Loading...
HomeMy WebLinkAboutTRC Response Letter 10-28-25Intracoastal Engineering PLLc October 28th, 2025 New Hanover County Engineering Department 230 Government Center Drive, Suite 170 Wilmington, NC 28403 Attn: Zach Dickerson Re: Reagan Retail & Office Center PN 2024-007 Egov# SITECN-24-000038 Dear Mr. Dickerson, Please find enclosed a pdf plan set revised per TRC comments. Below are our responses to each comment. Plannin 0 1.General Commentsa.Zoning is B-2. Noted.b.Proposed use of retail and general office, allmved by right. Noted.2.UDO Section 5.1, Parking and Loadinga.Parking is sufficient per the use. Thanks for including parking space sizedetails. Noted.b.As of .June 17, 2024, any development requiring 25 or more parking spacesis required to run conduit for Electric Vehicle Parking. 1.This is required for 20% of parking spaces, capping at 15 spaces.11.66 parking spaces are shov,rn on the site plan, 20% is 13 spaces. 111.Please show on the site plan the 13 spaces to which the conduit,-vill be run.1v. Please note: Electric Vehicle Charging Stations are not required for developments in Nev,, Hanover County-only conduit. The 13 spaces are shown where the conduit will be run. 3.UDO Section 5.2, Traffic, Access and Connecthit)·a.Please note that no building permit for any strncture shall be issued whichrequires NCDOT approval for a Driveway Permit until NCDOT has issuedthe permit approval. E,·idence of approval shall accompany the applicationfor building permit. Noted. We are currently working with NCDOT for approval. 5725 Oleander Dr. Unit E-7 Wilmington, NC 28403 (910)859-8983