Loading...
HomeMy WebLinkAbout252033 Market Street Cook Out TIA_FINAL_2025-10-27TRANSPORTATION IMPACT ANALYSIS October 27, 2025 Project # 252033 Wilmington, NC Prepared For: Cook Out Restaurants Inc. Market Street Cook Out Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Home Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 NC License: C-2522 Winston-Salem, NC 27101 Main: 336.744.1636; Fax: 336.458.9377 Transportation Impact Analysis Market Street Cook Out Wilmington, NC Prepared for Cook Out Restaurants Inc. October 27, 2025 Analysis and Graphics by: Dylan Coley, PE Reviewed by: Scott A. James, PE, PTOE Sealed by: Dylan Coley, PE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 10/27/2025 252033 Market Street Cook Out i EXECUTIVE SUMMARY The proposed Market Street Cook Out is located at 7245 Market Street in New Hanover County, NC. It will consist of a 4,450 square foot fast food restaurant with a drive-through window. The location was previously a high turnover (sit-down) restaurant, and the existing driveway will be maintained as a right-in/right-out access to US 17 (Market Street); no other access points are proposed. The expected build-out year for this development is 2027. Information regarding the property was provided by Sambatek. DAVENPORT was retained to determine the potential traffic impact of this development and to identify transportation improvements that may be required to accommodate the new development site traffic. The Transportation Impact Analysis (TIA) was performed based on the scope agreed upon with the Wilmington Urban Area Metropolitan Planning Organization (WMPO), New Hanover County and the North Carolina Department of Transportation (NCDOT). This site has a trip generation potential of 2,019 daily trips, 254 trips in the midday peak hour, and 173 trips in the PM peak hour. In conclusion, this study has estimated the potential traffic impact of this development and determined that no improvements are necessary to mitigate future traffic. The proposed site traffic is not expected to have a detrimental effect on transportation capacity and mobility in the study area. The site access recommendations summarized in Figure A and in Table A should be in compliance with applicable NCDOT Policy on Street and Driveway Access to North Carolina Highways and/or local standards. Table A – Recommended Improvements INTERSECTION RECOMMENDATIONS US 17 (Market Street) and Site Access •Maintain existing site access configuration. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE ***This document, together with the concepts and designs presented herein, is intended only for the specificpurpose and client for which it was prepared. Reuse of, or improper reliance on, this document by otherswithout written authorization and adaptation by DAVENPORT, shall be without liability to DAVENPORT, andshall be a violation of the agreement between DAVENPORT and the client. FIGURE A RECOMMENDED IMPROVEMENTS MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 BLACK = EXISTING GRAY = UNANALYZED BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP IPS = INTERNAL PROTECTED STEM SIGNALIZED RCI 65 0 ' SPEEDLIMIT45 SR-1929 (Wendover Lane) US 1 7 S B ( M a r k e t St r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Proposed Site Access 50' IPS Maintain existing site access configuration. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out iii Table of Contents EXECUTIVE SUMMARY ................................................................................................. i Figure A: Recommended Improvements .............................................................................. ii 1.0 Introduction ............................................................................................................. 1 Figure 2A – Site Location Map ............................................................................................... 3 Figure 2B – Vicinity Map ......................................................................................................... 4 2.0 Existing Conditions ................................................................................................ 5 2.1 Inventory .............................................................................................................................. 5 2.2 Existing Traffic Volumes ................................................................................................... 5 Figure 3 – Existing Lane Geometry ....................................................................................... 6 Figure 4 – Existing Traffic Volumes ...................................................................................... 7 3.0 Approved Development and Committed Improvements ..................................... 8 3.1 Approved Developments .................................................................................................. 8 3.2 Committed Improvements ................................................................................................ 8 4.0 Methodology ........................................................................................................... 8 4.1 Baseline Assumptions and Standards ........................................................................... 8 4.2 Trip Generation .................................................................................................................. 9 4.3 Trip Distribution and Assignment .................................................................................... 9 4.4 Future Build Volumes ........................................................................................................ 9 Figure 5 – Trip Distribution ................................................................................................... 10 Figure 6 – Site Trips............................................................................................................... 11 Figure 7 – Future Build Volumes ......................................................................................... 12 5.0 Capacity Analysis ................................................................................................. 13 5.1 Level of Service Evaluation Criteria .............................................................................. 13 5.2 Queueing Evaluation ....................................................................................................... 13 5.3 Level of Service and Queueing Results ....................................................................... 14 6.0 Internal Protected Stem ....................................................................................... 16 7.0 Summary and Conclusion ................................................................................... 16 Figure 8 – Recommended Improvements .......................................................................... 17 Appendix ...................................................................................................................... 