Loading...
HomeMy WebLinkAboutCommercial Site Plan TRC Comments Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 1 To: Brad Schuler, Paramounte Engineering From: Ryan Beil, Development Review Planner Date: December 17, 2025 Technical Review Committee (TRC) PID#: R01100-008-033-000, R01100-008-012-000 Egov# SITECN-25-000117 Subject: 4901 Las Tortugas Dr – Standard Technologies - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. The following comments have been received for the December 17, 2025, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 2 Planning, Ryan Beil 910-798-7444 Compliance with local zoning requirements 1. General Comments a. Zoned I-1. b. As stated in the application the intended use is Other Fabricated Metal Product Manufacturing. The Unified Development Ordinance (UDO) does not define this use, but the North American Industry Classification System (NAICS code 3329) defines it as: i. As those primarily engaged in manufacturing fabricated metal products (except forgings and stampings, cutlery and hand tools, architectural and structural metals, boilers, tanks, shipping containers, hardware, spring and wire products, machine shop products, turned products, screws and nuts and bolts). ii. Please list all incidental or customary activities that may occur on the property in line with and under the general definition of the requested use. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. d. There does not appear to be Duke Energy Transmission Lines/Easement on the Property, please confirm. 2. UDO Section 5.1, Parking and Loading a. Use requires 1.5 parking spaces for every 1,000 square feet of building area. Project proposes 85,000 square feet. Required parking is 85,000 / 1,000 = 85 x 1.5 = 128 required parking spaces. Plans show 128 parking spaces meaning parking requirements have been met. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. 4. UDO Section 5.3, Tree Retention a. Note: Land disturbance permits can be issued by county Engineering before a Tree Removal Permit is approved by Planning. However, any trees removed before the Tree Removal Permit is issued may result in enforcement action under Section 5.3.2 of the Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 3 Unified Development Ordinance to include prohibiting any development of the site for 3 to 5 years. 5. UDO Section 5.4, Landscaping and Buffering a. Street yard landscaping does not apply to this project as the only street frontage is the driveway which is exempt from street yard landscaping. b. Foundation plantings are required. The foundation planting area shall be 12 percent of the area of the first-floor building face, or building face up to 25 feet in height, whichever is less, adjacent to the parking area or internal drive; and c. The foundation planting area shall be planted as landscaped areas of sufficient variety, height, and size, with plantings listed in New Hanover County Tree and Landscaping Manual. d. Parking lot landscaping is required. i. A landscaped strip shall be required along any side of a parking lot abutting another parking lot or land in a Residential zoning district. 1. The perimeter landscaping strip shall be a minimum of ten feet in width. 2. A minimum of one evergreen or deciduous tree for every 20 linear feet of planting strip on average, rounded to the highest whole number, shall be planted within the planting strip. 3. When adjacent to another parking lot, the landscaping strip may be interrupted by driveway connections between parking lots. ii. Internal parking lot landscaping will be required, equaling 8% of the total area to be used for parking, loading, driveways, internal drive aisles, and other vehicular or pedestrian use. iii. Landscaping islands, either separate from or protruding from the perimeter landscaping strips, shall be a minimum of 12 feet in width measured from back of curb to back of curb. 1. One planted or existing tree shall be required for every 144 square feet, rounded to the next lowest whole number of total interior landscaped area, with a minimum of one tree per each island. 2. At least 75% of the trees required for interior landscaping shall be a shade/canopy species. Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 4 3. The remainder of interior landscaped area shall be covered with appropriate mulching or vegetative groundcover, except for designated pedestrian walkways. 