Loading...
HomeMy WebLinkAbout3305 Frederickson Flex Space Site PlanCOVINGTON FLEX 3305 FREDRICKSON RD WILMINGTON, NC 28401 DESIGN DEVELOPMENT SEPTEMBER 29, 2025 SHEET INDEX PROJECT NAME: COVINGTON FLEX APPLICANT: DAE BUILDING, INC. 717 S. KERR AVENUE WILMINGTON, NC 28403 CONTACT: NATALIE OAKES PHONE: (910) 833-2147, EXT. 111 EMAIL: NATALIE@DAEBUILDING.COM PROJECT ADDRESS: 3305 FREDRICKSON RD WILMINGTON, NC 28401 ENGINEER: RIVERVIEW ENGINEERING, PLLC (P-1944) 4904 PARK AVENUE WILMINGTON, NC 28403 CONTACT: NICHOLAS J. LAURETTA, PE, LEED AP (035107) PHONE: (910) 398-2882 EMAIL: NLAURETTA@RIVERVIEWENG.COM SURVEYOR:McKIM & CREED 243 N. FRONT STREET WILMINGTON, NC 28401 CONTACT: CODY HURST PHONE: 910-343-1048 EMAIL: CHURST@MCKIMCREED.COM PROJECT INFORMATION ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X COVER SHEET C-001 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT VICINITY MAP1SCALE: 1" = 250' PROJECT VICINITY LOCATION MAP VICINITY MAP PROJECT LOCATION LOCATION MAP2SCALE: 1" = 2000' NUMBER SHEET C-001 COVER SHEET C-002 GENERAL NOTES CX101 EXISTING CONDITIONS PLAN CX102 TREE REMOVAL AND DEMOLITION PLAN CE101 SEDIMENT & EROSION CONTROL PLAN - PHASE 1 CS101 SITE PLAN CS102 DRIVEWAY GRADING PLAN L101 LANDSCAPE PLAN CG101 STORM DRAINAGE AND GRADING PLAN CG103 DRAINAGE AREA MAP CU101 UTILITY PLAN CE501 SEDIMENT & EROSION CONTROL DETAILS CE502 SEDIMENT & EROSION CONTROL DETAILS CS501 SITE DETAILS CU501 UTILITY DETAILS CU502 UTILITY DETAILS CU503 UTILITY DETAILS CG501 UTILITY DETAILS 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X GENERAL NOTES C-002 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT CONSTRUCTION NOTES 1.CONSTRUCTION AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF WILMINGTON STANDARDS AND SPECIFICATIONS. 2.CONTRACTOR IS FULLY RESPONSIBLE FOR ACQUIRING THE LOCATION OF EXISTING UTILITIES FROM THE APPROPRIATE PARTIES PRIOR TO CONSTRUCTION. 3.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES, USING FLAGMEN, ETC. AS NECESSARY TO ENSURE SAFETY TO THE PUBLIC. 4.THESE DRAWINGS SHOW INFORMATION OBTAINED FROM THE AVAILABLE RECORDS REGARDING PIPES, CONDUITS, TELEPHONE LINES, AND OTHER STRUCTURES AND CONDITIONS WHICH EXIST ALONG THE LINES OF WORK AND BELOW THE SURFACE OF THE GROUND. THE OWNER AND ENGINEER DISCLAIM ANY RESPONSIBILITIES FOR THE ACCURACY OR COMPLETENESS OF SAID INFORMATION, AND SUCH INFORMATION IS BEING SHOWN ONLY FOR THE CONVENIENCE OF THE CONTRACTOR WHO MUST VERIFY THE INFORMATION TO HIS OWN SATISFACTION DURING THE BIDDING AND CONSTRUCTION PHASES. IF THE CONTRACTOR RELIES ON SAID INFORMATION, HE DOES SO AT HIS OWN RISK. THE GIVING OF THE INFORMATION ON THE CONTRACT DRAWINGS WILL NOT RELIEVE THE CONTRACTOR OF HIS OBLIGATIONS TO SUPPORT AND PROTECT ALL PIPES, CONDUITS, TELEPHONE LINES, AND OTHER STRUCTURES, WHETHER ABOVE OR BELOW GRADE. 5.SHOULD ANY DAMAGE OCCUR TO EXISTING UTILITIES, IT SHALL BE REPAIRED SOLELY AT THE CONTRACTOR'S EXPENSE. 6.THE CONTRACTOR SHALL VERIFY EXISTING INVERTS PRIOR TO CONSTRUCTION OF UNDERGROUND UTILITIES. TEST PITTING OF EXISTING LINES PRIOR TO CONSTRUCTION, IF NECESSARY, SHALL BE COORDINATED WITH THE OWNER. 7.ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL CONFORM TO THE DRAWINGS, PROJECT SPECIFICATIONS, AND LOCAL BUILDING CODES. 8.ALL DISTURBED AREAS SHALL BE SMOOTHLY GRADED TO PROMOTE POSITIVE DRAINAGE AND STABILIZED WITH TOPSOIL, SEED, AND MULCH. IF SETTLEMENT OCCURS, TOPSOIL, SEEDING, AND MULCH SHALL BE REPEATED UNTIL SETTLEMENT SUBSIDES. (SEE EROSION AND SEDIMENT CONTROL DETAILS AND SPECIFICATIONS.) 9.WATER MAINS WILL BE INSTALLED AT A DEPTH THAT WILL PROVIDE 36" COVER OVER THE PIPES BELOW PROPOSED GRADE UNLESS SHOWN OTHERWISE ON THESE PLANS OR DIRECTED OTHERWISE BY THE ENGINEER. 10.ALL WATER VALVES, BOXES, AND FIRE HYDRANT ASSEMBLES SHALL BE SET AND ADJUSTED TO FINISHED GRADE. 11.THE OWNER IS RESPONSIBLE FOR THE ACQUISITION OF ALL EASEMENTS, BOTH TEMPORARY AND PERMANENT. 12.THE CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL SURVEY CONTROL PRIOR TO STAKING OUT CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO PROCEEDING WITH WORK. 13.ANY PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE REPLACED SOLELY AT THE CONTRACTOR'S EXPENSE. 14.THE CONTRACTOR ASSUMES ALL RESPONSIBILITY FOR ANY DEVIATION FROM THESE PLANS. 15.FIRE HYDRANTS SHALL BE PLACED A MINIMUM DISTANCE OF 6 FEET FROM BACK OF CURB AND SHALL HAVE A CLEAR SPACE OF 3 FEET FROM ANY PERMANENT STRUCTURE PER CFPUA STANDARDS. 16.ALL SELECT AND BORROW MATERIAL SHALL MEET CRITERIA SET FORTH BY SECTIONS 1016 AND 1018 OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION'S STANDARDS AND SPECIFICATIONS FOR ROADS AND STRUCTURES. SEE SECTION FOR PLACEMENT AND COMPACTION INFORMATION. 17.THE ENGINEER AND THE CONTRACTOR SHALL INSPECT ALL EXISTING PIPES USED IN THE FINAL DRAINAGE SYSTEM AND AGREE ON THE CONDITION OF THE PIPES PRIOR TO CONSTRUCTION. IF DAMAGE OCCURS TO THESE PIPES DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF THE PIPE(S). 18.EXISTING PAVING, CONCRETE, AND OTHER UNSUITABLE MATERIALS INCLUDING UNDERCUT EXCAVATION SHALL NOT BE USED AS FILL MATERIAL AND SHALL BE DISPOSED OF OUTSIDE THE PROJECT LIMITS AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITTING AND FEES FOR DISPOSAL. 19.ALL TREES, STUMPS, ROOT MAT, ETC. SHALL BE ENTIRELY REMOVED REGARDLESS OF DEPTH. BURIAL OF ORGANIC MATERIAL WITHIN THE PROJECT LIMITS IS NOT PERMITTED. OPEN BURNING OF DOWNED TREES AND STUMPS IS NOT PERMITTED. CHIPPED MATERIALS MUST BE REMOVED PRIOR TO THE PLACEMENT OF EMBANKMENT OR TOPSOIL. 20.THE CONTRACTOR IS SOLELY RESPONSIBLE TO OBTAIN OFF-SITE SPOIL AREAS FOR DISPOSAL OF EXCESS AND/OR UNSUITABLE MATERIALS AS NECESSARY. OFF-SITE SPOIL AREAS MUST BE SUBMITTED TO THE ENGINEER AND APPLICABLE REGULATORY AGENCIES PRIOR TO UTILIZATION BY THE CONTRACTOR. NO AREAS DESIGNATED AS WETLANDS WILL BE PERMITTED FOR USE AS A DISPOSAL SITE. THE CONTRACTOR SHALL SUBMIT DOCUMENTATION TO THE ENGINEER THAT NO WETLANDS WILL BE IMPACTED. THE ENGINEER WILL NOT CONSIDER ANY DELAYS OR MONETARY CLAIMS OF ANY NATURE RESULTING FROM THE CONTRACTOR'S FAILURE OR DIFFICULTY IN FINDING NECESSARY DISPOSAL SITES TO MEET THE TIME FRAMES AND CAPACITIES REQUIRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PLANS, PERMITS, EROSION AND SEDIMENT CONTROL MEASURES, ETC. REQUIRED BY THE APPROPRIATE REGULATORY AGENCIES FOR UTILIZING OFF-SITE SPOIL AREAS. THE CONTRACTOR SHALL CERTIFY TO THE ENGINEER THAT ALL REQUIRED PERMITS HAVE BEEN OBTAINED PRIOR TO UTILIZING THE OFF-SITE SPOIL AREAS. ALL COSTS FOR PROCURING AND UTILIZING THE OFF-SITE SPOIL AREAS ARE TO BE INCIDENTAL TO THE BASE BID. UTILITY COMPANY CONTACTS DUKE/PROGRESS ENERGY: SID LIVINGSTON / MARK HATFIELD (910) 452-2777 DUKE ENERGY (TRANSMISSION): BILL WILDER (910) 772-4903 AT&T: JAMES BATSON (910) 452-5300 SPECTRUM: ROBERT JOHN (910) 216-4494 PIEDMONT NATURAL GAS: PAUL GONKA (910) 512-2841 / DJ MEDEIROS (910) 431-3233 CAPE FEAR PUBLIC UTILITY AUTHORITY: (910) 332-6550 MATERIALS AND EASEMENT NOTES: 1.ALL CATCH BASINS ARE NCDOT STD 840.02, 840.03 2.ALL DROP INLETS ARE NCDOT STD 840.14, 840.16 3.ALL STORM DRAINAGE PIPING TO BE RCP, UNLESS OTHERWISE NOTED 4.ALL STORM DRAINAGE PIPING CONVEYING DISCHARGE FROM THE PUBLIC RIGHT-OF-WAY SHALL BE CONTAINED WITHIN A PUBLIC DRAINAGE EASEMENT WHOSE WIDTH IS DETERMINED BY THE DEPTH OF BURY 5.WATER AND SANITARY SEWER UTILITIES ARE PUBLIC - CAPE FEAR PUBLIC UTILITY AUTHORITY EXCAVATION, GRADING, AND BACKFILLING NOTES 1.ANY UNDERCUTTING IN GOOD SOIL SHALL BE REPLACED AND THE REPLACEMENT MATERIAL SHALL BE COMPACTED TO NINETY-FIVE (95) PERCENT OF MAXIMUM DENSITY OBTAINED AT OPTIMUM MOISTURE CONTENT, AS DETERMINED BY THE ASTM D 698 STANDARD PROCTOR TEST METHOD. IN THE EVENT THAT MATERIAL ENCOUNTERED AT PIPE GRADE, SUBGRADE OF PARKING OR ROADWAYS AND SUBGRADE OF BUILDING FOUNDATIONS IS FOUND TO BE SOFT, SPONGY, OR IN ANY OTHER WAY UNSUITABLE, THE CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER IMMEDIATELY. SUCH UNSUITABLE MATERIAL SHALL BE REMOVED TO A DEPTH AS SPECIFIED BY THE GEOTECHNICAL ENGINEER AND REPLACED WITH A MINIMUM OF SIX (6) INCHES OF STONE, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER. 2.BEFORE BACKFILLING IS COMMENCED OVER PIPES AND OTHER INSTALLATIONS, EARTH FILL SHALL BE SOLIDLY TAMPED AROUND AND ABOVE THE PIPE TO A DEPTH OF ONE (1) FOOT ABOVE THE TOP OF THE PIPE. CARE SHALL BE TAKEN TO PREVENT ANY DISTURBANCE TO THE PIPE OR DAMAGE TO NEWLY MADE JOINTS. THE FILLING OF THE TRENCH SHALL BE CARRIED OUT SIMULTANEOUSLY ON BOTH SIDES OF THE PIPES IN SUCH A MANNER THAT INJURIOUS SIDE PRESSURES DO NOT OCCUR. 3.THE MATERIAL FOR BACKFILLING SHALL BE FREE FROM ALL PERISHABLE AND OBJECTIONABLE MATERIALS. BEFORE PLACING ANY BACKFILL, ALL RUBBISH, FORM, BLOCKS, WIRES OR OTHER UNSUITABLE MATERIAL SHALL BE REMOVED FROM EXCAVATION. THE BACK-FILLING OVER PIPES SHALL BE PLACED IN LAYERS NOT OVER SIX (6) INCHES THICK AND COMPACTED TO A MINIMUM DENSITY OF NINETY-FIVE (95) PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR COMPACTION TEST TO A DEPTH OF 12 INCHES BELOW FINISHED GRADE. THE LAST 12 INCHES OF BACKFILL SHALL BE PLACED IN LAYERS NOT OVER SIX (6) INCHES THICK AND COMPACTED TO A MINIMUM DENSITY OF NINETY-EIGHT (98) PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR COMPACTION TEST. STORM DRAINAGE AND GRADING NOTES 1.IN ACCORDANCE WITH NC GENERAL STATUTES, NPDES REGULATIONS, AND NCDENR REQUIREMENTS, STORMWATER DISCHARGE OUTFALLS SHALL BE INSPECTED BY THE CONTRACTOR. INSPECTIONS SHALL BE PERFORMED BY THE CONTRACTOR AFTER EACH STORM EVENT OF 1/2 INCH OR GREATER, WITH ONE WEEKLY INSPECTION MINIMUM. NCDENR STANDARD INSPECTION REPORTS SHALL BE PREPARED AND SIGNED WITH COPIES PROVIDED TO THE OWNER, ARCHITECT, AND ENGINEER, BY THE CONTRACTOR. 2.INLET PROTECTION SHALL BE INSTALLED AROUND OUTFALL. DEVICES SHALL BE CONSTRUCTED TO FINAL PROPOSED CONDITION UPON STABILIZATION OF CONTRIBUTING GROUND SURFACES AND REMOVAL OF SEDIMENT FROM STORM PIPES. 3.ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY CONSTRUCTION MANAGER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 4.UNLESS OTHERWISE NOTED, GRADES AND SPOT ELEVATIONS NOTED ON PLANS INDICATE FINISHED GRADE OR PAVEMENT SURFACE. ALL DIMENSIONS ARE MEASURED TO THE BACK OF CURB UNLESS OTHERWISE INDICATED. 5.COORDINATION WITH CITY SURVEYOR TO DETERMINE MONUMENTATION IS REQUIRED. NOTE ON PLANS. 6.CONTRACTOR TO COORDINATE WITH CITY OF WILMINGTON CONSTRUCTION INSPECTOR TO ENSURE EDGE OF CATCH BASIN GRATES ALIGN WITH TRAVEL LANE AS REQUIRED. EROSION CONTROL NOTES 1.TOTAL LAND DISTURBANCE AREA: 0.88 ACRES 2.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE COUNTY EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3.GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF STATE LAW AND IS SUBJECT TO A FINE. ANY BUILDER THAT ANTICIPATED THE DISTURBANCE OF MORE THAN ONE ACRE WILL BE REQUIRED TO GET AN EROSION CONTROL PERMIT FROM NEW HANOVER COUNTY. 4.GROUND COVER MUST BE PROVIDED ON EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING; AND, A PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 5.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF NEW HANOVER COUNTY. 6.SLOPES SHALL BE GRADED NO STEEPER THAN 3:1. 7.ADDITIONAL DEVICES MAY BE REQUIRED AS AGREED UPON BY THE FIELD INSPECTOR, ENGINEER, AND OWNER. 8.IF ACTIVE CONSTRUCTION CEASES IN ANY AREA FOR MORE THAN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER), ALL DISTURBED AREAS MUST BE SEEDED, MULCHED, AND TACKED. 9.WITHIN 24 HOURS FOLLOWING ANY RAIN EVENT, THE CONTRACTOR SHALL INSPECT AND REPAIR, AS NECESSARY, ALL DAMAGED EROSION CONTROL MEASURES. 10.ALL ACTIVITY AND INSTALLATION OF EROSION CONTROL MATTING WILL BE COMPLETE PRIOR TO ANY RAIN EVENT. FIRE PROTECTION NOTES 1.FIRE SPRINKLERS WILL BE PROVIDED FOR BUILDING. 2.HYDRANT MUST BE WITHIN 150' OF THE FDC. 3.THE FDC MUST BE WITHIN 40' OF FIRE APPARATUS PLACEMENT. 4.LANDSCAPING OR PARKING CANNOT BLOCK OR IMPEDE THE FDC OR FIRE HYDRANTS. A 3-FOOT CLEAR SPACE SHALL BE MAINTAINED AROUND THE CIRCUMFERENCE OF THE HYDRANT AND FDC. 5.HYDRANTS MUST BE LOCATED WITHIN 8' OF THE CURB. 6.COMBUSTIBLE MATERIALS MAY NOT BE STORED OR ERECTED ONSITE WITHOUT CITY FIRE INSPECTOR APPROVAL. 7.NEW HYDRANTS MUST BE AVAILABLE FOR USE PRIOR TO CONSTRUCTION OF THE BUILDING(S). 8.UNDERGROUND FIRE LINE AND PRIVATE WATER MAINS MUST BE PERMITTED AND INSPECTED BY CITY OF WILMINGTON FIRE DEPARTMENT FROM THE PUBLIC RIGHT-OF-WAY TO THE BUILDING. CONTACT CITY OF WILMINGTON FIRE DEPARTMENT AT 910-798-7420. 9.A MINIMUM OF 5' SHALL SEPARATE UNDERGROUND FIRE LINES OR PRIVATE WATER MAINS FROM UNDERGROUND UTILITIES 10.CONTRACTOR SHALL MAINTAIN AN ALL WEATHER ACCESS FOR EMERGENCY VEHICLES AT ALL TIMES DURING CONSTRUCTION. 11.ALL WEATHER ACCESS ROAD MUST BE MAINTAINED AROUND CONSTRUCTION SITE AT ALL TIMES. 12.FIRE HYDRANTS ARE TO BE INSTALLED PER CFPUA SPECIFICATIONS. EROSION CONTROL MAINTENANCE PLAN: 1.ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED AND REPAIRED, AS NECESSARY, EVERY SEVEN (7) DAYS AND WITHIN 24 HOURS OF EVERY ONE-HALF (0.5) INCH OR GREATER RAINFALL. 2.ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. 3.SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP. THE SEDIMENT FENCE WILL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. 4.ALL AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 5.STONE CONSTRUCTION ENTRANCE TO BE CLEANED WHEN SEDIMENT ACCUMULATIONS ARE VISIBLE OR SEDIMENT IS TRACKED ON TO THE PAVEMENT. STONE WILL BE PERIODICALLY TOP DRESSED WITH 2 INCHES OF #4 STONE TO MAINTAIN 6 INCH DEPTH. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS REQUIRED. 6.INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT. CLEAR THE DANDY SACKS OF SEDIMENT AND THE MESH WIRE OF ANY DEBRIS Or OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. INLET PROTECTION SHOULD BE CLEANED OUT WHEN IT IS HALF FULL. 7.INSPECT WATTLES ONCE A WEEK AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAIN FALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. CORRECT ALL DAMAGE FROM SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM / WADDLE AND EROSION FROM HIGH FLOWS AROUND EDGES OF DAM IMMEDIATELY.IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL PER NCDENR PRACTICE 6.31. REMOVE SEDIMENT ACCUMULATION BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO THE CHANNEL VEGETATION/LINING, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM / WADDLE. ADD STONES TO CHECK DAMS AND REPAIR/REPLACE WATTLES AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 8.INSPECT SILT FENCE ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT IMMEDIATELY. SEDIMENT SHALL BE REMOVED FROM BEHIND THE SILT FENCE WHEN IT BECOMES ABOUT 0.5 FEET DEEP. THE SEDIMENT FENCE WILL BE REPAIRED OR REPLACED AS NECESSARY TO MAINTAIN A BARRIER. 9.INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OF IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. REPAIR OR REPLACE RIPRAP AS REQUIRED TO MAINTAIN EFFECTIVENESS. CONTROL WEED AND BRUSH GROWTH AS NEEDED. 10.SILT FENCE OUTLETS ARE TO BE INSPECTED ONCE A WEEK AND AFTER EACH RAIN EVENT. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE STONE BECOME CLOGGED WITH SEDIMENT, IT SHALL BE CLEANED AND/OR REPACED PRIOR TO THE NEXT STORM EVENT. IF WASHOUT BETWEEN THE STONE AND SILT FENCE OCCURS, THE AREAS SHALL BE REPAIRED IMMEDIATELY. UTILITY NOTES 1.SCHEDULE A PRECONSTRUCTION MEETING WITH CAPE FEAR PUBLIC UTILITY AUTHORITY 48 HOURS PRIOR TO CONSTRUCTION OF WATER AND SEWER LINES. 2.WATER AND SANITARY SEWER UTILITY MAINS ARE PRIVATE BEYOND THE PUBLIC STREET RIGHT-OF-WAY. 3.THIS PROJECT SHALL COMPLY WITH THE CFPUA CROSS CONNECTION CONTROL REQUIREMENTS. WATER METER(S) CANNOT BE RELEASED UNTIL ALL REQUIREMENTS ARE MET AND NCDENR HAS ISSUED THE "FINAL APPROVAL". 4.ALL COMMERCIAL WATER SERVICES AND ANY IRRIGATION SYSTEMS SUPPLIED BY CFPUA WATER SHALL HAVE A BACKFLOW PREVENTION DEVICE ACCEPTABLE TO CFPUA AND APPROVED BY USCFCCCHR OR ASSE. 5.BACKFLOW PREVENTION AND METERS WILL BE PROVIDED FOR BOTH FIRE LINES (RPDA) AND DOMESTIC SERVICE (RPZ). FIRE LINE BACKFLOW PREVENTER AND DOMESTIC SERVICE BACKFLOW PREVENTER WILL BE LOCATED AS SHOWN ON THE UTILITY PLANS. INSTALLER OF BACKFLOW PREVENTERS MUST CONTACT CFPUA PRIOR TO INSTALLING UNITS TO GIVE CFPUA THE OPTION TO VERIFY INSTALLATION PROCEDURES. 5.1.REDUCED PRESSURE PRINCIPLE ASSEMBLY FOR DOMESTIC WATER SERVICE 5.2.REDUCE PRESSURE DETECTOR ASSEMBLY WILL BE UTILIZED FOR THE BACKFLOW PREVENTER ON THE FIRE SERVICE. 6.IF THE CONTRACTOR DESIRES CFPUA WATER FOR CONSTRUCTION HE SHALL APPLY IN ADVANCE FOR THIS SERVICE AND MUST PROVIDE A REDUCED PRESSURE ZONE (RPZ) BACKFLOW PREVENTION DEVICE ON THE DEVELOPER'S SIDE OF THE WATER METER BOX. 7.WATER: 1.5" AND 2" PVC SERVICES SHALL BE CONSTRUCTED USING ASTM D2241, IPS, GASKETED PIPE, SDR 21. 4"-12" PVC MAINS AND SERVICES SHALL BE CONSTRUCTED USING AWWA C-900 PVC, CL235 (DR-18). REQUIREMENTS OF AWWA C900 ELASOMERIC PUSH-ON JOINTS. 8.SANITARY SEWER: FOR PIPE SIZES 4" AND 6" PIPE SHALL BE SCH 40 CONFORMING TO THE REQUIREMENTS OF ASTM D1785 WITH SOLVENT WELD JOINTS CONFORMING TO ASTM D2672. FOR PIPE SIZES 8" THROUGH 12", PIPE SHALL BE CLASS 150, DR18 CONFORMING TO THE REQUIREMENTS OF AWWA C900 WITH ELASTOMERIC PUSH-ON JOINTS CONFORMING TO ASTM D3212 OR ASTM D3139. 9.WATER AND SEWER SERVICES CANNOT BE ACTIVATED ON NEW MAINS UNTIL ENGINEER'S CERTIFICATION AND AS-BUILTS ARE RECEIVED AND "FINAL APPROVAL" ISSUED BY PUBLIC WATER SUPPLY SECTION OF NCDENR AND "FINAL ENGINEERING CERTIFICATION" ISSUED BY DIVISION OF WATER QUALITY OF NCDENR. 10.WATERLINE TRACER WIRE: SEE CFPUA DETAIL WD-17. 11.SITE UTILITY CONTRACTOR TO PROVIDE WATER AND SANITARY SEWER SERVICE TO WITHIN 5 FEET OF THE BUILDING. CONTRACTOR SHALL COORDINATE SITE PLAN CONNECTIONS WITH THE ARCHITECTURAL BUILDING PLANS. 12.MAXIMUM BENDING RADIUS FOR 8" C-900 PVC WATER MAIN BENDS IS 380' (ONE-HALF MANUFACTURER'S RECOMMENDED ALLOWABLE LONGITUDINAL BENDING). 13.UNDERGROUND UTILITIES: ALL NEW UTILITIES SHALL BE INSTALLED UNDERGROUND, EXCEPT WHERE SUCH PLACEMENT IS PROHIBITED OR DEEMED IMPRACTICAL BY THE UTILITY PROVIDER. UNDERGROUND TERMINAL FACILITIES FOR STREET LIGHTING ALONG THE PUBLIC STREETS ABUTTING THE SUBJECT SITE SHALL BE INSTALLED BY THE DEVELOPER. 14.MINIMUM OF 36" COVERAGE ABOVE ALL WATERMAINS. 15.MINIMUM OF 36" VERTICAL SEPARATION BETWEEN WATERLINES AND STORMDRAIN CURB INLETS 16.A VARIANCE IS NOT ANTICIPATED FROM ANY NORTH CAROLINA DIVISION OF WATER QUALITY (DWQ) REQUIREMENT. 17.PLANS ARE IN COMPLIANCE WITH CAPE FEAR PUBLIC UTILITY AUTHORITY TECHNICAL STANDARDS AND SPECIFICATIONS. RELATION OF WATER MAINS TO SANITARY SEWERS: 1.LATERAL SEPARATION OF SANITARY SEWERS AND WATER MAINS: WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWERS UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10 FOOT LATERAL SEPARATION, IN WHICH CASE: 1.1.THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER, OR 1.2.THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH, AND ABOVE THE TOP OF THE SEWER. 2.CROSSING A WATER MAIN OVER A SEWER MAIN: WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS OVER A SEWER THE WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE BOTTOM OF THE WATER MAIN IS AT LEAST 24 INCHES ABOVE THE TOP OF THE SEWER MAIN. UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION - IN WHICH CASE BOTH THE WATER MAIN AND THE SEWER MAIN SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS THAT ARE EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 3.CROSSING A WATER MAIN UNDER A SEWER MAIN: WHENEVER IT IS NECESSARY FOR A WATER MAIN TO CROSS UNDER A SEWER MAIN BOTH THE WATER MAIN AND THE SEWER MAIN SHALL BE CONSTRUCTED OF FERROUS MATERIALS AND WITH JOINTS EQUIVALENT TO WATER MAIN STANDARDS FOR A DISTANCE OF 10 FEET ON EACH SIDE OF THE POINT OF CROSSING. 4.CROSSING A SEWER MAIN/WATER MAIN OVER OR UNDER A STORM DRAIN: WHENEVER IT IS NECESSARY FOR A SEWER MAIN/WATER MAIN TO CROSS A STORM DRAIN PIPE, THE SEWER MAIN/WATER MAIN SHALL BE LAID AT SUCH AN ELEVATION THAT THE OUTSIDE OF THE SEWER MAIN/WATER MAIN NEAREST TO THE OUTSIDE OF THE STORM DRAIN PIPE SHALL MAINTAIN A 24 INCH CLEAR SEPARATION DISTANCE HORIZONTAL, OR THE SEWER MAIN/WATER MAIN SHALL EITHER BE CONSTRUCTED OF DUCTILE IRON PIPE OR ENCASED IN EITHER CONCRETE OR DUCTILE IRON PIPE FOR AT LEAST 5 FEET ON EITHER SIDE OF THE CROSSING. CAPE FEAR PUBLIC UTILITY AUTHORITY CONSTRUCTION PROCEDURE: 1.THE DESIGN ENGINEERING SHALL SUBMIT 3 SETS OF FINAL DESIGN PLANS AND APPROVED SPECIFICATIONS PRIOR TO SCHEDULING THE PRE-CONSTRUCTION MEETING. 