18 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 1 1.0 Introduction The proposed Market Street Cook Out is located at 7245 Market Street in New Hanover County, NC. It will consist of a 4,450 square foot fast food restaurant with a drive-through window. The location was previously a high turnover (sit-down) restaurant, and the existing driveway will be maintained as a right-in/right-out access to US 17 (Market Street); no other access points are proposed. The expected build-out year for this development is 2027. Information regarding the property was provided by Sambatek. A conceptual site plan is shown in Figure 1, and a site location map and a vicinity map are provided in Figures 2A and 2B, respectively. DAVENPORT was retained to determine the potential traffic impact of this development and to identify transportation improvements that may be required to accommodate the new development traffic. The following intersections are included in the study: 1.US 17 (Market Street) at Site Access (unsignalized right-in/right-out) This intersection was analyzed during the AM and PM peaks for the following conditions: •2025 Existing Conditions •2027 Future Build Conditions •2027 Future Build Conditions + Improvements The Transportation Impact Analysis (TIA) was performed based on the scope agreed upon with the Wilmington Urban Area Metropolitan Planning Organization (WMPO), New Hanover County and the North Carolina Department of Transportation (NCDOT). It was conducted according to the standards and best practices of the transportation engineering profession. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D FIGURE 1 CONCEPTUAL SITE PLAN Cook Out Market Street Project Number 252033 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D FIGURE 2A SITE LOCATION MAP SITE INDICATOR N Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D FIGURE 2B VICINITY MAP SITE INDICATOR STUDY INTERSECTION N Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 5 2.0 Existing Conditions 2.1 Inventory Table 2.1 presents a summary of the study area roadway conditions. Figure 3 shows the existing lane geometry. Table 2.1 - Street Inventory Facility Name Route # 2023 AADT (vpd) Typical Cross Section Lane Width Speed Limit (MPH) Maintained By Market Street US 17 44,000 4-lanedivided 11 feet 45 NCDOT 2.2 Existing Traffic Volumes 24-hour bi-directional counts for this project were collected by Burns Services, Incorporated onWednesday, October 8, 2025, when local public schools were in session. Table 2.2 contains thelocation, date, and times these counts were conducted. As Cook Out restaurants do not openuntil 10:30am, the midday peak hour was used instead of the AM peak hour. The weekday middayand PM peak hours on US 17 were identified as 11am-12pm and 5-6pm. The existing weekdaymidday and PM peak hour volumes are shown in Figure 4. Traffic count data are provided in theAppendix. Table 2.2 - Traffic Volume Data Count Location Date Taken Hours US 17 (Market Street) Wednesday, October 8, 2025 12:00am – 11:59pm Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE ***This document, together with the concepts and designs presented herein, is intended only for the specificpurpose and client for which it was prepared. Reuse of, or improper reliance on, this document by otherswithout written authorization and adaptation by DAVENPORT, shall be without liability to DAVENPORT, andshall be a violation of the agreement between DAVENPORT and the client. MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 2023 AADT VOLUMESXXXX BLACK = EXISTING GRAY = UNANALYZED TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP FIGURE 3 EXISTING LANE GEOMETRY SIGNALIZED RCI 65 0 ' 44 , 0 0 0 SPEEDLIMIT45 SR-1929 (Wendover Lane) US 1 7 S B ( M a r k e t St r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Existing Site Access (Vacant Site) Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE *** BLACK = EXISTING TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, thisdocument by others without written authorization and adaptation by DAVENPORT, shall be withoutliability to DAVENPORT, and shall be a violation of the agreement between DAVENPORT and theclient. FIGURE 4 2025 EXISTING TRAFFIC VOLUMES MIDDAY / PM PEAKS ** A minimum of 4 vehicles per hour is analyzed for each movement perNCDOT Congestion ManagementGuidelines. 0 / 0 0 / 0 14 9 1 / 1 5 8 7 SIGNALIZED RCI SR-1929 (Wendover Lane) US 1 7 S B (M a r k e t S t r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Existing Site Access (Vacant Site) Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 8 3.0 Approved Development and Committed Improvements 3.1 Approved Developments Approved developments are projects that have been authorized in the area but are not yet constructed. Per the approved scoping document, there are no approved developments to consider for this site. 3.2 Committed Improvements Committed improvements are projects planned by NCDOT, the County, or City, or that are associated with a prior approved development(s) in the area but are not yet constructed. Per the approved scoping document, there is one committed improvement to be included in this study. •U-4902D – NCDOT STIP project to convert segments of US 17 to a reduced conflict intersection (RCI) corridor. In the immediate vicinity of the site, U-4902D improvements were already in place at the time traffic volume data was collected. As such, U-4902D roadway geometry was used as the basis for all analysis scenarios, including the 2025 “Existing Conditions” scenario. 4.0 Methodology 4.1 Baseline Assumptions and Standards In general, the analysis for this project was conducted utilizing commonly accepted NCDOT standards. Table 4.1 contains a summary of the baseline assumptions. Table 4.1 - Assumptions Annual Growth Rate 1% Analysis Software Synchro/SimTraffic Lane Widths 12 feet Peak Hour Factor 0.90 Truck Percentage 2% A minimum of four vehicles per hour were assigned to all movements, per NCDOT Congestion Management standards. This includes entering and exiting movements at the site access in the 2025 existing conditions analysis, though the site is currently vacant and not generating traffic. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 9 4.2 Trip Generation The proposed development will consist of a 4,450 square foot fast food restaurant with a drive-through window. As approved in the scoping document, the trip generation potential of this site was projected based on a custom Cook Out trip generation rate study developed by DAVENPORT, which references the volume on the adjacent roadway as the independent variable. The site trip generation was based on the NCDOT 2023 AADT volumes, which estimated 44,000 vehicles per day traveling on US 17. The data collection effort described in Section 2.2 observed a daily total volume of 45,437 vehicles during the 24-hour collection period. To be conservative, the trip generation was revised to reference 45,500 vehicles per day as the adjacent street volume. Relevant excerpts from the custom Cook Out trip generation study are provided in the Appendix. Table 4.2 presents the result of the proposed development’s trip generation potential. Table 4.2 - ITE 11th Edition Trip Generation Average Weekday Driveway Volumes Daily Midday Peak Hour PM Peak Hour Land Use Independent Variable Data Source Total Enter Exit Total Enter Exit Total Cook Out 45.5k vpd Daily Adjacent Street Volume Custom Trip Generation Study 2,064 132 130 262 91 88 179 Total Primary Trips 2,064 132 130 262 91 88 179 4.3 Trip Distribution and Assignment The Site Access is an existing right-in/right-out access driveway, supported by the presence of a centerline median on US 17 (Market Street). As such, all site trips originate from the northeast and exit to the southwest. Site trip distributions are shown in Figure 5. 