Loading...
HomeMy WebLinkAboutPandion Drive TRC Compiled Comments Pandion Drive – Major Subdivision – TRC Review Page | 1 To: Lonnie Ellisor, Pulte Group (Lonnie.ellisor@PulteGroup.com) From: Zach Dickerson, Senior Planner Date: November 5, 2025 TRC Review PID#: R02900-002-008-005 Egov# SUBPP-25-0029 Subject: Pandion Drive- Preliminary Plan TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. Pandion Drive – Major Subdivision – TRC Review Page | 2 The following comments have been received for the November 5, 2025, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Planning, Zach Dickerson 910-798-7450 Compliance with local zoning requirements 1. General Comments a. The zoning is R-15, single-family housing proposed. b. Is this subdivision intended to be part of the Scotts Hill Village neighborhood? Or a completely separate development? c. This is proposed as a performance residential subdivision. i. Density for Performance Residential: 2.5 dwelling units per acre in the R-15 zoning district. ii. Need to show density calculations. Example: 1. Total site acreage = 20.93 acres 2. Zoning District allows maximum 2.5 dwelling units per acre under performance residential subdivision. 3. Developable site acreage * zoning density = 52 dwelling units d. Staff recommend including the location of traffic calming devices on the preliminary plans. Installation of traffic calming devices are not required, but including potential locations on the plan ensures the future HOA / owners will have the opportunity to install them without conducting a traffic study. 2. UDO Section 5.1, Parking and Loading a. Single-family dwelling units require a minimum of two parking spaces per unit. b. Please note parking requirements on site plan. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. 4. UDO Section 5.3, Tree Retention a. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Pandion Drive – Major Subdivision – TRC Review Page | 3 Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. b. Please note that because New Hanover County does not require a Tree Removal Permit for residential less than one acre in size, it does not require mitigation for tree removal on future lots in residential subdivisions that are less than one acre in size. c. It does, however, require potential mitigation for trees located in infrastructure areas, such as the road and stormwater pond. d. This can be edited for the tree removal permit. Is there a numbered tree chart? Something like this that corresponds to the tree survey itself: 5. UDO Section 5.4, Landscaping and Buffering a. Landscaping and buffering are only required for the amenity areas. Per this site plan it does not appear there is a planned amenity building- please confirm. 6. UDO Section 5.5, Lighting a. Please note under 5.5.2.A that a lighting plan is not required for single-family residential projects and the county does not require streetlights, however a lighting plan is required for any amenity area. 7. UDO Section 5.6, Signs a. Will there be any neighborhood entrance signs? If so, please indicate the location on this site plan and ensure that they will not cause any visibility issues at the intersection b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Pandion Drive – Major Subdivision – TRC Review Page | 4 8. UDO Section 5.7, Conservation Resources a. Per the New Hanover County Conservation Resource map, there are no Conservation Resources on this property. 9. UDO Section 5.8, Open Space Requirements a. Total site acreage is 20.93 acres. b. Performance residential developments require a minimum 20% open space. c. 20% * 20.93 = 4.19 acres of open space. d. Site plan proposes 4.34 acres of open space, 21%. e. Are there any planned pedestrian easements or infrastructure to the open space behind lots 1-8? This might make the open space more accessible to residents. 10. UDO Article 6, Subdivision Design and Improvements. a. Sidewalks noted as 5’ in width and along one side of the street, as required in R-15. All good. b. Are there sidewalks along this portion of Pandion Drive? If not, they will need to be installed. c. Block length is ok, thanks! d. Links and nodes ratio is ok, thanks! 11. UDO Article 9, Flood Damage Prevention a. There are portions of this site that are in the floodplain, but only the far eastern reaches of lots 49-52. Pandion Drive – Major Subdivision – TRC Review Page | 5 NHC Fire Services, David Stone 910-798-7458 Compliance with the NC Fire Code 1. Please annotate where any proposed or existing fire hydrants will be to serve the homes on Pandion Drive. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A County stormwater and land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/251/Stormwater-Permitting and https://www.nhcgov.com/249/Sediment-Erosion-Controlhowever. 2. Please contact the State for their stormwater permit requirements. It is anticipated a new high density permit will be required. 3. Routing of the impervious drinage from Lot 52 appears to be challenging. It appears a conveyance measure may be required to ensure the impervious is directed to the SCM. 4. This parcel qualifies for an exemption to the County’s pre and post storm attenuation requirements should it be design in accordance with the City and County’s Low Impact Design (LID) Manual (http://laserfiche.nhcgov.com/weblink/0/edoc/3273331/LID-Manual.pdf). Please provide requisite documentation for compliance with LID manual and a variance request in accordance with NHC UDO, Section 7.12 during the County stormwater permitting process. As the subdivision is developed and impervious area added, each parcel will need submit similar documents as part of the building permit application and it’s site plan requirements. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site plan reflects connection to public water and sewer. Proposed infrastructure does not violate setbacks to surrounding properties’ well or septic systems. Pandion Drive – Major Subdivision – TRC Review Page | 6 NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Road A and B shall assume the names of the streets they align with. Road A – Sidbury Park Lane. Road B- Tiger Lily Place. 2. Please contact me for address assignment following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering- Plan-Review-103. 3. CFPUA water and sewer available via a mainline extension. 4. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 5. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 6. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. No comments. WMPO, Luke Hutson 910-473-5130 New Hanover County contracted traffic engineering services comments: 1. Comments attached. Pandion Drive – Major Subdivision – TRC Review Page | 7 Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources New Hanover County Sustainability Manager New Hanover County Soil & Water Conservation Army Corps of Engineers MEMORANDUM To: New Hanover County Technical Review Committee Date: October 9, 2025 Subject: Pandion Drive Subdivision NCDOT Projects: • N/A WMPO 2045 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Single Family Detached Housing (210) 52 Dwelling Units 553 41 54