HomeMy WebLinkAboutS25-04 Planning Board Staff SummaryS25-04 Staff Summary – Planning Board 9-4-2025 Page 1 of 16
STAFF SUMMARY FOR S25-04
SPECIAL USE PERMIT APPLICATION
APPLICATION SUMMARY
Case Number: S25-04
Requests:
S25-02 – R-15 Additional Dwelling Allowance
Applicant: Property Owner(s):
James Yopp with Hoosier Daddy, LLC Hoosier Daddy, LLC
Location: Acreage:
5669, 5671, 5713, 5831 Carolina Beach Road and
1051, 1055, 1052, 1046 Rosa Parks Lane 43.10
PID(s): Comp Plan Place Type:
R07600-004-027-000, R07600-004-028-000,
R07600-004-035-000, R07600-004-035-001,
R07600-004-037-000, R07600-004-038-000,
R07600-004-045-000, R07600-004-052-000
Urban Mixed Use and General Residential
Existing Land Use: Proposed Land Uses:
Vacant land with partial road infrastructure Maximum 291 mix of attached and multi-
family dwelling units
Current Zoning:
R-15, Residential
S25-04 Staff Summary – Planning Board 9-4-2025 Page 2 of 16
SURROUNDING AREA
LAND USE ZONING
North Coastal Christian High School and the Villages at Myrtle
Grove Shopping Center R-15 and B-2
East Single-Family Residential (Sentry Oaks Subdivision) R-15
South Single-Family Residential (Tarin Woods Subdivision) R-15
West Motorcycle sales, general retail, Autumn Care of Myrtle
Grove, and Single-Family Residential B-2 and R-15
ZONING HISTORY
April 7, 1971 Initially zoned R-15 (Area 5)
COMMUNITY SERVICES
Water/Sewer Public water available through CFPUA. Public sewer available through
connection to an existing force main.
Fire Protection New Hanover County Fire Services, New Hanover County Southern Fire
District, New Hanover County Station 18.
Schools Porters Neck Elementary, Holly Shelter Middle, and Laney High Schools
Recreation Hanover Pines Park
CONSERVATION, HISTORIC, & ARCHAEOLOGICAL RESOURCES
Conservation
The conservation resource map indicates pocosin wetlands on the property;
however, they are not underlaid with Class IV soils. Pocosin wetlands require
Class IV soils to trigger additional development standards.
Historic No known historic resources
Archaeological No known archaeological resources
S25-04 Staff Summary – Planning Board 9-4-2025 Page 3 of 16
APPLICANT’S PROPOSED PLANS
Site Plan with Staff Markup
N
Access to Carolina Beach Road
Multi-Family
or Attached
Single Family
Amenity and
Open Space
Stormwater
Open Space
Proposed
Stormwater
Attached
Single Family
Existing
Stormwater
Stormwater
S25-04 Staff Summary – Planning Board 9-4-2025 Page 4 of 16
Project History
• In June 2025 the Board of Commissioners denied special use permit S25-02 for an Additional
Dwelling Allowance for 10.2 dwelling units per acre for a total of 444 dwelling units on parcels
that comprise much of the subject site.
• Section 10.2.10.F of the Unified Development Ordinance (UDO) states if an application
requiring a public hearing is denied, no application proposing the same or similar
development on all or part of the same land shall be submitted within one year after the date
of denial unless the Planning Director determines that
o There has been substantial change in the circumstances relevant to the issues or
facts considered during review of the prior application that might reasonably
affect the action of the decision-making body;
o New or additional information is available that was not available at the time of
review of the prior application that might reasonably affect the action of the
decision-making body;
o The new application proposed to be submitted is materially different from the
prior application; or
o The final decision on the prior application was based on material mistake of fact.
• The applicant revised and resubmitted a special use permit application by the August 1, 2025
deadline, in accordance with the ordinance requirements for Additional Dwelling Allowances.
• On August 18, the Board of Commissioners amended the UDO to permit Additional Dwelling
Allowances through the conditional rezoning process.
• Since the application was submitted before the amendment was adopted, it must be reviewed
under the prior ordinance standards.
