Loading...
HomeMy WebLinkAboutTRC Approval Letter - Major Subdivision Preliminary Plan Major Subdivision Preliminary Plan TRC Approval – 6900 Carolina Beach Road – McQuillan Pines Page 1 of 2 PRELIMINARY PLAN APPROVAL To: James Yopp, River Road Construction Co., james@rockfordpartners.net From: Ryan Beil, Development Review Planner Date: October,6th , 2025 Subject: McQuillan Pines – Performance Residential Development – Preliminary Plan Approval The preliminary plan for McQuillan Pines has been approved by the Technical Review Committee (TRC). The approved plan consists of 85 single-family attached units on 33.83 acres of land located at 6900 Carolina Beach Road (PID# R08200-001-010-000, R08200-001-012-000). This approval is valid for two years unless a building permit application for all or a portion of the project is submitted to the County. The approved preliminary plan is enclosed. Approved rezoning conditions: The site was originally rezoned to (CZD) RMF-L and (CZD) B-2 on March 6th, 2023, and then the rezoning was modified on July 21, 2025 under case Z23-04M. The site has the following seven (7) zoning conditions: 1. Any RV and Boat storage must be located on the interior of the mini storage and may not be visible from a public right-of-way. 2. The access easement from Southern Charm to Carolina Beach Road shall be public. 3. The access easements from both Southern Charm Drive and Carolina Beach Road shall not be gated. 4. Single-family attached structures shall be limited to three stories. The mini storage height will be limited to 3 stores or 50 feet. 5. The buffer yard between the new residential structures and the adjacent residential structures shall be no less than 20 feet. 6. The mini storage structure will be limited to a 12,000 square foot maximum building footprint and a 36,000 gross square foot maximum. 7. A minimum 20-foot-wide public access easement shall be provided along the frontage parallel with Carolina Beach Road to accommodate future public bicycle and pedestrian use. Major Subdivision Preliminary Plan TRC Approval – 6900 Carolina Beach Road – McQuillan Pines Page 2 of 2 While the opaque buffers have been approved with vegetation and fencing in different configurations along the perimeter, there is fencing present on a section of the northern boundary of the site between the existing residential homes and the proposed development, where if that fencing was removed, the opaque buffer would not meet requirements. In the event of that fencing being removed, new fencing would need to be constructed along the property line to satisfy the opaque buffer requirements. The TRC Commercial Preliminary Plan Approval allows the project to move forward with the next step in the development process. The project may be subject to additional regulations of the County’s development ordinances and applicants are responsible for obtaining all applicable permits and approvals under any law, regulation, or requirement of any other federal, state, or local government or regulatory agency. This includes but is not limited to: • A Tree Removal Permit from New Hanover County Planning & Land Use. • New Hanover County Engineering for any required land disturbance and stormwater permits. • CFPUA on water and sewer utility permits and approvals. • Construction plans must also be approved through Planning & Land Use and Engineering. Construction plans must be approved prior to full site work taking place on the property. If you have any questions or concerns, please do not hesitate to contact me at (910) 798-7444 or rbeil@nhcgov.net. Sincerely, Ryan Beil Development Review Planner cc: TRC (Fire Services, Engineering, CFPUA, NCDOT) Enclosure EDGE OF PAVEMENT 66 FM 66 FM DO NO T E N T E R ONE WAY Final Design Not For Construction 41 42 43 41 42 43 SS F M SS F M SS F M SS F M SS F M SS F M 52 : ( ; , S 7 , 1 * F 2 5 & ( M $ , 1 $3 3 5 2 ;  / 2 & $ 7 , 2 1 2 F Final Design Not For Construction 41 42 43 41 42 43 SS F M SS F M SS F M SS F M SS F M SS F M 52 : ( ; , S 7 , 1 * F 2 5 & ( M $ , 1 $3 3 5 2 ;  / 2 & $ 7 , 2 1 2 F SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM DO N O T E N T E R ONE WAY Final Design Not For Construction Final Design Not For Construction 0+00 1+00 2+00 EDGE OF PAVEMENT DO N O T E N T E R ONE WAY Final Design Not For Construction 33 34 35 36 37 38 39 40 41 42 43 30 31 32 33 34 35 36 37 38 39 40 41 42 43 S S F M S S F M S S F M S S F M SS F M SS F M SS F M SS F M 5 2 : (; , S 7 , 1 * F 2 5 & ( M $ , 1 ('*( 2F 3$9(M(17 SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FMSS FMSS FM SS FM SS FM SS FM SS FM $ 3 3 5 2 ;  / 2 & $ 7 , 2 1 2 F SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM DO N O T E N T E R ONE WAY Final Design Not For Construction Final Design Not For Construction SS F M S S F M S S F M S S F M S S F M S S F M SS F M SS F M DO N O T E N T E R ONE WAY FF=20.00 FF=20.10 FF=19.80 FF=20.10 FF=21.50 FF=25.00 FF=20.10 Final Design Not For Construction FF=21.00 FF=21.00 FF=21.00 FF=20.80 FF=19.80 FF=20.10 FF=20.10 FF=20.80FF=20.80 Final Design Not For Construction SS F M SS F M S S F M SS FMSS FMSS FMSS FMSS FMSS FMSS FMSS FM SS FM ONE WAY SS F M SS F M SS F M SS F M SS F M SS F M DO NOT ENTER SS F M SS F M SS F M SS F M DO NOT ENTER ON E W A Y Final Design Not For Construction S S F M S S F M SS F M SS FMSS FMSS FMSS FMSS FMSS FMSS FMSS FM SS FM DO N O T E N T E R ONE WAY SS F M SS F M S S F M SS F M SS F M SS F M DO NOT ENTER Final Design Not For Construction S S F M SS F M SS F M (; , S 7 , 1 * F 2 5 & ( M $ , 1 $3 3 5 2 ;  / 2 & $ 7 , 2 1 2 F SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM SS FM DO N O T E N T E R ONE WAY SS FM SS FM SS FM SS FM SS FM SS FM Final Design Not For Construction SS F M SS F M SS F M S S F M S S F M DO N O T E N T E R ONE WAY Final Design Not For Construction