Loading...
HomeMy WebLinkAbout9-3-2025 TRC Agenda Packet TECHNICAL REVIEW COMMITTEE AGENDA September 3rd, 2025 New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, September 3rd, 2025 at 2:00 p.m. to discuss the below items. The Technical Review Committee (TRC) is a staff-level group that reviews projects for compliance with the regulations administered by each respective review agency. The TRC meetings are considered staff meetings with applicants and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state agencies about the review comments they have been provided. No voting is involved in the technical review process and no approvals or denials are made at TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Information about the projects can be found on online at the county’s Development Activity page. This meeting will be conducted remotely via teleconference. Interested parties can listen to the September 3, 2025 TRC meeting by calling 336-218-2051 and entering conference ID: 925 009 753# 2 Agenda Items Item 1: Paws4People Vocational School - 5000 Transformation Lane - SITECN-25-000091 • Request by Terry Henry with Paws4People Inc. for a new 7,000 sq ft vocational trade school and requisite parking on the site. • The site is located at 5000 Transformation Lane, Castle Hayne. Site is 10.57 acres, zoned PD (Planned Development), tied to conditional rezoning Z25-10. • Engineer is Trevor Smith with Becker Morgan Group, (tsmith@beckermorgan.com) • Case planner is Zach Dickerson (zdickerson@nhcgov.com) Item 2: ILM East Aviation, Office and Retail - 1420 John Morris Road - SITECN-25-000092 • Request by ARQ Realty Group on behalf of ILM Airport for a new complex with aviation hangars, retail and office spaces. Total new building square footage is 232,110 sq ft. • The site is several parcels totaling 36.20 acres, main address tied to this is 1420 John Morris Road, zoned AC (Airport Commerce) • Engineer is Bart McClain with Wm G. Daniel and Associates (bmcclain@wmgda.com) • Case planners are Ryan Beil and Zach Dickerson (rbeil@nhcgov.com & zdickerson@nhcgov.com) Item 3: McQuillan Pines Townhomes & Commercial - 6900 Carolina Beach Road - SUBPP-25- 0026 • Request by James Yopp of River Road Construction Co for 85 townhome units. • The site is 33.83 acres in total, with 13 acres disturbed. Main address is 6900 Carolina Beach Road, zoned CZD (RMF-L), Residential Multi-Family, Low-Density, Rezoning case Z23-04M, • Engineer is Rodney Wright with CSD Engineering (rodney@csd-engineering.com) • Case planner is Ryan Beil (rbeil@nhcgov.com) Paws4People Vocational School – 5000 Transformation Lane – TRC Review Page | 1 To: Terry Henry, Paws4People Inc. From: Zach Dickerson, Senior Planner Date: September 3, 2025 Technical Review Committee (TRC) PID#: R01100-008-016-000 Egov# SITECN-25-000091 Subject: 5000 Transformation Lane – Paws4People Vocation School - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the September 3, 2025, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Paws4People Vocational School – 5000 Transformation Lane – TRC Review Page | 2 Planning, Zach Dickerson 910-798-7450 Compliance with local zoning requirements 1. General Comments a. Zoning is Planned Development (PD) b. As stated in the application the intended use is Vocation or Trade School. The Unified Development Ordinance (UDO) defines the use as i. A public or private school offering vocational or trade instruction- such as teaching of trade or industrial skills, clerical or data processing, barbering or hair dressing, computer or electronic technology, or artistic skills – to students and that operates in buildings or structures or on premises of land leased or owned by the educational institution for administrative purposes and meets the State requirements for a vocational training facility. Such uses include classrooms, laboratories, auditoriums, libraries, cafeterias, and other facilities that further the educational mission of the institution. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. d. This site was rezoned to Planned Development as part of rezoning case Z25-10. Please list out the following conditions on the site plan. i. The site will be developed in accordance with the Terms and Conditions document as agreed upon per the rezoning. ii. Side setbacks within the PD shall be 20’ from the property line. 2. UDO Section 5.1, Parking and Loading a. Vocational/Trade Schools require 3 parking spaces per 1,000 square feet of use. b. 7,000 sq ft of use = 21 parking spaces required. c. It appears there are a total of 33 spaces shared between the trade school and the lodging to the east. d. The type of lodging provided on this site does not directly correspond with the type of lodging described in the UDO. However, the parking for lodging is based on the number of rooms in the building and the amount of common space, broken out below. Please these numbers so we can make sure there is enough parking for both of these uses with the shared lot. Paws4People Vocational School – 5000 Transformation Lane – TRC Review Page | 3 i. 1 parking space required per bedroom- how many bedrooms does this building have? ii. 2 parking spaces required per 1,000 sq ft of common indoor space- how much common space does this building have? 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. 4. UDO Section 5.3, Tree Retention a. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. b. It does appear that there will be some trees removed for construction of this building. Please submit for a Tree Removal Permit on Coast. c. Tree Removal Permit Application: https://www.nhcgov.com/DocumentCenter/View/1239/Tree-Removal-Permit-PDF 5. UDO Section 5.4, Landscaping and Buffering a. The parking lot landscaping looks good- please confirm what species and size of trees are being planted. b. Because of the required transitional landscape buffer required to the north, per Table 5.4.5.B, you are not required to do additional perimeter landscaping for the parking lot, though you are certainly welcome to. c. And please note 5.4.2.B, that 15 trees are required to be planted or retained per acre disturbed on the site. This is a relatively small area of disturbance for this phase of the project, but it would be helpful to have a note on the landscaping page that this requirement is being met for this phase. 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any new lighting proposed for the site? Paws4People Vocational School – 5000 Transformation Lane – TRC Review Page | 4 7. UDO Section 5.6, Signs a. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. 8. UDO Section 5.7, Conservation Resources a. Per the New Hanover County Conservation Resources Map, there is some Pocosin Conservation Resource on this site. However, there are no Class IV soils on this site, so the Pocosin is unregulated. b. No further action needs to be taken. 9. UDO Article 9, Flood Damage Prevention a. This site is not in a flood hazard area. NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire Finals required 2. Portable fire extinguishers required per NFPA 10 NHC Soil & Water Conservation, Dru Harrison 910-798-7138 General comments about existing soil conditions of the site. 1. See attached comments. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A County stormwater and land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/251/Stormwater-Permitting and https://www.nhcgov.com/249/Sediment-Erosion-Controlhowever. 2. Please contact the State for their stormwater permit requirements. Paws4People Vocational School – 5000 Transformation Lane – TRC Review Page | 5 NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site plan reflects connection to public water and sewer. Proposed infrastructure does not violate setbacks to any surrounding properties’ well or septic systems. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Proposed building will need its own individual address. 2. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water and sewer available. 4. CFPUA Meter Sizing Form will be required to determine if a CFPUA Plan Review will be required. 5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. See comments attached. WMPO, Luke Hutson 910-473-5130 New Hanover County contracted traffic engineering services comments: 1. See comments attached. Paws4People Vocational School – 5000 Transformation Lane – TRC Review Page | 6 Army Corps of Engineers, Brad Shaver 910-251-4611 Requirements if wetlands are impacted 1. There is an existing Jurisdictional Determination on this site. Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources New Hanover County Sustainability Manager United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for New Hanover County, North Carolina Natural Resources Conservation Service August 22, 2025 9 Custom Soil Resource Report Soil Map (5000 Transformation Lane) 38 0 3 7 1 0 38 0 3 7 9 0 38 0 3 8 7 0 38 0 3 9 5 0 38 0 4 0 3 0 38 0 4 1 1 0 38 0 4 1 9 0 38 0 3 7 1 0 38 0 3 7 9 0 38 0 3 8 7 0 38 0 3 9 5 0 38 0 4 0 3 0 38 0 4 1 1 0 235300 235380 235460 235540 235620 235700 235780 235860 235940 236020 235300 235380 235460 235540 235620 235700 235780 235860 235940 236020 34° 20' 42'' N 77 ° 5 2 ' 3 9 ' ' W 34° 20' 42'' N 77 ° 5 2 ' 9 ' ' W 34° 20' 26'' N 77 ° 5 2 ' 3 9 ' ' W 34° 20' 26'' N 77 ° 5 2 ' 9 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 150 300 600 900Feet 0 50 100 200 300Meters Map Scale: 1:3,480 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: New Hanover County, North Carolina Survey Area Data: Version 26, Sep 9, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 8, 2022—Dec 1, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Map Unit Legend (5000 Transformation Lane) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Le Leon sand 18.1 77.8% Ly Lynn Haven fine sand 3.6 15.6% Mu Murville fine sand 1.5 6.6% Totals for Area of Interest 23.3 100.0% Custom Soil Resource Report To: New Hanover County Planning Department From: Dru Harrison, New Hanover County Soil & Water Conservation District Director Date: 8/22/2025 RE: 5000 Transformation Lane I have reviewed this plan as requested and have these Comments: The Soils are predominantly Leon sand (Le), Lynn Haven flne sand (Ly), and Murville flne sand (Mu). According to USDA Websoil Survey, “Wilmington/New Hanover Classiflcation of soils for Septic Tank Suitability”, Leon, Lynn Haven, and Murville are Class III soils. The Soil Survey of New Hanover County lists Leon and Lynn Haven as poorly drained, and Murville as very poorly drained. Leon, Lynn Haven, and Murville are on the New Hanover County Hydric Soils “A” list which means they are possibly wetland areas and subject to regulation under the Clean Water Act. The U.S. Army Corps of Engineers has federal jurisdiction over 404 Permits and the NCDEHNR, Dept. of Water Quality, has state jurisdiction over 401 Permits under the Clean Water Act. Before disturbing possible wetland areas, developers should contact these agencies to stay in compliance with State and Federal regulations. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN J.R. “JOEY” HOPKINS GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum To: New Hanover County Technical Review Committee Date: August 21, 2025 Subject: Paws4People – 5000 Transformation Lane ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx NCDOT Driveway Permit: An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. • Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Site Plan Comments: Sight Triangles and Sight Distance: • Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. • Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Show and label all gates with distances to the right of way line. Label the internal protection stem length for the proposed driveway connection. • Measured from the right-of-way line. You can coordinate with the district office with any questions 910-398-9100. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION 7,2 0 0 S . F . PR O P O S E D B U I L D I N G F.F . E . = 2 9 . 0 0 ' XXXXXXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X XX X X X X X X X X X X X X X XXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X XX EXISTING BUILDING EXISTING BUILDING VV TRANSFORMATION LANE30' PRIVATE ACCESS & UTILITY EASEMENT PROPOSED STORM WATERWET POND8,163 SF (0.187 AC)SEE SHEET C-503FOR WET POND DETAILS BRADIE K-9 5000 TRANSFORMATION LANE CASTLE HAYNENEW HANOVER COUNTY, NC CENTERTRAINING 06/25/2024 2022290.01 C-001  North Carolina Dover302.734.7950 Salisbury410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600Wilmington Newark302.369.3700 980.270.9100Charlotte 919.243.1332Raleigh NC License #: C-4743 .PDF COVER SHEET ... .... F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Aug 01, 2025 - 3:53pm BRADIE K-9 5000 TRANSFORMATION LANE CASTLE HAYNENEW HANOVER COUNTY, NC CENTERTRAINING C-001 1" = 30'  North Carolina Dover302.734.7950 Salisbury410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600Wilmington Newark302.369.3700 980.270.9100Charlotte 919.243.1332Raleigh NC License #: C-4743 .PDF J.P.G. THMS COVER SHEET ... .... F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Aug 01, 2025 - 3:53pm 2025-08-01 DRAWN BY: DATE: PROJECT NO.: COPYRIGHT 2023 MARK DATE DESCRIPTION ISSUE BLOCK PROJECT TITLE SHEET TITLE SCALE: SHEET PROJ. MGR.: C-001LAYER STATE: 0 SCALE: 1" = 30' 15 30 60 . 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 GENERAL NOTES: 1. TOPOGRAPHIC SURVEY DATA SHOWN HERON WAS PREPARED BY PORT CITY LAND SURVEYING, PLLC ON 12/10/2024,VERTICAL DATUM IS BASED ON NVD '88. A TREE INVENTORY OF THE SITE WAS CONDUCTED WITH THEAFOREMENTIONED SURVEY.2. THE PROJECT IS LOCATED WITHIN A PLANNED DEVELOPMENT DISTRICT CREATED JUNE 2, 2025. THIS IS A MASTERPLAN APPROVED WITH CASE Z25-10 TITLED "PAWS4PEOPLE ASSISTANCE DOG TRAINING CENTER".3. THE EXISTING UTILITIES SHOWN WERE TAKEN FROM THE BEST AVAILABLE RECORDS. THE CONTRACTOR SHALLCONTACT NORTH CAROLINA 811 (1-800-632-4949) TO VERIFY THEIR EXACT LOCATION PRIOR TO START OF ANYCONSTRUCTION. ANY DAMAGE INCURRED TO ANY UTILITIES SHALL BE REPAIRED IMMEDIATELY AT THE CONTRACTORSEXPENSE. IF THE CONTRACTOR RELIES ON THE UTILITY LOCATION SHOWN HEREON, THEY DO SO AT THEIR OWN RISKAND WILL NOT BE ENTITLED TO ADDITIONAL COMPENSATION DUE TO TIME DELAYS FROM SAID RELIANCE.4. THIS AREA OF DEVELOPMENT IS NOT IMPACTED BY THE 100 YEAR FLOOD PLAIN AS SHOWN ON FIRM 3720324100K ANDFIRM 3720323100K, EFFECTIVE 8/28/2018.5. A WETLAND DELINEATION WAS COMPLETED BY TERRACON DATED 9/24/24 AND DETERMINED THAT THERE ARE AREASOF WETLANDS WITHIN THE EXISTING PARCEL.6. A WETLAND JURISDICTIONAL DETERMINATION WAS APPROVED BY USACE DATED 3/31/2025 THAT DETERMINED 404JURISDICTIONAL WETLANDS, NON-JURISDICTIONAL WETLANDS AND JURISDICTIONAL DITCHES EXIST ONE SITE. AJURISDICTIONAL DETERMINATION IS VALID FOR FIVE YEARS OR UNTIL 3/31/2030.7. ALL ROADS, PARKING AND OTHER PAVED AREAS WILL BE PRIVATELY OWNED AND MAINTAINED AND ARE NOTINTENDED FOR DEDICATION.8. NORTH CAROLINA REGULATIONS PROHIBIT THE BURIAL OF CONSTRUCTION DEMOLITION DEBRIS, INCLUDING TREEAND STUMPS ON CONSTRUCTION SITES. ANY SOLID WASTE FOUND DURING EXCAVATION MUST BE REMOVED ANDPROPERLY DISCARDED.9. ALL HANDICAPPED PARKING DEMARCATION, STALLS, AND BUILDING ACCESSIBLE ROUTES SHALL COMPLY WITH THE"AMERICAN WITH DISABILITIES ACT".10. THIS DRAWING DOES NOT INCLUDE NECESSARY COMPONENT FOR CONSTRUCTION SAFETY. ALL CONSTRUCTIONMUST BE DONE IN COMPLIANCE WITH THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 AND ALL RULES ANDREGULATION THERETO APPURTENANT.11. BEFORE THE CONTRACTOR CAN BEGIN CONSTRUCTION HE MUST OBTAIN THE PROPER PERMITS AND/OR APPROVALSFROM NEW HANOVER COUNTY (NHC), CAPE FEAR PUBLIC UTILITY AUTHORITY (CFPUA), NORTH CAROLINADEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ), AND ANY OTHER APPLICABLE STATE AND LOCAL CODES.12. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE ACCORDING TO NEW HANOVER COUNTY AND STATE OFNORTH CAROLINA STANDARDS AND ANY OTHER APPLICABLE STATE AND LOCAL CODES.13. CARE SHALL BE TAKEN DURING FINAL GRADING TO ENSURE POSITIVE DRAINAGE AWAY FROM BUILDINGS AND TORECEIVING STRUCTURES. ROOF DRAIN DOWNSPOUTS TO BE CONNECTED TO STORM DRAINAGE OR DIRECTED TOSTREET AND/OR PARKING AREAS.14. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ANY RELOCATIONS, REALIGNMENTS, DISCONNECTIONS, ORCONNECTIONS OF EXISTING UTILITIES WITH APPLICABLE AUTHORITIES.15. CONTRACTOR AND BUILDER ARE RESPONSIBLE FOR COORDINATING FINISHED FLOOR ELEVATIONS OF ALL BUILDINGSWITH THE OWNER.16. MINIMUM SEPARATION OF UTILITIES SHALL BE MAINTAINED AS FOLLOWS:16.1. HORIZONTAL SEPARATION OF TEN (10) FEET BETWEEN SANITARY SEWER AND WATER MAINS AND STORM SEWER.16.2. WATER MAINS SHALL BE AT LEAST EIGHTEEN (18) INCHES ABOVE THE ELEVATION OF THE TOP OF STORM &SANITARY SEWER PIPE. IN INSTANCES WHERE WATER MAINS MUST RUN UNDER STORM SEWER A MINIMUMCLEARANCE OF 12 INCHES IS REQUIRED AND FURTHER CFPUA REVIEW AND APPROVAL IS REQUIRED.16.3. MINIMUM COVER OF THIRTY-SIX (36) INCHES SHALL BE PROVIDED FOR ALL BURIED WATER MAINS AND SANITARYSEWER MAINS.17. TWO VALVES ARE REQUIRED AT "T" INTERSECTIONS AND ONE VALVE ON THE WATER LINE TO FIRE HYDRANTS. CONCRETE CURB & GUTTER CONCRETE SIDEWALK, SLAB / PAVING IMPERVIOUS SURFACED ROAD, DRIVE INDIVIDUAL TREE OR BUSH STRUCTURE (CONCRETE, WOOD, DRAINAGE DITCH OR SWALE WETLAND BOUNDARY LINE ELEVATION SPOT SHOT PROPERTY OR RIGHT-OF-WAY LINE LIGHT POLE CENTERLINE BENCH MARK METAL, ETC.) CONTOUR OR PARKING LOT WIRE FENCE 49 EVERGREEN DECIDUOUS N/A N/A X X XCHAINLINK FENCE STOCKADE FENCE 43.55 X X X 55 25.15 B.C.25.00 T.C.25.50 V V V N/A ITEM WATER MAIN & SIZE PROPOSEDLEGENDEXISTING EX. 10" F.M. EX. 10"S EX. 10" W U.E. U.T. EX. 2" G 10" S 12" F.M. 12" W U.E. U.T. 2" G SANITARY GRAVITY SEWER LINE (S)SIZE & FLOW DIRECTION C-1-Notes-Legend-Portrait SANITARY SEWER CLEANOUT (C.O.) WATER VALVE (W.V.) OR METER (W.M.) FIRE HYDRANT (F.H.) SANITARY SEWER MANHOLE (S.S.M.H.) STORM DRAIN MANHOLE (S.D.M.H.) CATCH BASIN (C.B.) STORM DRAIN LINE (CMP, RCP, HDPE) SANITARY SEWER FORCE MAIN (F.M.)SIZE & FLOW DIRECTION UNDERGROUND ELECTRIC (U.E.) UNDERGROUND TELEPHONE (U.T.) UNDERGROUND GAS MAIN (G) UTILITY POLE W/ OVERHEAD SERVICE(TELEPHONE (O.T.), ELECTRIC (O.E.) F.H. W.V.W.M.W.M. W.V. F.H. TAX PARCEL: R01100-008-016-000CAPE FEAR RIVER BASIN NEW HANOVER COUNTY, NORTH CAROLINA BRADIE K-9 TRAINING CENTER CAPE FEAR RIVER BASIN SITE DEVELOPMENT PLANS VICINITY MAP SCALE: 1" = 500' BRADIE K-9 TRAINING CENTER. NEW HANOVER COUNTY, NC SITE BLU E C L A Y R D . GLAZIER RD. BROOKDALE DR. SITE DATA 1.5000 TRANSFORMATION LANECASTLE HAYNE, NC 284291-888-762-PAWS3.3333 JAECKLE DRIVE, SUITE 120WILMINGTON, NC 28403910-341-7600 5.6.PROPOSED: 7.8.9. 10.11. 10.57 ACRES 16.FRONT:SIDE:REAR: 20.21. 22. 