Port, Waterway, & Beach Commission Meeting
August 13, 2025
GBA MIRP 25 Report Aerial
Notes/Discussion: SANDBAR Oyster Company presentation is postponed and will be rescheduled for a later
meeting. Chairman Barbour led introductions. 7/9/25 meeting minutes approved (motion by Chairman Barbour,
seconded by Mayor Mills)
Feb 27
Carolina Beach Inlet Maintenance Dredging
•Merritt worked from June 17th to July 9th
•Moved 39,745cy per Captain’s Logs
•USCG hoping to relocate buoys by end of the month
•USACE aiming for late September/early October Merritt event
USACE Survey
7/31, 8/5-8/6
Notes/Discussion: One of the longer Merritt events on the east coast since October 2024. USCG Oak Island Aid to Navigation Team
has a vessel in the shipyard being retrofitted to be able to relocate the heavier #1 and #2 buoys as needed in the future. Dredge Murden is
still expected to be back in service this fall but is scheduled out until the end of the year. Discussion around how a hopper dredge would
lose effectiveness until the dredge material management site within the inlet is emptied anyway.
Feb 27
6/9 Pre Dredge
Survey
7/31, 8/5-8/6
Current Survey
Notes/Discussion: Discussion around the inlet borrow area for CSRM projects effects the inlet and how
management of the inlet benefits from an empty inlet borrow area.
•Town of Kure Beach upgrading outfalls
•Met with Town and USACE to sync up
•Schedule will be passed along once available
Carolina Beach and Kure Beach FY26 Coastal Storm Risk Management (CSRM)
Looking N from Golden
Sands in CB
Looking S from the
southern end of CB’s
rock revetment
Notes/Discussion: Meeting with Town of Kure Beach shows the positive federal/local partnership involved to make sure these CSRM
projects run smoothly. Jay Healy asked if the USACE would be willing to host a community meeting prior to the project start, like they have
done previously. The USACE indicated in the meeting with the Town of Kure Beach that they are willing to have a community meeting and
provide the project progress tracker like past projects.
Mason Inlet Relocation Project (MIRP)
•GBA has finalized the 2025 MIRP Physical
Monitoring Report
•File copies provided to Town of Wrightsville
Beach, Figure Eight HOA, and Shell Island Resort
•Recommendation for 2026/2027 Mason Inlet
Relocation Maintenance Event
•333,340cy within template (256,485cy
landward of COLREGS)
•MHW has not crossed opposite corridor
limit, but channel clearly bends to the
south
•Davey Resource Group has removed Waterbird
Management Area stakes since nesting easting has
ended. They continue their monitoring efforts
GBA MIRP 2025 Report
Notes/Discussion:
Mason Creek AIWW Crossing
•Included as bid option in USACE FY26 AIWW Maintenance Contract
•Posted on 7/24 with a bid opening scheduled for 8/22
•CAMA Minor Modification request submitted
USACE Bid Plan
Notes/Discussion:
Carolina Beach AIWW Crossing
•Included the USACE FY26 AIWW Maintenance Contract
USACE Bid Plan
Notes/Discussion:
Next Meeting: September 10th
Public Comment:
Chairman Barbour adjourned the meeting. Next meeting is September 10th.