CONCRETE 3 5 . 0 ' PROPOSED GRASS AREA PRO P E O C TIE TO EX. FENCE PROPOSED GRASS AREA PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PRO P E O C PRO P E O C PR O P E O C P R O P E O C PROP. PATTERN C INTERMEDIATE HOLDING POSITION MARKING 3'x1' YELLOW DASH W/ 6" BLACK OUTLINE PROPOSED CONCRETE 30. 0 ' PROP. 6" SOLID YELLOW LINE W/ 6" BLACK OUTLINE PROP. 6" SOLID YELLOW LINE W/ 6" BLACK OUTLINE HANGAR E OFFICE 3,592 sf PROPOSED HANGAR F (120'x100') 12,000 sf HANGAR F OFFICE PROPOSED HANGAR G (120'x100') 12,000 sf 7 9 . 0 ' Wilmington International Airport PROPOSED HC PARKING SIGNS (TYP) PROPOSED24" SPILL CURB (TYP) PROPOSED 6' CONCRETE SIDEWALK (TYP) PROPOSED24" SPILL CURB (TYP) PROPOSED 6' CONCRETE SIDEWALK (TYP) PROPOSED 24" STD. CURB (TYP) PROPOSED 6' CONCRETE SIDEWALK (TYP) PROPOSED 24" STD.CURB (TYP) PROPOSED6' CONCRETE SIDEWALK (TYP) PROPOSED 6' CONCRETESIDEWALK (TYP) PROPOSED 5' CONCRETE SIDEWALK (TYP) PROPOSED 5' CONCRETE SIDEWALK (TYP) PROPOSED 2' CONCRETE FLUME PROPOSED 2' CONCRETE FLUME W/ NEENAH SOLID COVER PROPOSED STOP BAR PROPOSEDSTOP BAR PROPOSED STOP BAR PROP. 4" 4,500 PSICONCRETE REINFORCED W/ #4 REBAR 12" O.C. EACH WAY ON 4" CABC TIE TO PROPOSED 24" SPILL CURB (TYP) PROPOSED 3' CONCRETE SIDEWALK (TYP) PROPOSED 5' CONCRETE SIDEWALK(TYP) BUILDING 1 OFFICES/SCHOOL 14,830 SF GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) PROPOSED 5' CONCRETE SIDEWALK (TYP) PROPOSED HC PARKING SIGNS (TYP) FOREBAY FOREBAY X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X PROPOSED 8'x12' CONC. GENERATOR PADBUILDING 3 PROPOSED 8'x12' CONC. GENERATOR PADHANGAR E PR O P . P H 1 C O N C R E T E L I M I T S PROPOSED 8'x12' CONC. GENERATOR PADHANGAR F PROP. BIKE RACK 5 5 . 0 ' 50' R 35' TAPER PROP. NCDOT STD GUARDRAIL PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 8.0'x8.67' CONC. TRANSFORMER PAD PROPOSED 8.0'x8.67' CONC. TRANSFORMER PAD PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED CHARGEPOINT 6000 EV CHARGING STATION 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' Site Plan North Side CS - 5Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT DEVELOPER: ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 TRAFFIC SIGN NOTE ALL SIGNS WILL USE PRISMATIC SHEETING AND WILL ADHERE TO THE RETROREFLECTIVITY STANDARDS FOUND IN THE LATEST EDITION OF THE MUTCD. MATCHLINE SHEET CS-4 PUBLIC AREA STRIPING & SIGNAGE NOTES 1. ALL ONSITE PAVEMENT MARKINGS TO BE 4" WHITE PAINT, UNLESS OTHERWISE NOTED. 2. STOP BAR AT N KERR AVE. TO BE 24" WHITE THERMOPLASTIC. 3. STOP BARS INTERNAL TO SITE TO BE 24" WHITE PAINT. 4. STOP SIGN AT N KERR AVE. TO BE MUTCD R1-1 36"x36". 5. INTERNAL STOP SIGNS ARE TO BE MUTCD R1-1 30"x30". 6. DIRECTIONAL ARROWS TO BE WHITE PAINT. PAVEMENT/CONCRETE DESIGN LEGEND DRIVE AISLES (HEAVY DUTY) PARKING SPACES (LIGHT DUTY) (8" CABC & 3" S9.5B) (6" CABC & 3" S9.5B) TAXILANE - ADG I (8" CABC & 3" S9.5B) TAXILANE/APRON - ADG II & III (6" P-209 CRUSHED AGGREGATE & 7" P-501 PCC 4,500 PSI) 07/30/2025 Bart J. McClain NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. ARQ - ILM East Side Development SITE NOTES: 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS AND DETAILS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES. 3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THIS SITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018. 4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TO THE CONTRACTOR UPON THEIR REQUEST. 5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BY MATRIX EAST, PLLC . OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 WATERFLOW 6-24 6-24 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport W W W W W W W W W CO CO SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSS SSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSS SS SS SSSS SS SS SS SS SSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS X X X X X X X X X X X X X X X X X X X X X X X X X SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SS SS PROP. 4" PVC DOM SEWER SERVICE (TYP) PROP. MH 5 TOP = 21.46 OUT = 14.31 PROP. MH 3TOP = 19.96 IN = 12.47 OUT = 12.37 PRO P . 1 7 6 . 7 6 ' 8 " P V C S S @ 0 . 5 0 % KNOX LOCK REQUIRED IN GATE PRO P . 8 " P V C C - 9 0 0 W A T E R L I N E PRO P . 4 " D O M . S E W E R S E R V I C E PRO P E O P PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. O/W/S SEPARATOR 1000 GAL (TYP) PRO P . 4 " S E W E R S E R V I C E T O O W S PROP. 2" PVC C-900 DOM. WATER SERVICE KNOX LOCKREQUIRED ON GATE PROP. 4" DCVADOMESTIC BACKFLOWIN INSULATE HOTBOX PROP. 4" DOMESTIC MASTER WATER METER EX. 12" PVC C-900 W A T E R L I N E SS S E R V I C E PROP. 4 " P V C D O M PROP. O/W/S SEPARATOR1000 GAL (TYP) PROP FH 6" LEG PROP. 105.38' 8" PVC SS @ 0 . 5 0 % PRO P . 1 9 9 . 7 2 ' 8 " P V C S S @ 0 . 5 0 % PROP. MH 1 TOP = 22.40IN = 10.86OUT = 10.76 PRO P . 6 " S E W E R S E R V I C E PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. 4" PVC DOM SEWERSERVICE (TYP) PRO P . 4 " D O M . S E W E R S E R V I C E PROP. 1-1/2"DOM WATERSERVICE PROP. 1-1/2" DOM WATER SERVICE PROP. 1-1/2"DOM WATER SERVICES PRO P . 6 " P V C C - 9 0 0 W A T E R L I N E PROP. 8 " P V C C - 9 0 0 W A T E R L I N E PROP FH 6" LEG PROP FH6" LEG RUN W A Y 6 - 2 4 PROPOSED CONTROLLEDACCESS GATE #7 20' 10 ' (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 EXISTING GRASS T A X I W A Y N O V E M B E R PROPOSED RETAININGWALL PROPOSED HANGAR 1 PROPOSED HANGAR 5 PROPOSED HANGAR 4 PROPOSED HANGAR 3 PROPOSED HANGAR 2 CEMETERY ACCESS PROPOSED HANGAR A 12,000 sf PROPOSED HANGAR B 12,000 sf PROPOSED HANGAR C 12,000 sf PROPOSED HANGAR D 12,000 sf PROPOSED HANGAR E 12,000 sf PROPOSED GSE BLDG. BUILDING #3 PROPOSED 2-STORY (19,200 SF TOTAL) SPRINKLED PROPOSED CONCRETE PROPOSED FUEL TANKS PROP. 2" DCVA DOMESTICBACKFLOW IN INSULATED HOTBOX PROP. 2" DOMESTIC MASTER WATER METER PROP. 16"x8" TAPPING SLEEVEWITH VALVE PRO P . 8 " P V C C - 9 0 0 W A T E R L I N E PROP FH 6" LEG EX. 12" PVC C-900 W A T E R L I N E PROP 8"x8"x8" TEE3-8" GV PROP CUT IN12"x12"x8" TEE2-12" GV 1-8" GV EX 16"x12" TAPPING SLEEVE W/ VALVE (BY OTHERS) PROP. 4" PVC OWS SERVICE (TYP) EX. 20' CAPE FEARPUBLIC UTILITY EASEMENT SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS PROP. MH 4TOP = 19.83IN = 13.57 OUT = 13.47 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSPROP. MH 6TOP = 18.40 OUT = 14.02 SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROP. O/W/SSEPARATOR 1000 GAL (TYP) SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS PROP. 4" DOM. SS SERVICE PROP. 4" SS SERVICE TO OWS PROP. 6" DOM. S S S E R V I C E W W W W PROP FDC PROP. 6" FIRE LINE BACKFLOW PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PRO P . 8 " P V C C - 9 0 0 W A T E R L I N E WWWWWWWWWWWWWWWWWWW W W W W W W W W W PROP. 1" DOMESTIC BACKFLOW PROP. 1" DOMESTICWATER METER SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSS PROP. 4" DOM.SS SERVICE PROP. 2" DOMESTIC DCVA BACKFLOW IN INSULATED HOTBOX PROP. 2" DOMESTIC MASTER WATER METER PROP 8"x8"x8" TEE 2-8" GV 1-8"x6" REDUCER1-6" GV W W W W W W W W W W W W W W W W W W SS SS PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E W W W W PROP FH6" LEG EX FH (BY OTHERS) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport PROPOSED HANGAR F (12,000 sf) SPRINKLED PROPOSED HANGAR G 12,000 sf BUILDING #1 PROPOSEDCONTROLLED ACCESS GATE #1 HANGAR F OFFICESPRINKLED PROPOSED CONTROLLED ACCESS GATE #2 HANGAR (12,000 SF)SS SS W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W PROP. 2" DOM WATER SERVICE SS SS SS SS 1-1/2" DOMESTIC WATER SERVICE SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS PROP. O/W/SSEPARATOR1000 GAL (TYP) SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROP. 4" DOM.SS SERVICE PRO P . 4 " D O M . S E W E R S E R V I C E SSSSSSSSSSSS PROP. 4" SS SERVICE TO OWS PROP. 4" SS SERVICE TO OWS BUILDING 1OFFICES/SCHOOL14,830 SF W W PROP FDC PR O P . 1 4 7 . 4 2 ' 8 " P V C S S @ 0 . 5 0 % PRO P . 9 0 . 0 0 ' 8 " P V C S S @ 0 . 5 0 % (BY OTHERS) (BY OTHERS) SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS SS SSSSSSSSSS SSSSSSSS PROP. 2000 GAL GREASE TRAP S S S S S S EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA.CONCRETE MANHOLE EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING8-INCH DIA.GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING FIRE HYDRANT EXISTINGFIRE HYDRANT EXISTINGFIRE HYDRANT EXISTING 12-INCH WATER MAIN EXISTING12-INCH WATER MAIN EXISTING 2-INCH WATER SERVICE EXISTING WATER METER EXISTING BACKFLOW PREVENTER EXISTING BACKFLOW PREVENTER EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING FIRE HYDRANT TEE WITH MJ CAP SS SS SS SS SS SS EXISTING6-INCH SEWER SERVICE EXISTING6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING TEMPORARY FIRE HYDRANT REMOVE AND RELOCATE TEMPORARY FIRE HYDRANT EDDB EAST-1A EDDB EAST-1B EDDB EAST-1C W W W W PROP FH 6" LEG PROP. 4" DOM.SS SERVICE PROP. MH 2TOP = 20.70 IN = 11.84 OUT = 11.74 PROP. O/W/SSEPARATOR 1000 GAL (TYP)SS SS WWWWWWWWWWWWWW PROP. 1" IRRIGDCVA BACKFLOW IN INSULATED HOTBOX PROP. 1" IRRIG TAP PROP. 1" IRRIG METER X X X X X X X X X PROP. 2" DOMWATER SERVICE FOREBAY FOREBAY FOREBAY FOREBAY FOREBAY W W W W PROPOSED8'x12' CONC.GENERATOR PADBUILDING 3 PROPOSED8'x12' CONC.GENERATOR PADHANGAR E PROPOSED8'x12' CONC.GENERATOR PADHANGAR F PROPOSED8'x12' CONC.GENERATOR PADBUILDING 1 PROP. 2-2" PVC CONDUITS PROP. 2-2" PVC CONDUITS PROP. 1-2" PVC CONDUIT PROP. 2-2"PVC CONDUITS PROP. 1-2"PVC CONDUIT PROP. 1-1/2" DOMESTICWATER SERVICE PROP. 4"FIRE LINE TO FDC PROP. 1-2"PVC CONDUITS PROP. BIKERACK PROP. 8" RPDA BACKFLOWPREVENTER IN INSULATED HOTBOX W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP. 8" RPDA BACKFLOW PREVENTER IN INSULATED HOTBOX PRO P . 6 " P V C C - 9 0 0 W A T E R L I N E PRO P . 2 " P V C C - 9 0 0 D O M E S T I C S E R V I C E W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW WW PROP. 4" DOM TAP PROP. 4" PVC C-900 DOM WATER SERVICE W W PROP. 4" PVC C-900 DOM WATER SERVICE PROP. 1-1/2" DOM WATER SERVICE PROP. 6" C-900FIRE LINE PROP. 4" PVC C-900 DOM WATER SERVICE PRO P . 1 . 5 " P V C C - 9 0 0 D O M . S E R V I C E PROP ILM PRIVATE UTILITY EASEMENT PROP ILM PRIVATEUTILITY EASEMENT PROP ILM PRIVATE UTILITY EASEMENT PROP ILM PRIVATE UTILITY EASEMENT PROP. 6" PVC DOM. SEWER SERVICE PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 6" PVC DOM.SEWER SERVICE PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROPOSED4" GV PROPOSED6" GV PROPOSED2" BLOWOFF HANGAR E OFFICE 3,570 SF PRO P . 6 " P V C C - 9 0 0 W A T E R L I N E KNOX LOCKREQUIRED ON GATE PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO SSSSSSSSSSSSSSSSSSSSSSSSSSSS PROP.CO PROP.CO PROP.COPROP. 4" DOM. SS SERVICE PROP.CO PROP.COPROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP. 4" PVCC-900 FIRELINE PROP. 2" DOMWATER SERVICE OVERHEAD POWER TO BE REMO V E D EX. POWER POLEAND GUY WIRES TO BE REMOVED AND POWER TO BE UNDERGROUND EX. POWER POLE AND GUY WIRES TOBE REMOVED ANDPOWER TO BE UNDERGROUND PROPOSED8' SECURITYFENCE (TYP) PROP. NCDOT STD GUARDRAIL PROPOSED 8' SECURITY FENCE (TYP) W W W W W W W W W W W W W W W W W W W W PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROP. 2" PVC C-900 DOM. WATER SERVICE PROP. 2" PVC C-900 DOM. WATER SERVICE PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 4" PVC C-900 OWS SEWER SERVICE (TYP) PROP. 6" PVC C-900OWS SEWER SERVICE (TYP) PROP. 6" PVC C-900OWS SEWER SERVICE (TYP) PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 2" TAP PROP. 1" PVC C-900DOM. WATER SERVICE EXISTING ILM PRIVATE UTILITY EASEMENT W W W W W W W W PROP FDC TO GSE BLDG W WW WW WW W PROP. 4" PVC C-900 FIRELINE TO FDC PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Overall Utility Plan CS - 6 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 0'100'200'300' GRAPHIC SCALE (IN FEET) 1 INCH = 100 FT ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 Existing Water Line by WK Dickson Existing Sewer Line by WK DicksonSSSSSSSSSS Proposed Water Line by CFCAWWWW Proposed Sewer Line by CFCASSSSSSSS UTILITY LEGEND Financially Responsible Contact: Benjamin Zucker ARQ Realty, LLC Group 919-939-6769 NOTE: BUILDING 3, HANGAR F, AND GSE TO BE SPRINKLED. NOTE: GATED ENTRANCES/EXITS (4) TO AIRPORT AREAS WILL HAVE KNOX LOCKS ON EXTERIOR SIDE OF GATES. KNOX BOX'S FOR BUILDINGS TO BE LOCATED ON OUTSIDE WALL NEXT TO THE RISER ROOM DOOR. UNDERGROUND UTILITY NOTE: UNDERGROUND UTILITY RELOCATIONS ARE TO BE COORDINATED BETWEEN THE CONTRACTOR AND THE INDIVIDUAL UTILITY COMPANIES. July 30, 2025 07/30/2025 Bart J. McClain ARQ - ILM East Side Development Existing Water and Sewer Utility Note: The existing water and sewer lines shown on this plan in blue and green are from approved ILM utility extension plans entitled 'Work Authorization 03 - ILM East Utility Expansion' by WK Dickson and approved by CFPUA on March 28, 2025. NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. NOTE: FOR 50 SCALE UTILITY BLOWUPS, SEE SHEETS CS-7 AND CS-8 THIS SET. OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W PROP. MH 3 TOP = 19.96 IN = 12.47 OUT = 12.37 PR O P . 1 7 6 . 7 6 ' 8 " P V C S S @ 0 . 5 0 % KNOX LOCK REQUIRED IN GATE PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. 2" PVC C-900 DOM. WATER SERVICE PROP. 4" DCVA DOMESTIC BACKFLOW IN INSULATE HOTBOX PROP. 4" DOMESTIC MASTER WATER METER EX. 12" PVC C - 9 0 0 W A T E R L I N E PROP. MH 1 TOP = 22.40 IN = 10.86 OUT = 10.76 PROPOSED CONTROLLED ACCESS GATE #7 20' 10 ' (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 GRASS PROPOSED HANGAR 1 PROPOSED HANGAR 5 PROPOSED HANGAR 4 PROPOSED HANGAR 3 PROPOSED HANGAR 2 PROPOSED FUEL TANKS EX. 12" PVC C-900 W A T E R L I N E PROP CUT IN 12"x12"x8" TEE 2-12" GV 1-8" GV EX 16"x12" TAPPING SLEEVE W/ VALVE (BY OTHERS) EX. 20' CAPE FEAR PUBLIC UTILITY EASEMENT PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES WWWWWWWWWWWWWWWWWWW W W W W W W W W W PROP. 1" DOMESTIC BACKFLOW PROP. 1" DOMESTIC WATER METER SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROP. 2" DOMESTIC DCVA BACKFLOW IN INSULATED HOTBOX PROP. 2" DOMESTIC MASTER WATER METER W W W W W W W W W W W W W W W W W W PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E W W W W PROP FH 6" LEG EX FH (BY OTHERS) (BY OTHERS) (BY OTHERS) S S S S S S EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING FIRE HYDRANT EXISTING FIRE HYDRANT EXISTINGFIRE HYDRANT EXISTING 12-INCH WATER MAIN EXISTING 12-INCH WATER MAIN EXISTING 2-INCH WATER SERVICE EXISTING WATER METER EXISTING BACKFLOW PREVENTER EXISTING BACKFLOW PREVENTER EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING FIRE HYDRANT TEE WITH MJ CAP SS SS SS SS SS SS EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING TEMPORARY FIRE HYDRANT REMOVE AND RELOCATE TEMPORARY FIRE HYDRANT EDDB EAST-1C W W W W TOP = 20.70 IN = 11.84 OUT = 11.74 WWWWWWWWWWWWWW PROP. 1" IRRIG DCVA BACKFLOW IN INSULATED HOTBOX PROP. 1" IRRIG TAP PROP. 1" IRRIG METER PROP. 2" DOM WATER SERVICE FOREBAY FOREBAY FOREBAY X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX PROP. 2-2" PVC CONDUITS PROP. 2-2" PVC CONDUITS PROP. 1-2" PVC CONDUIT PROP. 1-1/2" DOMESTIC WATER SERVICE PROP. 1-2" PVC CONDUITS PROP. 8" RPDA BACKFLOW PREVENTER IN INSULATED HOTBOX W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW WW PROP. 4" DOM TAP PROP. 4" PVC C-900 DOM WATER SERVICE PROP ILM PRIVATE UTILITY EASEMENT PROP ILM PRIVATE UTILITY EASEMENT PROP. 6" PVC DOM. SEWER SERVICE PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 6" PVC DOM. SEWER SERVICE PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 4" PVC DOM. SEWER SERVICE (TYP) X X X XXXXXXXXX X X X XXXXXXXXX PROP. CO PROP. CO PROP. CO SSSSSSSSSSSSSSSSSSSSSSSSSSSS PROP.CO PROP. CO PROP. COPROP. 4" DOM. SS SERVICE OVERHEAD POWER TO B E R E M O V E D EX. POWER POLE AND GUY WIRES TO BE REMOVED AND POWER TO BE UNDERGROUND EX. POWER POLE AND GUY WIRES TO BE REMOVED AND POWER TO BE UNDERGROUND PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 5.5'x6.83' CONC.TRANSFORMER PAD PROP. 2" PVC C-900 DOM. WATER SERVICE PROP. 2" PVC C-900 DOM. WATER SERVICE PROP. 1" PVC C-900 DOM. WATER SERVICE PROP. 1" PVC C-900 DOM. WATER SERVICE PROP. 1" PVC C-900 DOM. WATER SERVICE PROP. 4" PVC C-900 OWS SEWER SERVICE (TYP) PROP. 6" PVC C-900 OWS SEWER SERVICE (TYP) PROP. 6" PVC C-900 OWS SEWER SERVICE (TYP) PROP. 1" PVC C-900 DOM. WATER SERVICE PROP. 2" TAP PROP. 1" PVC C-900 DOM. WATER SERVICE EXISTING ILM PRIVATE UTILITY EASEMENT 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' Utility Plan South Side CS - 7Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG July 30, 2025 07/30/2025 Bart J. McClain MATCHLINE SHEET CS-8 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. Existing Water Line by WK Dickson Existing Sewer Line by WK DicksonSSSSSSSSSS Proposed Water Line by CFCAWWWW Proposed Sewer Line by CFCASSSSSSSS UTILITY LEGEND NOTE: BUILDING 3, HANGAR F, AND GSE TO BE SPRINKLED. NOTE: GATED ENTRANCES/EXITS (4) TO AIRPORT AREAS WILL HAVE KNOX LOCKS ON EXTERIOR SIDE OF GATES. KNOX BOX'S FOR BUILDINGS TO BE LOCATED ON OUTSIDE WALL NEXT TO THE RISER ROOM DOOR. UNDERGROUND UTILITY NOTE: UNDERGROUND UTILITY RELOCATIONS ARE TO BE COORDINATED BETWEEN THE CONTRACTOR AND THE INDIVIDUAL UTILITY COMPANIES. Existing Water and Sewer Utility Note: The existing water and sewer lines shown on this plan in blue and green are from approved ILM utility extension plans entitled 'Work Authorization 03 - ILM East Utility Expansion' by WK Dickson and approved by CFPUA on March 28, 2025. ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 WATERFLOWWilmington International Airport W W W SSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSS SSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS SSSS SS SS SSSS SS SS SS SS SSSS SSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SS SS PROP. 4" PVC DOM SEWER SERVICE (TYP) PROP. MH 5 TOP = 21.46 OUT = 14.31 PROP. MH 3 PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PR O P . 4 " D O M . S E W E R S E R V I C E PRO P E O P PR O P . 4 " S E W E R S E R V I C E T O O W S KNOX LOCK REQUIRED ON GATE SS S E R V I C E PR O P . 4 " P V C D O M PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP FH 6" LEG PROP. 105.38' 8" PVC S S @ 0 . 5 0 % PR O P . 1 9 9 . 7 2 ' 8 " P V C S S @ 0 . 5 0 % PR O P . 6 " S E W E R S E R V I C E PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. 4" PVC DOM SEWER SERVICE (TYP) PRO P . 4 " D O M . S E W E R S E R V I C E PROP. 1-1/2" DOM WATER SERVICE PROP. 1-1/2" DOM WATER SERVICE PROP. 1-1/2" DOM WATER SERVICES PRO P . 6 " P V C C - 9 0 0 W A T E R L I N E PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PROP FH 6" LEG PROP FH 6" LEG (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 EXISTING GRASS T A X I W A Y N O V E M B E R PROPOSED RETAINING WALL CEMETERY ACCESS PROPOSED HANGAR A 12,000 sf PROPOSED HANGAR B 12,000 sf PROPOSED HANGAR C 12,000 sf PROPOSED HANGAR D 12,000 sf PROPOSED HANGAR E 12,000 sf PROPOSED GSE BLDG. BUILDING #3 PROPOSED 2-STORY (19,200 SF TOTAL) SPRINKLED PROPOSED CONCRETE PROP. 2" DCVA DOMESTIC BACKFLOW IN INSULATED HOTBOX PROP. 2" DOMESTIC MASTER WATER METER PROP. 16"x8" TAPPING SLEEVE WITH VALVE PRO P . 8 " P V C C - 9 0 0 W A T E R L I N E PROP FH 6" LEG PROP 8"x8"x8" TEE 3-8" GV PROP. 4" PVC OWS SERVICE (TYP) SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS PROP. MH 4 TOP = 19.83 IN = 13.57 OUT = 13.47 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSPROP. MH 6 TOP = 18.40 OUT = 14.02 SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROP. O/W/S SEPARATOR 1000 GAL (TYP) SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS PROP. 4" DOM. SS SERVICE PROP. 4" SS SERVICE TO OWS PROP. 6" DO M . S S S E R V I C E W W W W PROP FDC PROP. 6" FIRE LINE BACKFLOW PROJECT AREA 36.20 ACRES PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E SS SS SSSSSSSSSSSSSSSS PROP. 4" DOM. SS SERVICE PROP 8"x8"x8" TEE 2-8" GV 1-8"x6" REDUCER 1-6" GV SS SS Wilmington International Airport PROPOSED HANGAR F (12,000 sf) SPRINKLED PROPOSED HANGAR G 12,000 sf BUILDING #1 PROPOSED CONTROLLED ACCESS GATE #1 HANGAR F OFFICE SPRINKLED PROPOSED CONTROLLED ACCESS GATE #2 HANGAR (12,000 SF) SS SS W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W PROP. 2" DOM WATER SERVICE SS SS SS SS 1-1/2" DOMESTIC WATER SERVICE SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS PROP. O/W/S SEPARATOR 1000 GAL (TYP) SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROP. 4" DOM. SS SERVICE PR O P . 4 " D O M . S E W E R S E R V I C E SSSSSSSSSSSS PROP. 4" SS SERVICE TO OWS PROP. 4" SS SERVICE TO OWS BUILDING 1 OFFICES/SCHOOL 14,830 SF W W PROP FDC PR O P . 1 4 7 . 4 2 ' 8 " P V C S S @ 0 . 5 0 % PR O P . 9 0 . 0 0 ' 8 " P V C S S @ 0 . 5 0 % SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS SS SSSSSSSSSS SSSSSSSS PROP. 2000 GAL GREASE TRAP EDDB EAST-1A EDDB EAST-1B PROP. MANUAL ENTRANCE GATE PROP FH 6" LEG PROP. 4" DOM. SS SERVICE PROP. MH 2 TOP = 20.70 PROP. O/W/S SEPARATOR 1000 GAL (TYP)SS SS FOREBAY FOREBAY X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X W W W W PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 3 PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR E PROPOSED8'x12' CONC. GENERATOR PAD HANGAR F PROPOSED8'x12' CONC. GENERATOR PAD BUILDING 1 PROP. 2-2" PVC CONDUITS PROP. 1-2" PVC CONDUIT PROP. 4"FIRE LINE TO FDC W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP. 8" RPDA BACKFLOW PREVENTER IN INSULATED HOTBOX PRO P . 