23. OWNER OF RECORD: PAWS4PEOPLE FOUNDATION ENGINEER: BECKER MORGAN GROUP INC. PROPERTY MAP NUMBER: PIN: R01100-008-016-000 ZONING CLASSIFICATION: EXISTING:PD PLANNED DEVELOPMENT / NEW HANOVER COUNTYPD PLANNED DEVELOPMENT / NEW HANOVER COUNTY DEED SUMMARY: BK. 6144, PG. 1443PLAT REFERENCE: BK. 6, PG. 90EXISTING USE: PROPOSED USE: VOCATION OR TRADE SCHOOL - MPD - Z25-10TOTAL PARCEL AREA: SETBACKS: PD PLANNED DEVELOPMENT - Z25-1025 FT.15 FT.20 FT. SOURCE OF WATER: CAPE FEAR PUBLIC UTILITY AUTHORITYSOURCE OF SEWER: CAPE FEAR PUBLIC UTILITY AUTHORITY SOURCE OF GAS: PIEDMONT NATURAL GAS SOURCE OF ELECTRIC: DUKE ENERGY 12. BUILDING: ± 7,200 S.F.PROPOSED BUILDING:13. EXISTING: ± 11,537 S.F. (0.26 AC.)IMPERVIOUS COVERAGE: 18. LOT COVERAGE: PERMITTED: 50% (NEW HANOVER COUNTY)19. BUILDING HEIGHT: PERMITTED: 40 FT.PROPOSED: 27 FT. 17.PERIMETER BUFFER ALONG NON-PD ZONING: 10 FT.LANDSCAPE BUFFER: PD PLANNED DEVELOPMENT - Z25-10 4.1144 SHIPYARD BOULEVARDWILMINGTON, NC 28412910-791-0080 SURVEYOR: PORT CITY LAND SURVEYING, PLLC PROPOSED: ± 27,506 S.F. (0.63 AC.)14. TOTAL DISTURBED AREA:L.O.D.: ± 79,917 S.F. (1.83 AC.)15. PARKING CALCULATIONS PER NHC UDO TABLE 5.1.2.A, VOCATION OR TRADE SCHOOL PARKING RATIO IS 3 SPACES PER 1,000 SF GFA. REQUIRED: 21 PARKING SPACESPROPOSED: 33 PARKING SPACES VOCATION OR TRADE SCHOOL - MPD - Z25-10 1.83 ACRESTOTAL PROJECT AREA: 24. SURVEY BENCHMARK: NAIL SETELEV. 24.84'DATUM: NAVD 8825. FEMA FLOOD ZONE: BASED ON FEMA FIRM PANEL 3720324100K & 3720323100K, DATED AUGUST 28, 2018, THIS SITE AREA IS LOCATED IN FLOOD ZONE XUNSHADED AREA OF MINIMAL FLOOD HAZARD 15' DRAINAGE EASEMENT 53' 57 ' 7,2 0 0 S . F . PR O P O S E D B U I L D I N G F. F . E . = 2 9 . 0 0 ' XXXXXXXXXXXXX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X XXXXXXXXX X X X X X XXXXX X X X X X X X X X X X XX X X X X X X X X X X X X XXXXXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXXX X X X X X X X XXXXX EXISTING BUILDINGFFE: 28.25'HEIGHT: 15' EXISTING BUILDINGFFE. 28.25'HEIGHT: 15' EX I S T I N G B U I L D I N G EXISTING CONTAINERS PROPOSED TREE LINE T-4 16" PINE TREE 21" PINE TREE 21" PINE TREE 17" OAK TREE 8" OAK TREE 3"/8" OAK CLUSTER 20 ' D R A I N A G E EAS E M E N T EXISTING TREE LINE 8" OAK TREE TRANSFORMATION LANE30' PRIVATE ACCESS & UTILITY EASEMENT G-5 G-4 G-2 G-8 G-3 G-5 G-1 G-2 G-6 G-3 9' 18' 9' 18' 9' 18' 9' 18' 24'24' 3' R 10' R 15' R 20' R 9' 9' 9' 3' R 14. 5 ' 12' 10' 7' 7' 5' 10 ' 3' R G-9 6 12 9 T-1 T-3 T-2 T-4 G-9 G-9 T-1 T-3 T-2 G-1 G-10 G-2 G-2 VVVVV 20' SETBACK (TYP.) 6 15'20' LANDS N/F PIN: R01100-008-016-000 DEED REF: 6144-144310.57 ACRES ± PAWS4PEOPLE INC. ZONING - PD 5000 TRANSFORMATION LANE EXISTING CONCRETE SIDEWALK EX. EDGE OF PAVEMENT EXISTING CONCRETE PAD EX. EDGE OF PAVEMENT 60' UTILITY AND ACCESSEASEMENT, M.B. 37 PG 343 30 '60 ' 20' SETBACK 20 ' G-1 EXISTING 6'-8' WOODEN FENCE EX. 4' CHAINLINK FENCE 10' LANDSCAPE BUFFER10' 10' LANDSCAPE BUFFER 10' 24' 24' G-12 G-11 G-1 G-12 G-11 PROPOSED STORM WATERWET POND8,163 SF (0.187 AC) 15' DRAINAGE EASEMENT 15' G-10 20' 24' 30' UTILITY AND ACCESSEASEMENT, M.B. 37 PG 343 21' 12. 6 ' LANDS N/FWILLIAMS, JAMES S JR.PIN: R01100-008-003-000DEED REF. 1415-628ZONING - R-15 LANDS N/FPAWS4PEOPLE INC.PIN: R01100-008-039-000DEED REF. 6144-1443ZONING - PD LANDS N/FWILLIAMS, JAMES S IIIPIN: R01100-008-003-003DEED REF. 6042-1557ZONING - R-15 PR. ROOF CANOPY 20' SETBACK 20 ' 5' T-4 G-4 PR. 10' WIDE LOADING AREA BRADIE K-9 5000 TRANSFORMATION LANE CASTLE HAYNENEW HANOVER COUNTY, NC CENTERTRAINING C-201  North Carolina Dover302.734.7950 Salisbury410.546.9100 Maryland www.beckermorgan.com Delaware 910.341.7600Wilmington Newark302.369.3700 980.270.9100Charlotte 919.243.1332Raleigh NC License #: C-4743 .PDF SITE PLAN ... .... F:\AutoCADCivil\Projects\2022\2022290.01\DWG\2022290.01-SITE-C3D21-NC.dwg, Aug 01, 2025 - 3:55pm 2025-08-01 DRAWN BY: DATE: PROJECT NO.: COPYRIGHT 2023 MARK DATE DESCRIPTION ISSUE BLOCK PROJECT TITLE SHEET TITLE SCALE: SHEET PROJ. MGR.: C-201LAYER STATE: 0 SCALE: 1" = 20' 10 20 40 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x3624x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 24x36 . G-4G-5G-6G-7 G-1 G-3 G-2 GENERAL CONSTRUCTION NOTES PROPOSED FULL DEPTH BITUMINOUS PAVEMENT. SEE "FULL DEPTH PAVEMENT SECTION DETAIL" ON SHEET C-901. PROPOSED 4" THICK CONCRETE SIDEWALK AT LOCATIONS AND WIDTHS SHOWN. SEE "CONCRETE SIDEWALK DETAIL" ON PROPOSED BUILDING, SEE ARCHITECTURE PLANS. PROPOSED 6" CURB & REVERSE PAN GUTTER. SEE "6" CURB AND REVERSE PAN GUTTER" DETAIL ON SHEET C-901. PROPOSED ROADWAY REPLACEMENT PAVEMENT. SEE "PAVEMENT TIE-IN SECTION" DETAIL ON SHEET C-901. PROPOSED DEPRESSED CURB. SEE "CURB TAPER DETAIL" ON SHEET C-901.PROPOSED ACCESSIBLE RAMP. SEE "ACCESSIBLE RAMP DETAIL" ON SHEET C-901. C-PR-SITE-C-NOTES.DWG G-8 PROPOSED OVERHEAD DOOR, SEE ARCHITECTURE PLANS.G-9 PROPOSED EDGE OF PAVEMENT AT LOCATIONS SHOWN. G-10 PROPOSED TREELINE LIMITS.G-11 PROPOSED 6" CURB & GUTTER. SEE "6" CURB AND GUTTER "DETAIL ON SHEET C-901.G-12 CONTRACTOR TO TRANSISTION FROM REGULAR CURB GUTTER TO REVERSE PAN GUTTER AT LOCATIONS SHOWN. SHEET C-901. T-2T-1 PROPOSED PAINTED HANDICAP ACCESSIBLE SYMBOL - 4" WIDE SOLID HANDICAPPED WHITE LINE (TYP.). SEE "ACCESSIBLE PROPOSED PAINTED PARKING SPACE STRIPING - 4" WIDE SOLID WHITE LINE (TYP.) PROPOSED PAINTED STRAIGHT LINE AND 45° CROSS-HATCH STRIPING - 4" WIDE SOLID WHITE LINE (TYP.). SEE "ACCESSIBLE T-4 PROPOSED ACCESSIBLE PARKING SIGN (TYP.). SEE "ACCESSIBLE PARKING SIGN & POLE" DETAIL ON SHEET C-901. T-3 STRIPING & SIGNAGE CONSTRUCTION NOTES C-PR-STRIPING-C-NOTES.DWG THERMO SYMBOL" DETAIL ON SHEET C-901. PARKING SPACE PLAN" DETAIL ON SHEET C-901. 06/25/2024 2022290.01 1" = 20' J.P.G. THMS MEMORANDUM To: New Hanover County Technical Review Committee Date: August 15, 2025 Subject: Paws4People NCDOT Projects: • N/A WMPO 2045 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Animal Hospital/Veterinary Clinic (640) 7,200 SF 155 26 25 Small Office Building (712) 7,200 SF 104 12 16 ILM East Airport Commercial – TRC Review Page | 1 To: ARQ Realty, LLC Bart McClain (bmcclain@wmgda.com) From: Zach Dickerson & Ryan Beil, New Hanover County Planning & Land Use Date: September 3, 2025 Technical Review Committee (TRC) PID#: R04200-001-023-000, R04210-001-006-000, R04210-001-005-000, R04210-001-004- 000, R04210-001-003-000, R04210-001-002-000, R04210-001-001-000, R04200-001-022-000, R04200- 001-021-000, R04200-001-027-000, R04210-001-007-000, R04210-001-008-000, R04200-001-025-000. Egov# SITECN-25-000092 Subject: 1420 John Morris Road – ILM East - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is ILM East Airport Commercial – TRC Review Page | 2 not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the September 3rd, 2025, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Planning, Zach Dickerson & Ryan Beil Compliance with local zoning requirements 1. General Comments a. Zoning district is Airport Commerce (AC). b. As stated in the application the intended use is Airport and Terminal, General Retail, and Offices for Private and Professional Activities. The Unified Development Ordinance (UDO) defines the use as a. Airport and Terminal: Establishments providing air traffic control to regulate the flow of air traffic; establishments that operate international, national, or civil airports or public flying fields; or that support airport operations (such as rental of hangar spaces, cargo handling services, and passenger parking lots); and establishments providing specialty air transportation or flying services. b. Offices for Private Business and Professional Activities: Establishments primarily engaged in the day-to-day administrative or clerical services for businesses or other organizations that provide professional or other services to the general public on a walk-in or appointment basis in an office setting. c. Retail Sales, General: Commercial enterprises that provide goods and/or services for sale, lease, or rental directly to the consumer. Examples include stores selling, leasing, or renting consumer, home, and business goods such as art, clothing, dry goods, electronic equipment, furniture, garden supplies, hardware, jewelry. Pet food, and printed material. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. d. Site is compliant with AC zoning district setbacks. 2. UDO Section 5.1, Parking and Loading a. Airport and Terminal Use has no minimum parking requirements. ILM East Airport Commercial – TRC Review Page | 3 b. Offices for Private and Professional Activities use requires 2.5 parking spaces per 1,000 sq ft. Site plan notes 28,000 sq ft of office use, which comes to 70 parking spaces for office use. c. General Retail use requires 2.5 parking spaces per 1,000 sq ft. Site plan notes 9,600 sq ft of retail use which comes out to 24 spaces required. d. Total parking required is 94 spaces. Site plan notes that 113 spaces are provided. e. EV Parking requirements noted on site plan and meets minimum requirements. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. 4. UDO Section 5.3, Tree Retention a. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. b. It does not appear that any trees will be removed for this project- please confirm. 