HomeMy WebLinkAbout10-15-2025 TRC Agenda Packet
TECHNICAL REVIEW COMMITTEE AGENDA
October 15th, 2025
New Hanover County’s Technical Review Committee (TRC) will meet Wednesday, October
15th, 2025 at 2:00 p.m. to discuss the below items.
The Technical Review Committee (TRC) is a staff-level group that reviews projects for compliance
with the regulations administered by each respective review agency. The TRC meetings are
considered staff meetings with applicants and are not public hearings.
The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily
participating state agencies about the review comments they have been provided.
No voting is involved in the technical review process and no approvals or denials are made at TRC
meetings. Following the TRC meeting, applicants are responsible for updating their plans to
address review comments. Applicants are also responsible for coordinating with state and federal
agencies for compliance with any additional requirements.
Information about the projects can be found on online at the county’s Development Activity
page.
This meeting will be conducted remotely via teleconference.
Interested parties can listen to the October 15, 2025 TRC meeting by calling 336-218-2051 and
entering conference ID: 996 422 952#
2
Agenda Items
Item 1: Honeycutt Construction Maintenance Building – 4720 N College Road –
SITECN-25-000100
• Request by David Honeycutt with DMH Land, LLC for a new 8,000 sq ft
maintenance building on the current site.
• The site is located at 4720 N College Road and is a total of 31.26 acres, zoned
I-2.
• The engineer is Mark Hargrove with Port City Consulting Engineers, PLLC
(mark@portcityeng.com)
• The case planner is Amy Doss (adoss@nhcgov.com)
Maintenance Building – 4720 N. College Road – TRC Review
Page | 1
To: Mark Hargrove, PE, Port City Consulting Engineers, PLLC
From: Amy Doss, Development Planner
Date: October 15, 2025 Technical Review Committee (TRC)
PID#: R018000-002-002-000
Egov# SITECN-25-000100
Subject: 4720 N. College Road – Maintenance Building - TRC Review
Technical Review Committee (TRC) General Information
The TRC is a staff-level group of local government officials that reviews projects for compliance with
the local regulations administered by each respective review agency. Voluntarily participating state
agencies may also provide comments. And general information and non-binding recommendations
about the site may also be provided by government agencies.
The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an
opportunity for applicants to speak with county staff and any voluntarily participating state or federal
agencies about the review comments they have been provided.
No voting is involved in the TRC process, and no final approvals or denials are made at the TRC
meetings. Following the TRC meeting, applicants are responsible for updating their plans to address
review comments. Those revised plans need to be resubmitted to the assigned case planner. The case
planner will facilitate additional reviews until all comments have been addressed, and the necessary
departments have stated the plans comply with the applicable minimum requirements for
development.
Following any future TRC approval, the project is required to obtain additional permits to include a
zoning compliance permit for the site. Applicants are also responsible for coordinating with state and
federal agencies for compliance with any additional requirements. Any activity on the property that is
not approved as part of the TRC review and zoning compliance permit will be considered a violation
of the UDO and subject to enforcement action under Article 12 Violations and Enforcement.
The following comments have been received for the October 15, 2025, TRC meeting. Additional
comments may be made upon further review of subsequent revisions.
Maintenance Building – 4720 N. College Road – TRC Review
Page | 2
Planning, Amy Doss 910-798-7571
Compliance with local UDO requirements
1. General Comments
a. Zoning District: I-2, Industrial.
b. As stated in the application the intended use is maintenance building for the existing
office and laydown yard.
c. The Planning and Land Use Department’s review of the site is for compliance with the
UDO and use specific requirements of the specified land use. Any other activity that
might occur on the property beyond the definition above should be noted on the
application and site plan for additional review and comment.
d. Plans note a Duke easement on this property. Please confirm with Duke Energy to get
Duke Energy approval for this site plan before proceeding with any other permits.
2. UDO Section 5.1, Parking and Loading
a. Please confirm that no new parking will be added for the expansion.
3. UDO Section 5.2, Traffic, Access and Connectivity
a. No new driveway is proposed.
b. No additional traffic generation is expected.
4. UDO Section 5.3, Tree Retention
a. Are any trees located within the limits of disturbance?
b. Note: Land disturbance permits can be issued by county Engineering before a Tree
Removal Permit is approved by Planning. However, any trees removed before the Tree
Removal Permit is issued may result in enforcement action under Section 5.3.2 of the
Unified Development Ordinance to include prohibiting any development of the site for
3 to 5 years.
5. UDO Section 5.4, Landscaping and Buffering
a. Please provide a landscape plan with foundation plantings as required; 12% of the
area of the building face, up to 25’ in height.