2.SUBMITTALS FOR MATERIALS SHOULD BE MADE IN ACCORDANCE WITH CFPUA SPECIFICATION SECTION 01340. MATERIAL SHOP DRAWING SUBMITTALS ARE REQUIRED FOR ALL PHYSICAL ASSETS TO ENSURE THEY COMPLY WITH CFPUA TECHNICAL SPECIFICATIONS AND DETAILS. THESE SUBMITTALS ARE PROJECT-SPECIFIC, AND MUST INCLUDE OR HIGHLIGHT ONLY THE SPECIFIC MATERIALS TO BE USED IN THE PROJECT. THE SUBMITTAL APPROVAL PROCESS IS GENERALLY AS FOLLOWS: MATERIAL VENDOR FURNISHES SUBMITTALS TO THE CONTRACTOR BASED ON THE PROJECT REQUIREMENTS. CONTRACTOR REVIEWS THE SUBMITTALS FOR COMPLIANCE WITH THE APPROVED CONSTRUCTION DRAWINGS, CFPUA TECHNICAL SPECIFICATIONS AND DETAILS, AND FORWARDS TO THE DEVELOPER’S ENGINEER-OF-RECORD WHEN COMPLETE. THE DEVELOPER'S ENGINEER-OF-RECORD VERIFIES COMPLIANCE, STAMPS AND SIGNS THE SUBMITTAL, AND FORWARDS THE PACKAGE TO THE CFPUA CONSTRUCTION MANAGER. IF IT IS DETERMINED THAT THE MATERIAL SHOP DRAWING SUBMITTAL IS NOT IN COMPLIANCE, THE ENGINEER SHALL RETURN IT TO THE CONTRACTOR FOR CORRECTION AND RESUBMISSION AS NOTED ABOVE. CFPUA’S CONSTRUCTION MANAGER REVIEWS THE SUBMITTAL FROM THE DEVELOPER’S ENGINEER-OF-RECORD, VERIFIES COMPLIANCE, AND NOTIFIES THE ENGINEER THAT THE MATERIALS ARE APPROVED FOR CONSTRUCTION. IF IT IS DETERMINED THAT THE MATERIAL SHOP DRAWING SUBMITTAL IS NOT IN COMPLIANCE, THE SUBMITTAL WILL BE RETURNED TO THE ENGINEER FOR CORRECTION AND RESUBMISSION AS NOTED ABOVE. 3.ANY REQUEST FOR DEVIATIONS FROM THE STAMPED DRAWINGS AND MATERIAL SUBMITTALS MUST BE SUBMITTED TO THE CFPUA CONSTRUCTION MANAGER. THE DEVIATION WILL BE REVIEWED BY CFPUA STAFF. THE ENGINEER, CONTRACTOR AND CFPUA INSPECTOR WILL BE NOTIFIED IF IT IS APPROVED, NEEDS TO BE REVISED AND RESUBMITTED OR REJECTED. ANY CHANGES TO THE STAMPED CONSTRUCTION DOCUMENTS MADE IN THE FIELD BY THE CONTRACTOR MUST BE APPROVED BY THE ENGINEER OF RECORD AND CFPUA CONSTRUCTION MANAGER. THE CFPUA INSPECTOR CANNOT APPROVE MAJOR CHANGES FROM THE STAMPED CONSTRUCTION DOCUMENTS. 4.THE CFPUA INSPECTOR SHALL BE NOTIFIED WHEN ANY MATERIAL IS DELIVERED TO THE JOB SITE. THE CFPUA INSPECTOR WILL VERIFY THAT ALL MATERIALS MEET CFPUA SPECIFICATIONS, DETAILS, AND/OR APPROVED SUBMITTAL. THE CFPUA INSPECTOR WILL NOTIFY THE CONTRACTOR AND THE CFPUA CONSTRUCTION MANAGER OF ANY UNAPPROVED MATERIAL, AND THAT THE UNAPPROVED MATERIAL MUST BE REMOVED FROM THE PROJECT SITE. 5.CONTRACTOR SHALL GIVE TWO (2) BUSINESS DAYS NOTIFICATION FOR SCHEDULING TO THE ASSIGNED CFPUA INSPECTOR FOR EACH OF THE FOLLOWING: -OPERATING A CFPUA VALVE (INCLUDES TAPPING VALVES) -WHEN BEGINNING CONSTRUCTION AND IF THE CONTRACTOR PULLS OFF THE SITE -LAYING OUT OF ANY CONNECTION IN EXISTING MANHOLE -CUTTING IN ANY NEW MANHOLES ON EXISTING LINES -CORING ANY MANHOLES -CONNECTING TO AN EXISTING SEWER FORCE MAINS -CONNECTING ONTO EXISTING WATER LINES -ANY BORES AND THREADING CARRIER PIPES -ALL CAMERA WORK, TESTING, CHLORINATION AND WATER SAMPLING -ALL TESTING CAPE FEAR PUBLIC UTILITY AUTHORITY TESTING PROCEDURE: 1.ALL STRUCTURES, PRESSURE PIPING AND GRAVITY SEWER PIPING SHALL BE TESTED BY THE CONTRACTOR AS SPECIFIED IN THE CFPUA SPECIFICATIONS IN ACCORDANCE WITH APPLICABLE REGULATIONS AND AS DIRECTED BY THE CFPUA INSPECTOR. ALL TESTING MUST BE CONDUCTED IN THE PRESENCE OF THE CFPUA INSPECTOR. THE CONTRACTOR IS TO GIVE TWO (2) BUSINESS DAYS NOTIFICATION FOR SCHEDULING, TO THE ASSIGNED CFPUA INSPECTOR FOR ALL TESTING. 2.ALL PRESSURE PIPE LINES MUST BE SUBJECTED TO HYDROSTATIC TESTING IN ACCORDANCE WITH THE APPROPRIATE CFPUA SPECIFICATION. THESE PIPE LINES SHALL BE TESTED TO 150 PSI FOR A PERIOD OF TWO (2) HOURS. IF THE PRESSURE DROPS MORE THAN THREE (3) PSI, THE TEST FAILS. REFER TO THE APPROPRIATE CFPUA SPECIFICATION FOR MORE INFORMATION ON THE PROCEDURE. 3.ALL WATER MAINS AND SERVICES MUST BE FLUSHED, CHLORINATED AND SAMPLED IN ACCORDANCE WITH THE CFPUA SPECIFICATION 02660 AND AS DIRECTED BY THE CFPUA INSPECTOR. 4.SEWER LINE SEGMENT TESTING: EACH SEWER LINE SEGMENT (THE SEWER MAIN BETWEEN MANHOLES) SHALL BE TESTED: THIRTY (30) DAYS AFTER INSTALLATION AND PRIOR TO FINAL ACCEPTANCE OF THE PROJECT, ALL SEWER LINE SEGMENTS AND ALL SERVICES SHALL BE CAMERA INSPECTED AND VIDEO RECORDED. THE CFPUA INSPECTOR WILL REVIEW THE VIDEO RECORDING FOR ACCEPTANCE. AS AN ALTERNATIVE TO WAITING THIRTY (30) DAYS TO PERMIT STABILIZATION OF THE SOIL-PIPE SYSTEM, THE CFPUA MAY ACCEPT CERTIFICATION FROM A SOIL TESTING FIR VERIFYING THAT THE BACKFILL OF THE TRENCH HAS BEEN COMPACTED TO AT LEAST 95% MAXIMUM DENSITY. AFTER TWO (2) PAPER COPIES OF THE AS-BUILTS HAVE BEEN SUBMITTED TO THE CFPUA INSPECTOR. AFTER GRAVEL HAS BEEN INSTALLED ON ALL ROADWAYS. 5.VIDEO INSPECTION TESTING: THE CONTRACTOR SHALL PROVIDE A DVD(S) OF EACH SEWER LINE SEGMENT AND SERVICE LINE TO ENSURE THAT THE LINES MEET MINIMUM STANDARDS. THE DVD(S) WILL BE REVIEWED IN THE ORDER THEY ARE RECEIVED. THE TYPICAL REVIEW TIME IS GENERALLY TEN (10) TO FIFTEEN (15) BUSINESS DAYS BUT WILL DEPEND ON THE COMPLEXITY OF THE PROJECT, SIZE, QUALITY OF THE DVD(S), ETC. THE MAIN LINE CAMERA INSPECTION MUST HAVE PROJECT NAME, FOOTAGES, MANHOLE NUMBERS, AND DATES OF INSPECTION. THE SERVICE LINE CAMERA INSPECTION MUST INCLUDE PROJECT NAME, FOOTAGES, ADDRESS AND/OR LOT NUMBER, AND DATE OF INSPECTION.THE CAMERA INSPECTION MUST SHOW THE FULL DIAMETER OF THE PIPE. THE CAMERA INSPECTION MUST BE PERFORMED UPON COMPLETION OF CLEANING AND POTABLE WATER INTRODUCED INTO THE SYSTEM TO BE TESTED. ALL DEFECTS IN THE PIPELINE AND APPURTENANCES SHALL BE REMEDIED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE CFPUA AND WILL BE RE-INSPECTED AS OUTLINED ABOVE. 6.TWO (2) SETS OF AS-BUILT RECORD DRAWINGS SHALL BE PROVIDED IN ACCORDANCE WITH CFPUA SPECIFICATION SECTION 01720 FOR REVIEW. GENERAL NOTES 1.ALL MATERIALS AND CONSTRUCTION METHODS PER THE LATEST EDITION OF THE CITY OF WILMINGTON SPECIFICATIONS AND DETAILS. 2.ALL SITE WORK, AT A MINIMUM, SHALL BE PERFORMED IN ACCORDANCE WITH THE 2024 NCDOT ROADWAY STANDARD DRAWINGS AND STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES UNLESS OTHERWISE NOTED OR DIRECTED. ROADS SHALL BE CONSTRUCTED TO NCDOT STANDARDS AND SPECIFICATIONS (LATEST EDITION). 3.UNDERGROUND UTILITIES MAY EXIST ON, ALONG OR WITHIN CONFLICT OF THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING NC 811 OR THE APPROPRIATE UTILITY COMPANIES PRIOR TO ANY EXCAVATION. 4.THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE DEMOLITION OF ANY EXISTING ON SITE ITEMS AS SHOWN ON THE DEMO PLAN, ABOVE AND BELOW GROUND. THE CONTRACTOR IS ALSO RESPONSIBLE FOR REMOVAL OF ALL WASTE RESULTING FROM DEMOLITION. 5.THE CONTRACTOR SHALL OBSERVE ALL REQUIRED SAFETY PRECAUTIONS IN THE PERFORMANCE OF ALL WORK IN ACCORDANCE WITH CURRENT OSHA REGULATIONS. 6.THE CONTRACTOR SHALL GRADE, SEED, AND SOD OR OTHERWISE PROVIDE TEMPORARY AND PERMANENT STABILIZATION OF ALL DISTURBED AREAS. 7.WORK WITHIN PUBLIC RIGHT-OF-WAYS SHALL BE IN ACCORDANCE WITH ALL STATE AND LOCAL REQUIREMENTS, NOTIFICATIONS, STANDARDS AND POLICIES. 8.ANY SUBSTITUTIONS, CHANGES, OR MODIFICATIONS SHALL BE APPROVED BY THE PROJECT ENGINEER, PLANNING DEPARTMENT STAFF, AND OWNER PRIOR TO INSTALLATION/CONSTRUCTION. 9.THE GRADE LINES DENOTE THE FINISHED ELEVATIONS OF THE PROPOSED SURFACE. GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING, ENDING AND AT STRUCTURES AS DIRECTED BY THE ENGINEER IN ORDER TO PROVIDE A PROPER TIE-IN. CONTRACTOR SHALL FIELD VERIFY ALL PROPOSED INVERTS, FFE'S, AND FINISHED SURFACES TO ENSURE THAT MINIMUM SLOPE AND COVER REQUIREMENTS ARE PROVIDED PRIOR TO INSTALLATION. 10.THE EARTHWORK ON THIS PLAN DOES NOT NECESSARILY BALANCE. OFFSITE BORROW OR WASTE MAY BE REQUIRED. 11.ALL PIPE INVERTS TO BE VERIFIED IN THE FIELD PRIOR TO CONSTRUCTING GRAVITY SYSTEMS AND SHALL BE ADJUSTED BY THE ENGINEER IF NECESSARY. ALL STORM DRIANAGE PIPE SHALL BE HP PIPE DUAL WALL (POLYPROPYLENE PIPE). 12.NEW SIGNS REQUIRE ZONING COMPLIANCE AND BUILDING PERMITS PER UDO. A PERMIT IS REQUIRED FOR THE SITE IDENTIFICATION SIGN. SIGN SHALL MEET CITY OF WILMINGTON STANDARDS. SURVEY LEGEND (EXISTING) PROPERTY LINE CENTERLINE EASEMENT LOT CORNER EXISTING CONCRETE MONUMENT EXISTING IRON ROD NEW IRON PIPE ROD CORRUGATED METAL PIPE IRRIGATION CONTROL VALVE RIGHT OF WAY ADJOINER LINE OVER HEAD WIRE GUY WIRE (ANCHORE) LIGHT POLE ECM EIR NIPS ICV 42" CMP OHW GW WATER METER SEWER CLEAN OUT TELEPHONE PEDESTAL WETLANDWETWET LP W CO T CIVIL LEGEND (NEW) LIMITS OF DISTURBANCELODLOD STORM DRAINAGE PIPE WATER MAINW SANITARY SEWER MAIN WATER SERVICE WATER VALVE SANITARY SEWER SERVICE SS W PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR 30 29 CURB CUT ROOF DRAIN CC RD DEMOLITION SEDIMENT AND EROSION CONTROL LEGEND LOD LOD SF LIMITS OF DISTURBANCE SILT FENCE WATTLE CHECK DAM CONSTRUCTION ENTRANCE INLET PROTECTION LOD SF CE IP DRAINAGE AREA DA CD OUTLET PROTECTION OP 9/29/25 OH E OH E OH E OH E OH E OH E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OH E O H E OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E N/F BGCS PROPERTY ASSOCIATION, LLC PID R03200-002-001-001 DEED BOOK 5766 PAGE 1717 MAP BOOK 33 PAGE 362 LUC: 730-OFFICE AND PROFESSIONAL COMMERCIAL ZONING: I-2 F R E D R I C K S O N R O A D 7 0 ' P U B L I C R I G H T O F W A Y M A P B O O K 3 3 P A G E 3 6 2 S 2 8 ° 5 9 ' 5 4 " E ( T I E ) 3 5 8 . 9 2 ' ( G R I D & G R O U N D ) S 2 8 ° 5 9 ' 5 4 " E ( T I E ) 3 5 8 . 9 2 ' ( G R I D & G R O U N D ) N 4 0 ° 4 2 ' 5 6 " W ( T I E ) 8 2 . 