5. UDO Section 5.4, Landscaping and Buffering a. Interior parking lot landscaping calculations look good. a. Please note that for airport property, we have historically not required trees. You are welcome to provide them, but in the case specifically of the airport, you are allowed shrubs in place. b. Street Yard Landscaping: a. The site plan notes 1 canopy tree and 3 understories- you don’t need both. You only need the 3 understories if there are powerlines over the street yard area that would prevent canopy trees from being planted. b. Other than that the calculations look good. c. Foundation Plantings: a. Foundation planting calculations look good. d. Dumpster screening looks good. ILM East Airport Commercial – TRC Review Page | 4 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any lighting proposed for the site? 7. UDO Section 5.6, Signs a. I noted the stop sign detail on page 19, but didn’t see another sign in the site plans unless I missed something. Are any new signs planned for the development? b. If so, please take note that any sign adjacent to an NCDOT maintained road cannot be inside the 10x70’ sight triangle. c. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. 8. UDO Section 5.7, Conservation Resources a. Please note, per the New Hanover County Conservation Resource Map there are Swamp Forest resources present, coinciding with field located wetlands but they exist outside the development envelope. b. Although swamp forest is present, the total acreage is 1.06 and thus falls below the regulatory threshold. 9. UDO Article 9, Flood Damage Prevention a. Per the New Hanover County Flood Hazard map, no part of the property is in a floodplain. NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire finals required. 2. Please send email to rgriswold@nhcgov.com with a proposed phasing plan for check off purposes. 3. Any fuel tanks shall be permitted through County Fire. 4. Underground fire line permits are required on all private side fire lines. 5. Private side fire lines inspections include thrust block inspections, pressure testing, and flushing. ILM East Airport Commercial – TRC Review Page | 5 NHC Soil & Water Conservation, Dru Harrison 910-798-7138 General comments about existing soil conditions of the site. 1. See attached comments. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A County stormwater and land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/251/Stormwater- Permitting and https://www.nhcgov.com/249/Sediment-Erosion-Controlhowever. 2. The stormwater calculations are not needed for TRC approval and should be submitted for County stormwater permitting. Upon cursory review of the calculations, please see Section 2.3.2.2, 2.3.2.3, 2.3.2.5, 2.4.2, 3.2.3, 3.5, 3.6.3, and 4.4.2 of the New Hanover Stormwater Design Manual for requirements on County stormwater permitting. A set of preliminary comments as follows: a. Please include in the narrative the required items indicated in Table 2-5. b. Please provide all stormwater conveyance calculations as indicated in the tables with the design criteria set to a 25-year storm event. c. Please include pond routing for the 100-year 24-hour storm event assuming the outlet structure is obstructed and only the emergency spillway is functioning. d. Please submit the executed operation and maintenance (O&M) plan and agreement. The form can be downloaded at https://www.nhcgov.com/DocumentCenter/View/465/Stormwater-Maintenance- Form-PDF. e. Please provide an executed Designer’s Plan and Property Owner’s Plan Certification on the cover page of the plans. These forms can be downloaded at https://www.nhcgov.com/DocumentCenter/View/3398/NHC-Designer-Plan- Certification and https://www.nhcgov.com/DocumentCenter/View/3396/NHC- Property-Owner-Plan-Certification f. Please use the Type III rainfall distribution for hydrograph calculations. g. Please use the frequency factor with the revised calculations that rely on the rational method. h. Please use a minimum pipe diameter of 15”. 3. Please contact the State for their stormwater permit requirements. ILM East Airport Commercial – TRC Review Page | 6 NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site plan reflects connection to public water and sewer. Proposed infrastructure does not violate septic or well setbacks to surrounding properties. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Please contact me for street name proposals prior to TRC approval. 2. Each building or hanger will need its own individual address. 3. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. CFPUA water available; sewer would require a mainline extension. 4. CFPUA Meter Sizing Form will be required. 5. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 6. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 7. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. ILM East Airport Commercial – TRC Review Page | 7 NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. Comments attached. WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. Comments attached. Army Corps of Engineers, Brad Shaver 910-251-4611 Requirements if wetlands are impacted 1. No comments. Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources New Hanover County Sustainability Manager United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for New Hanover County, North Carolina Natural Resources Conservation Service August 22, 2025 Custom Soil Resource Report Soil Map (Morris Rd and Kerr Ave (Be, Bp, JO, Ls, NO, To, Wr)) 37 9 5 6 0 0 37 9 5 7 0 0 37 9 5 8 0 0 37 9 5 9 0 0 37 9 6 0 0 0 37 9 6 1 0 0 37 9 6 2 0 0 37 9 6 3 0 0 37 9 6 4 0 0 37 9 6 5 0 0 37 9 6 6 0 0 37 9 5 6 0 0 37 9 5 7 0 0 37 9 5 8 0 0 37 9 5 9 0 0 37 9 6 0 0 0 37 9 6 1 0 0 37 9 6 2 0 0 37 9 6 3 0 0 37 9 6 4 0 0 37 9 6 5 0 0 37 9 6 6 0 0 233400 233500 233600 233700 233800 233900 234000 234100 234200 233400 233500 233600 233700 233800 233900 234000 234100 34° 16' 37'' N 77 ° 5 3 ' 4 6 ' ' W 34° 16' 37'' N 77 ° 5 3 ' 1 2 ' ' W 34° 16' 0'' N 77 ° 5 3 ' 4 6 ' ' W 34° 16' 0'' N 77 ° 5 3 ' 1 2 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 250 500 1000 1500Feet 0 50 100 200 300Meters Map Scale: 1:5,500 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: New Hanover County, North Carolina Survey Area Data: Version 26, Sep 9, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 8, 2022—Dec 1, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report Map Unit Legend (Morris Rd and Kerr Ave (Be, Bp, JO, Ls, NO, To, Wr)) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Be Baymeade fine sand, 1 to 6 percent slopes 10.3 18.1% Bp Borrow pits 0.4 0.6% JO Johnston soils 5.2 9.1% Ls Lynchburg fine sandy loam, 0 to 2 percent slopes, Atlantic Coast Flatwoods 0.2 0.4% No Norfolk fine sandy loam, 0 to 4 percent slopes 20.2 35.7% To Torhunta loamy fine sand 2.9 5.1% Wr Wrightsboro fine sandy loam, 0 to 2 percent slopes 17.5 31.0% Totals for Area of Interest 56.6 100.0% Custom Soil Resource Report To: New Hanover County Planning Department From: Dru Harrison, New Hanover County Soil & Water Conservation District Director Date: 8/22/2025 RE: Morris Rd & Kerr Ave I have reviewed this plan as requested and have these Comments: The Soils are predominantly Baymeade flne sand (Be), Borrow Pits (Bp), Johnston soils (JO), Lynchburg flne sandy loam (Ls), Norfolk flne sandy loam (NO), Torhunta loamy flne sand (To), and Wrightsboro flne sandy loam (Wr). According to USDA Websoil Survey, “Wilmington/New Hanover Classiflcation of soils for Septic Tank Suitability”, Norfolk is a class I soil, Baymeade, Lynchburg, and Wrightsboro are class II soils, Torhunta is a class III soil, and Johnston is a class IV soil. The Soil Survey of New Hanover County lists Baymeade and Norfolk as well drained, Borrow Pits and Wrightsboro are moderately well drained, Lynchburg is poorly drained, and Johnston and Torhunta as very poorly drained. Johnston and Torhunta soils are on the New Hanover County Hydric Soils Ä list which means they are possibly wetland areas and subject to regulation under the Clean Water Act. Lynchburg is on the Hydric Soils “B” list, which means it may contain areas of wetland. It should be noted, according to the Soil Survey of New Hanover County, the limitation for dwellings with or without basements and for small commercial buildings is severe for all of the soils on this site. The limitations are due to fiooding and/or wetness. An adequate drainage and maintenance plan is needed for suitable housing. The U.S. Army Corps of Engineers has federal jurisdiction over 404 Permits and the NCDEHNR, Dept. of Water Quality, has state jurisdiction over 401 Permits under the Clean Water Act. Before disturbing possible wetland areas, developers should contact these agencies to stay in compliance with State and Federal regulations. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN J.R. “JOEY” HOPKINS GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum To: New Hanover County Technical Review Committee Date: August 21, 2025 Subject: ILM East Aviation Office & Retail – 1420 John Morris Road ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. • Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Roadway Improvements: Per the Trip Generation Assessment from Kimley Horn roadway improvements are needed. • This was based on: o AADT of 16,500 for North Kerr Avenue. o AM Peak (65 trips) 60/40 split. ▪ 26 south bound right turning movements. ▪ 39 north bound left turning movements. Refer to the NCDOT Roadway Design Manual for help with the design of any required roadway improvements. • Figure 8-10 Recommended Treatment for Turn Lanes. Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Site Plan Comments: Drainage/Stormwater Conveyance: • If the drainage does not naturally flow to the NCDOT right of way the historic drainage pattern should be maintained. • Hydraulic calculations and associated plan sheets will need to be submitted for the site. o This will be reviewed by the NCDOT Hydraulics Unit. NCDOT Standard Drawings: • Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. Sight Triangles and Sight Distance: • Show and label the 10’ X 70’ NCDOT sight triangles. o No obstructions shall be placed within the NCDOT sight triangles. • Show and label the stopping sight distance. o No obstructions shall be placed within the stopping sight distance. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD WATERFLOW 6-24 6-24 XX X X X X X X X X X X X X X X X X X XXX X X X X XXX X X X XXX X X X XXXX X X X XXX X X X XXX X X XXX X X X XXX X X X X Wilmington International Airport Wilmington International Airport CO CO RUNW A Y 6 - 2 4 102 . 6 ' PROPOSEDCONTROLLEDACCESS GATE #7 PROPOSEDHANGAR A(120'x100')12,000 sf PROPOSEDHANGAR B(120'x100')12,000 sf EDDB EAST-1A CEMETERYACCESS PROPOSED8' SECURITYFENCE (TYP) PROPOSEDHANGAR 1 (10 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 24.8' 25.4' 99. 0 ' EDDB EAST-1C (10 0 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 PROPOSEDHANGAR 5 PROPOSEDHANGAR 4 PROPOSEDHANGAR 3 PROPOSEDHANGAR E(120'x100')12,000 sf HANGAR(12,000 SF) 100 EDDB EAST-1B PROPOSEDDUMPSTERSW/ SCREEN WALL 18'9' BUILDING #1 T A X I W A Y N O V E M B E R JET BLASTDEFLECTOR8' HIGH PROPOSEDRETAININGWALL HANGAR DOFFICE3,250 SF PROPOSEDHANGAR C(120'x100')12,000 sf PROPOSEDHANGAR D(120'x100')12,000 sf PROPOSEDCHARGEPOINT 6000EV CHARGINGSTATION SELF SERVEFUEL STATIONAREA 110 . 0 ' 79. 0 ' 79.0 ' 35.0 ' 158.0 ' ADGII ADGIII ADGII PROP E O C ( 1 ' O U T S I D E P 7 7 L I N E ) PROP EOC 110. 0 ' 58.0' PROPOSEDDUMPSTERSW/ SCREEN WALL X X X X X X X X X X X X PROPOSED2-STORYRETAIL (9,600 SF)OFFICE (9,600 SF)(19,200 SF TOTAL) BUILDING #3 PROPOSEDCONTROLLEDACCESS GATE #4 PROPOSEDCONTROLLEDACCESS GATE #2XX X X X X X X PROPOSEDGSE BLDG.(89.33'x50.67')4,525 sf PROJECT AREA 36.20 ACRES PROJECT AREA36.20 ACRES PROJECT AREA 36.20 ACRES PROPOSEDCONCRETE 3" S9.5B8" CABC 3" S9.5B8" CABC 3" S9.5B8" CABC 3" S9.5B8" CABC GRASSEDSWALE EAST-1AFROMEDDB EAST-1A GRASSEDSWALE EAST-1BFROMEDDB EAST-1B GRASSEDSWALE EASE-1C FROMEDDB EAST-1C PROPOSEDRETAININGWALL PROPOSEDCHARGEPOINT 6000EV CHARGINGSTATION PROPOSEDCONCRETE PROPOSEDCONCRETE PROPOSEDCONCRETE PROPOSEDCONCRETE PROPOSEDCONCRETE PROPOSEDFUEL STORAGETANKS PROPOSED ACCESSSCANNER W/ KEYPADWITHIN 2'x10'x6" RAISEDCONCRETE ISLAND PROPOSEDFUEL PUMPCABINET X X X X X X X X PROPOSEDCONTROLLEDACCESS GATE #1 PROPOSEDCONTROLLEDACCESS GATE #3 PROPOSEDCONTROLLEDACCESS GATE #6 X X X PROPOSEDCONCRETE 69. 0 ' 105 . 0 ' PROP E O C JET BLASTDEFLECTOR8' HIGH79.0 ' PROP. 6" SOLIDYELLOW LINEW/ 6" BLACKOUTLINE PROP. 12" SOLIDYELLOW LINEW/ 6" BLACKOUTLINE PROP. 12" SOLIDYELLOW LINEW/ 6" BLACKOUTLINE PROP. 12" SOLIDYELLOW LINEW/ 6" BLACKOUTLINE PROP. NON-MOVEMENTAREA MARKING6" SOLID YELLOW3'x6" YELLOW DASHW/ 3' GAP W/ 6"BLACK OUTLINE PROP. NON-MOVEMENTAREA MARKING6" SOLID YELLOW3'x6" YELLOW DASHW/ 3' GAP W/ 6"BLACK OUTLINE PROP. 6" SOLIDYELLOW LINEW/ 6" BLACKOUTLINE PROP. 6" SOLIDYELLOW LINE PROP. 6" SOLIDYELLOW LINE PROP. NON-MOVEMENTAREA MARKING6" SOLID YELLOW3'x6" YELLOW DASHW/ 3' GAP W/ 6"BLACK OUTLINE PROPOSEDGRASS AREA PROPOSEDCONCRETE PROPOSEDCONCRETE PROPOSEDFENCE 35.0 'PROPOSEDGRASS AREA PROP E O C TIE TOEX. FENCE PROPOSEDGRASS AREA PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP)PROPOSED8' SECURITYFENCE (TYP) PROP E O C PROP E O C PROP E O C PR O P E O C PROP. PATTERN C INTERMEDIATEHOLDING POSITION MARKING3'x1' YELLOW DASH W/ 6"BLACK OUTLINE X XXX X X X XXX PROPOSEDCONCRETE 30.0' PROP. 6" SOLIDYELLOW LINEW/ 6" BLACKOUTLINEPROP. 6" SOLIDYELLOW LINEW/ 6" BLACKOUTLINE HANGAR EOFFICE3,570 SF PROPOSEDHANGAR F(120'x100')12,000 sf HANGAR FOFFICE PROPOSEDHANGAR G(120'x100')12,000 sf 79.0 ' XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport PROPHC PKNGSIGNS PROPOSEDHC PARKINGSIGNS (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" STD.CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" STD.CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED24" STD.CURB (TYP) PROPOSED24" STD.CURB (TYP)PROPOSED4' CONCRETEFLUME PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP)PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED24" STD.CURB (TYP) PROPOSED24" STD.CURB (TYP) END 24"CURB PROPOSED24" SPILLCURB (TYP)PROPOSED24" SPILLCURB (TYP) PROPOSED24" SPILLCURB (TYP) PROPOSED24" STD.CURB (TYP) PROPOSED6' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSED2' CONCRETEFLUME PROPOSED2' CONCRETEFLUME PROPOSED2' CONCRETEFLUME W/NEENAH SOLIDCOVER PROPOSED2' CONCRETEFLUME W/NEENAH SOLIDCOVER PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BAR PROPOSEDSTOP BAR PROPOSEDSTOP BAR PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BARAND SIGN PROP. 4" 4,500 PSICONCRETE REINFORCEDW/ #4 REBAR 12" O.C. EACHWAY ON 4" CABC PROP. 4" 4,500 PSICONCRETE REINFORCEDW/ #4 REBAR 12" O.C. EACHWAY ON 4" CABC 25.0' 25.0 ' 37.0' TIE TOEX. PAVE TIE TOEX. PAVE PROP. PATTERN C INTERMEDIATEHOLDING POSITION MARKING3'x1' YELLOW DASH W/ 6"BLACK OUTLINE PROPOSED24" SPILLCURB (TYP) PROPOSED3' CONCRETESIDEWALK(TYP) PROPOSED5' CONCRETESIDEWALK(TYP) BUILDING 1OFFICES/SCHOOL14,830 SF PROPOSED24" SPILLCURB (TYP)17 GPR CEMETERY BUFFERFROM NEW SOUTH ASSOC.,INC. (ARCHAEOLOGIST) GPR CEMETERY BUFFERFROM NEW SOUTH ASSOC.,INC. (ARCHAEOLOGIST) PROPOSED5' CONCRETESIDEWALK(TYP) PROPOSEDHC PARKINGSIGNS (TYP) 32' R 32' R 20' R 20' R 30' R 30' R 20' R20' R 95' R 120' R 200.5' R 225' R 200' R 225' R 45' R 70' R PROPOSEDHC PARKINGSIGN (TYP) X X XX X X X X X FOREBAY FOREBAY FOREBAY FOREBAY FOREBAY X X XX X X X X X X X X X X X X X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X XXX X X X X XX X X X XX X X X XXX X X X XXX X X X X X X X X X X X XXXX X X X X X X X X X X X X X X X X X X X X X XX XX X XXX X X X X XXX X X X XXX X X X XXXX X X X XXX X X X XXX X X XXX X X X XXX X X X X X X X XX X X X X X X X X X X X XXX PROPOSED8'x12' CONC.GENERATOR PADBUILDING 3 PROPOSED8'x12' CONC.GENERATOR PADHANGAR E PROP. PH 1 C O N C R E T E L I M I T S PROPOSED8'x12' CONC.GENERATOR PADHANGAR F PROP. BIKERACK 55. 0 ' 50' R 35' TAPER END 24"CURB PROPOSEDHANGAR 2 48.5' 75.5 ' PROPOSEDCONTROLLEDACCESSGATE XXX XXX PROPOSEDRETAININGWALL PROP. NCDOT STDGUARDRAIL PROPOSED8' SECURITYFENCE (TYP) 52.8' PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD 23 PROPOSEDCHARGEPOINT 6000EV CHARGINGSTATION 1150 SE MAYNARD ROADSUITE 260CARY, NC 27511(919) 467-9708C-0329 1" = 100' OverallSite Plan CS - 3Contact the North Carolina One Call Centerprior to doing any digging. (1-800-632-4949) July 30, 2025 DEVELOPER: OWNER:Wilmington International Airport1740 Airport Blvd. - Suite 12 Wilmington, NC 28405 910-341-4333 ext: 1000 ARQ - ILMEast Side Development 0' 100' 200' 300' GRAPHIC SCALE (IN FEET)1 INCH = 100 FT ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120Wilmington, NC 28405910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120Wilmington, NC 28405910-720-0054 ext: 700 PAVEMENT/CONCRETE DESIGN LEGENDDRIVE AISLES (HEAVY DUTY) PARKING SPACES (LIGHT DUTY) (8" CABC & 3" S9.5B) (6" CABC & 3" S9.5B) TAXILANE - ADG I(8" CABC & 3" S9.5B) TAXILANE/APRON - ADG II & III TRAFFIC SIGN NOTEALL SIGNS WILL USE PRISMATIC SHEETING AND WILLADHERE TO THE RETROREFLECTIVITY STANDARDSFOUND IN THE LATEST EDITION OF THE MUTCD. 07/30/2025 Bart J. McClain PUBLIC AREA STRIPING & SIGNAGE NOTES1. ALL ONSITE PAVEMENT MARKINGS TO BE 4" WHITEPAINT, UNLESS OTHERWISE NOTED.2. STOP BAR AT N KERR AVE. TO BE 24" WHITETHERMOPLASTIC.3. STOP BARS INTERNAL TO SITE TO BE 24" WHITE PAINT.4. STOP SIGN AT N KERR AVE. TO BE MUTCD R1-1 36"x36".5. INTERNAL STOP SIGNS ARE TO BE MUTCD R1-1 30"x30".6. DIRECTIONAL ARROWS TO BE WHITE PAINT. CURB RAMP NOTECurb ramp locations are approximate only. Curb rampsshould be located and constructed in accordance with theTown of Cary and NCDOT standards after the locations ofthe propsed stop bars and/or pedestrian crosswalks havebeen staked out. (6" P-209 CRUSHED AGGREGATE & 7" P-501 PCC 4,500 PSI) NOTEALL CONSTRUCTION MUST BE PERFORMED INACCORDANCE WITH CURRENT NEW HANOVERCOUNTY, ILM, CFPUA, NCDEQ, & NCDOTSTANDARD SPECIFICATIONS AND DETAILS. SITE NOTES:1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH NEW HANOVERCOUNTY, ILM, NCDEQ, AND NCDOT STANDARD SPECIFICATIONS ANDDETAILS.2. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALLEXISTING UTILITIES.3. FEMA MAPPED 100 YR FLOOD HAZARD AREAS NOT LOCATED ON THISSITE. FEMA MAP #3720313900K DATED AUGUST 28, 2018.4. DIGITAL INFORMATION AND A STAKING PLAN WILL BE PROVIDED TOTHE CONTRACTOR UPON THEIR REQUEST.5. ASBUILT AND TOPOGRAPHIC INFORMATION FROM FIELD SURVEY BYMATRIX EAST, PLLC . NOTE:FOR 50 SCALE SITE BLOWUPS, SEE SHEETS CS-4 AND CS-5 THIS SET. WATERFLOW 6-24 6-24 XX X XX X X X X X X X XX X XXX X X XXX X X X X XX X X X X XXX X X X XXX X X X X XXX X X X XXX X X XXX X X X XXX X X X X Wilmington International Airport Wilmington International Airport W W W W W W W W W CO CO SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW SSSS SSSS SSSS SSSS SSSS SSSS SSSS SSSS SSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSS SSSS SSSSSSSS SSSS SSSS SSSS SSSSSSSSSSSSSSSSSSSS SSSS SSSS SSSS SSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSS SSSS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSS W W W W W W W W W W WW W W W W W W W W W W W W W W W WW W W W W W W W W W WW WW WWWWWW SSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSSSSSS SSSS SSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSS SSSS SSSSSS SSSSSS SSSSSS SSSS SSSS SS SSSS SS SSSS SSSSSS SSSSSS SSSSSSSSSS SSSSSS SSSSSS SSSS SSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSS SS SSSSSS SSSS SSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSS SSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSS SSSSSS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SSSS SSSSSS SS SSSSSSSSSS SS SSSSSSSSSSSS X X X X X X X X X X X X X X XXX X X X X XXXX SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SSSS SSSS SSSS SSSSSSSS SSSSSSSSSSSSSSSS W W W W W W W W W W W W W W WW W WW W W WW W W W W W W W W W W W W W W W W WWWW W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SSSSSSSS W WW W W WW W W W W W W W W W W W W W W W W WWWWWWWWWWWWW WWWWWWWWWW WWWW WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWW SSSS SSSS SS SS SS SS PROP. 4" PVCDOM SEWERSERVICE (TYP) PROP. MH 5TOP = 21.46OUT = 14.31 PROP. MH 3TOP = 19.96IN = 12.47OUT = 12.37 PROP . 1 7 6 . 7 6 ' 8 " P V C S S @ 0 . 5 0 % KNOX LOCKREQUIRED IN GATE PROP. 8 " P V C C - 9 0 0 W A T E R L I N E PROP. 4" DO M . S E W E R S E R V I C E PROP E O P PROP. O/W/SSEPARATOR1000 GAL (TYP) PROP. O/W/SSEPARATOR1000 GAL (TYP) PROP. 4" S E W E R S E R V I C E T O O W S PROP. 2" PVC C-900DOM. WATER SERVICE KNOX LOCKREQUIRED ON GATE PROP. 4" DCVADOMESTIC BACKFLOWIN INSULATE HOTBOXPROP. 4" DOMESTICMASTER WATER METER EX. 12" PVC C-900 WATER LI N E SS SERVICE PROP. 4" P V C D O M PROP. O/W/SSEPARATOR1000 GAL (TYP) PROP FH6" LEG PROP. 105.38' 8" PVC SS @ 0.50% PROP. 1 9 9 . 7 2 ' 8 " P V C S S @ 0 . 5 0 % PROP. MH 1TOP = 22.40IN = 10.86OUT = 10.76 PROP . 6 " S E W E R S E R V I C E PROP. O/W/SSEPARATOR1000 GAL (TYP) PROP. 4" PVCDOM SEWERSERVICE (TYP) PROP. 4" DO M . S E W E R S E R V I C E PROP. 1-1/2"DOM WATERSERVICE PROP. 1-1/2"DOM WATERSERVICE PROP. 1-1/2"DOM WATERSERVICES PROP. 6" PV C C - 9 0 0 W A T E R L I N E PROP. 8" P V C C - 9 0 0 W A T E R L I N E PROP FH6" LEG PROP FH6" LEG RUNW A Y 6 - 2 4 PROPOSEDCONTROLLEDACCESS GATE #7 20' 10' (100 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 (100 ' P U B L I C R / W ) N. K E R R A V E N U E - S R 1 1 7 5 EXISTINGGRASS TA X I W A Y N O V E M B E R PROPOSEDRETAININGWALL PROPOSEDHANGAR 1 PROPOSEDHANGAR 5 PROPOSEDHANGAR 4 PROPOSEDHANGAR 3 PROPOSEDHANGAR 2 CEMETERYACCESS PROPOSEDHANGAR A12,000 sf PROPOSEDHANGAR B12,000 sf PROPOSEDHANGAR C12,000 sf PROPOSEDHANGAR D12,000 sf PROPOSEDHANGAR E12,000 sf PROPOSEDGSE BLDG. BUILDING #3PROPOSED2-STORY(19,200 SF TOTAL)SPRINKLED PROPOSEDCONCRETE PROPOSEDFUEL TANKS PROP. 2" DCVA DOMESTICBACKFLOW IN INSULATEDHOTBOX PROP. 2" DOMESTICMASTER WATER METER PROP. 16"x8"TAPPING SLEEVEWITH VALVE PROP. 8" P V C C - 9 0 0 W A T E R L I N E PROP FH6" LEG EX. 12" PVC C-900 WATER LINE PROP8"x8"x8" TEE3-8" GV PROP CUT IN12"x12"x8" TEE2-12" GV1-8" GV EX16"x12" TAPPINGSLEEVE W/ VALVE(BY OTHERS) PROP. 4" PVCOWS SERVICE(TYP) EX. 20' CAPE FEARPUBLIC UTILITY EASEMENT SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSPROP. MH 4TOP = 19.83IN = 13.57OUT = 13.47 SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSPROP. MH 6TOP = 18.40OUT = 14.02 SSSS SS SS SSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSS PROP. O/W/SSEPARATOR1000 GAL (TYP) SS SSSS SSSS SSSS SSSS SSSS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS PROP. 4" DOM.SS SERVICE PROP. 4" SSSERVICE TO OWS PROP. 6" DOM. SS SERV I C E WW WW PROPFDC PROP. 6" FIRE LINEBACKFLOW PROP. 8 " P V C C - 9 0 0 W A T E R L I N E PROP. 8" PVC C - 9 0 0 W A T E R L I N E WWWWWWWWWWWWWWWWWWW W W WWW W WWW PROP. 1" DOMESTICBACKFLOW PROP. 1" DOMESTICWATER METER SSSSSSSSSSSS SS SS SS SSSSSS SS SS SSSS SS SSSSSSSSSSSSSSSSSS PROP. 4" DOM.SS SERVICE PROP. 2" DOMESTICDCVA BACKFLOWIN INSULATED HOTBOX PROP. 2" DOMESTICMASTER WATER METER PROP8"x8"x8" TEE2-8" GV1-8"x6" REDUCER1-6" GV W W W W W W W W W W W W W W W W W W SS SS PRO P . 8 " P V C C - 9 0 0 W A T E R L I N E W WW W PROP FH6" LEG EX FH(BY OTHERS) X X X X X X X X X X X X X X X X XX X X X XXXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X X X Wilmington International Airport Wilmington International Airport PROPOSEDHANGAR F(12,000 sf)SPRINKLED PROPOSEDHANGAR G12,000 sf BUILDING #1 PROPOSEDCONTROLLEDACCESS GATE #1 HANGAR FOFFICESPRINKLED PROPOSEDCONTROLLEDACCESS GATE #2 HANGAR(12,000 SF)SSSSWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWW PROP. 2" DOMWATER SERVICE SS SS SS SS 1-1/2" DOMESTICWATER SERVICE SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSS SS PROP. O/W/SSEPARATOR1000 GAL (TYP) SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS SSSS SSSS PROP. 4" DOM.SS SERVICE PROP. 4" D O M . S E W E R S E R V I C E SSSSSSSSSSSSPROP. 4" SSSERVICE TO OWS PROP. 4" SSSERVICE TO OWS BUILDING 1OFFICES/SCHOOL14,830 SF WW PROPFDC PROP. 1 4 7 . 4 2 ' 8 " P V C S S @ 0 . 5 0 % PROP. 90.00' 8 " P V C S S @ 0 . 5 0 % (BY OTHERS) (BY OTHERS) SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSS SSSSSSSS PROP. 2000 GALGREASE TRAP S S S S S S EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA. CONCRETE MANHOLE EXISTING 4-FT DIA.CONCRETE MANHOLE EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING8-INCH DIA.GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING8-INCH DIA. GRAVITY SEWER EXISTING 8-INCH DIA. GRAVITY SEWER EXISTING FIRE HYDRANT EXISTINGFIRE HYDRANT EXISTINGFIRE HYDRANT EXISTING 12-INCH WATER MAIN EXISTING12-INCH WATER MAIN EXISTING 2-INCH WATER SERVICE EXISTING WATER METER EXISTING BACKFLOW PREVENTER EXISTING BACKFLOW PREVENTER EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING FIRE HYDRANT TEE WITH MJ CAP SSSS SSSS SSSS EXISTING6-INCH SEWER SERVICE EXISTING6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING 6-INCH SEWER SERVICE EXISTING TEMPORARY FIRE HYDRANT REMOVE AND RELOCATETEMPORARY FIRE HYDRANT EDDB EAST-1A EDDB EAST-1B EDDB EAST-1C W W W W PROP FH6" LEGPROP. 4" DOM.SS SERVICE PROP. MH 2TOP = 20.70IN = 11.84OUT = 11.74 PROP. O/W/SSEPARATOR1000 GAL (TYP)SSSS WWWWWWWWWWWWWW PROP. 1" IRRIGDCVA BACKFLOWIN INSULATED HOTBOX PROP. 1" IRRIGTAP PROP. 1" IRRIGMETER XX X X X X X X X PROP. 2" DOMWATER SERVICE FOREBAY FOREBAY FOREBAY FOREBAY FOREBAY W WWW PROPOSED8'x12' CONC.GENERATOR PADBUILDING 3 PROPOSED8'x12' CONC.GENERATOR PADHANGAR E PROPOSED8'x12' CONC.GENERATOR PADHANGAR F PROPOSED8'x12' CONC.GENERATOR PADBUILDING 1 PROP. 2-2"PVC CONDUITS PROP. 2-2"PVC CONDUITS PROP. 1-2"PVC CONDUIT PROP. 2-2"PVC CONDUITS PROP. 1-2"PVC CONDUIT PROP. 1-1/2" DOMESTICWATER SERVICE PROP. 4"FIRELINE TO FDC PROP. 1-2"PVC CONDUITS PROP. BIKERACK PROP. 8" RPDA BACKFLOWPREVENTER IN INSULATED HOTBOX W W WWW WWWWW WWWWWWWW WWWWW WWWWW WWWWWWWW W W W WWW W W W WWWW W W W WWWW W W WW PROP. 8" RPDA BACKFLOWPREVENTER IN INSULATEDHOTBOX PROP. 6" P V C C - 9 0 0 W A T E R L I N E PROP. 2" P V C C - 9 0 0 D O M ESTIC SER V I C E W WWW WW W W W W WWW W WWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW WW PROP. 4" DOMTAP PROP. 4" PVC C-900DOM WATER SERVICE WW PROP. 4" PVC C-900DOM WATER SERVICE PROP. 1-1/2" DOMWATER SERVICE PROP. 6" C-900FIRE LINE PROP. 4" PVC C-900DOM WATER SERVICE PROP. 1.5" P V C C - 9 0 0 D O M . S E R V I C E PROP ILM PRIVATEUTILITY EASEMENT PROP ILM PRIVATEUTILITY EASEMENT PROP ILM PRIVATEUTILITY EASEMENT PROP ILM PRIVATEUTILITY EASEMENT PROP. 6" PVC DOM.SEWER SERVICE PROP. 4" PVC DOM.SEWER SERVICE(TYP)PROP. 4" PVC DOM.SEWER SERVICE(TYP) PROP. 6" PVC DOM.SEWER SERVICE PROP. 4" PVC DOM.SEWER SERVICE(TYP)PROP. 4" PVC DOM.SEWER SERVICE(TYP) PROPOSED4" GV PROPOSED6" GVPROPOSED2" BLOWOFF HANGAR EOFFICE3,570 SF PROP. 6 " P V C C - 9 0 0 W A T E R L I N E KNOX LOCKREQUIRED ON GATE PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO SSSSSSSSSSSSSSSSSSSSSSSSSSSS PROP.CO PROP.CO PROP.COPROP. 4" DOM.SS SERVICE PROP.CO PROP.COPROP.CO PROP.CO PROP.CO PROP.COPROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.COPROP.CO PROP.COPROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.COPROP.COPROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP.CO PROP. 4" PVCC-900 FIRELINEPROP. 