6. UDO Section 5.5, Lighting
a. Please note that a lighting plan is not required for TRC approval but will be required
prior to issuance of construction plan approvals.
b. Is any lighting proposed for the site?
Maintenance Building – 4720 N. College Road – TRC Review
Page | 3
7. UDO Section 5.6, Signs
a. Are any signs planned? If so, please show the location.
b. For any signs on the site, a separate sign permit must be submitted and reviewed by
the county for compliance with Section 5.6 of the UDO for standards at or after the
submittal of the separate zoning compliance and construction permits for the primary
building or use. Any approval granted by the TRC for the site design is not an approval
for the ultimate size or placement of the sign.
8. UDO Section 5.7, Conservation Resources
a. Per the New Hanover County Conservation Resource Overlay map, there is existing
swamp forest conservation resource on this parcel. However, wetlands are noted on
the site plan and are not being disturbed.
9. UDO Article 9, Flood Damage Prevention
a. Portions of the property exist within regulated flood hazard areas including AE,
however the building does not appear to be located within the flood hazard areas.
b. The following comments have been received from Ken Vafier, Planning Operations
Supervisor:
i. Please note the flood hazard areas on the Overall Site Plan, sheet C-3, as noted
on the Existing Conditions sheet C-2.
ii. any activity meeting definition of Development within a Special Flood Hazard
Area must obtain a Floodplain Development Permit prior to initiation of
development activity. This includes fill, grading, storage or materials, etc.
iii. Any proposed fill in SFHA must also meet specific regulations of Section 9.8.2.E.
iv. Any other applicable regulations within Article 9, Flood Damage Prevention, will
apply to development activity in a SFHA.
NHC Fire Services, Ray Griswold 910-798-7448
Compliance with NC Fire Code
1. Fire finals required.
2. Portable fire extinguishers required per NFPA 10.
Maintenance Building – 4720 N. College Road – TRC Review
Page | 4
NHC Engineering, Galen Jamison 910-798-7072
Stormwater management and land disturbance
1. A County stormwater permit revision and land disturbing permit issued by the County is
required for this project. Please digitally submit the permit applications documentation with
requisite review fees to the COAST online permit portal (https://newhanovercountync-
energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at
https://www.nhcgov.com/251/Stormwater-Permitting and
https://www.nhcgov.com/249/Sediment-Erosion-Controlhowever.
2. The revision to County stormwater permit STMW-19-0054 will include the 25-year
conveyance calculations.
3. Please contact the State for their stormwater permit requirements.
4. Please provide a Designer’s Construction Completion Certification for the phase I and II for
this development project. Nothing could be found in the County files.
5. Please complete the proposed contours for the drainage swales and determine if the swales
need to be extended to the SCM inlet ditch.
NHC Environmental Health, Dustin Fenske 910-798-6732
Septic tanks and wells
1. New structure must not have any water using fixtures that drain to a wastewater system due
to the limitations of where the septic system is located. Proposed structure does not violate
any septic setbacks.
2. Drinking water well will meet setbacks to new structure. Proposed structure will not violate
any well setbacks to surrounding properties.
NHC Addressing, McCabe Watson 910-798-7068
Street naming and property address
1. Proposed building will need it’s own individual address.
2. Please contact me for address assignment following TRC approval.
Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620
Public water and sewer
1. No CFPUA water and sewer available.
Maintenance Building – 4720 N. College Road – TRC Review
Page | 5
NCDOT, Nick Drees 910-343-3915
Driveway access and state road improvements
1. Comments attached.
WMPO, Caitlin Cerza 910-473-5130
New Hanover County contracted traffic engineering services comments:
1. No comments received at this time.
Army Corps of Engineers, Brad Shaver 910-251-4611
Information or Requirements if wetlands are impacted
1. No comments received at this time.
Project information also provided to the following state agencies and non-regulatory local
agencies for their awareness:
New Hanover County Emergency Management
New Hanover County Schools
NHC Soil and Water Conservation
NHC Sustainability Manager
NC Department of Environmental Quality (DEQ)
NC DEQ Division of Coastal Management
NC DEQ Division of Energy, Mineral, and Land Resources
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
JOSH STEIN J.R. “JOEY” HOPKINS
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403
Memorandum
To: New Hanover County Technical Review Committee
Date: October 1, 2025
Subject: Honeycutt Construction Phase III – 4720 North College Road
________________________________________________________________________
These are preliminary comments and are based on the plans as submitted for the proposed
site. They are subject to further review upon receipt of any additional information.
Subsequently, additional comments and/or requirements may be necessary for this site.
General Comments:
NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT
Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx
You can coordinate with the District Office with any questions 910-398-9100.
NCDOT Driveway Permit:
An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and
15 of the Policy on Street and Driveway Access to North Carolina Highways to include
access locations within 500’ of the proposed access on both sides of the State Road.