6 " P V C C - 9 0 0 W A T E R L I N E PRO P . 2 " P V C C - 9 0 0 D O M E S T I C S E R V I C E W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP. 4" PVC C-900 DOM WATER SERVICE PROP. 1-1/2" DOM WATER SERVICE PROP. 6" C-900 FIRE LINE PROP. 4" PVC C-900 DOM WATER SERVICE PRO P . 1 . 5 " P V C C - 9 0 0 D O M . S E R V I C E PROP ILM PRIVATE UTILITY EASEMENT PROP ILM PRIVATE UTILITY EASEMENT PROPOSED 4" GV PROPOSED 6" GV PROPOSED 2" BLOWOFF HANGAR E OFFICE 3,570 SF PR O P . 6 " P V C C - 9 0 0 W A T E R L I N E KNOX LOCK REQUIRED ON GATE PROP. CO PROP. CO PROP. CO PROP. COPROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP.CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. 4" PVC C-900 FIRELINE PROP. 2" DOM WATER SERVICE PROPOSED 8' SECURITY FENCE (TYP) PROP. NCDOT STD GUARDRAIL PROPOSED 8' SECURITY FENCE (TYP) W W W W W W W W W W W W W W W W W W W W PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 8.0'x8.67' CONC. TRANSFORMER PAD PROPOSED 8.0'x8.67' CONC. TRANSFORMER PAD PROPOSED 8.0'x8.67' CONC. TRANSFORMER PAD PROPOSED5.5'x6.83' CONC. TRANSFORMER PAD PROPOSED 5.5'x6.83' CONC. TRANSFORMER PAD W W W W W W W W PROP FDC TO GSE BLDG W W W W W W W W PROP. 4" PVC C-900 FIRELINE TO FDC 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' Utility Plan North Side CS - 8Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT DEVELOPER: ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 MATCHLINE SHEET CS-7 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED 07/30/2025 Bart J. McClain WW SS SS W EE TT GG NOTE: BUILDING 3, HANGAR F, AND GSE TO BE SPRINKLED. NOTE: GATED ENTRANCES/EXITS (4) TO AIRPORT AREAS WILL HAVE KNOX LOCKS ON EXTERIOR SIDE OF GATES. KNOX BOX'S FOR BUILDINGS TO BE LOCATED ON OUTSIDE WALL NEXT TO THE RISER ROOM DOOR. UNDERGROUND UTILITY NOTE: UNDERGROUND UTILITY RELOCATIONS ARE TO BE COORDINATED BETWEEN THE CONTRACTOR AND THE INDIVIDUAL UTILITY COMPANIES. Existing Water and Sewer Utility Note: The existing water and sewer lines shown on this plan in blue and green are from approved ILM utility extension plans entitled 'Work Authorization 03 - ILM East Utility Expansion' by WK Dickson and approved by CFPUA on March 28, 2025. Existing Water Line by WK Dickson Existing Sewer Line by WK DicksonSSSSSSSSSS Proposed Water Line by CFCAWWWW Proposed Sewer Line by CFCASSSSSSSS UTILITY LEGEND ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 WATERFLOW6-24 6-24 X Wilmington International Airport Wilmington International Airport X X X X X PROP. JB 50 PROP.JB 51 PROP.MH 41A PROP. GI 73 PROP.GI 71 PROP. CB 70 PROP.SLOT DRAIN TOP 20.00 PROP. JB 64 BUILDING #3 PROPOSED 2-STORY FFE 19.25 PROPOSED HANGAR D FFE 21.00 PROPOSED HANGAR C FFE 21.00 PROPOSED HANGAR B FFE 21.00 PROPOSED HANGAR A FFE 21.00 PROP. END 57 PROP. JB 66 PROP.GI 65 PROP.JB 59 PROP.JB 58 PROP. JB 44 PROP.SLOT DRAIN TOP 20.10 PROP.SLOT DRAINTOP VARIES PROP.SLOT DRAIN TOP 20.10 PROP.SLOT DRAIN TOP 20.21 PROP. JB 56 END PIPE20A PROP. 30" HDPE PROP. ADSSLOT DRAINTOP 22.00 PROP. ADS SLOT DRAINTOP 22.10 PROP.SLOT DRAIN TOP VARIES PROP. JB 43 PROP. JB 46 PROP. SLOT DRAINTOP 20.21 PROP. GI 30B PROP. FES 30A PROP. FES 80INV 17.00 PROP. FESINV 13.00 PROP. FESINV 11.70 PROP.GI 47 PROP. SWALE140 LF PR O P . 3 6 " H D P E PR O P . 3 0 " H D P E PR O P . 3 0 " H D P E PR O P . 3 0 " H D P E PR O P . 2 4 " H D P E PR O P . 2 4 " H D P E PROP. 12" HDPE PRO P . 1 5 " H D P E PROP. 15" HDPE PROP.GI 21 PROP.GI 23 PROP. DI 34 PROP. RISER 37TOP 17.80 12" INV 15.00 18" INV 12.74 PROP. FES 1 PROP. RISER 1DTOP 16.50 12" INV 13.818" INV 13.8 PROP. GI 10 PROP. GI 11 PROP. GI 28 PROP.GI 27 PROP. GI 2 PROP.GI 24 PROP.MH 22 RUN W A Y 6 - 2 4 CEMETERYACCESS PROPOSED HANGAR 1 FFE 22.50 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 N. K E R R A V E N U E - S R 1 1 7 5 PROPOSED HANGAR 5 FFE 22.50 T A X I W A Y N O V E M B E R PROPOSED RETAININGWALL (1 0 0 ' P U B L I C R / W ) PROPOSED HANGAR 4 FFE 22.50 PROPOSED HANGAR 3 FFE 22.50 PROPOSED HANGAR 2 FFE 22.50 EXISTING GRASS PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A EDDB EAST-1A 162 LF GRASSED SWALE EAST-1B FROM EDDB EAST-1B EDDB EAST-1B 251 LF GRASSED SWALE EAST-1C FROM EDDB EAST-1C EDDB EAST-1C PROP. RISER 40BTOP 14.8512" INV 12.00 18" INV 10.60 PROP.FES 1A PROP.GI 1B PROP. FES 31 INV 9.5 PROP. ST MH 36 PROP.ST MH 35 PROP. CB 33 PROP.ST MH 32 PROP. FES 81INV 17.50 PROP.CB 9 PROP.CB 8 PROP.MH 3 PR O P . 2 4 " H D P E PROP.MH 4 PR O P . 2 4 " H D P E PROP. MH 5 PRO P . 2 4 " H D P E PROP.MH 6 PRO P . 1 8 " H D P E PROP.MH 7 PR O P . 1 5 " H D P E PROP.GI 25 P R O P . 2 4 " H D P E PR O P . 1 8 " H D P E PROP. 15" HDPE PROP. GI 29 PROP. 135.1 7 ' 1 2 " H D P E @ 0 . 5 0 % PROP.15" HDPE PROP. 77.00' 18" HDPE@ 0.65% PR O P . 1 8 " H D P E PROP. 18" RCP PROP. 18" HDPE PRO P . 1 8 " H D P E PROP.24" HDPE PROP. 84.56'18" RCP @ 1.54% PROP. 18" HDPE PROP.12" HDPE PROP.12" HDPE PROP . 4 2 " H D P E PRO P . 3 6 " H D P E PRO P . 2 4 " H D P E PROP . 1 8 " H D P E PROP . 1 5 " H D P E PRO P . 2 4 " H D P E PRO P . 2 4 " H D P E PROP . 3 0 " H D P E PRO P . 2 4 " H D P E PRO P . 1 2 " H D P E PROP. FES INV 18.65 PROP. FESINV 18.10 PROP. 81.22' 18" RCP @ 0.68% PROP. 12" HDPE PROP. 12" HDPE PROP. 22° BEND PROP. ADSSLOT DRAIN TOP 22.00 PROP. 12" HDPE PROP. 12" HDPE END PIPE22A PROP. 45°BEND PROP. ADS SLOT DRAINTOP 21.95 PROP. 12" HDPE PROP. 12" HDPE END PIPE 24A PROP. 22°BEND PROP. 90' SLOT DRAIN PROP. 90' SLOT DRAI N PROP. 100' SLOT DRAI N PROP. 90' SLOT DRAI N PROP. 70' SLOT DRAIN PROP. 80' SLOT DRAIN PROP. 70' SLOT DRAIN PROP. 70' SLOT DRAI N PROP. ADS SLOT DRAINTOP 22.00 PROP. ADSSLOT DRAIN TOP 21.95 PROP. ADSSLOT DRAINTOP 22.10 PROP. 60' SLOT DR A I N PROP. 60' SLOT DR A I N PROP. 90' SLOT DRAI N PROP. GI 26 PROP. SLOT DRAINTOP 21.25 END PIPE 25C PROP. PROP.FES 1C END PIPE 4A END PIPE5A END PIPE6A PROP.MH 20 PROP. FES 40AINV 10.30 PROP. END 74 PROP.JB 45D PROP.JB 45C PROP. JB 45B PRO P . 1 8 " H D P E PRO P . 1 5 " H D P E PRO P . 1 2 " H D P E PRO P . 1 8 " H D P E PROP . 1 5 " H D P E PROP.JB 58B PROP. 6' GAP NO SLOT DRAIN PROP. JB 45 PROP. JB 25B 12" HDPE PROP. 15" HDPE PROP. 18" HDPE PROP. JB 25A PROP. VEL DISS PROP.VEL DISS/ PROP.VEL DISS 21 22 21 2 1 21 21 21 21 18 12 11 10 10 ' T O P E L E V 1 6 . 0 3' T O P E L E V 1 2 . 0 20 20 20 20 20 17161514 18 10' T O P E L E V 1 8 . 0 17 16151413 13 14 15 1514 222120191817161514 22212019 22 22 22212019 21 22 22 21 20 21 20 22 22 22 22 2120 22 21 2221 20 20 20 19 17 18 19 20 12 20 20 20 20 20 20 20 19 18 17 16 15 1617 1819 20 13 14 15 16 16 1514 13 11 10 22 22 22 22 22 22 21 21 21 20 20 20 20 20 22 1817 161514 1716 15 2121201918 17 16 19 19 19 18 18 171819202122 22 2 2 21 12 1110 1011 1212 11 10 13 1415 1617 1819 20 1314 15 1617 1819 20 20 19 18 15 1617 1819 20 14 9101112121110 9101112 13 14 13 1212111 0 22 22 22 22 22 22 22 22 2222 22 2222 22 22 2222 22 23 23 23 23 23 23 23 2323 22 21 22 18 19 18 1716 21 22 22 22 22 22 21 21 21 2 2 22 22 22 22 22 PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAPNO SLOT DRAIN PROP. 6' GAPNO SLOT DRAIN PROP. 6' GAPNO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAPNO SLOT DRAIN PROP. 12" HDPE PROP. ADS SLOT DRAINTOP 22.00PROP. 6' GAPNO SLOT DRAIN ENDPIPE 2BINV 19.50 ENDPIPE 2A INV 18.50 PROP.18" RCP PROP.18" RCP PROP. 18" RCP PROP.18" RCP 20 PR O P . 2 4 " H D P E PRO P . 1 2 " H D P E 22 22 22 22 22 22 22 PROP. 6"Wx12"H CONC. CURBTOP 23.40 PROP.JB 61 PROP.SLOT DRAINTOP 19.71 PROP. JB 67 PRO P . 1 8 " H D P E PROP. 18" H D P E 20 20 20 19 19 20 20 20 20 2 0 20 20 20 20 20 20 20 PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) 10' T O P E L E V 2 0 . 0 PROP. 10' EMERGENCY SPILLWAY ELEV 17.0 Wilmington International Airport Wilmington International Airport PROPOSED GSE BLDG. FFE 21.00 PROPOSED HANGAR E FFE 21.00 PROPOSED HANGAR G FFE 21.20 PROPOSED HANGAR F FFE 21.20 HANGAR FFE 21.20 BUILDING #1 BUILDING 1 OFFICES/SCHOOL FFE 21.20 PROP.SLOT DRAINTOP 20.00 PROP. 1 8 " H D P E 20 21 21 21 21 21 21 21 19 PROP.SLOT DRAIN TOP 20.55 20 20 20 PRO P . 1 8 " H D P E PROP . 1 8 " H D P E PROP.GI 48 19 21 21 21 22 22 21 PROP. GI 45E PROP.JB 45A PR O P . 1 2 " H D P E PRO P . 1 2 " H D P E PROP . 2 4 " H D P E PROP. JB 58A PROP. 14'12" HDPE PROP. 2'FLUME W/ NEENAH COVER PROP.CB 41 PRO P . 4 2 " H D P E PRO P . 4 2 " H D P E 20 21 21 20 20 20 20 20 19 19 20 PROP. 2'FLUME W/NEENAH COVER 21 21 21 21 22 GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) PROPOSEDNCDOT STD GUARDRAIL PROP. 10'EMERGENCY SPILLWAYELEV 15.0 PROP. RAILROAD TIE CHECK DAM (TYP) PROP. 1 8 " H D P E PROP . 1 5 " H D P E PROP.CB 72 PROP. 81.22' 18" RCP @ 0.68% PROP. FESINV 18.10 PROP. FES INV 18.65 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROP. SECURITY FENCE PROP.CB 42 13 14 14 1 3 13 14 15 15 1413 FOREBAY PROP. 10' RIP-RAPSPILLWAY EL 14.0 PROP. 4' WIDE 1' TALLBERM FOR FLOW DIVERSION 16 15 14 16 15 14 PROP. 10' RIP-RAP SPILLWAY EL 15.0 FOREBAY 16 . 5 16 PROP. 10'RIP-RAP SPILLWAYEL 18.0 1716 18 15 . 5 15.5 1817 FOREBAY FOREBAY FOREBAY PROP. 10'RIP-RAP SPILLWAYEL 17.5 PROP. 10'RIP-RAP SPILLWAYEL 16.5 AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1A AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1C AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1C X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X PROPOSED8'x12' CONC.GENERATOR PADBUILDING 3 PROPOSED8'x12' CONC.GENERATOR PADHANGAR E PROPOSED8'x12' CONC.GENERATOR PADHANGAR F PROPOSED8'x12' CONC.GENERATOR PADBUILDING 1 PROP. BIKERACK PROP. FES 111INV 20.0 PROP. FES 110INV 19.0 TEMP. 127.77'15 HDPE @ 0.78 X X X X X X PROP.VEDLOCITY DISSIPATOR SEE CALCS PROP.FES 40 15 FOREBAY BOTTOM IS 6.6' ABOVE TOP OF SEWER PIPE 21 21 PROPOSED8' SECURITY FENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) PROPOSEDCONTROLLEDACCESS GATE #3 PROPOSED 8' SECURITYFENCE (TYP) PROPOSED8' SECURITY FENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED 8' SECURITYFENCE (TYP) 19 18 17 20 20 T.B.M. #1 PK Nail in asphalt at the intersection of N Kerr Ave and Morris Road Elev. 21.34 PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG WATERSHED = SMITH CREEK RIVER BASIN = CAPE FEAR 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Overall Grading Plan CS - 9Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 07/30/2025 Bart J. McClain T.B.M. #2 New Nail set ±500' west of the intersection of N Kerr Ave and Morris Road on north side. Elev. 22.63 ARQ - ILM East Side Development NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. NOTE: FOR 50 SCALE GRADING/DRAINAGE BLOWUPS, SEE SHEETS CS-10 AND CS-11 THIS SET DISTURBED AREA NOTE: FOR DENUDED AREA, SEE STAGE 1C EROSION CONTROL SHEET CS-15 DENUDED AREA = 29.08 AC OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X X X X X X X X X X X X END PIPE 20A PROP. 30" HDPE PROP. ADS SLOT DRAIN TOP 22.00 PROP. ADS SLOT DRAIN TOP 22.10 PROP. FES 80 INV 17.00 PROP. SWALE 140 LF PR O P . 3 6 " H D P E PR O P . 3 0 " H D P E P R O P . 3 0 " H D P E PR O P . 3 0 " H D P E P R O P . 2 4 " H D P E PR O P . 2 4 " H D P E PROP. 12" HDPE PR O P . 1 5 " H D P E PROP. 15" HDPE PROP. GI 21 PROP. GI 23 PROP. FES 1 PROP. RISER 1D TOP 16.50 12" INV 13.8 18" INV 13.8 PROP. GI 10 PROP. GI 11 PROP. GI 28 PROP. GI 27 PROP. GI 2 PROP. GI 24 PROP. MH 22 PROPOSED HANGAR 1 FFE 22.50 N. K E R R A V E N U E - S R 1 1 7 5 PROPOSED HANGAR 5 FFE 22.50 (1 0 0 ' P U B L I C R / W ) PROPOSED HANGAR 4 FFE 22.50 PROPOSED HANGAR 3 FFE 22.50 PROPOSED HANGAR 2 FFE 22.50 EXISTING GRASS PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES 251 LF GRASSED SWALE EAST-1C FROM EDDB EAST-1C EDDB EAST-1C PROP. FES 1A PROP. GI 1B PROP. FES 81 INV 17.50 PROP. CB 9 PROP. CB 8 PROP. MH 3 PR O P . 2 4 " H D P E PROP. MH 4 PR O P . 2 4 " H D P E PROP. MH 5 PR O P . 2 4 " H D P E PROP. MH 6 PR O P . 1 8 " H D P E PROP. MH 7 PR O P . 1 5 " H D P E PROP. GI 25 P R O P . 2 4 " H D P E PR O P . 1 8 " H D P E PROP. 15" HDPE PROP. GI 29 PROP. 135. 1 7 ' 1 2 " H D P E @ 0 . 5 0 % PROP. 15" HDPE PROP. 77.00' 18" HDPE @ 0.65% PROP. FES INV 18.65 PROP. FES INV 18.10 PROP. 81.22' 18" RCP @ 0.68% PROP. 12" HDPE PROP. 12" HDPE PROP. 22° BEND PROP. ADS SLOT DRAIN TOP 22.00 PROP. 12" HDPE PROP. 12" HDPE END PIPE 22A PROP. 45° BEND PROP. ADS SLOT DRAIN TOP 21.95 PROP. 12" HDPE PROP. 12" HDPE END PIPE 24A PROP. 22° BEND PROP. 90' SLOT D R A I N PROP. 90' SLOT D R A I N PROP. 100' SLOT D R A I N PROP. 90' SLOT D R A I N PROP. 70' SLOT D R A I N PROP. 80' SLOT D R A I N PROP. 70' SLOT D R A I N PROP. 70' SLOT D R A I N PROP. ADS SLOT DRAIN TOP 22.00 PROP. ADS SLOT DRAIN TOP 21.95 PROP. ADS SLOT DRAIN TOP 22.10 PROP. 60' SLOT D R A I N PROP. 60' SLOT D R A I N PROP. 90' SLOT D R A I N PROP. GI 26 PROP. SLOT DRAIN TOP 21.25 END PIPE 25C PROP. PROP. FES 1C END PIPE 4A END PIPE 5A END PIPE 6A PROP. MH 20 PROP. JB 25B 12" HDPE PROP. 15" HDPE PROP. 18" HDPE PROP. JB 25A PROP. VEL DISS/ PROP. VEL DISS 1817161514 18 10 ' T O P E L E V 1 8 . 0 17 16 15 14 13 13 14 15 15 14 2221201918 17 161514 222120 19 22 2 2 22212019 21 22 22 21 20 21 22 22 22 22 2120 22 21 22 21 22 22 22 22 22 22 21 22 1817 161514 2121201918 17 16 171819202122 22 2 2 21 22 22 22 22 22 22 22 22 2 2 22 22 2222 22 22 22 22 22 23 23 23 23 23 23 23 23 23 22 21 22 22 22 22 22 22 21 21 21 2 2 22 22 22 22 22 PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 12" HDPE PROP. ADS SLOT DRAIN TOP 22.00PROP. 6' GAP NO SLOT DRAIN END PIPE 2B INV 19.50 END PIPE 2A INV 18.50 X X X X X X X X PROP. 18" RCP PROP. 18" RCP X X X22 22 22 22 22 22 22 PROP. 6"Wx12"H CONC. CURB TOP 23.40 PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) 10 ' T O P E L E V 2 0 . 0 PROP. 10' EMERGENCY SPILLWAY ELEV 17.0 X X X X X X X X X X X X X X X X X X X 22 2 2 2 1 PROP. 14' 12" HDPE 20 20 20 20 1 9 19 20 PROP. 2' FLUME W/ NEENAH COVER 21 21 21 21 2 2 16 15 14 16 15 14 PROP. 10' RIP-RAP SPILLWAY EL 15.0 FOREBAY 16 . 5 1 6 PROP. 10' RIP-RAP SPILLWAY EL 18.0 FOREBAY FOREBAY PROP. 10' RIP-RAP SPILLWAY EL 17.5 AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1C AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1C X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX PROP. FES 111 INV 20.0 PROP. FES 110 INV 19.0 TEMP. 127.77' 15 HDPE @ 0.78 X X X XXXXXXXXX X X X XXXXXXXXX FOREBAY BOTTOM IS 6.6' ABOVE TOP OF SEWER PIPE PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' Grading / Drainage Plan South Side CS - 10Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 07/30/2025 Bart J. McClain July 30, 2025 ARQ - ILM East Side Development MATCHLINE SHEET CS-11 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. T.B.M. #1 PK Nail in asphalt at the intersection of N Kerr Ave and Morris Road Elev. 21.34 WW SS SS W EE TT GG WATERSHED = SMITH CREEK DENUDED AREA: 29.08 Ac. RIVER BASIN = CAPE FEAR T.B.M. #2 New Nail set ±500' west of the intersection of N Kerr Ave and Morris Road on north side. Elev. 22.63 DISTURBED AREA NOTE: FOR DENUDED AREA, SEE STAGE 1C EROSION CONTROL SHEET CS-15 OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 WATERFLOW X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport W W W X X X X X X X X PROP. JB 50 PROP. JB 51 PROP. MH 41A PROP. GI 73 PROP. GI 71 PROP. CB 70 PROP. SLOT DRAIN TOP 20.00 PROP. JB 64 BUILDING #3 PROPOSED 2-STORY FFE 19.25 PROPOSED HANGAR D FFE 21.00 PROPOSED HANGAR C FFE 21.00 PROPOSED HANGAR B FFE 21.00 PROPOSED HANGAR A FFE 21.00 PROP. END 57 PROP. JB 66 PROP. GI 65 PROP. JB 59 PROP. JB 58 PROP. JB 44 PROP. SLOT DRAIN TOP 20.10 PROP. SLOT DRAIN TOP VARIES PROP. SLOT DRAIN TOP 20.10 PROP. SLOT DRAIN TOP 20.21 PROP. JB 56 PROP. SLOT DRAIN TOP VARIES PROP. JB 43 PROP. JB 46 PROP. SLOT DRAIN TOP 20.21 PROP. GI 30B PROP. FES 30A PROP. FES INV 13.00 PROP. FES INV 11.70 PROP. GI 47 PROP. DI 34 PROP. RISER 37 TOP 17.80 12" INV 15.00 18" INV 12.74 CEMETERY ACCESS (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 T A X I W A Y N O V E M B E R PROPOSED RETAINING WALL EXISTING 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A EDDB EAST-1A 162 LF GRASSED SWALE EAST-1B FROM EDDB EAST-1B EDDB EAST-1B PROP. RISER 40B TOP 14.85 12" INV 12.00 18" INV 10.60 PROP. FES 31 INV 9.5 PROP. ST MH 36 PROP. ST MH 35 PROP. CB 33 PROP. ST MH 32 PR O P . 1 8 " H D P E PROP. 18" RCP PROP. 18" HDPE PR O P . 1 8 " H D P E PROP. 24" HDPE PROP. 84.56' 18" RCP @ 1.54% PROP. 18" HDPE PROP. 12" HDPE PROP. 12" HDPE PROP . 4 2 " H D P E PR O P . 3 6 " H D P E PRO P . 2 4 " H D P E PRO P . 1 8 " H D P E PRO P . 1 5 " H D P E PRO P . 2 4 " H D P E PRO P . 2 4 " H D P E PRO P . 3 0 " H D P E PR O P . 2 4 " H D P E PR O P . 1 2 " H D P E PROP. FES 40A INV 10.30 PROP. END 74 PROP. JB 45D PROP. JB 45C PROP. JB 45B PR O P . 1 8 " H D P E PR O P . 1 5 " H D P E PRO P . 1 2 " H D P E PR O P . 1 8 " H D P E PRO P . 1 5 " H D P E PROP. JB 58B PROP. 6' GAP NO SLOT DRAIN PROP. JB 45 PROP. VEL DISS 21 22 2 1 2 1 21 21 21 21 12 11 10 10 ' T O P E L E V 1 6 . 0 3' T O P E L E V 1 2 . 0 20 20 20 20 20 20 20 20 20 19 17 18 19 20 1 2 20 20 20 20 20 20 20 19 18 17 16 15 1617 1819 20 13 14 15 16 16 15 14 13 11 10 21 21 2 0 20 20 20 20 1716 15 19 19 19 1 8 18 12 11 10 10 11 12 12 11 10 13 1415 1617 1819 20 1314 15 1617 1819 20 20 19 18 15 1617 1819 20 14 9101112121110 9101112 13 14 13 1 2 12 111 0 18 19 18 17 16 21 PROP. 6' GAP NO SLOT DRAIN PROP. 6' GAP NO SLOT DRAIN PROP. 18" RCP PROP. 18" RCP 20 PR O P . 2 4 " H D P E PRO P . 1 2 " H D P E PROP. JB 61 PROP. SLOT DRAIN TOP 19.71 PROP. JB 67 PRO P . 1 8 " H D P E PROP. 18" H D P E 20 20 20 19 19 20 20 20 20 2 0 20 20 20 20 20 20 20 PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) 10 ' T O P E L E V 2 0 . 0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport PROPOSED GSE BLDG. FFE 21.00 PROPOSED HANGAR E FFE 21.00 PROPOSED HANGAR G FFE 21.20 PROPOSED HANGAR F FFE 21.20 HANGAR FFE 21.20 BUILDING #1 BUILDING 1 OFFICES/SCHOOL FFE 21.20 PROP. SLOT DRAIN TOP 20.00 PR O P . 1 8 " H D P E 20 21 21 21 21 21 21 21 19 PROP. SLOT DRAIN TOP 20.55 20 20 20 PR O P . 1 8 " H D P E PRO P . 1 8 " H D P E PROP. GI 48 19 21 2 1 21 PROP. GI 45E PROP. JB 45A PR O P . 1 2 " H D P E PR O P . 1 2 " H D P E PRO P . 2 4 " H D P E PROP. JB 58A PROP. 2' FLUME W/ NEENAH COVER PROP. CB 41 PR O P . 4 2 " H D P E PRO P . 4 2 " H D P E 21 21 20 2 0 GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) X X X X X X X X X PROPOSED NCDOT STD GUARDRAIL PROP. 10' EMERGENCY SPILLWAY ELEV 15.0 PROP. RAILROAD TIE CHECK DAM (TYP) PR O P . 1 8 " H D P E PRO P . 1 5 " H D P E PROP. CB 72 PROP. CB 42 1 3 1 4 1 4 1 3 1 3 1 4 1 5 1 5 1 4 1 3 FOREBAY PROP. 10' RIP-RAP SPILLWAY EL 14.0 PROP. 4' WIDE 1' TALL BERM FOR FLOW DIVERSION 1716 18 1 5 . 5 15.5 18 17 FOREBAY PROP. 10' RIP-RAP SPILLWAY EL 16.5 AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1A PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 3 PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR E PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR F PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 1 PROP. BIKE RACK PROP. VEDLOCITY DISSIPATOR SEE CALCS PROP. FES 40 15 21 21 PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED CONTROLLED ACCESS GATE #3 PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) 19 18 17 20 20 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' CS - 11Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, CFPUA, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS.T.B.M. #1 PK Nail in asphalt at the intersection of N Kerr Ave and Morris Road Elev. 21.34 WW SS SS W EE TT GG WATERSHED = SMITH CREEK DENUDED AREA: 29.08 Ac. RIVER BASIN = CAPE FEAR T.B.M. #2 New Nail set ±500' west of the intersection of N Kerr Ave and Morris Road on north side. Elev. 22.63 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ - ILM East Side Development Grading / Drainage Plan North Side MATCHLINE SHEET CS-10 DISTURBED AREA NOTE: FOR DENUDED AREA, SEE STAGE 1C EROSION CONTROL SHEET CS-15 OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 6-24 6-24 Wilmington International Airport Wilmington International Airport PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES X X X XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 162 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1B PERMANENT RISER/SKIMMER BASIN #1 BOTTOM EL = 12.00 PROPOSED COMBINATIONSILT/TREE PROTECTIONFENCE T A X I W A Y N O V E M B E R N. K E R R A V E N U E - S R 1 1 7 5 (1 0 0 ' P U B L I C R / W ) RUN W A Y 6 - 2 4 PROP. FES 30A PROP. GI 30B PROPOSEDCOMBINATION SILT/TREE PROTECTIONFENCE PROPOSED COMBINATIONSILT/TREE PROTECTION FENCE PROPOSEDDISTURBED AREA (TYP) PROPOSED COMBINATIONSILT/TREE PROTECTION FENCE PROPOSEDDISTURBEDAREA (TYP) X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXX X X X RELOCATED FENCE 2'INSIDE R/W DURING CONSTRUCTION ONLY.EXISTING FENCE TO BERELOCATED TO 2' INSIDE R/W DURINGCONSTRUCTION ONLY. PROP. FES 31 INV 9.5 PROP.18" HDPE PROP. ST MH 32 PROP SILT FENCE PROP TREE PROTECTION FENCE PROP SILT FENCE1' INSIDE R/W PROP SILT FENCE1' INSIDE R/W PROPSILT FENCE 1' INSIDE R/W PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PROP. 18" HDPE PROPSILT FENCE XXX X X XX X PROP SILT FENCE PROPSILT FENCE PROPSILT FENCE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport XXXXXXX X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX PROP. MANUALENTRANCE GATE PROP. MANUAL ENTRANCE GATE PROP TEMPORARYGRAVEL CONSTRUCTIONENTRANCE #2 PROP TEMPORARY GRAVEL CONSTRUCTIONENTRANCE #1 EXISTING HANGAREMPLOYEE PARKING TEMP. 6' CHAINLINK FENCE TEMP. 20' GRAVELCONSTRUCTION & EMPLOYEE ENTRANCE X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXX X X X X X X X XXXXXXXX XX X X XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 15 1617 18 14 9101112121110 9101112 13 1212111 0 20 20 19 18 17 16 11 10 PROP SILTFENCE OUTLET PROP SILT FENCE PROP TREE PROTECTIONFENCE TEMP. VEHICLE ACCESS FOR PROPOSED 6" SOLID WHITE LINEWITH 4' BLACK OUTLINE 14' OFF EXISTING EDGE OF PAVEMENTFOR TEMPORARY VEHICLE LANEALONG ENTIRE PAVEMENT ROUTE TO EXISTING DOUBLE YELLOWLINE AT TWY NOVEMBER TERMINATION. PROPOSED DISTURBED AREA (TYP) PROPOSEDDISTURBED AREA (TYP) PROPOSED DISTURBEDAREA (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) PROP. 84.56' 18" RCP @ 1.54% PROP. DIVERSION DITCH #4 138 LF PROP. DIVERSION DITCH #1 236 LF PROP. DIVERSIONDITCH #2 211 LF PROP. SLOPEDRAIN (TYP) PROP. SLOPE DRAIN (TYP) PROP. SLOPE DRAIN (TYP) TEMPORARY 18" RISER BARREL TEMPORARY 24" PERFORATED CMP RISERBOTTOM 210 TOP 214 PROPOSED BAFFLES (TYP) PROP. DIVERSION DITCH #3 204 LF PROP. 81.22' 18" RCP @ 0.68% PROP. FESINV 18.10 PROP. FES INV 18.65 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROP. SECURITY FENC E LAYDOWN STAGING AREA LAYDOWN STAGING AREA PROPOSED SKIMMER(TYP) TEMPORARY SEDIMENT BASIN #2 WITH SKIMMER BOTTOM EL = 12.00 PROP. 10' EMERGENCYSPILLWAY ELEV 14.0 TEMP. 6' CHAINLINK FENCE 39 . 