4.4 Future Build Volumes The 2027 Future Build traffic volumes were computed by applying a one percent (1%) compounded annual growth rate to the 2025 Existing traffic volumes and adding site trips. Site trips are shown in Figure 6 and 2027 Future Build volumes are shown in Figure 7. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE *** MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, thisdocument by others without written authorization and adaptation by DAVENPORT, shall be withoutliability to DAVENPORT, and shall be a violation of the agreement between DAVENPORT and theclient. FIGURE 5 TRIP DISTRIBUTION ** A minimum of 4 vehicles per hour is analyzed for each movement perNCDOT Congestion ManagementGuidelines. BLACK = EXISTING GRAY = UNANALYZED BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP ORIGIN/DESTINATION NODE% IN = ENTERING OUT = EXITING 100% OUT 10 0 % I N SR-1929 (Wendover Lane) US 1 7 S B (M a r k e t S t r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Proposed Site Access 100% IN 100% OUT SIGNALIZED RCI Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE *** BLACK = EXISTING GRAY = UNANALYZED BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, thisdocument by others without written authorization and adaptation by DAVENPORT, shall be withoutliability to DAVENPORT, and shall be a violation of the agreement between DAVENPORT and theclient. FIGURE 6 SITE TRIPS MIDDAY / PM PEAKS ** A minimum of 4 vehicles per hour is analyzed for each movement perNCDOT Congestion ManagementGuidelines. 130 / 88 13 2 / 9 1 0 / 0 SR-1929 (Wendover Lane) US 1 7 S B (M a r k e t S t r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Proposed Site Access SIGNALIZED RCI Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE *** BLACK = EXISTING GRAY = UNANALYZED BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, thisdocument by others without written authorization and adaptation by DAVENPORT, shall be withoutliability to DAVENPORT, and shall be a violation of the agreement between DAVENPORT and theclient. FIGURE 7 2027 FUTURE BUILD VOLUMES MIDDAY / PM PEAKS ** A minimum of 4 vehicles per hour is analyzed for each movement perNCDOT Congestion ManagementGuidelines. 130 / 88 13 2 / 9 1 15 2 1 / 1 6 1 9 SR-1929 (Wendover Lane) US 1 7 S B (M a r k e t S t r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Proposed Site Access SIGNALIZED RCI Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 13 5.0 Capacity Analysis 5.1 Level of Service Evaluation Criteria The Transportation Research Board’s Highway Capacity Manual (HCM) utilizes the term “level of service” (LOS) to measure how traffic operates in intersections and on roadway segments. There are six levels of service ranging from A to F as shown in Table 5.1. Level of service “A” represents low-volume traffic operations and level of service “F” represents high-volume, oversaturated traffic operations. Synchro traffic modeling software is used to determine the LOS and delay for study intersections. Synchro analysis worksheet reports are provided in the Appendix. 5.2 Queueing Evaluation A queueing analysis was performed using Synchro and SimTraffic™ simulation software, based on a minimum 10-minute seeding, a 60-minute recording period, and 10 runs. The maximum SimTraffic queues and 95th-percentile Synchro queues are provided, along with the turn lane lengths. Synchro and SimTraffic queue reports are provided in the Appendix. Table 5.1 – Highway Capacity Manual Levels of Service and Control Delay Criteria Signalized Intersection Unsignalized Intersection Level of Service Control Delay Per vehicle (seconds) Level of Service Delay Range (seconds) A ≤ 10 A ≤ 10 B >10 and ≤ 20 B >10 and ≤ 15 C >20 and ≤ 35 C >15 and ≤ 25 D >35 and ≤ 55 D >25 and ≤ 35 E >55 and ≤ 80 E >35 and ≤ 50 F >80 F >50 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 14 5.3 Level of Service and Queueing Results The results of the capacity and queue analyses are discussed in the following paragraphs. The LOS, delay, and queue results are summarized in Table 5.2. US 17 (Market Street) and Site Access (unsignalized right-in/right-out) During both the weekday midday and PM peak hours, the eastbound approach of the intersection operates at LOS C under Existing conditions (with 4 vehicles entering and exiting the site access though the site is currently vacant, as described in Section 2.2). Under Future Build conditions, the eastbound approach operates at LOS D during both peak hours. Minimal queuing is observed on the approaches. The need for a right-turn lane was evaluated using NCDOT Division 3’s turn lane nomograph. Based on the projected volumes, and an assumed 55% of US 17 southbound through traffic using the outside lane, the nomograph advises a southbound right-turn lane with 200 feet of storage and appropriate deceleration and taper lengths. However, given the physical constraints of a nearby driveway, there is insufficient space to construct such a turn lane. The LOS of the eastbound approach is typical of unsignalized approaches at a major thoroughfare such as US 17.The capacity and queuing analysis indicate that the Site Access can function adequatelywithout a southbound right-turn lane. Additionally, US 17 in the vicinity of the project areagenerally does not have dedicated turn lanes for site accesses. Therefore, it is not recommended to install a southbound right-turn lane. It is recommended that the site access remain in its currentconfiguration, with one ingress lane and one egress lane. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 15 Table 5.2 - LOS and Queueing US 17 (Market Street) and Site Access Scenario Worst Approach Level of Service per Movement & by Approach (delay in seconds/vehicle) Eastbound Southbound AM Peak Hour 2025 Existing C (16.7) EB Approach R TR C (16.7) A (0.0) Available Storage (ft) FULL FULL 95th% Queue (ft) 0 0 Max Queue (ft) 32 0 2027 Future Build D (32.1) EB Approach R TR D (32.1) A (0.0) Available Storage (ft) FULL FULL 95th% Queue (ft) 73 0 Max Queue (ft) 104 0 PM Peak Hour 2025 Existing C (17.7) EB Approach R TR C (17.7) A (0.0) Available Storage (ft) FULL FULL 95th% Queue (ft) 0 0 Max Queue (ft) 32 0 2027 Future Build D (26.8) EB Approach R TR D (26.8) A (0.0) Available Storage (ft) FULL FULL 95th% Queue (ft) 43 0 Max Queue (ft) 88 0 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 16 6.0 Internal Protected Stem The NCDOT Policy on Street and Driveway Access to North Carolina Highways, or the Driveway Manual, states that the length of the internal protected stem (IPS) will be determined from the maximum vehicle storage required as measured from the right-of-way line to the nearest conflict point with a minimum recommendation of 100 feet. For the purposes of this report, the IPS is estimated from the edge of right-of-way as shown in the conceptual site plan. Table 6.1 summarizes the maximum storage recorded in the analysis as compared to the estimated IPS. The proposed one-way on-site circulation pattern is anticipated to minimize traffic concerns related to the short IPS. Table 6.1 – Queue Lengths on Site Driveways Site Drive Estimated IPS (feet) 95th-percentile Queue (feet) Maximum Queue (feet) AM PM AM PM Site Access - Eastbound 50 73 43 104 88 7.0 Summary and Conclusion The proposed Market Street Cook Out is located at 7245 Market Street in New Hanover County, NC. It will consist of a 4,450 square foot fast food restaurant with a drive-through window. The location was previously a high turnover (sit-down) restaurant, and the existing driveway will be maintained as a right-in/right-out access to US 17 (Market Street); no other access points are proposed. The expected build-out year for this development is 2027. Information regarding the property was provided by Sambatek. The Transportation Impact Analysis (TIA) was performed based on the scope agreed upon with the Wilmington Urban Area Metropolitan Planning Organization (WMPO), New Hanover County, and the North Carolina Department of Transportation (NCDOT). This site has a trip generation potential of 2,064 daily trips, 262 trips in the midday peak hour, and 179 trips in the PM peak hour. In conclusion, this study has determined the potential traffic impact of this development. No improvements are recommended to mitigate future site traffic. Table 7.1 summarizes the study recommendations, which are also reflected in Figure 8. Table 7.1 – Summary of Recommended Improvements INTERSECTION RECOMMENDATIONS US 17 (Market Street) and Site Access •Maintain existing site access configuration. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D *** NOT TO SCALE ***This document, together with the concepts and designs presented herein, is intended only for the specificpurpose and client for which it was prepared. Reuse of, or improper reliance on, this document by otherswithout written authorization and adaptation by DAVENPORT, shall be without liability to DAVENPORT, andshall be a violation of the agreement between DAVENPORT and the client. FIGURE 8 RECOMMENDED IMPROVEMENTS MARKET STREET COOK OUT NEW HANOVER COUNTY, NC PROJECT NUMBER 252033 BLACK = EXISTING GRAY = UNANALYZED BLUE = PROPOSED TRAFFIC MOVEMENT ROADWAY LEGEND SIGNAL STOP IPS = INTERNAL PROTECTED STEM SIGNALIZED RCI 65 0 ' SPEEDLIMIT45 SR-1929 (Wendover Lane) US 1 7 S B ( M a r k e t St r e e t ) US 1 7 N B (M a r k e t S t r e e t ) Proposed Site Access 50' IPS Maintain existing site access configuration. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 10/27/2025 252033 Market Street Cook Out 18 Appendix Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 252033 Market Street Cook Out Approved Scoping Documents Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D August 22, 2025 REVISED September 5, 2025 Mr. Scott James, PE, PTOE Davenport 1426 Navaho Trail, #108 Wilmington, NC 28409 RE: Revised approved Scope for the Traffic Impact Analysis (TIA) associated with the proposed Cookout (Market Street) in New Hanover County, North Carolina Dear Mr. James: Based on the information provided, and conversations held to date, it is our understanding that the proposed Cookout (Market Street), to be located in New Hanover County, will be built in 2027 and consist of: Build Year 2027  ITE Land Use Code 934: 4.45kSF Fast Food Restaurant with Drive-Through Window  ITE Land Use Code 935: 4.45kSF Fast Food Restaurant with Drive-Through and No Indoor Seating Below please find the scope to be used for the Traffic Impact Analysis: 1. Data Collection - Analysis Parameters: a. Study Intersections i. US 17 (Market Street) at Site Access (Right in/Right out) b. Traffic counts i. N/A c. Site Trip Generation, Site Trip Distribution and Background Traffic Assumptions i. Site Trip Generation Estimate  Approved as submitted in scoping request (by DAVENPORT, dated 08/08/25), per the DAVENPORT 2009 Trip Generation Study, Cook Out. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Page 2 of 3 ii. Site Trip Distribution  To be submitted for approval and approved prior to use in the TIA. iii. Adjacent Development (approved but as of yet to be built);  N/A iv. Planned Roadway Improvements  U-4902D US 17 Business (Market Street) v. Background Traffic Assumptions  Build year – 2027  Growth rate – 1% per year 2. Capacity Analysis: Weekday AM & PM Peak Hour a. Technical Analysis i. 2025 Existing Conditions ii. 2027 Future No-Build Conditions [existing + 1% background growth] iii. 2027 Future Build Conditions [existing + 1% background growth + site trips] iv. 2027 Future Build Conditions with Improvements [existing + 1% background growth + site trips + improvements] 3. Final Report Submittal: a. Completed TIA Application b. Signed and sealed by a Professional Engineer c. Electronic copies to include PDF of TIA and Synchro files and Synchro analysis files in digital format 4. Notes: a. This scope shall remain valid for three months from the date of this letter. b. Please note that if any changes occur (including but not limited to; land use, intensity, phasing, and/or site access) additional analysis may be required. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Page 3 of 3 Please contact me at (910) 341-7890 with any questions regarding this scope. Sincerely, Caitlin M. Cerza Transportation Planning Engineer Wilmington Urban Area MPO Attachments: Traffic Impact Analysis Supplemental Guidelines (dated September 28, 2022) Scoping request application (provided by Davenport, dated August 8, 2025) Ec: Ben Hughes, PE, District Engineer, NCDOT Jon Roan, Deputy District Engineer, NCDOT Michael Bass, Assistant District Engineer, NCDOT Frank Mike, Assistant District Engineer, NCDOT Madi Lee, PE, Development Review Engineer, NCDOT Stonewall Mathis, PE, Division Traffic Engineer, NCDOT Bryce Cox, Senior Assistant Traffic Engineer, NCDOT Nick Drees, Engineering Specialist, NCDOT Abby Lorenzo, MPA, Deputy Director, WMPO Luke Hutson, Engineering Associate, WMPO Robert Farrell, Development Review Supervisor, New Hanover County Zach Dickerson, Senior Development Review Planner, New Hanover County Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Traffic Impact Analysis Supplemental Guidelines Developed by: NCDOT Division 3 Page 1 of 4 Updated: 09/28/2022 Submittal Framework for TIAs (3 Step process) Step 1: Scoping Document – A scope approval will be provided no later than 10 business days from receipt of the complete scoping document. Incomplete scoping