Submit to the local NCDOT District Engineer’s Office.
• This is a requirement due to the redevelopment/expansion.
• Refer to the NCDOT checklist (included) for required documents and site plan
information.
NCDOT Encroachment Agreement:
An NCDOT Encroachment Agreement is required for any utility connections or
installations within the NCDOT right-of-way (form 16.6).
• Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for
required documents and site plan information.
An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths
installed within the NCDOT right-of-way (form 16.6).
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT 3 ENGINEER’S OFFICE
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
04-11-03 COURIER
Telephone: 910-398-9100
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
5911 OLEANDER DRIVE, SUITE 101
WILMINGTON, NC 28403
Site Plan Comments:
Sight Triangles and Sight Distance:
• Show and label the 10’ X 70’ NCDOT sight triangles.
o No obstructions shall be placed within the NCDOT sight triangles.
• Show and label the stopping sight distance.
o No obstructions shall be placed within the stopping sight distance.
Identification Signing and Landscaping:
• Identification signing or landscape vegetation within the median and the sight
distance triangle must not obstruct the driver’s line of sight. No landscaping or
signing will be allowed to exceed 42 inches in height, measured from the Edge of
Pavement (EOP) within the median or sight triangle.
• All pylon signs in the median or sight distance triangle must provide a vertical
clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the
EOP. Signing located within a clear recovery area shall be of a “breakaway
design.”
• Only low growing shrubbery, consistent with the NCDOT’s landscaping policies,
as contained in the publication “Guidelines for Planting Within Highway Right of
Way,” will be allowed within a landscaped median and the sight distance triangle
at the entranceway to a development, whether the street or driveway connection to
the State Highway System is designated as a public facility or not. Landscaping
within the right-of-way and sight distance triangles may require additional
approval by the District Engineer.
Site Development For
SEPTEMBER, 2025
NEW HANOVER COUNTY, NORTH CAROLINA
DMH LAND, LLC
4070 NORTH COLLEGE ROAD
CASTLE HAYNE, NC 28429
TEL: 910-782-8719
david@honeycuttcorp.com
PORT CITY CONSULTING
ENGINEERS, PLLC
6216 STONEBRIDGE ROAD
WILMINGTON, NC 28409
910-599-1744 LICENSE No. P-1032
11" OAK
PRELIMINARY - DO NOT USE FOR CONSTRUCTION
VICINITY MAP
4720 NORTH COLLEGE ROAD
EIP
EIP
EIP
EIP
No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.
Sheet No.No.
Checked By
Revision Designer
Drawn By
Date By Scale
Date
Job No.NORTH CAROLINANEW HANOVER COUNTY
C-34720 NORTH COLLEGE ROADDMH LAND, LLC
WILMINGTON, NC 28429 OVERALL SITE PLANHCS OFFICE - PHASE III PORT CITY CONSULTINGENGINEERS, PLLC6216 STONEBRIDGE ROADWILMINGTON, NC 28409910-599-1744 LICENSE No. P-1032
PRELIMINARY - DO NOT USE FOR CONSTRUCTION
1 inch = 100 ft.
100
GRAPHIC SCALE
0 50 100 200
NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________
Applicant Checklist NCDOT Checklist
Driveway Application Process and Site Plan Requirements
ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND
DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE
APPLICATION TO THE APPLICANT FOR REVISION.
***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS***
Electronic Pre-Submittals
In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to
identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all
other required documents.
All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx
In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction.
Online resources:
•NCDOT Policy on Street and Driveway Access to North Carolina Highways:
https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an
d%20Driveway%20Access.pdf
•NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way:
https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx
•Electronic Forms Database:
https://connect.ncdot.gov/Pages/default.aspx
1)
a.Cover Letter
Include contact information for applicant and engineer, including email address, mailing address, and phone
number. Include the parcel number(s), description of all phases of the development and future land uses to be
served by the permit, and a description of the adjoining land owned or controlled by the applicant.
b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below)
https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc
c.$50.00 Inspection Fee Per Access Point
Attach to Permit Application form (not applicable for municipalities, churches, and schools)
d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc
e.Verification of Compliance with Environmental Regulations (form downloadable via link below)
https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf
f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional
site plan requirement details can be found in section 2 of this document.
g.Design Plan Requirements for projects involving roadway improvements
If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information
Y N n/a
Engineering Studies
The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined
herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local
government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs
that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses
(TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina
licensed Professional Engineer.
Section 1: Requi
red Documents
|Required documents to accompany all Initial Driveway Application Submittals
Please note that these are the minimum requirements of all driveway permit applications.
All required documentation shall be submitted through the online portal as PDF files, with the exception of the
Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501
Barbados Blvd, Castle Hayne, NC 28429.