4. No parking space shall be located more than 120 feet from a landscaped island. 5. All parking spaces shall be blocked or curbed to prevent vehicles from encroaching more than one foot into planting islands or landscaped yards or damaging adjacent fences or screens. e. A Type A Opaque Buffer will be required along the Eastern edge of the property where it abuts residentially zoned properties. i. This can be achieved by one of three options, and the minimum buffer width shall be 50 percent of the minimum required setback as set forth in Article 3: Zoning Districts, 20 feet, or 25 percent of the minimum structure setback for taller structures outlined in Section 3.1.3.C, whichever is greater. This can be achieved with existing vegetation as long as it is noted on the landscape plans. 6. UDO Section 5.5, Lighting a. Please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. b. Is any lighting proposed for the site? 7. UDO Section 5.6, Signs a. Check to see if the location of the freestanding sign is shown on the plan. If a free standing sign is along a DOT maintained road or near an intersection with a DOT road (including the driveway access), required DOT sight triangles must be shown on the plan and the sign location must be outside the sight triangles. b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. 8. UDO Section 5.7, Conservation Resources a. The New Hanover County conservation resource map indicates pocosin wetlands are on the property; however, they are not underlaid with Class IV soils. Pocosin wetlands require Class IV soils to trigger additional development standards. Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 5 9. UDO Article 9, Flood Damage Prevention a. Per the New Hanover County Flood map, no part of the property or any of the buildings are in the floodplain. NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire Finals required 2. Add a fire hydrant at the entrance to the project 3. A fire hydrant shall be within 100 feet of the FDC 4. Proper fire alarm and sprinkler permits will be required 5. KNOX Boxes will be required 6. Underground Fire line permits required on the private side of this project NHC Soil & Water Conservation, Dru Harrison 910-798-7138 General comments about existing soil conditions of the site. 1. No comments NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. A County stormwater and land disturbing permit issued by the County is required for this project. Please digitally submit the permit applications documentation with requisite review fees to the COAST online permit portal (https://newhanovercountync- energovpub.tylerhost.net/apps/selfservice#/home). Applicable forms can be found at https://www.nhcgov.com/251/Stormwater-Permitting and https://www.nhcgov.com/249/Sediment-Erosion-Control. 2. The driveway culvert to the NW appears to capture offsite drainage from FAA Vortac Facility and is routed through the SCM which isn’t required. Consideration should be given to direct the offsite drainage away from the proposed SCM. 3. Please contact the State for their stormwater permit requirements. It is anticipated a new high density permit will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Site plan reflects connection to public water and sewer. Proposed infrastructure does not affect setbacks to adjacent properties well heads or septic systems. Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 6 NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Please contact me for address assignments following TRC approval. Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering- Plan-Review-103. 3. CFPUA water and sewer available via mainline extension. 4. Capacity is dependent on the analysis of the pipe collection system (gravity and force mains). 5. A capacity determination can be provided upon submittal of the NC DWQ FTA/FTSE Application Form and a Preliminary Plan, this determination does not guarantee capacity. 