1 0 ' ( G R O U N D ) SD SD SD SD SD SD SD SD SD SD SD SD SD SD RC #200 N 195,757.63 GROUND E 2,310,621.06 GROUND EL. 15.99' RC #201 NC GRID NAD83/2011 N 196,071.55 GRID E 2,310,447.06 GRID EL. 15.18' 27004 14.430 RBF 1/2" 0.6' A.G. BENT, S.A.B. ROW DISC RBF 1/2" 0.2'A.G. 2723314.41GAS MKR 2723414.35 RBF 1/2" 0.4' B.G. GWGW GW GW GW 2717516.04LP GW GW E T T PROPERTY LINES PER DEED BOOK AND PAGE PAVEMENT LOCATED WHERE VISIBLE, CONTINUES UNDER GROUND (TO BE REMOVED) 4' HOGWIRE FENCE WITH 1 STRAND BARBED WIRE ON TOP (TO BE REMOVED) INT E R S T A T E I 4 0 N/F CAROLINA POWER & LIGHT CO PIN R03200-004-002-000 DEED BOOK 507 PAGE 66 LUC: 491-UTILITIES ZONING: I-2 18" RCP INV=12.32' 18" RCP INV=12.52' 15" RCP INV=12.54' 15" RCP INV=12.56' 15" RCP INV=13.03' 15" RCP INV=13.11' N/F ORD, LLC PID R03200-002-0035-000 DEED BOOK 6736 PAGE 1717 MAP BOOK 33 PAGE 2160 LUC: 899-OTHER SERVICES COMMERCIAL ZONING: I-2 W W W W W W W W W W W W W W W W W W W W W ELECTRIC PEDESTAL (TO BE REMOVED) LOD LO D L O D L O D LOD LOD LOD LO D LO D LO D L O D LO D LO D LO D L O D LO D LO D LOD LO D LO D LOD LOD L O D L O D LO D L O D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LO D LO D L O D L O D LO D LO D L O D L O D LOD LOD LOD LOD LOD LOD LOD LO D L O D L O D L O D ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X DEMOLITION PLAN CX102 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT SCALE: 1" = 20' 20'0 20'40' GRAPHIC SCALE NC GRID NAD 83/2011 DEMOLITION PLAN1SCALE: 1" = 20' DEMOLITION NOTES 1.THE CONTRACTOR SHALL VISIT THE SITE TO BECOME FAMILIARIZED WITH FIELD DEMOLITION CONDITIONS. 2.THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER DISPOSAL OF ALL DEMOLISHED DEBRIS ASSOCIATED WITH THE PROJECT IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. 3.THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING DUST GENERATED BY THE WORK, INCLUDING BUT NOT LIMITED TO DEMOLITION AND CONSTRUCTION ACTIVITIES, SITE VEHICULAR TRAFFIC AND RELATED OPERATIONS. 4.THE CONTRACTOR IS RESPONSIBLE FOR HAVING ALL EXISTING UTILITIES LOCATED PRIOR TO BEGINNING ANY DEMOLITION. CONTRACTOR SHALL CONTACT NC ONE CALL AT LEAST 72 HOURS PRIOR TO BEGINNING CONSTRUCTION OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED. 5.EXISTING UTILITIES AND STRUCTURES SHOWN, BOTH UNDERGROUND AND ABOVE GROUND, ARE BASED ON FIELD SURVEY AND THE BEST AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S REPRESENTATIVE AND ENGINEER IMMEDIATELY. 6.THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF DISCONNECTING AND ABANDONING ALL EXISTING UTILITIES WITH THE OWNER UNLESS OTHERWISE NOTED. ALL EXISTING UTILITIES AND ASSOCIATED PIPING, ETC. NOT IN USE ON THE SITE SHALL BE PROPERLY ABANDONED AND REMOVED AS REQUIRED. COORDINATE WITH THE OWNER. 7.THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ANY EXISTING UTILITIES THAT REMAIN IN SERVICE DURING DEMOLITION. 8.THE CONTRACTOR IS RESPONSIBLE FOR STABILIZATION OF ALL DISTURBED AREAS AND SLOPES ON AND OFF SITE IN ACCORDANCE WITH THE EROSION CONTROL MEASURES SPECIFIED ON THE PLANS AND IN THE SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TO DETERMINE WHO IS RESPONSIBLE FOR PROVIDING THE PERMANENT STABILIZATION MEASURES AND THE TYPE OF PERMANENT MEASURES PRIOR TO BEGINNING DEMOLITION AND CONSTRUCTION. THE PERMANENT STABILIZATION MEASURES SHALL BE IN PLACE AND ACCEPTABLE TO THE OWNER'S REPRESENTATIVE AND ENGINEER PRIOR TO PROJECT CLOSEOUT. COORDINATE INSPECTION WITH THE OWNER AND ENGINEER PRIOR TO PROJECT CLOSEOUT. 9.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND CONTACTING THE ENGINEER FOR THE REQUIRED INSPECTIONS ON THE PROJECT. 10.WETLANDS EXIST ON SITE. WETLANDS WILL NOT BE DISTURBED DURING CONSTRUCTION OF THIS PROJECT. 9/29/25 OH E OH E OH E OH E OH E OH E O H E OH E OH E OH E OH E OH E OH E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OH E O H E OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E N/F BGCS PROPERTY ASSOCIATION, LLC PID R03200-002-001-001 DEED BOOK 5766 PAGE 1717 MAP BOOK 33 PAGE 362 LUC: 730-OFFICE AND PROFESSIONAL COMMERCIAL ZONING: I-2 F R E D R I C K S O N R O A D 7 0 ' P U B L I C R I G H T O F W A Y M A P B O O K 3 3 P A G E 3 6 2 SD SD SD SD SD SD SD SD SD SD SD SD SD SD GWGW GW GW GW 2717516.04LP GW GW E T T N/F ORD, LLC PID R03200-002-0035-000 DEED BOOK 6736 PAGE 1717 MAP BOOK 33 PAGE 2160 LUC: 899-OTHER SERVICES COMMERCIAL ZONING: I-2 W W W W W W W W W W W W W W W W W W W W W SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F S F SF SF SF S F S F S F S F SF LOD LO D L O D L O D LOD LOD LOD LO D LO D LO D L O D LO D LO D LO D L O D LO D LO D LOD LO D LO D LOD LOD L O D L O D LO D LO D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LO D LO D L O D L O D LO D LO D L O D L O D LOD LOD LOD LOD LOD LOD LOD LO D L O D L O D L O D ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X SEDIMENT & EROSION CONTROL PLAN - PHASE 1 CE101 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT SEDIMENT & EROSION CONTROL PLAN - PHASE 11SCALE: 1" = 20' SCALE: 1" = 20' 20'0 20'40' GRAPHIC SCALE NC GRID NAD 83/2011 DA-1 17,311 SF 0.40 AC DA-2 15,049 SF 0.35 AC DA-3 631 SF 0.01 AC CONSTRUCTION SEQUENCE: 1.OBTAIN ALL NECESSARY STATE AND LOCAL PERMIT APPROVALS. 2.PRIOR TO CLEARING TREES, INSTALLING SEDIMENT CONTROL MEASURES, OR GRADING, A PRECONSTRUCTION MEETING MUST BE CONDUCTED ON-SITE WITH THE NEW HANOVER COUNTY EROSION CONTROL INSPECTOR. 3.PRIOR TO ANY CLEARING AND GRUBBING, INSTALL SILT FENCE, TREE PROTECTION FENCE AND GRAVEL CONSTRUCTION ENTRANCES. 4.COMMENCE CLEARING DOWN TO STUMPS WITHIN LIMITS OF CONSTRUCTION. 5.CONVERT WET POND TO TEMPORARY SEDIMENT BASIN 1 PRIOR TO GRUBBING, GRADDING, OR CONSTRUCTION. 6.INSTALL TEMPORARY SKIMMER BASIN 2. 7.TEMPORARY BASINS SHALL BE CONSTRUCTED PRIOR TO CONSTRUCTION OF ANY DIVERSION DITCHES THAT CONVEY WATER TO A BASIN. THE CONTRACTOR SHALL FIELD ADJUST TEMPORARY DIVERSION DITCHES AS REQUIRED TO MAINTAIN THE DIVERSION TO THE BASINS. 8.COMMENCE GRUBBING AND GRADING WITHIN LIMITS OF DISTURBANCE. 9.INSTALL SEWER AND WATER, AND STORMWATER MANAGEMENT FACILITIES TO INCLUDE PIPING, CATCH BASINS AND DROP INLETS, INSTALL STAGE TWO INLET PROTECTION AND OUTLET CONTROL AS SHOWN ON PLANS. 10.REMOVE ACCUMULATED SEDIMENT FROM DITCHES AND SKIMMER BASIN AS REQUIRED ON THE PLANS AND PERMIT. 11.COMPLETE ROADWAY, DRIVEWAY AND PARKING LOT CONSTRUCTION TO SUBGRADE. 12.INSTALL GRAVEL BASE IN ROADWAYS AND PARKING LOTS. 13.INSTALL CONCRETE CURB AND GUTTER. 14.INSTALL BASE COURSE ASPHALT AND PERVIOUS PAVEMENT. 15.COMMENCE BUILDING CONSTRUCTION. 16.THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN EROSION CONTROL MEASURES AND CLEAN TEMPORARY SEDIMENT TRAPS AND BASINS TO MEET NEW HANOVER COUNTY APPROVAL. 17.SEED AND STABILIZE ALL AREAS PER EROSION CONTROL NOTES ON SHEET CE501 - SEDIMENT AND EROSION CONTROL DETAILS. 18.REMOVE PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES. CONTACT NEW HANOVER COUNTY SEDIMENT AND EROSION CONTROL INSPECTOR TO SCHEDULE REMOVAL OF PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES. 19.REMOVE TEMPORARY SEDIMENT BASIN 1. PUMP OUT BASIN USING SEDIMENT BAG TO FILTER EFFLUENT, REMOVE BAFFLES, AND REMOVE ACCUMULATED SEDIMENT FROM BOTTOM OF THE BASIN. ACCUMULATED SEDIMENT SHALL BE DISPOSED OF OFF SITE IN STATE LICENSED FACILITY. 20.REMOVE SKIMMER FROM TEMPORARY SEDIMENT BASIN 1 AND RETURN OUTLET STRUCTURE TO ORIGINAL CONFIGURATION. 21.GRADE TEMPORARY SKIMMER BASIN 2 TO CONFORM WITH FINAL SCM CONFIGURATION. 22.INSTALL LANDSCAPING AND FINAL GROUND STABILIZATION MEASURES. 23.UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL REQUEST FINAL INSPECTION FROM THE NEW HANOVER COUNTY EROSION CONTROL INSPECTOR TO ALLOW REMOVAL OF ALL TEMPORARY EROSION CONTROL DEVICES. NO.DA LENGTH AC/100 LF (SF)(AC)(FT) 1 17,311 0.40 190 0.21 2 15,049 0.35 235 0.15 3 631 0.01 63 0.02 SILT FENCE TABLE: SF IP DA SF SF CE SF CD CD 9/29/25 N/F BGCS PROPERTY ASSOCIATION, LLC PID R03200-002-001-001 DEED BOOK 5766 PAGE 1717 MAP BOOK 33 PAGE 362 LUC: 730-OFFICE AND PROFESSIONAL COMMERCIAL ZONING: I-2 F R E D R I C K S O N R O A D 7 0 ' P U B L I C R I G H T O F W A Y M A P B O O K 3 3 P A G E 3 6 2 S 2 8 ° 5 9 ' 5 4 " E ( T I E ) 3 5 8 . 9 2 ' ( G R I D & G R O U N D ) S 2 8 ° 5 9 ' 5 4 " E ( T I E ) 3 5 8 . 9 2 ' ( G R I D & G R O U N D ) N 4 0 ° 4 2 ' 5 6 " W ( T I E ) 8 2 . 1 0 ' ( G R O U N D ) SD SD SD SD SD SD SD SD SD SD SD SD SD SD RC #200 N 195,757.63 GROUND E 2,310,621.06 GROUND EL. 15.99' RC #201 NC GRID NAD83/2011 N 196,071.55 GRID E 2,310,447.06 GRID EL. 15.18' 27004 14.430 RBF 1/2" 0.6' A.G. BENT, S.A.B. ROW DISC RBF 1/2" 0.2'A.G. 2723314.41GAS MKR 2723414.35 RBF 1/2" 0.4' B.G. T T PROPERTY LINES PER DEED BOOK AND PAGE INT E R S T A T E I 4 0 N/F CAROLINA POWER & LIGHT CO PIN R03200-004-002-000 DEED BOOK 507 PAGE 66 LUC: 491-UTILITIES ZONING: I-2 18" RCP INV=12.32' 18" RCP INV=12.52' 15" RCP INV=12.54' 15" RCP INV=12.56' 15" RCP INV=13.03' 15" RCP INV=13.11' N/F ORD, LLC PID R03200-002-0035-000 DEED BOOK 6736 PAGE 1717 MAP BOOK 33 PAGE 2160 LUC: 899-OTHER SERVICES COMMERCIAL ZONING: I-2 W W W W W W W W W W W W W W W W W W W W W LOD LO D L O D L O D LOD LOD LOD LO D LO D LO D L O D LO D LO D LO D L O D LO D LO D LOD LO D LO D LOD LOD L O D L O D LO D LO D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LO D LO D L O D L O D LO D LO D L O D L O D LOD LOD LOD LOD LOD LOD LOD LO D L O D L O D L O D SITE DATA ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X SITE PLAN CS101 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT SITE PLAN1SCALE: 1" = 20' GENERAL NOTES PROJECT NAME COVINGTON FLEX PROJECT ADDRESS 3305 FREDERICKSON RD NEW HANOVER COUNTY, NC PARCEL ID - PARCEL A RO3200-002-035-000 TOTAL PROPERTY ACREAGE ±0.80 AC APPLICANT/DEVELOPER DAE BUILDING, INC. ENGINEER RIVERVIEW ENGINEERING, PLLC NICHOLAS LAURETTA, PE, LEED AP ZONING I-2 LAND USE 899 - OTHER SERVICES CAMA LAND USE URBAN FLOOD HAZARD ZONE X RIVER BASIN CAPE FEAR RECEIVING STREAM TOOMERS CREEK CLASSIFICATION WS-IV SETBACKS (SEE NOTE 5)REQUIRED PROVIDED FRONT 50 50 SIDE STREET 0 0 SIDE INTERIOR 0 0 REAR 0 0 PROPOSED STRUCTURES NUMBER OF BUILDINGS 1 BUILDING SQUARE FOOTAGE 9,600 SF BY-RIGHT HEIGHT N/A BUILDING HEIGHT TBD CONSTRUCTION TYPE TBD BUILDING LOT COVERAGE 33% IMPERVIOUS COVERAGE EXISTING 2,085 SF PROPOSED 19,678 SF PROPOSED OFFSITE 0 SF DISTURBED AREA 0.88 ACRES PARKING SUMMARY INTENSITY REQUIRED PROVIDED WAREHOUSING (1.5 PER 1000 SF)10,400 16 15 ADA COMPLIANT PARKING 1 1 FLOOD PLAIN NOTES THE SITE IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY FEMA FLOOD PANEL 3720311900K, EFFECTIVE AUGUST 28, 2018. STORMWATER NOTES 1.STORMWATER MANAGEMENT WILL BE DESIGNED IN ACCORDANCE WITH STATE AND NEW HANOVER COUNTY STANDARDS. 2.FULL PERMIT APPROVALS WILL BE PROVIDED TO NEW HANOVER COUNTY WHEN RECEIVED. UTILITY NOTES 1.ALL WATER SERVICES WILL BE PROVIDED BY CFPUA. 