5 ' X X X X X X X X X X X X X X X X X X X X X X X PROP. MANUALENTRANCE GATE PROP. BIKERACK PROPROCK CHECKDAM 100' OC PROP ROCKCHECK DAM 100' OC PROP ROCKCHECK DAM 100' OC PROPROCK CHECKDAM 100' OC PROPOSED CONSTRUCTIONENTRANCE ACCESS GATE TO BE INSTALLED IN THIS AREA PROP FDC TO GSE BLDG 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 07/30/2025 Bart J. McClain 1" = 100' Stage 1A Overall Erosion Control Plan CS - 12 July 30, 2025 DEVELOPER: 0'100'200'300' GRAPHIC SCALE (IN FEET) 1 INCH = 100 FT ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. RIVER BASIN: CAPE FEAR SMITH CREEK: CLASS-C;Sw DISTURBED AREA 29.08 ACRES PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED NPDES GROUND STABILIZATION CHART NOTE: PRIOR TO START OF EARTHWORK, THE CONTRACTOR MUST NOTIFY NCDENR STAFF AS TO THE SOURCE OF PROPOSED FILL MATERIAL. ANY & ALL FILL MUST BE FROM A DULY PERMITTED SITE. NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion-control devices or structures. In any event, slopes left exposed will, within 7 and 14 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. Erosion Control Matting: All erosion control matting to be ROLLMAX EroNet S75 Erosion Control Blanket or equal. EROSION NOTES: 1. No land disturbing activities, including timbering or demolition activities, are allowed without first obtaining a sediment and erosion control plan approval and Certificate of Coverage. 2. Contractor to contact DEMLR Wilmington Regional Office at least 48 hours prior to commencing the land-disturbing activity. The contact number is (910)-796-7215. 3. Per NPDES requirements, a rain gauge, self-inspections records, permit, Certificate of Coverage, and S&E plan are required to be maintained on site and accessible during inspection. It is recommended that these items be placed in a permits box at the beginning or entrance of project. 4. Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring. Basin Emergency Spillway: All basin emergency spillways to be 50 MIL heavy duty silver tarpaulins or equivalent for UV resistance. STAGE 1 EROSION CONTROL QUANTITIES: TEMP CONSTRUCTION ENTRANCE 2 RISER/SKIMMER BASIN 2 (1 & 2) SKIMMER BASIN 0 SILT FENCE 3,266 DIVERSION DITCH 789 LF DIVERSION DITCH (CLEAN WATER)0 LF ROCK CHECK DAM 11 SLOPE DRAIN (DIV DITCH BASIN INLETS)2 GRAVEL INLET PROTECTION 6 SILT SACK 0SITE NOTES: 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS AND DETAILS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES. 3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THIS SITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018. 4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TO THE CONTRACTOR UPON THEIR REQUEST. 5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BY MATRIX EAST, PLLC . ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X CONSTRUCTION SEQUENCE NOTE: FOR STAGE 1A CONSTRUCTION SEQUENCE, SEE SHEET CS-26 THIS SET. Wilmington International Airport W W W PROJECT AREA 36.20 ACRES 162 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1B PERMANENT RISER/SKIMMER BASIN #1 BOTTOM EL = 12.00 PROPOSED COMBINATION SILT/TREE PROTECTION FENCE N. K E R R A V E N U E - S R 1 1 7 5 (1 0 0 ' P U B L I C R / W ) PROP. FES 30A PROP. GI 30B PROPOSED COMBINATION SILT/TREE PROTECTION FENCE PROPOSED COMBINATION SILT/TREE PROTECTION FENCE PROPOSED DISTURBED AREA (TYP) PROPOSED COMBINATION SILT/TREE PROTECTION FENCE PROPOSED DISTURBED AREA (TYP) X X X X X X X X X X XXXXXXXXXXXXXXXXXXX X X X X X X RELOCATED FENCE 2' INSIDE R/W DURING CONSTRUCTION ONLY. EXISTING FENCE TO BE RELOCATED TO 2' INSIDE R/W DURING CONSTRUCTION ONLY. PROP. FES 31 INV 9.5 PROP. 18" HDPE PROP. ST MH 32 PROP SILT FENCE PROP TREE PROTECTION FENCE PROP SILT FENCE 1' INSIDE R/W PROP SILT FENCE 1' INSIDE R/W PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PROP. 18" HDPE PROP SILT FENCE X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport PROP. MANUAL ENTRANCE GATE PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE #1 X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X XXXXXXX X X X X XXXXXX X X X X X X X X X X X X X X X X X X X 15 1617 18 14 9101112121110 9101112 13 1 2121 1 1 0 20 20 19 18 17 16 11 10 PROPOSED DISTURBED AREA (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) PROP. 84.56' 18" RCP @ 1.54% PROP. DIVERSION DITCH #4 138 LF PROP. DIVERSION DITCH #1 236 LF PROP. DIVERSION DITCH #2 211 LF PROP. SLOPE DRAIN (TYP) PROP. SLOPE DRAIN (TYP) PROP. SLOPE DRAIN (TYP) TEMPORARY 18" RISER BARREL TEMPORARY 24" PERFORATED CMP RISER BOTTOM 210 TOP 214 PROPOSED BAFFLES (TYP) PROP. DIVERSION DITCH #3 204 LF LAYDOWN STAGING AREA PROPOSED SKIMMER (TYP) TEMPORARY SEDIMENT BASIN #2 WITH SKIMMER BOTTOM EL = 12.00 PROP. 10' EMERGENCY SPILLWAY ELEV 14.0 PROP. BIKE RACK PROP ROCK CHECK DAM 100' OC PROPOSED CONSTRUCTION ENTRANCE ACCESS GATE TO BE INSTALLED IN THIS AREA PROP FDC TO GSE BLDG 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' CS - 13Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 July 30, 2025 07/30/2025 Bart J. McClain ARQ - ILM East Side Development Stage 1A Erosion Control Plan NPDES GROUND STABILIZATION CHART Erosion Control Matting: All erosion control matting to be ROLLMAX EroNet S75 Erosion Control Blanket or equal. Basin Emergency Spillway: All basin emergency spillways to be 50 MIL heavy duty silver tarpaulins or equivalent for UV resistance. NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. RIVER BASIN: CAPE FEAR SMITH CREEK: CLASS-C;Sw DISTURBED AREA 29.08 ACRES EROSION NOTES: 1. No land disturbing activities, including timbering or demolition activities, are allowed without first obtaining a sediment and erosion control plan approval and Certificate of Coverage. 2. Contractor to contact DEMLR Wilmington Regional Office at least 48 hours prior to commencing the land-disturbing activity. The contact number is (910)-796-7215. 3. Per NPDES requirements, a rain gauge, self-inspections records, permit, Certificate of Coverage, and S&E plan are required to be maintained on site and accessible during inspection. It is recommended that these items be placed in a permits box at the beginning or entrance of project. 4. Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring. NOTE: PRIOR TO START OF EARTHWORK, THE CONTRACTOR MUST NOTIFY NCDENR STAFF AS TO THE SOURCE OF PROPOSED FILL MATERIAL. ANY & ALL FILL MUST BE FROM A DULY PERMITTED SITE. NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion-control devices or structures. In any event, slopes left exposed will, within 7 and 14 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X CONSTRUCTION SEQUENCE NOTE: FOR STAGE 1A CONSTRUCTION SEQUENCE, SEE SHEET CS-26 THIS SET. Wilmington International Airport W W W PROJECT AREA 36.20 ACRES X X X X X X X X X X XXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport PROP. MANUAL ENTRANCE GATE X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X X X X X X XXXXXXX X X X X XXXXXX X X X X X X X X X X X X X X X X X X X 15 1617 18 14 9101112121110 9101112 13 1 2121 1 1 0 20 20 19 18 17 16 11 10 PROP. BIKE RACK PROP. ST MH 32 PROP. 15' GRAVEL ACCESS DRIVE PROP. MH 41A PROPOSED PERMANENT 8' SECURITY FENCE (TYP) PROP ROCK CHECK DAM 100' OC PROP. 10' EMERGENCY SPILLWAY ELEV 14.0 TEMPORARY SEDIMENT BASIN #2 WITH SKIMMER BOTTOM EL = 12.00 PROPOSED SKIMMER (TYP) LAYDOWN STAGING AREA PROP. DIVERSION DITCH #3 204 LF PROPOSED BAFFLES (TYP) TEMPORARY 24" PERFORATED CMP RISER BOTTOM 210 TOP 214 TEMPORARY 18" RISER BARREL PROP. SLOPE DRAIN (TYP) PROP. SLOPE DRAIN (TYP) PROP. SLOPE DRAIN (TYP) PROP. DIVERSION DITCH #2 211 LF PROP. DIVERSION DITCH #1 236 LF PROP. DIVERSION DITCH #4 150 LF PROP. 84.56' 18" RCP @ 1.54% PROP. RAILROAD TIE CHECK DAM (TYP) PRO P . 1 5 " H D P E PR O P . 4 2 " H D P E PROP. MH 41A PRO P . 1 8 " H D P E PROP. 10' EMERGENCY SPILLWAY ELEV 15.0 PROP. FES 40 PROPOSED DISTURBED AREA (TYP) PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE #1 PROP SILT FENCE PROP. 18" RCP PROP. 18" HDPE PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PROP SILT FENCE 1' INSIDE R/W PROP SILT FENCE 1' INSIDE R/W PROP TREE PROTECTION FENCE PROP SILT FENCE PROP. 18" HDPE EXISTING FENCE TO BE RELOCATED TO 2' INSIDE R/W DURING CONSTRUCTION ONLY. RELOCATED FENCE 2' INSIDE R/W DURING CONSTRUCTION ONLY. PROPOSED DISTURBED AREA (TYP) PROPOSED DISTURBED AREA (TYP) PROPOSED COMBINATION SILT/TREE PROTECTION FENCE PROPOSED COMBINATION SILT/TREE PROTECTION FENCEPROPOSED SKIMMER (TYP) PROPOSED BAFFLES (TYP) PROP. GI 30B PROP. FES 30A (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A PERMANENT RISER/SKIMMER BASIN #1 BOTTOM EL = 12.00 PROP. RISER 40B TOP 14.77 12" INV 12.77 18" INV 10.60 PROP. FES 40A INV 10.30 PROP. 4.75'/1' SLOPE TO EX. BASIN DAM ELEV. 16.0 PROP. CB 41 PROP. CB 70 PROP. CB 72 PROPOSED NCDOT STD GUARDRAIL PROPOSED RETAINING WALL PROP. ST MH 32 PROP. FES 31 INV 9.5 PROPOSED COMBINATION SILT/TREE PROTECTION FENCE PROPOSED COMBINATION SILT/TREE PROTECTION FENCE 162 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1B PROP FDC TO GSE BLDG 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 50' CS - 14Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 Stage 1B Erosion Control Plan July 30, 2025 07/30/2025 Bart J. McClain ARQ - ILM East Side Development 0'50'100'150' GRAPHIC SCALE (IN FEET) 1 INCH = 50 FT NPDES GROUND STABILIZATION CHART Erosion Control Matting: All erosion control matting to be ROLLMAX EroNet S75 Erosion Control Blanket or equal. Basin Emergency Spillway: All basin emergency spillways to be 50 MIL heavy duty silver tarpaulins or equivalent for UV resistance. NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. RIVER BASIN: CAPE FEAR SMITH CREEK: CLASS-C;Sw DISTURBED AREA 29.08 ACRES EROSION NOTES: 1. No land disturbing activities, including timbering or demolition activities, are allowed without first obtaining a sediment and erosion control plan approval and Certificate of Coverage. 2. Contractor to contact DEMLR Wilmington Regional Office at least 48 hours prior to commencing the land-disturbing activity. The contact number is (910)-796-7215. 3. Per NPDES requirements, a rain gauge, self-inspections records, permit, Certificate of Coverage, and S&E plan are required to be maintained on site and accessible during inspection. It is recommended that these items be placed in a permits box at the beginning or entrance of project. 4. Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring. X X NOTE: PRIOR TO START OF EARTHWORK, THE CONTRACTOR MUST NOTIFY NCDENR STAFF AS TO THE SOURCE OF PROPOSED FILL MATERIAL. ANY & ALL FILL MUST BE FROM A DULY PERMITTED SITE. NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion-control devices or structures. In any event, slopes left exposed will, within 7 and 14 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 CONSTRUCTION SEQUENCE NOTE: FOR STAGE 1B CONSTRUCTION SEQUENCE, SEE SHEET CS-26 THIS SET. 6-24 6-24 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES PROJECT AREA 36.20 ACRES X X X XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PROP.GI 1B PROP. FES 1A 251 LF GRASSED SWALE EAST-1C FROM EDDB EAST-1C X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXX X X X PROP.18" RCPXXX X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport XXXXXXX X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX PROP. MANUAL ENTRANCE GATE X X X X X X X X X X X X X X X X X X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXX X X X X X X X XXXXXXXX XX X X XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PROP.CB 70 PROP. 81.22' 18" RCP @ 0.68% PROP. FESINV 18.10 PROP. FES INV 18.65 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROP. SECURITY FENC E PROP. FES 40A INV 10.30 PROP.18" HDPE PROP. 18" HDPE PROP.18" RCP PR O P . 1 8 " H D P E PROP.JB 33 PROP. ST MH 35 PROP.ST MH 37 PROP. RISER 40B TOP 14.7712" INV 12.77 18" INV 10.60 162 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1B PERMANENT RISER/SKIMMER BASIN #1 BOTTOM EL = 9.00 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A PROPOSED COMBINATIONSILT/TREE PROTECTIONFENCE T A X I W A Y N O V E M B E R N. K E R R A V E N U E - S R 1 1 7 5 (1 0 0 ' P U B L I C R / W ) RUN W A Y 6 - 2 4 PROP. RISER 38TOP 17.80 12" INV 16.0018" INV 12.38 PROP.DI 34 PROP. FES 30A PROP. GI 30B PERMANENT RISER/SKIMMER BASIN #3 BOTTOM EL = 14.00 PROPOSED BAFFLES (TYP) PROPOSED BAFFLES (TYP) PROPOSED SKIMMER (TYP) PROPOSED SKIMMER (TYP) PROPOSEDCOMBINATION SILT/TREE PROTECTIONFENCE PROPOSEDCOMBINATIONSILT/TREE PROTECTION FENCE PROPOSEDDISTURBED AREA (TYP) PROPOSED COMBINATIONSILT/TREE PROTECTION FENCE PROPOSEDDISTURBEDAREA (TYP) RELOCATED FENCE 2'INSIDE R/W DURING CONSTRUCTION ONLY.EXISTING FENCE TO BERELOCATED TO 2' INSIDE R/W DURINGCONSTRUCTION ONLY. PROP. FES 31 INV 9.5 PROP. 18" HDPE PROP.ST MH 32 PROP SILT FENCE PROP TREE PROTECTION FENCE PROP SILT FENCE 1' INSIDE R/W PROP SILT FENCE1' INSIDE R/W PROPSILT FENCE 1' INSIDE R/W PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PROP. 18" HDPE PROP.18" RCP PROPSILT FENCE PROP SILT FENCE END PROPSILT FENCE & BEGIN COMBINATION SILT AND TREE PROTECTION FENCE PROPOSED COMBINATIONSILT AND TREE PROTECTION FENCE PROPOSED COMBINATION SILT AND TREE PROTECTIONFENCE PROP SILT FENCE PROPSILT FENCE PROPSILT FENCE PROP TEMPORARYGRAVEL CONSTRUCTIONENTRANCE PROP TEMPORARYGRAVEL CONSTRUCTIONENTRANCE PROP TEMPORARY GRAVEL CONSTRUCTIONENTRANCE PROPOSEDRETAINING WALL X X X X X TEMP. 6' CHAINLINK FENCE 39 . 5 ' X X X X X X X X X X X X X X X X X X X X X X X PROP. MANUALENTRANCE GATE PROP. BIKERACK PROP. 10' EMERGENCYSPILLWAY ELEV 14.0 TEMPORARY SEDIMENT BASIN #2 WITH SKIMMER BOTTOM EL = 12.00 PROPOSED SKIMMER(TYP) LAYDOWN STAGING AREA PROP. DIVERSION DITCH #3 204 LF PROPOSED BAFFLES (TYP) TEMPORARY 24" PERFORATED CMP RISERBOTTOM 210 TOP 214 TEMPORARY 18" RISER BARREL PROP. SLOPE DRAIN (TYP) PROP. SLOPE DRAIN (TYP) PROP. SLOPEDRAIN (TYP) PROP. DIVERSIONDITCH #2 211 LF PROP. DIVERSION DITCH #1 236 LF PROP. DIVERSION DITCH #4 283 LF PROP. 84.56' 18" RCP @ 1.54% PROP. RAILROAD TIE CHECK DAM (TYP) PROP.CB 72 PROP . 1 5 " H D P E PROPOSEDNCDOT STDGUARDRAIL PRO P . 4 2 " H D P E PROP.MH 42 PROP.CB 41 PROP.CB 70 PROP. 1 8 " H D P E PROP. 10'EMERGENCY SPILLWAYELEV 15.0 PROP. FES 41 PROPOSED DISTURBEDAREA (TYP) PROPOSEDDISTURBED AREA (TYP) PROPOSED DISTURBED AREA (TYP) PROPOSED 6" SOLID WHITE LINEWITH 4' BLACK OUTLINE 14' OFF EXISTING EDGE OF PAVEMENTFOR TEMPORARY VEHICLE LANEALONG ENTIRE PAVEMENT ROUTE TO EXISTING DOUBLE YELLOWLINE AT TWY NOVEMBER TERMINATION. TEMP. VEHICLE ACCESS FOR PROP TREE PROTECTIONFENCE PROP SILT FENCE PROP SILTFENCE OUTLET TEMP. 20' GRAVELCONSTRUCTION & EMPLOYEE ENTRANCE TEMP. 6' CHAINLINK FENCE EXISTING HANGAREMPLOYEE PARKING PROPOSEDRETAINING WALL PROP TEMPORARY GRAVEL CONSTRUCTIONENTRANCE #1 PROP TEMPORARYGRAVEL CONSTRUCTIONENTRANCE #2 PROP. MANUALENTRANCE GATE PROPSILT FENCE PROPSILT FENCE PROP SILT FENCE PROPSILT FENCE PROP. 18" RCP PROP. 18" HDPE PROP TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PROPSILT FENCE 1' INSIDE R/W PROP SILT FENCE1' INSIDE R/W PROP SILT FENCE1' INSIDE R/W PROP TREE PROTECTION FENCE PROP SILT FENCEPROP. ST MH 32 PROP.18" HDPE PROP. FES 31 INV 9.5 EXISTING FENCE TO BERELOCATED TO 2' INSIDE R/W DURINGCONSTRUCTION ONLY. RELOCATED FENCE 2'INSIDE R/W DURING CONSTRUCTION ONLY. PROPOSEDDISTURBEDAREA (TYP) PROPOSED COMBINATIONSILT/TREE PROTECTION FENCE PROPOSEDDISTURBED AREA (TYP) PROPOSED COMBINATIONSILT/TREE PROTECTION FENCE PROPOSEDCOMBINATION SILT/TREE PROTECTIONFENCEPROPOSED SKIMMER (TYP) PROPOSED BAFFLES (TYP) PROP. GI 30B PROP. FES 30A RUN W A Y 6 - 2 4 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 T A X I W A Y N O V E M B E R PROPOSED COMBINATIONSILT/TREE PROTECTIONFENCE 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A PERMANENT RISER/SKIMMER BASIN #1 BOTTOM EL = 12.00 162 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1B PROP. RISER 40BTOP 14.77 12" INV 12.7718" INV 10.60 PROP. ST MH 35 PROP. FES 40AINV 10.30 INLET CONTROL (TYP) INLET CONTROL (TYP) INLET CONTROL (TYP) SLOT DRAINS TO BE COVERED UNTIL CONCRETE IS POURED SLOT DRAINS TO BE COVERED UNTIL CONCRETE IS POURED SLOT DRAINS TO BE COVERED UNTIL CONCRETE IS POURED SLOT DRAINS TO BE COVERED UNTIL CONCRETE IS POURED SLOT DRAINS TO BE COVERED UNTIL CONCRETE IS POURED INLETCONTROL (TYP) INLET CONTROL (TYP) INLET CONTROL(TYP) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X PROPOSEDPERMANENT 8' SECURITYFENCE (TYP) PROPOSEDPERMANENT GATE FOR CEMETERYACCESS PROPOSED6' CHAINLINKFENCE (TYP) PROPOSED6' CHAINLINK FENCE (TYP) PROP. MANUAL KEY ACCESSENTRANCE GATE PROPOSEDPERMANENT 8' SECURITY FENCE (TYP) PROPOSEDTEMPORARY8' SECURITY FENCE (TYP) PROPOSED TEMPORARY8' SECURITYFENCE (TYP) 21.2 21.2 21.2 21.2 21.7 21.7 21.5 21.5 21.5 21.5 21.5 20 20 20 20 3' T O P E L E V 1 2 . 0 10 ' T O P E L E V 1 6 . 0 101112 21 21 21 21 21 21 22 21 22 22 10 11 13 14 15 16 16 15 14 13 20 1918 1716 15 16 17 18 19 20 20 20 20 20 12 20 19 18 17 19 20 20 20 2122 20 21 20 21 22 2119202122 22 22 20 2221 212121 20 19 19 2020 20 20 20 21 21 20 21 22 22 21 21 21 20 20 20 19 21 21 21 21 21 21 21 20 10' T O P E L E V 2 0 . 0 20 2 0 20 20 20 20 19 20 22 22 22 22 22 22 22 22 21 21 21 22 22 21 1617 1819 18 22 21 22 23 23 23 23 23 22 2322 1 0 111212 1314 13 1211109 1011121211109 14 20 1918 1716 15 1819 20 20 1918 1716 15 1413 20 1918 1716 1514 13 10 11 12 12 11 10 10 11 12 21 2222 2221201918 1617 18 18 19 19 19 16171819202121 15 1617 20 20 20 20 20 21 21 23 22212121 22 20 20 20 2021 20 20.0 20.0 20.0 20.0 19 19.2 5 19.7 5 19.2 5 21 21 21 21 PROP. MH 42 PROP.JB 43 PRO P . 4 2 " H D P E PR O P . 3 6 " H D P E PROP. JB 44 PRO P . 2 4 " H D P E PROP.JB 58 PROP. 18" H D P E PROP.SLOT DRAIN TOP 20.10 PRO P . 2 4 " H D P E PRO P . 2 4 " H D P E PROP.GI 100 PROP. 1 8 " H D P E PROP. GI 101 PRO P . 1 2 " H D P E PROP. GI 45E PROP. GI 48 PROP.SLOT DRAIN TOP 20.55 PROP. 6' GAP NO SLOT DRAIN PROP . 1 8 " H D P E PRO P . 1 8 " H D P E PROP.JB 50 PROP. SLOT DRAINTOP 20.00 PROP. JB 56 PROP . 1 5 " H D P E PROP. 6' GAPNO SLOT DRAIN PROP.SLOT DRAINTOP VARIES PROP. END 57 PROP. JB 51 PROP. 14'12" HDPE PROP. 2'FLUME W/NEENAH COVER PROP . 1 5 " H D P E PRO P . 1 8 " H D P E PROP. SLOT DRAINTOP 20.10 PROP . 1 8 " H D P E PRO P . 2 4 " H D P E PROP.SLOT DRAINTOP 20.00 PROP.JB 59 PROP.GI 65 PROP . 