documents will not be accepted for review and approval. The documents to include for review and approval are: 1. Site Plan/Vicinity Map and a plan overlay on an aerial map 2. Proposed Land Uses and Trip Generation, including Pass-by and Internal Capture 3. Proposed Study Intersections and Types of Accesses 4. Proposed Annual Growth Rate with justification 5. Proposed Build Out Year(s) 6. Study Method for Capacity Analysis – peak periods and conditions 7. Approved Adjacent Developments 8. Committed Improvements *IMPORTANT* If the proposed development is phased, then land uses, trip generation estimates, build out years, roadway improvements and analysis must reflect the proposed phasing. The phase schedule must be submitted for approval prior to use in the TIA. Step 1.A: Pre-Completeness Check – Documents for Input Verification prior to full TIA submittal – This step is recommended, as these will be the first items checked at Step 2. If the applicant chooses to submit for input verification, then comments or approval will be provided no later than 20 business days from receipt of the documents. This step will result in the reduced likelihood of issues discovered in the Completeness Review and Final Review. All or any portion of these items can be submitted for review/approval: 1. Trip Distribution – Traffic counts must be performed prior to submittal of proposed distributions. 2. Proposed Volume Balancing 3. All diagrams – Existing Traffic Volumes, Future No Build Volumes, and Future Build Volumes 4. Synchro / Sidra Network Model Framework – Submit the framework for the Future No Build analysis. This Synchro / Sidra model can be modified for Existing analysis. Step 2: Completeness Review – TIA Report – A digital submittal of the completed document is to be submitted for Preliminary Review. This review will be conducted to determine the completeness of the TIA report, and comments or approval will be provided no later than 20 business days from receipt of the TIA. Step 3: Final Sealed TIA Report - After preliminary approval has been provided, a digital and/or hard copy (as requested) of the sealed TIA report is to be submitted. Final review comments or approval will be provided no later than 20 business days from receipt of the TIA. The NCDOT Congestion Management Section’s Capacity Analysis Guidelines Standards & Best Practices shall be the basis for the development of all TIA reports. This Supplement provides a submittal framework for TIAs, as well as direction on certain items within the Standards & Best Practices. Any deviations from the any of these documents must be approved prior to preparation of the TIA. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Developed by: NCDOT Division 3 Page 2 of 4 Updated: 09/28/2022 Supplemental Direction for the Capacity Analysis Standards & Best Practices Background Traffic Assumptions, Site Trip Generation, and Site Trip Distribution 1. Peak Hour Determination – In order to establish an accurate peak hour for analysis, the controlling study intersection shall be determined. Once determined, the controlling intersection’s peak hour timeframe shall be used for all other study intersections: a) Analyze all study intersection volumes and determine the controlling intersection (intersection with highest total volume). b) Identify the relevant peak hours for the controlling intersection (e.g. 7:45-8:45 AM; 4:45-5:45 PM). c) Use the volumes from the same peak hour at all other intersections in the study. d) Do not use volume balancing without prior approval. Use of the same time period at all intersections will typically reduce the need to perform volume balancing. 2. Site Trip Generation: a) Unadjusted Trips – Use the appropriate Land Use Code in the ITE Trip Generation Manual (currently the 11th Edition). The NCDOT Congestion Management Rate vs Equation Spreadsheet recommends the variable, peak hour type, and type of trip calculation method to use for specific land uses. b) Internal Capture - The Standards state to limit reductions for internal capture to the “land use categories and time periods in the current HANDBOOK.” The current ITE Trip Generation Handbook is the 3rd Edition. The Standards also state to estimate internal capture rates “using the NCHRP 684 spreadsheet referenced in the current HANDBOOK.” The Standards give guidance on using the spreadsheet: “Do not use transit or non-motorized splits in spreadsheet. Vehicle occupancy “1.1” (NC averages). Use Walking Distance between land uses of 4000’ or the calculated maximum distance between a given pair of land use categories in the proposed site.” To determine the internal capture entering and exiting per Land Use, use the percentages in Table 6-P: Internal Capture Percentages by Land Use with the “Estimated Vehicle-Trips” in Table 1-P: Base Vehicle-Trip Generation Estimates (Tables found in the NCHRP 684 Internal Trip Capture Estimation Tool). c) Pass-by – The Standards state “to limit pass-by percentages to retail land uses in [the] HANDBOOK.” The current ITE Trip Generation Handbook is the 3rd Edition. The calculation of the trips should be based on the total peak hour trips with a 50/50 entering/exiting split; they are pass- by trips which means they enter and exit along the same path, in the same direction, within the same hour. The pass-by will be capped at 10% of the adjacent street traffic. 3. Site Trip Distribution – Determined based on collected traffic count data. Both site trip distribution and pass-by trip distribution should be submitted for approval prior to use in the TIA. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Developed by: NCDOT Division 3 Page 3 of 4 Updated: 09/28/2022 Synchro Signalized Intersection Setup 1. For existing signals, the size and position of the detector loops and the timing chart settings must match the existing signal plans, with exception of: a) Yellow Time = 5 sec b) Red Time = 2 sec c) Specific timing settings provided by the signal timing agency 2. For proposed signals, size and place the detector loops according to Part 1, Section 4 of the NCDOT Signal Design Manual. 3. Contact signal timing agency for existing peak hour timings and other operational mode information. Request specific analysis periods to ensure proper information is provided. 4. Existing signal timings shall be “locked” for all scenarios unless signal phasing changes are necessary in the “Future Build with Improvements” scenario. 5. Recall Mode: a) If simulating ‘free run’ operation (Actuated-Uncoordinated), use Min Recall on main street phases. b) If simulating ‘Coordinated Mode’ (Actuated-Coordinate), use C-Max on the coordinated phases. 6. Right-Turn-On-Red (RTOR) shall not be used in existing or future conditions without prior approval. In some circumstances, RTOR may be necessary to minimize Synchro conflict errors. 7. All signalized left turns with a dedicated signal phase will be protected-only movements in all future conditions. Protected-only left turn phasing in future conditions will identify required vehicle storage needs in the event that protected-only phasing is necessary in the future. 