2.ALL SEWER SERVICES WILL BE PROVIDED BY CFPUA. 3.HYDRANTS WILL BE PROVIDED PER NEW HANOVER COUNTY EMERGENCY MANAGEMENT REQUIREMENTS. ENVIRONMENTAL NOTES 1.NO KNOWN HISTORIC OR ARCHEOLOGICAL SITES EXIST ON THE SUBJECT PARCEL. 2.NO JURISDICTIONAL WETLANDS AND STREAMS EXIST ONSITE. SCALE: 1" = 20' 20'0 20'40' GRAPHIC SCALE NC GRID NAD 83/2011 20'x40' 50.0' F R O N T SETB A C K 20'x40' 20'x40' 20'x40' 20'x40'20'x40'20'x40'20'x40'20'x40' 20'x40' 9 37.5' STRE E T Y A R D VARIA B L E W I D T H STRE E T Y A R D ASPHALT (11,055 SF) 20'x40'20'x40' 4 2 4 . 0 ' 9.0' 18 . 0 ' 24 . 0 ' R3 0 ' R20' 24 . 0 ' 70'X10' SIGHT DISTANCE TRIANGLE (TYP.) LANDSCAPE DATA DISTURBED AREA ± 0.88 ACRES AC. 0.88 ACRES * 15 = 14 TREES (2" CAL.) STREETYARD REQUIREMENTS 1 CANOPY TREE OR 3 UNDERSTORY TREES AND 6 SHRUBS PER 600 SF REQUIRED 25' WIDE X 259 LF = 6,475 SF PROPOSED 5,864 SF SHADING REQUIREMENTS 8% REQUIRED 9,798 SF * 0.08 = 784 SF PROVIDED 1,540 SF TRANSITIONAL BUFFER N/A FOUNDATION PLANTINGS 12% OF BUILDING FACE 240 LF * 15 FT * 0.12 = 432 SF PROVIDED: 480 SF MITIGATION DOCUMENTED TREES NO TREE REMOVAL SIGNIFICANT TREES NO TREE REMOVAL LANDSCAPE NOTES 1.PRIOR TO ANY CLEARING, GRADING OR CONSTRUCTION ACTIVITY,TREE PROTECTION FENCING WILL BE INSTALLED AROUND PROTECTED TREES OR GROVES OF TREES. NO CONSTRUCTION WORKERS, TOOLS, MATERIALS OR VEHICLES ARE PERMITTED WITHIN THE TREE PROTECTION FENCING. 2.THE AREAS WITHIN THE TRIANGULAR SIGHT DISTANCE SHALL BE MAINTAINED FREE OF ALL OBSTRUCTIONS BETWEEN 30" AND 10'. 3.A RAIN/FREEZE SENSOR SHALL BE USED IF THERE IS AN IRRIGATION SENSOR. 4.ALL PLANT BEDS ARE TO RECEIVE 3-4" OF PINESTRAW OR MULCH. 5.LANDSCAPING SHALL BE COMPLETE BEFORE ISSUANCE OF A CO. BOTANICAL / COMMON NAME CALIPER HEIGHT QTY REMARKS KEY NO.CANOPY TREE 1 PRUNUS CAROLINIANA / CAROLINA CHERRYLAUREL 3"10' - 12'14 STREETYARD/SHADING 2 QUERCUS LAURIFOLIA / LAUREL OAK 3"10' - 12'14 DISTURBED AREA BOTANICAL / COMMON NAME CALIPER HEIGHT QTY REMARKS UNDERSTORY TREE 3 LAGERSTOREMIA INDICA / CREPE MYRTLE 2"8' - 10'2 PARKING LOT ISLAND BOTANICAL / COMMON NAME HEIGHT SPREAD SPACING QTY REMARKS SHRUBS 4 ILEX VOMITORIA NANA / DWARF YAUPON 24"24"4' O.C.33 STREETYARD 5 ILEX VOMITORIA / YAUPON HOLLY 3' O.C.33 STREETYARD 6 DISTYLIUM BLUE CASCADE 52 FOUNDATION BOTANICAL / COMMON NAME QUANTITY REMARKS GROUND COVER CYNODON DACTYLON / BERMUDA GRASS PLANT SCHEDULE INFILTRATION BASIN 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 3 3 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 4 5 6 6 9/29/25 OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OHEOHE OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OHE BGC S P R O P E R T Y A S S O C I A T I O N , L L C PID R 0 3 2 0 0 - 0 0 2 - 0 0 1 - 0 0 1 DEE D B O O K 5 7 6 6 P A G E 1 7 1 7 MAP B O O K 3 3 P A G E 3 6 2 LUC : 7 3 0 - O F F I C E A N D P R O F E S S I O N A L COM M E R C I A L ZO N I N G : I - 2 FREDRICKSON ROAD 70' PUBLIC RIGHT OF WAY MAP BOOK 33 PAGE 362 S28°59'54"E (TIE) 358.92' (GRID & GROUND) S28°59'54"E (TIE) 358.92' (GRID & GROUND) N40°42'56"W ( T I E ) 82.10' (GROU N D ) SD SD SD SD SD SD SD SD SD SD SD SD SD SD GWGW GW GW GW 2717516.04LP GW GW E T T CA R O L I N A P O W E R & L I G H T C O PIN R 0 3 2 0 0 - 0 0 4 - 0 0 2 - 0 0 0 DE E D B O O K 5 0 7 P A G E 6 6 LU C : 4 9 1 - U T I L I T I E S 18" R C P IN V = 1 2 . 3 2 ' 18" R C P IN V = 1 2 . 5 2 ' 15 " R C P IN V = 1 2 . 5 4 ' 15 " R C P IN V = 1 2 . 5 6 ' 15" R C P IN V = 1 3 . 0 3 ' 15" R C P IN V = 1 3 . 1 1 ' W W W W W W W W W W W W W W W W W W W W W 10+00 11+00 12+00 13+00 14+00 14+50 10 + 0 0 11+0 0 11+ 6 3 . 7 4 70 L F O F 1 5 " R C P @ 0 . 4 3 % 16 15 14 1312 12 13 14 15 16 15.5 15.5 15.5 15 16 TRENCH DRAIN 1 9 L F O F 1 2 " H D P E @ 2 . 4 5 % LO D LOD LOD LOD LO D LO D LO D LODLODLODLODLODLODLODLODLODLOD LO D LODLOD LO D LO D LODLODLODLODLODLOD L O D LO D LO D L O D LO D LO D LO D LOD LOD LOD LOD LOD LOD LOD LOD LODLODLODLODLODLODLODLODLODLODLOD LO D LO D LO D LO D LO D LO D LO D LODLODLODLOD 48LF OF 12" HDPE @ 0.00% 13 EL E V A T I O N EL E V A T I O N STATION 10 15 20 10 15 20 10+00 11+00 12+00 13+00 14+00 14+50 EL E V A T I O N EL E V A T I O N STATION 13 15 20 13 15 20 10+00 11+00 11+75 2.00% -0.50% EL E V . 1 6 . 3 7 ST A 1 0 + 8 2 . 2 6 EL E V . 1 5 . 9 7 ST A 1 1 + 6 3 . 7 5 EL E V . 1 5 . 3 9 ST A 1 0 + 3 3 . 1 1 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X DRIVEWAY GRADING PLAN CS102 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT SCALE: 1" = 20' 20'0 20'40' GRAPHIC SCALE NC GRID NAD 83/2011 DRIVEWAY GRADING PLAN1SCALE: 1" = 20' NCDOT STANDARD DRAWINGS PART OF THIS SET BY REFERENCE NCDOT DETAIL DWG NO. WORK ZONE ADVANCE WARNING SIGNS 1101.01 TEMPORARY LANE CLOSURES 1101.02 TRAFFIC CONTROL DESIGN TABLES 1101.11 PORTABLE WORK ZONE SIGNS 1110.02 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS 1205.01 TEMPORARY SILT FENCE 1605.01 MATTING INSTALLATION 1631.01 COIR FIBER BAFFLE 1640.01 NCDOT NOTES 1.CONTRACTOR SHALL BE RESPONSIBLE FOR UTILIZING ALL APPLICABLE AND CURRENT NCDOT STANDARD DRAWINGS INCLUDING, BUT NOT LIMITED TO, THE DRAWINGS INCLUDED OR REFERENCED WITHIN THESE PLANS AND THE APPROVED PERMIT PACKAGE. 2.UPON SUBSTANTIAL PROJECT COMPLETION, CONTRACTOR TO CLEAR EXISTING CULVERTS/PIPES, CATCH BASINS, AND DITCHES ALONG FRONTAGE AND DOWNSTREAM AS NECESSARY TO ACHIEVE POSITIVE DRAINAGE. 3.ALL PROPOSED OR RELOCATED SIGNAGE SHALL BE PLACED OR REPLACED IN ACCORDANCE WITH NCDOT APPROVED BREAKAWAY SIGN SUPPORTS AS DETAILED IN DIVISION 12 IN THE NCDOT STANDARD DRAWINGS. 4.CONTRACTOR TO SAWCUT EXISTING ASPHALT FOR SMOOTH JOINT NOT ALIGNED WITH WHEEL PATH. FREDRICKSON ROAD PROFILE2SCALE: HOR 1" = 20' VER 1" = 2' DRIVEWAY PROFILE3SCALE: HOR 1" = 20' VER 1" = 2' 2" SF9.5C SUPERPAVE HOT MIX ASPHALT SURFACE COURSE (NCDOT SPECIFICATION) 8" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) 1 2 DRIVEWAY SECTION SCALE: NOT TO SCALE4 24.0' ASPHALT 1 2 ℄ 3' PLAZA 1.0% MIN. 2.0% MAX. FIL L S L O P E (M A X . 2 : 1 ) CUT S L O P E (MAX . 1 . 5 : 1 ) FILL S L O P E (MAX . 2 : 1 ) CU T S L O P E (M A X . 1 . 5 : 1 ) -0.02 FT/FT-0.02 FT/FT EDGE OF PAVEMENT 3' PLAZA 1.0% MIN. 2.0% MAX. 8" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) NCDOT DRIVEWAY PAVEMENT SECTION SCALE: NOT TO SCALE 2" SF9.5C SUPERPAVE HOT MIX ASPHALT SURFACE COURSE (NCDOT SPECIFICATION) 5 12" COMPACTED SUBGRADE (98% OF MAXIMUM DRY DENSITY ASTM D-698) 70'X10' SIGHT DISTANCE TRIANGLE (TYP.) 22 . 9 ' 34 . 6 ' 75.7' R 3 0 ' 63 . 1 ' 69 . 9 ' 35 . 3 ' END OF PAVEMENT EXISTING DRIVEWAY EXISTING DRIVEWAY SUTTON STEAM PLANT ROAD EXISTING DRIVEWAY EXISTING DRIVEWAY TO BE WIDENED 24.0' 350.0' LIMITS OF SIGHT DISTANCE M.P.H. 35 POSTED SPEED LIMIT 350.0' 3. 5 ' 9/29/25 OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E O H E OH E OH E OH E OH E OH E OH E OH E OH E OH E OH E OHE OHE OHE OHE OHE OH E O H E OHE OHE OHE OHE OHE OHE OHE OHE OH E OH E OH E OH E OH E OH E N/F BGCS PROPERTY ASSOCIATION, LLC PID R03200-002-001-001 DEED BOOK 5766 PAGE 1717 MAP BOOK 33 PAGE 362 LUC: 730-OFFICE AND PROFESSIONAL COMMERCIAL ZONING: I-2 F R E D R I C K S O N R O A D 7 0 ' P U B L I C R I G H T O F W A Y M A P B O O K 3 3 P A G E 3 6 2 S 2 8 ° 5 9 ' 5 4 " E ( T I E ) 3 5 8 . 9 2 ' ( G R I D & G R O U N D ) S 2 8 ° 5 9 ' 5 4 " E ( T I E ) 3 5 8 . 9 2 ' ( G R I D & G R O U N D ) N 4 0 ° 4 2 ' 5 6 " W ( T I E ) 8 2 . 1 0 ' ( G R O U N D ) SD SD SD SD SD SD SD RC #201 NC GRID NAD83/2011 N 196,071.55 GRID E 2,310,447.06 GRID EL. 15.18' 27004 14.430 RBF 1/2" 0.6' A.G. BENT, S.A.B. ROW DISC RBF 1/2" 0.2'A.G. 2723314.41GAS MKR 2723414.35 RBF 1/2" 0.4' B.G. GWGW GW GW GW 2717516.04LP GW GW E T T PROPERTY LINES PER DEED BOOK AND PAGE INT E R S T A T E I 4 0 N/F CAROLINA POWER & LIGHT CO PIN R03200-004-002-000 DEED BOOK 507 PAGE 66 LUC: 491-UTILITIES ZONING: I-2 18" RCP INV=12.32' 18" RCP INV=12.52' 15" RCP INV=12.54' 15" RCP INV=12.56' N/F ORD, LLC PID R03200-002-0035-000 DEED BOOK 6736 PAGE 1717 MAP BOOK 33 PAGE 2160 LUC: 899-OTHER SERVICES COMMERCIAL ZONING: I-2 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W PROP. O1 RIM: 14.75 INV OUT: 12.90 PROP. O2 RIM: 14.12 INV IN: 12.6070LF O F 1 5 " R C P @ 0 . 4 3 % 1 7 16 15 1 4 13 1 2 1 2 1 3 1 4 1 5 16 17 18 17 1 6 . 5 15 . 5 1 5 . 5 1 5 . 5 15 17 15 16 17 16 T R E N C H D R A I N 19L F O F 1 2 " HD P E @ 2 . 4 5 % PROP. YI RIM: 15.79 INV IN: 14.37 INV OUT: 14.37 PROP. FES RIM: 14.99 INV IN: 13.90 LOD LO D L O D L O D LOD LOD LOD LO D LO D LO D L O D LO D LO D LO D L O D LO D LO D LOD LO D LO D LOD LOD L O D L O D LO D LO D L O D LO D LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D LO D LO D LO D L O D L O D LO D LO D L O D L O D LOD LOD LOD LOD LOD LOD LOD LO D L O D L O D L O D 17 . 5 17.10 15.87 15.85 16.60 4 8 L F O F 1 2 " H D P E @ 0 . 0 0 % W W W 1 3 EL E V A T I O N EL E V A T I O N STATION 10 15 20 10 15 20 10+00 11+00 12+00 EL E V A T I O N EL E V A T I O N STATION 10 15 20 10 15 20 10+00 11+00 3 1 TEMPORARY POOL: 14.5 EXISTING GRADE PROPOSED GRADE 3 1 3 1 3 1 EXISTING GRADE PROPOSED GRADE EXISTING SUBGRADE EXISTING SUBGRADE SHWT: 10.0 SHWT: 10.0 BOTTOM: 12.0 48LF OF 12" HDPE @ 0.00% ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X STORM DRAINAGE AND GRADING PLAN CG101 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT SCALE: 1" = 20' 20'0 20'40' GRAPHIC SCALE NC GRID NAD 83/2011 STORM DRAINAGE AND GRADING PLAN1SCALE: 1" = 20' EXCAVATION, GRADING, AND BACKFILLING NOTES 1.ANY UNDERCUTTING IN GOOD SOIL SHALL BE REPLACED AND THE REPLACEMENT MATERIAL SHALL BE COMPACTED TO NINETY-FIVE (95) PERCENT OF MAXIMUM DENSITY OBTAINED AT OPTIMUM MOISTURE CONTENT, AS DETERMINED BY THE ASTM D 698 STANDARD PROCTOR TEST METHOD. IN THE EVENT THAT MATERIAL ENCOUNTERED AT PIPE GRADE, SUBGRADE OF PARKING OR ROADWAYS AND SUBGRADE OF BUILDING FOUNDATIONS IS FOUND TO BE SOFT, SPONGY, OR IN ANY OTHER WAY UNSUITABLE, THE CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER IMMEDIATELY. SUCH UNSUITABLE MATERIAL SHALL BE REMOVED TO A DEPTH AS SPECIFIED BY THE GEOTECHNICAL ENGINEER AND REPLACED WITH A MINIMUM OF SIX (6) INCHES OF STONE, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER. 2.BEFORE BACKFILLING IS COMMENCED OVER PIPES AND OTHER INSTALLATIONS, EARTH FILL SHALL BE SOLIDLY TAMPED AROUND AND ABOVE THE PIPE TO A DEPTH OF ONE (1) FOOT ABOVE THE TOP OF THE PIPE. CARE SHALL BE TAKEN TO PREVENT ANY DISTURBANCE TO THE PIPE OR DAMAGE TO NEWLY MADE JOINTS. THE FILLING OF THE TRENCH SHALL BE CARRIED OUT SIMULTANEOUSLY ON BOTH SIDES OF THE PIPES IN SUCH A MANNER THAT INJURIOUS SIDE PRESSURES DO NOT OCCUR. 