• Planning staff reviewed the proposed application and determined the current request under
consideration is materially different from the prior denied application. The table below
outlines the primary differences between the two projects:
S25-02 – Denied Project S25-04 – Proposed Project
Density 10.2 dwelling units per acre 6.75 dwelling units per acre
Unit Count 444 units 291 units
Access No direct access to Carolina Beach
Road. Possible access to Rosa Parks
Lane.
Direct access to Carolina Beach Road.
Conditioned access to Rosa Parks
Lane.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 5 of 16
Project Description
• The project features a collector road running north from the existing Tarin Woods
development that divides the project into a western section (outlined in Blue) and an eastern
section (outlined in Green).
• The project consists of eight parcels totaling 43.10 acres. The area outlined in Blue totals
approximately 13.10 acres, while the area outlined in Green is approximately 30 acres. The
area outlined in Green is a portion of a larger parent parcel, if approved the additional dwelling
allowance and conditions of approval would only apply to the acreage shown in the
application and on the concept plan.
• The project proposes a total of 291 residential units at a maximum density of 6.75 dwelling
units per acre.
• The concept plan includes 69 total buildings consisting of an amenity building and a mix of
multi-family, row-style, quadraplex, triplex, dual unit attached, and detached single-family
dwellings.
• The area outlined in Blue consists of 110 units across Buildings 29 – 45, 66, 67, and 69. The
concept plan includes a provision allowing flexibility in the unit type by proposing the options
for the following housing types: Multi-Family, Row-Style, Quadraplex, Triplex, Dual-Unit
Attached, and Detached Single-Family.
• This area with potential multi-family structures provides the possibility for a transitional
development pattern moving east through the amenity area to the central drive.
• The area outlined in Green consists of 181 units across Buildings 1 – 28 and 46 – 65. The
concept plan includes a provision allowing flexibility in the unit type by proposing the option
for the following attached housing types: Row-Style, Quadraplex, Triplex, Dual-Unit Attached,
and Detached Single-Family.
• The buildings in the eastern section do not allow multi-family development and would act as
a transition to the existing lower density, detached single-family development further east.
• Building 68 is proposed as a 3,060 square foot amenity building.
• The project includes a new access road with right-in, right-out access onto Carolina Beach
Road and a condition restricting access to Rosa Parks Drive unless the application reaches an
access agreement with the other residents of Rosa Parks Drive.
• The project does not include a road stub to the Coastal Christian property to the north.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 6 of 16
ZONING CONSIDERATIONS
• Additional Dwelling Allowances are permitted in the R-15 district with approval of a Special
Use Permit and are subject to the requirements in Section 3.1.3.E of the UDO. These standards
generally address density, open space, utility and stormwater improvements, proximity to
higher density place types listed in the Comprehensive Land Use Plan, access, and impervious
surface limitations.
• Additional Dwelling Allowances require a minimum 35% open space. The minimum required
open space is 15.08 acres. The application shows the 15.11 acres of open space are provided,
slightly exceeding the requirement for a 43.10-acre project.
• The concept plan states the maximum building height for all structures is 40 feet which
complies with the R-15 height restrictions of the UDO.
• Additional Dwelling Allowances caps impervious surface at 40%. The application shows 17.24
acres of impervious surface, which is slightly below the 40% maximum for the site at both the
acreage listed in the application and the calculated acreage of the site. The site also includes
3.68 acres of pervious driveways and parking areas in the eastern portion of the site.
• As proposed, the application meets the minimum requirements of Section 3.1.3.E.
• If approved, the project would be subject to the Technical Review Committee and Zoning
Compliance review processes to ensure full compliance with all ordinance requirements and
specific conditions included in the approval. Only minor deviations from the approved
conceptual plan, as defined by the UDO, would be allowed.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 7 of 16
AREA DEVELOPMENT
Target
S25-04 Staff Summary – Planning Board 9-4-2025 Page 8 of 16
TRANSPORTATION
CURRENT CONDITIONS
Intensity of Current Zoning Typical development under current zoning would allow a
maximum of 108 single-family dwelling units.