6. Capacity is issued to projects on a first come, first serve basis, when capacity is available, the plans meet Authority requirements, and the NC DWQ FTA/FTSE forms are signed by the Authority. NCDOT, Nick Drees 910-398-9114 Driveway access and state road improvements 1. Comments attached WMPO, Luke Hutson 910-343-3915 New Hanover County contracted traffic engineering services comments: 1. Comments attached Army Corps of Engineers, Brad Shaver 910-251-4611 Requirements if wetlands are impacted 1. No comments Standard Technologies – 4901 Las Tortugas Dr – TRC Review Page | 7 Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools New Hanover County Sustainability Manager NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN DANIEL H. JOHNSON GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUIT 101 WILMINGTON, NC 28403 Memorandum DATE: December 4, 2025 TO: New Hanover County Technical Review Committee SUBJECT: Standard Technologies – 4901 Las Tortugas Drive ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway Permit is required. Submit plans in accordance with pages 14 and 15 of the Policy on Street and Driveway Access to North Carolina Highways to include access locations within 500’ of the proposed access on both sides of the State Road. Submit to the local NCDOT District Engineer’s Office. • Refer to the NCDOT checklist (included) for required documents and site plan information. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DISTRICT 3 ENGINEER’S OFFICE 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Las Tortugas Drive (Proposed Extension): The extension of Las Tortugas Drive would need to go through the NCDOT subdivision review process prior to construction. • Refer to the NCDOT Subdivision Roads Minimum Construction Standards for additional information. Site Plan Comments: Drainage/Stormwater Conveyance: • If the drainage does not naturally flow to the NCDOT right of way the historic drainage pattern should be maintained. NCDOT Standard Drawings: • Include/update the NCDOT Standard Drawings (2024) that are applicable to the development. Identification Signing and Landscaping: • Identification signing or landscape vegetation within the median and the sight distance triangle must not obstruct the driver’s line of sight. No landscaping or signing will be allowed to exceed 42 inches in height, measured from the Edge of Pavement (EOP) within the median or sight triangle. • All pylon signs in the median or sight distance triangle must provide a vertical clear sight zone between 3 feet-6 inches and 10 feet-0 inches measured from the EOP. Signing located within a clear recovery area shall be of a “breakaway design.” • Only low growing shrubbery, consistent with the NCDOT’s landscaping policies, as contained in the publication “Guidelines for Planting Within Highway Right of Way,” will be allowed within a landscaped median and the sight distance triangle at the entranceway to a development, whether the street or driveway connection to the State Highway System is designated as a public facility or not. Landscaping within the right-of-way and sight distance triangles may require additional approval by the District Engineer. Gated Entrances: • Show and label any proposed gates with distances to the right of way line. PROPOSED STORMWATERMANAGEMENT AREA SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROPOSED85,000 SF BUILDING VAN W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWW BA R B A D O S B L V D . LAS TORTUGAS ROAD VAN EXTEND LAS TORTUGAS ROAD TOPROPERTY LINE. ADJUST EXISTINGCULVERT AND SWALES AS NEEDED. NIXON LN BROOKDALE DR BLU E C L A Y R D WOOD H A V E N D R HERM I T A G E D R MCG R E G O R R D GILBER T C U R R Y D R BLUE C L A Y R D 40 GLAZIER RD HOLLY SHELTER RD SHOULDERBRANCHCEMETERY BAR B A D O S B L V D . 40 NORTHEAST CAPE FEAR RIVER LASTORTUGOSRD BLUE CLAYRD EXT WOODHAVENDR SITE VICINITY MAP SCALE: 1" = 2,000' ST A N D A R D T E C H N O L O G I E S NE W H A N O V E R C O U N T Y NO R T H C A R O L I N A 25295.PE SE L L E R S F A M I L Y P R O P E R T I E S , L L C 41 5 G L E N N E L L E N D R I V E WI L M I N G T O N , N C 2 8 4 1 2 DA T E : SC A L E : DE S I G N E D : DR A W N : CH E C K E D : PEI JOB#: CO N C E P T U A L L A Y O U T : PR E L I M I N A R Y L A Y O U T : FIN A L D E S I G N : RE L E A S E D F O R C O N S T : PR O J E C T S T A T U S RE V I S I O N S : DR A W I N G I N F O R M A T I O N SEAL CL I E N T I N F O R M A T I O N : 12 2 C i n e m a D r i v e Wil m i n g t o n , N o r t h C a r o l i n a 2 8 4 0 3 (9 1 0 ) 7 9 1 - 6 7 0 7 ( O ) ( 9 1 0 ) 7 9 1 - 6 7 6 0 ( F ) NC