Major Subdivision Preliminary Plan TRC Approval – 1728 Rockhill Rd –Legacy Landing Phase II Page 1 of 2
PRELIMINARY PLAN APPROVAL
To: Marlowe Foster, Cape Fear Habitat for Humanity, marlowefoster@capefearhabitat.org
From: Ryan Beil, Development Review Planner
Date: September, 4th, 2025
Subject: Legacy Landing Phase II –Performance Residential Development – Preliminary Plan
Approval
The preliminary plan for Legacy Landing Phase II has been approved by the Technical Review
Committee (TRC). The approved plan consists of 14 single-family attached dwelling units on 2.78
acres of land located at 1728 Rockhill Road, (PID#R02500-003-097-000). This approval is valid for two
years unless a building permit application for all or a portion of the project is submitted to the
County. The approved preliminary plan is enclosed.
The site was rezoned to (CZD) R-10 on March 20th, 2024 under rezoning case Z24-01 The site has the
following two conditions:
1. The permitted density range is 0 dwelling units per acre to a maximum of 3.1 dwelling units
per acre. Planning staff is authorized to administratively approve reductions in density within
the permitted range.
2. The housing types in the development shall be limited to detached single-family dwellings
and dual unit attached dwellings as defined in Section 2.3 of the Unified Development
Ordinance.
The TRC Commercial Preliminary Plan Approval allows the project to move forward with the next step
in the development process. The project may be subject to additional regulations of the County’s
development ordinances and applicants are responsible for obtaining all applicable permits and
approvals under any law, regulation, or requirement of any other federal, state, or local government
or regulatory agency. This includes but is not limited to:
• Floodplain Development Permits.
• A Tree Removal Permit from New Hanover County Planning & Land Use.
Major Subdivision Preliminary Plan TRC Approval – 1728 Rockhill Rd –Legacy Landing Phase II Page 2 of 2
• New Hanover County Engineering for any required land disturbance and stormwater permits.
• CFPUA on water and sewer utility permits and approvals.
• Construction plans must also be approved through Planning & Land Use and Engineering.
Construction plans must be approved prior to full site work taking place on the property.
If you have any questions or concerns, please do not hesitate to contact me at (910) 798-7444 or
rbeil@nhcgov.com.
Sincerely,
Ryan Beil
Development Review Planner
cc: TRC (Fire Services, Engineering, CFPUA, NCDOT)
Enclosure