4 2 " H D P E PROP. 24" HDPE PROP. DI 34 PROP.18" HDPE PROP. ST MH 35 PROP. RISER 38TOP 17.80 12" INV 16.0018" INV 12.74 PROP.ST MH 37 PROP. 18" RCP EDDB EAST-1B PROP. FESINV 18.10 PROP. FES INV 18.65 PROP. 81.22' 18" RCP @ 0.68% PROP. VEL DISS/FOREBAY AREA PROP. FES 80INV 17.00 PROP. 77.00'18" HDPE @ 0.65% PROP. VEL DISS/ FOREBAY AREA PROP.FES 110 PROP. FES 81 INV 17.50 PROP.FES 111 PROP FDC TO GSE BLDG 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 07/30/2025 Bart J. McClain 1" = 100' CS - 15 July 30, 2025 DEVELOPER: 0'100'200'300' GRAPHIC SCALE (IN FEET) 1 INCH = 100 FT ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT NEW HANOVER COUNTY, ILM, NCDEQ, & NCDOT STANDARD SPECIFICATIONS AND DETAILS. RIVER BASIN: CAPE FEAR SMITH CREEK: CLASS-C;Sw DISTURBED AREA 29.08 ACRES PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED NPDES GROUND STABILIZATION CHART NOTE: PRIOR TO START OF EARTHWORK, THE CONTRACTOR MUST NOTIFY NCDENR STAFF AS TO THE SOURCE OF PROPOSED FILL MATERIAL. ANY & ALL FILL MUST BE FROM A DULY PERMITTED SITE. NOTE: Pursuant to G.S. 113A-57(2), the angle for graded slopes and fills shall be no greater than the angle that can be retained by vegetative cover or other adequate erosion-control devices or structures. In any event, slopes left exposed will, within 7 and 14 calendar days of completion of any phase of grading, be planted or otherwise provided with temporary or permanent ground cover, devices, or structures sufficient to restrain erosion. Pursuant to G.S. 113A-57(3), provisions for permanent ground cover sufficient to restrain erosion must be accomplished for all disturbed areas within 15 working days or 90 calendar days (whichever is shorter) following completion of construction or development. Erosion Control Matting: All erosion control matting to be ROLLMAX EroNet S75 Erosion Control Blanket or equal. EROSION NOTES: 1. No land disturbing activities, including timbering or demolition activities, are allowed without first obtaining a sediment and erosion control plan approval and Certificate of Coverage. 2. Contractor to contact DEMLR Wilmington Regional Office at least 48 hours prior to commencing the land-disturbing activity. The contact number is (910)-796-7215. 3. Per NPDES requirements, a rain gauge, self-inspections records, permit, Certificate of Coverage, and S&E plan are required to be maintained on site and accessible during inspection. It is recommended that these items be placed in a permits box at the beginning or entrance of project. 4. Self-inspections for erosion and sedimentation control measures are to be performed at least once every seven calendar days and within 24 hours of every rain event of greater than 1 inch. Any needed repairs shall be made immediately to maintain measures as designed. All ESC measures shall be maintained as specified in the construction details on this plan. A rain gauge shall be installed at the project site for monitoring. Basin Emergency Spillway: All basin emergency spillways to be 50 MIL heavy duty silver tarpaulins or equivalent for UV resistance. STAGE 2 EROSION CONTROL QUANTITIES: TEMP CONSTRUCTION ENTRANCE 1 RISER/SKIMMER BASIN 1 (#3) SKIMMER BASIN 0 SILT FENCE 0 LF DIVERSION DITCH 0 LF DIVERSION DITCH (CLEAN WATER)0 LF ROCK CHECK DAM 0 SLOPE DRAIN (DIV DITCH BASIN INLETS)0 GRAVEL INLET PROTECTION 21 SILT SACK 0 SITE NOTES: 1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVER COUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS AND DETAILS. 2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING UTILITIES. 3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THIS SITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018. 4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TO THE CONTRACTOR UPON THEIR REQUEST. 5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BY MATRIX EAST, PLLC . Stage 1C Overall Erosion Control Plan ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X CONSTRUCTION SEQUENCE NOTE: FOR STAGE 1C CONSTRUCTION SEQUENCE, SEE SHEET CS-26 THIS SET. WATERFLOW XXXX X X SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SSSSSSSSSSSS X X X X X X X X X X X X X X X X X X X X X SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS S S S S S S SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W WWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS W W W W WWWWWWWWWWWWWWWW W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS W W W W X X X X X X X X X X X XXXXXXXXXX X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SSSSSSSS SSSSSSSS S S W W W W SS SS WWWWWWWWWWWWWW X X X PROP. MH 3 STA. 14+15.86 TOP = 19.96 IN = 12.47 OUT = 12.37 PROP. 176.76' 8" C-900 PVC SS @ 0.50% STA. 10+00.00 P R O P . 1 0 5 . 3 8 ' 8 " C - 9 0 0 P V C S S @ 0 . 5 0 % PROP. 199.72' 8" C-900 PVC SS @ 0.50% STA. 11+33.72 PROP TOP 22.40 PROPOSED FUEL TANKS PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PROP. MH 4 STA. 16+15.58 TOP = 19.89 IN = 13.57 OUT = 13.47 PROP. MH 6 TOP = 18.40 OUT = 14.02 PROP. 8" PVC C-900 WATER LINE PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PROP. 1" DOMESTIC BACKFLOW PROP. 1" DOMESTIC WATER METER PROP FH 6" LEG BUILDING #1 HANGAR (12,000 SF) BUILDING 1 OFFICES/SCHOOL 14,477 SF PR O P . 9 0 . 0 0 ' 8 " C - 9 0 0 P V C S S @ 0 . 5 0 % ( B Y O T H E R S ) REMOVE AND RELOCATE TEMPORARY FIRE HYDRANT EDDB EAST-1B PROP. 4" DOM. PVC SS SERVICE PROP. MH 2 STA. 13+10.48 TOP = 19.34 IN = 11.84 OUT = 11.74 PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. MH 5 STA. 17+63.00 TOP = 21.04 OUT = 14.31 SS S E R V I C E PR O P . 4 " P V C D O M PROP. 147.42' 8" C-900 PVC SS @ 0.50% CO CO PR O P . 4 " D O M . P V C S E W E R S E R V I C E PR O P . 1 " T Y P E K C O P P E R D O M . W A T E R S E R V I C E PROP DUMPSTER CO CO CO PROP DUMPSTER COCO PROP. 6" DOM. PVC SS SERVICE (F O R E X . H A N G A R ) (FO R E X . H A N G A R ) PROPOSED CONCRETE APRON PROPOSED CONCRETE APRON 45° 45° 45° 45° X X X X X X X X X X X X X X X X X X X XXXXXXXXXX X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X XXXX W W W W P R O P . B I K E R A C K FOREBAY W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW W W W W XXX XXXXXXXXX SS SS SS SS SS SS SS SS SS SS SS SS SS SS 1 1 + 0 0 12 + 0 0 13 + 0 0 14+00 15 + 0 0 16 + 0 0 17 + 0 0 PROPOSED HANGAR F (12,000 sf) SPRINKLED KNOX LOCK REQUIRED ON GATE PROPOSED CONTROLLED ACCESS GATE #2 PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR F PROPOSED4" GV PROP. CO PROP. CO PROP. CO PROPOSED2" BLOWOFF PROPOSED 6" GV PROP. 6" SEWER SERVICE PROP. 6" PVC C-900 WATER LINEPROP. 8" PVC C-900 WATER LINE PROP. 1-2" PVC CONDUIT PROP FDC PROP FH 6" LEG PROP. 1-1/2" DOM WATER SERVICE PROP. 6" C-900 FIRE LINE PROP. 4" PVC C-900 DOM WATER SERVICE HANGAR F OFFICE SPRINKLED PROPOSED CONTROLLED ACCESS GATE #1 PROP 8"x8"x8" TEE 2-8" GV 1-8"x6" REDUCER 1-6" GV KNOX LOCK REQUIRED ON GATE PROPOSED HANGAR E 12,000 sf HANGAR E OFFICE 3,570 SF PROP. 4" PVC C-900 FIRELINE PROP. 2" DOM WATER SERVICE PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR E P R O P . 6 " D O M . S S S E R V I C E PROP. 4"FIRE LINE TO FDCPROP. 1-1/2" DOMESTIC WATER SERVICE PR O P . 1 . 5 " P V C C - 9 0 0 D O M . S E R V I C E PROP FDC PROP FH 6" LEG PROP ILM PRIVATE UTILITY EASEMENT PROP. 4" PVC C-900 DOM WATER SERVICE PROP 8"x8"x8" TEE 3-8" GV PROP. 2" DOM WATER SERVICEPROP FH 6" LEG PROP. 2-2" PVC CONDUITSPROP ILM PRIVATE UTILITY EASEMENT EX. 20' CAPE FEAR PUBLIC UTILITY EASEMENT PROP. 2-2" PVC CONDUITS PROP. 8" BACKFLOW PREVENTER IN HOTBOX PROP. 1" IRRIG TAP PROP. 4" DOM TAP PROP 12"x12"x8" TEE 2-12" GV 1-8" GV PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP. 2-2" PVC CONDUITS PROP. 2" DOM WATER SERVICE PROP. 2" DOMESTIC WATER METER PROP. 2" DOMESTIC BACKFLOW PROP. 4" PVC C-900 DOM WATER SERVICE PROP. 4" DOMESTIC BACKFLOW PROP. 4" DOMESTIC MASTER WATER METER PROP. 1" IRRIG BACKFLOW PROP. 1" IRRIG METER PROP. 1-2" PVC CONDUITS KNOX LOCK REQUIRED IN GATE PROPOSED CONTROLLED ACCESS GATE #7 PROP ILM PRIVATE UTILITY EASEMENT PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 1 PROP. 4" DOM. SS SERVICE PROP. CO PROP . 8 " P V C C - 9 0 0 W A T E R L I N E PROP. 4" C-900 FIRELINE TO PVC PROPOSED HANGAR 1 PROPOSED CONCRETE APRON PROPOSED CONCRETE APRON W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP FDC TO GSE BLDG PROP. 4" PVC C-900 FIRE LINE TO FDC 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 Private Water & Gravity SS Plan Profile #1 Sta. 10+00 - 17+63 CS - 16 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'40'80'120' GRAPHIC SCALE (IN FEET) 1 INCH = 40 FT DEVELOPER: ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT TOWN OF CLAYTON STANDARD SPECIFICATIONS AND DETAILS. PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG HORIZ: 1"=40' VERT: 1"=4' 20 10 0 20 10 0PR O P T O P 2 2 . 4 0 PR O P I N : 1 0 . 8 6 PR O P S S M H 2 ( 4 ' Ø ) ST A . 1 3 + 1 0 . 4 8 TO P : 1 9 . 3 4 IN : 11 . 8 4 OU T : 1 1 . 7 4 PR O P S S M H 3 ( 4 ' Ø ) ST A . 1 4 + 1 5 . 8 6 TO P : 1 9 . 9 6 IN : 12 . 4 7 OU T : 1 2 . 3 7 PR O P S S M H 4 ( 4 ' Ø ) ST A . 1 6 + 1 5 . 5 8 TO P : 1 9 . 8 9 IN : 13 . 5 7 OU T : 1 3 . 4 7 PR O P S S M H 5 ( 4 ' Ø ) ST A . 1 7 + 6 3 . 0 0 TO P : 2 1 . 0 4 OU T : 1 4 . 3 1 EX. 134 LF 8" C-900 PVC @ 0.50% SLOPE PROP. 176.76 LF 8" C-900 PVC PROP. 105.38 LF 8" C-900 PVC @ 0.50% SLOPE PROP. 199.72 LF 8" C-900 PVC PROP. 147.42 LF 8" C-900 PVC PROP. 4" PVC SEWER LATERAL STA. 17+42.70 @ 0.50% SLOPE @ 0.50% SLOPE @ 0.50% SLOPE PROP. 4" PVC SEWER LATERAL STA. 15+46.16 PROP. 20.3 LF 6" PVC SEWER LATERAL STUB PROP. 6" PVC CLEANOUT STA. 17+83.30 PROP. G R A D E PROP. GRADE PROP. G R A D E PRIVATE GRAVITY SEWER PRIVATE GRAVITY SEWER PRIVATE GRAVITY SEWER PRIVATE GRAVITY SEWER PRIVATE GRAVITY SEWER 6" PVC C900 WATE R M A I N 8" PVC C900 WATER MAIN PROP. 8"x8" TEE 8" PVC C900 WATER MAIN 18 " MI N . 18 " MI N . 3' MI N . PUBLIC WATER & PRIVATE GRAVITY SEWER #1 PROP FH PROP. 12"x6" FH TEE PROP FH PROP. 8"x6" FH TEE PROP. 8"x8" TEE ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 WATERFLOW XXXX X X SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SSSSSSSSSSSS X X X X X X X X X X X X X X X X X X X X X SSSSSSSSSSSSSSSSSSSSSSSSSSSS SS S S S S S S SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W WWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS W W W W WWWWWWWWWWWWWWWW W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS W W W W X X X X X X X X X X X XXXXXXXXXX X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS W W SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SSSSSSSS SSSSSSSS S S W W W W SS SS WWWWWWWWWWWWWW X X X W W W W P R O P . B I K E R A C K W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROPOSED CONCRETE APRON PROPOSED CONCRETE APRON PROPOSED HANGAR 1 PROP. 4" C-900 FIRELINE TO PVC PROP . 8 " P V C C - 9 0 0 W A T E R L I N E PROP. CO PROP. 4" DOM. SS SERVICE PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 1 PROP ILM PRIVATE UTILITY EASEMENT PROPOSED CONTROLLED ACCESS GATE #7 KNOX LOCK REQUIRED IN GATE PROP. 1-2" PVC CONDUITS PROP. 1" IRRIG METER PROP. 1" IRRIG BACKFLOW PROP. 4" DOMESTIC MASTER WATER METER PROP. 4" DOMESTIC BACKFLOW PROP. 4" PVC C-900 DOM WATER SERVICE PROP. 2" DOMESTIC BACKFLOW PROP. 2" DOMESTIC WATER METER PROP. 2" DOM WATER SERVICE PROP. 2-2" PVC CONDUITS PROP. 4" PVC DOM. SEWER SERVICE (TYP) PROP 12"x12"x8" TEE 2-12" GV 1-8" GV PROP. 4" DOM TAP PROP. 1" IRRIG TAP PROP. 8" BACKFLOW PREVENTER IN HOTBOX PROP. 2-2" PVC CONDUITS EX. 20' CAPE FEAR PUBLIC UTILITY EASEMENT PROP ILM PRIVATE UTILITY EASEMENT PROP. 2-2" PVC CONDUITS PROP FH 6" LEG PROP. 2" DOM WATER SERVICE PROP 8"x8"x8" TEE 3-8" GV PROP. 4" PVC C-900 DOM WATER SERVICE PROP ILM PRIVATE UTILITY EASEMENT PROP FH 6" LEG PROP FDC PR O P . 1 . 5 " P V C C - 9 0 0 D O M . S E R V I C E PROP. 1-1/2" DOMESTIC WATER SERVICE PROP. 4"FIRE LINE TO FDC P R O P . 6 " D O M . S S S E R V I C E PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR E PROP. 2" DOM WATER SERVICE PROP. 4" PVC C-900 FIRELINE HANGAR E OFFICE 3,570 SF PROPOSED HANGAR E 12,000 sf KNOX LOCK REQUIRED ON GATE PROP 8"x8"x8" TEE 2-8" GV 1-8"x6" REDUCER 1-6" GV PROPOSED CONTROLLED ACCESS GATE #1 HANGAR F OFFICE SPRINKLED PROP. 4" PVC C-900 DOM WATER SERVICE PROP. 6" C-900 FIRE LINE PROP. 1-1/2" DOM WATER SERVICE PROP FH 6" LEG PROP FDC PROP. 1-2" PVC CONDUIT PROP. 8" PVC C-900 WATER LINE PROP. 6" PVC C-900 WATER LINE PROP. 6" SEWER SERVICE PROPOSED 6" GV PROPOSED2" BLOWOFF PROP. CO PROP. CO PROP. CO PROPOSED4" GV PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR F PROPOSED CONTROLLED ACCESS GATE #2 KNOX LOCK REQUIRED ON GATE PROPOSED HANGAR F (12,000 sf) SPRINKLED 1 1 + 0 0 FOREBAY 45° 45° 45° 45° PROPOSED CONCRETE APRON PROPOSED CONCRETE APRON (FO R E X . H A N G A R ) (F O R E X . H A N G A R ) PROP. 6" DOM. PVC SS SERVICE CO CO PROP DUMPSTER CO CO CO PROP DUMPSTER PR O P . 1 " T Y P E K C O P P E R D O M . W A T E R S E R V I C E PRO P . 4 " D O M . P V C S E W E R S E R V I C E CO CO PROP. 147.42' 8" C-900 PVC SS @ 0.50% PR O P . 4 " P V C D O M SS S E R V I C E PROP. MH 5 TOP = 21.04 OUT = 14.31 PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. MH 2 TOP = 19.34 IN = 11.84 OUT = 11.74 PROP. 4" DOM. PVC SS SERVICE EDDB EAST-1B REMOVE AND RELOCATE TEMPORARY FIRE HYDRANT ( B Y O T H E R S ) PR O P . 9 0 . 0 0 ' 8 " C - 9 0 0 P V C S S @ 0 . 5 0 % BUILDING 1 OFFICES/SCHOOL 14,477 SF HANGAR (12,000 SF) BUILDING #1 PROP FH 6" LEG PROP. 1" DOMESTIC WATER METER PROP. 1" DOMESTIC BACKFLOW PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PROP. 8" PVC C-900 WATER LINE PROP. MH 6 STA. 12+68.32 TOP = 18.40 OUT = 14.02 PROP. MH 4 STA. 13+58.32 TOP = 19.89 IN = 13.57 OUT = 13.47 PR O P . 8 " P V C C - 9 0 0 W A T E R L I N E PROPOSED FUEL TANKS PROP TOP 22.40 PROP. 199.72' 8" C-900 PVC SS @ 0.50% P R O P . 1 0 5 . 3 8 ' 8 " C - 9 0 0 P V C S S @ 0 . 5 0 % STA. 10+00.00 PROP. 176.76' 8" C-900 PVC SS @ 0.50% PROP. MH 3 TOP = 19.96 IN = 12.47 OUT = 12.37 11+00 12 + 0 0 W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP FDC TO GSE BLDG PROP. 4" PVC C-900 FIRE LINE TO FDC 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 CS - 17 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'40'80'120' GRAPHIC SCALE (IN FEET) 1 INCH = 40 FT DEVELOPER: ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT TOWN OF CLAYTON STANDARD SPECIFICATIONS AND DETAILS. PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG HORIZ: 1"=40' VERT: 1"=4' 20 10 0 20 10 0 PUBLIC WATER & PRIVATE GRAVITY SEWER #2 Private Water & Gravity SS Plan Profile #2 Sta. 10+00 - 13+72.32 STA. 10+00.00 W/L TEE STA. 13+72.32 W/L TEE PROP. 8" C-900 PVC PRIVATE GRAVITY SEWER STA. 10+14.00 PROP. 8" C-900 PVC PRIVATE GRAVITY SEWER STA. 13+58.32 PR O P S S M H 4 ( 4 ' Ø ) ST A . 1 6 + 1 5 . 5 8 ( # 1 ) = ST A . 1 3 + 5 8 . 3 2 ( # 2 ) TO P : 1 9 . 8 9 IN : 13 . 5 7 OU T : 1 3 . 4 7 PR O P S S M H 6 ( 4 ' Ø ) ST A . 1 2 + 6 8 . 3 2 TO P : 1 8 . 4 0 OU T : 1 4 . 0 2 PROP FH PROP. 8"x6" FH TEE PROP. GRAD E PROP. GRADE PROP. 147.42 LF 8" C-900 P V C @ 0.50% SLOPE PRIVATE GRAVITY SEWER PROP. 8"x8" TEE STA. 10+00.00 PROP. 8" GATE VALVE PROP. 8" GATE VALVE 18 " MI N . 18 " MI N . 3'MI N . 3'MI N . ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X W W WWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW SSSS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SSSS SSSSSSSS SSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS SSSS SS SS SSSS SS SS SS SS SSSS SSSSSSSSSSSS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS XXXXXXXXXXXX XXXXXXXXXXXXXXX X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W WWWWWWWWWWWWWWWWWWWWWW PROP. CO PROP. CO PROP. 8" BACKFLOW PREVENTER PROP. 16"x8" TAPPING SLEEVE WITH VALVE STA. 10+00.00 PROP. 2" DOMESTIC MASTER WATER METER PROP. 2"" DOM BACKFLOW PROPOSED HANGAR D 12,000 sf N . K E R R A V E N U E - S R 1 1 7 5 (1 0 0 ' P U B L I C R / W ) PROP. 8" PVC C-900 WATER LINE PROP. 1-1/2" DOM WATER SERVICE PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. COPROP. CO PROP. CO PROP ILM PRIVATE UTILITY EASEMENT PROP. 2" PVC C-900 DOMESTIC SERVICE PROP. 6" PVC C-900 WATER LINE PROP. 4" PVC OWS SERVICE (TYP) PROPOSED HANGAR C 12,000 sf PROPOSED HANGAR B 12,000 sf PROPOSED RETAINING WALL PROP FH 6" LEG PROP. 6" PVC C-900 WATER LINE PROP. 1-1/2" DOM WATER SERVICES PROP. 4" DOM. SEWER SERVICE PROP. O/W/S SEPARATOR 1000 GAL (TYP) PROP. 4" SEWER SERVICE TO OWS PROP. 4" PVC DOM SEWER SERVICE (TYP) PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO PROP. CO FOREBAY EDDB EAST-1A PROPOSED HANGAR A 12,000 sf CEMETERY ACCESS PROP FH 6" LEG PROP. 1-1/2" DOM WATER SERVICE PROP. 4" PVC DOM SEWER SERVICE (TYP) PROP. 4" DOM. SEWER SERVICE PROP. CB 42 PR O P . 4 2 " H D P E PROP. JB 43 PROP. 12" HDPE PROP. CB 41 PROP. MH 41A PROP. CB 70 PROP. 18" HDPE PROP. FES 40 PR O P . 4 2 " H D P E PROP. 10' EMERGENCY SPILLWAY ELEV 15.0 PROP. 12" HDPE PROP. GI 71 PROP. 15" HDPE PROPOSED NCDOT STD GUARDRAIL PROPOSED FENCE PROP. CB 72 PROP. 12" HDPE PROP. GI 73 PROP. FES 31 INV 9.5 PROP. 18" HDPE PROP. 18" HDPE PROP. CB 33 PROP. DI 34 PROP. ST MH 35 PROP. 18" HDPE PROP FENCE PROP. FES INV 13.00 PROP. 84.56' 18" RCP @ 1.54% PROP. FES INV 11.70 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A 162 LF GRASSED SWALE EAST-1B FROM EDDB EAST-1B PR O P . 3 6 " H D P E PROPOSED CONTROLLED ACCESS GATE #3 PROJECT BOUNDARY GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) STA.4+36.82 PROP 90° BEND PROP. 6" GV STA. 8+13.01 PROP. 8"x8"x6" TEE 8"x6" REDUCER 6" GV PROP. 6" GV PROP. ST MH 32 9+ 0 0 8+ 0 0 7+ 0 0 6+ 0 0 5+ 0 0 RE Q U I R E D O N G A T E PR O P . 6 " S E W E R S E R V I C E PROP. 18" HDPE 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 CS - 18 Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'40'80'120' GRAPHIC SCALE (IN FEET) 1 INCH = 40 FT DEVELOPER: ARCHITECT:DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 NOTE ALL CONSTRUCTION MUST BE PERFORMED IN ACCORDANCE WITH CURRENT TOWN OF CLAYTON STANDARD SPECIFICATIONS AND DETAILS. PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. INFORMATION AVAILABLE. THE SURVEYOR HAS NOT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT SURVEYOR FURTHER DOES NOT WARRANT THAT THE IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE GROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER- FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG HORIZ: 1"=40' VERT: 1"=4' 20 10 0 20 10 0 PRIVATE WATERLINE - NORTH ENTRANCE Private Water Plan Profile #3 ARQ - ILM East Side Development PROP FH PROP. 6"x6" FH TEE PR O P S T M H 4 1 A ST A . 3 + 9 5 . 3 1 O/ S 1 3 . 0 ' L T TO P : 2 0 . 4 0 IN : 13 . 7 3 OU T : 1 3 . 7 3 PR O P C B 7 0 ST A . 5 + 0 3 . 8 2 O/ S 1 3 . 0 ' L T TO P : 2 0 . 0 0 IN : 15 . 1 2 OU T : 1 5 . 1 2 PR O P C B 7 2 ST A . 3 + 9 5 . 3 1 O/ S 1 3 . 0 ' L T TO P : 2 0 . 4 0 IN : 16 . 4 7 OU T : 1 6 . 4 7 PR O P S T M H 3 2 ST A . 8 + 1 5 . 9 5 O/ S 2 5 . 9 0 ' L T TO P : 1 8 . 5 0 IN : 9. 6 7 OU T : 9 . 6 7 PR O P C B 3 3 ST A . 9 + 9 0 . 6 3 O/ S 3 4 . 4 7 ' L T TO P : 1 8 . 4 0 IN : 10 . 4 7 OU T : 1 0 . 4 7 PROP. 200.34' 18" HDPE @ 0.50% PROP. 270.00' 15" HDPE @ 0.50% PROP. 159.04' 18" HDPE @ 0.50% PROP. GRADE 3'MI N . PROP. GRADE 3' MI N . PROP FH PROP. 6"x6" FH TEE PROP. 8"x6 REDUCER 6" GV OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 As Shown Site Details CS - 19 July 30, 2025 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 8' wall (Material to match buildings) DUMPSTER PLANSECTION @ DUMPSTER Please reference the latest NC Accessibility Code for complete code. NOTES: 1. PARKING PAD IS 6" CONCRETE SLAB. SIZE SHOWN IS 4'X6' MIN. PAD FOR SINGLE RACK AND 2'-6" ADDITIONAL WIDTH PER RACK FOR RACKS TO BE SPACED 2'-6" O.C. IF MORE THAN ONE. 2. 5' WIDE UNOBSTRUCTED MANEUVERING AREA IS REQUIRED BEHIND RACKS WHEN ORIENTED PARALLEL TO A SIDEWALK AS SHOWN; REQUIRES 4'X11' MIN. PAD. 3. RACKS SHALL BE FLANGE MOUNTED AND SHALL HAVE BLACK POLYESTER POWDER COAT. OTHER PLACEMENTS SHALL MEET MINIMUM SIZE REQUIREMENTS. 4. BICYCLE PARKING SHALL NOT ENCROACH ON ACCESSIBLE PATHS. 5. DESIGNATED PLACEMENT WITHIN PARKING LOTS MAY ALSO BE ACCEPTABLE. BICYCLE PARKING 24' 36' INVERTED "U" RACKS 2' 4'9' 2' 2.2' 6' SIDEWALK 1 RACK 3 RACKS OPTION 1: PERPENDICULAR TO SIDEWALK 2' SIDEWALK OPTION 2: PARALLEL TO SIDEWALK 4' 11'5'2.2' 1 RACK 3 RACKS 9'2.5' 2.5' 2' 11'5'2.2' 2' 2' 2.5'2'2.5' 2.2' 6' 'HOOP RACK' 3'-6" 2" 4" (TYP) GUARD RAIL DETAIL (TYP) ARQ - ILM East Side Development 17.50' B-B 2.00' 10.50' ENTRANCE DRIVEWAY TYPICAL SECTION SCALE: 1" = 10' 5.00'25.00' 17.50' 2.00' 10.50' 5.00' 35.00' 2"#9 BARBED WIRE TO BE INSTALLED ALONG BOTTOM WHEN GAPS EXCEED 3" OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 As Shown Site & Sewer Utility Details CS - 20 July 30, 2025 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 As Shown Water Utility Details CS - 21 July 30, 2025 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 As Shown Storm Drainage Details CS - 22 July 30, 2025 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ - ILM East Side Development CHK'DMM/DD/YYREV.DESCRIPTION BY 4640 TRUEMAN BLVD HILLIARD, OHIO 43026 NOTE: ALL DIMENSIONS ARE ± 1/2 FOOT. DRAWING NUMBER: NTSAdvanced Drainage Systems, Inc. KJS 07-05-2023 1 OF 1 0 ---- © 2023 ADS, INC COMPRESSIVE STRENGTH CONCRETE (BY OTHERS) 14" - 12" RECESS INTO FINISHED PAVEMENTALUMINUM SLOT RISER WITH OPTIONAL STEEL GRATING ADS N-12 HDPE ASPHALT OR CONCRETE PAVEMENT (BY OTHERS) BASE MATERIAL AS APPROPRIATE STABLE, UNDISTURBED EARTH OR COMPACTED FILL BASE MATERIAL AS APPROPRIATE EXPANSION JOINT (BY OTHERS) NOTES: 1.BACKFILL DESIGN SHOULD BE USED FOR HS-20 LOADING APPLICATIONS. 2.SITE ENGINEER TO PROVIDE SITE SPECIFIC DETAILS, SUCH AS CONCRETE STRENGTH. 