2" DOMWATER SERVICE OVERHEAD POWER TO BE REMOVED EX. POWER POLEAND GUY WIRES TOBE REMOVED ANDPOWER TO BEUNDERGROUND EX. POWER POLEAND GUY WIRES TOBE REMOVED ANDPOWER TO BEUNDERGROUND PROPOSED8' SECURITYFENCE (TYP) PROP. NCDOT STDGUARDRAIL PROPOSED8' SECURITYFENCE (TYP) W W W W W W W W W W W W W W WWWW WW PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED8.0'x8.67' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROPOSED5.5'x6.83' CONC.TRANSFORMER PAD PROP. 2" PVC C-900DOM. WATER SERVICE PROP. 2" PVC C-900DOM. WATER SERVICE PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 4" PVC C-900OWS SEWER SERVICE(TYP) PROP. 6" PVC C-900OWS SEWER SERVICE(TYP) PROP. 6" PVC C-900OWS SEWER SERVICE(TYP) PROP. 1" PVC C-900DOM. WATER SERVICE PROP. 2" TAP PROP. 1" PVC C-900DOM. WATER SERVICE EXISTING ILM PRIVATEUTILITY EASEMENT WWWWWWWW PROPFDC TOGSE BLDG WWWWWWWW PROP. 4" PVC C-900FIRELINE TO FDC PHYSICALLY LOCATED THE UNDERGROUND UTILITIES.INFORMATION AVAILABLE. THE SURVEYOR HAS NOTTHEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROMLOCATION INDICATED ALTHOUGH HE DOES CERTIFY THATUNDERGROUND UTILITIES SHOWN ARE IN THE EXACTSURVEYOR FURTHER DOES NOT WARRANT THAT THEIN THE AREA, EITHER IN SERVICE OR ABANDONED. THEGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIESTHE SURVEYOR MAKES NO GUARANTEE THAT THE UNDER-FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS.THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED WW SS SS W EE TT GG 1150 SE MAYNARD ROADSUITE 260CARY, NC 27511(919) 467-9708C-0329 1" = 100' OverallUtility Plan CS - 6 DEVELOPER:ARQ Realty, LLC 6711 Netherlands Drive - Suite 120Wilmington, NC 28405910-720-0054 ext: 700 Contact the North Carolina One Call Centerprior to doing any digging. (1-800-632-4949) 0' 100' 200' 300' GRAPHIC SCALE (IN FEET)1 INCH = 100 FT ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120Wilmington, NC 28405910-720-0054 ext: 700 Existing Water Line by WK Dickson Existing Sewer Line by WK DicksonSSSSSSSSSS Proposed Water Line by CFCAWWWW Proposed Sewer Line by CFCASSSSSSSS UTILITY LEGEND Financially Responsible Contact:Benjamin ZuckerARQ Realty, LLC Group919-939-6769 NOTE:BUILDING 3, HANGAR F, AND GSE TOBE SPRINKLED. NOTE:GATED ENTRANCES/EXITS (4) TOAIRPORT AREAS WILL HAVE KNOXLOCKS ON EXTERIOR SIDE OF GATES.KNOX BOX'S FOR BUILDINGS TO BELOCATED ON OUTSIDE WALL NEXT TOTHE RISER ROOM DOOR. UNDERGROUND UTILITY NOTE:UNDERGROUND UTILITY RELOCATIONS ARE TO BECOORDINATED BETWEEN THE CONTRACTOR AND THEINDIVIDUAL UTILITY COMPANIES. July 30, 2025 07/30/2025 Bart J. McClain ARQ - ILMEast Side Development Existing Water and Sewer Utility Note:The existing water and sewer lines shown on this plan in blueand green are from approved ILM utility extension plansentitled 'Work Authorization 03 - ILM East Utility Expansion' byWK Dickson and approved by CFPUA on March 28, 2025. NOTEALL CONSTRUCTION MUST BE PERFORMED INACCORDANCE WITH CURRENT NEW HANOVERCOUNTY, ILM, CFPUA, NCDEQ, & NCDOTSTANDARD SPECIFICATIONS AND DETAILS. NOTE:FOR 50 SCALE UTILITY BLOWUPS, SEESHEETS CS-7 AND CS-8 THIS SET. OWNER:NHC; NHC Airport Authority1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 X X X X X X X X X X X X X X X X X X X X X X X X X X X X WWWWWWWWWWWWWWWWWWWWWWWWWWWW SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSS SS SS SS SS SSSS SS SS PROP.GI 73 PROPOSEDHANGAR DFFE 21.00 PROP.SLOT DRAINTOP 20.21 PROP.JB 46 PROP.GI 30B PROP.FES 30A PROP. FESINV 13.00 PROP. FESINV 11.70 PROP.DI 34 (1 0 0 ' P U B L I C R / W ) . K E R R A V E N U E - S R 1 1 7 5 PROPOSEDRETAININGWALL 162 LF GRASSEDSWALE EAST-1BFROMEDDB EAST-1B PROP. FES 31INV 9.5 PROP.CB 33 PROP.ST MH 32 PROP.18" HDPE PROP. 1 8 " H D P E PROP.24" HDPE PROP. 84.56'18" RCP @ 1.54% PROP.18" HDPE PROP.12" HDPE PROP.JB 45D PROP.JB 45C PROP. 1 5 " H D P E PROP. 1 2 " H D P E 20 20 20 20 19 18 17 16 151617181920 11 10 151617181920 14 9101112121110 9101112 13 1413 12121110 PROP.18" RCP AILROADCK DAM PROP. RAILROADTIE CHECK DAM(TYP) PROP.CB 72 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) WATERFLOW SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS WWWWWWWWWWWWWWWWWWWWWWWW SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW W W SS SS SS SS SS SS SS SS W W W W W W W W W W W W W W W W W W W W W W W W WW W W W W W W W W W W W W W W W W W W WW W W W W WWWWWWWWWWWWWWWWWWWW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWW SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSS W W W W PROP.JB 51 BUILDING #3PROPOSED2-STORY FFE 19.25 PROP. FES 80INV 17.00 PROP.GI 47 PROP . 1 5 " H D P E PROP. 15" HDPE PROP. RISER 37TOP 17.8012" INV 15.0018" INV 12.74 PROP.GI 10 PROP.GI 11 PROP.GI 28 PROP.GI 27 EDDB EAST-1B PROP.ST MH 36 PROP.ST MH 35 PROP. FES 81INV 17.50 PROP.CB 9 PROP.CB 8 PR O P . 1 5 " H D P E PROP.15" HDPE PROP. 77.00'18" HDPE@ 0.65% PRO P . 1 8 " H D P E PROP.18" RCP PRO P . 1 2 " H D P E PROP. FESINV 18.65 PROP. FESINV 18.10 PROP. 81.22'18" RCP @ 0.68% HDPE PROP. 6' GAPNO SLOT DRAIN PROP.VEL DISS PROP.VEL DISS/ 22 22 22212019 21 20 20 20 20 19 20 20 20 20 20 1716 15 2121201918 17 16 19 19 19 18 18 171819202122 22 22 21 20 19 18 22 22 22 22 22 2222 22 2222 22 2223 23 23 23 23 23 232323 22 21 22 18 19 18 1716 21 2221 21 21 SS SS 10' T O P E L E V 2 0 . 0 X X X X X X X X X X PROPOSEDGSE BLDG.FFE 21.00 PROPOSEDHANGAR EFFE 21.00 HANGARFFE 21.20 BUILDING #1 21 21 21 19 SS SS W W W W W W W W W W W WWW W W W W W W W W W W W W W W W W W W W W W W W WWW W W W W W W W W W W W W SS SS SS SS W W SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSS SS SSSSSSSSSS SSSSSSSS PROP.SLOT DRAINTOP 20.55 20 20 20 PE PROP. 1 8 " H D P E 21 PROP.GI 45E SS SS WWWWWWWWWWWWWW 20 20 20 19 19 20 21 22 70' R 45' R PROPOSED24" SPILLCURB (TYP) PROPOSEDSTOP BARAND SIGN PROPOSEDSTOP BAR PROPOSED24" SPILLCURB (TYP) PROPOSED24" STD.CURB (TYP) PROP. 81.22'18" RCP @ 0.68% PROP. FESINV 18.10 PROP. FESINV 18.65 16. 5 16 PROP. 10'RIP-RAPSPILLWAYEL 18.0 1716 18 15 . 5 15.5 1817 FOREBAY FOREBAY FOREBAY PROP. 10'RIP-RAPSPILLWAYEL 17.5 PROP. 10'RIP-RAPSPILLWAYEL 16.5 W W W W PROPOSED8'x12' CONC.GENERATOR PADBUILDING 3 PROPOSED8'x12' CONC.GENERATOR PADHANGAR E PROPOSED8'x12' CONC.GENERATOR PADBUILDING 1 PROP. FES 110INV 19.0 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWW WW W W 21 21 PROPOSED8' SECURITYFENCE (TYP) PROPOSED8' SECURITYFENCE (TYP) 1150 SE MAYNARD ROADSUITE 260CARY, NC 27511(919) 467-9708C-0329 1" = 100' EDDB EAST-1BPlan / Profile Contact the North Carolina One Call Centerprior to doing any digging. (1-800-632-4949) 0' 40' 80' 120' GRAPHIC SCALE (IN FEET)1 INCH = 40 FT DEVELOPER: ARCHITECT: DEVELOPER: 6711 Netherlands Drive - Suite 120 Wilmington, NC 28405 910-720-0054 ext: 700 ARQ Realty, LLC 6711 Netherlands Drive - Suite 120Wilmington, NC 28405910-720-0054 ext: 700 Bart J. McClain EDDB EAST-1B PLAN VIEW SWALE EAST-1B EDDB EAST-1B PROFILE VIEWHORIZ SCALE 1" = 5'VERT SCALE 1" = 2' HORIZ SCALE 1" = 40' HORIZ SCALE 1" = 40' WW SS SS W EETT GG ANTI-FLOATATION CONCRETE PROP. 18.89' 18" RCP @ 0.53% TOP OF 10' DAM ELEV. 20.00 3:1 SLOP E PROPOSED TRASH RACK RISER TOP ELEV 17.80 10' EMERGENCY SPILLWAY ELEV. 19.00 PROPOSED 12' PVC DRAWDOWN PIPE INV 15.00 RISER 37 INV 12.74 WIRE MESH OVER OPENING PROP. 2'x2' INSIDE CONCRETE RISER TEMPORARY POOL ELEV. 16.50 PROP. 77.00' 18" HDPE @ 0.65% FES 18" HDPE 17.00 3 : 1 S L O P E TO MH 36PROP. VELOCITY DISSIPATOR 4' FOREBAY BERM SEE PLAN VIEW FOR FOREBAY ELEVATIONS 3:1 3 : 1 10' WIDE RIP-RAP SPILLWAY/KEYWAY THROUGH DAM. FOREBAY BOTTOM SEE PLAN GEO-TEXTILE UNDERLINER WITH 4" CABC ABOVE. CLASS A RIP-RAP ABOVE CABC TO ALLOW FILTRATION FROM FOREBAY TO BASIN TO PREVENT PONDING. APPROX. 0.5% BOTTOM SLOPE FROM FOREBAY TO OUTLET PIPE. Forebay Note;A rip-rap spillway/keyway is being used inthe forebay berm to impound water and allowsediment to settle out, as well as allow topercolate through the keyway to preventextended ponding within the forebay. SHWT NOTE:SHWT borings were conducted by Soil & Environmental Consultants, Inc., on March 13, 2024 to determineapproximate SHWT elevations at the EDDB locations.All EDDB's are 1' or more above the SHWT at theboring locations. CS - 28 July 30, 2025 07/30/2025 ARQ - ILMEast Side Development OWNER:NHC; NHC Airport Authority1740 Airport Blvd. Wilmington, NC 28405 910-341-4333 MEMORANDUM To: New Hanover County Technical Review Committee Date: August 15, 2025 Subject: ILM East Aviation, Office, and Retail NCDOT Projects: • N/A WMPO 2045 MTP Projects: • N/A New Hanover County Projects: • NCHBIKEPEDPRIORITIES-2024 – Kerr Avenue North/Barvarian Lane. 10’ paved Multi Use Path. TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips General Office Space (710) 38,000 SF 500 73 74 McQuillan Pines – Major Subdivision – TRC Review Page | 1 To: James Yopp, 7150 River Road, james@rockfordpartners.net From: Ryan Beil, Development Review Planner Date: September, 2nd, 2025 TRC Review PID#: R08200-001-010-000, R08200-001-012-000 Egov# SUBPP- 25-0026 Subject: McQuillan Pines- Preliminary Plan TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. McQuillan Pines – Major Subdivision – TRC Review Page | 2 The following comments have been received for the September 2nd, 2025, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Planning, Ryan Beil 910-798-7444 Compliance with local zoning requirements 1. General Comments a. The zoning is split between CZD B-2 and CZD RMF-L, and the housing type proposed is row-style single-family attached. b. This is a performance subdivision. i. The RMF-L district allows a maximum density of 10 dwelling units per acre. Density calculations: 1. Total site acreage = 13.87 acres 2. RMF-L Zoning District allows maximum of 10 dwelling units per acre under performance residential subdivision standards. 3. Developable site acreage (13.96) x 10 units per acre= 140 units maximum a. Proposing 85 units. c. This project was a part of a modification of a conditional rezoning, Z23-04M with the following conditions: i. Any RV and Boat storage must be located on the interior of the mini storage and may not be visible from a public right-of-way. ii. The access easement from Southern Charm to Carolina Beach Road shall be public. iii. The access easements from both Southern Charm Drive and Carolina Beach Road shall not be gated. iv. Single-family attached structures shall be limited to three stories. The mini storage height will be limited to 3 stories or 50 feet. v. The buffer yard between the new residential structures and the adjacent residential structures shall be no less than 20 feet. vi. The mini storage structure will be limited to a 12,000 square foot maximum building footprint and a 36,000 gross square foot maximum. McQuillan Pines – Major Subdivision – TRC Review Page | 3 vii. A minimum 20-foot-wide public access easement shall be provided along the frontage parallel with Carolina Beach Road to accommodate future public bicycle and pedestrian use. d. Please include the updated conditions from Z23-04M on the site plan. I see the existing conditions from Z23-04 on page 5 of the Site Plan, but not the most recent conditions from the Modification of the rezoning. e. Staff recommend including the location of traffic calming devices on the preliminary plans. Installation of traffic calming devices are not required, but including potential locations on the plan ensures the future HOA / owners will have the opportunity to install them without conducting a traffic study. 