PROPOSED ACCESS
Primary Access Right-in, Right-out access onto Carolina Beach Road
Secondary Access Right-in, Right-out access onto Carolina Beach at Manassas Drive
S25-04 Staff Summary – Planning Board 9-4-2025 Page 9 of 16
EXISTING ROADWAY CHARACTERISTICS
Affected Roadway Carolina Beach Road
Type of Roadway State Highway
Roadway Planning Capacity
(AADT) 41,369
Latest Traffic Volume (AADT) -
2023 45,500
Latest WMPO Point-in-Time
Count (DT) 47,645
Current Level of Congestion Above Capacity
Sources
Source of Planning Capacity: WMPO
Source of Latest Traffic Volume: 2023
Source of WMPO Point-in-Time Count: South of Sanders Road,
July 1, 2024
NEARBY NCDOT STIP ROADWAY PROJECTS
U-5702B- S. College Rd.
Improvements
(2025 Right-of-way acquisition and
utilities)
- Access management and travel time improvements
along College Road between Shipyard Boulevard and
Carolina Beach Road
U-5790 – Monkey Junction
Intersection and Roadway
Improvements
(2029 Right-of-way acquisition and
utilities)
- Project to convert the intersection of Carolina Beach
Road and College Road to a continuous flow intersection.
- The project includes widening Carolina Beach Road
south of the intersection of Sanders Road.
TRAFFIC GENERATION
Traffic Generation
by Present
Designation
Traffic Generated
by Proposed
Project
Potential Impact
of Proposed
Project
AM Peak Hour Trips 81 146 +65
PM Peak Hour Trips 108 171 +63
Assumptions
Typical Development with Existing Zoning – 108 single family
dwelling units.
Proposed Development – 291 dwelling units.
Sources
Source of Trip Generation: ITE Trip Generation Manual, 11th ed
S25-04 Staff Summary – Planning Board 9-4-2025 Page 10 of 16
TRAFFIC IMPACT ANALYSIS (TIA)
The site’s projected traffic exceeds the 100 peak-hour trips that triggers the ordinance requirement for
a Traffic Impact Analysis (TIA). A TIA for a more intensive development was approved in 2022. For the
current proposal of 291 units, the applicant’s traffic engineers submitted traffic generation information
to NCDOT, WMPO, and County Planning staff, confirming it remained within the parameters of the 2022
TIA and the majority of the required improvements have been installed in previous sections of Tarin
Woods. As a result, no additional improvements were required.
Approval Date July 27, 2022
Revised Approval Date August 27, 2025
Development Proposal Analyzed 125 Detached Single-Family Dwellings and 241 Attached Single-
Family Dwellings
Study Intersections
- US 421 (Carolina Beach Road) at southbound to
northbound U-Turn near Rosa Parks Lane
- US 421 (Carolina Beach Road) at Sanders Road
- US 421 (Carolina Beach Road) at Beau Rivage
Marketplace driveway (Harris Teeter)
- US 421 (Carolina Beach Road) at Manassas Drive/Sharks
Eye Lane
- Manassas Drive at Shiloh Drive
- Myrtle Grove Road at Lt. Congleton Road
- US 421 (Carolina Beach Road) and site access north of
Rosa Parks – RI/RO
- US 421 (Carolina Beach Road) and site access south of
Tregembo Animal Park – egress only
Trip Generation
- 204 AM peak hour trips
- 255 PM peak hour trips
- 3,058 average daily trips
Traffic Data Collection - September 2, 2021 (US 421 at Sanders Road) and
December 9, 2021
Trip Distribution and
Assignment
- 65% to and from the north on US 421
- 20% to and from the south on US 421
- 5% to and from the west on Sanders Road
- 5% to and from the west on Beau Rivage Marketplace
Driveway
- 5% to and from the north on Myrtle Grove Road
S25-04 Staff Summary – Planning Board 9-4-2025 Page 11 of 16
Approved Developments &
Background Growth
- Tarin Woods II Development (215 single family detached
housing)
- Planned Roadway/Intersection Improvements
o Manassas Drive dual right turn lanes
o Beau Rivage Marketplace (Harris Teeter) leftover
- Full Build – 2026
- Growth Rate – 1% per year
Required Improvements
Phase 1A – Build year of 2023 for 125 single family detached
dwelling units
- No improvements required
Phase 1B – Build year of 2024 for 125 single family attached
dwelling units
- Extend southbound U-turn land on Carolina Beach Road
south of Rosa Parks Lane to provide 500 feet of storage,
50 feet of full width deceleration and 100 feet of taper
and optimize signal timings
- Construct the new proposed site access to Carolina
Beach Road with an internal protected stem of 175 feet
measured from the right-of-way line with right-in/right-
out ingress and egress lanes and stop controls on the
westbound approach.