L i c e n s e # : C - 2 8 4 6 PR E L I M I N A R Y D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N 425' 200 ' 90' 30 ' 64' 30' 24' 30' SITE DATA TABULATIONPROJECT ADDRESS: 4901 LAS TORTUGAS DRIVE PROPERTY OWNER: PHILIP B BERMAN ETAL1931 LONDON LANEWILMINGTON, NC 28405 PARCEL ID: R01100-008-033-000R01100-008-012-000 DEED BOOK / PAGE: 5272 / 27882787 / 558 CURRENT ZONING: I-1 (LIGHT INDUSTRIAL) TOTAL SITE AREA: ±34.71 ACRES OR 1,512,062 SF PROPOSED USE: OTHER FABRICATED METAL PRODUCT MANUFACTURING FLOOD INFORMATION: THIS SITE IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY FEMA FLOOD PANELS 3720323100K & 3720324100K,DATED AUGUST 28, 2018. BUILDING DATANUMBER OF BUILDINGS: 1 BUILDING GROSS FLOOR AREA: 85,000 SF PROPOSED BUILDING HEIGHT: 48' MAXNUMBER OF STORIES: 1 DIMENSIONAL REQUIREMENTS I-1 FRONT SETBACK: 50' SIDE SETBACK, INTERIOR: 50' WHEN ADJACENT TO RESIDENTIAL LOTSREAR SETBACK: 50' WHEN ADJACENT TO RESIDENTIAL LOTSMAX BUILDING HEIGHT: 50' PARKING STANDARDS STANDARD: 1.5 SPACES PER 1,000 SFREQUIRED: 128 SPACESPROVIDED: 128 SPACES INCLUDING 5 ADA SPACES IMPERVIOUS AREA PROPOSED IMPERVIOUS AREA:BUILDINGS: 85,000 SFCONCRETE/ASPHALT: 61,100 SF GRAVEL:67,000 SFTOTAL 213,100 SF (14.1% OF THE SITE) GENERAL NOTES 1. ALL EXTERIOR SIGNS TO BE PERMITTED SEPARATELY AND SHALL COMPLY WITH SECTION 5.6 OF THE UDO.2. TRIP GENERATION IS LESS THAN 100 PEAK HOUR TRIPS. A TRAFFIC IMPACTANALYSIS IS NOT REQUIRED. WASTE DISPOSAL ALL TRASH AND RELATED EQUIPMENT SHALL BE SCREENED FROM VIEW FROM ANYPUBLIC RIGHT-OF-WAY OR ADJACENT PROPERTY. UTILITY INFORMATION CONTRACTOR SHALL INSTALL WATER AND SEWER SERVICES IN ACCORDANCE WITH CFPUA STANDARD DETAILS AND SPECIFICATIONS. EXTERIOR LIGHTINGEXTERIOR LIGHTING SHALL COMPLY WITH SECTION 5.5 OF THE UDO. LEGEND SITE BOUNDARY ADJACENT PROPERTY BOUNDARY WATER LINE SEWER LINE FIRE HYDRANT CONCRETE ASPHALT GRAVELEXISTING VEGETATION 1. THE SITE SITE HAS BEEN PREVIOUSLY CLEARED. CURRENTLY THERE AREA MIXTURE OF POND, SHORT LEAF, AND LOBLOLLY PINES RANGING UP TO 22" DBH AND UNDERBRUSH VEGETATION CONSISTING OF SWAMP TITI. NO SPECIMEN TREES WERE OBSERVED ON THE SITE.2. PRIOR TO CONSTRUCTION ACTIVITIES, APPLICABLE TREE REMOVAL PERMITS SHALL BE OBTAIN FROM NEW HANOVER COUNTY. 30' 30' OV E R A L L S I T E P L A N C-2.0 10/ 2 4 / 2 5 1" = 1 0 0 ' JR B JR B JR BWW SS 192 ' 128' 24' PROPOSED FIRE HYDRANT, TYP. EXISTING PROPERTY BOUNDARY EXISTING VEGETATION WITHIN REQUIREDBUFFER TO BE RETAINED AND SUPPLEMENTEDAS NEEDED TO COMPLY WITH COUNTY STANDARDS PROPOSED STORMWATER MANAGEMENT AREA SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS PROPOSED85,000 SF BUILDING VAN W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW VA N NIXON LN BROOKDALE DR BLU E C L A Y R D WOOD H A V E N D R HERM I T A G E D R MCG R E G O R R D GILBER T C U R R Y D R BLUE C L A Y R D 40 GLAZIER RD HOLLY SHELTER RD SHOULDERBRANCHCEMETERY BAR B A D O S B L V D . 40 NORTHEAST CAPE FEAR RIVER LASTORTUGOSRD BLUE CLAYRD EXT WOODHAVENDR SITE VICINITY MAP SCALE: 1" = 2,000' ST A N D A R D T E C H N O L O G I E S NE W H A N O V E R C O U N T Y NO R T H C A R O L I N A 25295.PE SE L L E R S F A M I L Y P R O P E R T I E S , L L C 41 5 G L E N N E L L E N D R I V E WI L M I N G T O N , N C 2 8 4 1 2 DA T E : SC A L E : DE S I G N E D : DR A W N : CH E C K E D : PEI JOB#: CO N C E P T U A L L A Y O U T : PR E L I M I N A R Y L A Y O U T : FIN A L D E S I G N : RE L E A S E D F O R C O N S T : PR O J E C T S T A T U S RE V I S I O N S : DR A W I N G I N F O R M A T I O N SEAL CL I E N T I N F O R M A T I O N : 12 2 C i n e m a D r i v e Wil m i n g t o n , N o r t h C a r o l i n a 2 8 4 0 3 (9 1 0 ) 7 9 1 - 6 7 0 7 ( O ) ( 9 1 0 ) 7 9 1 - 6 7 6 0 ( F ) NC L i c e n s e # : C - 2 8 4 6 PR E L I M I N A R Y D E S I G N - N O T R E L E A S E D F O R C O N S T R U C T I O N BUILDING DATA NUMBER OF BUILDINGS: 1BUILDING GROSS FLOOR AREA: 85,000 SFPROPOSED BUILDING HEIGHT: 48' MAX NUMBER OF STORIES: 1 DIMENSIONAL REQUIREMENTS I-1 FRONT SETBACK: 50'SIDE SETBACK, INTERIOR: 50' WHEN ADJACENT TO RESIDENTIAL LOTS REAR SETBACK: 50' WHEN ADJACENT TO RESIDENTIAL LOTS MAX BUILDING HEIGHT: 50' PARKING STANDARDSSTANDARD: 1.5 SPACES PER 1,000 SF REQUIRED: 128 SPACES PROVIDED: 128 SPACES INCLUDING 5 ADA SPACES IMPERVIOUS AREAPROPOSED IMPERVIOUS AREA: BUILDINGS: 85,000 SF