2. UDO Section 5.1, Parking and Loading a. 2 spaces required per 2 (+) bedrooms. 85 units with 3 bedrooms. 85 x 2 =170 required spaces. b. For the CZD B-2 section, .5 spaces required per 1000 sq ft. i. 36,000 square feet / 1000 = 36 ii. 36 x .5 =18 spots required, appears to be 19 spots provided in this section, please confirm. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. 4. UDO Section 5.3, Tree Retention a. Tree removal permit has been received and approved. 5. UDO Section 5.4, Landscaping and Buffering a. Landscaping and buffering are only required for the amenity areas. Additionally, as listed in condition 5, the buffer yard between the new residential structures and the adjacent residential structures shall be no less than 20 feet. b. A transitional buffer is also required along the northern perimeter where the property abuts single family residential housing. c. B-2 zoning requires 25 square feet per linear foot of street frontage, with 1 canopy tree and 5 shrubs per every 600 square feet of street yard area i. 270.5 linear feet -26.5 = 244 linear feet. 244 x 25= 6101 square feet required. McQuillan Pines – Major Subdivision – TRC Review Page | 4 ii. 6,181 square feet provided. iii. 6,181sq ft / 600 sq ft = 10 canopy trees and 72 shrubs provided. 6. UDO Section 5.5, Lighting a. Please note under 5.5.2.A that a lighting plan is not required for single-family residential projects and the county does not require streetlights, however a lighting plan is required for any amenity area. 7. UDO Section 5.6, Signs a. I see the location of a freestanding sign at the Southern Charm Drive intersection with Carolina Beach Road. If the sign is along a DOT maintained road or near an intersection with a DOT road (including the driveway access). They need to show the required DOT sight triangles on the plan and the sign location must be outside the sight triangles. b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. 8. UDO Section 5.7, Conservation Resources a. Per the New Hanover County Planning Map there is Pocosin present, but Pocosin is only regulated as a conservation resource if there are Class IV soils present, which there are not. 9. UDO Section 5.8, Open Space Requirements a. 20% of open space required, 5.99 acres of open space provided, meaning open space requirement has been met. 10. UDO Article 6, Subdivision Design and Improvements. a. Sidewalks are shown. b. Block length meets our requirements. c. Check for street connectivity requirements (links and nodes). There are 13 links and 7 nodes, yielding a ratio of 1.85 which meets the requirements. 11. UDO Article 9, Flood Damage Prevention McQuillan Pines – Major Subdivision – TRC Review Page | 5 a. Per the New Hanover County Flood Hazard map, no part of the property is in floodplain. NHC Fire Services, David Stone 910-798-7458 Compliance with the NC Fire Code 1. Roads with fire hydrants are required to be 26 feet exclusive of curbs. Submitted plans show 24-foot roads. 2. No parking on fire department access roads needs to be placed in the HOA covenant or signs installed along the roadway. 3. No gates or traffic calming devices unless approved through TRC. NHC Soil & Water Conservation, Reviewer 910-798-7138 General comments about existing soil conditions of the site: 1. Comments are attached NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. Please resubmit for permit revisions to County stormwater permit STMW-23-0039 and land disturbance permit LNDP-23-00041. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync-energovpub.tylerhost.net/apps/selfservice#/home) using the referenced permit numbers. 2. Please contact the State for their stormwater permit requirements. It is anticipated a high density permit will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site Plan reflects connection to public water and sewer. Home at 6900 Carolina Beach Rd. has an existing septic system and well on the property. Any septic tank must be properly abandoned by Pumping, Crushing and Filling. Well Heads must be located, identified, protected and properly abandoned by a Certified Well Driller. Proposed infrastructure does not violate setbacks on any surrounding properties septic systems or wells. McQuillan Pines – Major Subdivision – TRC Review Page | 6 NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Each building and unit will need its own individual address. 2. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. Utility Plan Review required by CFPUA. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering-Plan-Review-103. 3. Per engineer, water will be provided by NC Aqua; CFPUA sewer would require a mainline extension. 4. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 5. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 6. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. WMPO, Caitlin Cerza 910-473-5130 New Hanover County contracted traffic engineering services comments: 1. Comments are attached Army Corps of Engineers, Brad Shaver 910-251-4611 Requirements if wetlands are impacted 1. No comments McQuillan Pines – Major Subdivision – TRC Review Page | 7 Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources ******** See Note Above New Hanover County Sustainability Manager ******** See Note Above New Hanover County Soil & Water Conservation United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for New Hanover County, North Carolina Natural Resources Conservation Service August 22, 2025 Custom Soil Resource Report Soil Map (6900 Carolina Beach Rd (Ly, Wa)) 37 7 5 2 8 0 37 7 5 3 2 0 37 7 5 3 6 0 37 7 5 4 0 0 37 7 5 4 4 0 37 7 5 4 8 0 37 7 5 5 2 0 37 7 5 2 8 0 37 7 5 3 2 0 37 7 5 3 6 0 37 7 5 4 0 0 37 7 5 4 4 0 37 7 5 4 8 0 232450 232490 232530 232570 232610 232650 232690 232730 232770 232810 232450 232490 232530 232570 232610 232650 232690 232730 232770 232810 34° 5' 10'' N 77 ° 5 3 ' 5 9 ' ' W 34° 5' 10'' N 77 ° 5 3 ' 4 4 ' ' W 34° 5' 2'' N 77 ° 5 3 ' 5 9 ' ' W 34° 5' 2'' N 77 ° 5 3 ' 4 4 ' ' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 50 100 200 300Feet 0 25 50 100 150Meters Map Scale: 1:1,800 if printed on A landscape (11" x 8.5") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: New Hanover County, North Carolina Survey Area Data: Version 26, Sep 9, 2024 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Nov 8, 2022—Dec 1, 2022 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report Map Unit Legend (6900 Carolina Beach Rd (Ly, Wa)) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI Ly Lynn Haven fine sand 4.7 61.7% Wa Wakulla sand, 1 to 8 percent slopes 2.9 38.3% Totals for Area of Interest 7.6 100.0% Custom Soil Resource Report To: New Hanover County Planning Department From: Dru Harrison, New Hanover County Soil & Water Conservation District Director Date: 8/22/2025 RE: 6900 Carolina Beach Rd I have reviewed this plan as requested and have these Comments: The Soils are predominantly Lynn Haven fine sand (Ly) and Wakulla sand (Wa). According to USDA Websoil Survey, “Wilmington/New Hanover Classification of soils for Septic Tank Suitability”, Wakulla is a Cass I Soil and Lynn Haven is Class III soil. The Soil Survey of New Hanover County lists Wakulla as somewhat excessively drained and Lynn Haven as poorly drained. Lynn Haven is on the New Hanover County Hydric Soils “A” list which means it is possibly wetland areas and subject to regulation under the Clean Water Act. The U.S. Army Corps of Engineers has federal jurisdiction over 404 Permits and the NCDEHNR, Dept. of Water Quality, has state jurisdiction over 401 Permits under the Clean Water Act. Before disturbing possible wetland areas, developers should contact these agencies to stay in compliance with State and Federal regulations. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN J.R. “JOEY” HOPKINS GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum To: New Hanover County Technical Review Committee Date: August 21, 2025 Subject: McQuillan Pines – 6900 Carolina Beach Road ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the district office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway permit has been approved for this site. • A revised driveway permit will be required. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). EDGE OF PAVEMENT SS FM SS FM DO NOT ENT E R ONE WAY Final Design Not For Construction SS F SS F M SS F M SS F M SS F M SS F M SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM DO N O T E N T E R ONE WAY Final Design Not ForConstruction MEMORANDUM To: New Hanover County Technical Review Committee Date: August 15, 2025 Subject: McQuillan Pines Townhomes NCDOT Projects: • N/A WMPO 2045 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Multifamily Housing Low Rise (215) 85 Dwelling Units 612 39 47