3.REFER TO ADS TECH NOTE 2.11 FOR ADDITIONAL DESIGN INFORMATION. Nominal Diameter, ID, in. (mm) Depth of Invert, H, in. (mm) Minimum Maximum 4 (100)10.75 (273)28.50 (724) 6 (150)13.00 (330)30.50 (775) 8 (200)15.00 (381)32.50 (826) 10 (250)17.00 (432)34.50 (876) 12 (300)19.50 (495)48.50 (1232) 15 (375)22.50 (572)51.50 (1308) 18 (450)25.50 (648)54.50 (1384) 24 (600)31.75 (806)60.50 (1537) 30 (750)38.75 (984)66.50 (1689) 36 (900)44.75 (1137)72.50 (1842) ID H 6" MIN. OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 3:1 SIDE SLOPES 0.5 % SL O P E 0.5 % SL O P E 4' BOTTO M RAILROAD TIE CHECK-DAM TO INCREASE INFILTRATION #57 WASHED STONE TO PREVENT DOWNSTREAM SCOUR 3" DIAMETER WEEP HOLE NCDEQ TREATMENT SWALE (TYP) GRASS LINED TREATMENT SWALE COMPACTED FILL NOTES: 1. FLOW DEPTH WITH INSTALLATION OF RAILROAD TIE CHECK DAMS TO BE 6" IN DEPTH. 2. GRASSS LINING TO BE BERMUDA, TALL FESCUE, OR KENTUCKY BLUEGRASS. 3. SWALES ARE DESIGNED TO NON-EROSIVELY PASS THE 10 YEAR STORM. SEE SWALE CALCULATIONS, IN STORM REPORT. 4. GRASS TO BE MANAGED AT AN AVERAGE OF 6 INCHES AND NOT TO BE CUT LOWER THAN 4 INCHES. 5. SWALES ARE DESIGNED TO ACHIEVE A MINIMUM 6 INCHES OF FREEBOARD DURING THE 10 YEAR STORM. SWALE MAINTENANCE: 1. THE DRAINAGE AREA OF THE TREATMENT SWALE WILL BE CAREFULLY MANAGED TO REDUCE THE SEDIMENT LOAD TO THE TREATMENT SWALE. 2. AFTER THE INITIAL FERTILIZATION TO ESTABLISH THE GRASS IN THE SWALE, FERTILIZER WILL NOT BE APPLIED TO THE TREATMENT SWALE. 3. THE TREATMENT SWALE WILL BE INSPECTED QUARTERLY. RECORDS OF INSPECTION AND MAINTENANCE WILL BE KEPT IN A KNOWN SET LOCATION AND WILL BE AVAILABLE UPON REQUEST. 07/30/2025 Bart J. McClain 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 As Shown Charts & Tables CS - 23 July 30, 2025 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Erosion Control Details CS - 24 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 Construction: 1.Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade it. 2.Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3.Provide drainage to carry water to a sediment trap or other suitable outlet. 4.Use geotextile fabrics in order to improve stability of the foundation in locations subject to seepage or high water table. Maintenance: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater. Make any required repairs immediately. 2.Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. 3.Sediment on roadways is to be removed immediately by broom and shovel, either by manual or mechanical means, and not to be washed off where it has the potential to enter a stream, drainage way or storm drain system. Pub l i c R o a d 2-3" COURSE AGGREGATE 6" MIN. AS R E Q U I R E D 12' M I N . 50' M I N . IF 50' C A N N O T B E R E A C H E D , A L E N G T H SUF F I C I E N T E N O U G H T O R E T A I N S E D I M E N T O N SITE A N D O F F R O A D W A Y S . DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual Updates TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT GEOTEXTILE FABRIC TO BE USED IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. CONSIDERATIONS FOR CONSTRUCTION SCHEDULING CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION CONSTRUCTION ACCESS: Construction entrance, construction routes, equipment parking areas. First land-disturbing activity- Stabilize bare areas immediately with gravel and temporary vegetation as construction takes place. SEDIMENT TRAPS AND BARRIERS: Basin traps, sediment fences, and outlet protection. Install principal basins after construction site is accessed. Install additional traps and barriers as needed during grading. RUNOFF CONTROL: Diversions, perimeter dikes, water bars, and outlet protection. Install key practices after principal sediment traps and before land grading. Install additional runoff-control measures during grading. RUNOFF CONVEYANCE SYSTEM: Stabilize streambanks, storm drains, channels, inlet and outlet protection, and slope drains. Where necessary, stabilize streambanks as early as possible. Install principal runoff conveyance system with runoff-control measures. Install remainder of system after grading. LANDING CLEARING AND GRADING: Site preparation- cutting, filling and grading, sediment traps, barriers, diversions, drains, and surface roughening. Begin major clearing and grading AFTER principal sediment and key runoff-control measures are installed. Clear borrow and disposal areas only as needed. Install additional control measures as grading progresses. Mark trees and buffer areas for preservation. SURFACE STABILIZATION: Temporary and permanent seeding, mulching, sodding and riprap. Apply temporary or permanent stabilization measures immediately on all disturbed areas where work is delayed or complete. BUILDING CONSTRUCTION: Buildings, utilities, and paving.Install necessary additional erosion and sedimentation control practices as work takes place. LANDSCAPE AND FINAL STABILIZATION: Topsoiling, trees and shrubs, permanent seeding, mulching, sodding, and riprap. Last construction phase: Stabilize all open areas, including borrow and spoil areas. Remove and stabilize all temporary control areas. NOTE: The above are the main aspects of a typical construction sequence in general terms. A detailed Construction Sequence should be site specific based on your project and site needs. As a minimum, the construction sequence schedule should show the following: ·The erosion and sedimentation control practices to be installed, ·Principal development activities, ·What measures should be in place before other activities are begun, and ·Compatibility with the general construction schedule of the contract. Many timely construction techniques can reduce the erosion potential of a site, such as (1) shaping earthen fills daily to prevent overflows and (2) constructing temporary diversions ahead of anticipated storms. These types of activities cannot be put on the construction sequence schedule, but should be used whenever possible. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesCONSTRUCTION SEQUENCING SPACING GUIDE FOR SLOPE BREAKS SLOPE SPACING (FT) Steep Slopes 2:1 20 3:1 35 4:1 45 Long Slopes 15-25%50 10-15%80 6-10%125 3-6%200 <3%300 Use slope breaks, such as diversions, wattles, or benches, as appropriate, to reduce the length of cut-and-fill slope to limit sheet and rill erosion and prevent gullying. NOTES: 1.Construct and maintain all erosion and sediment control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2.Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of all critical areas. 3.Scarify areas to be topsoiled to a minimum depth of 2 inches before placing topsoil. 4.Clear and grub areas to be filled by removing trees, vegetation, roots, or other objectionable material that would affect the planned stability of the fill. 5.Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, building debris, and other materials inappropriate for constructing stable fills. 6.Place all fill in layers not to exceed 9 inches in thickness, and compact the layers as required to reduce erosion, slippage, settlement, or other related problems. 7.Do not incorporate frozen, soft, mucky, or highly compressible materials into fill slopes. 8.Do not place fill on a frozen foundation, due to possible subsidence and slippage. 9.Keep diversions and other water conveyance measures free of sediment during all phases of development. 10.Handle seeps or springs encountered during construction in accordance with approved methods (subsurface drain). 11.Permanently stabilize all graded areas immediately after final grading is completed on each area in the grading plan. Apply temporary stabilization measures on all graded areas when work is to be interrupted or delayed for 30 days or longer. 12.Show topsoil, stockpiles, borrow areas, and spoil areas on the plans, and make sure they are adequately protected from erosion. Include final stabilization of these areas in the plan. MAINTENANCE: 1.Periodically check all graded areas and the supporting erosion and sedimentation control practices, especially after heavy rainfalls. 2.Promptly remove all sediment from diversions and other water-disposal practices. 3.If washouts or breaks occur, repair immediately. 4.Prompt maintenance of small eroded areas before they become significant gullies is an essential part of an effective erosion and sedimentation control plan. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesLAND GRADING TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER TEMPORARY SEEDING RECOMMENDATIONS FOR FALL Seeding Mixture Species Rye (grain) Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) Rate (lb/acre) 120 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding Dates Mountains—Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont—Jan. 1 - May 1 Coastal Plain—Dec. 1 - Apr. 15 Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Seeding Mixture Species German millet Rate (lb/acre) 40 Seeding Dates Mountains — May 15 - Aug. 15 Piedmont — May 1 - Aug. 15 Coastal Plain — Apr. 15 - Aug. 15 Mulch Maintenance Seeding Mixture Species Rye (grain) Seeding Dates Mountains — Aug. 15 - Dec. 15 Coastal Plain and Piedmont — Aug. 15 - Dec. 31 Mulch Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. Rate (lb/acre) 120 Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. SEED BED PREPARATION: LIMING- Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1-112 tons/acre on coarse-textured soils and 2-3 tons/acre on fine-textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. FERTILIZER- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700 - 1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. SURFACE ROUGHENING- If recent tillage operations have resulted in a loose surface additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by raking, harrowing, or other suitable methods for fine grading. The finished grade shall be a smooth even soil surface with a loosen uniformly fine texture. All ridges and depressions shall be removed and filled to provide the approved surface drainage. Planting is to be done immediately after finished grades are obtained and seedbed preparation is completed. Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. In the Piedmont and Mountains, a small-stemmed Sudangrass may be substituted at a rate of 50 lb/acre. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesTEMPORARY SEEDING Size of Riprap stones Weight (lb) Mean Spherical Diameter (ft) Length (ft) Rectangular Shape Width/Height (ft) 50 0.8 1.4 0.5 100 1.1 1.8 0.6 150 1.3 2.0 0.7 300 1.6 2.6 0.9 500 1.9 3.0 1.0 1000 2.2 3.7 1.3 1500 2.6 4.7 1.5 2000 2.8 5.4 1.8 4000 3.6 6.0 2.0 6000 4.0 6.9 2.3 8000 4.5 7.6 2.5 20,000 6.1 10.0 3.3 Sizes for Riprap and Erosion Control Stone Specified by NCDOT Riprap Erosion Control Class 1 Class 2 Class A Class B 5-200 lb 25-250 lb 2"-6"5"-15" 30% shall weigh a minimum of 60 lbs each 60% shall weigh a minimum of 100 lbs each No more than 10% shall weigh less than 15 lbs each No more than 5% shall weigh less than 50 lbs each 10% tolerance top and bottom sizes Equally distributed, no gradation specified Equally distributed, no gradation specified Riprap should be a well-graded mixture with 50% by weight larger than the specified design size. Diameter of the largest stone size in the mix should be 1.5 times the d50 size with smaller sizes grading down to 1 inch. Synthetic Filter Fabric: 1.Place the cloth filter directly on the prepared foundation. 2.Overlap the edges by at least 12 inches, and space anchor pins every 3 feet along the overlap. 3.Bury the upstream end of the cloth a minimum of 12 inches below ground and bury the lower end of the cloth or over lap with the next section as required. 4.If damage occurs while placing riprap, remove the riprap, and repair the sheet by adding another layer of filter material with a minimum overlap of 12 inches around the damaged area. If damage is extensive, remove and replace the entire sheet. 5.If placing large stones or machine placing is difficult, a 4 inch layer of fine gravel or sand may be needed to protect the filter cloth. 6" GRAVEL FILTER (OR FILTER CLOTH)T min. 1.5 T min. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesRIP RAP Subgrade Preparation: 1.Prepare the subgrade for riprap and filter to the required lines and grades shown on the plans. 2.Compact any fill required in the subgrade to a density approximating that of the surrounding undisturbed material or overfill depressions with riprap. 3.Remove brush, trees, stumps, and other objectionable material. Sand and Gravel Filter Blanket: 1.Place the filter blanket immediately after the ground foundation is prepared. 2.When using gravel, spread filter stone in a uniform layer to the specified depth. 3.When more than one layer of filter material is used, spread the layers with minimal mixing. Maintenance: In general, once a riprap installation has been properly designed and installed it requires very little maintenance. Riprap should be inspected periodically for scour or dislodged stones. Control of weed and brush growth may be needed in some locations. Stone Placement: 1.Placement of riprap should follow immediately after placement of the filter. 2.Place so that riprap forms a dense, well-graded mass of stone with a minimum of voids. 3.Place to its full thickness in one operation. 4.Do not place by dumping through chutes or other methods that cause segregation of stone sizes. 5.Take care not to dislodge underlying base or filter when placing stone. 6.The toe of the riprap slope should be keyed to a stable foundation at its base. 7.The toe should be excavated to a depth about 1.5 times the design thickness of the riprap and extend horizontally from the slope, as shown above. 8.Hand placing may be necessary to achieve the proper distribution of stone sizes to produce a relatively smooth, uniform surface. T NOTES: 1.Lime, fertilize and seed before installation. Planting of shrubs, trees, etc. should occur after installation. 2.Slope surface shall be smooth before placement for proper soil contact. 3.Design velocities exceeding 2 feet/second require temporary blankets, mats or similar liners to protect seed and soil until vegetation becomes established. 4.Terminal anchor trenches are required at RECP ends and intermittent check slots must be constructed across channels at 25 foot intervals. 5.Terminal anchor trenches should be a minimum of 12 inches in depth and 6 inches in width. Intermittent check slots should be 6 inches deep and 6 inches wide. 6.For installation on a slope, place RECP 2-3 feet over the top of the slope and into an excavated end trench measuring approximately 12 inches deep by 6 inches wide. Pin the RECP at 1 foot intervals along the bottom of the trench, backfill and compact. Unroll the RECP down the slope maintaining direct contact between the soil and RECP. Secure using staples or pins in a 3 foot center-to-center pattern. 7.11 gauge, at least 6 inch by 1 inch staples or 12 inch minimum length wooden stakes are recommended for anchoring. 8.Grass-lined channels with design velocities exceeding 6 feet/second should include turf reinforcement mats 9.Check slots to be constructed per manufacturers specifications. 10.Staking or stapling layout per manufacturers specification. 11.If there is a berm at the top of slope, anchor up-slope of the berm. 12.Do not stretch blankets/matting tight, allow the rolls to conform to any irregularities. 13.For slopes less than 3H:1V, rolls may be placed in horizontal strips. MAINTENANCE: 1.Inspect Rolled Erosion Control Products at least weekly and after each rainfall of 1.0 inch or greater; repair immediately. 2.Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3.Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4.If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5.Monitor and repair the RECP as necessary until ground cover is established. OVERLAP 6" MIN.LONGITUDINAL ANCHOR TRENCH OVERCUT CHANNEL 2" TO ALLOW BULKING DURING SEEDBED PREPARATION DESIGN DEPTH 6" MIN. 6" MIN. TYPICAL INSTALLATION WITH EROSION CONTROL BLANKETS OR TURFREINFORCEMENT MATS INTERMITTENT CHECK SLOT LONGITUDINAL ANCHOR TRENCH SINGLE-LAP SPLICED ENDS OR BEGIN NEW ROLL IN AN INTERMITTENT CHECK SLOT FLOWPREPARE SOIL AND APPLY SEED BEFORE INSTALLING BLANKETS, MATS OR OTHER TEMPORARY CHANNEL LINER SYSTEMS 6" MIN. OVERLAP ANCHOR 6"X6" MIN. TRENCH AND STAPLE AT 12" INTERVALS STAPLE OVERLAPS MAX. 5" SPACING 3" MIN. OVERLAP BRING MATERIAL DOWN TO A LEVEL AREA, TURN THE END UNDER 4" AND STAPLE AT 12" INTERVALS. CHECK SLOTS AT 25' INTERVALS CHAN N E L BOTT O M STAKES AT 3'-5' INTERVALS INITIAL CHANNEL ANCHOR TRENCH 12" TERMINAL SLOPE AND CHANNEL ANCHOR TRENCH DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesROLLED EROSION CONTROL PRODUCTS 2' MIN. 18" MIN. 6' TYPICAL COMPACTED SOIL FLOW 9' TYPICAL 18" MIN. 3: 1 M A X COURSE AGGREGATE FLOW TEMPORARY EARTHEN DIVERSION DIKE TEMPORARY GRAVEL DIVERSION DIKE FOR VEHICLE CROSSING NOTES: 1.Remove and properly dispose of all tree, brush, stumps, and other objectionable material. 2.Temporary diversions are to only be used for drainage areas of 5 acres or less. 3.Ridges will have a 2 feet minimum top width, 2:1 or flatter side slopes and a minimum of 0.3 feet freeboard. 4.Channels will have a parabolic, trapezoidal, or V shape with side slopes of 2:1 or flatter. 5.Any point where vehicles will be crossing should have 3:1 or flatter side slopes. 6.Ensure the top of the dike is not lower at any point than the design elevation plus the specified settlement. 7.Provide sufficient room around diversions to permit machine re-grading and cleanout. 8.Vegetate the ridge immediately after construction unless it will remain in place less than 30 working days. MAINTENANCE: 1.Inspect all measures at least weekly and after every rainfall of 1.0 inch or greater. 2.Make all repairs immediately. 3.Immediately remove any sediment from the flow area and repair the diversion ridge. 4.Check outlets and make timely repairs as needed. 2:1 M A X DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesTEMPORARY DIVERSIONS CHANNEL DIKE AND CHANNEL DIKE 2:1 SLOPE OR FLATTER 2' MIN. TOP 6" FREEBOARD STEEP CUT OR FILL SLOPE Minimum Design Storm for Degrees of Hazard Level of Protection Area to Be Protected Minimum Design Storm Low All erosion control facilities. Open areas, parking lots, minor recreation areas. 10 year Medium Recreation development, low-capacity roads and minor structures. 25 year, 24 hour 50 year, 24 hour High Major structures, homes, main school buildings, high-capacity roads. 100 year, 24 hour USE OF DIVERSIONS TO PROTECT CUT OR FILL SLOPES, PROTECT STRUCTURES OR OFF-SITE PROPERTY, OR BREAK LONG SLOPES. CROSS-SECTION FOR PERMANENT DIVERSION LOCATED ABOVE A SLOPE. NOTES: 1.Permanent Diversions can be installed as temporary diversions until the site is stabilized and then completed as a permanent measure, or they can be installed in final form during the initial construction operation, so long as they function properly and meet all temporary measure standards. 2.Remove and properly dispose of all trees, brush, stumps, or other objectionable material. Fill and compact all ditches, swales, or gullies that will be crossed to natural ground level or above. 3.Just before placement of fill, the base of the ridge should be disked by machinery. 4. Excavate, shape, and stabilize the diversion to line, grade, and cross section, as required in the design plan. 5.Compact the ridge to prevent unequal settlement, and to provide stability against seepage. 6.Stabilized the diversion with Permanent vegetation after installation. MAINTENANCE: 1.Inspect permanent diversions at least weekly and after each rainfall of 1.0 inch or greater. 2.Immediately remove any obstructions from the flow area, and repair the diversion ridge. 3.Check outlets, and make timely repairs as needed. 4.Maintain the vegetation in a vigorous, healthy condition at all times. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesPERMANENT DIVERSIONS NOTES: 1.Remove and properly dispose of all trees, brush, stumps, and other objectionable material. Fill and compact all ditches and gullies that will be crossed by machinery to natural ground level or above. 2.Disk the base of the dike before placing fill. 3.Ensure that the constructed cross section meets all design requirements. 4.Compact the dike by tracking with construction equipment. 5.Divert all sediment laden water into a temporary sediment trap or sediment basin. Runoff from undisturbed areas should empty into an outlet protection device such as a level spreader or riprap outlet structure unless well stabilized natural outlets exist. 6.Ensure that the top of the dike is not lower at any point than the design elevation plus the specified settlement after it has been compacted. 7.Leave sufficient area along the dike to permit machine re-grading and cleanout. 8.Immediately seed and mulch the dike after its construction, and stabilize the flow portion in accordance with design requirements. Design Criteria Drainage Area:5 acres or less Dike Design Channel Design Side Slope: 2:1 or flatter Shape: Parabolic, Trapezoidal, or V-Shaped 3:1 of flatter where vehicles must cross Side Slope:2:1 or flatter Width:2.0 ft minimum 3:1 or flatter where vehicles must cross Height:1.5 ft minimum Stabilization:Based on velocity of reaches Freeboard:0.5 ft minimum Settlement:10% of total fill height minimum DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesDIVERSION DIKE (PERIMETER PROTECTION) Maintenance: 1.Inspect diversion dikes at least weekly and after each rainfall of 1.0 inch or greater. 