CONCRETE/ASPHALT: 61,100 SFGRAVEL67,000 SF TOTAL 213,100 SF (14.1% OF THE SITE) GENERAL NOTES 1. ALL EXTERIOR SIGNS TO BE PERMITTED SEPARATELY AND SHALL COMPLY WITHSECTION 5.6 OF THE UDO. 2. TRIP GENERATION IS LESS THAN 100 PEAK HOUR TRIPS. A TRAFFIC IMPACT ANALYSIS IS NOT REQUIRED. WASTE DISPOSALALL TRASH AND RELATED EQUIPMENT SHALL BE SCREENED FROM VIEW FROM ANY PUBLIC RIGHT-OF-WAY OR ADJACENT PROPERTY. UTILITY INFORMATION CONTRACTOR SHALL INSTALL WATER AND SEWER SERVICES IN ACCORDANCE WITHCFPUA STANDARD DETAILS AND SPECIFICATIONS. EXTERIOR LIGHTING EXTERIOR LIGHTING SHALL COMPLY WITH SECTION 5.5 OF THE UDO. EXISTING VEGETATION 1. THE SITE SITE HAS BEEN PREVIOUSLY CLEARED. CURRENTLY THERE ARE A MIXTURE OF POND, SHORT LEAF, AND LOBLOLLY PINES RANGING UP TO22" DBH AND UNDERBRUSH VEGETATION CONSISTING OF SWAMP TITI. NOSPECIMEN TREES WERE OBSERVED ON THE SITE. 2. PRIOR TO CONSTRUCTION ACTIVITIES, APPLICABLE TREE REMOVALPERMITS SHALL BE OBTAIN FROM NEW HANOVER COUNTY. SI T E P L A N C-2.1 10/ 2 4 / 2 5 1" = 4 0 ' JR B JR B JR B SITE DATA TABULATION PROJECT ADDRESS: 4901 LAS TORTUGAS DRIVE PROPERTY OWNER: PHILIP BERMAN 1931 LONDON LANEWILMINGTON, NC 28405 PARCEL ID: R01100-008-033-000 R01100-008-012-000 DEED BOOK / PAGE: 5272 / 2788 2787 / 558 CURRENT ZONING: I-1 (LIGHT INDUSTRIAL) TOTAL SITE AREA: ±34.71 ACRES OR 1,512,062 SF PROPOSED USE: OTHER FABRICATED METAL PRODUCT MANUFACTURING FLOOD INFORMATION: THIS SITE IS NOT LOCATED IN A SPECIAL FLOOD HAZARD AREA AS DETERMINED BY FEMA FLOOD PANELS 3720323100K & 3720324100K,DATED AUGUST 28, 2018. LEGEND SITE BOUNDARY ADJACENT PROPERTY BOUNDARY WATER LINE SEWER LINE FIRE HYDRANT CONCRETE ASPHALT GRAVEL W W SS 20'24'40'24'20' 10 ' 20 ' 30' 10' 20'24'20' 10 ' 30' 30' 30' 425' 30' 24' 19 2 ' PROPOSED FIRE HYDRANT, TYP. TRUCK LOADING AREA EXTEND LAS TORTUGAS DRIVE TOPROPERTY LINE. ADJUST EXISTINGCULVERT AND SWALES AS NEEDED. 5 20 1717 18 15 17 19 WHEEL STOP, TYP. ADA PARKING, TYP. 20 0 ' PROPERTY BOUNDARY LANDSCAPING CALCULATIONSFOUNDATION PLANTINGSREQUIRED: 2,628 SF = (876' X 25' HEIGHT) X 12% PROVIDED: 4,270 SF INTERIOR PARKING PLANTING AREA REQUIRED: 4,194 SF (52,421 SF X 8%) = 29 TREES (1 PER 144 SF)PROVIDED: 5,129 SF TREE RENTENTION REQUIRED: 15 TREES PLANTED OR RETAINEDPER EACH ACRE DISTURBED = 15 X 20 AC = 300 TREES FOUNDATION PLANTING AREAS, TYP. PROPOSED LANDSCAPEISLANDS, TYP. R5 0 'R50' R2 5 'R25' R 1 0 0 ' R7 0 ' R25'R25'R25 'R25' R5 0 ' R2 5 ' R15' R6 0 ' R9 0 ' R25'R2 5 ' R50' R80' 89' NCDOT | Division 3 | District 3 Project Name:_____________________________ Date:_______________ Applicant Checklist NCDOT Checklist Driveway Application Process and Site Plan Requirements ALL APPLICATIONS SHALL BE ACCOMPANIED BY COMPLETE AND DETAILED SITE PLANS THAT ADHERE TO THE POLICIES LISTED IN THE POLICY ON STREET AND DRIVEWAY ACCESS TO NORTH CAROLINA HIGHWAYS AND THIS DOCUMENT. FAILURE TO ADHERE TO THESE POLICIES WILL RESULT IN THE RETURN OF THE APPLICATION TO THE APPLICANT FOR REVISION. ***THE NCDOT WILL NOT BEGIN THE REVIEW PROCESS ON INCOMPLETE APPLICATIONS*** Electronic Pre-Submittals In an effort to save time and resources, we are happy to provide an initial assessment of a driveway permit submittal’s plans via email to identify any major issues up front. This initial assessment can be followed up with a submittal of one digital copy of the plans along with all other required documents. All Permit applications shall be submitted through the online portal https://connect.ncdot.gov/site/Permits/Pages/default.aspx In the notify email section of the portal application please include the District Office email (Div3Dist3@ncdot.gov). See the last pages for further instruction. Online resources: •NCDOT Policy on Street and Driveway Access to North Carolina Highways: https://connect.ncdot.gov/projects/Roadway/RoadwayDesignAdministrativeDocuments/Policy%20on%20Street%20an d%20Driveway%20Access.pdf •NCDOT Policies and Procedures for Accommodating Utilities on Highway Rights of Way: https://connect.ncdot.gov/municipalities/Utilities/Pages/UtilitiesManuals.aspx •Electronic Forms Database: https://connect.ncdot.gov/Pages/default.aspx 1) a.Cover Letter Include contact information for applicant and engineer, including email address, mailing address, and phone number. Include the parcel number(s), description of all phases of the development and future land uses to be served by the permit, and a description of the adjoining land owned or controlled by the applicant. b.NCDOT Street and Driveway Access Permit Application (form downloadable via link below) https://connect.ncdot.gov/resources/BusinessForms/TEB-65-04.doc c.