8. Permissive-only left-turn phasing should remain permissive in future conditions, except where protected-only phasing is being analyzed as an improvement to the intersection in the Future Build with Improvement condition. Synchro Analysis and Data Reports 1. Any “Field Condition” analysis that the engineer wishes to include can be provided in a separate supplemental analysis file. 2. The “Future No-Build” and “Future Build” analysis conditions should only include improvements that are a requirement of approved developments or a State/Municipal project to be constructed in the build year for the proposed development. Any other capacity gained from lane improvements shown in the analysis is assumed to be proposed by the developer and should only be included in the “Future Build + Improvements” analysis condition. 3. The TIA shall include a chart that shows the “Level of Service” and “Delay” for each movement, approach, and overall intersection, for every access alternative and build scenario. 4. A SimTraffic “Queuing and Blocking Report” for the network shall be included. 5. A comparison chart listing the Synchro 95th Percentile Queues and the SimTraffic Maximum Queues shall be provided for all exclusive turn lanes. This chart shall include the existing turn lane length for comparison to the reported Queue lengths. A sample chart is included on the last page. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Developed by: NCDOT Division 3 Page 4 of 4 Updated: 09/28/2022 Recommendations of the TIA Report 1. The NCDOT Policy On Street And Driveway Access to North Carolina Highways (p. 21-22) states, “The applicant shall be required to identify mitigation improvements to the roadway network if at least one of the following conditions exists when comparing base network conditions to project conditions: a) The total average delay at an intersection or individual approach increases by 25% or greater, while maintaining the same Level of Service, b) The Level of Service degrades by at least one level, or c) Level of Service is “F.” 2. In the event that approved developments do not move forward, a revised scenario reflecting the future conditions will be required as directed by the reviewing agencies to reflect the changes in the underlying assumptions of the analysis. 3. The Best Practices state, “When performing analyses, providing an adequate overall intersection LOS alone is not sufficient. Items such as queuing, individual movement level of service, and volume-to- capacity ratio should be evaluated and addressed.” The information in the charts listed under “Synchro Analysis and Data Reports” in the previous section, should be used when determining the improvements to address the impacts of site-generated traffic. 4. Recommended storage lane lengths shall be provided for all exclusive turn lanes and based on the Synchro 95th Percentile Queue or the SimTraffic Maximum Queue, whichever is larger. 5. If phase changes are recommended as an improvement, then a Synchro analysis for “Future Build + Improvements” shall be included in the TIA. 6. Signal timing adjustments and/or Signal Optimization in Synchro (i.e. “Optimize Splits”) shall not be used unless phase changes are recommended as an improvement. Signal timing adjustment and/or Signal Optimization as a sole “improvement” to mitigate the impacts of site-generated traffic will not be permitted. 7. Use the Manual on Uniform Traffic Control Devices for proposed full-movement signals to conduct signal warrant analysis based upon a 13-hour turning movement count. 8. Use the Guidelines for Signalization of Intersections with Two or Three Approaches (ITRE report dated December 31, 2017) where applicable, to determine possible signalization. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 1426 Navaho Trail, #108 Winston-Salem, NC 27101 Wilmington, NC 28409 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912 Date Received by WMPO/NCDOT (to be completed by the Department): ________________________ Date Submitted by Applicant: August 08, 2025 Transportation Impact Analysis (TIA) Scoping DAVENPORT Project Number 252033 7245 Market Street Cookout Restaurant New Hanover County, NC Description: 7245 Market Street (existing restaurant building between Wendover Drive and Lendire Road) Tax Parcel ID: # R04400-002-036-000 Full Build (2027): *Cook Out Restaurant with (1) Drive-Through Window and Limited Indoor Seating Two ITE Land Use Codes apply: ITE Land Use Code 934: 4.45kSF Fast Food Restaurant with Drive-Through Window ITE Land Use Code 935: 4.45kSF Fast Food Restaurant with Drive-Through and No Indoor Seating * We propose to use custom trip generation rates from the 2009 Custom Trip Generation Study Proposed Study Intersections: 1. US 17 (Market Street) at SR 2892 (Lendire Road) - signalized 2. US 17 (Market Street) at SR 2717/ SR 1363 (Torchwood Boulevard/Bayshore Drive) - signalized 3. US 17 (Market Street) at Site Access (Right-in/ Right-out) Proposed annual growth rate: 1%, conservative, due to recent trends in traffic growth. Analysis Periods: Weekday PM peak (4:00 pm - 6:00 pm), and Saturday mid-day Peak (12:00 pm - 2:00 pm) TIA Analysis Scenarios: • 2025 Existing Conditions • 2027 Future No-Build Conditions • 2027 Future Build Conditions • 2027 Future Build Conditions with Improvements (if necessary) 08/08/2025 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Page 2 08/08/2025 7245 Market Street Cookout DAVENPORT Project No. 252033 Home Office: Wilmington Regional Office: Serving the Southeast since 2002 119 Brookstown Ave. Suite PH1 1426 Navaho Trail, #108 Winston-Salem, NC 27101 Wilmington, NC 28409 Main: 336.744.1636; Fax: 336.458.9377 Main: 910.251.8912 Trip Generation Table: Table - ITE 11th Edition Trip Generation Average Weekday Driveway Volumes Daily Volume PM Peak Hour Saturday Peak Hour ITE Land Use Code Metric Data Source Enter Exit Total Enter Exit Total DAVENPORT 2009 Trip Generation Study, Cook Out1 44k AADT Adj Street2 Custom (2009) 2019 88 85 173 97 96 193 934, Fast-Food Restaurant with Drive-Through Window 4450 SF Adjacent- Rate 2080 76 71 147 125* 121* 246* 935, Fast-Food Restaurant with Drive-Through Window and No Indoor Seating 1 Drive-thru Lanes Adjacent- Rate - 30 30 60 65* 66* 131* Total Estimated Site Trips 2019 88 85 173 97 96 193 *Saturday peak trips were calculated using Generator / Rate. 1 Cook Out custom trip generation rate from 2009 DAVENPORT Project #09-218 (excerpted sheets provided) 2 2023 NCDOT AADT volumes (figure attached) Proposed Site Trip Directional Distribution: To be completed and sent for approval after taking counts Approved developments: N/A, unless advised otherwise Committed Improvements: • U- 4902D US 17 Business (Market Street) access management STIP (under construction). Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D FIGURE 1 PRELIMINARY SITE PLAN Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D FIGURE 2A SITE LOCATION MAP SITE INDICATOR SITE Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D FIGURE 2B VICINITY MAP Transportation Impact Analysis Townsend Trace Greensboro, NC Prepared for Linder Ventures III LLC May 4, 2021 Analysis by: Monisha Badarinath, E.I. Drafting/Graphics by: Monisha Badarinath, E.I. Reviewed by: Dionne Brown, P.E. Frank Amenya, P.E., PTOE Sealed by: Frank Amenya, P.E., PTOE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. 05/04/2021 Transportation Impact Analysis Townsend Trace Greensboro, NC Prepared for Linder Ventures III LLC May 4, 2021 Analysis by: Monisha Badarinath, E.I. Drafting/Graphics by: Monisha Badarinath, E.I. Reviewed by: Dionne Brown, P.E. Frank Amenya, P.E., PTOE Sealed by: Frank Amenya, P.E., PTOE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. 05/04/2021 SITE INDICATOR STUDY INTERSECTIONS EXISTING PROPOSED SITE Transportation Impact Analysis Townsend Trace Greensboro, NC Prepared for Linder Ventures III LLC May 4, 2021 Analysis by: Monisha Badarinath, E.I. Drafting/Graphics by: Monisha Badarinath, E.I. Reviewed by: Dionne Brown, P.E. Frank Amenya, P.E., PTOE Sealed by: Frank Amenya, P.E., PTOE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. 05/04/2021 2 Transportation Impact Analysis Townsend Trace Greensboro, NC Prepared for Linder Ventures III LLC May 4, 2021 Analysis by: Monisha Badarinath, E.I. Drafting/Graphics by: Monisha Badarinath, E.I. Reviewed by: Dionne Brown, P.E. Frank Amenya, P.E., PTOE Sealed by: Frank Amenya, P.E., PTOE This document, together with the concepts and designs presented herein, is intended only for the specific purpose and client for which it was prepared. Reuse of, or improper reliance on, this document by others without written authorization and adaptation by DAVENPORT shall be without liability to DAVENPORT and shall be a violation of the agreement between DAVENPORT and the client. SEAL This report is printed on recycled paper with 30% post-consumer content. All paper is FSC Certified. The entire document, including binding, is 100% recyclable. 05/04/2021 1 3 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 2017 46000 4100 51000 2018 2019 46500 4500 50500 2020 2021 41000 48000 2022 2023 44000 4300 53000 Slope -575.00 21.49 175.00 AVERAGE Percent Slope -1.30681818 0.499767442 0.330188679 0% Market Street and Site Access 1 Market Street and Bayshore Drive/Torchwood Boulevard Market Street and Lendire Drive NCDOT AADT Volumes by Location y = -575x + 46675 y = 21.429x + 4221.4 y = 175x + 49925 0 10000 20000 30000 40000 50000 60000 2017 2018 2019 2020 2021 2022 2023 Market Street and Site Access 1 Market Street and Bayshore Drive/Torchwood Boulevard Market Street and Lendire Drive Linear (Market Street and Site Access 1) Linear (Market Street and Bayshore Drive/Torchwood Boulevard) Linear (Market Street and Lendire Drive) Linear (#REF!) Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 2017 48412 7425 53541 2018 49412 7498 56845 2019 48124 7634 57098 2020 7745 2021 48412 7654 58765 2022 47121 7434 59876 2023 46213 7231 56652 2024 45857 7231 55362 Slope -433.03 -40.29 263.75 AVERAGE Percent Slope -0.94430512 -0.557129028 0.476409812 0% Market Street and Site Access 1 Market Street and Bayshore Drive/Torchwood Boulevard Market Street and Lendire Drive WMPO ADT Volumes by Location y = -433.03x + 49630 y = -40.286x + 7662.8 y = 263.75x + 55671 0 10000 20000 30000 40000 50000 60000 70000 2017 2018 2019 2020 2021 2022 2023 2024 Market Street and Site Access 1 Market Street and Bayshore Drive/Torchwood Boulevard Market Street and Lendire Drive Linear (Market Street and Site Access 1) Linear (Market Street and Bayshore Drive/Torchwood Boulevard) Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D WEEKDAY PM PEAK HOUR Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D WEEKDAY PM PEAK HOUR Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 252033 Market Street Cook Out Capacity Analysis Synchro Worksheets Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D HCM 6th TWSC 100: US 17 SB & Site Access 10/16/2025 Scenario 1 252033 Cook Out Market Street 3:05 pm 09/22/2025 Existing Midday Synchro 11 Report DAVENPORT Page 1 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 4 0 0 1491 4 Future Vol, veh/h 0 4 0 0 1491 4 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 4 0 0 1657 4 Major/Minor Minor2 Major2 Conflicting Flow All - 831 - 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 313 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 313 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach EB SB HCM Control Delay, s 16.7 0 HCM LOS C Minor Lane/Major Mvmt EBLn1 SBT SBR Capacity (veh/h) 313 - - HCM Lane V/C Ratio 0.014 - - HCM Control Delay (s) 16.7 - - HCM Lane LOS C - - HCM 95th %tile Q(veh) 0 - - Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D HCM 6th TWSC 100: US 17 SB & Site Access 10/16/2025 Scenario 1 252033 Cook Out Market Street 3:05 pm 09/22/2025 Existing PM Synchro 11 Report DAVENPORT Page 1 Intersection Int Delay, s/veh 0 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 4 0 0 1587 4 Future Vol, veh/h 0 4 0 0 1587 4 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 4 0 0 1763 4 Major/Minor Minor2 Major2 Conflicting Flow All - 884 - 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 288 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 288 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach EB SB HCM Control Delay, s 17.7 0 HCM LOS C Minor Lane/Major Mvmt EBLn1 SBT SBR Capacity (veh/h) 288 - - HCM Lane V/C Ratio 0.015 - - HCM Control Delay (s) 17.7 - - HCM Lane LOS C - - HCM 95th %tile Q(veh) 0 - - Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D HCM 6th TWSC 100: US 17 SB & Site Access 10/16/2025 Scenario 1 252033 Cook Out Market Street 3:05 pm 09/22/2025 2027 FB Midday Synchro 11 Report DAVENPORT Page 1 Intersection Int Delay, s/veh 2.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 130 0 0 1521 132 Future Vol, veh/h 0 130 0 0 1521 132 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 144 0 0 1690 147 Major/Minor Minor2 Major2 Conflicting Flow All - 919 - 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 273 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 273 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach EB SB HCM Control Delay, s 32.1 0 HCM LOS D Minor Lane/Major Mvmt EBLn1 SBT SBR Capacity (veh/h) 273 - - HCM Lane V/C Ratio 0.529 - - HCM Control Delay (s) 32.1 - - HCM Lane LOS D - - HCM 95th %tile Q(veh) 2.9 - - Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D HCM 6th TWSC 100: US 17 SB & Site Access 10/16/2025 Scenario 1 252033 Cook Out Market Street 3:05 pm 09/22/2025 2027 FB PM Synchro 11 Report DAVENPORT Page 1 Intersection Int Delay, s/veh 1.3 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 88 0 0 1619 91 Future Vol, veh/h 0 88 0 0 1619 91 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 ---- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 22222 Mvmt Flow 0 98 0 0 1799 101 Major/Minor Minor2 Major2 Conflicting Flow All - 950 - 0 Stage 1 - - - - Stage 2 - - - - Critical Hdwy - 6.94 - - Critical Hdwy Stg 1 - - - - Critical Hdwy Stg 2 - - - - Follow-up Hdwy - 3.32 - - Pot Cap-1 Maneuver 0 261 - - Stage 1 0 - - - Stage 2 0 - - - Platoon blocked, % - - Mov Cap-1 Maneuver - 261 - - Mov Cap-2 Maneuver - - - - Stage 1 - - - - Stage 2 - - - - Approach EB SB HCM Control Delay, s 26.8 0 HCM LOS D Minor Lane/Major Mvmt EBLn1 SBT SBR Capacity (veh/h) 261 - - HCM Lane V/C Ratio 0.375 - - HCM Control Delay (s) 26.8 - - HCM Lane LOS D - - HCM 95th %tile Q(veh) 1.7 - - Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 252033 Market Street Cook Out Queueing Analysis SimTraffic Worksheets Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Queuing and Blocking Report Existing Midday 10/16/2025 Scenario 1 252033 Cook Out Market Street SimTraffic Report DAVENPORT Page 1 Intersection: 100: US 17 SB & Site Access Movement EB Directions Served R Maximum Queue (ft) 32 Average Queue (ft) 4 95th Queue (ft) 22 Link Distance (ft) 994 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Queuing and Blocking Report Existing PM 10/16/2025 Scenario 1 252033 Cook Out Market Street SimTraffic Report DAVENPORT Page 1 Intersection: 100: US 17 SB & Site Access Movement EB Directions Served R Maximum Queue (ft) 32 Average Queue (ft) 4 95th Queue (ft) 21 Link Distance (ft) 994 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Queuing and Blocking Report 2027 FB Midday 10/16/2025 Scenario 1 252033 Cook Out Market Street SimTraffic Report DAVENPORT Page 1 Intersection: 100: US 17 SB & Site Access Movement EB Directions Served R Maximum Queue (ft) 104 Average Queue (ft) 48 95th Queue (ft) 81 Link Distance (ft) 994 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Queuing and Blocking Report 2027 FB PM 10/16/2025 Scenario 1 252033 Cook Out Market Street SimTraffic Report DAVENPORT Page 1 Intersection: 100: US 17 SB & Site Access Movement EB Directions Served R Maximum Queue (ft) 88 Average Queue (ft) 40 95th Queue (ft) 71 Link Distance (ft) 994 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 0 Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 252033 Market Street Cook Out Traffic Counts Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Printed: 10/14/2025 at 08:34 TrafficViewer Pro v1.6.4.124 PicoCount 2500 V2.41 (s/n# 23091872) Daily Vehicle Volume Report Location: Unit ID: Study Date: Wilmington 18946 EB 18946 eb Wednesday, 10/08/2025 Northbound Volume Southbound Volume Total Volume 00:00 - 00:14 00:15 - 00:29 00:30 - 00:44 00:45 - 00:59 01:00 - 01:14 01:15 - 01:29 01:30 - 01:44 01:45 - 01:59 02:00 - 02:14 02:15 - 02:29 02:30 - 02:44 02:45 - 02:59 03:00 - 03:14 03:15 - 03:29 03:30 - 03:44 03:45 - 03:59 04:00 - 04:14 04:15 - 04:29 04:30 - 04:44 04:45 - 04:59 05:00 - 05:14 05:15 - 05:29 05:30 - 05:44 05:45 - 05:59 06:00 - 06:14 06:15 - 06:29 06:30 - 06:44 06:45 - 06:59 07:00 - 07:14 07:15 - 07:29 07:30 - 07:44 07:45 - 07:59 08:00 - 08:14 08:15 - 08:29 08:30 - 08:44 08:45 - 08:59 09:00 - 09:14 09:15 - 09:29 09:30 - 09:44 09:45 - 09:59 10:00 - 10:14 10:15 - 10:29 10:30 - 10:44 10:45 - 10:59 11:00 - 11:14 11:15 - 11:29 11:30 - 11:44 11:45 - 11:59 12:00 - 12:14 12:15 - 12:29 12:30 - 12:44 12:45 - 12:59 46 16 62 29 17 46 20 10 30 10 17 27 13 10 23 17 9 26 14 6 20 22 6 28 8 5 13 21 20 41 19 13 32 13 17 30 13 19 32 5 14 19 11 19 30 9 15 24 11 21 32 7 19 26 17 39 56 48 44 92 12 39 51 35 49 84 59 81 140 103 149 252 89 153 242 138 213 351 197 258 455 207 341 548 243 389 632 266 505 771 275 459 734 291 506 797 288 428 716 347 396 743 300 451 751 273 420 693 284 358 642 314 390 704 316 393 709 306 369 675 312 398 710 328 396 724 336 391 727 359 371 730 375 362 737 366 372 738 397 401 798 416 356 772 448 390 838 448 367 815 422 415 837 373 395 768 Page 1G:\Shared drives\2025 Project Files\Private Projects\DB#--0418.Davenport.Wilmington\Wilmington.tvp Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Printed: 10/14/2025 at 08:34 TrafficViewer Pro v1.6.4.124 PicoCount 2500 V2.41 (s/n# 23091872) Daily Vehicle Volume Report Location: Unit ID: Study Date: Wilmington 18946 EB 18946 eb Wednesday, 10/08/2025 Northbound Volume Southbound Volume Total Volume 13:00 - 13:14 13:15 - 13:29 13:30 - 13:44 13:45 - 13:59 14:00 - 14:14 14:15 - 14:29 14:30 - 14:44 14:45 - 14:59 15:00 - 15:14 15:15 - 15:29 15:30 - 15:44 15:45 - 15:59 16:00 - 16:14 16:15 - 16:29 16:30 - 16:44 16:45 - 16:59 17:00 - 17:14 17:15 - 17:29 17:30 - 17:44 17:45 - 17:59 18:00 - 18:14 18:15 - 18:29 18:30 - 18:44 18:45 - 18:59 19:00 - 19:14 19:15 - 19:29 19:30 - 19:44 19:45 - 19:59 20:00 - 20:14 20:15 - 20:29 20:30 - 20:44 20:45 - 20:59 21:00 - 21:14 21:15 - 21:29 21:30 - 21:44 21:45 - 21:59 22:00 - 22:14 22:15 - 22:29 22:30 - 22:44 22:45 - 22:59 23:00 - 23:14 23:15 - 23:29 23:30 - 23:44 23:45 - 23:59 Totals AM Peak Time AM Peak Volume PM Peak Time PM Peak Volume 388 358 746 404 363 767 397 422 819 384 356 740 404 352 756 428 343 771 402 357 759 429 371 800 395 352 747 438 358 796 409 389 798 440 366 806 437 369 806 455 396 851 491 367 858 426 387 813 467 424 891 486 418 904 459 366 825 497 379 876 513 314 827 494 340 834 407 298 705 335 255 590 339 239 578 394 235 629 297 181 478 292 192 484 297 165 462 246 162 408 310 150 460 185 129 314 188 151 339 176 117 293 123 102 225 126 80 206 113 93 206 93 71 164 63 64 127 69 54 123 57 46 103 41 31 72 37 27 64 16 28 44 23123 22314 45437 10:58 - 11:57 07:16 - 08:15 10:50 - 11:49 1563 1901 3052 17:20 - 18:19 16:39 - 17:38 17:01 - 18:00 1972 1613 3497 Page 2G:\Shared drives\2025 Project Files\Private Projects\DB#--0418.Davenport.Wilmington\Wilmington.tvp Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D Printed: 10/14/2025 at 08:34 TrafficViewer Pro v1.6.4.124 PicoCount 2500 V2.41 (s/n# 23091872) Daily Vehicle Volume Report Location: Unit ID: Study Date: Wilmington 18946 EB 18946 eb Wednesday, 10/08/2025 Page 3G:\Shared drives\2025 Project Files\Private Projects\DB#--0418.Davenport.Wilmington\Wilmington.tvp Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D 252033 Market Street Cook Out Supporting Documentation Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D AM Peak PM Peak Right Turning Traffic (Horizontal Axis) 132 91 Opposing Volume (Vertical Axis) 969 981 1800 1600 1400 1200 1000 800 600 400 200 0 50 100 150 200 250 300 350 400 450 500 550 600 30 MPH = 75' 35 MPH = 75' 40 MPH = 100' 45 MPH = 100' 50 MPH = 100' 55 MPH = 150' 60 MPH = 200' RIGHT TURN LANE STORAGE CALCULATION: V: = + V_R: RIGHT TURN TAPER DESIGN SPEED }*SPECIAL HIGH SPEED DESIGN REQUIRED. SEE ROADWAY DESIGN MANUAL FIGURE 1 *STORAGE LENGTH(S) DOES NOT INCLUDE DECELERATION LENGTH 60 V_R: RIGHT TURNING VOLUMN (VPH) V_L: LEFT TURNING VOLUMN (VPH)Note: Where adjacent signalization may provide opportunities for gaps In the traffic stream a reduction in the above storage values can be considered on a case by case basis. NO TURN LANES WARRANTED FOR ROADS WITH LESS THAN 4,000 AADT RIGHT TURNING TRAFFIC Enter Values Here OPPOSING VOLUMNE (VPH) ADJACENT VOLUME RIGHT TURN VOLUME (*100 VPH MINIMUM) *Note: To account for 2 through lanes on US 17 southbound, the outer lane was assumed to carry 55% of southbound traffic. Docusign Envelope ID: 7CE2A5F9-9169-4925-823C-781EAFD8187D