2.Immediately remove sediment from the flow area and repair the dike. 3.Check outlets, and make timely repairs as needed to avoid gully formation. 4.when area above the temporary diversion dike is permanently stabilized, remove the dike, and fill and stabilized the channel to blend with the natural surface. 07/30/2025 Bart J. McClain July 30, 2025 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Erosion Control Details CS - 25 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 T T T e e d b d d PARABOLIC CHANNEL CROSS SECTION TRIANGULAR "V" CHANNEL CROSS SECTION TRAPEZOIDAL CHANNEL CROSS SECTION X-Section Area (A) = Zd2 Top Width (T) = 2dz Z= e d X-Section Area (A) = 2 3 Td Top Width (T) = 1.5 Ad Z= e d X-Section Area (A) = bd + Zd2 Top Width (T) = b + 2dz NOTES: 1.At a minimum, grass-lined channels should carry peak runoff from the 10-year storm without eroding. Increase the capacity according to the potential damage if flood hazard exists. 2.If design velocity of the channel to be vegetated by seeding exceeds 2 feet per second, a temporary channel liner is required. 3.Channel side slopes should be 3:1 or flatter to aid in the establishment of vegetation and for maintenance. V-shaped channels along roadways should have side slopes of 6:1 or flatter for safety. 4.Remove all trees, brush, stumps, and other objectionable material from the foundation area, and dispose of properly. 5.Excavate the channel, and shape it to neat lines and dimensions shown on the plans plus a 0.2 foot overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 6.Remove and properly dispose of all excess soil so that the surface water may enter the channel freely. 7.The procedure used to establish grass in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period. Maintenance: 1.During the establishment period, check grass-lined channels after every rainfall. 2.After grass is established, periodically check the channel. check after heavy rainfall events and immediately make any necessary repairs. 3.Check the channel outlet and all road crossings for bank stability and evidence of piping or scour holes. 4.Remove all significant sediment accumulations to maintain the designed carrying capacity. 5.Keep grass in a healthy, vigorous condition at all times. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesGRASS-LINED CHANNELS FILTER BLANKET d SECTION AA La AAAA d La FILTER BLANKET PLAN SECTION A PLAN AA d0 3d0 PIPE OUTLET TO WELL-DEFINED CHANNEL PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL NOTES: 1.Compact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprap thickness. 2.The riprap and gravel filter must conform to the specified grading limits shown on the plans. 3.Filter cloth, when used, must meet design requirements, and be properly protected from punching or tearing during installation. Repair any damage by removing the riprap and placing another piece over the damaged area. If the damage is extensive, replace the entire filter cloth. 4.All connecting joints should overlap so the top layer is above the downstream layer a minimum of 1 foot. 5.The minimum thickness of the riprap should be 1.5 times the maximum stone diameter but not less than 6". 6.Riprap may be field stone or rough quarry stone. It should be hard, angular highly weather-resistant and well graded. 7.Construct the apron on zero grade with no overfill at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly below it. 8.Ensure that the apron is properly aligned with the receiving stream and preferably straight throughout its length. If a curve is needed, place in the upper section of the apron. MAINTENANCE: 1.Inspect outlet structures at least weekly and after each rainfall of 1.0 inch or greater. 2.Check outlets for erosion around or below riprap and for if stones have been dislodged. Make repairs immediately to prevent further damage. La = Length of Riprap Apron d = Thickness of Riprap Apron La = Length of Riprap Apron d = Thickness of Riprap Apron DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesOUTLET STABILIZATION STRUCTURE 2:1 SLOPE GRAVEL FILTER CONCRETE BLOCKSDEWATERING 1' MIN. 2' MAX. TEMPORARY SEDIMENT POOL WIRE SCREEN DEWATERING DROP INLET WITH GRATE NOTES: 1.Lay one block, on each side of the structure, on its side in the bottom row to allow pool drainage. The foundation should be excavated at least 2 inches below the crest of the storm drain. Place the bottom row of blocks against the edge of the storm drain for lateral support and to avoid washouts when overflow occurs. If needed, give lateral support to subsequent rows by placing 2 inch x 4 inch wood studs through block openings. 2.Carefully fit hardware cloth or comparable wire mesh with 1/2-inch openings over all block openings to hold gravel in place. 3.Use clean gravel 1/2 to 3/4 inch in diameter, placed 2 inches below the top of the block on a 2:1 slope or flatter and smooth it to an even grade. NCDOT #57 washed stone is recommended. SEDIMENT MAINTENANCE: 1.Inspect all measures at least weekly and after every rainfall of 1.0 inch or greater; repair immediately. 2.Remove sediment as necessary to provide adequate storage volume for subsequent rains. 3.When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil, and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact before stabilizing. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesBLOCK AND GRAVEL INLET PROTECTION (TEMPORARY) FLOW NATURAL GROUND RIPRAP HEADWALL CLASS B RIPRAP FILTER BERM NCDOT #5 OR #57 WASHED STONE PIPE INVERT, 36' PIPE MAX. 1.5' 2' CLASS B RIPRAPNCDOT #5 OR #57 WASHED STONE RIPRAP HEADWALL, 1' MIN. HEIGHT FROM ROAD SHOULDER NATURAL GROUND 3'1'PIPE INLET NOTES: 1.Clear the area of all debris that might hinder excavation and disposal of spoil. 2.Install the Class B or Class 1 riprap in a semi-circle around the pipe inlet. The stone should be built up higher on each end where it ties into the embankment. The minimum crest width of the riprap should be 3 feet, with a minimum bottom width of 11 feet. The minimum height should be 2 feet, but also 1 foot lower than the embankment of diversions. 3.A 1 foot thick layer of NC DOT #5 or #57 stone should be placed on the outside slope of the riprap. 4.The sediment storage area should be excavated around the outside of the stone horseshoe 18 inches below natural grade. 5.When contributing drainage area has been stabilized, remove the pipe and rock, fill depression, establish final grading elevations, compact the area properly, and stabilize with ground cover. MAINTENANCE: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater and repair immediately. 2.Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. 3.Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. 4.Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. 5.After all the sediment-producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesROCK PIPE INLET PROTECTION Notes: 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may impound volumes of water sufficient to cause failure of the structure) 3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have a minimum 50 pound tensile strength. 5.When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely into the ground a minimum of 24 inches. Wire mesh should be a minimum 14-gauge with 6 inch mesh spacing. 6.Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have a minimum of 50 pound tensile strength. 7.Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier. 8.Place 12 inches of fabric along the bottom and side of the trench. 9.Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10.Do not attach filter fabric to existing trees. 11.Do not place across ditches, streams, or any other areas of concentrated flow. Maintenance: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater. Make any required repairs immediately. 2.Should the fabric of a sediment fence collapse, tear, decompose, or become ineffective, replace it promptly. 3.Remove sediment deposits as necessary to provide adequate storage volume for the next rain and reduce pressure on the fence. Take care to avoid undermining the fence during cleanouts. 4.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. STEEL POST 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 18-24" 8" DOWN & 4" FORWARD ALONG THE TRENCH24" WIRE FENCE FILTER FABRIC PLASTIC OR WIRE TIES 24" 8" MIN. 4" MIN. BACKFILL TRENCH AND COMPACT THOROUGHLY UPSLOPE WIRE FENCE FILTER FABRIC STEEL POST PLASTIC OR WIRE CROSS SECTION VIEW Max. Slope Length and Slope for Which Sediment Fence is Applicable Slope Slope Length (ft)Max. Area (ft2) <2%100 10,000 2 to 5%75 7,500 5 to 10%50 5,000 10 to 20%25 2,500 >20%15 1,500 DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesSEDIMENT FENCE PERSPECTIVE VIEW ARM ASSEMBLY "C" ENCLOSURE WATER ENTRY UNITPVC ELBOW PVC END CAP PVC END CAP PVC TEE PVC PIPE 1/2" HOLES IN UNDERSIDE FLEXIBLE HOSE Ɵ SCHEDULE 40 PVC PIPE PVC VENT PIPE PVC TEE ORIFICE PLATE BOTTOM SURFACE WATER SURFACE END VIEW FRONT VIEW SKIMMER DEWATERING DEVICE INFLOW STRUCTURE BAFFLES EM B A N K M E N T EMERGENCY SPILLWAY AVERAGE WIDTH (W)=AREA* L * AREA OF BASIN WATER SURFACE AT TOP OF PRINCIPAL SPILLWAY ELEVATION BAFFLESINFLOW STRUCTURE FILTER FABRIC DEWATERING ZONE SEDIMENT STORAGE ZONE EMERGENCY SPILLWAY PLAN VIEW 6" MIN INVERT ELEVATION OF EMERGENCY SPILLWAY ABOVE BAFFLES 1' FREEBOARD AT ALL TIMES EMBANKMENT NOTES: 1.Clear, grub and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed. 2.Place the fill in lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3.Place the barrel on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe. Place the fill around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. 4.Place a minimum depth of 2 feet compacted backfill over the pipe spillway before crossing with construction equipment. 5.Ensure that the flow length to basin width ratio is at least 2:1 to improve trapping efficiency. Length is measured at the elevation of the principal spillway. 6.Assemble the skimmer following manufacturers instructions or as designed and lay on the bottom of the basin with the flexible joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope and anchor it to the side of the basin.This will be used to pull the skimmer to the side for maintenance. 7.Install the spillway in undisturbed soil to the greatest extent possible. The spillway should be lined with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-inch staples or pins. 8.Filter fabric must be long enough to extend down the slope and exit onto stable ground. The width of the fabric must be one piece, not joined or spliced; otherwise water can get under the fabric. 9.The upper section(s) should overlap the lower section(s) so that water cannot flow under the fabric. Secure the upper edge and sides of the fabric in a trench with staples or pins. 10.Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment-laden water to the upper end of the pool area to improve basin trap efficiency. 11.Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. MAINTENANCE: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater. Make necessary repairs immediately. 2.Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or within the first cell. 3.Make sure any vegetation growing in the bottom of the basin does not hold down the skimmer. 4.Repair baffles if they are damaged. Re-anchor the baffles if water is flowing underneath or around them. 5.Ensure the skimmer is not clogged with trash or debris. 6.If the skimmer arm or barrel pipe is clogged, remove orifice and clear debris with a plumber’s snake or by flushing with clean water. Be sure to replace the orifice before repositioning the skimmer. 7.Check fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. SECTION VIEW DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesSKIMMER SEDIMENT BASIN 4' MAX. VARIABLE DEPTH SECURE BOTTOM OF BAFFLE TO GROUND WITH 12" STAPLES AT 12" MAXIMUM SPACING BAFFLE MATERIAL 9 GAUGE MIN. HIGH TENSION WIRE STRAND SHALL BE SECURED TO POST TO SUPPORT BAFFLE MATERIAL DRAPE BAFFLE MATERIAL OVER WIRE STRAND AND SECURE WITH PLASTIC TIES AT POSTS AND ON WIRE EVERY 12" 3' MIN. BAFFLE MATERIAL SHOULD BE SECURED TO THE BOTTOM AND SIDES OF BASIN USING 12" LANDSCAPE STAPLES 11 GAUGE LANDSCAPING STAPLE BAFFLE MATERIAL STEEL POST 2'-0" DEPTH NOTES: 1.Use matting made of 100% coconut fiber(coir) twine woven into high strength matrix. 2.Staples should be made of 0.125 inch diameter, new steel wire formed into a ‘U’ shape not less than 12 inches in length with a throat of 1 inch in width. The staples anchor the porous baffles into the sides and bottom of the basin. 3.Grade the basin so that the bottom is level front to back and side to side. 4.Install the coir fiber baffles immediately upon excavation of the basins. 5.Install posts across the width of the sediment trap. 6.Steel posts should be driven to a depth of 24 inches and spaced in a maximum of 4 feet apart. The top of the fabric should be a minimum of 6 inches higher than the invert of the spillway. Tops of the baffles should be a minimum of 2 inches lower than the top of the earthen embankment. 7.Install 3 coir fiber baffles in basins at drainage outlets with a spacing of 1/4 the basin length. 2 coir fiber baffles can be installed in the basins less than 20 feet in length with a spacing of 1/3 the basin length. 8.Attach a 9-gauge high tension wire strand to the steel posts at a height of 6 inches above the spillway elevation with plastic ties or wire fasteners to prevent sagging. If the temporary sediment basin will be converted to a permanent stormwater basin of a greater depth, the baffle height should be based on the pool depth during use as a temporary sediment basin. MAINTENANCE: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater and repair immediately. 2.Maintain access to baffles. If the fabric collapses, tears, decomposes, or becomes ineffective, replace immediately. 3.Remove sediment deposits when it reaches half full. Replace if baffle fabric is damaged during clean-out operations. Sediment depth should never exceed half the designed storage depth. STEEL POST EXTEND 9 GAUGE WIRE TO BASIN SIDE OR INSTALL T-POST TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL POST. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesPOROUS BAFFLES SCREEN ACCESSIBLE THROUGH DOOR FLOAT BARREL PIPE LONGER THAN SHOWN. FLEXIBLE JOINT (RADIATOR HOSE) OUTLET END: CONNECTION TO OUTLET PIPE OR RISER STANDARD SKIMMER DETAIL 4' MIN. LEVEL SECTION STABILIZE OUTLET PLASTIC CORRUGATED PIPE 10' SPACING INLET 3: 1 4' MIN. DIVERSION DIKE HOLD-DOWN STAKES 1.5' MIN. PLAN VIEW STANDARD T-SECTION CROSS-SECTION VIEW ISLAND OVER INLET DIVERSION CHANNEL NATURAL GROUND TOP OF DIVERSION TOP OF HAND-COMPACTED FILL (ISLAND) 1' MIN.1.5' MIN. 6" MIN. 3: 1 NOTES: 1.Place slope drains on undisturbed soil or well compacted fill at locations and elevations shown on the plan. 2.Slightly slope the section of pipe under the dike toward its outlet. 3.Hand tamp the soil under and around the entrance section in lifts not to exceed 6 inches. 4.Fill over the drain at the top of the slope to a minimum of 1.5 feet depth, 4 feet top width and 3:1 side slopes. 2.Ensure all slope drain connections are watertight. 3.Compact fill material and securely fasten the exposed section of the drain with grommets or stakes spaced no more than 10 feet apart. 4.Extend the drain beyond the toe of the slope, and adequately protect the outlet from erosion. 5.Make the compacted, settled dike ridge no less than 1 foot above the top of the pipe at every point. 6.Immediately stabilize all disturbed areas following construction. MAINTENANCE: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater; repair immediately. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual Updates Size of Slope Drain Max. Drainage Area per Pipe (Acres) Pipe Diameter (Inches) 0.50 12 0.75 15 1.00 18 >1.00*as designed * Inlet design becomes more complex beyond this size. TEMPORARY SLOPE DRAINS 07/30/2025 Bart J. McClain July 30, 2025 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' Erosion Control Calc's and Details CS - 26 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 EROSION CONTROL DEVICES MAINTENANCE SPECIFICATIONS FOR Gravel Inlet Protection Inspect the barrier at least weekly and after each significant (1/2 inch or greater) rainfall and make repairs as needed. Remove sediment as necessary to provide adequate storage volume for subsequent rains. When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil, and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact it. Appropriately stabilize all bare areas around the inlet. Silt Fence Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. Construction Entrance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2- inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. Skimmer Basin Inspect skimmer sediment basins at least weekly and after each significant (one-half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re-anchor the baffles if water is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin, usually jerking on the rope will make the skimmer bob up and down and dislodge the debris and restore flow. If this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged; if so remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather can result in ice forming in the basin. Some special precautions should be taken in gthe winter to prevent the skimmer from plugging with ice. Porous Baffles Inspect baffles at least once a week and after each rainfall. Make any required repairs immediately. Be sure to maintain access to the baffles. Should the fabric of a baffle collapse, tear, decompose, or become ineffective, replace it promptly. Remove sediment deposits when it reaches half full to provide adequate storage volume for the next rain and to reduce pressure on the baffles. Take care to avoid damaging the baffles during cleanout. Sediment depth should never exceed half the designed storage depth. After the contributing drainage area has been properly stabilized, remove all baffle materials and unstable sediment deposits, bring the area to grade, and stabilize it. Porous Baffle Construction Specification Gravel Inlet Protection Construction Specification Skimmer Basin Diversion Ditch Inspect temporary diversions once a week and after every rainfall. Immediately remove sediment from the flow area and repair the diversion ridge. Carefully check outlets and make timely repairs as needed. When the area protected is permanently stabilized, remove the ridge and the channel to blend with the natural ground level and appropriately stabilize it. Diversion Ditch Construction Specification Erosion Control Matting Construction Specification See installation instructions on sheet CS-36. Slope Drain Construction Specification Erosion Control Matting Inspect Rolled Erosion Control Products at least weekly and after each significant (1/2 inch or greater) rain fall event repair immediately. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. Monitor and repair the RECP as necessary until ground cover is established. Slope Drain Inspect the slope drain and supporting diversion after every rainfall, and promptly make necessary repairs. When the protected area has been permanently stabilized, temporary measures may be removed, materials disposed of properly, and all disturbed areas stabilized appropriately. EROSION CONTROL DEVICES CONSTRUCTION SPECIFICATIONS FOR Permanent Stream Crossing Inspect permanent stream crossings periodically and after major storms to check for channel blockage, erosion of abutments, channel degradation, riprap displacement, slope failure, and piping. Make all needed repairs immediately to prevent further damage to the installation. Coffer Dam Inspect stone and liner periodically and after rain events to check for liner shifting, stone displacement, and erosion or channeling at edges. Male all repairs immediately. Coffer Dam Construction Specification TEMP. DIVERSION DITCH LINER OR EQUAL 07/30/2025 Bart J. McClain July 30, 2025 ARQ - ILM East Side Development ITEMS BELOW PRETAIN TO ALL EROSION CONTROL STAGES A. CONTRACTOR TO KEEP ABUTTING STREETS FREE OF SEDIMENT AT ALL TIMES. B. CONTRACTOR TO CONTINUOUSLY MAINTAIN EROSION CONTROL MEASURES ON-SITE TO ENSURE PROPER FUNCTION. C. CONTRACTOR TO ENSURE COMPLIANCE WITH CONDITIONS OF NPDES PERMIT. D. PRIOR TO IMPORT OF ANY OFF-SITE FILL, CONTRACTOR MUST NOTIFY NCDENR (910-433-3300) OF SOURCE OF BORROW AND FURNISH TO NCDENR DOCUMENTATION FOR THE APPROVED PERMIT ASSOCIATED WITH THE BORROW SOURCE. STAGE 1A SEQUENCE OF CONSTRUCTION OPERATIONS 1. OBTAIN PLAN APPROVAL AND OTHER APPLICABLE PERMITS. 