$50.00 Inspection Fee Per Access Point Attach to Permit Application form (not applicable for municipalities, churches, and schools) d.NPDES Stormwater Permit Compliance Certification (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/NPDESstatement.doc e.Verification of Compliance with Environmental Regulations (form downloadable via link below) https://connect.ncdot.gov/municipalities/Utilities/EncroachmentForms/VCER-1.pdf f.Site Plans (to include the “Master Plan” of a tract even if only a small portion is being developed first) Additional site plan requirement details can be found in section 2 of this document. g.Design Plan Requirements for projects involving roadway improvements If roadway improvements are required as part of the permit, then roadway plans, pavement marking plans,signing plans, and traffic control plans will be required - See Section 6 for more information Y N n/a Engineering Studies The applicant may be required by the District Engineer to submit studies based on, but not limited to, the parameters outlined herein. If study requirements of the local government agency are more restrictive than the NCDOT requirements, then local government requirements will govern. However, this does not imply that the NCDOT is obligated to approve entrance designs that are too constrictive to allow smooth and safe traffic flow. All studies including, but not limited to, Traffic Impact Analyses (TIA), traffic signal studies, and drainage studies, must be prepared under the direct charge of and sealed by a North Carolina licensed Professional Engineer. Section 1: Requi red Documents |Required documents to accompany all Initial Driveway Application Submittals Please note that these are the minimum requirements of all driveway permit applications. All required documentation shall be submitted through the online portal as PDF files, with the exception of the Performance and Indemnity Bond and the $50 Inspection Fee(s), these should be mailed or delivered to 5501 Barbados Blvd, Castle Hayne, NC 28429. If a Traffic Impact Analysis and/or roadway improvements are deemed necessary as a condition of the permit, there may be additional submittal materials required. State of North Carolina | Department of Transportation | Division 3 | District 3 5501 Barbados Blvd, Castle Hayne, NC 28429 Form Updated 10/15/2021 (910) 398-9100 T NCDOT Permit #___________________ Y N n/a Section 1: Required Documents (continued) 2)Required documents to accompany all Driveway Applications PRIOR TO FINAL APPROVAL a.Site Plans One (1) digital copy (PDF) unless otherwise requested by the District Office. Additional site plan requirement details can be found in section 2 of this document. b.Performance and Indemnity Bond Information/Forms See last page of document for bond information and forms c.Performance and Indemnity Bond Amount 100% of the cost of the work within NCDOT Right-of-Way (R/W) based on the attached estimate determined by the applicant's engineer and approved by the District Engineer. Bond hold letter required for for municipalities, churches, and schools. See pages 101-105 in the Policies and Procedures for Accommodating Utilities on Highway Rights of Way for acceptable bond types d.Radius Encroachment Letter (if applicable) If driveway radius encroaches on the frontage of an adjacent property, a Radius Encroachment will be required e.Hold Harmless Letter (if applicable) If the Permit is within the limits of an active NCDOT project, a Hold Harmless letter from the NCDOT contractor will be required. If the project is in preconstruction, coordinate with the Department's Project Development Unit Section 2: General Site Plan Requirements | All site plans shall include and show, at a minimum, the items listed below Page numbers reference the NCDOT Policy on Street and Driveway Access to North Carolina Highways 1)Drawn to a scale of 20, 30, 40, or 50 feet per inch and the scale shall be shown 2)North arrow, vicinity map, date of plan, and date of most-recent revision if applicable 3)Contact information of applicant and engineer, including mailing address, phone number, and email address 4)Show R/W lines, highway control of access, and property lines 5)All existing utilities (including handholes) and easements 6)R/W width 7)Existing posted speed limit(s) and design speed limit(s) 8)Show all property lines, intersections, signals, signal loops, railroads, or crossovers within 500’ in all directions of the property lines of the proposed development 9)Show location of sidewalks, crosswalks, greenways, multi-use paths, curb ramps, railroads, bus stops, and any other relevant transportation facilities in the development area 10)Include a plan sheet showing full site build-out and land use 11)Buildings shown with “gross leasable area” 12)Width of property frontage 13)Distance from R/W to buildings and gasoline service islands 14)Distance from R/W to existing/proposed Edge of Pavement (EOP) (pages 32 & 34) 15)All streams, bridges, retaining walls, signs, or other fixed objects such as trees, utility poles, traffic signals, etc. Section 3: Driveway Plan Requirements | All driveway plans shall include and show, at a minimum, the items listed below 1)Provide comprehensive survey within the existing R/W on both sides of the road for a distance of 500’ in all directions from the development’s property lines. Provide additional hydraulic survey data to the nearest storm water inlet/outlet including ditch lines and storm water pipes, if located outside of the 500' distance. 2)Lane configurations and widths of all existing and proposed driveways, roadways, and adjacent roadways 3)All driveway widths (2-way: 20’ minimum, 36’ maximum | 1-way: 12’ minimum, 24’ maximum | with island: 14'ingress, 18' egress) (pages 50 & 77) 4)Driveway Profile - In shoulder sections, maintain minimum 2% fall from edge of travel way for required shoulder width distance Primary: 8’ minimum | Secondary: 6’ minimum 5)All existing and/or proposed driveway radii (20’ minimum, 50’ maximum, 30’ typical) (pages 34 & 51) In curb and gutter sections, use City of Wilmington flare (SD 3-03.3) - (see attached) In shoulder sections, show grades at the EOP and centerline 6)No curbing is allowed within NCDOT R/W along shoulder sections except as part of a driveway island (page 31) 7)Driveway angles of approach to existing roadway (90° preferred, 75°-90° required for 2-way driveways, 45°-90° allowed for right-in/right-out on a case-by-case basis) (page 51) 8)Driveway Profile (pages 42- 43) Y N n/a Y N n/a □□ □□ □ □ Y N n/a Y N n/a Y N n/a Y N n/a Section 3: Driveway Plan Requirements (continued) 9)Driveway Pavement Cross Section (to be in place from EOP to edge of R/W) Asphalt: 8” ABC stone and 1.5” S9.5B Concrete: 6” of concrete 10)Driveway Offset (driveway EOP to property line; page 75): Minimum: 20’ 11)Corner Clearance (radius point to radius point; page 52)Minimum: 50’ Desirable: 100’ or Municipal std. 12)Minimum 10’x70’ sight triangles at driveways (measured from and along the R/W line) (page 31) 13)Sight Distance (length of sight-distance in both directions shown for each driveway; pages 27-29) 14)Driveways should be aligned with existing opposing driveways or correct offset should be provided (pages 40-41) 15)Distance between driveways being requested (if applicable; page 51) 16)Minimum internal storage areas with specified queues (pages 31-33) 17)Minimum protected driveway stem(s) provided and indicated (pages 33-34) 18)Indicate any gated entrances (100’ minimum setback from R/W required) - traffic queuing study may be required | Section 6: Roadway Plan Requirements If off-site improvements are required, roadway plans shall show, at a minimum, the items below 1)Full width typical sections must be shown (paved shoulders to match the typical section of the adjacent roadway) 2)Minimum Asphalt Typical Section (for turn lanes and/or paved shoulders) Adjacent recently-completed or upcoming TIP projects w/ different typical sections may supersede those below •Primary Routes (US & NC) and Secondary Routes with Annual Average Daily Traffic (AADT) ≥10,000 5.5” B25.0C, 3” I19.0C, 1.5” S9.5C; any overlay of existing pavement is to be a minimum of 1.5” S9.5C •Secondary Routes with AADT<10,000 5.5” B25.0C, 1.5” S9.5B; any overlay of existing pavement is to be a minimum of 1.5” S9.5B 