3.THE MATERIAL FOR BACKFILLING SHALL BE FREE FROM ALL PERISHABLE AND OBJECTIONABLE MATERIALS. BEFORE PLACING ANY BACKFILL, ALL RUBBISH, FORM, BLOCKS, WIRES OR OTHER UNSUITABLE MATERIAL SHALL BE REMOVED FROM EXCAVATION. THE BACK-FILLING OVER PIPES SHALL BE PLACED IN LAYERS NOT OVER SIX (6) INCHES THICK AND COMPACTED TO A MINIMUM DENSITY OF NINETY-FIVE (95) PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR COMPACTION TEST TO A DEPTH OF 12 INCHES BELOW FINISHED GRADE. THE LAST 12 INCHES OF BACKFILL SHALL BE PLACED IN LAYERS NOT OVER SIX (6) INCHES THICK AND COMPACTED TO A MINIMUM DENSITY OF NINETY-EIGHT (98) PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR COMPACTION TEST. STORM DRAINAGE AND GRADING NOTES 1.IN ACCORDANCE WITH NC GENERAL STATUTES, NPDES REGULATIONS, AND NCDENR REQUIREMENTS, STORMWATER DISCHARGE OUTFALLS SHALL BE INSPECTED BY THE CONTRACTOR. INSPECTIONS SHALL BE PERFORMED BY THE CONTRACTOR AFTER EACH STORM EVENT OF 1/2 INCH OR GREATER, WITH ONE WEEKLY INSPECTION MINIMUM. NCDENR STANDARD INSPECTION REPORTS SHALL BE PREPARED AND SIGNED WITH COPIES PROVIDED TO THE OWNER, ARCHITECT, AND ENGINEER, BY THE CONTRACTOR. 2.INLET PROTECTION SHALL BE INSTALLED AROUND OUTFALL. DEVICES SHALL BE CONSTRUCTED TO FINAL PROPOSED CONDITION UPON STABILIZATION OF CONTRIBUTING GROUND SURFACES AND REMOVAL OF SEDIMENT FROM STORM PIPES. 3.ALL DIMENSIONS AND GRADES SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. CONTRACTOR SHALL NOTIFY CONSTRUCTION MANAGER IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION FOR NECESSARY PLAN OR GRADE CHANGES. NO EXTRA COMPENSATION SHALL BE PAID TO CONTRACTOR FOR ANY WORK DONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 4.UNLESS OTHERWISE NOTED, GRADES AND SPOT ELEVATIONS NOTED ON PLANS INDICATE FINISHED GRADE OR PAVEMENT SURFACE. ALL DIMENSIONS ARE MEASURED TO THE BACK OF CURB UNLESS OTHERWISE INDICATED. PROPOSED INFILTRATION BASIN FFE: 17.10 FFE : 1 7 . 1 0 ALL ROOF LEADERS TO DRAIN TO ASPHALT EXISTING - DRAINAGE AREA LU AREA (AC)MU HSG*CN CN*AREA OPEN SPACE 0.8 Kr A 39 31 0.80 AC CN 39 Tc (MIN.)5 ROUTING SUMMARY POA 2-YEAR PRE POST ROUTED Δ (%) O1 0.02 1.85 0.00 0 10-YEAR PRE POST ROUTED Δ (%) O1 0.43 3.89 0.00 0 25-YEAR PRE POST ROUTED Δ (%) O1 1.21 5.43 1.18 98 PROPOSED- DRAINAGE AREA LU AREA (AC)MU HSG*CN CN*AREA IMPERVIOUS 0.45 Kr A 98 44 OPEN SPACE 0.35 Kr A 39 14 0.80 AC CN 72 Tc (MIN.)5 SCM DETAILS2SCALE: HOR. 1" = 30' VER. 1" = 3' OUTFALL STRUCTURE SCALE: NOT TO SCALE3 4'-0"6"6" ANTI-FLOATATION 5'-0" 6" 4'-0"6"6" ANTI-FLOATATION 5'-0" 6" TRASH RACK TRASH RACK 75 LF OF Ø15" RCP INV. UP: 13.40' MSL INV. DN: 13.00' MSL EL. 15.15' MSL 15" RCP OUTLET PIPE WATER SURFACE EL. RETURN EVENT ELEVATION (FT) 2-YEAR 13.55 10-YEAR 14.75 25-YEAR 15.23 50-YEAR 15.31 SCM NOTES 1.TEMPORARY PUMP WILL BE PROVIDED TO DRAIN SCM FOR ROUTINE MAINTENANCE OR IN AN EMERGENCY 2.THE DAM STRUCTURE, INCLUDING FRONT AND BACK EMBANKMENT SLOPES, OF THE POND SHALL BE VEGETATED WITH NON-CLUMPING TURF GRASS; TREES AND WOODY SHRUBS ARE NOT BE ALLOWED WATER AND SEWER DEMAND GENERAL BUSINESS 25 GAL/EMPLOYEE/SHIFT 24 EMPLOYEES / 1 SHIFT DEMAND SEWER DEMAND 600 GPD (SEPTIC SYSTEM) WATER DEMAND 600 GPD (CFPUA) GUY WIRE TO REMAIN AND PROTECTED DURING CONSTRUCTION GUY WIRE TO REMAIN AND PROTECTED DURING CONSTRUCTION POWER POLE REMAIN AND PROTECTED DURING CONSTRUCTION FIRE HYDRANT TO REMAIN AND PROTECTED DURING CONSTRUCTION EXISTING TAP AND VALVE TO BE USED FOR WATER SERVICE REPLACE EXISTING METER BOX AND SETTER WITH 1-1/2" MASTER METER INSTALL 1-1/2" RZP 2" HDPE SDR9 WATER MAIN 2"X1" HDPE TEE 1" HDPE SDR9 SERVICE 1" QUARTER TURN VALVE IN VALVE BOX (TYP. OF 12) 2"X2" HDPE TEE2" PERMANENT BLOWOFF 2" PERMANENT BLOWOFF 2" HDPE SDR9 WATER MAIN OP 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X SEDIMENT & EROSION CONTROL DETAILS CE501 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT NCG01 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITHTHE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). Thepermittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1.Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2.Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3.Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4.Provide ponding area for containment of treated Stormwater before dischargingoffsite. 5.Store flocculants in leak-proof containers that are kept under storm-resistant cover or surrounded by secondary containment structures. HAZARDOUS AND TOXIC WASTE 1.Create designated hazardous waste collection areas on-site. 2.Place hazardous waste containers under cover or in secondary containment. 3.Do not store hazardous chemicals, drums or bagged materials directly on the ground. EQUIPMENT AND VEHICLE MAINTENANCE 1.Maintain vehicles and equipment to prevent discharge of fluids. 2.Provide drip pans under any stored equipment. 3.Identify leaks and repair as soon as feasible, or remove leaking equipment from theproject. 4.Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5.Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6.Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1.Never bury or burn waste. Place litter and debris in approved waste containers. 2.Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3.Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4.Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5.Cover waste containers at the end of each workday and before storm events orprovide secondary containment. Repair or replace damaged waste containers. 6.Anchor all lightweight items in waste containers during times of high winds. 7.Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8.Dispose waste off-site at an approved disposal facility. 9.On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1.Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2.Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3.Contain liquid wastes in a controlled area. 4.Containment must be labeled, sized and placed appropriately for the needs of site. 5.Prevent the discharge of soaps, solvents, detergents and other liquid wastes fromconstruction sites. PORTABLE TOILETS 1.Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2.Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3.Monitor portable toilets for leaking and properly dispose of any leaked material.Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit.HERBICIDES, PESTICIDES AND RODENTICIDES 1.Store and apply herbicides, pesticides and rodenticides in accordance with labelrestrictions. 2.Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case ofaccidental poisoning. 3.Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4.Do not stockpile these materials onsite. CONCRETE WASHOUTS 1.Do not discharge concrete or cement slurry from the site. 2.Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3.Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4.Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority forreview and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5.Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6.Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7.Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by theapproving authority. 8.Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9.Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10.At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. EARTHEN STOCKPILE MANAGEMENT 1.Show stockpile locations on plans. Locate earthen-material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonablyavailable. 2.Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3.Provide stable stone access point when feasible. 4.Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. A A BELOW GRADE WASHOUT STRUCTURE 1:1SIDE SLOPE(TYP.) 10 MILPLASTICLINING 3'- 0 " MIN . & X ' MAX . SECTION A-A NOT TO SCALE ABOVE GRADE WASHOUT STRUCTURENOT TO SCALE PLAN SECTION B-B HIGHCOHESIVE &LOW FILTRATIONSOIL BERM 8" 6" 2' HIGHCOHESIVE &LOW FILTRATIONSOIL BERM1:1 SIDE SLOPE(TYP.) 10 MILPLASTIC LINING B B 3'- 0 " MIN . & X ' MA X . A SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.)OR STAPLES SANDBAGS (TYP.)OR STAPLES NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BEMAINTAINED WHEN THE LIQUID AND/OR SOLID REACHES75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BECLEARY MARKED WITH SIGNAGE NOTING DEVICE. NOTES:1. ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURESSHALL BE MAINTAINED WHEN THE LIQUIDAND/OR SOLID REACHES 75% OF THESTRUCTURES CAPACITY TO PROVIDEADEQUATE HOLDING CAPACITY WITH AMINIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDSTO BE CLEARY MARKED WITH SIGNAGENOTING DEVICE. ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER CONCRETEWASHOUT CONCRETEWASHOUT PLAN CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.)CLEARLY MARKED SIGNAGENOTING DEVICE (18"X24" MIN.) SILT FENCE 10'MIN 10'MIN SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon aspracticable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. Site Area Description Timeframe variations -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed unless there is zero slope Stabilize within this many calendar days after ceasingland disturbance 7 7 7 14 None None (a)Perimeter dikes, swales, ditches, and perimeter slopes (b)High Quality Water (HQW) Zones (c)Slopes steeper than 3:1 If slopes are 10' or less in length and are not steeper than 2:1, 14 days are allowed (d)Slopes 3:1 to 4:1 (e)Areas with slopes flatter than 4:1 14 -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQWZones -10 days for Falls Lake Watershed NCG01 SELF-INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF-INSPECTION Self-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to orgreater than 1.0 inch occurs outside of normal business hours, the self-inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1.E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be kept on site and available for inspection at all times during normal business hours. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site-specific exemption based on unique site conditions that make this requirement not practical: (a)This General Permit as well as the Certificate of Coverage, after it is received. (b)Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically-available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard-copy records. PART III SELF-INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1.Occurrences that Must be Reported Permittees shall report the following occurrences: (a)Visible sediment deposition in a stream or wetland. (b)Oil spills if: ·They are 25 gallons or more, ·They are less than 25 gallons but cannot be cleaned up within 24 hours, ·They cause sheen on surface waters (regardless of volume), or ·They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d)Anticipated bypasses and unanticipated bypasses. (e)Noncompliance with the conditions of this permit that may endanger health or the environment. 2.Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather).Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a)The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur. The non-surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b)The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c)Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d)Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e)Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f)Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. TEMPORARY SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING TEMPORARY SEEDING RECOMMENDATIONS FOR SUMMER TEMPORARY SEEDING RECOMMENDATIONS FOR FALL Seeding Mixture Species Rye (grain) Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) Rate (lb/acre) 120 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. Seeding Dates Mountains—Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont—Jan. 1 - May 1 Coastal Plain—Dec. 1 - Apr. 15 Mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. Seeding Mixture Species German millet Rate (lb/acre) 40 Seeding Dates Mountains — May 15 - Aug. 15 Piedmont — May 1 - Aug. 15 Coastal Plain — Apr. 15 - Aug. 15 Mulch Maintenance Seeding Mixture Species Rye (grain) Seeding Dates Mountains — Aug. 15 - Dec. 15 Coastal Plain and Piedmont — Aug. 15 - Dec. 31 Mulch Maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. Rate (lb/acre) 120 Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. SEED BED PREPARATION: LIMING- Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1-11 2 tons/acre on coarse-textured soils and 2-3 tons/acre on fine-textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. FERTILIZER- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700 - 1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. SURFACE ROUGHENING- If recent tillage operations have resulted in a loose surface additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by raking, harrowing, or other suitable methods for fine grading. The finished grade shall be a smooth even soil surface with a loosen uniformly fine texture. All ridges and depressions shall be removed and filled to provide the approved surface drainage. Planting is to be done immediately after finished grades are obtained and seedbed preparation is completed. Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. In the Piedmont and Mountains, a small-stemmed Sudangrass may be substituted at a rate of 50 lb/acre. DATE:PAGE: NORTH CAROLINA Department of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesTEMPORARY SEEDING NOTES: 1.Permanent seeding, sodding or other means of stabilization are required when all construction work is completed according to the NPDES timeframes table. 2.A North Carolina Department of Agriculture soils test (or equal) is highly recommended to be obtained for all areas to be seeded, sprigged, sodded or planted. 3.Use a seeding mix that will produce fast0growing nurse crops and includes non-invasive species that will eventually provide a permanent groundcover. Soil blankets may be used in lieu of nurse crops. Mat, tack or crimp mulch, as needed to stabilize seeded areas until root establishment. Mulch must cover at leaser 80% of the soil surface. 4.Ground cover shall be maintained until permanent vegetation is established and stable against accelerated erosion. SEED BED PREPARATION: LIMING- Apply lime according to soil test recommendations. If the pH (acidity) of the soil is not known, an application of ground agricultural limestone at the rate of 1 to 1 12 tons/acre on coarse0textured soils and 2-3 tons/acre on fine-textured soils is usually sufficient. Apply limestone uniformly and incorporate into the top 4-6 inches of soil. Soils with a pH of 6 or higher need not be limed. FERTILIZER- Base application rates on soil tests. When these are not possible, apply a 10-10-10 grade fertilizer at 700-1,000 lb/acre. Both fertilizer and lime should be incorporated into the top 4-6 inches of soil. If a hydraulic seeder is used, do not mix seed and fertilizer more than 30 minutes before application. SURFACE ROUGHENING- If recent tillage operations have resulted in a loose surface additional roughening may not be required, except to break up large clods. If rainfall causes the surface to become sealed or crusted, loosen it just prior to seeding by raking, harrowing, or other suitable methods for fine grading. the finished grade shall be a smooth even soil surface with a loosen uniformly fine texture. all ridges and depressions shall be removed and filled to provide the approved surface drainage . Planting is to be done immediately after finished grades are obtained and seedbed preparation is completed. SEEDING MIXTURE Species Rate Centipede 5 lbs/acre Indian Woodoats 1.5-2.5 lbs/acre* Virginia Wild Rye 4-6 lbs/acre *Depending upon mix with other species. See table 6.11.d from Chapter 6 of the NC Erosion and Sediment Control Planning and Design Manual. Seeding Dates Coastal or Eastern Piedmont for Centipede- Sept. 1 - May 1 Coastal and Piedmont for Indian Woodoats and Virginia Wild Rye- Feb 15 - April 1 Mountains for Indian Woodoats and Virginia Wild Rye- March 1 - May 15 Maintenance: Significant maintenance may be required to obtain desired cover. SEEDING MIXTURE Species Rate Indian Woodoats 1.5-2.5 lbs/acre* Virginia Wild Rye 4-6 lbs/acre* *Depending upon mix with other species. See table 6.11.d from Chapter 6 of the NC Erosion and Sediment Control Planning and Design Manual. Seeding Dates Mountains - July 15- Aug 15 Piedmont - Aug 15 - Oct 15 Maintenance: Indian Woodoats and Virginia Wild Rye are both sun and shade tolerant. SEEDING MIXTURE Species Rate Hard Fescue 15 lbs/acre Switchgrass 2.5-3.5 lbs/acre* Indian Grass 5-7 lbs/acre* Big Bluestem 5-7 lbs/acre* Indian Woodoats 1.5-2.5 lbs/acre* Virginia Wild Rye 4-6 lbs/acre* *Depending upon mix with other species. See table 6.11.d from Chapter 6 of the NC Erosion and Sediment Control Planning and Design Manual. Seeding Dates Mountains - Hard Fescue- Aug 1 - June 1 Mountains- Switchgrass, Indian Grass, Big Bluestem- Dec 1 - April 15 Piedmont and Coastal- Switchgrass, Indian Grass, Big Bluestem- Dec 1 - April 1 Coastal- Indian Woodoats and Virginia Wild Rye- Sept 1 - Nov 1 Maintenance: Hard Fescue is not recommended for slopes > 5%. Prefers shade. NON-INVASIVE PERMANENT SEEDING RECOMMENDATIONS FOR LATE WINTER AND EARLY SPRING NON-INVASIVE PERMANENT SEEDING RECOMMENDATIONS FOR SUMMER NON-INVASIVE PERMANENT SEEDING RECOMMENDATIONS FOR FALL DATE:PAGE: NORTH CAROLINA Department of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesPERMANENT SEEDING CONSIDERATIONS FOR CONSTRUCTION SCHEDULING CONSTRUCTION ACTIVITY SCHEDULE CONSIDERATION CONSTRUCTION ACCESS: Construction entrance, construction routes, equipment parking areas. First land-disturbing activity- Stabilize bare areas immediately with gravel and temporary vegetation as construction takes place. SEDIMENT TRAPS AND BARRIERS: Basin traps, sediment fences, and outlet protection. Install principal basins after construction site is accessed. Install additional traps and barriers as needed during grading. RUNOFF CONTROL: Diversions, perimeter dikes, water bars, and outlet protection. Install key practices after principal sediment traps and before land grading. Install additional runoff-control measures during grading. RUNOFF CONVEYANCE SYSTEM: Stabilize streambanks, storm drains, channels, inlet and outlet protection, and slope drains. Where necessary, stabilize streambanks as early as possible. Install principal runoff conveyance system with runoff-control measures. Install remainder of system after grading. LANDING CLEARING AND GRADING: Site preparation- cutting, filling and grading, sediment traps, barriers, diversions, drains, and surface roughening. Begin major clearing and grading AFTER principal sediment and key runoff-control measures are installed. Clear borrow and disposal areas only as needed. Install additional control measures as grading progresses. Mark trees and buffer areas for preservation. SURFACE STABILIZATION: Temporary and permanent seeding, mulching, sodding and riprap. Apply temporary or permanent stabilization measures immediately on all disturbed areas where work is delayed or complete. BUILDING CONSTRUCTION: Buildings, utilities, and paving.Install necessary additional erosion and sedimentation control practices as work takes place. LANDSCAPE AND FINAL STABILIZATION: Topsoiling, trees and shrubs, permanent seeding, mulching, sodding, and riprap. Last construction phase: Stabilize all open areas, including borrow and spoil areas. Remove and stabilize all temporary control areas. NOTE: The above are the main aspects of a typical construction sequence in general terms. A detailed Construction Sequence should be site specific based on your project and site needs. As a minimum, the construction sequence schedule should show the following: ·The erosion and sedimentation control practices to be installed, ·Principal development activities, ·What measures should be in place before other activities are begun, and ·Compatibility with the general construction schedule of the contract. Many timely construction techniques can reduce the erosion potential of a site, such as (1) shaping earthen fills daily to prevent overflows and (2) constructing temporary diversions ahead of anticipated storms. These types of activities cannot be put on the construction sequence schedule, but should be used whenever possible. DATE:PAGE: NORTH CAROLINA Department of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesCONSTRUCTION SEQUENCING 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X SEDIMENT & EROSION CONTROL DETAILS CE502 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT Construction: 1.Clear the entrance and exit area of all vegetation, roots, and other objectionable material and properly grade it. 2.Place the gravel to the specific grade and dimensions shown on the plans, and smooth it. 3.Provide drainage to carry water to a sediment trap or other suitable outlet. 