- Construct a northbound right turn lane on Carolina
Beach Road from the U-turn bulb south of the proposed
access
Phase 2 – Build year of 2026 for 116 single family attached
dwelling units
- Construct a future third access into the site meeting
NCDOT roadway standards
SUMMARY
The proposed project lies north of the Tarin Woods subdivision and includes a new collector road
extending from the existing neighborhood to a new northern right-in, right-out access on Carolina
Beach Road. A condition limits access to the unimproved Rosa Parks Drive until an agreement is reached
with its adjoining property owners. A TIA approved in 2022 for the Tarin Woods development was
confirmed by the WMPO and NCDOT to be consistent with the proposed project and noted that most
required improvements were completed in earlier phases of Tarin Woods.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 12 of 16
ENVIRONMENTAL
• The property is not within a Natural Heritage Area or the Special Flood Hazard Area.
• The property is within the Mott Creek and Everette Creek watersheds.
• Per the Classification of Soils in New Hanover County for Septic Tank Suitability, soils on the
property consist of Class I (Suitable), Class III (Severe Limitation), and Class IV (Unsuitable) soils;
however, the project is expected to be served by CFPUA water and sewer if developed.
• The conservation resource map indicates pocosin wetlands on the property however they are
not underlaid with Class IV soils which triggers additional development standards.
OTHER CONSIDERATIONS
Schools
PUBLIC SCHOOL ENROLLMENT ZONES
Elementary School Bellamy Elementary
2024-2025 Capacity 104%
Middle School Myrtle Grove Middle
2024-2025 Capacity 80%
High School Ashley High
2024-2025 Capacity 99.7%
STUDENT GENERATION RATES (SGRs)
Overall SGR (24-25) 0.19 public school students per residential unit
Elementary School SGR (24-25) 0.08 public school students per residential unit
Middle School SGR (24-25) 0.04 public school students per residential unit
High School SGR (24-25) 0.07 public school students per residential unit
Local Area SGR (24-25) 0.09 - Higher than the County-Wide Generation Rate
SGR Trend (20-21 to 24-25) Decrease of 0.05 public school students per residential
unit
POTENTIAL PROJECT STUDENT IMPACT
Intensity of Current Zoning: Typical Development under current zoning would allow
a maximum of 108 residential units.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 13 of 16
Context and Compatibility
• The property is located between existing properties zoned and used for commercial purposes
along Carolina Beach Road and the existing Tarin Woods Subdivision, a lower density single -
family residential development.
• The proposed multi-family and attached housing type increases housing type diversity in the
area and acts as an appropriate transition between the Carolina Beach Road corridor and the
existing lower density residential development to the south and east.
• The property is located south of the Village at Myrtle Grove shopping center and Monkey
Junction commercial node providing services, amenities, and educational and employment
opportunities.
• Hanover Pines Park is south of the proposed project and accessible by bicycle, pedestrian, and
passenger vehicles without needing to access Carolina Beach Road.
• Most of the surrounding land is either single-family developments or commercial uses
intended to serve the surrounding homes.
Proposed Development: 291 residential units
Students
Generated by
Current Zoning
Students
Generated by
Proposed
Project
Potential Impact
of Proposed
Project
Elementary School 9 23 +14
Middle School 4 12 +8
High School 8 20 +12
TOTAL 21 55 +34
Sources 2024-2025 NHC Student Yield Analysis
SUMMARY
The proposed project is anticipated to be built out within five years, and currently, the elementary
school that serves the area is over capacity and the high school is nearing capacity. There are
private schools in the area such as Coastal Christian north of the development.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 14 of 16
2016 COMPREHENSIVE LAND USE PLAN
The New Hanover County Future Land Use Map provides a general representation of the vision for
New Hanover County’s future land use, as designated by place types describing the character and
function of the different types of development that make up the c ommunity. These place types are
intended to identify general areas for particular development patterns and should not be interpreted
as being parcel specific.