If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there
may be additional submittal materials required.
State of North Carolina | Department of Transportation | Division 3 | District 3
5501 Barbados Blvd, Castle Hayne, NC 28429
Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________
Y N n/a
Section 1: Required Documents (continued)
2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL
a.Site Plans
One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement
details can be found in section 2 of this document.
b.Performance and Indemnity Bond Information/Forms
See last page of document for bond information and forms
c.Performance and Indemnity Bond Amount
100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by
the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities,
churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway
Rights of Way for acceptable bond types
d.Radius Encroachment Letter (if applicable)
If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required
e.Hold Harmless Letter (if applicable)
If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will
be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit
Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below
Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways
1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown
2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable
3)Contact information of applicant and engineer, including mailing address, phone number, and email address
4)Show R/W lines, highway control of access, and property lines
5)All existing utilities (including handholes) and easements
6)R/W width
7)Existing posted speed limit(s) and design speed limit(s)
8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of
the property lines of the proposed development
9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any
other relevant transportation facilities in the development area
10)Include a plan sheet showing full site build-out and land use
11)Buildings shown with “gross leasable area”
12)Width of property frontage
13)Distance from R/W to buildings and gasoline service islands
14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34)
15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc.
Section 3: Driveway Plan Requirements
|
All driveway plans shall include and show, at a minimum, the items listed below
1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all
directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm
water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance.
2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways
3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77)
4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required
shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum
5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51)
In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached)
In shoulder sections, show grades at the EOP and centerline
6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31)
7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90°
allowed for right-in/right-out on a case-by-case basis) (page 51)
8)Driveway Profile (pages 42- 43)
Y N n/a Y N n/a
□□ □□ □ □
Y N n/a Y N n/a
Y N n/a Y N n/a
Section 3: Driveway Plan Requirements (continued)
9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W)
Asphalt: 8” ABC stone and 1.5” S9.5B
Concrete: 6” of concrete
10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’
11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std.
12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31)
13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29)
14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41)
15)Distance between driveways being requested (if applicable; page 51)
16)Minimum internal storage areas with specified queues (pages 31-33)
17)Minimum protected driveway stem(s) provided and indicated (pages 33-34)
18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required
|
Section 6: Roadway Plan Requirements
If off-site improvements are required, roadway plans shall show, at a minimum, the items below
1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway)
2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders)
Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below
•Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000
5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C
•Secondary Routes with AADT<10,000
5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B
3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary
The grinding of pavement markings will not be allowed
4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum
5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter
6)Indicate existing roadway grade
7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78)
8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79)
See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details
9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services
10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location
11)New and/or revised signal plans must be included for new installations and if signal modifications are required
All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic
Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200.
|
Section 4: Drainag e Requirements
All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below
Section 5: Internal Circ ulation Requirements
|All internal circulation details shall adhere to, at a minimum, the items listed below
1)Interior driveway channelization stems
Minimum 100’ from the ROW or at the discretion of the District Engineer
2)Traffic flow pattern
3)Traffic control devices
4)Pavement Markings
Y N n/a Y N n /a
Y N n/a Y N n/a
Y N n/a Y N n/a
Y N n/a Y N n/a
1)Pipe Cover Minimums (measured from top of pipe to subgrade)
High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12”
2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2)
Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and
310.04 of the Roadway Standard Drawings for details
Pipes >30" on multilane highways posted above 45mph require guardrail
Pipes ≥36" require an endwall on the inlet end
3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently
dedicated drainage easement will be required to accommodate the proposed project drainage
4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements)
5)Provide spot elevations along frontage of driveway (at EOP and centerline)
6)Provide grades and spot elevations for existing and proposed ditches
7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted)
C/L
EOTEOP
P/L
R/WR/W
R/W
EOP
EOP
EOP
EOP
NTS
R/W
P/L
DRAINAGE FLOW
DRAINAGE FLOW
DRAINAGE FLOW
SHOULDER WIDTH
SHOULDER WIDTH
SHOULDER WIDTH
SHOULDER WIDTH
S IGHT T R IANGLE
10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70'
DRIVEWAY
RR MIN. 30'MIN. 30'
NO ROADWAY IMPROVEMENT
COMMERCIAL DRIVEWAY WITH
NORMAL CROWN ROADWAY
6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or
20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST
PIPE/TYPE/SIZE
WIDTH
CON
CR
ET
E
/ASP
HA
LT
LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER
SITE ADDRESS:TAX PARCEL #
20191115
PARALLEL END S.D. 310.02
INVERT ELEVATION
PARALLEL END S.D. 310.02
INVERT ELEVATION
20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST
OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION
OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION