HomeMy WebLinkAboutCommercial Site Plan TRC Comments Holly Shelter Road Business Park – TRC Review Page | 1 To: Ana Wadsworth, The Wooten Company From: Robert Farrell, Development Review Supervisor Date: December 17, 2025 Technical Review Committee (TRC) PID#: R01200-002-012-000, R01200-002-001-000, R01200-002-009-000, R01200-002-010- 000, R01200-002-008-000 Egov# SITECN-25-000113 Subject: 5900-6100 block of Holly Shelter Road – Holly Shelter Business Park Entrance Road and Utility Infrastructure - TRC Review Technical Review Committee (TRC) General Information The TRC is a staff-level group of local government officials that reviews projects for compliance with the local regulations administered by each respective review agency. Voluntarily participating state agencies may also provide comments. And general information and non-binding recommendations about the site may also be provided by government agencies. The TRC meetings are considered staff meetings and are not public hearings. The TRC meeting is an opportunity for applicants to speak with county staff and any voluntarily participating state or federal agencies about the review comments they have been provided. No voting is involved in the TRC process, and no final approvals or denials are made at the TRC meetings. Following the TRC meeting, applicants are responsible for updating their plans to address review comments. Those revised plans need to be resubmitted to the assigned case planner. The case planner will facilitate additional reviews until all comments have been addressed, and the necessary departments have stated the plans comply with the applicable minimum requirements for development. Following any future TRC approval, the project is required to obtain additional permits to include a zoning compliance permit for the site. Applicants are also responsible for coordinating with state and federal agencies for compliance with any additional requirements. Any activity on the property that is not approved as part of the TRC review and zoning compliance permit will be considered a violation of the UDO and subject to enforcement action under Article 12 Violations and Enforcement. Holly Shelter Road Business Park – TRC Review Page | 2 The following comments have been received for the December 17, 2025, TRC meeting. Additional comments may be made upon further review of subsequent revisions. Planning, Robert Farrell, rfarrell@nhcgov.com Compliance with local UDO requirements 1. General Comments a. The property is zoned I-2, Heavy Industrial. b. Based on the description in the application staff understands the intended use is “Utility Lines, Structures, and / or Facilities; General” which the Unified Development Ordinance (UDO) defines the use as i. Lines, facilities, or structures engaged in the treatment, transmission, and / or distribution of electricity, gas, steam, water, sewer, cable, or other utility not otherwise specified by this ordinance. ii. While plans and phases for future development are not included in the application, the proposed infrastructure is part of the initial groundwork for a future business park. iii. The plans include a divided road, a sewer pump station, equipment storage and staging area for the project, and a stormwater pond. c. The Planning and Land Use Department’s review of the site is for compliance with the UDO and use specific requirements of the specified land use. Any other activity that might occur on the property beyond the definition above should be noted on the application and site plan for additional review and comment. 2. UDO Section 5.1, Parking and Loading a. No parking spaces required. Table 5.1.2.A states the use of Utility Lines, Structures and / or Facilities, General require a minimum of 2 parking spaces for every 1,000 square feet of office facilities. Since the project does not propose any office space no parking is required. 3. UDO Section 5.2, Traffic, Access and Connectivity a. Please note that no building permit for any structure shall be issued which requires NCDOT approval for a Driveway Permit until NCDOT has issued the permit approval. Evidence of approval shall accompany the application for building permit. Holly Shelter Road Business Park – TRC Review Page | 3 4. UDO Section 5.3, Tree Retention a. Tree removal permit TR-23-000040 was issued August 10, 2023. The site was cleared except for a required perimeter of existing trees. 5. UDO Section 5.4, Landscaping and Buffering a. Transitional and parking lot landscaping and buffers are not required. Plans indicate a row of plantings around the exterior of the fenced compound. b. Please state the paved area inside the compound is understood to be an internal drive and work area which would exempt the interior of the compound from foundation planting requirements. 6. UDO Section 5.5, Lighting a. Please confirm no exterior lighting is proposed for the project. b. If exterior lighting is proposed, please note that a lighting plan is not required for TRC approval but will be required prior to issuance of construction plan approvals. 7. UDO Section 5.6, Signs a. Plans do not indicate any freestanding signs proposed as part of the development. If any freestanding signs are proposed as part of the infrastructure plans, please show the location on the plans. b. For any signs on the site, a separate sign permit must be submitted and reviewed by the county for compliance with Section 5.6 of the UDO for standards at or after the submittal of the separate zoning compliance and construction permits for the primary building or use. Any approval granted by the TRC for the site design is not an approval for the ultimate size or placement of the sign. 8. UDO Section 5.7, Conservation Resources a. The New Hanover County Conservation Resources map indicates the entire site is within a pocosin conservation resource. Pocosin conservation resources must be underlaid with Class IV soils to trigger the standards of Section 5.7. b. The county soils map indicates only approximately 1.3 acres of Class IV soils on the property, which is below the minimum distinct area of 2.5 acres and below the minimum 5 acres required to trigger requirements for additional conservation. 9. UDO Article 9, Flood Damage Prevention a. Site is not within a Special Flood Hazard Area. Holly Shelter Road Business Park – TRC Review Page | 4 NHC Fire Services, Ray Griswold 910-798-7448 Compliance with NC Fire Code 1. Fire Finals required 2. A fire hydrants needs to be at / near the main entrance to the park 3. Any Private fire mains / hydrants are to be permitted through county fire. Any hydrants that are on Mainline are normally CFPUA. Just need to be notified once the water is turned on. NHC Engineering, Galen Jamison 910-798-7072 Stormwater management and land disturbance 1. Since this will become a NCDOT road, all stormwater requirements and drainage design must be approved by the DOT. No stormwater permit from the County is required. Should the DOT drainage design not incorporate NHC stormwater ordinance, the remaining parcels may be except from County storm attenuation requirements. 2. New Hanover County can’t issue a land disturbing permit to themselves, therefore, an erosion and sediment control permit issued by the State will be required. 3. Please contact the State for their stormwater permit requirements. It is anticipated a low- density stormwater with future pockets of high density permit will be required. NHC Environmental Health, Dustin Fenske 910-798-6732 Septic tanks and wells 1. Scope of work for road improvements does not involve any aspects that require Environmental Health review. NHC Addressing, McCabe Watson 910-798-7068 Street naming and property address 1. Please submit street name proposals prior to TRC approval. 2. Please contact me for address assignment for pump station site following TRC approval. Holly Shelter Road Business Park – TRC Review Page | 5 Cape Fear Public Utility Authority, Bernice Johnson 910-332-6620 Public water and sewer 1. CFPUA TRC Comments provided are preliminary comments only. 2. CFPUA is moving toward becoming paperless. When ready to submit plan review package, upload all documents to https://www.cfpua.org/FormCenter/Engineering-3/Engineering- Plan-Review-103. 3. CFPUA water and sewer available via mainline extensions and pump station installation. 4. Project currently in CFPUA Plan Review NCDOT, Nick Drees 910-343-3915 Driveway access and state road improvements 1. See attached. WMPO, Luke Hutson 910-473-5130 New Hanover County contracted traffic engineering services comments: 1. See attached. Project information also provided to the following state agencies and non-regulatory local agencies for their awareness: New Hanover County Emergency Management New Hanover County Schools New Hanover County Sustainability Manager New Hanover County Soil & Water NC Department of Environmental Quality (DEQ) NC DEQ Division of Coastal Management NC DEQ Division of Energy, Mineral, and Land Resources US Army Corps of Engineers STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION JOSH STEIN DANIEL H. JOHNSON GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Memorandum DATE: December 4, 2025 TO: New Hanover County Technical Review Committee SUBJECT: Holly Shelter Business Park – 6000 Block of Holly Shelter Road ________________________________________________________________________ These are preliminary comments and are based on the plans as submitted for the proposed site. They are subject to further review upon receipt of any additional information. Subsequently, additional comments and/or requirements may be necessary for this site. General Comments: NCDOT Driveway Permits, and Encroachments are submitted through the NCDOT Online Portal.https://connect.ncdot.gov/municipalities/Utilities/Pages/help.aspx You can coordinate with the District Office with any questions 910-398-9100. NCDOT Driveway Permit: An NCDOT Driveway permit has been submitted to NCDOT for review. • Permit # D033-065-25-00164. NCDOT Encroachment Agreement: An NCDOT Encroachment Agreement is required for any utility connections or installations within the NCDOT right-of-way (form 16.6). • Refer to the NCDOT UAM Manual and the NCDOT encroachment checklist for required documents and site plan information. An NCDOT Encroachment Agreement is required for any sidewalk or multi-use paths installed within the NCDOT right-of-way (form 16.6). Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 04-11-03 COURIER Telephone: 910-398-9100 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 5911 OLEANDER DRIVE, SUITE 101 WILMINGTON, NC 28403 Required Roadway Improvements: SR 1002 (Holly Shelter Road) at Site Access 1 (proposed signalized intersection): • Phase 1: o Construct the northbound approach with one (1) ingress lane and two (2) egress lanes, striped as an exclusive left turn lane and an exclusive right turn lane. o Provide stop control for the northbound approach. o Provide an internal protected stem of 250 feet, as measured from the right- of-way line. o Construct an eastbound right turn lane with 300 feet of full width storage and appropriate deceleration and taper lengths. • Phase 2: o Signalize the intersection. o Restripe the northbound approach as an exclusive left turn lane and a shared left/right turn lane. o Construct a second receiving lane on westbound Holly Shelter with 2,000 feet of full width storage and appropriate taper. o Construct a westbound left turn lane with 100 feet of full width storage and appropriate deceleration and taper lengths. • Refer to the NCDOT Roadway Design Manual for help with the design of any required roadway improvements. o Figure 8-10 Recommended Treatment for Turn Lanes. Site Plan Comments: Subdivision Review Information: • General Statute 136-102.6 states, any subdivision built, planned, platted, or recorded after October 1, 1975, must be built to current NCDOT standards to include the dedication of right-of-way as public to be considered for addition. • Refer to the NCDOT Subdivision Roads Minimum Construction Standards for additional information. • Business Park Road is proposed to be a future public road and is currently going through the subdivision review process. • At this time the proposed design is not approved and will require design revisions. T:\ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - G - 0 . 0 0 . d w g M S O R R E N T I N O 1 1 / 1 1 / 2 0 2 5 4 : 1 6 P M 120 North Boylan Avenue x Raleigh, NC 27603-1423 (919) 828-0531 x thewootencompany.comLicense Number : F-0115 NOT TO SCALE NOT TO SCALE PROJECT AREA MAP NOT TO SCALE G-0.00 NEW HANOVER COUNTY AUGUST 2025 NORTH CAROLINA CHRIS COUDRIET COUNTY COMMISSIONERS COUNTY MANAGER BILL RIVENBARK, CHAIRLEANN PIERCE, VICE-CHAIRDANE SCALISESTEPHANIE WALKERROB ZAPPLE VICINITY MAP NORTHEAST CAPE FE A R RIV E R INTERSTATE INTERSTATE INTERSTATE INTERSTATE INTERSTATE US H I G H W A Y 1 1 7 S N C O L L E G E R D JOHN JAY BURNE Y J R R W Y MARTIN LUTHER KING J R P K W Y MARKET S T HOLLY SHELT E R R D ISLAND C R E E K R D PROJECT AREA BL U E C L A Y R D HOLLY SHE L T E R R D LUL A N I X O N R D DIA M O N D S H A M R O C K R D ID E A L C E M E N T R D HOLLY SHE L T E R R D PROJECT LOCATION REVISIONS FINAL DRAWINGFOR REVIEW PURPOSES ONLYNOT RELEASED FOR CONSTRUCTIONHOLLY SHELTER ROAD BUSINESS PARK ROADWAY INFRASTRUCTURE IMPROVEMENTS - PHASE 1 SITE DATA TABLE: SITE ADDRESS:LAT: N034.3620LONG: W077.8476 EXISTING PARCEL ZONING:I-2-INDUSTRIAL DISTRICT ADJACENT PARCEL ZONING:I-2-INDUSTRIAL DISTRICT PARCEL ID#'sR01200-002-001-000R01200-002-009-000R01200-002-012-000R01200-002-011-000R01200-002-010-000 OWNER INFO:SIDBURY LAND & TIMBER LLC1201 GLEN MEADE RD, WILMINGTON, NC 28401HILL@CAMERONCO.COM(910) 512-3263 ENGINEER:THE WOOTEN COMPANY120 N BOYLAN AVE, RALEIGH, NC 27603ANASTASIA M. WADSWORTH - ENGINEERMATTHEW M. SORRENTINO - SITE DESIGNERAWADSWORTH@THEWOOTENCOMPANY.COMMSORRENTINO@THEWOOTENCOMPANY.COM(919) 828-0531 T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - G - 0 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 2 6 P M AB B R E V I A T I O N S L E G E N D G-0.01 A AREA ABND ABANDONED ABC AGGREGATE BASE COURSE AFF ABOVE FINISHED FLOOR APRX APPROXIMATE ASPH ASPHALT ASSY ASSEMBLY AVG AVERAGE ARV AIR RELEASE VALVE AZ AZIMUTH AWWA AMERICAN WATER WORKSASSOCIATION B-B BACK OF CURB TO BACK OF CURB BLDG BUILDING BM BENCHMARK BO BLOW-OFF BOA BLOW-OFF ASSEMBLY BOT BOTTOM BW BARBED WIRE C&G CURB AND GUTTER CB CATCH BASIN C CENTERLINE CIP CAST IRON PIPE CI CURB INLET CLR CLEARANCE CM CONCRETE MONUMENT CMP CORRUGATED METAL PIPE CMU CONCRETE MASONRY UNIT CO CLEAN OUT COMM COMMUNICATIONS CONC CONCRETE CONT CONTINUOUS CSTR CONSTRUCTION CONTR CONTRACTOR COR CORNER CPED CABLE TV PEDESTAL CLVT CULVERT DDEPTH DI DROP INLET DIA DIAMETER DIP DUCTILE IRON PIPE DIM DIMENSION DISCH DISCHARGE DIST DISTANCE DNF DID NOT FIND DOT DEPARTMENT OF TRANSPORTATION DW DOMESTIC WATER DELTA E EAST E-E EDGE OF PAVEMENT TO EDGE OFPAVEMENT EACH EACH EFF EFFLUENT EIP EXISTING IRON PIPE EL ELEVATION ELEC ELECTRIC EPED ELECTRIC PEDESTAL EP EDGE OF PAVEMENT EW EACH WAY EWTR EDGE OF WATER Ex EXISTING EXPJT EXPANSION JOINT FDC FIRE DEPARTMENT CONNECTION FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FHA FIRE HYDRANT ASSEMBLY FHL FIRE HYDRANT LEG FHV FIRE HYDRANT VALVE FIN FINISH FLG FLAG FLNG FLANGE FM FORCE MAIN FOHH FIBER OPTIC HAND HOLE FOM FIBER OPTIC MARKER FOPD FIBER OPTIC PEDESTAL FP FIRE PROCECTION FPS FEET PER SECOND FT FEET FTG FOOTING G GAS GA GAUGE GALV GALVANIZED GM GAS METER GPM GALLONS PER MINUTE GR GRADE GTV GATE VALVE GV GAS VALVE GYP GYPSUM HCP HANDICAPPED HH HAND HOLE HORZ HORIZONTAL HP HORSE POWER HWA HIGH WATER ALARM HWL HIGH WATER LEVEL ID INSIDE DIAMETER IN INCH IN/HR INCHES PER HOUR INF INFLUENT INT INTERSECTION INV INVERT IPS IRON PIPE SET ISL ISLAND JB JUNCTION BOX KWY KEYWAY L LENGTH LF LINEAR FEET LP LIGHT POLE LT LEFT LWL LOW WATER LEVEL MAX MAXIMUM MATL MATERIAL MECH MECHANICAL MFR MANUFACTURER MH MANHOLE MIN MINMUM MJ MECHANICAL JOINT MON MONUMENT N NORTH NAD 83 NORTH AMERICAN DATUM 83 NCWN NORMAL CROWN NC GRID NORTH CAROLINA GRID NCGS NORTH CAROLINA GEODETIC SURVEY No. NUMBER NOM NOMINAL NTS NOT TO SCALE NWL NORMAL WATER LEVEL N/A NOT AVAILABLE N/R NOT REQUIRED OC ON CENTER OD OUTSIDE DIAMETER OH OVERHEAD ORIG ORIGINAL P PROPERTY LINE PC POINT OF CURVATURE PE PLAIN END PED PEDESTAL PI POINT OF INTERSECTION PIV POST INDICATOR VALVE POB POINT OF BEGINNING POC POINT OF CONNECTION POE POINT OF ENDING PRV PRESSURE REDUCING VALVE PSI POUNDS PER SQUARE INCH PT POINT OR POINT OF TANGENCY PUE PERMANENT UTILITY EASEMENT PVC POLYVINYL CHLORIDE PVMT PAVEMENT R RADIUS RCP REINFORCED CONCRETE PIPE REF REFERENCE REQ'D REQUIRED REINF REINFORCED RET RETAINING REV REVISED RPM REVOLUTIONS PER MINUTE RPZ REDUCED PRESSURE ZONE RT RIGHT R/W RIGHT-OF-WAY SSOUTH SCH SCHEDULE SDMH STORM DRAINAGE MANHOLE SF SILT FENCE SHT SHEET SGNL SIGNAL POLE SPECS SPECIFICATIONS SQ SQUARE SS SANITARY SEWER SSMH SANITARY SEWER MANHOLE SSTL STAINLESS STEEL ST STREE STA. STATION STD STANDARD SYM SYMBOL S/W SIDEWALK T TANGENT TBM TEMPORARY BENCHMARK TCE TEMPORARY CONSTRUCTION EASEMENT TCP TERRA COTTA PIPE TDD TEMPORARY DIVERSION DITCH TEMP TEMPORARY THH TELEPHONE HAND HOLE THK THICK TOC TOP OF CURB TOP TOP OF SLOPE TOW TOP OF WALL TPED TELEPHONE PEDESTAL TPHN TELEPHONE TRANS TRANSFORMER TRFCBX TRAFFIC SIGNAL CONTROL BOX TRFCPL TRAFFIC SIGNAL POLE TYP TYPICAL UMKR UTILITY MARKER UP UTILITY POLE U/G UNDERGROUND VC VERTICAL CURVE VCP VITRIFIED CLAY PIPE VERT VERTICAL VOL VOLUME VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY WL WATER LINE WM WATER METER WT WEIGHT WV WATER VALVE WTP WATER TREATMENT PLANT WWF WELDED WIRE FABRIC WWTP WASTE WATER TREATMENT PLANT W/WITH YH YARD HYDRANT YI YARD INLET LEGEND FONT STYLE INDICATES DESIGN FEATURES SURVEY CODE PROPOSED BENCHMARK BM CONCRETE MONUMENT FOUND CMF CONCRETE MONUMENT SET CMS CONTROL POINT CP GEOTECHNICAL BORE BORE IRON PIPE FOUND IPF IRON PIPE SET IPS IRON ROD FOUND IRF IRON ROD SET IRS MAG NAIL FOUND MNF MAG NAIL SET MNS MILE MARKER (HWY)MM MILE MARKER (RR)MM NAIL FOUND NLF NAIL SET NLS PK NAIL FOUND PKF PK NAIL SET PKS PROPERTY LINE TEMPORARY BENCHMARK TBM WETLAND FLAG WLF ROADWAY CODE PROPOSED ASPHALT DRIVEWAY ASPHALT OVERLAY BRICK DRIVEWAY BRICK SIDEWALK / WALKWAY BRIDGE BRDG CONCRETE DRIVEWAY CONCRETE DRIVEWAY(STAMPED) CONCRETE SIDEWALK /WALKWAY SWLK BACK OF CURB BC FACE OF CURB FC EDGE OF PAVEMENT EP FLOWLINE FLOW GUARDRAIL GDRL GRAVEL DRIVEWAY / PATH SOIL DRIVEWAY / PATH UTILITIES CODE PROPOSED CABLE TV CABLE CTV CABLE TV HAND HOLE CHH CABLE TV PEDESTAL CPED UNDERGROUND ELECTRICALCABLE UGE OVERHEAD ELECTRICAL WIRE OHE ELECTRICAL HAND HOLE EHH ELECTRICAL MANHOLE EMH ELECTRICAL METER EM ELECTRICAL PEDESTAL EPED FIBER OPTIC CABLE FOC FIBER OPTIC HAND HOLE FOHH GAS LINE GL GAS LINE w/SIZE GL GAS METER GM GAS VALVE GV GUY / ANCHOR WIRE GUY LIGHT POLE / AREA LIGHT LP POWER POLE PP STEAM MANHOLE STMH TELECOMMUNICATIONS CABLE COM TELECOMMUNICATIONSMANHOLE TMH TELEPHONE CABLE COM TELEPHONE HAND HOLE THH TELEPHONE PEDESTAL TPED TRAFFIC SIGNAL BOX TFCB TRAFFIC SIGNAL POLE TFCP TRANSFORMER TRNS UTILITY MARKER / WARNINGPOST WIT UTILITY POLE UP CTV UGE OHE FOC G COM COMEASEMENTS PROPOSED ACCESS EASEMENT AE DRAINAGE EASEMENT SDE PUBLIC UTILITY EASEMENT UE/PUE RIGHT-OF-WAY RW RIGHT-OF-WAY (RAILROAD)RRW SEWER EASEMENT SSE TEMPORARY CONSTRUCTIONEASEMENT TCE WATER EASEMENT WLE PERMANENT ACCESSEASEMENT PAE AE PDE PUE RW SSE TCE WLE EROSION CONTROL CODE PROPOSED CHECK DAM RCHK INLET PROTECTION RIP-RAP RPRP LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE @ACCESS EASEMENT LIMITS OF DISTURBANCE @EDGE OF PAVEMENT LIMITS OF DISTURBANCE @RIGHT-OF-WAY LIMITS OF DISTURBANCE @UTILITY EASEMENT LIMITS OF DISTURBANCE @TEMPORARY CONSTRUCTIONEASEMENT LIMITS OF DISTURBANCE @TEMPORARY CONSTRUCTIONACCESS RIPARIAN BUFFER - ZONE 1 RBZ1 RIPARIAN BUFFER - ZONE 2 RBZ2 SILT FENCE SF SILT FENCE OUTLET SFOLT SILT FENCE / TREE PROTECTIONFENCE SF/TPF SUPER SILT FENCE SSF TREE PROTECTION FENCE TPF WATTLE WTTL WATTLE BARRIER WB LOD LOD/PAE LOD/EP LOD/RW LOD/RW LOD/UE LOD/PUE LOD/TCE LOD/TCA SF SF/TPF SSF TPF WB SITE CODE PROPOSED AREA LIGHT / LIGHT POLE LP BOLLARD BOLL BUFFER CURB FLOW LINE FENCE FNC FIRE HOSE HOSE FIRE WATER LINE FWL SIGN SN CUT LINE FILL LINE X X X X HOSE FWL STORM DRAINAGE CODE PROPOSED CATCH BASIN / COMBINATIONINLET CB CURB INLET CI DROP INLET DI FLARED END SECTION FES JUNCTION BOX JB DRAINAGE MANHOLE SDMH STORM DRAINAGE PIPE SEWER CODE PROPOSED AIR RELEASE VALVE INMANHOLE (FORCE MAIN)ARVMH CLEAN OUT SSCO SEWER FORCE MAIN FM SEWER FORCE MAIN w/SIZE FM GRAVITY SEWER LINE SS GRAVITY SEWER LINE w/SIZE SS SEWER MANHOLE SSMH SEWER TEST PORT TPRT FM SS VEGETATION CODE PROPOSED CONIFEROUS TREE CTREE DECIDUOUS TREE DTREE HEDGE / SHRUB ROW HED LANDSCAPING LSCP SHRUB SHB STUMP SHRUB (TO BE REMOVED) TREE (TO BE REMOVED) TREELINE / WOODS WATER CODE PROPOSED AIR RELEASE VALVE INMANHOLE ARVMH BLOW OFF BO BLOW OFF (TEMPORARY)BO FIRE HYDRANT FH FIRE HYDRANT VALVE FHV PLUG PLG MONITORING WELL MW REDUCER / INCREASER RDCR WATER LINE WL WATER LINE w/SIZE WL WATER METER WM WATER VALVE WV YARD HYDRANT YH WL OTHER CODE PROPOSED FINISHED FLOOR ELEVATION,RIGHT OF ALIGNMENT FFE FINISHED FLOOR ELEVATION,LEFT OF ALIGNMENT FFE ABBREVIATIONS: LVL MMS AMW ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION NO R T H C A R O L I N A NEW H A N O V E R C O U N T Y NE W H A N O V E R C O U N T Y HO L L Y S H E L T E R B U S I N E S S P A R K - P H A S E 1 RE V I S I O N S 120 N o r t h B o y l a n A v e n u e x R a l e i g h , N C 2 7 6 0 3 - 1 4 2 3 (9 1 9 ) 8 2 8 - 0 5 3 1 x th e w o o t e n c o m p a n y . c o m Lic e n s e N u m b e r : F - 0 1 1 5 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc811.org F C PAE PAE T:\ S t a n d a r d s \ C A D D \ C i v i l 3 D \ 0 1 _ T e m p l a t e s \ T W C - C I V L _ T i t l e b l o c k _ 2 4 x 3 6 . d w g E M O R R I S O N 6 / 2 1 / 2 0 2 1 1 : 3 4 P M GE N E R A L N O T E S - S H E E T I N D E X LVL MMS AMW G-0.02 ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION NO R T H C A R O L I N A NEW H A N O V E R C O U N T Y NE W H A N O V E R C O U N T Y HO L L Y S H E L T E R B U S I N E S S P A R K - P H A S E 1 RE V I S I O N S 120 N o r t h B o y l a n A v e n u e x R a l e i g h , N C 2 7 6 0 3 - 1 4 2 3 (9 1 9 ) 8 2 8 - 0 5 3 1 x th e w o o t e n c o m p a n y . c o m Lic e n s e N u m b e r : F - 0 1 1 5 GENERAL NOTES 1)IN ACCORDANCE WITH NORTH CAROLINA STATE LAW, ALL NECESSARY PERMITS AND ENCROACHMENTS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OFCONSTRUCTION ACTIVITIES. 2) THROUGHOUT THE DURATION OF THE PROJECT THE CONTRACTOR SHALL MAINTAIN, ON THE PROJECT SITE, A COMPLETE SET OF APPROVED CONSTRUCTIONPLANS AND SPECIFICATIONS, INCLUDING ADDENDA, AS WELL AS ALL REQUIRED ENVIRONMENTAL PERMITS, NCDOT ENCROACHMENTS, AND EASEMENTS. 3) CONSTRUCTION AND MATERIAL SPECIFICATIONS SHALL CONFORM TO THE CURRENT NEW HANOVER COUNTY AND NCDOT STANDARDS AND DETAILS AS WELLAS THE CONTRACT DOCUMENTS. ALL SHOP DRAWINGS SHALL BE REVIEWED BY THE ENGINEER BEFORE EQUIPMENT OR MATERIALS ARE ORDERED. 4) THE VERTICAL CONTROL POINTS USED IN DETERMINING THE SITE ELEVATIONS SHOWN HEREIN WERE ESTABLISHED USING STATIC DIFFERENTIAL GPSMETHODS HOLDING NCGS MONUMENT "INN" AS A FIXED VERTICAL REFERENCE STATION (ELEV = 263.605 M). THE VERTICAL ERROR AFTER ADJUSTMENT IS0.002M AT A 95% CONFIDENCE LEVEL. THE VERTICAL DATUM IS NGVD 29. 5) A REGISTERED LAND SURVEYOR, AT THE CONTRACTOR'S EXPENSE, SHALL REPLACE PROPERTY IRONS, MONUMENTS, OTHER PERMANENT POINTS AND LINESOF REFERENCE, AND CONSTRUCTION STAKES DISTURBED OR DESTROYED BY THE CONTRACTOR. 6) ONLY AS NECESSARY UTILITIES (I.E., POWER POLES, LIGHT POLES, TELEPHONE, AND CABLE PEDESTALS, ETC.) LOCATED WITHIN THE PROJECT LIMITS TO BERELOCATED BY RESPECTIVE UTILITY COMPANIES PRIOR TO COMMENCING CONSTRUCTION. COORDINATE WITH UTILITY OWNER TO VERIFY UTILITYREALIGNMENT/RELOCATION WORK IS COMPLETE PRIOR TO START OF CONSTRUCTION. 7) ALL INDIVIDUAL TREES TO REMAIN UNLESS OTHERWISE NOTED ON THE PLAN OR AS DIRECTED BY ENGINEER AND APPROVED BY OWNER. VEGETATION INPERMANENT EASEMENTS TO BE REMOVED. VEGETATION IN TEMPORARY EASEMENTS TO BE REMOVED ONLY AS NECESSARY FOR CONSTRUCTION.VEGETATION IN THE RIGHT OF WAY TO BE REMOVED IF APPROVED. COORDINATE WITH ENGINEER/OWNER. 8) TEMPORARILY REMOVE MINOR ITEMS AS REQUIRED FOR CONSTRUCTION. MINOR ITEMS SHALL INCLUDE, BUT ARE NOT LIMITED TO: FENCES, LANDSCAPING,MAILBOXES, SIGNS, ETC. REINSTALL ITEMS TO THEIR ORIGINAL CONDITION AT A LOCATION AS CLOSE TO ORIGINAL LOCATION AS PRACTICABLE. 9) APPROXIMATE LOCATION OF EXISTING UTILITIES ARE SHOWN ON DRAWINGS. NOTIFY UTILITY LOCATING SERVICE TO MARK LOCATION OF EXISTINGUTILITIES AT LEAST 3 DAYS PRIOR TO COMMENCING CONSTRUCTION ACTIVITY IN ACCORDANCE W/ ALL CURRENT 811 REQUIREMENTS. CONTRACTORRESPONSIBLE FOR VERIFYING EXACT LOCATION OF THESE EXISTING UTILITIES. THE COST TO REPAIR THESE FACILITIES, IF DAMAGED, SHALL BE THERESPONSIBILITY OF THE CONTRACTOR. 10) SUPPORT EXISTING POLES, FENCES, CULVERTS, PAVEMENT, UTILITIES, CURBING, AND OTHER STRUCTURES DURING CONSTRUCTION. RESTORE DAMAGEDITEMS TO ORIGINAL CONDITION AT NO ADDITIONAL COST. 11) STAGING AREAS SHALL BE DELINEATED WITH TREE PROTECTION FENCING AROUND EXISTING TREES. 12) SIDEWALK TO JOIN FLUSH WITH ADJACENT EXISTING OR PROPOSED CONCRETE AND ASPHALT DRIVES. 13) CONTRACTOR TO ENSURE ACCESS TO DRIVEWAYS IS MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT. 14) LAND DISTURBANCE FOR THIS PROJECT IS GREATER THAN 1 (ONE) ACRE. EROSION CONTROL PLAN APPROVAL IS REQUIRED. IT IS THE CONTRACTOR'SRESPONSIBILITY TO COMPLY WITH THE EROSION CONTROL REQUIREMENTS, DEVICES, MAINTENANCE, ETC. AS INDICATED ON THE PLANS. 15) ONE WEEK PRIOR TO CONNECTIONS BEING MADE TO EXISTING STRUCTURES AND PIPES, A COORDINATION MEETING SHALL BE HELD BETWEEN THECONTRACTOR, ENGINEER, AND OWNER TO DISCUSS THE CONSTRUCTION PLAN SUBMITTED BY THE CONTRACTOR. 16) THE ENGINEER AND THE OWNER SHALL BE NOTIFIED 24 HOURS PRIOR TO SERVICE INTERRUPTIONS OR CONNECTIONS BEING MADE. ANY SERVICEINTERRUPTED BY THE CONTRACTOR SHALL BE RETURNED TO SERVICE BEFORE THE END OF THE WORKING DAY. CONTRACTOR SHALL MAINTAIN ACCESS FORVEHICULAR AND PEDESTRIAN TRAFFIC AT ALL TIMES AND FOLLOW ANY OWNER RESTRICTIONS REGARDING HOURS OF OPERATION. 17) SAFETY AND CONVENIENCE OF THE PUBLIC NECESSITATE THAT ALL WORK, INCLUDING EXCAVATION, BE DONE IN SUCH A MANNER AS TO CAUSE MINIMUMTRAFFIC INTERRUPTION, BOTH PEDESTRIAN AND VEHICULAR. UTILITIES SUCH AS FIRE HYDRANTS, VALVES, ETC., SHALL BE ACCESSIBLE AT ALL TIMES.GUTTERS AND DRAINS SHALL BE LEFT OPEN AND CLEAR AT ALL TIMES, AND THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DRAINAGE AROUND HISWORK. UNLESS SPECIFICALLY WAIVED BY THE PUBLIC WORKS DEPARTMENT, PROVISIONS SHALL BE MADE TO MAINTAIN VEHICULAR TRAFFIC ON ALLSTREETS IN WHICH WORK IS IN PROGRESS, AND SUITABLE WALKWAYS SHALL BE MAINTAINED FOR PEDESTRIAN TRAVEL. 18) PAVEMENTS TO BE REMOVED SHALL BE CUT ALONG STRAIGHT LINES WITH AN APPROPRIATE SAW CUT MACHINE. PAVEMENT CUTS OF CITY STREETS SHALLBE REPAIRED THE SAME DAY WITH TEMPORARY OR PERMANENT PATCHES. ONCE WORK HAS BEEN COMPLETED, TEMPORARY PATCHES SHALL BE REPLACEDWITH PERMANENT PATCHES. PAVEMENT CUTS WITHIN NCDOT RIGHT OF WAY SHALL NOT BE PERFORMED WITHOUT APPROVED ENCROACHMENT PERMITS ONSITE AND WORK SHALL CONFORM TO THE PERMITS. 19) PAVEMENT STRIPING, MARKINGS, AND DIRECTIONAL ARROWS SHALL FOLLOW NCDOT AND MUTCD STANDARDS. SURVEY NOTES UNLESS OTHERWISE NOTED ALL COORDINATES AND DISTANCES SHOWN HEREON ARE US SURVEY FEET GROUND MEASUREMENTS.MEASUREMENTS HAVE BEEN LOCALIZED AT NC STATE PLANE NAD 83 (2011) COORDINATES NORTH 588,000 SFT AND EAST 2,135,000SFT AND NAVD 88 ELEVATION 220 SFT YIELDING A COMBINED FACTOR OF 0.9998693172. EROSION CONTROL NOTES: 1. INSTALL SILT FENCE OVER AND AROUND TOP OF EXISTING PIPE AND INLETS AT DISTURBED AREAS. 2. INSTALL SILT FENCE AROUND SPOIL PILES AND STOCK PILES / STAGING AREAS. 3. CONSTRUCTION OPERATIONS SHALL BE LIMITED TO THE LIMITS OF DISTURBANCE LINES SHOWN ON THE PLANS. NO CONSTRUCTION ACTIVITIES SHALLEXTEND BEYOND THESE LIMITS. IF ADDITIONAL LAND IS REQUIRED FOR BORROW OR WASTE, MATERIAL LAY-DOWN, OR STAGING AREAS, THEN THECONTRACTOR SHALL BE RESPONSIBLE FOR SECURING THESE LANDS AND ADDITIONAL EROSION CONTROL PERMIT FOR ANY OFFSITE STAGING ORSTOCKPILE AREAS. ENSURE BORROW OR WASTE, MATERIAL LAY-DOWN OR STAGING AREAS ARE A MINIMUM OF 50' AWAY FROM DRAIN INLETS,TEMPORARY DIVERSIONS, CHANNELS, AND SURFACE WATER BODIES. 4. PROVIDE EROSION CONTROL MEASURES AROUND STOCK/WASTE PILES AND STAGING AREAS AS APPROVED BY ENGINEER. ENSURE BORROW OR WASTE,MATERIAL LAY-DOWN, STOCK PILES, OR STAGING AREAS ARE AT A MINIMUM OF 50 FEET FROM ANY STORM DRAIN INLET OR SURFACE WATER. 5. PROTECT STORM PIPE INLETS FROM SEDIMENT RUNOFF DUE TO LAND DISTURBING ACTIVITIES WITH SILT FENCE OR ARC FILTER AS APPROPRIATE FORSITE CONDITIONS. ROCK CHECK DAMS SHALL BE PROVIDED PER GENERAL NOTES. 6. REPLACE DISTURBED STORM PIPE OUTLET PROTECTION WITH EQUAL OR GREATER AMOUNT OF RIP-RAP WITHIN 15 DAYS OF DISTURBANCE. 7. WHERE AREA AROUND OUTLET IS DISTURBED AND NO OUTLET PROTECTION EXISTS, CLASS "1" RIP-RAP SHALL BE PLACED AROUND PIPE OUTLET ASDIRECTED BY ENGINEER. 8. PROVIDE EROSION CONTROL MATTING IN DITCHES AND SWALES AS DIRECTED BY ENGINEER. 9. A TEMPORARY PUMP AROUND SYSTEM MUST BE UTILIZED WHEN OPEN CUTTING CROSS STREAMS. IF NO FLOW IS PRESENT, DIKES ONLY MAY BE UTILIZEDAT THE DISCRETION OF THE ENGINEER. 10. ANY SEEPAGE PUMPED OUT OF BORE PITS OR TRENCHES SHALL BE PUMPED THROUGH A DEWATERING BAG. 11. SWEEP PAVED AREAS CLEAN AS NECESSARY TO PREVENT SILT RUNOFF. 12. THE CONTRACTOR SHALL SEED, MULCH AND TACK ALL DISTURBED AREAS WITHIN SEVEN (7) DAYS AFTER BACKFILLING TRENCH. ALL SEDIMENTATIONCONTROL MEASURES SHALL BE KEPT IN OPERABLE CONDITION UNTIL A STAND OF GRASS IS ESTABLISHED AND THE AREA IS CAPABLE OF RESISTINGEROSION BY WIND AND RAIN. THE CONTRACTOR SHALL INSPECT ALL SILT FENCE AND ROCK CHECK DAMS AT LEAST WEEKLY AND IMMEDIATELY AFTERRAINFALL WHICH RESULTS IN STORMWATER FLOW INTO DITCHES. UPON STABILIZATION OF THE SEEDED AREAS, THE CONTRACTOR SHALL REMOVE SILTFENCE, CHECK DAMS AND OTHER SEDIMENTATION CONTROL MEASURES AS DIRECTED IN THE SPECIFICATIONS. 13. LIMIT TRENCHING OPERATIONS AND DISTURBANCES TO THE LENGTH THAT CAN BE STABILIZED AT THE END OF EACH DAY. Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc811.org CAPE FEAR PUBLIC UTILITY AUTHORITY STANDARD NOTES: 1. ALL INDIVIDUALS ENGAGED IN CFPUA PROJECTS MUST ADHERE TO CFPUA TECHNICAL STANDARDS, WHICH ENCOMPASS SPECIFICATIONS, STANDARDDETAILS, THE DESIGN GUIDE MANUAL, AND THE MATERIAL SPECIFICATION MANUAL. THESE DOCUMENTS PROVIDE ESSENTIAL REQUIREMENTS FORMATERIALS, CONSTRUCTION METHODS, AND DESIGN PRINCIPLES. AN UNDERSTANDING OF THE ABOVE-MENTIONED RESOURCES IS REQUIRED TO AVOIDNON-COMPLIANCE ISSUE. 2. ATTENTION: COMPLY WITH NOTES ON APPLICABLE DETAILS. SHEET INDEX Sheet Number Sheet Title G-0.00 COVER G-0.01 ABBREVIATIONS LEGEND G-0.02 GENERAL NOTES - SHEET INDEX G-0.03 TYPICAL SECTIONS G-0.04 OVERALL KEY SHEET G-0.05 OVERALL EASEMENT PLAN G-0.06 OVERALL CONCEPTUAL SITE DEVELOPMENT PLAN C-1.00 EXISTING CONDITIONS & DEMO PLAN C-1.01 EXISTING CONDITIONS & DEMO PLAN C-1.02 EXISTING CONDITIONS & DEMO PLAN C-1.03 EXISTING CONDIONS & DEMO PLAN C-2.00 HOLLY SHELTER RD. PLAN & PROFILE - 0+00.00-5+00.00 C-2.01 HOLLY SHELTER RD. PLAN & PROFILE - 5+00.00-9+03.13 C-2.02 PROPOSED PLAN & PROFILE - 0+00.00-5+50.00 C-2.03 PROPOSED PLAN & PROFILE - 5+50.00-9+50.00 C-2.04 PROPOSED PLAN & PROFILE - 9+50.00-15+00.00 C-2.05 PROPOSED PLAN & PROFILE - 15+00.00-20+50.00 C-2.06 PROPOSED PLAN & PROFILE - 20+50.00-26+00.00 C-2.07 PROPOSED PLAN & PROFILE - 26+00.00-27+31.47 C-2.08 PLUNGE POOL PLAN - 9+50.00-15+00.00 C-2.09 SIGHT DISTANCE EXHIBIT C-2.10 SIGHT DISTANCE EXHIBIT C-3.00 WATER MAIN PLAN AND PROFILE - 0+00.00-13+00.00 C-3.01 WATER MAIN PLAN AND PROFILE - 13+00.00-27+00.00 C-3.02 WATER MAIN PLAN AND PROFILES C-3.03 GRAVITY SEWER PLAN AND PROFILE - 0+00.00-8+00.00 C-3.04 GRAVITY SEWER PLAN AND PROFILE - 8+00.00-21+46.90 C-3.05 FORCE MAIN PLAN AND PROFILE - 0+00.00-13+16.36 C-4.00 HOLLY SHELTER ROADWAY CROSS SECTIONS C-4.01 HOLLY SHELTER ROADWAY CROSS SECTIONS C-4.02 HOLLY SHELTER ROADWAY CROSS SECTIONS C-4.03 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.04 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.05 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.06 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.07 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.08 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.09 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.10 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.11 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.12 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.13 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.14 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.15 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.16 BUSINESS PARK ROADWAY CROSS SECTIONS C-4.17 BUSINESS PARK ROADWAY STORM PROFILES C-5.00 ROADWAY MARKING PLAN C-5.01 ROADWAY MARKING PLAN C-5.02 ROADWAY MARKING PLAN C-5.03 ROADWAY MARKING PLAN C-6.00 EROSION CONTROL - PHASE I C-6.01 EROSION CONTROL - PHASE I C-6.02 EROSION CONTROL - PHASE I C-6.03 EROSION CONTROL - PHASE I C-6.04 EROSION CONTROL - PHASE I C-6.05 EROSION CONTROL - PHASE I C-6.06 EROSION CONTROL - PHASE II C-6.07 EROSION CONTROL - PHASE II C-6.08 EROSION CONTROL - PHASE II C-6.09 EROSION CONTROL - PHASE II C-6.10 EROSION CONTROL - PHASE II C-6.11 EROSION CONTROL - PHASE II C-6.12 EROSION CONTROL - PHASE III C-6.13 EROSION CONTROL - PHASE III C-6.14 EROSION CONTROL - PHASE III C-6.15 EROSION CONTROL - PHASE III C-6.16 EROSION CONTROL - PHASE III C-6.17 EROSION CONTROL - PHASE III C-6.18 SEDIMENT DEVICE SIZING AND DRAINAGE AREAS C-7.00 UTIITY DETAILS C-7.01 UTILITY DETAILS C-7.02 ROADWAY DETAILS C-7.03 EROSION CONTROL DETAILS C-7.04 EROSION CONTROL DETAILS C-7.05 STORM WATER DETAILS EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND CERTIFICATE OF COVERAGE(COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES (INCLUDINGTIMBERING AND DEMOLITION) OCCUR. PHASE I 1. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OFCOVERAGE MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES(INCLUDING TIMBERING AND DEMOLITION) OCCUR. 2. POST SEDIMENTATION & EROSION CONTROL APPROVAL AT A CONSPICUOUSLOCATION AT THE PROJECT SITE. 3. CALL NCDEQ AT THE WILMINGTON REGIONAL OFFICE - LAND QUALITY SECTION(910-796-7215) TO SCHEDULE A PRE-CONSTRUCTION MEETING AT LEAST 48 HOURSPRIOR TO PROJECT ACTIVATION.4. CONSTRUCTION ACTIVITIES THAT HAVE AN E&SC PLAN APPROVED ON OR AFTERAPRIL 1, 2019 ARE REQUIRED TO FILL OUT AND SUBMIT AN ELECTRONIC NOTICE OFINTENT (E-NOT) FORM. ALL CONSTRUCTION ACTIVITIES AREA REQUIRED TO FOLLOWTHE NEW NCG01 PERMIT REGARDLESS OF WHEN THEY ARE APPROVED. 5. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND A CERTIFICATE OFCOVERAGE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIESOCCUR.6. IN ADDITION TO THE REQUIREMENTS OF THIS PLAN AND OUTLINED IN THE PROJECTSPECIFICATIONS, THE CONTRACTOR SHALL ADHERE TO THE LATEST NCDEQSEDIMENTATION AND EROSION CONTROL MANUAL FOR GUIDANCE ONCONSTRUCTION OF MEASURES REQUIRED BY THIS PLAN. CONTRACTOR SHALL ALSOADHERE TO THE SELF INSPECTION AND SELF REPORTING AND NPDES AS REQUIREDUNDER THE SEDIMENTATION POLLUTION CONTROL ACT AND NPDES STORMWATERPERMIT FOR CONSTRUCTION ACTIVITIES, NCG 010000. SEE PLAN SHEET. 7. A RAIN GAUGE WILL BE INSTALLED ON THE SITE, AND A WRITTEN RECORD OF DAILYRAINFALL AMOUNTS SHALL BE RETAINED AND MADE AVAILABLE TO DIVISION OFWATER QUALITY UPON REQUEST. AN APPROVED COPY OF THE E&SC PLAN WITHPLACARD & APPROVAL LETTER, AN APPROVED COPY OF NPDES PERMIT WITH AMINIMUM OF 30 DAYS OF SELF-INSPECTION REPORTS ARE TO BE KEPT ON SITE UNTILPROJECT CLOSURE.8. INSTALL CONSTRUCTION ENTRANCE AS INDICATED ON THE DRAWINGS.9. INSTALL ALL PERIMETER CONTROLS, SEDIMENT BASIN, CHECK DAMS, AND OUTLETPROTECTION AS INDICATED ON THE DRAWINGS.*NOTE: ES MEASURES ARE TO BE INSTALLED AT ANY AREAS USED FOR CONTRACTOREQUIPMENT STAGING, LAY DOWN/SPOIL/WASTE AREAS.10.STABILIZE ALL RUNOFF CONVEYANCE SYSTEMS AND INSTALL INLET PROTECTIONAND OUTLET PROTECTION AS INDICATED ON THE DRAWINGS. 11.ONCE THE TEMPORARY MEASURES HAVE BEEN INSTALLED, CONTACT THE STATEEROSION CONTROL FIELD ENGINEER REPRESENTATIVE TO REQUEST INSPECTION OFINSTALLED MEASURES PRIOR TO CONSTRUCTION CLEARING AND DEMOLITION. 12. AFTER THE STATE HAS CONDUCTED AN INSPECTION AND PROVIDED ANAUTHORIZATION TO PROCEED, THE REMAINING WORK MAY BEGIN. PHASE II 1. BEGIN EARTHWORK/GRADING AS INDICATED ON THE DRAWINGS.2. STABILIZE DENUDED AREAS AND STOCKPILE AS SOON AS PRACTICAL. 3. STOCKPILES, LAYDOWN OR WASTE AREAS, CONCRETE WASHOUTS, PORTABLETOILETS, AND FUELS MUST BE LOCATED AT LEAST 50 FEET AWAY FROM ANYOPEN WATER CONVEYANCES, SUCH AS BASINS, DITCHES, STORM DRAIN INLETS,ETC. THE LOCATION OF THESE ACTIVITIES MAY BE FIELD ADJUSTED IF THEDISTANCE REQUIREMENTS ARE MET. 4. CULVERT INSTALLATION: 4.1. ALL CULVERT SECTIONS, BEDDING MATERIALS, RIPRAP, AND PUMPINGEQUIPMENT SPECIFIC TO CULVERT INSTALLATION SHALL BE LOCATED INDESIGNATED STABILIZED AREAS OUTSIDE OF BUFFER ZONES.4.2. CONSTRUCT TEMPORARY DIVERSION BERMS OR DIKES TO ISOLATE THE WORKAREA AND DIRECT UPSTREAM FLOW TO THE PUMP INTAKE LOCATION. 4.3. INSTALL A PUMP-AROUND SYSTEM, INCLUDING: 4.3.1. INTAKE SUMP WITH SEDIMENT FILTER OR ROCK CHECK.4.3.2. PRIMARY AND BACKUP PUMPS SIZED FOR PEAK BASE FLOW. 4.3.3. DISCHARGE LINE ROUTED DOWNSTREAM OF THE WORK AREA WITH ENERGYDISSIPATION (RIPRAP APRON OR OUTLET PROTECTION). 4.4. INSPECT AND TEST PUMP SYSTEM BEFORE EXCAVATION BEGINS.4.5. DURING ALL PUMPING OPERATIONS, MONITOR FLOW DURING ALL ACTIVECONSTRUCTION HOURS TO MAINTAIN DOWNSTREAM FLOW ATPRE-CONSTRUCTION LEVELS. 4.6. INSPECT DAILY FOR LEAKS, SEDIMENT DISCHARGE, OR EQUIPMENT FAILURE.MAINTAIN A BACKUP PUMP ON SITE. 4.7. BEGIN EXCAVATION WITHIN ISOLATED AREA TO THE REQUIRED CULVERT SUBGRADE ELEVATION. 4.8. MAINTAIN STABLE SIDE SLOPES OR INSTALL SHORING AS NEEDED. 4.9. DEWATER EXCAVATION AS NECESSARY USING SUMP PUMPS WITH SEDIMENTFILTRATION. 4.10. INSTALL RIPRAP APRONS OR ENERGY DISSIPATORS AT INLET AND OUTLET PERDESIGN PLANS. ENSURE THAT OUTFLOW FROM CULVERTS ARE ROUTED TOSEDIMENT BASINS AS SPECIFIED ON THE CONSTRUCTION PLANS. 4.11. ONCE CULVERT IS INSTALLED AND SLOPES ARE STABILIZED, GRADUALLYDIVERT STREAM FLOW INTO THE NEW STRUCTURE. 4.12. REMOVE THE TEMPORARY PUMP-AROUND AND DIVERSION DIKES. 4.13. RESTORE DISTURBED AREAS TO FINAL GRADE AND STABILIZE IMMEDIATELY. 5. INSTALL WATER, ELECTRIC, AND OTHER PROPOSED UTILITIES AS INDICATED ONTHE DRAWINGS. 6. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING CONSTRUCTIONOF THE BUILDING AND INSTALLATION OF UTILITIES. INSPECT DEVICES AFTEREVERY RAINFALL EVENT AND CLEAN BEHIND THE DEVICES WHEN HALF-FULL.REPAIR OR REPLACE ANY MEASURES NOT PERFORMING AS INTENDED. 7. ANY DEWATERING FOR ESC MAINTENANCE OR UTILITY/STORM TRENCHING TOBE DONE THROUGH A SILT BAG. ALL SILT BAGS ARE TO BE CONTINUOUSLYMONITORED DURING OPERATION. 8. ALL DITCHES WILL BE LINED TO THE TOP OF BANK. 9. ANY BARE SOILS BETWEEN DOWNSTREAM TOE OF BASIN OR DIVERSIONS ANDPERIMETER MEASURES IS TO BE IMMEDIATELY SEEDED, MULCHED, AND TACKEDAFTER INSTALLATION. 10. UPSTREAM AND DOWNSTREAM SEDIMENT BASIN SLOPES WILL BE COVEREDWITH A SUITABLE RECP IMMEDIATELY AFTER SEEDING. 11. ANY VEGETATION ALONG THE TOP OF DRAINAGE WAY WILL BE MAINTAINEDWITHOUT THE USE OF HEAVY EQUIPMENT. SILT FENCE WILL BE INSTALLEDALONG TOP OF BANK, AND THE STUMPS AND ROOT WADS WILL BE LEFT INPLACE UNTIL AN APPLICABLE CROSSING IS MADE AND DISTURBED SOILS AREPERMANENTLY STABILIZED. 12. ALL SEDIMENT CONTAINMENT DEVICES MUST BE MAINTAINED UNTIL ALLAREAS HAVE BEEN STABILIZED WITH THE ESTABLISHMENT OF PERMANENTVEGETATION. 13. PERIMETER MEASURES MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS AREPERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVEALL TEMPORARY EROSION CONTROL MEASURES, AND PROVIDE PERMANENTSEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUNDCOVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED ORCONVERTED TO PERMANENT SCMS UNTIL ALL UPLAND AREAS AREPERMANENTLY STABILIZED. 14. BEGIN PAVING AND INSTALL CURB AND/OR CURB AND GUTTER AS INDICATEDON THE DRAWINGS. PHASE III1. BEGIN FINE GRADING OF SITE. 2. INSTALL PERMANENT SEEDING/SOD AS REQUIRED. COMPLY WITH THE GROUNDSTABILIZATION REQUIREMENTS AS PER PLANS AND SPECIFICATIONS. GROUNDSTABILIZATION WILL BE APPLIED WITHIN 14 CALENDAR DAYS FROM LAST LANDDISTURBING ACTIVITY. FOR STEEP SLOPES, THAT AREA MUST BE STABILIZEDWITHIN 7 CALENDAR DAYS. FOR CRITICAL AREAS, GROUND STABILIZATIONWILL BE APPLIED AT THE END OF THE DAY. 3. PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR90 CALENDAR DAYS, WHICHEVER IS SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. 4. UPON COMPLETION OF FINAL CONSTRUCTION AND ONCE SITE IS 70% STABILIZED, REMOVE ANY ACCUMULATED SEDIMENT FROM SEDIMENT BASINSAND DIVERSION DITCHES. 5. REMOVE ANY ACCUMULATED SEDIMENT FROM STORM DRAINAGE STRUCTURES. 6. REMOVE ALL TEMPORARY MEASURES, AND RE-ESTABLISH GRADES. SEED ANDMULCH PER PLANS AND SPECIFICATIONS. 7. REQUEST AN INSPECTION BY THE ENGINEER AND CONTACT THE STATE EROSIONCONTROL FIELD ENGINEER REPRESENTATIVE TO REQUEST FINAL INSPECTION. 8. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT NCDEQ TOCLOSE OUT, VIA INSPECTION REPORT; THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $120ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEENCLOSED OUT. PHASED EROSION CONTROL SEQUENCE T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - G - 0 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 2 6 P M AB B R E V I A T I O N S L E G E N D G-0.01 LVL MMS AMW ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION NO R T H C A R O L I N A NEW H A N O V E R C O U N T Y NE W H A N O V E R C O U N T Y HO L L Y S H E L T E R B U S I N E S S P A R K - P H A S E 1 RE V I S I O N S 120 N o r t h B o y l a n A v e n u e x R a l e i g h , N C 2 7 6 0 3 - 1 4 2 3 (9 1 9 ) 8 2 8 - 0 5 3 1 x th e w o o t e n c o m p a n y . c o m Lic e n s e N u m b e r : F - 0 1 1 5 Notify NC811 Three Full Working Days Before Digging Dial 811 or 1-800-632-4949, or visit www.nc811.org BUSINESS PARK ROAD TYPICAL SECTION PAVEMENT SCHEDULE - FULL DEPTH ASPHALT (WEDGING - USE FOR 6' OR LESS ASPHALT WIDTH) C PROP. MIN. 3" ASPHALT SURFACE COURSE, TYPE S9.5C AT AN AVERAGE RATE OF336 LBS PER SQ. YD. D PROP. MIN. 4" ASPHALT INTERMEDIATE COURSE, TYPE I19.0C AT AN AVERAGERATE OF 456 LBS PER SQ. YD. E PROP. MIN. 4" B25.0C ASPHALT CONCRETE BASE COURSE AT AN AVERAGE RATE OF456 LBS PER SQ. YD. T EARTH MATERIAL NTS 12.5'VARIES VARIESVARIES GR A S S S T R I P GR A S S S H O U L D E R ( M I N . W I D T H 4 ' ) AS P H A L T T R A V E L L A N E DR A I N A G E D I T C H PA V E D S H O U L D E R ( M I N . W I D T H 2 ' ) GR A S S S T R I P GR A S S S H O U L D E R ( M I N . W I D T H 4 ' ) AS P H A L T T R A V E L L A N E DR A I N A G E D I T C H PA V E D S H O U L D E R ( M I N . W I D T H 2 ' ) 16" WATERMAIN FUTURE NATURAL GAS FUTURE FIBER OPTIC LINE 12.5'4'2'14'VARIES (2) 6" CONDUITFOR UG ELECTRIC ME D I A N ( G R A S S E D ) AS P H A L T T R A V E L L A N E PAV E D S H O U L D E R ( M I N . W I D T H 4 ' ) GR A S S S H O U L D E R DR A I N A G E D I T C H 35' PERMANENTUTILITY/ACCESSEASEMENT FUTURE 16" WATER MAIN 1' INSIDE R.O.W.(INSTALLED BY OTHERS) GENERAL NOTES: 2024 SPECIFICATIONS EFFECTIVE: 01-2024 REVISED: GRADE LINE:GRADING AND SURFACING: THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. GRADING AND SURFACING OR RESURFACING AND WIDENING: THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE PLACED GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A PROPER TIE-IN. SHOULDER CONSTRUCTION: ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01 SIDE ROADS: THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT. THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS INVOLVED. BERM DITCHES: BERM DITCHES SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD. NO. 240.01 AT LOCATIONS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. DRIVEWAYS: DRIVEWAYS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD. 848.02 USING 3 FOOT RADII OR RADII AS SHOWN ON THE PLANS. LOCATIONS OF DRIVES WILL BE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER. SUBSURFACE PLANS: NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. THE CONTRACTOR SHOULD MAKE HIS OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. UTILITIES: UTILITY OWNERS ON THIS PROJECT ARE CAPE FEAR, AT&T COMMUNICATIONS, DUKE ENERGY, PIEDMONT NATURAL GAS. RIGHT-OF-WAY MARKERS: ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT. NCDOT STANDARD NOTES 4' ULT I M A T E C / L 2' UL T I M A T E C / L 50' RIG H T O F W A Y 4'VARIES VARIES 100' VARIES MIL L 1 - 1 / 2 " D E E P T O PR O V I D E S T A G G E R E D J O I N T 2% 4% 8% 3:1 SA W C U T P A V E M E N T 9' 3:1 3:1 3:1 3:1 STA: 0+00.00 - 9+03.13HOLLY SHELTER ROAD TYPICAL SECTION NTS 3:1 3:1 3:1 3:1 2% 4% 8% 2% 2% 2% 2% 4% 8% 2% 1'= 6 " C U R B A N D G U T T E R VARIES 2% AS P H A L T T R A V E L L A N E GR A D E P O I N T GR A D E P O I N T PROPOSED BUSINESS PARK ROADPROPOSED DESIGN SPEED: 40mphPROPOSED POSTED SPEED: 35mph EXISTING HOLLY SHELTER ROADPROPOSED DESIGN SPEED: 60mphPROPOSED POSTED SPEED: 55mph 12" SANITARYSEWER FORCEMAIN 10" SANITARYSEWER GRAVITY MAIN PAVEMENT SCHEDULE - ASPHALT OVER ABC C PROP. MIN. 3" ASPHALT SURFACE COURSE, TYPE S9.5C AT AN AVERAGE RATE OF336 LBS PER SQ YD D PROP. MIN. 4" ASPHALT INTERMEDIATE COURSE, TYPE I19.0C AT AN AVERAGERATE OF 456 LBS PER SQ YD. J PROP. MIN. 8" ABC STONE BASE T EARTH MATERIAL 1'PE R M A N E N T D R A I N A G E E A S E M E N T 30' 25' PERMANENTUTILITY/ACCESSEASEMENT 1'= 6 " C U R B A N D G U T T E R 12' LA N E L I N E 2' LA N E L I N E 2' 1'MILL 1-1/2" DEEP 1' BEYONDULTIMATE CENTER NOTES: 1. ALL GRASS SHOULDERS AND GRASS STRIPS TO HAVE 4" OF TOPSOIL. 2. MEDIAN TO HAVE 4" OF TOPSOIL IN GRASSED AREA. R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/WW R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WW R/W R/W R/W R/W R/WWR/W/W R/WWR/ R/WWW/W /WW/ R/WW R/WR/R/WR/W R/WRR/WR/WWWWWWWW R/W/W RR/R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W PBPB R/W R/W PR. DRAINAGE AREA 134.49 AC PR. DRAINAGE AREA 378.48 AC PR. DRAINAGE AREA 421.23 AC PR. DRAINAGE AREA 618.64 AC PR. DRAINAGE AREA 8 17.44 AC PR. DRAINAGE AREA 713.28 AC PR. DRAINAGE AREA 1A0.89 AC 0.34 AC - IMP0.55 AC- LAWN PR. DRAINAGE AREA 8A 0.89 AC0.34 AC - IMP0.55 AC- LAWN PR. DRAINAGE AREA 3A1.45 AC 0.61 AC - IMP0.84 AC- LAWN PR. DRAINAGE AREA 6A 1.45 AC0.61 AC - IMP0.84 AC- LAWN PR. DRAINAGE AREA 4A0.82 AC 0.25 AC - IMP0.57 AC- LAWN PR. DRAINAGE AREA 5A0.82 AC 0.25 AC - IMP0.57 AC- LAWN PR. DRAINAGE AREA 3B 13.70 AC PROPOSED BUSINESS PARK ROAD T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - G - 0 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 2 6 P M OV E R A L L K E Y S H E E T G-0.04 LVL MMS AMW ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION NO R T H C A R O L I N A NEW H A N O V E R C O U N T Y NE W H A N O V E R C O U N T Y HO L L Y S H E L T E R B U S I N E S S P A R K - P H A S E 1 RE V I S I O N S 120 N o r t h B o y l a n A v e n u e x R a l e i g h , N C 2 7 6 0 3 - 1 4 2 3 (9 1 9 ) 8 2 8 - 0 5 3 1 x th e w o o t e n c o m p a n y . c o m Lic e n s e N u m b e r : F - 0 1 1 5 C-1.00C-2.00C-4.00 C-1.00C-2.01C-4.00 C-1.01C-2.02C-4.01 C-1.01C-2.03C-4.01 C-1.02C-2.04C-4.02 C-1.02C-2.05C-4.02 C-1.03C-2.06C-4.03 C-1.03C-2.07C-4.03 C-2.08 0 50' 100' 200' SCALE: 1"=100'HORZ. EQUIPMENTANDSTAGINGAREA FUTURE ROADWAY EXTENSIONAND GRADING (BY OTHERS) R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WW R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/WR/R/WR/W R/WRR/WR/WWWWWWWW W FM FM FM SSSSSSSSSS SS W W W SSSS E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E