2. SCHEDULE PRE-CONSTRUCTION CONFERENCE AT LEAST ONE WEEK PRIOR TO STARTING CONSTRUCTION. 3. INSTALL MANUAL ACCESS GATES AT PROPOSED CONSTRUCTION ENTRANCES #1 & 2 AS SHOWN ON THE PLAN. 4. DISTURBING ONLY AS MUCH AS NECESSARY, INSTALL CONSTRUCTION ENTRANCE #1 WITH DRIVEWAY CULVERT, CONSTRUCTION ENTRANCE #2, SILT FENCE, COMBINATION TREE/SILT FENCE, AND TREE PROTECTION FENCE AS SHOWN ON PLAN. 5. INSTALL 20' GRAVEL ACCESS DRIVE AND GRAVEL EMPLOYEE PARKING WITH FENCING AT CONSTRUCTION ENTRANCE #2. 5. ONCE PERIMETER EROSION CONTROL IS INSTALLED, INSTALL PERMANENT STORM FES 30A - 30B, SWALE EAST-1B, FES 31 - MH 32, AND ASSOCIATED GRADING REQUIRED. 6. ONCE PERMANENT STORM PIPE IS INSTALLED, INSTALL TEMPORARY RISER SKIMMER BASIN #2, CONNECT OUTLET BARREL TO MH 32, DIVERT EXISTING DITCH INTO TEMPORARY BASIN #2, AND CONSTRUCT DIVERSION DITCHES AS SHOWN ON PLAN. 7. CALL EROSION INSPECTOR FOR AN ON-SITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT TO OBTAIN A CERTIFICATE OF COMPLIANCE. 8. ONCE CERTIFICATE OF COMPLIANCE IS OBTAINED, BEGIN STAGE 1B CONSTRUCTION SEQUENCE STAGE 1C SEQUENCE OF CONSTRUCTION OPERATIONS 1. ENSURE ACCESS TO THE EXISTING SOUTH SIDE T-HANGARS FROM CONTROL TOWER ROAD IS PROVIDED AND FUNCTIONING. 2.CLOSE MORRIS ROAD ENTRANCE AND INSTALL CONSTRUCTION ENTRANCE #3. 3. INSTALL PERMANENT RISER BASIN #3 AND ASSOCIATED STORM DRAINAGE OUTLET PIPING. 4. AS STORM IS INSTALLED, IMMEDIATELY INSTALL INLET PROTECTION AS SHOWN ON PLAN. 5. AS SITE IS BROUGHT UP TO GRADE, INSTALL UTILITIES AND STORM DRAINAGE AS SHOWN ON THE PLAN. AS STORM DRAINAGE IS INSTALLED, DIVERT FLOW FROM TEMPORARY RISER BASIN #2 TO ADJACENT STORM DRAINAGE INLETS WITH INLET PROTECTION. 4. ONCE ALL FLOW IS DIVERTED FROM BASIN #2, CONTACT NCDENR (910-433-3300) FOR PERMISSION TO REMOVE TEMPORARY SEDIMENT BASIN #2 AND BRING AREA UP TO GRADE. 5. ALL CUT AND FILL SLOPES OF 3:1 OR STEEPER IN SLOPE SHALL BE STABILIZED BY TEMPORARY SEEDING WITHIN 14 DAYS OF ACHIEVEMENT OF THE SLOPE. 6. FOLLOWING COMPLETION OF CURBS AND PLACEMENT OF STONE BASE FOR PARKING AREAS AND DRIVES, AND ALL DISTURBED AREAS HAVE BEEN STABILIZED, CONTACT NCDENR (910-433-3300) FOR PERMISSION TO REMOVE BAFFLES AND SKIMMERS FROM PERMANENT RISER BASINS #1 AND #3. 7. NOTIFY NCDENR (910-433-3300) FOR COMPLIANCE INSPECTION. 8. UPON ATTAINMENT OF FULL STABILIZATION OF ALL DISTURBED AREAS, REMOVE ALL REMAINING PERIMETER EROSION CONTROL MEASURES. STAGE 1B SEQUENCE OF CONSTRUCTION OPERATIONS 1. BEGIN CONSTRUCTION AND ASSOCIATED GRADING FOR PERMANENT RETAINING WALL WEST OF CONSTRUCTION #1. 2. AS RETAINING WALL BEGINS, INSTALL PERMANENT RISER/SKIMMER BASIN #1 WITH ASSOCIATED DITCH, AND INSTALL STORM PIPING AND STRUCTURES FES 40, CB 41, MH 41A, CB 70, AND CB 72. 3. AS WALL REACHES COMPLETION, INSTALL 20' GRAVEL DRIVE WITH SHOULDERS, AND SLOPE AT 3:1 TO TOP OD SEDIMENT BASIN #2 DAM. 4. AS STORM IS INSTALLED, IMMEDIATELY INSTALL INLET PROTECTION AS SHOWN ON PLAN. 5. AS THE STAGE 1B GRADING IS COMPLETE, STABILIZE ALL DISTURBED AREAS ACCORDING TO THE NPDES GROUND STABILIZATION CHART LOCATED ON THIS SHEET. 12. BEGIN STAGE 1C CONSTRUCTION SEQUENCE OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 Wilmington International Airport WWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SSSSSSSSSSSS SSSSSSSS SSSS SS SS SS SS SS SS SS SS SS SS PROP. MH 41A PROP. GI 71 PROP. CB 70 PROPOSED HANGAR B FFE 21.00 PROPOSED HANGAR A FFE 21.00 PROP. JB 58 PROP. SLOT DRAIN PROP. JB 43 CEMETERY ACCESS PROPOSED RETAINING WALL 262 LF GRASSED SWALE EAST-1A FROM EDDB EAST-1A EDDB EAST-1A 162 LF GRASSED SWALE EAST-1B FROM EDDB EAST-1B PROP. RISER 40B TOP 14.85 12" INV 12.00 18" INV 10.60 PROP. FES 31 INV 9.5 PROP. 18" HDPE PROP. 12" HDPE PRO P . 4 2 " H D P E PR O P . 3 6 " H D P E PR O P . 2 4 " H D P E PR O P . 2 4 " H D P E PROP. FES 40A INV 10.30 PROP. END 74 12 11 10 10 ' T O P E L E V 1 6 . 0 3 ' T O P E L E V 1 2 . 0 20 20 20 20 20 17 18 19 20 1 2 20 20 20 20 15 1617 1 3 14 1 5 16 16 15 1 4 13 11 10 12 11 1 0 10 11 12 12 1 1 10 13 1415 1617 1819 20 1314 15 1617 1819 20 14 13 1 2 12 1 1 1 0 PROP. 18" RCP PRO P . 1 2 " H D P E PROP. JB 61 PROP. SLOT DRAIN TOP 19.71 PROP. 18 " H D P E 20 19 20 20 PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM Wilmington International Airport PRO P . 1 8 " H D P E 20 PROP. CB 41 PR O P . 4 2 " H D P E PRO P . 4 2 " H D P E GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) GPR CEMETERY BUFFER FROM NEW SOUTH ASSOC., INC. (ARCHAEOLOGIST) PROPOSED NCDOT STD GUARDRAIL PROP. 10' EMERGENCY SPILLWAY ELEV 15.0 PROP. RAILROAD TIE CHECK DAM (TYP) PR O P . 1 8 " H D P E PRO P . 1 5 " H D P E PROP. CB 72 PROP. CB 42 1 3 1 4 1 4 1 3 1 3 1 4 1 5 1 5 1 4 1 3 FOREBAY PROP. 10' RIP-RAP SPILLWAY EL 14.0 PROP. 4' WIDE 1' TALL BERM FOR FLOW DIVERSION AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1A X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP. VEDLOCITY DISSIPATOR SEE CALCS PROP. FES 40 15 PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) PROPOSED CONTROLLED ACCESS GATE #3 19 18 17 20 WW SS SS W EE TT GG 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 As Shown EDDB EAST-1A Plan / Profile CS - 27Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) July 30, 2025 0'40'80'120' GRAPHIC SCALE (IN FEET) 1 INCH = 40 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 07/30/2025 Bart J. McClain EDDB EAST-1A PLAN VIEW EDDB EAST-1A PROFILE VIEW HORIZ SCALE 1" = 5' VERT SCALE 1" = 2' HORIZ SCALE 1" = 40' SHWT NOTE: SHWT borings were conducted by Soil & Environmental Consultants, Inc., on March 13, 2024 to determine approximate SHWT elevations at the EDDB locations. All EDDB's are 1' or more above the SHWT at the boring locations. Note; EDDB East-1A utilizes a flow diversion berm to prevent short circuiting of the proposed basin. APPROX. 0.5% BOTTOM SLOPE FROM FOREBAY TO OUTLET PIPE. ANTI-FLOATATION CONCRETE PROP. 43.38' 18" RCP @ 0.69% TOP OF 10' DAM ELEV. 16.00 3:1 SL O P E SLOPE ( S E E G R A D I N G P L A N ) PROPOSED TRASH RACK RISER TOP ELEV 14.85 10' EMERGENCY SPILLWAY ELEV. 15.00 PROPOSED 12' PVC DRAWDOWN PIPE INV 12.77 RISER 40B INV 10.60 FES 40A 18" RCP INV 10.30 WIRE MESH OVER OPENING PROP. 2'x2' INSIDE CONCRETE RISERTEMPORARY POOL ELEV. 14.67 TREATMENT SWALE 4' BOTTOM, 3:1 SIDES, 0.5% SLOPE PROP. 20.50' 42" HDPE @ 0.54% FES 40 42" HDPE 14.00 4' FOREBAY BERM ELEV. 15.0 FOREBAY BOTTOM ELEV. 13.00 3:1 S L O P E PROP. VELOCITY DISSIPATOR 3:1 3: 1 10' WIDE RIP-RAP SPILLWAY/KEYWAY THROUGH DAM. EL. 14.0 GEO-TEXTILE UNDERLINER WITH 4" CABC ABOVE. CLASS A RIP-RAP ABOVE CABC TO ALLOW FILTRATION FROM FOREBAY TO BASIN TO PREVENT PONDING. Forebay Note; A rip-rap spillway/keyway is being used in the forebay berm to impound water and allow sediment to settle out, as well as allow to percolate through the keyway to prevent extended ponding within the forebay. ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X X X X X X X X X X X X X X X X X X X X X X X X X X X WWWWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SS SS SS SS SSSS SS SS PROP. GI 73 PROPOSED HANGAR D FFE 21.00 PROP. SLOT DRAIN TOP 20.21 PROP. JB 46 PROP. GI 30B PROP. FES 30A PROP. FES INV 13.00 PROP. FES INV 11.70 PROP. DI 34 (1 0 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROPOSED RETAINING WALL 162 LF GRASSED SWALE EAST-1B FROM EDDB EAST-1B PROP. FES 31 INV 9.5 PROP. CB 33 PROP. ST MH 32 PROP. 18" HDPE PR O P . 1 8 " H D P E PROP. 24" HDPE PROP. 84.56' 18" RCP @ 1.54% PROP. 18" HDPE PROP. 12" HDPE PROP. JB 45D PROP. JB 45C PR O P . 1 5 " H D P E PRO P . 1 2 " H D P E 20 20 20 20 19 18 17 16 15 1617 1819 20 11 10 15 1617 1819 20 14 910 11121211 10 9101112 13 14 13 1 2 12 1 1 1 0 PROP. 18" RCP PROP. RAILROAD TIE CHECK DAM PROP. RAILROAD TIE CHECK DAM (TYP) PROP. CB 72 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) WATERFLOW SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS W W W W PROP. JB 51 BUILDING #3 PROPOSED 2-STORY FFE 19.25 PROP. FES 80 INV 17.00 PROP. GI 47 PR O P . 1 5 " H D P E PROP. 15" HDP E PROP. RISER 37 TOP 17.80 12" INV 15.00 18" INV 12.74 PROP. GI 10 PROP. GI 11 PROP. GI 28 PROP. GI 27 EDDB EAST-1B PROP. ST MH 36 PROP. ST MH 35 PROP. FES 81 INV 17.50 PROP. CB 9 PROP. CB 8 PR O P . 1 5 " H D P E PROP. 15" HDPE PROP. 77.00' 18" HDPE @ 0.65% PR O P . 1 8 " H D P E PROP. 18" RCP PR O P . 1 2 " H D P E PROP. FES INV 18.65 PROP. FES INV 18.10 PROP. 81.22' 18" RCP @ 0.68% PR O P . 1 2 " H D P E PROP. 6' GAP NO SLOT DRAIN PROP. VEL DISS PROP. VEL DISS/ 22 2 2 22212019 21 20 20 20 20 19 2 0 20 20 20 20 1716 15 2121201918 17 16 19 19 19 1 8 18 171819202122 22 2 2 21 20 19 18 22 22 22 22 22 2 222 22 22 22 22 22 23 23 23 23 23 23 23 23 23 22 21 22 18 19 18 17 16 21 22 21 2 1 21 SS SS 10 ' T O P E L E V 2 0 . 0 X X X X X X X X X X PROPOSED GSE BLDG. FFE 21.00 PROPOSED HANGAR E FFE 21.00 HANGAR FFE 21.20 BUILDING #1 21 21 21 19 SS SS W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W SS SS SS SS W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS SS SS SSSSSSSS SSSSSSSS PROP. SLOT DRAIN TOP 20.55 20 20 20 PR O P . 1 8 " H D P E PRO P . 1 8 " H D P E 21 PROP. GI 45E SS SS WWWWWWWWWWWWWW 20 2 0 20 1 9 19 20 2 1 2 2 70' R 45' R PROPOSED 24" SPILL CURB (TYP) PROPOSED STOP BAR AND SIGN PROPOSED STOP BAR AND SIGN PROPOSED 24" SPILL CURB (TYP) PROPOSED 24" STD. CURB (TYP) PROP. 81.22' 18" RCP @ 0.68% PROP. FES INV 18.10 PROP. FES INV 18.65 16 . 5 1 6 PROP. 10' RIP-RAP SPILLWAY EL 18.0 1716 18 1 5 . 5 15.5 18 17 FOREBAY FOREBAY FOREBAY PROP. 10' RIP-RAP SPILLWAY EL 17.5 PROP. 10' RIP-RAP SPILLWAY EL 16.5 W W W W PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 3 PROPOSED 8'x12' CONC. GENERATOR PAD HANGAR E PROPOSED 8'x12' CONC. GENERATOR PAD BUILDING 1 PROP. FES 110 INV 19.0 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW WW W W 21 21 PROPOSED 8' SECURITY FENCE (TYP) PROPOSED 8' SECURITY FENCE (TYP) 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' EDDB EAST-1B Plan / Profile Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 0'40'80'120' GRAPHIC SCALE (IN FEET) 1 INCH = 40 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 Bart J. McClain EDDB EAST-1B PLAN VIEW SWALE EAST-1B EDDB EAST-1B PROFILE VIEW HORIZ SCALE 1" = 5' VERT SCALE 1" = 2' HORIZ SCALE 1" = 40'HORIZ SCALE 1" = 40' WW SS SS W EE TT GG ANTI-FLOATATION CONCRETE PROP. 18.89' 18" RCP @ 0.53% TOP OF 10' DAM ELEV. 20.00 3:1 SL O P E PROPOSED TRASH RACK RISER TOP ELEV 17.80 10' EMERGENCY SPILLWAY ELEV. 19.00 PROPOSED 12' PVC DRAWDOWN PIPE INV 15.00 RISER 37 INV 12.74 WIRE MESH OVER OPENING PROP. 2'x2' INSIDE CONCRETE RISER TEMPORARY POOL ELEV. 16.50 PROP. 77.00' 18" HDPE @ 0.65% FES 18" HDPE 17.00 3:1 S L O P E TO MH 36PROP. VELOCITY DISSIPATOR 4' FOREBAY BERM SEE PLAN VIEW FOR FOREBAY ELEVATIONS 3:1 3: 1 10' WIDE RIP-RAP SPILLWAY/KEYWAY THROUGH DAM. FOREBAY BOTTOM SEE PLAN GEO-TEXTILE UNDERLINER WITH 4" CABC ABOVE. CLASS A RIP-RAP ABOVE CABC TO ALLOW FILTRATION FROM FOREBAY TO BASIN TO PREVENT PONDING. APPROX. 0.5% BOTTOM SLOPE FROM FOREBAY TO OUTLET PIPE. Forebay Note; A rip-rap spillway/keyway is being used in the forebay berm to impound water and allow sediment to settle out, as well as allow to percolate through the keyway to prevent extended ponding within the forebay. SHWT NOTE: SHWT borings were conducted by Soil & Environmental Consultants, Inc., on March 13, 2024 to determine approximate SHWT elevations at the EDDB locations. All EDDB's are 1' or more above the SHWT at the boring locations. CS - 28 July 30, 2025 07/30/2025 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 W W PROP. 30" HDPE PROP. ADS SLOT DRAIN TOP 22.00 PR O P . 3 6 " H D P E PR O P . 3 0 " H D P E PROP. FES 1 PROP. RISER 1D TOP 16.50 12" INV 13.8 18" INV 13.8 PROP. GI 2 PROPOSED HANGAR 4 FFE 22.50 251 LF GRASSED SWALE EAST-1C FROM EDDB EAST-1C EDDB EAST-1C W W W PROP. FES 1A PROP. GI 1B PROP. MH 3 PR O P . 2 4 " H D P E PROP. FES 1C PROP. VEL DISS 1817161514 18 10 ' T O P E L E V 1 8 . 0 17 16 15 14 13 13 14 15 15 14 2221201918 17 161514 222120 19 22 21 20 21 18 17 161514 PROP. 12" HDP E PROP. ADS SLOT DRAIN TOP 22.00PROP. 6' GAP NO SLOT DRAIN END PIPE 2B INV 19.50 END PIPE 2A INV 18.50 PROP. 18" RCP PROP. 18" RCP PROP. RAILROAD TIE CHECK DAM (TYP) PROP. RAILROAD TIE CHECK DAM (TYP) PROP. 10' EMERGENCY SPILLWAY ELEV 17.0 S S END PROP SILT FENCE & BEGIN COMBINATION SILT AND TREE PROTECTION FENCE PROPOSED COMBINATION SILT AND TREE PROTECTION FENCE PROPOSED COMBINATION SILT AND TREE PROTECTION FENCE 16 15 14 16 15 14 PROP. 10' RIP-RAP SPILLWAY EL 15.0 FOREBAY AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1C AREA OUTSIDE PROJECT AREA CONTRIBUTORY TO EDDB EAST-1C FOREBAY BOTTOM IS 6.6' ABOVE TOP OF SEWER PIPE 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 1" = 100' EDDB EAST-1C Plan / Profile Contact the North Carolina One Call Center prior to doing any digging. (1-800-632-4949) 0'40'80'120' GRAPHIC SCALE (IN FEET) 1 INCH = 40 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 Bart J. McClain EDDB EAST-1C PLAN VIEW EDDB EAST-1C PROFILE VIEW HORIZ SCALE 1" = 5' VERT SCALE 1" = 2' HORIZ SCALE 1" = 40' WW SS SS W EE TT GG ANTI-FLOATATION CONCRETE PROP. 38.50' 18" RCP @ 1.04% TOP OF 10' DAM ELEV. 18.00 3:1 SL O P E PROPOSED TRASH RACK RISER TOP ELEV 16.50 10' EMERGENCY SPILLWAY ELEV. 17.00 PROPOSED 12' PVC DRAWDOWN PIPE INV 14.00 RISER 1D INV 14.00 WIRE MESH OVER OPENING PROP. 2'x2' INSIDE CONCRETE RISER TEMPORARY POOL ELEV. 16.42 PROP. 63.89' 36" HDPE @ 0.50% FES 1 36" HDPE INV 14.20 3:1 S L O P E FES 1C 18" RCP INV 13.60 TREATMENT SWALE 4' BOTTOM, 3:1 SIDES, 0.5% SLOPE 3:1 S L O P E TO GI 2 3:1 3: 1 10' WIDE RIP-RAP SPILLWAY/KEYWAY THROUGH DAM. EL. 15.0 APPROX. 0.5% BOTTOM SLOPE FROM FOREBAY TO OUTLET PIPE. 4' FOREBAY BERM ELEV. 16.0 PROP. VELOCITY DISSIPATOR FOREBAY BOTTOM SEE PLAN GEO-TEXTILE UNDERLINER WITH 4" CABC ABOVE. CLASS A RIP-RAP ABOVE CABC TO ALLOW FILTRATION FROM FOREBAY TO BASIN TO PREVENT PONDING. Forebay Note; A rip-rap spillway/keyway is being used in the forebay berm to impound water and allow sediment to settle out, as well as allow to percolate through the keyway to prevent extended ponding within the forebay. SHWT NOTE: SHWT borings were conducted by Soil & Environmental Consultants, Inc., on March 13, 2024 to determine approximate SHWT elevations at the EDDB locations. All EDDB's are 1' or more above the SHWT at the boring locations. CS - 29 July 30, 2025 07/30/2025 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 1150 SE MAYNARD ROAD SUITE 260 CARY, NC 27511 (919) 467-9708 C-0329 NCG-01 GROUND COVER & MATERIALS HANDLING GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before discharging offsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A A BELOW GRADE WASHOUT STRUCTURE 1:1 SIDE SLOPE (TYP.) 10 MILPLASTICLINING 3'-0" MIN. & X' MAX. SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE SECTION B-B HIGHCOHESIVE &LOW FILTRATIONSOIL BERM 8" 6" 2' HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE (TYP.) 10 MIL PLASTIC LINING B B 3'-0" MIN.& X' MAX. A SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES SANDBAGS (TYP.) OR STAPLES NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. NOTES: 1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETE WASHOUT CLEARLY MARKED SIGNAGE NOTING DEVICE (18"X24" MIN.) SILT FENCE 10' MIN 10' MIN SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasing land disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10 feet or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed Temporary Stabilization Permanent Stabilization ·Temporary grass seed covered with straw or other mulches and tackifiers. ·Hydroseeding ·Rolled erosion control products with or without temporary grass seed ·Appropriately applied straw or other mulch ·Plastic sheeting ·Permanent grass seed covered with straw or other mulches and tackifiers ·Geotextile fabrics such as permanent soil reinforcement matting ·Hydroseeding ·Shrubs or other permanent plantings covered with mulch ·Uniform and evenly distributed ground cover sufficient to restrain erosion ·Structural methods such as concrete, asphalt or retaining walls ·Rolled erosion control products with grass seed NCG01- SELF INSPECTION PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1.E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: (a)This General Permit as well as the Certificate of Coverage, after it is received. (b)Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1.Occurrences that Must be Reported Permittees shall report the following occurrences: (a)Visible sediment deposition in a stream or wetland. (b)Oil spills if: ·They are 25 gallons or more, ·They are less than 25 gallons but cannot be cleaned up within 24 hours, ·They cause sheen on surface waters (regardless of volume), or ·They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d)Anticipated bypasses and unanticipated bypasses. (e)Noncompliance with the conditions of this permit that may endanger health or the environment. 2.Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a)The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur. The non-surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b)The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c)Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d)Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e)Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f)Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. Item to Document Document Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures are modified after initial installation. (b) A phase of grading has been completed.Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. Occurrence (a) Visible sediment deposition in a stream or wetland Reporting Timeframe (After Discovery) and Other Requirements • Within 24 hours, an oral or electronic notification. • Within 7 Calendar Days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case- by-case basis. • If the stream is named on the NC 303(d) list as impaired for sediment- related caused, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired-waters conditions. (b) Oil spills and release of hazardous substances per item 1(b)-(c) above (c) Anticipated bypasses [40 CFR 122.41(m)(3)] (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] (e) Noncompliance with the conditions of this permit that may endanger health or the environment [40 CFR 122.41(I)(7)] • Within 24 Hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. • Within 24 Hours, an oral or electronic notification • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. • Within 24 Hours, an oral or electronic notification • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate and prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case- by-case basis. Inspect (1) Rain gauge maintained in good working order Frequency (during normal business hours) Daily Inspection records must include: (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours. (3) Stormwater discharge outfalls(SDOs) At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours. (4) Perimeter of Site At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours. (5) Streams or wetlands onsite or offsite (where accessible) (6) Ground Stabilization Measures At least once per 7 calendar days and within 24 hours of a rain event ≥ 1.0 inch in 24 hours. After each phase of grading. 1. Identification of the measures inspected 2. Date and Time of the inspection 3. Name of the person performing the inspection 4. Indication of whether the measures were operating properly 5. Description of maintenance needs for the measure 6. Description, Evidence, and date of corrective actions taken Daily rainfall amounts. If no daily rain gauge observations are made during weekend on holiday periods, and no individual-day rainfall information is available, record the cumulative rain measurement for those unattended days (this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "Zero." The permittee may use another rain-monitoring device approved by the Division. 1.Identification of the discharge outfalls inspected 2.Date and Time of the inspection 3.Name of the person performing the inspection 4.Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration 5.Indication of visible sediment leaving the site 6.Description, Evidence, and date corrective actions taken If visible Sedimentation is found outside site limits, then record of the following shall be made: 1)Actions taken to clean up or stabilize sediment that has left the site limits 2)Description, Evidence and date of corrective actions taken 3)An explanation as to the actions taken to control future releases If the stream or wetland has increased visible sedimentation or has visible increased turbidity from the construction activity, then a record of the following shall be made: 1)Description, Evidence and date of corrective actions taken 2)Records of required reports to the appropriate Division Regional Office per Part III, Section C, Item(2)(a) of this permit 1.The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land-disturbing activity, construction or redevelopment, permanent ground cover). 