4.Use geotextile fabrics in order to improve stability of the foundation in locations subject to seepage or high water table. Maintenance: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater. Make any required repairs immediately. 2.Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. 3.Sediment on roadways is to be removed immediately by broom and shovel, either by manual or mechanical means, and not to be washed off where it has the potential to enter a stream, drainage way or storm drain system. Pub l i c R o a d 2-3" COURSE AGGREGATE 6" MIN. AS R E Q U I R E D 12' M I N . 50' M I N . IF 50 ' C A N N O T B E R E A C H E D , A L E N G T H SUF F I C I E N T E N O U G H T O R E T A I N S E D I M E N T O N SIT E A N D O F F R O A D W A Y S . DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual Updates TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT GEOTEXTILE FABRIC TO BE USED IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. Notes: 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 24 inches above the ground. (Higher fences may impound volumes of water sufficient to cause failure of the structure) 3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid joints. When joints are necessary, securely fasten the filter cloth only at a support post with 4 feet minimum overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the upslope side of the posts. Extend the wire mesh support to the bottom of the trench. Fasten the wire reinforcement, then fabric on the upslope side of the fence post. Wire or plastic zip ties should have a minimum 50 pound tensile strength. 5.When a wire mesh support fence is used, space posts a maximum of 8 feet apart. Supports should be driven securely into the ground a minimum of 24 inches. Wire mesh should be a minimum 14-gauge with 6 inch mesh spacing. 6.Extra strength filter fabric with 6 foot post spacing does not require a wire mesh support fence. Securely fasten the filter fabric directly to posts. Wire or plastic zip ties should have a minimum of 50 pound tensile strength. 7.Excavate the trench approximately 4 inches wide and 8 inches deep along the proposed line of the posts and upslope from the barrier. 8.Place 12 inches of fabric along the bottom and side of the trench. 9.Backfill the trench with soil placed over the filter fabric and compact. Thorough compaction of the backfill is critical to silt fence performance. 10.Do not attach filter fabric to existing trees. 11.Do not place across ditches, streams, or any other areas of concentrated flow. Maintenance: 1.Inspect all measures at least weekly and after each rainfall of 1.0 inch or greater. Make any required repairs immediately. 2.Should the fabric of a sediment fence collapse, tear, decompose, or become ineffective, replace it promptly. 3.Remove sediment deposits as necessary to provide adequate storage volume for the next rain and reduce pressure on the fence. Take care to avoid undermining the fence during cleanouts. 4.Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly stabilized. STEEL POST 8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE 6' MAX. EXTRA STRENGTH FABRIC WITHOUT WIRE FENCE 18-24" 8" DOWN & 4" FORWARD ALONG THE TRENCH24" WIRE FENCE FILTER FABRIC PLASTIC OR WIRE TIES 24" 8" MIN. 4" MIN. BACKFILL TRENCH AND COMPACT THOROUGHLY UPSLOPE WIRE FENCE FILTER FABRIC STEEL POST PLASTIC OR WIRE CROSS SECTION VIEW Max. Slope Length and Slope for Which Sediment Fence is Applicable Slope Slope Length (ft)Max. Area (ft2) <2%100 10,000 2 to 5%75 7,500 5 to 10%50 5,000 10 to 20%25 2,500 >20%15 1,500 DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesSEDIMENT FENCE 2:1 SLOPE GRAVEL FILTER CONCRETE BLOCKSDEWATERING 1' MIN. 2' MAX. TEMPORARY SEDIMENT POOL WIRE SCREEN DEWATERING DROP INLET WITH GRATE NOTES: 1.Lay one block, on each side of the structure, on its side in the bottom row to allow pool drainage. The foundation should be excavated at least 2 inches below the crest of the storm drain. Place the bottom row of blocks against the edge of the storm drain for lateral support and to avoid washouts when overflow occurs. If needed, give lateral support to subsequent rows by placing 2 inch x 4 inch wood studs through block openings. 2.Carefully fit hardware cloth or comparable wire mesh with 1/2-inch openings over all block openings to hold gravel in place. 3.Use clean gravel 1/2 to 3/4 inch in diameter, placed 2 inches below the top of the block on a 2:1 slope or flatter and smooth it to an even grade. NCDOT #57 washed stone is recommended. SEDIMENT MAINTENANCE: 1.Inspect all measures at least weekly and after every rainfall of 1.0 inch or greater; repair immediately. 2.Remove sediment as necessary to provide adequate storage volume for subsequent rains. 3.When the contributing drainage area has been adequately stabilized, remove all materials and any unstable soil, and either salvage or dispose of it properly. Bring the disturbed area to proper grade, then smooth and compact before stabilizing. DATE:PAGE: NORTH CAROLINADepartment of Environmental Quality Effective Date: 9/1/2023 In accordance with the 2013 Design Manual UpdatesBLOCK AND GRAVEL INLET PROTECTION (TEMPORARY) 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X SITE DETAILS CS501 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT 6" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) 2" SF9.5C SUPERPAVE HOT MIX ASPHALT SURFACE COURSE (NCDOT SPECIFICATION) 12" COMPACTED SUBGRADE (98% OF MAXIMUM DRY DENSITY ASTM D-698)6" MIN. 12" MIN. 5" PORTLAND CEMENT CONCRETE (4,000 PSI, AIR-ENTRAINED) 6" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) 6" MIN. ASPHALT TO CONCRETE TRANSITION 6" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) CONCRETE PAVEMENT SECTION (HEAVY DUTY) 5" PORTLAND CEMENT CONCRETE (4,000 PSI, AIR-ENTRAINED) 12" COMPACTED SUBGRADE (98% OF MAXIMUM DRY DENSITY ASTM D-698) 12" 12"x6" 2" 18" 9"R7-8a R7-8 12"x18" MUTCD 18" 6" 12"x9" R7-8D 2" 9" 9" PAVEMENT/GRASS 7' 12" NOTE ALL SIGNS SHALL BE PER A.D.A. CODE. INSTALL ONE SIGN PER EACH PARKING SPACE. R=5 4' - 0 " 1 3 " 18 " 12" GRID 20" 25 1 / 2 " 12" 10" 1 8 " 5" 5" 5" CURB LINE OR END OF PARKING SPACE1" CENTERLINE OF PARKING SPACE ADA PARKING SYMBOL SCALE: NOT TO SCALE4 SCALE: NOT TO SCALE3 SCALE: NOT TO SCALE6 ADA PARKING SIGN SCALE: NOT TO SCALE5 12" 1:1 1/8" RAD 1/2" RADIUS 1-1/4" RADIUS 1" RADIUS 6"18" 24" 6" 6" 12 " 7" 4" MIN. AGGREGATE BASE COURSE UNDER THE CURB & GUTTER 8" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) NCDOT DRIVEWAY PAVEMENT SECTION 2" SF9.5C SUPERPAVE HOT MIX ASPHALT SURFACE COURSE (NCDOT SPECIFICATION) 12" COMPACTED SUBGRADE (98% OF MAXIMUM DRY DENSITY ASTM D-698) 6" AGGREGATE BASE COURSE (NCDOT SPECIFICATION) ASPHALT PAVEMENT SECTION (LIGHT DUTY) 2" SF9.5C SUPERPAVE HOT MIX ASPHALT SURFACE COURSE (NCDOT SPECIFICATION) 12" COMPACTED SUBGRADE (98% OF MAXIMUM DRY DENSITY ASTM D-698) SCALE: NOT TO SCALE2 SCALE: NOT TO SCALE1 NOTES : 1.EXPANSION JOINT MATERIAL TO COMPLY WITH CURRENT NCDOT STANDARDS 2.50' MAX EXPANSION JOINT SPACING, 10' MAX CONTRACTION JOINT SPACING 3.MINIMUM INSTALLATION LENGTH IS 5 FT. 4.CONCRETE TO BE 3000 PSI MIN 5.VERTICAL CURB AND GUTTER BASE CAN BE SLOPED 3/4" OR USE A FLAT BASE 24" CONCRETE CURB AND GUTTER SCALE: NOT TO SCALE8 SIGN INSTALLATION SCALE: NOT TO SCALE7 STOPWHITE BORDER 10" WHITE LETTERING RED BACKGROUND NOTE: MOUNT SIGN ON BREAK-AWAY SIGN POST. SEE DETAIL A1, THIS SHEET. 1-3/4" X 1-3/4" 12 GAUGE POST 3/8"RIVET (TYP) 2-1/4" ANCHOR SLEEVE EXISTING GROUND 2-1/4"X 2-1/4" 12 GAUGE SLEEVE 2" X 2" 12 GAUGE POST NOTES: 1.STRUCTURAL STEEL TUBING USED FOR POST & SLEEVES MUST BE GALVANIZED 12 GAUGE COLD ROLLED STEEL, OF THE NOMINAL DIMENSIONS SHOWN HERON AND MEET THE REQUIREMENTS OF ASTM A446 GRADE A. 2.GALVANIZING MUST BE PER ASTM A525. POSTS & SLEEVES MUST HAVE 7/16" DIA. HOLES SPACED 1" OC ±1/8" AND MUST HAVE NO MORE VARIATION IN STRAIGHTNESS THAN 1/6" IN 3'. POSTS MUST BE SQUARE WITHIN ±0.014", HAVE TWIST NO GREATER THAN 0.062" IN 3' AND HAVE CORNER RADII OF 5/32" ±1/64". 3.THE SIGNS MUST BE MOUNTED ON POSTS IN ACCORDANCE WITH NCDOT STANDARD SPECIFICATIONS DIVISION 900. ALL FASTENING HARDWARE IS TO BE PROVIDED BY THE CONTRACTOR. 4.MAXIMUM SIGN SIZE 5.2 SQ. FT.RIVET SPECIFICATION: DIMENSION: 3/8" DIA SHANK, 7/8" DIA HEAD GRIP RANGE: .200-.366 FINISH: ELECTRO-GALVANIZED, ASTM-B-633, TYPE III SCI 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X STORM DRAINAGE DETAILS CG501 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X UTILITY DETAILS CU501 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT 9/29/25 ENGINEER PROJECT OWNER STAMP CHECKED BY PRINCIPAL IN CHARGE REVISIONS ISSUE FOR ISSUE DATE PROJECT ADDRESS PROJECT NUMBER SHEET TITLE SHEET NUMBER www.rivervieweng.com 4904 PARK AVENUE WILMINGTON, NC 28403 (910) 398-2882 nlauretta@rivervieweng.com DRAWN BY CO V I N G T O N F L E X UTILITY DETAILS CU503 DESIGN DEVELOPMENT 1026.02 3305 FREDRICKSON RD WILMINGTON, NC 28401 REVIEW - NOT FOR CONSTRUCTION SEPTEMBER 29, 2025 N. LAURETTA, PE, LEED AP NJL DA E B U I L D I N G , I N C . 71 1 K E R R A V E N U E WI L M I N G T O N , N C 2 8 4 0 3 NJL/JAT 9/29/25