WWWWFM R/W/W RR/R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W PBPB 30' 5' 25'10' 35' LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD / T C E LOD/TCE PDE PDE PD E PDE PD E PDE LOD / T C E LOD / T C E LO D / T C E PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE PUE PUE PU E PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE PUE/PAE LOD LO D LOD LOD LO D LO D PDE PDE R/W R/W 68 ' 88 ' PUEPUEUEPUPUEPUEEEEUUEEUEPUEPUEPUE/PAPU/PAAPUE/PAPUE/PAAPA/PPUE LOD/TCEOD/OD/T/TCELOD/TLOLOLOLOODODLOD/T/TLOD/TLOOTCETCTCETCETCETCETCETCE PROPOSED BUSINESS PARK ROAD T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - G - 0 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 2 6 P M OV E R A L L E A S E M E N T P L A N G-0.05 LVL MMS AMW ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION NO R T H C A R O L I N A NEW H A N O V E R C O U N T Y NE W H A N O V E R C O U N T Y HO L L Y S H E L T E R B U S I N E S S P A R K - P H A S E 1 RE V I S I O N S 120 N o r t h B o y l a n A v e n u e x R a l e i g h , N C 2 7 6 0 3 - 1 4 2 3 (9 1 9 ) 8 2 8 - 0 5 3 1 x th e w o o t e n c o m p a n y . c o m Lic e n s e N u m b e r : F - 0 1 1 5 C-1.00C-2.00C-4.00 C-1.00C-2.01C-4.00 C-1.01C-2.02C-4.01 C-1.01C-2.03C-4.01 C-1.02C-2.04C-4.02 C-1.02C-2.05C-4.02 C-1.03C-2.06C-4.03 C-1.03C-2.07C-4.03 C-2.08 0 50' 100' 200' SCALE: 1"=100'HORZ. EQUIPMENTANDSTAGINGAREA EASEMENT LEGEND LIMITS OF DISTURBANCE/TEMPORARY CONSTRUCTION EASEMENT PERMANENT DRAINAGE EASEMENT PERMANENT UTILITY EASEMENT & PERMANENT ACCESS EASEMENT PERMANENT UTILITY EASEMENT LIMITS OF DISTURBANCE LOD/TCE PDE PUE LOD PUE/PAE FUTURE ROADWAY EXTENSIONAND GRADING (BY OTHERS) RB Z2 RB Z2 RB Z2 RB Z2 RB Z 2 RB Z 2 FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL 16 20 24 28 32 36 40 -1+00 0+00 1+00 2+00 -1+00 0+00 1+00 2+0 X R/W R/ W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W HOLLY SH E L T E R R O A D (SR-1002) FM FMF R/WR/WR/W R/WWLWL R/WWLWL W W W W W W W W W W W W W W W W W LOT 3- 11.3 AC BLDG. SQ.FT. 60,300 LOT 3- 11.3 AC BLDG. SQ.FT.67,600 LOT 1- 19.8 AC BLDG. SQ.FT. 321,900 LOT 2- 30.1 AC BLDG. SQ.FT. 321,900 LOT 7- 28.9 AC BLDG. SQ.FT. 90,000 R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W R/W R/W R/W R/W R/ W R/ W R/W R/W R/ W R/ W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/ W R/W R/ W R/W R/ W R/ W R/W R/W R/W R/W LOT 4- 11.7 AC BLDG. SQ.FT.90,000 LOT 6 - 21.4 AC BLDG. SQ.FT. 120,000 ADDITIONAL210,000 SQ.FT. LOT 10- 98.1 AC BLDG. SQ.FT. 1,000,000 FM FM FM FM FM FM FM FMR/WMMR/WR/W R/WFMFMWR/W R/WR/WFMFMR/W R/WR/WR/W R/WR/R/R/WR/W R/WR/WR/W R/WR/WR/W R/WWR/W R/W R/W R/W R/W R/WR/WW R/W WLWL WLWL WLWL WLWWWL WLR/RR/WW WLR/WR/W R RB Z 2 Z2 RB ZRR/WR/WR/R/ FMMM R/WR/WR/ R/WR/WR/W R/W R/W R/W WLWL WLWL R/W/WR/W R/WWLWLRR RB Z 2 /WWW/WWW R/WR/W R/WR/W WWW R/WR/WR//R R/WR/WRRR/R/ 2 RB Z RB Z2 R/ W R/ W R/ W R/ W WW WW R/ W R/ W R/WR/WWWWW R/WR/WR/WR/WW R/WR/W R/WR/WRRRR FMMM FM R/WR/WR/ R/WR/R/WR/W R/W R/W WLWR/WR/W WLR/R/ W R/WR/W R/WR/WRRR/WR/W Z2Z22BZ2 R/WR/W WWLWLWLWL WWLWLWLWL WWWLWLWLWL WWLWLWLWL WWLWLWLW WWWWLWLWWWWWL /WWR/WR/WLWLR/WR/WR/WR/WR/WR/R/R/ WRRWLWLR/WR/WR/R/ WR/RWWWWR/R/RR WWWLWLWWRRRR WWWLWLWLWLWWWWW LOT 3- 11.3 ACAC BLDG. SQ.FT. 60,300BLDG. LOT 3- 11.3 ACAC BLDG. SQ.FT.DG. 67,600 LOT 1- 19.8 ACAC BLDG. SQ.FT. 321,900BLDG. LOT 2- 30.1 ACAC BLDG. SQ.FT. 321,900BLDG. LOT 7- 28.9 ACAC BLDG. SQ.FT. 90,000BLDG. R/W R/W R/W R/W R/W R/W R/W W R/W R/W /WWWW R/W R/W R/W R/W R/W R/ W R/W RR/WR/WR/WWRRWWWWWWWRRRR R/W R/WR R/W /W R/ W R/ R/ W R/W R/W R/ W R/ W R/W R/W R/W R/W /WR/W R/W R/R/WR/ R/W R/W R/W R/ W R/W W R/ W R/W WWW R/ W R/W R/W R//WR/W R/WR//W/ LOT 6 - 21.4 ACAC BLDG. SQ.FT. 120,000BLDG. ADDITIONALONAL210,000 SQ.FT.210,00 LOT 10- 98.1 ACAC BLDG. SQ.FT. 1,000,000BLDG. S R// AC1.7 ACAC Q.FT.00 LOT 8- 33.1 AC BLDG. SQ.FT.500,000 LOT 9 - 24.2 AC BLDG. SQ.FT.150,000 LOT 5- 26.5 AC BLDG. SQ.FT. 112,000 LOT 9 - 24.2 AC BLDG. SQ.FT.150,000 LOT 9 - 24.2 AC BLDG. SQ.FT.200,000 LOT 4- 11 DG. SQBLDG. DG. 90,00 R/WWL/W/WL R/WR/W /WWWLWL/W/W/W/W PROPOSEDSEWERPUMPSTATION PR O P O S E D B U S I N E S S P A R K R O A D T:\ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - G - 0 . 0 0 . d w g M S O R R E N T I N O 1 1 / 1 1 / 2 0 2 5 4 : 1 3 P M OV E R A L L C O N C E P T U A L S I T E D E V E L O P M E N T P L A N G-0.06 LVL MMS AMW ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION NO R T H C A R O L I N A NEW H A N O V E R C O U N T Y NE W H A N O V E R C O U N T Y HO L L Y S H E L T E R B U S I N E S S P A R K - P H A S E 1 RE V I S I O N S 120 N o r t h B o y l a n A v e n u e x R a l e i g h , N C 2 7 6 0 3 - 1 4 2 3 (9 1 9 ) 8 2 8 - 0 5 3 1 x th e w o o t e n c o m p a n y . c o m Lic e n s e N u m b e r : F - 0 1 1 5 WETLANDS (TYP) RELATIVELYPERMANENTWATER (TYP) FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM R/R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL LOD / T C E LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 0+00 1+00 2+00 3+00 4+00 5+0MILL 1-1/2" DEEP SAW CUT AND REMOVE EX. PAVEMENT EX. HOLLY SHELTERROAD CENTER LINE N224515.11E2347019.68 10 ' 5'5'5 0100'0001000 HOLLY SHELTER ROAD (SR-1002) FOC FOC FOC FOC FOC FOC FOC FOC FOC O FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC FOC OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHEFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFM R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL WL FM FM FM LO D / T C E LOD / T C E LO D / T C E LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD 9+60.77 +00 6+00 7+00 8+00 9+00 EXI S T I N G T I M B E R D R I V E (G R A V E L / S O I L ) (TO BE REMOVED) PRO P . B U S I FMFMFM HOLLY SHELTER ROAD (SR-1002) 100' FUTURE RIGHT-OF-WAYMB:72 PG:357 10' 5' T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - C - 1 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 5 5 P M EX I S T I N G C O N D I T I O N S & D E M O P L A N 0 10' 20' 40' SCALE: 1"=20'HORZ. LVL MMS AMW C-1.00 ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION MA T C H L I N E - 5 + 0 0 . 0 0 MA T C H L I N E - 5 + 0 0 . 0 0 NOTE: TREE CLEARING AND GRUBBING LIMITS SHALL BE INSIDE THE LOD LINE. EXISTING SWING FENCETO BE REMOVED MILL 1-1/2" DEEP TOPROVIDE STAGGERED JOINT SAW CUT AND REMOVE EX. PAVEMENT (RPW) RELATIVELY PERMANENT WATER (TYP) LEGEND: MILL PAVEMENT SAWCUT AND REMOVE PAVEMENT TREE LINE TO BE REMOVED FO C FO C FO C FOC FOC FOC FOC OC FO C FO C FO C FO C FO C FO C FOC FOC FOC FOC FOC FOC F C FO C FO C FO C FO C FO C FO C OH E OH E OH E OH E OH E OH E FM FM FM FM FM FM FM R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W WL WL WL WL WL WL WL FMFMFM LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD LOD LO D LO D LOD 8+ 0 0 9+ 0 0 0+00 1+00 2+00 3+00 4+00 5+00 BP : 0 + 0 0 . 0 0 PI: 1 + 9 8 . 7 8 PI : 2 + 2 5 . 2 5 PI: 3 + 0 0 . 5 3 EXISTING TIMBER DRIVE(GRAVEL / SOIL) EXISTING TIMBER DRIVE(GRAVEL / SOIL) (TO BE REMOVED) (TO BE REMOVED) (TO B E R E M O V E D ) (RPW) RELATIVELY PERMANENT WATER (TYP) PROP. BUSINESS PARK ROADCENTER LINE0000000 BP : 0 0+0 0 0000 FMFM 00+0 BBPP:P 000+00000000000 FMFFM +++++ 100 ' F U T U R E R I G H T - O F - W A Y MB: 7 2 P G : 3 5 7 R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE 6+00 7+00 8+00 9+00 (TO BE REMOVED) (TO BE REMOVED) (TO BE REMOVED)10 0 ' F U T U R E R I G H T - O F - W A Y MB : 7 2 P G : 3 5 7 EXISTING TIMBER DRIVE(GRAVEL / SOIL) PROP. BUSINESS PARK ROADCENTER LINE T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - C - 1 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 5 5 P M EX I S T I N G C O N D I T I O N S & D E M O P L A N LVL MMS AMW C-1.01 ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION MA T C H L I N E - 5 + 5 0 . 0 0 0 10' 20' 40' SCALE: 1"=20'HORZ. MA T C H L I N E - 5 + 5 0 . 0 0 MA T C H L I N E - 9 + 5 0 . 