3)Pavement overlay is required if modification of existing pavement markings and/or lanes is necessary The grinding of pavement markings will not be allowed 4)Shoulder Widths (Paved + Unpaved) Primary: 8’ minimum | Secondary: 6’ minimum 5)Ditch Slopes - front and back slopes - minimum 3:1 or flatter 6)Indicate existing roadway grade 7)All taper lengths and deceleration lengths should be appropriately designed for the given design speed (page 78) 8)All turn lanes should be designed according to the Driveway Manual and Roadway Standard Drawings (page 79) See 1205.04 Sheets 1 & 2 and 1205.05 Sheet 1 of the Roadway Standard Drawings for details 9)Pavement marking and signing plans are required - plans must be approved by Division Traffic Services 10)Traffic control plans are required - Detailed phasing plans may be required based on project type and location 11)New and/or revised signal plans must be included for new installations and if signal modifications are required All signal plans must be reviewed and approved by Division Traffic Services and the Signal Design Unit. A Traffic Agreement must be completed to facilitate the review. Contact Division Traffic Services at (910) 341-2200. | Section 4: Drainag e Requirements All drainage features on NCDOT Right-of-Way shall adhere to, at a minimum, the items listed below Section 5: Internal Circ ulation Requirements |All internal circulation details shall adhere to, at a minimum, the items listed below 1)Interior driveway channelization stems Minimum 100’ from the ROW or at the discretion of the District Engineer 2)Traffic flow pattern 3)Traffic control devices 4)Pavement Markings Y N n/a Y N n /a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a Y N n/a 1)Pipe Cover Minimums (measured from top of pipe to subgrade) High Density Polyethylene (HDPE): 24” | Corrugated Aluminum (CAP): 12” | Reinforced Concrete (RCP): 12” 2)Pipe End Treatment (see Roadway Design Manual 5-20, B-2) Pipes ≤24" on multilane highways posted above 45mph require Parallel Pipe End Sections See 310.02 and 310.04 of the Roadway Standard Drawings for details Pipes >30" on multilane highways posted above 45mph require guardrail Pipes ≥36" require an endwall on the inlet end 3)All proposed Drainage is to be provided inside existing R/W. Otherwise, additional R/W or a permanently dedicated drainage easement will be required to accommodate the proposed project drainage 4)All sizes, types, and invert elevations of existing/proposed pipes and drainage structures must be shown(see Sec.3 #1 for survey requirements) 5)Provide spot elevations along frontage of driveway (at EOP and centerline) 6)Provide grades and spot elevations for existing and proposed ditches 7)Show how drainage will be accommodated along property frontage(District Engineer may require applicant to provide drainage calculations when warranted) C/L EOTEOP P/L R/WR/W R/W EOP EOP EOP EOP NTS R/W P/L DRAINAGE FLOW DRAINAGE FLOW DRAINAGE FLOW SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH SHOULDER WIDTH S IGHT T R IANGLE 10 ' BY 70 'S I GHT T R I AN G L E10' B Y 70' DRIVEWAY RR MIN. 30'MIN. 30' NO ROADWAY IMPROVEMENT COMMERCIAL DRIVEWAY WITH NORMAL CROWN ROADWAY 6" LOWER THAN THE EDGE OF PAVEMENTMIN 2% FALL AWAY or 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST PIPE/TYPE/SIZE WIDTH CON CR ET E /ASP HA LT LOCAL NAME ROAD POSTED SPEED ( ) MPH WIDTH WIDTHSR NUMBER SITE ADDRESS:TAX PARCEL # 20191115 PARALLEL END S.D. 310.02 INVERT ELEVATION PARALLEL END S.D. 310.02 INVERT ELEVATION 20' AWAY FROM THE PROPERTY LINEDRIVEWAY SHALL BE LOCATED AT LEAST OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION OR 500' OF XYZ SURVEY DATA PAST THE PROPERT LINENEAREST OUTFALL ELEVATION MEMORANDUM To: New Hanover County Technical Review Committee Date: November 25, 2025 Subject: Standard Technologies Fabrication NCDOT Projects: • N/A WMPO 2045 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: Based on the 11th edition ITE Trip Generation Manual, a TIA is not required. Any changes to the proposed land use or intensities will require an additional Trip Generation calculation to determine whether a Traffic Impact Analysis (TIA) is necessary. Land Use (ITE Code) Intensity Unit 24 Hour Volumes AM Peak Hour Trips PM Peak Hour Trips Manufacturing (140) 85,000 SF 522 83 79