Future Land Use
Map Place Type
General Residential and Urban Mixed Use
Because of the general nature of place type borders, sites located in
proximity to the boundaries between place types could be appropriately
developed with either place type, allowing site-specific features and evolving
development patterns in the surrounding area to be considered.
Place Type
Description
General Residential: Focuses on lower-density housing and associated civic
and commercial services. Typically, housing is single -family or duplexes.
Commercial uses should be limited to strategically located office and retail
spaces, while recreation and school facilities are encouraged throughout.
Types of uses include single-family residential, low density multi-family
residential, light commercial, civic, and recreational.
Urban Mixed Use: Promotes development of a mix of residential, office, and
retail uses at higher densities. Types of uses encouraged include office, retail,
mixed use, small recreation, commercial, institutional, single -family, and
multi-family residential.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 15 of 16
Analysis
The 2016 Comprehensive Plan classifies the majority of the property as
General Residential, which encourages single family and duplex residential
development at a maximum density of 8 dwelling units per acre.
The Urban Mixed Use place type promotes multi-family and higher density
single-family development to provide a range of housing types, opportunities,
and choices. The Urban Mixed Use place type does not recommend a
maximum density and identifies Monkey Junction as an appropriate area for
higher density development.
The requirements for an Additional Dwelling Allowance require a project to
be totally or primarily in, contiguous to, or within 250 feet of, the boundary of
areas classified as Employment Center, Urban Mixed Use, or Community
Mixed Use place types in the Comprehensive Plan.
Proposed Conditions
Applicant Proposed Conditions: (additional conditions may be added that will bring the
proposal in line with the required conclusions)
1. Existing trees shall be retained, or another appropriate traffic prevention measure shall be
established at the eastern terminus of Rosa Parks Lane to prevent vehicular ingress and
egress until such time a written agreement is reached to provide connectivi ty. An access
easement shall be recorded on the final plat from the edge of pavement to the property line
with Rosa Parks Lane to ensure the possibility of future access.
2. Dwelling types approved with this application may be reconfigured on the site and such
changes may be approved by staff without the requirement for a modification to the permit
so long as the changes do not substantially change the approved site design or exceed the
approved unit count or density.
3. A homeowners association meeting the following requirements shall be established prior to
the conveyance of the first lot.
a. When a plat or map is to be recorded, the maps or plat shall contain a Certificate
indicating the book and page number of the homeowner association covenants,
conditions, and restrictions;
b. Responsibilities for maintenance of private streets, open space, recreation facilities,
and other common areas shall be specified, including the ongoing maintenance of the
pervious concrete;
c. Responsibilities for exterior maintenance of attached dwelling units shall be specified;
and
d. The Association shall be authorized to rebuild damaged or destroyed portions of
structures containing attached dwelling units when the individual owner fails to do so.
S25-04 Staff Summary – Planning Board 9-4-2025 Page 16 of 16
PRELIMINARY FORUM
The Planning Board does not make a decision or recommendation on special use permits. The
board is requested to hear the presentation of staff, the applicant, and the public to facilitate an
open and transparent discussion of the special use permit applica tion. Questions and comments
related to the following topics are encouraged:
• Components of the proposal that are not clear or where additional information is needed to
understand the project,
• Advice to the applicant on the presentation they will be giving to the Board of
Commissioners,
• Advice to the parties speaking in opposition on what they may want to consider when
preparing for the Board of Commissioners meeting, and
• Advice to both parties on potential issues that should be addressed before the public
hearing.
Following the Preliminary Forum the special use permit will be scheduled for the October 6 Board of
Commissioners meeting for a quasi-judicial hearing. There are four principal conclusions the Board
of Commissioners must make when considering a special use permit request based on clear,
substantial evidence presented at the hearing.
• Conclusion 1: The Board must find that the use will not materially endanger the public
health or safety where proposed and developed according to the plan as submitted and
approved.
• Conclusion 2: The Board must find that the use meets all required conditions and
specifications of the Unified Development Ordinance.
• Conclusion 3: The Board must find that the use will not substantially injure the value of
adjoining or abutting property or that the use is a public necessity.
• Conclusion 4: The Board must find that the location and character of the use if developed
according to the plan as submitted and approved will be in harmony with the area in which it
is to be located and in general conformity with the Comprehensive Land Use Plan for Ne w
Hanover County.