0 0 NOTE: TREE CLEARING AND GRUBBING LIMITS SHALL BE INSIDE THE LOD LINE. HO L L Y S H E L T E R R O A D (S R - 1 0 0 2 ) SAW CUT AND REMOVE EX. PAVEMENT LEGEND: MILL PAVEMENT SAWCUT AND REMOVE PAVEMENT TREE LINE TO BE REMOVED R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD / T LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE 10+00 11+00 12+00 13+00 14+00 15+0 EXISTING TIMBER DRIVE(GRAVEL / SOIL) (TO BE REMOVED) EX I S T I N G T I M B E R D R I V E (G R A V E L / S O I L ) 100 ' F U T U R E R I G H T - O F - W A Y MB: 7 2 P G : 3 5 7 (RPW) RELATIVELY PERMANENT WATER (TYP) PROP. BUSINESS PARK ROADCENTER LINE R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LO D / T C E LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD/TCE LOD +00 16+00 17+00 18+00 19+00 20+00 100 ' F U T U R E R I G H T - O F - W A Y MB : 7 2 P G : 3 5 7 EXISTING TIMBER DRIVE(GRAVEL / SOIL) (RPW) RELATIVELY PERMANENT WATER (TYP) PROP. BUSINESS PARK ROADCENTER LINE T:\ S h a r e d \ P r o j e c t s \ N e w _ H a n o v e r _ C o u n t y - 3 5 1 4 \ A - H o l l y S h e l t e r B u s i n e s s \ _ C A D D \ S h e e t S e t s \ 3 5 1 4 - C - 1 . 0 0 . d w g M S O R R E N T I N O 1 1 / 6 / 2 0 2 5 5 : 5 5 P M EX I S T I N G C O N D I T I O N S & D E M O P L A N LVL MMS AMW C-1.02 ISSUED FOR: DATE: 10/2025 DRAWN BY: CHECKED BY: PROJECT NO.: DESIGNED BY: 3514-A FINALDRAWINGFOR REVIEWPURPOSES ONLYNOT RELEASED FORCONSTRUCTION MA T C H L I N E - 9 + 5 0 . 0 0 MA T C H L I N E - 1 5 + 0 0 . 0 0 0 10' 20' 40' SCALE: 1"=20'HORZ. MA T C H L I N E - 1 5 + 0 0 . 0 0 MA T C H L I N E - 2 0 + 5 0 . 0 0 NOTE: TREE CLEARING AND GRUBBING LIMITS SHALL BE INSIDE THE LOD LINE. TREE LINE TO BE REMOVED MEMORANDUM To: New Hanover County Technical Review Committee Date: December 2, 2025 Subject: Holly Shelter Road NCDOT Projects: • N/A WMPO 2050 MTP Projects: • N/A New Hanover County Projects: • N/A TIA: A TIA for Holly Shelter Industrial Park was approved by the WMPO on November 11, 2024. All improvements outlined in the approved TIA are required. Please reach out to Caitlin Cerza (Caitlin.Cerza@wilmingtonnc.gov), the WMPO’s Transportation Planning Engineer, if any questions arise related to the TIA. The TIA approval with conditions letter will be attached to these comments. November 11, 2024 Ms. Erin Govea, PE DAVENPORT 1426 Navaho Trail, Suite 108 Wilmington, NC 28409 RE: Approval with conditions for the Traffic Impact Analysis (TIA) associated with the Holly Shelter Industrial Park development in New Hanover County, NC Dear Ms. Govea, The WMPO has coordinated the review of the Holly Shelter Industrial Park TIA (sealed October 8, 2024) by NCDOT and New Hanover County Staff. Based on the information provided and conversations held to date, it is our understanding that the proposed development will be built in four (4) phases and will consist of: Phase 1 (build year 2026): • ITE Land Use Code 130 – 281,250 SF Industrial Park • ITE Land Use Code 140 – 281,250 SF Manufacturing Phase 2 (build year 2031): • ITE Land Use Code 130 – 792,750 SF Industrial Park • ITE Land Use Code 140 – 792,750 SF Manufacturing Phase 3 (build year 2036): • ITE Land Use Code 130 – 895,250 SF Industrial Park • ITE Land Use Code 140 – 895,250 SF Manufacturing Full Build (build year 2041) • ITE Land Use Code 130 – 1,195,250 SF Industrial Park • ITE Land Use Code 140 – 1,195,250 SF Manufacturing The following improvements are required for this development: Approval with Conditions for the Holly Shelter Industrial Park Traffic Impact Analysis – New Hanover Page 2 of 4 SR 1002 (Holly Shelter Road) at I-40 Eastbound Ramps (future signalized intersection) Phase 1 • No improvements are required. Phase 2 • Signalize the intersection if this improvement has not already been performed by others. • Optimize signal timings. • Extend the northbound right turn lane to provide 350 feet of full width storage and appropriate deceleration and taper lengths. Phase 3 • No further improvements are required. Full Build • No further improvements are required. SR 1002 (Holly Shelter Road) at I-40 Westbound Ramps (future signalized intersection) Phase 1 • Extend the northbound right turn lane to provide 400 feet of full width storage and appropriate deceleration and taper lengths. Phase 2 • Signalize the intersection if this improvement has not already been performed by others. Phase 3 • No further improvements are required. Full Build • No further improvements are required. SR 1002 (Holly Shelter Road) at Site Access 1 (proposed signalized intersection) Phase 1 • Construct the northbound approach with one (1) ingress lane and two (2) egress lanes, striped as an exclusive left turn lane and an exclusive right turn lane. • Provide stop control for the northbound approach. • Provide an internal protected stem of 250 feet, as measured from the right-of-way line. • Construct an eastbound right turn lane with 300 feet of full width storage and appropriate deceleration and taper lengths. Approval with Conditions for the Holly Shelter Industrial Park Traffic Impact Analysis – New Hanover Page 3 of 4 Phase 2 • Signalize the intersection. • Restripe the northbound approach as an exclusive left turn lane and a shared left/right turn lane. • Construct a second receiving lane on westbound Holly Shelter with 2,000 feet of full width storage and appropriate taper. • Construct a westbound left turn lane with 100 feet of full width storage and appropriate deceleration and taper lengths. Phase 3 • No further improvements are required. Full Build • No further improvements are required. SR 1002 (Holly Shelter Road) at Site Access 2 (proposed stop-controlled intersection) Phase 2 • Construct the northbound approach with one (1) ingress lane and one (1) egress lane. • Provide stop control for the northbound approach. • Provide an internal protected stem of 125 feet, as measured from the right-of-way line. • Construct an eastbound right turn lane with 100 feet of full width storage and appropriate deceleration and taper lengths. Phase 3 • No additional improvements are required in this phase. Full Build • The applicant is to monitor this intersection for signalization and perform a signal warrant analysis six (6) months to one (1) year after full build out. • Provide signalization if/when warranted. SR 1002 (Holly Shelter Road) at Site Access 3 (proposed right-in/right-out stop-controlled intersection) Phase 3 • Construct the northbound approach as a right-in/right-out driveway with one (1) ingress lane and one (1) egress lane. • Provide stop control for the northbound approach. • Provide an internal protected stem of 50 feet, as measured from the right-of-way line. • Construct an eastbound deceleration lane with 50 feet of full width storage and a 200-foot taper. Approval with Conditions for the Holly Shelter Industrial Park Traffic Impact Analysis – New Hanover Page 4 of 4 Full Build • No further improvements are required. If changes are made to the proposed site driveways and/or land uses, the current trip distribution may need to be modified and would require a revised Traffic Impact Analysis to be submitted for review by the NCDOT, WMPO, and New Hanover County, in which instance this approval would become null and void. The applicant is required to obtain all applicable New Hanover County and NCDOT permits for access to the road network. A copy of this TIA approval shall be included with any NCDOT driveway permit application. All applicable NCDOT and New Hanover County technical standards and policies shall apply. Please contact me at (910) 341-7890 with any questions regarding this approval. Sincerely, Abby Lorenzo, MPA Deputy Director Wilmington Urban Area MPO Ec: Ben Hughes, PE, District Engineer, NCDOT Jon Roan, Deputy District Engineer, NCDOT Michael Bass, Assistant District Engineer, NCDOT Frank Mike, Assistant District Engineer, NCDOT Madi Lee, PE, Development Review Engineer, NCDOT Stonewall Mathis, PE, Division Traffic Engineer, NCDOT Bryce Cox, Assistant Traffic Engineer, NCDOT Nick Drees, Engineering Specialist, NCDOT Robert Farrell, Development Review Supervisor, New Hanover County Zach Dickerson, Development Review Senior Planner, New Hanover County Bill McDow, Associate Planner, WMPO