2.Documentation that the required ground stabilization measures have been provided within the required timeframe or assurance that they will be provided as soon as possible. 1" = 100' NCG01 Details CS - 30 DEVELOPER: ARQ Realty, LLC 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 07/30/2025 Bart J. McClain July 30, 2025 ARQ - ILM East Side Development OWNER: NHC; NHC Airport Authority 1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 TREES BO SRO CM GK GINKGO BILOBA 'PRINCETON SENTRY' MALE GINKGO LAGERSTROEMIA INDICA 'CATAWBA' CATAWBA CREPE MYRTLE QUERCUS FALCATA SOUTHERN RED OAK QUERCUS NIGRA BLACK OAK FSG LIQUIDAMBAR STYRACIFLUA 'ROTUNDILOBA' FRUITLESS SWEETGUM SBM MAGNOLIA VIRGINIANA 'MOONGLOW' MOONGLOW SWEETBAY MAGNOLIA CT VITEX AGNUS-CASTUS 'SHOAL CREEK' SHOAL CREEK CHASTE TREE SHRUBS OL NERIUM OLEANDER 'HARDY RED' HARDY RED OLEANDER DYH ILEX VOMITORIA 'NANA' DWARF YAUPON HOLLY CCL PRUNUS CAROLINIANA 'MONUS' BRIGHT'N'TIGHT (R) CAROLINA CHERRY LAUREL WM MYRICA CERIFERA WAX MYRTLE CJ JUNIPERUS HORIZONTALIS 'BLUE CHIP' BLUE CHIP CREEPING JUNIPER AB ABELIA X GRANDIFLORA 'ROSE CREEK' ROSE CREEK GLOSSY ABELIA JV JUNIPERUS VIRGINIANA EASTERN RED CEDAR SWO QUERCUS LYRATA SWAMP WHITE OAK OLP NERIUM OLEANDER 'PETITE PILAR CREAM' PETITE PILAR CREAM DWARF OLEANDER WATERFLOWCO PROP. BIKE RACK X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X XXXXXXXXX X X X XXXXXXXXX SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS W W W W WWWWWWWWWWWWWWWWWWW W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W SS SS SS SS W W W W W W SS SS WWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW WW W W SSSSSSSSSSSSSSSSSSSSSSSSSSSS W W W W W W W W W W W W W W W W W W W W KE R R A V E N U E ( S R 1 7 5 ) 10 0 ' P U B L I C R O W 25 ' S E T B A C K & S T R E E T Y A R D B U F F E R 20.00' ST R E E T S E G M E N T A : 1 0 7 0 L F 25.00' 25 ' S E T B A C K & S T R E E T Y A R D B U F F E R STR E E T S E G M E N T B : 7 7 0 L F 25.00' 12' 20 . 0 0 ' BUILDING #1 OFFICE/SCHOOL BUILDING 2: EXISTING HANGAR BUILDING 2: EXISTING OFFICE SCM DRY BASIN COVERED ENTRYWAY SCM DRY BASIN BUILDING 1 HANGAR MORR I S R D FOREBAY PROPOSED HANGAR 1 PROPOSED HANGAR E PROPOSED HANGAR G PROPOSED HANGAR F PROPOSED HANGAR A PROPOSED HANGAR B PROPOSED HANGAR C PROPOSED HANGAR D EXISTING WETLANDS NO PLANTS INSIDE SECURITY FENCE PROPOSED GSE BLDG NO PLANTS INSIDE SECURITY FENCE NO PLANTS INSIDE SECURITY FENCE NO P L A N T S I N S I D E S E C U R I T Y F E N C E 3-SRO 500 SF ENHANCED LANDSCAPE (1/L-1.2) TIE INTO EXISTING PAVEMENT 24" CURB (TYP.) PROP. WALLS PROP. SIGN IN FUTURE PHASE DUMPSTERS & SCREENING WALL, TYP. 5' SIDEWALK, TYP. PAVED VIEWING PLATFORM WITH MOVEABLE SEATING PROP. FENCE SOD, TYP. 6' BENCH, TYP. EX TREE TO REMAIN 2" MULCH IN TREE ISLANDS, TYP. STOP SIGN, TYP.SOD, TYP. 10-WM 5' SIDEWALK, TYP. EAST 2 487 SF FOUNDATION PLANTING (5/L-1.1) SOUTH 1 679 SF FOUNDATION PLANTING (5/L-1.1) 1-SBM 1-SBM 3-SRO 2-SBM 1-BO 3-GK 1-CM 1-CM 2-GK 1-CM 1-CM 1-BO 3-BO 6' BENCH, TYP. 2-FSG2-FSG NO PLANTS IN UTILITY EASEMENT 12-CCL SOD, TYP. 5-WM 5-WM 5-WM BIKE RACK SOD, TYP. HYDRANT, TYP. NO PLANTS IN UTILITY EASEMENT HYDRANT, TYP. 2" MULCH IN TREE ISLANDS, TYP. HYDRANT, TYP. 15-CCL 2" MULCH TO BEDLINE, TYP. EAST 1 337 SF FOUNDATION PLANTING (5/L-1.1) 2" MULCH, TYP. 2" MULCH TO BEDLINE, TYP. REQUIRED STREET YARD BUFFER CONTINUES (2/L-1) REQUIRED STREET YARD BUFFER CONTINUES (2/L-1) 479 SF ENHANCED LANDSCAPE (1/L-1.2) 1-SBM 5' SIDEWALK, TYP. 5' SIDEWALK, TYP. SOD, TYP. SOD, TYP. SOD, TYP. STOP SIGN, TYP. 7-FSG 2-GK 1-CT 2-SBM 2-SBM 2-SBM 1-CT 1-FSG 1-BO 2-BO 1-CT 1-BO 1-SWO 1-BO 1-SWO 1-BO 1-CT 1-CT 1-CT 1-GK 1-GK 1-GK 1-GK 12-SRO HYDRANT, TYP. 6-WM 5-WM 5-WM 5-WM EX. UTILITY EASEMENT SOD, TYP. NO PLANTS IN UTILITY EASEMENT3-WM SOD, TYP. 2" MULCH IN TREE ISLANDS, TYP. 1-GK 3-CCL 1-BO 820 SF FOUNDATION PLANTING (1/L-1.1) 1,652 SF FOUNDATION PLANTING (1/L-1.1) 953 SF FOUNDATION PLANTING (1/L-1.1) 847 SF FOUNDATION PLANTING (2/L-1.1) 514 SF FOUNDATION PLANTING (2/L-1.1) 1,102 SF FOUNDATION PLANTING (3/L-1.1) 1-GK 3-WM NO PLANTS IN UTILITY EASEMENTS 1,370 SF FOUNDATION PLANTING (3/L-1.1) BUILDING 3 768 SF FOUNDATION PLANTING (4/L-1.1) STOP SIGN, TYP. BENCH, TYP. 10. 0 0 ' 2" MULCH, TYP. STOP SIGN, TYP. 2" MULCH TO FENCE LINE, TYP. 2" MULCH, TYP. 1-JV 2" MULCH TO BEDLINE, TYP. SOD, TYP. GSE BUILDING TO BE SCREENED BY STREET YARD BUFFER SOD, TYP. 1-FSG 1-GK STOP SIGN, TYP. 10-OLP 3-DYH 3-DYH 3-GK 5' SIDEWALK, TYP. 5' SIDEWALK, TYP. 16' 12' 25 ' S E T B A C K & S T R E E T Y A R D B U F F E R 25.00' 24.00' CANOPY TREE (A) 24.00' 25 . 0 0 ' UNDERSTORY TREE (C) SHRUB CANOPY TREE (B) UNDERSTORY TREE (D) 600 SF 600 SFWATERFLOW 6-24 6-24 CO CO XX X X X X X X X X X X X X X X X X X XXXXXXX X X X X X X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXX X XX XX X X XX X X XX X X XX X X X XX X X X X X XX X X X X X X X X X X X X X X X X X X X XX X X XX X X X X X X X X X X X X X X XX XX XX X X XX X X XX X X X X X X X XX X X XX X X XX X X X X X X X XXX XX X X X X X X X X X X X X XX X XX X X X X X X X X X X XXXX XXX XXX PROJECT BOUNDARY BLDG 1 BLDG 2 HANGARS HANGARS KE R R A V E BLDG 3 L-1 SCALE: DRAWN BY: DATE: OF SHEET REVISIONS: PROJECT # LA N D S C A P E A R C H I T E C T U R E & L A N D P L A N N I N G 50 1 1 S O U T H P A R K D R I V E , S T E . 2 0 0 - D U R H A M , N C 2 7 7 1 3 p: ( 9 1 9 ) 4 8 4 - 8 8 8 0 e : i n f o @ t m t l a . c o m 07/31/2025 PMP, MK, MA WI L M I N G T O N , N C 2 8 4 0 3 14 2 0 J O H N M O R R I S R D AR Q - I L M E A S T S I D E D E V . 03 LA N D S C A P E P L A N AS NOTED 24012 REQUIRED LANDSCAPE SCALE: 1"=50' 1 L-1 REQUIRED LANDSCAPE CALCULATIONS PRELIMINARY NOT FOR CONSTRUCTION 2025-07-31 PER NEW HANOVER COUNTY UDO PARKING AREA - INTERNAL PLANTINGS REQUIRED: -1 TREE PER 144 S.F. OF TOTAL INTERIOR LANDSCAPED AREA -MIN. 1 TREE PER PARKING ISLAND (12' WIDE) -MIN. SIZE AT INSTALL: CANOPY TREES 2"CAL, UNDERSTORY TREES 8'HT, SHRUBS 18" HT TOTAL AREA USED FOR PARKING, LOADING, DRIVEWAYS, INTERNAL DRIVE AISLES AND OTHER VEHICULAR AND PEDESTRIAN USE:112,994 SF TOTAL INTERIOR LANDSCAPE AREA REQUIRED:9,040 SF (8%) MINIMUM VSA TREES REQUIRED: 9,430 / 144 = 62.8 (63) TOTAL INTERIOR LANDSCAPE AREA PROVIDED:11,837 SF (10%) TOTAL VSA TREES REQUIRED: 11,837 / 144 = 82.2 75% CANOPY: 83 X 0.75 = 62.25 (63) 25% UNDERSTORY: 83 X 0.25 = 20.75 (21) TOTAL VSA TREES PROVIDED = 84 PARKING AREA - SCREENING REQUIRED: PARKING AREAS WITHIN 50' FROM THE PUBLIC R/W SHALL BE SCREENED PROVIDED:PARKING AREAS ALONG MORRIS ROAD SCREENED WITH A ROW OF EVERGREEN SHRUBS AND REQUIRED PARKING AREA CANOPY TREES FOUNDATION PLANTINGS REQUIRED: FOR ALL PORTIONS OF BUILDING ADJACENT TO PARKING LOTS OR INTERNAL DRIVE AISLES, 12% 1ST FLOOR BUILDING FACE AREA TO HT OR 25', WHICHEVER IS LESS BUILDING 1: EAST 1: 112 LF x 25' HT = 2,800 SF 2,800 LF x 0.12 = 336 SF REQUIRED 337 SF OF FOUNDATION PLANTING AREA PROVIDED (12%) EAST 2:139.3 LF x 25' HT = 3,483.25 SF 3,483.25 x 0.12 = 417.99 (418) SF REQUIRED 679 SF OF FOUNDATION PLANTING AREA PROVIDED (19%) SOUTH 1: 87.1 LF x 25' HT = 2,177.1 SF 2,177.1 x 0.12 = 261.3 (262) SF REQUIRED 460 SF OF FOUNDATION PLANTING AREA PROVIDED (21%) BUILDING 2: 265.2 LF x 25' HT = 6,630 SF 6,630 x 0.12 = 795.6 (796) SF 1,102 OF FOUNDATION PLANTING AREA PROVIDED (17%) BUILDING 3: 400 LF x 12' = 4,800 SF 4,800 x 0.12 = 576 SF 768 SF OF FOUNDATION PLANTING AREA PROVIDED (16%) HANGAR 1: 456 LF x 25' HT = 11,400 SF 11,400 x 0.12 = 1,368 SF 1,270 SF OF FOUNDATION PLANTING AREA PROVIDED (12%) HANGAR A :120 LF x 25' HT = 3,000 SF 3,000 x 0.12 = 360 SF 820 SF PROVIDED (27%) HANGAR B/C:226.9 LF x 25' HT = 5,672.5 (5,673) SF 5,673 x 0.12 = 680.7 SF 1,652 SF PROVIDED (29%) HANGAR D: 256.4 LF x 25' HT = 6,410 SF 6,410 x 0.12 = 769.2 (770) SF 953 SF PROVIDED (15%) HANGAR E:256.4 LF x 25' HT = 6410 SF 6410 X 0.12 = 769.2 (770 SF) 846.7 SF PROVIDED (13%) HANGAR F: 108 LF x 25' HT = 2,700 SF 2700 X 0.12 = 324 SF 514.6 SF PROVIDED (19%) STREETYARD BUFFER REQUIRED:25 SF PER 1 LF FRONTAGE FOR EVERY 600 SF: 1 CANOPY TREE, 3 UNDERSTORY, AND 6 SHRUBS (12") PROVIDED: KERR AVENUE (SEE TYPICAL SECTION 2/L-1) SEGMENT A: 1070 LF [1067 x 25 = 26,750 SF] CANOPY TREES: 26,750 / 600 = 44.6 X 1 = 44.6 (45) REQUIRED/PROVIDED UNDERSTORY TREES: 26,750 / 600 = 44.6 X 3 = 133.8 (134) REQUIRED/PROVIDED SHRUBS: 26,750 / 600 = 44.6 x 6 = 267.6 (268) REQUIRED/PROVIDED SEGMENT B: 770 LF [770 x 25 = 19,250 SF] CANOPY TREES: 19,250 / 600 = 32.1 X 1 = 32.1 (33) REQUIRED/PROVIDED UNDERSTORY TREES: 19,250 / 600 = 32.1 X 3 = 96.3 (97) REQUIRED/PROVIDED SHRUBS: 19,250 / 600 = 32.1 x 6 = 192.6 (193) REQUIRED/PROVIDED PLANT LEGEND: SITE MAP (NTS) 600 SF STREETYARD BUFFER SECTION, TYP. SCALE: 1"=10' 2 L-1100'50'25'50' SCALE: 1" = 50' 0 S W N E SHRUBS OL NERIUM OLEANDER 'HARDY RED' HARDY RED OLEANDER DYH ILEX VOMITORIA 'NANA' DWARF YAUPON HOLLY CCL PRUNUS CAROLINIANA 'MONUS' BRIGHT'N'TIGHT (R) CAROLINA CHERRY LAUREL WM MYRICA CERIFERA WAX MYRTLE CJ JUNIPERUS HORIZONTALIS 'BLUE CHIP' BLUE CHIP CREEPING JUNIPER AB ABELIA X GRANDIFLORA 'ROSE CREEK' ROSE CREEK GLOSSY ABELIA OLP NERIUM OLEANDER 'PETITE PILAR CREAM' PETITE PILAR CREAM DWARF OLEANDER SSSSSSSS SS SS SS SS 3-PP 24-BB 8-BB 3-PP 5-MU 3-MU 3-MU 8-MF 9-MF 3-MF 7-MF 3-JS 5-JS 2" GREY RIVER ROCK COBBLE AS MULCH 3-JS 3-MU 8-MF 13-BB 6-LC 7-LC 12-LC 5-MC 14-MF 5-OL P PLANTER, TYP. ENHANCED PLANTING BENCH, TYP. 1-SBM X X X X SS SS SS SS W W W W W W W W W W W S S SS W W W W W W W W W W W W 3-DYH 5-SG 9-WM 5-OL 5-OL 5-OLP 3-DYH 5-SG 2" MULCH, TYP. 1-BO 1GK 1-FSG 1-CM 1-FSG 2" MULCH IN TREE ISLANDS, TYP. 16' P R O P . B I K E R A C K 3-MU 3-MU 3-JS 9-MF 12-BB 1-PP 7-BF 6-LC 2-SBM 2" GREY RIVER ROCK COBBLE AS MULCH BENCH PLANTERS, TYP. 1-SBM 3-GK 3-SRO12' X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXX X X X XXXXXXXXX W W W W SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W W WWWWWWWWWWWWWWWWWWW W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SS SS SS SS W W W W W W W W W W WWWWWWWWWWWWWW W W W W W W W W W W W W WWWWWWWWWWWWWW WW SSSSSSSSSSSSSSSSSSSSSSSSSSSS 20.00' 12' 20 . 0 0 ' BUILDING 2: EXISTING HANGAR BUILDING 2: EXISTING OFFICE SCM DRY BASIN MORR I S R D PROPOSED HANGAR 1 NO PLANTS INSIDE EX. UTILITY EASEMENT 3-OL 7-CJ 3-AB 3-AB 4-SG 3-AB 3-AB 3-CJ 6-LB 11-LB 7-BF 7-BF 12-OL 5-SG 3-AB 3-AB 5-SG 3-AB3-AB 5-SG 3-AB 3-AB 5-SG 3-AB3-AB 7-SG 3-AB 3-AB 1-SBM EX TREE TO REMAIN 15-CCL 3-DYH 10-OLP 3-DYH ENHANCED PLANTING 3-WM 1-BO 1-BO 1-BO 1-BO 15-WM1-CT 1-CT 1-SWO 1-SWO 15-WM 8-WM 2-BO 2-FSG 2-GK 12-SRO 1-GK X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX WWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROPOSED HANGAR A PROPOSED HANGAR B PROPOSED HANGAR C PROPOSED HANGAR D EXISTING WETLANDS NO P L A N T S I N S I D E S E C U R I T Y F E N C E 4-DYH 3-SG 3-OL 3-SG 4-DYH 5-CJ 7-MG 5-CJ 4-DYH 3-SG 3-OL 3-SG 4-DYH 5-CJ 7-MG 5-CJ 4-DYH 3-SG 3-OL 3-SG 4-DYH 5-CJ 7-MG 5-CJ 4-DYH 3-SG 3-OL 3-SG 4-DYH 5-CJ 7-MG 5-CJ 2-SBM 1-GK 2-SBM 1-GK 1-GK 2-SBM 7-FSG 1-CT 1-CT 2" MULCH TO FENCELINE, TYP. SOD, TYP. SOD, TYP. 2" MULCH, TYP. 25 ' S E T B A C K & S T R E E T Y A R D B U F F E R 25.00' WATERFLOW X X X X X X X X X X X X X SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSS SSSS SS SSSS SS SSSS SS SSSS SSSSSSSS SSW W W W W W W W W W W W W W W WW W WW W WWW WWW W WW W WWW WWW W WWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W 3-AB 6-SG 4-AB 3-DYH 5-OL 3-ABE 7-OL 3-AB 5-SG 5-DYH 3-AB 6-WM 3-OL1-CT 2-GK 5-AB 3-SG 15-LB 13-BF SOD, TYP. 3-DYH 2" MULCH, TYP. 2" MULCH, TYP. SOD, TYP. FORBS MU MUHLENBERGIA CAPILLARIS PINK MUHLY GRASS MF NASSELLA TENUISSIMA MEXICAN FEATHER GRASS JS PHLOMIS FRUTICOSA JERUSALEM SAGE PP OPUNTIA MACRORHIZA BIG ROOT PRICKLY PEAR BB MONARDA DIDYMA 'JACOB CLINE' RED BEE BALM LC SANTOLINA INCANA 'NANA' GREY LAVENDER COTTON BF GAILLARDIA X GRANDIFLORA 'GOBLIN' BLANKET FLOWER SG PANICUM VIRGATUM 'DALLAS BLUES' DALLAS BLUES SWITCH GRASS LB PENNISETUM ALOPECUROIDES 'LITTLE BUNNY' DWARF FOUNTAIN GRASS TREES BO SRO CM GK GINKGO BILOBA 'PRINCETON SENTRY' MALE GINKGO LAGERSTROEMIA INDICA 'CATAWBA' CATAWBA CREPE MYRTLE QUERCUS FALCATA SOUTHERN RED OAK QUERCUS NIGRA BLACK OAK FSG LIQUIDAMBAR STYRACIFLUA 'ROTUNDILOBA' FRUITLESS SWEETGUM SBM MAGNOLIA VIRGINIANA 'MOONGLOW' MOONGLOW SWEETBAY MAGNOLIA CT VITEX AGNUS-CASTUS 'SHOAL CREEK' SHOAL CREEK CHASTE TREE JV JUNIPERUS VIRGINIANA EASTERN RED CEDAR SWO QUERCUS LYRATA SWAMP WHITE OAK X X X X W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W WWW W W SCM DRY BASIN FOREBAY BUILDING 3 10.0 0 ' 5-OL 3-DYH 3-DYH 3-OL 6-DYH 3-DYH 3-SG 3-OL 3-SG 3-AB 8-OL 5-DYH 1-GK 2-SBM 12-CCL3-GK 1-CM 1-CM 2-GK 2-FSG 1-CM 1-SRO 1-BO 1-BO 3-CCL PRELIMINARY NOT FOR CONSTRUCTION PLANT LEGEND: REQUIRED LANDSCAPING EAST 2 (487 SF)SOUTH 1 (679 SF)EAST 1 (337 SF) L-1.1 SCALE: DRAWN BY: DATE: OF SHEET REVISIONS: PROJECT # LA N D S C A P E A R C H I T E C T U R E & L A N D P L A N N I N G 50 1 1 S O U T H P A R K D R I V E , S T E . 2 0 0 - D U R H A M , N C 2 7 7 1 3 p: ( 9 1 9 ) 4 8 4 - 8 8 8 0 e : i n f o @ t m t l a . c o m 07/31/2025 PMP, MK, MA WI L M I N G T O N , N C 2 8 4 0 3 14 2 0 J O H N M O R R I S R D AR Q - I L M E A S T S I D E D E V . 03 LA N D S C A P E P L A N AS NOTED 24012 SCALE: 1"=20' 5 BUILDING 2 & HANGAR 1 FOUNDATION PLANTINGS SCALE: 1"=40' 3 HANGAR A-D FOUNDATION PLANTINGS SCALE: 1"=40' 1 L-1.1 BUILDING 2 FOUNDATION PLANTINGS HANGAR E & F FOUNDATION PLANTINGS SCALE: 1"=20' 2 L-1.1 L-1.1 L-1.1 BUILDING 3 SCALE: 1"=40' 4 L-1.1 40'20'10'20' SCALE: 1" = 20' 0 80'40'20'40' SCALE: 1" = 40' 0 S W N E 2025-07-31 PRELIMINARY NOT FOR CONSTRUCTION L-1.2 SCALE: DRAWN BY: DATE: OF SHEET REVISIONS: PROJECT # LA N D S C A P E A R C H I T E C T U R E & L A N D P L A N N I N G 50 1 1 S O U T H P A R K D R I V E , S T E . 2 0 0 - D U R H A M , N C 2 7 7 1 3 p: ( 9 1 9 ) 4 8 4 - 8 8 8 0 e : i n f o @ t m t l a . c o m 07/31/2025 PMP, MK, MA WI L M I N G T O N , N C 2 8 4 0 3 14 2 0 J O H N M O R R I S R D AR Q - I L M E A S T S I D E D E V . 03 LA N D S C A P E D E T A I L S AS NOTED 24012 PLANT SCHEDULE SCALE: 1"=20' 8 L-1.2 LANDSCAPE SCOPE OF WORK 1.FURNISH ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED OR INDICATED BY THE DRAWINGS AND SPECIFICATIONS TO COMPLETE THE WORK INCLUDING INSTALLATION OF ALL TREES, SHRUBS, GROUNDCOVER, ANNUALS, SEED, SOD AND MULCH. 2.MATERIALS AND WORK: THE SELECTION OF ALL MATERIALS AND THE EXECUTION OF ALL WORK REQUIRED UNDER THE CONTRACT SHALL BE SUBJECT TO APPROVAL BY THE OWNER. THE OWNER SHALL HAVE THE RIGHT TO REJECT ANY AND ALL MATERIALS AND ANY AND ALL WORK, WHICH IN HIS OPINION, DOES NOT MEET THE REQUIREMENTS OF THE CONTRACT. 3.PLANT MATERIALS: ALL PLANT MATERIALS SHALL BE NURSERY GROWN, FRESHLY DUG IN THE FIELD, NATURALLY SHAPED, WELL BRANCHED, FULLY FOLIATED WHEN IN LEAF WITH FULLY DEVELOPED ROOT SYSTEMS. TREES MUST BE SELF-SUPPORTING, WITH STRAIGHT TRUNKS AND LEADERS INTACT. ALL PLANTS MUST BE FREE OF DISEASE, INSECT INFESTATION OR THEIR EGGS AND SHALL HAVE BEEN GROWN IN CLIMATIC CONDITIONS SIMILAR TO THOSE OF THE PROJECT SITE 4.PLANT SIZE: SPECIFIED SIZES INDICATES THE MINIMUM ALLOWABLE SIZE AT PLANTING. WHERE CONTAINER AND HEIGHT/SPREADS ARE INDICATED FOR A SINGLE SPECIES, BOTH SIZE REQUIREMENTS SHALL BE MET WHEN ONLY PLANT HEIGHT OR SPREAD ARE INDICATED, CONTAINER SIZE SHALL BE BASED ON “AMERICAN STANDARDS FOR NURSERY STOCK” STANDARDS. 5.ORGANIC MATTER: AGED MANURE, COMPOST OR PINE BARK FINES, AT THE OPTION OF THE CONTRACTOR, MATERIAL SHALL BE AIR DRIED, FINELY SHREDDED AND SUITABLE FOR HORTICULTURAL PURPOSES AND SHALL CONTAIN NO MORE THAN 35% MOISTURE CONTENT BY WEIGHT. 6.PINE BARK MULCH: ALL PINE BARK MULCH SHALL BE CLEAN, DOUBLE GROUND, FINE TEXTURED NUGGET MULCH WITH MINIMAL AMOUNTS OF SAPWOOD CONTENT. 7.TURF AREAS: PRIOR TO ANY SEEDING OR SOD APPLICATION, VERIFY THAT ALL TRENCHING AND LAND DISTURBING ACTIVITIES HAVE BEEN COMPLETED. ENSURE ALL AREAS ARE FREE OF STONES, LARGE SOIL CLODS AND ANY OTHER CONSTRUCTION DEBRIS. LANDSCAPE PLAN NOTES 1.ALL PLANT MATERIAL ON THIS SITE MUST MEET MINIMUM NEW HANOVER COUNTY UDO REQUIREMENTS FOR SIZE, HEIGHT, AND SPACING. PLANT MATERIAL SHALL BE INSTALLED ACCORDING TO SOUND NURSERY PRACTICES AND IN CONFORMANCE WITH THE GENERAL PLANTING NOTES AND DETAILS WITHIN THIS PLAN SET. 2.PLANTING STOCK SHALL MEET ALL STANDARDS WITHIN THE LATEST EDITION OF “AMERICAN STANDARDS FOR NURSERY STOCK.” ALL PLANTS SHALL BE VIGOROUS, HEALTHY MATERIAL FREE FROM PESTS AND DISEASE. 3.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW THE PROJECT SITE AND FAMILIARIZE WITH ACTUAL FIELD CONDITIONS PRIOR TO BIDDING AND COMMENCING WORK. THE CONTRACTOR SHALL ACCEPT ACTUAL CONDITIONS AT THE SITE AND PERFORM THE WORK SPECIFIED INCLUDING THE FINE GRADING AND INCORPORATION OF TOPSOIL INTO PLANTING AREAS, WITHOUT ADDITIONAL COMPENSATION FOR POSSIBLE VARIATIONS FROM GRADES AND CONDITIONS SHOWN WEATHER SURFACE OR SUBSURFACE. IF FIELD CONDITIONS ARE FOUND TO BE SIGNIFICANTLY DIFFERENT THE CONTRACTOR SHALL NOTIFY THE PROJECT LANDSCAPE ARCHITECT OR ENGINEER IMMEDIATELY AND PRIOR TO ORDERING MATERIALS. 4.CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED PERMITS TO PERFORM THE WORK. 5.CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES ABOVE AND BELOW GROUND AND SHALL BE RESPONSIBLE FOR ANY DAMAGE RESULTING FROM THEIR ACTIVITIES. CONTRACTOR SHALL NOTIFY NORTH CAROLINA ONE CALL (1-800-632-4949) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. CONTRACTOR TO CONTACT ANY LOCAL UTILITIES THAT PROVIDE THEIR OWN LOCATOR SERVICES INDEPENDENT OF NORTH CAROLINA ONE CALL. THE CONTRACTOR MAY ALSO NEED TO ENGAGE A PRIVATE UTILITY LOCATING FIRM AT THEIR OWN COST TO EFFICIENTLY HAVE ALL UTILITIES LOCATED. 6.ANY DAMAGE TO EXISTING IMPROVEMENTS OUTSIDE OF THE PROJECT LIMITS, INCLUDING CURB AND GUTTER, SIDEWALKS, PAVED OR TURF AREAS SHALL BE REPAIRED TO ORIGINAL CONDITIONS BY THE CONTRACTOR WITHOUT ADDITIONAL COST TO THE DEVELOPER. 7.PLANT QUANTITIES TO BE VERIFIED BY LANDSCAPE CONTRACTOR. IN THE EVENT OF A DISCREPANCY BETWEEN THE QUANTITY OF PLANTS SHOWN ON THE PLANS AS COMPARED TO THE PLANT LIST THE CONTRACTOR SHALL PROVIDE THE QUANTITY SHOWN ON THE PLANS. 8.CONTRACTOR SHALL OBTAIN WRITTEN AUTHORIZATION FROM THE LANDSCAPE ARCHITECT FOR ANY PLANT SUBSTITUTIONS OR MODIFICATIONS TO THE LANDSCAPE PLANS. THIS MAY REQUIRE A MODIFICATION TO THE APPROVED PLANS. NOTIFY THE LANDSCAPE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES ON THE PLANS. 9.ALL ABOVE GROUND MECHANICAL EQUIPMENT, ELECTRICAL TRANSFORMERS, DUMPSTERS, BACKFLOW PREVENTERS, AND VALVE BOXES SHALL BE SCREENED FROM VIEW OF ADJACENT PROPERTIES AND RIGHT-OF-WAY WHILE MAINTAINING REQUIRED ACCESS TO LOCAL CODE STANDARDS AND REQUIREMENTS. 10.WITHIN THE SIGHT TRIANGLES SHOWN ON THIS PLAN, NO OBSTRUCTIONS BETWEEN TWO FEET AND EIGHT FEET IN HEIGHT ABOVE THE NEAREST VEHICLE SURFACE OR ADJACENT CURB LINE SHALL BE ALLOWED. 11.ALL UNPAVED AREAS SHALL BE TOPSOILED AND SEEDED / SODDED OR MULCHED TO THE LIMITS OF CONSTRUCTION BASED ON ACTUAL FIELD CONDITIONS BEYOND THE APPROVED PLANS. 12.ALL SOD TO BE REBEL FESCUE IV, TURF GEM, LESCO OR EQUAL. ALL SEED TO BE REBEL FESCUE IV, TURF GEM, LESCO OR EQUAL @ 6 LBS. PER 1000 S.F. IN LAWN AREAS 3” TOPSOIL SHALL BE TILLED INTO THE TOP 6” OF GROUND PRIOR TO SEEDING. 13.SLOPES GREATER THAN 3:1 SHALL REQUIRE HYDRO-SEEDING. SLOPES GREATER THAN 2:1 SHALL BE SODDED WITH CENTIPEDE GRASS. ADDITIONAL STABILIZATION MEASURES MAY BE REQUIRED FOR SLOPES GREATER THAN 3:1 TO ENSURE SOIL STABILIZATION AND ESTABLISHMENT OF PERMANENT GROUND COVER. 14.INTERIOR MULCH SHALL BE DOUBLE GROUND PINE BARK TO A DEPTH OF 4". PERIMETER LANDSCAPE BUFFERS SHALL BE MULCHED WITH 4” PINE STRAW TO BED LINES SHOWN OR BUFFER LIMITS. BED LINES SHALL CONFORM TO CONFIGURATION SHOWN ON THE PLANS. 15.PINE STRAW SHALL NOT BE USED AS MULCH OR GROUNDCOVER WITHIN TEN FEET OF ANY STRUCTURES CONSISTING OF EXTERIOR COMBUSTIBLE CONSTRUCTION. 16.CONTRACTOR SHALL LEVEL AND SMOOTH ALL DISTURBED AREAS AND REMOVE ALL ROCKS AND CONSTRUCTION DEBRIS PRIOR TO SEEDING, SOD OR PLANT INSTALLATION. 17.NOTE THAT WITHIN LANDSCAPED AREAS SURROUNDING BUILDING, THE GRADES SHOWN ON THE GRADING SHEET ARE "TOP OF MULCH" OR "TOP OF TOPSOIL." CONTRACTOR SHALL ENSURE POSITIVE FINISHED DRAINAGE (MIN. 2%) AWAY FROM ALL BUILDINGS AND COORDINATE WITH THE LANDSCAPE PLAN TO LEAVE SUBGRADE LOW ENOUGH TO MAINTAIN THESE SPOTS AS FINISHED GRADE. 18.OWNER SHALL MAINTAIN ALL PLANT BEDS AND PLANT MATERIAL IN GOOD HEALTH, AND ANY DEAD, UNHEALTHY OR MISSING PLANTS SHALL BE REPLACED WITH THE SAME PLANT MATERIAL ORIGINALLY SPECIFIED ON THIS PLAN. 19.TREE PLANTING AND SITE LIGHTING SHALL BE SEPARATED BY AT LEAST 10 FEET. TREE PLANTING, TYP. NTS 1 NTS 2 NTS 3 NTS 4 TREE PLANTING ON SLOPE, TYP.SHRUB PLANTING, TYP. SOIL PREPARATION FOR PLANTING, TYP. NTS 5 PERENNIAL PLANTING, TYP. 2014 URBAN TREE FOUNDATION 2014 URBAN TREE FOUNDATION 2014 URBAN TREE FOUNDATION2014 URBAN TREE FOUNDATION 2014 URBAN TREE FOUNDATION METAL EDGING SHALL COMPLETELY SURROUND MULCH BEDS EXCEPT WHERE ABUTTING A SIDEWALK NTS 6 SOD / MULCH EDGING, TYP. NTS 7 LANDSCAPE FORMS 'GENERATION50' BENCH (OR OWNER-APPROVED EQUAL)L-1.2 L-1.2 L-1.2 L-1.2 L-1.2L-1.2L-1.2 2025-07-31